UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 10-K
(Mark One)
☒     ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the Fiscal Year Ended December 31, 20212022
or
☐    TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from __________to__________
Commission File Number: 001-35455
SSR MINING INC.
(Exact name of registrant as specified in its charter)

British Columbia
(State or Other Jurisdiction of Incorporation or Organization)
98-0211014
(I.R.S. Employer Identification No.)
Suite 8001300 - 70016900 E. Belleview Avenue,Layton Ave, Denver, Colorado 80237
(Address of Principal Executive Offices)
Registrant’s telephone number, including area code (303) 292-1299

Securities registered pursuant to Section 12(b) of the Act.
Title of each classTrading symbolName of each exchange on which registered
Common shares without par valueSSRMThe Nasdaq Stock Market LLC

Securities registered pursuant to Section 12(g) of the Act. None
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.      Yes      No
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.      Yes      No



Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.      Yes      No
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).      Yes      No
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12-b2 of the Exchange Act.
Large accelerated filerAccelerated filer
Non-accelerated filerSmaller reporting company
Emerging growth company

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.     
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report.     
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ☐
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to § 240.10D-1(b). ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12-b2 of the Exchange Act).      Yes      No

At June 30, 2021,2022, the aggregate market value of the registrant’s voting and non-voting common equity held by non-affiliates of the registrant was $3,351,155,606$3,537,761,233 based on the closing sale price as reported on Nasdaq Global Market on that date. There were 212,380,004206,762,854 common shares outstanding on January 31, 2022.2023.
DOCUMENTS INCORPORATED BY REFERENCE
Designated portions of the registrant’s definitive Proxy Statement for its 20222023 Annual Meeting of Shareholders, which is to be filed subsequent to the date hereof, are incorporated by reference into Part III of this Annual Report on Form 10-K.



EXPLANATORY NOTE
As of June 30, 2021, we determined that we no longer qualified as a "foreign private issuer," as such term is defined in Rule 405 under the Securities Act of 1933, as amended. Consequently, we were required to comply with U.S. domestic issuer requirements beginning January 1, 2022. As a U.S. domestic issuer, we have adopted U.S. generally accepted accounting principles for the first time with the preparation of our consolidated financial statements for the years ended December 31, 2021, 2020 and 2019. As a foreign private issuer, we previously prepared our consolidated financial statements in accordance with International Financial Reporting Standards, as issued by the International Accounting Standards Board.




TABLE OF CONTENTS
Page
PART I
PART II
PART III
PART IV
1


PART I
Full Year 20212022 Highlights:
Strong full year operating costOperating performance: The Company reported full year 2021 production2022 production of 794,456623,819 gold equivalent ounces at Cost of sales per gold equivalent ounces atounce of $985and all-in sustaining costs (“AISC”) of $955$1,339 per gold equivalent ounce. See "Non-GAAP Measure – Cash Costs and AISC" for an explanation of AISC and a reconciliation of this financial measure to net income and production costs, which are the comparable GAAP financial measures.(1)
Generated peer leading free cash flow:Financial results: Full year free cash flow of $444.2 million resulted in a sector-leading free cash flow yield of 12%. Attributable net income in 20212022 was $368.1$194.1 million, or $1.70 in$0.89 per diluted share and adjusted attributable net income was $144.8 million, or $0.67 per diluted share. See "Non-GAAP Measure – Free Cash Flow"For the twelve months ending December 31, 2022, operating cash flow was $160.9 million and "Non-GAAP Measure – Adjusted Attributable Net Income" for explanations of these measures and reconciliations tofree cash provided by operating activities and net income attributable to equity holders of SSR Mining (GAAP), respectively, which is the comparable GAAP financial measures.flow was $23.4 million. (1)
Delivered strong capitalCapital returns: For the twelve months ending December 31, 2022, SSR Mining returned $158.8 million to shareholders, representing a 4.9% yield, through initial dividends and inaugural share buy-back program: During 2021, the Company returned $191.3repurchases. Quarterly dividend payments totaled $58.8 million in capital2022, reflecting the Company’s announcement of a 40% increase to shareholders throughthe base dividend payments and the repurchase of 8,800,700 shares under theon January 31, 2022. The Company announced a Normal Course Issuer Bid (“NCIB”) program announcedunder the requirements of the TSX on April 19, 2021. The inauguralJune 16, 2022, following the completion of the previous NCIB. During 2022, a total of $100.0 million in common shares were repurchased, representing a repurchase of 6,053,126 shares as part of the NCIB program. In addition, the Company's Board of Directors declared a quarterly dividend program was announced in February 2021, with a $0.05 quarterlyof $0.07 per share dividend declared at the discretion of the Board of Directors. Subsequently, the Board has approved a 40% increase in the quarterly base dividend to $0.07 per share.be payable on March 30, 2023.
Balance Sheet Remained a Key Strength:sheet and financial strength: Closed 2021 withAt the end of 2022, SSR Mining had a cash and cash equivalent balance of $1,017.6$655.5 million despite the aforementioned $191.3Mafter returning $58.8 million in capital returnsdividend payments to shareholders, and $70.0using $100.0 million for share repurchases, making $71.2 million in scheduled debt repayments.
Increased gold mineral reserves by 14%: Mineral resource to reserve conversion at Ҫӧpler’s Çakmaktepe Extension (Ardich)repayments, and Seabee’s Gap Hanging Wall drove an increase to mineral reservesusing $170.0 million for strategic M&A transactions, including the acquisition of Taiga Gold Corp. for $20.0 million and offset depletion at Marigold and Puna, increasing gold mineral reserves by 14%. Total gold equivalent mineral reserves increased by 13%, or 1.2 million ounces, to 10.2 million total ounces.30% of the Kartaltepe joint venture for $150.0 million.
Delivered strong near-mine and greenfield exploration results across the portfolio: Delivered positive exploration updates from the Çakmaktepe Extension, (Ardich), Seabee Gold Operations, and Marigold Copper Hill, and Amisk propertiesMine in 2021,2022, showcasing opportunities for growth across SSR Mining's robust global exploration platform. See Item 2. Properties for further information.
Expanded development portfolio in core jurisdictions and continued asset rationalizations: On December 2, 2021,Completed the Company announced the proposed acquisition of Taiga Gold Corp. for $21.0 million.: On April 14, 2022,the Company completed the acquisition of Taiga Gold Cop. (“Taiga Gold”). The transaction will consolidateconsolidated a 100% interest in the Fisher propertiesproperty contiguous to the Seabee mine, eliminated an existinga 2.5% net smelter return (“NSR”)NSR royalty on the majority of the Fisher properties,property, and added five new properties covering 30,480over 29,100 hectares to complement the Company’s existing exploration platform. Earlierplatform in the underexplored and geologically prospective Province of Saskatchewan. The Company’s Saskatchewan assets now cover an area of approximately 131,150 hectares.
Completed the sale of the Pitarrilla project: On July 6, 2022 the Company completed the sale of the Pitarrilla project to Endeavour Silver. As consideration for the sale, SSR Mining received $35.0 million in cash, $35.0 million (2) in common shares of Endeavour Silver, and a 1.25% net smelter return royalty on the Pitarrilla property. The sale was originally announced on January 13, 2022.
Acquired an additional 30% ownership in Kartaltepe: In the fourth quarter of 2021,2022, the Company announced and completed an agreement to increase itsacquire an additional 30% ownership interest in the joint venture coveringKartaltepe Mining Joint Venture at the Copper Hill exploration target in Turkey to 70%. Additionally, the Company progressed its portfolio rationalization process with the announcement of the sale of its non-core royalty portfolio to EMX Royalty Corporation ("EMX") on July 29, 2021,Çöpler District from partner Lidya Mining for total consideration of $100.0 million.
Updated Technical Report Summaries at all producing assets reiterate quality of longer-term platform:$150.0 million in cash. This acquisition will streamline operating, financial and exploration activities across the Ҫöpler District while creating tangible synergies. The Company has completed Technical Report Summariesnow owns 80% of the entire Çöpler District.
(1) AISC, free cash flow, adjusted attributable net income (loss), and adjusted attributable net income (loss) per diluted share are non-GAAP financial measures. For explanations of these measures and reconciliations to the most comparable financial measure calculated under U.S. GAAP, please see the discussion under "Non-GAAP Financial Measures" in Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations herein.
(2) The fair value of the common shares of Endeavour Silver on July 6, 2022 was $25.6 million. See Note 3 to the Consolidated Financial Statements for each of its operating assets in compliance with Subpart 1300 of Regulation S-K. These reports include refreshed operating and economic assumptions for each asset and provide a base case for further growth and optimization to support the Company's long-term production base.more information.

2


ITEM 1. BUSINESS
Introduction
SSR Mining is a precious metals mining company with four producing assets located in the United States, Turkey,Türkiye, Canada and Argentina. The Company is primarily engaged in the operation, acquisition, exploration and development of precious metal resource properties, located in Turkey and the Americas. The Company producesproducing gold doré as well as copper, silver and lead and zinc concentrates. SSR Mining's diversified asset portfolio is comprised of high-margin, long-life assets located in some of the world's most prolific metal districts. In 2021, the Company's four operating assets produced over 794 thousand gold equivalent ounces and generated over $440.0 million dollars of free cash flow. See "Non-GAAP Measure – Free Cash Flow" for an explanation of this measure and a reconciliation to cash provided by operating activities, which is the comparable GAAP financial measure.
The Company has an experienced leadership team with a proven track record of delivery and value creation. Across the organization, the Company has expertise in project construction, mining (open pit and underground), and processing (pressure oxidation, heap leach and flotation), with a robust commitment to health, safety, community engagement and environmental management.
The Company has a strong balance sheet, with over $1 billion$655.5 million in cash and cash equivalents as of December 31, 2021,2022, to support its growth pipeline. The Company intends to leverage its balance sheet strength and proven track record of free cash flow generation to fund growth across its portfolio to facilitate superior returns to shareholders.
In this report, "SSR Mining," the "Company," "our" and "we" refer to SSR Mining Inc. together with its affiliates and subsidiaries, unless the context otherwise requires. All currency references herein are in United States dollars ("USD") unless otherwise indicated. References to "CAD" or the use of the symbol “C$” refers to Canadian dollars. References to “TL” are to the lawful currency of Turkey,Türkiye, the Turkish Lira. References to “ARS” are to the lawful currency of Argentina, the Argentine peso.
All share data in this report refers to consolidated shares/data, unless otherwise indicated.

Segment Information
The Company's operations consist of four operating mine sites - Çöpler Gold Mine, located in Erzincan Province, TurkeyTürkiye ("Çöpler"), Marigold Mine, located in Nevada, United States ("Marigold"), Seabee Gold Operations, located in Saskatchewan, Canada ("Seabee" or "SGO"), and Puna Operations, located in Jujuy Province, Argentina ("Puna") - each of which is a reportable operating segment and which are also referred to as producing assets. The contributions to our revenue by reportable operating segment for the year ended December 31, 20212022 were 41%31% from Çöpler (2020(202124%41%; 20192020nil)24%), 29%30% from Marigold (2020(202148%29%; 2019202052%48%), 15%21% from Seabee (2020(202116%15%; 2019202024%16%) and 15%18% from Puna (2020(202112%15%; 2019202024%12%). See Note 4 to the Consolidated Financial Statements for further information relating to our reportable operating segments.
In addition to current mine production, the Company also operatesparticipates in exploration and development activities at properties located in Canada, Turkey,Türkiye, and Peru and Mexico. . See Item 2, Properties, for further information about the Company's production and exploration properties.
Principal Products
Çöpler, Marigold and Seabee produce gold doré. Doré is unrefined gold bullion bars usually consisting of in excess of 90% gold, which is subsequently refined by a third party to gold bullion. The Company sells gold doré produced at Marigold and Seabee primarily to bullion banks, however all of theand gold doré produced at Çöpler is deliveredsold to the Istanbul Gold Refinery.Central Bank of Türkiye. Puna produces silver, lead and zinc concentrates, which are sold to smelters or traders for further refining.
During 2022, sales of gold doré accounted for 82% of revenue, with 31% sold to Central Bank of Türkiye, 28% to CIBC and 16% to Bank of Montreal. During 2021, sales of gold doré to Central Bank of Türkiye and CIBC accounted for 84%41% and 30% of revenue, with 41% sold to Istanbul Gold Refinery, 30% to CIBC.the Company's total revenues, respectively. During 2020, sales of gold doré to CIBC, Istanbul Gold Refinery,Central Bank of Türkiye and Bank of Montreal accounted for 45%, 24%, and 14% of the Company's total revenues, respectively. During 2019, sales of gold doré to CIBC, Bank of Nova Scotia, and Bank of Montreal accounted for 37%, 22%, and 17% of the Company's total revenues, respectively.
3


re
spectively.
The Company sells lead and zinc concentrate with high silver content, through contractual arrangements with smelters and traders located in Asia and Europe. The concentrates are sold under supply contracts updated annually or as needed through spot sales, with processing fees based on the demand for the concentrates in the global marketplace.
3


The Company’s revenue by product category for the years ended December 31 was as follows:follows:
Years Ended December 31,Years Ended December 31,
Product Revenue (1)
Product Revenue (1)
202120202019
Product Revenue (1)
202220212020
GoldGold84 %88 %76 %Gold82 %84 %88 %
SilverSilver12 %11 %19 %Silver14 %12 %11 %
LeadLead%%%Lead%%%
ZincZinc%%%Zinc%%— %
(1) The Company also realizes de minimus revenue from copper.
As of December 31, 2021,2022, the Company had attributable proven and probable gold reserves of 9,154reserves of 7,620 koz. For information on the mineral resources and mineral reserves for each operating asset, see Item 2, “Proven and Probable Reserve Estimates" and "Resource Estimates”.
The market prices of gold and silver are key drivers of the Company’s profitability. The prices of gold and silver can fluctuate widely and are affected by a number of macroeconomic factors, including global or regional consumption patterns, the supply of, and demand for gold and silver, interest rates, exchange rates, inflation or deflation, global economic conditions resulting from the COVID-19 pandemic, and the political and economic conditions of major gold- and silver-producing and gold- and silver-consuming countries throughout the world. Importantly, the price of gold and silver can be impacted by their role as safe havens during periods of market turmoil and as defense against the perceived inflationary impacts and currency depreciation caused by the responses of governments and central banking authorities to various economic threats. See Item 1A. Risk Factors, for further information.
During 2021,2022, the gold price, based on the London Bullion Market Association (“LBMA”) averaged $1,799$1,800 per ounce, which was $29$1 per ounce, or 0.1%, higher than the 2021 annual average of $1,799 per ounce and $30 per ounce, or 2%, higher than the 2020 annual average of $1,770 per ounce and $409 per ounce, or 29%, higher than the 2019 annual average of $1,393 per ounce. During 2021,2022, the price of silver, based on the LBMA silver price, averaged $25.14$21.73 per ounce, which was $3.41 less per ounce, or 14%, less than the 2021 annual average of $25.14 per ounce and $4.59 per ounce, or 22%6%, higher than the 2020 annual average of $20.55 per ounce and $8.93 per ounce, or 55%, higher than the 2019 annual average of $16.21 per ounce. See Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations, below, for further information relating to metal prices. For further details, see "Consolidated Results" and "Results of Operations" in Item 7, Management's Discussion and Analysis.Analysis of Financial Condition and Results of Operations.
Competition
The precious and base metals mineral exploration and mining business is competitive. Competition is primarily for: mineral properties that can be developed and produced economically; technical experts that can find, develop and mine such mineral properties; labor to operate the mineral properties; and capital to finance exploration, development and operations.
The Company competes with other mining and exploration companies in the acquisition of mineral properties and in connection with the recruitment and retention of qualified employees. There is significant competition for mineral properties. Many larger competitors have greater financial and technical resources available to them. If the Company is unsuccessful in acquiring additional mineral properties or qualified personnel, the Company may not be able to replace mineral reserves, maintain production or grow.

4


Licenses and Concessions
Other than operating licenses for our mining and processing facilities, there are no third party patents, licenses or franchises material to our business. In many countries, however, we conduct our mining and exploration activities pursuant to concessions granted by, or under contracts with, the host government, including the United States, Canada, Mexico, Peru, Argentina, and Turkey.Türkiye. The concessions and contracts are subject to the political risks associated with the host country. See Item 1A. Risk Factors for further information.
Condition of Physical Assets and Insurance
Our business is capital intensive and requires ongoing capital investment for the replacement, modernization or expansion of equipment and facilities. See Results of Consolidated Operations and Liquidity and Capital Resources within Item 7. Management’s Discussion and Analysis of Consolidated Financial Condition and Results of Operations, for further information.
We maintain insurance policies against property loss and business interruption and insure against risks that are typical in the operation of our business, in amounts that we believe to be reasonable. Such insurance, however, contains exclusions and limitations on coverage, particularly with respect to environmental liability and political risk. There can be no assurance that claims would be paid under such insurance policies in connection with a particular event. See Item 1A. Risk Factors, below for further information.
Çöpler Operations Temporary Shutdown
In June 2022, Türkiye's Ministry of Environment, Urbanization and Climate Change (“Ministry of Environment”) temporarily suspended operations at the Çöpler mine site as a result of a leak of leach solution containing a small amount of diluted cyanide on June 21, 2022. The leak occurred from a pipeline that pumps diluted cyanide solution to Çöpler’s heap leach pad. The Ministry of Environment ordered certain remediation and improvement initiatives to be undertaken. The Company completed these initiatives and received the required regulatory approvals from Türkiye's government authorities on September 22, 2022, at which time all operations were restarted at the Ҫӧpler mine.
During Ҫӧpler’s temporary suspension, the Company accelerated and completed planned maintenance in Ҫӧpler’s sulfide plant that had been previously scheduled for the fourth quarter of 2022. During this period, the Company completed a scheduled partial relining of the face bricks in Autoclave 1.
Environmental, Social and Governance ("ESG")
The Company’s approach to environmental and social development is underpinned by the goal of minimizing the impact of our operations to the environment and leaving a positive legacy in the communities where the Company operates. For the Company, being a responsible corporate citizen means protecting the natural environment associated with its business activities, providing a safe workplace and work processes for its employees and contractors, and investing in the communities where the Company operates in an effort to enhance the lives of those who live and work in these communities beyond the life of its operations. The Company takes a long-term view of its corporate responsibility, which is reflected in the policies that guide the Company’s business decisions, and in its corporate culture that fosters safe and ethical behavior across all levels of SSR Mining.the Company.

Environment Stewardship
The Company is committed to executing its business with strong environmental and community stewardship through the ongoing development of a sustainable approach to operating its business. The Company’s Environmental & Sustainability Policy defines the organization’s commitments to responsible environmental stewardship and to health and welfare of the people and communities in which the Company operates. The policy is designed to guide the Company in advancing each of those commitments. The Company annually publishes an ESG and Sustainability Report, which is developed using the Global Reporting Initiative framework and outlines the Company’s approach to sustainability across a range of areas and summarizes the Company’s sustainability performance. The Company's Environmental & Sustainability Policy and its ESG and Sustainability Report are available on the Company’s website.
5


The Company’s Board of Directors has also established an Environmental, Health, Safety and Sustainability Committee of the Board (the “EHS&S Committee”) that, as part of its mandate, is responsible for reviewing the Company’s safety, health, security, risk, environment, community relations and sustainability policies and practices, and monitoring the Company’s performance in these areas. The Company’s EHS&S Committee charter is available on the Company’s website.
In 2007, Marigold became the first operating gold mine in the world certified as fully compliant with the International Cyanide Management Code (the “Cyanide Code”), a voluntary industry program for companies involved in the production of gold by the cyanidation process. The Cyanide Code addresses the production of cyanide, its transport from the producer to the mine, its on-site storage and use, decommissioning and financial assurance, worker safety, emergency response, training, stakeholder involvement and verification of implementation of the Cyanide Code. Marigold has been recertified in compliance with the Cyanide Code each time it has been audited by the International Cyanide Management Institute, with the most recent successful recertification occurring in 2021.
5


Producing precious metals is an energy-intensive business, resulting in carbon emissions. The Company's principal energy sources are purchased electricity, diesel fuel, natural gas and propane. The Company's operations are subject to a range of risks related to transitioning the business to meet regulatory, societal and investor expectations for operating in a low-carbon economy. Transitioning to a lower-carbon economy may entail extensive policy, legal, technology, and market changes to address mitigation and adaptation requirements related to climate change. SSR Mining plans to establish an action plan to achieve net zero emissions by 2050. Consistent with this commitment, actions taken to achieve transition to a low-carbon economy may result in increased costs for the Company's operations, partners and suppliers, including increased energy, capital equipment, environmental monitoring and reporting and other costs to achieve the Company's carbon neutrality goal and to comply with ongoing regulations and legislation to address carbon emissions.
Community Engagement
The Company’s community relations program is based on open and continuous communication with the members of communities located in its areas of operation. The Company takes a shared-value approach to local development activities to promote sustainable long-term economic and social benefits. In addition, the Company strives to ensure that local stakeholders have an opportunity for input and dialogue. Projects aimed at assisting and advancing the Company’s communities include training and employment, development of infrastructure and support for education and medical services, among others. At all times, the Company works to be a partner in the long-term sustainability of the communities in which it operates. In addition to direct investments made by SSR Mining, the Company also invests in the local communities surrounding its operations by supporting education, social programs and infrastructure projects.
Environmental Regulations
The Company’s activities are subject to extensive laws and regulations governing the protection of the environment and natural resources in all jurisdictions where the Company operates throughout the exploration, development and operating stages of a mining property. These laws address, among other things, emissions into the air and air quality, discharges into water and water quality, management of waste, management and disposal of solid and hazardous substances, protection of natural resources, fisheries and wildlife protection, antiquities, endangered species, noise and use and reclamation of lands disturbed by mining operations.
The Company is required to obtain governmental permits and, in some instances, provide bonding requirements under federal, state, or provincial air, water quality, and mine reclamation rules and permits. Violations of environmental laws are subject to civil sanctions and, in some cases, criminal sanctions, including the suspension or revocation of permits. Additionally, environmental laws in the countries in which the Company operates require that the Company periodically perform environmental impact studies and updates at its mines.
Reclamation
The Company’s mining, exploration and development activities are subject to various federal, provincial, state and municipal laws and regulations relating to the protection of the environment, including requirements for closure and
6


reclamation of mining properties. The Company believes that how it closes a mine is just as important as how it opens and operates a mine.
The Company has certain reclamation obligations at its mineral properties, including Çöpler, Marigold, Seabee and Puna Operations. At Marigold, the Company engages in concurrent reclamation practices and provides bonds for all permitted features, as part of the State of Nevada permitting process. Current bonding amounts are based on third party cost estimates to reclaim all permitted features at Marigold, with the exception of a few features permitted as permanent, post-mining features. The U.S. Bureau of Land Management (“BLM”) and the State of Nevada both review and approve the bond estimate, and the BLM holds the financial instruments providing the bond backing. At Seabee, the Company also has an approved closure plan and financial assurance held by the Province of Saskatchewan. The closure plan addresses all final reclamation requirements as well as the longer-term post-reclamation monitoring and maintenance phase. As required by the Company’s environmental permits, the closure plan is periodically updated.
6


The financial and operational effect of environmental protection requirements on the capital expenditures and earnings of each mineral property are not significantly different than that of similar sized mines in the same jurisdiction, and therefore should not have a negative effect on the Company’s competitive position in the future. See Item 7. Management’s Discussion and Analysis of Consolidated Financial Condition and Results of Operations, for further information regarding closure and reclamation cost estimates.
7


Human Capital Management
Employees and Contractors
AsAs of December 31, 2021, the2022, the Company employed approximately 2,4292,500 full-time employees and 1,6082,050 contract employees throughout the United States, Canada, Mexico, Peru, Argentina and Turkey.Türkiye.
As ofof December 31, 2021, 2022, of the 649630 full-time employees in Turkey,Türkiye, approximately 61%64% were represented by a union, and of the 839900 full-time employees in Argentina, approximately 63%60% were represented by a union.
Diversity and Inclusion
The Company recognizes that a workforce composed of many individuals with a mix of skills, experience, perspectives, backgrounds and characteristics leads to a more robust understanding of opportunities, issues and risks, and to stronger decision-making. Given the broad geographic footprint of the Company’s operations, we benefit from a meaningfully diverse workforce. The Company’s Board of Directors also recognizes that a diverse board of directors makes prudent business sense and makes for better oversight and corporate governance and is committed to a merit-based process, which is based on objective criteria, solicits multiple perspectives and is free of conscious or unconscious bias and discrimination, for the identification and selection of nominees to the Board. In March 2019, the Company became a member of each of the Catalyst Accord 2022 and the 30% Club Canada. These initiatives are aimed at accelerating the advancement of women in the workplace with a target goal of at least 30% representation of women on public-company boards. TheIn 2022, the Board remains committed to these initiatives and is currently going through its annual Board renewal process with a focus on increasing diversityof Directors added two members who are women, bringing the total female representation on the Board including female Board members. The Board has engaged a third-party search firm to assist the Board in recruiting additional directors to ensure that the slate of nominees presented in the Company’s proxy will reflect its commitment to Board diversity.over 30%.
The Company has adopted a Diversity Policy which requires the Company to establish specific diversity initiatives, programs and targets. The Company’s Corporate Governance and Nominating Committee oversees the diversity initiatives at the Board level and the Company’s Compensation and Leadership Development Committees oversee such initiatives across the Company. The Company’s Corporate Governance and Nominating Committee reviews the Diversity Policy available on our website annually and assesses its effectiveness. The Company and the Board of Directors are committed to establishing measurable diversity objectives and assessing on an annual basis the achievement against these objectives, including the representation of women at all levels of the organization.
In addition, the Company’s Code of Business Conduct and Ethics (the “Code of Conduct”), available on ourthe Company's website, promotes and supports diversity and inclusion.
Health and Safety
The Company is committed to the health and safety of its employees and does so by creating and maintaining a safe working environment, equipment, work processes, effective safety and health management systems, and by complying with all applicable health and safety laws and regulations. The Company acknowledges that there are inherent risks associated with the Company’s business and, through proactive risk management, continuously strives to maximize the safety of its operations and minimize and control health and safety risks.

7


The Company’s safety framework emphasizes effective risk-centered management systems, positive and effective work cultures and proactive leadership to drive culture enhancement. The Company focuses on balancing the human and technical aspects of safety: blending leadership behaviors with traditional management activities to create a safe, productive culture. The Company ensures that its workers understand their individual roles and contributions to safe production and a safe workplace. In this way, the Company’s employees maintain safety awareness, recognize hazards and analyze risk in their daily activities. The technical aspects of safety are addressed through established systems, policies and procedures that enable the Company's employees to identify and assess job-related risks, and that support our efforts to provide appropriate training and verify training competencies. Performance measurement and accountability provides feedback and maintains focus on continuous improvement.
Human Rights
As part of the Company’s commitment to being a responsible corporate citizen, the Company recognizes the important role and responsibility it has in respecting the human rights of its stakeholders. The Company has adopted a Human Rights Policy, available on the Company’s website, which is aligned with the United Nations Guiding Principles on Business and Human Rights, the United Nations Global Compact, and the Organization for Economic Cooperation and Development Guidelines for Multinational Enterprises. This includes support and respect for the human rights expressed in the International Bill of Human Rights and the principles concerning fundamental rights set out in the International Labour Organization’s Declaration on Fundamental Principles and Rights at Work.
COVID-19 Impact
During the year ended December 31, 2021, the COVID-19 pandemic negatively impacted global economic and certain financial markets. Many industries have been impacted by the COVID-19 pandemic and are facing operating challenges associated with the regulations and guidelines resulting from efforts to contain it.
Seabee and Puna were placed into care and maintenance near the end of the first quarter of 2020 and subsequently restarted through the second and third quarters of 2020, with no operational shutdowns in 2021. At Çöpler and Marigold, where no operational shutdowns have taken place, the sites continued to operate with limited impact from COVID-19 and have implemented numerous measures intended to protect employees, including quarantining, testing, ensuring physical distancing and providing additional protective equipment. Currently, Çöpler, Marigold, Seabee and Puna are all operating as expected, with limited impacts resulting from ongoing COVID-19 restrictions and related impacts. Each of the sites continue to work with national and local authorities in accordance with applicable regulations and remain vigilant with respect to on-site specific protocols to protect the health and safety of employees and stakeholders; however, all sites remain vulnerable to potential COVID-19 restrictions and impacts, including those resulting from existing or new variants and new governmental restrictions, which could suspend or limit the Company's operations or result in temporary loss of employees due to COVID-19 infections. COVID-19 is slowing government processes, including permitting, which has impacted the Company's operations as the Company is seeking additional permits and land access for possible growth and operations.
The Company continues to restrict non-essential travel and manage the contact of its employees and contractors in order to reduce the risk of COVID-19 impacting its operations and the communities surrounding our mine sites. The Company has reopened its corporate offices to the extent permitted by local health ordinances, with employees still working remotely, as necessary or required, to mitigate the spread of COVID-19.
8


Forward-Looking Statements
Certain statements contained in this report (including information incorporated by reference herein) are "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and are intended to be covered by the safe harbor provided for under these sections. Forward looking statements can be identified with words such as “may,” “will,” “could,” “should,” “expect,” “plan,” “anticipate,” “believe,” “intend,” “estimate,” “projects,” “predict,” “potential,” “continue” and similar expressions, as well as statements written in the future tense. When made, forward-looking statements are based on information known to management at such time and/or management’s good faith belief with respect to future events. Such statements are subject to risks and uncertainties that could cause actual performance or results to differ materially from those expressed in the Company's forward-looking statements. Many of these factors are beyond the Company's ability to control or predict. Given these uncertainties, readers are cautioned not to place undue reliance on forward-looking statements. Forward-looking statements include, without limitation:
forecasts and outlook;
timing, production, cost, operating and capital expenditure guidance;
the Company’s intention to return excess attributable free cash flow to shareholders;
the timing and implementation of the Company’s dividend policy;
the implementation of any share buyback program;
statements regarding plans or expectations for the declaration of future dividends and the amount thereof;
future cash costs and all-in sustaining costs (“AISC”) per ounce of gold, silver and other metals sold;
the prices of gold, silver, copper, lead, zinc and other metals;
mineral resources, mineral reserves, realization of mineral reserves, and the existence or realization of mineral resource estimates;
the Company’s ability to discover new areas of mineralization;
the timing and extent of capital investment at the Company’s operations;
the timing of production and production levels and the results of the Company’s exploration and development programs;
current financial resources being sufficient to carry out plans, commitments and business requirements for the next twelve months;
movements in commodity prices not impacting the value of any financial instruments;
estimated production rates for gold, silver and other metals produced by the Company;
the estimated cost of sustaining capital;
availability of sufficient financing;
receipt of regulatory approvals;
the timing of studies, announcements, and analysis;
the timing of construction and development of proposed mines and process facilities;
9


ongoing or future development plans and capital replacement;
9


estimates of expected or anticipated economic returns from the Company’s mining projects, including future sales of metals, concentrate or other products produced by the Company and the timing thereof;
the impact of COVID-19, including any existing and new variants, on the Company's operations;
the Company’s plans and expectations for its properties and operations; and
all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, environmental, regulatory, and political matters that may influence or be influenced by future events or conditions.
Such forward-looking information and statements are based on a number of material factors and assumptions, including, but not limited to:
the inherent speculative nature of exploration results;
the ability to explore;
communications with local stakeholders;
maintaining community and governmental relations;
status of negotiations of joint ventures;
weather conditions at the Company’s operations;
commodity prices;
the ultimate determination of and realization of mineral reserves;
existence or realization of mineral resources;
the development approach;
availability and receipt of required approvals, titles, licenses and permits;
sufficient working capital to develop and operate the mines and implement development plans;
access to adequate services and supplies;
foreign currency exchange rates;
interest rates;
inflation;
access to capital markets and associated cost of funds;
availability of a qualified workforce;
ability to negotiate, finalize, and execute relevant agreements;
lack of social opposition to the Company’s mines or facilities;
lack of legal challenges with respect to the Company’s properties;
10


the timing and amount of future production;
the ability to meet production, cost, and capital expenditure targets;
timing and ability to produce studies and analyses;
10


capital and operating expenditures;
economic conditions;
availability of sufficient financing;
the ultimate ability to mine, process, and sell mineral products on economically favorable terms; and
any and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, geopolitical, regulatory and political factors that may influence future events or conditions.
The above list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements and information, and such statements and information will not be updated to reflect events or circumstances arising after the date of such statements or to reflect the occurrence of anticipated or unanticipated events.
Available Information

SSR Mining Inc. was incorporated in British Columbia, Canada in 2005 and its predecessor companies date back to 1946. The corporate office is located at Suite 8001300 - 70016900 E. Belleview Avenue,Layton Ave Denver, Colorado 80237. SSR Mining’s common shares are listed on the Nasdaq Global Market and the Toronto Stock Exchange under the trading symbol “SSRM.” The Company’s CHESS depositary interests (“CDIs”) are listed under the ticker symbol “SSR” on Australian Securities Exchange (ASX).
General information about the Company is available through the Company’s website at http://www.ssrmining.com. The Company’s press releases and filings with the SEC in the United States and on SEDAR in Canada are available free of charge within the Investors section of the Company’s website at http://ir.ssrmining.com/investors. In addition, the SEC maintains an internet site that contains reports, proxy and information statements and other information regarding issuers, such as the Company, that are filed electronically with the SEC. The address of that website is http://www.sec.gov. The documents that the Company files under Canadian securities law requirements are available on SEDAR at the following address http://sedar.com. The information on or linked to the Company’s website is neither a part of nor incorporated by reference in this Annual Report or any of the Company’s other SEC filings or filings made on SEDAR. All references to www.ssrmining.comwww.ssrmining.com in this Annual Report are inactive textual references only and information contained at that website is not incorporated herein and does not constitute a part of this Annual Report.
As of June 30, 2021, we determined that we no longer qualified as a “foreign private issuer,” as such term is defined in Rule 405 under the Securities Act of 1933, as amended. Consequently, we were required to comply with U.S. domestic issuer requirements beginning January 1, 2022. As a U.S. domestic issuer, we have adopted U.S. generally accepted accounting principles for the first time with the preparation of our consolidated financial statements for the years ended December 31, 2021, 2020 and 2019. As a foreign private issuer, we previously prepared our consolidated financial statements in accordance with International Financial Reporting Standards.
11


ITEM 1A. RISK FACTORS
The Company's business activities are subject to significant risks, including those described below. You should carefully consider these risks. If any of the described risks actually occurs, the Company's business, financial position and results of operations could be materially adversely affected. Such risks are not the only ones faced by the Company and additional risks and uncertainties not presently known to us or that we currently deem immaterial may also affect the Company's business. This Annual Report contains forward-looking statements that involve risks and uncertainties. The Company's actual results could differ materially from those anticipated in the forward-looking statements as a result of a number of factors, including the risks described below. See “Cautionary Note Concerning Forward-Looking Statements.”
12

11


Risk Factor Summary
The Company is subject to a variety of risks and uncertainties, including risks related to the Company's operations and business, financial risks and risks related to the Company's indebtedness, risks related to the Company's industry and the jurisdictions in which we operate, risks related to our personnel, risks related to governmental regulation and legal proceedings and risks related to ownership of Company equity, which could have a material adverse effect on the Company's business, financial condition, results of operations and cash flow. The following is a summary of the principal risks faced by the Company, including, but not limited to:
Risks Related to the Company's Operations and Business:
The Company's production, development plans and cost estimates may vary and/or not be achieved.
Changes in the market prices of gold, silver and other metals, which in the past have fluctuated widely, will affect the Company’s operations.
Epidemics, pandemics or other public health crises, including COVID-19, has, and could in the future, adversely affect the Company’s business.
The Company’s estimates of mineral reserves and mineral resources are based on interpretation and assumptions and may yield less mineral production under actual conditions than is currently estimated.
The Company may be unable to replace its mineral reserves or acquire additional commercially mineable mineral rights.
Increased operating and capital costs could affect the Company's profitability.
The Company's operations may be adversely affected by rising energy prices or energy shortages.
Supply chain and other disruptions could adversely affect the Company's business.
Continuation of the Company's mining production is dependent on the availability of sufficient water supplies to support our mining operations.
The Company may be exposed to future development risks.
Land reclamation, mine closure and remediation requirements and costs may be burdensome and actual environmental and asset retirement obligations may exceed estimates and reserves.
The Company is subject to certain transportation risks that could have a negative impact on the Company’s ability to operate.
The Company may beis subject to information systems security threats.threats and other risks.
The Company’s joint venture interests are subject to risks.
Reputation loss may result in decreased investor confidence, increased challenges in developing and maintaining community relations and an impediment to the Company’s overall ability to advance its projects, thereby having a material adverse impact on the Company’s financial performance, financial condition, cash flows and growth prospects.
Financial Risks and Risks Related to Our Indebtedness:
The Company is subject to risks associated with its financial instruments.
The Company may be adversely affected by fluctuations in foreign exchange rates.
Inflation may have a material adverse effect on results of operations.
Future funding requirements may affect the Company's business or its ability to develop mineral properties, complete exploration and development programs, pay cash dividends or engage in share repurchase transactions.
The Company may be unable to generate sufficient cash to service its debt and other actions to satisfy such obligations may be unsuccessful.
The Company may fail to fulfill its obligations under existing and future indebtedness, and such indebtedness may impair the financial health of the Company.
1213


Risks Related to Our Industry and the Jurisdictions in Which We Operate:
Political or economic instability or unexpected regulatory change in the countries where the Company’s mineral properties are located could adversely affect its business.
Suitable infrastructure may not be available or damage to existing infrastructure may occur.
Mining is inherently risky and subject to conditions and events beyond the Company’s control.
Mining companies are increasingly required to consider and provide benefits to the communities and countries in which they operate in order to maintain operations.
Indigenous peoples’ title claims and rights to consultation and accommodation may affect the Company’s existing operations as well as development projects and future acquisitions.
Civil disobedience in certain of the countries where the Company’s mineral properties are located could adversely affect its business.
The Company and the mining industry face geotechnical challenges, which could adversely impact our production and profitability.
Risks Related to Our Personnel:
Certain of the Company’s directors and/or officers also serve, or may serve, as directors of other companies involved in natural resource exploration and development, and consequently there exists the possibility for these directors and/or officers to be in a position of conflict.
The Company could be subject to potential labor unrest or other labor disturbances.
The Company is dependent on its ability to recruit and retain qualified personnel.
The Company relies on contractors to conduct a significant portion of its operations and construction projects.
Risks Related to Governmental Regulation and Legal Proceedings:
The Company is subject to significant governmental regulations.
The Company requires permits to conduct its operations, and delays in obtaining or failing to obtain such permits, or a failure to comply with the terms of any such permits that the Company has obtained, would adversely affect the Company’s business.
The Company’s activities are subject to environmental laws and regulations that may increase the Company’s costs and restrict its operations.
Compliance with emerging climate change regulations could result in significant costs and climate change may present physical risks to a mining company’s operations.
The Company may be required by human rights laws to take actions that delay the Company’s operations or the advancement of its projects.
The Company’s mineral properties may be subject to uncertain title.
The Company is subject to claims and legal proceedings that arise in the ordinary course of business.
The Company is subject to assessment by taxation authorities in multiple jurisdictions that arise in the ordinary course of business.
Risks Related to Ownership of Company Equity:
The Company’s common shares are publicly traded and are subject to various factors that have historically made the Company’s common share price volatile.
Holders of our common shares may not receive dividends.
Future sales or issuances of equity securities could decrease the value of the Company’s common shares, dilute investors’ voting power and reduce the Company’s earnings per share.
14

13


Risks Related to the Company's Operations and Business
The Company’s production, development plans and cost estimates may vary and/or not be achieved.
The Company has prepared estimates of future production, operating costs and capital costs for Çöpler, Marigold, Seabee and Puna, and the Company’s technical studies and reports for the Company’s projects, including the Çöpler District Master Plan 2021 Technical Report Summary, as amended, the Marigold 2021 Technical Report Summary, as amended, the Seabee 2021 Technical Report Summary, as amended, and the Puna 2021 Technical Report Summary, as amended, contain estimates of future production, development plans, operating and capital costs and other economic and technical estimates relating to these projects. These estimates are based on a variety of factors and assumptions and there is no assurance that such production, plans, costs or other estimates will be achieved. Actual production, costs and financial returns may vary significantly from the estimates depending on a variety of factors many of which are not within the Company’s control. These factors include, but are not limited to: actual ore mined varying from estimates of grade, tonnage, dilution, metallurgical and other characteristics; short-term operating factors such as the need for sequential development of ore bodies and the processing of new or different ore grades from those planned; mine failures, slope failures or equipment failures; industrial accidents; natural phenomena such as inclement weather conditions, inadequate ice thickness for an ice road at Seabee, floods, droughts, wildfires, rock slides and earthquakes; encountering unusual or unexpected geological conditions; changes in power costs and potential power shortages; exchange rate and commodity price fluctuations; shortages of principal supplies needed for operations, including explosives, fuels, chemical reagents, water, equipment parts and lubricants; labor shortages or strikes; epidemics, pandemics and public health emergencies, including those related to the recent outbreak of COVID-19; high rates of inflation; civil disobedience and protests; and restrictions (including changes to the taxation regime) or regulations imposed by governmental or regulatory authorities, including permitting and environmental regulations, or other changes in the regulatory environments. Failure to achieve estimates or material increases in costs could have a material adverse impact on the Company’s future cash flows, profitability, results of operations and financial condition.
Changes in the market prices of gold, silver and other metals, which in the past have fluctuated widely, will affect the Company’s operations.
The Company’s profitability and long-term viability and the economic feasibility of its mineral properties depend, in large part, on the market price of gold, silver, copper, lead and zinc. The market prices for these metals are volatile and are affected by numerous factors beyond the Company’s control, including:
global or regional consumption patterns;
the supply of, and demand for, these metals;
gold sales, purchases or leasing by governments and central banks;
the monetary policies employed by the world’s major central banks;
the fiscal policies employed by the world’s major industrialized economies;
recession or reduced economic activity in the United States and other industrialized or developing countries;
speculative short positions taken by significant investors or traders in gold, silver, lead, zinc or other metals;
forward sales by producers in hedging or similar transactions;
the availability and costs of metal substitutes;
decreased industrial, jewelry, base metal or investment demand;
increased import and export taxes;
inflation and/or expectations for inflation;
14


other political and economic conditions, including interest rates and currency values; and
changing investor or consumer sentiment, including in connection with transition to a low-carbon economy, investor interest in crypto currencies and other investment alternatives and other factors
15


The Company cannot predict the effect of these factors on metal prices. For example, average gold prices for 20212022 were $1,799$1,800 per ounce (2020: $1,770; 2019: $1,393)(2021: $1,799; 2020: $1,770), average silver prices for 20212022 were $25.14$21.73 per ounce (2020: $20.55; 2019: $16.21)(2021: $25.14; 2020: $20.55), average lead prices for 20212022 were $1.00$0.97 per pound (2020: $0.89; 2019: $0.99)(2021: $1.00; 2020: $0.89) and average zinc prices for 20212022 were $1.36$1.57 per pound (2020: $1.03; 2019: $1.24)(2021: $1.36; 2020: $1.03). AnyAny decline in our realized prices adversely impacts our revenues, net income and operating cash flows.
In addition, a decrease in the market price of gold, silver and other metals would affect the profitability of Çöpler, Marigold, Seabee and Puna Operations and could affect the Company’s ability to finance the exploration and development of any of the Company’s other mineral properties. The market price of gold, silver and other metals may not remain at current levels. In particular, an increase in worldwide supply, and consequential downward pressure on prices, may result over the longer term from increased gold or silver production from mines developed or expanded as a result of current metal price levels.
Furthermore, sustained lower gold, silver, copper, zinc, lead or other metal prices may:
reduce revenues further through production declines due to cessation of the mining of deposits, or portions of deposits, that have become uneconomic at sustained lower metal prices;
reduce or eliminate the profit that we currently expect from ore stockpiles and ore on leach pads and increase the likelihood and amount that the Company might be required to record as an impairment charge related to the carrying value of its stockpiles and ore on leach pads;
halt or delay the development of new projects;
reduce funds available for exploration and advanced projects with the result that depleted reserves may not be replaced; and
reduce existing reserves by removing ores from reserves that can no longer be economically processed at prevailing prices.
Epidemics, pandemics or other public health crises, including COVID-19, has, and could in the future, adversely affect the Company’s business.
The COVID-19 pandemic has adversely impacted the Company’s operations since 2020, including production and operating income, as well as temporary suspension of operations at Seabee and Puna. While allPuna in 2020. Although no operational shut downs took place at any of the Company's properties in 2021 or 2022, the Company’s mines are currently operating at expected levels the health and safety protocols that the Company has implemented for the protection ofreopened its employees and other stakeholders are adding costs and impacting the efficiency of the Company's operations. Therecorporate offices in 2022 at full capacity, there is no assurance that the operations at any or all of the Company's mines will not be the subject of new or additional restrictions, protocols, suspensions or closures, in whole or in part, in the future, which could have a material adverse effect on the Company's business.

15


The global responses to Additionally, the COVID-19 pandemic have led to significant restrictions on travel, temporary business closures, quarantines, stock market volatility, supplierhealth and vendor uncertaintysafety protocols that the Company has implemented for the protection of its employees and a general reductionother stakeholders largely remain in global consumer activity. The effectsplace and are adding costs and impacting the efficiency of the Company's operations. We remain vulnerable to potential COVID-19 pandemic continue to evolve,restrictions and governments may introduceimpacts, including those resulting from increases in infection rates, existing or new variants and new governmental mandates or modify existing, laws, regulations, decreesrestrictions, which could suspend or other orders that could impactlimit the Company’sCompany's operations or affect itsresult in temporary loss of employees suppliers, local communities, customers, and other stakeholders. In addition, there is the risk that the responses of the relevant governments, including the effectiveness of vaccination programs implemented in the markets in which we operate, may be insufficientdue to contain the impact of the COVID-19 pandemic, which could further impact the Company’s ability to operate. Further, there is the risk that oneinfections or more of the Company’s employees, contractors or community members could contract COVID-19 or be directly affected by someone who contracts COVID-19 and is required to self-isolate. This could impact the Company’s workforce, its ability to operate at that location and the health of the surrounding community. related illness.
The Company has implemented what it believes to be the necessary protocols in each of the jurisdictions in which it operates in order to adequately respond to possible new developments relating to the COVID-19 pandemic, including to further protect the health and safety of its workforce, their families and neighboring communities. However, with the uncertainties surrounding the continued development of the COVID-19 pandemic, including in connection with existing or new variants of COVID-19, and the resulting implications globally, there is no assurance that any protocols that have been or that may be put in place will mitigate the risks or that they will not cause the Company to experience less favorable economic and/or health and safety outcomes.
Finally, while the COVID-19 pandemic has adversely impacted the Company’s operations in the short term, it is difficult to predict the long-term impact on the global economy, which could in turn materially adversely affect our operations, financial results and/or liquidity position. The prolonged exposure ofIn particular, government processes were slowed or delayed, including permitting, over the last two years, which impacted the Company's business and the economy to the impacts of COVID-19 may exacerbate many of the risks thatoperations as the Company is subjectregularly seeking additional permits and land access for possible growth. Although government processes are returning to includingactivity levels we experienced in the past, a return of the restricted government processes that we experience during the height of the COVID-19 pandemic could have a negative impact on the growth of our business.
16


The global response to the COVID-19 pandemic has led to significant restrictions on travel, temporary business closures, quarantines, stock market volatility, supplier and vendor uncertainty and a general reduction in global consumer activity. Although the effects of COVID-19 have moderated, governments may introduce new, or modify existing, laws, regulations, decrees or other orders in response to a resurgence in infection rates, existence of new variants or other factors, all of which could impact the Company’s suppliers, local communities, customers, and other stakeholders and negatively impact our business.
COVID-19 exposed the Company to many of the risks described in this report, and expose the Company to the following:including operational and supply chain delays and disruptions, labor shortages, social unrest, breach of material contracts and customer agreements, increased insurance premiums and/or taxes, increased supplier and contractor expenses, decreased demand or the inability to sell and deliver precious metals, declines in the price of precious metals, delays in permitting or approvals, governmental disruptions, international economic and political conditions, international or regional consumptive patterns, expectations on inflation or deflation, interest rates, capital markets volatility, or other unknown but potentially significant impacts, including the possibility of a significant protracted economic downturn, including a global recession. These factorsA return of the various restrictions, orders, protocols and shutdowns that were imposed in connection with the COVID-19 pandemic will again expose the company to these risks, which may impact, among other things, the Company’s operating plans, production, liquidity and cash flows, valuation of its long-lived assets, the broader market and the trading price of SSR Mining’s common shares.
Given the uncertainty of the duration and magnitude of the impact of the COVID-19 pandemic, the Company’s future operations, including production and cash cost estimates, are subject to a higher than normal degree of risk and uncertainty. It is unknown whether and how the Company’s operations may be affected if the COVID-19 pandemic persists for an extended period of time. Should the duration, spread or intensity of the COVID-19 pandemic further develop in 2022, SSR Mining’s business, financial condition and results of operations could be more significantly impacted.
Further, to the extent that the COVID-19 pandemic adversely affects our business and financial results, it may also have the effect of heightening many of the other risk factors described herein, including, but not limited to, risks related to commodity prices and commodity markets, commodity price fluctuations, our indebtedness, information systems and cyber security and risks relating to our mining operations such as risks related to mineral reserve and mineral resource estimates, production forecasts, impacts of governmental regulations, international operations, availability of infrastructure and employees and challenging global financial conditions.

16


The Company may be unable to replace its mineral reserves or acquire additional commercially mineable mineral rights.
The Company must continually replace its depleted mineral reserves to maintain production levels over the long term. Mineral reserves can be replaced by expanding known ore bodies, locating new deposits or making acquisitions. There is a risk that depletion of the Company’s mineral reserves will not be offset by discoveries or acquisitions. The Company’s mineral base may decline if mineral reserves are mined without adequate replacement and the Company may not be able to sustain production beyond the current mine lives, based on current production rates. If the Company’s mineral reserves are not replaced either by the development of additional mineral reserves and/or additions to mineral reserves, there may be an adverse impact on the Company’s future cash flows, earnings, results of operations and financial condition, and this may be compounded by requirements to expend funds for reclamation and decommissioning.
The Company’s future growth and productivity will depend, in part, on its ability to identify and acquire additional commercially mineable mineral rights, and on the costs and results of continued exploration and potential development programs. Mineral exploration is highly speculative in nature and is frequently non-productive. Most exploration projects do not result in the discovery of commercially mineable ore deposits, and there is no assurance that any anticipated or estimated level of recovery of mineral reserves will be realized or that any identified mineral deposit will ever qualify as a commercially mineable (or viable) orebody that can be legally and economically exploited. Once a site with mineralization is discovered, it may take several years from the initial phases of drilling until production is possible, during which time the economic feasibility of production may change. Substantial expenditures are also required to establish proven and/or probable mineral reserves and to construct mining and processing facilities. Material changes in mineral reserves, grades, stripping ratios or recovery rates may affect the economic viability of any project. As a result, there is no assurance that current or future exploration programs will be successful.
The Company may consider, from time to time, the acquisition of ore reserves from third parties. Such acquisitions are typically based on an analysis of a variety of factors including, but not limited to, historical operating results, estimates of and assumptions regarding the extent of ore reserves, the timing of production from such reserves, cash and other operating costs and the Company's assumptions for future gold, silver, copper, zinc or lead prices or other mineral prices. In connection with any acquisitions, the Company may rely on data and reports prepared by third parties, which may contain information or data that the Company is unable to independently verify or confirm. Other than historical operating results, all of these factors are uncertain and may have an impact on the Company's revenue, cash flow and other operating issues, as well as contributing to the uncertainties related to the process used to estimate ore reserves. In addition, there may be intense competition for the acquisition of ore reserves and/or attractive mining properties. There can be no assurance that the Company will be able to successfully acquire any desired ore reserves or mining properties.
17


The Company’s estimates of mineral reserves and mineral resources are based on interpretation and assumptions and may yield less mineral production under actual conditions than is currently estimated.
There are numerous uncertainties inherent in estimating quantities of mineral reserves and grades of mineralization, including many factors beyond the Company’s control. In making determinations about whether to advance any of the Company’s projects to development or to mine existing mineral reserves, the Company must rely upon estimated calculations as to the mineral reserves and grades of mineralization on its properties. Until ore is actually mined and processed, mineral reserves and grades of mineralization must be considered as estimates only. These estimates are imprecise and depend upon geological interpretation and statistical inferences drawn from drilling and sampling, which may prove to be unreliable. The Company cannot assure that mineral reserves, mineral resources or other mineralization estimates will be accurate, or that mineralization can be mined or processed profitably. Actual operating and capital cost and economic returns on projects may differ significantly from original estimates. Further, it may take many years from the initial phases of exploration until commencement of production, during which time, the economic feasibility of production may change.

