Table of Contents


UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
     
FORM 10-K
     
xANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended December 31, 20152016

or
¨TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from                    to                    

Commission
File Number
 
Name of Registrant, State of Incorporation,
Address of Principal Executive Offices and Telephone Number
 
IRS Employer
Identification Number
1-9894 ALLIANT ENERGY CORPORATION 39-1380265
  (a Wisconsin corporation)  
  4902 N. Biltmore Lane  
  Madison, Wisconsin 53718  
  Telephone (608) 458-3311  
   
1-4117 INTERSTATE POWER AND LIGHT COMPANY 42-0331370
  (an Iowa corporation)  
  Alliant Energy Tower  
  Cedar Rapids, Iowa 52401  
  Telephone (319) 786-4411  
   
0-337 WISCONSIN POWER AND LIGHT COMPANY 39-0714890
  (a Wisconsin corporation)  
  4902 N. Biltmore Lane  
  Madison, Wisconsin 53718  
  Telephone (608) 458-3311  
This combined Form 10-K is separately filed by Alliant Energy Corporation, Interstate Power and Light Company and Wisconsin Power and Light Company. Information contained in the Form 10-K relating to Interstate Power and Light Company and Wisconsin Power and Light Company is filed by each such registrant on its own behalf. Each of Interstate Power and Light Company and Wisconsin Power and Light Company makes no representation as to information relating to registrants other than itself.

Securities registered pursuant to Section 12(b) of the Act:
 Title of ClassName of Each Exchange on Which Registered
Alliant Energy CorporationCommon Stock, $0.01 Par ValueNew York Stock Exchange
Alliant Energy CorporationCommon Share Purchase RightsNew York Stock Exchange
Interstate Power and Light Company5.100% Series D Cumulative Perpetual Preferred Stock, $0.01 Par ValueNew York Stock Exchange

Securities registered pursuant to Section 12(g) of the Act: None

Indicate by check mark if the registrants are well-known seasoned issuers, as defined in Rule 405 of the Securities Act.
Yes x  No  ¨

Indicate by check mark if the registrants are not required to file reports pursuant to Section 13 or Section 15(d) of the Act.
Yes ¨  No  x
Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports) and (2) have been subject to such filing requirements for the past 90 days.    Yes x  No  ¨
Indicate by check mark whether the registrants have submitted electronically and posted on their corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrants were required to submit and post such files).    Yes x  No  ¨

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of the registrants’ knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. ¨
Indicate by check mark whether the registrants are large accelerated filers, accelerated filers, non-accelerated filers, or smaller reporting companies. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.
 Large Accelerated Filer Accelerated Filer Non-accelerated Filer Smaller Reporting Company Filer
Alliant Energy Corporationx      
Interstate Power and Light Company    x  
Wisconsin Power and Light Company    x  

Indicate by check mark whether the registrants are shell companies (as defined in Rule 12b-2 of the Exchange Act).    Yes ¨  No  x

The aggregate market value of the voting and non-voting common equity held by nonaffiliates as of June 30, 20152016:
Alliant Energy Corporation$6.59.0 billion
Interstate Power and Light Company$—
Wisconsin Power and Light Company$—
Number of shares outstanding of each class of common stock as of January 29, 201631, 2017:
Alliant Energy CorporationCommon stock, $0.01 par value, 113,465,499227,687,330 shares outstanding
  
Interstate Power and Light CompanyCommon stock, $2.50 par value, 13,370,788 shares outstanding (all of which are owned beneficially and of record by Alliant Energy Corporation)
  
Wisconsin Power and Light CompanyCommon stock, $5 par value, 13,236,601 shares outstanding (all of which are owned beneficially and of record by Alliant Energy Corporation)

DOCUMENTS INCORPORATED BY REFERENCE

Portions of the Proxy Statement relating to Alliant Energy Corporation’s 20162017 Annual Meeting of Shareowners are, or will be upon filing with the Securities and Exchange Commission, incorporated by reference into Part III hereof.




Table of Contents


TABLE OF CONTENTS
 Page Number
 
 
 
 
 
 
 
 
 
 
 
 
 
  



Table of Contents


Page Number
  
  
  
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
 
 
 
 
 
 
 
  




Table of Contents


DEFINITIONS

The following abbreviations or acronyms used in this Form 10-K are defined below:
Abbreviation or AcronymDefinitionAbbreviation or AcronymDefinition
20162017 Alliant Energy Proxy StatementAlliant Energy’s Proxy Statement for the 20162017 Annual Meeting of ShareownersHDDHeating degree days
AEFAlliant Energy Finance, LLCIPLInterstate Power and Light Company
AFUDCAllowance for funds used during constructionIRSInternal Revenue Service
Alliant EnergyAlliant Energy Corporation
ANRITCANR PipelineITC Midwest LLC
AOCLAccumulated other comprehensive lossIUBIowa Utilities Board
AROAsset retirement obligation
ARRsKWhAuction revenue rights
ARRAAmerican Recovery and Reinvestment Act of 2009Kilowatt-hour
ATCAmerican Transmission Company LLCMarshalltownMarshalltown Generating Station
ATIAE Transco Investments, LLC
Audit CommitteeAudit Committee of the Board of Directors
Bent TreeBent Tree - Phase I wind farm
CACertificate of authority
CAAClean Air Act
CAIRClean Air Interstate Rule
CAOChief Accounting Officer
Cash Balance PlanAlliant Energy Cash Balance Pension Plan
CCRCoal combustion residuals
CDDCooling degree days
CEOChief Executive Officer
CFOChief Financial Officer
CO2Carbon dioxide
CO2eCarbon dioxide-equivalent
ColumbiaColumbia Energy Center
Corporate ServicesAlliant Energy Corporate Services, Inc.
CPCNCertificate of Public Convenience and Necessity
CRANDICCedar Rapids and Iowa City Railway Company
CSAPRCross-State Air Pollution Rule
CWIPConstruction work in progress
DAECDuane Arnold Energy Center
DATCDuke-American Transmission Company, LLC
DCPAlliant Energy Deferred Compensation Plan
DLIPAlliant Energy Director Long Term Incentive Plan
DNRDepartment of Natural Resources
DthDekatherm
EdgewaterEdgewater Generating Station
EECREnergy efficiency cost recovery
EEPEnergy efficiency plan
EGUElectric generating unit
EmeryEmery Generating Station
EPAU.S. Environmental Protection Agency
EPBEmissions plan and budget
EPSEarnings per weighted average common share
EVPExecutive Vice President
FASBFinancial Accounting Standards Board
FCSFirm Citygate Supplies
FERCFederal Energy Regulatory Commission
Financial StatementsConsolidated Financial Statements
FTRFinancial transmission right
Fuel-relatedElectric production fuel and energy purchases
FWSU.S. Fish and Wildlife Service
GAAPU.S. generally accepted accounting principles
GHGGreenhouse gases
HAPsHazardous air pollutants
HDDHeating degree days
IBEWInternational Brotherhood of Electrical Workers
IPLInterstate Power and Light Company
IRSInternal Revenue Service
ITCITC Midwest LLC

1

Table of Contents


Abbreviation or AcronymDefinition
IUBIowa Utilities Board
KEESAKey Executive Employment and Severance Agreement
KewauneeKewaunee Nuclear Power Plant
KWhKilowatt-hour
MarshalltownMarshalltown Generating Station
MATSMercury and Air Toxic Standard
MDAManagement’s Discussion and Analysis of Financial Condition and Results of Operations
CACertificate of authorityMGPManufactured gas plant
CAAClean Air ActMISOMidcontinent Independent System Operator, Inc.
MPUCCAIRMinnesota Public Utilities CommissionClean Air Interstate Rule
MVPMulti-value project
MWMegawatt
CCRCoal combustion residualsMWhMegawatt-hour
N.A.CDDNational AssociationCooling degree days
N/ANot applicable
CO2Carbon dioxideNAAQSNational Ambient Air Quality Standards
NBPLCorporate ServicesNorthern Border Pipeline Company
NeenahNeenahAlliant Energy FacilityCorporate Services, Inc.
Nelson DeweyNelson Dewey Generating Station
NGPLNatural Gas Pipeline Co. of America
NNGNorthern Natural Gas Company
Northern Iowa CourtU.S. District Court for the Northern District of Iowa
Note(s)Combined Notes to Consolidated Financial Statements
CPCNCertificate of Public Convenience and NecessityNOxNitrogen oxide
CRANDICCedar Rapids and Iowa City Railway CompanyOIPAlliant Energy 2010 Omnibus Incentive Plan
CSAPRCross-State Air Pollution RuleOPEBOther postretirement benefits
CWIPConstruction work in progressPATH ActProtecting Americans from Tax Hikes Act
DAECDuane Arnold Energy CenterPPAPurchased power agreement
DATCDuke-American Transmission Company, LLCPSCWPublic Service Commission of Wisconsin
PSDDCPPrevention of Significant DeteriorationAlliant Energy Deferred Compensation Plan
RECsRenewable energy credits
Receivables AgreementReceivables Purchase and Sale Agreement
DLIPAlliant Energy Director Long Term Incentive PlanRESRenewable energy standards
ResourcesDthAlliant Energy Resources, LLCDekatherm
RiversideRiverside Energy Center
EEPEnergy efficiency planRMTRMT, Inc.
RPSEGURenewable portfolio standardElectric generating unit
SCRSelective catalytic reduction
EPAU.S. Environmental Protection AgencySECSecurities and Exchange Commission
Sheboygan FallsEPBSheboygan Falls Energy FacilityEmissions plan and budget
SIPState implementation plan
SO2Sulfur dioxide
SRPEPSSupplemental Retirement PlanEarnings per weighted average common share
SSRSystem Support Resource
U.S.United States of America
FERCFederal Energy Regulatory CommissionVEBAVoluntary Employees’ Beneficiary Association
Financial StatementsConsolidated Financial StatementsVIEVariable interest entity
VPFTRVice PresidentFinancial transmission right
WACCWeighted-average cost of capital
Western Wisconsin CourtFuel-relatedU.S. District Court for the Western District of WisconsinElectric production fuel and purchased power
Whiting PetroleumWhiting Petroleum Corporation
GAAPU.S. generally accepted accounting principlesWPLWisconsin Power and Light Company
GHGGreenhouse gasesWPL TranscoWPL Transco, LLC


2

Table of Contents


FORWARD-LOOKING STATEMENTS
Statements contained in this Annual Report on Form 10-K that are not of historical fact are forward-looking statements intended to qualify for the safe harbors from liability established by the Private Securities Litigation Reform Act of 1995. These forward-looking statements can be identified as such because the statements include words such as “may,” “believe,” “expect,” “anticipate,” “plan,” “project, “will,” “projections,” “estimate,” or other words of similar import. Similarly, statements that describe future financial performance or plans or strategies are forward-looking statements. Such forward-looking statements are subject to certain risks and uncertainties that could cause actual results to differ materially from those expressed in, or implied by, such statements. Some, but not all, of the risks and uncertainties of Alliant Energy, IPL and WPL that could materially affect actual results include:

federal and state regulatory or governmental actions, including the impact of energy, tax (including potential tax reform), financial and health care legislation, and of regulatory agency orders;
IPL’s and WPL’s ability to obtain adequate and timely rate relief to allow for, among other things, the recovery of fuel costs, operating costs, transmission costs, environmental compliance and remediation costs, deferred expenditures, capital expenditures, and remaining costs related to EGUs that may be permanently closed, earning their authorized rates of return, and the payments to their parent of expected levels of dividends;
the ability to continue cost controls and operational efficiencies;
the impact of IPL’s pending retail electric base rate freezefiling, which is currently expected to be filed in Iowa during 2016;
the impactsecond quarter of WPL’s retail electric and gas base rate freeze in Wisconsin during 2016;2017;
weather effects on results of utility operations, including impacts of temperature changes in IPL’s and WPL’s service territories on customers’ demand for electricity and gas;operations;
the impact of the economy in IPL’s and WPL’s service territories and the resulting impacts on sales volumes, margins and the ability to collect unpaid bills;
the impact of customer- and third party-owned generation, including alternative electric suppliers, in IPL’s and WPL’s service territories on system reliability, operating expenses and customers’ demand for electricity;
the impact of energy efficiency, franchise retention customer- and third party-owned generation and customer disconnects on sales volumes and margins;
the impact that price changes may have on IPL’s and WPL’s customers’ demand for electric, gas and steam services and their ability to pay their bills;
developments that adversely impact the ability to implement the strategic plan, including unanticipated issues withplan;
the ability to qualify for the full level of production tax credits on planned and potential new environmental control equipment for various fossil-fueled EGUs of IPL and WPL, IPL’s construction of Marshalltown, WPL’s proposed Riverside expansion, various replacements, modernization and expansion of IPL’s and WPL’s electric and gas distribution systems, Resources’ electricity output and selling price of such output from its Franklin County wind farm,farms and the potential decommissioningimpact of certain EGUs of IPL and WPL;changes to production tax credits for wind farms;
issues related to the availability and operations of EGUs, including start-up risks, breakdown or failure of equipment, performance below expected or contracted levels of output or efficiency, operator error, employee safety, transmission constraints, compliance with mandatory reliability standards and risks related to recovery of resulting incremental costs through rates;
disruptions in the supply and delivery of natural gas, purchased electricity and coal, including due to the bankruptcy of coal mining companies;coal;
changes in the price of delivered coal, natural gas, and purchased electricity and coal due to shifts in supply and demand caused by market conditions and regulations, and the ability to recover and to retain the recovery of related changes in purchased power, fuel and fuel-related costs through rates in a timely manner;regulations;
impacts on equity income from unconsolidated investments due to further potential changes to ATC’s authorized return on equity;
issues associated with environmental remediation and environmental compliance, including compliance with the Consent Decree between WPL, the EPA and the Sierra Club, the Consent Decree between IPL, the EPA, the Sierra Club, the State of Iowa and Linn County in Iowa, the CCR rule, the Clean Power Plan, future changes in environmental laws and regulations, including the EPA’s regulations for CO2 emissions reductions from new and existing fossil-fueled EGUs, and litigation associated with environmental requirements;
the ability to defend against environmental claims brought by state and federal agencies, such as the EPA, state natural resources agencies or third parties, such as the Sierra Club, and the impact on operating expenses of defending and resolving such claims;
the ability to recover through rates all environmental compliance and remediation costs, including costs for projects put on hold due to uncertainty of future environmental laws and regulations;
impacts that storms or natural disasters in IPL’s and WPL’s service territories may have on their operations and recovery of and rate relief for, costs associated with restoration activities;

3

Table of Contents


the direct or indirect effects resulting from terrorist incidents, including physical attacks and cyber attacks, or responses to such incidents;
the impact of penalties or third-party claims related to, or in connection with, a failure to maintain the security of personally identifiable information, including associated costs to notify affected persons and to mitigate their information security concerns;
the direct or indirect effects resulting from breakdown or failure of equipment in the operation of gas distribution systems, such as leaks, explosions and mechanical problems, and compliance with gas transmission and distribution safety regulations, such as those that may beproposed rules issued by the Pipeline and Hazardous Materials Safety Administration;
risks associated with integration of a new customer billing and information system, which was completed in the first quarter of 2016;

impacts of IPL’s future tax benefits from Iowa rate-making practices, including deductions for repairs expenditures and allocation of mixed service costs, and recoverability of the associated regulatory assets from customers, when the differences reverse in future periods;
any material post-closing adjustments related to any past asset divestitures, including the sales of IPL’s Minnesota electric and natural gas assets, RMT and Whiting Petroleum, which could result from, among other things, warranties, parental guarantees or litigation;
continued access to the capital markets on competitive terms and rates, and the actions of credit rating agencies;
inflation and interest rates;
changes to the creditworthiness of counterparties with which Alliant Energy, IPL and WPL have contractual arrangements, including participants in the energy markets and fuel suppliers and transporters;
issues related to electric transmission, including operating in Regional Transmission Organization energy and ancillary services markets, the impacts of potential future billing adjustments and cost allocation changes from Regional Transmission Organizations and recovery of costs incurred;
current or future litigation, regulatory investigations, proceedings or inquiries;
reputational damage from negative publicity, protests, fines, penalties and other negative consequences resulting in regulatory and/or legal actions;
Alliant Energy’s ability to sustain its dividend payout ratio goal;
employee workforce factors, including changes in key executives, collective bargaining agreements and negotiations, work stoppages or restructurings;
inability to access technological developments, including those related to technological developments;wind turbines, solar generation, smart technology, battery storage and other future technologies;
changes in technology that alter the channels through which electric customers buy or utilize power;electricity;
material changes in retirementemployee-related benefit and benefit plancompensation costs;
the impact of performance-based compensation plans accruals;
the effect of accounting standards issued periodically by standard-setting bodies, including a new revenue recognition standard, which is currently expected to be adopted in 2018;
the impact of changes to production tax credits for wind farms;bodies;
the impact of adjustments made to deferred tax assets and liabilities from state apportionment assumptions;
the ability to utilize tax credits and net operating losses generated to date, and those that may be generated in the future, before they expire;
impacts of the extension of bonus depreciation deductions;
the ability to successfully complete tax audits and changes in tax accounting methods with no material impact on earnings and cash flows; and
factors listed in MDA and Item 1A Risk Factors.

Alliant Energy, IPL and WPL each assume no obligation, and disclaim any duty, to update the forward-looking statements in this Annual Report on Form 10-K, except as required by law.

WEBSITE ACCESS TO REPORTS
Alliant Energy, IPL and WPL make their periodic and current reports, and amendments to those reports, available, free of charge, on Alliant Energy’s website at www.alliantenergy.com/investors on the same day as such material is electronically filed with, or furnished to, the SEC. Alliant Energy, IPL and WPL are not including the information contained on Alliant Energy’s website as a part of, or incorporating it by reference into, this Annual Report on Form 10-K.


4

Table of Contents


PART I

This Annual Report on Form 10-K includes information relating to Alliant Energy, IPL and WPL (as well as ResourcesAEF and Corporate Services). Where appropriate, information relating to a specific entity has been segregated and labeled as such. Unless otherwise noted, the information herein excludes discontinued operations for all periods presented.

ITEM 1. BUSINESS

A. GENERAL
Alliant Energy was incorporated in Wisconsin in 1981 and maintains its principal executive offices in Madison, Wisconsin. Alliant Energy operates as a regulated investor-owned public utility holding company. Alliant Energy’s primary focus is to provide regulated electric and natural gas service to approximately 950,000960,000 electric and approximately 410,000 natural gas customers in the Midwest through its two public utility subsidiaries, IPL and WPL. The primary first tier wholly-owned subsidiaries of Alliant Energy are: IPL, WPL, Resources and Corporate Services. A brief description of the primary first tier subsidiaries of Alliant Energy isare as follows:

1) IPL - was incorporated in 1925 in Iowa as Iowa Railway and Light Corporation. IPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas to retail customers in select markets in Iowa. IPL provides utility services to incorporated communities as directed by the IUB and utilizes non-exclusive franchises, which cover the use of public right-of-ways for utility facilities in incorporated communities for a maximum term of 25 years. At December 31, 20152016, IPL supplied electric and natural gas service to

approximately 489,000490,000 and 225,000220,000 retail customers, respectively, in Iowa. IPL also sells electricity to wholesale customers in Minnesota, Illinois and Iowa. IPL is also engaged in the generation and distribution of steam for two customers in Cedar Rapids, Iowa. In 20152016, 20142015 and 20132014, IPL had no single customer for which electric, gas, steam and/or other sales accounted for 10% or more of IPL’s consolidated revenues.

2) WPL - was incorporated in 1917 in Wisconsin as Eastern Wisconsin Electric Company. WPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas to retail customers in select markets in Wisconsin. WPL operates in municipalities pursuant to permits of indefinite duration and state statutes authorizing utility operation in areas annexed by a municipality. At December 31, 2015,2016, WPL supplied electric and natural gas service to approximately 461,000470,000 and 184,000190,000 retail customers, respectively. WPL also sells electricity to wholesale customers in Wisconsin. In 2016, 2015, 2014 and 2013,2014, WPL had no single customer for which electric, gas and/or other sales accounted for 10% or more of WPL’s consolidated revenues. WPL’s consolidated subsidiary, WPL Transco, holdsheld Alliant Energy’s investment in ATC.ATC until December 31, 2016. Refer to Note 6(a) for further discussion of ATC.WPL’s transfer of its investment in ATC to ATI on December 31, 2016.

3) RESOURCESAEF - was incorporatedcreated in 19882016 in Wisconsin. In 2008, Resources was converted toWisconsin as a limited liability company. Alliant Energy’s non-regulated investments are organized under Resources.AEF. Refer to “Information Relating to Non-regulated Operations” for additional details.

4) CORPORATE SERVICES - was incorporated in 1997 in Iowa. Corporate Services provides administrative services to Alliant Energy, IPL, WPL and Resources.AEF.

Refer to Note 17 for further discussion of business segments, which information is incorporated herein by reference.

B. INFORMATION RELATING TO ALLIANT ENERGY ON A CONSOLIDATED BASIS

1) EMPLOYEES - At December 31, 2015,2016, Alliant Energy’s consolidated subsidiariesEnergy, IPL and WPL had the following full- and part-time employees:
Number of Number of Total Percentage of EmployeesTotal Number of Percentage of Employees
Bargaining Unit Other Number of Covered by CollectiveNumber of Bargaining Unit Covered by Collective
Employees Employees Employees Bargaining AgreementsEmployees Employees Bargaining Agreements
Alliant Energy3,978 2,244 56%
IPL1,103
 584
 1,687
 65%1,679 1,095 65%
WPL1,117
 241
 1,358
 82%1,286 1,044 81%
Corporate Services26
 886
 912
 3%
Resources88
 25
 113
 78%
2,334
 1,736
 4,070
 57%


5

TableThe majority of ContentsIPL’s bargaining unit employees are covered by the International Brotherhood of Electrical Workers Local 204 (Cedar Rapids) collective bargaining agreement, which expires on August 31, 2017. All of WPL’s bargaining unit employees are covered by the International Brotherhood of Electrical Workers Local 965 collective bargaining agreement, which expires on May 31, 2019.


At December 31, 2015, Alliant Energy employees covered by collective bargaining agreements were as follows:
Number ofContract
EmployeesExpiration Date
IPL:
IBEW Local 204 (Cedar Rapids)785
8/31/17
IBEW - Various318
Various
1,103
WPL - IBEW Local 9651,117
5/31/19
Resources and Corporate Services - Various114
Various
2,334

2) CAPITAL EXPENDITURE AND INVESTMENT PLANS - Refer to “Liquidity and Capital Resources” in MDA for discussion of anticipated construction and acquisition expenditures for 20162017 through 20192020.

3) REGULATION - Alliant Energy, IPL and WPL are subject to regulation by various federal, state and local agencies. The following includes the primary regulations impacting Alliant Energy’s, IPL’s and WPL’s businesses.

FERC -
Public Utility Holding Company Act of 2005 - Alliant Energy is registered with FERC as a public utility holding company, pursuant to the Public Utility Holding Company Act of 2005, and is required to maintain certain records and to report certain transactions involving its public utilities, service company and other entities regulated by FERC. Corporate Services, IPL and WPL are subject to regulation by FERC under the Public Utility Holding Company Act of 2005 for various matters including, but not limited to, affiliate transactions, public utility mergers, acquisitions and dispositions, and books, records and accounting requirements.

Energy Policy Act - The Energy Policy Act requires creation of an Electric Reliability Organization to provide oversight by FERC. FERC designated North American Electric Reliability Corporation as the overarching Electric Reliability Organization. Midwest Reliability Organization, which is a regional member of North American Electric Reliability Corporation, has direct responsibility for mandatory electric reliability standards for IPL and WPL.


Federal Power Act - FERC also has jurisdiction, under the Federal Power Act, over certain electric utility facilities and operations, electric wholesale and transmission rates, dividend payments, issuance of IPL’s securities, and accounting practices of Corporate Services, IPL and WPL.

Electric Wholesale Rates - IPL and WPL have receivedreceive wholesale electric market-based rate authority from FERC. Market-based rate authorization allows for wholesale sales of electricity within the MISO market and in transactions directly with third parties, based on the market value of the transactions. IPL and WPL also have FERC-approved cost-of-servicecost of service formula based rates related to the provision of firm full- and partial-requirement wholesale electric sales. Both IPL’s and WPL’s wholesale cost-of-service tariffs are formula-based tariffs thatsales, which allow for true-ups to actual costs, including fuel costs.

Electric Transmission Rates - FERC regulates the rates charged for electric transmission facilities used in interstate commerce. Neither IPL nor WPL own or operate electric transmission facilities; however, both IPL and WPL pay for the use of the interstate electric transmission system based upon FERC-regulated rates. IPL and WPL rely primarily on the use of the ITC and ATC transmission systems, respectively. Due to the formula rates used by ITC and ATC to charge their customers and possible future changes to these rates, there is uncertainty regarding IPL’s and WPL’s future electric transmission service expense. Refer to “Other Future Considerations” in MDA for further discussion of electric transmission service expense.

Natural Gas Act - FERC regulates the transportation and sale for resale of natural gas in interstate commerce under the Natural Gas Act. Under the Natural Gas Act, FERC has authority over certain natural gas facilities and operations of IPL and WPL.

IUB - IPL is subject to regulation by the IUB for various matters including, but not limited to, retail utility rates and standards of service, accounting requirements, sales of assets with values that exceed 3% of IPL’s revenues, and approval of the location and construction of EGUs.


6

Table of Contents


Retail Utility Base Rates - IPL files periodic requests with the IUB for retail rate changes. These filingschanges, which are based on historical test periods. The historical test periods may be adjusted for certain known and measurable changes to capital investments, cost of capital and operating and maintenance expenses consistent with IUB rules and regulations. Interim retail rates can be placed in effect 10 days after the rate application filing, subject to refund, and must be based on previously established regulatory principles. The IUB must decide on requests for retail rate changes within 10 months of the date of the application for which changes are filed, or the interim rates granted become permanent.

Retail Commodity Cost Recovery Mechanisms - Refer to Note 1(g) for discussion of IPL’s retail electric and natural gas tariffs, which contain automatic adjustment clauses for changes in prudently incurred commodity costs required to serve its retail customers. Any over- or under-collection of commodity costs are revised monthly and automatically reflected in future billings to retail customers.

Retail Electric Transmission Cost Recovery Mechanism - ElectricRefer to Note 1(g) for discussion of a transmission cost recovery rider utilized by IPL for recovery of its electric transmission service expense is billed to IPL’sfrom its retail electric customers through a transmission cost rider. This cost recovery mechanism provides for subsequent adjustments to electric rates charged to retail electric customers for changes in electric transmission service expense. Changes in the under-/over-collection of these costs are revised annually and reflected in future billings to customers. The transmission cost rider will remain in effect until the IUB’s final decision in IPL’s next retail electric base rate case, at which time the rider will continue in its current form, continue in a modified form or be terminated.

Energy Efficiency Cost Recovery Mechanism - In accordance with Iowa law, IPL is required to file an EEP every five years with the IUB. An EEP provides a utility’s plan and related budget to achieve specified levels of electric and gas energy savings. IUB approval demonstrates that IPL’s EEP is reasonably expected to achieve cost-effective delivery of the energy efficiency programs. ToRefer to Note 1(g) for discussion of the extent approved by the IUB, costs associated with executing the EEP are recovered from ratepayers through an additional tariff called an EECR factor. The EECR factors are revised annually and include a reconciliation to eliminate any over- or under-recoveryrecovery of IPL’s energy efficiency expensecosts from prior periods.its retail electric and gas customers.

Electric Generating Units - IPL must obtain a certificate of public convenience, use and necessity (GCU Certificate) from the IUB in order to construct a new, or significantly alter (including fuel switching) an existing, EGU located in Iowa with 25 MW or more of capacity. IPL’s ownership and operation of EGUs (including those located outside the state of Iowa) to serve Iowa customers is subject to retail utility rate regulation by the IUB.

Gas Pipeline Projects - IPL must obtain a pipeline permit from the IUB related to the siting of utility gas pipelines in Iowa that will be operated at a pressure over 150 pounds per square inch and will transport gas from a gathering or storage facility to a distribution system or single, large volume customer.

Advance Rate-making Principles - Iowa law provides Iowa utilities with rate-making principles prior to making certain generation investments in Iowa. As a result, IPL may file for, and the IUB must render a decision on, rate-making principles for EGUs located in Iowa, including any new combined-cycle natural gas-fired EGU, any renewable generating resource such as a wind facility, and base-load (nuclear or coal-fired generation) EGUs with a nameplate generating capacity of 300

MW or more, combined-cycle natural gas-fired EGUs and renewable generating resources, such as wind facilities.more. Upon approval of rate-making principles by the IUB, IPL must either build the EGU under the approved rate-making principles, or not at all.

Electric Generating Unit Environmental Controls Projects - IPL is required to submit an updated EPB biennially to the IUB setting out a multi-year plan and budget for managing regulated emissions from its coal-fired EGUs in a cost-effective manner. IPL must simultaneously submit this plan and budget to the Iowa DNRDepartment of Natural Resources for a determination of whether the plan and budget meet state environmental requirements for regulated emissions. The reasonable costs associated with implementing the approved plan are expected to be included in IPL’s future retail electric rates.

PSCW - Alliant Energy is subject to regulation by the PSCW for the type and amount of Alliant Energy’s investments in non-utility businesses and other affiliated interest activities, among other matters. WPL is also subject to regulation by the PSCW related to its operations in Wisconsin for various matters including, but not limited to, retail utility rates and standards of service, accounting requirements, issuance and use of proceeds of securities, affiliate transactions, approval of the location and construction of EGUs and certain other additions and extensions to facilities.


7

Table of Contents


Retail Utility Base Rates - WPL files periodic requests with the PSCW for retail rate changes. These filings are required to be based on forward-looking test periods. There is no statutory time limit for the PSCW to decide retail base rate requests. However, the PSCW attempts to process retail base rate cases in approximately 10 months and has the ability to approve interim retail rate relief, subject to refund, if necessary. Currently, WPL is required to defer a portion of its earnings if its annual regulatory return on common equity exceeds certain levels and is allowed to request a change in retail base rates if its annual return on common equity falls below a certain level.

Retail Commodity Cost Recovery Mechanisms -
Electric - WPL’s retail electric base rates include estimates of annual fuel-related costs anticipated during the forward-looking test period. During each retail electric rate proceeding, or in a separate fuel cost plan approval proceeding, the PSCW sets fuel monitoring ranges based on the forecasted fuel-related costs used to determine rates in such proceeding. If WPL’s actual fuel-related costs fall outside these fuel monitoring ranges, WPL is authorized to defer the incremental over- or under-collection of fuel-related costs from retail electric customers that are outside the approved ranges. Deferrals of under-collections are reduced to the extent actual return on common equity earned by WPL during the fuel cost plan year exceeds the applicable authorized return on common equity. Subject to review and approval by the PSCW, any deferred over- or under-collection of fuel-related costs for each year are reflected in future billings to retail customers.

Natural Gas - WPL’s retail natural gas tariffs contain an automatic adjustment clause for changes in prudently incurred natural gas costs required to serve its retail gas customers. Any over- or under-collectionRefer to Note 1(g) for discussion of naturalthe recovery of these costs from WPL’s retail electric and gas costs are revised monthly and automatically reflected in future billings to retail customers.

Retail Electric Transmission Cost Recovery - WPL’s retail electric base rates include estimates of electric transmission service expense anticipated during the forward-looking test period. A majorityRefer to Note 1(g) for discussion of the recovery of WPL’s electric transmission service expense is currently subject to a reconciliation of such estimated amounts to actual costs incurred with any difference deferred for inclusion in future base rate changes.from its retail electric customers.

Energy Efficiency Cost Recovery - WPL contributes a certain percentage1.2% of its annual retail utility revenues to help fund Focus on Energy, Wisconsin’s state-wide energy efficiency and renewable energy resource program. Estimated contributionsRefer to Focus on Energy, along with WPL-runNote 1(g) for discussion of the recovery of WPL’s energy efficiency program costs are recovered from WPL’sits retail customers through changes in base rates determined during periodic rate proceedingselectric and include a reconciliation of such estimated amounts to actual costs incurred with any difference deferred for inclusion in a future base rate proceeding.gas customers.

New Electric Generating Units - A CA application is required to be filed with the PSCW for construction approval of any new EGU with a capacity of less than 100 MW and a project cost of $10$10.7 million or more. WPL must obtain a CPCN from the PSCW in order to construct a new EGU in Wisconsin with a capacity of 100 MW or more. In addition, WPL’s ownership and operation of EGUs (including those located outside the state of Wisconsin) to serve Wisconsin customers is subject to retail utility rate regulation by the PSCW.

Electric Generating Unit Upgrades -and Electric Distribution Projects- A CA application is required to be filed with the PSCW for construction approval of any additions to EGUs, including environmental controls projects. The current PSCW rules require a CA application for such projects, with an estimated project cost of $10 million or more.

Electric Distribution Projects - A CA application is required to be filed with the PSCW for construction approval ofas well as electric distribution projects, with an estimated project costcosts of $10$10.7 million or more.

Gas Distribution Projects - A CA application is required to be filed with the PSCW for construction approval of gas projects with an estimated project cost of $2.5 million or more and at any time that WPL requests to extend gas service to a new portion of its service territory.

Advance Rate-making Principles - Wisconsin law provides Wisconsin utilities with the opportunity to request rate-making principles prior to the purchase or construction of any nuclear or fossil-fueled EGU or renewable generating resource, such as a wind facility, utilized to serve Wisconsin customers. WPL is not obligated to file for or accept authorized rate-making principles under Wisconsin law. WPL can proceed with an approved project under traditional rate-making terms or accept authorized rate-making principles under Wisconsin law.


8



MPUC - IPL is subject to limited regulation by the MPUC related to its operations in Minnesota for various matters including, but not limited to, approval of the location and construction of EGUs located in Minnesota with a capacity in excess of 50 MW. Refer to Note 3 for discussion of IPL’s sales of its Minnesota electric and natural gas distribution assets in 2015.

Environmental - Extensive environmental laws and regulations are applicable as a result of current and past operations. The environmental laws and regulations relate to the protection of the environment and health and safety matters, including those governing air emissions; water discharges; protection of habitat for potentially threatened and endangered species; the

management, storage and disposal of hazardous materials; and the clean-up of contaminated sites, including former MGP sites.

The EPA administers certain federal regulatory programs and has delegated the administration of other environmental regulatory programs to the applicable state environmental agencies. In general, the stateState agencies generally have jurisdiction over air and water quality, hazardous substances management, transportation and clean-up, and solid waste management requirements. In certain cases, the state environmental agencies have delegated the administration of environmental programs to local agencies.

Federal, state and local permits are regularly obtained to assure compliance with environmental laws and regulations. Costs associated with such compliance have increased in recent years and are expected to continue to increase in the future. Prudently incurred compliance and remediation costs for IPL and WPL are anticipated to be recoverable, in whole or part, through future rate case proceedings. Refer to “Environmental Matters” in MDA and Note 16(e) for further discussion of electric and gas environmental matters, including current or proposed environmental regulations. Refer to “Strategic Overview” in MDA for details of future environmental compliance plans to adhere to applicable environmental requirements.

Refer to Notes 1(b), 1(g), 2 and 16(e) and “Rate Matters” and “Environmental Matters” in MDA for additional information regarding regulation and utility rate matters.

4) STRATEGIC OVERVIEW - Refer to “Strategic Overview” in MDA for discussion of various strategic actions by Alliant Energy, IPL and WPL.

C. INFORMATION RELATING TO UTILITY OPERATIONS
Alliant Energy’s utility business (IPL and WPL) has three segments: a) electric operations; b) gas operations; and c) other, which includes IPL’s steam operations and the unallocated portions of the utility business. IPL’s and WPL’s operating revenues and operating income (loss)as a percentage of total revenues for these three utility business segments were as follows:
 2015 2014 2013
 IPL WPL IPL WPL IPL WPL
 Revenue Income Revenue Income Revenue Income Revenue Income Revenue Income Revenue Income
Electric85% 91% 88% 96% 81% 80% 84% 92% 82% 82% 85% 92%
Gas12% 7% 12% 5% 16% 12% 15% 9% 15% 14% 14% 9%
Other3% 2% % (1%) 3% 8% 1% (1%) 3% 4% 1% (1%)
 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
IPLWPL

1) ELECTRIC UTILITY OPERATIONS
General - Electric utility operations represent the largest operating segment for Alliant Energy, IPL and WPL. Alliant Energy’s electric utility operations are located in the Midwest with IPL providing retail electric service in Iowa and WPL providing retail and wholesale electric service in Wisconsin. IPL also sells electricity to wholesale customers in Minnesota, Illinois and Iowa. In 2015, IPL completed the sale of its Minnesota electric distribution assets. Refer to Note 3 for further discussion of the sale. Refer to the “Electric Operating Information” tables for additional details regarding electric utility operations.

Jurisdictions - The percentage of regulated electric utility revenues were as follows:
 IPL WPL
 2015 2014 2013 2015 2014 2013
IUB93% 93% 93% % % %
PSCW% % % 87% 86% 85%
MPUC3% 5% 5% % % %
FERC4% 2% 2% 13% 14% 15%
 100% 100% 100% 100% 100% 100%

9

Table of Contents



Customers - The number of electric customers at December 31, 2015 was as follows:
 Retail Wholesale Other Total
 Customers Customers Customers Customers
IPL488,582
 8
 1,042
 489,632
WPL461,466
 21
 1,859
 463,346
 950,048
 29
 2,901
 952,978

IPL and WPL provide electric utility service to a diversified base of retail customers in several industries, with the largest concentrations in the food and industrial manufacturing, chemical (including ethanol) and paper industries. IPL’s retailIPL and WPL also sell electricity to wholesale customers, in the above table are billed under base rates established by the IUB that include recovery of and a return on investments in electric infrastructure and other costs required to serve customers. Electric transmission service expense is billed to IPL’s Iowa retail electric customers through a transmission cost rider. IPL’s fuel-related costs are recovered pursuant to fuel adjustment clauses. WPL’s retail customers in the above table are billed under base rates established by the PSCW that include recovery of and a return on investments in electric infrastructure and recovery of fuel-related costs, electric transmission service costs and other costs required to serve customers. Refer to Note 2 and “Rate Matters” in MDA for discussion of utility rate cases.

Wholesale customers in the above table, which primarily consist of municipalities and rural electric cooperatives, are billed under wholesale service agreements. These agreements include standardized pricing mechanisms that are detailed in tariffs approved by FERC through wholesale rate case proceedings. The tariffs include an annual true-up process for actual costs incurred.cooperatives. Refer to “Strategic Overview” in MDA for discussion of recent agreements with certain of WPL’s electric wholesale customers related to its proposedWPL’s Riverside expansion. Refer to “Other Future Considerations” in MDA for discussion of notifications provided to each of IPL and WPL to terminate certain of their wholesale power supply agreements. Refer to Note 3 for discussion of a wholesale power supply agreement between IPL and Southern Minnesota Energy Cooperative, which became effective upon the sale of IPL’s Minnesota electric distribution assets in 2015.

Seasonality - Electric sales are seasonal to some extent with the annual peak normally occurring in the summer months due to air conditioning requirements. Electric sales are also impacted to a certain extent in the winter months due to heating requirements. MaximumRefer to the “Electric Operating Information” tables for additional details regarding maximum summer and winter peak hour demands were as follows:demands.
 2015 2014
 Summer Peak Winter Peak Summer Peak Winter Peak
 MW Date MW Date MW Date MW Date
Alliant Energy5,385 July 13 4,668 January 7 5,426 July 22 4,803 January 6
IPL3,005 July 13 2,531 January 7 2,840 September 4 2,601 January 6
WPL2,564 August 14 2,153 January 7 2,594 July 22 2,202 January 6

Competition - Retail electric customers in Iowa and Wisconsin currently do not have the ability to choose their electric supplier, and IPL and WPL have obligations to serve all their retail electric customers. Although electric service in Iowa and Wisconsin is regulated, IPL and WPL still face competition from self-generation by large industrial customers, customer- and third party-owned generation (e.g. solar panels), alternative energy sources, and petitions to municipalize (Iowa) as well as

service territory expansions by municipal utilities through annexations (Wisconsin). In addition, IPL’s and WPL’s wholesale customers may choose to purchase their electric energy and capacity needs from the MISO market, independent power producers or other utilities. However, IPL and WPL attemptAlliant Energy’s strategic plan includes actions to retain current customers and attract new customers into theirIPL’s and WPL’s service territories in an effort to keep energy rates low for all of their customers. Refer to “Strategic Overview” in MDA for discussion of the growth element of the strategic plan, which includes accelerating the growth of customers’ electric usage.

Renewable Energy Standards - As discussed in greater detail below, the states in which IPLIowa and WPL operateWisconsin have RES, which establish the minimum amount of energy electric utilities or service providersIPL and WPL must supply from renewable resources.

IPL - The Iowa RES requires IPL to purchase or own 49.8 MW of nameplate capacity from alternate energy or small hydro facilities located in its Iowa service area. IPL primarily relies upon RECsrenewable energy generated from the wind projects it owns and renewable energy acquired under PPAs to meet suchthese requirements. IPL currently exceeds the RES requirement.


10

Table of Contents


WPL - The Wisconsin RES requires WPL to increase the portion of its total Wisconsin retail electric sales supplied by renewable energy sources above a benchmark of average retail sales from renewables in 2001, 2002 and 2003. The RES required a 6% increase above the benchmark by 2015. Based on this RES, WPL was required to supply a minimum of 9.28% of its total Wisconsin retail electric sales with renewable energy sources by 2015. WPL may reach the RES with renewable energy it generates, it acquires under PPAs or through the use of renewable resource credits. WPL met the 2015 requirements of the RES withutilizes its current renewable portfolio, which primarily consists of wind and hydro, as well as the use of excess renewable resource credits generated from previous years. A confirmation onto meet these requirements. IPL and WPL meeting the 2015 renewable requirements is expected from the PSCW in the second half of 2016.currently meet or exceed their respective RES requirements.

Energy Efficiency Programs -IPL and WPL continue to promote energy efficiency, including their customers’ ability to efficiently manage their energy use. Refer to “Strategic Overview” in MDA for discussion of Several energy efficiency programs at and initiatives help customers reduce their energy usage and related costs through the use of new energy efficient equipment, products and practices. The following are current key energy efficiency programs:

IPL EEP - In 2013, IPL received an order from the IUB approving IPL’s EEP for 2014 through 2018. The EEP includes IPL spending approximately $400 million for electric and WPL.natural gas energy efficiency programs in Iowa from 2014 through 2018, and is expected to conserve electric and natural gas usage equal to that of more than 100,000 homes.

Focus on Energy Program - In 2016, WPL contributed 1.2% of its annual retail utility revenues to help fund Focus on Energy, Wisconsin’s state-wide energy efficiency and renewable energy resource program.

Electric Supply - Alliant Energy, IPL and WPL have met, historical customer demand of electricity and expect to continue meeting, futurecustomer demand of electricity through a mix of electric supply including internally generated electricity,owned EGUs, PPAs and additional purchases from wholesale energy markets. Alliant Energy’s mix of electric supply has changed with WPL’s purchases of Wisconsin Electric Power Company’s 25% interest in Edgewater Unit 5 in 2011 and Riverside in 2012, the completion of wind projects including WPL’s Bent Tree wind farm in 2011, the expiration of WPL’s Kewaunee PPA in December 2013, IPL’s DAEC PPA for a term from February 2014 through December 2025, WPL’s 150 MW PPA for a term from January 2014 through December 2018, the switch from coal to natural gas as the fuel type at IPL’s M.L. Kapp Unit 2 in June 2015 and IPL’s and WPL’s retirement of various EGUs. Alliant Energy expects its mix of electric supply to change further in the next several years with IPL’s construction of Marshalltown, WPL’s proposed construction of the Riverside expansion, WPL’s retirementIPL’s approved 500 MW of Nelson Dewey Units 1 and 2 and Edgewater Unit 3 in December 2015,additional wind generation and the proposed retirement of additionalvarious EGUs. Generation plans are periodically updated to identify longer term electric supply resource needs. These long-termLong-term generation plans are intended to meet customer demand, reduce carbon emissions, reduce reliance on wholesale market purchases and mitigate the impacts of future EGU retirements while maintaining compliance with long-term electric demand planning reserve margins, environmental requirements and RES established by regulators. Alliant Energy, IPL and WPL currently expect to meet utility customer demand in the future. However, unanticipated regional or local reliability issues could still arise in the event of outages or unexpected delays in the construction of new generating and/or transmission facilities, retirement of EGUs, EGU outages, transmission system outages or extended periods of extreme weather conditions. Refer to the “Electric Operating Information” tables for a profile of the sources of electric supply used to meet customer demand from 20112014 to 20152016. Refer to “Strategic Overview” in MDA for details of future generation plans.

Sources of Electric Energy - SourcesIn 2016, sources of electric energy were approximately as follows:
 2015 2014 2013
 IPL WPL Total IPL WPL Total IPL WPL Total
Internally generated coal-fired EGUs38% 46% 42% 43% 47% 45% 41% 56% 48%
Purchased power46% 28% 37% 47% 33% 40% 49% 29% 40%
Internally generated natural gas-fired EGUs12% 20% 15% 6% 13% 10% 6% 9% 7%
Internally generated wind farms4% 5% 5% 4% 5% 5% 4% 5% 4%
Other% 1% 1% % 2% % % 1% 1%
 100% 100% 100% 100% 100% 100% 100% 100% 100%

Electric Demand Planning Reserve Margin - IPL and WPL are required to maintain a planning reserve margin above their load at the time of the MISO-wide peak to ensure reliability of electric service to their customers. The required installed capacity reserve margin is 15.2%15.8% and the required unforced capacity reserve margin is 7.6%7.8% for the June 1, 20162017 through May 31, 20172018 MISO planning year. IPL and WPL currently have adequate capacity to meet thesuch MISO planning reserve margin requirements for the June 1, 2016 through May 31, 2017 MISO planning year.requirements.


Generation - IPL and WPL own a portfolio of EGUs located in Iowa, Wisconsin and Minnesota with a diversified fuel mix including coal, natural gas, renewable resources and renewable resources.coal. Refer to “Properties” in Item 2 for details of IPL’s and WPL’s EGUs. Refer to


11

Table of ContentsNote 1(g)


Nameplate Capacity - At December 31, the nameplate capacityfor discussion of IPL’s and WPL’s EGUs by primary fuel type was as follows:rate recovery of fuel-related costs and
 2015 2014
 IPL WPL Total IPL WPL Total
 MWs % MWs % MWs % MWs % MWs % MWs %
Natural gas1,249
 39% 1,448
 50% 2,697
 44% 1,031
 32% 1,448
 45% 2,479
 39%
Coal1,423
 44% 1,167
 40% 2,590
 42% 1,641
 51% 1,463
 46% 3,104
 48%
Oil343
 11% 
 % 343
 6% 347
 11% 
 % 347
 5%
Wind200
 6% 269
 9% 469
 8% 200
 6% 269
 8% 469
 7%
Hydro
 % 41
 1% 41
 % 
 % 41
 1% 41
 1%
Total3,215
 100% 2,925
 100% 6,140
 100% 3,219
 100% 3,221
 100% 6,440
 100%
Note 16(b) for details on IPL’s and WPL’s natural gas, coal and purchased power commitments.

Fuel Costs - The average cost of delivered fuel per million British Thermal Units used for electric generation was as follows:
IPL WPLIPL WPL
2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014
All fuels
$2.21
 
$2.50
 
$2.36
 
$2.67
 
$2.82
 
$2.52

$2.17
 
$2.21
 
$2.50
 
$2.61
 
$2.67
 
$2.82
Natural gas (a)2.86
 3.37
 6.05
 3.25
 3.68
 5.51
Coal1.94
 2.05
 1.99
 2.49
 2.22
 2.21
1.98
 1.94
 2.05
 2.47
 2.49
 2.22
Natural gas (a)3.37
 6.05
 4.63
 3.68
 5.51
 4.86

(a)The average cost of natural gas includes commodity and transportation costs as well as realized gains and losses from swap and option contracts used to hedge the price of natural gas volumes expected to be used by IPL’s and WPL’s natural gas-fired EGUs.

Natural Gas - As discussed in “Properties” in Item 2, Alliant Energy, IPL and WPL own several natural gas-fired EGUs. WPL also has exclusive rights to the output of AEF’s Sheboygan Falls facility under an affiliated lease agreement. These facilities help meet customer demand for electricity generally during peak hour demands and when natural gas prices are low enough to make natural gas-fired generation economical compared to other fuel sources, such as occurred in 2016 and 2015. Alliant Energy manages the gas supply to these gas-fired EGUs and helps ensure an adequate supply is available at known prices through a combination of gas commodity, pipeline transportation and storage agreements held by IPL and WPL for 2017 through 2028. Alliant Energy, IPL and WPL believe they are reasonably insulated against gas price volatility for these EGUs given their use of forward contracts and hedging practices, as well as their regulatory cost-recovery mechanisms. Refer to “Strategic Overview” in MDA for discussion of IPL’s construction of Marshalltown and WPL’s construction of the Riverside expansion, both of which are natural gas-fired combined-cycle EGUs.

Wind - As discussed in “Properties” in Item 2, IPL owns the Whispering Willow - East wind farm and WPL owns the Cedar Ridge and Bent Tree wind farms. All or some of the renewable energy attributes associated with generation from these sources may be used in future years to comply with RES or other regulatory requirements, or sold to third parties in the form of renewable energy credits or other environmental commodities. Refer to “Strategic Overview” in MDA for discussion of IPL’s and WPL’s planned and potential addition of wind generation to Alliant Energy’s resources portfolio.

Coal - Coal is a primaryone of the fuel sourcesources for internally generated electric supply. Alliant Energy, through Corporate Services as agent for IPL and WPL, hasowned EGUs. Coal contracts entered into contracts with different suppliers to help ensure that a specified supply of coal is available, and delivered, at known prices for IPL’s and WPL’s coal-fired EGUs for 20162017 through 2018. As of December 31, 2015, existing contracts provide for a portfolio of coal supplies that cover approximately 79%, 55% and 33% of IPL’s and WPL’s estimated aggregate annual coal supply needs for 2016 through 2018, respectively.2019. Alliant Energy, IPL and WPL believe thistheir coal supply portfolio of coal supplies represents a reasonable balance between the risks of insufficient supplies and those associated with being unable to respond to future coal market changes. Remaining coal requirements are expected to be met from either future term contracts or purchases in the spot market. Alliant Energy, through its subsidiaries Corporate Services, IPL and WPL, also enters into various coal transportation agreements to meet IPL’s and WPL’s coal supply requirements. As of December 31, 2015, existing coal transportation agreements cover IPL’s and WPL’s estimated coal transportation needs for 2016 and 2017. In 2015 and 2016, two of Alliant Energy’s coal suppliers filed for restructuring under Chapter 11 of the U.S. Bankruptcy Code. There has been no significant impact to Alliant Energy, IPL and WPL as a result of these bankruptcy filings.

Nearly all of the coal utilized by IPL and WPL is from the Wyoming Powder River Basin. A majority of this coal is transported by rail-car directly from Wyoming to IPL’s and WPL’s EGUs, with the remainder transported from Wyoming to the Mississippi River by rail-car and then via barges to the final destination. As protection against interruptions in coal deliveries, IPL and WPL strive to maintain average coal inventory supply targets of 25 to 55 days for EGUs with year-round deliveries and 30 to 125 days (depending upon the time of year) for EGUs with seasonal deliveries. As of December 31, 2015, actual inventory days ranged from 29 to 92 days for EGUs with year-round deliveries and were 161 days for an EGU with seasonal deliveries. The EGU days on hand were computed based on actual tons of inventory divided by estimated average daily tons burned. Coal inventory levels have been impacted by continued lower natural gas prices, which makescan make natural gas-fired generation more economical compared to other fuel sources, such as coal. Coal inventory levels have also been impacted by lower electric demand due to milder temperatures in the fourth quarter of 2015.

Average delivered coal costs moderately declined during the last halfportions of 2015 dueand 2016. In 2015 and 2016, three of Alliant Energy’s coal suppliers filed for restructuring under Chapter 11 of the U.S. Bankruptcy Code. Two coal suppliers have emerged from Chapter 11 restructuring. There has been no significant impact to downward rail rate adjustments, lower rail fuel surcharges to historic low levelsAlliant Energy, IPL and lower spot market coal prices. However, average delivered coal costs are expected to slightly increase in the future due to price structures and adjustment provisions in existing coal contracts, in conjunction with expected rising market prices; rate structures and adjustment provisions in existing transportation contracts; and expected future coal and transportation market trends. Existing coal commodity contracts with termsWPL as a result of greater than one year have fixed future year prices that generally reflect recent market trends. Rate adjustment provisions in current rail transportation contracts are based on changes in the All Inclusive Index Less Fuel as published by the Association of American Railroads. These transportation contracts also contain fuel surcharges that are subject to change monthly based on changes in diesel fuel prices, which are currently at low levels. Other factors that may impact coal prices for future

12

Table of Contents


commitments are increasing costs for supplier mineral rights, increasing costs to mine the coal, and changes in various associated laws and regulations. For example, emission restrictions related to SO2, NOx and mercury, along with other environmental limitations on EGUs, continue to increase and will likely limit the ability to obtain, and further increase the cost of, adequate coal supplies. Factors that may impact future transportation rates include, but are not limited to: the possible need for railroads to enhance and expand infrastructure, corresponding investments in locomotives and crews, and the desire to improve margins on coal movements commensurate with margins on non-coal movements.these bankruptcy filings.

Alliant Energy, IPL and WPL believe they are reasonably insulated against coal price volatility given their current coal procurement process, the specific coal market in their primary purchase region and regulatory cost-recovery mechanisms. The coal procurement process stressessupports periodic purchases, staggering of contract terms, stair-stepped levels of supply going forward for multiple years and supplier diversity. Similarly, given the term lengths of their transportation agreements and, as appropriate, strategic alignment of agreement expirations for negotiation purposes, Alliant Energy, IPL and WPL believe they are reasonably insulated against future higher coal transportation rates from the major railroads.

Natural Gas - Alliant Energy owns several larger natural gas-fired EGUs, including IPL’s Emery (603 MW), WPL’s Riverside (675 MW), WPL’s Neenah (371 MW) and Resources’ Sheboygan Falls (347 MW) facilities. WPL has exclusive rights to the output of Sheboygan Falls under an affiliated lease agreement. IPL and WPL also currently own several smaller natural gas-fired EGUs, including IPL’s M.L. Kapp Unit 2 (218 MW) for which the fuel type was switched from coal to natural gas in June 2015. These facilities help meet customer demand for electricity generally during peak hour demands and when natural gas prices are low enough to make natural gas-fired generation economical compared to other fuel sources, such as occurred in 2015. Alliant Energy manages the gas supply to these gas-fired EGUs and provides supply through a combination of third-party deliveries and pipeline transportation and storage contracts held by IPL and WPL. IPL and WPL have contracts to provide storage capacity, as well as firm pipeline transportation per day, as follows (in Dths):
 Storage Firm Pipeline
 Capacity Transportation
Riverside2,500,000
 80,000
Emery1,250,000
 60,000

In addition, IPL and WPL have each purchased 5,000 Dths per day of fixed price physical natural gas commodities for Emery and Riverside, respectively, for a five-year term from 2016 through 2020. These purchases represent less than 10% of the expected gas needs of these EGUs.

Refer to “Strategic Overview” in MDA for discussion of IPL’s construction of Marshalltown and WPL’s proposed construction of the Riverside expansion, both of which are natural gas-fired combined-cycle EGUs.

Wind - IPL’s 200 MW Whispering Willow - East wind farm in Franklin County, Iowa began generating electricity in 2009. WPL’s 68 MW Cedar Ridge wind farm in Fond du Lac County, Wisconsin began generating electricity in 2008. WPL’s 201 MW Bent Tree wind farm in Freeborn County, Minnesota began full generation of electricity in 2011. All or some of the renewable energy attributes associated with generation from these sources may be used in future years to comply with RES or other regulatory requirements, or sold to third parties in the form of RECs or other environmental commodities. Refer to “Properties” in Item 2 for the generating capacity of these wind farms.

Purchased Power - IPL and WPL periodically enter into PPAs and purchase electricity from wholesale energy markets to meet a portion of their customer demand for electricity. IPL’s most significant PPA is for the purchase of up to 431 MWs of capacity and the resulting energy from DAEC for a term from February 2014 through December 2025. WPL’s most significant PPA is for the purchase of 150 MWs of energy for a term from January 2014 through December 2018.


IPL’s DAEC PPA - In 2013, the IUB issued an order allowing IPL to proceed with a PPA for the purchase of capacity and energy generated by DAEC located near Palo, Iowa. The IUB also authorized IPL to recover the Iowa retail portion of the cost of the DAEC PPA from Iowa retail electric customers through the energy adjustment clause. The terms of the PPA provide IPL the right to the counterparty’s entire output quantities (70% of the total plant output) in exchange for payment from IPL to the counterparty based on the amount of MWhs received by IPL. Among the terms and conditions of the PPA are guarantees by the counterparty to provide minimum amounts of capacity and energy. The PPA also contains provisions for the replacement of energy from alternative sources under certain conditions as well as provisions that convey to IPL the potential environmental attributes associated with its portion of the output from DAEC.


13

Table of Contents


Refer to Note 1(g) for discussion of IPL’s and WPL’s rate recovery of fuel-related costs and Note 16(b) for details on IPL’s and WPL’s coal, natural gas and other purchased power commitments.

Electric Transmission - IPL and WPL do not own electric transmission assets and currently receive substantially all their electric transmission services from ITC and ATC, respectively. ITC and ATC are independent for-profit, transmission-only companies and are transmission-owning members of the MISO Regional Transmission Organization, Midwest Reliability Organization and Reliability First Corporation Regional Entities. The annual transmission service rates that ITC andor ATC chargecharges their customers are calculated each calendar year using a FERC-approved cost of service formula rate template referred to as Attachment “O.” Because Attachment “O” is a FERC-approved formula rate, ITC and ATC can implement new rates each calendar year without filing a request with FERC. However, new rates are subject to challenge by either FERC or customers. If the rates proposed by ITC or ATC are determined by FERC to be unjust or unreasonable or another mechanism is determined by FERC to be just and reasonable, ITC’s or ATC’s rates would change accordingly.

Refer to “Other Future Considerations” in MDA for additional information regarding transmission service charges from ITC and ATC.ATC, as well as discussion of a complaint pending with FERC regarding the level of return on equity that MISO transmission owners (including ITC and ATC) should be allowed to utilize in calculating the rates they charge their customers. Refer to Note 1(g) for discussion of a transmission cost rider utilized by IPL for recovery of its electric transmission service expense, and discussion of WPL’s electric transmission service expense, which is recovered from its retail electric customers through changes in base rates determined during periodic rate proceedings. Note 1(g) also discusses escrow accounting treatment for electric transmission service expense which WPL received as part of its approved retail electric rate case (2015/2016 Test Period) in July 2014 from the PSCW.through 2018 pursuant to PSCW orders. Refer to Note 18 for details of agreements between ATC and WPL.

ATC - WPL Transco, which is partially owned by WPLAs of December 31, 2016, ATI holds all of Alliant Energy’s investment in ATC and Resources’ subsidiary, ATI, has an ownership interest in ATC. WPL Transco’sfunds capital contributions to ATC, are currently funded by ATI, andwhich are included in “Other” in the construction and acquisition expenditures table in “Liquidity and Capital Resources” in MDA. Alliant Energy currently anticipates that ATI will fund capital contributions of approximately $20$23 million, $21$14 million, $3$6 million and $0$8 million to ATC in 2016, 2017, 2018, 2019 and 2019,2020, respectively, to help fund future proposed transmission projects. These future proposed transmission projects require approval from various regulatory agencies to construct. Certain of these future proposed transmission projects are currently being challenged by other utilities and other transmission-only companies who have requested to own a portion of the future transmission projects proposed by ATC. Alliant Energy and WPL are currently unable to determine the impact these challenges may have on ATC’s plans to construct these proposed transmission projects and the resulting impact on ATI’s future capital contributions to ATC and WPL’s and ATI’s equity earnings income and dividends received from ATC. In addition, refer to “Other Future Considerations” in MDA for discussion of potential changes to ATC’s return on equity, which couldmay result in Alliant Energy and WPL realizing lowerchanges to equity income and dividends from ATC in the future.

In 2011, Duke Energy Corporation and ATC announced the creation of DATC, a joint venture that is expected to acquire, build, own and operate new electric transmission infrastructure in North America. DATC continues to evaluate new projects and opportunities, and participates in a competitive bidding process on projects it considers to be viable. DATC is continuing the design and development of a proposed transmission line that would deliver wind energy generated in eastern Wyoming to California and the southwestern U.S. This transmission line is currently estimated to cost approximately $2.5 billion to $3.5 billion. Alliant Energy and WPL are currently unable to determine what impacts DATC and the transmission line project noted above, if constructed, will have on their future equity income, dividends received from ATC, capital contributions to ATC, or ownership in ATC. The expenditures in the construction and acquisition expenditures table in “Liquidity and Capital Resources” in MDA do not include any capital contributions for potential DATC projects.

MISO Markets - IPL and WPL are members of MISO, a FERC-approved Regional Transmission Organization, which is responsible for monitoring and ensuring equal access to the transmission system in their service territories.footprint. IPL and WPL participate in the wholesale energy and ancillary services markets operated by MISO, which are discussed in more detail below. Corporate Services acts asAs agent on behalf offor IPL and WPL, pursuant to service agreements. As agent, Corporate Services enters into energy, capacity, ancillary services, and transmission sale and purchase transactions within the markets operated by MISO. Corporate Services assigns such sales and purchases between IPL and WPL based on statements received from MISO. Refer to Note 18 for additional discussion of these assigned amounts.

Wholesale Energy Market - IPL and WPL participate in the wholesale energy market operated by MISO. The market dictates the process by which IPL and WPL buy and sell wholesale electricity, obtain transmission services, schedule generation and ensure resource adequacy to reliably serve load. InMISO generally dispatches the market, IPL and WPL submit day-ahead and/or real-time bids and offerslowest cost generators, while recognizing current system constraints, to reduce costs for energy. MISO evaluates IPL’s, WPL’s and other market participants’ offers, bids andpurchasers in the wholesale energy injections into, and withdrawals from, the system to economically dispatch the entire MISO system on an hourly basis. MISO settles these hourly offers and bids based on locational marginal prices, which are market-driven values based on the specific time and location of the purchase and/or sale of energy.market. The market is intended to send price signals to stakeholders about where generation or transmission system expansion is needed. In addition, MISO may dispatch generators that support reliability needs, but that would not have operated based on economic needs. In these cases, MISO’s settlement assures that these generators are made whole financially for their variable costs.


14

Table of Contents


Ancillary Services Market - IPL and WPL also participate in MISO’s ancillary services market. The ancillary services market, which integrates the procurement and use of regulation and contingency reserves with the existing wholesale energy market.market to ensure reliability of electricity supply. Regulation reserves refer to generation available to meet the moment-to-moment changes in generation that are necessary to meet changes in electricity demand. Contingency reserves refer to additional generation or demand response resources, either on-line or that can be brought on-line within 10 minutes, to meet certain major events such as the loss of a large EGU or transmission line.

Financial Transmission Rights and Auction Revenue Rights - In areas of constrained transmission capacity, costs could be higher due to congestion and its impact on locational marginal prices. FTRs provide a hedge for certain congestion costs that occur in the MISO day-ahead energy market. MISO allocates ARRsauction revenue rights to IPL and WPL eachannually based on a fiscal year based onfrom June 1 through May 31 and historical use of the transmission system. The revenue rights associated with the allocated ARRsauction revenue rights are used by IPL and WPL to acquire FTRs through the FTR auctions operated by MISO. MISO allocates ARRs annually based on a fiscal year from June 1 through May 31. IPL’s and WPL’s current FTRs acquired from ARRs extend through May 31, 2016.

Multi-value Projects - The MISO tariff identifies coststariffs billed to IPL and WPL includinginclude costs related to various shared transmission projects, including MVPs. MVPsmulti-value projects. Such projects include new large scale transmission projects that enable the reliable and economic delivery of energy in support of documented energy policy mandates or provide economic value across multiple pricing zones within MISO. MVPthe MISO footprint. Multi-value project costs are socialized across the entire MISO footprint based on energy usage of each MISO participant.usage. The MISO tarifftariffs billed to IPL and WPL also includesinclude a portion of the costs related to other shared transmission projects, including projects designed to reduce market congestion, to provide interconnection to the transmission grid for new generation, and to ensure compliance with applicable reliability standards. The costs of these projects are primarily allocated to MISO participants in a way that is commensurate with the benefit to the participants’ pricing zone. The MISO transmission chargestariffs billed to IPL and WPL are expected to increase in the future due to the increased number of shared transmission projects occurring in the MISO region. Refer to “Other Future Considerations” in MDA for further discussion of MISO transmission charges billed to IPL and WPL.

Resource Adequacy - MISO conducts various studies regarding reliability of electric service to ensure its market participants have adequate resources either owned or contracted, to meet MISO’s forecasted peak load obligations plus a reserve margin. Only accredited capacity assigned to EGUs from the MISO resource adequacy process is available to meet these requirements. To connect to the transmission system, MISO requires an EGU to obtain an interconnection agreement. In order for an EGU to receive accredited capacity, it must among othermeet MISO capacity accreditation requirements, satisfy allwhich can include satisfying transmission requirements identified in its interconnection agreement prior to the MISO planning year. New EGUs like Marshalltown and the Riverside expansion, or IPL’s and WPL’s planned additional wind generation, may not initially receive full accredited capacity based on the inability to satisfy all identified transmission requirements. Therefore, full accredited capacity may not be granted to such EGUs until all identified transmission requirements are resolved. As members of MISO, IPL and WPL must adhere to these resource adequacy protocols in executing their generation resource plans.

Attachment Y Notices and System Support Resources - MISO requires its market participants (including IPL and WPL, among others) who own EGUs to submit an Attachment Y Notice if they plan to retire an EGU, reduce theEGU capacity of an EGU or suspend all or a portion of theEGU operations of an EGU for a period longer than two months. Upon receiving an Attachment Y Notice, MISO will conduct a study to determine whether all or a portion of the EGU’s capacity is necessary to maintain system reliability. If the EGU’s capacity is determined to be necessary to maintain system reliability, MISO designates the EGU as an SSR. When an EGU is required to continue to operate for system reliability, the market participant may enter into an SSR agreement and negotiate an annual revenue requirement with MISO. The annual revenue requirement for the SSR is subject to FERC approval and is assigned to load serving entities that benefit from the continued operations of the EGU. Alliant Energy, IPL and WPL are currently unable to estimate the amount of aggregate SSR charges that may be assigned to IPL and WPL as load serving entities. Alliant Energy, IPL and WPL are also currently unable to estimate the impacts of any potential SSR designations on EGUs they plan to retire or modify. Refer to “Strategic OverviewProperties” in MDAItem 2 for discussion of EGUs that IPL and WPL currently plan to retire or modify, such as changing from coal-fired to an alternative fuel source, in the next few years. Refer to Note 2 for additional discussion of SSR costs.

Electric Environmental Matters - Refer to Note 16(e) and “Environmental Matters” in MDA for discussion of electric environmental matters, including current or proposed environmental regulations.


15

Table of Contents


Electric Operating Information - Alliant Energy2015 2014 2013 2012 20112016 2015 2014
Operating Revenues (in millions) (a):         
Residential
$983.0
 
$994.5
 
$1,009.1
 
$975.9
 
$985.8
Commercial667.8
 658.0
 649.4
 611.4
 612.1
Industrial823.3
 799.0
 765.4
 741.8
 748.9
Operating Revenues (in millions):     
Residential (a)
$1,001.1
 
$983.0
 
$994.5
Commercial (a)712.6
 667.8
 658.0
Industrial (a)787.1
 763.4
 735.1
Industrial - co-generation64.0
 59.9
 63.9
Retail subtotal2,474.1
 2,451.5
 2,423.9
 2,329.1
 2,346.8
2,564.8
 2,474.1
 2,451.5
Sales for resale:              
Wholesale221.0
 206.6
 195.4
 187.6
 189.8
Wholesale (a)256.6
 221.0
 206.6
Bulk power and other28.5
 2.9
 17.7
 23.8
 52.2
10.1
 28.5
 2.9
Other46.9
 52.6
 52.0
 48.8
 47.0
44.0
 46.9
 52.6
Total
$2,770.5
 
$2,713.6
 
$2,689.0
 
$2,589.3
 
$2,635.8

$2,875.5
 
$2,770.5
 
$2,713.6
Electric Sales (000s MWh) (a):         
Residential7,271
 7,697
 7,824
 7,679
 7,740
Commercial6,374
 6,449
 6,432
 6,352
 6,253
Industrial11,735
 11,821
 11,471
 11,555
 11,504
Electric Sales (000s MWh):     
Residential (a)7,152
 7,271
 7,697
Commercial (a)6,545
 6,374
 6,449
Industrial (a)10,702
 10,820
 10,813
Industrial - co-generation940
 915
 1,008
Retail subtotal25,380
 25,967
 25,727
 25,586
 25,497
25,339
 25,380
 25,967
Sales for resale:              
Wholesale3,614
 3,586
 3,564
 3,317
 3,372
Wholesale (a)4,039
 3,614
 3,586
Bulk power and other1,228
 335
 763
 1,303
 1,757
360
 1,228
 335
Other129
 155
 152
 151
 151
100
 129
 155
Total30,351
 30,043
 30,206
 30,357
 30,777
29,838
 30,351
 30,043
Customers (End of Period) (a):         
Residential809,634
 850,322
 847,350
 844,388
 842,780
Commercial137,870
 139,138
 138,520
 137,791
 136,732
Industrial2,544
 2,871
 2,881
 2,842
 2,895
Customers (End of Period):     
Residential (a)811,459
 809,634
 850,322
Commercial (a)141,528
 137,870
 139,138
Industrial (a)2,546
 2,544
 2,871
Other2,930
 3,662
 3,657
 3,647
 3,638
2,785
 2,930
 3,662
Total952,978
 995,993
 992,408
 988,668
 986,045
958,318
 952,978
 995,993
Other Selected Electric Data:              
Maximum summer peak hour demand (MW)5,385
 5,426
 5,820
 5,886
 5,734
5,615
 5,385
 5,426
Maximum winter peak hour demand (MW)4,668
 4,803
 4,648
 4,368
 4,423
4,559
 4,668
 4,803
Cooling degree days (b):              
Cedar Rapids, Iowa (IPL) (normal - 769)732
 670
 884
 1,052
 887
Madison, Wisconsin (WPL) (normal - 663)665
 620
 709
 1,070
 814
Cedar Rapids, Iowa (IPL) (normal - 766)971
 732
 670
Madison, Wisconsin (WPL) (normal - 662)780
 665
 620
Sources of electric energy (000s MWh):              
Gas4,505
 4,738
 2,971
Purchased power:     
Nuclear3,444
 3,741
 3,133
Wind (c)1,079
 1,190
 1,252
Other (c)8,912
 6,675
 8,074
Wind (c)1,382
 1,441
 1,390
Coal13,040
 13,818
 14,873
 14,680
 16,440
11,019
 13,040
 13,818
Purchased power:         
Nuclear (c)3,741
 3,133
 5,544
 5,483
 5,483
Wind (d)1,190
 1,252
 1,201
 1,188
 1,285
Other (d)6,675
 8,074
 5,541
 7,053
 6,244
Gas4,738
 2,971
 2,224
 1,285
 588
Wind (d)1,441
 1,390
 1,375
 1,198
 1,188
Other (d)189
 212
 200
 183
 225
Other (c)228
 189
 212
Total31,014
 30,850
 30,958
 31,070
 31,453
30,569
 31,014
 30,850
Revenue per KWh sold to retail customers (cents)9.75
 9.44
 9.42
 9.10
 9.20
10.12
 9.75
 9.44
(a)
In 2015, Alliant Energy sold its electric distribution assets in Minnesota to Southern Minnesota Energy Cooperative. At the date of the sale, Alliant Energy had approximately 42,000 electric retail customers in Minnesota. Prior to the asset sale, the electric sales to these retail customers are included in residential, commercial and industrial retail sales. Subsequent to the asset sale, the related electric sales are included in wholesale electric sales pursuant to a wholesale power supply agreement between IPL and Southern Minnesota Energy Cooperative, which is discussed in Note 3.
(b)
Cooling degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical cooling degree days. Refer to “Gas Utility Operations” below for details of heating degree days.
(c)2013 MWhs include replacement energy provided under the Kewaunee PPA after Kewaunee was shut down in May 2013.
(d)All or some of the renewable energy attributes associated with generation from these sources may be used in future years to comply with renewable energy standards or other regulatory requirements, or sold to third parties in the form of renewable energy credits or other environmental commodities.

16

Table of Contents


Electric Operating Information - IPL2015 2014 2013 2012 2011
Operating Revenues (in millions) (a):         
Residential
$540.3
 
$556.4
 
$574.3
 
$529.9
 
$543.2
Commercial416.3
 410.2
 409.6
 365.3
 366.0
Industrial453.6
 458.5
 442.9
 408.0
 415.4
Retail subtotal1,410.2
 1,425.1
 1,426.8
 1,303.2
 1,324.6
Sales for resale:         
Wholesale56.4
 32.2
 30.0
 27.8
 29.6
Bulk power and other5.1
 2.1
 2.0
 9.5
 24.6
Other32.1
 33.9
 33.0
 30.6
 29.5
Total
$1,503.8
 
$1,493.3
 
$1,491.8
 
$1,371.1
 
$1,408.3
Electric Sales (000s MWh) (a):         
Residential3,843
 4,164
 4,272
 4,141
 4,223
Commercial4,059
 4,099
 4,118
 4,045
 3,953
Industrial6,922
 7,132
 6,973
 7,116
 7,080
Retail subtotal14,824
 15,395
 15,363
 15,302
 15,256
Sales for resale:         
Wholesale845
 485
 419
 418
 417
Bulk power and other178
 59
 98
 377
 729
Other67
 81
 80
 81
 84
Total15,914
 16,020
 15,960
 16,178
 16,486
Customers (End of Period) (a):         
Residential406,028
 445,483
 444,905
 443,802
 443,358
Commercial80,982
 81,853
 81,587
 81,203
 80,506
Industrial1,572
 1,856
 1,863
 1,836
 1,906
Other1,050
 1,385
 1,374
 1,381
 1,381
Total489,632
 530,577
 529,729
 528,222
 527,151
Other Selected Electric Data:         
Maximum summer peak hour demand (MW)3,005
 2,840
 3,107
 3,130
 3,131
Maximum winter peak hour demand (MW)2,531
 2,601
 2,528
 2,404
 2,454
Cooling degree days (b):         
Cedar Rapids, Iowa (normal - 769)732
 670
 884
 1,052
 887
Sources of electric energy (000s MWh):         
Coal6,263
 7,092
 6,705
 7,302
 8,456
Purchased power:         
Nuclear3,741
 3,133
 3,592
 3,641
 3,624
Wind (c)757
 798
 768
 743
 661
Other (c)3,015
 3,802
 3,766
 3,237
 3,094
Gas1,874
 1,069
 920
 1,081
 532
Wind (c)653
 622
 639
 579
 568
Other (c)5
 12
 22
 38
 18
Total16,308
 16,528
 16,412
 16,621
 16,953
Revenue per KWh sold to retail customers (cents)9.51
 9.26
 9.29
 8.52
 8.68
(a)
In 2015, IPL sold its electric distribution assets in Minnesota to Southern Minnesota Energy Cooperative. At the date of the sale, IPL had approximately 42,000 electric retail customers in Minnesota. Prior to the asset sale, the electric sales to these retail customers are included in residential, commercial and industrial retail sales. Subsequent to the asset sale, the related electric sales are included in wholesale electric sales pursuant to a wholesale power supply agreement between IPL and Southern Minnesota Energy Cooperative, which is discussed in Note 3.
(b)
Cooling degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical cooling degree days. Refer to “Gas Utility Operations” below for details of heating degree days.
(c)All or some of the renewable energy attributes associated with generation from these sources may be used in future years to comply with renewable energy standards or other regulatory requirements, or sold to third parties in the form of renewable energy credits or other environmental commodities.


17

Table of Contents


Electric Operating Information - WPL2015 2014 2013 2012 2011
Electric Operating InformationIPL WPL
2016 2015 2014 2016 2015 2014
Operating Revenues (in millions):                    
Residential
$442.7
 
$438.1
 
$434.8
 
$446.0
 
$442.6
Commercial251.5
 247.8
 239.8
 246.1
 246.1
Industrial369.7
 340.5
 322.5
 333.8
 333.5
Residential (a)
$536.7
 
$540.3
 
$556.4
 
$464.4
 
$442.7
 
$438.1
Commercial (a)445.4
 416.3
 410.2
 267.2
 251.5
 247.8
Industrial (a)396.4
 393.7
 394.6
 390.7
 369.7
 340.5
Industrial - co-generation64.0
 59.9
 63.9
 N/A
 N/A
 N/A
Retail subtotal1,063.9
 1,026.4
 997.1
 1,025.9
 1,022.2
1,442.5
 1,410.2
 1,425.1
 1,122.3
 1,063.9
 1,026.4
Sales for resale:                    
Wholesale164.6
 174.4
 165.4
 159.8
 160.2
Wholesale (a)94.2
 56.4
 32.2
 162.4
 164.6
 174.4
Bulk power and other23.4
 0.8
 15.7
 14.3
 27.6
3.6
 5.1
 2.1
 6.5
 23.4
 0.8
Other14.8
 18.7
 19.0
 18.2
 17.5
29.4
 32.1
 33.9
 14.6
 14.8
 18.7
Total
$1,266.7
 
$1,220.3
 
$1,197.2
 
$1,218.2
 
$1,227.5

$1,569.7
 
$1,503.8
 
$1,493.3
 
$1,305.8
 
$1,266.7
 
$1,220.3
Electric Sales (000s MWh):                    
Residential3,428
 3,533
 3,552
 3,538
 3,517
Commercial2,315
 2,350
 2,314
 2,307
 2,300
Industrial4,813
 4,689
 4,498
 4,439
 4,424
Residential (a)3,633
 3,843
 4,164
 3,519
 3,428
 3,533
Commercial (a)4,159
 4,059
 4,099
 2,386
 2,315
 2,350
Industrial (a)5,791
 6,007
 6,124
 4,911
 4,813
 4,689
Industrial - co-generation940
 915
 1,008
 N/A
 N/A
 N/A
Retail subtotal10,556
 10,572
 10,364
 10,284
 10,241
14,523
 14,824
 15,395
 10,816
 10,556
 10,572
Sales for resale:                    
Wholesale2,769
 3,101
 3,145
 2,899
 2,955
Wholesale (a)1,360
 845
 485
 2,679
 2,769
 3,101
Bulk power and other1,050
 276
 665
 926
 1,028
46
 178
 59
 314
 1,050
 276
Other62
 74
 72
 70
 67
41
 67
 81
 59
 62
 74
Total14,437
 14,023
 14,246
 14,179
 14,291
15,970
 15,914
 16,020
 13,868
 14,437
 14,023
Customers (End of Period):                    
Residential403,606
 404,839
 402,445
 400,586
 399,422
Commercial56,888
 57,285
 56,933
 56,588
 56,226
Industrial972
 1,015
 1,018
 1,006
 989
Residential (a)403,558
 406,028
 445,483
 407,901
 403,606
 404,839
Commercial (a)83,936
 80,982
 81,853
 57,592
 56,888
 57,285
Industrial (a)1,511
 1,572
 1,856
 1,035
 972
 1,015
Other1,880
 2,277
 2,283
 2,266
 2,257
862
 1,050
 1,385
 1,923
 1,880
 2,277
Total463,346
 465,416
 462,679
 460,446
 458,894
489,867
 489,632
 530,577
 468,451
 463,346
 465,416
Other Selected Electric Data:                    
Maximum summer peak hour demand (MW)2,564
 2,594
 2,752
 2,851
 2,761
2,996
 3,005
 2,840
 2,681
 2,564
 2,594
Maximum winter peak hour demand (MW)2,153
 2,202
 2,120
 1,964
 1,991
2,479
 2,531
 2,601
 2,131
 2,153
 2,202
Cooling degree days (a):         
Madison, Wisconsin (normal - 663)665
 620
 709
 1,070
 814
Cooling degree days (b):           
Cedar Rapids, Iowa (IPL) (normal - 766)971
 732
 670
 N/A
 N/A
 N/A
Madison, Wisconsin (WPL) (normal - 662)N/A
 N/A
 N/A
 780
 665
 620
Sources of electric energy (000s MWh):                    
Coal6,777
 6,726
 8,168
 7,378
 7,984
Gas1,838
 1,874
 1,069
 2,667
 2,864
 1,902
Purchased power:                    
Nuclear (b)
 
 1,952
 1,842
 1,859
Nuclear3,444
 3,741
 3,133
 N/A
 N/A
 N/A
Wind (c)433
 454
 433
 445
 624
635
 757
 798
 444
 433
 454
Other (c)3,660
 4,272
 1,775
 3,816
 3,150
4,267
 3,015
 3,802
 4,645
 3,660
 4,272
Gas2,864
 1,902
 1,304
 204
 56
Wind (c)788
 768
 736
 619
 620
630
 653
 622
 752
 788
 768
Coal5,598
 6,263
 7,092
 5,421
 6,777
 6,726
Other (c)184
 200
 178
 145
 207
6
 5
 12
 222
 184
 200
Total14,706
 14,322
 14,546
 14,449
 14,500
16,418
 16,308
 16,528
 14,151
 14,706
 14,322
Revenue per KWh sold to retail customers (cents)10.08
 9.71
 9.62
 9.98
 9.98
9.93
 9.51
 9.26
 10.38
 10.08
 9.71
(a)
In 2015, IPL sold its electric distribution assets in Minnesota to Southern Minnesota Energy Cooperative. At the date of the sale, IPL had approximately 42,000 retail electric customers in Minnesota. Prior to the asset sale, the electric sales to these retail customers are included in IPL’s residential, commercial and industrial retail sales. Subsequent to the asset sale, the related electric sales are included in IPL’s wholesale electric sales pursuant to a wholesale power supply agreement between IPL and Southern Minnesota Energy Cooperative, which is discussed in Note 3.
(b)
Cooling degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical cooling degree days. Refer to “Gas Utility Operations” below for details of heating degree days.
(b)2013 MWhs include replacement energy provided under the Kewaunee PPA after Kewaunee was shut down in May 2013.
(c)All or some of the renewable energy attributes associated with generation from these sources may be used in future years to comply with renewable energy standards or other regulatory requirements, or sold to third parties in the form of renewable energy credits or other environmental commodities.


18

Table of Contents


2) GAS UTILITY OPERATIONS
General - Gas utility operations represent the second largest operating segment for Alliant Energy, IPL and WPL. Alliant Energy’s gas utility operations are located in the Midwest with IPL providing gas service in Iowa and WPL providing gas service in Wisconsin. In 2015, IPL completed the sale of its Minnesota natural gas distribution assets. Refer to Note 3 for further discussion of the sale. Refer to the “Gas Operating Information” tables for additional details regarding gas utility operations. Refer to Note 1(g) for information relating to utility natural gas cost recovery mechanisms and Note 16(b) for discussion of natural gas commitments.

Customers - The number of gas customers at December 31, 2015 were as follows:
 Retail Transportation / Total
 Customers Other Customers Customers
IPL224,914
 376
 225,290
WPL184,491
 251
 184,742
 409,405
 627
 410,032

IPL’s and WPL’s retail gas customers in the above table are billed under base rates established by the IUB or PSCW that include recovery of and a return on investments in gas infrastructure and recovery of costs required to serve customers. Commodity, storage and transportation costs incurred by IPL and WPL are recovered pursuantprovide gas utility service to natural gas cost recovery mechanisms.a diversified base of retail customers and industries, including research, education, hospitality, manufacturing and chemicals (including ethanol). In addition, to sales of natural gas to retail customers, IPL and WPL provide transportation service to commercial and industrial customers by moving customer-owned gas through Alliant Energy’s distribution systems to the customers’ meters. Revenues are collected for this service pursuant to transportation tariffs.

Seasonality - Gas sales follow a seasonal pattern with an annual base-load of gas and a large heating peak occurring during the winter season. Natural gas obtained from producers, marketers and brokers, as well as gas in storage, is utilized to meet the peak heating season requirements. Storage contracts generally allow IPL and WPL to purchase gas in the summer and inject it into underground storage fields, and remove it from storage fields in the winter to deliver to customers. TheRefer to the “Gas Operating Information” tables for details regarding maximum daily winter peak demands were as follows:demands.
 2015 2014
 Dth Date Dth Date
IPL267,314 January 7 296,190 January 6
WPL209,289 January 7 234,837 January 6

Competition - Gas customers in Iowa and Wisconsin currently do not have the ability to choose their gas distributor, and IPL and WPL have obligations to serve all their gas customers. Federal and state regulatory policies are in place to bring competition to the gas industry. While the gas utility distribution function is expected to remain a regulated function, sales of the natural gas commodity and related services are subject to competition from third-parties. Whenthird-parties who provide alternative fuel sources (e.g. propane). However, when natural gas service is available for a given area, customers in such area have generally selected natural gas over propane as a more cost competitive solution for their energyfuel needs. Recently, lower natural gas prices compared to propane prices have resulted in increased customer requests to convert from propane to natural gas. Alliant Energy, IPL and WPL are also currently extending various gas distribution systems in their existing Iowa and Wisconsin service territories to serve new customer demand. Refer to “Strategic Overview” in MDA for further discussion of gas distribution systems.systems, as well as discussion of the growth element of Alliant Energy’s strategic plan, which includes accelerating the growth of customers’ gas usage.

Gas Supply - IPL and WPL maintain purchase agreements with over 70 suppliers of natural gas from various gas producing regions of the U.S. and Canada. Recently, IPL and WPL have each purchased 5,000 Dths per day of fixed price physical natural gas commodities for a five-year term from 2016 through 2020.

In more recent years, natural gas prices have fallen to levels not seen in a decade. Prices have fallen largely due to surging supply caused by shale gas production. The tariffs for IPL’s and WPL’s retail gas customers provide for subsequent adjustments to their rates in the cost of gas sold. As a result, the decreased natural gas prices do not have a material impact on IPL’s or WPL’s gas margins, but result in lower customer bills.


19

Table of Contents


In providing gas commodity service to retail customers, Corporate Services administers a diversified portfolio of transportation and storage contracts on behalf of IPL and WPL. Transportation contracts with NNG, ANR, NGPLThe tariffs for IPL’s and NBPL allow accessWPL’s retail gas customers provide for subsequent adjustments to their rates for the cost of gas supplies located in the U.S. and Canada. Arrangements with FCS provide IPL withsold to these customers. As a result, natural gas delivered directly to its service territory. In prices do not have a material impact on IPL’s or WPL’s gas margins.2015, the maximum daily delivery capacity for IPL and WPL was as follows (in Dths):
 NNG ANR NGPL FCS NBPL Total
IPL170,142
 48,000
 76,673
 5,000
 4,126
 303,941
WPL91,056
 167,467
 
 
 
 258,523

Gas Demand Planning Reserve Margin - IPL and WPL are required to maintain adequate pipeline capacity to ensure they meet their customers’ maximum daily system demand requirements. Both IPL and WPL currently have planning reserve margins of 2%4% and 5%, respectively, above their forecasted maximum daily system demand requirements from November 20152016 through March 2016.

Refer to Note 1(g) for information relating to utility natural gas cost recovery mechanisms and Note 16(b) for discussion of natural gas commitments.2017.

Gas Environmental Matters - Refer to Note 16(e) and “Environmental Matters” in MDA for discussion of gas environmental matters.


Gas Operating Information - Alliant Energy2015 2014 2013 2012 20112016 2015 2014
Operating Revenues (in millions) (a):         
Residential
$215.1
 
$287.5
 
$262.5
 
$224.3
 
$269.7
Commercial120.5
 172.8
 150.3
 124.3
 155.1
Industrial14.3
 23.4
 21.1
 16.7
 24.5
Operating Revenues (in millions):     
Residential (a)
$197.6
 
$215.1
 
$287.5
Commercial (a)109.6
 120.5
 172.8
Industrial (a)15.2
 14.3
 23.4
Retail subtotal(a)349.9
 483.7
 433.9
 365.3
 449.3
322.4
 349.9
 483.7
Transportation/other31.3
 33.8
 30.9
 31.0
 27.4
33.0
 31.3
 33.8
Total
$381.2
 
$517.5
 
$464.8
 
$396.3
 
$476.7

$355.4
 
$381.2
 
$517.5
Gas Sales (000s Dths) (a):         
Gas Sales (000s Dths):     
Residential(a)26,672
 31,718
 29,916
 23,071
 26,891
25,571
 26,672
 31,718
Commercial(a)18,966
 23,301
 21,892
 17,115
 19,271
18,820
 18,966
 23,301
Industrial(a)2,997
 3,710
 3,803
 3,068
 3,848
3,352
 2,997
 3,710
Retail subtotal(a)48,635
 58,729
 55,611
 43,254
 50,010
47,743
 48,635
 58,729
Transportation/other74,162
 64,717
 60,261
 57,532
 52,210
77,485
 74,162
 64,717
Total122,797
 123,446
 115,872
 100,786
 102,220
125,228
 122,797
 123,446
Retail Customers at End of Period (a):              
Residential364,415
 373,319
 370,895
 368,708
 367,497
366,786
 364,415
 373,319
Commercial44,613
 46,180
 45,874
 45,684
 45,667
44,587
 44,613
 46,180
Industrial377
 428
 441
 456
 496
385
 377
 428
Total409,405
 419,927
 417,210
 414,848
 413,660
411,758
 409,405
 419,927
Other Selected Gas Data:              
Heating degree days (b):              
Cedar Rapids, Iowa (IPL) (normal - 6,756)6,300
 7,657
 7,232
 5,901
 6,745
Madison, Wisconsin (WPL) (normal - 7,046)6,667
 7,884
 7,627
 5,964
 6,992
Cedar Rapids, Iowa (IPL) (normal - 6,798)5,933
 6,300
 7,657
Madison, Wisconsin (WPL) (normal - 7,082)6,420
 6,667
 7,884
Revenue per Dth sold to retail customers
$7.19
 
$8.24
 
$7.80
 
$8.45
 
$8.98

$6.75
 
$7.19
 
$8.24
Purchased gas costs per Dth sold to retail customers
$4.40
 
$5.52
 
$4.90
 
$4.94
 
$5.88

$3.99
 
$4.40
 
$5.52
Gas Operating InformationIPL WPL
 2016 2015 2014 2016 2015 2014
Operating Revenues (in millions):           
Residential (a)
$110.6
 
$120.0
 
$162.5
 
$87.0
 
$95.1
 
$125.0
Commercial (a)61.9
 67.9
 96.1
 47.7
 52.6
 76.7
Industrial (a)10.6
 10.5
 17.4
 4.6
 3.8
 6.0
Retail subtotal (a)183.1
 198.4
 276.0
 139.3
 151.5
 207.7
Transportation/other20.9
 18.9
 20.5
 12.1
 12.4
 13.3
Total
$204.0
 
$217.3
 
$296.5
 
$151.4
 
$163.9
 
$221.0
Gas Sales (000s Dths):           
Residential (a)13,788
 14,472
 17,839
 11,783
 12,200
 13,879
Commercial (a)10,143
 10,166
 12,641
 8,677
 8,800
 10,660
Industrial (a)2,299
 2,239
 2,804
 1,053
 758
 906
Retail subtotal (a)26,230
 26,877
 33,284
 21,513
 21,758
 25,445
Transportation/other37,158
 34,129
 31,377
 40,327
 40,033
 33,340
Total63,388
 61,006
 64,661
 61,840
 61,791
 58,785
Retail Customers at End of Period (a):           
Residential199,326
 199,408
 208,240
 167,460
 165,007
 165,079
Commercial24,882
 25,289
 26,530
 19,705
 19,324
 19,650
Industrial212
 217
 244
 173
 160
 184
Total224,420
 224,914
 235,014
 187,338
 184,491
 184,913
Other Selected Gas Data:           
Maximum daily winter peak demand (Dth)262,409
 267,314
 296,190
 203,655
 209,289
 234,837
Heating degree days (b):           
Cedar Rapids, Iowa (IPL) (normal - 6,798)5,933
 6,300
 7,657
 N/A
 N/A
 N/A
Madison, Wisconsin (WPL) (normal - 7,082)N/A
 N/A
 N/A
 6,420
 6,667
 7,884
Revenue per Dth sold to retail customers
$6.98
 
$7.38
 
$8.29
 
$6.48
 
$6.96
 
$8.16
Purchased gas cost per Dth sold to retail customers
$4.21
 
$4.53
 
$5.54
 
$3.72
 
$4.25
 
$5.48
(a)In April 2015, Alliant EnergyIPL sold its natural gas distribution assets in Minnesota. At the date of the sale, Alliant EnergyIPL had approximately 11,000 retail gas retail customers in Minnesota.
(b)Heating degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical heating degree days.