17


Additionally, the Company is required to comply with the disclosure standards under new Regulation S-K Subpart 1300 for the year ended December 31, 2021.1300. The provisions of the new disclosure standards are intended to align with those used in the major mining regulatory jurisdictions, however certain provisions of the new disclosure standards may be more restrictive and/or prescriptive than those used in other regulatory jurisdictions. Such variation may result in declarations and disclosures of the Company differing, potentially materially, from those of our non-US joint-venture partners and competitors.
Any material changes in mineral reserves estimates and grades of mineralization will affect the economic viability of placing a property into production and a property’s return on capital. The Company’s estimates of mineral reserves and mineral resources have been determined and valued based on assumed future prices, cut-off grades and operating costs that may prove to be inaccurate. Extended declines in market prices for gold, silver and other precious metals may render portions of the Company’s mineralization uneconomic and result in reduced reported mineral reserves or mineral resources.
Any material reductions in estimates of mineralization, or of the Company’s ability to extract this mineralization, including estimates made in the Çöpler District Master Plan 2021 Technical Report Summary, as amended, the Marigold 2021 Technical Report Summary, as amended, the Seabee 2021 Technical Report Summary, as amended, and the Puna 2021 Technical Report Summary, as amended, and the technical reports for the Company’s additional projects, could have a material adverse effect on the Company’s results of operations or financial condition. There is no assurance that mineral recovery rates achieved in small scale tests will be duplicated in large scale tests under on-site conditions or in production scale. If our reserve estimations are required to be revised using significantly lower gold, silver, zinc, lead and other metal prices as a result of a decrease in commodity prices, increases in operating costs, reductions in metallurgical recovery or other modifying factors, this could result in material write-downs of our investment in mining properties or increased amortization, reclamation and closure charges.
Increased operating and capital costs could affect the Company's profitability.
Costs at any particular mining location are subject to variation due to a number of factors, such as variable ore grade, changing metallurgy and revisions to mine plans in response to the physical shape and location of the ore body, as well as the age and utilization rates for the mining and processing related facilities and equipment. In addition, costs are affected by the price and availability of input commodities, such as fuel, electricity, labor, chemical reagents, explosives, steel, concrete and mining and processing related equipment and facilities. Commodity costs are, at times, subject to volatile price movements, including increases that could make production at certain operations less profitable. Further, changes in laws and regulations can affect commodity prices, uses and transport. Reported costs may also be affected by changes in accounting standards. A material increase in costs at any significant location could have a significant effect on our profitability and operating cash flow.
We could have significant increases in capital and operating costs over the next several years in connection with the development of new projects and in the sustaining and/or expansion of existing mining and processing operations. Costs associated with capital expenditures may increase in the future as a result of factors beyond our control. Increased capital expenditures may have an adverse effect on the profitability of and cash flow generated from existing operations, as well as the economic returns anticipated from new projects.
The Company's operations may be adversely affected by rising energy prices or energy shortages.
Our mining operations and development projects require significant amounts of energy. Increasing global demand for energy, concerns about nuclear power and the limited growth of new energy sources are affecting the price and supply of energy. A variety of factors, including higher energy usage in emerging market economies, actual and
18


proposed taxation of carbon emissions as well as concerns surrounding unrest and potential and actual conflict in the Middle East and Ukraine, could result in increased demand or limited supply of energy and/or sharply escalating diesel fuel, gasoline, natural gas and other energy prices. Additionally, changes in energy laws and regulations in various jurisdictions may impact energy dispatch rules and the ability to access energy and sell excess energy. Limitations on energy supply and increased energy prices could negatively impact our operating costs and cash flow.

18


Our principal energy sources are electricity, purchased petroleum products, natural gas and coal. Some of our operations are in remote locations requiring long distance transmission of power, and in some locations we compete with other companies for access to third party power generators or electrical supply networks. As our operations move towards lower greenhouse gas (“GHG”) emissions targets, power sources and technology at our operations will continue to be evaluated. Certain of our operations may become more dependent upon access to electrical power supply as certain mines move towards electrification. A disruption in the transmission of energy, inadequate energy transmission infrastructure or the termination of any of our energy supply contracts could interrupt our energy supply and adversely affect our operations.
Supply chain and other disruptions could adversely affect the Company's business.
The Company’s ability to mine, process and sell products is critical to our operations. The Company’s operations depend on the continued availability of energy, water, equipment and labor, the costs of which are subject to worldwide supply and demand as well as other factors beyond the Company’s control. Supply chain disruptions, power outages, labor disputes and/or strikes, geopolitical activity, weather events and natural disasters and global health risks or pandemics could seriously harm the Company’s operations as well as the operations of the Company’s customers and suppliers. Likewise, disruptions in the transportation and delivery of products may impact our ability to sell our products and deliver them to our customers on time. In addition, the costs of transporting materials and products through our chain of sourcing and production may increase, and such increases could be significant. Further, the Company’s suppliers may experience capacity limitations in their own operations or may elect to reduce or eliminate certain product lines. To address this risk, generally, the Company seeks to have many sources of supply for key materials in order to avoid significant dependence on any one or a few suppliers, however, prices charged for such key materials by suppliers may differ substantially and obtaining key materials from different suppliers may impact the Company's costs. Although there can be no assurance that such mitigation efforts will prevent future difficulty in obtaining sufficient and timely delivery of certain materials, the Company believes it has adequate programs to ensure a reliable supply of key materials.
Failure to take adequate steps to mitigate the likelihood or potential impact of such disruptions, or to effectively manage such disruptions if they occur, could adversely affect our business and results of operations, as well as require additional resources to restore our global supply chain. Any of these factors could have a material adverse impact on our results of operations and financial condition.
Continuation of the Company's mining production is dependent on the availability of sufficient water supplies to support our mining operations.
The Company recognizes the right to clean, safe water and that reliable water supplies are vital for hygiene, sanitation, livelihoods and the health of the environment. Across the globe, water is a shared and regulated resource. Water is also critical to the Company's business, and the increasing pressure on water resources requires us to consider both current and future conditions in our water management approach. SSR Mining operates in areas where watersheds are under stress with limited supply, increasing population and water demand that impact water in various forms. The Company's management of water-related risks targets the specific areas of operation, as well as considering the physical environment and social and regulatory context. Although each of the Company's operations currently has sufficient water rights, claims and contracts to cover its operational demands, the potential outcome of pending or future legal proceedings or community negotiations relating to water rights, claims, contracts and uses is unknown and unpredictable. Further, laws and regulations may be introduced in certain operational jurisdictions, which could limit the Company's access to sufficient water resources. Water shortages may also result from weather or environmental changes and climate impacts out of the Company’s control. While the Company has considered and incorporated systems to address the impact of the dry season as part of its operating plans, there is no assurance that those systems will be sufficient to address all shortages in water supply. Any interruption or shortage of water supplies could require the Company to curtail or shut down mining production and could prevent the Company from pursuing expansion opportunities, resulting in production and processing delays or stoppages.

19


The Company may be exposed to future development risks.
Any adverse condition affecting mining or processing conditions at a Company property could have a material adverse effect on the Company’s financial performance and results of operations. The future development of any other properties found to be economically feasible and approved by the Company’s Board of Directors will require the construction and operation of mines, processing plants and related infrastructure. As a result, the Company is and will continue to be subject to all of the risks associated with establishing new mining operations, including:
the availability and cost of skilled labor, and mining and processing equipment;
the availability and cost of appropriate smelting and refining arrangements;
securing long-term access agreements required to develop and operate a mine;
the need to obtain and retain necessary environmental and other governmental approvals and permits and the timing of the receipt of those approvals and permits;
potential opposition from governmental or non-governmental organizations, environmental groups or local community groups which may delay or prevent development activities;
potential for labor unrest or other labor disturbances;
potential increases in cost structures due to changes in input costs including the cost of fuel, power, materials and supplies and fluctuations in currency exchange rates;
the timing and cost, which may be considerable, of the construction and expansion of mining, processing and tailings management facilities;
changes in tonnage, grades and metallurgical characteristics of ore to be mined and processed;
the quality of the data on which engineering assumptions were made;
adverse geotechnical conditions;
changes in tax laws, the laws and/or regulations around royalties and other taxes due to the regional and national governments and royalty agreements;
weather or severe climate impacts, including, without limitation, prolonged or unexpected precipitation, drought and/or sub-zero temperatures; and
potential delays and restrictions in connection with health and safety issues, including pandemics (such as COVID-19) and other infectious diseases.
The costs, timing and complexities of operating the Company's existing operations and constructing and developing the Company’s other projects may be greater than the Company anticipates. The majority of the Company's established and development property interests are not located in developed areas and, as a result, the Company’s property interests may not be served by appropriate road access, water and power supply and other support infrastructure. Cost estimates may also increase as more detailed engineering work is completed on a project.
Properties not yet in production or slated for expansion are subject to higher risks, as new mining operations often experience unexpected problems during the construction and start-up phase, and production delays and cost adjustments can often occur. Further, feasibility studies, pre-feasibility studies and preliminary economic assessments contain project-specific estimates of future production, which are based on a variety of factors and assumptions. There is no assurance that such estimates will be achieved and the failure to achieve production or cost estimates or material increases in costs could have a material adverse effect on the Company’s future cash flows, profitability, results of operations and financial condition and the Company’s share price.

20


In addition, developments are prone to material cost overruns versus budget. The capital expenditures and time required to develop new mines, including building mining and processing facilities for new properties, are considerable, and changes in cost or construction schedules can significantly increase both the time and capital required to build the mine. The project development schedules are also dependent on obtaining the governmental approvals and permits necessary for the operation of a mine, which is often beyond the Company’s control. It is not unusual in the mining industry for new mining operations to experience unexpected problems during the start-up phase, resulting in delays and requiring more capital than anticipated. There is no assurance that there will be sufficient availability of funds to finance construction and development activities, particularly if unexpected problems arise.
The Company’s production forecasts are based on full production rates being achieved at all of the Company’s mines. The Company’s ability to achieve and maintain full production rates at these mines is subject to a number of risks and uncertainties. Future development activities may not result in the expansion or replacement of current production forecasts with new production forecasts. One or more new projects may be less profitable than anticipated or may not be profitable at all. Any reduction in production forecasts could have a material adverse effect on the Company’s results of operations and financial position.
Land reclamation, mine closure and remediation requirements and costs may be burdensome and actual environmental and asset retirement obligations may exceed estimates and reserves.
Although variable depending on location and the governing authority, land reclamation, mine closure and remediation requirements are generally imposed on mining companies in order to minimize long-term effects of land disturbance. Such requirements may include requirements to control dispersion of potentially deleterious effluents, and reasonably re-establish pre-disturbance landforms and vegetation.
The laws and regulations governing mine closure and reclamation in a particular jurisdiction are subject to review at any time and may be amended to impose additional requirements and conditions. Any additional obligations may cause our provisions for environmental liabilities to be underestimated and could materially affect our financial position or results of operations. In addition, regulators are increasingly requesting security in the form of cash collateral, credit, trust arrangements or guarantees to secure the performance of environmental obligations, which could have an adverse effect on our financial position. For a more detailed description of potential environmental liabilities, see the discussion in Environmental Matters in Notes 6 and 1921 to the consolidated financial statements.Consolidated Financial Statements.
Under the U.S. Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (“CERCLA”) and its state law equivalents, current or former owners of properties may be held jointly and severally liable for the costs of site cleanup or required to undertake remedial actions in response to unpermitted releases of hazardous substances at such property, in addition to, among other potential consequences, liability to governmental entities for the cost of damages to natural resources, which may be significant. These subject properties are referred to as “superfund” sites. While no operations are currently so designated, it is possible that certain of our other current or former operations in the U.S. could be designated as a superfund site in the future, exposing us to potential liability under CERCLA.
In order to carry out reclamation, mine closure and remediation obligations imposed on the Company in connection with its exploration, potential development and production activities, the Company must allocate financial resources that might otherwise be spent on further exploration and development programs, including providing the appropriate regulatory authorities with reclamation financial assurance. The amount and nature of the financial assurance are dependent upon a number of factors, including the Company’s financial condition and reclamation cost estimates, and can be difficult to predict, particularly water remediation requirements which may be ongoing and long lasting. Changes to these amounts, as well as the nature of the collateral to be provided, could significantly increase the Company’s costs, making the maintenance and development of existing and new mines less economically feasible. To the extent that the value of the collateral provided to the regulatory authorities is or becomes insufficient to cover the amount of financial assurance the Company is required to post, the Company would be required to replace or supplement the existing security with more expensive forms of security, which might include cash deposits, which would reduce the Company’s cash available for operations and financing activities. There can be no assurance that the Company will be able to maintain or add to the Company’s current level of financial assurance. The Company may not have sufficient capital resources to further supplement the Company’s existing security.
21


Certain of the Company’s mineral properties have been subject to historic mining operations and certain of the mineral properties that were historically mined by the Company are subject to remediation obligations. In addition, the actual costs of reclamation, mine closure and remediation are uncertain and planned expenditures may differ from the actual expenditures required. Therefore, the amount that the Company is required to spend could be
21


materially higher than current estimates. Any additional amounts required to be spent on reclamation and mine closure may have an adverse effect on the Company’s financial position and results of operations and may cause the Company to alter the Company’s operations.
The Company is subject to certain transportation risks that could have a negative impact on the Company’s ability to operate.
The Company’s facilities depend on delivery of supplies of consumables (including diesel, tires, sodium cyanide and reagents) and capital items delivery to operate efficiently. At Seabee, supplies are delivered to site across a seasonal ice road. If the Company experiences prolonged disruption to the delivery of such consumables, the Company’s production efficiency and ability to effectively complete capital projects requiring such deliveries may be reduced. Separately, if the seasonal ice road becomes unusable or unavailable for any reason, the Company may incur significant costs to arrange alternative transportation, if such alternative transportation is even available or possible. There can be no assurance that these transportation risks will not have an adverse effect on any site, particularly Seabee, and therefore on the Company’s profitability.
In addition, ore mined at the Chinchillas property is loaded onto road trucks and transported approximately 45 kilometers to the Pirquitas processing facilities. Transportation of such ore is subject to numerous risks including, but not limited to, roadblocks, terrorism, interruption by domesticated and non-domesticated herding animals, theft, weather conditions, environmental liabilities in the event of an accident or spill, inability to transport ore in oversized loads, personal injury and loss of life. The Company is also subject to the risk of a potential interruption of business from a third party beyond the Company’s control, which could have a material adverse effect on the Company’s operations and revenues.
The Company may beis subject to information systems security threats.threats and other risks.
The Company has entered into agreements with third parties for hardware, software, telecommunications and other information technology (“IT”) services in connection with its operations. The Company’s operations depend, in part, on how well the Company and its suppliers protect networks, equipment, IT systems and software against damage from a number of threats, including, but not limited to, cable cuts, damage to physical plants, natural disasters, terrorism, fire, power loss, hacking, computer viruses, vandalism and theft. Cybersecurity risk is increasingly difficult to identify and quantify and cannot be fully mitigated because of the rapidly evolving nature of the threats, targets and consequences. Additionally, unauthorized parties may attempt to gain access to these systems or our information through fraud or other means of deceiving our third-party service providers, employees or vendors. In November 2022, Anagold, the Company's Turkish subsidiary, was the target of a ransomware attack. The attack did not cause any serious disruption to the Company's or Anagold's operations. Following the incident, the Company has taken and will continue to take additional steps designed to further protect its networks and its information.
Given the unpredictability of the timing, nature and scope of information technologycybersecurity attacks or other IT disruptions, we could potentially beit is difficult to predict how such disruptions may impact our business. However, cybersecurity attacks or IT disruptions subject us to, among other things, production downtimes, operational delays, the compromising of confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation or improper use of our systems and networks or financial losses from remedial actions. Outages in our operational technology may affect operations related to health and safety and could result in putting lives at risk of harm or death. In addition, as technologies evolve and cybersecurity attacks continue to become more sophisticated, we may incur significant costs to upgrade or enhance our security measures to protect against such attacks and we may face difficulties in fully anticipating or implementing adequate preventive measures or mitigating potential harm, which could have a material adverse effect on our cash flows, competitive position, financial condition or results of operations. For instance, we review our cybersecurity controls against actual and current industry threats and partner with security vendors to assist with protecting our network and data resources through activities such as penetration and vulnerability testing, assessments against current cybersecurity standards, and leveraging industry recommendations from both independent vendors as well as industry partners. These efforts are designed to address any remediation actions through our ongoing cyber security program. Such efforts may incur significant costs and yet prove insufficient to deter future cybersecurity attacks or prevent all security breaches.
22


The Company’s operations also depend on the timely maintenance, upgrade and replacement of networks, equipment, IT systems and software, as well as pre-emptive expenses to mitigate the risks of failures. Any of these and other events could result in information system failures, delays and/or increase in capital and operating expenses. The failure of information systems or a component of information systems could, depending on the nature of any such failure, adversely impact the Company’s reputation and results of operations.
Although to date the Company has not experienced any material losses relating to information systems security threats or other information security breaches, there can be no assurance that the Company will not incur such losses in the future. The Company’s risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As cyber threats continue to evolve, the Company may be required to expend additional resources to continue to modify or enhance protective measures or to investigate and remediate any security vulnerabilities.
22


General economic conditions may adversely affect the Company’s growth and profitability.
Market events and conditions, including the disruptions in the international credit markets and other financial systems, recession or fears of recession, along with political instability and fluctuation of currency prices expressed in USD, CAD, TL, ARS, or the currency of any other location in which the Company operates may result in commodity price volatility. These conditions have, at times, caused a loss of confidence in global credit markets, resulting in the collapse of, and/or government intervention in, major banks, financial institutions and insurers, and creating a climate of greater volatility, tighter regulations, less liquidity, widening credit spreads, less price transparency, increased credit losses and tighter credit conditions. Notwithstanding various actions by governments, concerns about the general condition of the capital markets, financial instruments, banks and investment banks, insurers and other financial institutions may cause the broader credit markets to be volatile and interest rates to remain low.continue to fluctuate. In addition, an increase in price levels generally, or in price levels in a particular sector such as the energy sector (such as current inflation related to domestic and global supply chain issues, which has led to both overall price increases and pronounced price increases in certain sectors) could result in a shift in demand for metals, which could adversely affect our revenues and, at the same time, increase our costs. These events are illustrative of the effect that events beyond the Company’s control may have on commodity prices, demand for metals, including gold, silver, zinc and lead, availability of credit, investor confidence, and general financial market liquidity, all of which may adversely affect the Company’s business.
The Company faces intense competition in the mining industry.
The mining industry is intensely competitive in all phases and the Company competes with many companies, several of which possess greater financial and technical resources than itself. Competition in the base and precious metals mining industry is primarily for mineral rich properties which can be developed and produced economically; the human resources and technical expertise to find, develop, and operate such properties; the labor to operate the properties; and the capital for the purpose of funding such properties. Many competitors not only explore for and mine precious metals, but also conduct refining and marketing operations on a world-wide basis. Such competition may result in the Company being unable to acquire desired properties, recruit or retain qualified employees or acquire the capital necessary to fund its operations and develop its properties. Existing or future competition in the mining industry could materially adversely affect the Company’s prospects for mineral exploration and success in the future.
The Company may be subject to risks associated with future acquisitions.
As part of the Company’s business strategy, it has sought and will continue to seek new operating, development and exploration opportunities in the mining industry. In pursuit of such opportunities, the Company may fail to select appropriate acquisition candidates or negotiate acceptable arrangements, including arrangements to finance acquisitions or integrate the acquired opportunities into the Company's existing business. The Company cannot provide assurance that it can complete any acquisition or business arrangement that it pursues, or is pursuing, on favorable terms, if at all, or that any acquisitions or business arrangements completed will ultimately benefit its business. Further, any acquisition the Company makes will require a significant amount of time and attention of the Company's management, as well as resources that otherwise could be spent on the operation and development of its existing business.
23



Any future acquisitions would be accompanied by risks, such as a significant decline in the relevant metal price after the Company commits to complete an acquisition on certain terms; the quality of the mineral deposit acquired proving to be lower than expected; the difficulty of assimilating the operations and personnel of any acquired companies; the potential disruption of its ongoing business; the inability of management to realize anticipated synergies and maximize its financial and strategic position; the failure to maintain uniform standards, controls, procedures and policies; and the potential for unknown or unanticipated liabilities associated with acquired assets and businesses, including tax, environmental or other liabilities. There can be no assurance that any business or assets acquired in the future will prove to be profitable, that the Company will be able to integrate the acquired businesses or assets successfully or that the Company will identify all potential liabilities during due diligence. Any of these factors could have a material adverse effect on its business, expansion, results of operations and financial condition.
The Company’s joint venture interests are subject to risks.
The Company has joint venture arrangements in respect of certain of its properties, including its properties in Turkey.Türkiye. Although the Company expects relations with its joint venture and strategic partners to remain positive, contractual or other disputes may arise that may have a material adverse effect on the Company’s financial condition or its ability to develop and operate its assets. Furthermore, the Company has inherently less control when it is not
23


the operator of a project subject to a joint venture agreement, even if the Company has a controlling interest under a joint venture agreement. In such instances, the contractual terms of the agreement may limit the Company’s ability to influence the operation of the project.
The Company’s interest in deferred consideration received from divestitures may not be fully realizable.
From time to time, as partial or full consideration for the Company’s disposition of assets, the Company may receive certain deferred cash or enter into long-term royalty arrangements, including net smelter royalties. The Company cannot provide any assurances that the Company will be able to realize the full value of any deferred cash or royalty interests.
Reputation loss may result in decreased investor confidence, increased challenges in developing and maintaining community relations and an impediment to the Company’s overall ability to advance its projects, thereby having a material adverse impact on the Company’s financial performance, financial condition, cash flows and growth prospects.
Damage to the Company’s reputation can be the result of the actual or perceived occurrence of any number of events, and could include negative publicity, whether true or not. The increased use of social media and other web-based tools to generate, publish and discuss user-generated content and to connect with other users has made it increasingly easier for individuals and groups to communicate and share opinions and views regarding the Company and its activities, whether true or not. In recent years, social media has grown to rival or even dominate traditional media outlets in reach and dissemination of information. This has resulted in an environment of information overload which is frequently infiltrated by fabricated and fraudulent information. Fabricated and fraudulent information articles multiply rapidly and act as narratives that omit or add information to facts. Social media may be the primary source of news and information in certain regions in which the Company conducts business, and traditional media outlets may pick up social media-based stories and further disseminate information beyond social media platforms. In this environment, false or fabricated information about the Company and its business may travel more quickly than the Company can issue or disseminate the truth.
The Company does not ultimately have direct control over how it is perceived by othersothers. Fabricated and fraudulent news articles may be misinterpreted as true and may lead to increased public scrutiny on the Company. Such increased public scrutiny may also lead to increased governmental or regulatory scrutiny, whether deserved or not, leading to potential reputational damage to the Company. Reputational damage, real or perceived, could have a material adverse impact on the Company’s financial performance, financial condition, cash flows and growth prospects.

The Company’s insurance coverage does not cover all of the Company’s potential losses, liabilities and damages related to its business and certain risks are uninsured and uninsurable.
The Company’s business is subject to a number of risks and hazards generally, including adverse environmental conditions, industrial accidents, labor disputes, unusual or unexpected geological conditions, ground or slope failures, cave-ins, mechanical failures, changes in the regulatory environment and natural phenomena such as inclement weather conditions, fires, floods, hurricanes and earthquakes. Such occurrences could result in damage to mineral properties or production facilities, personal injury or death, environmental damage to the Company’s properties or the properties of others, delays in mining, monetary losses and possible legal liability.

24


Although the Company maintains insurance to protect against certain risks in such amounts as it considers reasonable, the Company’s insurance will not cover all of the potential risks associated with a mining company’s operations. The Company may also be unable to maintain insurance to cover these risks at economically feasible premiums. Insurance coverage may not continue to be available or may not be adequate to cover any resulting liability. Moreover, insurance against risks such as loss of title to mineral property, environmental pollution, or other hazards as a result of exploration and production is not generally available to the Company or to other companies in the mining industry on acceptable terms. The Company might also become subject to liability for pollution or other hazards which may not be insured against or which it may elect not to insure against because of premium costs or other reasons. Losses from these events may cause the Company to incur significant costs that could have a material adverse effect upon its financial performance and results of operations.
24


The Company is exposed to market and/or counterparty risks related to the sale of its concentrates and metals.
There is no assurance that the Company will, in the future and where necessary, be successful in entering into arrangements to sell the Company’s doré or concentrates on acceptable terms, or at all. If the Company is not successful in entering into such arrangements, the Company may be forced to sell some or all of the Company’s products, or greater volumes of them than the Company may from time to time intend, in the spot market, or the Company may not have a market for its products and the Company’s future operating results may be materially adversely impacted as a result.
In addition, the Company may become subject to such market limitations and/or complications should any counterparty to any of the Company’s arrangements not honor such arrangement or should any of such counterparties become insolvent. Moreover, there is no assurance that the Company will be able to renew any agreements the Company has in place to sell doré or concentrates when such agreements expire, that the Company will be able to enter into any new or additional sale agreements, or that the Company’s doré or concentrates will meet the qualitative and/or quantitative requirements under supply agreements or of existing or future buyers.
Financial Risks and Risks Related to Our Indebtedness
The Company is subject to risks associated with its financial instruments.
The Company maintains financial instruments consisting of cash and cash equivalents, receivables, short-term investments, investments in publicly traded securities, trade and other payables and borrowings, including the Term Loan entered into with a syndicate of lenders (BNP Paribas (Suisse) SA, ING Bank NV, Societe Generale Corporate & Investment Banking and UniCredit S.P.A.) (the “Term Loan”), a Credit Agreement, as amended, with The Canadian Imperial Bank of Commerce, the Bank of Montreal and The Bank of Nova Scotia (the "Amended Credit Facility"), and the indenture governing the notes, dated as of March 19, 2019 entered into with The Bank of New York Mellon (the “2019 Notes”). The Company’s financial instruments are denominated in various foreign currency denominations and are held in various financial institutions. These financial instruments, and others which the Company may acquire, involve substantial risks including, but not limited to, credit risk, liquidity risk, interest rate risk and foreign currency risk. Volatility of external factors beyond the Company’s control may result in substantial and permanent losses. Furthermore, to adequately reduce these risks to acceptable levels, available investment alternatives may result in limited or no return on these assets and any derivative which may be acquired in attempt to mitigate these risks may be ineffective.

25


The Company's Term Loan and Amended Credit Facility use the London Inter-bank Offered Rate ("LIBOR") as the screen rate and benchmark rate, respectively, and contain LIBOR alternative provisions applicable when LIBOR ceases to exist. LIBOR has recently been the subject of international reform proposals and certain LIBOR settings were discontinued at the end of 2021, with the remaining settings expected to be discontinued by mid-2023. In the United States, the Alternative Reference Rates Committee has proposed the Secured Overnight Financing Rate ("SOFR") as an alternative to LIBOR for use in contracts that are currently indexed to USD LIBOR and has proposed a phased market transition plan to SOFR. There are significant differences between LIBOR and SOFR, such as LIBOR being an unsecured lending rate while SOFR is a secured lending rate, and SOFR is an overnight rate while LIBOR reflects term rates at different maturities. If our LIBOR-based borrowings are converted to SOFR or other alternative rates, the differences between LIBOR and such rates, plus the recommended spread adjustment, could result in interest costs that are higher than if LIBOR remained available, which could have a material adverse effect on our operating results. At this time, it is not possible to predict the effect that these developments, any discontinuance, modification or other reforms to LIBOR, or the establishment of alternative reference rates, such as SOFR, may have on LIBOR, other benchmark rates or floating rate debt instruments, or whether SOFR or any other alternative reference rates that have been proposed will attain market acceptance as replacements of LIBOR. While the Term Loan and Amended Credit Facility contain LIBOR alternative provisions, the use of alternative reference rates or other reforms could cause the interest rate on the Company's borrowings to be materially different than expected. These developments may cause the Company to renegotiate some of these agreements. The Company will continue to monitor market developments related to LIBOR's modification or discontinuance.
The Company may be adversely affected by fluctuations in foreign exchange rates.
The Company maintains its cash and cash equivalents primarily in USD. The Company’s revenues are in USD, while certain of the Company’s costs will be incurred in other currencies. Any appreciation in the currencies of Turkey,Türkiye, Canada, Argentina, or any other country in which the Company carries out exploration or development activities against the USD will increase the Company’s costs of carrying on operations in such countries. In addition, any decrease in the TL, CAD, ARS, or the currency of any other country in which the Company operates, against the USD will result in a loss on the Company’s books to the extent the Company holds funds or net monetary or non-monetary assets denominated in those currencies.
From time to time, countries in which the Company operates may adopt measures to restrict the availability of the local currency or the repatriation of capital across borders or enact tax rate changes designed to restrict fund movement across borders. These measures are imposed by governments or central banks, in some cases during times of economic instability, to prevent the removal of capital or the sudden devaluation of local currencies or to maintain in-country foreign currency reserves. In addition, many emerging markets countries require consents or reporting processes before local currency earnings can be converted into USD or other currencies and/or such earnings can be repatriated or otherwise transferred outside of the operating jurisdiction. These measures may have a number of negative effects on SSR Mining, reducing the immediately available capital that we could otherwise deploy for investment opportunities or the payment of expenses. In addition, measures that restrict the availability of the local currency or impose a requirement to operate in the local currency may create other practical difficulties for SSR Mining. As a result, the Company’s financial performance and forecasts may be significantly impacted by changes in foreign exchange rates.

26


Inflation may have a material adverse effect on results of operations.
Certain of the Company's operations are located in countries that have in the past experiencedand are currently experiencing high rates of inflation. It is possible that in the future, high inflation in the countries in which we operate may result in an increase in operational costs in local currencies (without a concurrent devaluation of the local currency of operations against the dollar or an increase in the dollar price of gold, silver, copper, zinc or lead). Maintaining operating costs in currencies subject to significant inflation could expose us to risks relating to devaluation and high domestic inflation. Country-specific inflation rates are often volatile and unpredictable, and global inflation rates rose consistently at the end of 2021 as a result of numerous global economic factors and the continuing impact of the COVID-19 pandemic. For instance, in Argentina, the level of inflation during 20192022 reached 53.8%, and the94.8%. The level of inflation in Turkey has fluctuated drastically over the end of 2021 and beginning ofTürkiye reached 72% during 2022, significantly impacting the value of the Turkish lira and precipitating Turkish governmental efforts to offset inflation impacts and restore the value of the lira, including lowering central bank interest rates. Significantly higher and sustained rates of inflation, with subsequent increases in operational costs, could result in the deferral or closure of projects and mines in the event that operating costs become prohibitive. This could have a material adverse effect on our business, financial position and results of operations.
The Company may be subject to risks associated with hedging activities.
Precious metals prices, foreign currency rates, and costs of materials and consumables associated with exploration, development and mining activities are subject to frequent, unpredictable and substantial volatility which is beyond the Company’s control. The Company currently haspreviously engaged in an interest rate hedge in place in relation to its Term Loan and the Company may engage in further additional
25


hedging activities in the future. Hedging activities are intended to mitigate exposure to fluctuations in the price of precious metals, foreign currencies, materials and consumables. Certain precious metals hedging strategies may protect a company against lower prices, but they may also limit the price that can be realized on precious metal that is subject to forward sales and call options where the market price of gold exceeds the gold price in a forward sale or call option contract. Similarly, hedges of foreign currencies, materials and consumables may protect a company against adverse currency variances and rising costs but may result in losses if currency rates and costs move counter to a company’s hedge position. Hedging activities may be uneconomic due to numerous factors and no assurances can be made that hedging will effectively mitigate risks as intended.
The Company is subject to risks associated with its financial instruments.
The Company maintains financial instruments consisting of cash and cash equivalents, receivables, short-term investments, investments in publicly traded securities, trade and other payables and borrowings, including the Term Loan entered into with a syndicate of lenders (BNP Paribas (Suisse) SA, ING Bank NV, Societe Generale Corporate & Investment Banking and UniCredit S.P.A.) (the “Term Loan”), a Credit Agreement, as amended, with The Canadian Imperial Bank of Commerce, the Bank of Montreal and The Bank of Nova Scotia (the "Amended Credit Agreement"), and the indenture governing the notes, dated as of March 19, 2019 entered into with The Bank of New York Mellon (the “2019 Notes”). The Company’s financial instruments are denominated in various foreign currency denominations and are held in various financial institutions. These financial instruments, and others which the Company may acquire, involve substantial risks including, but not limited to, credit risk, liquidity risk, interest rate risk and foreign currency risk. Volatility of external factors beyond the Company’s control may result in substantial and permanent losses. Furthermore, to adequately reduce these risks to acceptable levels, available investment alternatives may result in limited or no return on these assets and any derivative which may be acquired in attempt to mitigate these risks may be ineffective.
The Company's Term Loan and Amended Credit Agreement use the London Inter-bank Offered Rate ("LIBOR") as the screen rate and benchmark rate, respectively, and contain LIBOR alternative provisions applicable when LIBOR ceases to exist. LIBOR has recently been the subject of international reform proposals and certain LIBOR settings were discontinued at the end of 2021, with the remaining settings expected to be discontinued by mid-2023. In the United States, the Alternative Reference Rates Committee has proposed the Secured Overnight Financing Rate ("SOFR") as an alternative to LIBOR for use in contracts that are currently indexed to USD LIBOR and has proposed a phased market transition plan to SOFR. There are significant differences between LIBOR and SOFR, such as LIBOR being an unsecured lending rate while SOFR is a secured lending rate, and SOFR is an overnight rate while LIBOR reflects term rates at different maturities. If our LIBOR-based borrowings are converted to SOFR or other alternative rates, the differences between LIBOR and such rates, plus the recommended spread adjustment, could result in interest costs that are higher than if LIBOR remained available, which could have a material adverse effect on our operating results. At this time, it is not possible to predict the effect that these developments, any discontinuance, modification or other reforms to LIBOR, or the establishment of alternative reference rates, such as SOFR, may have on LIBOR, other benchmark rates or floating rate debt instruments, or whether SOFR or any other alternative reference rates that have been proposed will attain market acceptance as replacements of LIBOR. While the Term Loan and Amended Credit Agreement contain LIBOR alternative provisions, the use of alternative reference rates or other reforms could cause the interest rate on the Company's borrowings to be materially different than expected. These developments may cause the Company to renegotiate some of these agreements. The Company will continue to monitor market developments related to LIBOR's modification or discontinuance.
Future funding requirements may affect the Company's business or its ability to develop mineral properties, complete exploration and development programs, pay cash dividends or engage in share repurchase transactions.
Potential future investments, including projects in the Company’s project pipeline, acquisitions and other investments, will require significant funds for capital expenditures. The continuation of production, development and exploration activities, if any, will depend on the Company’s ability to generate sufficient operating cash flows from its mining operations and to obtain additional external financing where necessary. Depending on gold, silver, copper, zinc and lead prices, the Company's operating cash flow may not be sufficient to meet all of these expenditures, depending on the timing of development and other projects. As a result, new sources of capital may be needed to fund investments, ongoing business activities, construction and operation of potential future projects and exploration projects, in addition to funding possible share repurchase transactions and paying dividends. The Company's ability to raise and service significant new sources of capital will be a function of macroeconomic conditions, future gold, silver, copper, zinc and lead prices as well as the Company's operational performance, current cash flow and debt position, among other factors. Failure to obtain sufficient financing could result in the delay or indefinite postponement of exploration, development or production on any or all of its projects. There can be no assurance that additional capital or other types of financing will be available if needed or that, if available, the
26


terms of such financing will be favorable. Alternatively, the Company may determine that it may be necessary or preferable to issue additional equity or other securities, defer projects or sell assets in the future to meet the Company's capital needs.

27


U.S. and global markets have, from time to time, experienced significant dislocations and liquidity disruptions, and the COVID-19 pandemic has increased, and may continue to increase, volatility and pricing in the capital markets. Additional financing may not be commercially available when needed or, if available, the terms of such financing may not be favorable to us and, if raised by offering equity securities, any additional financing may involve substantial dilution to existing shareholders. In the event of lower gold, silver, copper, zinc or lead prices, unanticipated operating or financial challenges, or new funding limitations, the Company's ability to pursue new business opportunities, invest in existing and new projects, fund our ongoing business activities, retire or service all outstanding debt, repurchase shares and pay dividends could be significantly constrained. If the Company is unable to obtain financing or service existing or future debt we could be required to reduce, suspend or eliminate any dividend payments to shareholders or any planned share repurchase transactions. In addition, the Company's joint venture partners may not have sufficient funds or borrowing ability to make their expected capital commitments to such joint ventures. In the case that such joint venture partners do not make their economic commitments, the Company may be prevented from pursuing certain development opportunities or may assume additional financial obligations, which may require new sources of capital.
The Company may be unable to generate sufficient cash to service its debt and other actions to satisfy such obligations may be unsuccessful.
The Company's ability to make scheduled payments or to refinance our debt obligations and to fund our planned capital expenditures and other ongoing liquidity needs depends on our financial and operating performance, which is subject to prevailing economic and competitive conditions and to certain financial, business and other factors beyond our control. There can be no assurance that the Company's business will generate sufficient cash flow from operations or that borrowings will be available to us to pay the principal, premium, if any, and interest on our debt or to fund our other liquidity needs. The Company may need to refinance all or a portion of its debt on or before maturity, but there is no assurance that the Company will be able to refinance any debt on commercially reasonable terms, or at all.
If cash flows and capital resources are insufficient to fund the Company's debt service obligations, it may be forced to reduce or delay investments and capital expenditures or to sell assets, seek additional capital or restructure or refinance our debt. The Company's ability to restructure or refinance its debt will depend on the condition of the capital markets and our financial condition at such time. Any refinancing of the Company's debt could be at higher interest rates and may require the Company to comply with more onerous covenants, which could further restrict business operations. The terms of existing or future debt instruments, including the indenture governing the 2019 Notes, the Amended Credit FacilityAgreement and the Term Loan, may restrict us from adopting some of these alternatives. In addition, any failure to make payments of interest and principal on outstanding debt on a timely basis would likely result in a reduction of the Company's credit rating, which could harm our ability to incur additional debt.
The Company may fail to fulfill its obligations under existing and future indebtedness, and such indebtedness may impair the financial health of the Company.
As of December 31, 2021,2022, the Company had total indebtedness of approximately $367.0 million, $298.3 million, primarily in the form of the 2019 Notes and the Term Loan. The Company's level of debt and associated debt service obligations may have adverse effects on our business, financial condition, cash flows or results of operations, including:
making it more difficult for us to satisfy our obligations with respect our outstanding indebtedness;
reducing the amount of funds available to finance our operations, capital expenditures and other activities;
increasing our vulnerability to economic downturns and industry conditions;
limiting our flexibility in responding to changing business and economic conditions;
jeopardizing our ability to execute our business plans;
placing us at a disadvantage when compared to our competitors that have less debt;
increasing our cost of borrowing; and
28


limiting our ability to borrow additional funds.
27


The Company and its subsidiaries may incur substantial additional indebtedness in the future. If new debt is added to the Company and/or its subsidiaries’ existing debt levels, the existing risks associated with the Company’s aggregate debt would necessarily increase.
The Company’s subsidiary, Anagold Madencilik Sanayi ve Ticaret Anonim Şirketi, is party to the Term Loan assumed through the Company’s 2020 merger with Alacer Gold Corp. In addition, the Company is party to the Amended Credit Facility.Agreement. The Company's ability to make scheduled payments on or refinance its debt obligations under the Term Loan and Amended Credit FacilityAgreement depends on its financial condition and operating performance, which are subject to prevailing economic and competitive conditions and to certain financial, business, legislative, regulatory and other factors beyond its control. The Company may be unable to maintain a level of cash flows from operating activities sufficient to permit the Company to pay the principal, premium (if any) and interest on its indebtedness. If the Company’s cash flows and capital resources are insufficient to fund its debt service obligations, it could face substantial liquidity problems and could be forced to reduce or delay investments and capital expenditures or to dispose of material assets or operations, seek additional debt or equity capital or restructure or refinance its indebtedness. The Company may not be able to affect any such alternative measures on commercially reasonable terms or at all and, even if successful, those alternatives may not allow it to meet its scheduled debt service obligations. The Term Loan and the Amended Credit FacilityAgreement will restrict the Company's ability to dispose of assets and use the proceeds from those dispositions and may also restrict its ability to raise debt or equity capital to be used to repay other indebtedness when it becomes due. The Company may not be able to consummate those dispositions or to obtain proceeds in an amount sufficient to meet any debt service obligations then due.
Under the 2019 Notes, the Company has made various covenants to the trustees on behalf of the holders of such notes, including to make payments of interest and principal when due and, upon undergoing a fundamental change, to offer to purchase all of the outstanding 2019 Notes, plus accrued and unpaid interest, if any. Furthermore, if an event of default were to occur under the Term Loan, Amended Credit FacilityAgreement or 2019 Notes, this would place additional strain on the Company’s cash resources, which could inhibit its ability to further the Company’s exploration and development activities.
The Company may fail to meet financial covenants related to its indebtedness.
The terms of the Company’s debt, including the Term Loan and the Amended Credit Facility,Agreement, require the Company to satisfy various affirmative and negative covenants and to meet certain financial ratios and tests. These covenants limit, among other things, the Company’s ability to incur further indebtedness if doing so would cause it to fail to meet certain financial covenants, create certain liens on assets or engage in certain types of transactions. Although these covenants do not currently restrict the Company’s ability to conduct its business, there can be no assurances that the Company will continue to satisfy these covenants, that such covenants will not limit in its ability to respond to changes in its business or competitive activities in the future, or the Company will not be restricted from engaging in future mergers, acquisitions or dispositions of assets which may be beneficial to the Company. Furthermore, a breach of these covenants, including a failure to meet the financial tests or ratios, would likely result in an event of default under the associated debt instrument unless the Company can obtain a waiver or consent in respect of any such breach. There can be no assurance that such waiver or consent would be granted. In the event of any default, the applicable lenders could elect to declare all outstanding borrowings, together with accrued and unpaid interest, fees and other amounts due, to be immediately due and payable, which may have a material adverse impact on the Company’s business, profitability or financial condition.
For example, as a result of the suspended operations at the Çöpler mine, we were not in compliance with certain financial covenants under our Term Loan as of September 30, 2022. During the fourth quarter of 2022, we received a waiver for the non-compliance event from our lenders.
See
Note 18 to the Consolidated Financial Statements for additional information.
29


Risks Related to Our Industry and the Jurisdictions in Which We Operate
Political or economic instability or unexpected regulatory change in the countries where the Company’s mineral properties are located could adversely affect its business.
The Company currently conducts operations in the United States, Turkey,Türkiye, Canada and Argentina, and has development and exploration assets in the United States, Turkey,Türkiye, Canada, Mexico and Peru; as such, the Company is exposed to various levels of economic, political and other risks and uncertainties. These risks and uncertainties vary from country to country and include, but are not limited to: royalties and tax increases or claims by governmental bodies; expropriation or nationalization; employee profit-sharing requirements; foreign exchange controls; restrictions on repatriation of profits; import and export regulations; cancellation or renegotiation of contracts; changing fiscal regimes and uncertain regulatory environments; fluctuations in currency exchange rates; high rates of inflation; changes in royalty and tax regimes, including the elimination of tax exemptions;
28


underdeveloped industrial and economic infrastructure; unenforceability of contractual rights and judgments; loss of social license to operate resulting from a decline in societal support for the industry; loss of critical services such as power and water; and environmental permitting regulations. The occurrence of these various factors and uncertainties cannot be accurately predicted and could adversely affect the Company’s business.
Furthermore, the introduction of new tax laws, regulations or rules, or changes to, or differing interpretation of, or application of, existing tax laws, regulations or rules in any of the countries in which the Company’s operations or business is located, could result in an increase in its taxes, or other governmental charges, duties or impositions. No assurance can be given that new tax laws, rules or regulations will not be enacted or that existing tax laws will not be changed, interpreted or applied in a manner that could result in the Company’s profits being subject to additional taxation or that could otherwise have a material adverse effect on the Company.
Additionally, the taking of property by nationalization or expropriation without adequate compensation is a risk in certain jurisdictions in which the Company has operations. Expropriation, or the threat of expropriation, is often the result of poor economic conditions within a country or has underlying political rationales. Although the Company does not presently anticipate that any of its properties will be the subject of expropriation, there can be no assurance that this will not occur. Such governmental actions may have an adverse impact on the Company’s operations and profitability.
Suitable infrastructure may not be available or damage to existing infrastructure may occur.
Mining, processing, development and exploration activities depend on adequate infrastructure. Reliable roads, ice roads, bridges, port and/or rail transportation, power sources, water supply and access to key consumables are important determinants for capital and operating costs. The lack of availability on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay exploration, development or exploitation of the Company’s projects. If adequate infrastructure is not available in a timely manner, the Company cannot assure you that the exploitation or development of its projects will be commenced or completed on a timely basis, or at all, or that the resulting operations will achieve the anticipated production volume, or that the construction costs and operating costs associated with the exploitation and/or development of the Company’s projects will not be higher than anticipated. In addition, extreme weather phenomena, sabotage, vandalism, government, non-governmental organization and community or other interference in the maintenance or provision of such infrastructure could adversely affect the Company’s operations and profitability.
Mining is inherently risky and subject to conditions and events beyond the Company’s control.
The development and operation of a mine or mine property is inherently risky and involves many risks that even a combination of experience, knowledge and careful evaluation may not be able to overcome, including:
unusual or unexpected geological formations;
metallurgical and other processing problems;
shortages in materials or equipment and energy and electrical power supply interruptions or rationing;
failure of engineered structures;
30


inaccurate mineral modeling;
unanticipated changes in inventory levels at heap-leach operations;
metal losses;
environmental hazards, including discharge of metals, concentrates, pollutants or hazardous chemicals;
ground and water conditions;
power outages;
remote locations and inadequate infrastructure;
community relations problems;
labor disruptions;
the availability and retention of skilled personnel;
29


non-governmental organization or community activities;
industrial accidents, including in connection with the operation of mining equipment, milling equipment and/or conveyor systems and accidents associated with the preparation and ignition of large-scale blasting operations, milling and processing;
transportation incidents, including transportation of chemicals, explosions or other materials, transportation of large mining equipment and transportation of employees and business partners to and from sites;
fall-of-ground accidents in underground operations;
failure of mining pit slopes and tailings dam walls;
periodic interruptions due to inclement or hazardous weather conditions;
flooding, explosions, fire, rockbursts, cave-ins and landslides;
seismic activity;
changes to legal and regulatory requirements;
security incidents, including activities of illegal or artisanal miners, gold bullion or concentrate theft, including in transport, and corruption and fraud;
mechanical equipment and facility performance problems;
failure of unproven or evolving technologies or loss of information integrity or data; and
the availability of materials and equipment.
For example, in June 2022, Türkiye's Ministry of Environment, Urbanization and Climate Change (“Ministry of Environment”) temporarily suspended operations at the Çöpler mine site as a result of a leak of leach solution containing a small amount of diluted cyanide on June 21, 2022. The leak occurred from a pipeline that pumps diluted cyanide solution to Çöpler’s heap leach pad. The Ministry of Environment ordered certain remediation and improvement initiatives to be undertaken. The Company completed these initiatives and received the required regulatory approvals from Türkiye's government authorities on September 22, 2022, at which time operations were restarted at the Ҫӧpler mine. The leak and our remediation efforts led to a decline in production of gold and related product revenue during the third quarter of 2022, which impacted our financial results. In addition, as a result of the suspended operations at the Çöpler mine, we were also not in compliance with certain financial covenants under our Term Loan as of September 30, 2022. During the fourth quarter of 2022, we received a waiver for the non-compliance event from our lenders. See Note 18 to the to the Consolidated Financial Statements for additional information. We may also learn additional information about the leak at the Çöpler mine that materially adversely affects us and may lead to liabilities, including, but not limited to, monetary damages or settlement costs or liabilities related to compliance with applicable laws. Any such liabilities, individually or in the aggregate, could have a material adverse effect on our business, financial condition and results of operations.
These risks could result in damage to, or destruction of, mineral properties, production facilities or other properties, environmental damage, delays in mining, increased production costs,cost of sales, asset write downs, monetary losses and possible legal liability or penalties, occupational illness or health issues, personal injury, and loss of life, and/or facility and workforce evacuation. The Company may not be able to obtain insurance to cover these risks at economically feasible premiums, or at all. The Company may suffer a material adverse effect on its business if it incurs losses related to any significant events that are not covered by the Company’s insurance policies.

3130


Additionally, the Company’s operations, particularly those operations located outside of North America, are exposed to various levels of safety and security risks which could result in injury or death, damage to property, work stoppages, product theft, or blockades of the Company’s mining operations and projects. Risks and uncertainties vary from region to region and include, but are not limited to, terrorism, hostage taking, local drug gang and/or other gang activities, military and/or governmental repression, labor unrest and war or civil unrest. Local opposition to mine development projects could arise and such opposition may be violent. If the Company were to experience resistance or unrest in connection with its mines or projects, it could have a material adverse effect on the Company’s operations and profitability. Additionally, to the extent that such risks and uncertainties are directed towards local populations, the Company may not be able to retain sufficient labor forces to maintain the Company’s operations.
Mining companies are increasingly required to consider and provide benefits to the communities and countries in which they operate in order to maintain operations.
Greater scrutiny on multi-national companies to contribute to sustainable outcomes in the places where they operate, has led to a proliferation of standards, reporting initiatives and expectations focused on environmental stewardship, social performance, community engagement and transparency. Extractive industries, and mining in particular, have seen significant increases in stakeholder expectations and attention. These businesses are increasingly required to meaningfully engage with impacted stakeholders; to understand, avoid or mitigate negative impacts while optimizing economic development and employment opportunities associated with their operations. The expectation is for companies to recognize the impact their operations can have on the communities in which they operate and develop strategies and identify targets to address the actual or perceived impact to create shared value for shareholders, employees, governments, local communities and host countries. Such expectations tend to be particularly focused on companies whose activities are perceived to have high environmental impacts, like mining companies. In response, the Company has developed and continues to evolve a robust system of ESG management that includes standards, guidance, assurance, and participation in international organizations focused on sustainability and improved performance and outcomes for host communities and the environment. Despite the Company’s commitment to on-going engagement with communities and stakeholders, no assurances can be provided that increased stakeholder expectations will not result in interest from activists who seek a more rapid or more significant response to the environmental risks and opportunities faced by the Company or adverse financial and operational impacts to the business, including, without limitation, operational disruption, increased costs, increased investment obligations and increased taxes and royalties payable to governments. In connection with the leak at our Çöpler mine site, we experienced negative response from members of the local community through demonstrations at our facilities, social media communications and media reporting. Additionally, activists responded strongly against the Company through social media and other campaigns following the reports of the incident. Although our remediation of the incident was comprehensive and we do not believe that the incident resulted in any lasting environmental impacts to the region, and we have addressed these facts with the communities around our Çöpler mine site, the nature of the incident has impacted our reputation in the local community and the wider region. We will continue our engagement efforts with the affected communities, but there is no assurance that we will be able to reverse the negative perceptions associated with the incident at the Çöpler mine site. As a result of this incident, the associated media coverage and the reputational impacts, we may face challenges in our recruitment efforts for the Çöpler mine and cooperation of the communities and local and national governments in connection with our plans for growth and development.

Indigenous peoples’ title claims and rights to consultation and accommodation may affect the Company’s existing operations as well as development projects and future acquisitions.
Some of the Company’s properties may be subject to the rights or the asserted rights of various community stakeholders, including indigenous peoples. The presence of community stakeholders may impact the Company’s ability to develop or operate its mining properties and projects or to conduct exploration activities. Accordingly, the Company is subject to the risk that one or more groups may oppose the continued operation, further development, or new development or exploration of the Company’s current or future mining properties and projects. Such opposition may be directed through legal or administrative proceedings, or through protests or other campaigns against the Company’s activities. In addition, if historical artifacts or archaeological sites are discovered on or near the Company’s properties, the Company may be prohibited or restricted from developing or mining its mineral properties or be required to relocate or preserve such findings.

32


Governments in many jurisdictions, including in some parts of Turkey,Türkiye, Canada, the United States, Argentina, Mexico and Peru, must consult with, or may require the Company to consult with, indigenous peoples with respect to grants of mineral rights and the issuance or amendment of project authorizations and permits, pursuant to various international and national laws, codes, resolutions, conventions and guidelines, such as the International Labour Organization Convention 169. Consultation and other rights of indigenous peoples may require accommodation including undertakings regarding employment, royalty payments and other matters. This may affect the Company’s
31


ability to acquire effective mineral titles, permits or licenses in these jurisdictions within a reasonable time, and may affect the timetable and costs of development and operation of the Company’s mineral properties in these jurisdictions. In addition, the risk of unforeseen title claims by indigenous peoples could affect existing operations and development projects. These legal requirements may also affect the Company’s ability to expand or transfer existing operations or to develop new projects.

Civil disobedience in certain of the countries where the Company’s mineral properties are located could adversely affect its business.
Acts of civil disobedience are common in certain of the countries where the Company’s properties are located. In recent years, many mining companies have been the targets of actions to restrict their legally granted access to mining concessions or property. The evolving expectations related to human rights, indigenous rights, and environmental protections may result in opposition to our current and future operations, the development of new projects and mines, and exploration activities. Such opposition may take the form of legal or administrative proceedings or manifestations such as protests, roadblocks or other forms of public expression against our activities, any of which may have a negative impact on our local or global reputation and operations. Such acts of civil disobedience often occur with no warning and can result in significant direct and indirect costs and delays in operations. Opposition by community and activist groups to our operations may require modification of, or preclude the operation or development of, our projects and mines or may require us to enter into agreements with such groups or local governments, which may cause increased costs and significant delays to the advancement of our projects. While the Company has not faced such acts of civil disobedience to date, there can be no assurance that the Company will not face such disruptions to site access in the future.
The Company and the mining industry face geotechnical challenges, which could adversely impact our production and profitability.
As certain of our mines age, the Company may face geotechnical challenges faced by the mining industry as a whole, including mining deeper pits and more complex deposits, which generally leads to higher pit walls, more complex underground environments and increased exposure to geotechnical instability and hydrological impacts. As our operations mature, the open pits at our sites will necessarily become deeper and we may face certain geotechnical failures at some of our mines. Unanticipated adverse geotechnical and hydrological conditions may occur. Such conditions are often affected by risks and hazards outside of our control, such as severe weather and considerable rainfall, which may lead to periodic floods, mudslides, wall instability and seismic activity, which may result in slippage of material. Such events may not be detected in advance.
In addition, SSR Mining has operational and closed tailings impoundments in a variety of climatic and topographic settings. The failure of tailings dam and storage facilities and other impoundments at our mining sites could cause severe, and in some cases catastrophic, property and environmental damage and loss of life. Geotechnical or tailings storage facility failures could result in limited or restricted access to mine sites, suspension of operations, government investigations, increased monitoring costs, remediation costs and other impacts, which could result in a material adverse effect on our results of operations and financial position. Recognizing this risk, while SSR Mining continues to review its existing practices, there can be no assurance that these events will not occur in the future.

33


Risks Related to Our Personnel
Certain of the Company’s directors and/or officers also serve, or may serve, as directors of other companies involved in natural resource exploration and development, and consequently there exists the possibility for these directors and/or officers to be in a position of conflict.
Certain of the Company’s directors and/or officers may have fiduciary and/or contractual obligations to other companies, including companies that are engaged in business activities similar to those intended to be conducted by the Company. Accordingly, such companies may participate in transactions and have obligations that may be in conflict or competition with the Company’s business or acquisition strategy. As a result of such conflict, the Company may not be able to participate in certain transactions, which may have a material adverse effect on the Company’s financial position. Any decision made by any of these directors and/or officers involving SSR Mining is required to be made in accordance with their duties and obligations to deal fairly and in good faith with a view to the best interests of SSR Mining and its shareholders.
The Company could be subject to potential labor unrest or other labor disturbances.
Production at Çöpler, Marigold, Seabee and Puna is dependent upon the efforts of the Company’s employees and the Company’s relations with them. Relations with the Company’s employees may be affected by changes in the
32


scheme of labor relations that may be introduced by the relevant governmental authorities in those jurisdictions in which the Company carries on business. Changes in such legislation or in the relationship with the Company’s employees may have a material adverse effect on the Company’s business, financial condition and results of operations. Additionally, we could experience labor disputes, work stops or other disruptions in production due to union activities or other employee actions. A failure to successfully enter into new contracts or resolve any complaints could result in future labor disputes, work stoppages or other disruptions in production. Any labor unrest or other labor disturbances could have a material adverse effect on the Company’s business.
The Company is dependent on its ability to recruit and retain qualified personnel.
The Company competes with other mining companies to attract and retain key executives and skilled and experienced employees. The Company is dependent on the services of its key executives and other skilled and experienced personnel to focus on advancing its corporate objectives as well as the identification of new opportunities for growth and funding. Due to the size of the Company’s organization, the loss of any of these persons, or the Company’s inability to attract and retain suitable replacements for them or additional highly skilled employees and contractors required for the operation of the Company’s corporate offices, Çöpler, Marigold, Seabee and Puna and the Company’s other activities may have a material adverse effect on its business and financial condition.
The Company relies on contractors to conduct a significant portion of its operations and construction projects.
A significant portion of the Company's operations and construction projects in TurkeyTürkiye and Argentina are currently conducted in part by contractors. As a result, these operations are subject to a number of risks, some of which are outside of the Company's control, including:
Negotiating agreements with contractors on acceptable terms;
New legislation limiting or altering the ability to utilize contractors or outsourced resources;
The inability to replace a contractor and its operating equipment in the event that either party terminates the agreement;
Reduced control over those aspects of operations which are the responsibility of the contractor;
Failure of a contractor to perform under its agreement;
Interruption of operations or increased costs in the event that a contractor ceases its business due to insolvency or other unforeseen events;
34


Failure of a contractor to comply with applicable legal and regulatory requirements, to the extent it is responsible for such compliance;
Problems of a contractor with managing its workforce, labor unrest or other employment issues; and
Liability to third parties as a result of the actions of our contractors.
In addition, law and regulations relating to the use of contractors may vary in the jurisdictions in which we operate, and changes in legal and regulatory restrictions may also impact our ability to utilize contractors and outsourcing services. The occurrence of one or more of these risks could adversely affect our results of operations and financial position.
Risks Related to Governmental Regulation and Legal Proceedings
The Company is subject to significant governmental regulations.
The Company's operations are subject to extensive and complex laws and regulations governing worker health and safety across our operating regions and failure to comply with applicable legal requirements can result in substantial penalties, civil sanctions and, in some cases, criminal sanctions, including the suspension or revocation of permits. Future changes in applicable laws, regulations, permits and approvals or changes in their enforcement or regulatory interpretation could substantially increase costs to achieve compliance, lead to the revocation of existing or future exploration or mining rights or otherwise have an adverse impact on the Company's results of operations and financial position. Matters which may be regulated by federal, state, provincial, territorial and local laws and regulations include:
33


environmental protection;
the management and use of toxic substances and explosives;
the management of natural resources;
the exploration of mineral properties;
exports;
insurance restrictions;
import restrictions;
exchange controls;
capital controls;
price controls;
taxation and mining royalties;
labor standards and occupational health and safety, including mine safety;
employee profit-sharing arrangements;
anti-corruption and anti-bribery statutes; and
historical, archaeological and cultural preservation.

35


U.S. surface and underground mines are continuously inspected by the U.S. Department of Labor Mine Safety and Health Administration (“MSHA”), which inspections often lead to notices of violation under the Federal Mine Safety and Health Act of 1977. Our U.S. mine could be subject to a temporary or extended shutdown as a result of a violation alleged by MSHA. The Company’s mining operations outside of the U.S. are similarly subject to inspection and regulation under applicable jurisdictional laws and regulations. If inspections result in an alleged violation, the Company may be subject to fines, penalties or sanctions and its mining operations could be subject to temporary or extended closures. In addition to potential government restrictions and regulatory fines, penalties or sanctions, the Company's ability to operate and thus, its results of operations and financial position, could be adversely affected by accidents, injuries, fatalities or events detrimental (or perceived to be detrimental) to the health and safety of our employees, the environment or the communities in which the Company operates.
In addition to existing regulatory requirements, legislation and regulations may be adopted, regulatory procedures modified, or permit limits reduced at any time, any of which could result in additional exposure to liability, operating expense, capital expenditures or restrictions and delays in the mining, production or development of our properties. Mining accidents and fatalities or toxic waste releases, whether or not at our mines or related to metals mining, may increase the likelihood of additional regulation or changes in law or enhanced regulatory scrutiny. In addition, enforcement or regulatory tools and methods available to regulatory bodies such as MSHA, the U.S. Environmental Protection Agency (“EPA”), and their equivalent agencies in other jurisdictions in which the Company has operations, which have not been or have infrequently been used against us or the mining industry to date, may in the future be used more extensively or more consistently.
Failure to comply with applicable laws and regulations may result in civil or criminal fines or penalties or enforcement actions, including orders issued by regulatory or judicial authorities enjoining or curtailing operations or requiring corrective measures, installation of additional equipment or remedial actions, or the imposition of additional local or foreign parties as joint venture partners, any of which could result in significant expenditures. The Company may also be required to compensate private parties suffering loss or damage by reason of a breach of such laws, regulations or permitting requirements. Future laws and regulations, or more stringent enforcement of current laws and regulations by governmental authorities, cannot be accurately predicted and it is possible that these could cause the Company to incur additional expense, divert management time and attention from revenue generating activities or restrict or delay the exploration and development of the Company’s properties.
34


The Company requires permits to conduct its operations, and delays in obtaining or failing to obtain such permits, or a failure to comply with the terms of any such permits that the Company has obtained, would adversely affect the Company’s business.
The Company’s operations, including continued production at Çöpler, Marigold, Seabee and Puna, and further exploration, development and commencement of production on the Company’s other mineral properties, require licenses, permits and other approvals from various governmental authorities, including land and water usage permits. Obtaining or renewing governmental permits is a complex and time-consuming process. The duration and success of efforts to obtain and renew permits are contingent upon many variables not within the Company’s control.
The Company's ability to obtain the required permits and approvals to explore for, develop and operate mines and to successfully operate near communities in the jurisdictions in which we operate depends in part on our ability to develop, operate and close mines in a manner that is consistent with the creation of social and economic benefits in the surrounding communities, which may or may not be required by law. Our ability to obtain permits and approvals and to operate near certain communities may be adversely impacted by real or perceived detrimental events associated with our activities or those of other mining companies affecting the environment, health and safety of communities in which we operate. Further, certain communities may challenge, or seek to challenge, permits and approvals granted to the Company, including, but not limited to, environmental impact assessments and other operating permits, which may result in temporary or permanent suspension of such permits and approvals or the cessation of Company operations. Any delay or suspension of the Company's operations as a result of such challenges, whether such challenges have merit, may adversely affect the Company's business, results of operations or financial condition.

36


Previously obtained permits and approvals may be suspended or revoked for many reasons, including through government or court action, or may be adjusted in a manner that adversely affects our operations, including our ability to explore or develop properties, commence production or continue operations. There can be no assurance that all permits, licenses and approvals that are required for the operations of the Company, including any for construction of mining facilities or conduct of mining, will be obtainable or renewable on reasonable terms, or at all. Delays or a failure to obtain such required permits, or the expiry, revocation or failure by the Company to comply with the terms of any such permits that it has obtained, would adversely affect the Company’s business.
The Company’s activities are subject to environmental laws and regulations that may increase the Company’s costs and restrict its operations.
The Company’s activities are subject to extensive laws and regulations governing the protection of the environment, natural resources and human health. These laws address, among other things, emissions into the air and air quality, discharges into water and water quality, management of waste, management and disposal of solid and hazardous substances, protection of natural resources, fisheries and wildlife protection, antiquities, endangered species, noise and use and reclamation of lands disturbed by mining operations. The Company is required to obtain governmental permits and, in some instances, provide bonding requirements under federal, state or provincial air quality, water quality, and mine reclamation rules and permits. Although the Company makes provisions for reclamation costs, it cannot be assured that these provisions will be adequate to discharge the Company’s future obligations for these costs. Violations of environmental laws may be subject to civil sanctions and, in some cases, criminal sanctions, including the suspension or revocation of permits. While responsible environmental, health and safety stewardship is one of the Company’s core values, there can be no assurance that the Company has been or will be at all times in complete compliance with such laws, regulations and permits, or that the costs of complying with current and future environmental laws and permits will not materially and adversely affect the Company’s business, results of operations or financial condition.
Our U.S. operations are subject to the Clean Water Act (the "CWA"), which requires permits for certain discharges into waters of the United States. Such permitting has been a frequent subject of litigation and enforcement activity by environmental advocacy groups and the EPA, respectively, which has resulted in declines in such permits or extensive delays in receiving them, as well as the imposition of penalties for permit violations. In 2015, the regulatory definition of “waters of the United States” that are protected by the CWA was expanded by the EPA, thereby imposing significant additional restrictions on waterway discharges and land uses. However, in 2018, implementation of the relevant rule was suspended for two years, and in December 2019 a revised definition that narrows the 2015 version was implemented. Even with the narrowed rule, it is possible that in the future the definition could again be expanded, or states could take action to address a perceived fall-off in protection under the CWA, either of which could increase litigation involving water discharge permits, which may result in delays in, or in some instances preclude, the commencement or continuation of development or production operations.
35


Enforcement actions by the EPA or other federal or state agencies could also result. Adverse outcomes in lawsuits challenging permits or failure to comply with applicable regulations or permits could result in the suspension, denial, or revocation of required permits, or the imposition of penalties, any of which could have a material adverse impact on our cash flows, results of operations, or financial condition.
Some of the mining wastes from our U.S. operations currently are exempt to a limited extent from the extensive set of EPA regulations governing hazardous waste under the Resource Conservation and Recovery Act (“RCRA”). If the EPA were to repeal this exemption, and designate these mining wastes as hazardous under RCRA, we would be required to expend additional amounts on the handling of such wastes and to make significant expenditures to construct hazardous waste storage or disposal facilities. In addition, if any of these wastes or other substances we release or cause to be released into the environment cause or has caused contamination in or damage to the environment at a U.S. mining facility, that facility could be designated as a “Superfund” site under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (“CERCLA”). Under CERCLA, any present owner or operator of a Superfund site or the owner or operator at the time of contamination may be held jointly and severally liable regardless of fault and may be forced to undertake extensive remedial cleanup action or to pay for the cleanup efforts. The owner or operator also may be liable to federal, state and tribal governmental entities for the cost of damages to natural resources, which could be substantial.
37


Under certain environmental laws, the Company could be held jointly and severally liable for removal or remediation of any hazardous substance contamination at its current, former and future properties, at nearby properties, or at other third-party sites where the Company’s wastes may have migrated or been disposed. The Company could also be held liable for damages to natural resources resulting from hazardous substance contamination. Additionally, environmental laws in some of the countries in which the Company operates require that the Company periodically perform environmental impact studies at the Company’s mines. The Company cannot provide assurance that these studies will not reveal environmental impacts that would require the Company to make significant capital outlays or cause material changes or delays in its intended activities, any of which could adversely affect the Company’s business.
The failure to comply with environmental laws and regulations or liabilities related to hazardous substance contamination could result in project development delays, material financial impacts or other material impacts to the Company’s projects and activities, fines, penalties, lawsuits by the government or private parties, or material capital expenditures. Environmental legislation in many countries is evolving and the trend has been towards stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, and increasing responsibility for companies and their officers, directors and employees. Future changes in these laws or regulations could have a significant adverse impact on some portion of the Company’s business, causing the Company to re- evaluate those activities at that time.
In addition to evolving and expanding environmental regulations providing governmental authorities with the means to make claims against us, private parties have in the past and may in the future bring claims against us based upon damage to property and injury to persons resulting from the environmental, health and safety impacts of prior and current operations (including for exposure to or contamination by lead). Laws in the United States such as CERCLA and similar state laws may expose us to joint and several liability or claims for contribution made by the government (state or federal) or private parties. Moreover, exposure to these liabilities arises not only from our existing but also from closed operations, operations sold to third parties, or operations in which we had a leasehold, joint venture, or other interest. Because liability under CERCLA is often alleged on a joint and several basis against any property owner or operator or arranger for the transport of hazardous waste, our exposure to environmental claims may be greater because of the bankruptcy or dissolution of other mining companies which may have engaged in more significant activities at a mining site than we but which are no longer available for governmental agencies or other claimants to make claims against or obtain judgments from. Similarly, there is also the potential for claims against us based on agreements entered into by certain affiliates and predecessor companies relating to the transfer of businesses or properties, which contained indemnification provisions relating to environmental matters.
Compliance with emerging climate change regulations could result in significant costs and climate change may present physical risks to a mining company’s operations.
GHGs are emitted directly by the Company’s operations, as well as by external utilities from which it purchases power. Currently, a number of international and national measures to address or limit GHG emissions, including the Kyoto Protocol, the Copenhagen Accord, Durban Platform and the Paris Agreement, are in various phases of discussion or implementation in the countries in which the Company operates. These, or future, measures could require the Company to reduce its direct GHG emissions or energy use or to incur significant costs for GHG emissions permits or taxes or have these costs or taxes passed on by electricity utilities which supply the Company’s
36


operations. The Company could also incur significant costs associated with capital equipment, GHG monitoring and reporting and other obligations to comply with applicable requirements. Additionally, concerns about potential GHG emissions impacts could manifest themselves in shareholder proposals, preferred purchasing, delays or failures in obtaining or retaining regulatory approvals, lack of market acceptance, continued pressure for and adoption of more stringent regulatory intervention and litigation, including governmental entities and other plaintiffs bringing claims against us for purported damages caused by the alleged effects of climate change. These risks could result in unexpected costs, increase our operating expenses, reduce the demand for our products and result in reputational harm to the Company, which in turn could have an adverse effect on the Company’s business, results of operations and financial condition.

38


The Company’s operations could be exposed to a number of physical risks from climate change, such as changes in rainfall rates, rising sea levels, reduced water availability, higher temperatures, increased snowpack and extreme weather events. Events or conditions such as flooding or inadequate water supplies could disrupt mining and transport operations, mineral processing and rehabilitation efforts, could create resource shortages and could damage the Company’s property or equipment and increase health and safety risks on site. Such events or conditions could have other adverse effects on the Company’s workforce and on the communities around the Company’s mines, such as an increased risk of food insecurity, water scarcity and prevalence of disease. In addition, if the effects of extreme weather events cause prolonged disruption to the delivery, or increased prices, of essential commodities or capital items, particularly over the seasonal ice road at Seabee, the Company’s production efficiency may be reduced. Although the Company makes efforts to mitigate these risks by ensuring that extreme weather conditions are included in emergency response plans at mine sites as required, there can be no assurance that these efforts will be effective and that these risks will not have an adverse effect on the Company’s operations.
Further, climate change litigation has grown in frequency, as scientists, agencies, and the general public increasingly associate catastrophic environmental events with changing climate. In recent years, litigants have utilized common law theories and existing environmental statutes to try to hold companies liable for the effects of climate change. While much of the climate change litigation to date has focused on allegations that companies have or are contributing to GHG emissions, businesses have also been targeted based on a theory of failing to prepare for the effects of climate change. Additionally, increasing scrutiny of public climate change disclosures made by companies has prompted recent government investigations and enforcement actions. The Company may become subject to climate change-related lawsuits in the future. Regardless of whether future litigants are successful in such claims, such lawsuits may require significant time and attention by the Company’s management, result in significant defense costs and expense or possible penalties and may materially adversely affect the Company’s business and/or its ability to continue all or certain of its mining, exploration and development activities.
The Company may be required by human rights laws to take actions that delay the Company’s operations or the advancement of its projects.
Various international and national laws, codes, resolutions, conventions, guidelines and other materials relate to human rights (including rights with respect to health and safety and the environment surrounding the Company’s operations). Many of these materials impose obligations on government and companies to respect human rights. Some mandate that governments consult with communities surrounding the Company’s projects regarding government actions that may affect local stakeholders, including actions to approve or grant mining rights or permits. The obligations of government and private parties under the various international and national materials pertaining to human rights continue to evolve and be defined. One or more groups of people may oppose the Company’s current and future operations or further development or new development of its projects or operations. Such opposition may be directed through legal or administrative proceedings or expressed in manifestations such as protests, roadblocks or other forms of public expression against the Company’s activities, and may have a negative impact on its reputation. Opposition by such groups to the Company’s operations may require modification of, or preclude the operation or development of, the Company’s projects or may require it to enter into agreements with such groups or local governments with respect to its projects, in some cases causing considerable delays to the advancement of its projects.
The Company’s mineral properties may be subject to uncertain title.
There can be no assurance that title to the Company's mineral properties will not be challenged. The Company owns, leases or has under option, unpatented and patented mining claims, mineral claims or concessions which constitute its property holdings. The ownership and validity, or title, of unpatented mining claims and concessions are often uncertain and may be contested. Further, the Company may not have, or may not be able to obtain or economically obtain, all necessary surface rights to develop a property. Title insurance is generally not available for mineral properties and the Company’s ability to ensure that it has obtained a secure claim to individual mining properties or mining concessions may be severely constrained. The Company has not conducted surveys of all of the claims in
37


which it holds direct or indirect interests. A successful claim contesting the Company’s title to a property will cause the Company to lose the Company’s rights to explore and, if warranted, develop that property or undertake or continue production thereon. This could result in the Company not being compensated for its prior expenditures relating to the property.
39


The Company is subject to claims and legal proceedings that arise in the ordinary course of business.
The Company is subject to various claims and legal proceedings, including adverse rulings in current or future litigation against the Company and/or its directors or officers, covering a wide range of matters that arise in the ordinary course of business activities. Each of these matters is subject to various uncertainties and it is possible that some of these matters may be resolved unfavorably to the Company. The Company carries liability insurance coverage and establishes reserves for matters that are probable and can be reasonably estimated. In addition, the Company may be involved in disputes with other parties in the future that may result in litigation, which may have a material adverse impact on the Company’s future cash flows, profitability, results of operations and financial condition. Additionally, the Company may be subject to frivolous and/or nuisance claims. While such claims are often dismissed, there can be no assurance that all such claims will be dismissed entirely, or that the Company will not be required to incur significant expenses defending such claims.
The Company is subject to assessment by taxation authorities in multiple jurisdictions that arise in the ordinary course of business.
In the normal course of business, the Company is subject to assessment by taxation authorities in various jurisdictions. Income tax provisions and income tax filing positions require estimates and interpretations of income tax rules and regulations of the various jurisdictions in which the Company operates and judgments as to their interpretation and application to the Company’s specific situation. Tax rates and the calculations of taxes and the associated deferred tax assets and liabilities can change significantly and are influenced by changes in political administrations, foreign currency fluctuations and other factors. The Company’s business and operations, and that of its subsidiaries, is complex, and the Company has, historically, undertaken several significant financings, acquisitions and other material transactions. The computation of income taxes payable as a result of these transactions involves many complex factors as well as the Company’s interpretation of, and compliance with, relevant tax legislation and regulations. While the Company’s management believes that the provision for income tax is appropriate and in accordance with U.S. GAAP and applicable legislation and regulations, tax filing positions are subject to review and adjustment by taxation authorities, which may challenge the Company’s interpretation of the applicable tax legislation and regulations.
The Company is subject to anti-corruption laws.
The Company is subject to anti-corruption laws under the Canadian Corruption of Foreign Public Officials Act and the U.S. Foreign Corrupt Practices Act, which generally prohibit companies from engaging in bribery or other prohibited payments to foreign officials for the purpose of obtaining or retaining business. In addition, the Company may also be subject to the extra-territorial provisions of the Bribery Act 2010 (United Kingdom) which, in certain circumstances, can apply to offenses committed outside of the United Kingdom by foreign companies, as well as other anti-corruption laws applicable in the jurisdictions in which we operate. Corruption, extortion, bribery, pay-offs, theft and other fraudulent practices may occur from time-to-time in Turkey,Türkiye, Argentina, Peru, Mexico or any other jurisdiction in which the Company may conduct business, and the Company cannot provide assurance that its employees or other agents will not engage in such prohibited conduct for which the Company might be held responsible. If the Company’s employees or other agents, including past employees or agents of companies the Company has acquired, are found to have engaged in such practices, the Company could suffer severe penalties and other consequences that may have a material adverse effect on its business, financial condition and results of operations. The Company has an Anti-Corruption Policy and internal controls and procedures intended to address compliance and business integrity issues, and the Company trains its employees on anti-bribery compliance on a global basis. However, despite careful establishment and implementation, the Company cannot assure you that these or other anti-bribery, anti-fraud or anti-corruption policies and procedures are or will be sufficient to protect against fraudulent and/or corrupt activity. In particular, the Company, in spite of its best efforts, may not always be able to prevent or detect corrupt or unethical practices by current or former employees or third parties, such as subcontractors or joint venture partners, which may result in reputational damage, civil and/or criminal liability (under the Canadian Corruption of Foreign Public Officials Act, the U.S. Foreign Corrupt Practices Act or any other relevant compliance, anti-bribery, anti-fraud or anti-corruption laws) being imposed on the Company.


4038



Risks Related to Ownership of Company Equity
The Company’s common shares are publicly traded and are subject to various factors that have historically made the Company’s common share price volatile.
The market price of the Company’s common shares has experienced, and may continue to experience, significant volatility, which may result in losses to investors. The market price of the Company’s common shares may increase or decrease in response to a number of events and factors, including: the Company’s operating performance and the performance of competitors and other similar companies; volatility in metal prices; the public’s reaction to the Company’s press releases on developments at the Company’s properties, material change reports, other public announcements and the Company’s filings with the various securities regulatory authorities; changes in earnings estimates or recommendations by research analysts who track the Company’s common shares or the shares of other companies in the resource sector; changes in general economic and/or political conditions; the number of common shares to be publicly traded after an offering of the Company’s common shares; the arrival or departure of key personnel; and acquisitions, strategic alliances or joint ventures involving the Company or the Company’s competitors.
In addition, the global stock markets and prices for mining company shares have experienced volatility that often has been unrelated to the operating performance of such companies. These market and industry fluctuations may adversely affect the market price of the Company’s common shares, regardless of the Company’s operating performance. The variables which are not directly related to the Company’s success and are, therefore, not within the Company’s control, include other developments that affect the market for mining company shares, the breadth of the public market for the Company’s common shares and the attractiveness of alternative investments. The effect of these and other factors on the market price of the Company’s common shares on the exchanges on which they trade has historically made the Company’s common share price volatile and suggests that the Company’s common share price will continue to be volatile in the future.
Holders of our common shares may not receive dividends.
Holders of our common shares are entitled to receive only such dividends as the Company's Board of Directors may declare out of funds legally available for such payments. On February 17, 2021, the Company’s Board of Directors approved its inaugural quarterly dividend payment of $0.05 per common share that was paid on March 31, 2021 to shareholders of record at the close of business on March 5, 2021. The quarterly dividend payment was subsequently increased to $0.07 per common share as approved by the Company's Board of Directors on February 22, 2022. During the year ended December 31, 2021,2022, the Company declared and paid cash dividends of $0.20$0.28 per common share in the aggregate amount of $43.2$58.8 million. The declaration and payment of future dividends is at the discretion of the Board of Directors and will be made based on the Company’s financial position and other factors relevant at the time. The Company's ability to pay dividends will be subject to future earnings, capital requirements, financial condition, compliance with covenants and financial ratios related to existing or future indebtedness and other factors deemed relevant by the Board of Directors. An annualized dividend payout level has not been declared by the Board of Directors, and the declaration and payment of future dividends, including future quarterly dividends, remains at the discretion of the Board of Directors. The Company's dividend framework is non-binding, and the Board of Directors may modify the dividend framework or reduce, defer or eliminate the common stock dividend in the future.
Future sales or issuances of equity securities could decrease the value of the Company’s common shares, dilute investors’ voting power and reduce the Company’s earnings per share.
The Company may sell additional equity securities in subsequent offerings (including through the sale of securities convertible into equity securities) and may issue equity securities in acquisitions. The Company cannot predict the size of future issuances of equity securities or the size and terms of future issuances of debt instruments or other securities convertible into equity securities or the effect, if any, that future issuances and sales of the Company’s securities will have on the market price of the Company’s common shares.

41


Additional issuances of the Company’s securities may involve the issuance of a significant number of common shares at prices less than the current market price for the common shares. Issuances of substantial numbers of common shares, or the perception that such issuances could occur, may adversely affect prevailing market prices of the Company’s common shares. Any transaction involving the issuance of previously authorized but unissued common shares, or securities convertible into common shares, would result in dilution, possibly substantial, to security holders. The Company is not able at this time to predict the future amount of such issuances or dilution.

39


Furthermore, sales of substantial amounts of the Company’s securities by the Company or the Company’s existing shareholders, or the availability of such securities for sale, could adversely affect the prevailing market prices for the Company’s securities and dilute investors’ earnings per share.
Risks Related to Being a Public Company
The Company may fail to maintain adequate internal control over financial reporting pursuant to the requirements of applicable regulations.
No evaluation can provide complete assurance that the Company’s internal control over financial reporting will prevent, detect or uncover all failures of persons within the Company to disclose material information required to be reported. The effectiveness of the Company’s controls and procedures could also be limited by simple errors or faulty judgments. In addition, as the Company continues to expand, the challenges involved in implementing appropriate internal control over financial reporting will increase and will require that the Company continue to improve its internal control over financial reporting. Although the Company intends to devote substantial time and incur substantial costs, as necessary, to ensure ongoing compliance, the Company cannot be certain that it will be successful in complying with internal control regulations.
Due to the loss of the Company's foreign private issuer status, the Company is now required to comply with the Exchange Act’s domestic reporting regime.
As of June 30, 2021, we determined that we no longer qualified as a "foreign private issuer," as such term is defined in Rule 405 under the Securities Act, which means that as of January 1, 2022 we are required to comply with all the periodic disclosure and current reporting requirements of the Exchange Act applicable to U.S. domestic issuers. The transition from foreign private issuer status is expected to result in incremental increase in costs as the requirements applicable to U.S. domestic issuers are more detailed and extensive than the requirements for foreign private issuers.
The Company's accounting and other estimates may be imprecise.
Preparing consolidated financial statements requires management to make estimates and assumptions that affect the reported amounts and related disclosure of assets, liabilities, revenue and expenses at the date of the consolidated financial statements and reporting periods. The more significant areas requiring the use of management assumptions and estimates relate to:
Mineral reserves, mineral resources, and other resources that are the basis for future income and cash flow estimates and units-of-production depreciation, depletion and amortization calculations;
future ore grades, throughput and recoveries;
future metals prices;
future capital and operating costs;
environmental, reclamation and closure obligations;
permitting and other regulatory considerations;
asset impairments;
valuation of business combinations;combinations or asset acquisitions;
future foreign exchange rates, inflation rates and applicable tax rates;
42


reserves for contingencies and litigation; and
deferred tax asset valuation allowance.
Future estimates and actual results may differ materially from these estimates as a result of using different assumptions or conditions. For additional information, see Critical Accounting Policies and Estimates in Item 7. Management’s Discussion and Analysis of Consolidated Financial Condition and Results of Operations, Note 2 of the Notes to the Consolidated Financial Statements, and the risk factors set forth in this section.
It may be difficult to obtain and enforce judgments against the Company because of its Canadian incorporation and foreign assets.
The Company is a corporation existing under the laws of the Province of British Columbia. Some of the Company's officers, directors, and experts are Canadian or non-U.S. residents, and many of its assets are located outside the United States. Investors should not assume that Canadian or other foreign courts would enforce judgments of United States courts, or liabilities, obtained in actions against the Company or its directors, officers or experts predicated upon the civil liability provisions of the United States federal securities laws or the securities or “blue sky” laws of any state or jurisdiction of the United States. In addition, while statutory provisions exist in British Columbia for derivative actions to be brought in certain circumstances, the circumstances in which a derivative action may be
40


brought, and the procedures and defenses that may be available in respect of any such action, may be different than those of shareholders of a company incorporated in the United States.
ITEM 1B. UNRESOLVED STAFF COMMENTS.
None.
41


ITEM 2. PROPERTIES
The following descriptions summarize selected information about the Company’s four producing assets: Çöpler Gold Mine, Marigold Mine, Seabee Gold Operation and Puna Operations, each of which is an operating segment. All of the Company’s properties are wholly owned except for Çöpler.pler, which is 80% owned by the Company.
The disclosure in this Annual ReportItem 2. Properties of a scientific or technical nature for each asset is based on the Çöpler District Master Plan 2021 Technical Report Summary (the “CDMP21TRS”), the Marigold 2021 Technical Report Summary, the Seabee 2021 Technical Report Summary and the Puna 2021 Technical Report Summary (collectively, the “Technical Report Summaries”)., in each case as amended. Each amended Technical Report Summary ishas been filed with the SEC as an exhibit to this Annual Reportpart of the Company's Current Reports on Form 8-K filed on September 29, 2022 and incorporated by reference herein and is beinghas been filed concurrently with the applicable securities regulatory authorities in Canada as a technical report in compliance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), and areis available for review on EDGAR at www.sec.gov and on SEDAR at www.sedar.com. You should read each such Technical Report Summary as part of your review of the information in this Item 2. Properties.
Additional Mining Company Financial Information
The Company is listed on Nasdaq and the TSX and is subject to the ongoing disclosure and reporting requirements, including those required of a mineral resource company, in both the United States and Canada. The mineral resource company disclosure requirements in each country are different. As a result, certain additional disclosures have been included in this “Item 2. Properties” to comply with requirements under Canada’s National Instrument 51-102 – Continuous Disclosure Obligations ("NI 52-101") and 43-101. Certain of these additional disclosures include financial measures that are customary in the mining industry, including capital costs and operating costs, which have been calculated in a manner that is not in accordance with U.S. GAAP. There are no standardized definitions or comparable financial measures under U.S. GAAP for these mining industry non-GAAP financial measures. As a result, we have not identified a comparable financial measure calculated under U.S. GAAP and we have also not provided a reconciliation of these mining industry non-GAAP financial measures to a U.S. GAAP financial measure. We believe investors rely on these mining industry non-GAAP financial measures to assist in an evaluation and comparison of the operating performance of mining companies. These disclosures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with U.S. GAAP. These mining industry non-GAAP financial measures should be read in conjunction
43


with “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operation” and our consolidated financial statements included elsewhere in this Annual Report on Form 10-K.Report.
Properties OverviewSummary Disclosure
Producing Assets
The following descriptions summarize selected information about the Company’s exploration properties and four producing assets: Çöpler Gold Mine, Marigold Mine, Seabee Gold Operation and Puna Operations. All of the Company’s properties are wholly owned except for Çöpler, which is 80% owned by SSR,through a joint venture agreement.
Çöpler is an open pit gold mine located along the Tethyan belt in east-central Turkey’sTürkiye’s Erzincan Province. Çöpler contains oxide and sulfide ores which are mined concurrently and processed through its two separate processing circuits. Gold contained in oxide ore is recovered through heap leach processing producingto produce gold doré with a minor by-product of copper concentrate, while gold sulfide mineralization is subjected to pressure oxidation and carbon-in-leach processing, to produce gold doré. Further information on Çöpler is included herein under the “Çöpler Gold Mine, Erzincan Province, Türkiye” section and detailed disclosure of a scientific or technical nature regarding Çöpler is available in the CDMP21TRS.
Marigold is an open pit gold mine located along the northern margin of the Battle Mountain-Eureka Trend in Nevada, USA. Marigold is a run-of-mine heap leach operation producing gold doré bars. Further information on Marigold is included herein under the “Marigold Mine, Nevada, United States” section and detailed disclosure of a scientific or technical nature regarding Marigold is available in the Marigold 2021 Technical Report Summary.
42


Seabee is an underground gold mine located along the Trans-Hudson Corridor in east-central Saskatchewan, Canada. Seabee processes ore through its processing plant using gravity concentration, cyanide leaching and carbon-in-pulp to produce gold doré. Further information on Seabee is included herein under the “Seabee Gold Operation, Saskatchewan, Canada” section and detailed disclosure of a scientific or technical nature regarding Seabee is available in the Seabee 2021 Technical Report Summary.
Puna is an open pit silver-lead-zinc mine located along the silver belt in northern Argentina in the Province of Jujuy. Puna processes ore mined from the Chinchillas mine through its Pirquitas flotation processing mill to produce a silver/leadsilver-lead and a zinc concentrate. Further information on Puna is included herein under the “Puna Operations, Jujuy Province, Argentina” section and detailed disclosure of a scientific or technical nature regarding Puna is available in the Puna 2021 Technical Report Summary.
Exploration and Development
Amisk, Canada Exploration
The Amisk property is 39,880 hectares (and 126 claims) with extensive Proterozoic-volcano-sedimentary rock assemblages that are prospective for gold-silver epithermal, gold-rich volcanogenic massive sulfide and orogenic gold deposits. The Amisk property is located in Saskatchewan, Canada.
In the Amisk property the West Channel and Black Diamond trends occur along regional-scale ductile shear zones that range from 5 to 50 meters in orthogonal width. Intermediate volcanic and volcaniclastic rocks core much of these trends with lesser meta-volcanic, meta-sedimentary and gabbro packages occurring in proximity to the high-strain corridors. Alteration assemblages of sericite, iron-carbonate and silicification dominate the regional shear zones. Localized chlorite and diaspore occurrences are diagnostic and associated with auriferous quartz veins at the Monarch target area. Arsenopyrite is the most common sulfide mineral associated with this vein-hosted gold mineralization. Pyrite, chalcopyrite and pyrrhotite are also present, but generally to a lesser degree. Based on visual observations, Sulfide content related to gold mineralization can range from 1%-15%, with most zones hosting 3-5% total sulfide. Coarse visible gold is relatively uncommon on the property and is presently identified at the Raine-Walker, TCA and Black Diamond targets to-date.
In 2022, 13 diamond drillholes totaling 2,526 meters were completed at targets along the West Channel shear zone. A small field program was completed in the summer that included geological mapping and rock and soil sampling.
San Luis, Peru Exploration
The San Luis project is a wholly owned high-grade gold-silver project located in the Ancash Department of central Peru. The project is held by the Company’s wholly owned subsidiary, Reliant Ventures S.A.C.
In September 2012, Peru’s Ministry of Mines and Energy approved the EIA for the mining operation of the Ayelén deposit. Based on the preliminary and early works the Company conducted in respect of the project in 2017, the EIA now has no expiry date.
The San Luis project includes several vein systems across an area of land whose surface rights are held by two local communities: Ecash and Cochabamba.
While community relations efforts with both the Cochabamba and the Ecash Communities continues, exploration activities included geological mapping and prospecting. Fieldwork resulted in the discovery of six new gold and silver-bearing quartz veins within 1.5 km of the Ayelen vein system. Additional work is planned for 2023 to define the extent and continuity of mineralization.
43


ssrm-20221231_g1.jpg

44


Çöpler Gold Mine, Erzincan Province, TurkeyTürkiye
The ÇöÇöpler project consists of a number of mining licenses covering mineral resources on the Çöpler, Çakmaktepe, Çakmaktepe Expansion (Ardich),Extension, and Bayramdere deposits, mineral reserves on the Çöpler, Çakmaktepe Extension and Çakmaktepe open pit mines,deposits, oxide and sulfide processing facilities, and supporting infrastructure.
The Çöpler deposit, including the mineral resources and mineral reserves, is wholly owned by Anagold Madencilik Sanayi ve Ticaret Anonim Şirketi (“Anagold”). SSR Mining controls 80% of the shares of Anagold through a joint venture, Lidya Madencilik Sanayi ve Ticaret A.Ş. (“Lidya”) controls 18.5%, and a bank wholly‑owned by Çalık Holdings A.Ş. holds the remaining 1.5%. Çakmaktepe is wholly owned by Kartaltepe and Çakmaktepe Expansion (Ardich) spans both Kartaltepe and Anagold ground (predominantly Anagold). SSR Mining controls 50% of the shares of Kartaltepe Madencilik Sanayi ve Ticaret Anonim Şirketi (“Kartaltepe”). Kartaltepe is 80% owned by SSR Mining and 20% owned by Lidya after the completion of a 2022 acquisition of an additional 30% ownership interest in the Kartaltepe from partner Lidya, increasing SSR Mining’s ownership interest from 50% to 80%. The Çakmaktepe Expansion (Ardich)Extension deposit spans both Kartaltepe and Anagold ground. The Kartaltepe license includes Çakmaktepe Extension, Çakmaktepe, Bayramdere deposits and the MavialtınMavialtin Porphyry Belt (including the Aslantepe, Sarıdere, Fındıklıdere and Mavidere porphyries) have areas owned by both Anagold and Kartaltepe.Belt. SSR Mining is the Operator of both Anagold and Kartaltepe. All of the processing facilities and operating assets are located on land owned by Anagold. In total 77%80% of the exclusive Mineral Resources and 79%80% of the Mineral ReserveReserves at Çöpler project are owned by SSR Mining.
Also, in Turkey, SSR Mining owns 30%The total cost of Tunçpınar Madencilik Sanayi ve Ticaret Anonim Şirketi (“Tunçpınar”), operated by Lidya,Çöpler’s gross mineral properties, plant and 70%equipment as of Bakırtepe Madencilik Sanayi ve Ticaret Anonim Şirketi (“Bakırtepe”), which is operated by SSR Mining. Bakırtepe includes the Copper Hill exploration target. December 31, 2022 was $3,161.8 million.    
Property Description and Location
The ÇöÇöpler project is located in east central Turkey,Türkiye, 120 kilometers west of the city of Erzincan, in Erzincan Province, 40 kilometers east of the iron-mining city of Divriği, and 550 kilometers east of Turkey’sTürkiye’s capital city, Ankara. The nearest urban center, İliç, is located approximately 6 kilometers northeast of the Çöpler mine.
Çöpler uses the European 1950 ("E1950") datum coordinate system, which is a Turkish Government requirement. The Çöpler deposit is in UTM6 zone 37N of the E1950 coordinate system. Çöpler's project centroid is serviced by roadsituated at approximately 459,975 mE and rail networks. The4,364,420 mN and has an approximate elevation of 1,160 m above mean sea level ("mamsl").
Çöpler mine is accessed from the main paved highway between Erzincan and Kemaliye. The project areaKemaliye and is located in the Eastern Anatolia geographical district of Turkey.serviced by both road and rail networks.. Mining operations are conducted year-round. The climate is typically continental with cold, wet winters and hot, dry summers.
The Çöpler mining operations fall within the license areas numbered 847, 49729, and 20067313, which have been granted by the General Directorate of Mining and Petroleum Affairs.Affairs within Turkiye. The Çakmaktepe satellite mining operation is located 6 km east of the current Çöpler pit. The Çakmaktepe pits are located within Kartaltepe License 1054. Ore mined at Çakmaktepe is hauled and treated at the Anagold Çöpler facilities.
45


ssrm-20211231_g2.jpgssrm-20211231_g3.jpgssrm-20221231_g2.jpg
46


ssrm-20221231_g3.jpg

Anagold holds the exclusive right to engage in mining activities within the Çöpler project area. Anagold holds six granted licenses covering a combined area of approximately 16,600 hectares. Kartaltepe holds eight licenses covering approximately 9,200 hectares. The total near-mine tenement package is approximately 25,800 hectares.
4647


Kartaltepe sells Anagold ore from Çakmaktepe at an agreed rate. SSR Mining holds a 2% net smelter return (“NSR”) on the Kartaltepe licenses, receivable after repayment of a historical royalty pre-payment.
Under Turkish Mining Law, the royalty rate for precious metals is variable and tied to metal prices. The Çöpler project is subject to a mineral production royalty that is based on a sliding scale to gold price and is payable to the Turkish government. In September 2020 a presidential decree was issued, increasing the prescribed royalty rates by 25%. Royalty rates are reduced by 40% for ore processed in country, as an incentive to process ore locally. As the Çöpler project produces its gold doré on-site, the Çöpler project is eligible for a 40% reduction to the royalty rate.
History
The Çöpler region has been subject to gold and silver mining dating back at least to Roman times. The Turkish Geological Survey carried out regional exploration work in the early-1960s that was predominately confined to geological mapping. In 1964, a local Turkish company started mining for manganese until 1973; the property was sold in January 1979 and manganese production restarted, continuing until 1992.
In 1998, Anatolia Minerals Development Ltd (“Anatolia”) identified several porphyry-style gold–copper prospects in east central TurkeyTürkiye and applied for exploration licenses for these prospects, including in the Çöpler basin. In August 2009, a joint venture agreement between Anatolia and Lidya was executed.
In February 2011, Anatolia merged with Avoca Resources Limited, an Australian company, to become Alacer Gold Corp., which further merged with SSR Mining in September 2020.
Geological Setting, Mineralization, and Deposit Types
The ÇöÇöpler project is located near the northern margin of a complex collision zone that lies between the Pontide Belt / North Anatolian Fault, the Arabian Plate, and the East Anatolian Fault, which bounds several major plates. The region underwent crustal thickening related to the closure of a single ocean, or possibly several oceanic and micro-continental realms, in the late Cretaceous to early Tertiary period.
The gold, silver, and copper mineralization of economic interest at Çöpler occurs in a porphyry-related epithermal environment, with most of the gold mineralization concentrated in three zones: Main Zone, Manganese Zone, and Marble Zone, with mineralization present in five different forms:
Stockwork and veins with disseminated marcasite, pyrite, and arsenopyrite
Clay-altered brecciated and carbonatized diorite with rhodochrosite veinlets, and disseminated marcasite, pyrite, realgar, orpiment, sphalerite, and galena
Massive marcasite and pyrite replacement bodies
Massive jarositic gossan
Massive manganese oxide
Oxidation of this mineralization has resulted in the formation of gossans, massive manganese oxide, and goethitic / jarositic assemblages hosting fine-grained free gold. The oxidized cap is underlain by primary and secondary sulfide mineralization. In addition to the gold–silver–copper mineralization of economic interest some arsenic, lead, magnesium, manganese, mercury, and zinc are also present.
The Manganese Zone (pit) is about 650 m wide in the north-south direction and about 650 m in the east-west direction. The surface was predominantly covered with marble. A major component of the mineralization is associated with the contact between the diorite and the marble. Disseminated mineralization also occurs outside the contact zones. Mineralization ranges from the surface to 400m deep.