20

Table of Contents


Gas Operating Information - IPL2015 2014 2013 2012 2011
Operating Revenues (in millions) (a):         
Residential
$120.0
 
$162.5
 
$152.8
 
$126.4
 
$155.2
Commercial67.9
 96.1
 85.7
 69.7
 87.8
Industrial10.5
 17.4
 16.1
 12.8
 19.0
Retail subtotal198.4
 276.0
 254.6
 208.9
 262.0
Transportation/other18.9
 20.5
 19.3
 17.8
 14.3
Total
$217.3
 
$296.5
 
$273.9
 
$226.7
 
$276.3
Gas Sales (000s Dths) (a):         
Residential14,472
 17,839
 16,975
 12,955
 15,660
Commercial10,166
 12,641
 12,051
 9,403
 10,677
Industrial2,239
 2,804
 2,931
 2,435
 3,023
Retail subtotal26,877
 33,284
 31,957
 24,793
 29,360
Transportation/other34,129
 31,377
 32,019
 30,992
 27,720
Total61,006
 64,661
 63,976
 55,785
 57,080
Retail Customers at End of Period (a):         
Residential199,408
 208,240
 207,853
 207,121
 206,964
Commercial25,289
 26,530
 26,460
 26,439
 26,455
Industrial217
 244
 250
 260
 296
Total224,914
 235,014
 234,563
 233,820
 233,715
Other Selected Gas Data:         
Maximum daily winter peak demand (Dth)267,314
 296,190
 262,076
 233,456
 264,252
Heating degree days (a):         
Cedar Rapids, Iowa (normal - 6,756)6,300
 7,657
 7,232
 5,901
 6,745
Revenue per Dth sold to retail customers
$7.38
 
$8.29
 
$7.97
 
$8.43
 
$8.92
Purchased gas cost per Dth sold to retail customers
$4.53
 
$5.54
 
$4.96
 
$4.92
 
$5.96
(a)In April 2015, IPL sold its natural gas distribution assets in Minnesota. At the date of the sale, IPL had approximately 11,000 gas retail customers in Minnesota.
(b)Heating degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical heating degree days.
Gas Operating Information - WPL2015 2014 2013 2012 2011
Operating Revenues (in millions):         
Residential
$95.1
 
$125.0
 
$109.7
 
$97.9
 
$114.5
Commercial52.6
 76.7
 64.6
 54.6
 67.3
Industrial3.8
 6.0
 5.0
 3.9
 5.5
Retail subtotal151.5
 207.7
 179.3
 156.4
 187.3
Transportation/other12.4
 13.3
 11.6
 13.2
 13.1
Total
$163.9
 
$221.0
 
$190.9
 
$169.6
 
$200.4
Gas Sales (000s Dths):         
Residential12,200
 13,879
 12,941
 10,116
 11,231
Commercial8,800
 10,660
 9,841
 7,712
 8,594
Industrial758
 906
 872
 633
 825
Retail subtotal21,758
 25,445
 23,654
 18,461
 20,650
Transportation/other40,033
 33,340
 28,242
 26,540
 24,490
Total61,791
 58,785
 51,896
 45,001
 45,140
Retail Customers at End of Period:         
Residential165,007
 165,079
 163,042
 161,587
 160,533
Commercial19,324
 19,650
 19,414
 19,245
 19,212
Industrial160
 184
 191
 196
 200
Total184,491
 184,913
 182,647
 181,028
 179,945
Other Selected Gas Data:         
Maximum daily winter peak demand (Dth)209,289
 234,837
 193,628
 176,207
 177,041
Heating degree days (a):         
Madison, Wisconsin (normal - 7,046)6,667
 7,884
 7,627
 5,964
 6,992
Revenue per Dth sold to retail customers
$6.96
 
$8.16
 
$7.58
 
$8.47
 
$9.07
Purchased gas cost per Dth sold to retail customers
$4.25
 
$5.48
 
$4.83
 
$4.97
 
$5.77
(a)Heating degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical heating degree days.


21

Table of Contents


3) OTHER UTILITY OPERATIONS - STEAM - IPL’s Prairie Creek facility is the primary source of steam for IPL’s two high-pressure steam customers. IPL’s largest high-pressure steam customer accounts for approximately 90% of IPL’s steam revenues. This customer isThese customers are each under contract through 2025 for minimum quantities of annual steam usage, of at least 3.8 million Dths, with certain conditions. IPL’s other high-pressure steam customer is under contract through 2025 for annual steam usage of at least 0.3 million Dths, with certain conditions.

D. INFORMATION RELATING TO NON-REGULATED OPERATIONS

ResourcesAEF manages a portfolio of wholly-owned subsidiaries and additional investments through the following distinct platforms:

Non-regulated Generation - owns Sheboygan Falls, a 347 MW, simple-cycle, natural gas-fired EGU near Sheboygan Falls, Wisconsin, which is leased to WPL for an initial period of 20 years ending in 2025, and the 99 MW Franklin County wind farm in Franklin County, Iowa. In February 2017, FERC issued an order approving the transfer of the Franklin County wind farm from AEF to IPL. Alliant Energy and IPL currently expect to complete this transfer in 2017.

Transportation - includes a short-line railway that provides freight service between Cedar Rapids, Iowa and Iowa City, Iowa; a barge terminal and hauling services on the Mississippi River; and other transfer and storage services.

Other non-regulated investments - includes ATI’s partial ownership interest in WPL Transco,ATI, which currently holds all of Alliant Energy’s ownership interestinvestment in ATC, and several other modest investments.

ITEM 1A. RISK FACTORS

You should carefully consider each of the risks described below relating to Alliant Energy, IPL and WPL, together with all of the other information contained in this combined Annual Report on Form 10-K, before making an investment decision with respect to our securities. If any of the following risks develop into actual events, our business, financial condition or results of operations could be materially and adversely affected and you may lose all or part of your investment.

Our business is significantly impacted by government legislation, regulation and oversight - We are subject to extensive regulation by federal and state regulatory authorities, which significantly influences our operations and our ability to timely recover costs from customers and earn appropriate rates of return. In particular, regulatoryRegulatory authorities with jurisdiction over public utilities, including the IUB, the PSCW the MPUC and FERC, regulate many aspects of our operations. Our operationsWe are also subject to oversight and monitoring by organizations such as the North American Electric Reliability Corporation, the Pipeline and Hazardous Materials Safety Administration, and the Midcontinent Independent System Operator, Inc. Operations impacted by these regulatory authorities and organizationsThe impacts on our operations include: the amount and timing of changes to rates charged to our customers; authorized rates of return of IPL, WPL and ATC; our ability to site and construct new generating facilities and recover such costs, such as the natural gas-fired generating facilities in Marshalltown, Iowa and Beloit, Wisconsin, and future renewable energy projects, projects to utilize our remaining available wind sites, and the amount of costs associated therewith that may be recovered from customers;projects; the installation of environmental controls and the amountrecovery of costs for the construction and maintenance of such equipment that may be recovered from customers;associated costs; our ability to decommission generating facilities and recover thesuch costs incurred to decommission the facilities and the remaining carrying value of suchthese facilities; our ability to site, construct and constructrecover costs for new natural gas pipelines; our ability to recover costs to upgrade our gas transmission and distribution systemsystems to comply with the anticipated Pipeline and Hazardous Materials Safety Administration requirements that have not yet been finalized; the amount of certain sources of energy we must use, such as renewable sources; our ability to purchase generating facilities and recover the amount of costs associated therewith that may be recovered from customers;therewith; our ability to sell utility assets and any conditions placed upon the sale of such assets; the rates paid to transmission operators and how those costs are recovered from customers; our ability to enter into purchased power agreements and recover the amount of costs associated therewith, and how those costs are recovered from customers;therewith; resource adequacy requirements, energy capacity standards, what forms of energy are considered when determining whether we meet those standards, and when new facilities such as IPL’s Marshalltown Generating Station, and WPL’s proposed Riverside Energy Center expansion and IPL’s and WPL’s planned additional wind generation may be fully creditedaccredited with energy capacity; the allocation of expenditures by transmission companies on transmission network upgrades and our ability to recover costs associated therewith from customers;therewith; reliability; safety; the issuance of securities; accounting matters; and transactions between affiliates. Failure to obtain approvals from regulatory authorities and organizations for any of these matters failure to receive approvals in a timely manner, or receiving approvals with uneconomical conditions may adversely impact our ability to achieve our strategic plan, cause us to record an impairment of our assets, and/or have a material adverse impact on our financial condition and results of operations.

These regulatory authorities and organizations are also empowered to impose financial penalties and other sanctions, if we are found to have violated statutes and regulations governing utility operations. While we believe we comply in all material

22

Table of Contents


respects with applicable laws and regulations governing us, state or federal agencies may not agree and may find that we violated a law or regulation. Such a finding could cause fines or penalties or could require usincluding requirements to implement new compliance programs, which could increase our costs of compliance and may adversely impact our financial condition and results of operations.

Our utility financial condition is influenced by how regulatory authorities establish the rates we can charge our customers, our authorized rates of return and common equity levels, and the amount of deferred costs that may be recovered from customers. Our ability to timely obtain rate adjustments to earn authorized rates of return depends upon timely regulatory

action under applicable statutes and regulations, and we cannot assure that rate adjustments will be obtained or authorized rates of return on capital will be earned.guaranteed. In future rate cases, IPL and WPL may not receive an adequate amount of rate relief to recover all costs and earn their authorized rates of return, rates may be reduced, rate refunds may be required, rate adjustments may not be approved on a timely basis, costs may not be otherwise recovered through rates, future rates may be temporarily frozen, (as is the case for IPL’s and WPL’s retail electric base rates and WPL’s gas base rates through the end of 2016) and authorized rates of return on capital may be reduced. As a result, we may experience adverse impacts on our financial condition and results of operations.

We are subject to a wide variety of periodically changing statutes, regulations and rules for energy market operations, grid management and reliability, including and in addition to those described above, which are constantly changing.reliability. State and federal election results may serve as a catalyst for legislative and regulatory changes. Changes in statutes, regulations and rules or the imposition of additional regulations and rules may require us to incur additionalincrease our costs or change our business operations or our business plan,plans, which may have an adverse impact on our financial condition and results of operations.

Provisions of the Wisconsin Utility Holding Company Act limit our ability to invest in non-utility activities. Takeover attempts by potential purchasers who might be willing to pay a premium for our stock are also limited by certain provisions of the Wisconsin Utility Holding Company Act and the delays and conditions that generally result from the requirement that regulatory authorities approve such a transaction. During this time of industry changeChange driven by technology and changingevolving customer expectations, intentional or inadvertent policy changes could impact all of our business model competitiveness and accordingly our financial results.

Large constructionConstruction projects are subject to delays and cost increases that may not be recovered from customers - Our strategic plan includes constructing natural gas-fired generating facilities, constructing renewable generating facilities, installing environmental control equipment at our newer and more efficient coal-fired generating facilities, and making other large-scale improvements to such generating facilities, and large-scale additions and upgrades to our electric and gas distribution systems. These large construction projects are subject to various risks that could cause costs to increase or cause delays in completion. These risks include changes in costs of materials, equipment, commodities, fuel or labor; shortages in materials, equipment and qualified labor; changes to the scope or timing of the projects; general contractors or subcontractors not performing as required under their contracts; the inability to agree to contract terms or disputes in contract terms; poor initial cost estimates; work stoppages; adverse weather conditions; the inability to obtain necessary permits in a timely manner; adverse interpretation or enforcement of permit conditions; changes in applicable laws or regulations; governmental actions; legal action; unforeseen engineering or technology issues; limited access to capital; and other adverse economic conditions. We may not be able to recover all costs for the projects in rates and face increased risk of potential impairment of our project investment if a construction project is not completed or is delayed, or final costs exceed expectations or the costs approved by our regulators, for example, if theIPL’s Marshalltown Generating Station or expansion of wind generation exceeds the respective cost cap approved by the IUB. Inability to recover costs, or inability to complete the project in a timely manner, could adversely impact our financial condition and results of operations.

Demand for energy may decrease - Our results of operations are affected by the demand for energy in our service territories. We could lose customers, and therefore see lower demand for energy, due to economic conditions, customers constructing their own generation facilities, higher costs and rates charged to customers, or loss of service territory or franchises. Communities in our service territory have considered municipalization of both electric orand gas systems, which, if successful, could reduce the number of customers we serve, reducing the demand for our energy. Further, the energy conservation and technological advances that increase energy efficiency may temporarily or permanently reduce the demand for energy products. In addition, state and/or federal regulations require mandatory conservation measures, which would reduce the demand for energy. We may lose wholesale customers in addition to Jo-Carroll Energy, Inc., WPPI Energy and Great Lakes Utilities who have provided us notice of their intent to terminate their wholesale power supply agreements. Continuing technology improvements, tax incentives, regulatory developments and customer concern regarding their environmental and carbon footprint are making customer- and third party-owned generation technologies such as solar systems, wind turbines, microturbines and battery storage systems more cost effective, attractive and feasible for more of our

23

Table of Contents


customers. As more customers utilize their own generation, demand for energy from us may decline and negatively impact the affordability of our services for remaining customers. Future economic growth may not create enough growth for us to replace the lost energy demand from these customers. The loss of sales due to lower demand for energy may cause our rates to increase for remaining customers, as our rates must cover our fixed costs. The loss of customers, the inability to replace those customers with new customers, and the decrease in demand for energy could negatively impact our financial condition and results of operations.

Regional and national economic conditions could have an unfavorable impact on us - Our utility and non-regulated businesses follow the economic cycles of the customers we serve and credit risk of counterparties we do business with. Adverse economic conditions in our service territories can adversely affect the financial condition of our customers and

reduce their demand for electricity and natural gas. Reduced volumes of electricity and natural gas sold, or the inability to collect unpaid bills from our customers fromdue to deterioration in national or regional economic conditions, could adversely impact our financial condition and results of operations.

Our operating results may fluctuate on a seasonal and quarterly basis and can be adversely affected by the impacts of weather - Our electric and gas utilities are seasonal businesses and temperature patterns can have a material impact on their operating performance. Demand for electricity is greater in the summer months associated with higher air conditioning needs. In addition, market prices for electricity generally peak in the summer due to the higher demand. Conversely, demand for natural gas depends significantly upon temperature patterns in winter months due to heavy use in residential and commercial heating. As a result, our overall operating results in the future may fluctuate substantially on a seasonal basis. In addition, we have historically generated less revenues and income when temperatures are warmer in the winter and/or cooler in the summer. Thus, unusually mild winters and/or summers could have an adverse effect on our financial condition and results of operations.

We are subject to numerous environmental laws and regulations, compliance with which could be difficult and costly, and pursuant to which we could incur material liabilities - We are subject to environmental laws and regulations that affect many aspects of our past, present and future operations. The environmental laws and regulations govern air emissions, ambient air quality standards, water quality, cooling water intake structures, wastewater discharges, the generation, transport and disposal of coal combustion residuals and other solid wastes and hazardous substances, clean-up of contaminated sites, and protection of natural resources and wildlife. These laws and regulations require us to obtain and comply with a wide variety of environmental registrations, licenses, permits, inspections and other approvals, which are subject to renewal proceedings and legal challenges. Environmental laws and regulations can also require us to restrict or limit the output of certain facilities or to combust certain fuels, to install environmental controls and implement operational practices at our facilities, manage generation system dispatch within emissions limitations and constraints, clean up spills and correct environmental hazards and other contamination. We may be required to pay all or a portion of the costs to remediate (i.e., clean-up) sites where our past activities, or the activities of certain other parties, caused environmental contamination, including lakebeds, sites of manufactured gas plants operated by our predecessors and sites where asbestos was used in the past. Compliance with these regulations can significantly increase capital spending, operating costs and plant down-times, and can negatively affect the affordability of our services for customers. We cannot predict with certainty the amount and timing of all future expenditures (including the potential or magnitude of any fines or penalties, includingas well as the severity of any restriction on our operations) necessary to comply with, or as a result of liabilities under, these environmental laws and regulations, although we expect the expenditures to be material.

We are subject to Consent Decrees between each of IPL and WPL and various environmental agencies and organizations, which resolved environmental claims related to air emissions at certain coal-fired generating facilities. The Consent Decrees require construction of specific environmental controls equipment, establish emission rate limits, require retirement or fuel switching of certain facilities, and require IPL and WPL to complete certain environmental mitigation projects.

Although we believe we comply in all material respects with currently applicable environmental laws, regulations, and the Consent Decrees, we may be subject to regulatory enforcement action by state or federal agencies should we operate out of compliance. In some instances, complying with certain environmental regulations may not be sufficient to satisfy the obligations of the Consent Decrees or other operating regulations discussed earlier. In addition, citizen groups and private individuals may bring legal action against regulatory agencies or bring citizen enforcement actions against us claiming that the environmental requirements are not being sufficiently enforced by regulatory agencies. For example, the Consent Decrees resulted from allegations originally raised by the Sierra Club that IPL and WPL violated various provisions of the Clean Air Act. If we are unsuccessful defending or settling such litigation by governmental agencies, citizen groups, or individuals, we could be subject to restrictions or prohibitions on operating our generationgenerating facilities, costly upgrades to our generating facilities, payment of damages or fines, requirements to complete other beneficial environmental projects, and litigation costs, all of which could be material. An adverse result in such legal actions could have a material adverse impact

24

Table of Contents


on our financial condition and results of operations. In addition, we may also be subject to third party environmental claims relating to property damage or personal injury that arise from our operations.

We are subject to existing and potential future governmental mandates to provide customers with renewable energy and energy conservation offerings. These mandates are designed in part to mitigate the potential environmental impacts of utility operations. Failure to meet the requirements of these mandates may result in fines or penalties, which could have a material adverse effect on our results of operations. If our regulators do not allow us to recover all or a part of the costs incurred to comply with the mandates, it could have a material adverse effect on our results of operations.


Existing environmental laws or regulations may be revised and new laws or regulations seeking to protect the environment and natural resources may be adopted or become applicable to us. Areas in our service territories that are currently attainment areas under National Ambient Air Quality Standards could be designated as non-attainment areas due to new air monitoring results or more stringent air quality standards. These revised and new laws or regulations and any areas in our service territories designated as non-attainment may require regulation of hazardous air pollutants including mercury, nitrogen oxide, sulfur dioxide, carbon dioxide (CO2) and other greenhouse gases (GHG) emissions, particulate matter, coal ash and other coal combustion products, wastewater discharges, cooling water intake structures, and threatened, endangered or invasive species. Federal and state election results, such as the election of a new President of the U.S., may serve as a catalyst for regulatory changes. Such changes could materially increase our cost of compliance. Our strategic plan was developed in part to comply with expected environmental laws and regulations as we anticipate they will be finally adopted. Revision of existing environmental laws or regulations may cause: (1) state utility commissions to not approve our plans to install environmental controls at our existing generating facilities or not allow us to recover costs of such projects; (2) state utility commissions to not approve costs of emission allowances purchased to comply with environmental regulations that are no longer applicable to our operations; (3) co-owners in our jointly-owned facilities to not agree with our decision to move forward with and the timing of these projects; or (4) our current plans and/or past actions to not meet new requirements. These outcomes could have a material adverse effect on our financial condition and results of operations.

Actions related to global climate change and reducing GHG emissions could negatively impact us - The primary GHG emitted from our utility operations is CO2 from combustion of fossil fuels at our electric generating facilities, which are primarily fossil-fueled facilities. We could incur costs or other obligations to comply with any GHG regulations that are adopted in the future, and could become the target of legal claims or challenges, because generating electricity using fossil fuels emits CO2 and other GHGs. Further, investors may determine that we are too reliant on fossil fuels and not buy shares of our common stock, or sell shares of our common stock, which may cause our stock price to decrease. In 2013, a series of actions were announced to reduce carbon emissions, prepare the U.S. for the impacts of climate change, and lead international efforts to address climate change. In 2015, the U.S. joined the Paris Agreement, a global agreement that commits participating countries to setting nationally determined climate targets to reduce greenhouse gasGHG emissions and establishes a framework for reporting progress towards achieving these goals.

The EPA has proposed and adopted regulations governing GHG emissions that are expected to impact our operations. In October 2015, the EPA published regulations governing GHG emissions from new generating facilities, which would impact IPL’s Marshalltown Generating Station in Iowa and WPL’s proposed Riverside Energy Center expansion in Wisconsin. In October 2015, the EPA published regulations under Clean Air Act Section 111(d) to reduce CO2 emissions from existing fossil-fueled electric generating facilities, otherwise known as the Clean Power Plan. These EPA regulations are based on broad measures to lower CO2 emissions, which could impact the dispatch of existing fossil-fueled generating facilities and the fuel mix used to generate electricity, and require other actions in order to achieve CO2 emission reduction goals including fossil-fueled generating unit heat rate improvements, expansion of renewable energy resources and demand-side energy efficiency measures. The EPA’s GHG regulations are currently subject to litigation, and the new presidential administration may change or repeal the regulations, making the final form of the GHG emissions regulations uncertain. As a result of this uncertainty, strategies to comply with the regulations, including available control technologies or other allowed compliance measures, are unpredictable and we cannot provide any assurance regarding the potential impacts these regulations would have on our operations. The impacts of these regulations could have a material adverse impact on our financial condition and results of operations.

Threats of terrorism and catastrophic events that could result from terrorism may impact our operations in unpredictable ways - We are subject to direct and indirect effects of terrorist threats and activities. Generation, transmission and distribution facilities, in general, have been identified as potential targets of physical or cyber attacks. Physical attacks on transmission and distribution facilities that appeared to be terrorist-style attacks have occurred in the recent past.occurred. The risks posed by such attacks could include, among other things, the inability to generate, purchase or distribute electric energy or obtain fuel sources, the increased cost of security and insurance, the disruption of, volatility in, or other effects on capital markets, and a decline in the economy within our service territories, all of which could adversely impact our financial condition and results of operations. In addition, the cost of repairing damage to our facilities and infrastructure due to acts of

25

Table of Contents


terrorism, and the loss of revenue if such events prevent us from providing utility service to our customers, could adversely impact our financial condition and results of operations.

A cyber attack may disrupt our operations or lead to a loss or misuse of confidential and proprietary information or potential liability - We operate in an industry that requires the continuous use and operation of sophisticated information technology systems and network infrastructure. Cyber attacks targeting our electronic control systems used at our generating facilities and for electric and gas distribution systems, such as recently allegedly occurred in Ukraine, could result in a full or partial disruption of our electric and/or gas operations. Any disruption of these operations could result in a loss of service to

customers and a significant decrease in revenues, as well as significant expense to repair system damage and remedy security breaches. We have instituted certain safeguards to protect our operational systems and information technology assets. FERC, through the North American Electric Reliability Corporation, requires certain safeguards be implemented to deter cyber attacks. The safeguards we haveassets, which may not always be effective due to the evolving nature of cyber attacks and cyber security. We cannot guarantee that such protections will be completely successful in the event of a cyber attack. If the technology systems were to fail or be breached by a cyber attack or a computer virus, and not be recovered in a timely fashion, we may be unable to fulfill critical business functions and confidential data could be compromised, adversely impacting our financial condition and results of operation.

In addition, in the ordinary course of business, we collect and retain sensitive information including personal information about our customers, shareowners and employees. In some cases, we outsource administration of certain functions to vendors that could be targets of cyber attacks. For example, we outsource administration of our employee health insurance to Anthem. Anthem was the target of a cyber attack in 2014. Any theft, loss and/or fraudulent use of customer, shareowner, employee or proprietary data as a result of a cyber attack could subject us to significant litigation, liability and costs, as well as adversely impact our reputation with customers and regulators, among others.

We may not be able to fully recover costs related to commodity prices - The prices that we may obtain for electric energysales may not compensate for changes in delivered coal, natural gas, coal or electric energy spot-market costs, or changes in the relationship between such costs and the market prices of electric energy. As a result, we may be unable to pass on the changes in costs to our customers, especially at WPL where we do not have a retail electric automatic fuel cost adjustment clause, which would allow for more consistent and timely cost recovery.

We are exposed to changes in the price and availability of natural gas. In addition to supplying natural gas to our natural gas customers, we also have responsibility to supply natural gas to certain natural gas-fired electric generating facilities that we own. Our strategic plan includes increasing our reliance on natural-gas fired electric generating facilities, particularly the new facilities planned in Marshalltown, Iowa and Beloit, Wisconsin, and coal-fired facilities expected to switch from coal because a large portionto natural gas as the primary fuel type. This increases our exposure to market prices of natural gas, which have remained low recently, but have been volatile in the past. We have natural gas supply contracts in place, which are either fixed price in nature or market-based. As some of the electricity generated bycontracts are market-based, and some of the contracts are short-term, we may not be able to purchase natural gas with terms and prices as favorable as the current contracts. Natural gas prices may increase due to disruption of production or transportation of natural gas, failure to drill new wells and reduced supply generally, or regulatory developments that increase the cost of natural gas extraction methods, including fracking. Price increases may cause us is fromto incur additional costs to purchase natural gas, which may not be fully recovered through rates and may adversely impact our coal-fired generating facilities.financial condition and results of operations.

We are exposed to changes in the price and availability of coal. We have contracts of varying durations for the supply and transportation of coal for most of our generating capability, but as these contracts end or otherwise are not honored, we may not be able to purchase coal on terms as favorable as the current contracts. Further, we currently rely on coal primarily from the Powder River Basin in Wyoming and any disruption of coal production in, or transportation from, that region, including due to bankruptcy of coal mining companies, may cause us to incur additional costs which may not be fully recovered through rates. Increases in prices and costs due to disruptions that are not fully and timely recovered in rates may adversely affect our financial condition and results of operations.

We are exposed to changes in the price and availability of natural gas. In addition to supplying natural gas to our natural gas customers, we also have responsibility to supply natural gas to certain natural gas-fired electric generating facilities that we own. Our strategic plan includes increasing our reliance on natural-gas fired electric generating facilities, particularly the new facilities planned in Marshalltown, Iowa and Beloit, Wisconsin, and coal-fired facilities expected to switch from coal to natural gas as the primary fuel type. This increases our exposure to market prices of natural gas, which have remained low recently, but have been volatile in the past. We have natural gas supply contracts in place, which are generally short-term in duration. The natural gas supply commitments are either fixed price in nature or market-based. As some of the contracts are market-based, and some of the contracts are short-term, we may not be able to purchase natural gas with terms and prices as favorable as the current contracts. Natural gas prices may increase due to disruption of production or transportation of natural gas, failure to drill new wells and reduced supply generally, or regulatory developments that increase the cost of natural gas extraction methods, including fracking. Price increases may cause us to incur additional costs to purchase natural gas, which may not be fully recovered through rates and may adversely impact our financial condition and results of operations.

We may not be able to fully recover higher transmission costs related to changing transmission reliability requirements - Both IPL and WPL pay for the use of the interstate electric transmission system that they do not own or control. Rates charged to IPL and WPL for such transmission service are regulated by FERC. FERC also regulates transmission owners’ operations in order to support the reliability of the transmission network. Changes are occurring in the transmission network, which are necessary to, among other things, accommodate renewable energy and the decommissioning

26

Table of Contents


of older coal-fired generating facilities and prepare for potential compliance with future GHG regulations. These changes include socializing certain transmission network upgrades and system support resource payments, which may increase transmission costs to IPL and WPL. The prices that IPL and WPL charge for electric energy may not totally compensate for the increase in such transmission costs. We may not be able to fully or timely pass on the increases in such transmission costs to our customers. In addition, if the transmission cost rider at IPL isor escrow accounting treatment of transmission costs at WPL are amended or removed, we may not be able to fully recover IPL’s full transmission costs. Inability to fully recover transmission costs in a timely manner may adversely impact our financial condition and results of operations.

We are dependent on the capital markets and could be negatively impacted by disruptions in the capital markets - Successful implementation of our strategic plan and other long-term business strategies is dependent upon our ability to access the capital markets under competitive terms and rates. We have forecasted capital expenditures of approximately $5$6 billion over the next four years. Disruption, uncertainty or volatility in those markets could increase our cost of capital or limit the availability of capital. Disruptions

could be caused by Federal Reserve policies and actions, currency concerns, economic downturn or uncertainty, monetary policies, a negative view of the utility industry or our company, failures of financial institutions, U.S. debt management concerns, U.S. debt limit and budget debates including government shutdowns, European and worldwide sovereign debt concerns, other global or geopolitical events, or other factors. Any disruptions could adversely impact our ability to implement our strategic plan.

We rely on our strong credit ratings to access the credit markets. If our credit ratings are downgraded for any reason, we could pay higher interest rates in future financings, the pool of potential lenders could be reduced, borrowing costs under existing credit facilities could increase, our access to the commercial paper market could be limited, or we could be required to provide additional credit assurance, including cash collateral, to contract counterparties. If our access to capital were to become significantly constrained or costs of capital increased significantly due to lowered credit ratings, prevailing industry conditions, regulatory constraints, the volatility of the capital markets or other factors, our financial condition and results of operations could be adversely affected.

We are subject to employee workforce factors that could affect our businesses - We are subject to employee workforce factors, including loss or retirement of key personnel, and the availability of, and our ability to recruit qualified personnel, which could affect our businesses and our financial condition and results of operations. Further, the majorityoperate in an industry that requires many of our key personnel are eligibleemployees to retire andpossess specialized technical skills. Many of our workforce includes a significant number of employees whowith these specialized skills are nearing retirement. We need employees with specialized and technical skills in order to achieve our strategic plan. It may be difficult to hire and retain current employees with these specializedreplacements due to labor market conditions, the length of time needed to acquire the skills, especially as they near retirement, and it may be difficult to find new employees with the necessary skills.general competition for talent. We are also subject to collective bargaining agreements with approximately 2,3002,200 employees. Any work stoppage experienced in connectionsconnection with negotiations of collective bargaining agreements could adversely affect our financial condition and results of operations as well as our ability to implement our strategic plan.

We face risks associated with operating electric and natural gas infrastructure - The operation of electric generating facilities involves many risks, including start-up risks, breakdown or failure of equipment, failure of generating facilities including wind turbines, the dependence on a specific fuel source, including the supply and transportation of fuel, the risk of performance below expected or contracted levels of output or efficiency, employee safety, operator error and compliance with mandatory reliability standards. The operation of our energy delivery infrastructure involves many risks, including breakdown or failure of equipment and fires developing from our power lines. In addition, the North American transmission grid is highly interconnected and, in extraordinary circumstances, disruptions at particular points within the grid could cause an extensive power outage in our delivery systems. Increased utilization of customer- and third party-owned generation technologies could disrupt the reliability and balance of the electricity grid. Further, the transmission system in our utilities’ service territories is constrained, limiting the ability to transmit electric energy within our service territories. The transmission constraints could result in an inability to deliver energy from generating facilities, particularly wind generating facilities, to the national grid, or to access lower cost sources of electric energy. We also have obligations to provide electric service under regulatory requirements and contractual commitments. Failure to meet our service obligations could adversely impact our financial condition and results of operations.

The operation of our gas transmission and distribution infrastructure also involves many risks, such as leaks, explosions, mechanical problems and employee safety, which could cause substantial financial losses. These risks could result in loss of human life, particularly in highly populated areas, significant damage to property, environmental emissions, impairment of our operations and substantial losses to us. We are also responsible for compliance with new and changing mandatory reliability and safety standards, including anticipated new regulations under the Pipeline and Hazardous Materials Safety Administration. Our infrastructure is aging, which could impact safety and compliance with possible new regulations. Failure to meet these standards could result in substantial fines. Electric and gas infrastructure operations could be impacted

27

Table of Contents


by future compliance with the Clean Power Plan. We also have obligations to provide service under regulatory requirements and contractual commitments. Failure to meet our service obligations could adversely impact our financial condition and results of operations.

We face risks associated with integration of a new customer billing and information system - We recently implemented a new customer billing and information system for IPL and WPL.WPL, which was completed in 2016. This new customer billing and information system houses all customer records, and processes metering, billing and payment transactions. Integrating a new customer system is complex, costly and time consuming. If we do not successfully integrate the system and new related processes or if it doesdo not operate as intended, it could result in substantial disruptions to our business, including customer billings and collections, which could have a material adverse effect on our financial condition and results of operations.

Storms or other natural disasters may impact our operations in unpredictable ways - Storms and other natural disasters, including events such as floods, tornadoes, blizzards, ice storms, droughts, solar flares or pandemics may adversely impact our ability to generate, purchase or distribute electric energy or obtain fuel sources.or other critical supplies. We incur costs for preventive measures to replace, reinforce and modernize operating infrastructure that will provide for further grid resiliency.

In addition, we could incur large costs to repair damage to our generating facilities and infrastructure, or costs related to environmental remediation, due to storms or natural disasters. Severe storms may also impact our natural gas infrastructure. The restoration costs may not be fully covered by insurance policies. Some costs may not be recovered in rates or through insurance, including damaged assets, or there could be significant delays in cost recovery. Storms and natural disasters may prevent our customers from being able to operate or may significantly slow growth or cause a decline in the economy within our service territories. The reduced demand for energy could cause lower sales and revenues, which may not be replaced or recovered in rates. Any of these items could adversely affect our financial condition and results of operations.

We may incur material post-closing adjustments related to past asset and business divestitures - We previouslyhave sold certain non-regulated subsidiaries such as RMT, Inc. (RMT) and Whiting Petroleum Corporation (Whiting Petroleum), as well as regulated assets such as our recent sales of our Minnesota electric and natural gas distribution assets. We may continue to incur liabilities relating to our previous ownership of, or the transactions pursuant to which we disposed of, these subsidiaries and assets. For example, Alliant Energy continues to guarantee RMT’s performance obligations related to certain of RMT’s projects that were commenced prior to Alliant Energy’s sale of RMT. In addition, Alliant Energy Resources, LLC, as the successor to a predecessor entity that owned Whiting Petroleum and a wholly-owned subsidiary of Alliant Energy Finance, LLC, continues to guarantee the partnership obligations of an affiliate of Whiting Petroleum under general partnership agreements in the oil and gas industry, including liabilities with respect to the future abandonment of certain platforms off the coast of California and related onshore plant and equipment owned by the partnerships. Any potential liability under these guarantees may depend on a number of factors outside of our control, including the financial condition of RMT, Whiting Petroleum and/or their respective assignees. Any required payments on retained liabilities, guarantees or indemnification obligations with respect to RMT, Whiting Petroleum, the sales of our Minnesota electric and natural gas distribution assets, or other future asset or business divestitures, could have an adverse effect on our financial condition and results of operations.

We face risks related to non-regulated operations - We rely on our non-regulated operations for a portion of our earnings. If our non-regulated investments do not perform at expected levels, we could experience diminished earnings. Failure of our Transportation business to perform as expected could result in a material adverse impact on our financial condition and results of operations. In addition, Franklin County Wind LLC is a non-regulated subsidiary that operates a non-regulated 99 MW wind farm in Franklin County, Iowa, referred to as the Franklin County wind farm. The Franklin County wind farm’s electrical output is currently being sold into the general market at prevailing market prices. Additional decreases in forward electricity prices, or if there is reduced expected generation output from the facility if transmission upgrades in the region are not completed or do not result in expected decreased congestion, could trigger an impairment in the future. Such impairments could adversely impact our financial condition and results of operations. In addition, a variety of operating parameters, including adverse weather conditions, transmission constraints and breakdown or failure of equipment, could result in a material adverse impact on our financial condition and results of operations.

We are subject to limitations on our ability to pay dividends - Alliant Energy is a holding company with no significant operations of its own. Accordingly, the primary sources of funds for Alliant Energy to pay dividends to its shareowners are dividends and distributions from its subsidiaries, primarily its utility subsidiaries. Our subsidiaries are separate and distinct legal entities and have no obligation to pay any amounts to us, whether by dividends, distributions, loans or other payments. The ability of our subsidiaries to pay dividends or make distributions to us and, accordingly, our ability to pay dividends on Alliant Energy common stock will depend on regulatory limitations, earnings, cash flows, capital requirements and general financial condition of our subsidiaries. Our utilities have dividend payment restrictions based on the terms of any outstanding preferred stock and regulatory limitations applicable to them. If we do not receive adequate dividends and

28

Table of Contents


distributions from our subsidiaries, then we may not be able to make, or may have to reduce, dividend payments on Alliant Energy common stock.

Changes to certain tax elections, tax regulations and future taxable income could negatively impact our financial condition and results of operations - We have significantly reduced our federal and state income tax obligations over the past few years through tax planning strategies and the extension of bonus depreciation deductions for certain expenditures for property. These tax planning strategies and extensions of bonus depreciation deductions have generated large annual taxable losses and tax credits over the past few years that have resulted in significant federal net operating losses and tax credit carryforwards. We plan to utilize these net operating losses and tax credit carryforwards in the future to reduce our income tax obligations. If we cannot generate enough taxable income in the future to utilize all of the net operating losses and tax credit carryforwards before they expire due to lower than expected financial performance or changes to tax regulations, we may incur material charges to earnings. If the IRS does not agree with the deductions resulting from our tax planning strategies or our position on the qualification of production tax credits from planned and potential wind generating facilities, our financial condition and results of operations may be adversely impacted.

Our utility business currently operates wind generating facilities, which generate material production tax credits for us to use to reduce our federal tax obligations. The amount of production tax credits we earn is dependent on the level of electricity output generated by our wind farms and the applicable tax credit rate. A variety of operating and economic parameters, including significant transmission constraints, adverse weather conditions and breakdown or failure of equipment, could significantly reduce the production tax credits generated by our wind farms resulting in a material adverse impact on our financial condition and results of operations.

In addition, we have tax benefit riders in place in Iowa that provide billing credits to our customers. We have made certain assumptions regarding the timing of the tax benefit riders for accounting purposes. If those assumptions are not accurate, our results of operations and financial condition may be adversely impacted.

Lastly,
Also, if corporate tax rates or policies are changed with future federal or state legislation, we may be required to take material charges against earnings. For example, the new presidential administration has called for substantial change to fiscal and tax policies, which may include comprehensive tax reform. We are currently unable to determine what impacts these changes will have on our future financial condition or results of operations, including related impacts to IPL’s and WPL’s retail and wholesale electric and gas rates charged to their customers. However, it is possible that these changes could reduce corporate income tax rates, alter tax depreciation lives and methods, disallow deductions for net interest expense, and impede our ability to fully utilize our net operating loss and credit carryforwards.

Finally, FERC regulates utility income tax policies, including partnership tax policies, which impact our investment in ATC. FERC is currently investigating these income tax policies in addition to rate of return policies as a result of a recent court decision. The results of this investigation may lead to changes in FERC’s income tax policies, which would impact partnership entities, particularly our investment in ATC. We are currently unable to determine what impacts these potential changes will have on our future financial condition or results of operations, however, it is possible that a change could reduce Alliant Energy’s equity earnings and distributions from ATC.

Our pension and other postretirement benefits plans are subject to investment and interest rate risk that could negatively impact our financial condition - We have pension and other postretirement benefits plans that provide benefits to many of our employees and retirees. Costs of providing benefits and related funding requirements of these plans are subject to changes in the market value of the assets that fund the plans. The funded status of the plans and the related costs reflected in our financial statements are affected by various factors, which are subject to an inherent degree of uncertainty, including economic conditions, financial market performance, interest rates, life expectancies and demographics. Recessions and volatility in the domestic and international financial markets have negatively affected the asset values of our pension plans at various times in the past. Poor investment returns or lower interest rates may necessitate accelerated funding of the plans in the future to meet minimum federal government requirements. Downward pressure on the asset values of our pension plans may require us to fund obligations earlier than originally planned,requirements, which could have an adverse impact on our financial condition and results of operations.

We face risks related to non-regulated operations - We rely on our non-regulated operations for a portion of our earnings. If our non-regulated investments do not perform at expected levels, we could experience a material adverse impact on our financial condition and results of operations.

Energy industry changes could have a negative effect on our businesses - We operate in a highly regulated business environment. The advent of new and unregulated markets has the potential to significantly impact our financial condition and results of operations. The evolution of the wholesale and transmission markets has the potential to significantly increase costs of transmission, costs associated with inefficient generation dispatching, costs of participation in the new markets and costs stemming from estimated payment settlements. Competitive pressures, including advances in technology that reduce the costs of alternative methods of producing electric energy to a level that is competitive with that of current electric production methods, could result in our utilities losing market share and customers and incurring stranded costs (i.e., assets and other costs rendered unrecoverable through customer rates), which could be borne by our shareowners. Further, competitors may not be subject to the same operating, regulatory and financial requirements that we are, potentially causing a substantial competitive disadvantage for us. Changes in technology could also alter the channels through which electric customers buy or utilize power, which could reduce the revenues or increase the expenses of our utility companies. Increased competition from any restructuring efforts in our primary retail electric service territories may have a significant adverse impact on our financial condition and results of operations.

ITEM 1B. UNRESOLVED STAFF COMMENTS

None.


29

Table of Contents


ITEM 2. PROPERTIES
Alliant Energy - As a holding company, Alliant Energy doesn’t directly own any significant properties other than the stock of its subsidiaries. The principal properties of those subsidiaries are as follows:


IPL and WPL
Electric - At December 31, 20152016, IPL’s and WPL’s EGUs by primary fuel type were as follows:
      Primary Nameplate Generating
    In-service Dispatch Capacity Capacity
Name of EGU Location Dates Type (a) in MW in MW (b)
Ottumwa Generating Station (Unit 1) (c) Ottumwa, IA 1981 BL 348
 324
Lansing Generating Station (Unit 4) Lansing, IA 1977 BL 275
 235
Prairie Creek Generating Station (Units 1,3,4) (d) Cedar Rapids, IA 1958-1997 BL 213
 148
Burlington Generating Station (Unit 1) (d) Burlington, IA 1968 BL 212
 197
George Neal Generating Station (Unit 4) (e) Sioux City, IA 1979 BL 179
 155
George Neal Generating Station (Unit 3) (f) Sioux City, IA 1975 BL 164
 134
Louisa Generating Station (Unit 1) (g) Louisa, IA 1983 BL 32
 29
Total Coal       1,423
 1,222
           
Emery Generating Station (Units 1-3) Mason City, IA 2004 IN 603
 516
M.L. Kapp Generating Station (Unit 2) (h) Clinton, IA 1967 IN 218
 94
Sutherland Generating Station (Units 1,3) (d) Marshalltown, IA 1955-1961 IN 119
 87
Fox Lake Generating Station (Units 1,3) (d) Sherburn, MN 1950-1962 IN 93
 89
Burlington Combustion Turbines (Units 1-4) (d) Burlington, IA 1994-1996 PK 79
 52
Dubuque Generating Station (Units 3-4) (d) Dubuque, IA 1952-1959 IN 66
 58
Grinnell Combustion Turbines (Units 1-2) (d) Grinnell, IA 1990-1991 PK 48
 40
Red Cedar Combustion Turbine (Unit 1) Cedar Rapids, IA 1996 PK 23
 6
Total Gas       1,249
 942
           
Marshalltown Combustion Turbines (Units 1-3) Marshalltown, IA 1978 PK 189
 139
Lime Creek Combustion Turbines (Units 1-2) Mason City, IA 1991 PK 90
 69
Centerville Combustion Turbines (Units 1-2) (d) Centerville, IA 1990 PK 54
 47
Diesel Stations (5 Units) (d) Iowa 1963-1966 PK 10
 5
Total Oil       343
 260
           
Whispering Willow - East (121 Units) (i) Franklin Co., IA 2009 IN 200
 32
Total Wind       200
 32
           
Total capacity       3,215
 2,456
IPL Expected   Primary Nameplate Generating
  Retirement or In-service Dispatch Capacity Capacity
Name of EGU and Location Fuel Switch (a) Dates Type (b) in MW in MW (c)
Emery Generating Station (Units 1-3); Mason City, IA N/A 2004 IN 603
 527
M.L. Kapp Generating Station (Unit 2); Clinton, IA N/A 1967 IN 218
 92
Sutherland Generating Station (Units 1,3); Marshalltown, IA Retire by 6/30/17 (d) 1955-1961 IN 119
 99
Fox Lake Generating Station (Units 1,3); Sherburn, MN Retire by 12/31/17 1950-1962 IN 93
 83
Burlington Combustion Turbines (Units 1-4); Burlington, IA Retire by 12/31/17 1994-1996 PK 79
 51
Dubuque Generating Station (Units 3-4); Dubuque, IA Retire by 6/30/17 (d) 1952-1959 IN 66
 59
Grinnell Combustion Turbines (Units 1-2); Grinnell, IA Retire by 12/31/17 1990-1991 PK 48
 36
Red Cedar Combustion Turbine (Unit 1); Cedar Rapids, IA Retire by 12/31/18 1996 PK 23
 11
Total Gas       1,249
 958
           
Ottumwa Generating Station (Unit 1); Ottumwa, IA (e) N/A 1981 BL 348
 326
Lansing Generating Station (Unit 4); Lansing, IA N/A 1977 BL 275
 235
Prairie Creek Generating Station (Units 1,3,4); Cedar Rapids, IA Units 1 and 3 - fuel switch or retire by 12/31/25; Unit 4 - fuel switch by 12/31/17 (d) 1958-1997 BL 213
 147
Burlington Generating Station (Unit 1); Burlington, IA Fuel switch by 12/31/21 (d) 1968 BL 212
 203
George Neal Generating Station (Unit 4); Sioux City, IA (f) N/A 1979 BL 179
 160
George Neal Generating Station (Unit 3); Sioux City, IA (g) N/A 1975 BL 164
 131
Louisa Generating Station (Unit 1); Louisa, IA (h) N/A 1983 BL 32
 29
Total Coal       1,423
 1,231
           
Marshalltown Combustion Turbines (Units 1-3); Marshalltown, IA Fuel switch by 12/31/17 1978 PK 189
 139
Lime Creek Combustion Turbines (Units 1-2); Mason City, IA N/A 1991 PK 90
 69
Centerville Combustion Turbines (Units 1-2); Centerville, IA Retire by 12/31/17 1990 PK 54
 47
Diesel Stations (5 Units); Iowa (i) Retire by 12/31/17 1963-1966 PK 10
 
Total Oil       343
 255
           
Whispering Willow - East (121 Units); Franklin Co., IA N/A 2009 IN 200
 33
Total Wind       200
 33
           
Total capacity       3,215
 2,477
WPL     Primary Nameplate Generating
    In-service Dispatch Capacity Capacity
Name of EGU and Location Expected Retirement (a) Dates Type (b) in MW in MW (c)
Riverside Energy Center (Units 1-3); Beloit, WI N/A 2004 IN 675
 539
Neenah Energy Facility (Units 1-2); Neenah, WI N/A 2000 PK 371
 283
South Fond du Lac Combustion Turbines (2 Units); Fond du Lac, WI (j) N/A 1994 PK 191
 146
Rock River Combustion Turbines (Units 3-6); Beloit, WI Retire by 12/31/20 1967-1972 PK 169
 122
Sheepskin Combustion Turbine (Unit 1); Edgerton, WI Retire by 12/31/20 1971 PK 42
 35
Total Gas       1,448
 1,125
           
Columbia Energy Center (Units 1-2); Portage, WI (k) N/A 1975-1978 BL 514
 495
Edgewater Generating Station (Unit 5); Sheboygan, WI N/A 1985 BL 414
 399
Edgewater Generating Station (Unit 4); Sheboygan, WI (l) Retire by 12/31/18 (d) 1969 BL 239
 191
Total Coal       1,167
 1,085
           
Bent Tree (122 Units); Freeborn Co., MN N/A 2010-2011 IN 201
 32
Cedar Ridge (41 Units); Fond du Lac Co., WI N/A 2008 IN 68
 9
Total Wind       269
 41
           
Prairie du Sac Hydro Plant (8 Units); Prairie due Sac, WI N/A 1914-1940 IN 32
 12
Kilbourn Hydro Plant (4 Units); Wisconsin Dells, WI N/A 1926-1939 IN 10
 6
Total Hydro       42
 18
           
Total capacity       2,926
 2,269


(a)Expected dates for the retirement and fuel switching of these EGUs are subject to change depending on operational, regulatory, market and other factors. The potential retirement of other EGUs within the generation fleet continues to be evaluated. IPL and WPL are working with MISO, state regulatory commissions and other regulatory agencies, as required, to determine the final timing of certain of these actions. Final MISO studies could indicate that the retirement of an individual EGU may result in reliability issues and that transmission network upgrades for system reliability are necessary to enable such retirement. Under the current MISO tariff, the specific timing for the retirement of these EGUs could depend on the timing of the required transmission network upgrades as well as various operational, market and other factors.
(b)Base load EGUs (BL) are designed for nearly continuous operation at or near full capacity to provide the system base load. Intermediate EGUs (IN) follow system load changes with frequent starts and curtailments of output during low demand. Peak load EGUs (PK) are generally low efficiency, quick response units that run primarily when there is high demand.
(b)(c)
Based on the accredited generating capacity of the EGUs included in MISO’s resource adequacy process for the planning period from June 20152016 through May 20162017.
(c)(d)
Actions and plans for retirement or fuel switch meet requirements specified in IPL’s and WPL’s respective Consent Decree, which are discussed in Note 16(e).
(e)Represents IPL’s 48% ownership interest in this 726 MW (nameplate capacity) / 675680 MW (generating capacity) EGU, which is operated by IPL.
(d)
Refer to “Strategic Overview” in MDA for discussion of EGUs that may be retired or changed from coal-fired to an alternative fuel source in the next few years.
(e)(f)Represents IPL’s 25.695% ownership interest in this 696 MW (nameplate capacity) / 602 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
(f)Represents IPL’s 28% ownership interest in this 584 MW (nameplate capacity) / 477622 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
(g)Represents IPL’s 4%28% ownership interest in this 812584 MW (nameplate capacity) / 728466 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
(h)The fuel type at M.L. Kapp Unit 2 was switched from coal to natural gas in 2015.
(i)Generating capacity represents 16% of the capacity of this wind farm based upon the MISO resource adequacy process, which is determined separately for each wind farm, during the planning period from June 2015 through May 2016.

30

Table of Contents



At December 31, 2015, IPL owned approximately 17,567 miles of overhead electric distribution line and 2,872 miles of underground electric distribution cable, as well as 573 substation distribution transformers, substantially all of which are located in Iowa.

Gas - IPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related transmission and distribution equipment. At December 31, 2015, IPL’s gas distribution facilities included approximately 5,119 miles of gas mains located in Iowa.

Other - IPL’s other property consists primarily of steam service assets, operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment.

WPL
Electric - At December 31, 2015, WPL’s EGUs by primary fuel type were as follows:
      Primary Nameplate Generating
    In-service Dispatch Capacity Capacity
Name of EGU Location Dates Type (a) in MW in MW (b)
Columbia Energy Center (Units 1-2) (c) Portage, WI 1975-1978 BL 514
 499
Edgewater Generating Station (Unit 5) Sheboygan, WI 1985 BL 414
 413
Edgewater Generating Station (Unit 4) (d) (e) Sheboygan, WI 1969 BL 239
 204
Total Coal       1,167
 1,116
           
Riverside Energy Center (Units 1-3) Beloit, WI 2004 IN 675
 539
Neenah Energy Facility (Units 1-2) Neenah, WI 2000 PK 371
 275
South Fond du Lac Combustion Turbines (2 Units) (f) Fond du Lac, WI 1994 PK 191
 146
Rock River Combustion Turbines (Units 3-6) (e) Beloit, WI 1967-1972 PK 169
 108
Sheepskin Combustion Turbine (Unit 1) (e) Edgerton, WI 1971 PK 42
 36
Total Gas       1,448
 1,104
           
Bent Tree (122 Units) (g) Freeborn Co., MN 2010-2011 IN 201
 29
Cedar Ridge (41 Units) (h) Fond du Lac Co., WI 2008 IN 68
 8
Total Wind       269
 37
           
Prairie du Sac Hydro Plant (8 Units) Prairie du Sac, WI 1914-1940 IN 31
 14
Kilbourn Hydro Plant (4 Units) Wisconsin Dells, WI 1926-1939 IN 10
 6
Total Hydro       41
 20
           
Total capacity       2,925
 2,277

(a)BL are designed for nearly continuous operation at or near full capacity to provide the system base load. IN follow system load changes with frequent starts and curtailments of output during low demand. PK are generally low efficiency, quick response units that run primarily when there is high demand.
(b)Based on the accredited generating capacity of the EGUs included in MISO’s resource adequacy process for the planning period from June 2015 through May 2016.
(c)Represents WPL’s 46.2%IPL’s 4% ownership interest in this 1,112812 MW (nameplate capacity) / 1,080725 MW (generating capacity) EGU, which is operated by WPL.MidAmerican Energy Company.
(d)(i)Represents WPL’s 68.2% ownership interest in this 351 MW (nameplate capacity) / 299 MW (generating capacity) EGU, which is operated by WPL.These EGUs did not receive any accredited generating capacity for the planning period from June 2016 through May 2017.
(e)
Refer to “Strategic Overview” in MDA for discussion of EGUs that may be retired in the next few years.
(f)(j)Represents Units 2 and 3, which WPL owns. WPL also operates, but does not own, South Fond du Lac Combustion Turbines Units 1 and 4.
(g)(k)Generating capacity represents 14% of the capacity ofRepresents WPL’s 46.2% ownership interest in this wind farm based upon the MISO resource adequacy process,1,112 MW (nameplate capacity) / 1,072 MW (generating capacity) EGU, which is determined separately for each wind farm, during the planning period from June 2015 through May 2016.operated by WPL.
(h)(l)
Generating capacity represents 12% of the capacity ofRepresents WPL’s 68.2% ownership interest in this wind farm based upon the MISO resource adequacy process,351 MW (nameplate capacity) / 280 MW (generating capacity) EGU, which is determined separately for each wind farm, during the planning period from June 2015 through May 2016.
operated by WPL.


31

Table of Contents


At December 31, 2015, WPL2016, IPL owned approximately 16,28117,485 miles of overhead electric distribution line and 5,3152,977 miles of underground electric distribution cable, as well as 564 substation distribution transformers, substantially all of which are located in Iowa. At December 31, 2016, WPL owned approximately 16,222 miles of overhead electric distribution line and 5,481 miles of underground electric distribution cable, as well as 302 substation distribution transformers, substantially all of which are located in Wisconsin. Refer to Notes 2 and 3 for discussion of Nelson Dewey Units 1 and 2 and Edgewater Unit 3, which were retired in 2015.

Gas - IPL’s and WPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related transmission and distribution equipment. At December 31, 20152016, WPL’sIPL’s gas distribution facilities included approximately 4,3075,116 miles of gas mains located in Iowa and WPL’s included approximately 4,430 miles of gas mains located in Wisconsin.

Other - Refer to Note 10(b) for information regarding WPL’s lease of Sheboygan Falls from Resources’ Non-regulated Generation business.IPL’s and WPL’s other property consists primarily of operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment. IPL’s other property also includes steam service assets. Refer to Note 10(b) for information regarding WPL’s lease of Sheboygan Falls from AEF’s Non-regulated Generation business.

ResourcesAEF - Resources’AEF’s principal properties included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 20152016 were as follows:

Non-regulated Generation - Includes Sheboygan Falls, a 347 MW, simple-cycle, natural gas-fired facility near Sheboygan Falls, Wisconsin that was placed in service in 2005 and is leased to WPL, and the 99 MW (60 Units) Franklin County wind farm in Franklin County, Iowa that was placed in service in 2012. Sheboygan Falls wasand Franklin County wind farm were accredited with 282281 MW and 17 MW, respectively, of generating capacity for MISO’s resource adequacy process for the planning period from June 20152016 through May 2016.2017.


Transportation - Includes a short-line railway in Iowa with 114 miles of railroad track, 1310 active locomotives and 7212 rail-cars; and a barge terminal on the Mississippi River; and a coal terminal in Williams, Iowa.River.

Corporate Services - Corporate Services’ property included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 20152016 consisted primarily of computer software, the corporate headquarters building located in Madison, Wisconsin, and a new customer billing and information system for IPL and WPL which was placedand other computer software, and the corporate headquarters building located in service in 2015.Madison, Wisconsin.

ITEM 3. LEGAL PROCEEDINGS

Alliant Energy - None.

IPL - None.

WPL - None.

Other - Alliant Energy, IPL and WPL are involved in legal and administrative proceedings before various courts and agencies with respect to matters arising in the ordinary course of business. Although unable to predict the outcome of these matters, Alliant Energy, IPL and WPL believe that final disposition of these actions will not have a material effect on their financial condition or results of operations.

ITEM 4. MINE SAFETY DISCLOSURES

None.


32

Table of Contents


EXECUTIVE OFFICERS OF THE REGISTRANTS
None of the executive officers for Alliant Energy, IPL or WPL listed below are related to any member of the Board of Directors or nominee for director or any other executive officer. All of the executive officers have no definite terms of office and serve at the pleasure of the Board of Directors. The executive officers of Alliant Energy, IPL and WPL as of the date of this filing are as follows (numbers following the names represent the officer’s age as of the date of this filing):

Executive Officers of Alliant Energy
Patricia L. Kampling5657Ms. Kampling has served as a director since January 2012, and as Chairman of the Board, President and CEOChief Executive Officer (CEO) since April 2012. She previously served as President and Chief Operating Officer since February 2011 and as EVP and CFO from September 2010 to February 2011.
James H. Gallegos5556Mr. Gallegos has served as Senior VP,Vice President (VP), General Counsel and Corporate Secretary since February 2015. He previously served as Senior VP and General Counsel since February 2014 and as VP and General Counsel from November 2010 to February 2014.
Thomas L. Hanson62Mr. Hanson has served as Senior VP and CFO since January 2013. He previously served as VP and CFO since May 2011, as VP-CFO and Treasurer from February 2011 to May 2011 and as VP-CAO and Treasurer from September 2010 to February 2011.
Douglas R. Kopp6263Mr. Kopp has served as Senior VP since March 2014. He previously served as VP-Environmental Affairs since January 2013 and as Director-Environmental Affairs from January 2011 to January 2013.
John O. Larsen5253Mr. Larsen has served as Senior VP since February 2014. He previously served as Senior VP-Generation since January 2010.
Wayne A. Reschke6061Mr. Reschke has served as Senior VP since February 2016. He previously served as VP since February 2014 and as VP-Human Resources from September 2009 to February 2014.
Robert J. Durian4546Mr. Durian has served as VP, Chief Financial Officer (CFO) and Treasurer since December 2016. He previously served as VP, Chief Accounting Officer (CAO) and Treasurer since July 2016; VP, CAO and Controller from July 2015 to July 2016; and as Controller and CAO from February 2011 to July 2015.
Benjamin M. Bilitz42Mr. Bilitz has served as CAO and Controller since July 2015.December 2016. He previously served as Controller and CAO since February 2011July 2016 and as Assistant Controller from September 2010March 2011 to February 2011.July 2016.


Executive Officers of IPL
Patricia L. Kampling5657Ms. Kampling has served as a director since January 2012, and as Chairman of the Board and CEO since April 2012.
Douglas R. Kopp6263Mr. Kopp has served as President since April 2014.
James H. Gallegos5556Mr. Gallegos has served as Senior VP, General Counsel and Corporate Secretary since February 2015.
Thomas L. Hanson62Mr. Hanson has served as Senior VP and CFO since January 2013.
John O. Larsen5253Mr. Larsen has served as Senior VP since February 2014.
Wayne A. Reschke6061Mr. Reschke has served as Senior VP since February 2016.
Robert J. Durian4546Mr. Durian has served as VP, CFO and Treasurer since December 2016.
Benjamin M. Bilitz42Mr. Bilitz has served as CAO and Controller since July 2015.December 2016.

Executive Officers of WPL
Patricia L. Kampling5657Ms. Kampling has served as a director since January 2012, and as Chairman of the Board and CEO since April 2012.
John O. Larsen5253Mr. Larsen has served as President since December 2010.
James H. Gallegos5556Mr. Gallegos has served as Senior VP, General Counsel and Corporate Secretary since February 2015.
Thomas L. Hanson62Mr. Hanson has served as Senior VP and CFO since January 2013.
Douglas R. Kopp6263Mr. Kopp has served as Senior VP since March 2014.
Wayne A. Reschke6061Mr. Reschke has served as Senior VP since February 2016.
Robert J. Durian4546Mr. Durian has served as VP, CFO and Treasurer since December 2016.
Benjamin M. Bilitz42Mr. Bilitz has served as CAO and Controller since July 2015.December 2016.


33

Table of Contents


PART II

ITEM 5. MARKET FOR REGISTRANTS’ COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

Stock Price - Alliant Energy’s common stock trades on the New York Stock Exchange under the symbol “LNT.” Quarterly sales price high and low ranges and dividends with respect to Alliant Energy’s common stock were as follows:follows. Amounts reflect the effects of a two-for-one common stock split distributed in May 2016. Refer to Note 7 for additional details.
  2015 2014
Quarter High Low Dividend High Low Dividend
First 
$70.80
 
$59.92
 
$0.55
 
$56.99
 
$50.00
 
$0.51
Second 64.14
 57.06
 0.55
 60.88
 55.47
 0.51
Third 62.94
 54.27
 0.55
 60.89
 54.69
 0.51
Fourth 64.25
 56.14
 0.55
 69.78
 55.38
 0.51
Year 70.80
 54.27
 2.20
 69.78
 50.00
 2.04

Stock closingClosing sales price at December 31, 20152016: $62.45$37.89

Shareowners - At December 31, 20152016, there were 28,29427,287 holders of record of Alliant Energy’s common stock, including holders through Alliant Energy’s Shareowner Direct Plan. Alliant Energy is the sole common shareowner of all 13,370,788 and 13,236,601 shares of IPL and WPL common stock, respectively, currently outstanding. As a result, there is no established public trading market for the common stock of either IPL or WPL.

Dividends - In November 2015,2016, Alliant Energy announced an increase in its targeted 20162017 annual common stock dividend to $2.35$1.26 per share, which is equivalent to a quarterly rate of $0.5875$0.315 per share, beginning with the February 20162017 dividend payment. The timing and amount of future dividends is subject to an approved dividend declaration from Alliant Energy’s Board of Directors, and is dependent upon earnings expectations, capital requirements, and general financial business conditions, among other factors.

Alliant Energy does not have any significant common stock dividend restrictions. Refer to Note 7 for information about IPL’s and WPL’s dividend restrictions and limitations on distributions to their parent company.

Common Stock Repurchases - A summary of Alliant Energy common stock repurchases for the quarter ended December 31, 20152016 was as follows:
 Total Number Average Price Total Number of Shares Maximum Number (or Approximate Total Number Average Price Total Number of Shares Maximum Number (or Approximate
 of Shares Paid Per Purchased as Part of Dollar Value) of Shares That May of Shares Paid Per Purchased as Part of Dollar Value) of Shares That May
Period Purchased (a) Share Publicly Announced Plan Yet Be Purchased Under the Plan (a) Purchased (a) Share Publicly Announced Plan Yet Be Purchased Under the Plan (a)
October 1 to October 31 2,345
 
$58.95
  N/A 3,919
 
$37.22
  N/A
November 1 to November 30 2,043
 58.50
  N/A 3,684
 35.76
  N/A
December 1 to December 31 58
 61.74
  N/A 144
 37.14
  N/A
 4,446
 58.78
   7,747
 36.52
  

(a)All shares were purchased on the open market and held in a rabbi trust under the DCP. There is no limit on the number of shares of Alliant Energy common stock that may be held under the DCP, which currently does not have an expiration date.

Other - Refer to “Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters” in Item 12 for details of securities authorized for issuance under equity compensation plans.


34

Table of Contents


ITEM 6. SELECTED FINANCIAL DATA

Financial Information
Alliant Energy2015 (a) 2014 (a) 2013 (a) 2012 20112016 (a) 2015 (a) 2014 (a) 2013 2012
(dollars in millions, except per share data)(dollars in millions, except per share data)
Income Statement Data:  
Operating revenues
$3,253.6
 
$3,350.3
 
$3,276.8
 
$3,094.5
 
$3,221.4

$3,320.0
 
$3,253.6
 
$3,350.3
 
$3,276.8
 
$3,094.5
Income from continuing operations, net of tax390.9
 395.7
 382.1
 340.8
 341.4
Loss from discontinued operations, net of tax(2.5) (2.4) (5.9) (5.1) (19.5)
Net income388.4
 393.3
 376.2
 335.7
 321.9
Amounts attributable to Alliant Energy common shareowners:                  
Income from continuing operations, net of tax380.7
 385.5
 364.2
 324.9
 323.1
373.8
 380.7
 385.5
 364.2
 324.9
Loss from discontinued operations, net of tax(2.5) (2.4) (5.9) (5.1) (19.5)(2.3) (2.5) (2.4) (5.9) (5.1)
Net income378.2
 383.1
 358.3
 319.8
 303.6
371.5
 378.2
 383.1
 358.3
 319.8
Common Stock Data:                  
Earnings per weighted average common share attributable to Alliant Energy common shareowners (basic and diluted):         
Earnings per weighted average common share attributable to Alliant Energy common shareowners (basic and diluted) (b):         
Income from continuing operations, net of tax
$3.38
 
$3.48
 
$3.29
 
$2.93
 
$2.92

$1.65
 
$1.69
 
$1.74
 
$1.64
 
$1.47
Loss from discontinued operations, net of tax
($0.02) 
($0.02) 
($0.06) 
($0.04) 
($0.18)
($0.01) 
($0.01) 
($0.01) 
($0.02) 
($0.03)
Net income
$3.36
 
$3.46
 
$3.23
 
$2.89
 
$2.74

$1.64
 
$1.68
 
$1.73
 
$1.62
 
$1.44
Common shares outstanding at year-end (000s)113,459
 110,936
 110,944
 110,987
 111,019
Dividends declared per common share
$2.20
 
$2.04
 
$1.88
 
$1.80
 
$1.70
Market value per share at year-end
$62.45
 
$66.42
 
$51.60
 
$43.91
 
$44.11
Book value per share at year-end
$32.82
 
$31.00
 
$29.58
 
$28.25
 
$27.14
Common shares outstanding at year-end (000s) (b)227,674
 226,918
 221,871
 221,887
 221,975
Dividends declared per common share (b)
$1.175
 
$1.10
 
$1.02
 
$0.94
 
$0.90
Market value per share at year-end (b)
$37.89
 
$31.225
 
$33.21
 
$25.80
 
$21.955
Book value per share at year-end (b)
$16.96
 
$16.41
 
$15.50
 
$14.79
 
$14.12
Market capitalization at year-end
$7,085.5
 
$7,368.4
 
$5,724.7
 
$4,873.4
 
$4,897.0

$8,626.6
 
$7,085.5
 
$7,368.3
 
$5,724.7
 
$4,873.5
Other Selected Financial Data:                  
Cash flows from operating activities
$871.2
 
$891.6
 
$731.0
 
$841.1
 
$702.7

$859.6
 
$871.2
 
$891.6
 
$731.0
 
$841.1
Construction and acquisition expenditures
$1,034.3
 
$902.8
 
$798.3
 
$1,158.1
 
$673.4

$1,196.8
 
$1,034.3
 
$902.8
 
$798.3
 
$1,158.1
Total assets at year-end (b)
$12,495.2
 
$12,063.5
 
$11,092.5
 
$10,766.0
 
$9,668.8
Long-term obligations, net (b)
$3,837.0
 
$3,768.7
 
$3,318.2
 
$3,122.0
 
$2,688.9
Times interest earned before income taxes (c)3.47X
 3.44X
 3.52X
 3.75X
 3.59X
Capitalization ratios:         
Common equity47% 45% 46% 47% 50%
Preferred stock of subsidiaries3% 3% 3% 3% 3%
Long- and short-term debt50% 52% 51% 50% 47%
Total100% 100% 100% 100% 100%
Total assets at year-end
$13,373.8
 
$12,495.2
 
$12,063.5
 
$11,092.5
 
$10,766.0
Long-term obligations, net
$4,325.1
 
$3,837.0
 
$3,768.7
 
$3,318.2
 
$3,122.0
IPL         
Operating revenues
$1,820.4
 
$1,774.5
 
$1,848.1
 
$1,818.8
 
$1,650.3
Earnings available for common stock215.6
 186.0
 181.6
 172.0
 145.7
Cash dividends declared on common stock151.9
 140.0
 140.0
 128.1
 122.9
Cash flows from operating activities361.9
 385.0
 406.1
 232.6
 291.0
Total assets7,304.7
 6,709.1
 6,450.2
 5,793.9
 5,446.8
Long-term obligations, net2,154.0
 1,857.4
 1,758.6
 1,549.5
 1,353.7
          
WPL         
Operating revenues
$1,459.1
 
$1,435.1
 
$1,449.1
 
$1,406.3
 
$1,392.0
Earnings available for common stock190.4
 176.3
 180.4
 177.5
 169.4
Cash dividends declared on common stock135.0
 126.9
 118.7
 116.3
 112.0
Cash flows from operating activities521.4
 449.8
 424.4
 423.3
 427.4
Total assets5,290.3
 5,270.4
 5,117.6
 4,796.2
 4,754.4
Long-term obligations, net1,623.2
 1,624.2
 1,658.3
 1,423.2
 1,426.3

(a)
Refer to “Results of Operations” in MDA for discussion of the 2016, 2015, 2014 and 20132014 results of operations.
(b)
In 2015, Alliant Energy adoptedAmounts reflect the effects of a new accounting standard related to the presentation of debt issuance costs on the balance sheet, which was applied retrospectively. As a result, “Total assets at year-end” and “Long-term obligations, net” were revised to conform to the new presentation. The impact to 2013, 2012 and 2011 was not material.two-for-one common stock split distributed in May 2016. Refer to Notes 1(p) and 1(q)Note 7 for further details.
(c)Represents the sum of income from continuing operations before income taxes plus interest expense, divided by interest expense.


35

Table of Contents


IPL2015 (a) 2014 (a) 2013 (a) 2012 2011
 (in millions)
Operating revenues
$1,774.5
 
$1,848.1
 
$1,818.8
 
$1,650.3
 
$1,740.1
Net income (b)196.2
 191.8
 188.3
 158.3
 139.3
Earnings available for common stock (b)186.0
 181.6
 172.0
 145.7
 124.3
Cash dividends declared on common stock140.0
 140.0
 128.1
 122.9
 73.4
Cash flows from operating activities385.0
 406.1
 232.6
 291.0
 366.9
Total assets (b)6,709.1
 6,450.2
 5,793.9
 5,446.8
 5,084.1
Long-term obligations, net (b)1,857.4
 1,758.6
 1,549.5
 1,353.7
 1,302.0

(a)
Refer to “Results of Operations” in MDA for a discussion of the 2015, 2014 and 2013 results of operations.
(b)
In 2015, IPL adopted a new accounting standard related to the presentation of debt issuance costs on the balance sheet, as well as applied a change in method of recording income taxes, which were applied retrospectively. As a result, “Net income,” “Earnings available for common stock,” “Total assets,” and “Long-term obligations, net” were revised to conform to the new presentation. The impact to 2013, 2012 and 2011 was not material. Refer to Notes 1(c), 1(p) and 1(q) for furtheradditional details.

Alliant Energy is the sole common shareowner of all 13,370,788 and 13,236,601 shares of IPL’s and WPL’s common stock outstanding.outstanding, respectively. As such, earnings per share data is not disclosed herein.herein for IPL and WPL.

WPL2015 (a) 2014 (a) 2013 (a) 2012 2011
 (in millions)
Operating revenues
$1,435.1
 
$1,449.1
 
$1,406.3
 
$1,392.0
 
$1,434.4
Net income (b)177.6
 181.1
 179.1
 172.7
 163.5
Earnings available for common stock (b)176.3
 180.4
 177.5
 169.4
 160.2
Cash dividends declared on common stock126.9
 118.7
 116.3
 112.0
 112.1
Cash flows from operating activities449.8
 424.4
 423.3
 427.4
 428.8
Total assets (b)5,270.4
 5,117.6
 4,796.2
 4,754.4
 4,035.8
Long-term obligations, net (b)1,624.2
 1,658.3
 1,423.2
 1,426.3
 1,182.3

(a)
Refer to “Results of Operations” in MDA for a discussion of the 2015, 2014 and 2013 results of operations.
(b)
In 2015, WPL adopted a new accounting standard related to the presentation of debt issuance costs on the balance sheet, as well as applied a change in method of recording income taxes, which were applied retrospectively. As a result, “Net income,” “Earnings available for common stock,” “Total assets,” and “Long-term obligations, net” were revised to conform to the new presentation. The impact to 2013, 2012 and 2011 was not material. Refer to Notes 1(c), 1(p) and 1(q) for further details.

Alliant Energy is the sole common shareowner of all 13,236,601 shares of WPL’s common stock outstanding. As such, earnings per share data is not disclosed herein.

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

This MDA includes information relating to Alliant Energy, IPL and WPL, as well as ResourcesAEF and Corporate Services. Where appropriate, information relating to a specific entity has been segregated and labeled as such. The following discussion and analysis should be read in conjunction with the Financial Statements and Notes included in this report. Unless otherwise noted, all “per share” references in MDA refer to earnings per diluted share.


36

Table of Contents


CONTENTS OF MDA

MDA consists of the following information:


EXECUTIVE SUMMARYOVERVIEW

Description of Business
General - Alliant Energy is an investor-owned public utility holding company whose primary subsidiaries are IPL, WPL, ResourcesAEF and Corporate Services. IPL is aand WPL are public utility engaged principally in the generationutilities, and distribution of electricity and the distribution and transportation of natural gas to retail customers in select markets in Iowa. IPL also sells electricity to wholesale customers in Minnesota, Illinois and Iowa. WPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas to retail customers in select markets in Wisconsin. WPL also sells electricity to wholesale customers in Wisconsin. At December 31, 2015, WPL and Resources, through their ownership interests in WPL Transco, in aggregate held an approximate 16% ownership interest in ATC, a transmission-only utility operating primarily in the Midwest. ResourcesAEF is the parent company for Alliant Energy’s non-regulated businesses.businesses and holds all of Alliant Energy’s investment in ATC. Corporate Services provides administrative services to Alliant Energy and its subsidiaries. An illustration of Alliant Energy’s primary businesses is shown below.
  Alliant Energy  
      
     
Utilities, ATC and Corporate Services Non-regulated and Parent
 - Retail electric and gas services in IA (IPL)  - Transportation (Resources)(AEF)
 - Retail electric and gas services in WI (WPL)  - Non-regulated Generation (Resources)(AEF)
 - 16% interest in ATC (primarily WPL)(ATI) (a)  - Parent Company
 - Wholesale electric service in MN, IL & IA (IPL)  
 - Wholesale electric service in WI (WPL)  
 - Corporate Services 

(a)At December 31, 2016, ATI, a wholly-owned subsidiary of AEF, holds all of Alliant Energy’s investment in ATC, a transmission-only utility operating primarily in the Midwest.

Utilities, ATC and Corporate Services - IPL and WPL own a portfolio of EGUs located in Iowa, Wisconsin and Minnesota with a diversified fuel mix including coal, natural gas, renewable resources and renewable resources.coal. The output from these EGUs, supplemented with purchased power, is used to provide electric service to approximately 950,000960,000 electric customers in the upper Midwest. The utility business also procures natural gas from various suppliers to provide service to approximately 410,000 retail gas customers in the upper Midwest. Alliant Energy’s utility business is its primary source of earnings and cash flows. The earnings and cash flows from the utilities, ATC and Corporate Services business are sensitive to various external factors including, but not limited to, the amount and timing of rates approved by regulatory authorities, the impact of weather and economic conditions on electric and gas sales volumes and other factors listed in “Risk Factors” in Item 1A and “Forward-looking Statements.”

Non-regulated Business and Parent - ResourcesAEF manages various businesses including Non-regulated Generation (Sheboygan Falls and the Franklin County wind farm), Transportation (short-line railway and barge transportation services) and several other modest investments.


37

Table of Contents


Financial Results - Alliant Energy’s net income and EPS attributable to Alliant Energy common shareowners were as follows (dollars in millions, except per share amounts):
2015 20142016 2015
Income (Loss) EPS Income (Loss) EPSIncome (Loss) EPS (a) Income (Loss) EPS (a)
Continuing operations:              
Utilities, ATC and Corporate Services
$374.5
 
$3.32
 
$371.4
 
$3.35

$420.4
 
$1.85
 
$374.5
 
$1.66
Non-regulated and Parent6.2
 0.06
 14.1
 0.13
(46.6) (0.20) 6.2
 0.03
Income from continuing operations380.7
 3.38
 385.5
 3.48
373.8
 1.65
 380.7
 1.69
Loss from discontinued operations(2.5) (0.02) (2.4) (0.02)(2.3) (0.01) (2.5) (0.01)
Net income
$378.2
 
$3.36
 
$383.1
 
$3.46

$371.5
 
$1.64
 
$378.2
 
$1.68

(a) Amounts reflect the effects of a two-for-one stock split distributed in May 2016. Refer to Note 7 for additional details.

The table above includes EPS from continuing operations for utilities, ATC and Corporate Services, and non-regulated and parent, which are non-GAAP financial measures. Alliant Energy believes EPS from continuing operations for utilities, ATC

and Corporate Services, and non-regulated and parent are useful to investors because they facilitate an understanding of segment performance and trends and provide additional information about Alliant Energy’s operations on a basis consistent with the measures that management uses to manage its operations and evaluate its performance.

Lower earningsnet income and EPS from continuing operations in 20152016 compared to 20142015 was primarily due to asset valuation charges related to the Franklin County wind farm in 2016, partially offset by higher electric transmission service expense at WPL; lower electric and gas sales attributedmargins, higher AFUDC (primarily related to milder temperatures in 2015; higher income tax, depreciation, interestMarshalltown) and employee benefits-related expenses; losses on sales of IPL’s Minnesota electric and gas distribution assets in 2015; and lower earnings at Transportation. These items were partially offset by lower retail electric customer billing credits at IPL; lower energy efficiency cost recovery amortization at WPL; and capacity charges related to the IPL DAEC PPA in 2014.2015.

Refer to “Results of Operations” for additional details regarding the various factors impacting earnings during 20152016, 20142015 and 20132014.

2015 2016Overview - In 2015,2016, Alliant Energy, IPL and WPL focused on achieving financial objectives and executing their strategic plan, including providing competitive value and exceptional service for their customers and finding innovative ways to operate the business more efficiently and provide flexible energy resources.plan. Key developments in 20152016 include the following:
WPL’s Proposed RiversideIPL’s Expansion of Wind Generation - WPLIn October 2016, IPL and the Iowa Office of Consumer Advocate, among other customer groups, filed a CPCN applicationsettlement agreement with the PSCWIUB regarding the appropriate rate-making principles for approvalup to construct500 MW of additional wind generation at IPL. In October 2016, the Riverside expansion, a natural gas-fired combined-cycle EGU in Beloit, Wisconsin. Capital expenditures, excluding AFUDC, are currently estimated to be approximately $700 million to constructIUB issued an order approving the EGUsettlement agreement, with limited modifications, and a pipeline to supply natural gas to the EGU. A decision from the PSCW on WPL’s application is currently expected by the second quarter of 2016.establishing rate-making principles, which IPL accepted, with key terms as follows. Refer to “Strategic Overview” for discussionfurther discussion.
Up to 500 MW of additional wind generation that qualifies for the full level of production tax credits, regardless of the location in Iowa, with a cost cap of $1,830/kilowatt, including AFUDC and transmission costs. Any costs incurred in excess of this $1,830/kilowatt cost cap are expected to be incorporated into rates if determined to be reasonable and prudent.
A depreciable life of the wind generation of 40 years, unless changed as a result of a settlement agreement WPL entered intocontested case before the IUB.
An 11.0% return on common equity, with other Wisconsin utilities andthe exception of certain electric cooperatives regarding its proposed Riverside expansion CPCN application.transmission facilities classified as intangible assets, which would earn the rate of return on common equity the IUB finds reasonable during a future rate case.
SalesFranklin County Wind Farm - In addition to IPL’s expansion of wind generation discussed above, in February 2017, FERC issued an order approving the transfer of the 99 MW Franklin County wind farm from AEF to IPL. Alliant Energy and IPL currently expect to complete this transfer in 2017.
IPL’s Minnesota Electric and Natural Gas Distribution AssetsWPL’s Potential Expansion of Wind Generation - In 2015,addition to IPL’s 500 MW expansion of wind generation and transfer of the 99 MW Franklin County wind farm to IPL completedin 2017 discussed above, IPL and WPL are each exploring options to own and operate up to 200 MW of additional new wind generation.
WPL’s Construction of the salesRiverside Expansion - In May 2016, WPL received an order from the PSCW authorizing WPL to construct an approximate 730 MW natural gas-fired combined-cycle EGU in Beloit, Wisconsin, referred to as the Riverside expansion. After receiving the final necessary regulatory approvals and permits in the third quarter of 2016, WPL began constructing the Riverside expansion. WPL currently expects to place the Riverside expansion in service by early 2020. In November 2016, various electric cooperatives notified WPL of their intent to exercise their options to acquire approximately 65 MW of the Riverside expansion while the EGU is being constructed. As a result of the various electric cooperatives funding a portion of the capital expenditures during construction, WPL’s estimated portion of capital expenditures is expected to be approximately $640 million.
WPL’s Wisconsin Retail Electric and Gas Rate Case (2017/2018 Test Period) - In December 2016,WPL received an order from the PSCW authorizing WPL to implement an increase in annual retail electric rates of $9 million, or approximately 1%, and an increase in annual retail gas rates of $9 million, or approximately 13%. These increases are effective January 1, 2017 and extend through the end of 2018. The order included a return on common equity of 10.0% and continues a regulatory return on common equity sharing mechanism, whereby WPL must defer a portion of its Minnesota electricearnings if its annual regulatory return on common equity exceeds 10.25% during the 2017 and natural gas distribution assets2018 Test Period. WPL must defer 50% of its excess earnings between 10.25% and received proceeds11.00%, and 100% of $140 million. The proceeds from the natural gas distribution assets were used for general corporate purposes and the proceeds from the electric distribution assets were used to reduce cash amounts received from IPL’s sales of accounts receivable program.any excess earnings above 11.00%.
MISO Transmission Owner Return on Equity Complaints - Complaints are currently pendingA group of MISO cooperative and municipal utilities previously filed two complaints with FERC regardingrequesting a reduction to the level ofbase return on equity thatused by MISO transmission owners, including ITC and ATC, should be allowed to utilize in calculating the rates they charge their customers. Alliant Energy, IPL and WPL currently anticipate FERC’s decision on the MISO transmission owner complaints will reduce transmission owners’ current return on equity, which is expected to result in lower electric transmission service expense billed to IPL and WPL thereby reducing customer costs, and lower equity income and dividends from ATC in the future.ATC. In 2014,September 2016, FERC issued an order on the complaints establishing anfirst complaint and established a base return on equity of 10.32%, excluding any incentive adders granted by FERC, effective September 28, 2016, and for the refund date ofperiod from November 12, 2013.2013 through February 11, 2015. In October 2016, in response to MISO’s and the MISO transmission owners’ request, FERC ordered the related refunds to be issued no later than July 2017. In June 2016, a FERC administrative law judge issued an initial decision regarding the second complaint and recommended a base return on equity of 9.70%, excluding any incentive adders granted by FERC, for the refund period from February 12, 2015 through May 11, 2016. A final decision from FERC on the second complaint is currently expected in the first half of 2017. As a result of the two MISO complaints, Alliant Energy and WPL have realized $15a cumulative $24 million of reductions in the amountamounts of equity income from ATC for the period from November 12, 2013 through December 31, 2015,2016, including $12$9 million realized in 2015 and $3 million realized in 2014.2016.
At-the-Market Offering Program
Transfer of ATC Investment - In June 2016, WPL received an order from the PSCW requiring WPL to transfer its investment in ATC to Alliant Energy or an Alliant Energy subsidiary by December 31, 2022. On December 31, 2016, pursuant to the PSCW order, the investment in ATC was transferred to ATI. Refer to Note 6(a) for further discussion.
Common Stock Split-In 2015,April 2016, Alliant Energy issued 2,186,617Energy’s Board of Directors approved a two-for-one common stock split and a proportionate increase in the number of authorized shares of common stock through an at-the-market offering program andof Alliant Energy from 240 million shares to 480 million shares to implement the stock split. Alliant Energy shareowners of record at the close of business on May 4, 2016 received cash proceedsone additional share of $133 million, net of $2 million in fees and commissions. The proceeds from the issuances ofAlliant Energy common stock for each share held on that date. The proportionate interest that a shareowner owns in Alliant Energy did not change as a result of the stock split. The additional shares were used for general corporate purposes.
Customer Billingdistributed on May 19, 2016 and Information System - Corporate Services placedpost-split trading began on May 20, 2016. All Alliant Energy share and per share amounts in servicethis report have been reflected on a new customer billing and information system for IPL and WPL in 2015, which houses all customer records, and processes metering, billing and payment transactions.post-split basis.


38



Future Developments - In 20162017 and beyond, the following includes key items expected to impact Alliant Energy, IPL and WPL:
Protecting Americans from Tax Hikes Act - In December 2015, the PATH Act was enacted. The most significant provisions of the PATH Act for Alliant Energy, IPL and WPL relate to the extension of bonus depreciation deductions for certain capital expenditures for property incurred through December 31, 2019 and placed in service prior to December 31, 2020, as well as incentives for individuals and businesses to construct renewable generation. Refer to “Rate Matters” for further discussion.
Clean Power Plan - In 2015, the EPA published final standards under Section 111(d) of the CAA, which establish guidelines for states to follow in developing plans to reduce CO2 emissions from existing fossil-fueled EGUs. In February 2016, the Supreme Court issued a stay of these final standards until pending legal challenges are resolved, which places implementation of these final standards on hold indefinitely. In 2015, the EPA also published final standards under Section 111(b) of the CAA, which establish CO2 emissions limits for certain new fossil-fueled EGUs. Refer to “Environmental Matters” for further discussion.
Planned Utility Rate CasesCase - WPLIPL currently expects to make a retail electric and gas base rate filing for the 2017/2018 Test Period in the second quarter of 2016. WPL currently expects to make a retail fuel-related rate filing (2017 Test Year) in the second quarter of 2016.IPL currently expects to make separate retail electric and gas rate filings in the first half of 2017 based on a 2016 historical Test Year. Refer to “Rate Matters” for further discussion.

20162017 Forecast - In 2016,2017, the following financing activities, and impacts to results of operations, are currently anticipated to occur:
Financing Plans - Alliant Energy currently expects to issue approximately $25up to $150 million of common stock in 20162017 through one or more offerings and its Shareowner Direct Plan. Both IPL and WPL currently expect to receive capital contributions of approximately $165$150 million and $25 million, respectively, from their parent company, Alliant Energy, in 2016.2017. IPL currently expects to issue up to $300 million of long-term debt in 2016. The Alliant Energy parent company and ResourcesWPL currently expect to issue up to approximately $400$250 million and $300 million, respectively, of long-term debt securities in aggregate, primarily to refinance Alliant Energy’s $250 million and Franklin County Holdings LLC’s $60 million variable-rate term loan credit agreements expiring in 2016.2017.
Common Stock Dividends - Alliant Energy announced an increase in its targeted 20162017 annual common stock dividend to $2.35$1.26 per share, which is equivalent to a quarterly rate of $0.5875$0.315 per share, beginning with the February 20162017 dividend payment. The timing and amount of future dividends is subject to an approved dividend declaration from Alliant Energy’s Board of Directors, and is dependent upon earnings expectations, capital requirements, and general financial business conditions, among other factors. In addition, IPL and WPL currently expect to pay common stock dividends of approximately $150$156 million and $135$126 million, respectively, to their parent company in 2016.2017.
Utility Electric Margins - Alliant Energy, IPL and WPL currently expect an increase in electric margins in 2017 compared to 2016 as a result of base rate increases in effect from WPL’s recent retail electric rate case and IPL’s planned retail electric rate case. Refer to “Rate Matters” for further discussion of these rate cases.Alliant Energy, IPL and WPL are currently expecting a modest increase in temperature-normalized retail electric sales in 2016 compared to 2015. IPL currently expects to reduce the amount of billing credits on its Iowa retail electric customers’ bills in 2016 compared to 2015 related to the approved settlement agreement for IPL’s Iowa retail electric rates.
Electric Transmission Service Expense - Alliant Energy currently expects an increase in future electric transmission service expense in 2016 compared to 2015 due to higher Attachment “O” rates charged by ITC and ATC, as well as higher MISO transmission charges billed to IPL and WPL due to the number of shared transmission projects expected to be completed in the MISO region.
Other Operation and Maintenance Expenses - Alliant Energy and WPL currently expect decreases in energy efficiency cost recovery amortizations at WPL in 2016 compared to 2015 as approved by the PSCW in a July 2014 order. Partially offsetting this expected decrease, Alliant Energy, IPL and WPL currently expect an increase in retirement plan costs in 2016 compared to 2015, resulting from lower than expected returns on retirement plan assets in 2015.
Depreciation and Amortization Expenses - Alliant Energy currently expects its depreciation and amortization expenses to increase in 2016 compared to 2015 due to property additions, including various environmental controls projects at IPL and WPL placed in service in 2015 and expected to be placed in service in 2016.
Other Operation and Maintenance Expenses - Alliant Energy currently expects its other operation and maintenance expenses to increase in 2017 compared to 2016 primarily due to IPL’s Marshalltown facility, which is expected to be placed in service in April 2017, as well as higher energy delivery infrastructure maintenance expenditures. Also contributing to the increase are energy efficiency regulatory amortizations at WPL, which will be offset by increases in WPL’s base rates as discussed in “Rate Matters.”
Depreciation and Amortization Expenses - Alliant Energy currently expects its depreciation and amortization expenses to increase in 2017 compared to 2016 due to property additions, including various environmental controls projects at IPL and WPL placed in service in 2016 and IPL’s Marshalltown facility, which is expected to be placed in service in April 2017. Refer to “Rate Matters” for discussion of updated depreciation rates for WPL effective January 1, 2017 as a result of a recently completed depreciation study.
Interest Expense - Alliant Energy currently expects its interest expense to increase in 20162017 compared to 20152016 due to financings completed in 20152016 and 2016planned in 2017 as discussed above.
AFUDC - Alliant Energy currently expects AFUDC to increase in 2016 compared to 2015 primarily due to increased CWIP balances related to Marshalltown.


RESULTS OF OPERATIONS

Overview
Alliant Energy - Executive Summary”Overview provides an overview of Alliant Energy’s 20152016 and 20142015 earnings and the various components of its business.


39



IPL - Earnings available for common stock increased $30 million in 2016 and $4 million in 2015. The 2016 increase was due to higher AFUDC in 2016 related to Marshalltown, lower retail electric customer billing credits, losses recorded in 2015 related to IPL’s sales of its Minnesota electric and $10 million in 2014.natural gas distribution assets and higher income tax benefits. These items were partially offset by higher depreciation and interest expenses. The 2015 increase was the result of lower retail electric customer billing credits and lower purchased electric capacity expense related to the previous DAEC PPA. These items were substantially offset by lower retail electric and gas sales due to changes in temperatures in IPL’s service territory, losses recorded in 2015 related to IPL’s sales of its Minnesota electric and natural gas distribution assets, higher depreciation expense and lower income tax benefits.

WPL - Earnings available for common stock increased $14 million in 2016 and decreased $4 million in 2015 and increased $3 million in 2014.2015. The 2016 increase was due to higher retail electric sales, partially offset by higher depreciation expense. The 2015 decrease was the result of higher electric transmission service expense and lower retail electric and gas sales due to changes in temperatures in WPL’s service territory. These items wereThis was partially offset by lower energy efficiency cost recovery amortizations and changes in electric fuel-related costs, net of recoveries in 2015 compared to 2014.

Additional details of Alliant Energy’s, IPL’s and WPL’s 2016, 2015 2014 and 20132014 earnings are discussed below.