47


The Marble Zone (pit) is in the southeastern portion of the system and associated with a northeast striking fault contact between marble on the east and hornfels (metasediments) and intrusives on the west. The width is almost 350 m and the strike length is about 300 m east-north-east. Depth of the mineralization ranges from the surface to about 160 m.
The Main Zone (pit) drilling identified a mineralization extending about 750 m north-south and 1,000 m east west. Oxide zone is confined to near surface to depths of about 40 m. Main Pit is the largest area of exposure in the west and south of the Çöpler mine and exposes dominantly diorite-granodiorite porphyry in
48


the southern wall in contact with Hornfels Block. High grade gold is controlled by both faults and contacts. Supergene enrichment enhanced along syn- and post-mineral structures plays an important role in localizing high-grade gold mineralization at lithological contacts, late-stage faults and shear zones, and fault/contact intersections.
The West Pit exposes a high-grade gossan/fanglomerates at the basal contact of Munzur Limestone with hornfels. The contact is locally well preserved and shows a ~10 m thick zone of broken rock cataclastites at the base of limestone on a wide zone of highly sheared hornfelds with folded foliations. Some Gossans would be supergene of polymetallic replacement deposits. Gossans are confined to limestone and hornfels and enriched/formed as a result of karstic process in the area.
Mining Operations
Open pit mining at the Çöpler project is carried out by a mining contractor and managed by Anagold. The mining method is a conventional open pit method with drill and blast, and utilizing excavators and trucks operating on bench heights of 5 meters. The mining contractor provides operators, line supervisors, equipment, and ancillary facilities required for the mining operation. SSR MiningAnagold provides management, technical, mine planning, engineering, and grade control functions for the operation.
The facility infrastructure supports the mine, and the oxide heap leach and sulfide plant processing facilities. The current leach pad consists of four phases designed to accommodate approximately 5861 million tonnes of oxide ore heap with a nominal maximum heap height of 100 meters above the pad liner, with additional phases in development.
The tailings storage facility is developed and constructed in stages. Ongoingstages with ongoing work in ensuringto ensure sufficient long-term capacity for storage of tailings is undertaken.tailings. Studies by Anagold have determined that the effect of the addition of the flotation plant to the sulfide plant circuit wouldwill result in an increase in the solids content and improvement in the final settled density based on an increase in the rate of tailings consolidation. The flotation plant is in operation.
Infrastructure, Permitting and Compliance Activities
The power supply for the Çöpler mine and processing facilities is provided via a 154 kV transmission line to site. Existing mine site facilities are located primarily within the Çöpler and Sabırlı Creek watersheds immediately upstream of their confluence with the Karasu River. The only perennial surface water in the vicinity of the Çöpler project is the Karasu River flowing in the northern and western part of the area. All other valleys are either ephemeral streams or dry valleys.
The Çöpler mining and processing operations involve open pit mining from multiple pits, construction of multiple waste rock dumps to accommodate mined materials, processing of oxide ores and placement on heap leach pads, and processing of sulfide ores with placement of tailings in a tailings storage facility. Operation of the Çöpler mining and processing facilities, and mining at Çakmaktepe, have been investigated and authorized by means of a series of Environmental Impact Assessments ("EIAs"). Anagold has remained in compliance with all aspects of the EIAs and operating permits throughout the history of the project.
The currently permitted EIA boundary incorporates 1,747 hectares, whereas the footprint of the mine units covers a combined 1,089 hectares. The currently permitted Çakmaktepe EIA boundary incorporates 290360 hectares, but pending approval, itand the Company is anticipated thatin the Çakmaktepeprocess of submitting an EIA to increase the permitted boundary will increase to 360553 hectares.
48


Mineral Processing and Metallurgical Testing
Oxide Testwork
The heap leaching facilities were commissioned at the Çöpler mine site in late-2010 and have operated continuously since that time. Oxide heap leach operations were ongoing at the Cöpler District Master Plan 2021 Technical Report Summary (“CDMP21TRS”)CDMP21TRS effective date.
Metallurgical testwork on Çakmaktepe oxide material for heap leaching has been undertaken at the on-site metallurgical laboratory, initially under the supervision of Kappes, Cassiday & Associates. The initial testwork in 2015 undertook bottle roll and column leach tests. The results are comparable with the Çöpler oxide ore, with similar behavior and leach kinetics. Subsequently, Çakmaktepe oxide ore has been heap leached along with Çöpler oxide ore. Oxide column testwork on oxide ore continues at the on-site laboratory.
Metallurgical testwork on ArdichÇakmaktepe Extension oxide material for heap leaching has been undertaken at McClelland laboratories and supervised by Metallurgium. An initial testwork program, including bottle roll and column leach, was carried out in 2019. This initial program identified two distinct domains
49


with respect to gold recovery based on sulfur content: <1% and 1%–2%. The column testwork results indicated that the listwanite, dolomite, and jasperoid lithologies have physical properties amenable to heap leaching. This initial test program was followed up with further testwork in 2020.
Analysis of the results of the metallurgical testwork and a review of the existing recovery models for use in economic analysis were undertaken in 2020. This was done for the oxide and sulfide processing, including the flotation circuit. The resulting recoveries have been used in the economic analysis for the CDMP21TRS.
Oxide gold recoveries vary by lithology for Çöpler in the range 62.3%–78.4%, at Çakmaktepe the range is 61%–80%. At ArdichÇakmaktepe Extension, the testwork suggest recoveries will vary in the range 40%–73%. The average oxide recovery in the Reserve Case is 61%.
Sulfide Testwork
The sulfide process plant commenced commissioning in Q4’18.the fourth quarter of 2018. The plant consists principally of a pressure oxidation (POX) leach followed by a cyanide leach to recover gold.
Significant testwork had been conducted on sulfide ores prior to commissioning of the sulfide plant, with pilot plant testwork campaigns and a significant number of batch variability tests on POX / cyanide leach completed.
Whilst a POX / cyanide leach circuit was implemented, significant work had also been undertaken on flotation of the gold-bearing sulfides as a process route, although ultimately this option was not selected for development. Flotation of a partial stream of the plant feed was considered to maximize the available capacity of the plant, including the POX autoclave and available oxygen supply. Further flotation testwork demonstrated that the addition of a small flotation plant into the existing sulfide process route would allow optimization and maximization of already installed capacities.
The testwork indicates that sulfur recovery through flotation is estimated to be 75% to concentrate with a corresponding 55% gold recovery. Flotation tails gold recovery is estimated at 43%. A side stream flotation plant capable of treating 50 to 150 tonnes per hour commenced commissioning on December 24, 2021. Once fully commissioned the actual plant performance will be reconciled with expected performance.
The current determination of POX gold recovery is based on assessment of results for the pilot testwork programs undertaken prior to commencement of operations and benchmarked with the existing operating data. An equation has been derived to calculate gold recovery by material type for all ore that is subject to POX; this includes direct POX feed and flotation concentrate. The Reserve Case average sulfide gold recovery is 91%.
49


Processing and Recovery Operations
The Company currently operates a sulfide process plant and an oxide heap leach facility.
The oxide heap leaching facilities were commissioned at the Çöpler mine site in the second half of 2010 with initial gold production achieved in the fourth quarter of 2010. The process was originally designed to treat approximately 6.0 million tonnes per annum of ore by three-stage crushing (primary, secondary, and tertiary) to 80% passing 12.5 millimeters, agglomeration, and heap leaching on lined heap leach pads with dilute alkaline sodium cyanide solution. Gold is recovered through a carbon in-column system, followed by stripping of metal values from carbon, electrowinning and smelting to yield a doré (containing gold and silver) suitable for sale. Control of copper in leach solutions is undertaken in a sulfidization, acidification, recovery, and thickening ("SART") plant, which also regenerates cyanide.
The sulfide plant commenced commissioning in the fourth quarter of 2018. The basic flow of processing through the sulfide plant is as follows:
50


ssrm-20221231_g4.jpg
The incorporation of a flotation circuit into the existing sulfide plant to upgrade sulfide sulfur to fully utilize grinding and pressure oxidation (“POX”) autoclave capacity was constructed and commenced ore production at the end of December 2021. This addition to the sulfide plant is incorporated between grinding and acidulation by taking a bleed / slip stream from the grinding thickener feed, floating sulfides, and returning the sulfide concentrate to the grinding thickener to be combined with direct autoclave feed. Gold in the flotation tails (not recovered to the flotation concentrate) is combined with the material that was processed through the POX autoclave circuit, this combined stream then goes to the gold leaching and recovery circuits to recover gold.
Since completing ramp-up of the sulfide plant in June 2020, POX throughput has progressively improved to exceed design up to a monthly average peak of 330 tonnes per hour and at the maximum sulfide sulfur of 13.7 tonnes per hour. The gold recovery has remained at around 91%, with the tailings grade ranging between about 0.25–0.30 grams of gold per tonne.
SeeResource and Reserve Estimates
The following tables summarize the Company's estimated gold reserves and resources reflecting only the reserves and resources attributable to SSR Mining's ownership or economic interest as of December 31, 2022. Additionally, see “Proven and Probable Reserve Estimates” and "Resource Estimates"Estimates by Mineral” in this Item 2 for further information on the mineral resources and mineral reserves for Çöpler, and see "Operating Statistics" in this Item 2 for further information on production of the Çöpler operations for the years ended December 31, 20212022 and December 31, 2020.2021. A discussion of the changes in mineral resources and mineral reserves from 2021 to 2022 is also included below.
51


Çöpler Reserves as of December 31, 2022
ProvenProbableProven and Probable
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)(1)(2)(3)(4)
7,166 2.56590 40,524 2.032,648 47,690 2.113,238 84 %
Çöpler Stockpile— — — 10,605 2.18745 10,605 2.18745 91 %
TonnesGradeSilverTonnesGradeSilverTonnesGradeSilverMetallurgical
Silver(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)7,166 4.11947 40,524 4.485,834 47,690 4.426,781 %
TonnesGradeCopperTonnesGradeCopperTonnesGradeCopperMetallurgical
Copper(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)Recovery
Çöpler (OP)(5)(6)
7,166 — 0.240,524 0.016.747,690 0.016.9%
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine, Cakmaktepe and Çakmaktepe Extension.
(2)Mineral Reserves shown are SSR ownership share only. SSR Owns 80% rights in both the Anagold and Kartaltepe licenses. Cakmaktepe, Bayramdere and part of Çakmaktepe Extension fall within Kartaltepe license.
(3)Mineral Reserve cut-offs are based on $1,350/oz gold price. The average oxide recoveries are 61% and average sulfide recoveries are 91%. The weighted average gold recovery is 84%. All cut-off values include allowance for royalty payable. There are no credits for silver or copper in the cut-off calculations. Oxide cutoff grades vary between 0.44-0.80g/t gold and sulphide cutoff grades vary between 1.05-1.11g/t gold.
(4)There are no sulfide Mineral Reserves at Çakmaktepe and Bayramdere.
(5)There is no copper recovery in sulphide material.
(6)Copper oxide recoveries are 2%.
52


Çöpler Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferred
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP)(1)(2)(3)(4)(5)(6)(7)
2,598 1.94162 68,368 1.042,284 70,966 1.072,446 82,394 1.173,097 
TonnesGradeSilverTonnesGradeSilverTonnesGradeSilverTonnesGradeSilver
Silver(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP)(8)
2,598 4.32361 68,368 3.377,402 70,966 3.407,763 82,394 9.5725,339 
TonnesGradeCopperTonnesGradeCopperTonnesGradeCopperTonnesGradeCopper
Copper(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)
Çöpler (OP)(9)
2,598 0.031.568,368 0.15222.870,966 0.14224.382,394 0.13228.4
(1)Çöpler Mineral Resources include resources from Çöpler Mine, Cakmaktepe, Çakmaktepe Extension and Bayramdere. Mineral Resources are exclusive of Mineral Reserves.
(2)Mineral Resources shown are SSR ownership share only. SSR Owns 80% rights in both the Anagold and Kartaltepe licenses.
(3)All Mineral Resources for Çöpler were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual pit shells ($1,400/oz gold and $19.00/oz silver for Bayramdere).
(4)Oxide definitions: At Çöpler: oxide is defined as material <2% total sulfur and sulfide material is ≥2% total sulfur. At Çakmaktepe Extension and Çakmaktepe, oxide is comprised of low-sulfur (LS) oxide (<1% total sulfur) and high-sulfur oxide (≥1% and <2% total sulfur). At Bayramdere, oxide is defined as material <2% total sulfur.
(5)Sulfide definitions: At Çakmaktepe Extension, sulfide is comprised of standard sulfide material (≥2% total sulfur) and sulfide-with-Cu material (sulfide with Cu>0.10%). There is no sulfide material at Çakmaktepe or Bayramdere.
(6)Mineral Resources are reported at the variable gold cut-off grades based on different metallurgical parameters: oxide cut-off grades are 0.19-0.76 g/t gold, sulfide cut-off uses an NSR value in $/t based on gold price of $1,750/oz, silver price of $22.00/oz, and copper price of $3.95/lb with allowances for payability, deductions, transport, and royalties.
(7)Çöpler oxide recoveries vary between 38.0-78.4% and sulphide recoveries vary between 55-98%.
(8)Average silver recoveries are 16%.
(9)Copper oxide recoveries are 2% and sulphide recoveries are 65%.

Factors contributing to the differences in Mineral Reserves and Resources between EOY 2021 and EOY 2022 include: (i) mining depletion; and (ii) increase in SSR ownership in the Kartaltepe license to 80%. Additional ounces were realized from Çakmaktepe Extension and Cakmaktepe deposit that were part of the Kartaltepe licenses. The Qualified Persons are of the opinion that there are no material changes to the Mineral Resources and Reserves described herein as compared to the information presented the CDMP21TRS.
Exploration
The principal exploration technique at the Çöpler project has been reverse circulation and diamond core drilling, conducted in several campaigns starting in 2000. Initially, exploration was directed at evaluating the economic potential of the near-surface oxide mineralization for the recovery of gold by either heap leaching or conventional milling techniques.
5053


Exploration in Çöpler, after the discovery of several porphyry centers, identifieddelineated the ore body in four adjacent zones (and subsequent open pits) from east to west: Manganese, Pit, Marble, Pit, Main, Pit and West Pit.West.
Since 2000, the Company’s exploration program within the Çöpler district has identified several new gold-dominant and copper–gold prospects. The gold-dominant regional prospects include the Çöpler Saddle and Elmadere. Copper–gold prospects include Aslantepe, Sarıdere, Fındıklıdere and Mavidere porphyries located within the Mavialtın Porphyry Belt and the early exploration stage Meşeburnu porphyry located west of the Çöpler deposit.
Drilling
Drilling at the Çöpler deposit commenced in 2000, and since that time a total of 2,6352,731 holes have been drilled for 373,562389,003 meters. A total of 6896 diamond core holes have been completed in 2021 (18,4922022 (15,441 meters). Step-out drilling at the Çöpler deposit has defined most of the lateral boundaries of the mineralization. There has been additional development drilling as well asand condemnation drilling of areas planned for infrastructure during the last few years.
Drilling at Çakmaktepe commenced in 2012 and has resulted in the definition ofdefined three distinct mineralized zones: East, Central, and North. As production proceeded within the Çakmaktepe Central and East pits, additional targets were generated to provide push-back options around the pit design. A total of 136 diamond core holes have been completed since 2019 to test for continuation of the Çakmaktepe mineralizationdeposit to the north and the east.
Since the initial discovery of mineralization at Çakmaktepe Expansion (Ardich), SSR MiningExtension, Anagold has undertaken several drilling programs to better-definerefine the geological model and to attempt to increase resource inventories. Anagold has completed 531659 diamond core holes for 111,004 meters136,436meters at Çakmaktepe Expansion (Ardich)Extension from late-2017 tothrough December, 31, 2021,2022, including holes for metallurgical testing and hydrogeological studies. During 2022, 128 diamond core holes for 25,432 meters were completed at Çakmaktepe Extension, mainly for resource-reserve definition purposes.
Drilling at Bayramdere commenced in 2007 as part of the near-mine exploration strategy. Since that time 120 holes have been drilled at Bayramdere for a total of 10,734 meters.
Sampling, Analysis and Data Verification
Exploration samples are submitted to ALS Global laboratories, in Izmir, Turkey for sample preparation and analysis which is an ISO/IEC 17025:2005 certified and accredited laboratory.laboratory in Izmir, Türkiye, for sample preparation and analysis. Bureau Veritas (Acme) laboratory in Ankara, Türkiye is used for umpire check sample analysis. Gold is analyzed by fire assay with an AAS finish, and the multi-elementfinish. Multi-element analyses are determined by four acid digestion and ICP-AES and MS finish. For gold assays greater than or equal to 10 g/t, the fire assay process is repeated with a gravimetric finish for coarse gold. The drill and geochemical samples wereare collected in accordance with accepted industry standards. SSR Mining conducts routine QA/QC analysis on all assay results, including the systematic utilization of certified reference materials, blanks, field duplicates, and umpire laboratory check assays.
SSR Mining operates an onsite laboratory at Çöpler primarily for assay of production samples.samples for grade control purposes. The onsite laboratory is certified to ISO 17025:2017 but is not independent. It is primarily used in grade control.
Data verification procedures are well established at Çöpler. Routine ongoing checkingchecks of all data isare undertaken prior to being uploadedincorporation to the database. This is followed by campaign-basedCampaign-based independent data verification audits are conducted at milestone stages throughout data collection programs. For drillhole data, verification includes the checking of Topcon differential global positioning system ("DGPS") collar coordinates relative to topographic surveys, checking of down hole surveys relative to adjacent readings and planned dip and azimuth of the hole, checking logged data entries to ensure they are consistent with log key sheets, cross-checking a subset of assay data with the original laboratory reports, and submission of and review of QA/QC data.
The QA/QC program has historically consisted of a combination of QA/QC sample types that are designed to monitor different aspects of the sample preparation and assaying process. None of the verification programs have identified material issues with the supporting data.
5154


Capital and Operating Costs.Costs
The capital and operating cost estimates derived for Çöpler are based on a combination of the data set forth in the Çöpler District Master Plan 2021 Technical Report SummaryCDMP21TRS and budgetary estimates andthat reflect SSR Mining’s current estimates as of December 31, 2021.2022.
CapitalAs of December 31, 2022, capital costs are estimated to be $474$449.3 million for the life of Çöpler (life of mine or "LOM") and are primarily composed of mine and plant equipment, tailings storage expansions and asset componentization. Estimated operating costs for mine operations include both cash and non-cash costs.
CostCostTotal LOM ($M)5-Year Average per year ($/t)LOM Average per year ($/t)CostTotal LOM ($M)5-Year Average per year ($/t)LOM Average per year ($/t)
MiningMining$766$14.98$10.15Mining$718 $15.86 $9.91 
ProcessProcess2,22527.7929.49Process2,097 25.96 28.93 
Site Support and G&ASite Support and G&A4737.146.27Site Support and G&A360 5.72 4.97 
Operating CostsOperating Costs$3,464 $49.91$45.91Operating Costs$3,175 $47.54 $43.81 
Capital costs and operating costs are provided for mineral property disclosure purposes in accordance with NI 51-102 and are, generally, non-GAAP mining company financial measures. See “Additional Mining Company Financial Information” in this Item 2 for more information.
Costs in individual years may vary significantly as a result of, among other things, current or future nonrecurring expenditures, and changes to input costs and exchange rates. Please refer to the Çöpler District Master Plan 2021 Technical Report SummaryCDMP21TRS for other key metrics including detailed cash flows by year and net present value computations.
Çöpler Copper,Expansion, Initial Assessment Case
The Çöpler CopperExpansion project (C2)(CE) has been developed to leverage off the copper mineralization within and adjacent to existing resource pits. Supporting the 2021 Çöpler Mineral Resource estimate an Initial Assessment has been prepared to analyseanalyze the impact of changes in processing method for the Çöpler Mineral Resource. The current project has two processing methods: a sulfide process plant and a heap leach oxide processing facility.
The sulfide plant includes the crushing, grinding, flotation and pressure oxidation to produce gold and small amounts of silver. The heap leach facility produces gold and small amounts of silver and copper.
The scenario for the Initial Assessment Case analysis includes additional processing units to recover copperadditional gold from the sulfide Mineral Resource. The two processing units are:
A Copper Concentrator producing a copper concentrate for sale and a pyrite concentrate to feed to the sulfide plant
A Sodium Hydrosulfide (NaSH) copper recovery circuit to be installed in the current sulfide plant which will produce a copper concentrate for sale.
The copper concentrator with a capacity of 1.8 Mtpa and would make a copper concentrate for sale to smelters and a pyrite concentrate to be fed into the autoclaves in the sulfide plant. The pyrite concentrate would have a high gold content and also provide sulfur as a source of fuel for the autoclaves.
The Çöpler Mineral Resource has been selected for the Initial Assessment analysis, as the other Mineral Resources at the project do not have significant amounts of copper.
Implementation of the copperadditional recovery options will require capital expenditures and will also provide opportunities for operational cost and productivity improvements. The Çöpler CopperInitial Assessment Case shows the results of a shorter term analysis using the Reserve Case metal prices and the impact of the estimated capital and potential cost savings from economies of scale and reallocation of shared and fixed costs.
5255


For both the Initial Assessment economic analysis, the ArdichÇakmaktepe Extension and Cakmaktepe Mineral Reserve has been included in the cash flow analysis without change from the Reserve Case. This is to allow the analysis to quantify the impact of the copper concentrator and NaSH circuit and demonstrate the potential of the additional Mineral Resources.
A separate analysis of the Initial Assessment Case was prepared using only Measured and Indicated Mineral Resources (MI Case). Comparison of the initial years of the Initial Assessment and the MI Case showed only 1.4% of the material processed in the first nine years of the Initial Assessment is Inferred Mineral Resource. The majority of the Inferred material is processed in years 10 to 20 and does not exceed 50% of the total processing in any one year.
The Initial Assessment Case production is oxide of 41.8 Mt 1.26 g/t Au, 59.7 Mt at 2.45 g/t Au and 24.9 Mt at 0.50g/t Au and 0.2% Cu for a total of 126.4 Mt at 1.67 g/t Au. The gold production in the Initial Assessment Case is 5.4 Moz and 164 Mlb of copper. Copper is produced from all three processing streams. The impact of including the copper concentrator as a processing facility is to expand the Çöpler pit which ceases mining in 2043. Additional production in the Initial Assessment Case comes from feed of 1.8 Mtpa to the copper concentrator and also from additional sulfide and oxide processing feed that is exposed when the pit gets deeper. Total capital including contingency of 25% for the copper concentrator and the copper recovery circuit in the sulfide plant is $218M. The capital costs have an accuracy of +/- 50%.
The Initial Assessment Case shows an after-tax NPV at a 5% discount rate of $2.00 billion and the average AISC is $924/oz gold.
The Initial Assessment has been prepared to demonstrate economic potential of the Mineral Resources at the Çöpler Deposit. The Initial Assessment is preliminary in nature, it includes Inferred Mineral Resources that are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorisedcategorized as Mineral Reserves, and there is no certainty that this economic assessment will be realized.
Marigold Mine, Nevada, United States
Marigold Mine is an open pit mining and processing operation located in Nevada, United States. SSR Mining holds a 100% interest in Marigold through its wholly owned subsidiary, Marigold Mining Company.
The total cost of Marigold’s gross mineral properties, plant and equipment as of December 31, 2022 was $566.0 million.
Property Description and Location
Marigold is located in southeastern Humboldt County, in the northern foothills of the Battle Mountain Range, Nevada, U.S. The mine is situated approximately 5 kilometers south–southwest of the town of Valmy, Nevada. Other nearby municipalities include Winnemucca and Battle Mountain, Nevada, which lie approximately 58 kilometers to the northwest and 24 kilometers to the southeast of the property, respectively. Activities at the property are centered at approximately 40°45′ north latitude and 117°8′ west longitude.
5356


ssrm-20221231_g5.jpg
The surface and mineral rights held by the Company at Marigold are comprised of fee owned real property, unpatented mining claims, and leasehold rights held with respect to unpatented mining claims, mill site claims and certain surface lands. Certain of the leases require the Company to make NSR royalty payments to the lessors and comply with other obligations, including completing work commitments or paying taxes levied on the underlying properties. The NSR royalty payments are based on the specific gold-extraction areas and are payable when the corresponding gold ounces are extracted, produced, and sold. The NSR royalty payments vary between 0% and 10.0% of the value of gold production, net of off‑site refining costs, which equates to an annual average ranging from 3.7% to 10.0% and a weighted average of 7.8% over the life‑of‑mine. Mineral claims in Nevada are managed federally by the U.S. Bureau of Land Management.
The authorized Plan of Operations (“PoO”) area for Marigold currently encompasses approximately 10,703 hectares, with approximately 3,296 hectares within the PoO permitted for mining‑related disturbance. Land and mineral ownership within the PoO are within the corridor initially governed by the Pacific Railroad Act of 1862, and, as such, these areas generally have a “checkerboard” ownership pattern.
New Millennium, enabled by land acquisitions completed in 2016, 2018 and 2019, represents a low cost, high probability development opportunity. The New Millennium target area is comprised of six distinct zones which include East Basalt, Battle Cry, Antler, Section 6, L’il Gun and North Antler. In addition,
57


exploration on the 100% controlled 8,900-hectare land package to the south of Marigold continues at the past producing Buffalo Valley, North Peak, and Trenton Canyon mines.
54


History
The first recorded gold production from the property occurred in 1938 when the Marigold Mining Company developed and operated an underground mine which came to be known as Marigold. Approximately 9,000 tonnes of ore, averaging about 6.85 grams of gold per tonne, was processed before World War II halted production. Several unsuccessful attempts were made to open and operate the mine before exploration activities began again in 1968. The property was further explored and developed by various companies and operations from 1968, with two million ounces of gold recovered from Marigold by mid-2009.
The Company acquired Marigold in April 2014 for total cash consideration of $268 million. In August 2015, Marigold mine acquired 2,844 hectares of adjacent land from Newmont Corporation. This land included previously mined areas known as the Mud pit, NW pit, and the Valmy pits. Marigold has now been in continuous operation for more than 30 years and poured the four millionth ounce in 2020.
Geological Setting, Mineralization, and Deposit Types
Marigold is located in north‑central Nevada within the Basin and Range physiographic province bounded by Sierra Nevada to the west and the Colorado Plateau to the east. The western part of the North American continent has undergone a complex history of extensional and compressional tectonics from the Proterozoic through to the Quaternary. Predominantly Paleozoic rifting and basin subsidence led to the formation of thick (hundreds of meters) passive margin sedimentary sequences and repeated inter plate collisions caused accretion of arc related volcanics and ocean floor rocks, which were pushed together with the basin sediments to form fold and thrust belts. Subsequent extension related to subduction and back arc basin rifting resulted in the development of Basin and Range topography. Crustal thinning caused by the extension allowed the rise of magma close to the surface, which produced extensive and voluminous magmatism from the middle Eocene to late Miocene. Crustal extension with bimodal (mafic and felsic) volcanism occurred in the region from the late Miocene to the present day.
The property is in the Battle Mountain mining district on the northern end of the Battle Mountain-Eureka trend, a conspicuous lineament of sedimentary-hosted gold deposits. The Battle Mountain district hosts numerous mineral occurrences, including porphyry copper–gold, porphyry copper–molybdenum, skarn, placer gold, distal disseminated silver-gold, and Carlin-type gold systems. Gold at Marigold is currently mined from multiple deposits located on a >10-kilometer by 1.5-kilometer area. Depth of the mineralization ranges from the surface to about 250m for the oxide ore. The majority of individual mineralization zones at Marigold have coalesced into the Mackay pit.
The gold deposits at Marigold cumulatively define a north trending alignment of gold mineralized rock more than 8 kilometers long. A silver and base metal mineralizing event at Marigold includes a mineral association of chalcopyrite, argentiferous tennantite, galena, and sphalerite. Gold mineralizing fluids were primarily controlled by fault structure and lithology, with tertiary influence by fold geometry. The deposition of gold was restricted to fault zones and quartzite chert dominant horizons within the Valmy Formation and high permeability units within the Antler sequence. Gold mineralization was also influenced by fold geometry in the Valmy Formation.
Rocks within the Marigold mine area are oxidized to a maximum depth of approximately 450 meters. The redox boundary is not consistent throughout the Property and is substantially influenced by lithology. Shale, argillite, and siltstone units are frequently oxidized adjacent to pervasively oxidized quartzite horizons. Gold occurs natively in fractures in association with iron oxide.
Mining Operations
Marigold uses open pit mining methods at a life‑of‑mine sustained mining rate of approximately 250,000 tonnes per day. The mine conducts conventional drilling and blasting activities with a free face trim row blast to ensure stable wall rock conditions. Mining occurs on 15.2-meter benches. Loading operations are currently performed using one electric shovel and three hydraulic shovels. Waste and ore haulage is performed with a fleet of 300 tonne class haul trucks.
5558


The Marigold geotechnical management plan includes highwall monitoring using three radar systems which provide full coverage for the Mackay pit, the mine’s largest, and which can be deployed in smaller pits, if required. Routine monitoring of waste dumps, leach pads and inactive pits using INSAR data is performed by a third party monthly.
Infrastructure, Permitting and Compliance Activities
The infrastructure facilities at Marigold include ancillary buildings, offices and support buildings, access roads into the plant site, power distribution, source of fresh water and water distribution, fuel supply, storage and distribution, waste management and communications. Equipment maintenance is performed on site for all equipment. There are no contract mining operations on site.
The power supply for Marigold is provided by NV Energy Inc. via a 120 kV transmission line to site. Water for Marigold is supplied from three existing groundwater wells located near the access road to the Property. Marigold owns groundwater rights and collectively allows up to 3.134 million m3 liters of water consumption annually. Water is primarily consumed by retention in the heap leach pad, evaporation, processing operations and dust suppression.
Marigold holds valid permits for all facets of the current mining operation as required by county, state, and federal regulations. The Company performs duties on leased lands pursuant to all federal and state requirements to maintain leases in good standing. The Company engages in concurrent reclamation practices and is bonded for all permitted features, as part of the Nevada permitting process.
Mineral Processing and Metallurgical Testing
Marigold uses an assay method that measures cyanide-soluble gold. This technique generates a value that represents the head grade of the ore in terms of the amount of gold in a finely ground sample that can be dissolved by a strong sodium cyanide solution. The gold content of the final solution is measured using atomic absorption ("AA").
All Marigold blasthole samples are assayed for cyanide-soluble gold. Samples from each ore polygon delineated by ore control are selected for fire assay based on the grade distribution for the polygon tonnage and targeting one sample per every 2,000 short tons of ore. Therefore, some samples have two assay values: an AuCN (cyanide soluble) value; and an AuFA (fire assayed) value. The ratio of AuCN:AuFA provides the theoretical maximum gold recovery that can be achieved.
Testwork has demonstrated that, generally, all ore at Marigold behaves similarly. The ratio of AuCN / AuFA is an important characteristic. A best‑fit linear regression from approximately 155,000 pairs of fire assays (field AUFA in the database) and cyanide soluble assays (field AUAA in the database shows the AuCN / AuFA ratio is 0.8037:1 (~80% cyanide soluble gold), based on the most recent assessment in 2017.
Processing and Recovery Operations
Marigold processing plant and processing facilities combine run-of-mine (“ROM”) heap leaching, carbon adsorption, carbon desorption and electro-winning circuits to produce a final precious metal (doré) product. All processing of ore, which is oxide in nature, is completed via ROM heap leaching. ROM ore is delivered to the leach pad by haulage truck and stacked in 6.1-meter to 12.2-meter lifts. At any given time, approximately 0.5 million square meters of pad area is being leached.
Barren leach solution (cyanide-bearing solution, very low in gold grade) is applied selectively to different areas of the heap leach pad. The barren leach solution is pumped to the leach pad and the pregnant solution (gold-bearing) from the leach pad is then recovered through a carbon in-column system, followed by stripping of metal values from carbon, electrowinning and smelting to yield a doré (containing gold and silver) suitable for sale.
From March 1990 through December 2021, gold recovery from the heap leach pad was 71.1%70.5%. The LOM actual leach pad recovery is 74.2%74.5% (including in‑process gold inventory through December 2021).

5659


SeeResource and Reserve Estimates
The following tables present the mineral reserves and mineral resources information for Marigold. Additionally, see “Proven and Probable Reserve Estimates” and "Resource Estimates"Estimates by Mineral” in this Item 2 for further information on the mineral resources and mineral reserves for Marigold for the years ended December 31, 20212022 and December 31, 2020,2021, and see "Operating Statistics" in this Item 2 for further information on production of the Marigold operations for the years ended December 31, 2021,2022, December 31, 20202021 and December 31, 2019.2020. A discussion of the changes in mineral resources and mineral reserves from 2021 to 2022 is also included below.
Marigold Reserves as of December 31, 2022
ProvenProbableProven and Probable
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Marigold (OP)(1)
— — — 185,703 0.482,842 185,703 0.482,842 75 %
Marigold (leach pad inventory)— — — — — 314— — 31474 %
(1)Marigold Mineral Reserves are reported at a cut-off grade of 0.065 g/t payable gold (gold assay factored for metallurgical recovery, royalty, and net proceeds). No mining dilution is applied to the grade of the Mineral Reserves. Dilution is intrinsic to the Mineral Reserves estimate and is considered sufficient to represent the mining selectivity considered.
Marigold Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferred
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Marigold (OP)(1)(2)
— — — 115,294 0.431,611 115,294 0.431,611 21,680 0.36249
(1)Marigold Mineral Resource estimate is based on an optimised pit shell at a cut off grade of 0.065 g/t payable gold (gold assay factored for recovery, royalty, and net proceeds). Mineral Resources are exclusive of Mineral Reserves.
(2)Marigold metallurgical recoveries varies with gold grade and on average recoveries are 67%.

Differences between the 2021 and 2022 Mineral Reserves for Marigold are due to 2022 mine depletion and leach pad inventory changes.
Differences between the 2021 and 2022 Mineral Resources for Marigold are due to 2022 mine depletion.
The Qualified Persons are of the opinion that there are no material changes to the Mineral Resources and Reserves described herein as compared to the information presented in the Marigold 2021 Technical Report Summary.
Exploration
After the purchase of Marigold was completed in 2014, SSR Mining completed a gravity survey in areas that had not been previously covered, with a main objective to delineate possible fluid conduits or feeder structures for the Marigold mineralization. After finalizing the purchase of the Valmy property in 2015, the Company expanded the geophysical gravity survey to include this new ground.
60


An additional geophysical magnetic survey was conducted at the end of 2022 covering portions of the Trenton Canyon, Buffalo Valley and southern Marigold areas. This survey will be completed in 2023.
Drilling
The Company has conducted drilling and sampling throughout the Marigold property. 200 reverse circulation holes were completed for a total of 55,624 meters drilled in 2022. As of December 31, 2021,2022, a total of 9,3239,424 drillholes for 1,940,4381,960,011 meters of drilling hadhas been completed on the property. SSR Mining also has undertaken a deep drilling program at Marigold that, to date, includes nine diamond drillholes to test for sulfide mineralization at depth. This drilling has been completed across the property to help understand the overall geology of the property and to target higher gold grade sulfide ores beyond the oxidation boundary.property..
Sampling, Analysis and Data Verification
Since 2014, all exploration samples from Marigold and the Valmy property are analysedanalyzed at American Assay Laboratories (“AAL”), an ISO 17025 certified facility in Sparks, Nevada. AAL is independent from SSR Mining. All samples are subjected to first‑pass fire assay (“FA”) determination with an atomic absorption (“AA”) finish and FA with gravimetric finish for over‑limits. This is followed by a gold cyanide solution assay with an AA finish on samples that have FA values greater than or equal to 0.03 grams of gold per tonne.
Following the acquisition of Marigold and the adjacent Valmy property, the Company’s exploration personnel manually checked the entire drillhole database against the original documents for data entry errors. Less than 1% of the drillholes had any issues, and these were subsequently corrected. As an additional check, SSR Mining acquired the chip trays for 687 drillholes, pulps from 57 drillholes, and sample rejects from 66 drillholes, of which 5% were reviewed for lithology and alteration. The original logging was deemed accurate and was used to construct the lithological models.
The collar positions of 43 Valmy drillholes were verified using differentially corrected GPS methods. The results showed a maximum variance of 4 m in the X/Y planes (easting and northing) and < 1 m in the Z dimension (elevation). This error‑shift is less than half the size of a resource model cell and is not material to any resulting estimate. The Valmy data was deemed accurate and precise, and appropriate for resource estimation purposes.
For data collected after April 2014, verification was completed as part of the generation of the mineral resources estimate for Marigold. Three technical issues were identified in the Marigold mineral resources database which have been resolved: (i) drillholes were missing downhole surveys; (ii) some samples were only assayed by cyanide soluble analysis and not by FA; and (iii) assay results for a high percentage of lower grade samples were recorded as 0.0 grams of gold per tonne.
All drill samples collected during 2022 were submitted to American Assay Laboratories for analysis and subject to SSR Mining Quality Assurance, Quality Control (QAQC) procedures.
Capital and Operating Costs.
The capital and operating cost estimates derived for Marigold are based on a combination of the data set forth in the Marigold 2021 Technical Report Summary and budgetary estimates and reflect the Company’s current estimates as of December 31, 2021.2022.
CapitalAs of December 31, 2022, capital costs, exclusive of discretionary exploration, are estimated to be $359$299.0 million for the life of Marigold and are primarily composed of mine and plant equipment and the associated asset componentization. Estimated operating costs for mine operations include both cash and non-cash costs.
5761


Total LOM ($M)5-Year Average per year ($/t)LOM Average per year ($/t)Total LOM ($M)5-Year Average per year ($/t)LOM Average per year ($/t)
MiningMining$1,469 $7.53$7.18Mining$1,319 $7.46$7.22
ProcessingProcessing3731.571.82Processing3411.661.87
Site SupportSite Support2140.921.05Site Support1950.951.07
Operating CostsOperating Costs$2,056 $10.01$10.05Operating Costs$1,855 $10.07$10.16
Capital costs and operating costs are provided for mineral property disclosure purposes in accordance with NI 51-102 and, generally, are non-GAAP mining company financial measures. See “Additional Mining Company Financial Information” in this Item 2 for more information.
Costs in individual years may vary significantly as a result of, among other things, current or future nonrecurring expenditures, and changes to input costs and exchange rates. Please refer to the Marigold 2021 Technical Report Summary for other key metrics including detailed cash flows by year and net present value computations.
Trenton Canyon and Buffalo Valley
The Trenton Canyon project is located approximately 4 km south of New Millennium at Marigold and is one of three historically producing mines on a 100% controlled 8,900-hectare parcel acquired from Newmont Corporation in 2019. The Buffalo Valley project is located approximately 10 km south‑west of New Millennium.
Exploration work on the Trenton Canyon and Buffalo Valley properties consists of drilling, geophysical surveying, remote sensing, geochemical surveying, and mapping.
Gold mineralization at Trenton Canyon is structurally controlled with significantly less disseminationdisseminated mineralization than at Marigold. The net result of this change in mineralization style is higher gold grades in a smaller volume of mineralized rock at Trenton Canyon.
SSR MiningThe Company completed 59 reverse circulation holes for 17,128 meters and 10 core drillholes for a total of 4,086 meters at Trenton Canyon during 2022. In total the Company has completed 13 deep exploration diamond core holes on Trenton Canyon totaling 10,131 meters, and 249a total of 308 reverse circulation drillholes for 73,16590,293 meters and 22 drillholes for 14,073 meters. As of December 2021, one diamond core hole has been completed
The Company initiated the drilling program at Buffalo Valley tovalley in 2022 and completed 36 reverse circulation drillholes for a depthtotal of 59814,426 meters and 7 core drillholes for 3,315 meters.
At North Peak, the Company completed 5 reverse circulation holes for 1,794 meters in 2022.
Seabee Gold Operation, Saskatchewan, Canada
The Seabee Gold Operation (“SGO”) is an underground gold mining and milling operation, located in Saskatchewan, Canada. SSR Mining holds a 100% interest in the property through its wholly‑owned subsidiary, SGO Mining Inc.
The total cost of SGO’s gross mineral properties, plant and equipment as of December 31, 2022 was $544.7 million.
Property Description and Location
SGO is located at the north end of Laonil Lake, approximately 125 kilometers north-east of the town of La Ronge, Saskatchewan, Canada. Activities at the property are centered at approximately 55.7° north latitude and 103.5° west longitude.
62


Ore is currently produced from the Santoy underground mine from a ramp access/surface portal and is hauled 14 kilometers to the mill located at the Seabee site. A second underground mine, also having ramp access, was operated from 1991–2018 at Seabee. All ore is processed at the Seabee mill facility, which is located close to the now-closed Seabee mine and has been in operation since 1991. The Seabee mill facility produces gold doré bars that are shipped to a third-party refinery.
58


ssrm-20221231_g6.jpg
The mine is a remote operation. SGO is accessible by fixed-wing aircraft from the town of LaRonge and during the winter months, typically January through the end of March, a 60 kilometers winter road is also built between the mine site and Brabant Lake, approximately 120 kilometers north of La Ronge.
SGO is comprised of seven mineral leases and 102 mineral claims that cover an area of approximately 62,158 hectares, including the Fisher Property rights. SGO is subject to production and NSR royalties payable to third parties, including certain royalty payments to the Province of Saskatchewan, which are calculated on 10% of net operating profits and are payable once capital and exploration costs are recovered. The other NSR royalty payments are based on specific gold production and/or sales and vary between 1.0% and 3.0% of the value of gold production and/or sales, as applicable.
SGO currently has a valid surface lease with the Province of Saskatchewan, which was amended in March 2010. This surface lease provides land surface rights necessary to carry out the mining, milling and associated operations at the SGO. The existing surface lease is in effect from March 2010 to its expiry date of May 31, 2040.
History
The Laonil Lake region has been intermittently explored since the 1940s, with the first gold discovery made by prospectors in 1947, with detailed drilling and exploration of the property constituting the SGO conducted from 1947 until construction of the Seabee mill was initiated in the summer of 1990. Mill
63


construction was completed in late 1991, and mining commenced in December 1991. Exploration and production expanded into the Santoy segment of the property through the early 2000s.
The Company acquired the SGO on May 31, 2016. SGO has produced over 1.6 million ounces of gold since production began in 1991. Production has steadily increased to achieving 84 koz, 96 koz and 112 koz of gold during 2017, 2018 and 2019, respectively. A drop in gold production was experienced in 2020 due to impacts from the COVID-19 pandemic. In 2021 Seabee mineddelivered 119 koz and processed record tonnes delivering record production of 119 koz.
59


136 koz in 2022.
Geological Setting, Mineralization, and Deposit Types
Northern Saskatchewan forms part of the Churchill Province of the Canadian Shield and has been subdivided into a series of litho-structural crustal units, of which the SGO is located within the Glennie domain of the Proterozoic Trans-Hudson Orogen. The Glennie domain is wedge shaped and characterized by arcuate belts of Lower Proterozoic supracrustal rocks separated by granitoid gneisses and granitoid intrusions. It is bounded on the west by the north–north-east trending Stanley shear zone and bounded on the east by the north–south trending Tabbernor fault zone. To the south, Phanerozoic sedimentary rocks cover the Glennie domain.
Gold mineralization at the Santoy mine occurs in gold-sulfide-chlorite-quartz veins in the shear zones, near or in the granodiorite and granite sills. The gold mineralization throughout the SGO exhibits complex geometrical patterns attributed to a combination of structural and/or lithological controls.
Mining Operations
There is currently one operating mine as part of the SGO, that being the underground Santoy mine, with ore hauled to the surface and then 14 kilometers to the mill located near the old Seabee mine.
Access underground at the Santoy mine is provided from the surface via a main ramp with sublevels spaced between 17–20 meters vertically. Mining is carried out using sublevel open stoping mining methods with backfill, with stopes filled with a combination of rock fill and cemented rock fill, mined in a bottom-up mining sequence. Sill pillars are mined on retreat once the stopes below and above have been mined.
Infrastructure, Permitting and Compliance Activities
The major infrastructure at the SGO site includes roads, an airstrip, powerhouse and electrical distribution system, mill buildings and related services facilities, portal and ventilation raises, fuel storage, explosive storage, water supply and distribution, water management ponds and water treatment plant, tailings management facilities, administrative buildings and camp accommodation.
There are currently two tailings management facilities (“TMF”) that are being used by the mill; the East Lake TMF and the Triangle Lake TMF. Tailings deposition alternates between the two TMFs where winter deposition occurs in the Triangle Lake TMF and summer deposition is in the East Lake TMF. The remaining storage capacities of both facilities, based on the planned production rates, will potentially reach maximum capacity towards the end of 2030. To ensure that water treatment volumes are attained, a water treatment plant was constructed at East Lake TMF.
SGO holds an Approval to Operate Pollutant Control Facilities issued by the Province of Saskatchewan’s Ministry of Environment. This approval, which is a multi-year approval issued in October 2019, is valid until September 2022. Renewal of this approval is triggered through an application submitted to the Ministry of Environment at least 90 days prior to its expiry date. Subject to the terms and conditions of this approval, SSR Mining is authorized to operate all pollutant control facilities associated with the operation’s mine and mill.
Mineral Processing and Metallurgical Testing
SGO was originally developed based on bench-scale metallurgical testwork that characterized the Seabee deposit as a lode gold style of mineralisation that was free milling and that would respond to a standard flow sheet employing gravity recovery and cyanidation.
Historical recovery at the Seabee mill was in the 94%–96% range, with routine low levels of losses both in the tailings solids and solution. Future recovery estimates are 98%, based on the recent mill performance with recoveries of more than 98%. These improvements are attributed to the better condition of the leach equipment as well as the restored leach capacity.

6064


Processing and Recovery Operations
Material has been processed for 30 years in the mill constructed immediately adjacent to the old Seabee mine. The operation was initially developed and operated on diesel power and later connected to the Saskatchewan grid power in 1992. The initial capacity of the mill was 500 tonnes per day, which was later expanded to a nameplate capacity of 1,000 tonnes per day, with the addition of a third grinding mill in 2005. The mill flow sheet is a conventional crushing and grinding circuit employing gravity concentration and cyanide leaching and carbon-in-pulp for recovery and production of doré gold on site.
Capital projects have included the addition of the primary ball mill, addition of a second Knelson concentrator and AcadiaAcacia gravity gold recovery. The current Seabee process plant capacity is nominally 1,320 tonnes per day, or 1,240 tonnes per day annual average. The Seabee operation is characterized by coarse gold making the gravity recovery circuit critical to the overall gold recovery of the process plant. In recent years, with incorporation of gravity circuit improvements including the Acacia circuit, gold recovery has improved and is typically 98%.
SeeResource and Reserve Estimates
The following tables present the mineral reserves and mineral resources information for SGO. Additionally, see “Proven and Probable Reserve Estimates” and "Resource Estimates"Estimates by Mineral” in this Item 2 for further information on the mineral resources and mineral reserves for the SGO for the years ended December 31, 20212022 and December 31, 2020,2021, and see "Operating Statistics" in this Item 2 for further information on production of the SGO operations for the years ended December 31, 2021,2022, December 31, 20202021 and December 31, 2019.2020. A discussion of the changes in mineral resources and mineral reserves from 2021 to 2022 is also included below.
Seabee Reserves as of December 31, 2022
ProvenProbableProven and Probable
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Seabee (UG)(1)(2)
867.71212,243 6.304552,329 6.3547698 %
Seabee Stockpile1610.0051610.00598 %
(1)Seabee Mineral Reserves are reported using $1,600/oz gold and a cut-off grade of 2.52 g/t gold. Processing recoveries vary based on the feed grade. The average recovery is estimated to be 98%.
(2)Seabee Mineral Reserves includes Santoy 8, Santoy 9, and Gap Hangingwall ("GHW") lodes.
Seabee Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferred
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Seabee (UG)(1)
8411.973278111.4428786511.493192,754 6.05536
(1)Seabee Mineral Resources are reported using $1,750/oz gold and a cut-off grade of 2.07 g/t gold. Mineral Resources are exclusive of Mineral Reserves.

Differences between the 2021 and 2022 Mineral Resources and Reserves are due to depletion at the Santoy mine.
The Qualified Persons are of the opinion that there are no material changes to the Mineral Resources and Reserves described herein as compared to the information presented in the Seabee 2021 Technical Report Summary.
65


Exploration
Historically, several rock and soil sampling programs have been executed on the SGO property. Over 1,200 surface rock samples and nearly 7,000 soil samples were collected between 1985 and 1988, with a further nearly 2,000 surface rock samples and over 7,000 soil samples collected between 1990 and 2013. Early samples were largely collected around the Laonil Lake, Porky Lake and Pine Lake areas, but the focus of exploration later shifted to the Santoy area.
Upon its acquisition of the SGO, SSR Mining performed a review of all exploration activities conducted on the property by previous operators. In addition to the data review, the Company executed an exploration program that included detailed mapping of the Herb West and Santoy Lake areas, as well as the collection of accompanying soil samples to be submitted for gold assay. Limited anomalous occurrences were identified from grab and soil sample results, and no new showings or gold in soil trends were recognized. The Company plans to map additional regions to the north and east within the Herb Lake area as additional shear zones are targeted. The Company has also planned further exploration in prospective areas east and west of the Santoy Lake area.
The objective of ongoing exploration conducted by SSR is to delineate, increase, and upgrade Mineral Resources. Underground drilling since 2016 focused on the Santoy 8 and 9 veins and the Gap Hangingwall and Santoy Hangingwall veins. Since 2016, surface drilling has tested a number of early-stage targets near the SGO infrastructure, notably the past producing Porky West deposit and Shane targets. In total, exploration at the SGO has comprised of surficial geochemical sampling, airborne and ground geophysical surveys and extensive drilling.
At the SGO, the three-year budget calls for an average of 80 km of combined surface and underground drilling per year between 20222023 and 2024. This drilling is for testing of targets to maximize Mineral Resource potential at the mine as SSR develops its long-term strategy for continuing to replenish its 3–5 year reserve inventory in the same way it has for more than 20 years, with particular focus on bringing higher grade zones on stream to displace lower tenor inventory that currently occurs in the schedule from 2024 onwards.
Drilling
In 2022, a total exploration at the SGO has comprised of surficial geochemical sampling, airborne96 drillholes totaling 41,257 meters and ground geophysical surveys and extensive drilling.307 drillholes totaling 37,711 meters from underground were drilled. To date, drilling completed on the SGO property (by SSR and previous operators) includes 2,3242,475 surface drillholes totaling 496,197549,037 meters and 6,1396,436 underground drillholes totaling 1,161,1841,200,029 meters.

61


Sampling, Analysis and Data Verification
All drill samples in respect of the Seabee Gold Operation underground drilling program and some samples from the surface program were assayed by our onsite non-accredited assay laboratory, which is not independent from SSR Mining.the Company. Surface drilling samples not analyzed by our onsite assay laboratory were analyzed at Saskatchewan Research Council (“SRC”) formerly TSL Laboratories Inc. (“TSL”) in Saskatoon, Saskatchewan, which also serves as the QAQC laboratory for our onsite lab. Duplicate check assays were conducted at site as well as at TSL,SRC, which is independent from SSR Mining.the Company. Mean results of the spot checks were consistent with those reported. Sampling interval was established by minimum or maximum sampling lengths and geological and/or structural criteria.
SGO site lab typically prepares two hundred-gram samples that were pulverized until greater than 80 percent passed through a 200-mesh screen. Thirty-gram pulp samples were then analyzed for gold by fire assay with gravimetric finish (0.01 g/t gold detection limit). TSLSRC prepares a minus-200 mesh pulp (95% passing) weighing 250 grams from a minus 10 mesh coarse crush reject. Fire assay with Atomic Absorption finish was completed on a 30-gram aliquot to produce gold analytical results with a 0.003 g/t gold detection limit. Fire assay with gravimetric finish was prepared on those samples with greater than 3 g/t gold.
All regional exploration’s drill and surface samples are analyzed at TSL Laboratories Inc.SRC in Saskatoon, Saskatchewan. Duplicate check assays are conducted at TSL and the Saskatchewan Research Council,SRC, which are independent from SSR Mining. Mean results of the spot checks were consistent with those reported. Sampling interval was established by minimum or maximum sampling lengths and geological or structural criteria.
66


Capital and Operating Costs.
Capital costs are estimated to be $162$116.7 million and are primarily composed of mine and plant equipment and the associated asset componentization.componentization as of December 31, 2022. Estimated operating costs for mine operations include both cash and non-cash costs.
Cost ComponentCost ComponentUS$/t milledCost Component
Total
(US$M)
LOM Average ($/t Milled)
MiningMining$46Mining$103 $45.61 
Surface HaulageSurface Haulage6Surface Haulage13 5.65 
Milling (& Fixed Plant)Milling (& Fixed Plant)35Milling (& Fixed Plant)80 35.26 
General & AdminGeneral & Admin68General & Admin153 67.51 
Total Operating ExpenseTotal Operating Expense$155Total Operating Expense$349 $154.03 
Capital costs and operating costs are provided for mineral property disclosure purposes in accordance with NI 51-102 and are mining company financial measures. See “Additional Mining Company Financial Information” in this Item 2 for more information.
Costs in individual years may vary significantly as a result of, among other things, current or future nonrecurring expenditures, and changes to input costs and exchange rates. Please refer to the Seabee 2021 Technical Report Summary for other key metrics including detailed cash flows by year and net present value computations.
Fisher PropertyExploration and Development
SSR Mining announcedAmisk, Canada Exploration
The Amisk property is 39,880 hectares (and 126 claims) with extensive Proterozoic-volcano-sedimentary rock assemblages that are prospective for gold-silver epithermal, gold-rich volcanogenic massive sulfide and orogenic gold deposits. The Amisk property is located in Saskatchewan, Canada.
In the proposed acquisitionAmisk property the West Channel and Black Diamond trends occur along regional-scale ductile shear zones that range from 5 to 50 meters in orthogonal width. Intermediate volcanic and volcaniclastic rocks core much of Taiga Gold Corp.these trends with lesser meta-volcanic, meta-sedimentary and gabbro packages occurring in December 2021. Upon closing, expectedproximity to the high-strain corridors. Alteration assemblages of sericite, iron-carbonate and silicification dominate the regional shear zones. Localized chlorite and diaspore occurrences are diagnostic and associated with auriferous quartz veins at the Monarch target area. Arsenopyrite is the most common sulfide mineral associated with this vein-hosted gold mineralization. Pyrite, chalcopyrite and pyrrhotite are also present, but generally to a lesser degree. Based on visual observations, Sulfide content related to gold mineralization can range from 1%-15%, with most zones hosting 3-5% total sulfide. Coarse visible gold is relatively uncommon on the property and is presently identified at the Raine-Walker, TCA and Black Diamond targets to-date.
In 2022, 13 diamond drillholes totaling 2,526 meters were completed at targets along the West Channel shear zone. A small field program was completed in the first halfsummer that included geological mapping and rock and soil sampling.
San Luis, Peru Exploration
The San Luis project is a wholly owned high-grade gold-silver project located in the Ancash Department of 2022, SSR Mining will own 100%central Peru. The project is held by the Company’s wholly owned subsidiary, Reliant Ventures S.A.C.
In September 2012, Peru’s Ministry of Mines and Energy approved the EIA for the mining operation of the Fisher project. The Fisher property is contiguous toAyelén deposit. Based on the SGO leases southeastpreliminary and early works the Company conducted in respect of the Santoy mine.project in 2017, the EIA now has no expiry date.
Gold mineralization onThe San Luis project includes several vein systems across an area of land whose surface rights are held by two local communities: Ecash and Cochabamba.
While community relations efforts with both the Fisher property is foundCochabamba and the Ecash Communities continues, exploration activities included geological mapping and prospecting. Fieldwork resulted in four major areas,the discovery of six new gold and silver-bearing quartz veins within 16 kilometers1.5 km of the Santoy mine. Mineralization observed onAyelen vein system. Additional work is planned for 2023 to define the Fisher property to date is similar to thatextent and continuity of Santoy, where disseminated to coarse gold-bearing sheeted quartz veins occur along major ductile shear zones. Like the SGO, the Fisher property is hosted within the Pine Lake greenstone belt, which is dominated by supracrustal rocks, including mafic volcanics, sediments, mafic intrusions and a range of felsic intrusions, of which some are directly associated with gold-bearing quartz veins. The southern extension of the Santoy shear zone onto the Fisher property is an underexplored goldmineralization.
6243


target that occurs across a 10-kilometer-wide stratigraphic package and is considered as part of future exploration on the property.ssrm-20221231_g1.jpg
Puna Operations, Jujuy Province, Argentina
The Puna property (“Puna”) comprises the Chinchillas property and the Pirquitas property, both of which are located the Jujuy Province in far north Argentina. Puna is 100% owned by SSR Mining through its subsidiary Puna Operations Inc.
Property Description and Location
The Chinchillas property is located in the Puna region of northwestern Argentina, in the province of Jujuy, department of Rinconada, approximately 290 kilometers northwest of San Salvador de Jujuy, the capital of Jujuy Province. The property is centered at elevations ranging from 4,000–4,200 meters above sea level. The Pirquitas Property is also located in the Rinconada Department in the Province of Jujuy, approximately 45 kilometers southwest of the Chinchillas Property and approximately 335 kilometers northwest of San Salvador de Jujuy. Activities at the Property are centered at elevations of between 4,000–4,450 meters above sea level.
ssrm-20211231_g7.jpg
The Chinchillas property is composed of three contiguous claims, totaling 2,043 hectares, and the Pirquitas operation includes surface rights covering an area of approximately 7,500 hectares, which is used for purposes such as housing, infrastructure facilities, processing facilities, proposed tailings facility and other facilities to support mining operations for Puna. Ore from the Chinchillas mine is transported to the Pirquitas plant for processing. The Chinchillas mine is located approximately 45 kilometers from the Pirquitas plant.
6344