Utility Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchasespurchased power and purchased electric capacitytransmission service expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchasespurchased power and purchased electric capacitytransmission service expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in such expenses. These electric production fuel, energy purchases and purchased electric capacity expenses.margins may not be comparable to how other entities define utility margin. Electric margins and MWh sales were as follows:
Alliant EnergyRevenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)Revenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)
2015 2014 (a) 2013 (b) 2015 2014 (a) 2013 (b)2016 2015 (a) 2014 (b) 2016 2015 (a) 2014 (b)
Residential (c)
$983.0
 
$994.5
 (1%) 
$1,009.1
 (1%) 7,271
 7,697
 (6%) 7,824
 (2%)
$1,001.1
 
$983.0
 2% 
$994.5
 (1%) 7,152
 7,271
 (2%) 7,697
 (6%)
Commercial (c)667.8
 658.0
 1% 649.4
 1% 6,374
 6,449
 (1%) 6,432
 —%712.6
 667.8
 7% 658.0
 1% 6,545
 6,374
 3% 6,449
 (1%)
Industrial (c)823.3
 799.0
 3% 765.4
 4% 11,735
 11,821
 (1%) 11,471
 3%787.1
 763.4
 3% 735.1
 4% 10,702
 10,820
 (1%) 10,813
 —%
Industrial - co-generation64.0
 59.9
 7% 63.9
 (6%) 940
 915
 3% 1,008
 (9%)
Retail subtotal (c)2,474.1
 2,451.5
 1% 2,423.9
 1% 25,380
 25,967
 (2%) 25,727
 1%2,564.8
 2,474.1
 4% 2,451.5
 1% 25,339
 25,380
 —% 25,967
 (2%)
Sales for resale:                        
Wholesale (c)221.0
 206.6
 7% 195.4
 6% 3,614
 3,586
 1% 3,564
 1%256.6
 221.0
 16% 206.6
 7% 4,039
 3,614
 12% 3,586
 1%
Bulk power and other28.5
 2.9
 883% 17.7
 (84%) 1,228
 335
 267% 763
 (56%)10.1
 28.5
 (65%) 2.9
 883% 360
 1,228
 (71%) 335
 267%
Other46.9
 52.6
 (11%) 52.0
 1% 129
 155
 (17%) 152
 2%44.0
 46.9
 (6%) 52.6
 (11%) 100
 129
 (22%) 155
 (17%)
Total revenues/sales2,770.5
 2,713.6
 2% 2,689.0
 1% 30,351
 30,043
 1% 30,206
 (1%)2,875.5
 2,770.5
 4% 2,713.6
 2% 29,838
 30,351
 (2%) 30,043
 1%
Electric production fuel expense463.6
 443.9
 4% 431.0
 3%       408.1
 463.6
 (12%) 443.9
 4%       
Energy purchases expense372.3
 408.2
 (9%) 294.0
 39%       
Purchased electric capacity expense1.8
 25.1
 (93%) 216.8
 (88%)       
Margins (d)
$1,932.8
 
$1,836.4
 5% 
$1,747.2
 5%       
Purchased power expense445.9
 374.1
 19% 433.3
 (14%)       
Electric transmission service expense527.9
 485.3
 9% 447.5
 8%       
Electric margins (d)
$1,493.6
 
$1,447.5
 3% 
$1,388.9
 4%       
IPLRevenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)
 2015 2014 (a) 2013 (b) 2015 2014 (a) 2013 (b)
Residential (c)
$540.3
 
$556.4
 (3%) 
$574.3
 (3%) 3,843
 4,164
 (8%) 4,272
 (3%)
Commercial (c)416.3
 410.2
 1% 409.6
 —% 4,059
 4,099
 (1%) 4,118
 —%
Industrial (c)453.6
 458.5
 (1%) 442.9
 4% 6,922
 7,132
 (3%) 6,973
 2%
Retail subtotal (c)1,410.2
 1,425.1
 (1%) 1,426.8
 —% 14,824
 15,395
 (4%) 15,363
 —%
Sales for resale:                   
Wholesale (c)56.4
 32.2
 75% 30.0
 7% 845
 485
 74% 419
 16%
Bulk power and other5.1
 2.1
 143% 2.0
 5% 178
 59
 202% 98
 (40%)
Other32.1
 33.9
 (5%) 33.0
 3% 67
 81
 (17%) 80
 1%
Total revenues/sales1,503.8
 1,493.3
 1% 1,491.8
 —% 15,914
 16,020
 (1%) 15,960
 —%
Electric production fuel expense194.5
 231.5
 (16%) 193.9
 19%          
Energy purchases expense233.6
 240.8
 (3%) 188.2
 28%          
Purchased electric capacity expense0.3
 25.0
 (99%) 155.2
 (84%)          
Margins (d)
$1,075.4
 
$996.0
 8% 
$954.5
 4%          

40

Table of Contents
IPLRevenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)
 2016 2015 (a) 2014 (b) 2016 2015 (a) 2014 (b)
Residential (c)
$536.7
 
$540.3
 (1%) 
$556.4
 (3%) 3,633
 3,843
 (5%) 4,164
 (8%)
Commercial (c)445.4
 416.3
 7% 410.2
 1% 4,159
 4,059
 2% 4,099
 (1%)
Industrial (c)396.4
 393.7
 1% 394.6
 —% 5,791
 6,007
 (4%) 6,124
 (2%)
Industrial - co-generation64.0
 59.9
 7% 63.9
 (6%) 940
 915
 3% 1,008
 (9%)
Retail subtotal (c)1,442.5
 1,410.2
 2% 1,425.1
 (1%) 14,523
 14,824
 (2%) 15,395
 (4%)
Sales for resale:                   
Wholesale (c)94.2
 56.4
 67% 32.2
 75% 1,360
 845
 61% 485
 74%
Bulk power and other3.6
 5.1
 (29%) 2.1
 143% 46
 178
 (74%) 59
 202%
Other29.4
 32.1
 (8%) 33.9
 (5%) 41
 67
 (39%) 81
 (17%)
Total revenues/sales1,569.7
 1,503.8
 4% 1,493.3
 1% 15,970
 15,914
 —% 16,020
 (1%)
Electric production fuel expense159.1
 194.5
 (18%) 231.5
 (16%)          
Purchased power expense271.4
 233.9
 16% 265.8
 (12%)          
Electric transmission service expense359.7
 328.2
 10% 323.4
 1%          
Electric margins (d)
$779.5
 
$747.2
 4% 
$672.6
 11%          


WPLRevenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)Revenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)
2015 2014 (a) 2013 (b) 2015 2014 (a) 2013 (b)2016 2015 (a) 2014 (b) 2016 2015 (a) 2014 (b)
Residential
$442.7
 $438.1 1% $434.8 1% 3,428
 3,533
 (3%) 3,552
 (1%)
$464.4
 $442.7 5% $438.1 1% 3,519
 3,428
 3% 3,533
 (3%)
Commercial251.5
 247.8
 1% 239.8
 3% 2,315
 2,350
 (1%) 2,314
 2%267.2
 251.5
 6% 247.8
 1% 2,386
 2,315
 3% 2,350
 (1%)
Industrial369.7
 340.5
 9% 322.5
 6% 4,813
 4,689
 3% 4,498
 4%390.7
 369.7
 6% 340.5
 9% 4,911
 4,813
 2% 4,689
 3%
Retail subtotal1,063.9
 1,026.4
 4% 997.1
 3% 10,556
 10,572
 —% 10,364
 2%1,122.3
 1,063.9
 5% 1,026.4
 4% 10,816
 10,556
 2% 10,572
 —%
Sales for resale:                        
Wholesale164.6
 174.4
 (6%) 165.4
 5% 2,769
 3,101
 (11%) 3,145
 (1%)162.4
 164.6
 (1%) 174.4
 (6%) 2,679
 2,769
 (3%) 3,101
 (11%)
Bulk power and other23.4
 0.8
 2,825% 15.7
 (95%) 1,050
 276
 280% 665
 (58%)6.5
 23.4
 (72%) 0.8
 2,825% 314
 1,050
 (70%) 276
 280%
Other14.8
 18.7
 (21%) 19.0
 (2%) 62
 74
 (16%) 72
 3%14.6
 14.8
 (1%) 18.7
 (21%) 59
 62
 (5%) 74
 (16%)
Total revenues/sales1,266.7
 1,220.3
 4% 1,197.2
 2% 14,437
 14,023
 3% 14,246
 (2%)1,305.8
 1,266.7
 3% 1,220.3
 4% 13,868
 14,437
 (4%) 14,023
 3%
Electric production fuel expense269.1
 212.4
 27% 237.1
 (10%)       249.0
 269.1
 (7%) 212.4
 27%       
Energy purchases expense138.7
 167.4
 (17%) 105.8
 58%       
Purchased electric capacity expense1.5
 0.1
 1,400% 61.6
 (100%)       
Margins$857.4 $840.4 2% $792.7 6%       
Purchased power expense174.5
 140.2
 24% 167.5
 (16%)       
Electric transmission service expense168.2
 157.1
 7% 124.1
 27%       
Electric margins$714.1 $700.3 2% $716.3 (2%)       

(a)
Reflects the % change from 20142015 to 20152016. (b) Reflects the % change from 20132014 to 20142015.
(c)InOn July 31, 2015, IPL sold its electric distribution assets in Minnesota to Southern Minnesota Energy Cooperative.Minnesota. Prior to the asset sale, the related electric sales are included in residential, commercial and industrial retail sales. Subsequent to the asset sale, the related electric sales are included in wholesale electric sales pursuant to a wholesale power supply agreement between IPL and Southern Minnesota Energy Cooperative.
(d)
Includes $64 million, $72 million and $85 million and $79 million of electric tax benefit rider credits on IPL’s Iowa retail electric customers’ bills for 20152016, 20142015 and 2013, respectively, resulting from the electric tax benefit rider.2014, respectively. The electric tax benefit rider resulted in reductions in electric revenues that were offset by reductions in income tax expense for 20152016, 20142015 and 2013.2014.

Variances - Variances between periods in electric margins were as follows (in millions):
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Lower retail electric customer billing credits in 2015 at IPL (a)
$48
 
$48
 
$—
Purchased electric capacity expense at IPL in 2014 related to the previous DAEC PPA, which ended in February 201425
 25
 
Higher revenues at IPL in 2015 due to lower credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider (Refer to Note 2 for further details)
13
 13
 
Changes in electric fuel-related costs, net of recoveries at WPL11
 
 11
Higher revenues at WPL from the impact of increased sales volumes approved in its retail electric base rate case for 2015 (b)9
 
 9
Estimated changes in sales caused by temperatures(19) (10) (9)
Other (c)9
 3
 6
 
$96
 
$79
 
$17
2016 vs. 2015 Summary:Alliant Energy IPL WPL
Higher revenues at IPL due to lower retail electric customer billing credits related to the approved retail electric base rate freeze through 2016 (Refer to Note 2 for details)

$15
 
$15
 
$—
Estimated changes in sales caused by temperatures (Refer to “Temperatures” below for details)15
 10
 5
Higher revenues at IPL due to fewer electric tax benefit rider credits on customers’ bills (Refer to Note 2 for details)
8
 8
 
Higher electric transmission service expense at WPL (Refer to “Electric Transmission Service Expense” below for details)(11) 
 (11)
Other (a)19
 (1) 20
 
$46
 
$32
 
$14

41



2014 vs. 2013 Summary:Alliant Energy IPL WPL
Lower purchased electric capacity expense at IPL related to the previous DAEC PPA, which ended in February 2014
$129
 
$129
 
$—
Purchased electric capacity expense at WPL in 2013 related to the Kewaunee PPA, which ended in December 201361
 
 61
Higher revenues at IPL related to changes in recovery amounts for transmission costs through the transmission rider (d)18
 18
 
Retail electric customer billing credits at IPL (a)(72) (72) 
Estimated changes in sales caused by temperatures(17) (13) (4)
Lower wholesale margins (e)(11) (4) (7)
Changes in electric fuel-related costs, net of recoveries at WPL(9) 
 (9)
Changes in revenue requirement adjustment related to certain tax benefits from tax accounting method changes at IPL (Refer to Note 2 for further details)
(9) (9) 
Lower revenues at IPL due to changes in credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider (Refer to Note 2 for further details)
(6) (6) 
Other (c)5
 (1) 7
 
$89
 
$42
 
$48
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Higher revenues at IPL due to lower retail electric customer billing credits related to the approved retail electric base rate freeze (Refer to Note 2 for details)

$48
 
$48
 
$—
Lower purchased electric capacity expense at IPL attributed to the previous DAEC PPA, which ended in February 201425
 25
 
Higher revenues at IPL due to fewer electric tax benefit rider credits on customers’ bills (Refer to Note 2 for details)
13
 13
 
Changes in electric fuel-related costs, net of recoveries at WPL (Refer to “Electric Production Fuel and Purchased Power (Fuel-related) Expenses” below for details)11
 
 11
Higher revenues at WPL from the impact of increased sales volumes approved in its retail electric base rate case for 2015 (b)9
 
 9
Higher electric transmission service expense at WPL (Refer to “Electric Transmission Service Expense” below for details)(33) 
 (33)
Estimated changes in sales caused by temperatures (Refer to “Temperatures” below for details)(19) (10) (9)
Other (a)5
 (1) 6
 
$59
 
$75
 
($16)


(a)
Includes increases in temperature-normalized retail sales volumes at WPL in 2016 and 2015. Refer to Note 2“Sales Trends” below for further discussion of billing credits that began in 2014 related to the approved settlement agreement for IPL’s Iowa retail electric rates.
more information.
(b)The PSCW order received for WPL’s retail fuel-related rate filing (2015 Test Year) contained an increase in retail electric fuel-related revenues in 2015. A portion of the approved increase was attributable to the impact of increased sales volumes approved in WPL’s retail electric base rate case for 2015 resulting in higher electric margin in 2015.
(c)Includes increases in temperature-normalized retail sales volumes at WPL in 2015 and 2014. Refer to “Sales Trends” below for more information.
(d)Higher transmission rider revenues were offset by higher electric transmission service expense.
(e)Primarily due to lower nuclear capacity costs in 2014, which are included in the rates charged to wholesale customers.

Temperatures - Electric sales demand is seasonal to some extent with the annual peak normally occurring in the summer months due to air conditioning usage by residential, commercial and wholesale customers. Electric sales are also impacted to a certain extent in the winter months due to heating requirement usage. HDD data is used to measure the variability of temperatures during winter months and is correlated with both electric and gas sales demand. CDD data is used to measure the variability of temperatures during summer months and is correlated with electric sales demand. HDD and CDD are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical HDD and CDD. HDD and CDD in Alliant Energy’s service territories were as follows:
Actual  Actual  
2015 2014 2013 Normal2016 2015 2014 Normal
HDD:              
Cedar Rapids, Iowa (IPL)6,300
 7,657
 7,232
 6,756
5,933
 6,300
 7,657
 6,798
Madison, Wisconsin (WPL)6,667
 7,884
 7,627
 7,046
6,420
 6,667
 7,884
 7,082
CDD:              
Cedar Rapids, Iowa (IPL)732
 670
 884
 769
971
 732
 670
 766
Madison, Wisconsin (WPL)665
 620
 709
 663
780
 665
 620
 662

Estimated increases (decreases) to electric margins from the impacts of temperatures were as follows (in millions):
2015 2014 20132016 2015 2014
IPL
($7) 
$3
 
$16

$3
 
($7) 
$3
WPL(4) 5
 9
1
 (4) 5
Total Alliant Energy
($11) 
$8
 
$25

$4
 
($11) 
$8

Sales Trends -Alliant Energy’s retail sales volumes remained unchanged in 2016 and decreased 2% in 20152015. During 2016, WPL’s retail sales volumes increased due to the impact of temperatures on residential and increased 1%commercial sales resulting in 2014. higher cooling demand in 2016, an extra day of retail sales during the first quarter of 2016 due to the leap year and higher commercial and industrial sales driven by customer expansions. This increase was offset by a decrease in IPL’s retail sales volumes primarily related to IPL’s sale of its Minnesota electric distribution assets in 2015. The decrease in IPL’s retail sales was partially offset by the impact of temperatures on residential and commercial sales resulting in higher cooling demand in 2016, an extra day of retail sales during the first quarter of 2016 due to the leap year and an increase in commercial sales driven by customer expansion.

The 2015 decrease was primarily due to the impact of temperatures on residential and commercial sales resulting in lower heating demand in 2015 compared to 2014 and decreased retail sales related to IPL’s sale of its Minnesota electric distribution assets in 2015. IPL’s industrial sales volumes decreased 3% in 2015 primarily due to lower usage by industrial customers that have their own

42

Table of Contents


generation. WPL’s industrial sales volumes increased 3% in 2015 primarily due to production expansion at one of its industrial customers.

The 2014 increase was primarily due to an increase in industrial sales at IPL and WPL due to production expansion at several customers and higher IPL co-generation customer requirements, and modest customer growth in WPL’s service territory in 2014. These increases were partially offset by the impact temperatures had on electric sales in 2014.

Alliant Energy’s wholesale sales volumes increased 1%12% in 20152016 and 1% in 2014.2015. The 2015 increase wasincreases were primarily due to additional sales from IPL’s new wholesale power supply agreement with Southern Minnesota Energy Cooperative. This increase was substantiallyCooperative effective August 1, 2015. The increases were partially offset by decreased sales to WPL’s partial-requirement wholesale customers that have contractual options to be served by WPL, other power supply sources or the MISO market. The 2014 increase was primarily dueRefer to increases in salesOther Future Considerations” for discussion of notifications provided to oneeach of IPL’s full-requirementIPL and WPL to terminate certain of their wholesale customers due to production expansion partially offset by the impact of changes in sales to WPL’s partial-requirement wholesale customers.power supply agreements.

Alliant Energy’s bulk power and other revenuesales volume changes were largely due to changes in sales in the wholesale energy markets operated by MISO. These changes are impacted by several factors including the availability and dispatch of Alliant Energy’s EGUs and electricity demand within these wholesale energy markets. Changes in bulk power and other sales revenues were largely offset by changes in fuel-related costs, and therefore, did not have a significant impact on electric margins.


Electric Production Fuel and Energy PurchasesPurchased Power (Fuel-related) Cost RecoveriesExpenses - Fossil fuels, such as coalnatural gas and natural gas,coal, are burned to produce electricity at EGUs. The cost of fossil fuels used during each period is included in electric production fuel expense. Electricity is also purchased to meet customer demand and these costs are charged to energy purchasespurchased power expense.

Due to IPL’s cost recovery mechanisms for fuel-related costs,expenses, changes in fuel-related costsexpenses resulted in comparable changes in electric revenues, and therefore, did not have a significant impact on Alliant Energy’s and IPL’s electric margins. WPL’s cost recovery mechanism for wholesale fuel-related costsexpenses also provides for adjustments to its wholesale electric rates for changes in commodity costs, thereby mitigating impacts of changes to commodity costs on Alliant Energy’s and WPL’s electric margins.

WPL’s cost recovery mechanism for retail fuel-related costs providesexpenses supports deferrals of amounts that fall outside an approved bandwidth of plus or minus 2% of forecasted fuel-related costsexpenses determined by the PSCW each year. The difference between revenue collected and actual fuel-related costsexpenses incurred within the bandwidth increases or decreases Alliant Energy’s and WPL’s electric margins. WPL estimates the increase (decrease) to electric margins from amounts within the bandwidth were approximately $6 million, $6 million and ($5) million in 2016, 2015, and $4 million in 2015, 2014, and 2013, respectively. Refer to Note 2 for discussion of deferred fuel-related costs that were outside the approved bandwidth incurred in 2016, 2015 and 2014.

Refer to “Other Matters - Market Risk Sensitive Instruments and Positions” for further discussion of risks associated with increased fuel-related expenses on WPL’s electric margins. Refer to “Rate Matters” and Note 1(g) for additional information relating to recovery mechanisms for fuel-related expenses.

2016 vs. 2015 Summary - Alliant Energy’s electric production fuel expense decreased $56 million in 2016 primarily due to lower dispatch of IPL’s and WPL’s coal-fired EGUs during 2016 due to lower wholesale energy market prices and WPL’s retirement of Nelson Dewey Units 1 and 2 in December 2015. The decrease was also due to changes in the under-/over-collection of fuel-related expenses at IPL and lower natural gas prices. These items were partially offset by changes in the under-/over-collection of fuel-related expenses that were outside the approved bandwidth at WPL.

Alliant Energy’s purchased power expense increased $72 million in 2016 primarily due to increased volumes purchased resulting from lower dispatch of IPL’s and WPL’s coal-fired EGUs during 2016.

2015 vs. 2014 Summary - Alliant Energy’s electric production fuel expense increased $20 million in 2015 primarily due to deferrals recordedchanges in 2015 and 2014 forthe under-/over-collection of fuel-related costsexpenses that were outside the approved bandwidth at WPL. These items were partially offset by lower dispatch of IPL’s coal-fired EGUs during 2015 and changes in the under-/over-collection of fuel-related costsexpenses at IPL.

Alliant Energy’s energy purchasespurchased power expense decreased $36$59 million in 2015 primarily due to lower prices for electricity purchased by IPL and WPL from MISO wholesale energy markets and decreased volumes purchased. The decreased volumes purchased were due to lower electric sales.

2014 vs. 2013 Summary - Alliant Energy’s electric production fuel expense increased $13 million in 2014 primarily due to the unseasonably cold weather conditions in Alliant Energy’s service territory in the first quarter of 2014, which resulted in higher commodity prices and increased customer demand in the first quarter of 2014. This contributed to higher MISO dispatch of IPL’s and WPL’s EGUs in the first quarter of 2014. The increase in 2014decrease was also due to changes inpurchased electric capacity expense at IPL attributed to the under-/over-collection of fuel-related costs at IPL. These items were partially offset by deferred fuel-related costs incurred that fell outside the approved bandwidth for 2014 at WPL, as well as lower dispatch at WPL’s coal-fired EGUs during the third quarter of 2014, which included impacts of lower than planned coal deliveries.


43

Table of Contents


Alliant Energy’s energy purchases expense increased $114 million in 2014 primarily due to increased prices for electricity, partially resulting from IPL’s newprevious DAEC PPA, and the expiration of WPL’s Kewaunee PPA, and increased volumes partially due to lower dispatch of WPL’s coal-fired EGUs during the third quarter of 2014. The increase was also due to extremely cold temperatureswhich expired in the first quarter of 2014 contributing to higher prices for electricity purchased by IPL and WPL from MISO wholesale energy markets forFebruary 2014.

Purchased Electric CapacityTransmission Service Expense - PPAs help meet customer demand. Certain of these PPAs included minimum payments for IPL’s and WPL’s rights toVariances between periods in electric generating capacity. The previous DAEC PPA expired in February 2014 and the Kewaunee PPA expired in December 2013. Details of purchased electric capacitytransmission service expense included in the utility electric margins tables above were as follows (in millions):
 2015 2014 2013
DAEC PPA (IPL)
$—
 
$25
 
$154
Kewaunee PPA (WPL)
 
 61
Other2
 
 2
 
$2
 
$25
 
$217
2016 vs. 2015 Summary:Alliant Energy IPL WPL
Higher electric transmission service costs billed from ITC, ATC and MISO primarily due to increased electric transmission service rates
$35
 
$18
 
$17
Changes at IPL in the under-/over-collection of electric transmission service expense through the transmission cost rider (a)12
 12
 
Changes in WPL’s costs deferred pursuant to escrow treatment for the difference between actual electric transmission service costs and those costs used to determine rates (a)(7) 
 (7)
Other3
 2
 1
 
$43
 
$32
 
$11

2015 vs. 2014 Summary:Alliant Energy IPL WPL
Higher electric transmission service costs billed from ITC, ATC and MISO primarily due to increased electric transmission service rates
$18
 
$6
 
$12
WPL escrow treatment for the difference between actual electric transmission service costs and those costs used to determine rates (a)21
 
 21
Other(1) (1) 
 
$38
 
$5
 
$33

(a)
Refer to Notes 1(g) and 2 for additional information relating to recovery of electric transmission service expenses.

Refer to “Rate Matters” for discussion of the IUB’s approval of IPL’s retail electric rate settlement agreement in 2014, which includes a retail electric base rate freeze and retail electric customer billing credits at IPL through the end of 2016. Refer to Note 2 for discussion of WPL’s retail fuel-related rate increases effective January 1, 2015 and 2016, WPL retail rate cases including a retail electric base rate freeze at WPL through the end of 2016, IPL’s electric tax benefit rider, and IPL’s revenue requirement adjustment. Refer to “Other Future Considerations” for discussion of notifications providedadditional information on sales trends and electric transmission service expense. Refer to each of IPLRate Matters and WPL to terminate certain of their wholesale power supply agreements.Note 2 for information on electric rate increases in 2017.

Utility Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold. These gas margins may not be comparable to how other entities define utility margin. Gas margins and Dth sales were as follows:
Alliant EnergyRevenues and Costs (dollars in millions) Dths Sold (Dths in thousands)Revenues and Costs (dollars in millions) Dths Sold (Dths in thousands)
2015 2014 (a) 2013 (b) 2015 2014 (a) 2013 (b)2016 2015 (a) 2014 (b) 2016 2015 (a) 2014 (b)
Residential
$215.1
 
$287.5
 (25%) 
$262.5
 10% 26,672
 31,718
 (16%) 29,916
 6%
$197.6
 
$215.1
 (8%) 
$287.5
 (25%) 25,571
 26,672
 (4%) 31,718
 (16%)
Commercial120.5
 172.8
 (30%) 150.3
 15% 18,966
 23,301
 (19%) 21,892
 6%109.6
 120.5
 (9%) 172.8
 (30%) 18,820
 18,966
 (1%) 23,301
 (19%)
Industrial14.3
 23.4
 (39%) 21.1
 11% 2,997
 3,710
 (19%) 3,803
 (2%)15.2
 14.3
 6% 23.4
 (39%) 3,352
 2,997
 12% 3,710
 (19%)
Retail subtotal349.9
 483.7
 (28%) 433.9
 11% 48,635
 58,729
 (17%) 55,611
 6%322.4
 349.9
 (8%) 483.7
 (28%) 47,743
 48,635
 (2%) 58,729
 (17%)
Transportation/other31.3
 33.8
 (7%) 30.9
 9% 74,162
 64,717
 15% 60,261
 7%33.0
 31.3
 5% 33.8
 (7%) 77,485
 74,162
 4% 64,717
 15%
Total revenues/sales381.2
 517.5
 (26%) 464.8
 11% 122,797
 123,446
 (1%) 115,872
 7%355.4
 381.2
 (7%) 517.5
 (26%) 125,228
 122,797
 2% 123,446
 (1%)
Cost of gas sold219.1
 327.8
 (33%) 276.7
 18%       194.3
 219.1
 (11%) 327.8
 (33%)       
Margins (c)
$162.1
 
$189.7
 (15%) 
$188.1
 1%       
Gas margins (c)
$161.1
 
$162.1
 (1%) 
$189.7
 (15%)       
IPLRevenues and Costs (dollars in millions) Dths Sold (Dths in thousands)Revenues and Costs (dollars in millions) Dths Sold (Dths in thousands)
2015 2014 (a) 2013 (b) 2015 2014 (a) 2013 (b)2016 2015 (a) 2014 (b) 2016 2015 (a) 2014 (b)
Residential
$120.0
 
$162.5
 (26%) 
$152.8
 6% 14,472
 17,839
 (19%) 16,975
 5%
$110.6
 
$120.0
 (8%) 
$162.5
 (26%) 13,788
 14,472
 (5%) 17,839
 (19%)
Commercial67.9
 96.1
 (29%) 85.7
 12% 10,166
 12,641
 (20%) 12,051
 5%61.9
 67.9
 (9%) 96.1
 (29%) 10,143
 10,166
 —% 12,641
 (20%)
Industrial10.5
 17.4
 (40%) 16.1
 8% 2,239
 2,804
 (20%) 2,931
 (4%)10.6
 10.5
 1% 17.4
 (40%) 2,299
 2,239
 3% 2,804
 (20%)
Retail subtotal198.4
 276.0
 (28%) 254.6
 8% 26,877
 33,284
 (19%) 31,957
 4%183.1
 198.4
 (8%) 276.0
 (28%) 26,230
 26,877
 (2%) 33,284
 (19%)
Transportation/other18.9
 20.5
 (8%) 19.3
 6% 34,129
 31,377
 9% 32,019
 (2%)20.9
 18.9
 11% 20.5
 (8%) 37,158
 34,129
 9% 31,377
 9%
Total revenues/sales217.3
 296.5
 (27%) 273.9
 8% 61,006
 64,661
 (6%) 63,976
 1%204.0
 217.3
 (6%) 296.5
 (27%) 63,388
 61,006
 4% 64,661
 (6%)
Cost of gas sold123.3
 185.5
 (34%) 160.3
 16%       111.0
 123.3
 (10%) 185.5
 (34%)       
Margins (c)
$94.0
 
$111.0
 (15%) 
$113.6
 (2%)       
Gas margins (c)
$93.0
 
$94.0
 (1%) 
$111.0
 (15%)       

44

Table of Contents


WPLRevenues and Costs (dollars in millions) Dths Sold (Dths in thousands)Revenues and Costs (dollars in millions) Dths Sold (Dths in thousands)
2015 2014 (a) 2013 (b) 2015 2014 (a) 2013 (b)2016 2015 (a) 2014 (b) 2016 2015 (a) 2014 (b)
Residential
$95.1
 
$125.0
 (24%) 
$109.7
 14% 12,200
 13,879
 (12%) 12,941
 7%
$87.0
 
$95.1
 (9%) 
$125.0
 (24%) 11,783
 12,200
 (3%) 13,879
 (12%)
Commercial52.6
 76.7
 (31%) 64.6
 19% 8,800
 10,660
 (17%) 9,841
 8%47.7
 52.6
 (9%) 76.7
 (31%) 8,677
 8,800
 (1%) 10,660
 (17%)
Industrial3.8
 6.0
 (37%) 5.0
 20% 758
 906
 (16%) 872
 4%4.6
 3.8
 21% 6.0
 (37%) 1,053
 758
 39% 906
 (16%)
Retail subtotal151.5
 207.7
 (27%) 179.3
 16% 21,758
 25,445
 (14%) 23,654
 8%139.3
 151.5
 (8%) 207.7
 (27%) 21,513
 21,758
 (1%) 25,445
 (14%)
Transportation/other12.4
 13.3
 (7%) 11.6
 15% 40,033
 33,340
 20% 28,242
 18%12.1
 12.4
 (2%) 13.3
 (7%) 40,327
 40,033
 1% 33,340
 20%
Total revenues/sales163.9
 221.0
 (26%) 190.9
 16% 61,791
 58,785
 5% 51,896
 13%151.4
 163.9
 (8%) 221.0
 (26%) 61,840
 61,791
 —% 58,785
 5%
Cost of gas sold95.8
 142.3
 (33%) 116.4
 22%       83.3
 95.8
 (13%) 142.3
 (33%)       
Margins
$68.1
 
$78.7
 (13%) 
$74.5
 6%       
Gas margins
$68.1
 
$68.1
 —% 
$78.7
 (13%)       

(a)
Reflects the % change from 20142015 to 20152016. (b) Reflects the % change from 20132014 to 20142015.
(c)Includes $12 million $12 million and $11 million of gas tax benefit rider credits on IPL’s Iowa retail gas customers’ bills for each of 2016, 2015 2014 and 2013, respectively, resulting from the gas tax benefit rider.2014. The gas tax benefit rider resulted in reductions in gas revenues that were offset by reductions in income tax expense for 2016, 2015 2014 and 2013.2014.


Variances - Variances between periods in gas margins were as follows (in millions):
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Estimated decrease from changes in sales caused by temperatures
($14) 
($7) 
($7)
Lower revenues at IPL related to changes in recovery amounts for energy efficiency costs through the energy efficiency rider (a)(9) (9) 
Lower revenues at WPL due to the impact of changes in retail gas base rates effective January 2015(4) 
 (4)
Other(1) (1) 
 
($28) 
($17) 
($11)
2016 vs. 2015 Summary:Alliant Energy IPL WPL
Estimated changes in sales caused by temperatures (Refer to “Temperatures” below for details)
($3) 
($2) 
($1)
Other2
 1
 1
 
($1) 
($1) 
$—
2014 vs. 2013 Summary:Alliant Energy IPL WPL
Estimated increase from changes in sales caused by temperatures
$4
 
$2
 
$2
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Estimated changes in sales caused by temperatures (Refer to “Temperatures” below for details)
($14) 
($7) 
($7)
Lower revenues at IPL related to changes in recovery amounts for energy efficiency costs through the energy efficiency rider (a)(4) (4) 
(9) (9) 
Lower revenues at WPL due to the impact of changes in retail gas base rates effective January 2015(4) 
 (4)
Other2
 (1) 2
(1) (1) 

$2
 
($3) 
$4

($28) 
($17) 
($11)

(a)Changes in gas energy efficiency revenues were mostly offset by changes in energy efficiency expense included in other operation and maintenance expenses.

Natural Gas Cost Recoveries - Alliant Energy’s cost of gas sold decreased $109 million in 2015 and increased $51 million in 2014. The decrease in 2015 was primarily due to lower retail gas volumes at IPL and WPL caused by temperatures discussed below and lower natural gas prices. The increase in 2014 was primarily due to higher retail gas volumes caused by temperatures discussed below. Refer to Note 1(g) for additional information relating to natural gas cost recoveries.

Temperatures - Gas sales demand follows a seasonal pattern with an annual base load of gas and a large heating peak occurring during the winter season. HDD data is used to measure the variability of temperatures during winter months and is correlated with gas sales demand. Refer to “Utility Electric Margins” for HDD data details.

Estimated increases (decreases) to gas margins from the impacts of temperatures were as follows (in millions):
2015 2014 20132016 2015 2014
IPL
($2) 
$5
 
$3

($4) 
($2) 
$5
WPL(2) 5
 3
(3) (2) 5
Total Alliant Energy
($4) 
$10
 
$6

($7) 
($4) 
$10

Cost of Gas Sold - Alliant Energy’s cost of gas sold decreased $25 million in 2016 and $109 million in 2015. The decrease in 2016 was primarily due to lower natural gas prices. The decrease in 2015 was primarily due to lower retail gas volumes at IPL and WPL caused by temperatures discussed above and lower natural gas prices. Refer to Note 1(g) for additional information relating to natural gas cost recoveries.

Refer to Note 2 for discussion of IPL’sinformation on gas tax benefit rider and retail gas base rate decreases for WPL’s customers effective January 2015.increases in 2017.


45

Table of Contents


Other Utility Other Revenues - Variances between periods in utility other revenues were as follows (in millions):
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Lower margins from IPL’s sharing mechanism related to optimizing gas capacity contracts (a)
($5) 
($5) 
$—
Other(3) 
 (3)
 
($8) 
($5) 
($3)
2016 vs. 2015 Summary:Alliant Energy IPL WPL
Lower steam sales
($3) 
($3) 
$—
Other(6) (4) (3)
 
($9) 
($7) 
($3)
2014 vs. 2013 Summary:Alliant Energy IPL WPL
Lower coal sales at WPL (b)
($7) 
$—
 
($7)
Higher margins from IPL’s sharing mechanism related to optimizing gas capacity contracts (a)4
 4
 
Other(2) 1
 (3)
 
($5) 
$5
 
($10)
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Lower margins from IPL’s sharing mechanism related to optimizing gas capacity contracts (a)
($5) 
($5) 
$—
Other(3) 
 (3)
 
($8) 
($5) 
($3)

(a)Approximately 50% of all margins earned from IPL’s sharing mechanism relating to optimizing gas capacity contracts flow through the purchased gas adjustment clause to reduce retail gas customer bills in Iowa. The remaining margins are retained by IPL and recorded in utility other revenues. Due to the extreme cold temperatures causing natural gas price fluctuations in the first quarter of 2014, margins were higher than normal in 2014.
(b)Changes in utility other revenues related to coal sales were largely offset by changes in utility other operation and maintenance expenses related to coal sales.

Non-regulated Revenues - In 2015, Alliant Energy’s non-regulated revenues decreased $9 million in 2015, primarily due to decreased revenues at Transportation resulting from decreased demand for freight, barge and transfer services.


Electric Transmission Service ExpenseAsset Valuation Charges for Franklin County Wind Farm - Variances between periods in electric transmission service expense were as follows (in millions):
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Higher electric transmission service costs billed from ITC, ATC and MISO (a)
$18
 
$6
 
$12
Escrow treatment for the difference between actual electric transmission service costs and those costs used to determine rates during 2015 at WPL (Refer to Note 2 for further details)
21
 
 21
Other(1) (1) 
 
$38
 
$5
 
$33
2014 vs. 2013 Summary:Alliant Energy IPL WPL
Higher electric transmission service costs billed from ITC, ATC and MISO (a)
$38
 
$33
 
$5
Changes in the under-/over-collection of electric transmission service expense through the transmission cost rider at IPL (b)(11) (11) 
Other2
 
 2
 
$29
 
$22
 
$7

(a)Primarily due to increased electric transmission service rates.
(b)IPL is currently recovering the Iowa retail portion of its increased electric transmission service costs from its retail electric customers in Iowa through a transmission cost rider approved by the IUB in January 2011 and extended as part of the rate settlement approved in September 2014. The difference between electric transmission services expense and amounts collected from customers as electric revenues results in temporary costs (credits) recorded in electric transmission service expense until the amounts are reflected in future customer billings.

Refer to Notes 1(g) and 2Note 3 for additional information relating to recoverydetails of electric transmission service expenses.asset valuation charges recorded in 2016 by Alliant Energy for the Franklin County wind farm.


46

Table of Contents


Other Operation and Maintenance Expenses - Variances between periods in other operation and maintenance expenses were as follows (in millions):
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Lower energy efficiency cost recovery amortizations at WPL (a)
($38) 
$—
 
($38)
Lower generation expense (b)(13) (2) (11)
Changes in energy efficiency expense at IPL (c)(5) (5) 
Losses on sales of IPL’s Minnesota distribution assets recorded in 2015 (Refer to Note 3 for further details)
14
 14
 
Higher employee benefits-related expense (d)14
 7
 7
Voluntary employee separation charges recorded in 2015 (Refer to Note 12(a) for further details)
8
 5
 3
Other (includes lower costs due to cost controls and operational efficiencies)(16) (10) (3)
 
($36) 
$9
 
($42)
2016 vs. 2015 Summary:Alliant Energy IPL WPL
Lower energy efficiency cost recovery amortizations at WPL (a)
($15) 
$—
 
($15)
Losses on sales of IPL’s Minnesota distribution assets recorded in 2015 (Refer to Note 3 for details)
(14) (14) 
Voluntary employee separation charges in 2015 (Refer to Note 12(a) for details)
(8) (5) (3)
Higher bad debt expense at IPL (b)9
 9
 
Higher stock-based performance compensation expense (Refer to Note 12(b) for details)
7
 4
 3
Higher employee benefits-related expense (c)7
 5
 2
Other (includes lower costs due to cost controls and operational efficiencies)(9) (5) (3)
 
($23) 
($6) 
($16)
2014 vs. 2013 Summary:Alliant Energy IPL WPL
Higher energy efficiency cost recovery amortizations at WPL (a)
$20
 
$—
 
$20
Regulatory-related credit at IPL recorded in 2013 (e)7
 7
 
Higher generation expense (b)7
 4
 3
Higher customer service expense (f)6
 4
 2
Lower employee benefits-related expense (g)(8) (5) (3)
Lower expense related to coal sales at WPL (h)(7) 
 (7)
Other (includes increases in other administrative and general and distribution system expenses)4
 9
 4
 
$29
 
$19
 
$19
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Lower energy efficiency cost recovery amortizations at WPL (a)
($38) 
$—
 
($38)
Lower generation expense (d)(13) (2) (11)
Changes in energy efficiency expense at IPL (e)(5) (5) 
Losses on sales of IPL’s Minnesota distribution assets recorded in 2015 (Refer to Note 3 for details)
14
 14
 
Higher employee benefits-related expense (c)14
 7
 7
Voluntary employee separation charges in 2015 (Refer to Note 12(a) for details)
8
 5
 3
Other (includes lower costs due to cost controls and operational efficiencies)(16) (10) (3)
 
($36) 
$9
 
($42)

(a)The July 2014 PSCW order for WPL’s 2015/2016 Test Period electric and gas base rate case authorized lower energy efficiency cost recovery amortizations for 2015.2015 and 2016. The July 2012 PSCW order for WPL’s 2013/2014 Test Period electric and gas base rate case authorized changes in energy efficiency cost recovery amortizations for 2013 and 2014. Regulatory amortizations at WPL related to energy efficiency costs were ($11) million, $4 million and $42 million in 2016, 2015 and $22 million in 2015, 2014, and 2013, respectively.
(b)Primarily due to the timing and extentan increase in IPL’s allowance for doubtful accounts as a result of maintenance projects at IPL’s and WPL’s EGUs.increases in past due accounts receivable.
(c)Changes in IPL’s energy efficiency expense were offset by changes in electric and gas energy efficiency revenues.
(d)Primarily due to an increase in retirement plans costs and other employee benefits-related costs. The increased retirement plan costs in 2016 were largely due to lower than expected returns on plan assets in 2015. The increased retirement plan costs in 2015 were largely due to decreases in discount rates and a change to life expectancy assumptions in 2014.
(e)(d)In 2013, IPL received an order fromPrimarily due to the MPUC approving full cost recoverytiming and extent of the Minnesota retail portion ofmaintenance projects at IPL’s Whispering Willow - East wind farm construction costs effective January 1, 2013. As a result, Alliant Energy and IPL reversed a prior reserve and recognized a $7 million regulatory-related credit in 2013.WPL’s EGUs.
(f)Primarily due to increased customer billing and customer assistance-related expenses.
(g)Primarily due to a decrease in retirement plan costs, partially offset by an increase in other employee benefits-related costs and the reversal of a previously recorded reserve related to the Cash Balance Plan in 2013.
(h)(e)Changes in IPL’s energy efficiency expense related to coal sales at WPL were largely offset by changes in coal sales revenue at WPL.electric and gas energy efficiency revenues.

Depreciation and Amortization Expenses - Variances between periods in depreciation and amortization expenses were as follows (in millions):
2016 vs. 2015 Summary:Alliant Energy IPL WPL
Higher amortization expense from the new customer billing and information system placed in service in 2015
$8
 
$4
 
$4
Lower depreciation expense from the sale of IPL’s Minnesota distribution assets in 2015(3) (3) 
Other (includes the impact of property additions)5
 3
 4
 
$10
 
$4
 
$8
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Higher depreciation expense for IPL’s Ottumwa Unit 1 scrubber and baghouse placed in service in 2014
$5
 
$5
 
$—
Other (includes the impact of other property additions)8
 5
 3
 
$13
 
$10
 
$3
2014 vs. 2013 Summary:Alliant Energy IPL WPL
Higher depreciation expense for WPL’s Columbia Units 1 and 2 scrubbers and baghouses placed in service in 2014
$4
 
$—
 
$4
Other (includes the impact of other property additions)13
 6
 5
 
$17
 
$6
 
$9

47

Table of Contents



Interest Expense - Variances between periods in interest expense were as follows (in millions):
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Higher interest expense from the issuance of WPL’s $250 million, 4.1% debentures in October 2014
$8
 
$—
 
$8
Higher interest expense from the issuance of IPL’s $250 million, 3.25% senior debentures in November 20148
 8
 
Lower interest expense from the retirement of Alliant Energy’s $250 million, 4% senior notes in October 2014(8) 
 
Other(1) (1) (2)
 
$7
 
$7
 
$6
2014 vs. 2013 Summary:Alliant Energy IPL WPL
Higher interest expense from the issuance of IPL’s $250 million, 4.7% senior debentures in October 2013
$9
 
$9
 
$—
Other(1) 
 1
 
$8
 
$9
 
$1
2016 vs. 2015 Summary:Alliant Energy IPL WPL
Higher interest expense from the issuance of IPL’s $250 million, 3.4% senior debentures in August 2015
$5
 
$5
 
$—
Other4
 1
 (1)
 
$9
 
$6
 
($1)
2015 vs. 2014 Summary:Alliant Energy IPL WPL
Higher interest expense from the issuance of WPL’s $250 million, 4.1% debentures in October 2014
$8
 
$—
 
$8
Higher interest expense from the issuance of IPL’s $250 million, 3.25% senior debentures in November 20148
 8
 
Lower interest expense from the retirement of Alliant Energy’s $250 million, 4% senior notes in October 2014(8) 
 
Other(1) (1) (2)
 
$7
 
$7
 
$6

Refer to Note 9 for additional details of debt.

Equity Income from Unconsolidated Investments, Net - In 2016, Alliant Energy’s and WPL’s equity income from unconsolidated investments increased $6 million and $5 million, respectively, primarily due to higher ATC income and lower reserves for rate refunds recorded at ATC in 2016 compared to 2015. In 2015, Alliant Energy’s and WPL’s equity income from unconsolidated investments decreased $7 million and $8 million, respectively, primarily due to reserves for rate refunds recorded at ATC in 2015 at ATC.2015. Refer to “Other Future Considerations” for discussion of complaintsa complaint pending with FERC regarding the level of return on equity that MISO transmission owners (including ATC) should be allowed to utilize in calculating the rates they charge their customers. Refer to Note 6(a) for discussion of WPL’s transfer of its investment in ATC to ATI.

AFUDC - Refer to Note 3 for details of AFUDC recognized in 2016, 2015 2014 and 2013.2014.

Income Taxes - Refer to Note 11 for details of effective income tax rates for continuing operations.

Loss from Discontinued Operations, Net of Tax - Refer to Note 19 for discussion of discontinued operations.

Preferred Dividend Requirements of Subsidiaries - In 2014, Alliant Energy’s and IPL’s preferred dividend requirements of subsidiaries decreased $8 million and $6 million, respectively, primarily due to IPL recording charges of $5 million in 2013 related to the redemption of preferred stock. Refer to Note 8 for additional discussion of IPL’s preferred stock transactions.

STRATEGIC OVERVIEW

Strategic Plan - The strategic plan focuses on the core business of delivering regulated electriccreating customer growth and natural gas service invalue across IPL’s Iowa and WPL’s Wisconsin service territories. Customers have evolving expectations and access to increasingly competitive alternatives for energy. As a result, providing customized energy solutions while aggressively managing customer prices remains at the center of the strategic plan. Successful implementation of the strategic plan will result in increased earnings for Alliant Energy, IPL and WPL while limiting cost increases for IPL’s and WPL’s customers. The strategic plan is built upon threetwo key elements: competitive value, exceptional service,Growth and responsible resources.Optimization.

Competitive ValueGrowth - Aggressively managing costs and serving as a resource for customers seeking energy solutions are key elements to providing competitive value for customers. Given public policy changes may result in increases to future energy costs,The growth element of the strategic plan includes accelerating the growth of customers’ electric and gas usage and expanding the portfolio of energy resources with additional clean and renewable energy. Increasing electric and gas usage in IPL’s and WPL’s service territories is expected to help minimize individual customer prices, and expanding clean and renewable energy will help customers meet sustainability objectives and reduce Alliant Energy’s carbon emissions.

Accelerate Electric and Gas Growth - Actions to accelerate the growth of customers’ electric and gas usage include: retention of current customers and growth of new customers, economic development opportunities designed to attract new customers, and efforts to promote additional markets for electricity and gas, such as the electrification of the transportation sector (e.g. electric vehicles).

To help support retention and growth of current customers, the strategic plan focuses on promoting energy efficiency and using new and existing technologies and customized energy solutions, which are expected to help reduce energy costs, provide flexibility, increase productivity and help customers achieve sustainability objectives.

Economic development across Iowa and Wisconsin is focused on controlling costsattracting new businesses by providing planning resources and energy solutions that encourage companies to provide competitive and reliable rates toinvest in IPL’s and WPL’s customers.service territories. For example, IPLthe Big Cedar

Industrial Center announced in November 2016 is a 1,300 acre rail-served manufacturing and WPL have retail electric base rate freezesindustrial site in IowaIowa. This ready-to-build site is in close proximity to regional airport and Wisconsin, respectively, through 2016. IPL also hasinterstate freeways and offers access to IPL’s electric and gas tax benefit riders, which utilize tax benefits from income tax strategies to provide credits on Iowa retail customers’ bills to help lower customers’ costs. Refer to Note 2 for additional discussion of the retail electric base rate freezes, and Note 11 and “Rate Matters” for further discussion of the tax benefit riders.


48

Table of Contents


Exceptional Service - The strategic plan also focuses resources on utilizing expertise and creative problem solving to enhance the customer experience and ensure reliable service for customers. For example, Corporate Services placed in service a new customer billing and information system in 2015. The new customer billing and information system provides customers with enhanced payment and billing options, new self-service features, increased access to information and expanded options for communication. Investments to maintain strong reliabilityservices. In addition, investments are expected to be targeted at electricmade to extend various gas transmission and gas distribution system improvements, including replacing, modernizingsystems in IPL’s and upgrading aging infrastructure. System performanceWPL’s service territories to serve new customer demand for natural gas.

Expand Clean and Renewable Energy - The expansion of clean and renewable energy contributes to a more diverse energy portfolio and reduces emissions from EGUs. Alliant Energy is monitoredcurrently constructing two highly efficient natural gas-fired combined-cycle EGUs and necessary stepsis also focused on expanding its renewable generation portfolio with wind and solar. These new generation projects are takenexpected to continually improveincrease customer access to low-cost energy resources, and also support the safetyretirement of various older, smaller and reliability of service for customers. Providing exceptional customer service, including emergencyless efficient coal-fired EGUs, resulting in Alliant Energy reducing its carbon emissions and outage response, is part of the mission and commitment to customers.helping customers meet sustainability initiatives.

Responsible Resources-Optimization Another- The second key element of the strategic plan focuses resources on providing reliable electric and natural gas service to customers in IPL’s and WPL’s service territories through continued modernization of the power grid and gas distribution system and optimization of the generation fleet. Modernizing and optimizing the distribution and generation assets is focused on finding innovative waysexpected to operatemaximize the businessvalue of Alliant Energy’s existing infrastructure, expand customer options, and be more efficientlyprice-competitive and market-responsive for customers. For example, customer engagement initiatives include new pricing options and enhanced communication through mobile devices for customers.

Alliant Energy is modernizing the power grid to accommodate a growing two-way flow of electricity and information. This includes targeting investments in replacing and upgrading aging infrastructure in the electric distribution system. This also includes making investments in advanced metering infrastructure and a customer billing and information system, which support the integration of new technologies, as well as improving the security, reliability and resiliency of the power grid.

Since 2010, Alliant Energy has retired or fuel-switched approximately one-third of its older, smaller, less efficient and more costly coal-fired EGUs, and has made investments in its newer, more efficient coal-fired EGUs. Alliant Energy is also investing in responsive and cost-effective natural gas-fired generation, which complements its growing investments in renewable energy. These investments are expected to help reduce cost and provide flexible energy resources that benefitcompetitively-priced electricity for customers.

Generation Plans - A diversified fuel mix for EGUs is important to meeting the energy needs of customers and also recognizes the importance of using resources in efficient and environmentally responsible ways for the benefit of future generations. The current strategic plan includes the following portfolio of energy resources:

Natural gas - purchasing, constructing and/or converting to natural gas-fired EGUs.
Renewables - operating wind farms, solar projects and hydroelectric generators, as well as evaluating the development ofdeveloping future wind sites and solar projects.
PPAs - purchasing electricity to meet a portion of customers’ demand for electricity, including wind, solar power and nuclear generation PPAs.
Coal - implementing environmental controls and generation performance and reliability improvements at newer, larger and more efficient coal-fired EGUs, and fuel switching at, and retirement of, certain older, smaller and less efficient coal-fired EGUs.
PPAs - purchasing electricity to meet a portion of customers’ demand for electricity, including wind and solar power PPAs and a nuclear generation PPA related to DAEC for a term of February 2014 through December 2025.

Increasing levels of energy produced by natural gas-fired EGUs, wind farms and other renewable energy resources, and installing environmental controls at the more efficient coal-fired EGUs, result in significant environmental benefits. As a result of these efforts, SO2 and NOx emissions are currently expected to be reduced by approximately 90% and 80%, respectively, from 2005 levels by 2025.2020. Mercury emissions are currently expected to be reduced by approximately 90% from 2009 levels by 2025.2020. CO2 emissions have been reduced by approximately 15%22% from 2005 levels.

Additional generation portfolio details, as well as discussion of investments in environmental controlslevels and performance and reliability upgrades, are included in “Generation Plans” below.

Energy efficiency is also an important part of the strategic plan and provides customers with the opportunity to reduce their energy usage and related costs through the use of new energy efficient equipment, products and practices. IPL currently expects to spend approximately $400 million for electric and natural gas energy efficiency programs in Iowa from 2014 through 2018. In addition, WPL contributes 1.2% of its annual utility revenues to Wisconsin’s Focus on Energy program. Refer to “Energy Efficiency Programs” below for further discussion of energy efficiency programs.

Non-regulated Operations - The strategic plan for Alliant Energy’s non-regulated operations involves maintaining a modest portfolio of businesses that are accretive to earnings and cash flows but not significant users of capital.

Electric and Gas Distribution Systems - An important aspect of the strategic plan focuses resources on providing reliable electric and natural gas service to IPL’s and WPL’s customers. Investments are expected to be targeted at replacing, modernizing and upgrading aging infrastructure in the electric and gas distribution systems. These investments are designed to make the electric distribution system more resilient, robust and reliable to be able to meet customers’ changing and growing needs. Additionally, the Pipeline and Hazardous Materials Safety Administration is expected to expand and/or strengthen regulations related to gas transmission and distribution systems in the future. These regulations are expected to result in more inspections and investments to replace certain portions of IPL’s gas transmission and distribution systems and WPL’s gas distribution systems. These investments are expected to ensure the gas transmission and distribution systems are appropriately maintained and operated safely. Additional investments are expected to be made to extend various gas transmission and distribution systems in IPL’s and WPL’s service territories to serve new customer demand. Estimated capital expenditures for these expected and current projects for 2016 through 2019 are included in the “Electric and gas distribution systems” lines in the construction and acquisition expenditures table in “Liquidity and Capital Resources.”


49



IPL’s Proposed Clinton Natural Gas Pipeline - In September 2015, IPL filed a petition with the IUB for a pipeline permit to construct, maintain, and operate a natural gas pipeline in Scott and Clinton Counties in Iowa, referred to as the Clinton pipeline. IPL currently expects to receive the IUB’s decision on its petition in the second quarter of 2016. Subject to such approval, construction is expected to be completedreduced by the first quarter of 2017. Capital expenditures to construct the pipeline, excluding AFUDC, are currently estimated to be approximately $60 million to $70 million.40% from 2005 levels by 2030.

Generation Plans -Generation plans are reviewed and updated as deemed necessary and in accordance with regulatory requirements. Alliant Energy, IPL and WPL are currently evaluating the types of capacity and energy additions they will pursue to meet their customers’ long-term energy needs and are monitoring several related external factors that could influence those evaluations. Environmental compliance plans have also been developed to ensure cost effective compliance with current and proposed environmental laws and regulations impacting existing EGUs. Environmental compliance plans are reviewed and updated to address various external factors, as deemed necessary and in accordance with regulatory requirements. Some of the external factors impacting these plans include regulatory policies and decisions; changes in long-term projections of customer demand; availability and cost effectiveness of different generation and emission reduction technologies; developments related to environmental regulations; settlements reached with environmental agencies and citizens groups; forward market prices for fossil fuels electricity and emission allowances;electricity; market conditions for obtaining financing; developments related to federal and state RPS;renewable portfolio standards; environmental

requirements, such as any future requirements relating to GHG emissions or renewable energy sources; and federal and state tax incentives. Refer to “Environmental Matters” for details of current and proposed environmental regulations and requirements.

Natural Gas-Fired Generation -
IPL’s Construction of Marshalltown - In 2013, the IUB issued an order approving a siting certificate and establishing rate-making principles for IPL’s construction of an approximate 650 MW natural gas-fired combined-cycle EGU in Marshalltown, Iowa, referred to as Marshalltown. In 2013, IPL accepted the IUB’s rate-making principles, which include the following:

A cost cap of $920 million, including costs to construct Marshalltown, a pipeline to supply natural gas to Marshalltown and transmission network upgrades to transmit electricity from Marshalltown, as well as AFUDC. Any costs incurred in excess of the cost cap are expected to be incorporated into rates if determined to be reasonable and prudent.
An 11% return on common equity for the 35-year depreciable life of Marshalltown and a 10.3% return on common equity for the calculation of AFUDC related to the construction of Marshalltown.
The application of double leverage is deferred until IPL’s next retail electric base rate case, or other proceeding.which is expected to be filed in the second quarter of 2017 based on a 2016 historical Test Year.

In 2013, the IUB approved the construction of a pipeline for the transportation of natural gas to Marshalltown. AfterIPL began constructing Marshalltown in 2014 after receiving the final necessary regulatory approvals and permits, in the second quarter of 2014, IPL began constructing Marshalltown. IPL currentlyand expects to place Marshalltownthe EGU in service byin April 2017. Capital expenditures are currently estimated to be approximately $670 million to construct the second quarter of 2017.EGU and a pipeline to supply natural gas to the EGU, excluding transmission network upgrades and AFUDC.

Marshalltown will replace energy and capacity being eliminated with the planned 2017 retirements of Sutherland Units 1 and 3, Fox Lake Units 1 and 3, Burlington Combustion Turbines Units 1-4, Dubuque Units 3 and 4, Centerville Combustion Turbines Units 1 and 2, and Grinnell Combustion Turbines Units 1 and 2, which in aggregate have a nameplate capacity of approximately 460 MW.

IPL executed an engineering, procurement and construction contract for Marshalltown after a competitive bidding process. In September 2016, Marshalltown’s engineering, procurement and construction contractor announced that costs to construct Marshalltown will exceed its expectations and that it expects to seek compensation from vendors performing work on Marshalltown. IPL does not currently anticipate it will be responsible for these increased costs.

ITC has begunis constructing the majority of the required transmission network upgrades for Marshalltown and has elected to pursue an option under the terms of MISO’s Attachment “X” tariff to self-fund these transmission network upgrades. As a result, ITC will incur the capital expenditures to construct the transmission network upgrades and include a direct charge for such transmission network upgrade costs as part of its electric transmission service costs billed to IPL as the owner of Marshalltown.

Refer to Note 3 for further discussion of Marshalltown.

WPL’s Proposed Construction of the Riverside Expansion - In April 2015,2016, WPL filed a CPCN application withreceived an order from the PSCW for approvalauthorizing WPL to construct aan approximate 730 MW natural gas-fired combined-cycle EGU in Beloit, Wisconsin, referred to as the Riverside expansion. Construction proposals received to date indicateIn 2016, WPL executed a design, engineering, procurement and construction contract for the Riverside expansionexpansion. After receiving the final necessary regulatory approvals and permits in the third quarter of 2016, WPL began constructing the Riverside expansion. WPL currently expects to place the EGU in service by early 2020. WPL’s estimated portion of capital expenditures is expected to generate up to 700 MW of electricity. Capital expenditures are currently estimated to be approximately $700 million$640 million. The capital expenditures include costs to construct the EGU and a pipeline to supply natural gas to the EGU. The estimated capital expendituresEGU, and exclude transmission network upgrades and AFUDC.


50

TableThe Riverside expansion will replace energy and capacity being eliminated with the 2015 retirements of ContentsNelson Dewey Units 1 and 2 and Edgewater Unit 3, and the planned retirements of Edgewater Unit 4 and the Rock River and Sheepskin Combustion Turbine Units, which in aggregate have a nameplate capacity of approximately 700 MW.


WPL recently entered into agreements with neighboring utilities and electric cooperatives that if the proposed Riverside expansion is approved, would provide each of the neighboring utilities and electric cooperatives options to purchase a partial ownership interest in the Riverside expansion. The purchase price for such options is based on the ownership interest acquired and the net book value of the Riverside expansion on the date of the purchase. The exercise of each option is subject to PSCW approval, and the timing and ownership amounts of the options are as follows:

Counterparty Option Amount Option Timing
Wisconsin Public Service Corporation (WPSC) up to 200 MW (no more than 100 MW to be acquired in first two years) (a) 2020-2024 (a)(b)
Madison Gas and Electric Company (MGE) up to 50 MW (no more than 25 MW to be acquired in first two years) 2020-2025 (a)(b)
Electric cooperatives up to 55approximately 65 MW By September 2016During construction of the EGU

(a)If WPSC exercises its options, WPL may exercise reciprocal options, subject to approval by the PSCW, to purchase up to 200 MW of any natural-gas combined-cycle EGU that either WPSC or its affiliated utility, Wisconsin Electric Power Company (Wisconsin Electric), places in service within 10 years of the date the Riverside expansion is placed in service.
(b)Assumes an in-service date in early 2020.

WPSC and MGE Options - Starting onIn conjunction with the date the proposed Riverside expansion is placed in service, WPSC’s options would allow it to acquire up to 200 MW of the EGU over four years, with no more than 100 MW available to be acquired in the first two years. Similarly, MGE could acquire up to 50 MW over five years, with no more than 25 MW available to be acquired in the first two years. If WPSC exercises its options, and subject to approval by the PSCW,agreements WPL may exercise reciprocal options to purchase up to 200 MW of any natural-gas combined-cycle EGU that either WPSC or its affiliated utility, Wisconsin Electric Power Company (Wisconsin Electric), places in service within 10 years of the date the proposed Riverside expansion is placed in service.

The agreementsentered into with WPSC and MGE associated with the Riverside expansion, WPL also provide thatentered into amendments to the parties negotiateColumbia joint operating agreement. In November 2016, WPL received an order from the PSCW approving amendments to the Columbia joint operating agreement, that providewhich allow WPSC and MGE options to forgo certain capital expenditures at Columbia, which upon exercise would requireColumbia. Based on the additional capital expenditures WPL currently expects to incur such capital expendituresthrough June 1, 2020, WPL’s ownership interest in exchangeColumbia is expected to increase from 46.2% to 53.4%. Refer to Note 4 for a proportional increase in its ownership sharefurther discussion of Columbia. These options for WPSC and MGE expire when the proposed Riverside expansion is placed in service and exclude capital expenditures related to the Columbia Unit 2 SCR currently being constructed.these amendments.

In addition to the provisions described above, the settlement agreement WPL entered into with Wisconsin Electric and WPSC includesprovided for the following:

Riverside Expansion Market Participation Date - WPL agreed that the proposed Riverside expansion would not enter the MISO capacity market prior to the date set by MISO for qualifying generation as a capacity asset for the MISO planning year beginning June 1, 2020.
Riverside Expansion Interconnection Study - WPL agreed to file a request with MISO on behalf of itself, Wisconsin Electric and WPSC to complete a non-binding study to assess an interconnection option of the proposed Riverside expansion to ATC’s transmission system. WPL and the parties filed such request with MISO in January 2016.
WPL and Wisconsin Electric PPACapacity Agreement - In the second quarter of 2016, WPL and Wisconsin Electric agreed to enter intoexecuted a PPAcapacity agreement whereby WPL would purchase specified levels of energy and capacity from Wisconsin Electric from June 1, 2017 through 2019.May 31, 2020.
Renewable Generation Joint Development Agreement - In June 2016, WPL, Wisconsin Electric and WPSC agreed to negotiateexecuted a separate joint development agreement for the purpose of cooperatively developing any renewable resources greater than 50 MW in Wisconsin for the benefit of their respective customers. The terms of such agreement would be 10 yearshas a 10-year term beginning on a date no later than June 1, 2016. The2016, and the utility that originates such renewable resource would hold a majority ownership and operational control of the renewable resource. The other two utilities would have the right to acquire a minority interest in the other utility’s renewable resource.

Electric Cooperatives’ Options - WPL recently executed term sheets withIn November 2016, various electric cooperatives, which currently have wholesale power supply agreements with WPL. The term sheets provideWPL, notified WPL of their intent to exercise options to acquire approximately 65 MW of the electric cooperatives an option to purchase a partial ownership interest in the proposed Riverside expansion while the EGU is being constructed. The options would allow the electric cooperatives to acquire an aggregate maximum amount up to 55 MW, with each cooperative required to make elections regardingUpon exercise of such options, by September 2016. If the options are exercised, the current wholesale power supply agreements with the various electric cooperatives wouldwill be extended by at least four years until 2026 with automatic continuation of such agreements unless terminated by either party, with a five-year notice requirement.

A decision fromWind Generation - The strategic plan includes the PSCW on WPL’s CPCN application is currently expected byplanned and potential addition of wind generation as follows (in MW). Estimated capital expenditures for the second quarterplanned and potential wind generation projects for 2017 through 2020 are included in the “Renewable projects” line in the construction and acquisition expenditures table in “Liquidity and Capital Resources.”
  Status IPL WPL
Expansion of wind generation Approved by IUB 500
 N/A
Expansion of wind generation Planned 200
 200
Transfer of Franklin County wind farm assets from AEF to IPL Approved by FERC 99
 N/A

IPL’s Expansion of 2016. The Riverside expansion is also subjectWind Generation - In October 2016, IPL and the Iowa Office of Consumer Advocate, among other customer groups, filed a settlement agreement with the IUB regarding the appropriate rate-making principles for up to 500 MW of additional wind generation at IPL. In October 2016, the receiptIUB issued an order approving the settlement agreement, with limited modifications, and establishing rate-making principles, which IPL accepted, as follows:


Up to 500 MW of various approvalsadditional wind generation that qualifies for the full level of production tax credits, regardless of the location in Iowa, with a cost cap of $1,830/kilowatt, including AFUDC and permits necessary to construct and operate the EGU and connect such EGU to the transmission system. Subject to such approvals, construction is currentlycosts. Any costs incurred in excess of this $1,830/kilowatt cost cap are expected to begin by early 2017be incorporated into rates if determined to be reasonable and be completed by early 2020. The Riverside expansion would replace energy and capacity being eliminatedprudent.
A depreciable life of the wind generation of 40 years, unless changed as a result of a contested case before the IUB.
An 11.0% return on common equity, with the 2015 retirementsexception of Nelson Dewey Units 1certain transmission facilities classified as intangible assets, which would earn the rate of return on common equity the IUB finds reasonable during a future rate case.
A return on common equity for the calculation of AFUDC during the construction period that is the greater of 10.0% or the percentage the IUB finds reasonable during IPL’s next rate case.
The application of double leverage is deferred until IPL’s next retail electric base rate case or other future proceeding.
Amortization over a 10-year period of IPL’s prudently incurred and 2 and Edgewater Unit 3, andunreimbursed costs, effective with IPL’s next retail electric base rate case, if IPL cancels the planned retirementsconstruction of Edgewater Unit 4 and

51



the Rock River and Sheepskin Combustion Turbine Units, which in aggregate have a nameplate capacity of approximately 700 MW.wind generation.

In May 2014,IPL anticipates placing the PSCW authorized WPL to defer the retail portion500 MW of incremental pre-certificationadditional wind generation in service in 2019 and pre-construction costs associated with this proposed EGU beginning March 2014. As of December 31, 2015, WPL recorded $6 million of such costs in aggregate.2020.

Wind Generation -
Resources’ Franklin County Wind Farm - In addition to IPL’s expansion of wind generation discussed above, refer to Note 3 for discussion of a February 2017 FERC order approving the transfer of the 99 MW Franklin County wind farm from AEF to IPL. The Franklin County wind farm began generating electricity in 2012. ResourcesAEF is currently selling the electricity output from the wind farm into the MISO market as a merchant generator,generator.

IPL’s and is considering various options for thisWPL’s Potential Expansion of Wind Generation - In addition to IPL’s 500 MW expansion of wind farm. Such options include entering into a PPA with an independent third party, IPL or WPL; sellinggeneration and transfer of the project to IPL or WPL; or continuing to sell the output into the MISO market as a merchant generator. Refer to “Critical Accounting Policies and Estimates” and Note 3 for further discussion of the99 MW Franklin County wind farm.farm to IPL in 2017 discussed above, IPL and WPL are each exploring options to own and operate up to 200 MW of additional new wind generation. IPL and WPL currently plan to file the necessary applications for the new wind generation with the IUB and the PSCW, respectively, in the third quarter of 2017. Alliant Energy continues to review and evaluate the final amount and timing of this potential additional expansion of wind generation for IPL and WPL, which is subject to change pending further evaluation.

Undeveloped Wind Sites - In 2016, IPL and WPL entered into wind turbine supply agreements and made progress payments for a portion of the wind turbines in such agreements in order to be eligible for the full level of production tax credits from the electricity generated during the first 10 years of operation of future wind projects. IPL and WPL believe the progress payments in 2016 are sufficient to be eligible for the full level of production tax credits for all 900 MW of new wind generation in its current plan.

IPL has up toon-going project development associated with approximately 400 MW of wind site capacity remaining in Franklin County, Iowa. WPL has approximatelyApproximately 200 MW of windthis additional site capacity remainingis expected to be included in the future wind expansion. WPL has on-going project development associated with approximately 120 MW of wind capacity in Freeborn County, Minnesota. Future developmentMinnesota, which may be further expanded to 200 MW.

Solar Generation - In 2016, WPL began providing customers with energy from the 2.3 MW Rock River solar project through a 10-year PPA. The solar field is located at WPL’s Rock River landfill site in Beloit, Wisconsin. In 2017, IPL expects to install approximately 6 MW of the balance of these wind sites will depend on numerous factors such as changessolar arrays in customer demand, RPS, environmental requirements, electricity and fossil fuel prices, wind project costs, technology advancements and transmission capabilities.Dubuque, Iowa.

Coal-Fired Generation -
Environmental Controls Projects - The strategic plan includes adding environmental controls at newer, larger and more efficient coal-fired EGUs to continue producing affordable energy for customers and to benefit the environment. The following table provides current estimates ofCurrent projects include installing SCRs at IPL’s Ottumwa Unit 1 and WPL’s Columbia Unit 2 to achieve compliance obligations under CSAPR and the total (past and future) project costs for certain environmental controls projects included in the current environmental compliance plans (in millions):
ExpectedTotalComplianceRegulatory
Generating UnitIn-service DateTechnology (a)Project CostObligationsApprovals (b)
IPL:
Ottumwa Unit 12018/2019Consent Decrees. SCR$75-$100CSAPR, IPL Consent DecreeIn Process
WPL:
Edgewater Unit 52016Scrubber & Baghouse260-280MATS Rule, CSAPR, WPL Consent DecreeJune 2013 PSCW order
Columbia Unit 22018SCR40-60CSAPR, WPL Consent DecreeJanuary 2015 PSCW order

(a)
Scrubber is a post-combustion process that injects lime or lime slurry into the stream of gases leaving the EGU boiler to remove SO2 and other acid gases (including hydrochloric acid) and capture them in a solid or liquid waste by-product. A scrubber typically removes more than 90% of the SO2 emissions.
Baghouse, including carbon injection, is a post-combustion process that injects carbon particles into the stream of gases leaving the EGU boiler to facilitate the capture of mercury in filters or bags. This process can remove more than 85% of mercury emissions.
SCR is a post-combustion process that injects ammonia or urea into the stream of gases leaving the EGU boiler to convert NOx emissions into nitrogen and water. The use of a catalyst enhances the effectiveness of the conversion, enabling NOx emissions reductions of up to 90%. Refer to Note 16(e) for discussion of the Consent Decrees.
(b)
IPL’s Environmental Controls Projects - Under Iowa law, IPL is required to file an EPB biennially. Filing of periodic reports regarding the implementation of IPL’s compliance plan and related budget identified in an EPB is also currently required under a settlement agreement between IPL and the Iowa Office of Consumer Advocate. An EPB provides a utility’s compliance plan and related budget for managing regulated emissions from its coal-fired EGUs in a cost-effective manner. IUB approval of an EPB demonstrates that the EPB is reasonably expected to achieve cost-effective compliance with applicable state environmental requirements. IPL plans to include the SCR for Ottumwa Unit 1 in its next EPB filing, which is currently expected to be filed with the IUB in the first quarter of 2016.

WPL’s Environmental Controls ProjectsIPL - Under Iowa law, IPL is required to file an EPB biennially. Filing of periodic reports regarding the implementation of IPL’s compliance plan and related budget identified in an EPB is also currently required under a settlement agreement between IPL and the Iowa Office of Consumer Advocate, among others. An EPB provides a utility’s compliance plan and related budget for managing regulated emissions from its coal-fired EGUs in a cost-effective manner. IUB approval of an EPB demonstrates that the EPB is reasonably expected to achieve cost-effective compliance with applicable state environmental requirements. In April 2016, IPL filed its most recent EPB with the IUB, which includes the SCR for Ottumwa Unit 1. A decision from the IUB is currently expected in 2017. The SCR at Ottumwa Unit 1 is currently expected to be placed in service in 2018, with an estimated total project cost of $65 million to $80 million.


WPL - WPL must file a CA application and receive authorization from the PSCW to proceed with any individual environmental controls project with an estimated project cost of $10$10.7 million or more.

These capital expenditure estimates represent IPL’s or WPL’s respective portion WPL is currently constructing the SCR at Columbia Unit 2 pursuant to a 2015 PSCW order and expects to place it in service in 2018, with an estimated total (past and future) project cost of the total escalated capital expenditures and exclude AFUDC, if applicable. Capital expenditure estimates are subject$40 million to change based on future changes to plant-specific costs of environmental controls technologies and environmental requirements.$60 million. Refer to Note 16(e)3 for discussion of Consent Decrees,a scrubber and baghouse project at WPL’s Edgewater Unit 5, which include requirements for IPL and WPL to install environmental controls systems noted above at certain of their EGUs.was completed in July 2016.


52



Generation Improvement Projects - The strategic plan includes investments in generation maintenance and performance improvements at newer, larger and more efficient coal-fired EGUs, including WPL’s Columbia Units 1 and 2.

Columbia Units 1 and 2 - In 2014,2015, WPL received an order from the PSCW approving a request forbegan constructing generation maintenance and performance improvements at Columbia Units 1 and 2.2, pursuant to PSCW orders. WPL’s portion of the total capital expenditures for the projects, excluding AFUDC, is currently estimated to be between $50$70 million and $60$80 million. WPL began construction in February 2015 and currently expects to place the various projects in service by the end of 2017.

Estimated capital expenditures for the environmental controls and generation improvement projects for 2017 through 2020 are included in the “Generation - Other” line in the construction and acquisition expenditures table in “Liquidity and Capital Resources.” Such estimates represent IPL’s or WPL’s respective portion of the total escalated capital expenditures and exclude AFUDC, if applicable. Capital expenditure estimates are subject to change based on future changes to plant-specific costs of environmental controls technologies and environmental requirements.

Plant Retirements and Fuel Switching - The current strategic plan includes the retirement, or fuel switch from coal to natural gas, of several older, smaller and less efficient EGUs in the next several years. The plan includes the following EGUs, with net book values as of December 31, 20152016 (dollars in millions):millions; Combustion Turbine (CT)). Refer to “Properties” in Item 2 for additional details, including nameplate capacity.
NameplateNet Book
EGU (In-Service Year)CapacityActual/Expected DateValue
IPL:
M.L. Kapp Unit 2 (1967)218 MWFuel switch completed in June 2015 (a)
$39
Prairie Creek Unit 4 (1967)149 MWFuel switch by December 31, 2017 (a)52
Sutherland Units 1 (1955) and 3 (1961)119 MWRetire by December 31, 2017 (a) (b) (c)51
Dubuque Units 3 (1952) and 4 (1959)66 MWRetire by December 31, 2017 (a) (b)6
Fox Lake Unit 1 (1950) and 3 (1962)93 MWRetire by December 31, 2017 (b) (c)2
Other unitsApproximately 195 MWRetire by December 31, 2017 (b) (c)2
Burlington Generating Station (1968)212 MWFuel switch by December 31, 2021 (a)61
Prairie Creek Units 1 (1997) and 3 (1958)64 MWFuel switch or retire by December 31, 2025 (a) (b)95
WPL:
Nelson Dewey Units 1 (1959) and 2 (1962)227 MWRetired in December 2015 (a)38
Edgewater Unit 3 (1951)69 MWRetired in December 2015 (a)7
Edgewater Unit 4 (1969)239 MW (d)Retire by December 31, 2018 (a) (b) (e)46
Rock River Combustion Turbine Units 3-6 (1967-1972)169 MWRetire by December 31, 2019 (b) (e)2
Sheepskin Combustion Turbine Unit 1 (1971)42 MWRetire by December 31, 2019 (b) (e)

(a)
These actions and plans meet requirements specified in the Consent Decrees, which are discussed in Note 16(e).
(b)Final MISO studies could indicate that the retirement of an individual EGU may result in reliability issues and that transmission network upgrades for system reliability are necessary to enable such retirement. Under the current MISO tariff, the specific timing for the retirement of these EGUs could depend on the timing of the required transmission network upgrades as well as various operational, market and other factors.
(c)The retirements of Fox Lake Unit 3, Sutherland Units 1 and 3, and other units are contingent on the construction of Marshalltown as well as various operational, market and other factors.
(d)Reflects WPL’s 68.2% ownership interest in Edgewater Unit 4.
(e)The retirements of Edgewater Unit 4 and the Rock River and Sheepskin Combustion Turbine Units are contingent on the construction of the Riverside expansion as well as various operational, market and other factors.

Nameplate capacity in the above table represents the nominal amount of electricity an EGU is designed to produce. Each EGU is also assessed a generating capacity amount from MISO through its annual resource adequacy process. The generating capacity amount assessed by MISO is subject to change each year and is based upon the current performance capability of the EGU and historical forced outages.
IPL WPL
  Expected Net Book   Expected Net Book
EGU Action Value EGU Action Value
Sutherland Units 1 and 3 Retire by 6/30/17 
$43
 Edgewater Unit 4 Retire by 12/31/18 
$37
Dubuque Units 3 and 4 Retire by 6/30/17 5
 Rock River CT Units 3-6 Retire by 12/31/20 2
Prairie Creek Unit 4 Fuel switch by 12/31/17 52
 Sheepskin CT Unit 1 Retire by 12/31/20 
Marshalltown CT Units 1-3 Fuel switch by 12/31/17 4
      
Fox Lake Unit 1 and 3 Retire by 12/31/17 2
      
Other units Retire by 12/31/17 1
      
Red Cedar CT Unit 1 Retire by 12/31/18 4
      
Burlington Unit 1 Fuel switch by 12/31/21 62
      
Prairie Creek Units 1 and 3 Fuel switch or retire by 12/31/25 94
      

Alliant Energy, IPL and WPL are working with MISO, state regulatory commissions and other regulatory agencies, as required, to determine the final timing of these actions. The expected dates for the retirement and fuel switching of these EGUs are subject to change depending on operational, regulatory, market and other factors. The potential retirement of other EGUs within the generation fleet continues to be evaluated.

Utility Asset DivestituresElectric and Gas Distribution Systems -
IPL’s Minnesota Electric The strategic plan includes investments targeted at replacing, modernizing and Natural Gas Distribution Assets - Refer to Note 3 for discussion ofupgrading aging infrastructure in the sales of IPL’s Minnesota electric and natural gas distribution assetssystems. Estimated capital expenditures for expected and current electric and gas distribution infrastructure projects for 2017 through 2020 are included in 2015.


53



Energy Efficiency Programs - Several energy efficiency programsthe “Electric and initiatives help customers reduce their energy usagegas distributions systems” lines in the construction and related costs through the use of new energy efficient equipment, productsacquisition expenditures table in “Liquidity and practices. The following are current key energy efficiency programs:Capital Resources.”

Gas Pipeline Expansion - IPL EEPcurrently expects to place the Clinton natural gas pipeline, located in Scott and Clinton Counties in Iowa, which provides capacity for anticipated customer growth in Clinton County, into service in March 2017.

Pipeline and Hazardous Materials Safety Administration - In 2013,April 2016, the Pipeline and Hazardous Materials Safety Administration published proposed regulations to update safety requirements for gas transmission pipelines, which would add new assessment and repair criteria for gas pipelines, and require a systematic approach to verify a pipeline’s maximum allowable operating pressure. Alliant Energy, IPL received an order fromand WPL currently anticipate final regulations will be issued in 2017. Given that the IUB approvingPipeline and Hazardous Materials Safety Administration has not finalized these gas transmission regulations, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of these regulations on their financial condition and results of operations. In anticipation of these pending rule changes, Alliant Energy, IPL and WPL have started proactively replacing certain of IPL’s EEP for 2014 through 2018. The EEP includes transmission pipelines and making modifications to certain of WPL’s transmission pipelines.

Advanced Metering Infrastructure (AMI) - IPL spending approximately $400 million forcurrently plans to install AMI in its electric and natural gas energy efficiency programsservice territories in Iowa through a phased approach from 20142017 through 2018,2019. AMI is a system of meters, communications networks and data management systems that enables two-way communication between utilities and its customers. AMI allows for remote meter reading, automatic outage notification, and remote disconnects and reconnects. AMI technology is expected to conserve electricimprove customer service, enhance energy management initiatives and natural gas usage equal to that of more than 100,000 homes. In accordance with Iowa law, IPL is required to file an EEP every five years. An EEP provides a utility’s plan and related budget to achieve specified levels of energy savings. IUB approval demonstrates that IPL’s EEP is reasonably expected to achieve cost effective delivery of the energy efficiency programs. To the extent approved by the IUB, costs associated with executing the EEP are recovered from ratepayersprovide operational savings through an additional tariff called an EECR factor. The EECR factors are revised annually and include a reconciliation to eliminate any over- or under-recovery of energy efficiency expenses from prior periods. There are no carrying costs associated with the cost recovery factors. The annual EECR factors are based on IPL’s approved budget as filed with its EEP, along with any over- or under-collection from prior periods, and therefore are not expected to have a material impact on Alliant Energy’s and IPL’s financial condition or results of operations.increased efficiencies.

Focus on Energy Program -Non-regulated Operations In 2015- The strategic plan for Alliant Energy’s non-regulated operations involves maintaining a modest portfolio of businesses that are accretive to earnings and 2014, WPL contributed 1.2%cash flows but not significant users of annual utility revenues to help fund Focus on Energy, Wisconsin’s state-wide energy efficiency and renewable energy resource program.capital.

RATE MATTERS

Overview - Alliant Energy has two utility subsidiaries, IPL and WPL. IPL and WPL are subject to federal regulation by FERC, which has jurisdiction over wholesale electric rates and certain natural gas facilities, and state regulation in Iowa and Wisconsin for retail utility rates and standards of service. Such regulatory oversight also covers IPL’s and WPL’s plans for construction and financing of new EGUs and related activities.

Retail Base Rate Filings - Base rate changes reflect both returns on additions to infrastructure and recovery of changes in costs incurred or expected to be incurred. Given that a portion of the rate changes will offset changes in costs, revenues from rate changes should not be expected to result in an equal change in net income for either IPL or WPL.

WPL’s Wisconsin Retail Electric and Gas Rate Case (2015/2016(2017/2018 Test Period) - In July 2014, December 2016,WPL received an order from the PSCW authorizing WPL to maintainimplement an increase in annual retail electric rates of $9 million, or approximately 1%, and an increase in annual retail gas rates of $9 million, or approximately 13%. The $9 million net annual retail electric rate increase reflects a $60 million increase in base rates, at their current levelspartially offset by a $51 million reduction in fuel-related costs, using an estimate for 2017 fuel-related costs. These increases are effective January 1, 2017 and extend through the end of 2016.2018. The retail electric base rate case included a returnincreases reflect recovery of and a return onthe costs for environmental controls projects at Edgewater and Columbia, Units 1 and 2 and Edgewater Unit 5, generation performance and reliability improvements at Columbia Units 1 and 2, other ongoing capital expenditures, and an increaseinvestments in electric transmission service expense. The additional revenue requirement for these costand gas distribution systems, including expansion of natural gas pipeline infrastructure. These rate increases waswere partially offset by the impactutilization of changes in the amortization of regulatory liabilities associated withamounts that WPL previously over-recovered from its customers for energy efficiency cost recoveriesrecovery and increased sales volumes. The order also authorized WPL to implement a $5 million decrease in annual retail gas base rates effective January 1, 2015 followed by a freeze of such gas base rates throughelectric transmission cost recovery, as well as amounts deferred under the end of 2016.

The order requires escrow treatment of major transmission charges, allows continuation of an 8.2% AFUDC rate, and allows continuation of a 10.4% return on common equity sharing mechanism for the 2013/2014 Test Period. The order included a return on common equity of 10.0% and the following related provisions: (1) WPL may requestcontinues a change in retail base rates during the test period if its annual regulatory return on common equity falls below 8.5%; and (2)sharing mechanism, whereby WPL must defer a portion of its earnings if its annual regulatory return on common equity exceeds 10.65%10.25% during the test period.2017 and 2018 Test Period. WPL must defer 50% of its excess earnings between 10.65%10.25% and 11.40%11.00%, and 100% of any excess earnings above 11.40%11.00%. In addition, the order allows WPL to maintain its ability to request deferrals based on current practices. As of December 31, 2015, Alliant Energy and WPL did not record any deferred amounts for these provisions. Refer to Note 7 for details of WPL’s regulatory limitation on distributions of common stock dividends to its parent company in 2017 and 2018.

The order reflected the impact of the transfer of WPL’s investment in ATC to ATI on December 31, 2016 as discussed in Note 6(a), approved changes to depreciation rates pursuant to a September 2016 PSCW order, continued escrow treatment of transmission and energy conservation charges, and application of AFUDC rates to 100% of the retail portion of the CWIP balances for the Riverside expansion. The order also requires deferral of any potential changes in revenue requirement due to anticipated increases in WPL’s ownership share of Columbia resulting from the Riverside expansion agreements WPL previously entered into with neighboring utilities. The order also approved changes to retail rates, which result in a higher percentage of costs being recovered from customers through fixed and demand charges.

The fuel-related cost component of WPL’s retail electric rates for 2018 will be addressed in a separate filing, which is currently expected to be filed in the second or third quarter of 2017.

WPL’s Wisconsin Retail Electric and Gas Rate Case (2015/2016 Test Period) - Refer to Note 2 for details of a July 2014 PSCW order, which included a provision that required WPL to defer a portion of its earnings if its annual regulatory return on common equity exceeded 10.65% during 2015 and 2016. As of December 31, 2016, Alliant Energy and WPL deferred $6 million of WPL’s 2016 earnings for this provision, which WPL currently expects will be refunded to its customers in a future rate case or other proceeding.

WPLs Wisconsin Retail Electric and Gas Rate Case (2013/2014 Test Period) - Refer to Note 2 for details of a July 2012 PSCW order, which included a provision that required WPL to defer a portion of its earnings if its annual regulatory return on common equity exceeded 10.65% during 2013 and 2014. As of December 31, 2015,2016, Alliant Energy and WPL deferred $8$6 million of WPL’s 2013 and 2014 earnings for this provision, which WPL currently expects will be refundedis being returned to its customers as an offset to revenue requirements in a futurethe 2017/2018 Test Period retail rate case or other proceeding.discussed above.


54



IPL’s Iowa Retail Electric Rate Settlement Agreement - The IUB approved a settlement agreement in 2014 related to rates charged to IPL’s Iowa retail electric customers. The settlement agreement extendsextended IPL’s Iowa retail electric base rates authorized in its 2009 Test Year rate case through 2016 and providesprovided targeted retail electric customer billing credits of $105 million in aggregate. In 2016, 2015 and 2014, IPL recorded $9 million, $24 million and $72 million of such credits, respectively, and the remaining $9 million of such credits is targeted for 2016.respectively. The settlement agreement included the continuation of the energy adjustment clause, transmission cost rider and electric tax benefit rider credits; the ability for IPL to seek rate relief if a significant event occurs; and the ability for parties to the DAEC PPA proceeding to request show cause action if IPL’s Iowa retail electric return on common equity exceedsexceeded 11% for 2014, 2015 or 2016.

Items considered in settlement discussions included costs for environmental controls at Ottumwa Unit 1, George Neal Units 3 and 4, Burlington Unit 1 and Prairie Creek Units 3 and 4, generation performance and reliability improvements at Ottumwa Unit 1, and other ongoing capital expenditures; the elimination of purchased electric capacity payments from the previous DAEC PPA that ended in February 2014; and costs of the new DAEC PPA. IPL assumesassumed no change to its current authorized return on common equity and common equity component of the regulatory capital structure authorized in its 2009 Test Year case.

WPL’s Retail Fuel-related Rate Filings - Refer to Note 2 for discussion of WPL’s retail fuel-related rate filings for Test Years 2014 through 2016.

WPL’s Depreciation Study - In September 2016, the PSCW issued an order approving the implementation of updated depreciation rates for WPL effective January 1, 2017 as a result of a recently completed depreciation study. The September 2016 PSCW order also authorized WPL to recover the remaining net book value of Edgewater Unit 4 over a 10-year period beginning the later of the retirement date of the EGU or January 1, 2019. In December 2016, FERC issued an order approving the implementation and inclusion of the updated depreciation rates in WPL’s wholesale formula rates effective January 1, 2017.

IPL’s Tax Benefit Riders - In 2009, IPL filed a request with theThe IUB to create a regulatory liability account for potential tax benefits resulting from changes in tax accounting methodologieshas approved electric and tax elections available under the Internal Revenue Code. These potential tax benefits were related to the tax treatment of repairs expenditures, allocation of insurance proceeds from floods in 2008 and allocation of mixed service costs. In 2012, IPL filed a report with the IUB requesting approval of the final amount of the regulatory liability account based on the tax benefits generated from these changes in tax accounting methodologies and tax elections that were sustained under IRS audit. The 2012 report filed by IPL identified approximately $500 million of such tax benefits, which included $452 million allocated for use with the electric tax benefit rider and $48 million allocated for use with the gas tax benefit rider discussed below. Refer to “Property Method Changes” below for discussion of additionalriders proposed by IPL, which utilize regulatory liabilities generated from tax benefits recorded in 2014 from two additional tax accounting method changes implemented in 2014.

Electric - The electric tax benefit rider, which was approved by the IUB and implemented in 2011, utilizes amounts from the regulatory liability account to credit bills of IPL’s Iowa retail electric customers (beginning in 2011) and gas customers (beginning in 2013) to help offset the impact of rate increases on such customers. These credits on customers’ electric bills reduce electric revenues based on customers’ KWh usage.

Gas - The gas tax benefit rider, which was approved by the IUB and implemented in 2012, utilizes amounts from the regulatory liability account to credit bills of Iowa retail gas customers to help mitigate the impact of rate increases on such customers. These credits on customers’ gas bills reduce gas revenues based on a fixed amount per day.

Utilization of Tax Benefit Riders - IPL’s tax benefit riders regulatory liability account has been, and plans to be, utilized to credit bills of Iowa retail electric and gas customers as follows:
 Electric Gas Total
Regulatory liability account balance approved by IUB
$452
 
$48
 
$500
2011 through 2015 customer billing credits(380) (35) (415)
2016 customer billing credits (estimate)(65) (12) (77)
Remaining balance available for future periods
$7
 
$1
 
$8

Property Method Changes - In 2013, the U.S. Department of the Treasury issued tangible property regulations clarifying the tax treatment of costs incurred to acquire, maintain or improve tangible property and to retire and remove depreciable property. The regulations clarified the ability to deduct cost of removal expenditures on partial dispositions of assets. In 2014, the IRS issued implementation guidance related to these tangible property regulations, which allowed companies to file a tax accounting method change to deduct cost of removal expenditures on partial dispositions that were previously capitalized. In 2014, Alliant Energy, IPL and WPL implemented this tax accounting method change, which resulted in the inclusion of additional tax deductions on Alliant Energy’s U.S. federal income tax return for the calendar year 2014. In 2013, the IRS also issued guidance that clarified acceptable units of property to be used when assessing whether costs incurred for electric generation projects may be deducted as repair expenditures or if they must be capitalized. After assessing the guidance, Alliant Energy, IPL and WPL decided in 2014 to implement the new units of property by filing a tax accounting method change as part of Alliant Energy’s U.S. federal income tax return for the calendar year 2013. IPL currently

55



anticipates refunding $75 million of related current tax benefits from these two tax accounting method changes to its Iowa retail electric and gas customers in the future, which is recorded in Alliant Energy’s and IPL’s tax benefit riders regulatory liabilities.
 Electric Gas Total
Regulatory liability account balance approved by IUB
$520
 
$55
 
$575
2011 through 2016 customer billing credits(444) (47) (491)
2017 customer billing credits (estimate)(76) (8) (84)
Remaining balance available for future periods
$—
 
$—
 
$—

Refer to Notes 2 and 11 for additional discussion of the impacts of the electric and gas tax benefit riders on Alliant Energy’s and IPL’s regulatory assets and regulatory liabilities, income tax expense and effective income tax rates.

Planned Utility Rate CasesCase -
WPL’s Wisconsin Retail Electric and Gas Rate Case (2017/2018 Test Period) - WPL currently expects to make a retail electric and gas base rate filing for the 2017/2018 Test Period in the second quarter of 2016. Any rate changes granted from this request are expected to be effective on January 1, 2017. WPL currently expects a decision from the PSCW regarding this rate filing by the end of 2016.

WPL’s Retail Fuel-related Rate Filing (2017 Test Year) - WPL currently expects to make a retail fuel-related rate filing (2017 Test Year) in the second quarter of 2016. Such filing will establish WPL’s approved fuel-related costs for inclusion in its 2017 Test Period retail rates. Any rate changes granted from this request are expected to be effective on January 1, 2017. WPL currently expects a decision from the PSCW regarding this rate filing by the end of 2016.

IPL’s Iowa Retail Electric and Gas Rate CasesCase (2016 Test Year) - IPL currently expects to make separatea retail electric and gas rate filingsfiling in the first halfsecond quarter of 2017 based on a 2016 historical Test Year. The key drivers for the anticipated filingsfiling include recovery of capital projects, including Marshalltown, for the electric filingpower grid modernization and the proposed Clinton natural gas pipeline for the gas filing.investments that advance clean energy. Any rate changes are expected to be implemented in two phases with interim rates effective approximately 10 days after the filing and final rates effective approximatelyafter IUB approval. The IUB must decide on requests for retail rate changes within 10 months afterof the filing date.date of the application for which changes are filed, or the interim rates granted become permanent.

Retirement of WPL’s Nelson Dewey Units 1 and 2 and Edgewater Unit 3 - Refer to Note 2 for discussion of WPL’s December 2015 retirement of Nelson Dewey Units 1 and 2 and Edgewater Unit 3, including anticipated recovery of the remaining net book value of these EGUs from both its retail and wholesale customers.

Rate Case Details - Details of the currently effective rate orders in IPL’s and WPL’s key jurisdictions were as follows (Common Equity (CE); Preferred Equity (PE); Long-term Debt (LD); Short-term Debt (SD)):
 Authorized Return Average Authorized Return Average
 Test on Common Regulatory Capital Structure After-tax Rate Base Test on Common Regulatory Capital Structure After-tax Rate Base
Jurisdictions Period/Year Equity (a) CE PE LD SD WACC (in millions) Period/Year Equity (a) CE PE LD SD WACC (in millions)
IPL:                                
Iowa retail (IUB):      
Electric:      
- Emery (b) 2009 11.58% 48.2% 6.5% 45.3% N/A 8.85% $281 (c) 2009 11.58% 48.2% 6.5% 45.3% N/A 8.85% $281 (c)
- Whispering Willow - East (b) 2009 11.09% 48.2% 6.5% 45.3% N/A 8.61% 266 (c) 2009 11.09% 48.2% 6.5% 45.3% N/A 8.61% 266 (c)
- Other (b) 2009 9.53% 48.2% 6.5% 45.3% N/A 7.86% 1,843 (c) 2009 9.53% 48.2% 6.5% 45.3% N/A 7.86% 1,843 (c)
Gas (d) 2011 9.56% 48.8% 5.0% 46.2% N/A 7.76% 255 (c) 2011 9.56% 48.8% 5.0% 46.2% N/A 7.76% 255 (c)
Wholesale electric (FERC) (e) 2015 10.97% 47.7% 5.5% 46.8% N/A 7.94% 110 (f) 2016 10.97% 47.8% 5.0% 47.2% N/A 7.90% 119 (f)
WPL:      
Wisconsin retail (PSCW):      
Electric 2016 10.40% 51.0% N/A 46.2% 2.8% 7.84% 2,450 (g) 2017 10.00% 52.2% N/A 43.9% 3.9% 7.57% 2,699 (g)
Electric 2018 10.00% 52.2% N/A 45.2% 2.6% 7.59% 2,851 (g)
Gas 2017 10.00% 52.2% N/A 43.9% 3.9% 7.57% 259 (g)
Gas 2016 10.40% 51.0% N/A 46.2% 2.8% 7.84% 204 (g) 2018 10.00% 52.2% N/A 45.2% 2.6% 7.59% 284 (g)
Wholesale electric (FERC) (h) 2015 10.90% 55.0% N/A 45.0% N/A 8.49% 293 (f) 2016 10.90% 55.0% N/A 45.0% N/A 8.39% 299 (f)

(a)Authorized returns on common equity may not be indicative of actual returns earned or projections of future returns.
(b)Authorized returns on common equity and after-tax WACC reflect application of double leverage pursuant to a January 2011 IUB order. Prior to the application of double leverage, authorized returns on common equity were: Emery-12.23%, Whispering Willow-East-11.7% and Other-10.0%, and after-tax WACC were: Emery-9.16%, Whispering Willow-East-8.91% and Other-8.09%.
(c)Average rate base was calculated using a 13-month average duringbalances as of the end of the test year, adjusted for post-test year capital additions placed in service by September 30 following the end of the test year.
(d)Authorized returns on common equity and after-tax WACC reflect application of double leverage pursuant to the unanimous settlement agreement approved in the IUB’s November 2012 order. Prior to the application of double leverage, authorized return on common equity was 10.0% and after-tax WACC was 8.0%.
(e)IPL’s wholesale formula rates reflect annual changes in CE, PE, LD, WACC and rate base.

56



(f)Wholesale average rate base reflects production-related rate base calculated as the simple average of the beginning of the test year and end of the test year balances in accordance with the respectively approved formula rates.
(g)Average rate base amounts do not include CWIP or a cash working capital allowance and were calculated using a forecasted 13-month average for the test period. The PSCW provides a return on selected CWIP and a cash working capital allowance by adjusting the percentage return on rate base.
(h)WPL’s wholesale formula rates reflect annual changes in WACC and rate base.

ENVIRONMENTAL MATTERS

Overview - Alliant Energy, IPL and WPL are subject to regulation of environmental matters by federal, state and local authorities as a result of their current and past operations. Alliant Energy, IPL and WPL monitor these environmental matters and address them by installing controls that reduce emissions and by implementing operational modifications or other measures to address compliance obligations. There is currently significant regulatory uncertainty with respect to a number of environmental rules and regulations discussed below. Given the dynamic nature of environmental regulations and other related regulatory requirements, Alliant Energy, IPL and WPL have compliance plans to address these environmental obligations. Future expenditures for environmental compliance are expected to be material, including significant capital investments. Prudent expenditures incurred by IPL and WPL to comply with environmental requirements would likely be recovered in rates from their customers. Refer to “Strategic Overview” for details of environmental compliance plans, including discussion of specific projects and the associated estimated capital expenditures. The following are major environmental matters that could potentially have a significant impact on financial condition and results of operations.

Air Quality - The CAA and its amendments mandate preservation or enhancement of air quality through existing regulations and periodic reviews to ensure adequacy of the CAA provisions based on scientific data. As part of the basic framework under the CAA, the EPA is required to establish NAAQS, which serve to protect public health and welfare. These standards address six “criteria” pollutants, four of which (NOx, SO2, particulate matter and ozone) are particularly relevant to electric utility operations. Ozone is not directly emitted from EGUs; however, NOx emissions may contribute to its formation in the atmosphere. Fine particulate matter may also be formed in the atmosphere from SO2 and NOx emissions. Additional

emissions standards may also be applied under the CAA regulatory framework beyond NAAQS. The specific federal and state air quality rules that may affect operations are listed in the table below. Refer to the sections below the following table for detailed discussion of these air quality rules.
Environmental RuleEmissions RegulatedAlliant Energy’s Primary Facilities Potentially AffectedActual/Anticipated Compliance Deadline
CSAPRSO2, NOxFossil-fueled EGUs over 25 MW capacity in IA, WI and MNPhase I - 2015; Phase II - 2017
CAA Section 111(d)CO2Existing fossil-fueled EGUs over 25 MW capacityPhase I - 2022-2029; Phase II - 2030
CAA Section 111(b)CO2IPL’s Marshalltown facility and WPL’s Riverside expansionUpon startup of EGU

Refer to “Properties” in Item 2 for a list of IPL’s and WPL’s EGUs by primary fuel type that they currently own or operate, as well as discussion of various generating facilities that may be retired or changed from coal-fired to an alternative fuel source in the future.

CSAPR - CSAPR is a regional SO2 and NOx cap-and-trade program, where compliance with emission limits may be achieved by purchasing emission allowances and/or reducing emissions through changes in operations or the additions of environmental controls. CSAPR establishes state-specific annual SO2 and NOx emission caps and ozone season NOx emission caps. Compliance with CSAPR emission limits began in 2015, with additional emission limits reductions beginning in 2017. Alliant Energy, IPL and WPL are currently in compliance with the Phase I CSAPR emission limits. CSAPR emission allowances may be banked for future year compliance. In September 2016, the EPA issued a final rule to further reduce the CSAPR ozone season NOx emission caps in 2017 for several states, including Iowa and Wisconsin. Alliant Energy, IPL and WPL will continue to monitor legal and regulatory developments related to CSAPR and currently expect to meet the existing CSAPR compliance requirements based on planned and completed environmental controls projects for various EGUs.

GHG Emissions- Climate change continues to be assessed by policymakers, including consideration of the appropriate actions to mitigate climate change. There is continued debate regarding the public policy response that the U.S. should adopt, involving both domestic actions and international efforts. The primary GHG emitted from Alliant Energy’s, IPL’s and WPL’s utility operations is CO2 from the combustion of fossil fuels at their larger EGUs. In 2009, the EPA issued a finding that GHG emissions contribute to climate change, and therefore, threaten public health and welfare. This enabled the EPA to issue rules to report and regulate GHG emissions under the authority of the CAA.

Clean Air Act Section 111(d) - In 2015, the EPA published final standards under Section 111(d) of the CAA, referred to as the Clean Power Plan, which establish guidelines for states to follow in developing plans to reduce CO2 emissions from existing fossil-fueled EGUs. The final standards include an interim compliance period from 2022 through 2029 and a final compliance requirement beginning in 2030. In February 2016, the Supreme Court issued a stay of the Clean Power Plan until pending legal challenges are resolved, which places implementation of the final standards on hold indefinitely. Alliant Energy, IPL and WPL are currently unable to predict with certainty the outcome of the legal challenges to the Clean Power Plan or the impact of the final compliance requirements on their financial condition and results of operations, but expect that expenditures to comply with such requirements could be significant.

Clean Air Act Section 111(b) - In 2015, the EPA published final standards under Section 111(b) of the CAA, which establish CO2 emissions limits for certain new fossil-fueled EGUs. Marshalltown and the Riverside expansion are expected to be impacted by, and are being constructed to achieve compliance with, these standards. Given the EPA’s 111(b) rulemaking remains subject to legal challenges, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of these standards.

In addition, in order for the EPA to regulate existing fossil-fueled EGUs under Section 111(d) of the CAA, the EPA must have valid regulation of new fossil-fueled EGUs under Section 111(b) of the CAA. If the Section 111(b) legal challenges result in Section 111(b) being vacated, this could limit the EPA’s ability to implement the Clean Power Plan.

WPL Consent Decree - Refer to Note 16(e) for discussion of a Consent Decree approved by the U.S. District Court for the Western District of Wisconsin in 2013 and WPL’s obligations thereunder. The Consent Decree resolves a notice of violation issued by the EPA in 2009 and complaints filed by the Sierra Club in 2010 regarding alleged air permitting violations at Columbia, Edgewater and Nelson Dewey.

IPL Consent Decree - Refer to Note 16(e) for discussion of a Consent Decree approved by the U.S. District Court for the Northern District of Iowa in 2015 and IPL’s obligations thereunder. The Consent Decree resolves potential CAA issues associated with emissions from IPL’s coal-fired generating facilities in Iowa.


Water Quality -
Effluent Limitation Guidelines - In 2015, the EPA published final effluent limitation guidelines, which are expected to require changes to discharge limits for wastewater from certain IPL and WPL steam generating facilities. Compliance with the final guidelines for existing steam generating facilities will be required after November 1, 2018 but before December 31, 2023, depending on each facility’s wastewater permit renewal cycle. Effective January 2016, compliance for new steam generating facilities is required immediately upon operation. Projects required for compliance with these guidelines will be facility specific. Alliant Energy, IPL and WPL currently believe the expenditures to comply with these guidelines could be significant.

Land and Solid Waste -
Coal Combustion Residuals Rule - Refer to Note 13 for discussion of the final CCR Rule, including additional AROs that were recognized by Alliant Energy, IPL and WPL in 2015 related to such rule.

MGP Sites - Refer to Note 16(e) for discussion of IPL’s and WPL’s MGP sites.

Other - Refer to Note 16(e), Item 1 Business, “Strategic Overview” and “Liquidity and Capital Resources” for further discussion of environmental matters, including discussion of specific projects and the associated estimated capital expenditures.

LEGISLATIVE MATTERS

Overview - Various legislative developments are monitored, including those relating to energy, tax, financial and other matters. Key legislative developments include the following:

Protecting Americans from Tax Hikes Act - In December 2015, the PATH Act was enacted. The most significant provisions of the PATH Act for Alliant Energy, IPL and WPL relate to the extension of bonus depreciation deductions for certain capital expenditures for property incurred through December 31, 2019 and placed in service prior to December 31, 2020, as well as incentives for individuals and businesses to construct renewable generation. As a result of this new legislation, Alliant Energy currently estimates its total bonus depreciation deductions to be claimed on its U.S. federal income tax returns will be as follows (in millions):
Calendar Bonus Depreciation      
Year Deduction Alliant Energy IPL WPL
2015 50% 
$200
 
$100
 
$50
2016 50% 450
 200
 200
2017 50% 750
 550
 150
2018 40% 300
 200
 100
2019 30% 500
 100
 400

These estimated bonus depreciation deductions are expected to create additional deferred tax liabilities for IPL and WPL. Any decreases in IPL’s and WPL’s rate base amounts in the rate setting process caused by the expected increase in deferred tax liabilities are expected to be partially offset by increases in IPL’s and WPL’s rate base amounts due to the additional deferred tax assets expected from additional net operating losses. These bonus depreciation estimates could change based on various factors, including regulatory approvals, changes in capital expenditures incurred, additional clarifications in the PATH Act, or the timing of when property is placed in service. Refer to “Liquidity and Capital Resources” for discussion of the impact of these estimated bonus depreciation deductions on net operating loss carryforwards and the expected amount and timing of future federal income tax payments.

ENVIRONMENTAL MATTERS

Overview - Alliant Energy, IPL and WPL are subject to regulation of environmental matters by federal, state and local authorities as a result of their current and past operations. Alliant Energy, IPL and WPL monitor these environmental matters and address them by installing controls that reduce emissions and by implementing operational modifications or other measures to address compliance obligations. These programs are subject to continuing review and are periodically revised due to various factors, including, but not limited to, changes in environmental regulations, litigation of environmental requirements, construction plans and compliance costs. There is currently significant regulatory uncertainty with respect to a number of environmental rules and regulations discussed below. Given the dynamic nature of environmental regulations and other related regulatory requirements, Alliant Energy, IPL and WPL have compliance plans to address these environmental obligations. Future expenditures for environmental compliance are expected to be material, including significant capital investments. Prudent expenditures incurred by IPL and WPL to comply with environmental requirements would likely be recovered in rates from their customers. Refer to “Strategic Overview” for details of environmental compliance plans, including discussion of specific projects and the associated estimated capital expenditures. The following are major environmental matters that could potentially have a significant impact on financial condition and results of operations.

Air Quality - The CAA and its amendments mandate preservation of air quality through existing regulations and periodic reviews to ensure adequacy of the CAA provisions based on scientific data. As part of the basic framework under the CAA, the EPA is required to establish NAAQS rules, which serve to protect public health and welfare. These rules address six “criteria” pollutants, four of which (NOx, SO2, particulate matter and ozone) are particularly relevant to electric utility operations. Ozone is not directly emitted from EGUs; however, NOx emissions may contribute to its formation in the atmosphere. Fine particulate matter may also be formed in the atmosphere from SO2 and NOx emissions.

SIPs document the collection of regulations that individual state agencies will apply to maintain NAAQS rules and related CAA requirements. The EPA must approve each SIP and if a SIP is not acceptable to the EPA or if a state chooses not to issue separate state rules, then the EPA can assume enforcement of the CAA in that state by issuing a federal implementation plan. Routinely monitored locations that do not comply with NAAQS rules may be classified by the EPA as non-attainment

57



and require further actions to reduce emissions. Additional emissions standards may also be applied under the CAA regulatory framework beyond NAAQS rules. The specific federal and state air quality rules that may affect operations are listed in the table below. Refer to the sections below the following tables for detailed discussion of the following air quality rules.
EmissionsAlliant Energy’s Primary FacilitiesActual/Anticipated
Environmental RuleRegulatedPotentially AffectedCompliance Deadline
CSAPRSO2, NOxFossil-fueled EGUs over 25 MW capacity in IA, WI and MNPhase I - 2015; Phase II - 2017
MATS RuleMercury and other HAPsCoal-fired EGUs over 25 MW capacity in IA and WIApril 2015
2008 Ozone NAAQS RuleNOxFossil-fueled EGUs in non-attainment areasJuly 2015
2015 Ozone NAAQS RuleNOxFossil-fueled EGUs in non-attainment areas2020-2037
SO2 NAAQS RuleSO2Fossil-fueled EGUs in non-attainment areas2021-2025
CAA Section 111(d)CO2Existing fossil-fueled EGUs over 25 MW capacityPhase I - 2022-2029; Phase II - 2030
CAA Section 111(b)CO2Marshalltown and WPL’s proposed Riverside expansionUpon startup of EGU

The following table lists the fossil-fueled generating facilities by primary fuel type that IPL and WPL currently own or operate with greater than 25 MW of nameplate capacity. All of IPL’s generating facilities listed below are located in Iowa except for Fox Lake Unit 3, which is located in Minnesota. All of WPL’s generating facilities listed below are located in Wisconsin. Refer to “Strategic Overview” for discussion of various generating facilities that may be retired or changed from coal-fired to an alternative fuel source in the future.
IPLWPL
CoalNatural GasOilCoalNatural Gas
Ottumwa 1Emery 1-3Marshalltown 1-3Columbia 1-2Riverside 1-3
Lansing 4M.L. Kapp 2 (a)Lime Creek 1-2Edgewater 4-5Neenah 1-2
Prairie Creek 3-4Sutherland 1,3Centerville 1-2Sheboygan Falls 1-2
Burlington 1Fox Lake 3South Fond du Lac 1-4
George Neal 3-4Dubuque 3-4Rock River 3,5-6
Louisa 1Sheepskin 1

(a)IPL’s M.L. Kapp Unit 2 fuel type was switched from coal to natural gas in 2015.

As discussed in greater detail below, a number of these air regulations are subject to legal challenges, reconsideration and/or other uncertainties that affect the ability to predict with certainty what impact such regulations may have on financial condition and results of operations.

CSAPR - CSAPR is a regional SO2 and NOx cap-and-trade program, where compliance with emission limits may be achieved by purchasing emission allowances and/or reducing emissions through changes in operations or the additions of environmental controls. CSAPR establishes state-specific annual SO2 and NOx emission caps and ozone season NOx emission caps. In 2015, CSAPR replaced CAIR. Compliance with CSAPR emission limits began in 2015, with additional emission limits reductions beginning in 2017. Alliant Energy, IPL and WPL are currently in compliance with the Phase I CSAPR emission limits. The emission allowances used for Acid Rain and CAIR program compliance cannot be used for compliance with CSAPR. CSAPR emission allowances may be banked for future year compliance. In December 2015, the EPA issued a proposed rule to further reduce the CSAPR ozone season NOx emission caps in 2017 for several states, including Iowa and Wisconsin. Alliant Energy, IPL and WPL will continue to monitor legal and regulatory developments related to CSAPR and currently expect to meet the existing CSAPR compliance requirements based on planned and completed environmental controls projects for various EGUs.

MATS Rule - In 2011, the EPA issued the final MATS Rule for existing coal-fired EGUs, which requires emission limits for mercury and other HAPs, as well as work practice standards. Compliance with the MATS Rule began in April 2015. IPL and WPL have implemented environmental controls projects and operational procedures at various EGUs, refueled certain EGUs to natural gas and/or retired certain EGUs to achieve compliance with the MATS Rule. Pursuant to a June 2015 Supreme Court decision, the EPA published a proposed supplemental finding for the MATS Rule in December 2015 that concludes, after considering costs, it is “appropriate and necessary” to regulate HAPs from coal-fired EGUs. The MATS Rule will remain in effect while the EPA finalizes its supplemental finding, which is anticipated to be completed in 2016. Alliant

58



Energy, IPL and WPL currently expect continued compliance with the MATS Rule based on their completed actions, but will continue to monitor legal and regulatory developments related to this rule.

Ozone NAAQS Rule - The 2008 Ozone NAAQS Rule may require a reduction of NOx emissions in certain non-attainment areas designated by the EPA. Sheboygan County in Wisconsin is currently the only non-attainment area for the 2008 ozone NAAQS rule in Alliant Energy’s service territory. WPL operates Edgewater and Sheboygan Falls in Sheboygan County, Wisconsin. This non-attainment area was required to meet the ozone NAAQS by July 2015; however, in May 2015, Wisconsin asked the EPA for a one-year extension based on lower monitored ozone concentrations. Depending on the outcome of this request, additional NOx emission reductions may be required.

In October 2015, the EPA published the 2015 Ozone NAAQS Rule, which is more stringent than the 2008 Ozone NAAQS Rule and may require NOx emission reductions in certain non-attainment areas designated by the EPA. The EPA’s final designations of non-attainment areas for this revised rule are currently expected to be issued by October 2017. Compliance deadlines range from 2020 through 2037 depending on the level of ozone monitored in non-attainment areas. Depending on the level and location of non-attainment areas, Alliant Energy, IPL and WPL may be subject to additional NOx emissions reduction requirements to meet the 2015 Ozone NAAQS Rule. Alliant Energy, IPL and WPL do not currently believe there will be a significant impact of the 2015 Ozone NAAQS Rule on their financial condition and results of operations.

SO2 NAAQS Rule - In 2010, the EPA issued a final rule that establishes a new one-hour NAAQS for SO2. The EPA is currently working with states to complete attainment and non-attainment designations from July 2016 through December 2020. In addition, an SO2 monitoring device currently operates near one of IPL’s EGUs, which could result in the area surrounding the EGU receiving a non-attainment designation. Alliant Energy and IPL are currently unable to predict with certainty the outcome of such monitoring activities. Given that the EPA has not yet finalized SO2 NAAQS designations, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the SO2 NAAQS rule on their financial condition and result of operations.

GHG Emissions- Climate change continues to be assessed by policymakers, including consideration of the appropriate actions to mitigate climate change. There is continued debate regarding the public policy response that the U.S. should adopt, involving both domestic actions and international efforts.

In 2009, the EPA issued a finding that GHG emissions contribute to climate change, and therefore, threaten public health and welfare. This enabled the EPA to issue rules to report and regulate GHG emissions under the authority of the CAA. The EPA Mandatory GHG Reporting rule requires sources above certain threshold levels to monitor and report emissions. The primary GHG emitted from Alliant Energy’s, IPL’s and WPL’s utility operations is CO2 from the combustion of fossil fuels at their larger EGUs. Emissions of GHG are reported at the facility level in CO2e and include those facilities that emit 25,000 metric tons or more of CO2e annually. Annual emissions reported to the EPA for electric utility and gas distribution operations, in terms of total mass of CO2e, were as follows (in millions of metric tons):
 Alliant Energy IPL WPL
 2014 2013 2012 2014 2013 2012 2014 2013 2012
CO2e emissions (a)24.3 26.6 25.2 10.9 10.9 10.8 13.4 15.7 14.4

(a)CO2e emissions reported to the EPA represent all emissions from the facilities operated by IPL and WPL and do not reflect their share of co-owned facilities operated by other companies.

GHG Tailoring Rule - In 2010, the EPA issued the GHG Tailoring Rule, which establishes a GHG emissions threshold for major sources under the PSD construction permit and Title V operation permit. In 2014, the Supreme Court ruled that the EPA may not treat GHG emissions as “air pollutants” for determining whether a major source is required to obtain a PSD or Title V permit, but held that the EPA can continue requiring Best Available Control Technology for GHG emissions from sources otherwise subject to review under the PSD program. This rule remains subject to legal challenges and further rulemaking may also be required to update state regulations implementing the GHG Tailoring Rule to make the Supreme Court’s decision effective.

Clean Air Act Section 111(d) - In October 2015, the EPA published final standards under Section 111(d) of the CAA, referred to as the Clean Power Plan, which establish guidelines for states to follow in developing plans to reduce CO2 emissions from existing fossil-fueled EGUs. The final standards include an interim compliance period from 2022 through 2029 and a final compliance requirement beginning in 2030. In February 2016, the Supreme Court issued a stay of the Clean Power Plan until pending legal challenges are resolved, which places implementation of the final standards on hold indefinitely. Alliant Energy, IPL and WPL are currently unable to predict with certainty the outcome of the Clean Power Plan stay and its impact

59



on their financial condition and results of operations. Given the EPA’s rulemaking remains subject to legal challenges, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the final compliance requirements, but expect that expenditures to comply with such requirements could be significant.

Clean Air Act Section 111(b) - In October 2015, the EPA published final standards under Section 111(b) of the CAA, which establish CO2 emissions limits for certain new fossil-fueled EGUs. Marshalltown and WPL’s proposed Riverside expansion are expected to be impacted by these standards. Marshalltown is being constructed, and WPL’s proposed Riverside expansion is being designed, to achieve compliance with these standards. Given the EPA’s rulemaking remains subject to legal challenges, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of these standards.

WPL Consent Decree - Refer to Note 16(e) for discussion of a Consent Decree approved by the Western Wisconsin Court in 2013 and WPL’s obligations thereunder. The Consent Decree resolves a notice of violation issued by the EPA in 2009 and complaints filed by the Sierra Club in 2010 regarding alleged air permitting violations at Columbia, Edgewater and Nelson Dewey.

IPL Consent Decree - Refer to Note 16(e) for discussion of a Consent Decree approved by the Northern Iowa Court in September 2015 and IPL’s obligations thereunder. The Consent Decree resolves potential CAA issues associated with emissions from IPL’s coal-fired generating facilities in Iowa.

Water Quality -
Section 316(b) of Federal Clean Water Act - In 2014, the EPA published a final rule related to Section 316(b) of the Federal Clean Water Act to regulate cooling water intake structures and minimize adverse environmental impacts to fish and other aquatic life. This rule applies to existing and new cooling water intake structures at certain steam generating and manufacturing facilities. IPL and WPL have identified nine (Ottumwa 1, Prairie Creek Units 1-4, Fox Lake Units 1 and 3, Lansing Unit 4, Dubuque Units 3-4, M.L. Kapp Unit 2, Burlington Unit 1, George Neal Units 3-4 and Louisa Unit 1) and two (Columbia Units 1-2 and Edgewater Units 4-5) generating facilities, respectively, which may be impacted by the final Section 316(b) Rule. Compliance with this final rule will be incorporated during periodic facility permit renewal cycles, with final compliance anticipated by 2022. Alliant Energy, IPL and WPL do not currently believe there will be a significant impact from the EPA’s Section 316(b) rule on their financial condition and results of operations.

Effluent Limitation Guidelines - In November 2015, the EPA published final effluent limitation guidelines, which require changes to discharge limits for wastewater from steam generating facilities. IPL and WPL have identified ten (Emery Units 1-3, Ottumwa Unit 1, Prairie Creek Units 3-4, Fox Lake Units 1 and 3, Lansing Unit 4, Dubuque Units 3-4, Burlington Unit 1, Sutherland Units 1 and 3, George Neal Units 3-4 and Louisa Unit 1) and three (Riverside Units 1-3, Columbia Units 1-2 and Edgewater Units 4-5) existing steam generating facilities, respectively, that are expected to be impacted by these guidelines. In addition, Marshalltown and WPL’s proposed Riverside expansion are expected to be impacted by these guidelines. Compliance with the final guidelines for existing steam generating facilities will be required after November 1, 2018 but before December 31, 2023, depending on each facility’s wastewater permit renewal cycle, and immediately upon operation for new steam generating facilities constructed after January 2016. Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of these guidelines on their financial condition and results of operations, but believe the expenditures to comply with these guidelines could be significant.

Hydroelectric Fish Passage Device - In 2002, FERC issued an order requiring WPL to install a fish passage device at its Prairie du Sac hydro plant. WPL has been working with the FWS and the Wisconsin DNR on the final design for the fish passage device. In 2013, the FWS initiated an environmental study of the fish passage device under the National Environmental Policy Act, which could result in changes to the design of the fish passage device. The FWS has indicated that this environmental study will be completed in 2016. In 2014, FERC issued an order approving an extension of the project deadline to December 31, 2020. Alliant Energy and WPL currently believe the required capital investments and/or modifications to install the currently designed fish passage device at the facility could be approximately $15 million.

Land and Solid Waste -
Coal Combustion Residuals Rule - Refer to Note 13 for discussion of the final CCR Rule, including additional AROs that were recognized by Alliant Energy, IPL and WPL in 2015 related to such rule.

MGP Sites - Refer to Note 16(e) for discussion of IPL’s and WPL’s MGP sites.


60



Other - Refer to Note 16(e), Item 1 Business, “Strategic Overview” and “Liquidity and Capital Resources” for further discussion of environmental matters, including discussion of specific projects and the associated estimated capital expenditures.

LEGISLATIVE MATTERS

Overview - Various legislative developments are monitored, including those relating to energy, tax, financial and other matters. Key legislative developments include the following:

Protecting Americans from Tax Hikes Act - In December 2015, the PATH Act was enacted. Refer to “Rate Matters” for discussion of estimated bonus depreciation deductions from the PATH Act and resulting impacts to IPL’s and WPL’s future rate base amounts.

LIQUIDITY AND CAPITAL RESOURCES

Overview - Alliant Energy, IPL and WPL expect to maintain adequate liquidity to operate their businesses and implement their strategic plan as a result of operating cash flows generated by their utility business, and available capacity under their revolving credit facilities and IPL’s sales of accounts receivable program, supplemented by periodic issuances of long-term debt and Alliant Energy equity securities.

Liquidity Position - At December 31, 20152016, Alliant Energy had $68 million of cash and cash equivalents, $840756 million ($160108 million at the parent company, $300 million at IPL and $380348 million at WPL) of available capacity under the revolving credit facilities and $145129 million of available capacity at IPL under its sales of accounts receivable program. Refer to “Short-term Debt” below and Note 9(a) for further discussion of the credit facilities. Refer to Note 5(b) for additional information on IPL’s sales of accounts receivable program.


Capital Structure - Alliant Energy, IPL and WPL plan to maintain debt-to-total capitalization ratios that are consistent with their investment-grade credit ratings. Alliant Energy, IPL and WPL currently expect to maintain capital structures in which debt would not exceed 55% of total capital and preferred stock would not exceed 10% of total capital. These targets may be adjusted depending on subsequent developments and the impact on their respective WACC and investment-grade credit ratings. Capital structures as of December 31, 2016 were as follows (dollars in millions)(Common Equity (CE); IPL’s Preferred Stock (PS); Long-term Debt (including current maturities) (LD); Short-term Debt (SD)):
 December 31, 2015 December 31, 2014
 Alliant Energy (Consolidated) IPL WPL Alliant Energy (Consolidated) IPL WPL
Common equity
$3,724.1
 47% 
$1,995.3
 49% 
$1,756.3
 53% 
$3,438.7
 45% 
$1,784.3
 48% 
$1,706.9
 52%
IPL’s preferred stock200.0
 3% 200.0
 5% 
 % 200.0
 3% 200.0
 5% 
 %
Noncontrolling interest
 % 
 % 11.3
 % 1.8
 % 
 % 8.5
 %
Long-term debt (incl. current maturities)3,835.6
 48% 1,856.9
 46% 1,533.9
 46% 3,767.3
 50% 1,758.0
 47% 1,563.1
 48%
Short-term debt159.8
 2% 
 % 19.9
 1% 141.3
 2% 
 % 
 %
 
$7,919.5
 100% 
$4,052.2
 100% 
$3,321.4
 100% 
$7,549.1
 100% 
$3,742.3
 100% 
$3,278.5
 100%

Alliant Energy, IPL and WPL intend to manage their capital structures and liquidity positions in such a way that facilitates their ability to raise the necessary funds reliably and on reasonable terms and conditions, while maintaining financial capital structures consistent with those approved by regulators and necessary to maintain appropriate credit quality. In addition to capital structures, other important financial considerationsfactors used to determine the characteristics of future financings include anticipated proceeds from asset sales, financial coverage ratios, capital spending plans, regulatory orders and rate-making considerations, levels of debt imputed by rating agencies, market conditions and the impact of tax initiatives and legislation. The most significant debt imputations relate to the sales of accounts receivable program, the DAEC PPA, and pension and OPEB obligations. The PSCW factors certain imputed debt adjustments in establishing a regulatory capital structure as part of WPL’s retail rate cases. The IUB does not make any explicit adjustments for imputed debt in establishing capital ratios used in determining customer rates, although such adjustments are considered by IPL in recommending an appropriate capital structure. The most significant debt imputations relate to the DAEC PPA, pension and OPEB obligations and the sales of accounts receivable program.


61



Credit and Capital Markets - Alliant Energy, IPL and WPL are aware of the potential implications that credit and capital market disruptions might have on thetheir ability to raise external funding required for their respective operations and capital expenditure plans. Alliant Energy, IPL and WPL maintain revolving credit facilities to provide backstop liquidity to their commercial paper programs, and ensure a committed source of liquidity in the event the commercial paper market becomes disrupted and efficiently manage their long-term financings.disrupted. In addition, Alliant Energy and IPL maintainmaintains a sales of accounts receivable program at IPL as an alternative financing source.

Primary Sources and Uses of Cash - TheAlliant Energy’s most significant source of cash is from electric and gas sales to IPL’s and WPL’s customers. Cash from these sales reimburses IPL and WPL for prudently-incurred expenses to provide service to their utility customers and provides IPL and WPL a return of and a return on the assets used to provide such services. Utility operating cash flows are expected to cover the majority of IPL’s and WPL’s capital expenditures required to maintain their current infrastructure and to pay dividends paid to Alliant Energy’s shareowners. Capital needed to retire debt and fund capital expenditures related to large strategic projects is expected to be met primarily through external financings.

Cash Flows - Selected information from the cash flows statements was as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
201520142013 201520142013 201520142013201620152014 201620152014 201620152014
Cash and cash equivalents, January 1
$56.9

$9.8

$21.2
 
$5.3

$4.4

$4.5
 
$46.7

$0.5

$0.7

$5.8

$56.9

$9.8
 
$4.5

$5.3

$4.4
 
$0.4

$46.7

$0.5
Cash flows from (used for):          
Operating activities871.2
891.6
731.0
 385.0
406.1
232.6
 449.8
424.4
423.3
859.6
871.2
891.6
 361.9
385.0
406.1
 521.4
449.8
424.4
Investing activities(919.2)(917.7)(754.7) (511.9)(552.7)(423.3) (358.2)(320.1)(335.9)(1,186.5)(919.2)(917.7) (693.6)(511.9)(552.7) (478.9)(358.2)(320.1)
Financing activities(3.1)73.2
12.3
 126.1
147.5
190.6
 (137.9)(58.1)(87.6)329.3
(3.1)73.2
 330.5
126.1
147.5
 (38.7)(137.9)(58.1)
Net increase (decrease)(51.1)47.1
(11.4) (0.8)0.9
(0.1) (46.3)46.2
(0.2)2.4
(51.1)47.1
 (1.2)(0.8)0.9
 3.8
(46.3)46.2
Cash and cash equivalents, December 31
$5.8

$56.9

$9.8
 
$4.5

$5.3

$4.4
 
$0.4

$46.7

$0.5

$8.2

$5.8

$56.9
 
$3.3

$4.5

$5.3
 
$4.2

$0.4

$46.7


Operating Activities -
2016 vs. 2015 - The following items contributed to increased (decreased) operating activity cash flows in 2016 compared to 2015 (in millions):
 Alliant Energy IPL WPL
Decreased collections from IPL’s retail customers due to increased past due amounts
($33) 
($33) 
$—
Changes in cash collateral balances(27) 
 
Changes in income taxes (paid) refunded(10) (30) 35
Changes in the level of cash proceeds from IPL’s sales of accounts receivable33
 33
 
Timing of WPL’s fuel-related cost recoveries from customers (Refer to Note 2 for details)
17
 
 17
Changes in collections at IPL from higher revenues from retail electric customer billing credits related to the approved retail electric base rate freeze through 2016 (Refer to Note 2 for details)
15
 15
 
Other (includes other changes in working capital largely related to changes in inventory levels)(7) (8) 20
 
($12) 
($23) 
$72

2015 vs. 2014 - The following items contributed to increased (decreased) operating activity cash flows in 2015 compared to 2014 (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
Decreased collections from IPL’s and WPL’s retail customers caused by temperature impacts on electric and gas sales
($33) 
($17) 
($16)
($33) 
($17) 
($16)
Final receipt related to Alliant Energy’s tax separation and indemnification agreement with Whiting Petroleum in 2014 (Refer to Note 5(c) for details)
(26) 
 
(26) 
 
Timing of WPL’s fuel-related cost recoveries from customers50
 
 50
50
 
 50
Changes in IPL’s retail electric customer billing credits (Refer to “Rate Matters” for details)
48
 48
 
Changes in collections at IPL from higher revenues from retail electric customer billing credits related to the approved retail electric base rate freeze (Refer to Note 2 for details)
48
 48
 
Other (includes other changes in working capital largely related to changes in inventory levels)(59) (52) (9)(59) (52) (9)

($20) 
($21) 
$25

($20) 
($21) 
$25

2014 vs. 2013 - The following items contributed to increased (decreased) operating activity cash flows in 2014 compared to 2013 (in millions):
 Alliant Energy IPL WPL
Lower purchased electric capacity payments related to the previous DAEC PPA (IPL) and the Kewaunee PPA (WPL)
$190
 
$129
 
$61
Changes in the level of IPL’s accounts receivable sold (Refer to Note 5(b) for details)
94
 94
 
Final receipt related to Alliant Energy’s tax separation and indemnification agreement with Whiting Petroleum in 2014 (Refer to Note 5(c) for details)
26
 
 
IPL’s retail electric customer billing credits in 2014 (Refer to “Rate Matters” for details)
(72) (72) 
Timing of WPL’s fuel-related cost recoveries from customers(38) 
 (38)
Other (includes other changes in working capital largely related to changes in inventory levels)(39) 23
 (22)
 
$161
 
$174
 
$1


62



Income Tax Payments and Refunds - Income tax (payments) refunds were as follows (in millions):
2015 2014 20132016 2015 2014
IPL
$19
 
$20
 
$—

($11) 
$19
 
$20
WPL(7) (12) (23)28
 (7) (12)
Other subsidiaries(12) (3) 33
(27) (12) (3)
Alliant Energy
$—
 
$5
 
$10

($10) 
$—
 
$5

Alliant Energy’s income tax refunds in 2014 and 2013 were primarily due to federal and state claims filed related to net operating losses carried back to prior years. Alliant Energy, IPL and WPL currently do not expect to make any significant federal income tax payments through 2021 based on their current federal net operating loss and credit carryforward positions and future amounts of bonus depreciation expected to be claimed on Alliant Energy’s U.S. federal income tax returns for calendar years 20152016 through 2020. While no significant federal income tax payments through 2021 are expected to occur, some tax payments and refunds may occur for state taxes and between consolidated group members (including IPL and WPL) under the tax sharing agreement between Alliant Energy and its subsidiaries. Refer to Note 11 for discussion of the carryforward positions. Refer to “Rate Matters” for discussion of estimated bonus depreciation deductions from the PATH Act.

Pension Plan Contributions - Alliant Energy, IPL and WPL currently do not expect to make any significant pension plan contributions in 2016 through2017 and 2018 based on the funded status and assumed return on assets for each plan as of the December 31, 20152016 measurement date. Refer to Note 12(a) for discussion of the current funded levels of pension plans.

Transfer of ATC Investment - On December 31, 2016, pursuant to a PSCW order, WPL’s investment in ATC was transferred to ATI. The transfer will result in a reduction of WPL’s cash flows from operations related to WPL’s distributions from unconsolidated investments in 2017, as well as a reduction in WPL’s equity income from unconsolidated investments in 2017. The transfer is not expected to impact Alliant Energy’s cash flows from operations or income statement. Refer to Note 6(a) for further discussion of the transfer.


Investing Activities -
2016 vs. 2015 - The following items contributed to increased (decreased) investing activity cash flows in 2016 compared to 2015 (in millions):
 Alliant Energy IPL WPL
Higher utility construction expenditures (largely due to higher expenditures for IPL’s expansion of wind generation, IPL’s and WPL’s electric and gas distribution systems and WPL’s Riverside expansion in 2016, partially offset by lower expenditures for IPL’s Marshalltown facility and environmental controls projects at WPL’s Edgewater Unit 5 in 2016)
($179) 
($70) 
($109)
Proceeds from IPL’s Minnesota distribution asset sales in 2015 (Refer to Note 3 for details)
(140) (140) 
Proceeds from the liquidation of company-owned life insurance policies in 201631
 19
 
Other21
 9
 (12)
 
($267) 
($182) 
($121)

2015 vs. 2014 - The following items contributed to increased (decreased) investing activity cash flows in 2015 compared to 2014 (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
Proceeds from IPL’s Minnesota distribution asset sales in 2015 (Refer to Note 3 for details)

$140
 
$140
 
$—

$140
 
$140
 
$—
Higher utility construction expenditures (a)(125) (93) (31)
Higher utility construction expenditures (largely due to higher expenditures for IPL’s Marshalltown facility and environmental controls projects at WPL’s Edgewater Unit 5 in 2015, partially offset by lower expenditures for environmental controls projects at IPL’s Ottumwa Unit 1 and WPL’s Columbia Units 1 and 2 in 2015)(125) (93) (31)
Other(17) (6) (7)(17) (6) (7)

($2) 
$41
 
($38)
($2) 
$41
 
($38)

(a)Largely due to higher expenditures for Marshalltown and environmental controls projects at WPL’s Edgewater Unit 5 in 2015, partially offset by lower expenditures for environmental controls projects at IPL’s Ottumwa Unit 1 and WPL’s Columbia Units 1 and 2 in 2015.

2014 vs. 2013 - The following items contributed to increased (decreased) investing activity cash flows in 2014 compared to 2013 (in millions):
 Alliant Energy IPL WPL
Lower (higher) utility construction expenditures (a)
($107) 
($126) 
$19
Cash grant received in 2013 related to the Franklin County wind farm (Refer to Note 5(d) for details)
(62) 
 
Other6
 (3) (3)
 
($163) 
($129) 
$16

(a)Largely due to higher expenditures for Marshalltown, IPL’s and WPL’s electric and gas distribution systems and environmental controls projects at WPL’s Edgewater Unit 5 in 2014, partially offset by lower expenditures for environmental controls projects at WPL’s Columbia Units 1 and 2 in 2014.

Construction and Acquisition Expenditures - Construction and acquisition expenditures and financing plans are reviewed, approved and updated as part of the financial planning processes. Changes in such expenditures may result from a number of reasons including economic conditions, regulatory requirements, changing legislation, ability to obtain adequate and timely rate relief, improvements in technology, failure of generating facilities, improvements to ensure reliability of the electric and gas distribution systems, changing market conditions, customer and sales growth, funding of pension and OPEB plans, tax reform and new opportunities. Alliant Energy, IPL and WPL have not yet entered into contractual commitments relating to the majority of their anticipated future construction and acquisition expenditures. As a result, they have some discretion with regard to the level and timing of these expenditures. The table below summarizes anticipated construction and acquisition expenditures (in millions). Cost estimates represent Alliant Energy’s, IPL’s and WPL’s estimated portion of total escalated construction

63



expenditures and exclude AFUDC and capitalized interest, if applicable. Such estimates do not reflect any potential impacts to Alliant Energy’s and WPL’s capital expenditures resulting from the intent to exercise purchase options available to WPSC, MGE andby certain electric cooperatives for a partial ownership interest in the proposed Riverside expansion, noras well as additional capital expenditures related to Columbia that WPL mayis expected to incur related to the recent agreements entered into with WPSC and MGE. Refer to “Strategic Overview” for further discussion of certain key projects impacting construction and acquisition plans related to the utility business, and recent agreements with WPSC, MGE and certain of WPL’s electric wholesale customers.business.
Alliant Energy IPL WPLAlliant Energy IPL WPL
2016201720182019 2016201720182019 20162017201820192017201820192020 2017201820192020 2017201820192020
Generation:          
Renewable projects
$105

$310

$690

$260
 
$140

$290

$500

$150
 
$—

$20

$190

$110
Riverside expansion255
230
75
5
 



 255
230
75
5
Marshalltown
$200

$10

$—

$—
 
$200

$10

$—

$—
 
$—

$—

$—

$—
50



 50



 



Proposed Riverside expansion80
260
225
115
 



 80
260
225
115
Environmental compliance110
75
55
15
 30
40
50
10
 80
35
5
5
Other190
165
125
160
 95
65
50
75
 95
100
75
85
240
180
170
160
 85
85
85
85
 155
95
85
75
Distribution:          
Electric systems300
425
515
565
 165
235
310
370
 135
190
205
195
465
485
420
405
 280
310
240
235
 185
175
180
170
Gas systems200
225
195
160
 150
155
115
90
 50
70
80
70
130
125
95
220
 90
55
55
165
 40
70
40
55
Other85
170
160
200
 15
35
25
20
 40
35
10
10
155
115
110
105
 40
25
25
20
 20
15
15
15

$1,165

$1,330

$1,275

$1,215
 
$655

$540

$550

$565
 
$480

$690

$600

$480

$1,400

$1,445

$1,560

$1,155
 
$685

$765

$905

$655
 
$655

$605

$585

$430


Financing Activities -
2016 vs. 2015 - The following items contributed to increased (decreased) financing activity cash flows in 2016 compared to 2015 (in millions):
 Alliant Energy IPL WPL
Proceeds from long-term debt issued in 2016 (Refer to “Long-term Debt” below)
$800
 
$300
 
$—
Payments to retire long-term debt in 2015 (Refer to “Long-term Debt” below)181
 150
 31
Net changes in the amount of commercial paper outstanding66
 
 13
Payments to retire long-term debt in 2016 (Refer to “Long-term Debt” below)(310) 
 
Proceeds from long-term debt issued in 2015 (Refer to “Long-term Debt” below)(250) (250) 
Lower net proceeds from common stock issuances(125) 
 
Higher capital contributions from IPL’s and WPL’s parent company, Alliant Energy
 25
 60
Other (includes higher dividend payments in 2016)(30) (21) (5)
 
$332
 
$204
 
$99

2015 vs. 2014 - The following items contributed to increased (decreased) financing activity cash flows in 2015 compared to 2014 (in millions):
 Alliant Energy IPL WPL
Proceeds from long-term debt issued in 2014 (Refer to “Long-term Debt” below)
($810) 
($250) 
($250)
Payments to retire long-term debt in 2015 (Refer to “Long-term Debt” below)(181) (150) (31)
Payments to retire long-term debt in 2014 (Refer to “Long-term Debt” below)348
 38
 
Proceeds from long-term debt issued in 2015 (Refer to “Long-term Debt” below)250
 250
 
Net changes in the amount of commercial paper outstanding157
 
 204
Net proceeds from common stock issuances in 2015151
 
 
Higher capital contributions from IPL’s parent company, Alliant Energy
 75
 
Other9
 16
 (3)
 
($76) 
($21) 
($80)

2014 vs. 2013 - The following items contributed to increased (decreased) financing activity cash flows in 2014 compared to 2013 (in millions):
 Alliant Energy IPL WPL
Proceeds from long-term debt issued in 2014 (Refer to “Long-term Debt” below)
$810
 
$250
 
$250
Payments to redeem cumulative preferred stock in 2013211
 150
 61
Payments to retire long-term debt in 2014 (Refer to “Long-term Debt” below)(348) (38) 
Proceeds from long-term debt issued in 2013 (Refer to “Long-term Debt” below)(250) (250) 
Proceeds from IPL’s issuance of cumulative preferred stock in 2013(200) (200) 
Net changes in the amount of commercial paper outstanding(150) 76
 (281)
Lower capital contributions from IPL’s parent company, Alliant Energy
 (30) 
Other(12) (1) 
 
$61
 
($43) 
$30

FERC and Public Utility Holding Company Act Financing Authorizations - Under the Public Utility Holding Company Act of 2005, FERC has authority over the issuance of utility securities, except to the extent that a public utility’s primary state regulatory commission has retained jurisdiction over such matters. FERC currently has authority over the issuance of securities by IPL. FERC does not have authority over the issuance of securities by Alliant Energy, WPL, ResourcesAEF or Corporate Services.


64



In December 2015, IPL received authorization from FERC through December 31, 2017 for the following (in millions):
Initial Authorization and
Current Remaining Authority
Long-term debt securities issuances in aggregate
$550
Short-term debt securities outstanding at any time (including borrowings from its parent)300
Preferred stock issuances in aggregate300
 Initial Current
 Authorization Remaining Authority
Long-term debt securities issuances in aggregate
$550
 
$250
Short-term debt securities outstanding at any time (including borrowings from its parent)300
 300
Preferred stock issuances in aggregate300
 300

State Regulatory Financing Authorizations - In 2011,September 2016, WPL received authorization from the PSCW to have up to $400 million of short-term borrowings and/or letters of credit outstanding at any time through the earlier of the expiration date of WPL’s credit facility agreement (including extensions) or December 2018. As of2024. In December 31, 2015,2016, WPL also has remaining authorityreceived authorization from the PSCW to issue up to $300 million$1 billion of long-term debt securities in aggregate during 2017 through 2019, with no more than $650 million to be issued in 2016 pursuant to a November 2014 PSCW order.any year.

Shelf Registrations - Alliant Energy, IPL and WPL have current shelf registration statements on file with the SEC for availability to issue unspecified amounts of securities through December 2017. Alliant Energy’s shelf registration statement may be used to issue common stock, debt and other securities. IPL’s and WPL’s shelf registration statements may be used to issue preferred stock and debt securities.

Common Stock Split -As discussed in Note 7, Alliant Energy’s Board of Directors approved a two-for-one common stock split, which was distributed in May 2016.

Common Stock Dividends - Payment of common stock dividends is subject to dividend declaration by Alliant Energy’s Board of Directors. Alliant Energy’s general long-term goal is to maintain a dividend payout ratio that is competitive with

the industry average. Based on that, Alliant Energy’s goal is to maintain a dividend payout ratio of approximately 60% to 70% of consolidated earnings from continuing operations. IPL’s and WPL’s goal is to maintain dividend payout ratios of approximately 65% to 75%. Alliant Energy’s, IPL’s and WPL’s dividend payout ratios were 65%71%, 75%70% and 72%71% of their consolidated earnings from continuing operations in 2015,2016, respectively. Refer to “Executive SummaryOverview” for discussion of expected common stock dividends in 2016.2017. Refer to Note 7 for discussion of IPL’s and WPL’s dividend payment restrictions based on the terms of applicable regulatory limitations and IPL’s outstanding preferred stock.

Common Stock Issuances and Capital Contributions - Refer to Note 7 for discussion of common stock issuances by Alliant Energy capital contributions from Alliant Energy to IPL, payments of common stock dividends by IPL and WPL to their parent company, and repayments of capital by Resources to its parent company.in 2014 through 2016. Refer to “Executive SummaryOverview” for discussion of expected issuances of common stock and capital contributions in 2016.

Preferred Stock Issuance and Redemptions - Refer to Note 8 for discussion of IPL’s and WPL’s preferred stock redemptions and IPL’s issuance of preferred stock in 2013.2017.

Short-term Debt - Alliant Energy, IPL and WPL maintain committed revolving credit facilities to provide short-term borrowing flexibility and backstop liquidity for commercial paper outstanding. At December 31, 2015,2016, Alliant Energy’s short-term borrowing arrangements included three revolving credit facilities totaling $1 billion ($300 million for Alliant Energy at the parent company level, $300 million for IPL and $400 million for WPL). There are currently 13 lenders that participate in the three credit facilities, with aggregate respective commitments ranging from $10 million to $135 million. In 2014, eachEach of the credit facilities was extended one year throughexpire in December 2018. There2018 and there are currently no extension renewal provisions remaining for the credit facilities. Each of the credit facilities has a provision to expand the facility size up to $100 million, subject to lender approval for Alliant Energy and subject to lender and regulatory approvals for IPL and WPL. During 2015,2016, the Alliant Energy parent company, IPL and WPL issued commercial paper to meet short-term financing requirements and did not borrow directly under their respective credit facilities.

Alliant Energy’s, IPL’s and WPL’s credit facility agreements each contain a financial covenant, which requires the entities to maintain certain debt-to-capital ratios in order to borrow under the credit facilities. The debt-to-capital ratios cannot exceed 65%, 58% and 58% for Alliant Energy, IPL and WPL, respectively. The debt component of the capital ratios includes long- and short-term debt (excluding non-recourse debt and hybrid securities to the extent the total carrying value of such hybrid securities does not exceed 15% of consolidated capital of the applicable borrower), capital lease obligations, letters of credit, guarantees of the foregoing and new synthetic leases. Unfunded vested benefits under qualified pension plans and sales of accounts receivable are not included in the debt-to-capital ratios. The equity component of the capital ratios excludes accumulated other comprehensive income (loss).

The credit agreements contain provisions that prohibit placing liens on any of Alliant Energy’s, IPL’s or WPL’s property or their respective subsidiaries with certain exceptions. Exceptions include among others, liens to secure obligations of up to 5% of the consolidated assets of the applicable borrower (valued at carrying value), liens imposed by government entities,

65



materialmens’ and similar liens, judgment liens, and liens to secure additional non-recourse debt not to exceed $100 million outstanding at any one time at each of IPL and WPL, and $100 million at Alliant Energy’s non-utility subsidiaries, and purchase money liens.

The credit agreements contain provisions that require, during their term, any proceeds from asset sales, with certain exclusions, in excess of 20% of Alliant Energy’s, IPL’s and WPL’s respective consolidated assets be used to reduce commitments under their respective facilities. Exclusions include, among others, certain sale and lease-back transactions and sales of non-regulated assets and accounts receivable.

The credit agreements contain customary events of default. Alliant Energy’s credit agreement contains a cross-default provision that would be triggered if Alliant Energy or any domestic, majority-owned subsidiary of Alliant Energy defaults on debt (other than non-recourse debt) totaling $50 million or more. Accordingly, a cross-default provision would be triggered under the Alliant Energy credit agreement if IPL or WPL, as applicable, or a majority-owned subsidiary accounting for 20% or more of IPL’s or WPL’s, as applicable, consolidated assets (valued at carrying value), defaults on debt totaling $50 million or more. A default by a minority-owned subsidiary and, in the case of the Alliant Energy credit agreement, a default by a foreign subsidiary would not trigger a cross-default. A default by Alliant Energy, Corporate Services or ResourcesAEF and its subsidiaries would not trigger a cross-default under either the IPL or WPL credit agreements, nor would a default by either of IPL or WPL constitute a cross-default event for the other. If an event of default under any of the credit agreements occurs and is continuing, then the lenders may declare any outstanding obligations under the credit agreements immediately due and payable. In addition, if any order for relief is entered under bankruptcy laws with respect to Alliant Energy, IPL or WPL, then any outstanding obligations under the respective credit agreements would be immediately due and payable. In addition, IPL’s sales of accounts receivable program agreement contains a cross-default provision that is triggered if IPL or Alliant Energy incurs an event of default on debt totaling $50 million or more. If an event of default under IPL’s sales of accounts receivable program agreement occurs, then the counterparty could terminate such agreement. Refer to Note 5(b) for additional information on amounts outstanding under IPL’s sales of accounts receivable program.

A material adverse change representation is not required for borrowings under the credit agreements.

Refer to Note 9(a) for discussion of financial covenants required under the credit agreements, as well as additional information on the credit facilities and commercial paper outstanding. At December 31, 2015,2016, Alliant Energy, IPL and WPL were in compliance with all material covenants and other provisions of the credit agreements.

Refer to Note 9(a) for additional information on the credit facilities, commercial paper outstanding and debt-to-capital ratios.

Long-term Debt - Significant issuances of long-term debt in 2016, 2015 2014 and 20132014 were as follows (dollars in millions):
Company Principal Amount Type Interest Rate Maturity Date Use of Proceeds Principal Amount Type Interest Rate Maturity Date Use of Proceeds
2016:   
AEF 
$500
 Variable-rate term loan credit agreement 1% at December 31, 2016 Oct-2018 Retire borrowings under Alliant Energy’s and Franklin County Holdings LLC’s variable-rate term loan credit agreements that matured in 2016, reduce outstanding commercial paper and for general corporate purposes
IPL 300
 Senior debentures 3.7% Sep-2046 Reduce cash amounts received from its sales of accounts receivable program, reduce commercial paper classified as long-term debt and for general corporate purposes
2015:      
IPL 
$250
 Senior debentures 3.4% Aug-2025 Reduce commercial paper classified as long-term debt, reduce cash amounts received from its sales of accounts receivable program and for general corporate purposes 250
 Senior debentures 3.4% Aug-2025 Reduce commercial paper classified as long-term debt, reduce cash amounts received from its sales of accounts receivable program and for general corporate purposes
2014:      
Alliant Energy 250
 Variable-rate term loan credit agreement 1% at December 31, 2015 Oct-2016 Retire its $250 million, 4% senior notes due 2014 250
 Variable-rate term loan credit agreement 1% at December 31, 2015 Oct-2016 Retire its $250 million, 4% senior notes due 2014
IPL 250
 Senior debentures 3.25% Dec-2024 Reduce cash amounts received from its sales of accounts receivable program, reduce commercial paper classified as long-term debt and for general corporate purposes 250
 Senior debentures 3.25% Dec-2024 Reduce cash amounts received from its sales of accounts receivable program, reduce commercial paper classified as long-term debt and for general corporate purposes
WPL 250
 Debentures 4.1% Oct-2044 Reduce commercial paper and for general corporate purposes 250
 Debentures 4.1% Oct-2044 Reduce commercial paper and for general corporate purposes
Franklin County Holdings LLC 60
 Variable-rate term loan credit agreement 1% at December 31, 2015 Dec-2016 Retire borrowings under a term loan credit agreement that matured in December 2014 60
 Variable-rate term loan credit agreement 1% at December 31, 2015 Dec-2016 Retire borrowings under a term loan credit agreement that matured in December 2014
2013:   
IPL 250
 Senior debentures 4.7% Oct-2043 Reduce cash amounts received from its sales of accounts receivable program, reduce commercial paper classified as long-term debt and for general corporate purposes


66



Alliant Energy’s $250 million term loan credit agreement and Franklin County Holdings LLC’s $60AEF’s $500 million term loan credit agreement (with Alliant Energy as guarantor) includeincludes substantially the same covenants, including Alliant Energy maintaining a debt-to-capital ratio not to exceed 65% on a consolidated basis and events of default (except for a cross-default provision triggered at $100 million), that are included in Alliant Energy’s revolving credit facility financial covenant discussion abovediscussed in “Short-term Debt.”Note 9(a). At December 31, 2015,2016, Alliant Energy was in compliance with all material covenants and other provisions of the term loan credit agreements.agreement.

Significant retirements of long-term debt in 2016, 2015 2014 and 20132014 were as follows (dollars in millions):
Company Principal Amount Type Interest Rate Retirement Date Principal Amount Type Interest Rate Retirement Date
2016:   
Alliant Energy 
$250
 Variable-rate term loan credit agreement 1% at December 31, 2015 Oct-2016
Franklin County Holdings LLC 60
 Variable-rate term loan credit agreement 1% at December 31, 2015 Oct-2016
2015:      
IPL 
$150
 Senior debentures 3.3% Jun-2015 150
 Senior debentures 3.3% Jun-2015
WPL 16
 Pollution control revenue bonds 5% Sep-2015 16
 Pollution control revenue bonds 5% Sep-2015
WPL 15
 Pollution control revenue bonds 5.375% Aug-2015 15
 Pollution control revenue bonds 5.375% Aug-2015
2014:      
Alliant Energy 250
 Senior notes 4% Oct-2014 250
 Senior notes 4% Oct-2014
Franklin County Holdings LLC 60
 Variable-rate term loan credit agreement 1% at December 31, 2013 Dec-2014 60
 Variable-rate term loan credit agreement 1% at December 31, 2013 Dec-2014
IPL 38
 Pollution control revenue bonds 5% Jul-2014 38
 Pollution control revenue bonds 5% Jul-2014

Refer to Note 9(b) for further discussion of long-term debt.

Impact of Credit Ratings on Liquidity and Collateral Obligations -
Ratings Triggers - The long-term debt of Alliant Energy and its subsidiaries is not subject to any repayment requirements as a result of explicit credit rating downgrades or so-called “ratings triggers.” However, Alliant Energy and its subsidiaries are parties to various agreements that contain provisions dependent on credit ratings. In the event of a significant downgrade, Alliant Energy or its subsidiaries may need to provide credit support, such as letters of credit or cash collateral equal to the amount of the exposure, or may need to unwind the contract or pay the underlying obligation. In the event of a significant downgrade, management believes Alliant Energy, IPL and WPL have sufficient liquidity to cover counterparty credit support or collateral requirements under these various agreements. In addition, a downgrade in the credit ratings of Alliant Energy,

IPL or WPL could also result in them paying higher interest rates in future financings, reduce their pool of potential lenders, increase their borrowing costs under existing credit facilities or limit their access to the commercial paper market. Alliant Energy, IPL and WPL are committed to taking the necessary steps required to maintain investment-grade credit ratings. Credit ratings and outlooks as of the date of this report are as follows:
  Standard & Poor’s Ratings Services Moody’s Investors Service
Alliant Energy:Corporate/issuerA- A3Baa1
 Commercial paperA-2 P-2
 Senior unsecured long-term debtBBB+N/A A3Baa1
 OutlookStable NegativeStable
IPL:Corporate/issuerA- A3Baa1
 Commercial paperA-2 P-2
 Senior unsecured long-term debtA- A3Baa1
 Preferred stockBBB Baa2Baa3
 OutlookStable NegativeStable
WPL:Corporate/issuerA A1A2
 Commercial paperA-1 P-1
 Senior unsecured long-term debtA A1A2
 OutlookStable NegativeStable

Credit ratings are not recommendations to buy or sell securities and are subject to change, and each rating should be evaluated independently of any other rating. Each of Alliant Energy, IPL or WPL assumes no obligation to update their respective credit ratings. Refer to Note 15 for additional information on ratings triggers for commodity contracts accounted for as derivatives.


67



Off-Balance Sheet Arrangements -
Special Purpose Entities - IPL maintains a Receivables Agreement whereby it may sell its customer accounts receivables, unbilled revenues and certain other accounts receivables to a third party through wholly-owned and consolidated special purpose entities. TheIn March 2016, IPL extended through March 2018 the purchase commitment from the third party to which it sells its receivables expires in March 2016. IPL is currently pursuing the extension of the purchase commitment.receivables. In 2016, 2015 2014 and 2013,2014, IPL evaluated the third party that purchases IPL’s receivable assets under the Receivables Agreement and believes that the third party is a VIE. However, IPL concluded consolidation of the third party was not required. Refer to Note 5(b) for information regarding IPL’s sales of accounts receivable program.

Guarantees and Indemnifications - Alliant Energy and IPL have guarantees and indemnifications outstanding at December 31, 20152016 related to prior divestiture activities. Refer to Note 16(d) for additional information.

Certain Financial Commitments -
Contractual Obligations - Consolidated long-term contractual obligations as of December 31, 20152016 were as follows (in millions):
Alliant Energy2016 2017 2018 2019 2020 Thereafter Total2017 2018 2019 2020 2021 Thereafter Total
Operating expense purchase obligations (Note 16(b)):
             
Purchased power and fuel commitments (a)
$504
 
$340
 
$277
 
$198
 
$165
 
$765
 
$2,249
SO2 emission allowances14
 8
 
 
 
 
 22
Other (b)6
 2
 2
 2
 2
 7
 21
Operating expense purchase obligations (Note 16(b))

$529
 
$389
 
$297
 
$237
 
$220
 
$728
 
$2,400
Long-term debt maturities (Note 9(b))
313
 5
 356
 256
 357
 2,584
 3,871
5
 856
 256
 357
 8
 2,875
 4,357
Interest - long-term debt obligations183
 180
 180
 156
 140
 1,927
 2,766
199
 197
 167
 151
 140
 2,074
 2,928
Capital purchase obligations (Note 16(a))
23
 
 
 
 
 
 23
58
 
 
 
 
 
 58
Operating leases (Note 10(a))
6
 8
 3
 2
 2
 19
 40
6
 6
 2
 2
 1
 15
 32
Capital leases1
 1
 
 
 
 
 2
2
 1
 1
 1
 1
 
 6

$1,050
 
$544
 
$818
 
$614
 
$666
 
$5,302
 
$8,994

$799
 
$1,449
 
$723
 
$748
 
$370
 
$5,692
 
$9,781
IPL2016 2017 2018 2019 2020 Thereafter Total2017 2018 2019 2020 2021 Thereafter Total
Operating expense purchase obligations (Note 16(b)):
             
Purchased power and fuel commitments (a)
$291
 
$210
 
$183
 
$175
 
$151
 
$759
 
$1,769
SO2 emission allowances14
 8
 
 
 
 
 22
Other (b)1
 
 
 
 
 
 1
Operating expense purchase obligations (Note 16(b))

$322
 
$225
 
$209
 
$176
 
$172
 
$670
 
$1,774
Long-term debt maturities (Note 9(b))

 
 350
 
 200
 1,325
 1,875

 350
 
 200
 
 1,625
 2,175
Interest - long-term debt obligations95
 96
 96
 72
 72
 904
 1,335
107
 107
 83
 83
 75
 1,117
 1,572
Capital purchase obligations (Note 16(a))
7
 
 
 
 
 
 7
3
 
 
 
 
 
 3
Operating leases (Note 10(a))
3
 3
 2
 1
 1
 13
 23
3
 2
 1
 1
 1
 10
 18
Capital leases
 1
 
 
 
 
 1
1
 
 
 
 
 
 1

$411
 
$318
 
$631
 
$248
 
$424
 
$3,001
 
$5,033

$436
 
$684
 
$293
 
$460
 
$248
 
$3,422
 
$5,543

WPL2016 2017 2018 2019 2020 Thereafter Total2017 2018 2019 2020 2021 Thereafter Total
Operating expense purchase obligations (Note 16(b)):
             
Purchased power and fuel commitments (a)
$213
 
$130
 
$94
 
$23
 
$14
 
$6
 
$480
Other (b)2
 
 
 
 
 
 2
Operating expense purchase obligations (Note 16(b))

$206
 
$162
 
$85
 
$59
 
$46
 
$53
 
$611
Long-term debt maturities (Note 9(b))

 
 
 250
 150
 1,150
 1,550

 
 250
 150
 
 1,150
 1,550
Interest - long-term debt obligations80
 80
 80
 80
 64
 1,010
 1,394
80
 80
 80
 64
 60
 951
 1,315
Capital purchase obligations (Note 16(a))
16
 
 
 
 
 
 16
55
 
 
 
 
 
 55
Operating leases (Note 10(a))
3
 5
 1
 
 
 
 9
3
 4
 
 
 
 
 7
Capital lease - Sheboygan Falls (Note 10(b))
15
 15
 15
 15
 15
 68
 143
15
 15
 15
 15
 15
 53
 128
Capital leases - other1
 
 
 
 
 
 1
1
 1
 1
 1
 1
 
 5

$330
 
$230
 
$190
 
$368
 
$243
 
$2,234
 
$3,595

$360
 
$262
 
$431
 
$289
 
$122
 
$2,207
 
$3,671


68



(a)
Purchased power and fuel commitments represent normal business contracts used to ensure adequate purchased power, coal and natural gas supplies, and to minimize exposure to market price fluctuations. Alliant Energy, through its subsidiary Corporate Services, entered into system-wide coal contracts on behalf of IPL and WPL that include minimum future commitments. These commitments were assigned to IPL and WPL based on information available as of December 31, 2015 regarding expected future usage, which is subject to change.
(b)
Other operating expense purchase obligations represent individual commitments incurred during the normal course of business that exceeded $1 million at December 31, 2015.

At December 31, 2015,2016, Alliant Energy, IPL and WPL had no uncertain tax positions recorded as liabilities. Refer to Note 12(a) for anticipated pension and OPEB funding amounts, which are not included in the above tables. Refer to “Construction and Acquisition Expenditures” above for additional information on construction and acquisition programs. In addition, at December 31, 2015,2016, there were various other liabilities included on the balance sheets that, due to the nature of the liabilities, the timing of payments cannot be estimated and are therefore excluded from the above tables.

OTHER MATTERS

Market Risk Sensitive Instruments and Positions - Primary market risk exposures are associated with commodity prices, investment prices and interest rates. Risk management policies are used to monitor and assist in mitigating these market risks and derivative instruments are used to manage some of the exposures related to commodity prices. Refer to Notes 1(h) and 15 for further discussion of derivative instruments.

Commodity Price - Alliant Energy, IPL and WPL are exposed to the impact of market fluctuations in the price and transportation costs of commodities they procure and market. Established policies and procedures mitigate risks associated with these market fluctuations, including the use of various commodity derivatives and contracts of various durations for the forward sale and purchase of these commodities. Exposure to commodity price risks in the utility businesses is also significantly mitigated by current rate-making structures in place for recovery of fuel-related costs as well as the cost of natural gas purchased for resale. IPL’s electric and gas tariffs and WPL’s wholesale electric and gas tariffs provide for subsequent monthly adjustments to their tariff rates for material changes in prudently incurred commodity costs. IPL’s and WPL’s rate mechanisms, combined with commodity derivatives, significantly reduce commodity risk associated with their electric and gas margins.

WPL’s retail electric margins have the most exposure to the impact of changes in commodity prices due largely to the current retail recovery mechanism in place in Wisconsin for fuel-related costs. The cost recovery mechanism applicable for WPL’s retail electric customers is based on forecasts of fuel-related costs expected to be incurred during forward-looking test year periods and fuel monitoring ranges determined by the PSCW during each retail electric rate proceeding or in a separate fuel cost plan approval proceeding. Under this cost recovery mechanism, if WPL’s actual fuel-related costs fall outside this fuel monitoring range during the test period, WPL is authorized to defer the incremental under-/over-collection of fuel-related costs from retail electric customers that are outside the approved ranges. Deferral of under-collection of fuel-related costs are reduced to the extent WPL’s return on common equity during the fuel cost plan year exceeds the most recently authorized return on common equity. Refer to Note 2 for discussion of WPL’s retail fuel-related rate filings for Test Years 2014 through 2016.

In December 2015,2016, the PSCW approved annual forecasted fuel-related costs per MWh of $28.17$26.15 based on $392$361 million of variable fuel-related costs applicable for retail and wholesale customers for WPL’s 20162017 Test Period. The retail portion of the 20162017 fuel-related costs will be monitored using an annual bandwidth of plus or minus 2%. Based on the cost recovery mechanism in Wisconsin, the annual forecasted fuel-related costs approved by the PSCW in December 20152016 and an annual bandwidth of plus or minus 2%, Alliant Energy and WPL currently estimate the commodity risk exposure to their retail electric margins in 20162017 is approximately $6 million. However, if WPL’s return on common equity in 20162017 exceeds the most recently authorized return on common equity, the commodity risk exposure to WPL’s electric margins in 20162017 could increase.

Refer toNote 2 for discussion of WPL’s retail fuel-related rate filings for Test Years 2014 through 2016, and Note 1(g) for additional details of utility cost recovery mechanisms that significantly reduce commodity risk.

Investment Price - Alliant Energy, IPL and WPL are exposed to investment price risk as a result of their investments in securities, largely related to securities held by their pension and OPEB plans. Refer to Note 12(a) for details of the securities held by their pension and OPEB plans. Refer to “Critical Accounting Policies and Estimates” for the impact on retirement plan costs of changes in the rate of returns earned by plan assets.


69



Interest Rate - Alliant Energy, IPL and WPL are exposed to risk resulting from changes in interest rates associated with variable-rate borrowings. In addition, Alliant Energy and IPL are exposed to risk resulting from changes in interest rates as a result of cash proceedsamounts outstanding under IPL’s sales of accounts receivable program. Assuming the impact of a hypothetical 100 basis point increase in interest rates on variable-rate borrowings and cash proceeds outstanding under IPL’s sales of accounts receivable program at December 31, 20152016, Alliant Energy’s, IPL’s and WPL’s annual pre-tax expense would increase by approximately $5$8 million, $0 and $0,$1 million, respectively.

Refer to Notes 5(b) and 9 for additional information on cash proceeds outstanding under IPL’s sales of accounts receivable program, and short- and long-term variable-rate

borrowings, respectively. Refer to “Critical Accounting Policies and Estimates” for the impacts of changes in discount rates on retirement plan obligations and costs.

New Accounting Standards - Refer to Note 1(p)1(o) for discussion of new accounting standards impacting Alliant Energy, IPL and WPL.

Critical Accounting Policies and Estimates - The preparation of financial statements in conformity with GAAP requires that management to apply accounting policies and make estimates that affect results of operations and the amounts of assets and liabilities reported in the financial statements. The following accounting policies and estimates are critical to the business and the understanding of financial results as they require critical assumptions and judgments by management. The results of these assumptions and judgments form the basis for making estimates regarding the results of operations and the amounts of assets and liabilities that are not readily apparent from other sources. Actual financial results may differ materially from these estimates. Management has discussed these critical accounting policies and estimates with the Audit Committee.Committee of the Board of Directors. Refer to Note 1 for additional discussion of accounting policies and the estimates used in the preparation of the financial statements.

Contingencies - Assumptions and judgments are made each reporting period regarding the future outcome of contingent events and lossevents. Loss contingency amounts are recorded for any contingent events for which the likelihood of loss is probable and able to be reasonably estimated based upon current available information. The amounts recorded may differ from the actual income or expense that occursactuals when the uncertainty is resolved. The estimates made in accounting for contingencies, and the gains and losses that are recorded upon the ultimate resolution of these uncertainties, could have a significant effect on results of operations and the amount of assets and liabilities in the financial statements. Note 16 provides discussion of contingencies assessed at December 31, 20152016, including various pending legal proceedings, guarantees and indemnifications that may have a material impact on financial condition and results of operations.

Regulatory Assets and Regulatory Liabilities - Alliant Energy’s utility subsidiaries (IPLIPL and WPL)WPL are regulated by various federal and state regulatory agencies. As a result, they are subject to GAAP for regulated operations, which recognizes that the actions of a regulator can provide reasonable assurance of the existence of an asset or liability. Regulatory assets or regulatory liabilities arise as a result of a difference between GAAP and actions imposed by the regulatory agencies in the rate-making process. Regulatory assets generally represent incurred costs that have been deferred as such costs are probable of recovery in future customer rates. Regulatory liabilities generally represent obligations to make refunds to customers or amounts collected in rates for which the related costs have not yet been incurred. Regulatory assets and regulatory liabilities are recognized in accordance with the rulings of applicable federal and state regulators, and future regulatory rulings may impact the carrying value and accounting treatment of regulatory assets and regulatory liabilities.

Assumptions and judgments are made each reporting period regarding whether regulatory assets are probable of future recovery and regulatory liabilities are probable future obligations by considering factors such as regulatory environment changes, rate orders issued by the applicable regulatory agencies, historical decisions by such regulatory agencies regarding similar regulatory assets and regulatory liabilities, and subsequent events of such regulatory agencies. The decisions made by regulatory authorities have an impact on the recovery of costs, the rate of return on invested capital and the timing and amount of assets to be recovered by rates. A change in these decisions may result in a material impact on results of operations and the amount of assets and liabilities in the financial statements. Note 2 provides details of the nature and amounts of regulatory assets and regulatory liabilities assessed at December 31, 2015 as well as material changes to regulatory assets and regulatory liabilities during 20152016.

Long-Lived Assets - Periodic assessments regarding the recoverability of certain long-lived assets are completed when factors indicate the carrying value of such assets may be impaired or such assets are planned to be sold. These assessments require significant assumptions and judgments by management. The long-lived assets assessed for impairment generally include assets within non-regulated operations that are proposed to be sold or are currently generating operating losses, and

70



certain long-lived assets within regulated operations that may not be fully recovered from IPL’s and WPL’s customers as a result of regulatory decisions in the future.

Non-regulated Operations - Factors considered in determining if an impairment review is necessary for long-livedfuture, and assets within non-regulated operations include a significant underperformance of the assets relativethat are proposed to historicalbe sold or projected futureare currently generating operating results, a significant change in the use of the acquired assets or business strategy related to such assets, and significant negative industry, regulatory or economic trends. When an impairment review is deemed necessary, a comparison is made between the expected undiscounted future cash flows and the carrying amount of the asset. If the carrying amount of the asset exceeds the expected undiscounted future cash flows, an impairment loss is recognized equal to the amount by which the carrying amount of the asset exceeds the fair value of the asset. The fair value is determined by the use of quoted market prices, appraisals, or the use of valuation techniques such as expected discounted future cash flows. Long-lived assets within non-regulated operations assessed for impairment indicators in 2015 included Alliant Energy’s Franklin County wind farm.

Franklin County Wind Farm - Alliant Energy performed an impairment test of the carrying value of the Franklin County wind farm as of December 31, 2015 due to a decrease in forward electricity prices identified in the fourth quarter of 2015. The impairment test concluded the undiscounted cash flows expected from the Franklin County wind farm during its estimated useful life still exceeded its carrying value as of December 31, 2015, resulting in no impairment. A further decrease in the average forward electricity prices of approximately $2 to $3 per MWh over the remaining life of the wind farm could result in the undiscounted cash flows being less than the carrying value of the asset. Other factors that could have an effect on the future expected undiscounted cash flows for the wind farm include the volume of electricity generated, transmission constraints impacting the wind farm, the expected life of the wind farm and the likelihood of selling the wind farm. The expected output of the wind farm is, in part, based on transmission upgrades being completed in the next few years and could be significantly lower if the transmission upgrades are not completed or if the level of congestion reduction is lower than expected. If such a determination is made that the carrying amount of the assets exceeds the undiscounted cash flows in a future period, the resulting impairment charge would be material, and would likely exceed half of the carrying value. As of December 31, 2015, the carrying value of the Franklin County wind farm was $130 million and was recorded in “Property, plant and equipment, net” on Alliant Energy’s balance sheet. Note 3 provides additional discussion of the Franklin County wind farm.losses.

Regulated Operations - Certain long-lived assets within regulated operations are reviewed for possible impairment whenever events or changes in circumstances indicate all or a portion of the carrying value of the assets may be disallowed for rate-making purposes. If IPL or WPL is disallowed recovery of any portion of the carrying value of its regulated property, plant and equipment that is under construction, has been recently completed or is probable of being retired early, an impairment charge is recognized equal to the amount of the carrying value that was disallowed recovery. If IPL or WPL is disallowed a full or partial return on the carrying value of its regulated property, plant and equipment that is under construction, has been recently completed or is probable of being retired early, an impairment charge is recognized equal to the difference between

the carrying amount of the asset and the present value of the future revenues expected from its regulated property, plant and equipment. Alliant Energy’s, IPL’s and WPL’s long-lived assets within their regulated operations that were assessed for impairment and plant abandonment in 20152016 included IPL’s and WPL’s generating units subject to early retirement.

Generating Units Subject to Early Retirement - Due to current and proposed environmental regulations, Alliant Energy, IPL and WPL are evaluatingevaluate future plans for their electric generation fleet and have announced the early retirement of certain older and less-efficient EGUs. When it becomes probable that an EGU will be retired before the end of its useful life, Alliant Energy, IPL and WPL must assess whether the EGU meets the criteria to be considered probable of abandonment. EGUs that are considered probable of abandonment generally have material remaining net book values and are expected to cease operations in the near term significantly before the end of their original estimated useful lives. If an EGU meets such criteria to be considered probable of abandonment, Alliant Energy, IPL and WPL must assess the probability of full recovery of the remaining carrying value of such EGU. If it is probable that regulators will not allow full recovery of and a full return on the remaining net book value of the abandoned EGU, an impairment charge is recognized equal to the difference between the remaining carrying value and the present value of the future revenues expected from the abandoned EGU.

InAlliant Energy and IPL concluded that Sutherland Unit 3 met the criteria to be considered probable of abandonment as of December 2015, WPL retired Nelson Dewey Units 1 and 2 and Edgewater Unit 3. WPL received approval from FERC and the PSCW to reclassify the remaining net book value of these EGUs from property, plant and equipment to a regulatory asset on Alliant Energy’s and WPL’s balance sheets. The remaining net book value is included in WPL’s rate base and WPL is earning a return on the outstanding balance. WPL31, 2016. IPL is currently recovering the remaining net book value of these EGUs from both its retail and wholesale customers over a 10-year period beginning January 1, 2013 pursuant to orders previously received by the PSCW and FERC. Given that WPL is earningallowed a full recovery of and a full return on these assetsthis EGU from both its

71



retail and wholesale customers, and as a result, Alliant Energy and WPLIPL concluded that no impairment was required as of December 31, 2015. 2016.

Alliant Energy, IPL and WPL evaluated their other EGUs that are subject to early retirement and determined that no other EGUs met the criteria to be considered probable of abandonment as of December 31, 2015.2016. Refer to “Strategic Overview” for discussion of additional EGUs that may be retired early and could be considered probable of abandonment in future periods, along with the net book value of such EGUs.

Non-regulated Operations - Factors considered in determining if an impairment review is necessary for long-lived assets within non-regulated operations include a significant underperformance of the assets relative to historical or projected future operating results, a significant change in the use of the acquired assets or business strategy related to such assets, and significant negative industry, regulatory or economic trends. When an impairment review is deemed necessary, a comparison is made between the expected undiscounted future cash flows and the carrying amount of the asset. If the carrying amount of the asset exceeds the expected undiscounted future cash flows, an impairment loss is recognized equal to the amount by which the carrying amount of the asset exceeds the fair value of the asset. The fair value is determined by the use of quoted market prices, appraisals, or the use of valuation techniques such as expected discounted future cash flows. Long-lived assets within non-regulated operations assessed for impairment indicators in 2016 included Alliant Energy’s Franklin County wind farm.

Franklin County Wind Farm - Based on an evaluation of the strategic options for the Franklin County wind farm performed in 2016, Alliant Energy concluded it was probable the Franklin County wind farm will be transferred to IPL. As a result, Alliant Energy performed an impairment analysis of such assets in 2016. Refer to Note 3 for discussion of the impairment analysis, which resulted in non-cash, pre-tax asset valuation charges of $86 million recorded by Alliant Energy in 2016. Going forward, the Franklin County wind farm will be reviewed for possible impairment whenever events or changes in circumstances indicate all or a portion of the carrying value of the assets may be disallowed for rate-making purposes.

Unbilled Revenues - Unbilled revenues are primarily associated with utility operations. Energy sales to individual customers are based on the reading of customers’ meters, which occurs on a systematic basis throughout the month. Amounts of energy delivered to customers since the date of the last meter reading are estimated at the end of each reporting period and the corresponding estimated unbilled revenue is recorded. The unbilled revenue estimate is based on daily system demand volumes, estimated customer usage by class, weathertemperature impacts, line losses and the most recent customer rates. Such process involves the use of various judgments and assumptions and significant changes in these judgments and assumptions could have a material impact on results of operations. As of December 31, 20152016, unbilled revenues related to Alliant Energy’s utility operations were $154$180 million ($7290 million at IPL and $82$90 million at WPL). Note 5(b) provides discussion of IPL’s unbilled revenues as of December 31, 20152016 sold to a third party related to its sales of accounts receivable program.

Pensions and Other Postretirement Benefits - Alliant Energy, IPL and WPL sponsor various defined benefit pension and OPEB plans that provide benefits to a significant portion of their employees and retirees. Assumptions and judgments are made periodically to estimate the obligations and costs related to their retirement plans. There are many judgments and assumptions involved in determining an entity’s pension and other postretirement liabilities and costs each period including employee demographics (including life expectancies and compensation levels), discount rates, assumed rates of return and

funding. Changes made to plan provisions may also impact current and future benefits costs. Judgments and assumptions are supported by historical data and reasonable projections and are reviewed at least annually. The following table shows the impacts of changing certain key actuarial assumptions discussed above (in millions):
 Defined Benefit Pension Plans OPEB Plans Defined Benefit Pension Plans OPEB Plans
Change in Actuarial Assumption Impact on Projected Benefit Obligation at December 31, 2015 Impact on 2016 Net Periodic Benefit Costs Impact on Projected Benefit Obligation at December 31, 2015 Impact on 2016 Net Periodic Benefit Costs Impact on Projected Benefit Obligation at December 31, 2016 Impact on 2017 Net Periodic Benefit Costs Impact on Projected Benefit Obligation at December 31, 2016 Impact on 2017 Net Periodic Benefit Costs
Alliant Energy                
1% change in discount rate 
$167
 
$13
 
$21
 
$2
 
$162
 
$11
 
$21
 
$2
1% change in expected rate of return N/A
 9
 N/A
 1
 N/A
 9
 N/A
 1
IPL                
1% change in discount rate 78
 6
 8
 1
 75
 5
 8
 1
1% change in expected rate of return N/A
 4
 N/A
 1
 N/A
 4
 N/A
 1
WPL                
1% change in discount rate 72
 6
 8
 1
 71
 6
 8
 1
1% change in expected rate of return N/A
 4
 N/A
 
 N/A
 4
 N/A
 

Note 12(a) provides additional details of pension and OPEB plans.

Income Taxes - Alliant Energy, IPL and WPL are subject to income taxes in various jurisdictions. Assumptions and judgments are made each reporting period to estimate income tax assets, liabilities, benefits and expenses. Judgments and assumptions are supported by historical data and reasonable projections. Significant changes in these judgments and assumptions could have a material impact on financial condition and results of operations. Alliant Energy’s and IPL’s critical assumptions and judgments for 20152016 include estimates of qualifying deductions for repairs expenditures and allocation of mixed service costs due to the impact of Iowa rate-making principles on such property-related differences. Critical assumptions and judgments also include projections of future taxable income used to determine the ability to utilize net operating losses and credit carryforwards prior to their expiration.

Effect of Rate-making on Property-related Differences - Alliant Energy’s and IPL’s effective income tax rates are normally impacted by certain property-related differences at IPL for which deferred tax is not recorded in the income statement pursuant to Iowa rate-making principles. Changes in methods or assumptions regarding the amount of IPL’s qualifying repairs expenditures, allocation of mixed service costs, and costs related to retirement or removal of depreciable property could result in a material impact on Alliant Energy’s and IPL’s financial condition and results of operations. Refer to Note 1(c) for further discussion of regulatory accounting for taxes. Refer to Note 11 for details of how the effect of rate-making on property-related differences impacted Alliant Energy’s and IPL’s effective income tax rates for 2016, 2015 2014 and 2013.2014.


72



Carryforward Utilization - Significant federal tax credit carryforwards and federal and state net operating loss carryforwards have been generated. Based on projections of current and future taxable income, Alliant Energy, IPL and WPL plan to utilize substantially all of these carryforwards prior to their expiration. Changes in tax regulations or assumptions regarding current and future taxable income could require valuation allowances in the future resulting in a material impact on financial condition and results of operations. Refer to Note 11 for further discussion of federal tax credit carryforwards, and federal and state net operating loss carryforwards. Refer to “Rate Matters” for discussion of estimated bonus depreciation deductions from the PATH Act for 2015 through 2019, which are expected to create taxable losses and additional net operating losses for Alliant Energy, IPL and WPL.

Other Future Considerations - In addition to items discussed earlier in MDA, the Notes in Item 8 and “Risk Factors” in Item 1A, the following items could impact future financial condition or results of operations:

Electric Transmission Service Expense - IPL and WPL currently receive substantially all their transmission services from ITC and ATC, respectively. Due to the use of formula rates used bythat allow ITC and ATC to change the amount they charge to their customers and possible futurebased upon changes to these rates as discussed below,the costs they incur, there is uncertainty regarding the long-term trends of IPL’s and WPL’s future electric transmission service expense. Alliant Energy, IPLBased on IPL’s and WPL currently anticipate changes to theirWPL’s electric transmission service expense in 2016 as follows:

Attachment “O” Rates - The annual transmission service rates that ITC or ATC charges their customers are calculated each calendar year using a FERC-approved cost of service formula rate referred to as Attachment “O.” Because Attachment “O” is a FERC-approved formula rate, ITC and ATC can implement new rates each calendar year without filing a request with FERC. However, new rates are subject to challenge by either FERC or customers. If the rates proposed by ITC or ATC are determined by FERC to be unjust or unreasonable or another mechanism is determined by FERC to be just and reasonable, ITC’s or ATC’s rates would change accordingly. In December 2015, IPL filed a complaint with FERC regarding ITC’s Attachment “O” rate pursuant to FERC-approved Attachment “O” audit protocols. IPL’s complaint alleged that ITC acted imprudently by failing to take advantage of tax savings benefits available through bonus tax depreciation deductions, which results in higher Attachment “O” rates. Alliant Energy and IPL are currently unable to determine any resulting changes to future electric transmission service charges pending a decision by FERC on the complaint.

2016 Rates Charged by ITC to IPL - In August 2015, ITC filed with MISO the Attachment “O” rate it proposes to charge its customers in 2016 for electric transmission services. In January 2016, ITC subsequently revised its proposed 2016 Attachment “O” rate as a result of changes approved by FERC on how the Attachment “O” rate is calculated. The revised proposed rate was based on ITC’s estimated net revenue requirement for 2016, a true-up adjustment credit related to amounts that ITC over-recovered from its customers in 2014 and the FERC-approved changes in the Attachment “O” rate calculation. Amounts billed under the revised 2016 Attachment “O” rate are currently expected to be approximately 4% higher than the amounts ITC charged its customers in 2015. The proposed rates for 2016 do not include any impacts associated with changes from the MISO transmission owner return on equity complaints discussed below or any estimated 2015 true-up adjustments. The proposed rates for 2016 also do not include any impacts associated with IPL’s complaint filed with FERC in December 2015 related to ITC’s decision not to take advantage of tax savings benefits available through bonus depreciation deductions.

2016 Rates Charged by ATC to WPL - In September 2015, ATC shared with its customers the Attachment “O” rate it proposes to charge them in 2016 for electric transmission services. The proposed rate was based on ATC’s estimated net revenue requirement for 2016 as well as a true-up adjustment credit related to amounts that ATC over-recovered from its customers in 2014. Amounts billed under the 2016 Attachment “O” rate are currently expected to be approximately 7% higher than the amounts ATC charged its customers in 2015. The proposed rates for 2016 do not include any impacts associated with changes from the MISO transmission owner return on equity complaints discussed below or any estimated 2015 true-up adjustments.

MISO Transmission Charges Billed to IPL and WPL - MISO tariffs billed to IPL and WPL include costs related to various shared transmission projects including MVPs. MVPs include new large scale transmission projects that enable the reliable and economic delivery of energy in support of documented energy policy mandates or provide economic value across multiple pricing zones within MISO. MVP costs are socialized across the entire MISO footprint based on energy usage of each MISO participant. MISO tariffs billed to IPL and WPL also include costs related to other shared transmission projects, including projects designed to reduce market congestion, to provide interconnection to the transmission grid for new generation, and to ensure compliance with applicable reliability standards. The costs of these projects are primarily allocated to MISO participants in a way that is commensurate with the benefit to the participants’ pricing zone. The MISO transmission charges billed to IPL and WPL are expected to increase in the future due to the number of shared transmission projects expected to be completed in the MISO region.

73




2016Electric Transmission Service Expense - Alliant Energy, IPL and WPL currently estimate their total electric transmission service expense in 2016 will be higher than the comparable expense in 2015 by approximately $45 million, $35 million and $10 million, respectively, as a result of the items discussed above. A significant portion of the increase in IPL’s electric transmission service expense is expected to be offset with increases in retail electric revenues through the transmission cost recovery rider. Any difference between WPL’s actual electric transmission service expense incurred and amounts collected from customers as electric revenuesmechanisms discussed in 2016 will be recorded as a regulatory asset or regulatory liability due to the escrow treatment authorized for WPL in its 2015/2016 Test Period retail electric rate case.

Note 1(g)MISO Transmission Owner Return on Equity Complaints - In 2013, a group of MISO industrial customer organizations filed a complaint with FERC requesting to reduce the base return on equity used by MISO transmission owners, including ITC and ATC, among other items. ITC’s and ATC’s current authorized return on equity is 12.38% and 12.2%, respectively. In 2014, FERC issued an order on the complaint, established hearing and settlement procedures on the return on equity component of the complaint, and established an effective refund date of November 12, 2013. In December 2015, a FERC administrative law judge made an initial decision regarding this complaint and established a base return on equity of 10.32%, excluding any incentive adders granted by FERC. A final decision from FERC on this complaint is currently expected in 2016.

In June 2015, FERC issued an order on an additional complaint filed with FERC by a group of MISO cooperative and municipal utilities requesting to reduce the base return on equity used by MISO transmission owners, including ITC and ATC, to 8.67%. FERC’s June 2015 order established hearing procedures and an effective refund date of February 12, 2015. Various parties to the proceeding have filed testimony with FERC and hearings were held. An initial decision from a FERC administrative law judge is expected in 2016, and a final decision from FERC on this complaint is currently expected in 2017.

Based on other recent FERC return on equity decisions, Alliant Energy, IPL and WPL currently anticipate FERC’s final decisions on the MISO transmission owner complaints will reduce transmission owners’ current return on equity, which is expected to reduce electric transmission service expense costs billed by ITC and ATC to their customers and result in lower equity income and dividends from ATC in the future. Alliant Energy and WPL have realized $15 million of reductions in the amount of equity income from ATC for the period from November 12, 2013 through December 31, 2015, including $12 million realized in 2015 and $3 million realized in 2014. These reductions assume a 10.32% base return on equity for the period from November 12, 2013 to January 6, 2015 and a 10.82% return on equity (10.32% base return on equity plus 50 basis point incentive adder discussed below) for the period from January 6, 2015 to December 31, 2015.

Any changes in IPL’s electric transmission service costs billed by ITC to IPL are expected to be passed on to IPL’s Iowa retail electric customers through the transmission cost recovery rider. Any changes in WPL’s electric transmission service costs will be incorporated into WPL’s retail electric rates in a future retail electric base rate proceeding with the PSCW. Based on these transmission cost recovery mechanisms, IPL and WPL currently do not expect that any changes to electric transmission service costs billed by ITC and ATC due to these complaints will have a material impact on their financial condition and results of operations.

MISO2017 Electric Transmission Owners’ Request for Equity AdderService Expense - In January 2015, FERC issuedAlliant Energy and IPL currently estimate their total electric transmission service expense in 2017 will be lower than the comparable expense in 2016 by approximately $45 million, primarily due to an order granting a request from a group of MISO transmission owners, including ITC and ATC, to implement a 50 basis point incentive adder to theirexpected lower return on equity based on participationfor ITC in MISO. The implementation of the adder was effective January 6, 2015, subject2017 and refunds anticipated to certain conditions. Alliant Energy, IPL and WPL are currently unable to determine anybe received in 2017 from ITC resulting changes to future electric transmission service charges pending a decision by FERC onfrom the MISO transmission owner return on equity complaints discussed above.below, partially offset by increased rate base at ITC. WPL’s total electric transmission service expense in 2017 is expected to be consistent with 2016 due to the escrow

ITC Requestaccounting treatment for its electric transmission service expense, as well as cost estimates included in WPL’s approved retail electric rate case (2017/2018 Test Period), which exclude the impacts of an expected lower return on equity in 2017 and associated refunds resulting from the MISO transmission owner return on equity complaints.