Concentrates producedÇöpler Gold Mine, Erzincan Province, Türkiye
Çöpler consists of a number of mining licenses covering mineral resources on the Çöpler, Çakmaktepe, Çakmaktepe Extension, and Bayramdere deposits, mineral reserves on the Çöpler, Çakmaktepe Extension and Çakmaktepe deposits, oxide and sulfide processing facilities, and supporting infrastructure. The Çöpler deposit, including the mineral resources and mineral reserves, is wholly owned by Anagold Madencilik Sanayi ve Ticaret Anonim Şirketi (“Anagold”). SSR Mining controls 80% of the shares of Anagold through a joint venture, Lidya Madencilik Sanayi ve Ticaret A.Ş. (“Lidya”) controls 18.5%, and a bank wholly‑owned by Çalık Holdings A.Ş. holds the remaining 1.5%. Çakmaktepe is wholly owned by Kartaltepe Madencilik Sanayi ve Ticaret Anonim Şirketi (“Kartaltepe”). Kartaltepe is 80% owned by SSR Mining and 20% owned by Lidya after the completion of a 2022 acquisition of an additional 30% ownership interest in the Kartaltepe from partner Lidya, increasing SSR Mining’s ownership interest from 50% to 80%. The Çakmaktepe Extension deposit spans both Kartaltepe and Anagold ground. The Kartaltepe license includes Çakmaktepe Extension, Çakmaktepe, Bayramdere and the Mavialtin Porphyry Belt. SSR Mining is the Operator of both Anagold and Kartaltepe. All of the processing facilities and operating assets are located on land owned by Anagold. In total 80% of the exclusive Mineral Resources and 80% of the Mineral Reserves at PunaÇöpler project are owned by SSR Mining.
The total cost of Çöpler’s gross mineral properties, plant and equipment as of December 31, 2022 was $3,161.8 million.    
Property Description and Location
Çöpler is located in east central Türkiye, 120 kilometers west of the city of Erzincan, in Erzincan Province, 550 kilometers east of Türkiye’s capital city, Ankara. The nearest urban center, İliç, is located approximately 6 kilometers northeast of the Çöpler mine. Çöpler uses the European 1950 ("E1950") datum coordinate system, which is a Turkish Government requirement. The Çöpler deposit is in UTM6 zone 37N of the E1950 coordinate system. Çöpler's project centroid is situated at approximately 459,975 mE and 4,364,420 mN and has an approximate elevation of 1,160 m above mean sea level ("mamsl").
Çöpler mine is accessed from the main paved highway between Erzincan and Kemaliye and is serviced by both road and rail networks.. Mining operations are conducted year-round.
The Çöpler mining operations fall within the license areas numbered 847, 49729, and 20067313, which have been granted by the General Directorate of Mining and Petroleum Affairs within Turkiye. The Çakmaktepe satellite mining operation is located 6 km east of the current Çöpler pit. Çakmaktepe pits are located within Kartaltepe License 1054. Ore mined at Çakmaktepe is hauled and treated at the Anagold Çöpler facilities.
45


ssrm-20221231_g2.jpg
46


ssrm-20221231_g3.jpg

Anagold holds the exclusive right to engage in mining activities within the Çöpler project area. Anagold holds six granted licenses covering a combined area of approximately 16,600 hectares. Kartaltepe holds eight licenses covering approximately 9,200 hectares. The total near-mine tenement package is approximately 25,800 hectares.
47


Kartaltepe sells Anagold ore from Çakmaktepe at an agreed rate. SSR Mining holds a 2% net smelter return (“NSR”) on the Kartaltepe licenses, receivable after repayment of a historical royalty pre-payment.
Under Turkish Mining Law, the royalty rate for precious metals is variable and tied to metal prices. The Çöpler project is subject to a maximum 3% ‘mouth of mine value’mineral production royalty that is based on a sliding scale to gold price and is payable to the Province of Jujuy. ThisTurkish government. In September 2020 a presidential decree was issued, increasing the prescribed royalty paymentrates by 25%. Royalty rates are reduced by 40% for ore processed in country, as an incentive to process ore locally. As the Çöpler project produces its gold doré on-site, the Çöpler project is based oneligible for a 40% reduction to the net recoverable value of the contained metals less certain operating costs.royalty rate.
History
Chinchillas was first prospectedThe Çöpler region has been subject to gold and mined in small scalesilver mining dating back to Roman times. The Turkish Geological Survey carried out regional exploration work in the eighteenth century by Jesuit missionaries. An initial mining concessionearly-1960s that was grantedpredominately confined to geological mapping.
In 1998, Anatolia Minerals Development Ltd (“Anatolia”) identified several porphyry-style gold–copper prospects in 1956, with small scale production beginning after 1968 through 1982. Explorationeast central Türkiye and sampling were conducted on and off at Chinchillas between 1982 andapplied for exploration licenses for these prospects, including in the mid-2010s. Between the 1930s and 1995, the area of the Pirquitas mine had multiple small mining operations to recover silver and tin from placer and vein deposits, with comprehensive mineral exploration conducted on the property between 1995 and 2000. The Pirquitas mine was formally inaugurated in AprilÇöpler basin. In August 2009, and commercial production started in December of that year until open pit ore mining was completed in mid‑January 2017. The Pirquitas processing plant has been in continuous operation since 2009.
The Company entered into a joint venture agreement between Anatolia and Lidya was executed.
In February 2011, Anatolia merged with Avoca Resources Limited, an Australian company, to become Alacer Gold Corp., which further merged with SSR Mining in October 2015 comprising the Chinchillas property, the Pirquitas pit and the Pirquitas operations. The agreement included an 18‑month pre-development period to advance Chinchillas, including the infill drilling, engineering and environmental studies, and permitting, with an option for the Company to assume full ownership, which the Company exercised on March 31, 2017.September 2020.
Geological Setting, Mineralization, and Deposit Types
Çöpler is located near the northern margin of a complex collision zone that lies between the Pontide Belt / North Anatolian Fault, the Arabian Plate, and the East Anatolian Fault, which bounds several major plates. The Chinchillasgold, silver, and Pirquitas properties are considered partcopper mineralization of economic interest at Çöpler occurs in a porphyry-related epithermal environment, with most of the Bolivian tin‑silver–zinc belt that extendsgold mineralization concentrated in three zones: Main Zone, Manganese Zone, and Marble Zone, with mineralization present in five different forms:
Stockwork and veins with disseminated marcasite, pyrite, and arsenopyrite
Clay-altered brecciated and carbonatized diorite with rhodochrosite veinlets, and disseminated marcasite, pyrite, realgar, orpiment, sphalerite, and galena
Massive marcasite and pyrite replacement bodies
Massive jarositic gossan
Massive manganese oxide
Oxidation of this mineralization has resulted in the formation of gossans, massive manganese oxide, and goethitic / jarositic assemblages hosting fine-grained free gold. The oxidized cap is underlain by primary and secondary sulfide mineralization.
The Manganese Zone (pit) is about 650 m wide in the north-south direction and about 650 m in the east-west direction. The surface was predominantly covered with marble. A major component of the mineralization is associated with the contact between the diorite and the marble. Disseminated mineralization also occurs outside the contact zones. Mineralization ranges from the San Rafael tin‑copper deposit in southern Peru into the Puna region of Jujuy and are locatedsurface to 400m deep.
The Marble Zone (pit) is in the Puna geological belt. Deposits with similar environments and styles of mineralization include San Cristóbal, Potosí, and Pulacayo. These deposits are generally characterized by intrusion of dacite dome complexes with mineralization hosted in shears and breccias within the dacite domes and / or within shears and breccias within the host rocks. More rarely, as in the casesoutheastern portion of the Chinchillas Propertysystem and San Cristóbal,associated with a northeast striking fault contact between marble on the deposits also contain disseminated flat lying manto bodies within sedimentaryeast and pyroclastic rocks that are cut byhornfels (metasediments) and intrusives on the ‘feeder’ shears. Allwest. The width is almost 350 m and the deposits are knownstrike length is about 300 m east-north-east. Depth of the mineralization ranges from the surface to have large vertical extents.about 160 m.
Significant silver-lead-zincThe Main Zone (pit) drilling identified a mineralization occurs in four main areas atextending about 750 m north-south and 1,000 m east west. Oxide zone is confined to near surface to depths of about 40 m. Main Pit is the Chinchillas Property deposit: the Silver Mantos and Mantos Basement zoneslargest area of exposure in the west partand south of the Project,Çöpler mine and exposes dominantly diorite-granodiorite porphyry in
48


the Socavon del Diablosouthern wall in contact with Hornfels Block. High grade gold is controlled by both faults and Socavon Basementcontacts. Supergene enrichment enhanced along syn- and post-mineral structures plays an important role in localizing high-grade gold mineralization at lithological contacts, late-stage faults and shear zones, and fault/contact intersections.
The West Pit exposes a high-grade gossan/fanglomerates at the basal contact of Munzur Limestone with hornfels. The contact is locally well preserved and shows a ~10 m thick zone of broken rock cataclastites at the base of limestone on a wide zone of highly sheared hornfelds with folded foliations. Some Gossans would be supergene of polymetallic replacement deposits. Gossans are confined to limestone and hornfels and enriched/formed as a result of karstic process in the east part.area.
Mining Operations
Open pit mining at Çöpler is carried out by a mining contractor and managed by Anagold. The Chinchillas depositmining method is mined as a conventional open pit method with drill and blast, utilizing excavators and trucks operating on bench heights of 5 meters. The mining contractor provides operators, line supervisors, equipment, and ancillary facilities required for the mining operation. MostAnagold provides management, technical, mine planning, engineering, and grade control functions for the operation.
The facility infrastructure supports the mine, oxide heap leach and sulfide plant processing facilities. The current leach pad consists of four phases designed to accommodate approximately 61 million tonnes of oxide ore heap with a nominal maximum heap height of 100 meters above the pad liner, with additional phases in development.
The tailings storage facility is developed and constructed in stages with ongoing work to ensure sufficient long-term capacity for storage of tailings. Studies by Anagold have determined that the effect of the in-pit haulage for both ore and waste is carried out using 100 tonne haul trucks. Ore is mined in five-meter benches and stockpiled in a staging area closeaddition of the flotation plant to the pit. Insulfide plant circuit will result in an increase in the staging area, ore is loaded onto 35 tonne road trucks to be transported tosolids content and improvement in the crusher at the Pirquitas operation. Throughout the mining operation, low grade ore is stockpiled near the pit rim to be processed at the end of mine life. Waste rock will be mined and hauled to two major on-site rock storage facilitiesfinal settled density based on their geochemical characteristics.
an increase in the rate of tailings consolidation. The nearest community to Chinchillasflotation plant is the village of Santo Domingo, and nearest to Pirquitas is the village of Nuevo Pirquitas. Basic amenities are supplied from Susques and Abra Pampa, while supplies for mining are obtained through the provincial capital of San Salvador de Jujuy, which has an airport with daily commercial air service to Buenos Aires.in operation.
Infrastructure, Permitting and Compliance Activities
Infrastructure at Chinchillas is limited. Electricity onsite at Chinchillas is supplied along existingThe power lines from the generators at Pirquitas. Water supply for human consumption comes from bottled water, and water for mining operations is drawn from wells.

64


Pirquitas has been a permitted commercialthe Çöpler mine and processing facility, operated by SSR Mining since December 2009, with existing infrastructure that includesfacilities is provided via a processing plant, a permitted tailings facility, a fully serviced workers camp sufficient for approximately 670 personnel, a communications system including cellular and intranet access, fully serviced office buildings, and wastewater treatment154 kV transmission line to site. Existing mine site facilities organic waste landfill and a recycling center. Electricity is produced from natural gas at the Pirquitas site. Water supply is from a site known as San Marcos, which isare located primarily within the property a short distance downstream from where the Pirquitas River drains into the Collahuaima River. Domestic water is pumped from a diversionÇöpler and Sabırlı Creek watersheds immediately upstream of their confluence with the open pit for use atKarasu River.
Operation of the camp.
Government permits required to conduct exploration, drillingÇöpler mining and processing facilities, and mining at PunaÇakmaktepe, have been obtained.investigated and authorized by means of a series of Environmental Impact Assessments ("EIAs").
The currently permitted EIA boundary incorporates 1,747 hectares. The currently permitted Çakmaktepe EIA boundary incorporates 360 hectares, and the Company is in the process of submitting an EIA to increase the permitted boundary to 553 hectares.
Mineral Processing and Metallurgical Testing
Oxide Testwork
The heap leaching facilities were commissioned at the Çöpler mine site in late-2010 and have operated continuously since that time. Oxide heap leach operations were ongoing at the CDMP21TRS effective date.
Metallurgical testwork on Çakmaktepe oxide material for heap leaching has been undertaken at the on-site metallurgical testinglaboratory, initially under the supervision of ChinchillasKappes, Cassiday & Associates. The initial testwork in 2015 undertook bottle roll and column leach tests. The results are comparable with the Çöpler oxide ore, typeswith similar behavior and leach kinetics. Subsequently, Çakmaktepe oxide ore has been heap leached along with Çöpler oxide ore. Oxide column testwork on oxide ore continues at the on-site laboratory.
Metallurgical testwork on Çakmaktepe Extension oxide material for heap leaching has been undertaken at McClelland laboratories and supervised by Metallurgium. An initial testwork program, including bottle roll and column leach, was carried out in 2019. This initial program identified two distinct domains
49


with respect to gold recovery based on sulfur content: <1% and 1%–2%. The column testwork results indicated that the listwanite, dolomite, and jasperoid lithologies have physical properties amenable to heap leaching. This initial test program was followed up with further testwork in 2020.
Analysis of the results of the metallurgical testwork and a review of the existing recovery models for use in economic analysis were undertaken in 2020. This was done for the oxide and sulfide processing, including the flotation circuit. The resulting recoveries have been used in the economic analysis for the CDMP21TRS.
Oxide gold recoveries vary by lithology for Çöpler in the range 62.3%–78.4%, at Çakmaktepe the range is 61%–80%. At Çakmaktepe Extension, the testwork suggest recoveries will vary in the range 40%–73%. The average oxide recovery in the Reserve Case is 61%.
Sulfide Testwork
The sulfide process plant commenced commissioning in 2013the fourth quarter of 2018. The plant consists principally of a pressure oxidation (POX) leach followed by a cyanide leach to recover gold.
Significant testwork had been conducted on sulfide ores prior to commissioning of the sulfide plant, with pilot plant testwork campaigns and continued until 2016. a significant number of batch variability tests on POX / cyanide leach completed.
Whilst a POX / cyanide leach circuit was implemented, significant work had also been undertaken on flotation of the gold-bearing sulfides as a process route, although ultimately this option was not selected for development. Flotation of a partial stream of the plant feed was considered to maximize the available capacity of the plant, including the POX autoclave and available oxygen supply. Further flotation testwork demonstrated that the addition of a small flotation plant into the existing sulfide process route would allow optimization and maximization of already installed capacities.
The first testwork was focusedindicates that sulfur recovery through flotation is estimated to be 75% to concentrate with a corresponding 55% gold recovery. Flotation tails gold recovery is estimated at 43%. A side stream flotation plant capable of treating 50 to 150 tonnes per hour commenced commissioning on silverDecember 24, 2021.
The current determination of POX gold recovery is based on assessment of results for the pilot testwork programs undertaken prior to commencement of operations and benchmarked with the existing operating data. An equation has been derived to calculate gold recovery by both leachingmaterial type for all ore that is subject to POX; this includes direct POX feed and flotation methods with flotation proving to be superior at this early stage.concentrate. The second program continued process development of flotation into separate lead/silver and zinc concentrates. The third testwork campaign was designed to advance the flotation process and test specifically these ore types to the Pirquitas mill flow sheet.
The Pirquitas process plant operating performance since commencement on Chinchillas oresReserve Case average sulfide gold recovery is used to provide the concentrate grade recovery and mass pull relationships.91%.
Processing and Recovery Operations
The PirquitasCompany currently operates a sulfide process plant and an oxide heap leach facility.
The oxide heap leaching facilities were commissioned at the Çöpler mine site in the second half of 2010 with initial gold production achieved in the fourth quarter of 2010. The process was originally designed to treat approximately 6.0 million tonnes per annum of ore by three-stage crushing (primary, secondary, and tertiary) to 80% passing 12.5 millimeters, agglomeration, and heap leaching on lined heap leach pads with dilute alkaline sodium cyanide solution. Gold is recovered through a carbon in-column system, followed by stripping of metal values from carbon, electrowinning and smelting to yield a doré (containing gold and silver) suitable for sale. Control of copper in leach solutions is undertaken in a sulfidization, acidification, recovery, and thickening ("SART") plant, which also regenerates cyanide.
The sulfide plant commenced commissioning in the fourth quarter of 2018. The basic flow of processing through the sulfide plant consistsis as follows:
50


ssrm-20221231_g4.jpg
The incorporation of crushinga flotation circuit into the existing sulfide plant to upgrade sulfide sulfur to fully utilize grinding and froth flotationpressure oxidation (“POX”) autoclave capacity was constructed and commenced ore production at the end of December 2021. This addition to produce 2 products,the sulfide plant is incorporated between grinding and acidulation by taking a silver/lead and a zinc concentrate. These 2 product concentrates are bagged separately in one tonne bags and transported to Buenos Aires by truck for export to smelters. The Pirquitas process plant has continued to improve performancebleed / slip stream from the expected 4,000grinding thickener feed, floating sulfides, and returning the sulfide concentrate to the grinding thickener to be combined with direct autoclave feed. Gold in the flotation tails (not recovered to the flotation concentrate) is combined with the material that was processed through the POX autoclave circuit, this combined stream then goes to the gold leaching and recovery circuits to recover gold.
Since completing ramp-up of the sulfide plant in June 2020, POX throughput has progressively improved to exceed design up to a monthly average peak of 330 tonnes per day feed capacity to 4,500hour and at the maximum sulfide sulfur of 13.7 tonnes per day achieved in 2021.hour. The gold recovery has remained at around 91% with the tailings grade ranging between about 0.25–0.30 grams of gold per tonne.
SeeResource and Reserve Estimates
The following tables summarize the Company's estimated gold reserves and resources reflecting only the reserves and resources attributable to SSR Mining's ownership or economic interest as of December 31, 2022. Additionally, see “Proven and Probable Reserve Estimates” and "Resource Estimates"Estimates by Mineral” in this Item 2 for further information on the mineral resources and mineral reserves for Puna for the years ended December 31, 2021 and December 31, 2020,Çöpler, and see "Operating Statistics" in this Item 2 for further information on production of the PunaÇöpler operations for the years ended December 31, 2021, December 31, 20202022 and December 31, 2019.
Exploration
At Chinchillas, surface exploration programs included detailed mapping with a special emphasis on structures, rock chip sampling, trenching, soil sampling and talus sampling. These programs identified the major structural zones, the strong east–west control on basin formation, and new mineralized target areas. Work has included geophysical surveys IP ("Induced Polarization")/Resistivity, Controlled-Source Audio-Magnetotelluric Technique ("CSAMT"), Magnetics). Five drilling programs constituting approximately 50,000 meters of drilling were conducted at the Chinchillas property.
At Pirquitas, comprehensive mineral exploration was conducted on the property, including geological mapping, geophysical surveying (44 line-kilometers of ground magnetics and 19.2 line- kilometers of induced polarization surveying), underground rock sampling and multiple programs of RC and diamond drilling.
The Granada target area is at the intersection2021. A discussion of the Potosi veinchanges in mineral resources and Cortaderas vein-breccia in San Miguel Pit. The Potosí Veinmineral reserves from 2021 to 2022 is a west-northwest oriented steeply dipping vein. The Cortaderas Vein gives outcrops at the south slope of the Cortaderas Valley around 500 m north of the San Miguel Open Pit and oriented east-west with a dip direction around 60° to the southwest. Colquechaca and Blanca Veins are located slightly north of Potosi, strike both northwest and southeast and variably dip steeply to the north and south.

also included below.
6551


In 2019–2020,
Çöpler Reserves as of December 31, 2022
ProvenProbableProven and Probable
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)(1)(2)(3)(4)
7,166 2.56590 40,524 2.032,648 47,690 2.113,238 84 %
Çöpler Stockpile— — — 10,605 2.18745 10,605 2.18745 91 %
TonnesGradeSilverTonnesGradeSilverTonnesGradeSilverMetallurgical
Silver(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)7,166 4.11947 40,524 4.485,834 47,690 4.426,781 %
TonnesGradeCopperTonnesGradeCopperTonnesGradeCopperMetallurgical
Copper(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)Recovery
Çöpler (OP)(5)(6)
7,166 — 0.240,524 0.016.747,690 0.016.9%
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine, Cakmaktepe and Çakmaktepe Extension.
(2)Mineral Reserves shown are SSR ownership share only. SSR Owns 80% rights in both the objectiveAnagold and Kartaltepe licenses. Cakmaktepe, Bayramdere and part of Çakmaktepe Extension fall within Kartaltepe license.
(3)Mineral Reserve cut-offs are based on $1,350/oz gold price. The average oxide recoveries are 61% and average sulfide recoveries are 91%. The weighted average gold recovery is 84%. All cut-off values include allowance for royalty payable. There are no credits for silver or copper in the cut-off calculations. Oxide cutoff grades vary between 0.44-0.80g/t gold and sulphide cutoff grades vary between 1.05-1.11g/t gold.
(4)There are no sulfide Mineral Reserves at Çakmaktepe and Bayramdere.
(5)There is no copper recovery in sulphide material.
(6)Copper oxide recoveries are 2%.
52


Çöpler Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferred
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP)(1)(2)(3)(4)(5)(6)(7)
2,598 1.94162 68,368 1.042,284 70,966 1.072,446 82,394 1.173,097 
TonnesGradeSilverTonnesGradeSilverTonnesGradeSilverTonnesGradeSilver
Silver(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP)(8)
2,598 4.32361 68,368 3.377,402 70,966 3.407,763 82,394 9.5725,339 
TonnesGradeCopperTonnesGradeCopperTonnesGradeCopperTonnesGradeCopper
Copper(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)
Çöpler (OP)(9)
2,598 0.031.568,368 0.15222.870,966 0.14224.382,394 0.13228.4
(1)Çöpler Mineral Resources include resources from Çöpler Mine, Cakmaktepe, Çakmaktepe Extension and Bayramdere. Mineral Resources are exclusive of Mineral Reserves.
(2)Mineral Resources shown are SSR ownership share only. SSR Owns 80% rights in both the Anagold and Kartaltepe licenses.
(3)All Mineral Resources for Çöpler were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual pit shells ($1,400/oz gold and $19.00/oz silver for Bayramdere).
(4)Oxide definitions: At Çöpler: oxide is defined as material <2% total sulfur and sulfide material is ≥2% total sulfur. At Çakmaktepe Extension and Çakmaktepe, oxide is comprised of low-sulfur (LS) oxide (<1% total sulfur) and high-sulfur oxide (≥1% and <2% total sulfur). At Bayramdere, oxide is defined as material <2% total sulfur.
(5)Sulfide definitions: At Çakmaktepe Extension, sulfide is comprised of standard sulfide material (≥2% total sulfur) and sulfide-with-Cu material (sulfide with Cu>0.10%). There is no sulfide material at Çakmaktepe or Bayramdere.
(6)Mineral Resources are reported at the variable gold cut-off grades based on different metallurgical parameters: oxide cut-off grades are 0.19-0.76 g/t gold, sulfide cut-off uses an NSR value in $/t based on gold price of $1,750/oz, silver price of $22.00/oz, and copper price of $3.95/lb with allowances for payability, deductions, transport, and royalties.
(7)Çöpler oxide recoveries vary between 38.0-78.4% and sulphide recoveries vary between 55-98%.
(8)Average silver recoveries are 16%.
(9)Copper oxide recoveries are 2% and sulphide recoveries are 65%.

Factors contributing to the differences in Mineral Reserves and Resources between EOY 2021 and EOY 2022 include: (i) mining depletion; and (ii) increase in SSR ownership in the Kartaltepe license to 80%. Additional ounces were realized from Çakmaktepe Extension and Cakmaktepe deposit that were part of the deep Granada drill program wasKartaltepe licenses. The Qualified Persons are of the opinion that there are no material changes to test the theorized intersection betweenMineral Resources and Reserves described herein as compared to the south west dipping Cortaderas vein breccia andinformation presented the steeply north-dipping Potosi vein, located at depth beneath the San Miguel pit. Three HQ drill holes were completed between October 6, 2019 and January 31, 2020 and the total length drilled was 3,430 m. Results from the Granada drilling program intersected the two different mineral compositions that correspond with historically described veins. Mineralization is commonly filling open spaces as fracturing, brecciation, and faulting, usually as massive or semi-massive veins or veinlets, they have widths ranging commonly from 5–30 cm, and range up to 3.5 m. CDMP21TRS.
Exploration
The Granada target was not encounteredprincipal exploration technique at the anticipated depth but the program did identify significant intersections of gold values below the elevation of previous mining within the San Miguel open pit (~4,000 m). The gold values are commonly associated with elevated concentrations of Ag, As, Bi, Cu, and Sn.
Drilling
An early drilling program (before SSR, 2008), was effectively conducted in two phases, with the transition being marked by a change in analytical laboratories from American Assay Laboratories ("AAL") to the SGS Chile laboratory partway through its drilling program. RC drillholes AR 001-AR 092Çöpler project has been reverse circulation and diamond core drillholes DDH 001-DDH 042 were analyzeddrilling, conducted in several campaigns starting in 2000. Initially, exploration was directed at evaluating the economic potential of the near-surface oxide mineralization for the recovery of gold by AAL, RC drillholes AR 093-AR 164either heap leaching or conventional milling techniques.
53


Exploration in Çöpler, after the discovery of several porphyry centers, delineated the ore body in four adjacent zones from east to west: Manganese, Marble, Main, and West.
Since 2000, the Company’s exploration program within the Çöpler district has identified several new gold-dominant and copper–gold prospects. The gold-dominant regional prospects include the Çöpler Saddle and Elmadere. Copper–gold prospects include Aslantepe, Sarıdere, Fındıklıdere and Mavidere porphyries located within the Mavialtın Porphyry Belt and the early exploration stage Meşeburnu porphyry located west of the Çöpler deposit.
Drilling
Drilling at the Çöpler deposit commenced in 2000, and since that time a total of 2,731 holes have been drilled for 389,003 meters. A total of 96 diamond core drillholes DDH 043-DDH 069 were analyzed by SGS Chile. Both analytical labs took possessionholes have been completed in 2022 (15,441 meters). Step-out drilling at the Çöpler deposit has defined most of the sampleslateral boundaries of the mineralization. There has been additional development drilling and condemnation drilling of areas planned for infrastructure during the last few years.
Drilling at PirquitasÇakmaktepe commenced in 2012 and has defined three distinct mineralized zones: East, Central, and North. As production proceeded within the Çakmaktepe Central and East pits, additional targets were in custodygenerated to provide push-back options around the pit design. A total of them throughout136 diamond core holes have been completed since 2019 to test for continuation of the sample preparation and analysis steps (including sample transportation from siteÇakmaktepe deposit to the respective analytical laboratory). AAL set up sample preparation facilities on-sitenorth and the east.
Since the initial discovery of mineralization at Pirquitas whilst SGS Chile transportedÇakmaktepe Extension, Anagold has undertaken several drilling programs to refine the samples to their analytical laboratorygeological model and increase resource inventories. Anagold has completed 659 diamond core holes for 136,436meters at Çakmaktepe Extension from late-2017 through December, 2022, including holes for metallurgical testing and hydrogeological studies. During 2022, 128 diamond core holes for 25,432 meters were completed at Çakmaktepe Extension, mainly for resource-reserve definition purposes.
Drilling at Bayramdere commenced in Salta, Argentina. Each laboratory implemented QC programs2007 as part of the near-mine exploration strategy. Since that were reviewed and monitored by Sunshine Argentina and an independent consultant.
Alex Stewart is the primary laboratory and ALS in Peru ("ALS") is used as the secondary laboratory for check samples. All samples are testedtime 120 holes have been drilled at Bayramdere for a suitetotal of 39 elements including silver, lead and zinc by a four-acid digestion method and analysis by Inductively Coupled Plasma atomic emission spectroscopy ("ICP") (method ICP-MA-39). Silver greater than 200 parts per million (ppm) is assayed by fire assay using a 50 g sample with gravimetric finish (method Ag4A-50). Lead and zinc greater than 10,000 ppm are re-assayed by an oxidizing acid digestion for ore grade material and reading by ICP (method ICP-ORE).
ALS is used as secondary laboratory by method ME-ICP61 based on a four-acid digestion and reading by ICP. Samples greater than one percent lead or zinc are re-tested using ore grade method Pb-OG62 and Zn-OG62. Samples greater than 100 ppm silver are re-assayed by fire assay with gravimetric finish (method Ag-GRA22).10,734 meters.
Sampling, Analysis and Data Verification
No materialExploration samples are submitted to ALS Global laboratories, an ISO/IEC 17025:2005 certified and accredited laboratory in Izmir, Türkiye, for sample bias was identifiedpreparation and analysis. Bureau Veritas (Acme) laboratory in Ankara, Türkiye is used for umpire check sample analysis. Gold is analyzed by fire assay with an AAS finish. Multi-element analyses are determined by four acid digestion and ICP-AES and MS finish. For gold assays greater than or equal to 10 g/t, the qualified persons duringfire assay process is repeated with a gravimetric finish for coarse gold. The drill and geochemical samples are collected in accordance with accepted industry standards. SSR Mining conducts routine QA/QC analysis on all assay results, including the systematic utilization of certified reference materials, blanks, field duplicates, and umpire laboratory check assays.
SSR Mining operates an onsite laboratory at Çöpler primarily for assay of production samples for grade control purposes. The onsite laboratory is certified to ISO 17025:2017 but is not independent.
Routine checks of all data are undertaken prior to incorporation to the database. Campaign-based independent data verification audits are conducted at milestone stages throughout data collection programs. For drillhole data, verification includes checking Topcon differential global positioning system ("DGPS") collar coordinates relative to topographic surveys, down hole surveys relative to adjacent readings and planned dip and azimuth of the hole, logged data entries to ensure they are consistent with log key sheets, cross-checking a subset of assay data with the original laboratory reports, and submission and review of the drill data and assays. ObservationQA/QC data.
The QA/QC program has historically consisted of a combination of QA/QC sample types that are designed to monitor different aspects of the drill core during the site visitssample preparation and inspection and validationassaying process. None of the data collected convincedverification programs have identified material issues with the qualified persons that the drill data are adequate for the estimation of measured, indicated and inferred mineral resources.supporting data.
54


Capital and Operating Costs.Costs
TotalThe capital expenditure, exclusiveand operating cost estimates derived for Çöpler are based on a combination of discretionary exploration, isthe data set forth in the CDMP21TRS and budgetary estimates that reflect SSR Mining’s estimates as of December 31, 2022.
As of December 31, 2022, capital costs are estimated to be $47$449.3 million which isfor the life of Çöpler (life of mine or "LOM") and are primarily composed of mine and plant equipment, tailings storage facility expansions and asset componentization. Estimated operating costs for mine operations include both cash and non-cash costs.
DescriptionTotal ($M)LOM Average ($/t milled)
Mining Costs$110$15.01
Processing Costs18324.95
G&A Costs9312.71
Total$387$52.67
CostTotal LOM ($M)5-Year Average per year ($/t)LOM Average per year ($/t)
Mining$718 $15.86 $9.91 
Process2,097 25.96 28.93 
Site Support and G&A360 5.72 4.97 
Operating Costs$3,175 $47.54 $43.81 
Capital costs and operating costs are provided for mineral property disclosure purposes in accordance with NI 51-102 and are, generally, non-GAAP mining company financial measures. See “Additional Mining Company Financial Information” in this Item 2 for more information.
Costs in individual years may vary significantly as a result of, among other things, current or future nonrecurring expenditures, and changes to input costs and exchange rates. Please refer to the CDMP21TRS for other key metrics including detailed cash flows by year and net present value computations.
Çöpler Expansion, Initial Assessment Case
The Çöpler Expansion project (CE) has been developed to leverage off the copper mineralization within and adjacent to existing resource pits. Supporting the 2021 Çöpler Mineral Resource estimate an Initial Assessment has been prepared to analyze the impact of changes in processing method for the Çöpler Mineral Resource. The current project has two processing methods: a sulfide process plant and a heap leach oxide processing facility.
The sulfide plant includes the crushing, grinding, flotation and pressure oxidation to produce gold and small amounts of silver. The heap leach facility produces gold and small amounts of silver and copper.
The scenario for the Initial Assessment Case analysis includes additional processing units to recover additional gold from the sulfide Mineral Resource. The two processing units are:
A Concentrator producing a concentrate for sale and a pyrite concentrate to feed to the sulfide plant
A Sodium Hydrosulfide (NaSH) copper recovery circuit to be installed in the current sulfide plant which will produce a copper concentrate for sale.
The concentrator with a capacity of 1.8 Mtpa and would make concentrate for sale to smelters and a pyrite concentrate to be fed into the autoclaves in the sulfide plant. The pyrite concentrate would have a high gold content and provide sulfur as a source of fuel for the autoclaves.
The Çöpler Mineral Resource has been selected for the Initial Assessment analysis, as the other Mineral Resources at the project do not have significant amounts of copper.
Implementation of the additional recovery options will require capital expenditures and will also provide opportunities for operational cost and productivity improvements. The Çöpler Initial Assessment Case shows the results of a shorter term analysis using the Reserve Case metal prices and the impact of the estimated capital and potential cost savings from economies of scale and reallocation of shared and fixed costs.
55


For both the Initial Assessment economic analysis, the Çakmaktepe Extension and Cakmaktepe Mineral Reserve has been included in the cash flow analysis without change from the Reserve Case. This is to allow the analysis to quantify the impact of the concentrator and NaSH circuit and demonstrate the potential of the additional Mineral Resources.
A separate analysis of the Initial Assessment Case was prepared using only Measured and Indicated Mineral Resources (MI Case). Comparison of the initial years of the Initial Assessment and the MI Case showed only 1.4% of the material processed in the first nine years of the Initial Assessment is Inferred Mineral Resource. The majority of the Inferred material is processed in years 10 to 20 and does not exceed 50% of the total processing in any one year.
The Initial Assessment has been prepared to demonstrate economic potential of the Mineral Resources at the Çöpler Deposit. The Initial Assessment is preliminary in nature, it includes Inferred Mineral Resources that are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that this economic assessment will be realized.
Marigold Mine, Nevada, United States
Marigold Mine is an open pit mining and processing operation located in Nevada, United States. SSR Mining holds a 100% interest in Marigold through its wholly owned subsidiary, Marigold Mining Company.
The total cost of Marigold’s gross mineral properties, plant and equipment as of December 31, 2022 was $566.0 million.
Property Description and Location
Marigold is located in southeastern Humboldt County, in the northern foothills of the Battle Mountain Range, Nevada, U.S. The mine is situated approximately 5 kilometers south–southwest of the town of Valmy, Nevada. Other nearby municipalities include Winnemucca and Battle Mountain, Nevada, which lie approximately 58 kilometers to the northwest and 24 kilometers to the southeast of the property, respectively. Activities at the property are centered at approximately 40°45′ north latitude and 117°8′ west longitude.
56


ssrm-20221231_g5.jpg
The surface and mineral rights held by the Company at Marigold are comprised of fee owned real property, unpatented mining claims, and leasehold rights held with respect to unpatented mining claims, mill site claims and certain surface lands. Certain of the leases require the Company to make NSR royalty payments to the lessors and comply with other obligations, including completing work commitments or paying taxes levied on the underlying properties. The NSR royalty payments are based on the specific gold-extraction areas and are payable when the corresponding gold ounces are extracted, produced, and sold. The NSR royalty payments vary between 0% and 10.0% of the value of gold production, net of off‑site refining costs, which equates to an annual average ranging from 3.7% to 10.0% and a weighted average of 7.8% over the life‑of‑mine. Mineral claims in Nevada are managed federally by the U.S. Bureau of Land Management.
The authorized Plan of Operations (“PoO”) area for Marigold currently encompasses approximately 10,703 hectares, with approximately 3,296 hectares within the PoO permitted for mining‑related disturbance. Land and mineral ownership within the PoO are within the corridor initially governed by the Pacific Railroad Act of 1862, and, as such, these areas generally have a “checkerboard” ownership pattern.
New Millennium, enabled by land acquisitions completed in 2016, 2018 and 2019, represents a low cost, high probability development opportunity. The New Millennium target area is comprised of six distinct zones which include East Basalt, Battle Cry, Antler, Section 6, L’il Gun and North Antler. In addition,
57


exploration on the 100% controlled 8,900-hectare land package to the south of Marigold continues at the past producing Buffalo Valley, North Peak, and Trenton Canyon mines.
History
The first recorded gold production from the property occurred in 1938 when the Marigold Mining Company developed and operated an underground mine which came to be known as Marigold. Approximately 9,000 tonnes of ore, averaging about 6.85 grams of gold per tonne, was processed before World War II halted production. Several unsuccessful attempts were made to open and operate the mine before exploration activities began again in 1968. The property was further explored and developed by various companies and operations from 1968, with two million ounces of gold recovered from Marigold by mid-2009.
The Company acquired Marigold in April 2014 for total cash consideration of $268 million. In August 2015, Marigold mine acquired 2,844 hectares of adjacent land from Newmont Corporation. This land included previously mined areas known as the Mud pit, NW pit, and the Valmy pits. Marigold has now been in continuous operation for more than 30 years and poured the four millionth ounce in 2020.
Geological Setting, Mineralization, and Deposit Types
Marigold is located in north‑central Nevada within the Basin and Range physiographic province bounded by Sierra Nevada to the west and the Colorado Plateau to the east. The western part of the North American continent has undergone a complex history of extensional and compressional tectonics from the Proterozoic through to the Quaternary. Predominantly Paleozoic rifting and basin subsidence led to the formation of thick (hundreds of meters) passive margin sedimentary sequences and repeated inter plate collisions caused accretion of arc related volcanics and ocean floor rocks, which were pushed together with the basin sediments to form fold and thrust belts. Subsequent extension related to subduction and back arc basin rifting resulted in the development of Basin and Range topography. Crustal thinning caused by the extension allowed the rise of magma close to the surface, which produced extensive and voluminous magmatism from the middle Eocene to late Miocene. Crustal extension with bimodal (mafic and felsic) volcanism occurred in the region from the late Miocene to the present day.
The property is in the Battle Mountain mining district on the northern end of the Battle Mountain-Eureka trend, a conspicuous lineament of sedimentary-hosted gold deposits. The Battle Mountain district hosts numerous mineral occurrences, including porphyry copper–gold, porphyry copper–molybdenum, skarn, placer gold, distal disseminated silver-gold, and Carlin-type gold systems. Gold at Marigold is currently mined from multiple deposits located on a >10-kilometer by 1.5-kilometer area. Depth of the mineralization ranges from the surface to about 250m for the oxide ore. The majority of individual mineralization zones at Marigold have coalesced into the Mackay pit.
The gold deposits at Marigold cumulatively define a north trending alignment of gold mineralized rock more than 8 kilometers long. A silver and base metal mineralizing event at Marigold includes a mineral association of chalcopyrite, argentiferous tennantite, galena, and sphalerite. Gold mineralizing fluids were primarily controlled by fault structure and lithology, with tertiary influence by fold geometry. The deposition of gold was restricted to fault zones and quartzite chert dominant horizons within the Valmy Formation and high permeability units within the Antler sequence. Gold mineralization was also influenced by fold geometry in the Valmy Formation.
Rocks within the Marigold mine area are oxidized to a maximum depth of approximately 450 meters. The redox boundary is not consistent throughout the Property and is substantially influenced by lithology. Shale, argillite, and siltstone units are frequently oxidized adjacent to pervasively oxidized quartzite horizons. Gold occurs natively in fractures in association with iron oxide.
Mining Operations
Marigold uses open pit mining methods at a life‑of‑mine sustained mining rate of approximately 250,000 tonnes per day. The mine conducts conventional drilling and blasting activities with a free face trim row blast to ensure stable wall rock conditions. Mining occurs on 15.2-meter benches. Loading operations are currently performed using one electric shovel and three hydraulic shovels. Waste and ore haulage is performed with a fleet of 300 tonne class haul trucks.
58


The Marigold geotechnical management plan includes highwall monitoring using three radar systems which provide full coverage for the Mackay pit, the mine’s largest, and which can be deployed in smaller pits, if required. Routine monitoring of waste dumps, leach pads and inactive pits using INSAR data is performed by a third party monthly.
Infrastructure, Permitting and Compliance Activities
The infrastructure facilities at Marigold include ancillary buildings, offices and support buildings, access roads into the plant site, power distribution, source of fresh water and water distribution, fuel supply, storage and distribution, waste management and communications. Equipment maintenance is performed on site for all equipment. There are no contract mining operations on site.
The power supply for Marigold is provided by NV Energy Inc. via a 120 kV transmission line to site. Water for Marigold is supplied from three existing groundwater wells located near the access road to the Property. Marigold owns groundwater rights and collectively allows up to 3.134 million m3 liters of water consumption annually. Water is primarily consumed by retention in the heap leach pad, evaporation, processing operations and dust suppression.
Marigold holds valid permits for all facets of the current mining operation as required by county, state, and federal regulations. The Company performs duties on leased lands pursuant to all federal and state requirements to maintain leases in good standing. The Company engages in concurrent reclamation practices and is bonded for all permitted features, as part of the Nevada permitting process.
Mineral Processing and Metallurgical Testing
Marigold uses an assay method that measures cyanide-soluble gold. This technique generates a value that represents the head grade of the ore in terms of the amount of gold in a finely ground sample that can be dissolved by a strong sodium cyanide solution. The gold content of the final solution is measured using atomic absorption ("AA").
All Marigold blasthole samples are assayed for cyanide-soluble gold. Samples from each ore polygon delineated by ore control are selected for fire assay based on the grade distribution for the polygon tonnage and targeting one sample per every 2,000 short tons of ore. Therefore, some samples have two assay values: an AuCN (cyanide soluble) value; and an AuFA (fire assayed) value. The ratio of AuCN:AuFA provides the theoretical maximum gold recovery that can be achieved.
Testwork has demonstrated that, generally, all ore at Marigold behaves similarly. The ratio of AuCN / AuFA is an important characteristic. A best‑fit linear regression from approximately 155,000 pairs of fire assays (field AUFA in the database) and cyanide soluble assays (field AUAA in the database shows the AuCN / AuFA ratio is 0.8037:1 (~80% cyanide soluble gold), based on the most recent assessment in 2017.
Processing and Recovery Operations
Marigold processing plant and processing facilities combine run-of-mine (“ROM”) heap leaching, carbon adsorption, carbon desorption and electro-winning circuits to produce a final precious metal (doré) product. All processing of ore, which is oxide in nature, is completed via ROM heap leaching. ROM ore is delivered to the leach pad by haulage truck and stacked in 6.1-meter to 12.2-meter lifts. At any given time, approximately 0.5 million square meters of pad area is being leached.
Barren leach solution (cyanide-bearing solution, very low in gold grade) is applied selectively to different areas of the heap leach pad. The barren leach solution is pumped to the leach pad and the pregnant solution (gold-bearing) from the leach pad is then recovered through a carbon in-column system, followed by stripping of metal values from carbon, electrowinning and smelting to yield a doré (containing gold and silver) suitable for sale.
From March 1990 through December 2021, gold recovery from the heap leach pad was 70.5%. The LOM actual leach pad recovery is 74.5% (including in‑process gold inventory through December 2021).
59


Resource and Reserve Estimates
The following tables present the mineral reserves and mineral resources information for Marigold. Additionally, see “Proven and Probable Reserve Estimates by Mineral” in this Item 2 for further information on the mineral resources and mineral reserves for Marigold for the years ended December 31, 2022 and December 31, 2021, and see "Operating Statistics" in this Item 2 for further information on production of the Marigold operations for the years ended December 31, 2022, December 31, 2021 and December 31, 2020. A discussion of the changes in mineral resources and mineral reserves from 2021 to 2022 is also included below.
Marigold Reserves as of December 31, 2022
ProvenProbableProven and Probable
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Marigold (OP)(1)
— — — 185,703 0.482,842 185,703 0.482,842 75 %
Marigold (leach pad inventory)— — — — — 314— — 31474 %
(1)Marigold Mineral Reserves are reported at a cut-off grade of 0.065 g/t payable gold (gold assay factored for metallurgical recovery, royalty, and net proceeds). No mining dilution is applied to the grade of the Mineral Reserves. Dilution is intrinsic to the Mineral Reserves estimate and is considered sufficient to represent the mining selectivity considered.
Marigold Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferred
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Marigold (OP)(1)(2)
— — — 115,294 0.431,611 115,294 0.431,611 21,680 0.36249
(1)Marigold Mineral Resource estimate is based on an optimised pit shell at a cut off grade of 0.065 g/t payable gold (gold assay factored for recovery, royalty, and net proceeds). Mineral Resources are exclusive of Mineral Reserves.
(2)Marigold metallurgical recoveries varies with gold grade and on average recoveries are 67%.

Differences between the 2021 and 2022 Mineral Reserves for Marigold are due to 2022 mine depletion and leach pad inventory changes.
Differences between the 2021 and 2022 Mineral Resources for Marigold are due to 2022 mine depletion.
The Qualified Persons are of the opinion that there are no material changes to the Mineral Resources and Reserves described herein as compared to the information presented in the Marigold 2021 Technical Report Summary.
Exploration
After the purchase of Marigold was completed in 2014, SSR Mining completed a gravity survey in areas that had not been previously covered, with a main objective to delineate possible fluid conduits or feeder structures for the Marigold mineralization. After finalizing the purchase of the Valmy property in 2015, the Company expanded the geophysical gravity survey to include this new ground.
60


An additional geophysical magnetic survey was conducted at the end of 2022 covering portions of the Trenton Canyon, Buffalo Valley and southern Marigold areas. This survey will be completed in 2023.
Drilling
The Company has conducted drilling and sampling throughout the Marigold property. 200 reverse circulation holes were completed for a total of 55,624 meters drilled in 2022. As of December 31, 2022, a total of 9,424 drillholes for 1,960,011 meters of drilling has been completed on the property..
Sampling, Analysis and Data Verification
Since 2014, all exploration samples from Marigold and the Valmy property are analyzed at American Assay Laboratories (“AAL”), an ISO 17025 certified facility in Sparks, Nevada. AAL is independent from SSR Mining. All samples are subjected to first‑pass fire assay (“FA”) determination with an atomic absorption (“AA”) finish and FA with gravimetric finish for over‑limits. This is followed by a gold cyanide solution assay with an AA finish on samples that have FA values greater than or equal to 0.03 grams of gold per tonne.
Following the acquisition of Marigold and the adjacent Valmy property, the Company’s exploration personnel manually checked the entire drillhole database against the original documents for data entry errors. Less than 1% of the drillholes had any issues, and these were subsequently corrected. As an additional check, SSR Mining acquired the chip trays for 687 drillholes, pulps from 57 drillholes, and sample rejects from 66 drillholes, of which 5% were reviewed for lithology and alteration. The original logging was deemed accurate and was used to construct the lithological models.
The collar positions of 43 Valmy drillholes were verified using differentially corrected GPS methods. The results showed a maximum variance of 4 m in the X/Y planes (easting and northing) and < 1 m in the Z dimension (elevation). This error‑shift is less than half the size of a resource model cell and is not material to any resulting estimate. The Valmy data was deemed accurate and precise, and appropriate for resource estimation purposes.
For data collected after April 2014, verification was completed as part of the generation of the mineral resources estimate for Marigold. Three technical issues were identified in the Marigold mineral resources database which have been resolved: (i) drillholes were missing downhole surveys; (ii) some samples were only assayed by cyanide soluble analysis and not by FA; and (iii) assay results for a high percentage of lower grade samples were recorded as 0.0 grams of gold per tonne.
All drill samples collected during 2022 were submitted to American Assay Laboratories for analysis and subject to SSR Mining Quality Assurance, Quality Control (QAQC) procedures.
Capital and Operating Costs.
The capital and operating cost estimates derived for Marigold are based on a combination of the data set forth in the Marigold 2021 Technical Report Summary and budgetary estimates and reflect the Company’s current estimates as of December 31, 2022.
As of December 31, 2022, capital costs, exclusive of discretionary exploration, are estimated to be $299.0 million for the life of Marigold and are primarily composed of mine and plant equipment and the associated asset componentization. Estimated operating costs for mine operations include both cash and non-cash costs.
61


Total LOM ($M)5-Year Average per year ($/t)LOM Average per year ($/t)
Mining$1,319 $7.46$7.22
Processing3411.661.87
Site Support1950.951.07
Operating Costs$1,855 $10.07$10.16
Capital costs and operating costs are provided for mineral property disclosure purposes in accordance with NI 51-102 and, generally, are non-GAAP mining company financial measures. See “Additional Mining Company Financial Information” in this Item 2 for more information.
Costs in individual years may vary significantly as a result of, among other things, current or future nonrecurring expenditures, and changes to input costs and exchange rates. Please refer to the Marigold 2021 Technical Report Summary for other key metrics including detailed cash flows by year and net present value computations.
Trenton Canyon and Buffalo Valley
The Trenton Canyon project is located approximately 4 km south of New Millennium at Marigold and is one of three historically producing mines on a 100% controlled 8,900-hectare parcel acquired from Newmont Corporation in 2019. The Buffalo Valley project is located approximately 10 km south‑west of New Millennium.
Exploration work on the Trenton Canyon and Buffalo Valley properties consists of drilling, geophysical surveying, remote sensing, geochemical surveying, and mapping.
Gold mineralization at Trenton Canyon is structurally controlled with significantly less disseminated mineralization than at Marigold. The net result of this change in mineralization style is higher gold grades in a smaller volume of mineralized rock at Trenton Canyon.
The Company completed 59 reverse circulation holes for 17,128 meters and 10 core drillholes for a total of 4,086 meters at Trenton Canyon during 2022. In total the Company has completed a total of 308 reverse circulation drillholes for 90,293 meters and 22 drillholes for 14,073 meters.
The Company initiated the drilling program at Buffalo valley in 2022 and completed 36 reverse circulation drillholes for a total of 14,426 meters and 7 core drillholes for 3,315 meters.
At North Peak, the Company completed 5 reverse circulation holes for 1,794 meters in 2022.
Seabee Gold Operation, Saskatchewan, Canada
The Seabee Gold Operation (“SGO”) is an underground gold mining and milling operation, located in Saskatchewan, Canada. SSR Mining holds a 100% interest in the property through its wholly‑owned subsidiary, SGO Mining Inc.
The total cost of SGO’s gross mineral properties, plant and equipment as of December 31, 2022 was $544.7 million.
Property Description and Location
SGO is located at the north end of Laonil Lake, approximately 125 kilometers north-east of the town of La Ronge, Saskatchewan, Canada. Activities at the property are centered at approximately 55.7° north latitude and 103.5° west longitude.
62


Ore is currently produced from the Santoy underground mine from a ramp access/surface portal and is hauled 14 kilometers to the mill located at the Seabee site. A second underground mine, also having ramp access, was operated from 1991–2018 at Seabee. All ore is processed at the Seabee mill facility, which is located close to the now-closed Seabee mine and has been in operation since 1991. The Seabee mill facility produces gold doré bars that are shipped to a third-party refinery.
ssrm-20221231_g6.jpg
The mine is a remote operation. SGO is accessible by fixed-wing aircraft from the town of LaRonge and during the winter months, typically January through the end of March, a 60 kilometers winter road is also built between the mine site and Brabant Lake, approximately 120 kilometers north of La Ronge.
SGO is comprised of seven mineral leases and 102 mineral claims that cover an area of approximately 62,158 hectares, including the Fisher Property rights. SGO is subject to production and NSR royalties payable to third parties, including certain royalty payments to the Province of Saskatchewan, which are calculated on 10% of net operating profits and are payable once capital and exploration costs are recovered. The other NSR royalty payments are based on specific gold production and/or sales and vary between 1.0% and 3.0% of the value of gold production and/or sales, as applicable.
SGO currently has a valid surface lease with the Province of Saskatchewan, which was amended in March 2010. This surface lease provides land surface rights necessary to carry out the mining, milling and associated operations at the SGO. The existing surface lease is in effect from March 2010 to its expiry date of May 31, 2040.
History
The Laonil Lake region has been intermittently explored since the 1940s, with the first gold discovery made by prospectors in 1947, with detailed drilling and exploration of the property constituting the SGO conducted from 1947 until construction of the Seabee mill was initiated in the summer of 1990. Mill
63


construction was completed in late 1991, and mining commenced in December 1991. Exploration and production expanded into the Santoy segment of the property through the early 2000s.
The Company acquired the SGO on May 31, 2016. SGO has produced over 1.6 million ounces of gold since production began in 1991. In 2021 Seabee delivered 119 koz and 136 koz in 2022.
Geological Setting, Mineralization, and Deposit Types
Northern Saskatchewan forms part of the Churchill Province of the Canadian Shield and has been subdivided into a series of litho-structural crustal units, of which the SGO is located within the Glennie domain of the Proterozoic Trans-Hudson Orogen. The Glennie domain is wedge shaped and characterized by arcuate belts of Lower Proterozoic supracrustal rocks separated by granitoid gneisses and granitoid intrusions. It is bounded on the west by the north–north-east trending Stanley shear zone and bounded on the east by the north–south trending Tabbernor fault zone. To the south, Phanerozoic sedimentary rocks cover the Glennie domain.
Gold mineralization at the Santoy mine occurs in gold-sulfide-chlorite-quartz veins in the shear zones, near or in the granodiorite and granite sills. The gold mineralization throughout the SGO exhibits complex geometrical patterns attributed to a combination of structural and/or lithological controls.
Mining Operations
There is currently one operating mine as part of the SGO, the underground Santoy mine, with ore hauled to the surface and then 14 kilometers to the mill located near the old Seabee mine.
Access underground at the Santoy mine is provided from the surface via a main ramp with sublevels spaced between 17–20 meters vertically. Mining is carried out using sublevel open stoping mining methods with backfill, with stopes filled with a combination of rock fill and cemented rock fill, mined in a bottom-up mining sequence. Sill pillars are mined on retreat once the stopes below and above have been mined.
Infrastructure, Permitting and Compliance Activities
The major infrastructure at the SGO site includes roads, an airstrip, powerhouse and electrical distribution system, mill buildings and related services facilities, portal and ventilation raises, fuel storage, explosive storage, water supply and distribution, water management ponds and water treatment plant, tailings management facilities, administrative buildings and camp accommodation.
There are currently two tailings management facilities (“TMF”) that are being used by the mill; the East Lake TMF and the Triangle Lake TMF. Tailings deposition alternates between the two TMFs where winter deposition occurs in the Triangle Lake TMF and summer deposition is in the East Lake TMF. The remaining storage capacities of both facilities, based on the planned production rates, will potentially reach maximum capacity towards the end of 2030. To ensure that water treatment volumes are attained, a water treatment plant was constructed at East Lake TMF.
Mineral Processing and Metallurgical Testing
SGO was originally developed based on bench-scale metallurgical testwork that characterized the Seabee deposit as a lode gold style of mineralisation that was free milling and that would respond to a standard flow sheet employing gravity recovery and cyanidation.
Historical recovery at the Seabee mill was in the 94%–96% range, with routine low levels of losses both in the tailings solids and solution. Future recovery estimates are 98%, based on the recent mill performance with recoveries of more than 98%. These improvements are attributed to the better condition of the leach equipment as well as the restored leach capacity.

64


Processing and Recovery Operations
Material has been processed for 30 years in the mill constructed immediately adjacent to the old Seabee mine. The operation was initially developed and operated on diesel power and later connected to the Saskatchewan grid power in 1992. The initial capacity of the mill was 500 tonnes per day, which was later expanded to a nameplate capacity of 1,000 tonnes per day, with the addition of a third grinding mill in 2005. The mill flow sheet is a conventional crushing and grinding circuit employing gravity concentration and cyanide leaching and carbon-in-pulp for recovery and production of doré gold on site.
Capital projects have included the addition of the primary ball mill, addition of a second Knelson concentrator and Acacia gravity gold recovery. The current Seabee process plant capacity is nominally 1,320 tonnes per day, or 1,240 tonnes per day annual average. The Seabee operation is characterized by coarse gold making the gravity recovery circuit critical to the overall gold recovery of the process plant. In recent years, with incorporation of gravity circuit improvements including the Acacia circuit, gold recovery has improved and is typically 98%.
Resource and Reserve Estimates
The following tables present the mineral reserves and mineral resources information for SGO. Additionally, see “Proven and Probable Reserve Estimates by Mineral” in this Item 2 for further information on the mineral resources and mineral reserves for the SGO for the years ended December 31, 2022 and December 31, 2021, and see "Operating Statistics" in this Item 2 for further information on production of the SGO operations for the years ended December 31, 2022, December 31, 2021 and December 31, 2020. A discussion of the changes in mineral resources and mineral reserves from 2021 to 2022 is also included below.
Seabee Reserves as of December 31, 2022
ProvenProbableProven and Probable
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Seabee (UG)(1)(2)
867.71212,243 6.304552,329 6.3547698 %
Seabee Stockpile1610.0051610.00598 %
(1)Seabee Mineral Reserves are reported using $1,600/oz gold and a cut-off grade of 2.52 g/t gold. Processing recoveries vary based on the feed grade. The average recovery is estimated to be 98%.
(2)Seabee Mineral Reserves includes Santoy 8, Santoy 9, and Gap Hangingwall ("GHW") lodes.
Seabee Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferred
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Seabee (UG)(1)
8411.973278111.4428786511.493192,754 6.05536
(1)Seabee Mineral Resources are reported using $1,750/oz gold and a cut-off grade of 2.07 g/t gold. Mineral Resources are exclusive of Mineral Reserves.

Differences between the 2021 and 2022 Mineral Resources and Reserves are due to depletion at the Santoy mine.
The Qualified Persons are of the opinion that there are no material changes to the Mineral Resources and Reserves described herein as compared to the information presented in the Seabee 2021 Technical Report Summary.
65


Exploration
Historically, several rock and soil sampling programs have been executed on the SGO property. Over 1,200 surface rock samples and nearly 7,000 soil samples were collected between 1985 and 1988, with a further nearly 2,000 surface rock samples and over 7,000 soil samples collected between 1990 and 2013. Early samples were largely collected around the Laonil Lake, Porky Lake and Pine Lake areas, but the focus of exploration later shifted to the Santoy area.
Upon its acquisition of the SGO, SSR Mining performed a review of all exploration activities conducted on the property by previous operators. In addition to the data review, the Company executed an exploration program that included detailed mapping of the Herb West and Santoy Lake areas, as well as the collection of accompanying soil samples to be submitted for gold assay. Limited anomalous occurrences were identified from grab and soil sample results, and no new showings or gold in soil trends were recognized. The Company plans to map additional regions to the north and east within the Herb Lake area as additional shear zones are targeted. The Company has also planned further exploration in prospective areas east and west of the Santoy Lake area.
The objective of ongoing exploration conducted by SSR is to delineate, increase, and upgrade Mineral Resources. Underground drilling since 2016 focused on the Santoy 8 and 9 veins and the Gap Hangingwall and Santoy Hangingwall veins. Since 2016, surface drilling has tested a number of early-stage targets near the SGO infrastructure, notably the past producing Porky West deposit and Shane targets. In total, exploration at the SGO has comprised of surficial geochemical sampling, airborne and ground geophysical surveys and extensive drilling.
At the SGO, the three-year budget calls for an average of 80 km of combined surface and underground drilling per year between 2023 and 2024. This drilling is for testing of targets to maximize Mineral Resource potential at the mine as SSR develops its long-term strategy for continuing to replenish its 3–5 year reserve inventory in the same way it has for more than 20 years, with particular focus on bringing higher grade zones on stream to displace lower tenor inventory that currently occurs in the schedule from 2024 onwards.
Drilling
In 2022, a total of 96 drillholes totaling 41,257 meters and 307 drillholes totaling 37,711 meters from underground were drilled. To date, drilling completed on the SGO property (by SSR and previous operators) includes 2,475 surface drillholes totaling 549,037 meters and 6,436 underground drillholes totaling 1,200,029 meters.
Sampling, Analysis and Data Verification
All drill samples in respect of the Seabee Gold Operation underground drilling program and some samples from the surface program were assayed by our onsite non-accredited assay laboratory, which is not independent from the Company. Surface drilling samples not analyzed by our onsite assay laboratory were analyzed at Saskatchewan Research Council (“SRC”) formerly TSL Laboratories Inc. (“TSL”) in Saskatoon, Saskatchewan, which also serves as the QAQC laboratory for our onsite lab. Duplicate check assays were conducted at site as well as at SRC, which is independent from the Company. Mean results of the spot checks were consistent with those reported. Sampling interval was established by minimum or maximum sampling lengths and geological and/or structural criteria.
SGO site lab typically prepares two hundred-gram samples that were pulverized until greater than 80 percent passed through a 200-mesh screen. Thirty-gram pulp samples were then analyzed for gold by fire assay with gravimetric finish (0.01 g/t gold detection limit). SRC prepares a minus-200 mesh pulp (95% passing) weighing 250 grams from a minus 10 mesh coarse crush reject. Fire assay with Atomic Absorption finish was completed on a 30-gram aliquot to produce gold analytical results with a 0.003 g/t gold detection limit. Fire assay with gravimetric finish was prepared on those samples with greater than 3 g/t gold.
All regional exploration’s drill and surface samples are analyzed at SRC in Saskatoon, Saskatchewan. Duplicate check assays are conducted at SRC, which are independent from SSR Mining. Mean results of the spot checks were consistent with those reported. Sampling interval was established by minimum or maximum sampling lengths and geological or structural criteria.
66


Capital and Operating Costs.
Capital costs are estimated to be $116.7 million and are primarily composed of mine and plant equipment and the associated asset componentization as of December 31, 2022. Estimated operating costs for mine operations include both cash and non-cash costs.
Cost Component
Total
(US$M)
LOM Average ($/t Milled)
Mining$103 $45.61 
Surface Haulage13 5.65 
Milling (& Fixed Plant)80 35.26 
General & Admin153 67.51 
Total Operating Expense$349 $154.03 
Capital costs and operating costs are provided for mineral property disclosure purposes in accordance with NI 51-102 and are mining company financial measures. See “Additional Mining Company Financial Information” in this Item 2 for more information.
Costs in individual years may vary significantly as a result of, among other things, current or future nonrecurring expenditures, and changes to input costs and exchange rates. Please refer to the PunaSeabee 2021 Technical Report Summary for other key metrics including detailed cash flows by year and net present value computations.
Exploration and Development
Turkey Exploration
SSR Mining owns 30% of Tunçpınar Madencilik Sanayi ve Ticaret Anonim Şirketi (“Tunçpınar”) operated by Lidya and 70% of Bakırtepe Madencilik Sanayi ve Ticaret Anonim Şirketi (“Bakırtepe”) which is operated by SSR Mining. Bakırtepe includes the Copper Hill exploration target.
Copper hill is in the Black Sea region of Turkey and is a priority target of the Company’s exploration program.
Drilling at Copper Hill (Bakırtepe) commenced in April 2020, with eight diamond drill holes totaling 3,181 meters. Seven of the eight holes intersected sulfide (chalcopyrite) copper mineralization. To-date, 35 diamond drill holes, totaling 10,829 meters have been completed. The northwest-southeast trending mineralized zone has been identified over a strike length of at least 450 meters with a width of 180 meters and a depth extent of at least 200 meters. Copper Hill sits within the package of exploration leases known as Kazıkbeli. The Lidya Mining Exploration team discovered Bakırtepe and undertook the preliminary exploration activities on behalf of the joint venture with the Company. Site activities are now being transitioned to the SSR Mining Exploration and Project Development teams.
Amisk, Canada Exploration
The Amisk property is 39,880 hectares (and 126 claims) with extensive Proterozoic-volcano-sedimentary rock assemblages that are prospective for gold-silver epithermal, gold-rich volcanogenic massive sulfide and orogenic gold deposits. The Amisk property is located in Saskatchewan, Canada.
In the Amisk property the West Channel and Black Diamond trends occur along regional-scale ductile shear zones that range from 5 to 50 meters in orthogonal width. Intermediate volcanic and volcaniclastic rocks core much of these trends with lesser meta-volcanic, meta-sedimentary and gabbro packages occurring in proximity to the high-strain corridors. Alteration assemblages of sericite, iron-carbonate and silicification dominate the regional shear zones. Localized chlorite and diaspore occurrences are diagnostic and associated with auriferous quartz veins at the Monarch target area. Arsenopyrite is the most common sulfide mineral associated with this vein-hosted gold mineralization. Pyrite, chalcopyrite and pyrrhotite are also present, but generally to a lesser degree. Based on visual observations, Sulfide content related to gold mineralization can range from 1%-15%, with most zones hosting 3-5% total sulfide. Coarse visible gold is relatively uncommon on the property and is presently identified at the Raine-Walker, TCA and Black Diamond targets to-date.
Pitarrilla, Mexico Exploration
The Pitarrilla project is a wholly owned silver project located withinIn 2022, 13 diamond drillholes totaling 2,526 meters were completed at targets along the Municipality of Santa María del Oro and Indé, on the eastern flank of the Sierra Madre Occidental mountain rangeWest Channel shear zone. A small field program was completed in the central part of Durango State, Mexico. The project is held by the Company’s wholly owned subsidiary, SSR Durango, S.A. de C.V.
On January 12, 2022, the Company entered into an agreement with Endeavor Silver Corp. ("Endeavor Silver") to sell the Pitarrilla project. The transaction is expected to close in the first half of 2022. Until closing, Pitarrilla will be maintained in good standing by the Company.summer that included geological mapping and rock and soil sampling.
San Luis, Peru Exploration
The San Luis project is a wholly owned high-grade gold-silver project located in the Ancash Department of central Peru. The project is held by the Company’s wholly owned subsidiary, Reliant Ventures S.A.C.
67


In September 2012, Peru’s Ministry of Mines and Energy approved the EIA for the mining operation of the Ayelén deposit, completing a significant milestone for the San Luis project.deposit. Based on the preliminary and early works the Company conducted in respect of the project in 2017, the EIA now has no expiry date.
The San Luis project includes several vein systems across an area of land whose surface rights are held by two local communities: Ecash and Cochabamba.
While community relations efforts with both the Cochabamba and the Ecash Communities continues, exploration activities included geological mapping and prospecting. Fieldwork resulted in the discovery of six new gold and silver-bearing quartz veins within 1.5 km of the Ayelen vein system. Additional work is planned for 2023 to define the extent and continuity of mineralization.
43


ssrm-20221231_g1.jpg

44


Çöpler Gold Mine, Erzincan Province, Türkiye
Çöpler consists of a number of mining licenses covering mineral resources on the Çöpler, Çakmaktepe, Çakmaktepe Extension, and Bayramdere deposits, mineral reserves on the Çöpler, Çakmaktepe Extension and Çakmaktepe deposits, oxide and sulfide processing facilities, and supporting infrastructure. The executionÇöpler deposit, including the mineral resources and mineral reserves, is wholly owned by Anagold Madencilik Sanayi ve Ticaret Anonim Şirketi (“Anagold”). SSR Mining controls 80% of the shares of Anagold through a joint venture, Lidya Madencilik Sanayi ve Ticaret A.Ş. (“Lidya”) controls 18.5%, and a bank wholly‑owned by Çalık Holdings A.Ş. holds the remaining 1.5%. Çakmaktepe is wholly owned by Kartaltepe Madencilik Sanayi ve Ticaret Anonim Şirketi (“Kartaltepe”). Kartaltepe is 80% owned by SSR Mining and 20% owned by Lidya after the completion of a 2022 acquisition of an additional 30% ownership interest in the Kartaltepe from partner Lidya, increasing SSR Mining’s ownership interest from 50% to 80%. The Çakmaktepe Extension deposit spans both Kartaltepe and Anagold ground. The Kartaltepe license includes Çakmaktepe Extension, Çakmaktepe, Bayramdere and the Mavialtin Porphyry Belt. SSR Mining is the Operator of both Anagold and Kartaltepe. All of the processing facilities and operating assets are located on land owned by Anagold. In total 80% of the exclusive Mineral Resources and 80% of the Mineral Reserves at Çöpler project are owned by SSR Mining.
The total cost of Çöpler’s gross mineral properties, plant and equipment as of December 31, 2022 was $3,161.8 million.    
Property Description and Location
Çöpler is located in east central Türkiye, 120 kilometers west of the city of Erzincan, in Erzincan Province, 550 kilometers east of Türkiye’s capital city, Ankara. The nearest urban center, İliç, is located approximately 6 kilometers northeast of the Çöpler mine. Çöpler uses the European 1950 ("E1950") datum coordinate system, which is a Turkish Government requirement. The Çöpler deposit is in UTM6 zone 37N of the E1950 coordinate system. Çöpler's project centroid is situated at approximately 459,975 mE and 4,364,420 mN and has an approximate elevation of 1,160 m above mean sea level ("mamsl").
Çöpler mine is accessed from the main paved highway between Erzincan and Kemaliye and is serviced by both road and rail networks.. Mining operations are conducted year-round.
The Çöpler mining operations fall within the license areas numbered 847, 49729, and 20067313, which have been granted by the General Directorate of Mining and Petroleum Affairs within Turkiye. The Çakmaktepe satellite mining operation is located 6 km east of the current Çöpler pit. Çakmaktepe pits are located within Kartaltepe License 1054. Ore mined at Çakmaktepe is hauled and treated at the Anagold Çöpler facilities.
45


ssrm-20221231_g2.jpg
46


ssrm-20221231_g3.jpg

Anagold holds the exclusive right to engage in mining activities within the Çöpler project area. Anagold holds six granted licenses covering a combined area of approximately 16,600 hectares. Kartaltepe holds eight licenses covering approximately 9,200 hectares. The total near-mine tenement package is approximately 25,800 hectares.
47


Kartaltepe sells Anagold ore from Çakmaktepe at an agreed rate. SSR Mining holds a 2% net smelter return (“NSR”) on the Kartaltepe licenses, receivable after repayment of a historical royalty pre-payment.
Under Turkish Mining Law, the royalty rate for precious metals is variable and tied to metal prices. The Çöpler project is subject to a mineral production royalty that is based on a sliding scale to gold price and is payable to the Turkish government. In September 2020 a presidential decree was issued, increasing the prescribed royalty rates by 25%. Royalty rates are reduced by 40% for ore processed in country, as an incentive to process ore locally. As the Çöpler project produces its gold doré on-site, the Çöpler project is eligible for a 40% reduction to the royalty rate.
History
The Çöpler region has been subject to gold and silver mining dating back to Roman times. The Turkish Geological Survey carried out regional exploration work in the early-1960s that was predominately confined to geological mapping.
In 1998, Anatolia Minerals Development Ltd (“Anatolia”) identified several porphyry-style gold–copper prospects in east central Türkiye and applied for exploration licenses for these prospects, including in the Çöpler basin. In August 2009, a joint venture agreement between Anatolia and Lidya was executed.
In February 2011, Anatolia merged with Avoca Resources Limited, an Australian company, to become Alacer Gold Corp., which further merged with SSR Mining in September 2020.
Geological Setting, Mineralization, and Deposit Types
Çöpler is located near the northern margin of a complex collision zone that lies between the Pontide Belt / North Anatolian Fault, the Arabian Plate, and the East Anatolian Fault, which bounds several major plates. The gold, silver, and copper mineralization of economic interest at Çöpler occurs in a porphyry-related epithermal environment, with most of the gold mineralization concentrated in three zones: Main Zone, Manganese Zone, and Marble Zone, with mineralization present in five different forms:
Stockwork and veins with disseminated marcasite, pyrite, and arsenopyrite
Clay-altered brecciated and carbonatized diorite with rhodochrosite veinlets, and disseminated marcasite, pyrite, realgar, orpiment, sphalerite, and galena
Massive marcasite and pyrite replacement bodies
Massive jarositic gossan
Massive manganese oxide
Oxidation of this mineralization has resulted in the formation of gossans, massive manganese oxide, and goethitic / jarositic assemblages hosting fine-grained free gold. The oxidized cap is underlain by primary and secondary sulfide mineralization.
The Manganese Zone (pit) is about 650 m wide in the north-south direction and about 650 m in the east-west direction. The surface was predominantly covered with marble. A major component of the mineralization is associated with the contact between the diorite and the marble. Disseminated mineralization also occurs outside the contact zones. Mineralization ranges from the surface to 400m deep.
The Marble Zone (pit) is in the southeastern portion of the system and associated with a northeast striking fault contact between marble on the east and hornfels (metasediments) and intrusives on the west. The width is almost 350 m and the strike length is about 300 m east-north-east. Depth of the mineralization ranges from the surface to about 160 m.
The Main Zone (pit) drilling identified a mineralization extending about 750 m north-south and 1,000 m east west. Oxide zone is confined to near surface to depths of about 40 m. Main Pit is the largest area of exposure in the west and south of the Çöpler mine and exposes dominantly diorite-granodiorite porphyry in
48


the southern wall in contact with Hornfels Block. High grade gold is controlled by both faults and contacts. Supergene enrichment enhanced along syn- and post-mineral structures plays an important role in localizing high-grade gold mineralization at lithological contacts, late-stage faults and shear zones, and fault/contact intersections.
The West Pit exposes a high-grade gossan/fanglomerates at the basal contact of Munzur Limestone with hornfels. The contact is locally well preserved and shows a ~10 m thick zone of broken rock cataclastites at the base of limestone on a wide zone of highly sheared hornfelds with folded foliations. Some Gossans would be supergene of polymetallic replacement deposits. Gossans are confined to limestone and hornfels and enriched/formed as a result of karstic process in the area.
Mining Operations
Open pit mining at Çöpler is carried out by a mining contractor and managed by Anagold. The mining method is a conventional open pit method with drill and blast, utilizing excavators and trucks operating on bench heights of 5 meters. The mining contractor provides operators, line supervisors, equipment, and ancillary facilities required for the mining operation. Anagold provides management, technical, mine planning, engineering, and grade control functions for the operation.
The facility infrastructure supports the mine, oxide heap leach and sulfide plant processing facilities. The current leach pad consists of four phases designed to accommodate approximately 61 million tonnes of oxide ore heap with a nominal maximum heap height of 100 meters above the pad liner, with additional phases in development.
The tailings storage facility is developed and constructed in stages with ongoing work to ensure sufficient long-term capacity for storage of tailings. Studies by Anagold have determined that the effect of the addition of the flotation plant to the sulfide plant circuit will result in an increase in the solids content and improvement in the final settled density based on an increase in the rate of tailings consolidation. The flotation plant is in operation.
Infrastructure, Permitting and Compliance Activities
The power supply for the Çöpler mine and processing facilities is provided via a 154 kV transmission line to site. Existing mine site facilities are located primarily within the Çöpler and Sabırlı Creek watersheds immediately upstream of their confluence with the Karasu River.
Operation of the Çöpler mining and processing facilities, and mining at Çakmaktepe, have been investigated and authorized by means of a series of Environmental Impact Assessments ("EIAs").
The currently permitted EIA boundary incorporates 1,747 hectares. The currently permitted Çakmaktepe EIA boundary incorporates 360 hectares, and the Company is in the process of submitting an EIA to increase the permitted boundary to 553 hectares.
Mineral Processing and Metallurgical Testing
Oxide Testwork
The heap leaching facilities were commissioned at the Çöpler mine site in late-2010 and have operated continuously since that time. Oxide heap leach operations were ongoing at the CDMP21TRS effective date.
Metallurgical testwork on Çakmaktepe oxide material for heap leaching has been undertaken at the on-site metallurgical laboratory, initially under the supervision of Kappes, Cassiday & Associates. The initial testwork in 2015 undertook bottle roll and column leach tests. The results are comparable with the Çöpler oxide ore, with similar behavior and leach kinetics. Subsequently, Çakmaktepe oxide ore has been heap leached along with Çöpler oxide ore. Oxide column testwork on oxide ore continues at the on-site laboratory.
Metallurgical testwork on Çakmaktepe Extension oxide material for heap leaching has been undertaken at McClelland laboratories and supervised by Metallurgium. An initial testwork program, including bottle roll and column leach, was carried out in 2019. This initial program identified two distinct domains
49


with respect to gold recovery based on sulfur content: <1% and 1%–2%. The column testwork results indicated that the listwanite, dolomite, and jasperoid lithologies have physical properties amenable to heap leaching. This initial test program was followed up with further testwork in 2020.
Analysis of the results of the metallurgical testwork and a review of the existing recovery models for use in economic analysis were undertaken in 2020. This was done for the oxide and sulfide processing, including the flotation circuit. The resulting recoveries have been used in the economic analysis for the CDMP21TRS.
Oxide gold recoveries vary by lithology for Çöpler in the range 62.3%–78.4%, at Çakmaktepe the range is 61%–80%. At Çakmaktepe Extension, the testwork suggest recoveries will vary in the range 40%–73%. The average oxide recovery in the Reserve Case is 61%.
Sulfide Testwork
The sulfide process plant commenced commissioning in the fourth quarter of 2018. The plant consists principally of a pressure oxidation (POX) leach followed by a cyanide leach to recover gold.
Significant testwork had been conducted on sulfide ores prior to commissioning of the sulfide plant, with pilot plant testwork campaigns and a significant number of batch variability tests on POX / cyanide leach completed.
Whilst a POX / cyanide leach circuit was implemented, significant work had also been undertaken on flotation of the gold-bearing sulfides as a process route, although ultimately this option was not selected for development. Flotation of a partial stream of the plant feed was considered to maximize the available capacity of the plant, including the POX autoclave and available oxygen supply. Further flotation testwork demonstrated that the addition of a small flotation plant into the existing sulfide process route would allow optimization and maximization of already installed capacities.
The testwork indicates that sulfur recovery through flotation is estimated to be 75% to concentrate with a corresponding 55% gold recovery. Flotation tails gold recovery is estimated at 43%. A side stream flotation plant capable of treating 50 to 150 tonnes per hour commenced commissioning on December 24, 2021.
The current determination of POX gold recovery is based on assessment of results for the pilot testwork programs undertaken prior to commencement of operations and benchmarked with the existing operating data. An equation has been derived to calculate gold recovery by material type for all ore that is subject to POX; this includes direct POX feed and flotation concentrate. The Reserve Case average sulfide gold recovery is 91%.
Processing and Recovery Operations
The Company currently operates a sulfide process plant and an oxide heap leach facility.
The oxide heap leaching facilities were commissioned at the Çöpler mine site in the second half of 2010 with initial gold production achieved in the fourth quarter of 2010. The process was originally designed to treat approximately 6.0 million tonnes per annum of ore by three-stage crushing (primary, secondary, and tertiary) to 80% passing 12.5 millimeters, agglomeration, and heap leaching on lined heap leach pads with dilute alkaline sodium cyanide solution. Gold is recovered through a carbon in-column system, followed by stripping of metal values from carbon, electrowinning and smelting to yield a doré (containing gold and silver) suitable for sale. Control of copper in leach solutions is undertaken in a sulfidization, acidification, recovery, and thickening ("SART") plant, which also regenerates cyanide.
The sulfide plant commenced commissioning in the fourth quarter of 2018. The basic flow of processing through the sulfide plant is as follows:
50


ssrm-20221231_g4.jpg
The incorporation of a flotation circuit into the existing sulfide plant to upgrade sulfide sulfur to fully utilize grinding and pressure oxidation (“POX”) autoclave capacity was constructed and commenced ore production at the end of December 2021. This addition to the sulfide plant is incorporated between grinding and acidulation by taking a bleed / slip stream from the grinding thickener feed, floating sulfides, and returning the sulfide concentrate to the grinding thickener to be combined with direct autoclave feed. Gold in the flotation tails (not recovered to the flotation concentrate) is combined with the material that was processed through the POX autoclave circuit, this combined stream then goes to the gold leaching and recovery circuits to recover gold.
Since completing ramp-up of the sulfide plant in June 2020, POX throughput has progressively improved to exceed design up to a monthly average peak of 330 tonnes per hour and at the maximum sulfide sulfur of 13.7 tonnes per hour. The gold recovery has remained at around 91% with the tailings grade ranging between about 0.25–0.30 grams of gold per tonne.
Resource and Reserve Estimates
The following tables summarize the Company's estimated gold reserves and resources reflecting only the reserves and resources attributable to SSR Mining's ownership or economic interest as of December 31, 2022. Additionally, see “Proven and Probable Reserve Estimates by Mineral” in this Item 2 for further information on the mineral resources and mineral reserves for Çöpler, and see "Operating Statistics" in this Item 2 for further information on production of the Çöpler operations for the years ended December 31, 2022 and December 31, 2021. A discussion of the changes in mineral resources and mineral reserves from 2021 to 2022 is also included below.
51


Çöpler Reserves as of December 31, 2022
ProvenProbableProven and Probable
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)(1)(2)(3)(4)
7,166 2.56590 40,524 2.032,648 47,690 2.113,238 84 %
Çöpler Stockpile— — — 10,605 2.18745 10,605 2.18745 91 %
TonnesGradeSilverTonnesGradeSilverTonnesGradeSilverMetallurgical
Silver(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)7,166 4.11947 40,524 4.485,834 47,690 4.426,781 %
TonnesGradeCopperTonnesGradeCopperTonnesGradeCopperMetallurgical
Copper(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)Recovery
Çöpler (OP)(5)(6)
7,166 — 0.240,524 0.016.747,690 0.016.9%
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine, Cakmaktepe and Çakmaktepe Extension.
(2)Mineral Reserves shown are SSR ownership share only. SSR Owns 80% rights in both the Anagold and Kartaltepe licenses. Cakmaktepe, Bayramdere and part of Çakmaktepe Extension fall within Kartaltepe license.
(3)Mineral Reserve cut-offs are based on $1,350/oz gold price. The average oxide recoveries are 61% and average sulfide recoveries are 91%. The weighted average gold recovery is 84%. All cut-off values include allowance for royalty payable. There are no credits for silver or copper in the cut-off calculations. Oxide cutoff grades vary between 0.44-0.80g/t gold and sulphide cutoff grades vary between 1.05-1.11g/t gold.
(4)There are no sulfide Mineral Reserves at Çakmaktepe and Bayramdere.
(5)There is no copper recovery in sulphide material.
(6)Copper oxide recoveries are 2%.
52


Çöpler Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferred
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP)(1)(2)(3)(4)(5)(6)(7)
2,598 1.94162 68,368 1.042,284 70,966 1.072,446 82,394 1.173,097 
TonnesGradeSilverTonnesGradeSilverTonnesGradeSilverTonnesGradeSilver
Silver(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP)(8)
2,598 4.32361 68,368 3.377,402 70,966 3.407,763 82,394 9.5725,339 
TonnesGradeCopperTonnesGradeCopperTonnesGradeCopperTonnesGradeCopper
Copper(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)
Çöpler (OP)(9)
2,598 0.031.568,368 0.15222.870,966 0.14224.382,394 0.13228.4
(1)Çöpler Mineral Resources include resources from Çöpler Mine, Cakmaktepe, Çakmaktepe Extension and Bayramdere. Mineral Resources are exclusive of Mineral Reserves.
(2)Mineral Resources shown are SSR ownership share only. SSR Owns 80% rights in both the Anagold and Kartaltepe licenses.
(3)All Mineral Resources for Çöpler were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual pit shells ($1,400/oz gold and $19.00/oz silver for Bayramdere).
(4)Oxide definitions: At Çöpler: oxide is defined as material <2% total sulfur and sulfide material is ≥2% total sulfur. At Çakmaktepe Extension and Çakmaktepe, oxide is comprised of low-sulfur (LS) oxide (<1% total sulfur) and high-sulfur oxide (≥1% and <2% total sulfur). At Bayramdere, oxide is defined as material <2% total sulfur.
(5)Sulfide definitions: At Çakmaktepe Extension, sulfide is comprised of standard sulfide material (≥2% total sulfur) and sulfide-with-Cu material (sulfide with Cu>0.10%). There is no sulfide material at Çakmaktepe or Bayramdere.
(6)Mineral Resources are reported at the variable gold cut-off grades based on different metallurgical parameters: oxide cut-off grades are 0.19-0.76 g/t gold, sulfide cut-off uses an NSR value in $/t based on gold price of $1,750/oz, silver price of $22.00/oz, and copper price of $3.95/lb with allowances for payability, deductions, transport, and royalties.
(7)Çöpler oxide recoveries vary between 38.0-78.4% and sulphide recoveries vary between 55-98%.
(8)Average silver recoveries are 16%.
(9)Copper oxide recoveries are 2% and sulphide recoveries are 65%.

Factors contributing to the differences in Mineral Reserves and Resources between EOY 2021 and EOY 2022 include: (i) mining depletion; and (ii) increase in SSR ownership in the Kartaltepe license to 80%. Additional ounces were realized from Çakmaktepe Extension and Cakmaktepe deposit that were part of the Kartaltepe licenses. The Qualified Persons are of the opinion that there are no material changes to the Mineral Resources and Reserves described herein as compared to the information presented the CDMP21TRS.
Exploration
The principal exploration technique at the Çöpler project has been reverse circulation and diamond core drilling, conducted in several campaigns starting in 2000. Initially, exploration was directed at evaluating the economic potential of the near-surface oxide mineralization for the recovery of gold by either heap leaching or conventional milling techniques.
53


Exploration in Çöpler, after the discovery of several porphyry centers, delineated the ore body in four adjacent zones from east to west: Manganese, Marble, Main, and West.
Since 2000, the Company’s exploration program within the Çöpler district has identified several new gold-dominant and copper–gold prospects. The gold-dominant regional prospects include the Çöpler Saddle and Elmadere. Copper–gold prospects include Aslantepe, Sarıdere, Fındıklıdere and Mavidere porphyries located within the Mavialtın Porphyry Belt and the early exploration stage Meşeburnu porphyry located west of the Çöpler deposit.
Drilling
Drilling at the Çöpler deposit commenced in 2000, and since that time a total of 2,731 holes have been drilled for 389,003 meters. A total of 96 diamond core holes have been completed in 2022 (15,441 meters). Step-out drilling at the Çöpler deposit has defined most of the lateral boundaries of the mineralization. There has been additional development drilling and condemnation drilling of areas planned for infrastructure during the last few years.
Drilling at Çakmaktepe commenced in 2012 and has defined three distinct mineralized zones: East, Central, and North. As production proceeded within the Çakmaktepe Central and East pits, additional targets were generated to provide push-back options around the pit design. A total of 136 diamond core holes have been completed since 2019 to test for continuation of the Çakmaktepe deposit to the north and the east.
Since the initial discovery of mineralization at Çakmaktepe Extension, Anagold has undertaken several drilling programs to refine the geological model and increase resource inventories. Anagold has completed 659 diamond core holes for 136,436meters at Çakmaktepe Extension from late-2017 through December, 2022, including holes for metallurgical testing and hydrogeological studies. During 2022, 128 diamond core holes for 25,432 meters were completed at Çakmaktepe Extension, mainly for resource-reserve definition purposes.
Drilling at Bayramdere commenced in 2007 as part of the near-mine exploration strategy. Since that time 120 holes have been drilled at Bayramdere for a total of 10,734 meters.
Sampling, Analysis and Data Verification
Exploration samples are submitted to ALS Global laboratories, an ISO/IEC 17025:2005 certified and accredited laboratory in Izmir, Türkiye, for sample preparation and analysis. Bureau Veritas (Acme) laboratory in Ankara, Türkiye is used for umpire check sample analysis. Gold is analyzed by fire assay with an AAS finish. Multi-element analyses are determined by four acid digestion and ICP-AES and MS finish. For gold assays greater than or equal to 10 g/t, the fire assay process is repeated with a gravimetric finish for coarse gold. The drill and geochemical samples are collected in accordance with accepted industry standards. SSR Mining conducts routine QA/QC analysis on all assay results, including the systematic utilization of certified reference materials, blanks, field duplicates, and umpire laboratory check assays.
SSR Mining operates an onsite laboratory at Çöpler primarily for assay of production samples for grade control purposes. The onsite laboratory is certified to ISO 17025:2017 but is not independent.
Routine checks of all data are undertaken prior to incorporation to the database. Campaign-based independent data verification audits are conducted at milestone stages throughout data collection programs. For drillhole data, verification includes checking Topcon differential global positioning system ("DGPS") collar coordinates relative to topographic surveys, down hole surveys relative to adjacent readings and planned dip and azimuth of the hole, logged data entries to ensure they are consistent with log key sheets, cross-checking a subset of assay data with the original laboratory reports, and submission and review of QA/QC data.
The QA/QC program has historically consisted of a combination of QA/QC sample types that are designed to monitor different aspects of the sample preparation and assaying process. None of the verification programs have identified material issues with the supporting data.
54


Capital and Operating Costs
The capital and operating cost estimates derived for Çöpler are based on a combination of the data set forth in the CDMP21TRS and budgetary estimates that reflect SSR Mining’s estimates as of December 31, 2022.
As of December 31, 2022, capital costs are estimated to be $449.3 million for the life of Çöpler (life of mine or "LOM") and are primarily composed of mine and plant equipment, tailings storage expansions and asset componentization. Estimated operating costs for mine operations include both cash and non-cash costs.
CostTotal LOM ($M)5-Year Average per year ($/t)LOM Average per year ($/t)
Mining$718 $15.86 $9.91 
Process2,097 25.96 28.93 
Site Support and G&A360 5.72 4.97 
Operating Costs$3,175 $47.54 $43.81 
Capital costs and operating costs are provided for mineral property disclosure purposes in accordance with NI 51-102 and are, generally, non-GAAP mining company financial measures. See “Additional Mining Company Financial Information” in this Item 2 for more information.
Costs in individual years may vary significantly as a result of, among other things, current or future nonrecurring expenditures, and changes to input costs and exchange rates. Please refer to the CDMP21TRS for other key metrics including detailed cash flows by year and net present value computations.
Çöpler Expansion, Initial Assessment Case
The Çöpler Expansion project (CE) has been developed to leverage off the copper mineralization within and adjacent to existing resource pits. Supporting the 2021 Çöpler Mineral Resource estimate an Initial Assessment has been prepared to analyze the impact of changes in processing method for the Çöpler Mineral Resource. The current project has two processing methods: a sulfide process plant and a heap leach oxide processing facility.
The sulfide plant includes the crushing, grinding, flotation and pressure oxidation to produce gold and small amounts of silver. The heap leach facility produces gold and small amounts of silver and copper.
The scenario for the Initial Assessment Case analysis includes additional processing units to recover additional gold from the sulfide Mineral Resource. The two processing units are:
A Concentrator producing a concentrate for sale and a pyrite concentrate to feed to the sulfide plant
A Sodium Hydrosulfide (NaSH) copper recovery circuit to be installed in the current sulfide plant which will produce a copper concentrate for sale.
The concentrator with a capacity of 1.8 Mtpa and would make concentrate for sale to smelters and a pyrite concentrate to be fed into the autoclaves in the sulfide plant. The pyrite concentrate would have a high gold content and provide sulfur as a source of fuel for the autoclaves.
The Çöpler Mineral Resource has been selected for the Initial Assessment analysis, as the other Mineral Resources at the project do not have significant amounts of copper.
Implementation of the additional recovery options will require capital expenditures and will also provide opportunities for operational cost and productivity improvements. The Çöpler Initial Assessment Case shows the results of a shorter term analysis using the Reserve Case metal prices and the impact of the estimated capital and potential cost savings from economies of scale and reallocation of shared and fixed costs.
55


For both the Initial Assessment economic analysis, the Çakmaktepe Extension and Cakmaktepe Mineral Reserve has been included in the cash flow analysis without change from the Reserve Case. This is to allow the analysis to quantify the impact of the concentrator and NaSH circuit and demonstrate the potential of the additional Mineral Resources.
A separate analysis of the Initial Assessment Case was prepared using only Measured and Indicated Mineral Resources (MI Case). Comparison of the initial years of the Initial Assessment and the MI Case showed only 1.4% of the material processed in the first nine years of the Initial Assessment is Inferred Mineral Resource. The majority of the Inferred material is processed in years 10 to 20 and does not exceed 50% of the total processing in any one year.
The Initial Assessment has been prepared to demonstrate economic potential of the Mineral Resources at the Çöpler Deposit. The Initial Assessment is preliminary in nature, it includes Inferred Mineral Resources that are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that this economic assessment will be realized.
Marigold Mine, Nevada, United States
Marigold Mine is an open pit mining and processing operation located in Nevada, United States. SSR Mining holds a 100% interest in Marigold through its wholly owned subsidiary, Marigold Mining Company.
The total cost of Marigold’s gross mineral properties, plant and equipment as of December 31, 2022 was $566.0 million.
Property Description and Location
Marigold is located in southeastern Humboldt County, in the northern foothills of the Battle Mountain Range, Nevada, U.S. The mine is situated approximately 5 kilometers south–southwest of the town of Valmy, Nevada. Other nearby municipalities include Winnemucca and Battle Mountain, Nevada, which lie approximately 58 kilometers to the northwest and 24 kilometers to the southeast of the property, respectively. Activities at the property are centered at approximately 40°45′ north latitude and 117°8′ west longitude.
56


ssrm-20221231_g5.jpg
The surface and mineral rights held by the Company at Marigold are comprised of fee owned real property, unpatented mining claims, and leasehold rights held with respect to unpatented mining claims, mill site claims and certain surface lands. Certain of the leases require the Company to make NSR royalty payments to the lessors and comply with other obligations, including completing work commitments or paying taxes levied on the underlying properties. The NSR royalty payments are based on the specific gold-extraction areas and are payable when the corresponding gold ounces are extracted, produced, and sold. The NSR royalty payments vary between 0% and 10.0% of the value of gold production, net of off‑site refining costs, which equates to an annual average ranging from 3.7% to 10.0% and a weighted average of 7.8% over the life‑of‑mine. Mineral claims in Nevada are managed federally by the U.S. Bureau of Land Management.
The authorized Plan of Operations (“PoO”) area for Marigold currently encompasses approximately 10,703 hectares, with approximately 3,296 hectares within the PoO permitted for mining‑related disturbance. Land and mineral ownership within the PoO are within the corridor initially governed by the Pacific Railroad Act of 1862, and, as such, these areas generally have a “checkerboard” ownership pattern.
New Millennium, enabled by land acquisitions completed in 2016, 2018 and 2019, represents a low cost, high probability development opportunity. The New Millennium target area is comprised of six distinct zones which include East Basalt, Battle Cry, Antler, Section 6, L’il Gun and North Antler. In addition,
57


exploration on the 100% controlled 8,900-hectare land package to the south of Marigold continues at the past producing Buffalo Valley, North Peak, and Trenton Canyon mines.
History
The first recorded gold production from the property occurred in 1938 when the Marigold Mining Company developed and operated an underground mine which came to be known as Marigold. Approximately 9,000 tonnes of ore, averaging about 6.85 grams of gold per tonne, was processed before World War II halted production. Several unsuccessful attempts were made to open and operate the mine before exploration activities began again in 1968. The property was further explored and developed by various companies and operations from 1968, with two million ounces of gold recovered from Marigold by mid-2009.
The Company acquired Marigold in April 2014 for total cash consideration of $268 million. In August 2015, Marigold mine acquired 2,844 hectares of adjacent land from Newmont Corporation. This land included previously mined areas known as the Mud pit, NW pit, and the Valmy pits. Marigold has now been in continuous operation for more than 30 years and poured the four millionth ounce in 2020.
Geological Setting, Mineralization, and Deposit Types
Marigold is located in north‑central Nevada within the Basin and Range physiographic province bounded by Sierra Nevada to the west and the Colorado Plateau to the east. The western part of the North American continent has undergone a complex history of extensional and compressional tectonics from the Proterozoic through to the Quaternary. Predominantly Paleozoic rifting and basin subsidence led to the formation of thick (hundreds of meters) passive margin sedimentary sequences and repeated inter plate collisions caused accretion of arc related volcanics and ocean floor rocks, which were pushed together with the basin sediments to form fold and thrust belts. Subsequent extension related to subduction and back arc basin rifting resulted in the development of Basin and Range topography. Crustal thinning caused by the extension allowed the rise of magma close to the surface, which produced extensive and voluminous magmatism from the middle Eocene to late Miocene. Crustal extension with bimodal (mafic and felsic) volcanism occurred in the region from the late Miocene to the present day.
The property is in the Battle Mountain mining district on the northern end of the Battle Mountain-Eureka trend, a conspicuous lineament of sedimentary-hosted gold deposits. The Battle Mountain district hosts numerous mineral occurrences, including porphyry copper–gold, porphyry copper–molybdenum, skarn, placer gold, distal disseminated silver-gold, and Carlin-type gold systems. Gold at Marigold is currently mined from multiple deposits located on a >10-kilometer by 1.5-kilometer area. Depth of the mineralization ranges from the surface to about 250m for the oxide ore. The majority of individual mineralization zones at Marigold have coalesced into the Mackay pit.
The gold deposits at Marigold cumulatively define a north trending alignment of gold mineralized rock more than 8 kilometers long. A silver and base metal mineralizing event at Marigold includes a mineral association of chalcopyrite, argentiferous tennantite, galena, and sphalerite. Gold mineralizing fluids were primarily controlled by fault structure and lithology, with tertiary influence by fold geometry. The deposition of gold was restricted to fault zones and quartzite chert dominant horizons within the Valmy Formation and high permeability units within the Antler sequence. Gold mineralization was also influenced by fold geometry in the Valmy Formation.
Rocks within the Marigold mine area are oxidized to a maximum depth of approximately 450 meters. The redox boundary is not consistent throughout the Property and is substantially influenced by lithology. Shale, argillite, and siltstone units are frequently oxidized adjacent to pervasively oxidized quartzite horizons. Gold occurs natively in fractures in association with iron oxide.
Mining Operations
Marigold uses open pit mining methods at a life‑of‑mine sustained mining rate of approximately 250,000 tonnes per day. The mine conducts conventional drilling and blasting activities with a free face trim row blast to ensure stable wall rock conditions. Mining occurs on 15.2-meter benches. Loading operations are currently performed using one electric shovel and three hydraulic shovels. Waste and ore haulage is performed with a fleet of 300 tonne class haul trucks.
58


The Marigold geotechnical management plan includes highwall monitoring using three radar systems which provide full coverage for the Mackay pit, the mine’s largest, and which can be deployed in smaller pits, if required. Routine monitoring of waste dumps, leach pads and inactive pits using INSAR data is performed by a third party monthly.
Infrastructure, Permitting and Compliance Activities
The infrastructure facilities at Marigold include ancillary buildings, offices and support buildings, access roads into the plant site, power distribution, source of fresh water and water distribution, fuel supply, storage and distribution, waste management and communications. Equipment maintenance is performed on site for all equipment. There are no contract mining operations on site.
The power supply for Marigold is provided by NV Energy Inc. via a 120 kV transmission line to site. Water for Marigold is supplied from three existing groundwater wells located near the access road to the Property. Marigold owns groundwater rights and collectively allows up to 3.134 million m3 liters of water consumption annually. Water is primarily consumed by retention in the heap leach pad, evaporation, processing operations and dust suppression.
Marigold holds valid permits for all facets of the current mining operation as required by county, state, and federal regulations. The Company performs duties on leased lands pursuant to all federal and state requirements to maintain leases in good standing. The Company engages in concurrent reclamation practices and is bonded for all permitted features, as part of the Nevada permitting process.
Mineral Processing and Metallurgical Testing
Marigold uses an assay method that measures cyanide-soluble gold. This technique generates a value that represents the head grade of the ore in terms of the amount of gold in a finely ground sample that can be dissolved by a strong sodium cyanide solution. The gold content of the final solution is measured using atomic absorption ("AA").
All Marigold blasthole samples are assayed for cyanide-soluble gold. Samples from each ore polygon delineated by ore control are selected for fire assay based on the grade distribution for the polygon tonnage and targeting one sample per every 2,000 short tons of ore. Therefore, some samples have two assay values: an AuCN (cyanide soluble) value; and an AuFA (fire assayed) value. The ratio of AuCN:AuFA provides the theoretical maximum gold recovery that can be achieved.
Testwork has demonstrated that, generally, all ore at Marigold behaves similarly. The ratio of AuCN / AuFA is an important characteristic. A best‑fit linear regression from approximately 155,000 pairs of fire assays (field AUFA in the database) and cyanide soluble assays (field AUAA in the database shows the AuCN / AuFA ratio is 0.8037:1 (~80% cyanide soluble gold), based on the most recent assessment in 2017.
Processing and Recovery Operations
Marigold processing plant and processing facilities combine run-of-mine (“ROM”) heap leaching, carbon adsorption, carbon desorption and electro-winning circuits to produce a final precious metal (doré) product. All processing of ore, which is oxide in nature, is completed via ROM heap leaching. ROM ore is delivered to the leach pad by haulage truck and stacked in 6.1-meter to 12.2-meter lifts. At any given time, approximately 0.5 million square meters of pad area is being leached.
Barren leach solution (cyanide-bearing solution, very low in gold grade) is applied selectively to different areas of the heap leach pad. The barren leach solution is pumped to the leach pad and the pregnant solution (gold-bearing) from the leach pad is then recovered through a carbon in-column system, followed by stripping of metal values from carbon, electrowinning and smelting to yield a doré (containing gold and silver) suitable for sale.
From March 1990 through December 2021, gold recovery from the heap leach pad was 70.5%. The LOM actual leach pad recovery is 74.5% (including in‑process gold inventory through December 2021).
59


Resource and Reserve Estimates
The following tables present the mineral reserves and mineral resources information for Marigold. Additionally, see “Proven and Probable Reserve Estimates by Mineral” in this Item 2 for further information on the mineral resources and mineral reserves for Marigold for the years ended December 31, 2022 and December 31, 2021, and see "Operating Statistics" in this Item 2 for further information on production of the Marigold operations for the years ended December 31, 2022, December 31, 2021 and December 31, 2020. A discussion of the changes in mineral resources and mineral reserves from 2021 to 2022 is also included below.
Marigold Reserves as of December 31, 2022
ProvenProbableProven and Probable
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Marigold (OP)(1)
— — — 185,703 0.482,842 185,703 0.482,842 75 %
Marigold (leach pad inventory)— — — — — 314— — 31474 %
(1)Marigold Mineral Reserves are reported at a cut-off grade of 0.065 g/t payable gold (gold assay factored for metallurgical recovery, royalty, and net proceeds). No mining dilution is applied to the grade of the Mineral Reserves. Dilution is intrinsic to the Mineral Reserves estimate and is considered sufficient to represent the mining selectivity considered.
Marigold Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferred
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Marigold (OP)(1)(2)
— — — 115,294 0.431,611 115,294 0.431,611 21,680 0.36249
(1)Marigold Mineral Resource estimate is based on an optimised pit shell at a cut off grade of 0.065 g/t payable gold (gold assay factored for recovery, royalty, and net proceeds). Mineral Resources are exclusive of Mineral Reserves.
(2)Marigold metallurgical recoveries varies with gold grade and on average recoveries are 67%.