MISO Transmission Owner Return on Equity AdderComplaints - In January 2015, ITC requested approval fromA group of MISO cooperative and municipal utilities previously filed two complaints with FERC requesting a reduction to implement a 100 basis point incentive adder to itsthe base return on equity used by MISO transmission owners, including ITC and ATC. In September 2016, FERC issued an order on the first complaint and established a base return on equity of 10.32%, excluding any incentive adders granted by FERC, effective September 28, 2016, and for beingthe refund period from November 12, 2013 through February 11, 2015. In October 2016, in response to MISO’s and the MISO transmission owners’ request, FERC ordered the related refunds to be issued no later than July 2017. IPL anticipates the retail portion of the refund from ITC will be refunded to its customers in 2017 through the transmission cost rider, pending IUB approval. WPL will defer the refund from ATC to a regulatory liability and refunds to its retail customers are expected to be addressed in a future rate proceeding. WPL’s and IPL’s wholesale customers will receive their share of the refunds through normal monthly billing practices as the refunds are received. Alliant Energy, IPL and WPL currently expect to receive refunds of $51 million, $40 million and $11 million, respectively, in the first quarter of 2017, subject to final true-up by the end of July 2017.

In June 2016, a FERC administrative law judge issued an independentinitial decision regarding the second complaint and recommended a base return on equity of 9.70%, excluding any incentive adders granted by FERC, for the refund period from February 12, 2015 through May 11, 2016. A final decision from FERC on the second complaint is currently expected in the first half of 2017.

The total return on equity for ITC and ATC includes a base return on equity, as determined by FERC pursuant to the two MISO complaints, and incentive adders to the return on equity requested by the transmission company.owners and granted by FERC. In January 2015, FERC issued an order granting incentive adders of 0.50% to both ITC and ATC based on their participation in MISO effective January 6, 2015. In March 2015, FERC issued an order granting a 50 basis pointan additional incentive adder of 0.50% to ITC’s base return on equityITC for being an independent transmission company. The implementationcompany effective April 1, 2015.

As a result of the adder will be retroactively applied back to April 2015 pendingtwo MISO complaints, Alliant Energy and WPL have realized a decision by FERC oncumulative $24 million of reductions in the MISO transmission owner return onamount of equity complaints discussed above.income from ATC through December 31, 2016.


74



Sales Trends -
Jo-Carroll Energy, Inc. - In 2014, Jo-Carroll Energy, Inc. provided notice of termination of its wholesale power supply agreement with IPL effective April 1, 2018. Sales to Jo-Carroll Energy, Inc. represented 3% of IPL’s total electric sales in 2015.2016.

WPPI Energy - In 2014, WPPI Energy provided notice of termination of its wholesale power supply agreement with WPL effective May 31, 2017. Sales to WPPI Energy represented 6%5% of WPL’s total electric sales in 2015.2016.

Great Lakes Utilities - In 2014, Great Lakes Utilities provided notice of termination of its wholesale power supply agreement with WPL effective December 31, 2017. Sales to Great Lakes Utilities represented approximately 2% of WPL’s total electric sales in 2015.2016.

Retirement Plan Costs - Alliant Energy’s, IPL’s and WPL’s net periodic benefit costs related to their defined benefit pension and OPEB plans are currently expected to be higher in 2016 compared to 2015 by approximately $17 million, $10 million and $7 million, respectively. The increase in net periodic benefit costs is primarily due to lower than expected returns on plan assets resulting in decreases in retirement plan assets and increases in actuarial losses during 2015. Approximately 30% to 40% of net periodic benefit costs are allocated to capital projects each year. As a result, the increase in net periodic benefit costs is not expected to result in a comparable increase in other operation and maintenance expenses. Refer to Note 12(a) for additional details of defined benefit pension and OPEB plans.

Performance-based Compensation Plans - Alliant Energy’s total compensation package includes a performance-based compensation program, which provides substantially all of its non-bargaining employees an opportunity to receive annual cash payments based on the achievement of specific short-term annual operational and financial performance measures. In addition, the total compensation program for certain key employees includes long-term awards issued under equity-based compensation plans. In 2015, Alliant Energy, IPL and WPL incurred $35 million, $20 million and $15 million, respectively, of performance-based compensation expense. Refer to Note 12(b) for details of the equity-based compensation plans. Alliant Energy, IPL and WPL are currently unable to determine what impacts these performance-based compensation plans will have on their future financial condition or results of operations.

ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Quantitative and Qualitative Disclosures About Market Risk are reported in “Other Matters - Market Risk Sensitive Instruments and Positions” in MDA.

ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA


75



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM


To the Board of Directors and Shareowners of
Alliant Energy Corporation
Madison, Wisconsin

We have audited the accompanying consolidated balance sheets of Alliant Energy Corporation and subsidiaries (the “Company”) as of December 31, 20152016 and 2014,2015, and the related consolidated statements of income, common equity, and cash flows for each of the three years in the period ended December 31, 2015.2016. Our audits also included the Company’s financial statement schedules listed in the Index at Item 15. These financial statements and financial statement schedules are the responsibility of the Company’s management. Our responsibility is to express an opinion on the financial statements and financial statement schedules based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 20152016 and 2014,2015, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2015,2016, in conformity with accounting principles generally accepted in the United States of America. Also, in our opinion, such financial statement schedules, when considered in relation to the basic consolidated financial statements taken as a whole, present fairly, in all material respects, the information set forth therein.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the Company’s internal control over financial reporting as of December 31, 2015,2016, based on the criteria established in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 24, 20162017 expressed an unqualified opinion on the Company’s internal control over financial reporting.


/s/ DELOITTE & TOUCHE LLP
DELOITTE & TOUCHE LLP

Milwaukee, Wisconsin
February 24, 20162017


76



ALLIANT ENERGY CORPORATION
CONSOLIDATED STATEMENTS OF INCOME
Year Ended December 31,Year Ended December 31,
2015 2014 20132016 2015 2014
(in millions, except per share amounts)(in millions, except per share amounts)
Operating revenues:          
Electric utility
$2,770.5
 
$2,713.6
 
$2,689.0

$2,875.5
 
$2,770.5
 
$2,713.6
Gas utility381.2
 517.5
 464.8
355.4
 381.2
 517.5
Other utility57.9
 66.1
 71.3
48.6
 57.9
 66.1
Non-regulated44.0
 53.1
 51.7
40.5
 44.0
 53.1
Total operating revenues3,253.6
 3,350.3
 3,276.8
3,320.0
 3,253.6
 3,350.3
Operating expenses:          
Electric production fuel and purchased power837.7
 877.2
 941.8
854.0
 837.7
 877.2
Electric transmission service485.3
 447.5
 418.3
527.9
 485.3
 447.5
Cost of gas sold219.1
 327.8
 276.7
194.3
 219.1
 327.8
Asset valuation charges for Franklin County wind farm86.4
 
 
Other operation and maintenance629.5
 665.0
 635.6
606.5
 629.5
 665.0
Depreciation and amortization401.3
 388.1
 370.9
411.6
 401.3
 388.1
Taxes other than income taxes103.7
 101.1
 99.6
102.3
 103.7
 101.1
Total operating expenses2,676.6
 2,806.7
 2,742.9
2,783.0
 2,676.6
 2,806.7
Operating income577.0
 543.6
 533.9
537.0
 577.0
 543.6
Interest expense and other:          
Interest expense187.1
 180.6
 172.8
196.2
 187.1
 180.6
Equity income from unconsolidated investments, net(33.8) (40.4) (43.7)(39.6) (33.8) (40.4)
Allowance for funds used during construction(36.9) (34.8) (30.8)(62.5) (36.9) (34.8)
Interest income and other(0.7) (1.8) (0.4)(0.5) (0.7) (1.8)
Total interest expense and other115.7
 103.6
 97.9
93.6
 115.7
 103.6
Income from continuing operations before income taxes461.3
 440.0
 436.0
443.4
 461.3
 440.0
Income taxes70.4
 44.3
 53.9
59.4
 70.4
 44.3
Income from continuing operations, net of tax390.9
 395.7
 382.1
384.0
 390.9
 395.7
Loss from discontinued operations, net of tax(2.5) (2.4) (5.9)(2.3) (2.5) (2.4)
Net income388.4
 393.3
 376.2
381.7
 388.4
 393.3
Preferred dividend requirements of subsidiaries10.2
 10.2
 17.9
Preferred dividend requirements of Interstate Power and Light Company10.2
 10.2
 10.2
Net income attributable to Alliant Energy common shareowners
$378.2
 
$383.1
 
$358.3

$371.5
 
$378.2
 
$383.1
Weighted average number of common shares outstanding (basic and diluted)112.7
 110.8
 110.8
Earnings per weighted average common share attributable to Alliant Energy common shareowners (basic and diluted):     
Weighted average number of common shares outstanding (basic and diluted) (a)227.1
 225.4
 221.7
Earnings per weighted average common share attributable to Alliant Energy common shareowners (basic and diluted) (a):     
Income from continuing operations, net of tax
$3.38
 
$3.48
 
$3.29

$1.65
 
$1.69
 
$1.74
Loss from discontinued operations, net of tax(0.02) (0.02) (0.06)(0.01) (0.01) (0.01)
Net income
$3.36
 
$3.46
 
$3.23

$1.64
 
$1.68
 
$1.73
Amounts attributable to Alliant Energy common shareowners:          
Income from continuing operations, net of tax
$380.7
 
$385.5
 
$364.2

$373.8
 
$380.7
 
$385.5
Loss from discontinued operations, net of tax(2.5) (2.4) (5.9)(2.3) (2.5) (2.4)
Net income
$378.2
 
$383.1
 
$358.3

$371.5
 
$378.2
 
$383.1

(a)
Amounts reflect the effects of a two-for-one common stock split distributed in May 2016. Refer to Note 7 for additional details.

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

77



ALLIANT ENERGY CORPORATION
CONSOLIDATED BALANCE SHEETS
December 31,December 31,
2015 20142016 2015
(in millions, except per
share and share amounts)
(in millions, except per
share and share amounts)
ASSETS      
Current assets:      
Cash and cash equivalents
$5.8
 
$56.9

$8.2
 
$5.8
Accounts receivable, less allowance for doubtful accounts397.6
 427.3
493.3
 397.6
Production fuel, at weighted average cost98.8
 83.8
98.1
 98.8
Gas stored underground, at weighted average cost43.3
 67.1
37.6
 43.3
Materials and supplies, at weighted average cost81.4
 72.9
86.6
 81.4
Regulatory assets120.2
 68.1
57.8
 120.2
Deferred tax assets
 150.1
Other79.7
 116.9
95.5
 79.7
Total current assets826.8
 1,043.1
877.1
 826.8
Property, plant and equipment, net9,519.1
 8,938.4
10,279.2
 9,519.1
Investments:      
Investment in American Transmission Company LLC293.3
 286.5
317.6
 293.3
Other53.0
 58.4
20.0
 53.0
Total investments346.3
 344.9
337.6
 346.3
Other assets:      
Regulatory assets1,788.4
 1,715.6
1,857.3
 1,788.4
Deferred charges and other14.6
 21.5
22.6
 14.6
Total other assets1,803.0
 1,737.1
1,879.9
 1,803.0
Total assets
$12,495.2
 
$12,063.5

$13,373.8
 
$12,495.2
LIABILITIES AND EQUITY      
Current liabilities:      
Current maturities of long-term debt
$313.4
 
$183.0

$4.6
 
$313.4
Commercial paper159.8
 141.3
244.1
 159.8
Accounts payable402.4
 427.9
445.3
 402.4
Regulatory liabilities187.1
 200.1
186.2
 187.1
Accrued taxes59.5
 53.2
Other296.6
 262.4
222.3
 243.4
Total current liabilities1,359.3
 1,214.7
1,162.0
 1,359.3
Long-term debt, net (excluding current portion)3,522.2
 3,584.3
4,315.6
 3,522.2
Other liabilities:      
Deferred tax liabilities2,381.2
 2,321.1
2,570.2
 2,381.2
Regulatory liabilities550.6
 621.1
494.8
 550.6
Pension and other benefit obligations451.8
 421.7
489.9
 451.8
Other306.0
 260.1
279.3
 306.0
Total other liabilities3,689.6
 3,624.0
3,834.2
 3,689.6
Commitments and contingencies (Note 16)

 

 
Equity:      
Alliant Energy Corporation common equity:      
Common stock - $0.01 par value - 240,000,000 shares authorized; 113,459,216 and 110,935,680 shares outstanding1.1
 1.1
Additional paid-in capital1,663.0
 1,509.1
Common stock - $0.01 par value - 480,000,000 shares authorized; 227,673,654 and 226,918,432 shares outstanding (a)2.3
 2.3
Additional paid-in capital (a)1,693.1
 1,661.8
Retained earnings2,068.9
 1,938.0
2,177.0
 2,068.9
Accumulated other comprehensive loss(0.4) (0.6)(0.4) (0.4)
Shares in deferred compensation trust - 215,093 and 238,935 shares at a weighted average cost of $39.69 and $37.45 per share(8.5) (8.9)
Shares in deferred compensation trust - 441,695 and 430,186 shares at a weighted average cost of $22.71 and $19.84 per share (a)(10.0) (8.5)
Total Alliant Energy Corporation common equity3,724.1
 3,438.7
3,862.0
 3,724.1
Cumulative preferred stock of Interstate Power and Light Company200.0
 200.0
200.0
 200.0
Noncontrolling interest
 1.8
Total equity3,924.1
 3,640.5
4,062.0
 3,924.1
Total liabilities and equity
$12,495.2
 
$12,063.5

$13,373.8
 
$12,495.2
The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

78



ALLIANT ENERGY CORPORATION
CONSOLIDATED STATEMENTS OF CASH FLOWS
 Year Ended December 31,
 2015 2014 2013
 (in millions)
Cash flows from operating activities:     
Net income
$388.4
 
$393.3
 
$376.2
Adjustments to reconcile net income to net cash flows from operating activities:     
Depreciation and amortization401.3
 388.1
 370.9
Other amortizations12.4
 54.2
 40.2
Deferred tax expense and investment tax credits114.2
 55.2
 108.3
Equity income from unconsolidated investments, net(33.8) (40.4) (43.7)
Distributions from equity method investments30.6
 36.4
 35.4
Equity component of allowance for funds used during construction(24.4) (23.1) (20.3)
Other15.7
 2.0
 (3.7)
Other changes in assets and liabilities:     
Accounts receivable36.8
 48.7
 (49.2)
Sales of accounts receivable(17.0) (7.0) (101.0)
Regulatory assets(104.5) (439.8) 140.5
Regulatory liabilities(67.8) 10.8
 (90.8)
Deferred taxes94.6
 138.4
 101.9
Pension and other benefit obligations30.1
 215.1
 (157.4)
Other(5.4) 59.7
 23.7
Net cash flows from operating activities871.2
 891.6
 731.0
Cash flows used for investing activities:     
Construction and acquisition expenditures:     
Utility business(963.6) (838.9) (731.6)
Alliant Energy Corporate Services, Inc. and non-regulated businesses(70.7) (63.9) (66.7)
Proceeds from Minnesota electric and natural gas distribution asset sales139.9
 
 
Proceeds from Franklin County wind farm cash grant
 
 62.4
Other(24.8) (14.9) (18.8)
Net cash flows used for investing activities(919.2) (917.7) (754.7)
Cash flows from (used for) financing activities:     
Common stock dividends(247.3) (225.8) (208.3)
Proceeds from issuance of common stock, net151.2
 
 
Payments to redeem cumulative preferred stock of IPL and WPL
 
 (211.0)
Proceeds from issuance of cumulative preferred stock of IPL
 
 200.0
Proceeds from issuance of long-term debt250.7
 812.9
 250.0
Payments to retire long-term debt(183.0) (358.5) (1.5)
Net change in commercial paper18.5
 (138.1) 11.9
Other6.8
 (17.3) (28.8)
Net cash flows from (used for) financing activities(3.1) 73.2
 12.3
Net increase (decrease) in cash and cash equivalents(51.1) 47.1
 (11.4)
Cash and cash equivalents at beginning of period56.9
 9.8
 21.2
Cash and cash equivalents at end of period
$5.8
 
$56.9
 
$9.8
Supplemental cash flows information:     
Cash (paid) refunded during the period for:     
Interest, net of capitalized interest
($184.8) 
($180.8) 
($171.7)
Income taxes, net
$—
 
$5.3
 
$9.6
Significant non-cash investing and financing activities:     
Accrued capital expenditures
$148.3
 
$160.3
 
$103.8
The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

79



ALLIANT ENERGY CORPORATION
CONSOLIDATED STATEMENTS OF COMMON EQUITY
           Total
       Accumulated Shares in Alliant
   Additional   Other Deferred Energy
 Common Paid-In Retained Comprehensive Compensation Common
 Stock Capital Earnings Income (Loss) Trust Equity
 (in millions)
2013:           
Beginning balance$1.1 
$1,511.2
 
$1,630.7
 
($0.8) 
($7.3) 
$3,134.9
Net income attributable to Alliant Energy common shareowners    358.3
     358.3
Common stock dividends ($1.88 per share)    (208.3)     (208.3)
Preferred stock issuance costs  (5.4)       (5.4)
Other  2.0
     (0.7) 1.3
Other comprehensive income, net of tax      0.6
   0.6
Ending balance1.1 1,507.8
 1,780.7
 (0.2) (8.0) 3,281.4
2014:           
Net income attributable to Alliant Energy common shareowners    383.1
     383.1
Common stock dividends ($2.04 per share)    (225.8)     (225.8)
Other  1.3
     (0.9) 0.4
Other comprehensive loss, net of tax      (0.4)   (0.4)
Ending balance1.1
 1,509.1
 1,938.0
 (0.6) (8.9) 3,438.7
2015:           
Net income attributable to Alliant Energy common shareowners    378.2
     378.2
Common stock dividends ($2.20 per share)    (247.3)     (247.3)
Common stock issued, net  151.2
       151.2
Other  2.7
     0.4
 3.1
Other comprehensive income, net of tax      0.2
   0.2
Ending balance
$1.1
 
$1,663.0
 
$2,068.9
 
($0.4) 
($8.5) 
$3,724.1
(a)
Amounts reflect the effects of a two-for-one common stock split distributed in May 2016. Refer to Note 7 for additional details.

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

ALLIANT ENERGY CORPORATION
CONSOLIDATED STATEMENTS OF CASH FLOWS
80

 Year Ended December 31,
 2016 2015 2014
 (in millions)
Cash flows from operating activities:     
Net income
$381.7
 
$388.4
 
$393.3
Adjustments to reconcile net income to net cash flows from operating activities:     
Depreciation and amortization411.6
 401.3
 388.1
Other amortizations(4.8) 12.4
 54.2
Deferred tax expense and tax credits84.6
 114.2
 55.2
Equity income from unconsolidated investments, net(39.6) (33.8) (40.4)
Distributions from equity method investments28.3
 30.6
 36.4
Equity component of allowance for funds used during construction(42.3) (24.4) (23.1)
Asset valuation charges for Franklin County wind farm86.4
 
 
Other0.8
 15.7
 2.0
Other changes in assets and liabilities:     
Accounts receivable(121.4) 36.8
 48.7
Sales of accounts receivable16.0
 (17.0) (7.0)
Regulatory assets(3.6) (104.5) (439.8)
Regulatory liabilities(63.0) (67.8) 10.8
Deferred income taxes102.4
 94.6
 138.4
Pension and other benefit obligations38.1
 30.1
 215.1
Other(15.6) (5.4) 59.7
Net cash flows from operating activities859.6
 871.2
 891.6
Cash flows used for investing activities:     
Construction and acquisition expenditures:     
Utility business(1,142.7) (963.6) (838.9)
Alliant Energy Corporate Services, Inc. and non-regulated businesses(54.1) (70.7) (63.9)
Proceeds from Minnesota electric and natural gas distribution asset sales
 139.9
 
Other10.3
 (24.8) (14.9)
Net cash flows used for investing activities(1,186.5) (919.2) (917.7)
Cash flows from (used for) financing activities:     
Common stock dividends(266.5) (247.3) (225.8)
Proceeds from issuance of common stock, net26.6
 151.2
 
Proceeds from issuance of long-term debt800.0
 250.7
 812.9
Payments to retire long-term debt(313.4) (183.0) (358.5)
Net change in commercial paper84.3
 18.5
 (138.1)
Other(1.7) 6.8
 (17.3)
Net cash flows from (used for) financing activities329.3
 (3.1) 73.2
Net increase (decrease) in cash and cash equivalents2.4
 (51.1) 47.1
Cash and cash equivalents at beginning of period5.8
 56.9
 9.8
Cash and cash equivalents at end of period
$8.2
 
$5.8
 
$56.9
Supplemental cash flows information:     
Cash (paid) refunded during the period for:     
Interest, net of capitalized interest
($192.4) 
($184.8) 
($180.8)
Income taxes, net
($9.8) 
$—
 
$5.3
Significant non-cash investing and financing activities:     
Accrued capital expenditures
$154.4
 
$148.3
 
$160.3

ALLIANT ENERGY CORPORATION

CONSOLIDATED STATEMENTS OF COMMON EQUITY
           Total
       Accumulated Shares in Alliant
   Additional   Other Deferred Energy
 Common Paid-In Retained Comprehensive Compensation Common
 Stock Capital Earnings Income (Loss) Trust Equity
 (in millions)
2014:           
Beginning balance (a)
$2.2
 
$1,506.7
 
$1,780.7
 
($0.2) 
($8.0) 
$3,281.4
Net income attributable to Alliant Energy common shareowners    383.1
     383.1
Common stock dividends ($1.02 per share) (a)    (225.8)     (225.8)
Other  1.3
     (0.9) 0.4
Other comprehensive loss, net of tax      (0.4)   (0.4)
Ending balance (a)2.2
 1,508.0
 1,938.0
 (0.6) (8.9) 3,438.7
2015:           
Net income attributable to Alliant Energy common shareowners    378.2
     378.2
Common stock dividends ($1.10 per share) (a)    (247.3)     (247.3)
Common stock issued, net (a)0.1
 151.1
       151.2
Other  2.7
     0.4
 3.1
Other comprehensive income, net of tax      0.2
   0.2
Ending balance (a)2.3
 1,661.8
 2,068.9
 (0.4) (8.5) 3,724.1
2016:           
Net income attributable to Alliant Energy common shareowners    371.5
     371.5
Common stock dividends ($1.175 per share) (a)    (266.5)     (266.5)
Common stock issued, net  26.6
       26.6
Other  4.7
 3.1
   (1.5) 6.3
Ending balance
$2.3
 
$1,693.1
 
$2,177.0
 
($0.4) 
($10.0) 
$3,862.0

(a)
Amounts reflect the effects of a two-for-one common stock split distributed in May 2016. Refer to Note 7 for additional details.

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM


To the Board of Directors and Shareowners of
Interstate Power and Light Company
Cedar Rapids, Iowa

We have audited the accompanying consolidated balance sheets of Interstate Power and Light Company and subsidiary (the “Company”) as of December 31, 20152016 and 2014,2015, and the related consolidated statements of income, common equity, and cash flows for each of the three years in the period ended December 31, 2015.2016. Our audits also included the Company’s financial statement schedule listed in the Index at Item 15. These financial statements and the financial statement schedule are the responsibility of the Company’s management. Our responsibility is to express an opinion on the financial statements and the financial statement schedule based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. Our audits included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company’s internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 20152016 and 2014,2015, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2015,2016, in conformity with accounting principles generally accepted in the United States of America. Also, in our opinion, the financial statement schedule, when considered in relation to the basic consolidated financial statements taken as a whole, presents fairly, in all material respects, the information set forth therein.

As discussed in Note 1(q) to the financial statements, the Company has elected to change the method of calculating its income tax provision and related deferred tax assets and liabilities. The Company has retrospectively applied the new method to all periods presented in the accompanying financial statements.

/s/ DELOITTE & TOUCHE LLP
DELOITTE & TOUCHE LLP

Milwaukee, Wisconsin
February 24, 20162017


81



INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF INCOME
Year Ended December 31,Year Ended December 31,
2015 2014 20132016 2015 2014
(in millions)(in millions)
Operating revenues:          
Electric utility
$1,503.8
 
$1,493.3
 
$1,491.8

$1,569.7
 
$1,503.8
 
$1,493.3
Gas utility217.3
 296.5
 273.9
204.0
 217.3
 296.5
Steam and other53.4
 58.3
 53.1
46.7
 53.4
 58.3
Total operating revenues1,774.5
 1,848.1
 1,818.8
1,820.4
 1,774.5
 1,848.1
Operating expenses:          
Electric production fuel and purchased power428.4
 497.3
 537.3
430.5
 428.4
 497.3
Electric transmission service328.2
 323.4
 301.4
359.7
 328.2
 323.4
Cost of gas sold123.3
 185.5
 160.3
111.0
 123.3
 185.5
Other operation and maintenance389.9
 381.1
 362.3
383.7
 389.9
 381.1
Depreciation and amortization207.2
 197.5
 191.1
210.8
 207.2
 197.5
Taxes other than income taxes55.6
 54.1
 54.4
53.9
 55.6
 54.1
Total operating expenses1,532.6
 1,638.9
 1,606.8
1,549.6
 1,532.6
 1,638.9
Operating income241.9
 209.2
 212.0
270.8
 241.9
 209.2
Interest expense and other:          
Interest expense96.8
 89.9
 81.3
103.2
 96.8
 89.9
Allowance for funds used during construction(28.2) (25.9) (21.0)(52.0) (28.2) (25.9)
Interest income and other(0.2) 2.3
 (0.3)(0.3) (0.2) 2.3
Total interest expense and other68.4
 66.3
 60.0
50.9
 68.4
 66.3
Income before income taxes173.5
 142.9
 152.0
219.9
 173.5
 142.9
Income tax benefit(22.7) (48.9) (36.3)(5.9) (22.7) (48.9)
Net income196.2
 191.8
 188.3
225.8
 196.2
 191.8
Preferred dividend requirements10.2
 10.2
 16.3
10.2
 10.2
 10.2
Earnings available for common stock
$186.0
 
$181.6
 
$172.0

$215.6
 
$186.0
 
$181.6
Earnings per share data is not disclosed given Alliant Energy Corporation is the sole shareowner of all shares of IPL’s common stock outstanding during the periods presented.
The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

82



INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED BALANCE SHEETS
December 31,December 31,
2015 20142016 2015
(in millions, except per
share and share amounts)
(in millions, except per
share and share amounts)
ASSETS      
Current assets:      
Cash and cash equivalents
$4.5
 
$5.3

$3.3
 
$4.5
Accounts receivable, less allowance for doubtful accounts200.0
 216.7
240.7
 200.0
Production fuel, at weighted average cost60.2
 52.7
70.3
 60.2
Gas stored underground, at weighted average cost18.2
 30.8
16.3
 18.2
Materials and supplies, at weighted average cost45.7
 42.0
46.5
 45.7
Regulatory assets39.6
 38.7
17.7
 39.6
Deferred tax assets
 104.0
Other28.2
 65.0
27.7
 28.2
Total current assets396.4
 555.2
422.5
 396.4
Property, plant and equipment, net4,925.1
 4,554.7
5,435.6
 4,925.1
Investments19.6
 19.1
0.8
 19.6
Other assets:      
Regulatory assets1,363.0
 1,319.2
1,441.1
 1,363.0
Deferred charges and other5.0
 2.0
4.7
 5.0
Total other assets1,368.0
 1,321.2
1,445.8
 1,368.0
Total assets
$6,709.1
 
$6,450.2

$7,304.7
 
$6,709.1
LIABILITIES AND EQUITY      
Current liabilities:      
Current maturities of long-term debt
$—
 
$150.0
Accounts payable197.2
 259.6

$186.3
 
$197.2
Accounts payable to associated companies37.7
 31.3
43.3
 37.7
Regulatory liabilities130.9
 129.7
149.6
 130.9
Accrued taxes67.6
 45.3
53.8
 67.6
Accrued interest28.2
 25.4
31.6
 28.2
Other69.5
 64.6
57.2
 69.5
Total current liabilities531.1
 705.9
521.8
 531.1
Long-term debt, net (excluding current portion)1,856.9
 1,608.0
Long-term debt, net2,153.5
 1,856.9
Other liabilities:      
Deferred tax liabilities1,378.0
 1,370.3
1,511.8
 1,378.0
Regulatory liabilities358.3
 453.8
281.2
 358.3
Pension and other benefit obligations160.2
 142.4
173.2
 160.2
Other229.3
 185.5
214.2
 229.3
Total other liabilities2,125.8
 2,152.0
2,180.4
 2,125.8
Commitments and contingencies (Note 16)

 

 
Equity:      
Interstate Power and Light Company common equity:      
Common stock - $2.50 par value - 24,000,000 shares authorized; 13,370,788 shares outstanding33.4
 33.4
33.4
 33.4
Additional paid-in capital1,407.8
 1,242.8
1,597.8
 1,407.8
Retained earnings554.1
 508.1
617.8
 554.1
Total Interstate Power and Light Company common equity1,995.3
 1,784.3
2,249.0
 1,995.3
Cumulative preferred stock200.0
 200.0
200.0
 200.0
Total equity2,195.3
 1,984.3
2,449.0
 2,195.3
Total liabilities and equity
$6,709.1
 
$6,450.2

$7,304.7
 
$6,709.1

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

83



INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF CASH FLOWS
 Year Ended December 31,
 2015 2014 2013
 (in millions)
Cash flows from operating activities:     
Net income
$196.2
 
$191.8
 
$188.3
Adjustments to reconcile net income to net cash flows from operating activities:     
Depreciation and amortization207.2
 197.5
 191.1
Deferred tax expense (benefit) and investment tax credits28.9
 (11.5) 3.0
Equity component of allowance for funds used during construction(18.6) (17.1) (13.8)
Other19.5
 11.3
 (0.7)
Other changes in assets and liabilities:     
Accounts receivable20.4
 43.3
 (55.9)
Sales of accounts receivable(17.0) (7.0) (101.0)
Regulatory assets(76.3) (272.9) 71.4
Accounts payable(42.7) 18.8
 25.6
Regulatory liabilities(75.5) (18.9) (82.3)
Deferred taxes82.1
 140.4
 92.4
Pension and other benefit obligations17.8
 93.8
 (74.3)
Other43.0
 36.6
 (11.2)
Net cash flows from operating activities385.0
 406.1
 232.6
Cash flows used for investing activities:     
Utility construction and acquisition expenditures(619.3) (526.0) (400.2)
Proceeds from Minnesota electric and natural gas distribution asset sales139.9
 
 
Other(32.5) (26.7) (23.1)
Net cash flows used for investing activities(511.9) (552.7) (423.3)
Cash flows from financing activities:     
Common stock dividends(140.0) (140.0) (128.1)
Capital contributions from parent165.0
 90.0
 120.0
Payments to redeem cumulative preferred stock
 
 (150.0)
Proceeds from issuance of cumulative preferred stock
 
 200.0
Proceeds from issuance of long-term debt250.0
 250.0
 250.0
Payments to retire long-term debt(150.0) (38.4) 
Net change in commercial paper
 
 (76.3)
Other1.1
 (14.1) (25.0)
Net cash flows from financing activities126.1
 147.5
 190.6
Net increase (decrease) in cash and cash equivalents(0.8) 0.9
 (0.1)
Cash and cash equivalents at beginning of period5.3
 4.4
 4.5
Cash and cash equivalents at end of period
$4.5
 
$5.3
 
$4.4
Supplemental cash flows information:     
Cash (paid) refunded during the period for:     
Interest
($93.9) 
($89.8) 
($80.7)
Income taxes, net
$19.3
 
$20.1
 
$0.1
Significant non-cash investing and financing activities:     
Accrued capital expenditures
$77.0
 
$113.2
 
$58.1

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

84



INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF COMMON EQUITY
       Total
   Additional   IPL
 Common Paid-In Retained Common
 Stock Capital Earnings Equity
 (in millions)
2013:       
Beginning balance
$33.4
 
$1,037.8
 
$415.2
 
$1,486.4
Earnings available for common stock    172.0
 172.0
Common stock dividends    (128.1) (128.1)
Capital contribution from parent  120.0
   120.0
Preferred stock issuance costs  (5.4)   (5.4)
Other  0.4
 2.8
 3.2
Ending balance33.4
 1,152.8
 461.9
 1,648.1
2014:       
Earnings available for common stock    181.6
 181.6
Common stock dividends    (140.0) (140.0)
Capital contribution from parent  90.0
   90.0
Other    4.6
 4.6
Ending balance33.4
 1,242.8
 508.1
 1,784.3
2015:       
Earnings available for common stock    186.0
 186.0
Common stock dividends    (140.0) (140.0)
Capital contribution from parent  165.0
   165.0
Ending balance
$33.4
 
$1,407.8
 
$554.1
 
$1,995.3
 Year Ended December 31,
 2016 2015 2014
 (in millions)
Cash flows from operating activities:     
Net income
$225.8
 
$196.2
 
$191.8
Adjustments to reconcile net income to net cash flows from operating activities:     
Depreciation and amortization210.8
 207.2
 197.5
Deferred tax expense (benefit) and tax credits35.6
 28.9
 (11.5)
Equity component of allowance for funds used during construction(35.2) (18.6) (17.1)
Other2.9
 19.5
 11.3
Other changes in assets and liabilities:     
Accounts receivable(59.7) 20.4
 43.3
Sales of accounts receivable16.0
 (17.0) (7.0)
Regulatory assets(54.7) (76.3) (272.9)
Accounts payable8.0
 (42.7) 18.8
Regulatory liabilities(67.3) (75.5) (18.9)
Deferred income taxes97.7
 82.1
 140.4
Pension and other benefit obligations13.1
 17.8
 93.8
Other(31.1) 43.0
 36.6
Net cash flows from operating activities361.9
 385.0
 406.1
Cash flows used for investing activities:     
Utility construction and acquisition expenditures(689.7) (619.3) (526.0)
Proceeds from Minnesota electric and natural gas distribution asset sales
 139.9
 
Other(3.9) (32.5) (26.7)
Net cash flows used for investing activities(693.6) (511.9) (552.7)
Cash flows from financing activities:     
Common stock dividends(151.9) (140.0) (140.0)
Capital contributions from parent190.0
 165.0
 90.0
Proceeds from issuance of long-term debt300.0
 250.0
 250.0
Payments to retire long-term debt
 (150.0) (38.4)
Other(7.6) 1.1
 (14.1)
Net cash flows from financing activities330.5
 126.1
 147.5
Net increase (decrease) in cash and cash equivalents(1.2) (0.8) 0.9
Cash and cash equivalents at beginning of period4.5
 5.3
 4.4
Cash and cash equivalents at end of period
$3.3
 
$4.5
 
$5.3
Supplemental cash flows information:     
Cash (paid) refunded during the period for:     
Interest
($99.7) 
($93.9) 
($89.8)
Income taxes, net
($11.1) 
$19.3
 
$20.1
Significant non-cash investing and financing activities:     
Accrued capital expenditures
$53.8
 
$77.0
 
$113.2

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.


INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF COMMON EQUITY
85

Table of Contents
       Total
   Additional   IPL
 Common Paid-In Retained Common
 Stock Capital Earnings Equity
 (in millions)
2014:       
Beginning balance
$33.4
 
$1,152.8
 
$461.9
 
$1,648.1
Earnings available for common stock    181.6
 181.6
Common stock dividends    (140.0) (140.0)
Capital contribution from parent  90.0
   90.0
Other  
 4.6
 4.6
Ending balance33.4
 1,242.8
 508.1
 1,784.3
2015:       
Earnings available for common stock    186.0
 186.0
Common stock dividends    (140.0) (140.0)
Capital contribution from parent  165.0
   165.0
Ending balance33.4
 1,407.8
 554.1
 1,995.3
2016:       
Earnings available for common stock    215.6
 215.6
Common stock dividends    (151.9) (151.9)
Capital contribution from parent  190.0
   190.0
Ending balance
$33.4
 
$1,597.8
 
$617.8
 
$2,249.0

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM


To the Board of Directors and Shareowner of
Wisconsin Power and Light Company
Madison, Wisconsin

We have audited the accompanying consolidated balance sheets of Wisconsin Power and Light Company and subsidiary (the “Company”) as of December 31, 20152016 and 2014,2015, and the related consolidated statements of income, equity, and cash flows for each of the three years in the period ended December 31, 2015.2016. Our audits also included the Company’s financial statement schedule listed in the Index at Item 15. These financial statements and the financial statement schedule are the responsibility of the Company’s management. Our responsibility is to express an opinion on the financial statements and the financial statement schedule based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. Our audits included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company’s internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 20152016 and 2014,2015, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2015,2016, in conformity with accounting principles generally accepted in the United States of America. Also, in our opinion, the financial statement schedule, when considered in relation to the basic consolidated financial statements taken as a whole, presents fairly, in all material respects, the information set forth therein.

As discussed in Note 1(q) to the financial statements, the Company has elected to change the method of calculating its income tax provision and related deferred tax assets and liabilities. The Company has retrospectively applied the new method to all periods presented in the accompanying financial statements.

/s/ DELOITTE & TOUCHE LLP
DELOITTE & TOUCHE LLP

Milwaukee, Wisconsin
February 24, 20162017


86




WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF INCOME
Year Ended December 31,Year Ended December 31,
2015 2014 20132016 2015 2014
(in millions)(in millions)
Operating revenues:          
Electric utility
$1,266.7
 
$1,220.3
 
$1,197.2

$1,305.8
 
$1,266.7
 
$1,220.3
Gas utility163.9
 221.0
 190.9
151.4
 163.9
 221.0
Other4.5
 7.8
 18.2
1.9
 4.5
 7.8
Total operating revenues1,435.1
 1,449.1
 1,406.3
1,459.1
 1,435.1
 1,449.1
Operating expenses:          
Electric production fuel and purchased power409.3
 379.9
 404.5
423.5
 409.3
 379.9
Electric transmission service157.1
 124.1
 116.9
168.2
 157.1
 124.1
Cost of gas sold95.8
 142.3
 116.4
83.3
 95.8
 142.3
Other operation and maintenance235.4
 277.2
 258.4
219.8
 235.4
 277.2
Depreciation and amortization184.3
 181.2
 172.2
192.5
 184.3
 181.2
Taxes other than income taxes44.5
 43.4
 41.8
44.8
 44.5
 43.4
Total operating expenses1,126.4
 1,148.1
 1,110.2
1,132.1
 1,126.4
 1,148.1
Operating income308.7
 301.0
 296.1
327.0
 308.7
 301.0
Interest expense and other:          
Interest expense92.4
 86.4
 85.0
91.4
 92.4
 86.4
Equity income from unconsolidated investments(35.1) (42.8) (43.7)(39.8) (35.1) (42.8)
Allowance for funds used during construction(8.7) (8.9) (9.8)(10.5) (8.7) (8.9)
Interest income and other(0.4) (0.1) (0.1)(0.2) (0.4) (0.1)
Total interest expense and other48.2
 34.6
 31.4
40.9
 48.2
 34.6
Income before income taxes260.5
 266.4
 264.7
286.1
 260.5
 266.4
Income taxes82.9
 85.3
 85.6
93.3
 82.9
 85.3
Net income177.6
 181.1
 179.1
192.8
 177.6
 181.1
Net income attributable to noncontrolling interest1.3
 0.7
 
2.4
 1.3
 0.7
Preferred dividend requirements
 
 1.6
Earnings available for common stock
$176.3
 
$180.4
 
$177.5

$190.4
 
$176.3
 
$180.4

Earnings per share data is not disclosed given Alliant Energy Corporation is the sole shareowner of all shares of WPL’s common stock outstanding during the periods presented.
The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

87



WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED BALANCE SHEETS
December 31,December 31,
2015 20142016 2015
(in millions, except per
share and share amounts)
(in millions, except per
share and share amounts)
ASSETS      
Current assets:      
Cash and cash equivalents
$0.4
 
$46.7

$4.2
 
$0.4
Accounts receivable, less allowance for doubtful accounts185.4
 185.8
226.3
 185.4
Production fuel, at weighted average cost38.6
 31.1
27.8
 38.6
Gas stored underground, at weighted average cost25.1
 36.3
21.3
 25.1
Materials and supplies, at weighted average cost33.5
 29.2
36.3
 33.5
Regulatory assets80.6
 29.4
40.1
 80.6
Prepaid gross receipts tax39.2
 38.0
39.8
 39.2
Deferred tax assets
 37.7
Other20.7
 23.2
20.7
 20.7
Total current assets423.5
 457.4
416.5
 423.5
Property, plant and equipment, net4,103.7
 3,938.9
4,426.7
 4,103.7
Investments:      
Investment in American Transmission Company LLC293.3
 286.5

 293.3
Other15.4
 19.5
13.7
 15.4
Total investments308.7
 306.0
13.7
 308.7
Other assets:      
Regulatory assets425.4
 396.4
416.2
 425.4
Deferred charges and other9.1
 18.9
17.2
 9.1
Total other assets434.5
 415.3
433.4
 434.5
Total assets
$5,270.4
 
$5,117.6

$5,290.3
 
$5,270.4
LIABILITIES AND EQUITY   
Current liabilities:   
Current maturities of long-term debt
$—
 
$30.6
Commercial paper19.9
 
Accounts payable136.0
 112.9
Accounts payable to associated companies21.6
 25.5
Regulatory liabilities56.2
 70.4
Accrued interest23.7
 24.3
Other79.5
 46.6
Total current liabilities336.9
 310.3
Long-term debt, net (excluding current portion)1,533.9
 1,532.5
Other liabilities:   
Deferred tax liabilities1,005.4
 967.1
Regulatory liabilities192.3
 167.3
Capital lease obligations - Sheboygan Falls Energy Facility83.6
 89.4
Pension and other benefit obligations188.7
 180.4
Other162.0
 155.2
Total other liabilities1,632.0
 1,559.4
Commitments and contingencies (Note 16)

 
Equity:   
Wisconsin Power and Light Company common equity:   
Common stock - $5 par value - 18,000,000 shares authorized; 13,236,601 shares outstanding66.2
 66.2
Additional paid-in capital959.0
 959.0
Retained earnings731.1
 681.7
Total Wisconsin Power and Light Company common equity1,756.3
 1,706.9
Noncontrolling interest11.3
 8.5
Total equity1,767.6
 1,715.4
Total liabilities and equity
$5,270.4
 
$5,117.6
The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

88



WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF CASH FLOWS
 Year Ended December 31,
 2015 2014 2013
 (in millions)
Cash flows from operating activities:     
Net income
$177.6
 
$181.1
 
$179.1
Adjustments to reconcile net income to net cash flows from operating activities:     
Depreciation and amortization184.3
 181.2
 172.2
Other amortizations5.3
 47.3
 29.5
Deferred tax expense and investment tax credits77.6
 82.6
 89.8
Equity income from unconsolidated investments(35.1) (42.8) (43.7)
Distributions from equity method investments30.6
 36.4
 35.4
Other(5.7) (7.2) (6.7)
Other changes in assets and liabilities:     
Regulatory assets(28.2) (166.9) 69.1
Regulatory liabilities7.7
 29.7
 (8.5)
Pension and other benefit obligations8.3
 92.0
 (71.3)
Other27.4
 (9.0) (21.6)
Net cash flows from operating activities449.8
 424.4
 423.3
Cash flows used for investing activities:     
Utility construction and acquisition expenditures(344.3) (312.9) (331.4)
Other(13.9) (7.2) (4.5)
Net cash flows used for investing activities(358.2) (320.1) (335.9)
Cash flows used for financing activities:     
Common stock dividends(126.9) (118.7) (116.3)
Payments to redeem cumulative preferred stock
 
 (61.0)
Proceeds from issuance of long-term debt
 250.0
 
Net change in commercial paper19.9
 (183.7) 97.1
Other(30.9) (5.7) (7.4)
Net cash flows used for financing activities(137.9) (58.1) (87.6)
Net increase (decrease) in cash and cash equivalents(46.3) 46.2
 (0.2)
Cash and cash equivalents at beginning of period46.7
 0.5
 0.7
Cash and cash equivalents at end of period
$0.4
 
$46.7
 
$0.5
Supplemental cash flows information:     
Cash paid during the period for:     
Interest
($93.1) 
($84.6) 
($85.0)
Income taxes, net
($7.4) 
($12.2) 
($22.9)
Significant non-cash investing and financing activities:     
Accrued capital expenditures
$55.2
 
$38.4
 
$37.7

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

89



WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF EQUITY
 Total WPL Common Equity    
   Additional      
 Common Paid-In Retained Noncontrolling Total
 Stock Capital Earnings Interest Equity
 (in millions)
2013:         
Beginning balance
$66.2
 
$959.2
 
$565.9
 
$—
 
$1,591.3
Earnings available for common stock    177.5
   177.5
Common stock dividends    (116.3)   (116.3)
Other  (0.2) (4.9)   (5.1)
Ending balance66.2
 959.0
 622.2
 
 1,647.4
2014:         
Net income    180.4
 0.7
 181.1
Common stock dividends    (118.7)   (118.7)
Contributions from noncontrolling interest      8.6
 8.6
Distributions to noncontrolling interest      (0.8) (0.8)
Other    (2.2)   (2.2)
Ending balance66.2
 959.0
 681.7
 8.5
 1,715.4
2015:         
Net income    176.3
 1.3
 177.6
Common stock dividends    (126.9)   (126.9)
Contributions from noncontrolling interest      3.4
 3.4
Distributions to noncontrolling interest      (1.9) (1.9)
Ending balance
$66.2
 
$959.0
 
$731.1
 
$11.3
 
$1,767.6
LIABILITIES AND EQUITY   
Current liabilities:   
Commercial paper
$52.3
 
$19.9
Accounts payable192.9
 136.0
Accounts payable to associated companies34.6
 21.6
Regulatory liabilities36.6
 56.2
Accrued interest23.6
 23.7
Other54.7
 79.5
Total current liabilities394.7
 336.9
Long-term debt, net1,535.2
 1,533.9
Other liabilities:   
Deferred tax liabilities971.6
 1,005.4
Regulatory liabilities213.6
 192.3
Capital lease obligations - Sheboygan Falls Energy Facility77.2
 83.6
Pension and other benefit obligations207.8
 188.7
Other159.4
 162.0
Total other liabilities1,629.6
 1,632.0
Commitments and contingencies (Note 16)

 
Equity:   
Wisconsin Power and Light Company common equity:   
Common stock - $5 par value - 18,000,000 shares authorized; 13,236,601 shares outstanding66.2
 66.2
Additional paid-in capital1,019.0
 959.0
Retained earnings645.6
 731.1
Total Wisconsin Power and Light Company common equity1,730.8
 1,756.3
Noncontrolling interest
 11.3
Total equity1,730.8
 1,767.6
Total liabilities and equity
$5,290.3
 
$5,270.4

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.


WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF CASH FLOWS
90

Table of Contents
 Year Ended December 31,
 2016 2015 2014
 (in millions)
Cash flows from operating activities:     
Net income
$192.8
 
$177.6
 
$181.1
Adjustments to reconcile net income to net cash flows from operating activities:     
Depreciation and amortization192.5
 184.3
 181.2
Other amortizations(8.7) 5.3
 47.3
Deferred tax expense and tax credits114.5
 77.6
 82.6
Equity income from unconsolidated investments(39.8) (35.1) (42.8)
Distributions from equity method investments28.3
 30.6
 36.4
Other(6.3) (5.7) (7.2)
Other changes in assets and liabilities:     
Accounts receivable(47.6) 3.7
 2.2
Regulatory assets51.1
 (28.2) (166.9)
Pension and other benefit obligations19.1
 8.3
 92.0
Other25.5
 31.4
 18.5
Net cash flows from operating activities521.4
 449.8
 424.4
Cash flows used for investing activities:     
Utility construction and acquisition expenditures(453.0) (344.3) (312.9)
Other(25.9) (13.9) (7.2)
Net cash flows used for investing activities(478.9) (358.2) (320.1)
Cash flows used for financing activities:     
Common stock dividends(135.0) (126.9) (118.7)
Capital contribution from parent60.0
 
 
Proceeds from issuance of long-term debt
 
 250.0
Net change in commercial paper32.4
 19.9
 (183.7)
Other3.9
 (30.9) (5.7)
Net cash flows used for financing activities(38.7) (137.9) (58.1)
Net increase (decrease) in cash and cash equivalents3.8
 (46.3) 46.2
Cash and cash equivalents at beginning of period0.4
 46.7
 0.5
Cash and cash equivalents at end of period
$4.2
 
$0.4
 
$46.7
Supplemental cash flows information:     
Cash (paid) refunded during the period for:     
Interest
($91.5) 
($93.1) 
($84.6)
Income taxes, net
$27.8
 
($7.4) 
($12.2)
Significant non-cash investing and financing activities:     
Accrued capital expenditures
$93.1
 
$55.2
 
$38.4
Transfer of investment in ATC and tax liability to ATI
($163.6) 
$—
 
$—

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF EQUITY
 Total WPL Common Equity    
   Additional      
 Common Paid-In Retained Noncontrolling Total
 Stock Capital Earnings Interest Equity
 (in millions)
2014:         
Beginning balance
$66.2
 
$959.0
 
$622.2
 
$—
 
$1,647.4
Net income    180.4
 0.7
 181.1
Common stock dividends    (118.7)   (118.7)
Contributions from noncontrolling interest      8.6
 8.6
Distributions to noncontrolling interest      (0.8) (0.8)
Other    (2.2)   (2.2)
Ending balance66.2
 959.0
 681.7
 8.5
 1,715.4
2015:         
Net income    176.3
 1.3
 177.6
Common stock dividends    (126.9)   (126.9)
Contributions from noncontrolling interest      3.4
 3.4
Distributions to noncontrolling interest      (1.9) (1.9)
Ending balance66.2
 959.0
 731.1
 11.3
 1,767.6
2016:         
Net income    190.4
 2.4
 192.8
Common stock dividends    (135.0)   (135.0)
Capital contribution from parent  60.0
     60.0
Contributions from noncontrolling interest      11.5
 11.5
Distributions to noncontrolling interest      (2.5) (2.5)
Transfer of investment in ATC to ATI    (140.9) (22.7) (163.6)
Ending balance
$66.2
 
$1,019.0
 
$645.6
 
$—
 
$1,730.8

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.


ALLIANT ENERGY CORPORATION
INTERSTATE POWER AND LIGHT COMPANY
WISCONSIN POWER AND LIGHT COMPANY

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

NOTE 1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
NOTE 1(a) General -
Description of Business - Alliant Energy’s financial statements include the accounts of Alliant Energy and its consolidated subsidiaries. Alliant Energy is an investor-owned public utility holding company, whose primary wholly-owned subsidiaries are IPL, WPL, ResourcesAEF and Corporate Services.

IPL’s financial statements include the accounts of IPL and its consolidated subsidiary, IPL SPE LLC, which is used for IPL’s sales of accounts receivable program. IPL is a direct subsidiary of Alliant Energy and is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas to retail customers in select markets in Iowa. IPL also sells electricity to wholesale customers in Minnesota, Illinois and Iowa, and is engaged in the generation and distribution of steam for two customers in Cedar Rapids, Iowa. Refer to Note 3 for discussion of IPL’s sales of its Minnesota electric and natural gas distribution assets, which were sold in 2015.

WPL’s financial statements include the accounts of WPL and its consolidated subsidiary, WPL Transco, which holdsheld Alliant Energy’s investment in ATC.ATC until December 31, 2016. Refer to Note 6(a) for discussion of WPL’s transfer of its investment in ATC to ATI on December 31, 2016. WPL is a direct subsidiary of Alliant Energy and is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas to retail customers in select markets in Wisconsin. WPL also sells electricity to wholesale customers in Wisconsin. Refer to Note 6(a) for further discussion of ATC.

ResourcesAEF is comprised of Transportation, Non-regulated Generation, ATI and other non-regulated investments. Transportation includes a short-line railway that provides freight service between Cedar Rapids, Iowa and Iowa City, Iowa; barge terminal and hauling services on the Mississippi River; and other transfer and storage services. Non-regulated Generation owns Sheboygan Falls, a 347 MW, simple-cycle, natural gas-fired EGU near Sheboygan Falls, Wisconsin, which is leased to WPL for an initial period of 20 years ending in 2025. In addition, Non-regulated Generation currently owns the non-regulated 99 MW Franklin County wind farm located in Franklin County, Iowa. In February 2017, FERC issued an order approving the transfer of the Franklin County wind farm from AEF to IPL. Alliant Energy and IPL currently expect to complete this transfer in 2017. ATI, a wholly-owned subsidiary of AEF, held a partial interest in WPL Transco until December 31, 2016. As of December 31, 2016, ATI holds all of Alliant Energy’s investment in ATC. Refer to Note 6(a) for further discussion of ATI, a wholly-owned subsidiarythe transfer of Resources, which holds a partial interest in WPL Transco.WPL’s ATC investment to ATI.

Corporate Services is the subsidiary formed to provide administrative services to Alliant Energy and its subsidiaries.

Basis of Presentation - The financial statements reflect investments in controlled subsidiaries on a consolidated basis and Alliant Energy’s, IPL’s and WPL’s proportionate shares of jointly-owned utility EGUs. Unconsolidated investments, which Alliant Energy and WPL do not control, but do have the ability to exercise significant influence over operating and financial policies, are accounted for under the equity method of accounting. Under the equity method of accounting, Alliant Energy and WPL initially record the investment at cost, and adjust the carrying amount of the investment to recognize their respective share of the earnings or losses of the investee. Dividends received from an investee reduce the carrying amount of the equity investment. Investments that do not meet the criteria for consolidation or the equity method of accounting are accounted for under the cost method. Refer to Notes 1(n)1(m) and 6(a) for further discussion of VIEs and equity method investments, respectively.

All intercompany balances and transactions, other than certain transactions affecting the rate-making process at IPL and WPL, have been eliminated from the financial statements. Such transactions not eliminated include costs that are recoverable from customers through rate-making processes. The financial statements are prepared in conformity with GAAP, which give recognition to the rate-making and accounting practices of FERC and state commissions having regulatory jurisdiction. Certain prior period amounts in the Financial Statements and Notes have been reclassified to conform to the current period presentation for comparative purposes. Unless otherwise noted, the notes herein exclude discontinued operations for all periods presented, and assets and liabilities held for sale as of December 31, 2014. Refer topresented. As discussed in Note 1(p)7 for discussion of a new accounting standard related to the presentation of debt issuance costs on the balance sheets, which, all Alliant Energy IPLshare and WPL electedper share amounts have been adjusted to early adoptreflect a two-for-one common stock split distributed in the fourth quarter of 2015. In addition, refer to Note 1(c) for discussion of a change in method of recording income taxes implemented in the fourth quarter of 2015 that impacts the separate financial statements of IPL and WPL.May 2016. As required by GAAP, all prior period financial statements and disclosures presented herein have been restated to reflect these changes. Refer to Note 1(q) for details.the common stock split.


91



Use of Estimates - The preparation of the financial statements requires management to make estimates and assumptions that affect: (a) the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements; and (b) the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates.

NOTE 1(b) Regulatory Assets and Regulatory Liabilities - Alliant Energy, IPL and WPL are subject to regulation by FERC and various state regulatory commissions. As a result, Alliant Energy, IPL and WPL are subject to GAAP provisions for regulated operations, which provide that rate-regulated public utilities record certain costs and credits allowed in the rate-making process in different periods than for non-regulated entities. Regulatory assets generally represent incurred costs that have been deferred as such costs are probable of recovery in future customer rates. Regulatory liabilities generally represent obligations to make refunds to customers or amounts collected in rates for which the related costs have not yet been incurred. Amounts deferred as regulatory assets or accrued as regulatory liabilities are generally recognized in the income statements at the time they are reflected in rates. Refer to Note 2 for additional discussion of regulatory assets and regulatory liabilities.

NOTE 1(c) Income Taxes - The liability method of accounting is followed for deferred taxes, which requires the establishment of deferred tax assets and liabilities, as appropriate, for temporary differences between the tax basis of assets and liabilities and the amounts reported in the financial statements. Deferred taxes are recorded using currently enacted tax rates and estimates of state apportionment rates.apportionment. Changes in deferred tax assets and liabilities associated with certain property-related differences at IPL are accounted for differently than other subsidiaries of Alliant Energy due to rate-making practices in Iowa. Rate-making practices in Iowa do not include the impact of certain deferred tax expenses (benefits) in the determination of retail rates. Based on these rate-making practices, deferred tax expense (benefit) related to these property-related differences at IPL is not recorded in the income statement but instead recorded to regulatory assets or regulatory liabilities until these temporary differences reverse. Refer to Note 2 for further discussion of these tax regulatory assets and regulatory liabilities associated with property-related differences at IPL. In Wisconsin, the PSCW has allowed rate recovery of deferred tax expense on all temporary differences since 1991.

Investment tax credits are deferred and amortized to income over the average lives of the related property. Other tax credits reduce income tax expense in the year claimed.

The alternative transition method has been elected to calculate the beginning pool of excess tax benefits available to absorb any tax deficiencies associated with recognition of share-based payment awards.

Alliant Energy files a consolidated federal income tax return and a combined return in Wisconsin, which includes the aggregate taxable income or loss ofinclude Alliant Energy and its subsidiaries. In addition, a combined return including Alliant Energy and all of its subsidiaries is filed in Wisconsin. Alliant Energy subsidiaries with a presence in Iowa file as part of a consolidated return in Iowa.

Alliant Energy allocates consolidated income tax expense to its subsidiaries that are members of the group that file a consolidated or combined income tax return. In the fourth quarter of 2015, IPL and WPL changed their method ofuse the modified separate return approach for calculating their income tax provisions and related deferred tax assets and liabilities from the parent-company-down approach to the modified separate return approach. IPL and WPL believe the new method is preferable to the prior method because income taxes are more reflective of amounts that IPL and WPL would have reported as separate tax return filers, and the new method is more consistent with the way in which IPL’s and WPL’s regulators determine the tax-related components of their cost-based rates. Under the parent-company-down approach, consolidated income taxes were fully allocated to Alliant Energy’s subsidiaries, including IPL and WPL, based on a prorated allocation of separate company results using consolidated tax rates and apportionment factors.

Under the modified separate return approach,liabilities. IPL and WPL are assumed to file separate tax returns with the federal and state taxing authorities, except that net operating losses (and other current or deferred tax attributes) are characterized as realized (or realizable) by IPL and WPL when those tax attributes are realized (or realizable) by the consolidated tax return group of Alliant Energy (even if IPL and WPL would not otherwise have realized the attributes on a stand-alone basis). The difference in the income taxes recorded for IPL and WPL under the modified separate return method compared to the income taxes recorded on a separate return basis was not material in 2016, 2015 2014 or 2013.and 2014.

IPL’s and WPL’s comparative financial statements for prior years have been adjusted to apply the change in method of calculating their income tax provisions and related deferred tax assets and liabilities retrospectively. Refer to Note 1(q) for discussion of the changes to IPL’s and WPL’s financial statements.


92



NOTE 1(d) Cash and Cash Equivalents - Cash and cash equivalents include short-term liquid investments that have original maturities of less than 90 days.

NOTE 1(e) Property, Plant and Equipment -
Utility Plant -
General - Utility plant is recorded at the original cost of acquisition or construction, which includes material, labor, contractor services, AFUDC and allocable overheads, such as supervision, engineering, benefits, certain taxes and transportation. Repairs, replacements and renewals of items of property determined to be less than a unit of property or that do not increase the property’s life or functionality are charged to maintenance expense. Generally, ordinary retirements of utility plant and salvage value are netted and charged to accumulated depreciation upon removal from utility plant accounts and no gain or loss is recognized consistent with rate-making policies. However, if regulators have approved recovery of the remaining net book value of property, plant and equipment that is retired early, the remaining net book value is reclassified from property, plant and equipment to regulatory assets upon retirement. Property, plant and equipment that is probable of being retired early is classified as plant anticipated to be retired early.

Depreciation - IPL and WPL use a combination of remaining life and straight-line depreciation methods as approved by their respective regulatory commissions. The composite or group method of depreciation is used, in which a single depreciation

rate is applied to the gross investment in a particular class of property. This method pools similar assets and then depreciates each group as a whole. Periodic depreciation studies are performed to determine the appropriate group lives, net salvage, estimated cost of removal and group depreciation rates. These depreciation studies are subject to review and approval by IPL’s and WPL’s respective regulatory commissions. Depreciation expense is included within the recoverable cost of service component of rates charged to customers. The average rates of depreciation for electric, gas and other properties, consistent with current rate-making practices, were as follows:
IPL WPLIPL WPL
2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014
Electric - generation3.6% 3.6% 3.6% 3.2% 3.2% 3.3%3.5% 3.6% 3.6% 3.1% 3.2% 3.2%
Electric - distribution2.4% 2.5% 2.5% 2.7% 2.7% 2.7%2.4% 2.4% 2.5% 2.6% 2.7% 2.7%
Electric - other4.0% 4.0% 4.0% 4.5% 5.9% 5.0%4.2% 4.0% 4.0% 4.7% 4.5% 5.9%
Gas3.2% 3.3% 3.4% 2.5% 2.5% 2.5%3.3% 3.2% 3.3% 2.5% 2.5% 2.5%
Other3.9% 4.3% 4.7% 6.0% 6.0% 5.1%3.9% 3.9% 4.3% 5.9% 6.0% 6.0%

In September 2016, the PSCW issued an order approving the implementation of updated depreciation rates for WPL effective January 1, 2017 as a result of a recently completed depreciation study. WPL estimates the new average rates of depreciation for its electric generation, electric distribution and gas properties will be approximately 3.2%, 2.6% and 2.3%, respectively, during 2017.

AFUDC - AFUDC represents costs to finance construction additions, including a return on equity component and cost of debt component as required by regulatory accounting. AFUDC for IPL’s construction projects is calculated in accordance with FERC guidelines. AFUDC for WPL’s retail and wholesale jurisdiction construction projects is calculated in accordance with PSCW and FERC guidelines, respectively. The AFUDC rates, computed in accordance with the prescribed regulatory formula, were as follows:
2015 2014 20132016 2015 2014
IPL (Marshalltown CWIP) (a)7.9% 8.0% —%7.9% 7.9% 8.0%
IPL (other CWIP)7.7% 7.8% 8.2%7.7% 7.7% 7.8%
WPL (retail jurisdiction)8.2% 8.2% 8.2%8.2% 8.2% 8.2%
WPL (wholesale jurisdiction)7.9% 4.1% 4.5%6.7% 7.9% 4.1%

(a)In 2013, the IUB issued an order establishing rate-making principles for Marshalltown that requires a 10.3% return on common equity for the calculation of AFUDC related to the construction of such facility.

In accordance with their most recent rate orders, IPL applies its AFUDC rates to 100% of applicable CWIP balances and WPL generally applies its AFUDC rates to 50% of applicable CWIP balances. WPL may apply its AFUDC rates to 100% of the retail portion of the CWIP balances for construction projects requiring a CA or CPCN that were approved by the PSCW after its most recent rate order.order, including the Riverside expansion.

Non-utility Property -
General - Non-utility property is recorded at the original cost of acquisition or construction, which includes material, labor and contractor services. Repairs, replacements and renewals of items of property determined to be less than a unit of property or that do not increase the property’s life or functionality are charged to maintenance expense. Upon retirement or

93



sale of non-utility property, the original cost and related accumulated depreciation are removed from the accounts and any gain or loss is included in the income statements.

Costs related to software developed or obtained for internal use are capitalized and amortized on a straight-line basis over the estimated useful life of the related software. Corporate Services placed in service a new customer billing and information system for IPL and WPL in 2015, which is amortized over a 12-year period. The majority of the remaining software is amortized over a 5-year period. If software is retired prior to being fully amortized, the difference is recorded as a loss in the income statements.

NOTE 1(f) Operating Revenues -
Utility - Revenues from Alliant Energy’s utility business are primarily from electricity and natural gas sales and are recognized on an accrual basis as services are rendered or commodities are delivered to customers. Energy sales to individual customers are based on the reading of customers’ meters, which occurs on a systematic basis throughout each reporting period. Amounts of energy delivered to customers since the date of the last meter reading are estimated at the end of each reporting period and the corresponding estimated unbilled revenue is recorded in such reporting period. The unbilled revenue estimate is based on daily system demand volumes, estimated customer usage by class, weathertemperature impacts, line losses and the most recent customer rates.

IPL and WPL accrue revenues from their wholesale customers to the extent that the actual net revenue requirements calculated in accordance with FERC-approved formula rates for the reporting period are higher or lower than the amounts billed to wholesale customers during such period. Regulatory assets or regulatory liabilities are recorded as the offset for these accrued revenues under formulaic rate-making programs. IPL’s estimated recovery amount is recorded in the current period of service and is reflected in customer bills within two years under the provisions of approved formula rates. WPL’s estimated recovery amount is recorded in the current period of service and subject to final adjustments after a customer audit period in the subsequent year. Final settled recovery amounts are reflected in WPL’s customer bills within two years under the provisions of approved formula rates.

IPL and WPL participate in bid/offer-based wholesale energy and ancillary services markets operated by MISO. IPL’s and WPL’s customers and generating resources are located in the MISO region. MISO requires that all load serving entities and generation owners, including IPL and WPL, submit hourly day-ahead and/or real-time bids and offers for energy and ancillary services. The MISO day-ahead and real-time transactions are grouped together, resulting in a net supply to or net purchase from MISO for each hour of each day. The net supply to MISO is recorded in “Electric utility operating revenues” and the net purchase from MISO is recorded in “Electric production fuel and purchased power” in the income statements.

Non-regulated - Revenues from Alliant Energy’s non-regulated businesses are primarily from its Transportation business and are recognized on an accrual basis as services are rendered or goods are delivered to customers.

Taxes Collected from Customers - CertainSales or various other taxes collected by certain of Alliant Energy’s subsidiaries serve as collection agents for sales or variouson behalf of other taxes and record revenuesagencies are recorded on a net basis. Operating revenues dobasis and are not include the collection of the aforementioned taxes.included in operating revenues.

Revenue Recognition - Refer to Note 1(p)1(o) for discussion of a new accounting standard issued by FASBthe Financial Accounting Standards Board in 2014, which provides principles for recognizing revenue.

NOTE 1(g) Utility Cost Recovery Mechanisms -
Electric Production Fuel and Energy PurchasesPurchased Power (Fuel-related Costs) - Fuel-related costs are incurred each period to generate and purchase electricity to meet the demand of IPL’s and WPL’s electric customers. These fuel-related costs include the cost of fossil fuels (primarily coalnatural gas and natural gas)coal) used during each period to produce electricity at their EGUs, electricity purchased each period from MISO wholesale energy markets (primarily MISO) and under PPAs, costs for allowances acquired to allow certain emissions (primarily SO2 and NOx) from their EGUs and costs for chemicals utilized to control emissions from their EGUs. These fuel-related costs are recorded in “Electric production fuel and purchased power” in the income statements.

IPL Retail - The cost recovery mechanisms applicable for IPL’s retail electric customers provide for subsequentmonthly adjustments to their electric rates each month for changes in fuel-related costs. Fuel adjustment clause rules applicable to IPL’s Iowa retail jurisdiction also currently allow IPL to recoverrecovery of prudently incurred costs for emission allowances required to comply with EPA regulations including the Acid Rain program, through the fuel adjustment clause. Changes in the under-/over-collection of these costs each period are recognized in “Electric production fuel and purchased power” in Alliant Energy’s and IPL’s income statements. The cumulative effects of the under-/over-collection of these costs are recorded in regulatory

94



assets or regulatory liabilities on Alliant Energy’s and IPL’s balance sheets until they are reflected in future billings to customers. The fuel adjustment clause rules applicable to IPL’s Iowa retail jurisdiction currently do not contain a provision for recovery of environmental controls chemical costs to flow through the fuel adjustment clause.

Effective February 2014, IPL began recovering the Iowa retail portion of the DAEC PPA costs from its Iowa retail electric customers through the fuel adjustment clause pursuant to a January 2013 IUB order. This PPA does not contain minimum payments for electric generating capacity.

WPL Retail - The cost recovery mechanism applicable for WPL’s retail electric customers is based on forecasts of certain fuel-related costs expected to be incurred during forward-looking test year periods and fuel monitoring ranges determined by the PSCW during each retail electric retail rate proceeding or in a separate fuel cost plan approval proceeding. However, ifIf WPL’s actual fuel-related costs fall outside these fuel monitoring ranges, during the test period, WPL is authorized to defer the incremental under-/over-collection of fuel-related costs that are outside the approved ranges. Deferral of under-collections are reduced to the extent actual return on common equity earned by WPL during the fuel cost plan year exceeds the most recently authorized return on common equity. Deferred amounts for fuel-related costs outside the approved fuel monitoring ranges are recognized in “Electric production fuel and purchased power” in Alliant Energy’s and WPL’s income statements each period.statements. The cumulative effects of these deferred amounts are recorded in regulatory assets or regulatory liabilities on Alliant Energy’s and WPL’s balance sheets until they are reflected in future billings to customers. WPL’s retail fuel-related costs include costs for emission allowances and environmental controls chemicals.

IPL and WPL Wholesale - The cost recovery mechanisms applicable for IPL’s and WPL’s wholesale electric customers provide for subsequent adjustments to their electric rates for changes in fuel-related costs. Changes in the under-/over-collection of these costs are recognized in “Electric production fuel and purchased power” in the income statements each period.statements. The cumulative effects of the under-/over-collection of these costs are recorded in regulatory assets or regulatory liabilities on the balance sheets until they are reflected in future billings to customers. IPL’s and WPL’s costs for emission allowances and environmental controls chemicals are excluded from the fuel-relatedfuel-

related cost recovery mechanisms and are recovered from their wholesale electric customers through annual changes in base rates determined by a formula rate structure.

Purchased Electric Capacity - PPAs help meet the electricity demand of IPL’s and WPL’s customers. Certain of these PPAs include minimum payments for IPL’s and WPL’s rights to electric generating capacity, which are charged each period to “Electric production fuel and purchased power” in the income statements. Purchased electric capacity expenses are recovered from IPL’s and WPL’s retail electric customers through changes in base rates determined during periodic rate proceedings. Purchased electric capacity expenses are recovered from IPL’s and WPL’s wholesale electric customers through annual changes in base rates determined by a formula rate structure.

Electric Transmission Service - Costs incurred for the transmission of electricity to meet the demands of IPL’s and WPL’s customers are charged each period to “Electric transmission service” in the income statements.

IPL Retail - Electric transmission service expense is recovered from IPL’s Iowa retail electric customers through a transmission cost rider. This cost recovery mechanism provides for annual adjustments to electric rates charged to Iowaretail electric retail customers for changes in electric transmission service expense. Changes in the under-/over-collection of these costs are recognized in “Electric transmission service” in Alliant Energy’s and IPL’s income statements each period.statements. The cumulative effects of the under-/over-collection of these costs are recorded in regulatory assets or regulatory liabilities on Alliant Energy’s and IPL’s balance sheets until they are reflected in future billings to customers. The transmission cost rider will remain in effect until the IUB’s final decision in IPL’s next retail electric base rate case, at which time the rider will continue in its current form, continue in a modified form or be terminated.

WPL Retail - Electric transmission service expense is recovered from WPL’s retail electric customers through changes in base rates determined during periodic rate proceedings.

Pursuant to the escrow accounting treatment WPL received as part of its approved retail electric rate case (2015/2016 Test Period) in July 2014 from the PSCW, the difference between actual electric transmission service expense incurred and the amount of electric transmission service costs collected from customers as electric revenues in 2015 and 2016 will beis recognized in “Electric transmission service” in Alliant Energy’s and WPL’s income statements each period.statements. An offsetting amount will beis recorded in regulatory assets or regulatory liabilities on Alliant Energy’s and WPL’s balance sheets until they are reflected in future billings to customers. The PSCW’s December 2016 order for WPL’s retail electric rate case (2017/2018 Test Period) extends this escrow accounting treatment through 2018.


95



IPL and WPL Wholesale - IPL and WPL arrange transmission service for the majority of their respective wholesale electric customers. Electric transmission service expense is allocated to and recovered from these customers based on a load ratio share computation.

Cost of Gas Sold - Costs are incurred for the purchase, transportation and storage of natural gas to serve IPL’s and WPL’s gas customers and the costs associated with the natural gas delivered to customers during each period are charged to “Cost of gas sold” in the income statements. The tariffs for IPL’s and WPL’s retail gas customers provide for subsequent adjustments to their rates each month for changes in the cost of gas sold. Changes in the under-/over-collection of these costs are also recognized in “Cost of gas sold” in the income statements each period.statements. The cumulative effects of the under-/over-collection of these costs are recorded in regulatory assets or regulatory liabilities on the balance sheets until they are reflected in future billings to customers.

Energy Efficiency Costs - Costs are incurred to fund energy efficiency programs and initiatives that help customers reduce their energy usage. The costs incurred for these programs and initiatives are charged to “Other operation and maintenance” in the income statements each period.statements. Energy efficiency costs incurred by IPL are recovered from its retail electric and gas customers in Iowa through an additional tariff called an EECR factor. EECR factors areenergy efficiency cost recovery factor, which is revised annually and includeincludes a reconciliation to eliminate any under-/over-collection of energy efficiency costs from prior periods. Energy efficiency costs incurred by WPL are recovered from retail electric and gas customers through changes in base rates determined during periodic rate proceedings. Reconciliations of any under-/over-collection of energy efficiency costs from prior periods are also addressed in WPL’s periodic rate proceedings. Changes in the under-/over-collection of energy efficiency costs each period for IPL and WPL are recognized in “Other operation and maintenance” in the income statements. The cumulative effects of the under-/over-collection of these costs for IPL and WPL are recorded in regulatory assets or regulatory liabilities on the balance sheets until they are reflected in future billings to customers.

Refer to Note 2 for additional information regarding these utility cost recovery mechanisms.


NOTE 1(h) Financial Instruments - Financial instruments are periodically used for risk management purposes to mitigate exposures to fluctuations in certain commodity prices and transmission congestion costs. The fair value of those financial instruments that are determined to be derivatives are recorded as assets or liabilities on the balance sheets. At the end of each reporting period, derivative instruments representing unrealized gain positions are reported as derivative assets, and derivative instruments representing unrealized loss positions are reported as derivative liabilities. Certain commodity purchase and sales contracts qualify for and have been designated under the normal purchase and sale exception. Based on this designation, such contractsexception and are accounted for on the accrual basis of accounting. Alliant Energy, IPL and WPL have elected to not net the fair value amounts of derivatives subject to a master netting arrangement by counterparty. Alliant Energy, IPL and WPL do not offset fair value amounts recognized for the right to reclaim cash collateral (receivable) or the obligation to return cash collateral (payable) against fair value amounts recognized for derivative instruments that are executed with the same counterparty under the same master netting arrangement. Refer to Note 2 for discussion of the recognition of regulatory assets and regulatory liabilities related to the unrealized losses and gains on IPL’s and WPL’s derivative instruments. Refer to Notes 14, 15 and 16(f) for further discussion of derivatives and related credit risk.

NOTE 1(i) Asset Impairments -
Property, Plant and Equipment of Regulated Operations - Property, plant and equipment of regulated operations are reviewed for possible impairment whenever events or changes in circumstances indicate all or a portion of the carrying value of the assets may be disallowed for rate-making purposes. If IPL or WPL are disallowed recovery of any portion of the carrying value of their regulated property, plant and equipment that is under construction, has been recently completed or is probable of abandonment, or conclude it is probable recovery will be disallowed, an impairment charge is recognized equal to the amount of the carrying value that was disallowed or is probable of being disallowed. If IPL or WPL are disallowedonly allowed a full or partial return on the carrying value of their regulated property, plant and equipment that is under construction, has been recently completed or is probable of abandonment, or conclude it is probable a full return will not be allowed, an impairment charge is recognized equal to the difference between the carrying value and the present value of the future revenues expected from their regulated property, plant and equipment.

Property, Plant and Equipment of Non-regulated Operations - Property, plant and equipment of non-regulated operations are reviewed for possible impairment whenever events or changes in circumstances indicate the carrying value of the assets may not be recoverable. Impairment is indicated if the carrying value of an asset exceeds its undiscounted future cash flows. If an impairment is indicated, a charge is recognized equal to the amount the carrying value exceeds the asset’s fair value. In 2015, declines in forward electricity prices suggested that there may be anRefer to Note 3 for discussion of Alliant Energy’s impairment indicator for the Franklin County wind farm as a result of exposure to market prices. Alliant Energy performed an impairment test, which included an evaluation of key assumptions, including forward electricity prices, expected output of the wind farm, status of transmission upgrades expected to be completed, the expected life of the wind farm, and likelihood of the sale of the wind farm. Alliant Energy

96



concluded that the estimated undiscounted future cash flows exceeded the carrying valueanalysis of the Franklin County wind farm as of December 31, 2015,assets in 2016 and resulting asset valuation charges recorded by Alliant Energy in no impairment. However a further decline in average forward electricity prices of $2 to $3 per MWh over the remaining life of the wind farm could result in an impairment charge that would be material and would likely exceed half of the $130 million carrying value at December 31, 2015.2016.

Unconsolidated Equity Investments - If events or circumstances indicate the carrying value of investments accounted for under the equity method of accounting exceeds fair value and the decline in value is other than temporary, potential impairment is assessed. If an impairment is indicated, a charge is recognized equal to the amount the carrying value exceeds the investment’s fair value. Refer to Note 6(a) for additional discussion of investments accounted for under the equity method of accounting.

NOTE 1(j) Emission Allowances - Emission allowances are granted by the EPA at zero cost and permit the holder of the allowances to emit certain gaseous by-products of fossil fuel combustion, including SO2 and NOx. Purchased emission allowances are recorded as intangible assets at their original cost and evaluated for impairment as long-lived assets to be held and used. Emission allowances allocated or acquired are held primarily for consumption.

Amortization of emission allowances recorded in “Electric production fuel and purchased power” in the income statements in 2015, 2014 and 2013 was not material, and is based upon a weighted average cost for each EPA compliance program category of vintage year utilized during the reporting period. As of December 31, 2015, future estimated amortization expense for emission allowances was not material for 2016 through 2020.

Cash inflows and outflows related to sales and purchases of emission allowances are presented in investing activities in the cash flows statements. Refer to Note 2 for information regarding regulatory assets related to emission allowances.

NOTE 1(k) Asset Retirement Obligations - The fair value of a legal obligation associated with the retirement of an asset is recorded as a liability when an asset is placed in service, when a legal obligation is subsequently identified or when sufficient information becomes available to determine a reasonable estimate of the fair value of future retirement costs. When an ARO is recorded as a liability, an equivalent amount is added to the asset cost. The fair value of AROs at inception is determined using discounted cash flows analyses. The liability is accreted to its present value and the capitalized cost is depreciated over the useful life of the related asset. Accretion and depreciation expenses related to AROs for IPL’s and WPL’s regulated operations are recorded to regulatory assets on the balance sheets. Upon regulatory approval to recover IPL’s AROs expenditures, its regulatory assets are amortized to depreciation and amortization expenses in Alliant Energy’s and IPL’s income statements over the same time period that IPL’s customer rates are increased to recover the ARO expenditures.expenditures are recovered from IPL’s customers. WPL’s regulatory assets related to AROs are being recovered as a component of depreciation rates included in the most recent depreciation study approved by thepursuant to PSCW in its May 2012 order and subsequently approved by FERC.FERC orders. Accretion and depreciation expenses related to AROs for Alliant Energy’s non-regulated operations are recorded to depreciation and amortization expenses in Alliant Energy’s income statements. Upon settlement of the ARO liability, an entity settles the obligation for its recorded amount or incurs a gain or loss. Any gains or losses related to AROs for IPL’s and WPL’s regulated operations are recorded to regulatory liabilities or regulatory assets on the balance sheets. Refer to Note 13 for additional discussion of AROs.


NOTE 1(l)1(k) Debt Issuance and Retirement Costs - Debt issuance costs and debt premiums or discounts are presented on the balance sheet as a direct deduction from the carrying amount of the related debt liability, and are deferred and amortized over the expected life of each debt issue, considering maturity dates and, if applicable, redemption rights held by others. Alliant Energy’s non-regulated businesses and Corporate Services expense in the period of retirement any unamortized debt issuance costs and debt premiums or discounts on debt retired early. Refer to Note 2 for information on regulatory assets related to IPL’s and WPL’s debt retired early or refinanced. Refer to Note 1(p) for discussion of the adoption of a new accounting standard in the fourth quarter of 2015 related to the presentation of debt issuance costs on the balance sheets.

NOTE 1(m)1(l) Allowance for Doubtful Accounts - Allowances for doubtful accounts are recorded for estimated losses resulting from the inability of customers to make required payments. Allowances for doubtful accounts are estimated based on historical write-offs, customer arrears and other economic factors within IPL’s and WPL’s service territories. Refer to Note 5(a) for details of allowance for doubtful accounts.


97



NOTE 1(n)1(m) Variable Interest Entities - An entity is considered a VIE if its equity investors do not have sufficient equity at risk for the entity to finance its activities without additional subordinated financial support from other parties, or its equity investors lack any of the following characteristics: (1) power, through voting rights or similar rights, to direct the activities of the entity that most significantly impact the entity’s economic performance; (2) the obligation to absorb expected losses of the entity; or (3) the right to receive expected benefits of the entity. The primary beneficiary of a VIE is required to consolidate the VIE. The financial statements did not reflect any VIEs on a consolidated basis.

NOTE 1(o)1(n) Cash Flows Presentation - Alliant Energy presents cash flows from continuing operations together with cash flows from discontinued operations in its cash flows statements.

NOTE 1(p)1(o) New Accounting Standards -
Revenue Recognition - In May 2014, FASBthe Financial Accounting Standards Board issued an accounting standard providing principles for recognizing revenue for the transfer of promised goods or services to customers with the consideration to which the entity expects to be entitled in exchange for those goods or services. This standard also requires disclosures about the nature, amount, timing and uncertainty of revenue and cash flows arising from contracts with customers. Alliant Energy, IPL and WPL currently expect to adopt this standard on January 1, 2018. Upon adoption, the standard can be applied retrospectively to all prior reporting periods presented, or retrospectively with a cumulative effect to the opening retained earnings balance on January 1, 2018. Alliant Energy, IPL and WPL are currently evaluating the impact of this standard on their financial condition and results of operations.

Presentationoperations and do not anticipate a significant change in revenue recognition for retail electric and gas sales, which represent the majority of Debt Issuance Costs - In April 2015, FASB issued an accounting standard to simplify the presentation of debt issuance costs on the balance sheet. Under the new standard, debt issuance costs related to a recognized debt liability are presented on the balance sheet as a direct deduction from the carrying amount of that debt liability, consistent with debt discounts. In the fourth quarter of 2015,Alliant Energy’s, IPL’s and WPL’s revenues. Alliant Energy, IPL and WPL electedcontinue to early adoptevaluate additional impacts of this standard, as well as which is applied retrospectively. Refer to Note 1(q) for further discussion.transition method will be utilized.

Presentation of Deferred TaxesLeases - In November 2015, FASBFebruary 2016, the Financial Accounting Standards Board issued an accounting standard requiring lease assets and lease liabilities, including operating leases, to simplify the presentation of deferred taxesbe recognized on the balance sheet. Under the newsheet for all leases with terms longer than 12 months. The standard all deferred tax assets and liabilities are presented as non-current on the balance sheet. In the fourth quarteralso requires disclosure of 2015,key information about leasing arrangements. Alliant Energy, IPL and WPL electedcurrently expect to early adopt this standard with prospective application. As such, prior period amounts have not been retrospectively adjusted foron January 1, 2019 and are evaluating the impact of this standard.standard on their financial condition and results of operations and expect an increase in assets and liabilities from recognizing operating leases on their balance sheets.

NOTE 1(q) Changes in Accounting PrinciplesShare-based Compensation Award Payments - Refer to Note 1(p) for discussion of a newIn March 2016, the Financial Accounting Standards Board issued an accounting standard relatedintended to simplify certain aspects of the presentationaccounting for share-based compensation award payments and the associated income taxes. This standard changes the accounting for excess tax benefits, whereby such benefits are recognized in the income statement instead of debt issuance costsadditional paid-in capital on the balance sheets, whichsheet. Alliant Energy IPL and WPL elected to early adoptadopted this standard on January 1, 2016, which resulted in the fourth quarter of 2015. In addition, refer to Note 1(c) for discussiona cumulative effect of a change in method of calculating income tax provisions and relateddecrease to its deferred tax assetsliabilities and liabilities for IPL and WPL implementedan increase to its January 1, 2016 retained earnings balance of $3.1 million, which is included in the fourth quarter of 2015.“Other” in Alliant Energy’s common equity statement in 2016.

Comparative financial statements for prior years have been adjusted to retrospectively apply the new accounting standard related to the presentation of debt issuance costs for Alliant Energy, IPL and WPL, and change in method of calculating the income tax provisions and related deferred tax assets and liabilities for IPL and WPL. There are no required resettlements of cash between the companies for these periods. The following financial statement line items were affected by these changes (in millions):
Alliant EnergyOriginally Effect of New As
Balance Sheet as of December 31, 2014Reported Accounting Standard Adjusted
Deferred charges and other
$43.9
 
($22.4) 
$21.5
Total other assets1,759.5
 (22.4) 1,737.1
Total assets12,085.9
 (22.4) 12,063.5
Long-term debt, net (excluding current portion)3,606.7
 (22.4) 3,584.3
Total liabilities and equity12,085.9
 (22.4) 12,063.5
IPL2014 2013
Income Statements  Effect of Change in     Effect of Change in  
 Originally Method of Calculating As Originally Method of Calculating As
 Reported Income Taxes Adjusted Reported Income Taxes Adjusted
Income tax benefit
($51.7) 
$2.8
 
($48.9) 
($37.9) 
$1.6
 
($36.3)
Net income194.6
 (2.8) 191.8
 189.9
 (1.6) 188.3
Earnings available for common stock184.4
 (2.8) 181.6
 173.6
 (1.6) 172.0

98



IPL  Effect of New Effect of Change in  
Balance SheetsOriginally Accounting Method of Calculating As
December 31, 2014Reported Standard Income Taxes Adjusted
Deferred tax assets
$104.9
 
$—
 
($0.9) 
$104.0
Total current assets556.1
 
 (0.9) 555.2
Deferred charges and other12.7
 (10.7) 
 2.0
Total other assets1,331.9
 (10.7) 
 1,321.2
Total assets6,461.8
 (10.7) (0.9) 6,450.2
Long-term debt, net (excluding current portion)1,618.7
 (10.7) 
 1,608.0
Deferred tax liabilities1,341.4
 
 28.9
 1,370.3
Total other liabilities2,123.1
 
 28.9
 2,152.0
Retained earnings537.9
 
 (29.8) 508.1
Total IPL common equity1,814.1
 
 (29.8) 1,784.3
Total equity2,014.1
 
 (29.8) 1,984.3
Total liabilities and equity6,461.8
 (10.7) (0.9) 6,450.2
January 1, 2014       
Retained earnings493.5
 
 (31.6) 461.9
January 1, 2013       
Retained earnings448.0
 
 (32.8) 415.2
IPL2014 2013
Cash Flows  Effect of Change in     Effect of Change in  
 Originally Method of Calculating As Originally Method of Calculating As
 Reported Income Taxes Adjusted Reported Income Taxes Adjusted
Cash flows from operating activities:           
Net income
$194.6
 
($2.8) 
$191.8
 
$189.9
 
($1.6) 
$188.3
Adjustments to reconcile net income to net cash flows from operating activities:           
Deferred tax expense (benefit) and investment tax credits(9.7) (1.8) (11.5) 4.2
 (1.2) 3.0
Other changes in assets and liabilities:           
Other32.0
 4.6
 36.6
 (14.0) 2.8
 (11.2)
WPL2014 2013
Income Statements  Effect of Change in     Effect of Change in  
 Originally Method of Calculating As Originally Method of Calculating As
 Reported Income Taxes Adjusted Reported Income Taxes Adjusted
Income taxes
$85.6
 
($0.3) 
$85.3
 
$87.2
 
($1.6) 
$85.6
Net income180.8
 0.3
 181.1
 177.5
 1.6
 179.1
Earnings available for common stock180.1
 0.3
 180.4
 175.9
 1.6
 177.5

99



WPL  Effect of New Effect of Change in  
Balance SheetsOriginally Accounting Method of Calculating As
December 31, 2014Reported Standard Income Taxes Adjusted
Deferred tax assets
$37.5
 
$—
 
$0.2
 
$37.7
Total current assets457.2
 
 0.2
 457.4
Deferred charges and other29.7
 (10.8) 
 18.9
Total other assets426.1
 (10.8) 
 415.3
Total assets5,128.2
 (10.8) 0.2
 5,117.6
Long-term debt, net (excluding current portion)1,543.3
 (10.8) 
 1,532.5
Deferred tax liabilities970.0
 
 (2.9) 967.1
Total other liabilities1,562.3
 
 (2.9) 1,559.4
Retained earnings678.6
 
 3.1
 681.7
Total WPL common equity1,703.8
 
 3.1
 1,706.9
Total equity1,712.3
 
 3.1
 1,715.4
Total liabilities and equity5,128.2
 (10.8) 0.2
 5,117.6
January 1, 2014       
Retained earnings617.2
 
 5.0
 622.2
January 1, 2013       
Retained earnings557.6
 
 8.3
 565.9
WPL2014 2013
Cash Flows  Effect of Change in     Effect of Change in  
 Originally Method of Calculating As Originally Method of Calculating As
 Reported Income Taxes Adjusted Reported Income Taxes Adjusted
Cash flows from operating activities:    
      
Net income
$180.8
 
$0.3
 
$181.1
 
$177.5
 
$1.6
 
$179.1
Adjustments to reconcile net income to net cash flows from operating activities:           
Deferred tax expense and investment tax credits80.7
 1.9
 82.6
 86.5
 3.3
 89.8
Other changes in assets and liabilities:           
Other(6.8) (2.2) (9.0) (16.7) (4.9) (21.6)

The change in method of calculating the income tax provisions and related deferred tax assets and liabilities for IPL and WPL did not have a material impact on their income statements or cash flows statements for 2015. The following balance sheet line items for 2015 were affected by this change in method for IPL and WPL (in millions):
IPLAs Computed Under As Reported Under  
Balance Sheet as of December 31, 2015Parent-company-down Modified Separate Effect of
 Approach Return Approach Change
Deferred tax liabilities
$1,346.7
 
$1,378.0
 
$31.3
Total other liabilities2,094.5
 2,125.8
 31.3
Retained earnings585.4
 554.1
 (31.3)
Total IPL common equity2,026.6
 1,995.3
 (31.3)
Total equity2,226.6
 2,195.3
 (31.3)
WPLAs Computed Under As Reported Under  
Balance Sheet as of December 31, 2015Parent-company-down Modified Separate Effect of
 Approach Return Approach Change
Other current liabilities
$78.2
 
$79.5
 
$1.3
Total current liabilities335.6
 336.9
 1.3
Deferred tax liabilities1,010.8
 1,005.4
 (5.4)
Total other liabilities1,637.4
 1,632.0
 (5.4)
Retained earnings727.0
 731.1
 4.1
Total WPL common equity1,752.2
 1,756.3
 4.1
Total equity1,763.5
 1,767.6
 4.1

100




In addition, the following previously reported Selected Consolidated Quarterly Financial Data (Unaudited) for the three months ended were impacted as a result of the change in method of calculating the income tax provisions and related deferred tax assets and liabilities for IPL and WPL (in millions):
 March 31, 2015 June 30, 2015 September 30, 2015
 Originally As Originally As Originally As
 Reported Adjusted Reported Adjusted Reported Adjusted
IPL           
Net income
$50.4
 
$50.1
 
$19.2
 
$19.0
 
$120.0
 
$119.1
Earnings available for common stock47.8
 47.5
 16.7
 16.5
 117.4
 116.5
WPL           
Net income44.8
 45.1
 39.5
 39.7
 67.9
 68.4
Earnings available for common stock44.6
 44.9
 39.0
 39.2
 67.5
 68.0
 March 31, 2014 June 30, 2014 September 30, 2014 December 31, 2014
 Originally As Originally As Originally As Originally As
 Reported Adjusted Reported Adjusted Reported Adjusted Reported Adjusted
IPL               
Net income
$46.0
 
$45.3
 
$20.9
 
$20.5
 
$105.1
 
$104.6
 
$22.6
 
$21.4
Earnings available for common stock43.4
 42.7
 18.4
 18.0
 102.5
 102.0
 20.1
 18.9
WPL               
Net income54.8
 55.2
 34.6
 34.7
 61.6
 57.9
 29.8
 33.3
Earnings available for common stock54.8
 55.2
 34.6
 34.7
 61.6
 57.9
 29.1
 32.6

NOTE 2. REGULATORY MATTERS
Regulatory Assets - At December 31, regulatory assets were comprised of the following items (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2015 2014 2015 2014 2015 20142016 2015 2016 2015 2016 2015
Tax-related
$987.7
 
$955.3
 
$958.2
 
$928.0
 
$29.5
 
$27.3

$1,055.6
 
$987.7
 
$1,022.4
 
$958.2
 
$33.2
 
$29.5
Pension and OPEB costs579.5
 570.2
 298.1
 287.9
 281.4
 282.3
578.7
 579.5
 294.0
 298.1
 284.7
 281.4
AROs92.4
 73.7
 50.8
 41.4
 41.6
 32.3
105.9
 92.4
 64.3
 50.8
 41.6
 41.6
WPL’s EGUs retired early41.4
 45.0
 
 
 41.4
 45.0
Derivatives70.6
 46.9
 28.2
 28.0
 42.4
 18.9
30.7
 70.6
 10.0
 28.2
 20.7
 42.4
WPL’s EGUs retired early45.0
 
 
 
 45.0
 
Emission allowances26.2
 26.9
 26.2
 26.9
 
 
Commodity cost recovery35.9
 31.1
 2.8
 0.4
 33.1
 30.7
6.0
 35.9
 0.3
 2.8
 5.7
 33.1
Emission allowances26.9
 27.4
 26.9
 27.4
 
 
Environmental-related costs16.4
 16.0
 11.0
 11.5
 5.4
 4.5
Debt redemption costs14.3
 16.1
 9.5
 10.9
 4.8
 5.2
Other39.9
 47.0
 17.1
 22.4
 22.8
 24.6
70.6
 70.6
 41.6
 37.6
 29.0
 33.0

$1,908.6
 
$1,783.7
 
$1,402.6
 
$1,357.9
 
$506.0
 
$425.8

$1,915.1
 
$1,908.6
 
$1,458.8
 
$1,402.6
 
$456.3
 
$506.0

A portion of the regulatory assets in the above table are not earning a return. These regulatory assets, are expected to be recovered from customers in future rates; however,but not the respective carrying costs of these regulatory assets, are not expected to be recovered from customers in future rates. At December 31, 20152016, IPL and WPL had $3044 million and $129 million, respectively, of regulatory assets representing past expenditures that were not earning a return. IPL’s regulatory assets that were not earning a return consisted primarily of emission allowances, debt redemption costs, and costs for clean air compliance projects costs, and emission allowances.wind generation expansion projects. WPL’s regulatory assets that were not earning a return consisted primarily of amounts related to the wholesale portion of under-collected fuel-related costs, which is discussed in Note 1(g), and environmental-related costs. The other regulatory assets reported in the above table either earn a return or the cash has not yet been expended, in which case the assets are offset by liabilities that also do not incur a carrying cost.