Differences between the 2021 and 2022 Mineral Reserves for Marigold are due to 2022 mine depletion and leach pad inventory changes.
Differences between the 2021 and 2022 Mineral Resources for Marigold are due to 2022 mine depletion.
The Qualified Persons are of the opinion that there are no material changes to the Mineral Resources and Reserves described herein as compared to the information presented in the Marigold 2021 Technical Report Summary.
Exploration
After the purchase of Marigold was completed in 2014, SSR Mining completed a gravity survey in areas that had not been previously covered, with a main objective to delineate possible fluid conduits or feeder structures for the Marigold mineralization. After finalizing the purchase of the Valmy property in 2015, the Company expanded the geophysical gravity survey to include this new ground.
60


An additional geophysical magnetic survey was conducted at the end of 2022 covering portions of the Trenton Canyon, Buffalo Valley and southern Marigold areas. This survey will be completed in 2023.
Drilling
The Company has conducted drilling and sampling throughout the Marigold property. 200 reverse circulation holes were completed for a total of 55,624 meters drilled in 2022. As of December 31, 2022, a total of 9,424 drillholes for 1,960,011 meters of drilling has been completed on the property..
Sampling, Analysis and Data Verification
Since 2014, all exploration samples from Marigold and the Valmy property are analyzed at American Assay Laboratories (“AAL”), an ISO 17025 certified facility in Sparks, Nevada. AAL is independent from SSR Mining. All samples are subjected to first‑pass fire assay (“FA”) determination with an atomic absorption (“AA”) finish and FA with gravimetric finish for over‑limits. This is followed by a gold cyanide solution assay with an AA finish on samples that have FA values greater than or equal to 0.03 grams of gold per tonne.
Following the acquisition of Marigold and the adjacent Valmy property, the Company’s exploration personnel manually checked the entire drillhole database against the original documents for data entry errors. Less than 1% of the drillholes had any issues, and these were subsequently corrected. As an additional check, SSR Mining acquired the chip trays for 687 drillholes, pulps from 57 drillholes, and sample rejects from 66 drillholes, of which 5% were reviewed for lithology and alteration. The original logging was deemed accurate and was used to construct the lithological models.
The collar positions of 43 Valmy drillholes were verified using differentially corrected GPS methods. The results showed a maximum variance of 4 m in the X/Y planes (easting and northing) and < 1 m in the Z dimension (elevation). This error‑shift is less than half the size of a resource model cell and is not material to any resulting estimate. The Valmy data was deemed accurate and precise, and appropriate for resource estimation purposes.
For data collected after April 2014, verification was completed as part of the generation of the mineral resources estimate for Marigold. Three technical issues were identified in the Marigold mineral resources database which have been resolved: (i) drillholes were missing downhole surveys; (ii) some samples were only assayed by cyanide soluble analysis and not by FA; and (iii) assay results for a high percentage of lower grade samples were recorded as 0.0 grams of gold per tonne.
All drill samples collected during 2022 were submitted to American Assay Laboratories for analysis and subject to SSR Mining Quality Assurance, Quality Control (QAQC) procedures.
Capital and Operating Costs.
The capital and operating cost estimates derived for Marigold are based on a combination of the data set forth in the Marigold 2021 Technical Report Summary and budgetary estimates and reflect the Company’s current estimates as of December 31, 2022.
As of December 31, 2022, capital costs, exclusive of discretionary exploration, are estimated to be $299.0 million for the life of Marigold and are primarily composed of mine and plant equipment and the associated asset componentization. Estimated operating costs for mine operations include both cash and non-cash costs.
61


Total LOM ($M)5-Year Average per year ($/t)LOM Average per year ($/t)
Mining$1,319 $7.46$7.22
Processing3411.661.87
Site Support1950.951.07
Operating Costs$1,855 $10.07$10.16
Capital costs and operating costs are provided for mineral property disclosure purposes in accordance with NI 51-102 and, generally, are non-GAAP mining company financial measures. See “Additional Mining Company Financial Information” in this Item 2 for more information.
Costs in individual years may vary significantly as a result of, among other things, current or future nonrecurring expenditures, and changes to input costs and exchange rates. Please refer to the Marigold 2021 Technical Report Summary for other key metrics including detailed cash flows by year and net present value computations.
Trenton Canyon and Buffalo Valley
The Trenton Canyon project is located approximately 4 km south of New Millennium at Marigold and is one of three historically producing mines on a 100% controlled 8,900-hectare parcel acquired from Newmont Corporation in 2019. The Buffalo Valley project is located approximately 10 km south‑west of New Millennium.
Exploration work on the Trenton Canyon and Buffalo Valley properties consists of drilling, geophysical surveying, remote sensing, geochemical surveying, and mapping.
Gold mineralization at Trenton Canyon is structurally controlled with significantly less disseminated mineralization than at Marigold. The net result of this change in mineralization style is higher gold grades in a smaller volume of mineralized rock at Trenton Canyon.
The Company completed 59 reverse circulation holes for 17,128 meters and 10 core drillholes for a total of 4,086 meters at Trenton Canyon during 2022. In total the Company has completed a total of 308 reverse circulation drillholes for 90,293 meters and 22 drillholes for 14,073 meters.
The Company initiated the drilling program at Buffalo valley in 2022 and completed 36 reverse circulation drillholes for a total of 14,426 meters and 7 core drillholes for 3,315 meters.
At North Peak, the Company completed 5 reverse circulation holes for 1,794 meters in 2022.
Seabee Gold Operation, Saskatchewan, Canada
The Seabee Gold Operation (“SGO”) is an underground gold mining and milling operation, located in Saskatchewan, Canada. SSR Mining holds a 100% interest in the property through its wholly‑owned subsidiary, SGO Mining Inc.
The total cost of SGO’s gross mineral properties, plant and equipment as of December 31, 2022 was $544.7 million.
Property Description and Location
SGO is located at the north end of Laonil Lake, approximately 125 kilometers north-east of the town of La Ronge, Saskatchewan, Canada. Activities at the property are centered at approximately 55.7° north latitude and 103.5° west longitude.
62


Ore is currently produced from the Santoy underground mine from a ramp access/surface portal and is hauled 14 kilometers to the mill located at the Seabee site. A second underground mine, also having ramp access, was operated from 1991–2018 at Seabee. All ore is processed at the Seabee mill facility, which is located close to the now-closed Seabee mine and has been in operation since 1991. The Seabee mill facility produces gold doré bars that are shipped to a third-party refinery.
ssrm-20221231_g6.jpg
The mine is a remote operation. SGO is accessible by fixed-wing aircraft from the town of LaRonge and during the winter months, typically January through the end of March, a 60 kilometers winter road is also built between the mine site and Brabant Lake, approximately 120 kilometers north of La Ronge.
SGO is comprised of seven mineral leases and 102 mineral claims that cover an area of approximately 62,158 hectares, including the Fisher Property rights. SGO is subject to production and NSR royalties payable to third parties, including certain royalty payments to the Province of Saskatchewan, which are calculated on 10% of net operating profits and are payable once capital and exploration costs are recovered. The other NSR royalty payments are based on specific gold production and/or sales and vary between 1.0% and 3.0% of the value of gold production and/or sales, as applicable.
SGO currently has a valid surface lease with the Province of Saskatchewan, which was amended in March 2010. This surface lease provides land surface rights necessary to carry out the mining, milling and associated operations at the SGO. The existing surface lease is in effect from March 2010 to its expiry date of May 31, 2040.
History
The Laonil Lake region has been intermittently explored since the 1940s, with the first gold discovery made by prospectors in 1947, with detailed drilling and exploration of the property constituting the SGO conducted from 1947 until construction of the Seabee mill was initiated in the summer of 1990. Mill
63


construction was completed in late 1991, and mining commenced in December 1991. Exploration and production expanded into the Santoy segment of the property through the early 2000s.
The Company acquired the SGO on May 31, 2016. SGO has produced over 1.6 million ounces of gold since production began in 1991. In 2021 Seabee delivered 119 koz and 136 koz in 2022.
Geological Setting, Mineralization, and Deposit Types
Northern Saskatchewan forms part of the Churchill Province of the Canadian Shield and has been subdivided into a series of litho-structural crustal units, of which the SGO is located within the Glennie domain of the Proterozoic Trans-Hudson Orogen. The Glennie domain is wedge shaped and characterized by arcuate belts of Lower Proterozoic supracrustal rocks separated by granitoid gneisses and granitoid intrusions. It is bounded on the west by the north–north-east trending Stanley shear zone and bounded on the east by the north–south trending Tabbernor fault zone. To the south, Phanerozoic sedimentary rocks cover the Glennie domain.
Gold mineralization at the Santoy mine occurs in gold-sulfide-chlorite-quartz veins in the shear zones, near or in the granodiorite and granite sills. The gold mineralization throughout the SGO exhibits complex geometrical patterns attributed to a combination of structural and/or lithological controls.
Mining Operations
There is currently one operating mine as part of the SGO, the underground Santoy mine, with ore hauled to the surface and then 14 kilometers to the mill located near the old Seabee mine.
Access underground at the Santoy mine is provided from the surface via a main ramp with sublevels spaced between 17–20 meters vertically. Mining is carried out using sublevel open stoping mining methods with backfill, with stopes filled with a combination of rock fill and cemented rock fill, mined in a bottom-up mining sequence. Sill pillars are mined on retreat once the stopes below and above have been mined.
Infrastructure, Permitting and Compliance Activities
The major infrastructure at the SGO site includes roads, an airstrip, powerhouse and electrical distribution system, mill buildings and related services facilities, portal and ventilation raises, fuel storage, explosive storage, water supply and distribution, water management ponds and water treatment plant, tailings management facilities, administrative buildings and camp accommodation.
There are currently two tailings management facilities (“TMF”) that are being used by the mill; the East Lake TMF and the Triangle Lake TMF. Tailings deposition alternates between the two TMFs where winter deposition occurs in the Triangle Lake TMF and summer deposition is in the East Lake TMF. The remaining storage capacities of both facilities, based on the planned production rates, will potentially reach maximum capacity towards the end of 2030. To ensure that water treatment volumes are attained, a water treatment plant was constructed at East Lake TMF.
Mineral Processing and Metallurgical Testing
SGO was originally developed based on bench-scale metallurgical testwork that characterized the Seabee deposit as a lode gold style of mineralisation that was free milling and that would respond to a standard flow sheet employing gravity recovery and cyanidation.
Historical recovery at the Seabee mill was in the 94%–96% range, with routine low levels of losses both in the tailings solids and solution. Future recovery estimates are 98%, based on the recent mill performance with recoveries of more than 98%. These improvements are attributed to the better condition of the leach equipment as well as the restored leach capacity.

64


Processing and Recovery Operations
Material has been processed for 30 years in the mill constructed immediately adjacent to the old Seabee mine. The operation was initially developed and operated on diesel power and later connected to the Saskatchewan grid power in 1992. The initial capacity of the mill was 500 tonnes per day, which was later expanded to a nameplate capacity of 1,000 tonnes per day, with the addition of a third grinding mill in 2005. The mill flow sheet is a conventional crushing and grinding circuit employing gravity concentration and cyanide leaching and carbon-in-pulp for recovery and production of doré gold on site.
Capital projects have included the addition of the primary ball mill, addition of a second Knelson concentrator and Acacia gravity gold recovery. The current Seabee process plant capacity is nominally 1,320 tonnes per day, or 1,240 tonnes per day annual average. The Seabee operation is characterized by coarse gold making the gravity recovery circuit critical to the overall gold recovery of the process plant. In recent years, with incorporation of gravity circuit improvements including the Acacia circuit, gold recovery has improved and is typically 98%.
Resource and Reserve Estimates
The following tables present the mineral reserves and mineral resources information for SGO. Additionally, see “Proven and Probable Reserve Estimates by Mineral” in this Item 2 for further information on the mineral resources and mineral reserves for the SGO for the years ended December 31, 2022 and December 31, 2021, and see "Operating Statistics" in this Item 2 for further information on production of the SGO operations for the years ended December 31, 2022, December 31, 2021 and December 31, 2020. A discussion of the changes in mineral resources and mineral reserves from 2021 to 2022 is also included below.
Seabee Reserves as of December 31, 2022
ProvenProbableProven and Probable
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Seabee (UG)(1)(2)
867.71212,243 6.304552,329 6.3547698 %
Seabee Stockpile1610.0051610.00598 %
(1)Seabee Mineral Reserves are reported using $1,600/oz gold and a cut-off grade of 2.52 g/t gold. Processing recoveries vary based on the feed grade. The average recovery is estimated to be 98%.
(2)Seabee Mineral Reserves includes Santoy 8, Santoy 9, and Gap Hangingwall ("GHW") lodes.
Seabee Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferred
TonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
Gold(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Seabee (UG)(1)
8411.973278111.4428786511.493192,754 6.05536
(1)Seabee Mineral Resources are reported using $1,750/oz gold and a cut-off grade of 2.07 g/t gold. Mineral Resources are exclusive of Mineral Reserves.

Differences between the 2021 and 2022 Mineral Resources and Reserves are due to depletion at the Santoy mine.
The Qualified Persons are of the opinion that there are no material changes to the Mineral Resources and Reserves described herein as compared to the information presented in the Seabee 2021 Technical Report Summary.
65


Exploration
Historically, several rock and soil sampling programs have been executed on the SGO property. Over 1,200 surface rock samples and nearly 7,000 soil samples were collected between 1985 and 1988, with a further nearly 2,000 surface rock samples and over 7,000 soil samples collected between 1990 and 2013. Early samples were largely collected around the Laonil Lake, Porky Lake and Pine Lake areas, but the focus of exploration later shifted to the Santoy area.
Upon its acquisition of the SGO, SSR Mining performed a review of all exploration activities conducted on the property by previous operators. In addition to the data review, the Company executed an exploration program that included detailed mapping of the Herb West and Santoy Lake areas, as well as the collection of accompanying soil samples to be submitted for gold assay. Limited anomalous occurrences were identified from grab and soil sample results, and no new showings or gold in soil trends were recognized. The Company plans to map additional regions to the north and east within the Herb Lake area as additional shear zones are targeted. The Company has also planned further exploration in prospective areas east and west of the Santoy Lake area.
The objective of ongoing exploration conducted by SSR is to delineate, increase, and upgrade Mineral Resources. Underground drilling since 2016 focused on the Santoy 8 and 9 veins and the Gap Hangingwall and Santoy Hangingwall veins. Since 2016, surface drilling has tested a number of early-stage targets near the SGO infrastructure, notably the past producing Porky West deposit and Shane targets. In total, exploration at the SGO has comprised of surficial geochemical sampling, airborne and ground geophysical surveys and extensive drilling.
At the SGO, the three-year budget calls for an average of 80 km of combined surface and underground drilling per year between 2023 and 2024. This drilling is for testing of targets to maximize Mineral Resource potential at the mine as SSR develops its long-term strategy for continuing to replenish its 3–5 year reserve inventory in the same way it has for more than 20 years, with particular focus on bringing higher grade zones on stream to displace lower tenor inventory that currently occurs in the schedule from 2024 onwards.
Drilling
In 2022, a total of 96 drillholes totaling 41,257 meters and 307 drillholes totaling 37,711 meters from underground were drilled. To date, drilling completed on the SGO property (by SSR and previous operators) includes 2,475 surface drillholes totaling 549,037 meters and 6,436 underground drillholes totaling 1,200,029 meters.
Sampling, Analysis and Data Verification
All drill samples in respect of the Seabee Gold Operation underground drilling program and some samples from the surface program were assayed by our onsite non-accredited assay laboratory, which is not independent from the Company. Surface drilling samples not analyzed by our onsite assay laboratory were analyzed at Saskatchewan Research Council (“SRC”) formerly TSL Laboratories Inc. (“TSL”) in Saskatoon, Saskatchewan, which also serves as the QAQC laboratory for our onsite lab. Duplicate check assays were conducted at site as well as at SRC, which is independent from the Company. Mean results of the spot checks were consistent with those reported. Sampling interval was established by minimum or maximum sampling lengths and geological and/or structural criteria.
SGO site lab typically prepares two hundred-gram samples that were pulverized until greater than 80 percent passed through a 200-mesh screen. Thirty-gram pulp samples were then analyzed for gold by fire assay with gravimetric finish (0.01 g/t gold detection limit). SRC prepares a minus-200 mesh pulp (95% passing) weighing 250 grams from a minus 10 mesh coarse crush reject. Fire assay with Atomic Absorption finish was completed on a 30-gram aliquot to produce gold analytical results with a 0.003 g/t gold detection limit. Fire assay with gravimetric finish was prepared on those samples with greater than 3 g/t gold.
All regional exploration’s drill and surface samples are analyzed at SRC in Saskatoon, Saskatchewan. Duplicate check assays are conducted at SRC, which are independent from SSR Mining. Mean results of the spot checks were consistent with those reported. Sampling interval was established by minimum or maximum sampling lengths and geological or structural criteria.
66


Capital and Operating Costs.
Capital costs are estimated to be $116.7 million and are primarily composed of mine and plant equipment and the associated asset componentization as of December 31, 2022. Estimated operating costs for mine operations include both cash and non-cash costs.
Cost Component
Total
(US$M)
LOM Average ($/t Milled)
Mining$103 $45.61 
Surface Haulage13 5.65 
Milling (& Fixed Plant)80 35.26 
General & Admin153 67.51 
Total Operating Expense$349 $154.03 
Capital costs and operating costs are provided for mineral property disclosure purposes in accordance with NI 51-102 and are mining company financial measures. See “Additional Mining Company Financial Information” in this Item 2 for more information.
Costs in individual years may vary significantly as a result of, among other things, current or future nonrecurring expenditures, and changes to input costs and exchange rates. Please refer to the Seabee 2021 Technical Report Summary for other key metrics including detailed cash flows by year and net present value computations.
Fisher Property
The Company completed the acquisition of Taiga Gold Corp. on April 14 2022. The Company now owns 100% of the Fisher property. The Fisher property is contiguous to the SGO leases southeast of the Santoy mine.
Gold mineralization on the Fisher property is found in four major areas, and within 16 kilometers of the Santoy mine. Mineralization observed on the Fisher property to date is similar to that of Santoy, where disseminated to coarse gold-bearing sheeted quartz veins occur along major ductile shear zones. Like the SGO, the Fisher property is hosted within the Pine Lake greenstone belt, which is dominated by supracrustal rocks, including mafic volcanics, sediments, mafic intrusions and a range of felsic intrusions, of which some are directly associated with gold-bearing quartz veins. In 2022, the Company completed 17 diamond drill holes totaling 3,663 meters, including 10 holes at the Yin target and 7 holes at the George Lake target. A total of 54,780m have been drilled in the Fisher property. Summer fieldwork included geological mapping and rock and soil sampling along the George Lake trend. A high resolution UAV-supported aeromagnetic survey was also flown over the George Lake target area.
Puna Operations, Jujuy Province, Argentina
The Puna property (“Puna”) comprises the Chinchillas property and the Pirquitas property, both of which are located the Jujuy Province in far north Argentina. Puna is 100% owned by SSR Mining through its subsidiary Puna Operations Inc.
The total cost of Puna’s gross mineral properties, plant and equipment as of December 31, 2021 was $387.7 million.
Property Description and Location
The Chinchillas property is located in the Puna region of northwestern Argentina, in the province of Jujuy, department of Rinconada, approximately 290 kilometers northwest of San Salvador de Jujuy, the capital of Jujuy Province. The property is centered at elevations ranging from 4,000–4,200 meters above sea level. The property is centered at approximately at 3,473,150E and 7,512,360N (using the Gauss Kruger coordinate system, Argentina, Posgar Zone 3; 22⁰30′13″ south, 66°15′39″ west) at elevations ranging from 4,000–4,200 masl.
67


The Pirquitas Property is also located in the Rinconada Department in the Province of Jujuy, approximately 45 kilometers southwest of the Chinchillas Property and approximately 335 kilometers northwest of San Salvador de Jujuy. Activities at the Property are centered at elevations of between 4,000–4,450 meters above sea level. Activities at the property are centered at 22°42′ south latitude and 66°30′ west longitude.
ssrm-20221231_g7.jpg
The Chinchillas property is composed of three contiguous claims, totaling 2,043 hectares, and the Pirquitas operation includes surface rights covering an area of approximately 7,500 hectares, which is used for purposes such as housing, infrastructure facilities, processing facilities, proposed tailings facility and other facilities to support mining operations for Puna. Ore from the Chinchillas mine is transported to the Pirquitas plant for processing. The Chinchillas mine is located approximately 45 kilometers from the Pirquitas plant.
Concentrates produced at Puna are subject to a maximum 3% ‘mouth of mine value’ royalty that is payable to the Province of Jujuy. This royalty payment is based on the net recoverable value of the contained metals less certain operating costs.
68


History
Chinchillas was first prospected and mined in small scale in the eighteenth century by Jesuit missionaries. An initial mining concession was granted in 1956, with small scale production beginning after 1968 through 1982. Exploration and sampling were conducted on and off at Chinchillas between 1982 and the mid-2010s. Between the 1930s and 1995, the area of the Pirquitas mine had multiple small mining operations to recover silver and tin from placer and vein deposits, with comprehensive mineral exploration conducted on the property between 1995 and 2000. The Pirquitas mine was formally inaugurated in April 2009 and commercial production started in December of that year until open pit ore mining was completed in mid‑January 2017. The Pirquitas processing plant has been in continuous operation since 2009.
The Company entered into a joint venture in October 2015 comprising the Chinchillas property, the Pirquitas pit and the Pirquitas operations. The agreement included an 18‑month pre-development period to advance Chinchillas, including the infill drilling, engineering and environmental studies, and permitting, with an option for the Company to assume full ownership, which the Company exercised on March 31, 2017.
Geological Setting, Mineralization, and Deposit Types
The Chinchillas and Pirquitas properties are considered part of the Bolivian tin‑silver–zinc belt that extends from the San Rafael tin‑copper deposit in southern Peru into the Puna region of Jujuy and are located in the Puna geological belt. Deposits with similar environments and styles of mineralization include San Cristóbal, Potosí, and Pulacayo. These deposits are generally characterized by intrusion of dacite dome complexes with mineralization hosted in shears and breccias within the dacite domes and / or within shears and breccias within the host rocks. More rarely, as in the case of the Chinchillas Property and San Cristóbal, the deposits also contain disseminated flat lying manto bodies within sedimentary and pyroclastic rocks that are cut by the ‘feeder’ shears. All the deposits are known to have large vertical extents.
Significant silver-lead-zinc mineralization occurs in four main areas at the Chinchillas Property deposit: the Silver Mantos and Mantos Basement zones in the west part of the Project, and the Socavon del Diablo and Socavon Basement zones in the east part.
Mining Operations
The Chinchillas deposit is mined as a conventional open pit operation. Most of the in-pit haulage for both ore and waste is carried out using 100 tonne haul trucks. Ore is mined in five-meter benches and stockpiled in a staging area close to the pit. In the staging area, ore is loaded onto 35 tonne road trucks to be transported to the crusher at the Pirquitas operation. Throughout the mining operation, low grade ore is stockpiled near the pit rim to be processed at the end of mine life. Waste rock will be mined and hauled to two major on-site rock storage facilities based on their geochemical characteristics.
The nearest community to Chinchillas is the village of Santo Domingo, and nearest to Pirquitas is the village of Nuevo Pirquitas. Basic amenities are supplied from Susques and Abra Pampa, while supplies for mining are obtained through the provincial capital of San Salvador de Jujuy, which has an airport with daily commercial air service to Buenos Aires.
Infrastructure, Permitting and Compliance Activities
Infrastructure at Chinchillas is limited. Electricity onsite at Chinchillas is supplied along existing power lines from the generators at Pirquitas. Water supply for human consumption comes from bottled water, and water for mining operations is drawn from wells.
Pirquitas has been a permitted commercial mine and processing facility, operated by SSR Mining since December 2009, with existing infrastructure that includes a processing plant, a permitted tailings facility, a fully serviced workers camp sufficient for approximately 670 personnel, a communications system including cellular and intranet access, fully serviced office buildings, and wastewater treatment facilities, organic waste landfill and a recycling center. Electricity is produced from natural gas at the Pirquitas site. Water supply is from a site known as San Marcos, which is located within the property a short distance downstream from where the Pirquitas River drains into the Collahuaima River. Domestic water is pumped from a diversion upstream of the open pit for use at the camp.
69


Government permits required to conduct exploration, drilling and processing at Puna have been obtained.
Mineral Processing and Metallurgical Testing
The metallurgical testing of Chinchillas ore types commenced in 2013 and continued until 2016. The first testwork was focused on silver recovery by both leaching and flotation methods with flotation proving to be superior at this early stage. The second program continued process development of flotation into separate lead/silver and zinc concentrates. The third testwork campaign was designed to advance the flotation process and test specifically these ore types to the Pirquitas mill flow sheet.
The Pirquitas process plant operating performance since commencement on Chinchillas ores is used to provide the concentrate grade recovery and mass pull relationships.
Processing and Recovery Operations
The Pirquitas processing plant consists of crushing, grinding, and froth flotation to produce 2 products, a silver-lead and a zinc concentrate. These 2 product concentrates are bagged separately in one tonne bags and transported to Buenos Aires by truck for export to smelters. The Pirquitas process plant has continued to improve performance from the expected 4,000 tonnes per day feed capacity to 4,500 tonnes per day achieved in 2021.
Resource and Reserve Estimates
The following tables present the mineral reserves and mineral resources information for Puna. Additionally, see “Proven and Probable Reserve Estimates by Mineral” in this Item 2 for further information on the mineral resources and mineral reserves for Puna for the years ended December 31, 2022 and December 31, 2021, and see "Operating Statistics" in this Item 2 for further information on production of the Puna operations for the years ended December 31, 2022, December 31, 2021 and December 31, 2020. A discussion of the changes in mineral resources and mineral reserves from 2021 to 2022 is also included below.
70


Puna Reserves as of December 31, 2022
ProvenProbableProven and Probable
TonnesGradeSilverTonnesGradeSilverTonnesGradeSilverMetallurgical
Silver(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Chinchillas (OP)(1)(2)
1,818 163.519,556 4,393 155.2621,927 6,211 157.6831,483 98 %
Chinchillas (Stockpile)— — — 412123.751,639 412123.751,639 98 %
TonnesGradeLeadTonnesGradeLeadTonnesGradeLeadMetallurgical
Lead(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)Recovery
Chinchillas (OP)(1)(2)
1,818 1.37 54.84,393 1.28 124.06,211 1.31 178.895 %
Chinchillas (Stockpile)— — — 4121.19 10.84121.19 10.895 %
TonnesGradeZincTonnesGradeZincTonnesGradeZincMetallurgical
Zinc(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)Recovery
Chinchillas (OP)(1)(2)
1,818 0.26 10.54,393 0.22 21.26,211 0.23 31.763 %
Chinchillas (Stockpile)— — — 4120.60 5.44120.60 5.463 %
(1)Chinchillas Mineral Reserves are reported at NSR cut off value of $44.11 per tonne which incorporates appropriate metallurgical recoveries and includes lead and zinc attributable metals.
(2)Chinchillas processing recoveries vary based on the feed grade. The average recovery is estimated to be 98% for silver, 95% for lead and 63% for zinc.
71


Puna Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferred
TonnesGradeSilverTonnesGradeSilverTonnesGradeSilverTonnesGradeSilver
Silver(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Chinchillas(OP)(1)
828 110.312,935 4,548 103.7715,174 5,376 104.7818,109 123112.87446
Pirquitas (UG)(2)
79444.501,129 2,555 287.6723,627 2,634 292.3324,756 1,080 206.867,186 
TonnesGradeLeadTonnesGradeLeadTonnesGradeLeadTonnesGradeLead
Lead(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)
Chinchillas(OP)(1)
828 0.98 18.0 4,548 0.91 91.5 5,376 0.92 109.4 123 0.53 1.4 
Pirquitas (UG)(2)
79 0.20 0.3 2,555 0.02 1.1 2,634 0.02 1.4 1,080 — 0.1 
TonnesGradeZincTonnesGradeZincTonnesGradeZincTonnesGradeZinc
Zinc(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)(kt)%(Mlbs)
Chinchillas(OP)(1)
828 0.26 4.8 4,548 0.17 17.5 5,376 0.19 22.3 123 0.09 0.3 
Pirquitas (UG)(2)
79 1.17 2.0 2,555 4.56 256.8 2,634 4.46 258.9 1,080 7.45 177.4 
(1)Chinchillas Mineral Resource are contained within a pit shell generated using an NSR cut-off of $33.20. Metallurgical recoveries vary based on the grade and on average are 98% for silver, 95% for lead, and 63% for zinc. Mineral Resources are exclusive of Mineral Reserves.
(2)Piriquitas UG Mineral Resources are reported using a silver metal price of $20.00/oz, $1.10/lb lead, and $1.30/lb zinc. The cut-off grade includes lead and zinc attributable metal and is calculated at $100/t. Metallurgical recoveries vary with grade and on average are 87% for silver, 50% for lead, and 85% for zinc.
For the Puna operations as a whole, comparison of the 2022 Mineral Reserve with the 2021 Mineral Reserve and Mineral Resources shows a net decrease in contained silver and is attributed to mining depletion in 2022.
For Pirquitas, there was no change since EOY 2020 as there was no updated work on the Mineral Resource.
The Qualified Persons are of the opinion that there are no material changes to the Mineral Resources and Reserves described herein as compared to the information presented in the Puna 2021 Technical Report Summary.
Exploration
At Chinchillas, surface exploration programs included detailed mapping with a special emphasis on structures, rock chip sampling, trenching, soil sampling and talus sampling. These programs identified the major structural zones, the strong east–west control on basin formation, and new mineralized target areas. Work has included geophysical surveys IP ("Induced Polarization")/Resistivity, Controlled-Source Audio-Magnetotelluric Technique ("CSAMT"), Magnetics). Six drilling programs constituting approximately 60,000 meters of drilling were conducted at the Chinchillas property.
At Pirquitas, comprehensive mineral exploration was conducted on the property, including geological mapping, geophysical surveying (44 line-kilometers of ground magnetics and 19.2 line- kilometers of induced polarization surveying), underground rock sampling and multiple programs of RC and diamond drilling.
The Granada target area is at the intersection of the Potosi vein and Cortaderas vein-breccia in San Miguel Pit. The Potosí Vein is a west-northwest oriented steeply dipping vein. Colquechaca and Blanca Veins are located slightly north of Potosi, strike both northwest and southeast and variably dip steeply to the north and south.
72


In 2019–2020, the objective of the deep Granada drill program was to test the theorized intersection between the south west dipping Cortaderas vein breccia and the steeply north-dipping Potosi vein, located at depth beneath the San Miguel pit. Three HQ drill holes were completed between October 6, 2019 and January 31, 2020 and the total length drilled was 3,430 m. Results from the Granada drilling program intersected the two different mineral compositions that correspond with historically described veins. Mineralization is commonly filling open spaces as fracturing, brecciation, and faulting, usually as massive or semi-massive veins or veinlets, they have widths ranging commonly from 5–30 cm, and range up to 3.5 m. The Granada target was not encountered at the anticipated depth but the program did identify significant intersections of gold values below the elevation of previous mining within the San Miguel open pit (~4,000 m). The gold values are commonly associated with elevated concentrations of Ag, As, Bi, Cu, and Sn.
In 2022, exploration drilling was conducted on the Chinchillas and Pirquitas properties. At Chinchillas, 10,149 meters was completed in 59 drill holes in 2022. Drilling was completed within and around the margin of the open pit operation, and focused on reconciliation and resource expansion, as well as testing a series of high potential targets within 1.5 km of the operation. Areas tested include Socavon Del Diablo and the northern rim of the Chinchillas volcanic dome complex, evaluating targets hosted within both volcanic rocks and the adjacent brecciated sedimentary rocks.
At Pirquitas, 1,420 meters was completed in two deep holes testing the western margin of the Cortaderas vein-breccia deposit. The Cortaderas Vein gives outcrops at the south slope of the Cortaderas Valley around 500 m north of the San Luis project requires land accessMiguel Open Pit and use negotiationsoriented east-west with a dip direction around 60° to the southwest. Concentrations of vein-type sulphide mineralization were intersected at the expected depth and successfully expanded mineralization further to the northwest. Fieldwork earlier in the year focused on geological mapping and prospecting at both sites to help identify mineralization and identify drill targets.
Drilling
An early drilling program (before SSR, 2008), was effectively conducted in two phases, with the transition being marked by a change in analytical laboratories from American Assay Laboratories ("AAL") to the SGS Chile laboratory partway through its drilling program. RC drillholes AR 001-AR 092 and diamond core drillholes DDH 001-DDH 042 were analyzed by AAL, RC drillholes AR 093-AR 164 and diamond core drillholes DDH 043-DDH 069 were analyzed by SGS Chile. Both analytical labs took possession of the samples at Pirquitas and were in custody of them throughout the sample preparation and analysis steps (including sample transportation from site to the respective analytical laboratory). AAL set up sample preparation facilities on-site at Pirquitas whilst SGS Chile transported the samples to their analytical laboratory in Salta, Argentina. Each laboratory implemented QC programs that were reviewed and monitored by Sunshine Argentina and an independent consultant.
Alex Stewart is the primary laboratory and ALS in Peru ("ALS") is used as the secondary laboratory for check samples. All samples are tested for a suite of 39 elements including silver, lead and zinc by a four-acid digestion method and analysis by Inductively Coupled Plasma atomic emission spectroscopy ("ICP") (method ICP-MA-39). Silver greater than 200 parts per million (ppm) is assayed by fire assay using a 50 g sample with gravimetric finish (method Ag4A-50). Lead and zinc greater than 10,000 ppm are re-assayed by an oxidizing acid digestion for ore grade material and reading by ICP (method ICP-ORE).
ALS is used as secondary laboratory by method ME-ICP61 based on a four-acid digestion and reading by ICP. Samples greater than one percent lead or zinc are re-tested using ore grade method Pb-OG62 and Zn-OG62. Samples greater than 100 ppm silver are re-assayed by fire assay with gravimetric finish (method Ag-GRA22).
Sampling, Analysis and Data Verification
No material sample bias was identified by the Qualified Persons during the review of the drill data and assays. Observation of the drill core during the site visits and inspection and validation of the data collected convinced the Qualified Persons that the drill data are adequate for the estimation of measured, indicated and inferred mineral resources.
73


Capital and Operating Costs.
Total capital expenditure, exclusive of discretionary exploration, is estimated to be completed$31.6 million which is primarily composed of mine and plant equipment, tailings storage facility expansions and asset componentization as of December 31, 2022. Estimated operating costs for mine operations include both cash and non-cash costs.
DescriptionTotal ($M)LOM Average ($/t milled)
Mining Costs$75 $13.13 
Processing Costs142 24.84 
G&A Costs71 12.48 
Total$288 $50.45 
Capital costs and operating costs are provided for mineral property disclosure purposes in accordance with both communities. Exploration activities were successfully undertaken on land belongingNI 51-102 and are mining company financial measures. See “Additional Mining Company Financial Information” in this Item 2 for more information.
Costs in individual years may vary significantly as a result of, among other things, current or future nonrecurring expenditures, and changes to input costs and exchange rates. Please refer to the Ecash community inPuna 2021 Technical Report Summary for other key metrics including detailed cash flows by year and the company plans to extend exploration activities onto Cochabamba lands in 2022.net present value computations.
Qualified Persons
The Technical Report Summaries were prepared by OreWin, an independent mining consultancy based in Australia, and the following contributors, each of whom is an independent Qualified Persona qualified person for purposes of Subpart 1300 of Regulation S-K and NI 43-101:43-101, have approved the 2022 mineral resources and mineral reserves in this Annual Report, as set forth below (the "Qualified Persons"), and are of the opinion that there have been no material changes in the mineral reserves or mineral resources reported therein since the effective date of each Technical Report Summary:
In respect of the Çöpler District Master Plan 2021 Technical Report Summary, Bernard Peters, BEng (Mining), FAusIMM (201743), employed by OreWin as Technical Director - Mining, was responsible for the overall preparation, the Mineral Reserve estimates, Sections 1 to 5, Sections 10, Section 12 to 25; and Sharron Sylvester, BSc (Geol), RPGeo AIG (10125), employed by OreWin as Technical Director - Geology, was responsible for the preparation of the Mineral Resources, Sections 1 to 3, Section 6 to 9, Section 11, Sections 22 to 25.
In respect of the Marigold 2021 Technical Report Summary, Bernard Peters, BEng (Mining), FAusIMM (201743), employed by OreWin as Technical Director - Mining, was responsible for the overall preparation, the Mineral Reserve estimates, Sections 1 to 5, Sections 10, Section 12 to 25; and Sharron Sylvester, BSc (Geol), RPGeo AIG (10125), employed by OreWin as Technical Director - Geology, was responsible for the preparation of the Mineral Resources, Sections 1 to 3, Section 6 to 9, Section 11, Sections 22 to 25; OreWin Pty Ltd was responsible for the preparation of Sections 1 to 25.
In respect of the Seabee 2021 Technical Report Summary, Bernard Peters, BEng (Mining), FAusIMM (201743), employed by OreWin as Technical Director - Mining, was responsible for the overall preparation, the Mineral Reserve estimates, Sections 1 to 5, Sections 10, Section 12 to 25; and Sharron Sylvester, BSc (Geol), RPGeo AIG (10125), employed by OreWin as Technical Director - Geology, was responsible for the preparation of the Mineral Resources, Sections 1 to 3, Section 6 to 9, Section 11, Sections 22 to 25; OreWin Pty Ltd was responsible for the preparation of Sections 1 to 25.
In respect of the Puna 2021 Technical Report Summary, Gregory Gibson, BSc (Mining), SME(4134135)Karthik Rathnam, MAusIMM (CP), employed by SSR Mining as Vice President Americas Operations, was responsible for the preparation of Sections 1 to 25; Bernard Peters, BEng (Mining), FAusIMM (201743), employed by OreWin as Technical Director, - Mining, was responsible for the overall preparationResource Geology; and the Mineral Reserve estimates, Sections 1 to 5, Sections 10, Section 12 to 25; Sharron Sylvester, BSc (Geol)Brandon Heser, SME Registered Member (4119556), RPGeo AIG (10125), employed by OreWin as Technical Director - Geology, was responsible for the preparation of the Mineral Resources, Sections 1 to 3, Section 6 to 9, Section 11, Sections 22 to 25; OreWin Pty Ltd was responsible for the preparation of Sections 1 to 25.
Bernard Peters, an independent Qualified Person, has approved the 2021 mineral reserves, and Sharron Sylvester, an independent Qualified Person, has approved the 2021 mineral resources included in this Annual Report related to the Technical Report Summaries.
Additionally, Karthik Rathnam, a Qualified Person employed by SSR Mining as ManagerDirector, Mine Technical Services, have approved the Çöpler, Marigold, Seabee and Puna 2022 mineral resources and mineral reserves.
Karthik Rathnam, MAusIMM (CP), employed by SSR Mining as Director, Resource Geology, has approved the mineral resources and reserves included in this Annual Report in respect of the Pitarrilla, Mexico and San Luis, Peru exploration projects,project and Cengiz Demirci, a Qualified Person employed by SSR Mining as Vice President, Exploration, has approved the mineral resources and reserves included in this Annual Report in respect of the Amisk, Canada exploration project.
68


OreWin is not affiliated with SSR MiningThe Technical Report Summaries for each property were filed as part of our Annual Report on Form 10-K for the year ended December 31, 2021, and other than Gregory Gibson, Karthik Rathnameach Technical Report Summary was amended and Cengiz Demirci, nonefiled as part of the Qualified Persons identified above are employees of, or otherwise affiliated with, SSR Mining or any of its subsidiaries.Company's Current Reports on Form 8-K filed on September 29, 2022.
Internal Controls over the Mineral Reserves and Mineral Resources Estimation Process
The Company has internal controls over the mineral reserves and mineral resources estimation processes that result in reasonable and reliable estimates aligned with industry practice and reporting regulations. Annually, qualified persons and other employees review the estimates of mineral reserves and mineral resources, the supporting documentation, and compliance to the internal controls, and, based on their review of such information, recommend approval to use the mineral reserve and mineral resource estimates to our senior management. The Company’s controls utilize management systems including but not limited to, formal quality assurance and quality control protocols, standardized procedures, workflow processes, supervision and management approval, internal and external reviews and audits, reconciliations, and data security covering record keeping, chain of custody and data storage.
The Company's systems also cover exploration activities, sample preparation and analysis, data verification, mineral processing, metallurgical testing, recovery estimation, mine design and sequencing, and mineral reserve and resource evaluations, with environmental, social and regulatory considerations. The Company’s
74


quality assurance and control protocols over sampling and assaying of drill hole samples include insertion of blind samples consisting of standards, blanks, and duplicates in the primary sample streams, as well as selective sample validation at secondary laboratories.
These controls and other methods help to validate the reasonableness of the estimates. The effectiveness of the controls are reviewed periodically to address changes in conditions and the degree of compliance with policies and procedures. Refer to Item 1A. “Risk Factors” for discussion of risks associated with our estimates of mineral reserves and mineral resources.
6975


Proven and Probable Reserve Estimates by Mineral
Proven and probable Mineral Reserves are based on extensive drilling, sampling, geological modeling, and metallurgical testing from which economic feasibility has been determined. The price sensitivity of Mineral Reserves depends upon several factors including grade, metallurgical recovery, operating cost, waste-to-ore ratio and ore type. Metallurgical recovery rates vary depending on the metallurgical properties of each deposit and the production process used. The Mineral Reserve tables below list the average metallurgical recovery rate for each deposit, which takes into account the several different processing methods to be used. The cut-off grade, or lowest grade of mineralized material considered economic to process, varies with material type, metallurgical recoveries and operating costs.
The proven and probable Mineral Reserves presented herein are estimates based on information available at the time of calculation. No assurance can be given that the indicated levels of recovery of gold, silver, lead, zinc, and copper will be realized. Ounces of gold or silver, or pounds of copper, lead or zinc in the proven and probable Mineral Reserves are calculated without regard to any losses during metallurgical treatment. Mineral Reserves estimates may require revision based on actual production experience. Market price fluctuations of gold, silver, lead, zinc, and copper as well as increased production costscost of goods sold or reduced metallurgical recovery rates, could render proven and probable Mineral Reserves containing relatively lower grades of mineralization uneconomic to exploit and might result in a decrease in actual recovery as compared to the Mineral Reserves reported herein.
The Mineral Reserves presented below as of December 31, 2022 have been prepared in accordance with the U.S. Securities and Exchange Commission (SEC) Regulation S-K subpart 1300 rules for Property Disclosures for Mining Registrants (S-K 1300). Mineral Reserves metal prices used for preparation of the 2022 report, which were selected, in each case, by the Qualified Persons are: $1,350 per gold ounce, $18.50 per silver ounce, $0.90 per lead pound, $1.05 per zinc pound, and $3.30 per copper pound unless otherwise stated.
The Mineral Reserves presented below as of December 31, 2021 have been prepared in accordance with the U.S. Securities and Exchange Commission (SEC) Regulation S-K subpart 1300 rules for Property Disclosures for Mining Registrants (S-K 1300). Mineral Reserves metal prices used for preparation of the 2021 report, which were selected, in each case, by the Qualified Persons that prepared the 2021 Technical Report Summary for each property, are: $1,350 per gold ounce, $18.50 per silver ounce, $0.90 per lead pound, $1.05 per zinc pound, and $3.30 per copper pound unless otherwise stated.
The Mineral Reserves presented below as of December 31, 2020 have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). The Mineral Reserves metal price assumptions for 2020 report are: $1,350 per gold ounce, $18.50 per silver ounce, $0.90 per lead pound, $1.05 per zinc pound, and $3.00 per copper pound unless otherwise stated.
Technical Report Summaries for Çöpler, Marigold, Seabee and Chinchillas (Puna) operations, as amended, are available under the Company's profile on the SEDAR website at www.sedar.com and as part of the Company’s Annual ReportCurrent Reports on Form 10-K8-K filed on the SEC’s EDGAR website on September 29, 2022 at sec.gov. For additionalAdditionally, see "Resource and Reserve Estimates" previously presented in the individual property disclosures for each of Çöpler, Marigold, SGO and Puna of this Item 2 for further information abouton the projects, readers are encouraged to review the Company’s Annual Report on Form 10-K, which includes the Technical Report Summariesmineral resources and mineral reserves for each individual property.
The point of reference for Mineral Reserves is the point of feed into the processing facility for all projects except for Marigold, which is entry into the carbon columns in the processing facility.
Metals shown in the table are contained metals in ore mined and processed.
Tonnage is metric tonnes, ounces represent troy ounces, and g/t represents grams per metric tonne.
Figures may vary due to rounding.
7076


The following tables summarize the Company's estimated gold reserves asreflecting only the reserves attributable to SSR Mining's ownership or economic interest as of December 31, 20212022 and December 31, 2020 for2021 for each of its production and exploration assets:assets. The following tables solely reflect depletion that occurred through mining activity undertaken during 2022 and do not incorporate any drilling completed since the December 31, 2021 effective date of the Technical Report Summaries.
Gold Reserves as of December 31, 2021
Gold Reserves as of December 31, 2022Gold Reserves as of December 31, 2022
ProvenProbableProven and ProbableProvenProbableProven and Probable
SSRTonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgicalSSRTonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
DepositDepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)RecoveryDepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)(1)(2)(3) (4)
Çöpler (OP)(1)(2)(3) (4)
Turkey78%9,024 2.55 741 53,863 2.03 3,522 62,887 2.11 4,263 84 %
Çöpler (OP)(1)(2)(3) (4)
Türkiye80%7,166 2.56 590 40,524 2.03 2,648 47,690 2.11 3,238 84 %
Çöpler StockpileÇöpler StockpileTurkey80%— — — 12,479 2.25 901 12,479 2.25 901 91 %Çöpler StockpileTürkiye80%— — — 10,605 2.18 745 10,605 2.18 745 91 %
Marigold (OP)(5)
Marigold (OP)(5)
United States100%— — — 203,768 0.48 3,173 203,768 0.48 3,173 75 %
Marigold (OP)(5)
United States100%— — — 185,703 0.48 2,842 185,703 0.48 2,842 75 %
Marigold (leach pad inventory)Marigold (leach pad inventory)United States100%— — — — — 237 — — 237 71 %Marigold (leach pad inventory)United States100%— — — — — 314 — — 314 74 %
Seabee (UG)(6)(7)
Seabee (UG)(6)(7)
Canada100%304 9.16 90 2,379 6.40 490 2,684 6.72 580 98 %
Seabee (UG)(6)(7)
Canada100%86 7.71 21 2,243 6.30 455 2,329 6.35 476 98 %
Seabee StockpileSeabee StockpileCanada100%— — — 16 10.00 16 10.00 98 %
9,328 2.77 831 272,489 0.92 8,323 281,818 0.98 9,154 78 %7,252 2.62 611 239,091 0.87 7,009 246,343 0.92 7,620 77 %
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine, Cakmaktepe and Ardich.Çakmaktepe Extension.
(2)Mineral Reserves shown are SSR ownership share only. SSR owns 80% in both Anagold and Kartaltepe licenses. Cakmaktepe, Bayramdere and part of Çakmaktepe Extension fall within Kartaltepe license.
(3)Mineral Reserve cut-offs are based on $1,350/oz gold price. The average oxide recoveries are 61% and average sulfide recoveries are 91%. All cut-off values include allowance for royalty payable. There are no credits for silver or copper in the cut-off calculations. Oxide cutoff grades vary between 0.44-0.80g/t gold and sulphide cutoff grades vary between 1.05-1.11g/t gold.
(4)There are no sulfide Mineral Reserves at Çakmaktepe and Bayramdere.
(5)Marigold Mineral Reserves are reported at a cut-off grade of 0.065 g/t payable gold (gold assay factored for metallurgical recovery, royalty, and net proceeds). No mining dilution is applied to the grade of the Mineral Reserves. Dilution intrinsic to the Mineral Reserves estimate is considered sufficient to represent the mining selectivity considered.
(6)Seabee Mineral Reserves are reported using $1,600/oz gold and a cut-off grade of 2.52 g/t gold. Processing recoveries vary based on the feed grade. The average recovery is estimated to be 98%.
(7)Seabee Mineral Reserves includes Santoy 8, Santoy 9, and Gap Hangingwall ("GHW") lodes.

77


Gold Reserves as of December 31, 2021
ProvenProbableProven and Probable
SSRTonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
DepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)(1)(2)(3) (4)
Türkiye79%7,033 2.54 574 42,481 2.03 2,774 49,514 2.10 3,348 84 %
Çöpler StockpileTürkiye80%— — — 9,980 2.25 721 9,980 2.25 721 91 %
Marigold (OP)(5)
United States100%— — — 203,768 0.48 3,173 203,768 0.48 3,173 75 %
Marigold (leach pad inventory)United States100%— — — — — 237 — — 237 71 %
Seabee (UG)(6)(7)
Canada100%304 9.16 90 2,379 6.40 490 2,684 6.72 580 98 %
7,337 2.81 664 258,608 0.86 7,395 265,946 0.91 8,059 78 %
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine, Cakmaktepe and Çakmaktepe Extension.
(2)Mineral Reserves shown on a 100% basis.are SSR ownership share only. SSR Ownership is an average based on location of Mineral Reserves (gold) relative to licenses: Çöpler and part of ArdichÇakmaktepe Extension are on Anagold 80:20 ground ofon which SSR holds 80% rights, and Çakmaktepe, Bayramdere and the remainder of ArdichÇakmaktepe Extension are on Kartaltepe 50:50 ground ofon which SSRthe Company holds 50% rights. Total ownership percentages are weighted averages.
(3)Mineral Reserve cut-offs are based on $1,350/oz gold price. The average oxide recoveries are 73%61% and average sulfide recoveries are 91%. All cut-off values include allowance for royalty payable. There are no credits for silver or copper in the cut-off calculations. Oxide cutoff grades vary between 0.44-0.80g/t gold and sulphide cutoff grades vary between 1.05-1.11g/t gold.
(4)There are no sulfide Mineral Reserves at Çakmaktepe and Bayramdere.
(5)Marigold Mineral Reserves are reported at a cut-off grade of 0.065 g/t payable gold (gold assay factored for metallurgical recovery, royalty, and net proceeds). No mining dilution is applied to the grade of the Mineral Reserves. Dilution intrinsic to the Mineral Reserves estimate is considered sufficient to represent the mining selectivity considered.
(6)Seabee Mineral Reserves are reported using $1,600/oz gold and a cut-off grade of 2.52 g/t gold. Processing recoveries vary based on the feed grade. The average recovery is estimated to be 98%.
(7)Seabee Mineral Reserves includes Santoy 8, Santoy 9, and Gap Hangingwall ("GHW") lodes.


71
78


Gold Reserves as of December 31, 2020
ProvenProbableProven and Probable
SSRTonnesGradeGoldTonnesGradeGoldTonnesGradeGoldMetallurgical
DepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)(1)(2)(3) (4)
Turkey78%2,196 2.31 163 47,617 2.03 3,109 49,814 2.04 3,273 84 %
Çöpler StockpileTurkey80%— — — 6,993 2.54 571 6,993 2.54 571 91 %
Marigold (OP)(5)
United States100%— — — 219,398 0.49 3,425 219,398 0.47 3,425 75 %
Marigold (leach pad inventory)United States100%— — — — — 270 — — 270 73 %
Seabee (UG)(6)
Canada100%529 8.79 150 1,031 10.37 344 1,560 9.83 493 98 %
2,725 3.57 313 275,039 0.84 7,719 277,765 0.87 8,032 77 %
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine and Cakmaktepe.
(2)Çöpler Mineral Reserves are reported at the following cut-off grades: oxide cut-off grades are 0.47-0.71 g/t gold and Çöpler sulfide cut-off grade is 1.05 g/t gold. All cut-off grades include allowance for royalty payable.
(3)Metallurgical recoveries vary with grade and average recoveries for oxide is 61% and for sulphides is 91%. The overall average recovery is 84%.
(4)Copler Reserves are located on ground held 80% by SSR and Çakmaktepe reserves (<1%) of the total reserves on ground 50% by SSR.
(5)Marigold Mineral Reserves are reported using $1,350/oz gold and at a gold cut-off grade of 0.065 g/t which incorporates royalty and metallurgical recovery.
(6)Seabee Mineral Reserves are reported using $1,350/oz gold and a cut-off grade of 3.99 g/t gold.


72


The following tables summarize the Company's estimated silver reserves reflecting only the reserves attributable to SSR Mining's ownership or economic interest as ofDecember 31, 2022 and December 31, 2021 and December 31, 2020 for each of its production and exploration assets:
Silver Reserves as of December 31, 2021
Silver Reserves as of December 31, 2022Silver Reserves as of December 31, 2022
ProvenProbableProven and ProbableProvenProbableProven and Probable
SSRTonnesGradeSilverTonnesGradeSilverTonnesGradeSilverMetallurgicalSSRTonnesGradeSilverTonnesGradeSilverTonnesGradeSilverMetallurgical
DepositDepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)RecoveryDepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)(1)(2)(3)(4)
Çöpler (OP)(1)(2)(3)(4)
Turkey78%9,024 4.15 1,203 53,863 4.48 7,765 62,887 4.44 8,968 %
Çöpler (OP)(1)(2)(3)(4)
Türkiye80%7,166 4.11 947 40,524 4.48 5,834 47,690 4.42 6,781 %
Chinchillas (OP)(5)(6)
Chinchillas (OP)(5)(6)
Argentina100%2,379 168.91 12,918 5,041 155.30 25,174 7,420 159.68 38,092 98 %
Chinchillas (OP)(5)(6)
Argentina100%1,818 163.51 9,556 4,393 155.26 21,927 6,211 157.68 31,483 98 %
Chinchillas (Stockpile)Chinchillas (Stockpile)Argentina100%— — — 187 141.00 846 187 141.00 846 98 %Chinchillas (Stockpile)Argentina100%— — — 412 123.75 1,639 412 123.75 1,639 98 %
11,403 38.52 14,121 59,091 17.78 33,785 70,494 21.14 47,906 19 %8,984 36.36 10,503 45,329 20.17 29,400 54,313 22.85 39,903 20 %
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine, Cakmaktepe and Ardich.Çakmaktepe Extension.
(2)Mineral Reserves shown are shown on a 100% basis. SSR Ownership is an average based on location of Mineral Reserves (gold) relative to licenses: Çöplerownership share only. SSR owns 80% in both Anagold and Kartaltepe licenses. Cakmaktepe, Bayramdere and part of Ardich are on Anagold 80:20 ground of which SSR holds 80% rights, and Çakmaktepe Bayramdere and the remainder of Ardich are onExtension fall within Kartaltepe 50:50 ground of which SSR holds 50% rights. Total ownership percentages are weighted averages.license.
(3)Mineral Reserve cut-offs are based on $1,350/oz gold price. The average oxide recoveries are 73%61% and average sulfide recoveries are 91%. The weighted average gold recovery is 84%. All cut-off values include allowance for royalty payable. There are no credits for silver or copper in the cut-off calculations. Oxide cutoff grades vary between 0.44-0.80g/t gold and sulphide cutoff grades vary between 1.05-1.11g/t gold.
(4)There are no sulfide Mineral Reserves at Çakmaktepe and Bayramdere.
(5)Chinchillas Mineral Reserves are reported at NSR cut off value of $44.11 per tonne which incorporates appropriate metallurgical recoveries and includes lead and zinc attributable metals.
(6)Chinchillas processing recoveries vary based on the feed grade. The average recovery is estimated to be 98% for silver 93% for lead and 63% for zinc..