Tax-related - IPL and WPL record regulatory assets for certain temporary differences (primarily related to utility property, plant and equipment at IPL) that result in a decrease in current rates charged to customers and an increase in future rates charged to customers based on the timing of income tax expense that is used to determine such rates. These temporary

101



differences for IPL include the impacts of qualifying deductions for repairs expenditures, and allocation of mixed service costs, and Iowa accelerated tax depreciation, which all contribute to lower current income tax expense during the first part of an asset’s useful life and higher current tax expense during the last part of an asset’s useful life. These regulatory assets will be recovered from customers in the future when these temporary differences reverse resulting in additional current income tax expense used to determine customers’ rates. During 2015,2016, Alliant Energy’s and IPL’s tax-related regulatory assets increased primarily due to property-related differences for qualifying repair expenditures, partially offset by a reduction in certain tax-related regulatory assets due to the sales of IPL’s Minnesota electric and natural gas distribution assets in 2015.expenditures.

Pension and other postretirement benefits costs - The IUB and the PSCW have authorized IPL and WPL to record the retail portion of their respective previously unrecognized net actuarial gains and losses, and prior service costs and credits, as regulatory assets in lieu of AOCL on the balance sheets, as these amounts are expected to be recovered in future rates. IPL and WPL also recognize the wholesale portion of their previously unrecognized net actuarial gains and losses, and prior service costs and credits, as regulatory assets on the balance sheets because these costsamounts are expected to be recovered in rates in future periods under the formula rate structure. These regulatory assets will be increased or decreased as the net actuarial gains or losses, and prior service costs or credits, are subsequently amortized and recognized as a component of net periodic benefit costs. Regulatory assets are also increased or decreased as a result of the annual defined benefit plan measurement process.

Pension and OPEB costs are included within the recoverable cost of service component of rates charged to IPL’s and WPL’s customers. The recoverable costs included in customers’ rates are based upon pension and OPEB costs determined in accordance with GAAP and are calculated using different methods for the variousIPL’s and WPL’s respective regulatory jurisdictions in which IPL and WPL operate.jurisdictions. The IUB authorized IPL in its 2009 Test Year Iowa retail electric rate case order to recover from its retail electric customers in Iowa an allocated portion of annual costs equal to a two-year simple average of actual costs incurred during its 2009 Test Year and an estimate of costs for its forward-looking post-Test Year (2010). The PSCW has authorized WPL in its Wisconsin retail rate cases for the 2013/2014 and 2015/2016 Test Periods to recover from its retail electric and gas retail customers an estimated allocated portion of annual costs equal to the costs expected to be incurred during the respectiveeach test year periods.period. IPL and WPL are authorized to recover from their wholesale customers an allocated portion of actual pension costs incurred each year. In accordance withyear through FERC-approved formula rates, any over- or under-collection of these pension costs each year are refunded to or recovered from customers through subsequent changes to wholesale customer rates. Refer to Note 12(a) for additional details regarding pension and OPEB costs.

AROs - Alliant Energy, IPL and WPL believe it is probable that any differences between expenses accrued for legal AROs related to their regulated operations and expenses recovered currently in rates will be recoverable in future rates, and are deferring the differences as regulatory assets. Refer to Note 13 for additional details of AROs.

WPL’s electric generating units retired early - In December 2015, WPL retired Nelson Dewey Units 1 and 2 and Edgewater Unit 3. WPL received approval from the PSCW and FERC to reclassify the remaining net book value of these EGUs from property, plant and equipment to a regulatory asset on Alliant Energy’s and WPL’s balance sheets. The remaining net book value is included in WPL’s rate base and WPL is earning a return on the outstanding balance. WPL is currently recovering the remaining net book value of these EGUs from both its retail and wholesale customers over a 10-year period beginning January 1, 2013 pursuant to PSCW and FERC orders.

Derivatives - In accordance with IPL’s and WPL’s fuel and natural gas recovery mechanisms, prudently incurred costs from derivative instruments are recoverable from customers in the future after any losses are realized, and gains from derivative instruments are refundable to customers in the future after any gains are realized. Based on these recovery mechanisms, the changes in the fair value of derivative liabilities/assets resulted in comparable changes to regulatory assets/liabilities on the balance sheets. Refer to Note 15 for additional details of derivative assets and derivative liabilities.

WPL’s electric generating units retired early - In December 2015, WPL retired Nelson Dewey Units 1 and 2 and Edgewater Unit 3. WPL received approval from FERC and the PSCW to reclassify the remaining net book value of these EGUs from property, plant and equipment to a regulatory asset on Alliant Energy’s and WPL’s balance sheets. The remaining net book value is included in WPL’s rate base and WPL is earning a return on the outstanding balance. WPL is currently recovering the remaining net book value of these EGUs from both its retail and wholesale customers over a 10-year period beginning January 1, 2013 pursuant to orders previously received by the PSCW and FERC. Continued recovery of the retail portion of the remaining net book value of these EGUs is expected to be addressed in WPL’s next retail electric base rate case.

Commodity cost recovery - Refer to Note 1(g) for additional details of IPL’s and WPL’s cost recovery mechanisms.

Emission allowances - IPL entered into forward contracts in 2007 to purchase SO2 emission allowances with vintage years of 2014 through 2017 from various counterparties to meet future CAIR emission reduction standards. Any SO2 emission allowances acquired under these forward contracts could be used to meet requirements under the existing Acid Rain program regulations or the more stringent CAIR emission reduction standards but are not eligible to be used for compliance requirements under CSAPR. In 2011, the EPA issued CSAPR to replace CAIR with an anticipated effective date in 2012. As a result of the issuance of CSAPR, Alliant Energy and IPL concluded in 2011 that the allowances to be acquired under these

102



forward contracts would not be needed by IPL to comply with expected environmental regulations in the future. The value of these allowances was nominal, which was significantly below the contract price for these allowances. As a result, Alliant Energy and IPL recognized an obligation and offsettinghave recorded a regulatory assetsasset for the amount ofamounts paid under the forward contracts, that areas well as for the remaining obligation under the forward contracts as a result of concluding the amount is probable of recovery from IPL’s customers. The current value of these allowances continues to be nominal and significantly below the contract price for these allowances.

Environmental-related costsCommodity cost recovery - The IUB has permitted IPL to recover prudently incurred costs by allowing a representative level of MGP costs in the recoverable cost of service component of rates, as determined in its most recent retail gas rate case. Under the current rate-making treatment approved by the PSCW, the MGP expenditures of WPL are deferred and collected from retail gas customers over a five-year period after new rates are implemented. Regulatory assets recorded by IPL and WPL reflect the probable future rate recovery of MGP expenditures. Refer to Note 16(e)1(g) for additional details of environmental-related MGP costs.

Debt redemption costs - For debt retired early with no subsequent re-issuance, IPLIPL’s and WPL defer any debt repayment premiums and unamortized debt issuance costs and discounts as regulatory assets. These regulatory assets are amortized over the remaining original life of the debt retired early. Debt repayment premiums and other losses resulting from the refinancing of debt by IPL and WPL are deferred as regulatory assets and amortized over the life of the new debt issued.WPL’s cost recovery mechanisms.

Other - Alliant Energy, IPL and WPL assess whether IPL’s and WPL’s regulatory assets are probable of future recovery by considering factors such as applicable regulations, recent orders by the applicable regulatory agencies, historical treatment of similar costs by the applicable regulatory agencies and regulatory environment changes. Based on these assessments, Alliant Energy, IPL and WPL believe the regulatory assets recognized as of December 31, 20152016 in the above table are probable of future recovery. However, no assurance can be made that IPL and WPL will recover all of these regulatory assets in future rates. If future recovery of a regulatory asset ceases to be probable, the regulatory asset will be charged to expense in the period the likelihood of future recovery is less than probable.

Regulatory Liabilities - At December 31, regulatory liabilities were comprised of the following items (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2015 2014 2015 2014 2015 20142016 2015 2016 2015 2016 2015
Cost of removal obligations
$406.0
 
$421.7
 
$260.4
 
$279.1
 
$145.6
 
$142.6

$411.6
 
$406.0
 
$269.4
 
$260.4
 
$142.2
 
$145.6
IPL’s tax benefit riders159.2
 243.0
 159.2
 243.0
 
 
83.5
 159.2
 83.5
 159.2
 
 
Electric transmission cost recovery72.0
 43.5
 35.7
 21.9
 36.3
 21.6
Derivatives31.5
 8.5
 12.1
 6.7
 19.4
 1.8
Commodity cost recovery30.8
 37.6
 17.8
 23.5
 13.0
 14.1
Energy efficiency cost recovery48.3
 64.3
 
 
 48.3
 64.3
20.5
 48.3
 
 
 20.5
 48.3
Electric transmission cost recovery43.5
 19.4
 21.9
 19.4
 21.6
 
Commodity cost recovery37.6
 15.4
 23.5
 15.1
 14.1
 0.3
Other43.1
 57.4
 24.2
 26.9
 18.9
 30.5
31.1
 34.6
 12.3
 17.5
 18.8
 17.1

$737.7
 
$821.2
 
$489.2
 
$583.5
 
$248.5
 
$237.7

$681.0
 
$737.7
 
$430.8
 
$489.2
 
$250.2
 
$248.5

Regulatory liabilities related to cost of removal obligations, to the extent expensed through depreciation rates, reduce rate base. A significant portion of the remaining regulatory liabilities are not used to reduce rate base in the revenue requirement calculations utilized in IPL’s and WPL’s respective rate proceedings.

Cost of removal obligations - Alliant Energy, IPL and WPL collect in rates future removal costs for many assets that do not have associated legal AROs. Alliant Energy, IPL and WPL record a regulatory liability for the estimated amounts they have collected in rates for these future removal costs and reduce the regulatory liability for amounts spent on removal activities.


IPL’s tax benefit riders - IPL’sThe IUB has approved electric and gas tax benefit riders proposed by IPL, which utilize regulatory liabilities to credit bills of IPL’s Iowa retail electric and gas customers to help offset the impact of rate increases on such customers. TheseAlliant Energy and IPL recognize an offsetting reduction to income tax expense for the after-tax amounts credited to such customers, resulting in no impact to their net income from the electric and gas tax benefit riders. The tax benefit riders regulatory liabilities are related to tax benefits from tax accounting method changes for repairs expenditures, allocation of mixed service costs, allocation of insurance proceeds from floods in 2008, and cost of removal expenditures. In 2015,2016, Alliant Energy’s and IPL’s “IPL’s tax benefit riders” regulatory liabilities decreased by $84$76 million as follows (in millions):
Electric tax benefit rider credits
$7264
Gas tax benefit rider credits12
 
$8476

Electric tax benefit rider - The IUB has approved an electric tax benefit rider proposed by IPL, which utilizes regulatory liabilities to credit bills of Iowa retail electric customers beginning in 2011 to help offset the impact of rate increases on such

103



customers. Alliant Energy and IPL recognize an offsetting reduction to income tax expense for the after-tax amounts credited to IPL’s retail electric customers’ bills in Iowa, resulting in no impact to Alliant Energy’s and IPL’s net income from the electric tax benefit rider as follows (in millions):
 2015 2014 2013
Credit to IPL’s Iowa retail electric customers’ bills with reduction to electric revenues
$72
 
$85
 
$79
Income tax benefit resulting from decreased taxable income caused by credits30
 35
 33
Income tax benefit representing tax benefits realized from electric tax benefit rider42
 50
 46

In December 2015,2016, the IUB issued an order authorizing $65authorized $68 million and $7 million of regulatory liabilities from tax benefits to be credited to IPL’s retail electric and gas customers’ bills in Iowa in 20162017 through the electric and gas tax benefit rider.riders, respectively. Any remaining tax benefit rider regulatory liabilities are currently expected to be credited to IPL’s retail electric and gas customers’ bills in the future, subject to final review by the IUB.

Electric tax benefit rider - Details for IPL’s electric tax benefit rider are as follows (in millions):
 2016 2015 2014
Credit to IPL’s Iowa retail electric customers’ bills with reduction to electric revenues (based on customers’ KWh usage)
$64
 
$72
 
$85
Income tax benefit resulting from decreased taxable income caused by credits27
 30
 35
Income tax benefit representing tax benefits realized from electric tax benefit rider37
 42
 50

The IUB has authorized IPL to reduce the electric tax benefit rider billing credits on customers’ bills for 2013 through 2016 to recognize the revenue requirement impact of the changes in tax accounting methods related to tangible property and mixed service costs. The revenue requirement adjustment resulted in increases to electric revenues in Alliant Energy’s and IPL’s income statements and was recognized through the energy adjustment clause as a reduction of the credits on IPL’s Iowa retail electric customers’ bills from the electric tax benefit rider as follows (in millions):
 2015 2014 2013
Revenue requirement adjustment
$14
 
$15
 
$24

In December 2015, the IUB authorized IPL to reduce the $65 million of billing credits on customers’ bills by $15 million in 2016 to recognize the revenue requirement impact of the changes in tax accounting methods.
 2016 2015 2014
Revenue requirement adjustment
$14
 
$14
 
$15

Gas tax benefit rider - The IUB has approved aDetails for IPL’s gas tax benefit rider proposed by IPL, which utilizes approximately $12 million of regulatory liabilities annually to credit bills of Iowa retail gas customers beginning in January 2013 to help offset the impact of rate increases on such customers. Any remaining benefit, including any portion not utilized of the agreed upon amount from January 2013 through December 2015, is expected to be credited to Iowa’s retail gas customers’ bills in 2016. Alliant Energy and IPL utilized gas tax benefit rider-related regulatory liabilities to credit IPL’s Iowa retail gas customers’ billsare as follows (in millions):
 2015 2014 2013
Credit to IPL’s Iowa retail gas customers’ bills with reduction to gas revenues
$12
 
$12
 
$11
Income tax benefit resulting from decreased taxable income caused by credits5
 5
 4
Income tax benefit representing tax benefits realized from gas tax benefit rider7
 7
 7

Refer to Note 11 for additional details regarding IPL’s tax benefit riders.

Energy efficiency cost recovery - WPL and IPL collect revenues from their customers to offset certain expenditures incurred by WPL and IPL for energy efficiency programs, including state mandated programs and Shared Savings programs. Differences between forecasted costs used to set rates and actual costs for these programs are deferred as a regulatory asset or regulatory liability. The July 2014 PSCW order for WPL’s 2015/2016 Test Period electric and gas base rate case authorized lower energy efficiency cost recovery amortizations for 2015, which contributed to the decrease in Alliant Energy’s and WPL’s “Energy efficiency cost recovery” regulatory liabilities.
 2016 2015 2014
Credit to IPL’s Iowa retail gas customers’ bills with reduction to gas revenues (based on a fixed amount per day)
$12
 
$12
 
$12
Income tax benefit resulting from decreased taxable income caused by credits5
 5
 5
Income tax benefit representing tax benefits realized from gas tax benefit rider7
 7
 7

Electric transmission cost recovery - Electric revenues established in WPL’s retail electric rate case (2015/2016 Test Period) included recovery of expected increases in electric transmission service expense largely due to SSR costs expected to be incurred. Due to a revision in MISO’s method to allocate SSR costs, WPL no longer expects to incur certain SSR costs. The difference between actual electric transmission service expense incurred and amounts collected from customers as electric revenues in 2015 are recorded as electric transmission service expense with an offsetting amount recorded to regulatory liabilities due to the escrow treatment authorized for WPL in its 2015/2016 Test Period retail electric rate case. Refer to Note 1(g) for additional details of IPL’s and WPL’s electric transmission service cost recovery mechanisms.

Commodity cost recovery - Refer to Note 1(g) for additional details of IPL’s and WPL’s commodity cost recovery mechanisms.


104

Table of ContentsEnergy efficiency cost recovery - WPL and IPL collect revenues from their customers to offset certain expenditures they each incur for energy efficiency programs, including state mandated programs and Shared Savings programs. Differences between forecasted costs used to set rates and actual costs for these programs are deferred as a regulatory asset or regulatory liability. The PSCW’s order for WPL’s 2015/2016 Test Period electric and gas base rate case authorized energy efficiency cost recovery amortizations for 2016, which contributed to the decrease in Alliant Energy’s and WPL’s “Energy efficiency cost recovery” regulatory liabilities.


Utility Rate Cases -
WPL’s Wisconsin Retail Electric and Gas Rate Case (2017/2018 Test Period) - In December 2016, WPL received an order from the PSCW authorizing WPL to implement increases in annual retail electric and gas base rates of $9 million and $9 million, respectively, effective January 1, 2017 followed by a freeze of such rates through the end of 2018. The key drivers for the electric and gas base rate increases are recovery of the costs for environmental controls projects at Edgewater

and Columbia, and investments in electric and gas distribution systems, including expansion of natural gas pipeline infrastructure. The filing also included utilization of amounts that WPL previously over-recovered from its customers for energy efficiency cost recovery and electric transmission cost recovery, as well as amounts deferred under the return on common equity sharing mechanism for the 2013/2014 Test Period to reduce the requested base rate increases. The order included provisions that require WPL to defer a portion of its earnings if its annual regulatory return on common equity exceeds certain levels in 2017 or 2018.

WPL’s Wisconsin Retail Electric and Gas Rate Case (2015/2016 Test Period) - In July 2014, WPL received an order from the PSCW authorizing WPL to maintain retail electric base rates at their then current levels through the end of 2016. The retail electric base rate case included a return of and a return onof costs for environmental controls projects, at Columbia Units 1 and 2 and Edgewater Unit 5, generation performance and reliability improvements, at Columbia Units 1 and 2, other ongoing capital expenditures and an increase in electric transmission service expense. The additional revenue requirement for these cost increases was offset by the impact of changes in the amortization of regulatory liabilities associated with energy efficiency cost recoveries and increased sales volumes. The order also authorized WPL to implement a $5 million decrease in annual base rates for its retail gas customers effective January 1, 2015 followed by a freeze of such gas base rates through the end of 2016. The order included provisions that requirerequired WPL to defer a portion of its earnings if its annual regulatory return on common equity exceedsexceeded certain levels duringin 2015 or 2016 and allows WPL to request a change in retail base rates during this period if its annual regulatory return on common equity falls below a certain level.2016. As of December 31, 2015,2016, Alliant Energy and WPL did not record any deferred amounts$6 million of WPL’s 2016 earnings for these provisions.provisions, which is included in “Other” in Alliant Energy’s and WPL’s regulatory liabilities tables above.

WPL’s Wisconsin Retail Electric and Gas Rate Case (2013/2014 Test Period) - In July 2012, WPL received anThe PSCW’s order from the PSCW authorizing WPL to implement a decrease in annual retailfor WPL’s 2013/2014 Test Period electric and gas base rates of $13 million effective January 1, 2013, followed by a freeze of such gas base rates through the end of 2014. The order also authorized WPL to maintain retail electric base rates at their then current levels through the end of 2014. The orderrate case included a provisionprovisions that required WPL to defer a portion of its earnings if its annual regulatory return on common equity exceeded certain levels during 2013 or 2014. As of December 31, 2015,2016, Alliant Energy and WPL deferred $8$6 million of WPL’s 2013 and 2014 earnings for these provisions, which is included in “Other” in Alliant Energy’s and WPL’s regulatory liabilities tables above. WPL currently expects theThese deferred amountearnings will be refundedreturned to its customers as an offset to revenue requirements in a future rate case or other proceeding.2017 and 2018 as authorized by the PSCW.

IPL’s Iowa Retail Electric Rate Settlement Agreement - The IUB approved a settlement agreement in 2014 related to rates charged to IPL’s Iowa retail electric customers. The settlement agreement extendsextended IPL’s Iowa retail electric base rates authorized in its 2009 Test Year rate case through 2016 and providesprovided targeted retail electric customer billing credits of $105 million in aggregate. IPL recorded such billing credits in 2014 and 2015, and estimates billing credits in 2016, as follows (in millions):
 Actual Estimated
 2014 2015 2016
Billing credits to reduce retail electric customers’ bills
$72
 
$24
 
$9
 2016 2015 2014
Billing credits to reduce retail electric customers’ bills
$9
 
$24
 
$72

WPL’s Retail Fuel-related Rate Filing (2016 Test Year)Filings - In December 2015, WPL received an order from theThe PSCW authorizing anauthorized annual retail electric rate increase of $7 million, or approximately 1%, effective January 1, 2016. The increase reflectsincreases for WPL in 2014, 2015 and 2016, resulting from anticipated increases in retail electric fuel-related costs in 2016, including impacts of increased sales volumes approved in the retail base rate case for 2016. WPL’s 2016 fuel-related costs will be subject to deferral if they fall outside an annual bandwidth of plus or minus 2% of the approved annual forecasted fuel-related costs. Deferral of under-collections are reduced to the extent WPL’s actual return on common equity exceeds the most recently authorized return on common equity.

WPL’s Retail Fuel-related Rate Filing (2015 Test Year)- In December 2014, WPL received an order from the PSCW authorizing an annual retail electric rate increase of $39 million, or approximately 4%, effective January 1, 2015. The increase included $39 million of anticipated increases in retail electric fuel-related costs in 2015 attributable to $25 million for higher retail electric fuel-related costs per MWh anticipated in 2015 and $14 million from the impact of increased sales volumes approved in the retail electric base rate case for 2015. WPL’s 2015 fuel-related costs were subject to deferral if they were outside an annual bandwidth of plus or minus 2% of the approved annual forecasted fuel-related costs.during such periods. Retail fuel-related costs incurred by WPL through December 31,in 2015 and 2016 were lower than fuel-related costs used to determine rates for such period resulting in an over-collection of fuel-related costs. As of December 31, 2015,costs, and retail fuel-related costs outsideincurred by WPL in 2014 were higher than fuel-related costs used to determine rates for such period resulting in an under-collection of the approved range were $10 million and are included in “Commodity cost recovery” in Alliant Energy’s and WPL’s regulatory liabilities table above.

WPL’s Retail Fuel-related Rate Filing (2014 Test Year) - Pursuant to a 2013 PSCW order, WPL’s 2014fuel-related costs. These fuel-related costs were subject to deferral since they were outside an annual bandwidth of plus or minus 2% of the approved respective annual forecasted fuel-related costs. Retail fuel-related costs incurred byDetails on these rate increases, as well as amounts WPL through December 31, 2014 were higher than fuel-related costs used to determine ratesdeferred for such period resulting in an under-collection of fuel-related costs for 2014 of $33 million (including $28 million outside the approved range for 2014). As of December 31, 2015 and 2014, the $28 million of deferred fuel-related costs were includedover-collected (included in “Commodity cost recovery” regulatory liabilities) or under-collected (included in Alliant Energy’s and WPL’s“Commodity cost recovery” regulatory assets table above. In July 2015, WPL received an orderassets) fuel-related costs from the PSCW authorizing an annualits retail electric rate increase of $28 million, or approximately 2%, effective January 1, 2016 to recover the 2014 Test Year deferred fuel-related costs.customers are as follows (dollars in millions):

105

Table of Contents
  Retail Electric Deferral of Over (Under) Timing of Refunds To or
Year Rate Increase Collected Fuel-related Costs Collections From Customers
2016 
$7
 1% 
$9
 Pending
2015 39
 4% 10
 2016
2014 19
 2% (28) 2016



NOTE 3. PROPERTY, PLANT AND EQUIPMENT
At December 31, details of property, plant and equipment on the balance sheets were as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2015 2014 2015 2014 2015 20142016 2015 2016 2015 2016 2015
Utility:                      
Electric plant:                      
In service:           
Generation
$5,643.7
 
$5,463.0
 
$3,011.6
 
$2,872.4
 
$2,632.1
 
$2,590.6
Distribution4,489.9
 4,435.4
 2,447.9
 2,471.7
 2,042.0
 1,963.7
Other311.3
 309.1
 212.2
 215.5
 99.1
 93.6
Generation in service
$5,866.9
 
$5,643.7
 
$2,916.8
 
$3,011.6
 
$2,950.1
 
$2,632.1
Distribution in service4,739.2
 4,489.9
 2,589.3
 2,447.9
 2,149.9
 2,042.0
Other in service329.1
 311.3
 223.5
 212.2
 105.6
 99.1
Anticipated to be retired early (a)
 157.6
 
 
 
 157.6
108.3
 
 108.3
 
 
 
Total electric plant10,444.9
 10,365.1
 5,671.7
 5,559.6
 4,773.2
 4,805.5
11,043.5
 10,444.9
 5,837.9
 5,671.7
 5,205.6
 4,773.2
Gas plant in service1,018.3
 946.2
 513.6
 474.0
 504.7
 472.2
1,107.6
 1,018.3
 556.7
 513.6
 550.9
 504.7
Other plant in service530.6
 539.3
 296.0
 298.8
 234.6
 240.5
549.3
 530.6
 313.0
 296.0
 236.3
 234.6
Accumulated depreciation (a)(3,939.6) (3,923.1) (2,152.8) (2,124.5) (1,786.8) (1,798.6)
Accumulated depreciation(4,135.7) (3,939.6) (2,258.3) (2,152.8) (1,877.4) (1,786.8)
Net plant8,054.2
 7,927.5
 4,328.5
 4,207.9
 3,725.7
 3,719.6
8,564.7
 8,054.2
 4,449.3
 4,328.5
 4,115.4
 3,725.7
Leased Sheboygan Falls Energy Facility, net (b)
 
 
 
 58.6
 64.7

 
 
 
 52.4
 58.6
Construction work in progress897.5
 479.1
 578.2
 325.0
 319.3
 154.1
1,226.8
 897.5
 968.1
 578.2
 258.7
 319.3
Other, net18.5
 22.3
 18.4
 21.8
 0.1
 0.5
18.4
 18.5
 18.2
 18.4
 0.2
 0.1
Total utility8,970.2
 8,428.9
 4,925.1
 4,554.7
 4,103.7
 3,938.9
9,809.9
 8,970.2
 5,435.6
 4,925.1
 4,426.7
 4,103.7
Non-regulated and other:                      
Non-regulated Generation, net (c)229.3
 240.1
 
 
 
 
135.0
 229.3
 
 
 
 
Corporate Services and other, net (d)319.6
 269.4
 
 
 
 
334.3
 319.6
 
 
 
 
Total non-regulated and other548.9
 509.5
 
 
 
 
469.3
 548.9
 
 
 
 
Total property, plant and equipment
$9,519.1
 
$8,938.4
 
$4,925.1
 
$4,554.7
 
$4,103.7
 
$3,938.9

$10,279.2
 
$9,519.1
 
$5,435.6
 
$4,925.1
 
$4,426.7
 
$4,103.7

(a)
In December 2015, WPL retired Nelson Dewey Units 1 and 2 and Edgewater2016, IPL received approval from MISO to retire Sutherland Unit 3 and transferred the remaining net book value from property, plant and equipment to regulatory assets pursuant to orders from the PSCW and FERC. Refer to Note 2 for discussion of thecurrently anticipates retiring this EGU by June 30, 2017. The recovery of the remaining net book value of these EGUs.
this EGU is expected to be addressed in IPL’s next retail electric base rate case, which is currently expected to be filed in the second quarter of 2017.
(b)
Less accumulated amortization of $65.2$71.4 million and $59.1$65.2 million for WPL as of December 31, 20152016 and 2014,2015, respectively. The Sheboygan Falls Energy Facility is eliminated from WPL upon consolidation and is included in the “Non-regulated Generation, net” line within Alliant Energy’s consolidated property, plant and equipment.
(c)
Less accumulated depreciation of $59.0$46.5 million and $49.5$59.0 million for Alliant Energy as of December 31, 20152016 and 2014,2015, respectively.
(d)
Less accumulated depreciation of $252.9$272.0 million and $229.1$252.9 million for Alliant Energy as of December 31, 20152016 and 2014,2015, respectively.

Utility -
Environmental Controls Project -
WPL’s Edgewater Unit 5 - WPL is currently constructingConstruction of a scrubber and baghouse at Edgewater Unit 5.5 began in 2014 and was completed in 2016, which resulted in a transfer of the capitalized project costs from “Construction work in progress” to “Electric plant - Generation in service” in the above table for Alliant Energy and WPL in 2016. As of December 31, 2016 and 2015, the capitalized project costs for the scrubber and baghouse consisted of capitalized expenditures of $225 million and CWIP of $190 million, and AFUDC of $12 million and $8 million, respectively, for the scrubber and baghouse. The scrubber and baghouse reduce SO2 and mercury emissions at the EGU and are expected to help meet requirements under the MATS Rule and CSAPR. Construction began in 2014 and is expected to be completed in 2016. As of December 31, 2015 and 2014, Alliant Energy and WPL recorded capitalized expenditures for CWIP of $190 million and $90 million, and AFUDC of $8 million and $3 million, respectively, for the scrubber and baghouse in “Construction work in progress” in the above table for Alliant Energy and WPL.

Natural Gas-Fired Generation ProjectProjects -
IPL’s Marshalltown Generating Station - IPL is currently constructing Marshalltown, an approximate 650 MW natural gas-fired combined-cycle EGU. Construction began in 2014 and is expected to be completed in April 2017. As of December 31, 20152016 and 2014,2015, Alliant Energy and IPL recorded capitalized expenditures for CWIP of $453$612 million and $188$453 million, and AFUDC of $24$68 million and $4$24 million, respectively, for Marshalltown in “Construction work in progress” in the above table for Alliant Energy and IPL.


106

TableWPL’s Riverside Expansion - WPL is currently constructing the Riverside expansion, an approximate 730 MW natural gas-fired combined-cycle EGU. Construction began in 2016 and is expected to be completed in early 2020. As of ContentsDecember 31, 2016 and 2015, Alliant Energy and WPL recorded capitalized expenditures for CWIP of $81 million and $2 million, and AFUDC of $2 million and $0, respectively, for the Riverside expansion in “Construction work in progress” in the above table for Alliant Energy and WPL. These capital expenditures exclude any potential impacts from the intent to exercise purchase options by certain WPL electric cooperatives for a partial ownership interest in the Riverside expansion.

Wind Generation -
IPL’s Expansion of Wind Generation - IPL currently plans to add wind generation to its resources portfolio. In 2016, IPL entered into a turbine supply agreement and made progress payments for a portion of the wind turbines in such agreement in order to qualify for the full level of production tax credits for this new wind generation. IPL anticipates placing certain of the additional wind generation in service in 2019 and 2020. As of December 31, 2016, Alliant Energy and IPL recorded capitalized expenditures for CWIP of $102 million and AFUDC of $1 million for this expansion of wind generation in “Construction work in progress” in the above table for Alliant Energy and IPL.

Sales of IPL’s Minnesota Electric and Natural Gas Distribution Assets - In April 2015, IPL completed the sale of its Minnesota natural gas distribution assets (primarily related to property, plant and equipment) to Minnesota Energy Resources Corporation, a subsidiary of Integrys Energy Group, Inc. IPLand received proceeds of $11 million and a promissory note of $2 million. In July 2015, IPL completed the sale of its Minnesota electric distribution assets (primarily related to property, plant and equipment) to Southern Minnesota Energy Cooperative, a combined group of various neighboring electric cooperatives, and received proceeds of $129 million. The proceeds from the natural gas distribution assets were used for general corporate purposes and the proceeds from the electric distribution assets were used to reduce cash amounts received from IPL’s sales of accounts receivable program. The premium received over the book value of the property, plant and equipment sold was more than offset by a reduction in tax-related regulatory assets associated with the distribution assets. As a result, Alliant Energy and IPL recorded pre-tax charges of $11 million and $3 million for the Minnesota electric and natural gas distribution asset transactions, respectively, in “Other operation and maintenance” in their income statements in 2015.

The electric distribution asset sales agreement includes a wholesale power supply agreement between IPL and Southern Minnesota Energy Cooperative, which was approved by FERC in July 2015 and became effective upon the sale of IPL’s Minnesota electric distribution assets. The wholesale power supply agreement contains a five-year termination notice, which may not be given until the fifth anniversary of the effective date of the agreement, resulting in a minimum term of 10 years. The agreement remains in effect indefinitely, unless notice to terminate is provided by either party. This wholesale power supply agreement includes standardized pricing mechanisms that are detailed in IPL’s current tariffs accepted by FERC through wholesale rate case proceedings. IPL’s current return on common equity authorized by FERC related to its wholesale electric rates is 10.97%. As a result of IPL’s requirement to supply electricity to Southern Minnesota Energy Cooperative under the wholesale power supply agreement, the sale of the electric distribution assets did not have a significant impact on IPL’s generation plans or operating results.

Refer to Note 19 for further discussion of IPL’s sales of its Minnesota electric and natural gas distribution assets.

AFUDC - AFUDC represents costs to finance construction additions including a return on equity component and cost of debt component as required by regulatory accounting. The concurrent credit for the amount of AFUDC capitalized is recorded as “Allowance for funds used during construction” in the income statements. The amount of AFUDC generated by equity and debt components was as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2015 2014 2013 2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014 2016 2015 2014
Equity
$24.4
 
$23.1
 
$20.3
 
$18.6
 
$17.1
 
$13.8
 
$5.8
 
$6.0
 
$6.5

$42.3
 
$24.4
 
$23.1
 
$35.2
 
$18.6
 
$17.1
 
$7.1
 
$5.8
 
$6.0
Debt12.5
 11.7
 10.5
 9.6
 8.8
 7.2
 2.9
 2.9
 3.3
20.2
 12.5
 11.7
 16.8
 9.6
 8.8
 3.4
 2.9
 2.9

$36.9
 
$34.8
 
$30.8
 
$28.2
 
$25.9
 
$21.0
 
$8.7
 
$8.9
 
$9.8

$62.5
 
$36.9
 
$34.8
 
$52.0
 
$28.2
 
$25.9
 
$10.5
 
$8.7
 
$8.9

AFUDC related to various construction projects was recognized in the income statements as follows (in millions):
2015 2014 20132016 2015 2014
IPL:          
Marshalltown
$20.7
 
$3.7
 
$—

$43.8
 
$20.7
 
$3.7
Environmental controls - Ottumwa Unit 1
 10.6
 8.0

 
 10.6
Environmental controls - George Neal Units 3 and 4
 1.4
 5.1
Other7.5
 10.2
 7.9
8.2
 7.5
 11.6
28.2
 25.9
 21.0
52.0
 28.2
 25.9
WPL:          
Environmental controls - Edgewater Unit 55.1
 2.7
 
4.3
 5.1
 2.7
Environmental controls - Columbia Units 1 and 2
 4.0
 7.2
Other3.6
 2.2
 2.6
6.2
 3.6
 6.2
8.7
 8.9
 9.8
10.5
 8.7
 8.9
Alliant Energy
$36.9
 
$34.8
 
$30.8

$62.5
 
$36.9
 
$34.8

In 2014, scrubbers and baghouses were placed in service at IPL’s Ottumwa Unit 1 and George Neal Unit 3, and WPL’s Columbia Units 1 and 2. In 2013, a scrubber and baghouse was placed in service at IPL’s George Neal Unit 4.


107



Non-regulated and Other - The non-regulated and other property, plant and equipment recorded on Alliant Energy’s balance sheets includes the following:

Non-regulated Generation -
Franklin County Wind Farm - The Franklin County wind farm was placed into service in 2012 and is depreciated using the straight-line method over a 30-year period. Based on an evaluation of the strategic options for the Franklin County wind farm performed in 2016, Alliant Energy concluded it was probable the Franklin County wind farm will be transferred to IPL. As a result, Alliant Energy performed an impairment analysis of December 31, 2015,such assets in 2016. The impairment analysis evaluated the value of the assets and a reasonable estimate of the amount of costs associated with the Franklin County wind farm that would be allowed for recovery for IPL’s electric rate-making purposes. Based on various analyses, including discounted cash flows projected from the Franklin County wind farm, recently executed PPAs associated with wind generating facilities located near the Franklin County wind farm, and the cost of new wind farms identified through IPL’s planned wind expansion, the value of the Franklin County wind farm assets was determined to be approximately $33 million, subject to working capital adjustments. Alliant Energy concluded such value represents a reasonable estimate of the amount IPL will be allowed for recovery for IPL’s electric rate-making purposes. As a result, in 2016, the carrying amount of the Franklin County wind farm was reduced to such value, resulting in non-cash, pre-tax asset valuation charges of $86 million (after-tax charges of $51 million, or $0.23 per share). In 2016, Alliant Energy recorded $130 million onsuch charges as a reduction to “Non-regulated Generation, net” in the above table and charges to “Asset valuation charges for Franklin County wind farm” in its balance sheet relatedincome statement.

In February 2017, FERC issued an order approving the transfer of the Franklin County wind farm from AEF to IPL. Alliant Energy and IPL currently expect to complete this transfer in 2017. The final amount to be recovered for IPL’s electric rate-making purposes is expected to be determined by the wind farm. ReferIUB as part of IPL’s retail electric rate case for the 2016 Test Year, currently anticipated to Note 1(i) for discussionbe filed in the second quarter of an impairment test performed as of December 31, 2015 related2017, and therefore the final asset valuation charges are subject to the wind farm. Refer to Note 5(d) for discussion of a cash grant received in 2013 related to the wind farm.change.

Sheboygan Falls - Sheboygan Falls was placed into service in 2005 and is depreciated using the straight-line method over a 35-year period. As of December 31, 20152016, Alliant Energy recorded $99$95 million on its balance sheet related to Sheboygan Falls.

Corporate Services and Other - Property, plant and equipment related to Corporate Services includes a customer billing and information system for IPL and WPL and other computer software, and the corporate headquarters building located in Madison, Wisconsin. In addition, Corporate Services implemented a newThe customer billing and information system for IPL and WPL, which was placed in service in the fourth quarter of 2015 and is amortized using the straight-line method over a 12-year period. AsThe majority of December 31, 2015, Alliant Energy recorded capitalized expenditures of $102 million and capitalized interest of $3 million for the customer billing and information system in “Corporate Services and other, net” in the above table for Alliant Energy.remaining software is amortized over a 5-year period. Property, plant and equipment related to Transportation includes a short-line railway in Iowa and a barge terminal on the Mississippi River and a coal terminal in Williams, Iowa.River. The Corporate Services and Other property, plant and equipment is depreciated using the straight-line method over periods ranging from 5 to 30 years.


NOTE 4. JOINTLY-OWNED ELECTRIC UTILITY PLANT
Under joint ownership agreements with other utilities, IPL and WPL have undivided ownership interests in jointly-owned coal-fired EGUs. Each of the respective owners is responsible for the financing of its portion of the construction costs. KWh generation and operating expenses are primarily divided between the joint owners on the same basis as ownership. IPL’s and WPL’s shares of expenses from jointly-owned coal-fired EGUs are included in the corresponding operating expenses (e.g., electric production fuel, other operation and maintenance, etc.) in their income statements. Information relative to IPL’s and WPL’s ownership interest in these jointly-owned coal-fired EGUs at December 31, 20152016 was as follows (dollars in millions):
     Accumulated Construction    Accumulated Construction
In-service Ownership Electric Provision for Work inOwnership Electric Provision for Work in
Dates Interest % Plant Depreciation ProgressInterest % Plant Depreciation Progress
IPL               
Ottumwa Unit 11981 48.0% 
$481.4
 
$125.0
 
$6.5
48.0% 
$489.4
 
$137.3
 
$11.1
George Neal Unit 41979 25.7% 184.3
 76.3
 0.2
25.7% 185.2
 80.8
 1.6
George Neal Unit 31975 28.0% 150.0
 45.1
 0.1
28.0% 150.7
 49.1
 0.3
Louisa Unit 11983 4.0% 36.4
 21.1
 0.1
4.0% 36.5
 21.8
 0.6
   852.1
 267.5
 6.9
  861.8
 289.0
 13.6
WPL               
Columbia Units 1-21975-1978 46.2% 571.9
 175.5
 34.8
46.2% 640.2
 185.0
 51.0
Edgewater Unit 41969 68.2% 102.7
 58.2
 0.1
68.2% 99.4
 58.4
 0.2
   674.6
 233.7
 34.9
  739.6
 243.4
 51.2
Alliant Energy   
$1,526.7
 
$501.2
 
$41.8
  
$1,601.4
 
$532.4
 
$64.8

In November 2016, WPL received an order from the PSCW approving amendments to the Columbia joint operating agreement, which allow the co-owners to forgo certain capital expenditures at Columbia (excluding capital expenditures related to the Columbia Unit 2 SCR currently being constructed), resulting in WPL incurring these additional capital expenditures in exchange for a proportional increase in its ownership share of Columbia. Based on the additional capital expenditures WPL currently expects to incur through June 1, 2020, WPL’s ownership interest in Columbia is expected to increase in the future. In December 2016, WPL filed a request with FERC for approval of these amendments to the Columbia joint operating agreement, effective January 1, 2017. WPL currently expects to receive FERC’s decision on these amendments in 2017.

In November 2016, various electric cooperatives, which currently have wholesale power supply agreements with WPL, notified WPL of their intent to exercise purchase options for a partial ownership interest in the Riverside expansion. WPL currently expects the exercise of the purchase options to be effective in 2017.

NOTE 5. RECEIVABLES
NOTE 5(a) Accounts Receivable - Details for accounts receivable included on the balance sheets as of December 31 were as follows (in millions):
 Alliant Energy IPL WPL
 2015 2014 2015 2014 2015 2014
Customer
$93.8
 
$88.2
 
$4.6
 
$—
 
$81.5
 
$81.0
Unbilled utility revenues83.1
 85.4
 1.2
 
 81.9
 85.4
Deferred proceeds172.0
 177.2
 172.0
 177.2
 
 
Other53.5
 81.6
 22.8
 39.9
 25.7
 23.6
Allowance for doubtful accounts(4.8) (5.1) (0.6) (0.4) (3.7) (4.2)
 
$397.6
 
$427.3
 
$200.0
 
$216.7
 
$185.4
 
$185.8

108

Table of Contents
 Alliant Energy IPL WPL
 2016 2015 2016 2015 2016 2015
Customer
$111.7
 
$93.8
 
$—
 
$4.6
 
$104.4
 
$81.5
Unbilled utility revenues90.2
 83.1
 
 1.2
 90.2
 81.9
Deferred proceeds211.1
 172.0
 211.1
 172.0
 
 
Other89.0
 53.5
 30.7
 22.8
 38.8
 25.7
Allowance for doubtful accounts(8.7) (4.8) (1.1) (0.6) (7.1) (3.7)
 
$493.3
 
$397.6
 
$240.7
 
$200.0
 
$226.3
 
$185.4



NOTE 5(b) Sales of Accounts Receivable - IPL maintains a Receivables Agreement whereby it may sell its customer accounts receivables, unbilled revenues and certain other accounts receivables to a third party through wholly-owned and consolidated special purpose entities. IPL pays a monthly fee to the third party that varies based on interest rates, seasonal limits on cash proceeds and cash amounts received from the third party. TheIn March 2016, IPL extended through March 2018 the purchase commitment from the third party to which IPLit sells its receivables expires in March 2016. IPL currently expects to amend and extend the purchase commitment.receivables. The transfers of receivables meet the criteria for sale accounting established by the transfer of financial assets accounting rules. In exchange for the receivables sold,2016, 2015 and 2014, IPL receivesreceived cash proceeds of up to $180$180 million from the third party.party in exchange for the receivables sold. Cash proceeds are used by IPL to meet short-term financing needs, and cannot exceed the current seasonal limit or amount of receivables available for sale, whichever is less. The seasonal limit on cash proceeds as of December 31, 20152016 was $150 million, and effective February 2017 the limit on cash

proceeds is $125 million. The Receivables Agreement can be terminated by the third party if arrears or write-offs exceed certain levels. IPL was in compliance with all related covenants as of December 31, 2016.

As of December 31, 2015,2016, IPL sold $181.1248.1 million of receivables to the third party, received $5.021.0 million in cash proceeds and recorded deferred proceeds of $172.0$211.1 million. Deferred proceeds represent IPL’s interest in the receivables sold to the third party. At IPL’s request, deferred proceeds are paid to IPL from collections of receivables, after paying any required expenses incurred by the third party and the collection agent. Corporate Services acts as collection agent for the third party and receives a fee for collection services. IPL believes that the allowance for doubtful accounts related to its sales of receivables is a reasonable approximation of credit risk of the customers that generated the receivables. In 2016, 2015 and 2014, IPL’s costs incurred related to the sales of accounts receivable program were not material. Refer to Note 14 for discussion of the fair value of deferred proceeds.

IPL’s maximum and average outstanding aggregate cash proceeds (based on daily outstanding balances) related to the sales of accounts receivable program were as follows (in millions):
 2015 2014 2013
Maximum outstanding aggregate cash proceeds (based on daily outstanding balances)$137.0 $150.0 $170.0
Average outstanding aggregate cash proceeds (based on daily outstanding balances)46.7 46.4 105.9

In 2015, 2014 and 2013, IPL’s costs incurred related to the sales of accounts receivable program were not material.
 Maximum Average
 2016 2015 2014 2016 2015 2014
Outstanding aggregate cash proceeds$172.0 $137.0 $150.0 $73.2 $46.7 $46.4

As of December 31, the attributes of IPL’s receivables sold under the Receivables Agreement were as follows (in millions):
2015 20142016 2015
Customer accounts receivable$109.7 $134.8$157.6 $109.7
Unbilled utility revenues71.3 69.790.4 71.3
Other receivables0.1 0.10.1 0.1
Receivables sold to third party181.1 204.6248.1 181.1
Less: cash proceeds (a)5.0 22.021.0 5.0
Deferred proceeds176.1 182.6227.1 176.1
Less: allowance for doubtful accounts4.1 5.416.0 4.1
Fair value of deferred proceeds$172.0 $177.2$211.1 $172.0
Outstanding receivables past due$18.0 $19.9$68.0 $18.0

(a)Changes in cash proceeds are presented in “Sales of accounts receivable” in operating activities in Alliant Energy’s and IPL’s cash flows statements.

Additional attributes of IPL’s receivables sold under the Receivables Agreement were as follows (in millions):
2015 2014 20132016 2015 2014
Collections reinvested in receivables$1,812.9 $1,997.9 $1,880.8$1,818.1 $1,812.9 $1,997.9
Credit losses, net of recoveries8.8 11.4 11.9
Write-offs, net of recoveries4.8 8.8 11.4

In connection with the implementation of IPL’s new customer billing and information system in 2016, IPL postponed the write-off of customer bills for a portion of 2016, resulting in lower write-offs in 2016 and higher outstanding receivables past due as of December 31, 2016.

NOTE 5(c) Whiting Petroleum Tax Sharing Agreement - Prior to an initial public offering of Whiting Petroleum in 2003, Alliant Energy and Whiting Petroleum entered into a tax separation and indemnification agreement pursuant to which Alliant Energy and Whiting Petroleum made certain tax elections. These tax elections had the effect of increasing the tax basis of the assets of Whiting Petroleum’s consolidated tax group based on the sales price of Whiting Petroleum’s shares in the initial public offering. The increase in the tax basis of the assets was included inas income in Alliant Energy’s U.S. federal income tax return for the calendar year 2003. Pursuant to the tax separation and indemnification agreement, Whiting Petroleum paid

109



Resources Alliant Energy the final payment of $26 million in 2014, which represented the present value of certain future tax benefits expected to be realized by Whiting Petroleum through future tax deductions. The $26 million received by Alliant Energy is presented in operating activities in its cash flows statement in 2014.

NOTE 5(d) Franklin County Wind Farm Cash Grant - The ARRA provides incentives for wind projects placed into service between January 1, 2009 and December 31, 2012. In accordance with the ARRA, Alliant Energy filed an application with the U.S. Department of the Treasury in February 2013 requesting a cash grant for a portion of the qualifying project expenditures of the Franklin County wind farm that was placed into service in December 2012. Alliant Energy elected to record the anticipated cash grant as a reduction of the carrying value of the Franklin County wind farm. In 2013, Alliant Energy received $62.4 million of proceeds from the cash grant, which are presented in investing activities in Alliant Energy’s cash flows statement in 2013. The grant proceeds were used by Alliant Energy to reduce short-term borrowings incurred during the construction of the wind farm.


NOTE 6. INVESTMENTS
NOTE 6(a) Unconsolidated Equity Investments - Alliant Energy’s and WPL’s unconsolidated investments accounted for under the equity method of accounting are as follows (in millions):
Ownership Carrying Value at  
Interest at December 31, Equity (Income) / LossOwnership Interest at Carrying Value at December 31, Equity (Income) / Loss
December 31, 2015 2015 2014 2015 2014 2013December 31, 2016 2016 2015 2016 2015 2014
Alliant Energy                    
ATC (a)16% 
$293.3
 
$286.5
 
($34.2) 
($41.9) 
($42.7)16% 
$317.6
 
$293.3
 
($39.1) 
($34.2) 
($41.9)
Wisconsin River Power Company50% 8.7
 7.8
 (0.9) (0.9) (1.0)
OtherVarious 0.9
 2.3
 1.3
 2.4
 
Various 8.4
 9.6
 (0.5) 0.4
 1.5
 
$302.9
 
$296.6
 
($33.8) 
($40.4) 
($43.7) 
$326.0
 
$302.9
 
($39.6) 
($33.8) 
($40.4)
WPL                    
ATC (a)16% 
$293.3
 
$286.5
 
($34.2) 
($41.9) 
($42.7)
ATC—% 
$—
 
$293.3
 
($39.1) 
($34.2) 
($41.9)
Wisconsin River Power Company50% 8.7
 7.8
 (0.9) (0.9) (1.0)50% 7.7
 8.7
 (0.7) (0.9) (0.9)
 
$302.0
 
$294.3
 
($35.1) 
($42.8) 
($43.7) 
$7.7
 
$302.0
 
($39.8) 
($35.1) 
($42.8)

(a)
Alliant Energy and WPL havecurrently has the ability to exercise significant influence over ATC’s financial and operating policies through theirits participation on ATC’s Board of Directors. Refer to Note 18 for information regarding related party transactions with ATC.

Summary aggregate financial information from the financial statements of these investments is as follows (in millions):
Alliant Energy WPLAlliant Energy WPL
2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014
Operating revenues
$624
 
$643
 
$634
 
$624
 
$643
 
$634

$658
 
$624
 
$643
 
$658
 
$624
 
$643
Operating income299
 330
 334
 299
 330
 334
331
 299
 330
 331
 299
 330
Net income186
 240
 248
 202
 240
 250
232
 186
 240
 234
 202
 240
As of December 31:                      
Current assets88
 72
   87
 70
  82
 88
   6
 87
  
Non-current assets3,987
 3,773
   3,977
 3,747
  4,340
 3,987
   19
 3,977
  
Current liabilities332
 315
   332
 315
  498
 332
   3
 332
  
Non-current liabilities2,052
 1,871
   2,052
 1,870
  2,144
 2,052
   7
 2,052
  

MISO Transmission Owner Return on Equity Complaints - Complaints are currently pendingA group of MISO cooperative and municipal utilities previously filed two complaints with FERC regardingrequesting a reduction of the level ofbase return on equity thatused by MISO transmission owners, including ATC, should be allowed to utilize in calculating the rates they charge their customers. Alliant Energy and WPL currently anticipate FERC’s decision on the MISO transmission owner complaints will reduce transmission owners’ current return on equity, which is expected to result in lower equity income and dividends from ATC in the future.ATC. In 2014,September 2016, FERC issued an order on the complaints establishing an effectivefirst complaint to reduce the base return on equity for the refund date ofperiod from November 12, 2013.2013 through February 11, 2015. In June 2016, a FERC administrative law judge issued an initial decision regarding the second complaint recommending a reduction of the base return on equity for the refund period from February 12, 2015 through May 11, 2016. A final decision on the second complaint from FERC is currently expected in the first half of 2017. Alliant Energy and WPL have realized $15a cumulative $24 million of reductions in the amount of equity income from ATC foras a result of the period from November 12, 2013two complaints through December 31, 2015,2016, including $9 million, $12 million realized in 2015 and $3 million realized in 2014.2016, 2015 and 2014, respectively.


110



WPL’s Noncontrolling Interest and Investment in ATC - Prior to 2014, WPL owned 100% of WPL Transco, which holdsheld Alliant Energy’s investment in ATC. In 2014, WPL Transco’s operating agreement was amended to allow ATI, a wholly-owned subsidiary of Resources,AEF, to become a member of WPL Transco in addition to WPL. In 2014, ATI began funding capital contributions that WPL Transco makesmade to ATC. As of December 31, 2015, WPL’s and ATI’s ownership interests in WPL Transco were approximately 93% and 7%, respectively. WPL continues to consolidate WPL Transco and as a result, ATI’s ownership interest in WPL Transco was recorded as a noncontrolling interest in total equity on WPL’s balance sheets.

In 2015 and 2014, WPL Transco’s equity income from ATC and ATC dividends received by WPL Transco were allocated between WPL and ATI based on their respective ownership interests at the time the equity income was generated and at the time of the dividend payments. Prior to the transfer of the investment in ATC to ATI discussed below, WPL consolidated WPL Transco, and ATI’s ownership interest in WPL Transco is expected to increasewas recorded as a resultnoncontrolling interest in total equity on WPL’s balance sheets.

In June 2016, WPL received an order from the PSCW requiring WPL to transfer its investment in ATC to Alliant Energy or an Alliant Energy subsidiary by December 31, 2022. On December 31, 2016, pursuant to the PSCW order, WPL Transco was liquidated and WPL transferred its investment in ATC to ATI. In conjunction with the transfer of future capital contributionsthe investment in ATC, a deferred intercompany tax gain recognized by WPL was assumed by ATI. The impact of WPL’s transfer of the ATC investment, including the assumption of such intercompany tax gain by ATI, was recorded as a net reduction in total equity of $163.6 million on WPL’s balance sheet. WPL’s income statement includes all of the equity earnings from ATC through December 31, 2016, the date of transfer. There were no impacts of this transfer to WPL Transco. Alliant Energy’s aggregate ownership percentageconsolidated financial statements. As of December 31, 2016, ATI owns Alliant Energy’s entire investment in ATC is not expected to change as a result of WPL Transco’s amended operating agreement.ATC.

NOTE 6(b) Cash Surrender Value of Life Insurance Policies - Various life insurance policies cover certain current and former employees and directors. In 2016, certain of Alliant Energy’s and IPL’s company-owned life insurance policies were liquidated. The related proceeds of $31 million and $19 million were recorded in investing activities in Alliant Energy’s and IPL’s cash flow statements, respectively. At December 31, the cash surrender value of these investments was as follows (in millions):
 Alliant Energy IPL WPL
 2015 2014 2015 2014 2015 2014
Cash surrender value$42.3 $47.0 $18.9 $18.1 $6.4 $11.4
 Alliant Energy IPL WPL
 2016 2015 2016 2015 2016 2015
Cash surrender value$10.6 $42.3 $— $18.9 $5.8 $6.4

NOTE 7. COMMON EQUITY
Common Stock Split - On April 20, 2016, Alliant Energy’s Board of Directors approved a two-for-one common stock split and a proportionate increase in the number of authorized shares of common stock of Alliant Energy from 240 million shares to 480 million shares to implement the stock split. Alliant Energy shareowners of record at the close of business on May 4, 2016 received one additional share of Alliant Energy common stock for each share held on that date. The proportionate interest that a shareowner owns in Alliant Energy did not change as a result of the stock split. The additional shares were distributed on May 19, 2016 and post-split trading began on May 20, 2016. All Alliant Energy share and per share amounts in this report have been reflected on a post-split basis.

Common Share Activity - A summary of Alliant Energy’s common stock activity was as follows:
2015 2014 20132016 2015 2014
Shares outstanding, January 1110,935,680
 110,943,669
 110,987,400
226,918,432
 221,871,360
 221,887,338
At-the-market offering program2,186,617
 
 

 4,373,234
 
Shareowner Direct Plan issuances303,005
 
 
732,814
 606,010
 
Equity-based compensation plans (Note 12(b))
56,378
 35,547
 (23,374)22,408
 112,756
 71,094
Other(22,464) (43,536) (20,357)
 (44,928) (87,072)
Shares outstanding, December 31113,459,216
 110,935,680
 110,943,669
227,673,654
 226,918,432
 221,871,360

At December 31, 20152016, Alliant Energy had a total of 7.311.3 million shares available for issuance in the aggregate, pursuant to its Amended and Restated OIP, Shareowner Direct Plan and 401(k) Savings Plan.

At-the-Market Offering Program - In March 2015, Alliant Energy filed a prospectus supplement under which it may sell up to $150 million of its common stock through an at-the-market offering program. As of December 31,In 2015, Alliant Energy issued 2,186,6174,373,234 shares of common stock through this program and received cash proceeds of $133 million, net of $2 million in fees and commissions. The proceeds from the issuances of common stock were used for general corporate purposes. Alliant Energy currently has no plans to issue any additional common stock through theThis at-the-market offering program.program expired in 2016.

Shareowner Direct Plan - Beginning in 2015, Alliant Energy satisfied its requirements under the Shareowner Direct Plan (dividend reinvestment and stock purchase plan) by acquiring Alliant Energy common stock through original issue, rather than on the open market.

Shareowner Rights Agreement - Alliant Energy has established an amended and restated Shareowner Rights Agreement. The rights under this agreement will only become exercisable if a person or group has acquired, or announced an intention to acquire, 15% or more of Alliant Energy’s outstanding common stock. Each right will initially entitle registered shareowners to purchase from Alliant Energy one-halfone-quarter of one share of Alliant Energy’s common stock. The rights will be exercisable at an initial price of $110.00$55.00 per full share, subject to adjustment. If any shareowner acquires 15% or more of the outstanding common stock of Alliant Energy, each right (subject to limitations) will entitle its holder to purchase, at the right’s then current exercise price, a number of common shares of Alliant Energy or of the acquirer having a market value at the time of twice the right’s per full share exercise price. Alliant Energy’s Board of Directors is authorized to reduce the 15% ownership threshold to not less than 10%. The amended and restated Shareowner Rights Agreement expires in December 2018. Alliant Energy currently has no intention to redeem the Shareowner Rights Agreement and plans to allow it to naturally expire at the end of the term.


111



Dividend Restrictions - Alliant Energy does not have any significant common stock dividend restrictions. IPL and WPL each have common stock dividend restrictions based on applicable regulatory limitations. IPL also has common stock dividend restrictions based on the terms of its outstanding preferred stock. As of December 31, 2015,2016, IPL and WPL were in compliance with all such dividend restrictions.


IPL is restricted from paying common stock dividends to its parent company, Alliant Energy, if for any past or current dividend period, dividends on its preferred stock have not been paid, or declared and set apart for payment. IPL has paid all dividends on its preferred stock through 2015.

2016. Under the Federal Power Act, IPL may not pay dividends to its parent company in excess of the current amount of its retained earnings. As of December 31, 2015,2016, IPL’s amount of retained earnings that were free of dividend restrictions was $554$618 million.

If IPL’s actual 13-month average common equity ratio (calculated on a financial basis consistent with IPL’s rate cases) falls below 42% of total capitalization, IPL is required to notify the IUB.

Currently,Pursuant to a December 2016 PSCW order, WPL has a regulatory limitation on distributions to its parent company from an order issued by the PSCW in July 2014. The order prohibitscompany. WPL is prohibited from paying annual common stock dividends to its parent company in excess of $135forecasted dividend levels of $126 million in 20162017 and $140 million in 2018 if WPL’s actual 13-month average common equity ratio (calculated on a financial basis consistent with WPL’s rate cases) would fall below 52.25%51.00% for 2016.2017 or 2018. As of December 31, 2015,2016, WPL’s amount of retained earnings that were free of dividend restrictions was $135$126 million for 2016.2017.

Restricted Net Assets of Subsidiaries - IPL and WPL do not have regulatory authority to lend or advance any amounts to their parent company. As of December 31, 2016, the amount of net assets of IPL and WPL that were not available to be transferred to their parent company, Alliant Energy, in the form of loans, advances or cash dividends without the consent of IPL’s and WPL’s regulatory authorities was as follows (in billions):$1.6 billion for each.
 2015 2014
IPL
$1.4
 
$1.3
WPL1.6
 1.6

Capital Transactions With Subsidiaries - IPL, WPL and Resources paid common stock dividends and repayments of capital to their parent company, Alliant Energy, as follows (in millions):
 IPL WPL Resources
 2015 2014 2013 2015 2014 2013 2015 2014 2013
Common stock dividends
$140.0
 
$140.0
 
$128.1
 
$126.9
 
$118.7
 
$116.3
 
$—
 
$—
 
$—
Repayments of capital
 
 
 
 
 
 
 50.0
 95.0
Total distributions from common equity
$140.0
 
$140.0
 
$128.1
 
$126.9
 
$118.7
 
$116.3
 
$—
 
$50.0
 
$95.0

IPL received capital contributions from its parent company, Alliant Energy, as follows (in millions):
2015 2014 2013

$165.0
 
$90.0
 
$120.0

Comprehensive Income - In 20152016, 20142015 and 20132014, Alliant Energy’s other comprehensive income (loss) was $0.2 million0, ($0.4)$0.2 million and $0.6($0.4) million, respectively; therefore, its comprehensive income was substantially equal to its net income and its comprehensive income attributable to Alliant Energy common shareowners was substantially equal to its net income attributable to Alliant Energy common shareowners for such periods. In 2016, 2015, 2014 and 2013,2014, IPL and WPL had no other comprehensive income; therefore their comprehensive income was equal to their net income and their comprehensive income available for common stock was equal to their earnings available for common stock for such periods.

NOTE 8. REDEEMABLE PREFERRED STOCK
IPL is authorized to issue up to 16,000,000 shares of cumulative preferred stock in aggregate. Information related to the carrying value of IPL’s cumulative preferred stock at December 31 was as follows:
Liquidation Preference/Stated Value Shares Authorized Shares Outstanding Series 2015 2014
        (in millions)
$25 16,000,000 8,000,000 5.1% 
$200.0
 
$200.0
Series Liquidation Preference/Stated Value Shares Authorized Shares Outstanding 2016 2015
        (in millions)
5.1% $25 8,000,000 8,000,000 
$200.0
 
$200.0


112



IPL - In 2013, IPL issued 8,000,000 shares of 5.1% cumulative preferred stock and received proceeds of $200 million. The proceeds were used by IPL to redeem its 8.375% cumulative preferred stock, reduce commercial paper classified as long-term debt by $40 million and for other general corporate purposes. Alliant Energy and IPL incurred $5 million of issuance costs related to this transaction, which were recorded as a reduction of additional paid-in capital on Alliant Energy’s and IPL’s balance sheets in 2013. On or after March 15, 2018, IPL may, at its option, redeem the 5.1% cumulative preferred stock for cash at a redemption price of $25 per share plus accrued and unpaid dividends up to the redemption date.

The current articles of incorporation of IPL contain a provision that grants the holders of its cumulative preferred stock voting rights to elect two members of IPL’s Board of Directors if preferred dividends equal to six or more quarterly dividend requirements (whether or not consecutive) are in arrears. Such voting rights would not provide the holders of IPL’s preferred stock control of the decision on redemption of IPL’s preferred stock and could not force IPL to exercise its call option. Therefore, IPL’s cumulative preferred stock is presented in total equity on Alliant Energy’s and IPL’s balance sheets in a manner consistent with noncontrolling interests.

In 2013, IPL redeemed all 6,000,000 outstanding shares of its 8.375% cumulative preferred stock for $150 million plus accrued and unpaid dividends to the redemption date. Alliant Energy and IPL recorded a $5 million charge in 2013 related to this transaction in “Preferred dividend requirements” in their income statements.

Refer to Note 14 for information on the fair value of cumulative preferred stock.

WPL - In 2013, WPL redeemed all 1,049,225 outstanding shares of its 4.40% through 6.50% cumulative preferred stock for $61 million plus accrued and unpaid dividends to the redemption date.

NOTE 9. DEBT
NOTE 9(a) Short-term Debt - Alliant Energy and its subsidiaries maintain committed bank lines of credit to provide short-term borrowing flexibility and back-stop liquidity for commercial paper outstanding. At December 31, 2015,2016, Alliant Energy’s short-term borrowing arrangements included three revolving credit facilities totaling $1 billion ($300 million for Alliant Energy at the parent company level, $300 million for IPL and $400 million for WPL), which expire in December 2018. Information regarding commercial paper classified as short-term debt and back-stopped by the credit facilities was as follows (dollars in millions):
 Alliant Energy IPL WPL
 2015 2014 2015 2014 2015 2014
December 31           
Commercial paper:           
Amount outstanding$159.8 $141.3 $— $— $19.9 $—
Weighted average interest rates0.7% 0.4% N/A N/A 0.4% N/A
Weighted average remaining maturity4 days 4 days N/A N/A 4 days N/A
Available credit facility capacity$840.2 $858.7 $300.0 $300.0 $380.1 $400.0
 Alliant Energy IPL WPL
December 312016 2015 2016 2015 2016 2015
Commercial paper outstanding$244.1 $159.8 $— $— $52.3 $19.9
Commercial paper weighted average interest rates0.9% 0.7% N/A N/A 0.7% 0.4%
Available credit facility capacity$755.9 $840.2 $300.0 $300.0 $347.7 $380.1
Alliant Energy IPL WPL
2015 2014 2015 2014 2015 2014Alliant Energy IPL WPL
For the year ended 2016 2015 2016 2015 2016 2015
Maximum amount outstanding
(based on daily outstanding balances)
$181.2 $353.8 $18.4 $38.0 $24.7 $204.7$251.8 $181.2 $3.1 $18.4 $118.3 $24.7
Average amount outstanding
(based on daily outstanding balances)
$119.2 $255.9 $0.2 $0.2 $2.2 $122.9$179.0 $119.2 $— $0.2 $38.1 $2.2
Weighted average interest rates0.4% 0.2% 0.4% 0.2% 0.3% 0.1%0.6% 0.4% 0.7% 0.4% 0.4% 0.3%

Financial Covenants - The credit facility agreements and Alliant Energy’sAEF’s term loan credit agreement each contain a financial covenant, which requires Alliant Energy, IPL and WPL to maintain certain debt-to-capital ratios in order to borrow under the credit facilities and term loan credit agreement. The required debt-to-capital ratios compared to the actual debt-to-capital ratios at December 31, 20152016 were as follows:
Alliant Energy IPL WPLAlliant Energy IPL WPL
Requirement, not to exceed65% 58% 58%65% 58% 58%
Actual50% 46% 48%53% 47% 49%


113



The debt component of the capital ratios includes long- and short-term debt (excluding non-recourse debt and hybrid securities to the extent the total carrying value of such hybrid securities does not exceed 15% of consolidated capital of the applicable borrower), capital lease obligations, certain letters of credit, guarantees of the foregoing and new synthetic leases. Unfunded vested benefits under qualified pension plans and sales of accounts receivable are not included in the debt-to-capital ratios. The equity component of the capital ratios excludes accumulated other comprehensive income (loss).


NOTE 9(b) Long-Term Debt - Long-term debt, net as of December 31 was as follows (dollars in millions):
2015 20142016 2015
Alliant Energy IPL WPL Alliant Energy IPL WPLAlliant Energy IPL WPL Alliant Energy IPL WPL
Senior Debentures:           
Senior Debentures (a):           
5.875%, due 2018
$100.0
 
$100.0
 
$—
 
$100.0
 
$100.0
 
$—

$100.0
 
$100.0
 
$—
 
$100.0
 
$100.0
 
$—
7.25%, due 2018250.0
 250.0
 
 250.0
 250.0
 
250.0
 250.0
 
 250.0
 250.0
 
3.65%, due 2020200.0
 200.0
 
 200.0
 200.0
 
200.0
 200.0
 
 200.0
 200.0
 
3.25%, due 2024250.0
 250.0
 
 250.0
 250.0
 
250.0
 250.0
 
 250.0
 250.0
 
3.4%, due 2025 (a)250.0
 250.0
 
 
 
 
250.0
 250.0
 
 250.0
 250.0
 ���
5.5%, due 202550.0
 50.0
 
 50.0
 50.0
 
50.0
 50.0
 
 50.0
 50.0
 
6.45%, due 2033100.0
 100.0
 
 100.0
 100.0
 
100.0
 100.0
 
 100.0
 100.0
 
6.3%, due 2034125.0
 125.0
 
 125.0
 125.0
 
125.0
 125.0
 
 125.0
 125.0
 
6.25%, due 2039300.0
 300.0
 
 300.0
 300.0
 
300.0
 300.0
 
 300.0
 300.0
 
4.7%, due 2043250.0
 250.0
 
 250.0
 250.0
 
250.0
 250.0
 
 250.0
 250.0
 
3.3% (Retired in 2015)
 
 
 150.0
 150.0
 
3.7%, due 2046 (b)300.0
 300.0
 
 
 
 
1,875.0
 1,875.0
 
 1,775.0
 1,775.0
 
2,175.0
 2,175.0
 
 1,875.0
 1,875.0
 
Debentures:           
Debentures (a):           
5%, due 2019250.0
 
 250.0
 250.0
 
 250.0
250.0
 
 250.0
 250.0
 
 250.0
4.6%, due 2020150.0
 
 150.0
 150.0
 
 150.0
150.0
 
 150.0
 150.0
 
 150.0
2.25%, due 2022250.0
 
 250.0
 250.0
 
 250.0
250.0
 
 250.0
 250.0
 
 250.0
6.25%, due 2034100.0
 
 100.0
 100.0
 
 100.0
100.0
 
 100.0
 100.0
 
 100.0
6.375%, due 2037300.0
 
 300.0
 300.0
 
 300.0
300.0
 
 300.0
 300.0
 
 300.0
7.6%, due 2038250.0
 
 250.0
 250.0
 
 250.0
250.0
 
 250.0
 250.0
 
 250.0
4.1%, due 2044250.0
 
 250.0
 250.0
 
 250.0
250.0
 
 250.0
 250.0
 
 250.0
1,550.0
 
 1,550.0
 1,550.0
 
 1,550.0
1,550.0
 
 1,550.0
 1,550.0
 
 1,550.0
Pollution Control Revenue Bonds:           
5% (Retired in 2015)
 
 
 16.0
 
 16.0
5.375% (Retired in 2015)
 
 
 14.6
 
 14.6

 
 
 30.6
 
 30.6
Other:                      
Term loan credit agreement through 2016, 1% at December 31, 2015250.0
 
 
 250.0
 
 
Term loan credit agreement through 2016, 1% at December 31, 201560.0
 
 
 60.0
 
 
3.45% senior notes, due 202275.0
 
 
 75.0
 
 
5.06% senior secured notes, due 2016 to 202456.8
 
 
 58.9
 
 
Other, 1% at December 31, 2015, due 2016 to 20253.7
 
 
 3.3
 
 
AEF term loan credit agreement through 2018, 1% at December 31, 2016 (c)(d)500.0
 
 
 
 
 
Corporate Services 3.45% senior notes, due 2022 (a)75.0
 
 
 75.0
 
 
Sheboygan Power, LLC 5.06% senior secured notes, due 2017 to 2024 (secured by Sheboygan Falls and related assets) (a)53.8
 
 
 56.8
 
 
Alliant Energy term loan credit agreement, 1% at December 31, 2015 (Retired in 2016) (c)
 
 
 250.0
 
 
Franklin County Holdings LLC term loan credit agreement, 1% at December 31, 2015 (Retired in 2016) (c)
 
 
 60.0
 
 
Other, 1% at December 31, 2016, due 2017 to 20253.3
 
 
 3.7
 
 
445.5
 
 
 447.2
 
 
632.1
 
 
 445.5
 
 
Subtotal3,870.5
 1,875.0
 1,550.0
 3,802.8
 1,775.0
 1,580.6
4,357.1
 2,175.0
 1,550.0
 3,870.5
 1,875.0
 1,550.0
Current maturities(313.4) 
 
 (183.0) (150.0) (30.6)(4.6) 
 
 (313.4) 
 
Unamortized debt issuance costs(22.3) (11.8) (9.9) (22.4) (10.7) (10.8)(23.4) (13.7) (9.1) (22.3) (11.8) (9.9)
Unamortized debt (discount) and premium, net(12.6) (6.3) (6.2) (13.1) (6.3) (6.7)(13.5) (7.8) (5.7) (12.6) (6.3) (6.2)
Long-term debt, net
$3,522.2
 
$1,856.9
 
$1,533.9
 
$3,584.3
 
$1,608.0
 
$1,532.5
Long-term debt, net (e)
$4,315.6
 
$2,153.5
 
$1,535.2
 
$3,522.2
 
$1,856.9
 
$1,533.9

(a)Contains optional redemption provisions which, if elected by the issuer at its sole discretion, could require material redemption premium payments by the issuer. The redemption premium payments under these optional redemption provisions are variable and dependent on applicable U.S. Treasury rates at the time of redemption.
(b)In 2015,2016, IPL issued $250.0$300 million of 3.4%3.7% senior debentures due 2025.2046. The proceeds from the issuance were used by IPL to reduce commercial paper classified as long-term debt by $111 million, reduce cash amounts received from its sales of accounts receivable program, reduce commercial paper classified as long-term debt by $100 million and for general corporate purposes.
(c)In 2016, AEF entered into a $500 million variable-rate term loan credit agreement and used the proceeds from borrowings under this agreement to retire Alliant Energy’s and Franklin County Holdings LLC’s variable-rate term loan credit agreements that matured in 2016, reduce outstanding commercial paper at Alliant Energy and for general corporate purposes.
(d)
Refer to Note 9(a) for discussion of a financial covenant contained in AEF’s term loan credit agreement.
(e)There were no significant sinking fund requirements related to the outstanding long-term debt.


114



Five-Year Schedule of Debt Maturities - At December 31, 20152016, debt maturities for 20162017 through 20202021 were as follows (in millions):
2016 2017 2018 2019 20202017 2018 2019 2020 2021
IPL
$—
 
$—
 
$350
 
$—
 
$200

$—
 
$350
 
$—
 
$200
 
$—
WPL
 
 
 250
 150

 
 250
 150
 
Resources63
 5
 6
 6
 7
Alliant Energy parent company250
 
 
 
 
AEF5
 506
 6
 7
 8
Alliant Energy
$313
 
$5
 
$356
 
$256
 
$357

$5
 
$856
 
$256
 
$357
 
$8

At December 31, 2015, there were no significant sinking fund requirements related to the long-term debt on the balance sheets.

Indentures - IPL maintains an indenture related to all of its outstanding senior debentures. WPL maintains an indenture related to all of its outstanding debentures. Sheboygan Power, LLC, Resources’ wholly-owned subsidiary, maintains an indenture related to the issuance of its 5.06% senior secured notes due 2016 to 2024.

Optional Redemption Provisions - Alliant Energy and its subsidiaries have certain issuances of long-term debt that contain optional redemption provisions which, if elected by the issuer at its sole discretion, could require material redemption premium payments by the issuer. The redemption premium payments under these optional redemption provisions are variable and dependent on applicable U.S. Treasury rates at the time of redemption. At December 31, 2015, the debt issuances that contained these optional redemption provisions included all of IPL’s outstanding senior debentures, all of WPL’s outstanding debentures, Corporate Services’ senior notes due 2022 and Sheboygan Power, LLC’s senior secured notes due 2016 to 2024.

Security Provisions - Sheboygan Power, LLC’s 5.06% senior secured notes due 2016 to 2024 are secured by Sheboygan Falls and related assets.

Financial Covenant - Alliant Energy’s term loan credit agreement contains a financial covenant, which requires it to maintain a certain debt-to-capital ratio in order to borrow under the agreement. Refer to Note 9(a) for further discussion.

Carrying Amount and Fair Value of Long-term Debt - Refer to Note 14 for information on the carrying amount and fair value of long-term debt outstanding.

NOTE 10. LEASES
NOTE 10(a) Operating Leases - Various agreements have been entered into related to property, plant and equipment rights that are accounted for as operating leases. In 2016, 2015 2014 and 2013,2014, rental expenses associated with operating leases were not material. At December 31, 2015,2016, future minimum operating lease payments, excluding contingent rentals, were as follows (in millions):
2016 2017 2018 2019 2020 Thereafter Total2017 2018 2019 2020 2021 Thereafter Total
Alliant Energy
$6
 
$8
 
$3
 
$2
 
$2
 
$19
 
$40

$6
 
$6
 
$2
 
$2
 
$1
 
$15
 
$32
IPL3
 3
 2
 1
 1
 13
 23
3
 2
 1
 1
 1
 10
 18
WPL3
 5
 1
 
 
 
 9
3
 4
 
 
 
 
 7


115



NOTE 10(b) Capital Leases -
WPL - In 2005, WPL entered into a 20-year agreement with Resources’AEF’s Non-regulated Generation business to lease Sheboygan Falls, with an option for two lease renewal periods thereafter. The lease became effective in 2005 when Sheboygan Falls began commercial operation. WPL is responsible for the operation of Sheboygan Falls and has exclusive rights to its output. In 2005,output, and the PSCW approved this affiliated lease agreement with initial monthly lease payments of approximately $1.3 million. The lease payments were based on a 50% debt to capital ratio, a return on equity of 10.9%, a cost of debt based on the cost of senior notes issued by Resources’ Non-regulated Generation business in 2005 and certain costs incurred to construct the facility. In accordance with its order approving the lease agreement, the PSCW reserved the right to review the capital structure, return on equity and cost of debt every five years from the date of the order. No revisions to the lease have been made since its inception.2005. The capital lease asset is amortized using the straight-line method over the 20-year lease term. Since the inception of the lease in 2005, WPL’s retail and wholesale rates have includedinclude recovery of the monthly Sheboygan Falls lease payments. Sheboygan Falls lease expenses were included in WPL’s income statements as follows (in millions):
2015 2014 20132016 2015 2014
Interest expense
$9.9
 
$10.4
 
$10.9

$9.3
 
$9.9
 
$10.4
Depreciation and amortization6.2
 6.2
 6.2
6.2
 6.2
 6.2

$16.1
 
$16.6
 
$17.1

$15.5
 
$16.1
 
$16.6

At December 31, 20152016, WPL’s estimated future minimum capital lease payments for Sheboygan Falls were as follows (in millions):
 2016 2017 2018 2019 2020 Thereafter Total Less: amount representing interest Present value of minimum capital lease payments
Sheboygan Falls$15 $15 $15 $15 $15 $68 $143 $54 $89
 2017 2018 2019 2020 2021 Thereafter Total Less: amount representing interest Present value of minimum capital lease payments
Sheboygan Falls$15 $15 $15 $15 $15 $53 $128 $44 $84

NOTE 11. INCOME TAXES
Refer to Note 1(c) for discussion of a change implemented in the fourth quarter of 2015 related to IPL’s and WPL’s method of recording income taxes, which was applied retrospectively. Refer to Note 1(p) for discussion of the adoption of an accounting standard to simplify the presentation of deferred taxes on the balance sheet, which was applied prospectively.

Income Tax Expense (Benefit) - The components of “Income tax expense (benefit)” in the income statements were as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2015 2014 2013 2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014 2016 2015 2014
Current tax expense (benefit):                                  
Federal
$2.0
 
$36.6
 
$4.4
 
($14.1) 
$8.9
 
$10.2
 
$4.7
 
$2.0
 
($0.3)
$1.8
 
$2.0
 
$36.6
 
($12.8) 
($14.1) 
$8.9
 
($22.3) 
$4.7
 
$2.0
State3.2
 9.3
 (3.6) 11.5
 10.4
 4.2
 0.6
 0.8
 (4.3)17.2
 3.2
 9.3
 15.5
 11.5
 10.4
 1.1
 0.6
 0.8
IPL’s tax benefit riders(49.0) (56.7) (52.9) (49.0) (56.7) (52.9) 
 
 
(44.2) (49.0) (56.7) (44.2) (49.0) (56.7) 
 
 
Deferred tax expense (benefit):                                  
Federal120.8
 83.5
 123.9
 40.7
 10.8
 21.7
 76.8
 81.1
 84.0
112.8
 120.8
 83.5
 59.1
 40.7
 10.8
 112.3
 76.8
 81.1
State27.9
 4.6
 15.6
 3.3
 (7.9) (4.0) 20.2
 20.0
 24.1
4.9
 27.9
 4.6
 (9.0) 3.3
 (7.9) 20.8
 20.2
 20.0
Production tax credits(33.1) (31.3) (31.0) (14.5) (13.8) (14.1) (18.6) (17.5) (16.9)(31.8) (33.1) (31.3) (14.0) (14.5) (13.8) (17.8) (18.6) (17.5)
Investment tax credits(1.4) (1.6) (1.6) (0.6) (0.6) (0.6) (0.8) (1.0) (1.0)(1.3) (1.4) (1.6) (0.5) (0.6) (0.6) (0.8) (0.8) (1.0)
Provision recorded as a change in uncertain tax positions:                 
Deferred
 
 (0.4) 
 
 
 
 
 (0.4)
Provision recorded as a change in accrued interest
 (0.1) (0.5) 
 
 (0.8) 
 (0.1) 0.4

 
 (0.1) 
 
 
 
 
 (0.1)

$70.4
 
$44.3
 
$53.9
 
($22.7) 
($48.9) 
($36.3) 
$82.9
 
$85.3
 
$85.6

$59.4
 
$70.4
 
$44.3
 
($5.9) 
($22.7) 
($48.9) 
$93.3
 
$82.9
 
$85.3


116



Income Tax Rates - The overall income tax rates shown in the following table were computed by dividing income tax expense (benefit) by income from continuing operations before income taxes.
 Alliant Energy IPL WPL
 2015 2014 2013 2015 2014 2013 2015 2014 2013
Statutory federal income tax rate35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0%
State income taxes, net of federal benefits5.2
 5.4
 5.7
 6.2
 6.1
 6.3
 5.1
 5.1
 5.5
IPL’s tax benefit riders(10.6) (12.9) (12.1) (28.3) (39.6) (34.8) 
 
 
Effect of rate-making on property-related differences(6.8) (7.5) (6.0) (17.2) (21.9) (15.9) (0.5) (0.7) (0.8)
Production tax credits(7.2) (7.1) (7.1) (8.3) (9.6) (9.3) (7.1) (6.6) (6.4)
Adjustment of prior period taxes0.8
 (1.3) (1.3) 0.7
 (3.0) (3.6) 0.1
 
 (0.2)
Other items, net(1.1) (1.5) (1.8) (1.2) (1.2) (1.6) (0.8) (0.8) (0.8)
Overall income tax rate15.3% 10.1% 12.4% (13.1%) (34.2%) (23.9%) 31.8% 32.0% 32.3%

IPL’s tax benefit riders - Alliant Energy’s and IPL’s effective income tax rates include the impact of reducing income tax expense with offsetting reductions to regulatory liabilities as a result of implementing IPL’s tax benefit riders. Refer to Note 2 for additional details of the tax benefit riders.

Effect of rate-making on property-related differences - Alliant Energy’s and IPL’s income tax expense and benefits are impacted by certain property-related differences at IPL for which deferred tax is not recognized in the income statement pursuant to Iowa rate-making principles. In 2014, the increased benefits from property-related differences were primarily due to additional repairs deductions and additional deductions from the allocation of mixed service costs related to Marshalltown.

Production tax credits - Production tax credits are earned from owned and operated wind farms. Production tax credits are based on the electricity generated by each wind farm during the first 10 years of operation. Details regarding production tax credits (net of state tax impacts) related to various wind farms are as follows (dollars in millions):
 End of Production Nameplate      
 Tax Credit Generation Capacity in MW 2015 2014 2013
Cedar Ridge (WPL)December 2018 68 
$4.5
 
$4.1
 
$4.2
Bent Tree (WPL)February 2021 201 14.1
 13.4
 12.7
Subtotal (WPL)    18.6
 17.5
 16.9
Whispering Willow - East (IPL)December 2019 200 14.5
 13.8
 14.1
     
$33.1
 
$31.3
 
$31.0
 Alliant Energy IPL WPL
 2016 2015 2014 2016 2015 2014 2016 2015 2014
Statutory federal income tax rate35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0%
State income taxes, net of federal benefits5.4
 5.2
 5.4
 6.4
 6.2
 6.1
 5.1
 5.1
 5.1
IPL’s tax benefit riders(10.0) (10.6) (12.9) (20.1) (28.3) (39.6) 
 
 
Effect of rate-making on property-related differences(8.5) (6.8) (7.5) (16.2) (17.2) (21.9) (0.7) (0.5) (0.7)
Production tax credits(7.2) (7.2) (7.1) (6.3) (8.3) (9.6) (6.2) (7.1) (6.6)
Adjustment of prior period taxes(0.8) 0.8
 (1.3) (1.2) 0.7
 (3.0) (0.1) 0.1
 
Other items, net(0.5) (1.1) (1.5) (0.3) (1.2) (1.2) (0.5) (0.8) (0.8)
Overall income tax rate13.4% 15.3% 10.1% (2.7%) (13.1%) (34.2%) 32.6% 31.8% 32.0%

Deferred Tax Assets and Liabilities - The deferred tax (assets)assets and liabilities included on the balance sheets at December 31 arise from the following temporary differences (in millions):
 2015 2014
 DeferredDeferred Tax  DeferredDeferred Tax 
Alliant EnergyTax AssetsLiabilitiesNet Tax AssetsLiabilitiesNet
Property
$—

$2,762.9

$2,762.9
 
$—

$2,627.8

$2,627.8
Investment in ATC
138.1
138.1
 
131.6
131.6
Net operating losses carryforwards - state(38.3)
(38.3) (45.7)
(45.7)
Regulatory liability - IPL’s tax benefit riders(66.1)
(66.1) (100.9)
(100.9)
Federal credit carryforwards(236.4)
(236.4) (201.0)
(201.0)
Net operating losses carryforwards - federal(250.9)
(250.9) (332.8)
(332.8)
Other(85.4)157.3
71.9
 (88.1)180.1
92.0
 
($677.1)
$3,058.3

$2,381.2
 
($768.5)
$2,939.5

$2,171.0
 2015 2014
Current deferred tax assetsN/A 
($150.1)
Non-current deferred tax liabilities
$2,381.2
 2,321.1
Total net deferred tax liabilities
$2,381.2
 
$2,171.0

117



 2015 2014
 DeferredDeferred Tax  DeferredDeferred Tax 
IPLTax AssetsLiabilitiesNet Tax AssetsLiabilitiesNet
Property
$—

$1,587.8

$1,587.8
 
$—

$1,545.1

$1,545.1
Regulatory liability - tax benefit riders(66.1)
(66.1) (100.9)
(100.9)
Federal credit carryforwards(81.7)
(81.7) (66.5)
(66.5)
Net operating losses carryforwards - federal(113.1)
(113.1) (157.8)
(157.8)
Other(36.7)87.8
51.1
 (37.1)83.5
46.4
 
($297.6)
$1,675.6

$1,378.0
 
($362.3)
$1,628.6

$1,266.3
 2015 2014
Current deferred tax assetsN/A 
($104.0)
Non-current deferred tax liabilities
$1,378.0
 1,370.3
Total net deferred tax liabilities
$1,378.0
 
$1,266.3
 2015 2014
 DeferredDeferred Tax  DeferredDeferred Tax 
WPLTax AssetsLiabilitiesNet Tax AssetsLiabilitiesNet
Property
$—

$1,027.0

$1,027.0
 
$—

$963.0

$963.0
Investment in ATC
138.9
138.9
 
132.1
132.1
Federal credit carryforwards(95.5)
(95.5) (76.7)
(76.7)
Net operating losses carryforwards - federal(105.1)
(105.1) (131.6)
(131.6)
Other(27.8)67.9
40.1
 (37.1)79.7
42.6
 
($228.4)
$1,233.8

$1,005.4
 
($245.4)
$1,174.8

$929.4
 2015 2014
Current deferred tax assetsN/A 
($37.7)
Non-current deferred tax liabilities
$1,005.4
 967.1
Total net deferred tax liabilities
$1,005.4
 
$929.4
 Alliant Energy IPL WPL
 2016 2015 2016 2015 2016 2015
Deferred tax liabilities:           
Property
$2,919.0
 
$2,762.9
 
$1,677.0
 
$1,587.8
 
$1,124.5
 
$1,027.0
Investment in ATC153.1
 138.1
 
 
 
 138.9
Other95.3
 157.3
 71.4
 87.8
 59.1
 67.9
Total deferred tax liabilities3,167.4
 3,058.3
 1,748.4
 1,675.6
 1,183.6
 1,233.8
Deferred tax assets:           
Federal credit carryforwards268.4
 236.4
 95.9
 81.7
 112.9
 95.5
Net operating losses carryforwards - federal173.3
 250.9
 69.6
 113.1
 75.4
 105.1
Regulatory liability - IPL’s tax benefit riders34.7
 66.1
 34.7
 66.1
 
 
Net operating losses carryforwards - state32.9
 38.3
 0.6
 1.1
 0.1
 3.6
Other87.9
 85.4
 35.8
 35.6
 23.6
 24.2
Total deferred tax assets597.2
 677.1
 236.6
 297.6
 212.0
 228.4
Total deferred tax liabilities, net
$2,570.2
 
$2,381.2
 
$1,511.8
 
$1,378.0
 
$971.6
 
$1,005.4

Property - Property-related differences were primarily related to accelerated depreciation, including bonus depreciation. In December 2015, the PATH Act was enacted. The most significant provisions of the PATH Act for Alliant Energy, IPL and WPL relate to the extension of bonus depreciation deductions for certain expenditures for property incurred through December 31, 2019 and placed in service prior to December 31, 2020. Alliant Energy currently estimates its total bonus depreciation deductions to be claimed on its U.S. federal income tax return for calendar year 20152016 will be approximately $200$350 million ($100 million for IPL and $50$200 million for WPL).

Investment in ATC - WPL Transco has a partial ownership interest in ATC, which has generated deferred tax liabilities primarily from tax depreciation deductions taken at ATC in excess of book depreciation. The increase in deferred tax liabilities in 2015 was primarily due to bonus depreciation deductions estimated at ATC.

Regulatory liability tax benefit riders - Refer to Note 2 for discussion of regulatory liabilities associated with IPL’s tax benefit riders.

Carryforwards - At December 31, 20152016, tax carryforwards and associated deferred tax assets and expiration dates were estimated as follows (in millions):
   Alliant Energy IPL WPL
 Earliest Tax Deferred Tax Deferred Tax Deferred
 Expiration Date Carryforwards Tax Assets Carryforwards Tax Assets Carryforwards Tax Assets
Federal net operating losses2030 
$732
 
$251
 
$336
 
$113
 
$300
 
$105
State net operating losses2018 766
 38
 20
 1
 76
 4
Federal tax credits2022 240
 236
 85
 82
 96
 96
     
$525
   
$196
   
$205


118



At December 31, 2015, Alliant Energy’s state net operating losses carryforwards had expiration dates ranging from 2018 to 2034 with 99% expiring after 2024. At December 31, 2015, IPL’s state net operating losses carryforwards had expiration dates ranging from 2018 to 2034 with 95% expiring after 2021. At December 31, 2015, WPL’s state net operating losses carryforwards had expiration dates ranging from 2018 to 2034 with 96% expiring after 2033.
 Range of Expiration Dates Alliant Energy IPL WPL
Federal net operating losses2030-2034 
$506
 
$206
 
$215
State net operating losses2018-2034 673
 12
 2
Federal tax credits2022-2036 274
 100
 113

Uncertain Tax Positions - At December 31, 2016, 2015 2014 and 2013,2014, there were no uncertain tax positions or penalties accrued related to uncertain tax positions, and interest accrued and tax positions favorably impacting future effective tax rates for continuing operations were not material. As of December 31, 2015,2016, no material changes to unrecognized tax benefits are expected during the next 12 months.

Open tax years - Tax years that remain subject to the statute of limitations in the major jurisdictions for each of Alliant Energy, IPL and WPL are as follows:
Consolidated federal income tax returns (a)2012-20142013-2015
Consolidated Iowa income tax returns (b)2012-20142013-2015
Wisconsin combined tax returns (c)2011-20142012-2015


(a)TheseThe federal tax returns for 2013 and 2014 are effectively settled as a result of participation in the IRS Compliance Assurance Program, which allows Alliant Energy and the IRS to work together to resolve issues related to Alliant Energy’s current tax year before filing its federal income tax return. The statute of limitations for these federal tax returns expires three years from each filing date.
(b)The statute of limitations for these Iowa tax returns expires three years from each filing date.
(c)The statute of limitations for these Wisconsin combined tax returns expires four years from each filing date.

NOTE 12. BENEFIT PLANS
NOTE 12(a) Pension and Other Postretirement Benefits Plans - Retirement benefits are provided to substantially all employees through various qualified and non-qualified non-contributory defined benefit pension plans (currently closed to new hires), and/or through defined contribution plans (including 401(k) savings plans). Qualified and non-qualified non-contributory defined benefit pension plans are currently closed to new hires. Benefits of the non-contributory defined benefit pension plans are based on the plan participant’s years of service, age and compensation. Benefits of the defined contribution plans are based on the plan participant’s years of service, age, compensation and contributions. Certain defined benefit postretirement health care and life benefits are provided to eligible retirees. In general, the retiree health care plans consist of fixed benefit subsidy structures and the retiree life insurance plans are non-contributory.

IPL and WPL account for their participation in Alliant Energy and Corporate Services sponsored plans as multiple-employer plans. In IPL’s and WPL’s tables below, the defined benefit pension plans amounts represent those respective amounts for their bargaining unit employees covered under the qualified plans that they sponsor, as well as amounts directly assigned to them related to their current and former non-bargaining employees who are participants in the Alliant Energy and Corporate Services sponsored qualified and non-qualified defined benefit pension plans. In IPL’s and WPL’s tables below, the OPEB plans amounts represent respective amounts for their employees, as well as amounts directly assigned to them related to their current and former non-bargaining employees who are participants in the Corporate Services sponsored OPEB plan.

Assumptions - The assumptions for defined benefit pension and OPEB plans at the measurement date of December 31 were as follows:
Defined Benefit Pension Plans OPEB PlansDefined Benefit Pension Plans OPEB Plans
Alliant Energy2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014
Discount rate for benefit obligations4.47% 4.18% 4.97% 4.30% 3.97% 4.59%4.19% 4.47% 4.18% 3.98% 4.30% 3.97%
Discount rate for net periodic cost4.18% 4.97% 4.11% 3.97% 4.59% 3.82%4.47% 4.18% 4.97% 4.30% 3.97% 4.59%
Expected rate of return on plan assets7.60% 7.60% 7.60% 6.20% 7.40% 7.40%7.60% 7.60% 7.60% 6.30% 6.20% 7.40%
Rate of compensation increase3.65%-4.50% 3.50%-4.50% 3.50%-4.50% N/A N/A 3.50%3.65%-4.50% 3.65%-4.50% 3.50%-4.50% N/A N/A N/A
Medical cost trend on covered charges:            
Initial trend rate (end of year)N/A N/A N/A 7.25% 6.75% 7.00%N/A N/A N/A 7.00% 7.25% 6.75%
Ultimate trend rateN/A N/A N/A 5.00% 5.00% 5.00%N/A N/A N/A 5.00% 5.00% 5.00%
Qualified Defined Benefit Pension Plan OPEB PlansQualified Defined Benefit Pension Plan OPEB Plans
IPL2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014
Discount rate for benefit obligations4.50% 4.20% 5.05% 4.28% 3.94% 4.55%4.22% 4.50% 4.20% 3.95% 4.28% 3.94%
Discount rate for net periodic cost4.20% 5.05% 4.20% 3.94% 4.55% 3.76%4.50% 4.20% 5.05% 4.28% 3.94% 4.55%
Expected rate of return on plan assets7.60% 7.60% 7.60% 6.60% 7.60% 7.50%7.60% 7.60% 7.60% 6.60% 6.60% 7.60%
Rate of compensation increase3.65% 3.50% 3.50% N/A N/A 3.50%3.65% 3.65% 3.50% N/A N/A N/A
Medical cost trend on covered charges:  
Initial trend rate (end of year)N/A N/A N/A 7.25% 6.75% 7.00%N/A N/A N/A 7.00% 7.25% 6.75%
Ultimate trend rateN/A N/A N/A 5.00% 5.00% 5.00%N/A N/A N/A 5.00% 5.00% 5.00%

119



Qualified Defined Benefit Pension Plan OPEB PlansQualified Defined Benefit Pension Plan OPEB Plans
WPL2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014
Discount rate for benefit obligations4.51% 4.20% 5.05% 4.28% 3.96% 4.56%4.23% 4.51% 4.20% 3.96% 4.28% 3.96%
Discount rate for net periodic cost4.20% 5.05% 4.20% 3.96% 4.56% 3.81%4.51% 4.20% 5.05% 4.28% 3.96% 4.56%
Expected rate of return on plan assets7.60% 7.60% 7.60% 4.60% 7.30% 7.20%7.60% 7.60% 7.60% 4.70% 4.60% 7.30%
Rate of compensation increase3.65% 3.50% 3.50% N/A N/A 3.50%3.65% 3.65% 3.50% N/A N/A N/A
Medical cost trend on covered charges:  
Initial trend rate (end of year)N/A N/A N/A 7.25% 6.75% 7.00%N/A N/A N/A 7.00% 7.25% 6.75%
Ultimate trend rateN/A N/A N/A 5.00% 5.00% 5.00%N/A N/A N/A 5.00% 5.00% 5.00%


Expected rate of return on plan assets - The expected rate of return on plan assets is determined by analysis of projected asset class returns based on the target asset class allocations. A forward-looking building blocks approach is used, and historical returns, survey information and capital market information are reviewed to support the expected rate of return on plan assets assumption. Refer to “Investment Policy and Strategy for Plan Assets” below for additional information related to investment policy, and strategy and mix of assets for the pension and OPEB plans.

Life Expectancy - The life expectancy assumption is used in determining the benefit obligation and net periodic benefit cost for defined benefit pension and OPEB plans. This assumption was updated as of December 31, 2014 and 2015 to utilize new mortality tables that were released in 2014 by the Society of Actuaries and updated in 2015 respectively.and 2016.

Net Periodic Benefit Costs (Credits) - The components of net periodic benefit costs (credits) for sponsored defined benefit pension and OPEB plans are included in the tables below (in millions). In IPL’sNet periodic benefit costs are primarily included in “Other operation and WPL’s tables below, the defined benefit pension plans costs represent those respective costs for their bargaining unit employees covered under the qualified plans that they sponsor, as well as amounts directly assigned to them related to their current and former non-bargaining employees who are participantsmaintenance” in the Alliant Energy and Corporate Services sponsored qualified and non-qualified defined benefit pension plans. In IPL’s and WPL’s tables below, the OPEB plans costs (credits) represent respective costs (credits) for their employees, as well as amounts directly assigned to them related to their current and former non-bargaining employees who are participants in the Corporate Services sponsored OPEB plan.income statements.
Alliant EnergyDefined Benefit Pension Plans OPEB PlansDefined Benefit Pension Plans OPEB Plans
2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014
Service cost
$15.9
 
$13.1
 
$15.7
 
$5.5
 
$5.2
 
$6.3

$12.6
 
$15.9
 
$13.1
 
$5.3
 
$5.5
 
$5.2
Interest cost53.6
 54.1
 49.0
 9.1
 9.5
 8.5
53.0
 53.6
 54.1
 9.4
 9.1
 9.5
Expected return on plan assets (a)(75.0) (74.9) (74.0) (8.4) (8.3) (8.1)(65.5) (75.0) (74.9) (6.1) (8.4) (8.3)
Amortization of prior service cost (credit) (b)(0.2) 
 0.2
 (11.3) (11.9) (11.9)(0.3) (0.2) 
 (4.1) (11.3) (11.9)
Amortization of actuarial loss (c)35.4
 19.5
 36.2
 4.8
 2.4
 4.9
37.4
 35.4
 19.5
 4.7
 4.8
 2.4
Additional benefit costs (d)0.5
 
 9.0
 
 
 

 0.5
 
 
 
 

$30.2
 
$11.8
 
$36.1
 
($0.3) 
($3.1) 
($0.3)
$37.2
 
$30.2
 
$11.8
 
$9.2
 
($0.3) 
($3.1)
IPLDefined Benefit Pension Plans OPEB PlansDefined Benefit Pension Plans OPEB Plans
2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014
Service cost
$8.8
 
$7.2
 
$8.6
 
$2.4
 
$2.4
 
$2.9

$7.5
 
$8.8
 
$7.2
 
$2.3
 
$2.4
 
$2.4
Interest cost25.0
 25.1
 22.9
 3.8
 3.9
 3.6
24.5
 25.0
 25.1
 3.8
 3.8
 3.9
Expected return on plan assets (a)(35.8) (35.7) (35.2) (5.7) (5.8) (5.6)(30.9) (35.8) (35.7) (4.3) (5.7) (5.8)
Amortization of prior service cost (credit) (b)(0.1) 
 0.1
 (6.1) (6.3) (6.3)(0.2) (0.1) 
 (2.6) (6.1) (6.3)
Amortization of actuarial loss (c)15.3
 8.0
 15.2
 2.3
 1.1
 2.7
16.5
 15.3
 8.0
 2.6
 2.3
 1.1
Additional benefit costs (d)
 
 2.6
 
 
 

$13.2
 
$4.6
 
$14.2
 
($3.3) 
($4.7) 
($2.7)
$17.4
 
$13.2
 
$4.6
 
$1.8
 
($3.3) 
($4.7)

120



WPLDefined Benefit Pension Plans OPEB PlansDefined Benefit Pension Plans OPEB Plans
2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014
Service cost
$5.8
 
$4.9
 
$5.9
 
$2.1
 
$2.0
 
$2.5

$4.9
 
$5.8
 
$4.9
 
$2.0
 
$2.1
 
$2.0
Interest cost22.6
 22.6
 20.7
 3.7
 3.8
 3.4
22.3
 22.6
 22.6
 3.8
 3.7
 3.8
Expected return on plan assets (a)(32.4) (32.4) (31.9) (1.5) (1.3) (1.3)(28.3) (32.4) (32.4) (0.8) (1.5) (1.3)
Amortization of prior service cost (credit) (b)0.2
 0.3
 0.3
 (3.5) (3.9) (3.9)0.2
 0.2
 0.3
 (0.9) (3.5) (3.9)
Amortization of actuarial loss (c)16.8
 9.2
 17.1
 2.2
 1.3
 1.9
17.6
 16.8
 9.2
 1.8
 2.2
 1.3
Additional benefit costs (d)0.5
 
 0.6
 
 
 

 0.5
 
 
 
 

$13.5
 
$4.6
 
$12.7
 
$3.0
 
$1.9
 
$2.6

$16.7
 
$13.5
 
$4.6
 
$5.9
 
$3.0
 
$1.9

(a)The expected return on plan assets is based on the expected rate of return on plan assets and the fair value approach to the market-related value of plan assets.
(b)Unrecognized prior service costs (credits) for the OPEB plans are amortized over the average future service period to full eligibility of the participants of each plan.
(c)Unrecognized net actuarial gains or losses in excess of 10% of the greater of the plans’ benefit obligations or assets are amortized over the average future service lives of plan participants, except for the Alliant Energy Cash Balance Pension Plan where gains or losses outside the 10% threshold are amortized over the time period the participants are expected to receive benefits.
(d)In 2013, Alliant Energy filed a stipulation agreement with the Western Wisconsin Court related to a class-action lawsuit against the Cash Balance Plan. As a result, Alliant Energy recognized $9.0 million of additional benefits costs in 2013 related to the agreement. IPL recognized $5.5 million ($2.6 million directly assigned and $2.9 million allocated by Corporate Services) and WPL recognized $2.8 million ($0.6 million directly assigned and $2.2 million allocated by Corporate Services) of additional benefits costs in 2013 related to the agreement.


The estimated amortization from “Regulatory assets” and “Regulatory liabilities” on the balance sheets and AOCL on Alliant Energy’s balance sheet into net periodic benefit cost in 20162017 is as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
Defined Benefit   Defined Benefit   Defined Benefit  Defined Benefit   Defined Benefit   Defined Benefit  
Pension Plans OPEB Plans Pension Plans OPEB Plans Pension Plans OPEB PlansPension Plans OPEB Plans Pension Plans OPEB Plans Pension Plans OPEB Plans
Actuarial loss
$37.4
 
$4.8
 
$16.5
 
$2.6
 
$17.6
 
$1.8

$37.5
 
$3.8
 
$16.1
 
$2.0
 
$18.5
 
$1.6
Prior service cost (credit)(0.3) (4.1) (0.2) (2.6) 0.2
 (0.9)(0.4) (0.2) (0.2) 
 0.1
 (0.2)

$37.1
 
$0.7
 
$16.3
 
$—
 
$17.8
 
$0.9

$37.1
 
$3.6
 
$15.9
 
$2.0
 
$18.6
 
$1.4

Net periodic benefit costs are primarily included in “Other operation and maintenance” in the income statements.


121



Benefit Plan Assets and Obligations - A reconciliation of the funded status of Alliant Energy’s qualified and non-qualified defined benefit pension and OPEB plans to the amounts recognized on Alliant Energy’s balance sheets at December 31 was as follows (in millions):
Defined Benefit  Defined Benefit  
Pension Plans OPEB PlansPension Plans OPEB Plans
Alliant Energy2015 2014 2015 20142016 2015 2016 2015
Change in benefit obligation:              
Net benefit obligation at January 1
$1,301.5
 
$1,113.4
 
$231.1
 
$208.7

$1,206.3
 
$1,301.5
 
$221.4
 
$231.1
Service cost15.9
 13.1
 5.5
 5.2
12.6
 15.9
 5.3
 5.5
Interest cost53.6
 54.1
 9.1
 9.5
53.0
 53.6
 9.4
 9.1
Plan participants’ contributions
 
 3.1
 2.8

 
 2.4
 3.1
Plan amendments
 
 (0.3) 

 
 
 (0.3)
Additional benefit costs0.5
 
 
 

 0.5
 
 
Actuarial (gain) loss(70.1) 195.8
 (9.4) 22.3
48.3
 (70.1) (0.3) (9.4)
Gross benefits paid(95.1) (74.9) (17.7) (17.4)(75.9) (95.1) (18.1) (17.7)
Net benefit obligation at December 311,206.3
 1,301.5
 221.4
 231.1
1,244.3
 1,206.3
 220.1
 221.4
Change in plan assets:              
Fair value of plan assets at January 11,018.1
 1,022.9
 121.6
 124.9
895.0
 1,018.1
 106.9
 121.6
Actual return on plan assets(30.2) 66.4
 (4.9) 5.6
74.3
 (30.2) 8.2
 (4.9)
Employer contributions2.2
 3.7
 4.8
 5.7
2.3
 2.2
 6.4
 4.8
Plan participants’ contributions
 
 3.1
 2.8

 
 2.4
 3.1
Gross benefits paid(95.1) (74.9) (17.7) (17.4)(75.9) (95.1) (18.1) (17.7)
Fair value of plan assets at December 31895.0
 1,018.1
 106.9
 121.6
895.7
 895.0
 105.8
 106.9
Under funded status at December 31
($311.3) 
($283.4) 
($114.5) 
($109.5)
($348.6) 
($311.3) 
($114.3) 
($114.5)
Defined Benefit  Defined Benefit  
Pension Plans OPEB PlansPension Plans OPEB Plans
Alliant Energy2015 2014 2015 20142016 2015 2016 2015
Amounts recognized on the balance sheets consist of:              
Non-current assets
$—
 
$—
 
$3.0
 
$6.1

$—
 
$—
 
$3.2
 
$3.0
Other current liabilities(2.6) (2.5) (6.2) (5.6)(6.5) (2.6) (8.6) (6.2)
Pension and other benefit obligations(308.7) (280.9) (111.3) (110.0)(342.1) (308.7) (108.9) (111.3)
Net amounts recognized at December 31
($311.3) 
($283.4) 
($114.5) 
($109.5)
($348.6) 
($311.3) 
($114.3) 
($114.5)
Amounts recognized in Regulatory Assets and AOCL consist of (a):       
Amounts recognized in Regulatory Assets (refer to Note 2 for details) and AOCL (refer to Alliant Energy’s common equity statements for details) consist of:
       
Net actuarial loss
$533.1
 
$533.4
 
$59.8
 
$60.7

$535.1
 
$533.1
 
$52.6
 
$59.8
Prior service credit(7.2) (7.4) (5.6) (16.7)(6.9) (7.2) (1.5) (5.6)

$525.9
 
$526.0
 
$54.2
 
$44.0

$528.2
 
$525.9
 
$51.1
 
$54.2

(a)
Refer to Note 2 and Alliant Energy’s common equity statements for amounts recognized in “Regulatory assets” and “AOCL,” respectively, on Alliant Energy’s balance sheets.

In IPL’s and WPL’s tables below, the defined benefit pension plans amounts represent those respective amounts for their bargaining unit employees covered under the qualified plans that they sponsor, as well as amounts directly assigned to them related to their current and former non-bargaining employees who are participants in the Alliant Energy and Corporate Services sponsored qualified and non-qualified defined benefit pension plans. In IPL’s and WPL’s tables below, the OPEB plans amounts represent respective amounts for their employees, as well as amounts directly assigned to them related to their current and former non-bargaining employees who are participants in the Corporate Services sponsored OPEB plan.


122



A reconciliation of the funded status of IPL’s qualified and non-qualified defined benefit pension and OPEB plans to the amounts recognized on IPL’s balance sheets at December 31 was as follows (in millions):
Defined Benefit  Defined Benefit  
Pension Plans OPEB PlansPension Plans OPEB Plans
IPL2015 2014 2015 20142016 2015 2016 2015
Change in benefit obligation:              
Net benefit obligation at January 1
$603.1
 
$514.0
 
$96.4
 
$87.8

$556.1
 
$603.1
 
$91.3
 
$96.4
Service cost8.8
 7.2
 2.4
 2.4
7.5
 8.8
 2.3
 2.4
Interest cost25.0
 25.1
 3.8
 3.9
24.5
 25.0
 3.8
 3.8
Plan participants’ contributions
 
 1.0
 0.9

 
 0.9
 1.0
Plan amendments
 
 (0.1) 

 
 
 (0.1)
Actuarial (gain) loss(32.3) 91.4
 (4.6) 8.6
19.1
 (32.3) (0.7) (4.6)
Gross benefits paid(48.5) (34.6) (7.6) (7.2)(36.8) (48.5) (7.5) (7.6)
Net benefit obligation at December 31556.1
 603.1
 91.3
 96.4
570.4
 556.1
 90.1
 91.3
Change in plan assets:              
Fair value of plan assets at January 1484.7
 485.9
 78.7
 81.2
422.7
 484.7
 69.2
 78.7
Actual return on plan assets(14.3) 32.1
 (3.1) 3.6
35.3
 (14.3) 5.3
 (3.1)
Employer contributions0.8
 1.3
 0.2
 0.2
0.8
 0.8
 0.3
 0.2
Plan participants’ contributions
 
 1.0
 0.9

 
 0.9
 1.0
Gross benefits paid(48.5) (34.6) (7.6) (7.2)(36.8) (48.5) (7.5) (7.6)
Fair value of plan assets at December 31422.7
 484.7
 69.2
 78.7
422.0
 422.7
 68.2
 69.2
Under funded status at December 31
($133.4) 
($118.4) 
($22.1) 
($17.7)
($148.4) 
($133.4) 
($21.9) 
($22.1)
Defined Benefit  Defined Benefit  
Pension Plans OPEB PlansPension Plans OPEB Plans
IPL2015 2014 2015 20142016 2015 2016 2015
Amounts recognized on the balance sheets consist of:              
Non-current assets
$—
 
$—
 
$—
 
$1.2

$—
 
$—
 
$0.4
 
$—
Other current liabilities(0.8) (0.8) 
 
(0.7) (0.8) (1.9) 
Pension and other benefit obligations(132.6) (117.6) (22.1) (18.9)(147.7) (132.6) (20.4) (22.1)
Net amounts recognized at December 31
($133.4) 
($118.4) 
($22.1) 
($17.7)
($148.4) 
($133.4) 
($21.9) 
($22.1)
Amounts recognized in Regulatory Assets consist of (a):       
Amounts recognized in Regulatory Assets consist of (refer to Note 2 for details):
       
Net actuarial loss
$235.5
 
$233.1
 
$29.8
 
$27.9

$233.6
 
$235.5
 
$25.4
 
$29.8
Prior service credit(2.5) (2.6) (2.7) (8.7)(2.3) (2.5) 
 (2.7)

$233.0
 
$230.5
 
$27.1
 
$19.2

$231.3
 
$233.0
 
$25.4
 
$27.1

(a)
Refer to Note 2 for amounts recognized in “Regulatory assets” on IPL’s balance sheets.


123



A reconciliation of the funded status of WPL’s qualified and non-qualified defined benefit pension and OPEB plans to the amounts recognized on WPL’s balance sheets at December 31 was as follows (in millions):
Defined Benefit  Defined Benefit  
Pension Plans OPEB PlansPension Plans OPEB Plans
WPL2015 2014 2015 20142016 2015 2016 2015
Change in benefit obligation:              
Net benefit obligation at January 1
$547.6
 
$460.8
 
$94.0
 
$85.6

$505.9
 
$547.6
 
$89.7
 
$94.0
Service cost5.8
 4.9
 2.1
 2.0
4.9
 5.8
 2.0
 2.1
Interest cost22.6
 22.6
 3.7
 3.8
22.3
 22.6
 3.8
 3.7
Plan participants’ contributions
 
 1.6
 1.3

 
 1.2
 1.6
Plan amendments
 
 (0.2) 

 
 
 (0.2)
Additional benefit costs0.5
 
 
 

 0.5
 
 
Actuarial (gain) loss(30.0) 86.7
 (3.5) 9.2
25.7
 (30.0) 0.5
 (3.5)
Gross benefits paid(40.6) (27.4) (8.0) (7.9)(29.6) (40.6) (8.3) (8.0)
Net benefit obligation at December 31505.9
 547.6
 89.7
 94.0
529.2
 505.9
 88.9
 89.7
Change in plan assets:              
Fair value of plan assets at January 1440.3
 438.8
 21.8
 21.7
386.8
 440.3
 18.7
 21.8
Actual return on plan assets(13.0) 28.6
 (1.1) 1.2
32.4
 (13.0) 1.2
 (1.1)
Employer contributions0.1
 0.3
 4.4
 5.5
0.1
 0.1
 5.8
 4.4
Plan participants’ contributions
 
 1.6
 1.3

 
 1.2
 1.6
Gross benefits paid(40.6) (27.4) (8.0) (7.9)(29.6) (40.6) (8.3) (8.0)
Fair value of plan assets at December 31386.8
 440.3
 18.7
 21.8
389.7
 386.8
 18.6
 18.7
Under funded status at December 31
($119.1) 
($107.3) 
($71.0) 
($72.2)
($139.5) 
($119.1) 
($70.3) 
($71.0)
Defined Benefit  Defined Benefit  
Pension Plans OPEB PlansPension Plans OPEB Plans
WPL2015 2014 2015 20142016 2015 2016 2015
Amounts recognized on the balance sheets consist of:              
Non-current assets
$—
 
$—
 
$3.0
 
$4.9

$—
 
$—
 
$2.7
 
$3.0
Other current liabilities(0.1) (0.1) (6.0) (5.5)(0.1) (0.1) (6.4) (6.0)
Pension and other benefit obligations(119.0) (107.2) (68.0) (71.6)(139.4) (119.0) (66.6) (68.0)
Net amounts recognized at December 31
($119.1) 
($107.3) 
($71.0) 
($72.2)
($139.5) 
($119.1) 
($70.3) 
($71.0)
Amounts recognized in Regulatory Assets consist of (a):       
Amounts recognized in Regulatory Assets consist of (refer to Note 2 for details):
       
Net actuarial loss
$232.1
 
$233.5
 
$23.3
 
$26.3

$236.1
 
$232.1
 
$21.5
 
$23.3
Prior service credit(1.2) (1.0) (2.4) (5.6)(1.4) (1.2) (1.5) (2.4)

$230.9
 
$232.5
 
$20.9
 
$20.7

$234.7
 
$230.9
 
$20.0
 
$20.9

(a)
Refer to Note 2 for amounts recognized in “Regulatory assets” on WPL’s balance sheets.

Included in the following tables are accumulated benefit obligations, aggregate amounts applicable to defined benefit pension and OPEB plans with accumulated benefit obligations in excess of plan assets, as well as defined benefit pension plans with projected benefit obligations in excess of plan assets as of the December 31 measurement date (in millions):
 Defined Benefit  
 Pension Plans OPEB Plans
Alliant Energy2015 2014 2015 2014
Accumulated benefit obligations
$1,166.0
 
$1,255.0
 
$221.4
 
$231.1
Plans with accumulated benefit obligations in excess of plan assets:       
Accumulated benefit obligations1,166.0
 1,255.0
 221.4
 231.1
Fair value of plan assets895.0
 1,018.1
 106.9
 121.6
Plans with projected benefit obligations in excess of plan assets:       
Projected benefit obligations1,206.3
 1,301.5
 N/A
 N/A
Fair value of plan assets895.0
 1,018.1
 N/A
 N/A

124

Table of Contents
 Defined Benefit  
 Pension Plans OPEB Plans
Alliant Energy2016 2015 2016 2015
Accumulated benefit obligations
$1,201.5
 
$1,166.0
 
$220.1
 
$221.4
Plans with accumulated benefit obligations in excess of plan assets:       
Accumulated benefit obligations1,201.5
 1,166.0
 220.1
 221.4
Fair value of plan assets895.7
 895.0
 105.8
 106.9
Plans with projected benefit obligations in excess of plan assets:       
Projected benefit obligations1,244.3
 1,206.3
 N/A
 N/A
Fair value of plan assets895.7
 895.0
 N/A
 N/A


 Defined Benefit  
 Pension Plans OPEB Plans
IPL2015 2014 2015 2014
Accumulated benefit obligations
$531.0
 
$575.5
 
$91.3
 
$96.4
Plans with accumulated benefit obligations in excess of plan assets:       
Accumulated benefit obligations531.0
 575.5
 91.3
 96.4
Fair value of plan assets422.7
 484.7
 69.2
 78.7
Plans with projected benefit obligations in excess of plan assets:       
Projected benefit obligations556.1
 603.1
 N/A
 N/A
Fair value of plan assets422.7
 484.7
 N/A
 N/A
Defined Benefit  Defined Benefit  
Pension Plans OPEB PlansPension Plans OPEB Plans
WPL2015 2014 2015 2014
IPL2016 2015 2016 2015
Accumulated benefit obligations
$493.8
 
$532.5
 
$89.7
 
$94.0

$546.7
 
$531.0
 
$90.1
 
$91.3
Plans with accumulated benefit obligations in excess of plan assets:              
Accumulated benefit obligations493.8
 532.5
 89.7
 94.0
546.7
 531.0
 90.1
 91.3
Fair value of plan assets386.8
 440.3
 18.7
 21.8
422.0
 422.7
 68.2
 69.2
Plans with projected benefit obligations in excess of plan assets:              
Projected benefit obligations505.9
 547.6
 N/A
 N/A
570.4
 556.1
 N/A
 N/A
Fair value of plan assets386.8
 440.3
 N/A
 N/A
422.0
 422.7
 N/A
 N/A
 Defined Benefit  
 Pension Plans OPEB Plans
WPL2016 2015 2016 2015
Accumulated benefit obligations
$513.2
 
$493.8
 
$88.9
 
$89.7
Plans with accumulated benefit obligations in excess of plan assets:       
Accumulated benefit obligations513.2
 493.8
 88.9
 89.7
Fair value of plan assets389.7
 386.8
 18.6
 18.7
Plans with projected benefit obligations in excess of plan assets:       
Projected benefit obligations529.2
 505.9
 N/A
 N/A
Fair value of plan assets389.7
 386.8
 N/A
 N/A

In addition to the amounts recognized in regulatory assets in the above tables for IPL and WPL, regulatory assets were recognized for amounts associated with Corporate Services employees participating in other Alliant Energy sponsored benefit plans that were allocated to IPL and WPL at December 31 as follows (in millions):
 IPL WPL
 2015 2014 2015 2014
Regulatory assets
$38.0
 
$38.2
 
$29.5
 
$28.0
 IPL WPL
 2016 2015 2016 2015
Regulatory assets
$37.3
 
$38.0
 
$30.0
 
$29.5

Estimated Future Employer Contributions and Benefit Payments - Estimated funding for the qualified and non-qualified defined benefit pension and OPEB plans for 20162017 is as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
Defined benefit pension plans (a)
$2.6
 
$0.8
 
$0.1

$6.5
 
$0.7
 
$0.1
OPEB plans5.8
 
 5.5
8.7
 2.0
 6.4

(a)Alliant Energy sponsors several non-qualified defined benefit pension plans that cover certain current and former key employees of IPL and WPL. Alliant Energy allocates pension costs to IPL and WPL for these plans. In addition, IPL and WPL amounts reflect funding for their non-bargaining employees who are participants in the Alliant Energy and Corporate Services sponsored qualified and non-qualified defined benefit pension plans.

Expected benefit payments for the qualified and non-qualified defined benefit plans, which reflect expected future service, as appropriate, are as follows (in millions):
Alliant Energy2016 2017 2018 2019 2020 2021 - 20252017 2018 2019 2020 2021 2022 - 2026
Defined benefit pension benefits
$69.5
 
$74.3
 
$72.8
 
$74.3
 
$78.7
 
$401.4

$74.8
 
$73.2
 
$75.5
 
$77.6
 
$79.9
 
$405.9
OPEB17.8
 18.1
 18.2
 18.3
 18.2
 86.9
18.6
 18.5
 18.2
 17.8
 17.6
 82.6

$87.3
 
$92.4
 
$91.0
 
$92.6
 
$96.9
 
$488.3

$93.4
 
$91.7
 
$93.7
 
$95.4
 
$97.5
 
$488.5
IPL2016 2017 2018 2019 2020 2021 - 20252017 2018 2019 2020 2021 2022 - 2026
Defined benefit pension benefits
$32.8
 
$34.1
 
$34.8
 
$34.6
 
$37.8
 
$190.8

$34.0
 
$35.1
 
$35.0
 
$37.2
 
$37.9
 
$192.1
OPEB7.6
 7.6
 7.6
 7.5
 7.6
 36.0
7.7
 7.6
 7.4
 7.4
 7.2
 34.0

$40.4
 
$41.7
 
$42.4
 
$42.1
 
$45.4
 
$226.8

$41.7
 
$42.7
 
$42.4
 
$44.6
 
$45.1
 
$226.1

125



WPL2016 2017 2018 2019 2020 2021 - 20252017 2018 2019 2020 2021 2022 - 2026
Defined benefit pension benefits
$29.1
 
$29.8
 
$30.7
 
$31.1
 
$32.2
 
$163.7

$30.2
 
$30.9
 
$31.8
 
$32.5
 
$32.4
 
$167.1
OPEB7.5
 7.8
 7.8
 7.8
 7.6
 34.7
8.0
 8.0
 7.8
 7.4
 7.3
 32.7

$36.6
 
$37.6
 
$38.5
 
$38.9
 
$39.8
 
$198.4

$38.2
 
$38.9
 
$39.6
 
$39.9
 
$39.7
 
$199.8

Investment Policy and Strategy for Plan Assets - Investment policies and strategies employed with respect to assets of defined benefit pension and OPEB plans are to combine both preservation of principal and prudent and reasonable risk-taking to protect the integrity of plan assets, in order to meet the obligations to plan participants while minimizing benefit costs over the long term. It is recognized that risk and volatility are present with all types of investments. However, risk is mitigated at the total fund level through diversification by asset class including U.S. and international equity and fixed income exposure, global asset and risk parity strategies, the number of individual investments, and sector and industry limits. Global asset and risk parity strategies include investments in global equity, global debt, commodities and currencies.

Defined Benefit Pension Plan Assets - For assets of defined benefit pension plans, the mix among asset classes is controlled by asset allocation targets. Historical performance results and future expectations suggest that equity securities will provide higher total investment returns than debt securities over a long-term investment horizon. Consistent with the goals of meeting obligations to plan participants and minimizing benefit costs over the long-term, the defined benefit pension plans have a long-term investment posture more heavily weighted towards equity holdings. The asset allocation is monitored regularly and appropriate steps are taken as needed to rebalance the assets within the prescribed ranges. An overlay management service is also used to help maintain target allocations and meet liquidity needs. The overlay manager is authorized to use derivative financial instruments to facilitate this service. For separately managed accounts, prohibited investment vehicles include, but may not be limited to, direct ownership of real estate, margin trading, oil and gas limited partnerships and securities of the managers’ firms or affiliate firms.

At December 31, 20152016, the current target ranges and actual allocations for the defined benefit pension plan assets were as follows:
 Target Range Actual
 Allocation Allocation
Cash and equivalents0%-5% 2%
Equity securities:     
U.S. large cap core8%-18% 11%
U.S. large cap value2.5%-12.5% 7%
U.S. large cap growth2.5%-12.5% 7%
U.S. small cap value0%-4% 1%
U.S. small cap growth0%-4% 2%
International - developed markets7%-19% 12%
International - emerging markets0%-10% 5%
Global asset allocation securities5%-15% 11%
Risk parity allocation securities5%-15% 10%
Fixed income securities20%-40% 32%
 Target Range Actual
 Allocation Allocation
Cash and equivalents0%-5% 3%
Equity securities - domestic22%-42% 30%
Equity securities - international8%-28% 17%
Global asset allocation securities5%-15% 10%
Risk parity allocation securities5%-15% 10%
Fixed income securities20%-40% 30%


126



Other Postretirement Benefits Plan Assets - OPEB plan assets are comprised of specific assets within certain defined benefit pension plans (401(h) assets) as well as assets held in VEBA trusts. The investment policy and strategy of the 401(h) assets, except for the WPL 401(h) assets, mirrors those of the defined benefit pension plans, which are discussed above. For VEBA trusts with assets greater than $5 million and the WPL 401(h) assets, the mix among asset classes is controlled by allocation targets. The asset allocation is monitored regularly and appropriate steps are taken as needed to rebalance the assets within the prescribed ranges. Mutual funds are used to achieve the desired diversification. At December 31, 20152016, the current target ranges and actual allocations for VEBA trusts with assets greater than $5 million and the WPL 401(h) assets were as follows:
Target Range ActualTarget Range Actual
Allocation AllocationAllocation Allocation
Cash and equivalents0%-15% 3%0%-15% 3%
Equity securities:  
Domestic0%-45% 21%
International0%-21% 13%
Equity securities - domestic0%-45% 22%
Equity securities - international0%-21% 13%
Global asset allocation securities5%-40% 16%5%-40% 16%
Fixed income securities10%-70% 47%10%-70% 46%

Fair Value Measurements - The following tables report a framework for measuring fair value. TheFair value measurement accounting establishes three levels of fair value hierarchy prioritizesthat prioritize the inputs to valuation techniques used to measure fair value. The threeRefer to Note 14 for discussion of levels ofwithin the fair value hierarchy and examples of each are as follows:

hierarchy. Level 1 - Pricing inputs are quoted prices available in active markets for identical assets or liabilities as of the reporting date. Investmentsitems include investments in securities held in registered investment companies, treasury bills and directly held equity securities, which are valued at the closing price reported in the active market in which the securities are traded.

Level 2 - Pricing inputs are quoted prices for similar assets or liabilities in active markets, quoted prices for identical or similar assets or liabilities in inactive markets, inputs other than quoted prices that are observable for the asset or liabilityitems include fixed income securities consisting of corporate and inputs that are derived principally from or corroborated by observable market data by correlation or other means. Investments in common/collective trusts are valued at the net asset value of shares held by the plans,government bonds and agency obligations, which is based on the fair market value of the underlying investments in the common/collective trusts. Investments in corporate bonds are valued at the closing price reported in the active market for similar assets in which the individual securities are traded or based on yields currently available on comparable securities of issuers with similar credit ratings.

Level 3 - Pricing inputs Certain investments that are unobservable inputs for assets or liabilities for which little or no market data exist and require significant management judgment or estimation.

Themeasured at fair value hierarchy givesusing the highest priority to quoted prices in active markets (Level 1) and the lowest priority to unobservable data (Level 3). In some cases, the inputs used to measure fairnet asset value might fall in different levels of the fair value hierarchy. The lowest level input that is significant to a fair value measurement in its entirety determines the applicable levelpractical expedient have not been classified in the fair value hierarchy. AssessingThese fair value amounts are included in the significance of a particular inputtables below to reconcile the fair value measurement in its entirety requires judgment, considering factors specifichierarchy to the asset or liability.respective total plan assets.

The methods described above may produce a fair value calculation that may not be indicative of net realizable value or reflective of future fair values. Furthermore, while Alliant Energy, IPL and WPL believe their valuation methods are appropriate and consistent with other market participants, the use of different methodologies or assumptions to determine the fair value of certain financial instruments could result in a different fair value measurement at the reporting date.


127



At December 31, the fair values of Alliant Energy’s qualified and non-qualified defined benefit pension plan assets by asset category and fair value hierarchy level were as follows (in millions):
 2015 2014
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$23.1
 
$—
 
$23.1
 
$—
 
$49.3
 
$—
 
$49.3
 
$—
Equity securities:               
U.S. large cap core100.4
 100.4
 
 
 137.2
 137.2
 
 
U.S. large cap value59.9
 
 59.9
 
 72.2
 
 72.2
 
U.S. large cap growth60.5
 
 60.5
 
 73.2
 
 73.2
 
U.S. small cap value14.2
 
 14.2
 
 15.2
 
 15.2
 
U.S. small cap growth16.0
 16.0
 
 
 15.9
 15.9
 
 
International - developed markets104.4
 52.7
 51.7
 
 102.9
 52.1
 50.8
 
International - emerging markets41.2
 41.2
 
 
 47.2
 47.2
 
 
Global asset allocation securities96.3
 52.9
 43.4
 
 99.9
 57.2
 42.7
 
Risk parity allocation securities94.0
 
 94.0
 
 102.5
 
 102.5
 
Fixed income securities:               
Corporate bonds
 
 
 
 0.1
 
 0.1
 
Fixed income funds284.8
 
 284.8
 
 302.7
 0.2
 302.5
 
 894.8
 
$263.2
 
$631.6
 
$—
 1,018.3
 
$309.8
 
$708.5
 
$—
Accrued investment income0.2
       0.1
      
Due to brokers, net (pending trades with brokers)
       (0.3)      
Total pension plan assets
$895.0
       
$1,018.1
      
 2016 2015
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$30.4
 
$5.0
 
$25.4
 
$—
 
$23.1
 
$—
 
$23.1
 
$—
Equity securities - domestic183.6
 183.6
 
 
 116.4
 116.4
 
 
Equity securities - international97.4
 97.4
 
 
 93.9
 93.9
 
 
Global asset allocation securities53.0
 53.0
 
 
 52.9
 52.9
 
 
Fixed income securities125.4
 53.6
 71.8
 
 
 
 
 
Total assets in fair value hierarchy489.8
 
$392.6
 
$97.2
 
$—
 286.3
 
$263.2
 
$23.1
 
$—
Assets measured at net asset value405.9
       608.5
      
Accrued investment income1.1
       0.2
      
Due to brokers, net (pending trades with brokers)(1.1)       
      
Total pension plan assets
$895.7
       
$895.0
      

At December 31, the fair values of IPL’s qualified and non-qualified defined benefit pension plan assets by asset category and fair value hierarchy level were as follows (in millions):
 2015 2014
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$10.9
 
$—
 
$10.9
 
$—
 
$23.5
 
$—
 
$23.5
 
$—
Equity securities:               
U.S. large cap core47.4
 47.4
 
 
 65.3
 65.3
 
 
U.S. large cap value28.3
 
 28.3
 
 34.4
 
 34.4
 
U.S. large cap growth28.6
 
 28.6
 
 34.9
 
 34.9
 
U.S. small cap value6.7
 
 6.7
 
 7.2
 
 7.2
 
U.S. small cap growth7.5
 7.5
 
 
 7.6
 7.6
 
 
International - developed markets49.3
 24.9
 24.4
 
 49.0
 24.8
 24.2
 
International - emerging markets19.5
 19.5
 
 
 22.5
 22.5
 
 
Global asset allocation securities45.5
 25.0
 20.5
 
 47.5
 27.2
 20.3
 
Risk parity allocation securities44.4
 
 44.4
 
 48.8
 
 48.8
 
Fixed income securities:               
Fixed income funds134.5
 
 134.5
 
 144.1
 0.1
 144.0
 
 422.6
 
$124.3
 
$298.3
 
$—
 484.8
 
$147.5
 
$337.3
 
$—
Accrued investment income0.1
       0.1
      
Due to brokers, net (pending trades with brokers)
       (0.2)      
Total pension plan assets
$422.7
       
$484.7
      
 2016 2015
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$14.4
 
$2.4
 
$12.0
 
$—
 
$10.9
 
$—
 
$10.9
 
$—
Equity securities - domestic86.5
 86.5
 
 
 54.9
 54.9
 
 
Equity securities - international45.9
 45.9
 
 
 44.4
 44.4
 
 
Global asset allocation securities24.9
 24.9
 
 
 25.0
 25.0
 
 
Fixed income securities59.1
 25.3
 33.8
 
 
 
 
 
Total assets in fair value hierarchy230.8
 
$185.0
 
$45.8
 
$—
 135.2
 
$124.3
 
$10.9
 
$—
Assets measured at net asset value191.2
       287.4
      
Accrued investment income0.5
       0.1
      
Due to brokers, net (pending trades with brokers)(0.5)       
      
Total pension plan assets
$422.0
       
$422.7
      


128



At December 31, the fair values of WPL’s qualified and non-qualified defined benefit pension plan assets by asset category and fair value hierarchy level were as follows (in millions):
 2015 2014
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$10.0
 
$—
 
$10.0
 
$—
 
$21.3
 
$—
 
$21.3
 
$—
Equity securities:               
U.S. large cap core43.4
 43.4
 
 
 59.3
 59.3
 
 
U.S. large cap value25.9
 
 25.9
 
 31.3
 
 31.3
 
U.S. large cap growth26.2
 
 26.2
 
 31.7
 
 31.7
 
U.S. small cap value6.1
 
 6.1
 
 6.6
 
 6.6
 
U.S. small cap growth6.9
 6.9
 
 
 6.9
 6.9
 
 
International - developed markets45.1
 22.8
 22.3
 
 44.5
 22.5
 22.0
 
International - emerging markets17.8
 17.8
 
 
 20.4
 20.4
 
 
Global asset allocation securities41.6
 22.8
 18.8
 
 43.2
 24.8
 18.4
 
Risk parity allocation securities40.6
 
 40.6
 
 44.3
 
 44.3
 
Fixed income securities:               
Fixed income funds123.1
 
 123.1
 
 130.9
 0.1
 130.8
 
 386.7
 
$113.7
 
$273.0
 
$—
 440.4
 
$134.0
 
$306.4
 
$—
Accrued investment income0.1
       
      
Due to brokers, net (pending trades with brokers)
       (0.1)      
Total pension plan assets
$386.8
       
$440.3
      
 2016 2015
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$13.3
 
$2.2
 
$11.1
 
$—
 
$10.0
 
$—
 
$10.0
 
$—
Equity securities - domestic79.9
 79.9
 
 
 50.3
 50.3
 
 
Equity securities - international42.4
 42.4
 
 
 40.6
 40.6
 
 
Global asset allocation securities23.0
 23.0
 
 
 22.8
 22.8
 
 
Fixed income securities54.5
 23.3
 31.2
 
 
 
 
 
Total assets in fair value hierarchy213.1
 
$170.8
 
$42.3
 
$—
 123.7
 
$113.7
 
$10.0
 
$—
Assets measured at net asset value176.6
       263.0
      
Accrued investment income0.5
       0.1
      
Due to brokers, net (pending trades with brokers)(0.5)       
      
Total pension plan assets
$389.7
       
$386.8
      


At December 31, the fair values of Alliant Energy’s OPEB plan assets by asset category and fair value hierarchy level were as follows (in millions):
 2015 2014
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$3.6
 
$—
 
$3.6
 
$—
 
$3.7
 
$—
 
$3.7
 
$—
Equity securities:               
U.S. blend21.1
 21.1
 
 
 35.8
 35.8
 
 
U.S. large cap core0.9
 0.9
 
 
 2.9
 2.9
 
 
U.S. large cap value0.5
 
 0.5
 
 1.5
 
 1.5
 
U.S. large cap growth0.5
 
 0.5
 
 1.6
 
 1.6
 
U.S. small cap value0.1
 
 0.1
 
 0.3
 
 0.3
 
U.S. small cap growth0.1
 0.1
 
 
 0.4
 0.4
 
 
International - blend12.5
 12.5
 
 
 14.2
 14.2
 
 
International - developed markets1.0
 0.5
 0.5
 
 2.2
 1.1
 1.1
 
International - emerging markets0.4
 0.4
 
 
 1.0
 1.0
 
 
Global asset allocation securities16.4
 16.0
 0.4
 
 30.3
��29.4
 0.9
 
Risk parity allocation securities0.9
 
 0.9
 
 2.2
 
 2.2
 
Fixed income securities:               
Fixed income funds48.9
 46.3
 2.6
 
 25.5
 19.0
 6.5
 
Total OPEB plan assets
$106.9
 
$97.8
 
$9.1
 
$—
 
$121.6
 
$103.8
 
$17.8
 
$—
 2016 2015
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$3.5
 
$2.0
 
$1.5
 
$—
 
$3.6
 
$—
 
$3.6
 
$—
Equity securities - domestic22.5
 22.5
 
 
 22.1
 22.1
 
 
Equity securities - international13.5
 13.5
 
 
 13.4
 13.4
 
 
Global asset allocation securities16.5
 16.5
 
 
 16.0
 16.0
 
 
Fixed income securities46.8
 46.2
 0.6
 
 46.3
 46.3
 
 
Total assets in fair value hierarchy102.8
 
$100.7
 
$2.1
 
$—
 101.4
 
$97.8
 
$3.6
 
$—
Assets measured at net asset value3.0
       5.5
      
Total OPEB plan assets
$105.8
       
$106.9
      


129



At December 31, the fair values of IPL’s OPEB plan assets by asset category and fair value hierarchy level were as follows (in millions):
 2015 2014
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$0.9
 
$—
 
$0.9
 
$—
 
$1.4
 
$—
 
$1.4
 
$—
Equity securities:               
U.S. blend16.6
 16.6
 
 
 27.2
 27.2
 
 
U.S. large cap core0.1
 0.1
 
 
 0.5
 0.5
 
 
U.S. large cap value0.1
 
 0.1
 
 0.3
 
 0.3
 
U.S. large cap growth0.1
 
 0.1
 
 0.3
 
 0.3
 
U.S. small cap value
 
 
 
 0.1
 
 0.1
 
U.S. small cap growth
 
 
 
 0.1
 0.1
 
 
International - blend10.7
 10.7
 
 
 10.7
 10.7
 
 
International - developed markets0.1
 0.1
 
 
 0.4
 0.2
 0.2
 
International - emerging markets
 
 
 
 0.2
 0.2
 
 
Global asset allocation securities6.9
 6.9
 
 
 21.6
 21.5
 0.1
 
Risk parity allocation securities0.1
 
 0.1
 
 0.4
 
 0.4
 
Fixed income securities:               
Fixed income funds33.6
 33.3
 0.3
 
 15.5
 14.3
 1.2
 
Total OPEB plan assets
$69.2
 
$67.7
 
$1.5
 
$—
 
$78.7
 
$74.7
 
$4.0
 
$—
 2016 2015
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$0.8
 
$0.8
 
$—
 
$—
 
$0.9
 
$—
 
$0.9
 
$—
Equity securities - domestic17.0
 17.0
 
 
 16.7
 16.7
 
 
Equity securities - international11.0
 11.0
 
 
 10.8
 10.8
 
 
Global asset allocation securities7.0
 7.0
 
 
 6.9
 6.9
 
 
Fixed income securities32.4
 32.4
 
 
 33.3
 33.3
 
 
Total assets in fair value hierarchy68.2
 
$68.2
 
$—
 
$—
 68.6
 
$67.7
 
$0.9
 
$—
Assets measured at net asset value
       0.6
      
Total OPEB plan assets
$68.2
       
$69.2
      

At December 31, the fair values of WPL’s OPEB plan assets by asset category and fair value hierarchy level were as follows (in millions):
 2015 2014
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$2.3
 
$—
 
$2.3
 
$—
 
$1.4
 
$—
 
$1.4
 
$—
Equity securities:               
U.S. blend
 
 
 
 3.6
 3.6
 
 
U.S. large cap core
 
 
 
 1.6
 1.6
 
 
U.S. large cap value
 
 
 
 0.8
 
 0.8
 
U.S. large cap growth
 
 
 
 0.8
 
 0.8
 
U.S. small cap value
 
 
 
 0.2
 
 0.2
 
U.S. small cap growth
 
 
 
 0.2
 0.2
 
 
International - blend
 
 
 
 1.4
 1.4
 
 
International - developed markets
 
 
 
 1.2
 0.6
 0.6
 
International - emerging markets
 
 
 
 0.5
 0.5
 
 
Global asset allocation securities5.4
 5.4
 
 
 3.8
 3.3
 0.5
 
Risk parity allocation securities
 
 
 
 1.1
 
 1.1
 
Fixed income securities:               
Fixed income funds11.0
 11.0
 
 
 5.2
 1.8
 3.4
 
Total OPEB plan assets
$18.7
 
$16.4
 
$2.3
 
$—
 
$21.8
 
$13.0
 
$8.8
 
$—
 2016 2015
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$2.0
 
$0.7
 
$1.3
 
$—
 
$2.3
 
$—
 
$2.3
 
$—
Global asset allocation securities5.5
 5.5
 
 
 5.4
 5.4
 
 
Fixed income securities11.1
 11.1
 
 
 11.0
 11.0
 
 
Total OPEB plan assets
$18.6
 
$17.3
 
$1.3
 
$—
 
$18.7
 
$16.4
 
$2.3
 
$—

For the various defined benefit pension and OPEB plans, Alliant Energy common stock represented less than 1% of assets directly held in the plans at December 31, 20152016 and 2014.2015.

401(k) Savings Plans - A significant number of employees participate in defined contribution retirement plans (401(k) savings plans). Alliant Energy common stock directly held by participants represented 11.6%12.6% and 12.6%11.6% of total assets held in the 401(k) savings plans at December 31, 20152016 and 20142015, respectively. Costs related to the 401(k) savings plans, which are partially based on the participants’ contributions and include allocated costs associated with Corporate Services employees for IPL and WPL, were as follows (in millions):
 Alliant Energy IPL WPL
 2015 2014 2013 2015
 2014
 2013
 2015 2014 2013
401(k) costs
$24.9
 
$22.5
 
$19.2
 
$12.7
 
$11.1
 
$9.9
 
$11.2
 
$10.5
 
$8.5
 Alliant Energy IPL WPL
 2016 2015 2014 2016
 2015
 2014
 2016 2015 2014
401(k) costs
$23.6
 
$24.9
 
$22.5
 
$12.0
 
$12.7
 
$11.1
 
$10.7
 
$11.2
 
$10.5


130



Voluntary Employee Separation Charges - In 2015, Alliant Energy offered certain employees a voluntary separation package. Approximately 2% of total Alliant Energy employees accepted this package, which resulted in Alliant Energy, IPL and WPL recording charges of $8 million, $5 million and $3 million, respectively, in 2015.

NOTE 12(b) Equity-based Compensation Plans - All shares, units and awards included below have been adjusted to reflect the common stock split discussed in Note 7.

In 2015, Alliant Energy’s shareowners approved the Amended and Restated OIP, which permits the grant of shares of Alliant Energy common stock, restricted stock, restricted stock units, performance shares, performance units, and other stock-based

or cash-based awards to key employees. At December 31, 2015,2016, performance shares, performance-contingent restricted stock and restricted stock units (performance- and time-based) were outstanding under the Amended and 3.8Restated OIP, and 7.4 million shares of Alliant Energy’s common stock remained available for grants under the Amended and Restated OIP. Alliant Energy satisfies share payouts related to equity awards under the Amended and Restated OIP through the issuance of new shares of its common stock. Alliant Energy also has the DLIP, which permits the grant of cash-based long-term performance-based awards, including performance units, and restricted cash awards and restricted units, to certain key employees. At December 31, 20152016, performance units, and performance-contingent cash awards and restricted units (performance- and time-based) were outstanding under the DLIP. There is no limit to the number of grants that can be made under the DLIP and Alliant Energy satisfies all payouts under the DLIP through cash payments. Nonvested awards generally do not have non-forfeitable rights to dividends or dividend equivalents when dividends are paid to common shareowners.

A summary of compensation expense, (includingincluding amounts allocated to IPL and WPL)WPL, and the related income tax benefits recognized for share-based compensation awards was as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2015 2014 2013 2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014 2016 2015 2014
Compensation expense
$10.7
 
$15.3
 
$12.0
 
$5.7
 
$8.3
 
$6.2
 
$4.7
 
$6.4
 
$5.2

$18.0
 
$10.7
 
$15.3
 
$9.5
 
$5.7
 
$8.3
 
$7.9
 
$4.7
 
$6.4
Income tax benefits4.4
 6.2
 4.8
 2.4
 3.4
 2.5
 1.9
 2.6
 2.1
7.4
 4.4
 6.2
 4.0
 2.4
 3.4
 3.2
 1.9
 2.6

As of December 31, 2015,2016, Alliant Energy’s, IPL’s and WPL’s total unrecognized compensation cost related to share-based compensation awards was $3.9$5.0 million, $2.7 million and $2.2 million, respectively, which is expected to be recognized over a weighted average period of between 1 and 2 years. Share-based compensation expense is recognized on a straight-line basis over the requisite service periods and is primarily recorded in “Other operation and maintenance” in the income statements.

Performance Shares and Performance Units - Payouts of performance shares under the Amended and Restated OIP and performance units under the DLIP to key employees are contingent upon achievement over 3three-year periods of specified performance criteria, which currently include metrics of total shareowner return relative to an investor-owned utility peer group. Payouts of nonvested performance shares and units are based on achievement of the performance criteria and are prorated in the event of retirement, death or disability during the first year of the performance period based on time worked during the first year of the performance period, and are prorated upon involuntary termination without cause based on time worked during the entire performance period. Upon achievement of the performance criteria, payouts of performance shares and units to participants who terminate employment after the first year of the performance period due to retirement, death or disability are not prorated. Participants’ nonvested performance shares and units are forfeited if the participant voluntarily leaves Alliant Energy or is terminated for cause during the performance period. Nonvested performance shares and units do not have non-forfeitable rights to dividends when dividends are paid to common shareowners. Alliant Energy assumes it will make future payouts of its performance shares and units in cash; therefore, performance shares and units are accounted for as liability awards.

Performance Shares - Performance shares can be paid out in shares of Alliant Energy’s common stock, cash or a combination of cash and stock. Performance units must be paid out in cash. Alliant Energy assumes it will make future payouts of its performance shares and performance units in cash; therefore, performance shares and performance units are accounted for as liability awards. A summary of the performance shares and performance units activity, with amounts representing the target number of awards, was as follows:
 Performance Shares Performance Units
 2016 2015 2014 2016 2015 2014
Nonvested awards, January 1288,430
 288,848
 279,880
 116,412
 127,330
 131,824
Granted68,585
 90,806
 102,442
 23,918
 35,674
 40,844
Vested(98,186) (91,224) (90,470) (42,760) (45,690) (41,502)
Forfeited(1,230) 
 (3,004) (4,250) (902) (3,836)
Nonvested awards, December 31257,599
 288,430
 288,848
 93,320
 116,412
 127,330

Granted Awards - Each performance share’s value is based on the closing market price of one share of Alliant Energy’s common stock at the end of the performance period. The actual numberFor performance units granted in 2016, the value is based on the closing market price of shares that will be paid out upon vesting is dependent upon actual performance and may range from zero to 200%one share of Alliant Energy’s common stock at the target number of shares. A summaryend of the performance shares activity, with share amounts representing the target number ofperiod. For performance shares, was as follows:
 2015 2014 2013
Nonvested shares, January 1144,424
 139,940
 145,277
Granted45,403
 51,221
 49,093
Vested(45,612) (45,235) (54,430)
Forfeited
 (1,502) 
Nonvested shares, December 31144,215
 144,424
 139,940


131



Certain performance shares vested, resultingunits granted in payouts (a combination of cash2015 and common stock) as follows:
 2015 2014 2013
 2012 Grant 2011 Grant 2010 Grant
Performance shares vested45,612
 45,235
 54,430
Percentage of target number of performance shares167.5% 147.5% 197.5%
Aggregate payout value (in millions)
$5.1
 
$3.4
 
$4.8
Payout - cash (in millions)
$3.2
 
$2.9
 
$4.4
Payout - common stock shares issued10,975
 4,810
 4,177

Performance Units - Performance units must be paid out in cash. Each2014, each performance unit’s value is based on the averageclosing market price of one share of Alliant Energy’s common stock on the grant date of the award. The actual payout for performance shares and performance units is dependent upon actual performance and may range from zero to 200% of the target number of units. A summaryawards. Compensation expense for performance shares and performance units is recorded ratably over the performance period based on the fair value of the awards at each reporting period.


Vested Awards - Certain performance unit activity, with amounts representing the target number ofshares and performance units wasvested, resulting in payouts (a combination of cash and common stock for the performance shares and cash only for the performance units) as follows:
 2015 2014 2013
Nonvested units, January 163,665
 65,912
 64,969
Granted17,837
 20,422
 22,201
Vested(22,845) (20,751) (19,760)
Forfeited(451) (1,918) (1,498)
Nonvested units, December 3158,206
 63,665
 65,912

Certain performance units vested, resulting in cash payouts as follows:
 2015 2014 2013
 2012 Grant 2011 Grant 2010 Grant
Performance units vested22,845
 20,751
 19,760
Percentage of target number of performance units167.5% 147.5% 197.5%
Payout value (in millions)
$1.6
 
$1.2
 
$1.3
 Performance Shares Performance Units
 2016 2015 2014 2016 2015 2014
 2013 Grant 2012 Grant 2011 Grant 2013 Grant 2012 Grant 2011 Grant
Performance awards vested98,186 91,224 90,470 42,760 45,690 41,502
Percentage of target number of performance awards165.0% 167.5% 147.5% 165.0% 167.5% 147.5%
Aggregate payout value (in millions)$5.1 $5.1 $3.4 $1.7 $1.6 $1.2
Payout - cash (in millions)$2.9 $3.2 $2.9 $1.7 $1.6 $1.2
Payout - common stock shares issued22,408 21,950 9,620 N/A N/A N/A

Fair Value of Awards - Information related to fair values of nonvested performance shares and performance units at December 31, 20152016, by year of grant, were as follows:
 Performance Shares Performance Units
 2015 Grant 2014 Grant 2013 Grant 2015 Grant 2014 Grant 2013 Grant
Nonvested awards45,403
 49,719
 49,093
 17,386
 19,440
 21,380
Alliant Energy common stock closing price on December 31, 2015
$62.45
 
$62.45
 
$62.45
      
Alliant Energy common stock closing price on grant date      
$65.09
 
$53.77
 
$47.58
Estimated payout percentage based on performance criteria80% 125% 165% 80% 125% 165%
Fair values of each nonvested award
$49.96
 
$78.06
 
$103.04
 
$52.07
 
$67.21
 
$78.51

At December 31, 2015, fair values of nonvested performance shares and units were calculated based on Alliant Energy’s stock price and anticipated total shareowner returns of Alliant Energy and its investor-owned utility peer group over the performance period. The portion of the fair values based on anticipated total shareowner returns was estimated using a model that incorporates the probability of meeting performance targets based on historical returns relative to the peer group.
 Performance Shares Performance Units
 2016 Grant 2015 Grant 2014 Grant 2016 Grant 2015 Grant 2014 Grant
Nonvested awards at target67,355
 90,806
 99,438
 22,657
 33,268
 37,395
Alliant Energy common stock closing price on December 30, 2016
$37.89
 
$37.89
 
$37.89
 
$37.89
 N/A N/A
Alliant Energy common stock closing price on grant dateN/A N/A N/A N/A 
$32.55
 
$26.89
Estimated payout percentage based on performance criteria135% 155% 148% 135% 155% 148%
Fair values of each nonvested award
$51.15
 
$58.73
 
$56.08
 
$51.15
 
$50.45
 
$39.80

Performance-Contingent Restricted Stock - Vesting of performance-contingent restricted stock grants areis based on the achievement of certain performance targets (currently specified growth of consolidated income from continuing operations). If performance targets are not met within the performance period, which currently ranges from two to four years, these restricted stock grants are forfeited. Payouts of nonvested performance-contingent restricted stock are based on achievement of the performance criteria and are prorated in the event of retirement, death or disability during the first year of the performance period based on time worked during the first year of the performance period, and are prorated upon involuntary termination without cause based on time worked during the entire performance period. Upon achievement of the performance criteria, payouts of performance-contingent restricted stock to participants who terminate employment after the first year of the performance period due to retirement, death or disability are not prorated. Participants’ nonvested

132



performance-contingent restricted stock is forfeited if the participant voluntarily leaves Alliant Energy or is terminated for cause during the performance period. The fair value of performance-contingent restricted stock is based on the closing market price on the grant date. A summary of the performance-contingent restricted stock activity was as follows:
2016 2015 2014
2015 2014 2013  Weighted Average   Weighted Average   Weighted Average
Shares 
Weighted
Average
Fair Value
 Shares 
Weighted
Average
Fair Value
 Shares 
Weighted
Average
Fair Value
Shares Grant Date Fair Value Shares Grant Date Fair Value Shares Grant Date Fair Value
Nonvested shares, January 198,812
 
$50.69
 158,922
 
$42.71
 211,651
 
$32.42
190,244
 
$29.59
 197,624
 
$25.35
 317,844
 
$21.36
Granted45,403
 65.09
 51,221
 53.77
 49,093
 47.58

 
 90,806
 32.55
 102,442
 26.89
Vested (a)(49,093) 47.58
 (90,847) 40.91
 
 

 
 (98,186) 23.79
 (181,694) 20.46
Forfeited (b)
 
 (20,484) 39.85
 (101,822) 23.67

 
 
 
 (40,968) 19.93
Nonvested shares, December 3195,122
 59.17
 98,812
 50.69
 158,922
 42.71
190,244
 29.59
 190,244
 29.59
 197,624
 25.35

(a)In 2015, 49,09398,186 performance-contingent restricted shares granted in 2013 vested because the specified performance criteria for such shares were met. In 2014, 45,61291,224 and 45,23590,470 performance-contingent restricted shares granted in 2012 and 2011, respectively, vested because the specified performance criteria for such shares were met.
(b)In 2013, 101,822 performance-contingent restricted shares granted in 2009 were forfeited because the specified performance criteria for such shares were not met. The forfeitures during 2014 were primarily caused by retirements and terminations of participants.

Performance Restricted Stock Units and Performance Restricted Units - Alliant Energy granted new types of share-based compensation awards to key employees in 2016 referred to as performance restricted stock units under the Amended and Restated OIP, and performance restricted units and key employee performance restricted units under the DLIP. Payouts of these units are based on the achievement of certain performance targets (currently specified growth of consolidated income from continuing operations) during a three-year performance period. The actual number of units that will be paid out upon vesting is dependent upon actual performance and may range from zero to 200% of the target number of units. If performance targets are not met during the performance period, these units are forfeited. As of December 31, 2016, the amount of nonvested performance restricted units and key employee performance restricted units was not material.

Performance Restricted Stock Units - Performance restricted stock units generally must be paid out in shares and are accounted for as equity awards. Each performance restricted stock unit’s value is based on the closing market price of one share of Alliant Energy’s common stock on the grant date of the award. Compensation expense is recorded ratably over the performance period based on a probability assessment of payouts for the awards at each reporting period. A summary of the performance restricted stock units activity, with amounts representing the target number of units, was as follows:

 2016
 Units 
Weighted Average
Grant Date Fair Value
Granted68,585
 
$33.96
Forfeited(1,230) 33.90
Nonvested units, December 3167,355
 33.96

Restricted Stock Units and Restricted Units - Alliant Energy granted new types of share-based compensation awards to key employees in 2016 referred to as restricted stock units under the Amended and Restated OIP and restricted units under the DLIP. Payouts of these units are based on the expiration of a three-year time-vesting period. Each restricted stock unit’s value is based on the closing market price of one share of Alliant Energy’s common stock at the end of the time-vesting period. Compensation expense is recorded ratably over the performance period based on the fair value of the awards at each reporting period. Restricted stock units can be paid out in shares of Alliant Energy common stock, cash or a combination of cash and stock. Alliant Energy assumes it will make future payouts of its restricted stock units in cash; therefore, restricted stock units are accounted for as liability awards. As of December 31, 2016, the amount of nonvested restricted units was not material. A summary of the restricted stock units activity was as follows:
2016
Granted58,790
Forfeited(1,054)
Nonvested units, December 3157,736

Performance-Contingent Cash Awards - Performance-contingent cash award payouts to key employees are based on the achievement of certain performance targets (currently specified growth of consolidated income from continuing operations). If performance targets are not met within the performance period, which currently ranges from two to four years, there are no payouts for these awards. Payouts of nonvested awards are based on achievement of the performance criteria and are prorated in the event of retirement, death or disability during the first year of the performance period based on time worked during the first year of the performance period, and are prorated upon involuntary termination without cause based on time worked during the entire performance period. Upon achievement of the performance criteria, payouts of these awards to participants who terminate employment after the first year of the performance period due to retirement, death or disability are not prorated. Participants’ nonvested awards are forfeited if the participant voluntarily leaves Alliant Energy or is terminated for cause during the performance period. Each performance-contingent cash award’s value is based on the price of one share of Alliant Energy’s common stock at the end of the performance period. Alliant Energy accounts for performance-contingent cash awards as liability awards because payouts will be made in the form of cash. A summary of the performance-contingent cash awards activity was as follows:
2015 2014 20132016 2015 2014
Nonvested awards, January 178,930
 96,977
 59,639
163,752
 157,860
 193,954
Granted41,105
 42,446
 39,530

 82,210
 84,892
Vested (a)(37,332) (55,517) 

 (74,664) (111,034)
Forfeited(827) (4,976) (2,192)(3,652) (1,654) (9,952)
Nonvested awards, December 3181,876
 78,930
 96,977
160,100
 163,752
 157,860

(a)In 2015, 37,33274,664 performance-contingent cash awards granted in 2013 vested, resulting in cash payouts valued at $2.4 million. In 2014, 34,76669,532 and 20,75141,502 performance-contingent cash awards granted in 2012 and 2011 vested, resulting in cash payouts valued at $1.9 million and $1.1 million, respectively.

NOTE 12(c) Deferred Compensation Plan - Alliant Energy maintains a DCP under which key employees may defer up to 100% of base salary and performance-basedshort-term cash incentive compensation and directors may elect to defer all or part of their retainer and committee fees. Key employees who have made the maximum allowed contribution to the Alliant Energy 401(k) Savings Plan may receive an additional credit to the DCP. Key employees and directors may elect to have their deferrals credited to a company stock account, an interest account or equity accounts based on certain benchmark funds.


133



Company Stock Accounts - The DCP does not permit diversification of deferrals credited to the company stock account and all distributions from participants’ company stock accounts are made in the form of shares of Alliant Energy common stock. The deferred compensation obligations for participants’ company stock accounts are recorded in “Additional paid-in capital” and the shares of Alliant Energy common stock held in a rabbi trust to satisfy this obligation are recorded in “Shares in deferred compensation trust” on Alliant Energy’s balance sheets. At December 31, the carrying value of the deferred compensation obligation for the company stock accounts and the shares in the deferred compensation trust based on the historical value of the shares of Alliant Energy common stock contributed to the rabbi trust, and the fair market value of the shares held in the rabbi trust were as follows (in millions):
2015 20142016 2015
Carrying value
$8.5
 
$8.9

$10.0
 
$8.5
Fair market value13.4
 15.9
16.7
 13.4

Interest and Equity Accounts - Distributions from participants’ interest and equity accounts are in the form of cash payments. The deferred compensation obligations for participants’ interest and equity accounts are recorded in “Pension and other benefit obligations” on Alliant Energy’s and IPL’s balance sheets. At December 31, the carrying value of deferred compensation obligations for participants’ interest and equity accounts, which approximates fair market value, was as follows (in millions):
 Alliant Energy IPL
 2015 2014 2015 2014
Carrying value$18.3 $17.8 $5.0 $5.2
 Alliant Energy IPL
 2016 2015 2016 2015
Carrying value$19.4 $18.3 $4.6 $5.0

NOTE 13. ASSET RETIREMENT OBLIGATIONS
Recognized AROs relate to legal obligations for the removal, closure or dismantlement of several assets including, but not limited to, ash ponds, wind projects,farms, active ash landfills, certain coal yards and above ground storage tanks. Recognized AROs also include legal obligations for the management and final disposition of asbestos, lead-based paint and polychlorinated biphenyls. AROs are recorded in “Other current liabilities” and “Other liabilities” on the balance sheets. Refer to Note 2 for information regarding regulatory assets related to AROs. A reconciliation of the changes in AROs associated with long-lived assets is as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2015 2014 2015 2014 2015 20142016 2015 2016 2015 2016 2015
Balance, January 1
$114.0
 
$109.7
 
$51.8
 
$47.9
 
$52.4
 
$52.4

$214.0
 
$114.0
 
$132.9
 
$51.8
 
$71.9
 
$52.4
Revisions in estimated cash flows (a)17.3
 
 15.1
 
 3.2
 
(13.3) 17.3
 (5.8) 15.1
 (7.5) 3.2
Liabilities settled(8.8) (3.4) (4.3) (1.4) (4.5) (2.0)(14.0) (8.8) (6.8) (4.3) (7.2) (4.5)
Liabilities incurred (a)86.6
 3.7
 67.8
 3.5
 18.8
 0.2
2.6
 86.6
 0.7
 67.8
 1.9
 18.8
Accretion expense4.9
 4.0
 2.5
 1.8
 2.0
 1.8
6.4
 4.9
 3.7
 2.5
 2.3
 2.0
Balance, December 31
$214.0
 
$114.0
 
$132.9
 
$51.8
 
$71.9
 
$52.4

$195.7
 
$214.0
 
$124.7
 
$132.9
 
$61.4
 
$71.9

(a)In April 2015, the EPA published the final CCR Rule, which regulates CCR as a non-hazardous waste and iswas effective October 2015. IPL and WPL have nine and three coal-fired EGUs, respectively, with coal ash ponds that are impacted by this rule. In addition, IPL and WPL have four and two active CCR landfills, respectively, that are impacted by this rule. In 2015, Alliant Energy, IPL and WPL recognized additional AROs of $87 million, $67 million and $20 million, respectively, as a result of the final CCR Rule. TheThese increases in AROs resulted in corresponding increases in “Property,property, plant and equipment, net”net on the respective balance sheets. Actual costs resulting from the CCR ruleRule may be different than the amounts recorded in 2015 due to potential changes in compliance strategies that will be used, as well as other potential cost estimate changes. Expenditures incurred by IPL and WPL to comply with the CCR Rule are anticipated to be recovered in rates from their customers.

In addition, certain AROs related to EGU assets have not been recognized. Due to an indeterminate remediation date, the fair values of the AROs for these assets cannot be currently estimated. A liability for these AROs will be recorded when fair value is determinable. Removal costs of these EGUs are being recovered in rates and are recorded in regulatory liabilities.


134



NOTE 14. FAIR VALUE MEASUREMENTS
Valuation Hierarchy - Fair value measurement accounting establishes athree levels of fair value hierarchy that prioritizesprioritize the inputs to valuation techniques used to measure fair value. The three levels of the fair value hierarchy and examples of each are as follows:

Level 1 - Pricingpricing inputs are quoted prices available in active markets for identical assets or liabilities as of the reporting date. At each reporting date, Level 1 items included IPL’s 5.1% cumulative preferred stock.

Level 2 - Pricingpricing inputs are quoted prices for similar assets or liabilities in active markets or quoted prices for identical or similar assets or liabilities in markets that are not active as of the reporting date. At each reporting date, Level 2 items included certain non-exchange traded commodity contracts and substantially all of the long-term debt instruments.

Level 3 - Pricingpricing inputs are unobservable inputs for assets or liabilities for which little or no market data exist and require significant management judgment or estimation. At each reporting date, Level 3 items included FTRs, certain non-exchange traded commodity contracts and IPL’s deferred proceeds.

The fair value hierarchy gives the highest priority to quoted prices in active markets (Level 1) and the lowest priority to unobservable data (Level 3). In some cases, the inputs used to measure fair value might fall in different levels of the fair value hierarchy. The lowest level input that is significant to a fair value measurement in its entirety determines the applicable level in the fair value hierarchy. Assessing the significance of a particular input to the fair value measurement in its entirety requires judgment, considering factors specific to the asset or liability.


Valuation Techniques -
Derivative assets and derivative liabilities - Derivative instruments are periodically used for risk management purposes to mitigate exposures to fluctuations in certain commodity prices, and transmission congestion costs and rail transportation costs. Risk policies are maintained that govern the use of such derivative instruments. Derivative instruments were not designated as hedging instruments and included the following:
Risk management purposeType of instrument
Mitigate pricing volatility for: 
Electricity purchased to supply customersElectric swap and physical forward contracts (IPL and WPL)
Fuel used to supply natural gas-fired EGUsNatural gas swap and physical forward contracts (IPL and WPL)
Natural gas options (WPL)
Natural gas supplied to retail customersNatural gas options and physical forward contracts (IPL and WPL)
 Natural gas swap contracts (IPL)
Fuel used at coal-fired EGUsCoal physical forward contracts (IPL and WPL)
Optimize the value of natural gas pipeline capacityNatural gas physical forward contracts (IPL and WPL)
 Natural gas swap contracts (IPL)
Manage transmission congestion costsFTRs (IPL and WPL)
Manage rail transportation costsDiesel fuel swap contracts (WPL)

Swap, option and physical forward commodity contracts were non-exchange-based derivative instruments and were valued using indicative price quotations from a pricing vendor that provides daily exchange forward price settlements, from broker or dealer quotations, from market publications or from on-line exchanges. The indicative price quotations reflected the average of the bid-ask mid-point prices and were obtained from sources believed to provide the most liquid market for the commodity. A portion of these indicative price quotations were corroborated using quoted prices for similar assets or liabilities in active markets and categorized derivative instruments based on such indicative price quotations as Level 2. Commodity contracts that were valued using indicative price quotations based on significant assumptions such as seasonal or monthly shaping and indicative price quotations that could not be readily corroborated were categorized as Level 3. Swap, option and physical forward commodity contracts were predominately at liquid trading points. FTRs were valued using monthly or annual auction shadow prices from relevant auctions and were categorized as Level 3. Refer to Note 15 for additional details of derivative assets and derivative liabilities.

The fair value measurements of Level 3 derivative instruments include observable and unobservable inputs. The observable inputs are obtained from third-party pricing sources, counterparties and brokers and include bids, offers, historical transactions (including historical price differences between locations with both observable and unobservable prices) and executed trades. The significant unobservable inputs used in the fair value measurement of commodity contracts are forecasted electricity, natural gas and coal prices, and the expected volatility of such prices. Significant changes in any of those inputs would result in a significantly lower or higher fair value measurement.

135




Deferred proceeds (sales of receivables) - The fair value of IPL’s deferred proceeds related to its sales of accounts receivable program was calculated each reporting date using the cost approach valuation technique. The fair value represents the carrying amount of receivables sold less the allowance for doubtful accounts associated with the receivables sold and cash amounts received from the receivables sold due to the short-term nature of the collection period. These inputs were considered unobservable and deferred proceeds were categorized as Level 3. Deferred proceeds represent IPL’s maximum exposure to loss related to the receivables sold. Refer to Note 5(b) for additional information regarding deferred proceeds.

Long-term debt (including current maturities) - The fair value of long-term debt instruments was based on quoted market prices for similar liabilities at each reporting date or on a discounted cash flow methodology, which utilizes assumptions of current market pricing curves at each reporting date.date, and was substantially classified as Level 2. Refer to Note 9(b) for additional information regarding long-term debt.

Cumulative preferred stock - The fair value of IPL’s 5.1% cumulative preferred stock was based on its closing market price quoted by the New York Stock Exchange at each reporting date.date, and was classified as Level 1. Refer to Note 8 for additional information regarding cumulative preferred stock.


Fair Value of Financial Instruments - The carrying amounts of current assets and current liabilities approximate fair value because of the short maturity of such financial instruments. Carrying amounts and the related estimated fair values of other financial instruments at December 31 were as follows (in millions):
Alliant Energy2015 20142016 2015
  Fair Value   Fair Value  Fair Value   Fair Value
Carrying Level Level Level   Carrying Level Level Level  Carrying Level Level Level   Carrying Level Level Level  
Amount 1 2 3 Total Amount 1 2 3 TotalAmount 1 2 3 Total Amount 1 2 3 Total
Assets:                                      
Derivatives
$18.4
 
$—
 
$2.5
 
$15.9
 
$18.4
 
$38.6
 
$—
 
$2.6
 
$36.0
 
$38.6

$41.4
 
$—
 
$4.6
 
$36.8
 
$41.4
 
$18.4
 
$—
 
$2.5
 
$15.9
 
$18.4
Deferred proceeds172.0
 
 
 172.0
 172.0
 177.2
 
 
 177.2
 177.2
211.1
 
 
 211.1
 211.1
 172.0
 
 
 172.0
 172.0
Liabilities and equity:                                      
Derivatives64.6
 
 16.0
 48.6
 64.6
 37.6
 
 19.5
 18.1
 37.6
28.6
 
 0.5
 28.1
 28.6
 64.6
 
 16.0
 48.6
 64.6
Long-term debt (including current maturities)3,835.6
 
 4,332.4
 3.7
 4,336.1
 3,767.3
 
 4,414.9
 3.3
 4,418.2
4,320.2
 
 4,795.7
 3.3
 4,799.0
 3,835.6
 
 4,332.4
 3.7
 4,336.1
Cumulative preferred stock of IPL200.0
 206.6
 
 
 206.6
 200.0
 200.2
 
 
 200.2
IPL’s cumulative preferred stock200.0
 194.8
 
 
 194.8
 200.0
 206.6
 
 
 206.6
IPL2015 20142016 2015
  Fair Value   Fair Value  Fair Value   Fair Value
Carrying Level Level Level   Carrying Level Level Level  Carrying Level Level Level   Carrying Level Level Level  
Amount 1 2 3 Total Amount 1 2 3 TotalAmount 1 2 3 Total Amount 1 2 3 Total
Assets:                                      
Derivatives
$15.5
 
$—
 
$2.0
 
$13.5
 
$15.5
 
$28.0
 
$—
 
$2.4
 
$25.6
 
$28.0

$20.8
 
$—
 
$2.8
 
$18.0
 
$20.8
 
$15.5
 
$—
 
$2.0
 
$13.5
 
$15.5
Deferred proceeds172.0
 
 
 172.0
 172.0
 177.2
 
 
 177.2
 177.2
211.1
 
 
 211.1
 211.1
 172.0
 
 
 172.0
 172.0
Liabilities and equity:                                      
Derivatives23.4
 
 8.0
 15.4
 23.4
 19.5
 
 13.3
 6.2
 19.5
8.3
 
 0.4
 7.9
 8.3
 23.4
 
 8.0
 15.4
 23.4
Long-term debt (including current maturities)1,856.9
 
 2,092.7
 
 2,092.7
 1,758.0
 
 2,053.0
 
 2,053.0
2,153.5
 
 2,352.3
 
 2,352.3
 1,856.9
 
 2,092.7
 
 2,092.7
Cumulative preferred stock200.0
 206.6
 
 
 206.6
 200.0
 200.2
 
 
 200.2
200.0
 194.8
 
 
 194.8
 200.0
 206.6
 
 
 206.6

136



WPL2015 20142016 2015
  Fair Value   Fair Value  Fair Value   Fair Value
Carrying Level Level Level   Carrying Level Level Level  Carrying Level Level Level   Carrying Level Level Level  
Amount 1 2 3 Total Amount 1 2 3 TotalAmount 1 2 3 Total Amount 1 2 3 Total
Assets:                                      
Derivatives
$2.9
 
$—
 
$0.5
 
$2.4
 
$2.9
 
$10.6
 
$—
 
$0.2
 
$10.4
 
$10.6

$20.6
 
$—
 
$1.8
 
$18.8
 
$20.6
 
$2.9
 
$—
 
$0.5
 
$2.4
 
$2.9
Liabilities and equity:                                      
Derivatives41.2
 
 8.0
 33.2
 41.2
 18.1
 
 6.2
 11.9
 18.1
20.3
 
 0.1
 20.2
 20.3
 41.2
 
 8.0
 33.2
 41.2
Long-term debt (including current maturities)1,533.9
 
 1,793.0
 
 1,793.0
 1,563.1
 
 1,908.9
 
 1,908.9
1,535.2
 
 1,807.4
 
 1,807.4
 1,533.9
 
 1,793.0
 
 1,793.0

Unrealized gains and losses from derivative instruments are generally recorded with offsets to regulatory assets or regulatory liabilities, based on fuel and natural gas cost recovery mechanisms, as well as other specific regulatory authorizations. Based on these recovery mechanisms, the changes in the fair value of derivative liabilities resulted in comparable changes to regulatory assets, and the changes in the fair value of derivative assets resulted in comparable changes to regulatory liabilities.

Information for fair value measurements using significant unobservable inputs (Level 3 inputs) was as follows (in millions):
Alliant EnergyCommodity Contract Derivative  Commodity Contract Derivative  
Assets and (Liabilities), net Deferred ProceedsAssets and (Liabilities), net Deferred Proceeds
2015 2014 2015 20142016 2015 2016 2015
Beginning balance, January 1
$17.9
 
$4.4
 
$177.2
 
$203.5

($32.7) 
$17.9
 
$172.0
 
$177.2
Total net gains (losses) included in changes in net assets (realized/unrealized)(63.5) 11.1
 
 
30.7
 (63.5) 
 
Transfers into Level 30.9
 
 
 
Transfers out of Level 30.3
 
 
 
1.2
 0.3
 
 
Purchases36.9
 76.7
 
 
22.0
 36.9
 
 
Sales(1.9) (2.2) 
 
(1.0) (1.9) 
 
Settlements (a)(22.4) (72.1) (5.2) (26.3)(12.4) (22.4) 39.1
 (5.2)
Ending balance, December 31
($32.7) 
$17.9
 
$172.0
 
$177.2

$8.7
 
($32.7) 
$211.1
 
$172.0
The amount of total net losses for the period included in changes in net assets attributable to the change in unrealized losses relating to assets and liabilities held at December 31
($56.0) 
($0.4) 
$—
 
$—
The amount of total net gains (losses) for the period included in changes in net assets attributable to the change in unrealized gains (losses) relating to assets and liabilities held at December 31
$32.7
 
($56.0) 
$—
 
$—
IPLCommodity Contract Derivative  Commodity Contract Derivative  
Assets and (Liabilities), net Deferred ProceedsAssets and (Liabilities), net Deferred Proceeds
2015 2014 2015 20142016 2015 2016 2015
Beginning balance, January 1
$19.4
 
$14.6
 
$177.2
 
$203.5

($1.9) 
$19.4
 
$172.0
 
$177.2
Total net losses included in changes in net assets (realized/unrealized)(29.6) (5.9) 
 
Total net gains (losses) included in changes in net assets (realized/unrealized)7.3
 (29.6) 
 
Transfers into Level 30.5
 
 
 
Transfers out of Level 30.2
 
 
 
Purchases33.1
 68.8
 
 
20.6
 33.1
 
 
Sales(1.8) (2.0) 
 
(1.0) (1.8) 
 
Settlements (a)(23.0) (56.1) (5.2) (26.3)(15.6) (23.0) 39.1
 (5.2)
Ending balance, December 31
($1.9) 
$19.4
 
$172.0
 
$177.2

$10.1
 
($1.9) 
$211.1
 
$172.0
The amount of total net losses for the period included in changes in net assets attributable to the change in unrealized losses relating to assets and liabilities held at December 31
($23.1) 
($9.3) 
$—
 
$—
The amount of total net gains (losses) for the period included in changes in net assets attributable to the change in unrealized gains (losses) relating to assets and liabilities held at December 31
$8.5
 
($23.1) 
$—
 
$—

137



WPLCommodity Contract DerivativeCommodity Contract Derivative
Assets and (Liabilities), netAssets and (Liabilities), net
2015 20142016 2015
Beginning balance, January 1
($1.5) 
($10.2)
($30.8) 
($1.5)
Total net gains (losses) included in changes in net assets (realized/unrealized)(33.9) 17.0
23.4
 (33.9)
Transfers into Level 30.4
 
Transfers out of Level 30.3
 
1.0
 0.3
Purchases3.8
 7.9
1.4
 3.8
Sales(0.1) (0.2)
 (0.1)
Settlements0.6
 (16.0)3.2
 0.6
Ending balance, December 31
($30.8) 
($1.5)
($1.4) 
($30.8)
The amount of total net gains (losses) for the period included in changes in net assets attributable to the change in unrealized gains (losses) relating to assets and liabilities held at December 31
($32.9) 
$8.9

$24.2
 
($32.9)

(a)Settlements related to deferred proceeds are due to the change in the carrying amount of receivables sold less the allowance for doubtful accounts associated with the receivables sold and cash amounts received from the receivables sold.

Commodity Contracts - The fair value of electric, natural gas and coal commodity contracts categorized as Level 3 was recognized as net derivative assets (liabilities) at December 31 as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
Excluding FTRs FTRs Excluding FTRs FTRs Excluding FTRs FTRsExcluding FTRs FTRs Excluding FTRs FTRs Excluding FTRs FTRs
2016
($2.3) 
$11.0
 
$0.1
 
$10.0
 
($2.4) 
$1.0
2015
($43.1) 
$10.4
 
($12.3) 
$10.4
 
($30.8) 
$—
(43.1) 10.4
 (12.3) 10.4
 (30.8) 
2014(7.0) 24.9
 (3.2) 22.6
 (3.8) 2.3


NOTE 15. DERIVATIVE INSTRUMENTS
Commodity Derivatives -
Purpose - Derivative instruments are periodically used for risk management purposes to mitigate exposures to fluctuations in certain commodity prices and transmission congestion costs. Refer to Note 14 for detailed discussion of derivative instruments.

Notional Amounts - As of December 31, 2015,2016, gross notional amounts and settlement/delivery years related to outstanding swap contracts, option contracts, physical forward contracts, FTRs, coal contracts and coaldiesel fuel contracts that were accounted for as commodity derivative instruments were as follows (units in thousands):
Electricity FTRs Natural Gas CoalElectricity FTRs Natural Gas Coal Diesel Fuel
MWhs Years MWhs Years Dths Years Tons YearsMWhs Years MWhs Years Dths Years Tons Years Gallons Years
Alliant Energy5,868
 2016-2018 9,880
 2016 104,096
 2016-2020 4,945
 2016-20182,628
 2017-2018 8,970
 2017 139,865
 2017-2023 4,239
 2017-2019 6,552
 2017-2018
IPL809
 2016 5,622
 2016 55,985
 2016-2020 1,966
 2016-2018
  5,465
 2017 56,265
 2017-2021 1,955
 2017-2019 
 
WPL5,059
 2016-2018 4,258
 2016 48,111
 2016-2020 2,979
 2016-20182,628
 2017-2018 3,505
 2017 83,600
 2017-2023 2,284
 2017-2018 6,552
 2017-2018

Financial Statement Presentation - Derivative instruments are recorded at fair value each reporting date on the balance sheet as assets or liabilities. At December 31, the fair values of current derivative assets are included in “Other current assets,” non-current derivative assets are included in “Deferred charges and other,” current derivative liabilities are included in “Other current liabilities” and non-current derivative liabilities are included in “Other liabilities” on the balance sheets as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
Commodity contracts2015 2014 2015 2014 2015 20142016 2015 2016 2015 2016 2015
Current derivative assets
$15.1
 
$30.5
 
$13.8
 
$27.4
 
$1.3
 
$3.1

$29.4
 
$15.1
 
$19.1
 
$13.8
 
$10.3
 
$1.3
Non-current derivative assets3.3
 8.1
 1.7
 0.6
 1.6
 7.5
12.0
 3.3
 1.7
 1.7
 10.3
 1.6
Current derivative liabilities47.3
 28.1
 18.5
 16.4
 28.8
 11.7
13.3
 47.3
 2.7
 18.5
 10.6
 28.8
Non-current derivative liabilities17.3
 9.5
 4.9
 3.1
 12.4
 6.4
15.3
 17.3
 5.6
 4.9
 9.7
 12.4

Unrealized gains and losses from commodity derivative instruments wereare generally recorded with offsets to regulatory assets or regulatory liabilities, based on fuel and natural gas cost recovery mechanisms, as well as other specific regulatory authorizations. Based on these recovery mechanisms, the balance sheets.changes in the fair value of derivative liabilities resulted in comparable changes to regulatory assets, and the changes in the fair value of derivative assets resulted in comparable changes to regulatory liabilities. Refer to Notes Note 2 and 14 for further discussion.

138




Credit Risk-related Contingent Features - Various agreements contain credit risk-related contingent features, including requirements to maintain certain credit ratings and/or limitations on liability positions under the agreements based on credit ratings. Certain of these agreements with credit risk-related contingency features are accounted for as derivative instruments. In the event of a material change in creditworthiness or if liability positions exceed certain contractual limits, credit support may need to be provided in the form of letters of credit or cash collateral up to the amount of exposure under the contracts, or the contracts may need to be unwound and underlying liability positions paid. At December 31, 20152016 and 2014,2015, the aggregate fair value of all derivative instruments with credit risk-related contingent features in a net liability position was not materially different than amounts that would be required to be posted as credit support to counterparties by Alliant Energy, IPL or WPL if the most restrictive credit risk-related contingent features for derivative agreements in a net liability position were triggered.

Balance Sheet Offsetting - The fair value amounts of derivative instruments subject to a master netting arrangement are not netted by counterparty on the balance sheets. However, if the fair value amounts of derivative instruments by counterparty were netted, amounts would not be materially different from gross amounts of derivative assets and derivative liabilities at December 31, 20152016 and 2014.2015. Fair value amounts recognized for the right to reclaim cash collateral (receivable) or the obligation to return cash collateral (payable) are not offset against fair value amounts recognized for derivative instruments executed with the same counterparty under the same master netting arrangement.

NOTE 16. COMMITMENTS AND CONTINGENCIES
NOTE 16(a) Capital Purchase Obligations - Various contractual obligations contain minimum future commitments related to capital expenditures for certain construction projects. IPL’s projects include generation maintenance and performance improvements for Marshalltown Combustion Turbine Units 1-3.the installation of an SCR system at Ottumwa Unit 1 to reduce NOx emissions at the EGU. WPL’s projects include the installation of a scrubber and baghouse at Edgewater Unit 5 to reduce SO2 and mercury emissions,Riverside expansion, generation maintenance and performance improvements at Columbia Units 1 and 2, and the installation of an SCR system at Columbia Unit 2 to reduce NOx emissions at the EGU. At December 31, 20152016, Alliant Energy’s, IPL’s and WPL’s minimum future commitments related to certain contractual obligations for these projects were $23$58 million, $7$3 million and $16$55 million, respectively.

NOTE 16(b) Operating Expense Purchase Obligations - Various commodity supply, transportation and storage contracts help meet obligations to provide electricity and natural gas to utility customers. Other operating expense purchase obligations with various vendors provide other goods and services. At December 31, 20152016, minimum future commitments related to these operating expense purchase obligations were as follows (in millions):
Alliant Energy2016 2017 2018 2019 2020 Thereafter Total
Purchased power (a):             
DAEC (IPL) (b)
$125
 
$138
 
$131
 
$143
 
$133
 
$749
 
$1,419
Other77
 44
 44
 
 
 
 165
 202
 182
 175
 143
 133
 749
 1,584
Natural gas173
 82
 52
 43
 32
 16
 398
Coal (c)129
 76
 50
 12
 
 
 267
SO2 emission allowances14
 8
 
 
 
 
 22
Other (d)6
 2
 2
 2
 2
 7
 21
 
$524
 
$350
 
$279
 
$200
 
$167
 
$772
 
$2,292
Alliant Energy2017 2018 2019 2020 2021 Thereafter Total
Purchased power (a)
$185
 
$189
 
$159
 
$137
 
$149
 
$599
 
$1,418
Natural gas223
 142
 115
 98
 69
 124
 771
Coal (b)105
 54
 18
 
 
 
 177
Other (c)16
 4
 5
 2
 2
 5
 34
 
$529
 
$389
 
$297
 
$237
 
$220
 
$728
 
$2,400
IPL2016 2017 2018 2019 2020 Thereafter Total
Purchased power (a):             
DAEC (b)
$125
 
$138
 
$131
 
$143
 
$133
 
$749
 
$1,419
Other1
 
 
 
 
 
 1
 126
 138
 131
 143
 133
 749
 1,420
Natural gas95
 42
 35
 28
 18
 10
 228
Coal (c)70
 30
 17
 4
 
 
 121
SO2 emission allowances14
 8
 
 
 
 
 22
Other (d)1
 
 
 
 
 
 1
 $306 
$218
 
$183
 
$175
 
$151
 
$759
 
$1,792
IPL2017 2018 2019 2020 2021 Thereafter Total
Purchased power (a)
$138
 
$131
 
$144
 
$137
 
$149
 
$599
 
$1,298
Natural gas120
 74
 55
 39
 23
 71
 382
Coal (b)49
 19
 9
 
 
 
 77
Other (c)15
 1
 1
 
 
 
 17
 
$322
 
$225
 
$209
 
$176
 
$172
 
$670
 
$1,774

139



WPL2016 2017 2018 2019 2020 Thereafter Total2017 2018 2019 2020 2021 Thereafter Total
Purchased power (a)
$76
 
$44
 
$44
 
$—
 
$—
 
$—
 
$164

$47
 
$58
 
$15
 
$—
 
$—
 
$—
 
$120
Natural gas78
 40
 17
 15
 14
 6
 170
103
 68
 60
 59
 46
 53
 389
Coal (c)(b)59
 46
 33
 8
 
 
 146
56
 35
 9
 
 
 
 100
Other (d)(c)2
 
 
 
 
 
 2

 1
 1
 
 
 
 2

$215
 
$130
 
$94
 
$23
 
$14
 
$6
 
$482

$206
 
$162
 
$85
 
$59
 
$46
 
$53
 
$611

(a)
Includes payments required by PPAs for capacity rights and minimum quantities of MWhs required to be purchased. Refer to Note 18 for additional information on purchased power transactions.
(b)
Includes commitments incurred under a PPA, which grants IPL rights to purchase up to 431 MWs of capacity and the resulting energy from DAEC for a term through December 31, 2025. If energy delivered is less than the targeted energy amount, an adjustment payment will be made to IPL, which will be reflected in IPL’s fuel adjustment clause.
(c)Corporate Services entered into system-wide coal contracts on behalf of IPL and WPL that include minimum future commitments. These commitments were assigned to IPL and WPL based on information available as of December 31, 20152016 regarding expected future usage, which is subject to change.
(d)(c)
Includes individual commitments incurred during the normal course of business that exceeded $1$1 million at December 31, 2015.
2016.

Certain contracts are considered leases and are therefore not included here, but are included in Note 10.

NOTE 16(c) Legal Proceedings -
Flood Damage Claims - In 2013, several plaintiffs purporting to represent a class of residential and commercial property owners filed a complaint against CRANDIC, Alliant Energy and various other defendants in the Iowa District Court for Linn County. Plaintiffs assert claims of negligence and strict liability based on their allegations that CRANDIC (along with other defendants) caused or exacerbated flooding of the Cedar River in June 2008. OnIn February 12, 2016, the Iowa District Court for Linn County ruled in favor of Alliant Energy and CRANDIC and dismissed all claims against them, resulting in no loss. Plaintiffs have 30 days to seek anIn August 2016, the Iowa District Court for Linn County dismissed all claims against the remaining defendants. In September 2016, plaintiffs filed a notice of appeal with the Supreme Court of Iowa. Alliant Energy does not currently believe any material losses for this decision.complaint are both probable and reasonably estimated, and therefore has not recognized any material loss contingency amounts as of December 31, 2016.

Other - Alliant Energy, IPL and WPL are involved in other legal and administrative proceedings before various courts and agencies with respect to matters arising in the ordinary course of business. Although unable to predict the outcome of these matters, Alliant Energy, IPL and WPL believe that appropriate reserves have been established and final disposition of these actions will not have a material effect on their financial condition or results of operations.

NOTE 16(d) Guarantees and Indemnifications -
RMT - In 2013, Alliant Energy sold RMT. RMT provided renewable energy services, including construction and high voltage connection services for wind and solar projects. As part of the sale, Alliant Energy indemnified the buyer for any claims, including claims of warranty under the project obligations that were commenced or are based on actions that occurred prior to the sale, except for liabilities already accounted for through adjustments to the purchase price. TheIn 2016, the indemnification obligations either cease to exist when the statute of limitation for such claims is met or, in the case of RMT’s projects, when the warranty period under the agreements expires. Theand contractual warranty periods for RMT’s projects generally range from 12 to 60 months with the latest expiring in 2016. Limitedexpired; however, limited warranties may be extended in certain cases for warranty work performed.

Alliant Energy also continues to guarantee RMT’s performance obligations related to certain of RMT’s projects that were commenced prior to Alliant Energy’s sale of RMT. As of December 31, 20152016, Alliant Energy had $12375 million of performance guarantees outstanding, with $48 million and $75 millionwhich are currently expected to expire in 2016 and 2017, respectively.2017. The expiration of these performance guarantees may be extended depending on when all valid warranty claims are resolved for the respective projects.

Although Alliant Energy has received warranty claims related to certain of these projects, it does not currently believe that material losses are both probable and reasonably estimated, and therefore, has not recognized any material liabilities related to these matters as of December 31, 2015.2016. Alliant Energy does not currently believe that the range of future potential loss from any warranty claims will be material. Refer to Note 19 for further discussion of RMT, including amounts Alliant Energy recorded to “Operating expenses” in 2016, 2015 and 2014 related to certain warranty claims.


140



Whiting Petroleum - In 2004, Alliant Energy sold its remaining interest in Whiting Petroleum. Whiting Petroleum is an independent oil and gas company. Alliant Energy Resources, LLC, as the successor to a predecessor entity that owned Whiting Petroleum, and a wholly-owned subsidiary of AEF, continues to guarantee the partnership obligations of an affiliate of Whiting Petroleum under general partnership agreements in the oil and gas industry, including with respect to the future abandonment of certain platforms off the coast of California and related onshore plant and equipment owned by the partnerships. The guarantees do not include a maximum limit. As of December 31, 2015,2016, the present value of the abandonment obligations is estimated at $28$31 million. Alliant Energy is not aware of any material liabilities related to these guarantees of which it is probable that Alliant Energy Resources, LLC will be obligated to pay and therefore has not recognized any material liabilities related to this guarantee as of December 31, 2015.2016.

IPL’s Minnesota Electric Distribution Assets - IPL provided indemnifications associated with the July 2015 sale of its Minnesota electric distribution assets for losses resulting from potential breach of IPL’s representations, warranties and obligations under the sale agreement. Alliant Energy and IPL believe the likelihood of having to make any material cash payments under these indemnifications is remote. IPL has not recorded any material liabilities related to these indemnifications as of December 31, 2015.2016. The general terms of the indemnifications provided by IPL included a maximum limit of $17 million and expire in October 2020. Refer to Note 3 for further discussion of the sale of IPL’s Minnesota electric distribution assets.

NOTE 16(e) Environmental Matters - Alliant Energy, IPL and WPL are subject to environmental regulations as a result of their current and past operations. These regulations are designed to protect public health and the environment and have resulted in compliance, remediation, containment and monitoring obligations, which are recorded as environmental liabilities. At December 31, current environmental liabilities were included in “Other current liabilities” and non-current environmental liabilities. Substantially all of the environmental liabilities were included in “Other liabilities”recorded on the balance sheets as follows (in millions):relate to MGP sites.
 Alliant Energy IPL WPL
 2015 2014 2015 2014 2015 2014
Current environmental liabilities
$2.7
 
$2.0
 
$1.7
 
$1.7
 
$1.0
 
$0.3
Non-current environmental liabilities12.8
 13.5
 11.2
 11.9
 1.5
 1.6
 
$15.5
 
$15.5
 
$12.9
 
$13.6
 
$2.5
 
$1.9

MGP Sites - IPL and WPL have current or previous ownership interests in various sites that are previously associated with the production of gas for which IPL and WPL have, or may have in the future, liability for investigation, remediation and monitoring costs. IPL and WPL are working pursuant to the requirements of various federal and state agencies to investigate, mitigate, prevent and remediate, where necessary, the environmental impacts to property, including natural resources, at and around these former MGP sites in order to protect public health and the environment. IPL and WPL are currently monitoring and/or remediating 24 and 5 sites, respectively.

Environmental liabilities related to these MGP sites are recorded based upon periodic studies. Such amounts are based on the best current estimate of the remaining amount to be incurred for investigation, remediation and monitoring costs for those sites where the investigation process has been or is substantially completed, and the minimum of the estimated cost range for those sites where the investigation is in its earlier stages. There are inherent uncertainties associated with the estimated remaining costs for MGP projects primarily due to unknown site conditions and potential changes in regulatory agency requirements. It is possible that future cost estimates will be greater than current estimates as the investigation process proceeds and as additional facts become known. The amounts recognized as liabilities are reduced for expenditures incurred and are adjusted as further information develops or circumstances change. Costs of future expenditures for environmental remediation obligations are not discounted. At December 31, 2015,2016, estimated future costs expected to be incurred for the investigation, remediation and monitoring of the MGP sites, as well as environmental liabilities recorded on the balance sheets for these sites, were as follows (in millions):. At December 31, 2016, such amounts for WPL were not material.
Alliant Energy IPL WPLAlliant Energy IPL
Range of estimated future costs
$11
-$28 
$9
-$25 
$2
-$3
$14
-$27 
$12
-$24
Current and non-current environmental liabilities15 13 216 13


Refer to Note 2 for discussion of regulatory assets recorded by IPL and WPL, which reflect the probable future rate recovery of MGP expenditures. Considering the current rate treatment, and assuming no material change therein, Alliant Energy, IPL and WPL believe that the clean-up costs incurred for these MGP sites will not have a material effect on their financial condition or results of operations.


141



WPL Consent Decree - In 2009,2013, the U.S. District Court for the Western District of Wisconsin approved a Consent Decree that WPL, along with the other owners of Edgewater and Columbia, entered into with the EPA sent a notice of violation to WPL as an owner and the operatorSierra Club, thereby resolving claims against WPL. Such claims included allegations that the owners of Edgewater, Nelson Dewey and Columbia alleging that the owners of such EGUs failed to comply with appropriate pre-construction review and permitting requirements and as a result violated the PSDPrevention of Significant Deterioration program requirements, Title V Operating Permit requirements of the CAA and the Wisconsin SIP. In 2010, the Sierra Club filed complaints against WPL, as owner and operator of Nelson Dewey and Columbia, and separately as owner and operator of Edgewater, based on allegations that modifications were made at the facilities without complying with the PSD program requirements, Title V Operating Permit requirements of the CAA and state regulatory counterparts contained within the Wisconsin SIPState Implementation Plan designed to implement the CAA.

In 2013, WPL along with the other owners of Edgewater and Columbia, entered into a Consent Decree with the EPA and the Sierra Club to resolve the claims relating to Edgewater, Columbia and Nelson Dewey, while admitting no liability. In 2013,has completed various requirements under the Consent Decree was approved by the Western Wisconsin Court, thereby resolving all claims against WPL. Under the Consent Decree, WPL is required to install the following environmental controls systems:

SCR system at Edgewater Unit 5 by May 1, 2013 (placed in service in 2012);
Scrubbers and baghouses at Columbia Units 1 and 2 by December 31, 2014 (placed in service in 2014);
Scrubber and baghouse at Edgewater Unit 5 by December 31, 2016; and
Decree. WPL’s remaining requirements include installing an SCR system at Columbia Unit 2 by December 31, 2018.

WPL is also required toand fuel switchswitching or retireretiring Edgewater Unit 4 by December 31, 2018. In December 2015, WPL retired Nelson Dewey Units 1 and 2 and Edgewater Unit 3 consistent with the Consent Decree. In addition, theThe Consent Decree also establishes emission rate limits for SO2, NOx and particulate matter emission rate limits for Columbia Units 1 and 2, Nelson Dewey Units 1 and 2, and Edgewater Units 4 and 5. TheIn addition, the Consent Decree also includes annual plant-wide SO2 and NOx emission caps for SO2Columbia and NOx for Columbia, Edgewater and Nelson Dewey. In addition,Edgewater. WPL will completeis in the process of completing approximately $7 million in environmental mitigation projects.

Final recovery of the costs expected to be incurred related to the Consent Decree will be decided by the PSCW in future rate cases or other proceedings. Alliant Energy and WPL currently expect to recover any material costs incurred by WPL related to compliance with the terms of the Consent Decree from WPL’s electric customers.

IPL Consent Decree - In July 2015, the U.S. District Court for the Northern District of Iowa approved a Consent Decree that IPL entered into a Consent Decree with the EPA, the Sierra Club, the State of Iowa and Linn County in Iowa, to resolvethereby resolving potential claims regarding CAA issues associated with emissions from IPL’s coal-fired generating facilities in Iowa, while admitting no liability. In September 2015,Iowa. IPL has completed various requirements under the Consent Decree was approved by the Northern Iowa Court, thereby resolving all potential claims against IPL. Under the Consent Decree, IPL is required to install the following environmental controls systems:

Scrubber and baghouse at the Ottumwa Generating Station by December 31, 2015 (placed in service in 2014);
Scrubber and baghouse at the Lansing Generating Station by December 31, 2016 (scrubber was placed in service in June 2015 and baghouse was placed in service in 2010); and
Decree. IPL’s remaining requirements include installing an SCR system or equivalent NOx reduction system at the Ottumwa Generating Station by December 31, 2019.

IPL is also required to2019; fuel switchswitching or retire the following EGUs:

M.L. Kapp Generating Station by August 31, 2015 (switched the fuel type from coal to natural gas in June 2015);
retiring Prairie Creek Unit 4 by June 1, 2018;
2018, the Burlington Generating Station by December 31, 2021;2021 and
Prairie Creek Units 1 and 3 by December 31, 2025.

In addition, IPL is required to2025; and either installinstalling combined cycle technology at, or retire,retiring, the Dubuque and Sutherland GenerationGenerating Stations by June 1, 2019. IPL previously switched the fuel type from coal to natural gas at these EGUs.

The Consent Decree also establishes SO2, NOx and particulate matter emission rate limits with varying averaging times for the Burlington, Lansing, M.L. Kapp, Ottumwa and Prairie Creek Generating Stations. In addition, the Consent Decree includes calendar-year SO2 and NOx emission caps for the Prairie Creek Generating Station, and calendar-year SO2 and NOx emission caps in aggregate for the Burlington, Dubuque, Lansing, M.L. Kapp, Ottumwa, Prairie Creek and Sutherland Generating Stations. Pursuant toIPL is in the Consent Decree, IPL paid a civil penaltyprocess of $1 million in 2015 and will completecompleting approximately $6 million in environmental mitigation projects.


142



Alliant Energy and IPL currently expect to recover all material costs incurred by IPL related to the environmental control systems and environmental mitigation projects from IPL’s electric customers. The recovery of such costs will be decided by IPL’s regulators in future rate cases or other proceedings. Alliant Energy and IPL currently do not expect to recover costs related to the civil penalty from IPL’s electric customers.

Other Environmental Contingencies - In addition to the environmental liabilities discussed above, various environmental rules are monitored that may have a significant impact on future operations. Several of these environmental rules are subject to legal challenges, reconsideration and/or other uncertainties. Given uncertainties regarding the outcome, timing and compliance plans for these environmental matters, the complete financial impact of each of these rules is not able to be determined; however future capital investments and/or modifications to EGUs to comply with certain of these rules could be significant. Specific current, proposed or potential environmental matters are included below, along with a brief descriptioninclude, among others: CSAPR, Effluent Limitation Guidelines, CCR Rule, and various legislation and EPA regulations to monitor and regulate the emission of these environmental rules.GHG, including carbon emissions from new (CAA Section 111(b)) and existing (CAA Section 111(d)) fossil-fueled EGUs.

Air Quality -
CSAPR is an emissions trading program that requires SO2 and NOx emissions reductions at certain IPL and WPL fossil-fueled EGUs through installation of environmental controls and/or purchases of allowances. Compliance with emission limits began in 2015, with additional emission limits reductions beginning in 2017. Alliant Energy, IPL and WPL are currently in compliance with the Phase I CSAPR emission limits.

Ozone NAAQS Rule may require NOx emission reductions in certain non-attainment areas designated by the EPA. The EPA’s final designations of non-attainment areas for this rule are currently expected to be issued by October 2017. Compliance deadlines range from 2020 through 2037 depending on the level of ozone monitored in non-attainment areas. Sheboygan County in Wisconsin is currently the only non-attainment area in Alliant Energy’s service territory. WPL operates Edgewater and Sheboygan Falls in Sheboygan County, Wisconsin.

Clean Air Act Section 111(d) establishes standards under Section 111(d) of the CAA, otherwise referred to as the Clean Power Plan, for states to follow in developing plans to reduce CO2 emissions from existing fossil-fueled EGUs. The standards include an interim compliance period from 2022 through 2029 and a final compliance requirement beginning in 2030. In February 2016, the Supreme Court issued a stay of the Clean Power Plan until pending legal challenges are resolved, which places implementation of the final standards on hold indefinitely.

Clean Air Act Section 111(b) establishes standards under Section 111(b) of the CAA for CO2 emissions limits for certain new fossil-fueled EGUs. Marshalltown and WPL’s proposed Riverside expansion are expected to be impacted by these standards. Marshalltown is being constructed, and WPL’s proposed Riverside expansion is being designed, to achieve compliance with these standards.

Water Quality -
Section 316(b) of the Federal Clean Water Act regulates cooling water intake structures and minimizes adverse environmental impacts to fish and other aquatic life. Compliance will be incorporated during periodic facility permit renewal cycles, with final compliance anticipated by 2022.

Effluent Limitation Guidelines require changes to discharge limits for wastewater from steam generating facilities. Compliance for existing steam generating facilities will be required after November 1, 2018 but before December 31, 2023, depending on each facility’s wastewater permit renewal cycle, and immediately upon operation for new steam generating facilities constructed after January 2016.

Hydroelectric Fish Passage Device - WPL is currently required to install an agency-approved fish passage device at its Prairie du Sac hydro plant by December 31, 2020.

Land and Solid Waste -
CCR Rule establishes minimum criteria for disposing of CCR in landfills and surface impoundments (ash ponds), and allows for continued operation of ash ponds if they meet certain performance criteria. Refer to Note 13 for further discussion of the CCR Rule, including additional AROs that were recognized in 2015 related to such rule.


143



NOTE 16(f) Credit Risk - IPL and WPL provide regulated electricity and natural gas services to residential, commercial, industrial and wholesale customers in the Midwest region of the U.S.Iowa, Minnesota and Illinois for IPL and Wisconsin for WPL. The geographic concentration of these customers did not contribute significantly to overall credit risk exposure. In addition, as a result of a diverse customer base, IPL and WPL did not have any significant credit risk concentration for receivables arising from the sale of electricity or natural gas services.

Alliant Energy, IPL and WPL are subject to credit risk related to the ability of counterparties to meet their contractual payment obligations or the potential non-performance of counterparties to deliver contracted commodities and other goods or services at the contracted price. IPL and WPL are typically net buyers of commodities (primarily electricity, coal and natural gas) required to provide regulated electricity and natural gas services to their customers. As a result, IPL and WPL are also subject to credit risk related to their counterparties’ failures to deliver commodities at the contracted price.

Credit policies are maintained to mitigate credit risk. These credit policies include evaluation of the financial condition of certain counterparties, use of credit risk-related contingent provisions in certain commodity agreements that require credit support from counterparties that exceed certain exposure limits,not meeting specific criteria, diversification of counterparties to reduce concentrations of credit risk and the use of standardized agreements that facilitate the netting of cash flows associated with certain counterparties.

IPL has a PPA that grants it rights to purchase capacity and the resulting energy from DAEC through December 31, 2025. This PPA exposes Alliant Energy and IPL to risk of counterparty non-performance. However, financial risk is mitigated by IPL’s fuel-related cost recovery mechanisms. Refer to Note 16(b) for further discussion of the DAEC PPA.

Based on these credit policies and counterparty diversification, andas well as utility cost recovery mechanisms, it is unlikely that counterparty non-performance would have a material effect on financial condition or results of

operations. However, there is no assurance that these items will protect against all losses from counterparty non-performance.

Refer to Notes 5(a) and 15 for details of allowances for doubtful accounts and credit risk-related contingent features, respectively.

NOTE 16(g) Collective Bargaining Agreements - At December 31, 2016, employees covered by collective bargaining agreements represented 56%, 65% and 81% of total employees of Alliant Energy, IPL and WPL, respectively. In August 2017, IPL’s collective bargaining agreement with International Brotherhood of Electrical Workers Local 204 (Cedar Rapids) expires, representing 19% and 46% of total employees of Alliant Energy and IPL, respectively.

NOTE 17. SEGMENTS OF BUSINESS
Alliant Energy - Alliant Energy’s principal businesses as of December 31, 20152016 are:
Utility - includes the operations of IPL and WPL, which primarily serve retail customers in Iowa and Wisconsin. The utility business has three reportable segments: a) utility electric operations;operations, which include Alliant Energy’s investment in ATC; b) utility gas operations; and c) utility other, which includes steam operations and the unallocated portions of the utility business. Various line items in the following tables are not allocated to the electric and gas segments for management reporting purposes, and therefore, are included only in “Total Utility.”
Non-regulated, Parent and Other - includes the operations of ResourcesAEF and its subsidiaries, Corporate Services, the Alliant Energy parent company, and any Alliant Energy parent company consolidating adjustments. Resources’AEF’s businesses include Transportation, Non-regulated Generation and other non-regulated investments described in Note 1(a).

Alliant Energy’s administrative support services are directly charged to the applicable segment where practicable. In all other cases, administrative support services are allocated to the applicable segment based on services agreements. Intersegment revenues were not material to Alliant Energy’s operations and there was no single customer whose revenues were 10% or more of Alliant Energy’s consolidated revenues. All of Alliant Energy’s operations and assets are located in the U.S.


144



Certain financial information relating to Alliant Energy’s business segments, which represent the services and geographic informationprovided to its customers, was as follows (in millions):
Utility Non-Regulated, Alliant EnergyUtility Non-Regulated, Alliant Energy
2015Electric Gas Other Total Parent and Other Consolidated
2016Electric Gas Other Total Parent and Other Consolidated
Operating revenues
$2,770.5
 
$381.2
 
$57.9
 
$3,209.6
 
$44.0
 
$3,253.6

$2,875.5
 
$355.4
 
$48.6
 
$3,279.5
 
$40.5
 
$3,320.0
Depreciation and amortization358.6
 31.1
 1.8
 391.5
 9.8
 401.3
367.0
 34.2
 2.1
 403.3
 8.3
 411.6
Operating income514.1
 34.6
 1.9
 550.6
 26.4
 577.0
Operating income (loss)571.9
 30.7
 (4.8) 597.8
 (60.8) 537.0
Interest expense      189.2
 (2.1) 187.1
      194.6
 1.6
 196.2
Equity (income) loss from unconsolidated investments, net(35.1) 
 
 (35.1) 1.3
 (33.8)(39.8) 
 
 (39.8) 0.2
 (39.6)
Income taxes      60.2
 10.2
 70.4
Net income attributable to Alliant Energy common shareowners      362.3
 15.9
 378.2
Income tax expense (benefit)      87.4
 (28.0) 59.4
Net income (loss) attributable to Alliant Energy common shareowners      406.0
 (34.5) 371.5
Total assets10,211.3
 939.3
 828.9
 11,979.5
 515.7
 12,495.2
11,040.5
 1,091.1
 781.0
 12,912.6
 461.2
 13,373.8
Investments in equity method subsidiaries302.0
 
 
 302.0
 0.9
 302.9
325.3
 
 
 325.3
 0.7
 326.0
Construction and acquisition expenditures855.8
 106.4
 1.4
 963.6
 70.7
 1,034.3
1,005.5
 137.1
 0.1
 1,142.7
 54.1
 1,196.8
Utility Non-Regulated, Alliant EnergyUtility Non-Regulated, Alliant Energy
2014Electric Gas Other Total Parent and Other Consolidated
2015Electric Gas Other Total Parent and Other Consolidated
Operating revenues
$2,713.6
 
$517.5
 
$66.1
 
$3,297.2
 
$53.1
 
$3,350.3

$2,770.5
 
$381.2
 
$57.9
 
$3,209.6
 
$44.0
 
$3,253.6
Depreciation and amortization347.0
 29.9
 1.8
 378.7
 9.4
 388.1
358.6
 31.1
 1.8
 391.5
 9.8
 401.3
Operating income442.4
 53.8
 14.0
 510.2
 33.4
 543.6
514.1
 34.6
 1.9
 550.6
 26.4
 577.0
Interest expense      176.3
 4.3
 180.6
      189.2
 (2.1) 187.1
Equity (income) loss from unconsolidated investments, net(42.8) 
 
 (42.8) 2.4
 (40.4)(35.1) 
 
 (35.1) 1.3
 (33.8)
Income taxes      36.4
 7.9
 44.3
      60.2
 10.2
 70.4
Net income attributable to Alliant Energy common shareowners      362.0
 21.1
 383.1
      362.3
 15.9
 378.2
Total assets9,660.4
 913.5
 993.9
 11,567.8
 495.7
 12,063.5
10,211.3
 939.3
 828.9
 11,979.5
 515.7
 12,495.2
Investments in equity method subsidiaries294.3
 
 
 294.3
 2.3
 296.6
302.0
 
 
 302.0
 0.9
 302.9
Construction and acquisition expenditures774.8
 63.2
 0.9
 838.9
 63.9
 902.8
855.8
 106.4
 1.4
 963.6
 70.7
 1,034.3

 Utility Non-Regulated, Alliant Energy
2013Electric Gas Other Total Parent and Other Consolidated
Operating revenues
$2,689.0
 
$464.8
 
$71.3
 
$3,225.1
 
$51.7
 
$3,276.8
Depreciation and amortization333.0
 28.8
 1.5
 363.3
 7.6
 370.9
Operating income444.5
 57.3
 6.3
 508.1
 25.8
 533.9
Interest expense      166.3
 6.5
 172.8
Equity income from unconsolidated investments, net(43.7) 
 
 (43.7) 
 (43.7)
Income taxes      49.3
 4.6
 53.9
Net income attributable to Alliant Energy common shareowners      349.5
 8.8
 358.3
Total assets9,018.6
 859.3
 712.2
 10,590.1
 502.4
 11,092.5
Investments in equity method subsidiaries279.1
 
 
 279.1
 2.3
 281.4
Construction and acquisition expenditures677.3
 47.0
 7.3
 731.6
 66.7
 798.3

Services - Alliant Energy’s consolidated operating revenues by segment, which were substantially all related to services, were as follows:
 2015 2014 2013
Utility electric operations85% 81% 82%
Utility gas operations12% 15% 14%
Utility other2% 2% 2%
Other1% 2% 2%
 100% 100% 100%


145



Geographic Information - At December 31, 2015, 2014 and 2013, Alliant Energy, IPL and WPL did not have any long-lived assets to be held and used in foreign countries.
 Utility Non-Regulated, Alliant Energy
2014Electric Gas Other Total Parent and Other Consolidated
Operating revenues
$2,713.6
 
$517.5
 
$66.1
 
$3,297.2
 
$53.1
 
$3,350.3
Depreciation and amortization347.0
 29.9
 1.8
 378.7
 9.4
 388.1
Operating income442.4
 53.8
 14.0
 510.2
 33.4
 543.6
Interest expense      176.3
 4.3
 180.6
Equity income (loss) from unconsolidated investments, net(42.8) 
 
 (42.8) 2.4
 (40.4)
Income taxes      36.4
 7.9
 44.3
Net income attributable to Alliant Energy common shareowners      362.0
 21.1
 383.1
Total assets9,660.4
 913.5
 993.9
 11,567.8
 495.7
 12,063.5
Investments in equity method subsidiaries294.3
 
 
 294.3
 2.3
 296.6
Construction and acquisition expenditures774.8
 63.2
 0.9
 838.9
 63.9
 902.8

IPL - IPL is a utility primarily serving retail customers in Iowa and includes three reportable segments: a) electric operations; b) gas operations; and c) other, which includes steam operations and the unallocated portions of the utility business. Various line items in the following tables are not allocated to the electric and gas segments for management reporting purposes, and therefore, are included only in “Total.” Intersegment revenues were not material to IPL’s operations and there was no single customer whose revenues were 10% or more of IPL’s consolidated revenues. All of IPL’s operations and assets are located in the U.S. Certain financial information relating to IPL’s business segments, which represent the services provided to its customers, was as follows (in millions):
2016Electric Gas Other Total
Operating revenues
$1,569.7
 
$204.0
 
$46.7
 
$1,820.4
Depreciation and amortization189.4
 19.3
 2.1
 210.8
Operating income252.0
 15.5
 3.3
 270.8
Interest expense      103.2
Income tax benefit      (5.9)
Earnings available for common stock      215.6
Total assets6,278.2
 653.3
 373.2
 7,304.7
Construction and acquisition expenditures598.1
 91.5
 0.1
 689.7
2015Electric Gas Other Total
Operating revenues
$1,503.8
 
$217.3
 
$53.4
 
$1,774.5
Depreciation and amortization187.9
 17.5
 1.8
 207.2
Operating income218.8
 17.7
 5.4
 241.9
Interest expense      96.8
Income tax benefit      (22.7)
Earnings available for common stock      186.0
Total assets5,754.1
 548.2
 406.8
 6,709.1
Construction and acquisition expenditures561.2
 56.7
 1.4
 619.3
2014Electric Gas Other Total
Operating revenues
$1,493.3
 
$296.5
 
$58.3
 
$1,848.1
Depreciation and amortization178.7
 17.0
 1.8
 197.5
Operating income166.8
 25.7
 16.7
 209.2
Interest expense      89.9
Income tax benefit      (48.9)
Earnings available for common stock      181.6
Total assets5,398.3
 544.1
 507.8
 6,450.2
Construction and acquisition expenditures490.0
 35.1
 0.9
 526.0
2013Electric Gas Other Total
Operating revenues
$1,491.8
 
$273.9
 
$53.1
 
$1,818.8
Depreciation and amortization173.1
 16.5
 1.5
 191.1
Operating income173.1
 29.8
 9.1
 212.0
Interest expense      81.3
Income tax benefit      (36.3)
Earnings available for common stock      172.0
Total assets4,905.3
 518.8
 369.8
 5,793.9
Construction and acquisition expenditures365.4
 27.5
 7.3
 400.2

WPL - WPL is a utility serving customers in Wisconsin and includes three reportable segments: a) electric operations; b) gas operations; and c) other, which includes the unallocated portions of the utility business. Various line items in the following tables are not allocated to the electric and gas segments for management reporting purposes, and therefore, are included only in “Total.” Intersegment revenues were not material to WPL’s operations and there was no single customer whose revenues were 10% or more of WPL’s consolidated revenues. All of WPL’s operations and assets are located in the U.S. Certain financial information relating to WPL’s business segments, which represent the services provided to its customers, was as follows (in millions):

146



2016Electric Gas Other Total
Operating revenues
$1,305.8
 
$151.4
 
$1.9
 
$1,459.1
Depreciation and amortization177.6
 14.9
 
 192.5
Operating income (loss)319.9
 15.2
 (8.1) 327.0
Interest expense      91.4
Equity income from unconsolidated investments(39.8) 
 
 (39.8)
Income taxes      93.3
Earnings available for common stock      190.4
Total assets4,444.7
 437.8
 407.8
 5,290.3
Investments in equity method subsidiaries7.7
 
 
 7.7
Construction and acquisition expenditures407.4
 45.6
 
 453.0
2015Electric Gas Other Total
Operating revenues
$1,266.7
 
$163.9
 
$4.5
 
$1,435.1
Depreciation and amortization170.7
 13.6
 
 184.3
Operating income (loss)295.3
 16.9
 (3.5) 308.7
Interest expense      92.4
Equity income from unconsolidated investments(35.1) 
 
 (35.1)
Income taxes      82.9
Earnings available for common stock      176.3
Total assets4,457.2
 391.1
 422.1
 5,270.4
Investments in equity method subsidiaries302.0
 
 
 302.0
Construction and acquisition expenditures294.6
 49.7
 
 344.3
2014Electric Gas Other Total
Operating revenues
$1,220.3
 
$221.0
 
$7.8
 
$1,449.1
Depreciation and amortization168.3
 12.9
 
 181.2
Operating income (loss)275.6
 28.1
 (2.7) 301.0
Interest expense      86.4
Equity income from unconsolidated investments(42.8) 
 
 (42.8)
Income taxes      85.3
Earnings available for common stock      180.4
Total assets4,262.1
 369.4
 486.1
 5,117.6
Investments in equity method subsidiaries294.3
 
 
 294.3
Construction and acquisition expenditures284.8
 28.1
 
 312.9

2013Electric Gas Other Total
Operating revenues
$1,197.2
 
$190.9
 
$18.2
 
$1,406.3
Depreciation and amortization159.9
 12.3
 
 172.2
Operating income (loss)271.4
 27.5
 (2.8) 296.1
Interest expense      85.0
Equity income from unconsolidated investments(43.7) 
 
 (43.7)
Income taxes      85.6
Earnings available for common stock      177.5
Total assets4,113.3
 340.5
 342.4
 4,796.2
Investments in equity method subsidiaries279.1
 
 
 279.1
Construction and acquisition expenditures311.9
 19.5
 
 331.4

NOTE 18. RELATED PARTIES
Service Agreements - IPL and WPL are parties to service agreements with an affiliate, Corporate Services. Pursuant to these service agreements, IPL and WPL receive various administrative and general services. These services are billed to IPL and WPL at cost based on expenses incurred by Corporate Services for the benefit of IPL and WPL, respectively. These costs consisted primarily of employee compensation and benefits, fees associated with various professional services, depreciation and amortization of property, plant and equipment, and a return on net assets. Corporate Services also acts as agent on behalf of IPL and WPL pursuant to the service agreements. As agent, Corporate Services enters into energy, capacity, ancillary services, and transmission sale and purchase transactions within MISO. Corporate Services assigns such sales and purchases among IPL and WPL based on statements received from MISO. The amounts billed for services provided, sales credited and purchases were as follows (in millions):
IPL WPLIPL WPL
2015 2014 2013 2015 2014 20132016 2015 2014 2016 2015 2014
Corporate Services billings
$150
 
$148
 
$140
 
$121
 
$116
 
$103

$161
 
$150
 
$148
 
$133
 
$121
 
$116
Sales credited10
 8 7 24
 6 128
 10 8 7
 24 6
Purchases billed366
 422 365 66
 125 68433
 366 422 102
 66 125


147



As of December 31, net intercompany payables to Corporate Services were as follows (in millions):
2015 20142016 2015
IPL
$93
 
$84

$104
 
$93
WPL54
 58
72
 54


ATC - Pursuant to various agreements, WPL receives a range of transmission services from ATC. WPL provides operation, maintenance, and construction services to ATC. WPL and ATC also bill each other for use of shared facilities owned by each party. The related amounts billed between the parties were as follows (in millions):
2015 2014 20132016 2015 2014
ATC billings to WPL
$101
 
$96
 
$96

$110
 
$101
 
$96
WPL billings to ATC13
 9
 12
13
 13
 9

As of December 31, 20152016 and 20142015, WPL owed ATC net amounts of $8 million and $8 million, respectively.

Refer to Note 6(a) for discussion of WPL’s transfer of its investment in ATC to ATI on December 31, 2016.

WPL’s Sheboygan Falls Lease - Refer to Note 10(b) for discussion of WPL’s Sheboygan Falls lease.

Franklin County Wind Farm - Refer to Note 3 for discussion of a February 2017 FERC order approving the transfer of the Franklin County wind farm from AEF to IPL. Alliant Energy and IPL currently expect to complete this transfer in 2017.

NOTE 19. DISCONTINUED OPERATIONS AND ASSETS AND LIABILITIES HELD FOR SALE
In 2013, Alliant Energy sold RMT to narrow its strategic focus and risk profile. The operating results of RMT have been separately classified and reported as discontinued operations in Alliant Energy’s income statements. A summary of the components of discontinued operations in Alliant Energy’s income statements was as follows (in millions):
2015 2014 20132016 2015 2014
Operating revenues
$—
 
$—
 
$0.9
Operating expenses4.0
 3.7
 9.9

$3.9
 
$4.0
 
$3.7
Loss before income taxes(4.0) (3.7) (9.0)(3.9) (4.0) (3.7)
Income tax benefit(1.5) (1.3) (3.1)(1.6) (1.5) (1.3)
Loss from discontinued operations, net of tax
($2.5) 
($2.4) 
($5.9)
($2.3) 
($2.5) 
($2.4)

Refer to Note 16(d) for further discussion of warranty claims associated with RMT that have resulted in operating expenses subsequent to the sale.

In April 2015, IPL completed the sale of its Minnesota natural gas distribution assets, which qualified as held for sale as of December 31, 2014. In July 2015, IPL completed the sale of its Minnesota electric distribution assets. Alliant Energy and IPL evaluated the sales of IPL’s Minnesota electric and natural gas distribution assets and believe such sales did not represent a strategic shift that has, or will have, a major effect on their operational and financial results. As a result, the operating results of IPL’s Minnesota electric and natural gas distribution assets have not been separately classified and reported as discontinued operations in Alliant Energy’s and IPL’s income statements.

As of December 31, 2014, Alliant Energy’s and IPL’s balance sheets included assets held for sale related to IPL’s Minnesota natural gas distribution assets recorded in “Other current assets” and liabilities held for sale recorded in “Other current liabilities” as follows (in millions):
Assets held for sale:
Current assets
$1.1
Property, plant and equipment, net11.0
Non-current regulatory assets7.0
Total assets held for sale19.1
Liabilities held for sale:
Current liabilities1.0
Other liabilities7.1
Total liabilities held for sale8.1
Net assets held for sale
$11.0

Refer to Note 3 for further discussion of IPL’s sales of its Minnesota electric and natural gas distribution assets.


148



NOTE 20. SELECTED CONSOLIDATED QUARTERLY FINANCIAL DATA (UNAUDITED)
Alliant Energy - All “per share” references refer to earnings per diluted share. Summation of the individual quarters may not equal annual totals due to rounding. Refer to Note 19 for additional information on discontinued operations.
2015 20142016 2015
March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31
(in millions, except per share data)(in millions, except per share data)
Operating revenues
$897.4
 
$717.2
 
$898.9
 
$740.1
 
$952.8
 
$750.3
 
$843.1
 
$804.1

$843.8
 
$754.6
 
$924.6
 
$797.0
 
$897.4
 
$717.2
 
$898.9
 
$740.1
Operating income152.9
 109.0
 235.9
 79.2
 154.2
 103.3
 194.8
 91.3
145.9
 128.6
 162.6
 99.9
 152.9
 109.0
 235.9
 79.2
Amounts attributable to Alliant Energy common shareowners:                              
Income from continuing operations, net of tax96.6
 68.9
 180.0
 35.2
 108.0
 62.1
 155.2
 60.2
97.6
 84.4
 128.8
 63.0
 96.6
 68.9
 180.0
 35.2
Loss from discontinued operations, net of tax
 (1.3) (0.1) (1.1) 
 (0.3) (1.9) (0.2)(1.1) (0.5) (0.4) (0.3) 
 (1.3) (0.1) (1.1)
Net income96.6
 67.6
 179.9
 34.1
 108.0
 61.8
 153.3
 60.0
96.5
 83.9
 128.4
 62.7
 96.6
 67.6
 179.9
 34.1
Earnings per weighted average common share attributable to Alliant Energy common shareowners:               
Earnings per weighted average common share attributable to Alliant Energy common shareowners (a):               
Income from continuing operations, net of tax0.87
 0.61
 1.59
 0.31
 0.97
 0.56
 1.40
 0.54
0.43
 0.37
 0.57
 0.28
 0.43
 0.31
 0.79
 0.16
Loss from discontinued operations, net of tax
 (0.01) 
 (0.01) 
 
 (0.02) 

 
 
 
 
 (0.01) 
 (0.01)
Net income0.87
 0.60
 1.59
 0.30
 0.97
 0.56
 1.38
 0.54
0.43
 0.37
 0.57
 0.28
 0.43
 0.30
 0.79
 0.15

(a)
Amounts reflect the effects of a two-for-one common stock split distributed in May 2016. Refer to Note 7 for additional details.

IPL - Earnings per share data is not disclosed for IPL given Alliant Energy is the sole shareowner of all shares of IPL’s common stock outstanding during the periods presented. Refer to Note 1(q) for discussion of IPL’s previously reported Selected Consolidated Quarterly Financial Data (Unaudited), which was impacted as a result of a change to IPL’s method of recording income taxes retrospectively adopted in the fourth quarter of 2015.

2015 20142016 2015
March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31
(in millions)(in millions)
Operating revenues
$489.0
 
$382.2
 
$504.6
 
$398.7
 
$528.9
 
$411.9
 
$476.2
 
$431.1

$458.7
 
$411.0
 
$516.2
 
$434.5
 
$489.0
 
$382.2
 
$504.6
 
$398.7
Operating income65.5
 33.8
 117.0
 25.6
 57.5
 34.0
 93.9
 23.8
62.0
 48.0
 125.9
 34.9
 65.5
 33.8
 117.0
 25.6
Net income50.1
 19.0
 119.1
 8.0
 45.3
 20.5
 104.6
 21.4
48.2
 34.4
 116.7
 26.5
 50.1
 19.0
 119.1
 8.0
Earnings available for common stock47.5
 16.5
 116.5
 5.5
 42.7
 18.0
 102.0
 18.9
45.6
 31.9
 114.1
 24.0
 47.5
 16.5
 116.5
 5.5

WPL - Earnings per share data is not disclosed for WPL given Alliant Energy is the sole shareowner of all shares of WPL’s common stock outstanding during the periods presented. Refer to Note 1(q) for discussion of WPL’s previously reported Selected Consolidated Quarterly Financial Data (Unaudited), which was impacted as a result of a change to WPL’s method of recording income taxes retrospectively adopted in the fourth quarter of 2015.
2015 20142016 2015
March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31
(in millions)(in millions)
Operating revenues
$397.1
 
$324.7
 
$382.6
 
$330.7
 
$410.4
 
$324.5
 
$354.4
 
$359.8

$375.6
 
$334.3
 
$397.0
 
$352.2
 
$397.1
 
$324.7
 
$382.6
 
$330.7
Operating income80.8
 68.3
 110.3
 49.3
 87.7
 60.0
 93.9
 59.4
78.8
 75.0
 115.0
 58.2
 80.8
 68.3
 110.3
 49.3
Net income45.1
 39.7
 68.4
 24.4
 55.2
 34.7
 57.9
 33.3
47.0
 43.7
 69.6
 32.5
 45.1
 39.7
 68.4
 24.4
Earnings available for common stock44.9
 39.2
 68.0
 24.2
 55.2
 34.7
 57.9
 32.6
46.5
 43.2
 69.0
 31.7
 44.9
 39.2
 68.0
 24.2


149



ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

None.

ITEM 9A. CONTROLS AND PROCEDURES

Alliant Energy’s, IPL’s and WPL’s management evaluated, with the participation of each of Alliant Energy’s, IPL’s and WPL’s CEO, CFOChief Executive Officer, Chief Financial Officer and Disclosure Committee, the effectiveness of the design and operation of Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures as of the end of the quarter ended December 31, 20152016 pursuant to the requirements of the Securities Exchange Act of 1934, as amended. Based on their evaluation, the CEOChief Executive Officer and the CFOChief Financial Officer concluded that Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures were effective as of the end of the quarter ended December 31, 20152016.

During the fourth quarter of 2015, WPL implemented a new customer billing and information system, which houses all customer records, and processes metering, billing and payment transactions. The new system more fully automates and improves the efficiency of WPL’s financial reporting process, and resulted in a material change in Alliant Energy’s and WPL’s internal control over financial reporting. Other than WPL’s new customer billing and information system, thereThere was no change in Alliant Energy’s, IPL’s and WPL’s internal control over financial reporting that occurred during the quarter ended December 31, 20152016 that has materially affected, or is reasonably likely to materially affect, Alliant Energy’s, IPL’s and WPL’s internal control over financial reporting. There was no change in IPL’s internal control over financial reporting that occurred during the quarter ended December 31, 2015 that has materially affected, or is reasonably likely to materially affect, IPL’s internal control over financial reporting.


150



MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

Management’s Annual Report on Internal Control over Financial Reporting - The management of Alliant Energy, CorporationIPL and subsidiaries (Alliant Energy) isWPL are responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934. Alliant Energy’s, IPL’s and WPL’s internal control over financial reporting is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States of America.GAAP.

Because of the inherent limitations of internal control over financial reporting, misstatements may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Alliant Energy’s, IPL’s and WPL’s management assessed the effectiveness of Alliant Energy’stheir respective internal control over financial reporting as of December 31, 20152016 using the criteria set forth in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment,these assessments, Alliant Energy’s, IPL’s and WPL’s management concluded that, as of December 31, 2015, Alliant Energy’s2016, their respective internal control over financial reporting was effective.

Deloitte & Touche LLP, Alliant Energy’s independent registered public accounting firm, has audited Alliant Energy’s internal control over financial reporting. That report is included herein. This Annual Report on Form 10-K does not include an attestation report of IPL’s and WPL’s independent registered public accounting firm regarding their respective internal control over financial reporting. Management’s report was not subject to attestation by IPL’s and WPL’s independent registered public accounting firm pursuant to rules of the SEC that permit IPL and WPL to provide only management’s report in this Annual Report on Form 10-K.


/s/ Patricia L. Kampling
Patricia L. Kampling
Chairman, President and Chief Executive Officer


/s/ Thomas L. Hanson
Thomas L. Hanson
Senior Vice President and Chief Financial Officer


/s/ Robert J. Durian
Robert J. Durian
Vice President, Chief Accounting Officer and Controller


February 24, 2016


151



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM


To the Board of Directors and Shareowners of
Alliant Energy Corporation
Madison, Wisconsin

We have audited the internal control over financial reporting of Alliant Energy Corporation and subsidiaries (the “Company”) as of December 31, 2015,2016, based on the criteria established in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management’s Annual Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

A company’s internal control over financial reporting is a process designed by, or under the supervision of, the company’s principal executive and principal financial officers, or persons performing similar functions, and effected by the company’s board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2015,2016, based on the criteria established in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated financial statements and financial statement schedules as of and for the year ended December 31, 20152016 of the Company and our report dated February 24, 20162017 expressed an unqualified opinion on those financial statements and financial statement schedules.


/s/ DELOITTE & TOUCHE LLP
DELOITTE & TOUCHE LLP

Milwaukee, Wisconsin
February 24, 2016


152



MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

The management of Interstate Power and Light Company and subsidiary (IPL) is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934. IPL’s internal control over financial reporting is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States of America.

Because of the inherent limitations of internal control over financial reporting, misstatements may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

IPL’s management assessed the effectiveness of IPL’s internal control over financial reporting as of December 31, 2015 using the criteria set forth in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, IPL’s management concluded that, as of December 31, 2015, IPL’s internal control over financial reporting was effective.

This Annual Report on Form 10-K does not include an attestation report of IPL’s independent registered public accounting firm regarding IPL’s internal control over financial reporting. Management’s report was not subject to attestation by IPL’s independent registered public accounting firm pursuant to rules of the Securities and Exchange Commission that permit IPL to provide only management’s report in this Annual Report on Form 10-K.2017


/s/ Patricia L. Kampling
Patricia L. Kampling
Chairman and Chief Executive Officer


/s/ Thomas L. Hanson
Thomas L. Hanson
Senior Vice President and Chief Financial Officer


/s/ Robert J. Durian
Robert J. Durian
Vice President, Chief Accounting Officer and Controller


February 24, 2016


153



MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

The management of Wisconsin Power and Light Company and subsidiary (WPL) is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934. WPL’s internal control over financial reporting is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States of America.

Because of the inherent limitations of internal control over financial reporting, misstatements may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

WPL’s management assessed the effectiveness of WPL’s internal control over financial reporting as of December 31, 2015 using the criteria set forth in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, WPL’s management concluded that, as of December 31, 2015, WPL’s internal control over financial reporting was effective.

This Annual Report on Form 10-K does not include an attestation report of WPL’s independent registered public accounting firm regarding WPL’s internal control over financial reporting. Management’s report was not subject to attestation by WPL’s independent registered public accounting firm pursuant to rules of the Securities and Exchange Commission that permit WPL to provide only management’s report in this Annual Report on Form 10-K.


/s/ Patricia L. Kampling
Patricia L. Kampling
Chairman and Chief Executive Officer


/s/ Thomas L. Hanson
Thomas L. Hanson
Senior Vice President and Chief Financial Officer


/s/ Robert J. Durian
Robert J. Durian
Vice President, Chief Accounting Officer and Controller


February 24, 2016


154



ITEM 9B. OTHER INFORMATION

None.

PART III

ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

The directors of Alliant Energy, IPL and WPL are the same, and therefore, the information required by Item 10 relating to directors and nominees for election of directors is the same for all registrants. The information required by Item 10 relating to directors and nominees for election of directors at the 20162017 Annual Meeting of Shareowners, the timely filing of reports under Section 16 of the Securities Exchange Act of 1934, audit committees and audit committee financial experts, and Alliant Energy’s, IPL’s and WPL’s Code of Conduct is incorporated herein by reference to the relevant information in the 20162017 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of Alliant Energy’s, IPL’s and WPL’s fiscal years. The code of ethics, also referred to as the Code of Conduct, of Alliant Energy, IPL and WPL are the same. Information regarding executive officers of Alliant Energy, IPL and WPL may be found in Part I of this report under the caption “Executive Officers of the Registrants.”

ITEM 11. EXECUTIVE COMPENSATION

The directors and executive officers of Alliant Energy, IPL and WPL for which compensation information must be included are the same. Therefore, the information required by Item 11 for each of Alliant Energy, IPL and WPL is incorporated herein by reference to the relevant information in the 20162017 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of Alliant Energy’s, IPL’s and WPL’s fiscal years.

ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

ALLIANT ENERGY
Information regarding Alliant Energy’s equity compensation plans as of December 31, 20152016 was as follows:
 (A) (C) (A) (C)
 Number of securities to be (B) Number of securities remaining available Number of securities to be (B) Number of securities remaining available
 issued upon exercise of Weighted-average exercise for future issuance under equity issued upon exercise of Weighted-average exercise for future issuance under equity
 outstanding options, price of outstanding options, compensation plans (excluding outstanding options, price of outstanding options, compensation plans (excluding
Plan Category warrants and rights warrants and rights securities reflected in column (A)) warrants and rights warrants and rights securities reflected in column (A))
Equity compensation plans approved by shareowners 271,247 (a) $55.71 3,828,384 (b) 655,936 (a) $31.98 7,363,980 (b)
Equity compensation plans not approved by shareowners (c) N/A N/A N/A (d) N/A N/A N/A (d)
 271,247 $55.71 3,828,384 655,936 $31.98 7,363,980

(a)
Represents performance shares, performance restricted stock units and restricted stock units granted under the OIP. The performancePerformance shares may be paid out in shares of Alliant Energy’s common stock, cash, or a combination of cash and stock and performance restricted stock units are paid out in shares of Alliant Energy’s common stock. The awards are adjusted by a performance multiplier, which ranges from zero to 200%, based on the performance criteria. The performance sharesshare and performance restricted stock unit awards included in column (A) of the table reflect an assumed payout in the form of Alliant Energy’s common stock at the maximum performance multiplier of 200% for the 20152016 and 20142015 grants and at the actual performance multiplierestimated payout percentage of 165%148% for the 20132014 grants.
Also included are restricted stock units granted under the OIP, which may be paid out in shares of Alliant Energy’s common stock, cash, or a combination of cash and stock at the expiration of a three-year time-vesting period.
(b)
All of the available shares under the Amended and Restated OIP may be issued as awards in the form of shares of Alliant Energy’s common stock, restricted stock, restricted stock units, performance shares, performance units and other stock-based or cash-based awards. As of December 31, 20152016, there were performance shares, restricted stock awards, performance restricted stock units and restricted stock awardsunits outstanding under the Amended and Restated OIP. Excludes 95,122190,244 shares of non-vested restricted common stock previously issued and outstanding under the Amended and Restated OIP at December 31, 2015.2016.
(c)
As of December 31, 20152016, there were 215,093441,695 shares of Alliant Energy’s common stock outstanding under the DCP, which is described in Note 12(c).
(d)There is no limit on the number of shares of Alliant Energy’s common stock that may be held under the DCP.

The remainder of the information required by Item 12 is incorporated herein by reference to the relevant information in the 20162017 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of Alliant Energy’s fiscal year.


155



IPL AND WPL
None of IPL’s directors or executive officers own any shares of preferred stock in IPL. The remainder of the information required by Item 12 is incorporated herein by reference to the relevant information in the 20162017 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of IPL’s and WPL’s fiscal years.

ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

The information required by Item 13 for each of Alliant Energy, IPL and WPL is incorporated herein by reference to the relevant information in the 20162017 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of Alliant Energy’s, IPL’s and WPL’s fiscal years.

ITEM 14. PRINCIPAL ACCOUNTING FEES AND SERVICES

ALLIANT ENERGY
The information required by Item 14 is incorporated herein by reference to the relevant information in the 20162017 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of Alliant Energy’s fiscal year.

IPL AND WPL
Each of IPL’s and WPL’s Audit Committee of the Board of Directors has adopted a policy that requires advance approval of all audit, audit-related, tax and other permitted services performed by the independent registered public accounting firm. The policy provides for pre-approval by the Audit Committee of specifically defined audit and non-audit services after the Audit Committee is provided with the appropriate level of details regarding the specific services to be provided. The policy does not permit delegation of the Audit Committee’s authority to management. In the event the need for specific services arises between Audit Committee meetings, the Audit Committee has delegated to the Chairperson of the Audit Committee authority to approve permitted services provided that the Chairperson reports any decisions to the Audit Committee at its next scheduled meeting. The principal accounting fees billed to Alliant Energy by its independent registered public accounting firm, all of which were approved in advance by the Audit Committee, directly related and allocated to IPL and WPL were as follows (in thousands):
IPL WPLIPL WPL
2015 2014 2015 20142016 2015 2016 2015
Fees % of Total Fees % of Total Fees % of Total Fees % of TotalFees % of Total Fees % of Total Fees % of Total Fees % of Total
Audit fees
$1,036
 91% 
$1,037
 91% 
$969
 95% 
$1,042
 96%
$1,035
 93% 
$1,036
 91% 
$1,008
 95% 
$969
 95%
Audit-related fees90
 8% 88
 8% 41
 4% 38
 3%64
 6% 90
 8% 41
 4% 41
 4%
All other fees7
 1% 9
 1% 7
 1% 9
 1%8
 1% 7
 1% 7
 1% 7
 1%

$1,133
 100% 
$1,134
 100% 
$1,017
 100% 
$1,089
 100%
$1,107
 100% 
$1,133
 100% 
$1,056
 100% 
$1,017
 100%

IPL’s and WPL’s audit fees for 20152016 and 20142015 consisted of the respective fees billed for the audits of the financial statements of IPL and its subsidiary and WPL and its subsidiary, for reviews of financial statements included in Form 10-Q filings, and for services normally provided in connection with statutory and regulatory filings, such as financing transactions. IPL’s and WPL’s audit fees also included their respective portion of fees for the 20152016 and 20142015 audits of Alliant Energy’s financial statements and effectiveness of internal controls over financial reporting. IPL’s and WPL’s audit fees for 2015 also included fees billed for services related to a change in method of recording income taxes at IPL and WPL. IPL’s and WPL’s audit-related fees for 20152016 and 20142015 consisted of the fees billed for services rendered related to employee benefits plan audits and other attest services. All other fees for 20152016 and 20142015 for IPL and WPL consisted of license fees for accounting research software products and seminars. IPL and WPL did not have any tax fees for 20152016 or 2014.2015. The Audit Committee does not consider the provision of non-audit services by the independent registered public accounting firm described above to be incompatible with maintaining independence of the independent registered public accounting firm.


156



PART IV

ITEM 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES

(1)
Consolidated Financial Statements - Refer to Item 8 Financial Statements and Supplementary Data.

(2)
Financial Statement Schedules -
Schedule I. Condensed Parent Company Financial Statements
Schedule II. Valuation and Qualifying Accounts and Reserves

NOTE: All other schedules are omitted because they are not applicable or not required, or because that required information is shown either in the financial statements or in the notes thereto.

(3)
Exhibits Required by SEC Regulation S-K - Exhibits for Alliant Energy, IPL and WPL are listed in the Exhibit Index, which is incorporated herein by reference.

SCHEDULE I - CONDENSED PARENT COMPANY FINANCIAL STATEMENTS

ALLIANT ENERGY CORPORATION (Parent Company Only)
CONDENSED STATEMENTS OF INCOME
Year Ended December 31,Year Ended December 31,
2015 2014 20132016 2015 2014
(in millions)(in millions)
Operating revenues
$2
 
$2
 
$2

$1
 
$2
 
$2
Operating expenses3
 3
 1
3
 3
 3
Operating income (loss)(1) (1) 1
Operating loss(2) (1) (1)
Interest expense and other:          
Equity earnings from consolidated subsidiaries(379) (388) (361)(374) (379) (388)
Interest expense3
 9
 11
3
 3
 9
Interest income(3) (2) (2)(2) (3) (2)
Total interest expense and other(379) (381) (352)(373) (379) (381)
Income before income taxes378
 380
 353
371
 378
 380
Income tax benefit(1) (3) (5)(1) (1) (3)
Net income
$379
 
$383
 
$358

$372
 
$379
 
$383
The accompanying Notes to Condensed Financial Statements are an integral part of these statements.


157



ALLIANT ENERGY CORPORATION (Parent Company Only)
CONDENSED BALANCE SHEETS
December 31,December 31,
2015 20142016 2015
(in millions)(in millions)
ASSETS      
Current assets:      
Notes receivable from affiliated companies
$93
 
$95

$74
 
$93
Other9
 25
5
 9
Total current assets102
 120
79
 102
Investments:      
Investments in consolidated subsidiaries3,999
 3,721
4,211
 3,999
Other14
 15
2
 14
Total investments4,013
 3,736
4,213
 4,013
Other assets20
 10
64
 20
Total assets
$4,135
 
$3,866

$4,356
 
$4,135
LIABILITIES AND EQUITY      
Current liabilities:      
Current maturities of long-term debt
$250
 
$—

$—
 
$250
Commercial paper140
 141
192
 140
Notes payable to affiliated companies275
 
Other12
 29
12
 12
Total current liabilities402
 170
479
 402
Long-term debt, net (excluding current portion)
 250
Other liabilities12
 11
18
 12
Common equity:      
Common stock and additional paid-in capital1,664
 1,510
1,695
 1,664
Retained earnings2,066
 1,934
2,174
 2,066
Shares in deferred compensation trust(9) (9)(10) (9)
Total common equity3,721
 3,435
3,859
 3,721
Total liabilities and equity
$4,135
 
$3,866

$4,356
 
$4,135
The accompanying Notes to Condensed Financial Statements are an integral part of these statements.


158



ALLIANT ENERGY CORPORATION (Parent Company Only)
CONDENSED STATEMENTS OF CASH FLOWS

Year Ended December 31,Year Ended December 31,

2015
2014
20132016
2015
2014

(in millions)(in millions)
Net cash flows from operating activities
$262


$246


$238

$254


$262


$246
Cash flows used for investing activities:







Cash flows from (used for) investing activities:







Capital contributions to consolidated subsidiaries(165)
(90)
(120)(250)
(165)
(90)
Capital repayments from consolidated subsidiaries

50

95
130



50
Net change in notes receivable from affiliates2
 (23) 5
Net change in notes receivable from and payable to affiliates294
 2
 (23)
Other



(2)10




Net cash flows used for investing activities(163)
(63)
(22)
Net cash flows from (used for) investing activities184

(163)
(63)
Cash flows used for financing activities:















Common stock dividends(247)
(226)
(208)(267)
(247)
(226)
Proceeds from issuance of common stock, net151
 
 
27
 151
 
Proceeds from issuance of long-term debt
 250
 

 
 250
Payments to retire long-term debt
 (250) 
(250) 
 (250)
Net change in commercial paper(1)
45

(9)52

(1)
45
Other(2)
(2)
1


(2)
(2)
Net cash flows used for financing activities(99)
(183)
(216)(438)
(99)
(183)
Net decrease in cash and cash equivalents









Cash and cash equivalents at beginning of period









Cash and cash equivalents at end of period
$—


$—


$—

$—


$—


$—
Supplemental cash flows information:















Cash paid during the period for:















Interest, net of capitalized interest
($3)

($11)

($13)
($3)

($3)

($11)
Income taxes, net(9)
(5)
(7)(37)
(9)
(5)
The accompanying Notes to Condensed Financial Statements are an integral part of these statements.

ALLIANT ENERGY CORPORATION
(Parent Company Only)
NOTES TO CONDENSED FINANCIAL STATEMENTS

Pursuant to rules and regulations of the SEC, the Condensed Financial Statements of Alliant Energy Corporation (Parent Company Only) do not reflect all of the information and notes normally included with financial statements prepared in accordance with GAAP. Therefore, these Condensed Financial Statements should be read in conjunction with the Financial Statements and related Notes included in Alliant Energy’sthe combined 20152016 Form 10-K, Part II, Item 8, which is incorporated herein by reference.

In the Condensed Financial Statements of Alliant Energy Corporation (Parent Company Only), investments in subsidiaries are accounted for using the equity method.

Alliant Energy allocates income tax expense to its subsidiaries that are members of the group that file a consolidated or combined income tax return. In the fourth quarter of 2015, Alliant Energy changed its method of allocating income tax provisions and related deferred tax assets and liabilities to its subsidiaries from the parent-company-down approach to the modified separate return approach. The change was retrospectively applied to the Parent Company’s Condensed Financial Statements. This tax method change did not impact Alliant Energy’s consolidated financial statements. The change had no impact on Parent Company net income, but impacted the income tax provisions and the equity earnings from consolidated subsidiaries in the Parent Company Condensed Statements of Income, as well as investment in consolidated subsidiaries and deferred tax liabilities on the Parent Company Condensed Balance Sheets. Refer to Note 1(c) for additional information on the tax method change.


159



SCHEDULE II - VALUATION AND QUALIFYING ACCOUNTS AND RESERVES
    Additions  
 Balance,Charged toCharged to Other Balance,
DescriptionJanuary 1ExpenseAccounts (a)Deductions (b)December 31
 (in millions)
Valuation and Qualifying Accounts Which are Deducted in the Balance Sheet From the Assets to Which They Apply:
 Accumulated Provision for Uncollectible Accounts:    
  Alliant Energy (c)     
   Year ended December 31, 2015
$5.1

$8.1

$3.0

$11.4

$4.8
   Year ended December 31, 20144.8
11.7
4.1
15.5
5.1
   Year ended December 31, 20134.0
13.6
0.6
13.4
4.8
  IPL (c)    
   Year ended December 31, 2015
$0.4

$8.1


$7.9

$0.6
   Year ended December 31, 20140.7
11.5

11.8
0.4
   Year ended December 31, 20130.7
12.7

12.7
0.7
  WPL    
   Year ended December 31, 2015
$4.2

$—

$3.0

$3.5

$3.7
   Year ended December 31, 20141.7

4.1
1.6
4.2
   Year ended December 31, 20131.8

0.6
0.7
1.7
 Accumulated Provision for Uncollectible Accounts:    
  Alliant Energy (c)     
   Year ended December 31, 2016
$4.8

$17.4

$8.8

$22.3

$8.7
   Year ended December 31, 20155.1
8.1
3.0
11.4
4.8
   Year ended December 31, 20144.8
11.7
4.1
15.5
5.1
  IPL (c)    
   Year ended December 31, 2016
$0.6

$17.2

$—

$16.7

$1.1
   Year ended December 31, 20150.4
8.1

7.9
0.6
   Year ended December 31, 20140.7
11.5

11.8
0.4
  WPL    
   Year ended December 31, 2016
$3.7

$0.1

$8.8

$5.5

$7.1
   Year ended December 31, 20154.2

3.0
3.5
3.7
   Year ended December 31, 20141.7

4.1
1.6
4.2
Note: The above provisions relate to various customer, notes and other receivable balances included in various line items on the respective balance sheets.

Other Reserves:
 Accumulated Provision for Other Reserves (d):
  Alliant Energy    
   Year ended December 31, 2015
$32.6

$6.5

$—

$12.0

$27.1
   Year ended December 31, 201438.2
12.5

18.1
32.6
   Year ended December 31, 201333.4
23.2

18.4
38.2
  IPL    
   Year ended December 31, 2015
$10.6

$2.1

$��

$3.3

$9.4
   Year ended December 31, 201418.1
3.9

11.4
10.6
   Year ended December 31, 201311.6
9.3

2.8
18.1
  WPL    
   Year ended December 31, 2015
$16.3

$0.7

$—

$5.6

$11.4
   Year ended December 31, 201416.2
2.5

2.4
16.3
   Year ended December 31, 201313.5
8.8

6.1
16.2
 Accumulated Provision for Other Reserves (d):
  Alliant Energy    
   Year ended December 31, 2016
$27.1

$6.1

$—

$8.1

$25.1
   Year ended December 31, 201532.6
6.5

12.0
27.1
   Year ended December 31, 201438.2
12.5

18.1
32.6
  IPL    
   Year ended December 31, 2016
$9.4

$1.0

$—

$1.7

$8.7
   Year ended December 31, 201510.6
2.1

3.3
9.4
   Year ended December 31, 201418.1
3.9

11.4
10.6
  WPL    
   Year ended December 31, 2016
$11.4

$1.8

$—

$5.1

$8.1
   Year ended December 31, 201516.3
0.7

5.6
11.4
   Year ended December 31, 201416.2
2.5

2.4
16.3

(a)Accumulated provision for uncollectible accounts: In accordance with its regulatory treatment, certain amounts provided by WPL are recorded in regulatory assets. WPL expenses these amounts when an uncollectible account is written-off.
(b)Deductions are of the nature for which the reserves were created. In the case of the accumulated provision for uncollectible accounts, deductions from this reserve are reduced by recoveries of amounts previously written off.
(c)
Refer to Note 5(b) for discussion of IPL’s sales of accounts receivable program.
(d)Other reserves are largely related to injury and damage claims arising in the ordinary course of business.

160



SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant hasRegistrants have duly caused this report to be signed on itstheir behalf by the undersigned, thereunto duly authorized on the 24th day of February 2016.

ALLIANT ENERGY CORPORATION2017.
ALLIANT ENERGYINTERSTATE POWERWISCONSIN POWER
CORPORATIONAND LIGHT COMPANYAND LIGHT COMPANY
By: /s/ Patricia L. Kampling
By: /s/ Patricia L. Kampling
 
By: /s/ Patricia L. Kampling
Patricia L. Kampling
Chairman, President and Chief Executive Officer

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 24th day of February 2016.
/s/Patricia L. KamplingChairman, President, Chief Executive Officer and Director (Principal Executive Officer)
 Patricia L. Kampling 
/s/Thomas L. HansonSenior Vice President and Chief Financial Officer (Principal Financial Officer)
Thomas L. Hanson
/s/Robert J. DurianVice President, Chief Accounting Officer and Controller (Principal Accounting Officer)
Robert J. Durian
/s/Patrick E. AllenDirector
Patrick E. Allen
/s/Michael L. BennettDirector
Michael L. Bennett
/s/Deborah B. DunieDirector
Deborah B. Dunie
/s/Darryl B. HazelDirector
Darryl B. Hazel
/s/Singleton B. McAllisterDirector
Singleton B. McAllister
/s/Thomas F. O’TooleDirector
Thomas F. O’Toole
/s/Dean C. OestreichDirector
Dean C. Oestreich
/s/Carol P. SandersDirector
Carol P. Sanders
/s/Susan D. WhitingDirector
Susan D. Whiting

161



SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized on the 24th day of February 2016.

INTERSTATE POWER AND LIGHT COMPANY
By: /s/ Patricia L. Kampling
Patricia L. Kampling
Chairman, President and Chief Executive OfficerChairman and Chief Executive Officer Chairman and Chief Executive Officer

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrantRegistrants and in the capacities indicated on the 24th day of February 2016.2017.
ALLIANT ENERGYINTERSTATE POWERWISCONSIN POWER
CORPORATIONAND LIGHT COMPANYAND LIGHT COMPANY
By: /s/ Patricia L. Kampling
By: /s/ Patricia L. Kampling
By: /s/ Patricia L. Kampling
Patricia L. KamplingPatricia L. KamplingPatricia L. Kampling
Chairman, President, Chief Executive Officer and Director (Principal Executive Officer)Chairman, Chief Executive Officer and Director (Principal Executive Officer) Chairman, Chief Executive Officer and Director (Principal Executive Officer)
 Patricia L. Kampling  
/s/ Robert J. Durian/s/ Robert J. Durian/s/ Robert J. Durian
Robert J. DurianRobert J. DurianRobert J. Durian
Vice President, Chief Financial Officer and Treasurer (Principal Financial Officer)Vice President, Chief Financial Officer and Treasurer (Principal Financial Officer)Vice President, Chief Financial Officer and Treasurer (Principal Financial Officer)
    
/s/Thomas L. Hanson Benjamin M. Bilitz Senior Vice President and Chief Financial Officer (Principal Financial Officer)
Thomas L. Hanson/s/ Benjamin M. Bilitz /s/ Benjamin M. Bilitz
Benjamin M. Bilitz 
/s/Robert J. DurianBenjamin M. Bilitz Vice President, Benjamin M. Bilitz
Chief Accounting Officer and Controller (Principal Accounting Officer)Chief Accounting Officer and Controller (Principal Accounting Officer)Chief Accounting Officer and Controller (Principal Accounting Officer)
 Robert J. Durian  
/s/Patrick E. Allen Director
/s/ Patrick E. Allen /s/ Patrick E. Allen
Patrick E. Allen, DirectorPatrick E. Allen, DirectorPatrick E. Allen, Director
    
/s/Michael L. Bennett Director
/s/ Michael L. Bennett /s/ Michael L. Bennett
Michael L. Bennett, DirectorMichael L. Bennett, DirectorMichael L. Bennett, Director
    
/s/Deborah B. Dunie Director
/s/ Deborah B. Dunie /s/ Deborah B. Dunie
Deborah B. Dunie, DirectorDeborah B. Dunie, DirectorDeborah B. Dunie, Director
    
/s/Darryl B. Hazel Director
/s/ Darryl B. Hazel /s/ Darryl B. Hazel
Darryl B. Hazel, DirectorDarryl B. Hazel, DirectorDarryl B. Hazel, Director
    
/s/Singleton B. McAllister Director
/s/ Singleton B. McAllister /s/ Singleton B. McAllister
Singleton B. McAllister, DirectorSingleton B. McAllister, DirectorSingleton B. McAllister, Director
    
/s/Thomas F. O’Toole Director
/s/ Thomas F. O’Toole /s/ Thomas F. O’Toole
Thomas F. O’Toole, DirectorThomas F. O’Toole, DirectorThomas F. O’Toole, Director
    
/s/Dean C. Oestreich Director
/s/ Dean C. Oestreich /s/ Dean C. Oestreich
Dean C. Oestreich, DirectorDean C. Oestreich, DirectorDean C. Oestreich, Director
    
/s/Carol P. Sanders Director
/s/ Carol P. Sanders /s/ Carol P. Sanders
Carol P. Sanders, DirectorCarol P. Sanders, DirectorCarol P. Sanders, Director
    
/s/Susan D. Whiting Director
/s/ Susan D. Whiting 

162



SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized on the 24th day of February 2016.

WISCONSIN POWER AND LIGHT COMPANY
/s/ Susan D. Whiting
By: /s/ Patricia L. Kampling
Patricia L. Kampling
Chairman and Chief Executive Officer

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 24th day of February 2016.
/s/Patricia L. KamplingChairman, Chief Executive Officer and Director (Principal Executive Officer)
Patricia L. Kampling
/s/Thomas L. HansonSenior Vice President and Chief Financial Officer (Principal Financial Officer)
Thomas L. Hanson
/s/Robert J. DurianVice President, Chief Accounting Officer and Controller (Principal Accounting Officer)
Robert J. Durian
/s/Patrick E. AllenDirector
Patrick E. Allen
/s/Michael L. BennettDirector
Michael L. Bennett
/s/Deborah B. DunieDirector
Deborah B. Dunie
/s/Darryl B. HazelDirector
Darryl B. Hazel
/s/Singleton B. McAllisterDirector
Singleton B. McAllister
/s/Thomas F. O’TooleDirector
Thomas F. O’Toole
/s/Dean C. OestreichDirector
Dean C. Oestreich
/s/Carol P. SandersDirector
Carol P. Sanders
/s/Susan D. Whiting,Director
 Susan D. Whiting, Director Susan D. Whiting, Director



163



ALLIANT ENERGY CORPORATION
INTERSTATE POWER AND LIGHT COMPANY
WISCONSIN POWER AND LIGHT COMPANY

EXHIBIT INDEX

The following Exhibits are filed herewith or incorporated herein by reference.

Pursuant to Item 601(b)(4)(iii) of Regulation S-K, the registrants agree to furnish to the Securities and Exchange Commission, upon request, any instrument defining the rights of holders of unregistered long-term debt not filed as an exhibit to this combined Form 10-K. No such instrument authorizes securities in excess of 10% of the total assets of Alliant Energy, IPL or WPL, as the case may be.
Exhibit Number Description
1.1Distribution Agreement, dated March 4, 2015, among Alliant Energy; J.P. Morgan Securities LLC; Merrill Lynch, Pierce, Fenner & Smith Incorporated; and Goldman, Sachs & Co. (incorporated by reference to Exhibit 1.1 to Alliant Energy’s Form 8-K, filed March 4, 2015 (File No. 1-9894))
3.1 Restated Articles of Incorporation of Alliant Energy, as amended (incorporated by reference to Exhibit 4.1 to Alliant Energy’s Registration Statement on Form S-8 (Reg. No. 333-117654))
3.1aArticles of Amendment to Restated Articles of Incorporation of Alliant Energy, as amended, effective May 4, 2016 (incorporated by reference to Exhibit 3.1 to Alliant Energy’s Form 10-Q for the quarter ended March 31, 2016 (File No. 1-9894))
3.2 Amended and Restated Bylaws of Alliant Energy, effective May 7, 2015 (incorporated by reference to Exhibit 3.1 to Alliant Energy’s Form 8-K, filed May 13, 2015 (File No. 1-9894))
3.3 Amended and Restated Articles of Incorporation of WPL, effective May 9, 2013 (incorporated by reference to Exhibit 3.4 to WPL’s Form 8-K, filed May 13, 2013 (File No. 0-337))
3.4 Amended and Restated Bylaws of WPL, effective May 7, 2015 (incorporated by reference to Exhibit 3.3 to WPL’s Form 8-K, filed May 13, 2015 (File No. 0-337))
3.5 Amended and Restated Articles of Incorporation of IPL, effective May 10, 2013 (incorporated by reference to Exhibit 3.2 to IPL’s Form 8-K, filed May 13, 2013 (File No. 1-4117))
3.6 Amended and Restated Bylaws of IPL, effective May 7, 2015 (incorporated by reference to Exhibit 3.2 to IPL’s Form 8-K, filed May 13, 2015 (File No. 1-4117))
4.1 Third Amended and Restated Five Year Credit Agreement, dated December 14, 2011, among Alliant Energy and the Banks set forth therein (incorporated by reference to Exhibit 99.1 to Alliant Energy’s Form 8-K, filed December 19, 2011 (File No. 1-9894))
4.2 Senior Note Indenture, dated as of September 30, 2009, between Alliant Energy and Wells Fargo Bank, N.A.National Association (N.A.) (incorporated by reference to Exhibit 4.28 to Alliant Energy’s Registration Statement on Form S-3 (Reg. No. 333-162214))
4.3 Amended and Restated Rights Agreement, dated as of December 11, 2008, between Alliant Energy and Wells Fargo Bank, N.A. (incorporated by reference to Exhibit 4.1 to Alliant Energy’s Registration Statement on Form 8-A/A, filed December 12, 2008 (File No. 1-9894))
4.4 Third Amended and Restated Five Year Credit Agreement, dated December 14, 2011, among WPL and the Banks set forth therein (incorporated by reference to Exhibit 99.3 to WPL’s Form 8-K, filed December 19, 2011 (File No. 0-337))
4.5 Indenture, dated as of June 20, 1997, between WPL and Wells Fargo Bank, N.A., Successor, as Trustee (incorporated by reference to Exhibit 4.33 to Amendment No. 2 to WPL’s Registration Statement on Form S-3 (Reg. No. 033-60917))
4.6 Officers’ Certificate, dated as of July 28, 2004, creating WPL’s 6.25% Debentures due July 31, 2034 (incorporated by reference to Exhibit 4.1 to WPL’s Form 8-K, filed August 2, 2004 (File No. 0-337))
4.7 Officers’ Certificate, dated as of August 8, 2007, creating WPL’s 6.375% Debentures due August 15, 2037 (incorporated by reference to Exhibit 4.1 to WPL’s Form 8-K, filed August 9, 2007 (File No. 0-337))
4.8 Officer’s Certificate, dated as of October 1, 2008, creating WPL’s 7.60% Debentures due October 1, 2038 (incorporated by reference to Exhibit 4.2 to WPL’s Form 8-K, filed October 2, 2008 (File No. 0-337))
4.9 Officers’ Certificate, dated as of July 7, 2009, creating WPL’s 5.00% Debentures due July 15, 2019 (incorporated by reference to Exhibit 4.2 to WPL’s Form 8-K, filed July 8, 2009 (File No. 0-337))
4.10 Officers’ Certificate, dated as of June 10, 2010, creating WPL’s 4.60% Debentures due June 15, 2020 (incorporated by reference to Exhibit 4.2 to WPL’s Form 8-K, filed June 11, 2010 (File No. 0-337))
4.11 Officers’ Certificate, dated as of November 19, 2012, creating WPL’s 2.25% Debentures due November 15, 2022 (incorporated by reference to Exhibit 4.1 to WPL’s Form 8-K, filed November 19, 2012 (File No. 0-337))

164



4.12 Officers’ Certificate, dated as of October 14, 2014, creating WPL’s 4.10% Debentures due October 15, 2044 (incorporated by reference to Exhibit 4.1 to WPL’s Form 8-K, filed October 14, 2014 (File No. 0-337))
4.13 Third Amended and Restated Five Year Credit Agreement, dated December 14, 2011, among IPL and the Banks set forth therein (incorporated by reference to Exhibit 99.2 to IPL’s Form 8-K, filed December 19, 2011 (File No. 1-4117))

Exhibit NumberDescription
4.14 Indenture (For Senior Unsecured Debt Securities), dated as of August 20, 2003, between IPL and The Bank of New York Mellon Trust Co., N.A. (f/k/a The Bank of New York Trust Co., N.A.), as Trustee (incorporated by reference to Exhibit 4.11 to IPL’s Registration Statement on Form S-3 (Reg. No. 333-108199))
4.15 Officer’s Certificate, dated as of September 10, 2003, creating IPL’s 5.875% Senior Debentures due September 15, 2018 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed September 11, 2003 (File No. 1-4117))
4.16 Officer’s Certificate, dated as of October 14, 2003, creating IPL’s 6.45% Senior Debentures due October 15, 2033 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed October 15, 2003 (File No. 1-4117))
4.17 Officer’s Certificate, dated as of May 3, 2004, creating IPL’s 6.30% Senior Debentures due May 1, 2034 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed May 5, 2004 (File No. 1-4117))
4.17a Officer’s Certificate, dated as of August 2, 2004, reopening IPL’s 6.30% Senior Debentures due May 1, 2034 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed August 5, 2004 (File No. 1-4117))
4.18 Officer’s Certificate, dated as of July 18, 2005, creating IPL’s 5.50% Senior Debentures due July 15, 2025 (incorporated by reference to Exhibit 4 to IPL’s Form 8-K, filed July 19, 2005 (File No. 1-4117))
4.19 Officer’s Certificate, dated as of October 1, 2008, creating IPL’s 7.25% Senior Debentures due October 1, 2018 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed October 2, 2008 (File No. 1-4117))
4.20 Officer’s Certificate, dated as of July 7, 2009, creating IPL’s 6.25% Senior Debentures due July 15, 2039 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed July 8, 2009 (File No. 1-4117))
4.21 Officer’s Certificate, dated as of August 23, 2010, creating IPL’s 3.65% Senior Debentures due September 1, 2020 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed August 24, 2010 (File No. 1-4117))
4.22 Officer’s Certificate, dated as of October 8, 2013, creating IPL’s 4.70% Senior Debentures due October 15, 2043 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed October 8, 2013 (File No. 1-4117))
4.23 Officer’s Certificate, dated as of November 24, 2014, creating IPL’s 3.25% Senior Debentures due December 1, 2024 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed November 24, 2014 (File No. 1-4117))
4.24 Officer’s Certificate, dated as of August 18, 2015, creating IPL’s 3.40% Senior Debentures due August 15, 2025 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed August 18, 2015 (File No. 1-4117))
4.25 Officer’s Certificate, dated as of September 15, 2016, creating IPL’s 3.70% Senior Debentures due September 15, 2046 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed September 15, 2016 (File No. 1-4117))
4.26Form of Preferred Stock Certificate of IPL (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, filed March 20, 2013 (File No. 1-4117))
10.1 Operating Agreement of ATC, dated as of January 1, 2001 (incorporated by reference to Exhibit 10.16 to WPL’s Form 10-K for the year 2000 (File No. 0-337))
10.2 Term Loan Credit Agreement, dated as of October 7, 2014, between2016, among AEF, Alliant Energy, Wells FargoJPMorgan Chase Bank, N.A. and the lender parties set forth therein (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 8-K, filed October 14, 20147, 2016 (File No. 1-9894))
10.3# OIP (incorporated by reference to Appendix A to Alliant Energy’s definitive proxy statement filed on Schedule 14A on April 1, 2010 (File No. 1-9894))
10.3a# Amendment to the OIP (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 8-K, filed December 5, 2011 (File No. 1-9894))
10.3b# Form of Performance Share Agreement pursuant to the OIP, amended in 2012 (incorporated by reference to Exhibit 10.4c to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
10.3c# Form of Performance Share Agreement amended in 2015, pursuant to the OIP, amended in 2012 (incorporated by reference to Exhibit 10.3c to Alliant Energy’s Form 10-K for the year 2014 (File No. 1-9894))
10.3d# Form of Performance Contingent Restricted Stock Agreement pursuant to the OIP, amended in 2012 (incorporated by reference to Exhibit 10.4e to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
10.3e# Form of Performance Contingent Restricted Stock Agreement amended in 2015, pursuant to the OIP, amended in 2012 (incorporated by reference to Exhibit 10.3e to Alliant Energy’s Form 10-K for the year 2014 (File No. 1-9894))

165



10.4# Amended and Restated OIP, amended in 2015 (incorporated by reference to Appendix A to Alliant Energy’s definitive proxy statement filed on Schedule 14A on March 24, 2015 (File No. 1-9894))
10.4a# Form of Performance Share Agreement pursuant to the Amended and Restated OIP, amended in 2015 (incorporated by reference to Exhibit 10.4a to Alliant Energy’s Form 10-K for the year 2015 (File No. 1-9894))
10.4b# Form of Restricted Stock Unit Agreement pursuant to the Amended and Restated OIP, amended in 2015 (incorporated by reference to Exhibit 10.4b to Alliant Energy’s Form 10-K for the year 2015 (File No. 1-9894))

Exhibit NumberDescription
10.4c# Form of Performance Restricted Stock Unit Agreement pursuant to the Amended and Restated OIP, amended in 2015 (incorporated by reference to Exhibit 10.4c to Alliant Energy’s Form 10-K for the year 2015 (File No. 1-9894))
10.5# DLIP, for director-level employees, amended in 2012 (incorporated by reference to Exhibit 10.5c to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
10.5a#Form of Restricted Cash Agreement pursuant to the DLIP, amended in 2012 (incorporated by reference to Exhibit 10.5d to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
10.5b# Form of Performance Restricted Award Agreement pursuant to the DLIP, amended in 2012 (incorporated by reference to Exhibit 10.5e to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
10.6# DLIP, for director-level employees, amended in 2016
10.6a#Form of Performance Unit Agreement pursuant to the DLIP, amended in 2016
10.6b#Form of Performance Restricted Unit Agreement pursuant to the DLIP, amended in 2016
10.6c#Form of Restricted Unit Agreement pursuant to the DLIP, amended in 2016
10.7#DCP, as amended and restated effective January 1, 2011 (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 8-K, filed December 14, 2010 (File No. 1-9894))
10.6a#10.7a# Amendment to the DCP, as amended and restated (incorporated by reference to Exhibit 10.2 to Alliant Energy’s Form 8-K, filed December 5, 2011 (File No. 1-9894))
10.7#10.8# IES Industries Inc. Amended and Restated Key Employee Deferred Compensation Agreement, as amended (incorporated by reference to Exhibit 10.7 to Alliant Energy’s Form 10-K for the year 2015 (File No. 1-9894))
10.8#10.9# Alliant Energy Rabbi Trust Agreement for DCPs (incorporated by reference to Exhibit 10.19 to Alliant Energy’s Form 10-K for the year 2005 (File No. 1-9894))
10.8a#10.9a# Amendment to the Alliant Energy Rabbi Trust Agreement for DCPs (incorporated by reference to Exhibit 10.2 to Alliant Energy’s Form 10-Q for the quarter ended June 30, 2015 (File No. 1-9894))
10.8b#10.9b# Second Amendment to the Alliant Energy Rabbi Trust Agreement for DCPs (incorporated by reference to Exhibit 10.3 to Alliant Energy’s Form 10-Q for the quarter ended June 30, 2015 (File No. 1-9894))
10.9#10.10# Alliant Energy Excess Retirement Plan (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 10-Q for the quarter ended September 30, 2008 (File No. 1-9894))
10.9a#10.10a# Amendment to the Alliant Energy Excess Retirement Plan (incorporated by reference to Exhibit 10.4 to Alliant Energy’s Form 8-K, filed December 5, 2011 (File No. 1-9894))
10.10#10.11# Form of SRPSupplemental Retirement Plan (SRP) Agreement by and between Alliant Energy and each of T.L. Hanson, P.L. Kampling and J.O. Larsen (incorporated by reference to Exhibit 10.3 to Alliant Energy’s Form 8-K, filed December 12, 2008 (File No. 1-9894))
10.11#10.12# Alliant Energy Defined Contribution SRP (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 10-Q for the quarter ended September 30, 2010 (File No. 1-9894))
10.11a#10.12a# Amendment to the Alliant Energy Defined Contribution SRP (incorporated by reference to Exhibit 10.3 to Alliant Energy’s Form 8-K, filed December 5, 2011 (File No. 1-9894))
10.11b#10.12b# Amendment to the Alliant Energy Defined Contribution SRP (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 8-K, filed March 12, 2014 (File No. 1-9894))
10.12#10.13# Form of KEESA,Key Executive Employment and Severance Agreement (KEESA), by and between Alliant Energy and P.L. Kampling (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 8-K, filed October 29, 2010 (File No. 1-9894))
10.13#10.14# Form of KEESA, by and between Alliant Energy and each of J.H. Gallegos, T.L. Hanson, D.R. Kopp, J.O. Larsen, W.A. Reschke and R.J. Durian (incorporated by reference to Exhibit 10.3 to Alliant Energy’s Form 10-Q for the quarter ended June 30, 2008 (File No. 1-9894))
10.13a#10.14a# Form of Amendment to KEESA, by and between Alliant Energy and each of J.H. Gallegos, T.L. Hanson, D.R. Kopp, J.O. Larsen, W.A. Reschke and R.J. Durian (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 10-Q for the quarter ended September 30, 2015 (File No. 1-9894))
10.14#10.15# Form of Amendment Number One to KEESA, by and between Alliant Energy and each of P.L. Kampling, J.H. Gallegos, T.L. Hanson, D.R. Kopp, J.O. Larsen, W.A. Reschke and R.J. Durian (incorporated by reference to Exhibit 10.6 to Alliant Energy’s Form 8-K, filed December 5, 2011 (File No. 1-9894))
10.15#10.16# Executive Severance Benefit under the Alliant Energy Severance Plan Summary Plan Description, effective March 19, 2008 (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 8-K, filed March 24, 2008 (File No. 1-9894))
10.15a#10.16a# Amendment to the Executive Severance Benefit under the Alliant Energy Severance Plan Summary Plan Description (incorporated by reference to Exhibit 10.5 to Alliant Energy’s Form 8-K, filed December 5, 2011 (File No. 1-9894))
10.16#Executive Employee Reimbursement Agreement, by and between Alliant Energy and R.J. Durian (incorporated by reference to Exhibit 10.13 to Alliant Energy’s Form 10-K for the year 2013 (File No. 1-9894))
10.17#Terms of Alliant Energy Management Performance Pay Plan (incorporated by reference to Exhibit 10.16 to Alliant Energy’s Form 10-K for the year 2014 (File No. 1-9894))

166



10.18# Terms of Alliant Energy Executive Performance Pay Plan (incorporated by reference to Exhibit 10.18 to Alliant Energy’s Form 10-K for the year 2015 (File No. 1-9894))
10.19#10.18# Summary of Compensation and Benefits for Non-Employee Directors of Alliant Energy, IPL and WPL, effective January 1, 20162017
12.1 Ratio of Earnings to Fixed Charges for Alliant Energy

Exhibit NumberDescription
12.2 Ratio of Earnings to Fixed Charges and Ratio of Earnings to Combined Fixed Charges and Preferred Dividend Requirements for IPL
12.3 Ratio of Earnings to Fixed Charges for WPL
18.1Letter re change in accounting principles for IPL
18.2Letter re change in accounting principles for WPL
21.1 Subsidiaries of Alliant Energy
21.2 Subsidiaries of WPL
23.1 Consent of Independent Registered Public Accounting Firm for Alliant Energy
23.2 Consent of Independent Registered Public Accounting Firm for IPL
23.3 Consent of Independent Registered Public Accounting Firm for WPL
31.1 Certification of the Chairman, President and CEOChief Executive Officer for Alliant Energy
31.2 Certification of the Senior VPVice President, Chief Financial Officer and CFOTreasurer for Alliant Energy
31.3 Certification of the Chairman and CEOChief Executive Officer for IPL
31.4 Certification of the Senior VPVice President, Chief Financial Officer and CFOTreasurer for IPL
31.5 Certification of the Chairman and CEOChief Executive Officer for WPL
31.6 Certification of the Senior VPVice President, Chief Financial Officer and CFOTreasurer for WPL
32.1 Written Statement of the CEOChief Executive Officer and CFOChief Financial Officer Pursuant to 18 U.S.C.§1350 for Alliant Energy
32.2 Written Statement of the CEOChief Executive Officer and CFOChief Financial Officer Pursuant to 18 U.S.C.§1350 for IPL
32.3 Written Statement of the CEOChief Executive Officer and CFOChief Financial Officer Pursuant to 18 U.S.C.§1350 for WPL
101.INS*101.INS XBRLExtensible Business Reporting Language (XBRL) Instance Document
101.SCH*101.SCH XBRL Taxonomy Extension Schema Document
101.CAL*101.CAL XBRL Taxonomy Extension Calculation Linkbase Document
101.LAB*101.LAB XBRL Taxonomy Extension Label Linkbase Document
101.PRE*101.PRE XBRL Taxonomy Extension Presentation Linkbase Document
101.DEF*101.DEF XBRL Taxonomy Extension Definition Linkbase Document

# A management contract or compensatory plan or arrangement.
* Filed as Exhibit 101 to this report are the following documents formatted in Extensible Business Reporting Language (XBRL): (i) Alliant Energy’s, IPL’s and WPL’s Consolidated Statements of Income for the years ended December 31, 2015, 2014 and 2013; (ii) Alliant Energy’s, IPL’s and WPL’s Consolidated Balance Sheets as of December 31, 2015 and 2014; (iii) Alliant Energy’s, IPL’s and WPL’s Consolidated Statements of Cash Flows for the years ended December 31, 2015, 2014 and 2013; (iv) Alliant Energy’s and IPL’s Consolidated Statements of Common Equity and WPL’s Consolidated Statements of Equity for the years ended December 31, 2015, 2014 and 2013; and (v) the Combined Notes to Consolidated Financial Statements.


167137