7379


Silver Reserves as of December 31, 2020
Silver Reserves as of December 31, 2021Silver Reserves as of December 31, 2021
ProvenProbableProven and ProbableProvenProbableProven and Probable
SSRTonnesGradeSilverTonnesGradeSilverTonnesGradeSilverMetallurgicalSSRTonnesGradeSilverTonnesGradeSilverTonnesGradeSilverMetallurgical
DepositDepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)RecoveryDepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)Recovery
Çöpler (OP)(1)(2)(3)(4)
Çöpler (OP)(1)(2)(3)(4)
Turkey78%2,196 7.70 544 47,617 5.03 8,836 49,814 5.85 9,379 %
Çöpler (OP)(1)(2)(3)(4)
Türkiye79%7,033 4.06 918 42,481 4.47 6,100 49,514 4.41 7,018 %
Chinchillas (OP)(5)(6)
Chinchillas (OP)(5)(6)
Argentina100%420 142.58 1,926 7,614 162.17 39,696 8,034 161.14 41,622 96 %
Chinchillas (OP)(5)(6)
Argentina100%2,379 168.91 12,918 5,041 155.30 25,174 7,420 159.68 38,092 98 %
Chinchillas (Stockpile)Chinchillas (Stockpile)Argentina100%— — — 339 126.74 1,382 339 126.74 1,382 94 %Chinchillas (Stockpile)Argentina100%— — — 187 141.00 846 187 141.00 846 98 %
2,616 29.35 2,470 55,570 27.94 49,914 58,187 28.00 52,383 21 %9,412 45.72 13,836 47,709 20.94 32,120 57,121 25.02 45,956 21 %
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine, Cakmaktepe and Cakmaktepe.Çakmaktepe Extension.
(2)Çöpler Mineral Reserves shown are reported at the following cut-off grades: oxide cut-off grades are 0.47-0.71 g/t gold andSSR ownership share only. SSR Ownership is an average based on location of Mineral Reserves (gold) relative to licenses: Çöpler and part of Çakmaktepe Extension are on Anagold 80:20 ground on which SSR holds 80% rights, and Çakmaktepe, Bayramdere and the remainder of Çakmaktepe Extension are on Kartaltepe 50:50 ground on which SSR holds 50% rights. Total ownership percentages are weighted averages.
(3)Mineral Reserve cut-offs are based on $1,350/oz gold price. The average oxide recoveries are 61% and average sulfide cut-off graderecoveries are 91%. The weighted average gold recovery is 1.05 g/t gold.84%. All cut-off gradesvalues include allowance for royalty payable.
(3)Metallurgical recoveries There are no credits for silver or copper in the cut-off calculations. Oxide cutoff grades vary withbetween 0.44-0.80g/t gold grade and the average silver recovery is 9%.sulphide cutoff grades vary between 1.05-1.11g/t gold.
(4)Çöpler mineThere are no sulfide Mineral Reserves are located on ground held 80% by SSRat Çakmaktepe and Çakmaktepe Mineral Reserves (<1%) are located on ground held 50% by SSRBayramdere.
(5)Chinchillas Mineral Reserves are reported at NSR cut off value of $44.11 per tonne which incorporates appropriate metallurgical recoveries and includes lead and zinc attributable metals. Metal price assumptions
(6)Chinchillas processing recoveries vary based on the feed grade. The average recovery is estimated to be 98% for reserves are $18.00/oz silver, $0.90/lb lead, and $1.00/lb zinc.silver.
7480


The following tables summarize the Company's estimated lead reserves reflecting only the reserves attributable to SSR Mining's ownership or economic interest as of December 31, 20212022 and December 31, 20202021 for each of its production and exploration assets:
Lead Reserves as of December 31, 2021
Lead Reserves as of December 31, 2022Lead Reserves as of December 31, 2022
ProvenProbableProven and ProbableProvenProbableProven and Probable
SSRTonnesGradeLeadTonnesGradeLeadTonnesGradeLeadMetallurgicalSSRTonnesGradeLeadTonnesGradeLeadTonnesGradeLeadMetallurgical
DepositDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)RecoveryDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)Recovery
Chinchillas (OP)(1)(2)
Chinchillas (OP)(1)(2)
Argentina100%2,379 1.33 69.7 5,041 1.29 143.4 7,420 1.30 213.1 95 %
Chinchillas (OP)(1)(2)
Argentina100%1,818 1.37 54.8 4,393 1.28 124.0 6,211 1.31 178.8 95 %
Chinchillas StockpileChinchillas StockpileArgentina100%— — — 187 1.33 5.5 187 1.33 5.5 95 %Chinchillas StockpileArgentina100%— — — 412 1.19 10.8 412 1.19 10.8 95 %
2,379 1.33 69.7 5,228 1.29 148.9 7,607 1.30 218.6 95 %1,818 1.37 54.8 4,805 1.27 134.8 6,623 1.30 189.6 95 %
(1)Chinchillas Mineral Reserves are reported at NSR cut off value of $44.11 per tonne which incorporates appropriate metallurgical recoveries and includes silver and zinc attributable metals.
(2)Chinchillas processing recoveries vary based on the feed grade. The average recovery is estimated to be 98%95% for silver, 93% for lead, and 63% for zinc.lead.

Lead Reserves as of December 31, 2020
Lead Reserves as of December 31, 2021Lead Reserves as of December 31, 2021
ProvenProbableProven and ProbableProvenProbableProven and Probable
SSRTonnesGradeLeadTonnesGradeLeadTonnesGradeLeadMetallurgicalSSRTonnesGradeLeadTonnesGradeLeadTonnesGradeLeadMetallurgical
DepositDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)RecoveryDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)Recovery
Chinchillas (OP)(1)(2)
Chinchillas (OP)(1)(2)
Argentina100%420 0.73 6.8 7,614 1.39 232.6 8,034 1.35 239.4 96 %
Chinchillas (OP)(1)(2)
Argentina100%2,379 1.33 69.7 5,041 1.29 143.4 7,420 1.30 213.1 95 %
Chinchillas StockpileChinchillas StockpileArgentina100%— — — 339 0.84 6.3 339 0.84 6.3 94 %Chinchillas StockpileArgentina100%— — — 187 1.33 5.5 187 1.33 5.5 95 %
420 0.73 6.8 7,953 1.36 238.9 8,373 1.33 245.7 96 %2,379 1.33 69.7 5,228 1.29 148.9 7,607 1.30 218.6 95 %
(1)Chinchillas Mineral Reserves are reported at NSR cut off value of $44.11 per tonne which incorporates appropriate metallurgical recoveries and includes silver and zinc attributable metals. Metal price assumption
(2)Chinchillas processing recoveries vary based on the feed grade. The average recovery is estimated to be 95% for reserves are $0.90/lb lead.


7581


The following tables summarize the Company's estimated zinc reserves reflecting only the reserves attributable to SSR Mining's ownership or economic interest as of December 31, 20212022 and December 31, 2020 for2021 for each of its production and exploration assets:
Zinc Reserves as of December 31, 2021
Zinc Reserves as of December 31, 2022Zinc Reserves as of December 31, 2022
ProvenProbableProven and ProbableProvenProbableProven and Probable
SSRTonnesGradeZincTonnesGradeZincTonnesGradeZincMetallurgicalSSRTonnesGradeZincTonnesGradeZincTonnesGradeZincMetallurgical
DepositDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)RecoveryDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)Recovery
Chinchillas (OP)(1)(2)
Chinchillas (OP)(1)(2)
Argentina100%2,379 0.34 17.8 5,041 0.25 27.8 7,420 0.28 45.6 63 %
Chinchillas (OP)(1)(2)
Argentina100%1,818 0.26 10.5 4,393 0.22 21.2 6,211 0.23 31.7 63 %
Chinchillas StockpileChinchillas StockpileArgentina100%— — — 187 0.50 2.1 187 0.50 2.1 63 %Chinchillas StockpileArgentina100%— — — 412 0.60 5.4 412 0.60 5.4 63 %
2,379 0.34 17.8 5,228 0.26 29.9 7,607 0.28 47.7 63 %1,818 0.26 10.5 4,805 0.25 26.6 6,623 0.25 37.1 63 %
(1)Chinchillas Mineral Reserves are reported at NSR cut off value of $44.11 per tonne which incorporates appropriate metallurgical recoveries and includes silver and lead attributable metals.
(2)Chinchillas processing recoveries vary based on the feed grade. The average recovery is estimated to be 98% for silver, 95% for lead and 63% for zinc.

Zinc Reserves as of December 31, 2020
Zinc Reserves as of December 31, 2021Zinc Reserves as of December 31, 2021
ProvenProbableProven and ProbableProvenProbableProven and Probable
SSRTonnesGradeZincTonnesGradeZincTonnesGradeZincMetallurgicalSSRTonnesGradeZincTonnesGradeZincTonnesGradeZincMetallurgical
DepositDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)RecoveryDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)Recovery
Chinchillas (OP)(1)(2)
Chinchillas (OP)(1)(2)
Argentina100%420 0.37 3.4 7,614 0.36 60.4 8,034 0.36 63.8 15 %
Chinchillas (OP)(1)(2)
Argentina100%2,379 0.34 17.8 5,041 0.25 27.8 7,420 0.28 45.6 63 %
Chinchillas StockpileChinchillas StockpileArgentina100%— — — 339 0.45 3.4 339 0.45 3.4 68 %Chinchillas StockpileArgentina100%— — — 187 0.50 2.1 187 0.50 2.1 63 %
420 0.37 3.4 7,953 0.36 63.8 8,373 0.36 67.2 17 %2,379 0.34 17.8 5,228 0.26 29.9 7,607 0.28 47.7 63 %
(1)Chinchillas Mineral Reserves are reported at NSR cut off value of $44.11 per tonne which incorporates appropriate metallurgical recoveries and includes silver and lead attributable metals.
(2)Chinchillas processing recoveries vary based on the feed grade. The metal price assumptionaverage recovery is estimated to be 63% for reserves is $1.00/lb zinc.


7682


The following tables summarize the Company's estimated copper reserves reflecting only the reserves attributable to SSR Mining's ownership or economic interest as of December 31, 20212022 and December 31, 20202021 for each of its production and exploration assets:
Copper Reserves as of December 31, 2021
Copper Reserves as of December 31, 2022Copper Reserves as of December 31, 2022
ProvenProbableProven and ProbableProvenProbableProven and Probable
SSRTonnesGradeCopperTonnesGradeCopperTonnesGradeCopperMetallurgicalSSRTonnesGradeCopperTonnesGradeCopperTonnesGradeCopperMetallurgical
DepositDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)RecoveryDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)Recovery
Çöpler (OP)(1)(2)(3)(4)(5)(6)
Çöpler (OP)(1)(2)(3)(4)(5)(6)
Turkey78%9,024 — 0.2 53,863 0.01 9.2 62,887 0.01 9.4 %
Çöpler (OP)(1)(2)(3)(4)(5)(6)
Türkiye80%7,166 — 0.2 40,524 0.01 6.7 47,690 0.01 6.9 %
9,024 — 0.2 53,863 0.01 9.2 62,887 0.01 9.4 %7,166 — 0.2 40,524 0.01 6.7 47,690 0.01 6.9 %
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine, Cakmaktepe and Ardich.Çakmaktepe Extension.
(2)Mineral Reserves shown are SSR ownership share only. SSR owns 80% in both Anagold and Kartaltepe licenses. Cakmaktepe, Bayramdere and part of Cakmaktepe Extension fall within Kartaltepe license
(3)Mineral Reserve cut-offs are based on $1,350/oz gold price. The average oxide recoveries are 61% and average sulfide recoveries are 91%. All cut-off values include allowance for royalty payable. There are no credits for silver or copper in the cut-off calculations. Oxide cutoff grades varies between 0.44-0.80g/t gold and sulphide cutoff grades vary between 1.05-1.11g/t gold.
(4)There are no sulfide Mineral Reserves at Çakmaktepe.
(5) There is no copper recovery in sulphide material.
(6) Copper oxide recoveries are 2%.
83


Copper Reserves as of December 31, 2021
ProvenProbableProven and Probable
SSRTonnesGradeCopperTonnesGradeCopperTonnesGradeCopperMetallurgical
DepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)Recovery
Çöpler (OP)(1)(2)(3)(4)(5)(6)
Türkiye79%7,033 — 0.2 52,461 0.01 7.3 59,494 0.01 7.4 %
7,033 — 0.2 52,461 0.01 7.3 59,494 0.01 7.4 %
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine, Cakmaktepe and Çakmaktepe Extension.
(2)Mineral Reserves shown on a 100% basis.are SSR ownership share only. SSR Ownership is an average based on location of Mineral Reserves (gold) relative to licenses: Çöpler and part of ArdichÇakmaktepe Extension are on Anagold 80:20 ground ofon which SSR holds 80% rights, and Çakmaktepe, Bayramdere and the remainder of ArdichÇakmaktepe Extension are on Kartaltepe 50:50 ground ofon which SSR holds 50% rights. Total ownership percentages are weighted averages.
(3)Mineral Reserve cut-offs are based on $1,350/oz gold price. The average oxide recoveries are 73%61% and average sulfide recoveries are 91%. All cut-off values include allowance for royalty payable. There are no credits for silver or copper in the cut-off calculations. Oxide cutoff grades vary between 0.44-0.80g/t gold and sulphide cutoff grades vary between 1.05-1.11g/t gold.
(4)There are no sulfide Mineral Reserves at Çakmaktepe and Bayramdere.Çakmaktepe.
(5) There is no copper recovery in sulphide material.
(6) Copper oxide recoveries are 2%.
Copper Reserves as of December 31, 2020
ProvenProbableProven and Probable
SSRTonnesGradeCopperTonnesGradeCopperTonnesGradeCopperMetallurgical
DepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)Recovery
Çöpler (OP)(1)(2)(3)(4)(5)
Turkey78%2,196 0.01 0.3 47,344 0.02 18.1 49,540 0.02 18.4 %
2,196 0.01 0.3 47,344 0.02 18.1 49,540 0.02 18.4 %
isis
(1)Çöpler Mineral Reserves includes reserves from Çöpler Mine and Cakmaktepe.
(2)Çöpler Mineral Reserves are reported at the following cut-off grades: oxide cut-off grades are 0.47-0.71 g/t gold and Çöpler sulfide cut-off grade is 1.05 g/t gold. All cut-off grades include allowance for royalty payable.
(3)Çöpler mine Mineral Reserves are located on ground held 80% by SSR and Çakmaktepe Mineral Reserves (<1%) are located on ground held 50% by SSR.
(4)Metallurgical recoveries vary with grade and average recoveries for oxide is 2%.
(5)There is no copper recovery in sulphides.
77


Resource Estimates by Mineral
Mineral Resources are presented exclusive of Mineral Reserves. Due to the uncertainty that may be attached to Inferred Mineral Resources, it cannot be assumed that all or any part of an Inferred Mineral Resource will be upgraded to an Indicated or Measured Mineral Resource as a result of continued exploration.
The Mineral Resources presented below as of December 31, 2022 have been prepared in accordance with the U.S. Securities and Exchange Commission (SEC) Regulation S-K subpart 1300 rules for Property Disclosures for Mining Registrants (S-K 1300). Mineral Resources metal prices used for preparation of the 2021 report, which were selected, in each case, by the applicable Qualified Persons for each property, are: $1,750 per gold ounce, $22.00 per silver ounce, $0.95 per lead pound, $1.15 per zinc pound, and $3.95 per copper pound unless otherwise stated.
The Mineral Resources presented below as of December 31, 2021 have been prepared in accordance with the U.S. Securities and Exchange Commission (SEC) Regulation S-K subpart 1300 rules for Property Disclosures for Mining Registrants (S-K 1300). Mineral Resources metal prices used for preparation of the 2021 report, which were selected, in each case, by the applicable Qualified Persons for each property, are: $1,750 per gold ounce, $22.00 per silver ounce, $0.95 per lead pound, $1.15 per zinc pound, and $3.95 per copper pound unless otherwise stated.
The Mineral Resources presented below as of December 31, 2020 have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Resources metal prices used for preparation of the 2020 report are: $1,750 per gold ounce, $22.00 per silver ounce, $1.00 per lead pound, $1.15 per zinc pound, and $3.25 per copper pound unless otherwise stated in the footnotes.
The point of reference for Mineral Resources is the point of feed into the processing facility for all projects except for Marigold, which is entry into the carbon columns in the processing facility.
Metals shown in the tables below are contained metals in ore mined and processed.
84


Tonnage is metric tonnes, ounces represent troy ounces, and g/t represents grams per metric tonne.
Figures may vary due to rounding.

7885


The following tables summarize the Company's estimated gold resources reflecting only the resources attributable to SSR Mining's ownership or economic interest as of December 31, 20212022 and 20202021 for each of its production and exploration assets:
Gold Resources as of December 31, 2021
Gold Resources as of December 31, 2022Gold Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferredMeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGoldSSRTonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
DepositDepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)DepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Turkey77%3,306 1.92 204 88,948 1.03 2,933 92,254 1.06 3,137 103,154 1.17 3,875 
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Türkiye80%2,598 1.94 162 68,368 1.04 2,284 70,966 1.07 2,446 82,394 1.17 3,097 
Marigold (OP)(8)((9)
Marigold (OP)(8)((9)
United States100%— — — 115,294 0.43 1,611 115,294 0.43 1,611 21,795 0.36 250 
Marigold (OP)(8)((9)
United States100%— — — 115,294 0.43 1,611 115,294 0.43 1,611 21,680 0.36 249 
Seabee (UG)(10)
Seabee (UG)(10)
Canada100%71 19.75 45 797 12.23 313 869 12.83 358 2,754 6.05 536 
Seabee (UG)(10)
Canada100%84 11.97 32 781 11.44 287 865 11.49 319 2,754 6.05 536 
Amisk (OP)(11)
Amisk (OP)(11)
Canada100%— — — 43,976 0.73 1,028 43,976 0.73 1,028 49,985 0.52 830 
Amisk (OP)(11)
Canada100%— — — 43,976 0.73 1,028 43,976 0.73 1,028 49,985 0.52 830 
San Luis (UG)(12)
San Luis (UG)(12)
Peru100%— — — 484 22.40 349 484 22.43 349 20 5.60 
San Luis (UG)(12)
Peru100%— — — 484 22.43 349 484 22.43 349 20 5.60 
3,377 2.30 249 249,499 0.78 6,234 252,877 0.80 6,483 177,708 0.96 5,495 2,682 2.25 194 228,903 0.76 5,559 231,585 0.77 5,753 156,833 0.94 4,716 
(1)Çöpler Mineral Resources include resources from Çöpler Mine, Cakmaktepe, ArdichÇakmaktepe Extension and Bayramdere.
(2)Mineral Resources shown are shown on a 100% basis. SSR Ownership is an average based on location of Mineral Resources (gold) relative to licenses: Çöplerownership share only. SSR owns 80% in both Anagold and Kartaltepe licenses. Cakmaktepe, Bayramdere and part of Ardich are on Anagold 80:20 ground of which SSR holds 80% rights, and Çakmaktepe Bayramdere and the remainder of Ardich are onExtension fall within Kartaltepe 50:50 ground of which SSR holds 50% rights. Total ownership percentages are weighted averages.license.
(3)All Mineral Resources for Çöpler were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual pit shells ($1,400/oz gold and $19.00/oz silver for Bayramdere).
(4)Oxide definitions: At Çöpler: oxide is defined as material <2% total sulfur and sulfide material is ≥2% total sulfur. At ArdichÇakmaktepe Extension and Çakmaktepe, oxide is comprised of low-sulfur (LS) oxide (<1% total sulfur) and high-sulfur oxide (≥1% and <2% total sulfur). At Bayramdere, oxide is defined as material <2% total sulfur.
(5)Sulfide definitions: At Ardich,Çakmaktepe Extension, sulfide is comprised of standard sulfide material (≥2% total sulfur) and sulfide-with-Cu material (sulfide with Cu>0.10%). There is no sulfide material at Çakmaktepe or Bayramdere.
(6)Mineral Resources are reported at the variable gold cut-off grades based on different metallurgical parameters: oxide cut-off grades are 0.19-0.76 g/t gold, sulfide cut-off uses an NSR value in $/t based on gold price of $1,750/oz, silver price of $22.00/oz, and copper price of $3.95/lb with allowances for payability, deductions, transport, and royalties.
(7)Çöpler oxide recoveries vary between 38.0-78.4% and sulphide recoveries vary between 55-98%.
(8)Marigold Mineral Resource estimate is based on an optimised pit shell at a cut off grade of 0.065 g/t payable gold (gold assay factored for recovery, royalty, and net proceeds).
(9)Marigold metallurgical recoveries varies with gold grade and on average recoveries are 67%
(10)Seabee Mineral Resources are reported using a cut-off grade of 2.07 g/t and were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual underground shapes. Mineral resources includes Santoy 8, Santoy 9, and GHW lodes.
(11)Amisk Mineral Resources are reported using a gold equivalent cut-off grade of 0.30 g/t and include silver attributable ounces. Average gold recovery is 90%.
(12)San Luis Mineral Resources are reported at gold price assumptions of $600/oz using a gold equivalent cut-off grade of 6.0 g/t and include silver attributable ounces. Average gold recovery is 94%.

7986


Gold Resources as of December 31, 2020
MeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
DepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Turkey76%5,707 1.70 312 70,619 1.34 3,049 76,326 1.37 3,362 73,741 1.30 3,089 
Marigold (OP)(8)
United States100%— — — 121,332 0.43 1,680 121,332 0.43 1,680 28,597 0.36 334 
Seabee (UG)(9)
Canada100%24 103.17 80 1,421 9.40 429 1,445 10.97 510 2,030 7.77 507 
Amisk (OP)(10)
Canada100%— — — 43,976 0.73 1,028 43,976 0.73 1,028 49,985 0.52 830 
San Luis (UG)(11)
Peru100%— — — 484 22.40 349 484 22.40 349 20 5.60 
5,731 2.13 392 237,832 0.85 6,535 243,563 0.88 6,929 154,373 0.96 4,765 
Gold Resources as of December 31, 2021
MeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeGoldTonnesGradeGoldTonnesGradeGoldTonnesGradeGold
DepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Türkiye76%2,467 1.76 139 68,887 1.01 2,243 71,354 1.04 2,382 79,650 1.16 2,982 
Marigold (OP)(8)(9)
United States100%— — — 115,294 0.43 1,611 115,294 0.43 1,611 21,795 0.36 250 
Seabee (UG)(10)
Canada100%71 19.75 45 797 12.23 313 869 12.83 358 2,754 6.05 536 
Amisk (OP)(11)
Canada100%— — — 43,976 0.73 1,028 43,976 0.73 1,028 49,985 0.52 830 
San Luis (UG)(12)
Peru100%— — — 484 22.43 349 484 22.43 349 20 5.60 
2,538 2.27 184 229,438 0.75 5,544 231,977 0.77 5,728 154,204 0.93 4,602 
(1)Çöpler Mineral Resources include resources from Çöpler Mine, Cakmaktepe, ArdichÇakmaktepe Extension and Bayramdere.
(2)Mineral Resources shown are SSR ownership share only. SSR Ownership is an average based on location of Mineral Resources (gold) relative to licenses: Çöpler and part of Çakmaktepe Extension are on Anagold 80:20 ground on which SSR holds 80% rights, and Çakmaktepe, Bayramdere and the remainder of Çakmaktepe Extension are on Kartaltepe 50:50 ground on which SSR holds 50% rights. Total ownership percentages are weighted averages.
(3)All Mineral Resources for Çöpler were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual pit shells based on metal prices of $1,750/($1,400/oz for gold ($1,400 for gold and $19/$19.00/oz for silver for Bayramdere). The following parameters were used: gold metallurgical recoveries in oxide: Çöpler mine 62.3–78.4%, Çakmaktepe 38.0–80.0%, Ardich 40.0–73.0%, and Bayramdere 75.0%, and in sulfide: Çöpler 85.0%, and Ardich 82.9%; gold cut-off grades in oxide: Çöpler 0.32–0.41 g/t gold, Çakmaktepe 0.36–0.76 g/t gold, Ardich 0.30–0.55 g/t gold, and Bayramdere 0.35–0.50 g/t gold, and in sulfide: Çöpler 0.73 g/t gold and Ardich 0.77 g/t gold (there are no credits for silver or copper in the cut-off grade calculations); allowances have been made for royalty payable.
(3)(4)Oxide definitions: At Çöpler,pler: oxide is defined as material <2% total sulfur and sulfide material is ≥2% total sulfur.
(4)At ArdichÇakmaktepe Extension and Çakmaktepe, oxide is comprised of low-sulfur (LS) oxide is defined as material with (<1% total sulfur,sulfur) and high-sulfur (HS) oxide is material with ≥1%(≥1% and <2% total sulfur, and sulfide material is ≥2% total sulfur.
(5)sulfur). At Bayramdere.Bayramdere, oxide is defined as material <2% total sulfur.
(5)Sulfide definitions: At Çakmaktepe Extension, sulfide is comprised of standard sulfide material (≥2% total sulfur) and sulfide-with-Cu material (sulfide with Cu>0.10%). There is no sulfide material at Çakmaktepe or Bayramdere.
(6)Mineral Resources are reported at the followingvariable gold cut-off grades:grades based on different metallurgical parameters: oxide cut-off grades 0.32-0.76are 0.19-0.76 g/t gold, and Çöpler sulfide cut-off grades 0.73-0.77 g/uses an NSR value in $/t gold. All cut-off grades include allowancebased on gold price of $1,750/oz, silver price of $22.00/oz, and copper price of $3.95/lb with allowances for royalty payable.payability, deductions, transport, and royalties.
(7)Mineral Resources are shown on a 100% basis. ÇöÇöpler Mineral Resources are located on ground held 80% by SSR, Çakmaktepeoxide recoveries vary between 38.0-78.4% and Bayramdere Mineral Resources are located on ground held 50% by SSR, and approximately 96% of Ardich Mineral Resources are located on ground held 80% by SSR, with the remainder located on ground 50% held by SSR.sulphide recoveries vary between 55-98%.
(8)Marigold Mineral Resources are reported usingResource estimate is based on an optimised pit shell at a cut-ofcut off grade of 0.065 g/t within a conceptual open pit shell with a average processpayable gold (gold assay factored for recovery, of 75%royalty, and net proceeds).
(9)Marigold metallurgical recoveries varies with gold grade and on average recoveries are 67%
(10)Seabee Mineral Resources are reported using a cut-off grade of 3.112.07 g/t with an average recovery of 98%.and were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual underground shapes. Mineral resources includes Santoy 8, Santoy 9, and GHW lodes.
(10)(11)Amisk Mineral Resources are reported using a gold equivalent cut-off grade of 0.30 g/t and include silver attributable ounces. Gold processAverage gold recovery is 90%.
(11)(12)San Luis Mineral Resources are reported at gold price assumptions of $600/oz using a gold equivalent cut-off grade of 6.0 g/t and include silver attributable ounces. Gold processAverage gold recovery is 94%.

8087


The following tables summarize the Company's estimated silver resources reflecting only the resources attributable to SSR Mining's ownership or economic interest as of December 31, 20212022 and 20202021 for each of its production and exploration assets:
Silver Resources as of December 31, 2021
Silver Resources as of December 31, 2022Silver Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferredMeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeSilverTonnesGradeSilverTonnesGradeSilverTonnesGradeSilverSSRTonnesGradeSilverTonnesGradeSilverTonnesGradeSilverTonnesGradeSilver
DepositDepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)DepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Turkey77%3,306 4.30 457 88,948 3.35 9,572 92,254 3.38 10,029 103,154 9.56 31,695 
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Türkiye80%2,598 4.32 361 68,368 3.37 7,402 70,966 3.40 7,763 82,394 9.57 25,339 
Chinchillas (OP)(8)
Chinchillas (OP)(8)
Argentina100%1,110 99.20 3,540 4,904 101.13 15,943 6,014 100.76 19,483 165 101.86 540 
Chinchillas (OP)(8)
Argentina100%828 110.31 2,935 4,548 103.77 15,174 5,376 104.78 18,109 123 112.87 446 
Pirquitas (UG)(9)
Pirquitas (UG)(9)
Argentina100%79 444.50 1,129 2,555 287.67 23,627 2,634 292.33 24,756 1,080 206.86 7,185 
Pirquitas (UG)(9)
Argentina100%79 444.50 1,129 2,555 287.67 23,627 2,634 292.33 24,756 1,080 206.86 7,186 
San Luis (UG)(10)
San Luis (UG)(10)
Peru100%— — — 484 578.10 9,003 484 578.56 9,003 20 272.00 175 
San Luis (UG)(10)
Peru100%— — — 484 578.10 9,003 484 578.56 9,003 20 272.00 175 
Pitarilla (OP)(11)
Mexico100%12,345 90.10 35,746 147,016 97.50 460,728 159,361 96.90 496,474 8,524 77.40 21,213 
Pitarilla (UG)(12)
Mexico100%— — — 5,430 164.90 28,793 5,430 164.93 28,793 1,230 138.10 5,461 
Amisk(13)
Canada100%— — — 43,976 5.30 7,531 43,976 5.33 7,531 49,985 3.50 5,550 
16,840 75.52 40,872 293,313 58.88 555,197 310,153 59.78 596,069 164,158 13.62 71,819 
Amisk (OP)(11)
Amisk (OP)(11)
Canada100%— — — 43,976 5.30 7,531 43,976 5.33 7,531 49,985 3.45 5,550 
3,505 39.26 4,425 119,931 16.26 62,737 123,436 16.92 67,162 133,602 9.01 38,696 
(1)Çöpler Mineral Resources include resources from Çöpler Mine, Cakmaktepe, ArdichÇakmaktepe Extension and Bayramdere.
(2)Mineral Resources shown are shown on a 100% basis. SSR Ownership is an average based on location of Mineral Resources (gold) relative to licenses: Çöplerownership share only. SSR owns 80% in both Anagold and Kartaltepe licenses. Cakmaktepe, Bayramdere and part of Ardich are on Anagold 80:20 ground of which SSR holds 80% rights, and Çakmaktepe Bayramdere and the remainder of Ardich are onExtension fall within Kartaltepe 50:50 ground of which SSR holds 50% rights. Total ownership percentages are weighted averages.license.
(3)All Mineral Resources for Çöpler were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual pit shells ($1,400/oz for gold and $19.00/oz for silver for Bayramdere).
(4)Oxide definitions: At Çöpler: oxide is defined as material <2% total sulfur and sulfide material is ≥2% total sulfur. At ArdichÇakmaktepe Extension and Çakmaktepe, oxide is comprised of low-sulfur (LS) oxide (<1% total sulfur) and high-sulfur oxide (≥1% and <2% total sulfur). At Bayramdere: oxide is defined as material <2% total sulfur.
(5)Sulfide definitions: At Ardich,Çakmaktepe Extension, sulfide is comprised of standard sulfide material (≥2% total sulfur) and sulfide-with-Cu material (sulfide with Cu>0.10%). There is no sulfide material at Çakmaktepe or Bayramdere.
(6)Mineral Resources are reported at the variable gold cut-off grades based on different metallurgical parameters: oxide cut-off grades 0.19-0.76 g/t gold, sulfide cut-off uses an NSR value in $/t based on gold price of $1,750/oz, silver price of $22.00/oz, and copper price of $3.95/lb with allowances for payability, deductions, transport, and royalties.
(7)Average silver recoveries are 16%.
(8)Chinchillas Mineral Resource are contained within a pit shell generated using an NSR cut-off of $33.20. Metallurgical recoveries vary based on the grade and on average are 98% for silver, 95% for lead, and 63% for zinc.silver.
(9)Piriquitas UG Mineral Resources are reported using a silver metal price of $20.00/oz, $1.10/lb lead, and $1.30/lb zinc. The cut-off grade includes lead and zinc attributable metal and is calculated at $100/t. Metallurgical recoveries vary with grade and on average are 87% for silver, 50% for lead, and 85% for zinc.silver.
(10)San Luis Mineral Resources are reported at silver price assumptions of $9.25/oz. The cut-off grade includes gold ounces and is 6.0 g/t gold equivalent. GoldSilver process recovery is 90%.
(11)Amisk Mineral Resources are reported at a cut-off grade that includes gold ounces and is 0.30 g/t gold equivalent. Silver process recovery is 80%.
81
88


Silver Resources as of December 31, 2021
MeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeSilverTonnesGradeSilverTonnesGradeSilverTonnesGradeSilver
DepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Türkiye77%2,467 3.53 280 68,887 3.24 7,178 71,354 3.25 7,458 79,650 9.73 24,923 
Chinchillas (OP)(8)
Argentina100%1,110 99.20 3,540 4,904 101.13 15,943 6,014 100.76 19,483 165 101.86 540 
Pirquitas (UG)(9)
Argentina100%79 444.50 1,129 2,555 287.67 23,627 2,634 292.33 24,756 1,080 206.86 7,186 
San Luis (UG)(10)
Peru100%— — — 484 578.10 9,003 484 578.56 9,003 20 272.00 175 
Pitarilla (OP)(11)
Mexico100%12,345 90.10 35,746 147,016 97.50 460,728 159,361 96.90 496,474 8,524 77.40 21,213 
Pitarilla (UG)(12)
Mexico100%— — — 5,430 164.90 28,793 5,430 164.93 28,793 1,230 138.10 5,461 
Amisk (OP)(13)
Canada100%— — — 43,976 5.30 7,531 43,976 5.33 7,531 49,985 3.50 5,550 
16,001 79.13 40,695 273,252 62.93 552,803 289,253 63.82 593,498 140,654 14.40 65,048 
(1)Çöpler Mineral Resources include resources from Çöpler Mine, Cakmaktepe, Çakmaktepe Extension and Bayramdere.
(2)Mineral Resources shown are SSR ownership share only. SSR Ownership is an average based on location of Mineral Resources (gold) relative to licenses: Çöpler and part of Çakmaktepe Extension are on Anagold 80:20 ground on which SSR holds 80% rights, and Çakmaktepe, Bayramdere and the remainder of Çakmaktepe Extension are on Kartaltepe 50:50 ground on which SSR holds 50% rights. Total ownership percentages are weighted averages.
(3)All Mineral Resources for Çöpler were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual pit shells ($1,400/oz for gold and $19.00/oz for silver for Bayramdere).
(4)Oxide definitions: At Çöpler: oxide is defined as material <2% total sulfur and sulfide material is ≥2% total sulfur. At Çakmaktepe Extension and Çakmaktepe, oxide is comprised of low-sulfur (LS) oxide (<1% total sulfur) and high-sulfur oxide (≥1% and <2% total sulfur). At Bayramdere: oxide is defined as material <2% total sulfur.
(5)Sulfide definitions: At Çakmaktepe Extension, sulfide is comprised of standard sulfide material (≥2% total sulfur) and sulfide-with-Cu material (sulfide with Cu>0.10%). There is no sulfide material at Çakmaktepe or Bayramdere.
(6)Mineral Resources are reported at the variable gold cut-off grades based on different metallurgical parameters: oxide cut-off grades 0.19-0.76 g/t gold, sulfide cut-off uses an NSR value in $/t based on gold price of $1,750/oz, silver price of $22.00/oz, and copper price of $3.95/lb with allowances for payability, deductions, transport, and royalties.
(7)Average silver recoveries are 16%.
(8)Chinchillas Mineral Resource are contained within a pit shell generated using an NSR cut-off of $33.20. Metallurgical recoveries vary based on the grade and on average are 98% for silver.
(9)Piriquitas UG Mineral Resources are reported using a silver metal price of $20.00/oz, $1.10/lb lead, and $1.30/lb zinc. The cut-off grade includes lead and zinc attributable metal and is calculated at $100/t. Metallurgical recoveries vary with grade and on average are 87% for silver.
(10)San Luis Mineral Resources are reported at silver price assumptions of $9.25/oz. The cut-off grade includes gold ounces and is 6.0 g/t gold equivalent. Silver process recovery is 90%.
(11)Pitarilla Open Pit Mineral Resources are reported at silver price assumptions of $20.00/oz, $1.10/lb for lead, and $1.30/lb for zinc. The cut-off grade includes attributable lead and zinc metal and the NSR cut-off values is $16.38 per tonnes (leach) or $16.40 per tonne flotation. Silver process recovery is 71.8%.
(12)Pitarilla UG Mineral Resources are reported at silver price of $20.00/oz,$1.10/lb for lead, and $1.30/lb for zinc. The cut-off grade includes attributable lead and zinc metal and the NSR cut-off values is $80 per tonne. Silver process recovery is 72%.
(13)Amisk Mineral Resources are reported at a cut-off grade that includes gold ounces and is 0.30 g/t gold equivalent. Silver process recovery is 80%.


82


Silver Resources as of December 31, 2020
MeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeSilverTonnesGradeSilverTonnesGradeSilverTonnesGradeSilver
DepositCountryShare(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)(kt)(g/t)(koz)
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Turkey78%5,707 0.20 36 70,619 3.10 7,039 76,326 2.88 7,076 73,741 9.16 21,708 
Chinchillas (OP)(8)
Argentina100%378 85.89 1,043 14,077 69.52 31,463 14,455 69.95 32,507 21,836 49.82 34,974 
Pirquitas (UG)(9)
Argentina100%79 444.50 1,129 2,555 287.70 23,627 2,634 292.37 24,756 1,080 206.86 7,185 
San Luis (UG)(10)
Peru100%— — — 484 578.10 9,003 484 578.10 9,003 20 272.00 175 
Pitarilla (OP)(11)
Mexico100%12,345 90.06 35,746 147,016 97.50 460,728 159,361 96.90 496,474 8,524 77.41 21,213 
Pitarilla (UG)(12)
Mexico100%— — — 5,430 164.90 28,793 5,430 164.93 28,793 1,230 138.10 5,461 
Amisk(13)
Canada100%— — — 43,976 5.30 7,531 43,976 5.30 7,531 49,985 3.45 5,550 
18,509 63.78 37,954 284,157 62.19 568,184 302,666 62.29 606,140 156,416 19.14 96,266 
(1)Çöpler Mineral Resources include resources from Çöpler Mine, Cakmaktepe, Ardich and Bayramdere.
(2)All Mineral Resources for Çöpler were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual pit shells based on metal prices of $1,750/oz for gold ($1,400/oz for gold and $19.00/oz for silver for Bayramdere). The following parameters were used: gold metallurgical recoveries in oxide: Çöpler mine 62.3–78.4%, Çakmaktepe 38.0–80.0%, Ardich 40.0–73.0%, and Bayramdere 75.0%, and in sulfide: Çöpler 85.0%, and Ardich 82.9%; g cut-off grades in oxide: Çöpler 0.32–0.41 g/t gold, Çakmaktepe 0.36–0.76 g/t gold, Ardich 0.30–0.55 g/t gold, and Bayramdere 0.35–0.50 g/t gold, and in sulfide: Çöpler 0.73 g/t gold and Ardich 0.77 g/t gold, (there are no credits for silver or copper in the cut-off grade calculations); allowances have been made for royalty payable.
(3)At Çöpler, oxide is defined as material <2% total sulfur and sulfide material is ≥2% total sulfur.
(4)At Ardich and Çakmaktepe, low-sulfur (LS) oxide is defined as material with <1% total sulfur, high-sulfur (HS) oxide is material with ≥1% and <2% total sulfur, and sulfide material is ≥2% total sulfur.
(5)At Bayramdere, oxide is defined as material <2% total sulfur. There is no sulfide material at Bayramdere.
(6)Silver average recoveries are 9%.
(7)Mineral Resources are shown on a 100% basis. Çöpler Mineral Resources are located on ground held 80% by SSR, Çakmaktepe and Bayramdere Mineral Resources are located on ground held 50% by SSR, and approximately 96% of Ardich Mineral Resources are located on ground held 80% by SSR, with the remainder located on ground 50% held by SSR.
(8)Chinchillas Mineral Resources are calculated using a silver equivalent cut off value of 60.0g/t. The cut-off value includes lead and zinc attributable metal. Silver process recovery is 89%. Metal price assumption for resources are $20.00/oz silver.
(9)Piriquitas UG Mineral Resources are reported using a silver price of $20.00/oz. The cut-off grade includes lead and zinc attributable metal and is calculated at NSR $90-$100/t. Silver process recovery is 87%.
(10)San Luis Mineral Resources are reported using a silver price of $9.25/oz. The cut-off grade includes gold ounces and is 6.0 g/t gold equivalent. Gold process recovery is 90%
(11)Pitarilla Open Pit Mineral Resources are reported using a silver price of $20.00/oz. The cut-off grade includes attributable lead and zinc metal and the NSR cut-off values is $16.38 per tonnes (leach) or $16.40 per tonne flotation. Silver process recovery is 71.8%.
83


(12)Pitarilla UG Mineral Resources are reported using a silver price of $20.00/oz. The cut-off grade includes attributable lead and zinc metal and the NSR cut-off values is $80 per tonne. Silver process recovery is 72%.
(13)Amisk Mineral Resources are reported at a cut-off grade that includes gold ounces and is 0.30 g/t gold equivalent. Silver process recovery is 80%.

8489


The following tables summarize the Company's estimated lead resources reflecting only the resources attributable to SSR Mining's ownership or economic interest as of December 31, 20212022 and 20202021 for each of its production and exploration assets:
Lead Resources December 31, 2021
Lead Resources December 31, 2022Lead Resources December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferredMeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeLeadTonnesGradeLeadTonnesGradeLeadTonnesGradeLeadSSRTonnesGradeLeadTonnesGradeLeadTonnesGradeLeadTonnesGradeLead
DepositDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)DepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)
Chinchillas (OP)(1)
Chinchillas (OP)(1)
Argentina100%1,110 0.86 21.0 4,904 0.88 95.6 6,013 0.88 116.6 165 0.48 1.8 
Chinchillas (OP)(1)
Argentina100%828 0.98 18.0 4,548 0.91 91.5 5,376 0.92 109.4 123 0.53 1.4 
Pirquitas (UG)(2)
Pirquitas (UG)(2)
Argentina100%79 0.20 0.3 2,555 0.02 1.1 2,634 0.03 1.4 1,080 — 0.1 
Pirquitas (UG)(2)
Argentina100%79 0.20 0.3 2,555 0.02 1.1 2,634 0.02 1.4 1,080 — 0.1 
Pitarilla (OP)(3)
Mexico100%12,345 0.70 190.0 147,016 0.32 1,040.4 159,361 0.35 1,230.4 8,524 0.18 32.9 
Pitarilla (UG)(4)
Mexico100%— — — 5,430 0.68 81.4 5,430 0.68 81.4 1,230 0.89 24.1 
13,534 0.71 211.3 159,905 0.34 1,218.5 173,438 0.37 1,429.8 10,999 0.25 58.9 
907 0.92 18.3 7,103 0.59 92.6 8,010 0.63 110.8 1,203 0.05 1.5 
(1)Chinchillas Mineral Resource are contained within a pit shell generated using an NSR cut-off of $33.20. Metallurgical recoveries vary based on the grade and on average are 98% for silver, 95% for lead and 63% for zinc.
(2)Piriquitas UG Mineral Resources are contained within underground mining shapes based on an NSR cut-off on $90-$100/t are reported using a silver metal price of $20.00/oz, $1.10/lb for lead and $1.30/lb for zinc. Metallurgical recoveries vary with grade and on average are 87%50% for lead.


90


Lead Resources December 31, 2021
MeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeLeadTonnesGradeLeadTonnesGradeLeadTonnesGradeLead
DepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)
Chinchillas (OP)(1)
Argentina100%1,110 0.86 21.0 4,904 0.88 95.6 6,013 0.88 116.6 165 0.48 1.8 
Pirquitas (UG)(2)
Argentina100%79 0.20 0.3 2,555 0.02 0.9 2,634 0.02 1.2 1,080 — 0.1 
Pitarilla (OP)(3)
Mexico100%12,345 0.70 190.0 147,016 0.32 1,040.4 159,361 0.35 1,230.4 8,524 0.18 32.9 
Pitarilla (UG)(4)
Mexico100%— — — 5,430 0.68 81.4 5,430 0.68 81.4 1,230 0.89 24.1 
13,534 0.71 211.3 159,905 0.34 1,218.3 173,438 0.37 1,429.6 10,999 0.25 58.9 
(1)Chinchillas Mineral Resource are contained within a pit shell generated using an NSR cut-off of $33.20. Metallurgical recoveries vary based on the grade and on average are 98% for silver, 50%95% for lead and 85%63% for zinc.
(2)Piriquitas UG Mineral Resources are contained within underground mining shapes based on an NSR cut-off on $90-$100/t are reported using a silver metal price of $20.00/oz, $1.10/lb for lead and $1.30/lb for zinc. Metallurgical recoveries vary with grade and on average are 50% for lead.
(3)Pitarilla Open Pit Mineral Resources are reported using a silver price of $20.00/oz, $1.10/lb for lead, and $1.30/lb for zinc. The cut-off grade includes silver and zinc metal and the NSR cut-off values is $16.38 per tonnes (leach) or $16.40 per tonne flotation. Lead process recovery is 68%.
(4)Pitarilla UG Mineral Resources are reported using a silver price of $20.00/oz, $1.10/lb for lead, and $1.30/lb for zinc. The cut-off grade includes silver and zinc metal and the NSR cut-off values is $80 per tonne. Lead process recovery is 68%.

85


Lead Resources December 31, 2020
MeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeLeadTonnesGradeLeadTonnesGradeLeadTonnesGradeLead
DepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)
Chinchillas (OP)(1)
Argentina100%378 0.62 5.1 14,077 0.79 243.9 14,455 0.78 249.0 21,836 0.55 263.4 
Pirquitas (UG)(2)
Argentina100%79 0.20 0.3 2,555 0.02 1.1 2,634 0.03 1.4 1,080 — 0.1 
Pitarilla (OP)(3)
Mexico100%12,345 0.70 190.0 147,016 0.32 1,040.4 159,361 0.35 1,230.4 8,524 0.18 32.9 
Pitarilla (UG)(4)
Mexico100%— — — 5,430 0.68 81.4 5,430 0.68 81.4 1,230 0.89 24.1 
12,802 0.69 195.4 169,078 0.37 1,366.8 181,880 0.39 1,562.2 32,670 0.45 320.5 
(1)Chinchillas Mineral Resources are calculated using a silver equivalent cut off value of 60.0 g/t that includes silver and zinc attributable metal. Lead process recovery is 93%. Metal price assumption for resources is $1.10/lb lead.
(2)Piriquitas UG Mineral Resources are reported using a lead price of $1.10/lb. The cut-off grade includes silver and zinc attributable metal and is calculated at NSR $90-$100/t. Lead process recovery is 50%.
(3)Pitarilla Open Pit Mineral Resources are reported using a lead price of $1.10/lb. The cut-off grade includes silver and zinc metal and the NSR cut-off values is $16.38 per tonnes (leach) or $16.40 per tonne flotation. Lead process recovery is 68%.
(4)Mineral Resources are reported using a lead price of $1.10/lb. The cut-off grade includes silver and zinc metal and the NSR cut-off values is $80 per tonne. Lead process recovery is 68%.


8691


The following tables summarize the Company's estimated zinc resources reflecting only the resources attributable to SSR Mining's ownership or economic interest as of December 31, 20212022 and 20202021 for each of its production and exploration assets:
Zinc Resources as of December 31, 2021
Zinc Resources as of December 31, 2022Zinc Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferredMeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeZincTonnesGradeZincTonnesGradeZincTonnesGradeZincSSRTonnesGradeZincTonnesGradeZincTonnesGradeZincTonnesGradeZinc
DepositDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)DepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)
Chinchillas (OP)(1)
Chinchillas (OP)(1)
Argentina100%1,110 0.31 7.6 4,904 0.19 20.5 6,013 0.21 28.0 165 0.16 0.6 
Chinchillas (OP)(1)
Argentina100%828 0.26 4.8 4,548 0.17 17.5 5,376 0.19 22.3 123 0.09 0.3 
Pirquitas (UG)(2)
Pirquitas (UG)(2)
Argentina100%79 1.17 2.0 2,555 4.56 256.8 2,634 4.46 258.9 1,080 7.45 177.4 
Pirquitas (UG)(2)
Argentina100%79 1.17 2.0 2,555 4.56 256.8 2,634 4.46 258.9 1,080 7.45 177.4 
Pitarilla (OP)(3)
Mexico100%12,345 1.22 333.1 147,016 0.87 2,803.6 159,361 0.89 3,136.7 8,524 0.58 108.2 
Pitarilla (UG)(4)
Mexico100%— — — 5,430 1.34 160.4 5,430 1.34 160.4 1,230 1.25 33.9 
13,534 1.15 342.7 159,904 0.92 3,241.3 173,438 0.94 3,584.0 10,999 1.32 320.1 
907 0.34 6.8 7,103 1.75 274.3 8,010 1.59 281.2 1,203 6.70 177.7 
(1)Chinchillas Mineral Resources are calculated using a NSR cut off value of $33.20 that includes silver and lead attributable metal. The average recovery is estimated to be 98% for silver, 95% for lead and 63% for zinc.
(2)Piriquitas UG Mineral Resources are contained within underground mining shapes based on an NSR cut-off on $90-$100/t are reported using a silver metal price of $20.00/oz, $1.10/lb for lead, and $1.30/lb for zinc. Metallurgical recoveries vary with grade and on average are 85% for zinc.


92


Zinc Resources as of December 31, 2021
MeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeZincTonnesGradeZincTonnesGradeZincTonnesGradeZinc
DepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)
Chinchillas (OP)(1)
Argentina100%1,110 0.31 7.6 4,904 0.19 20.5 6,013 0.21 28.0 165 0.16 0.6 
Pirquitas (UG)(2)
Argentina100%79 1.17 2.0 2,555 4.56 256.8 2,634 4.46 258.9 1,080 7.45 177.4 
Pitarilla (OP)(3)
Mexico100%12,345 1.22 333.1 147,016 0.87 2,803.6 159,361 0.89 3,136.7 8,524 0.58 108.2 
Pitarilla (UG)(4)
Mexico100%— — — 5,430 1.34 160.4 5,430 1.34 160.4 1,230 1.25 33.9 
13,534 1.15 342.7 159,904 0.92 3,241.3 173,438 0.94 3,584.0 10,999 1.32 320.1 
(1)Chinchillas Mineral Resources are calculated using a NSR cut off value of $33.20 that includes silver and lead attributable metal. The average recovery is estimated to be 98% for silver, 93% for lead and 63% for zinc.
(2)Piriquitas UG Mineral Resources are contained within underground mining shapes based on an NSR cut-off on $90-$100/t are reported using a silver metal price of $20.00/oz, $1.10/lb for lead, and $1.30/lb for zinc. Metallurgical recoveries vary with grade and on average are 87% silver, 50% for lead, and 85% for zinc.
(3)Pitarilla Open Pit Mineral Resources are reported using a silver price of $20.00/oz, $1.10/lb for lead, and $1.30/lb for zinc. The cut-off grade includes silver and lead metal and the NSR cut-off values is $16.38 per tonnes (leach) or $16.40 per tonne flotation. Zinc process recovery is 72%.
(4)Pitarilla UG Mineral Resources are reported using a silver price of $20.00/oz, $1.10/lb for lead, and $1.30/lb for zinc. The cut-off grade includes silver and lead metal and the NSR cut-off values is $80 per tonne. Zinc process recovery is 72%.

87


Zinc Resources as of December 31, 2020
MeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeZincTonnesGradeZincTonnesGradeZincTonnesGradeZinc
DepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)
Chinchillas (OP)(1)
Argentina100%378 0.66 5.5 14,077 0.77 238.5 14,455 0.77 244.0 21,836 0.83 400.0 
Pirquitas (UG)(2)
Argentina100%79 1.17 2.0 2,555 4.56 256.8 2,634 4.46 258.8 1,080 7.45 177.4 
Pitarilla (OP)(3)
Mexico100%12,345 1.22 333.1 147,016 0.87 2,803.6 159,361 0.89 3,136.7 8,524 0.58 108.2 
Pitarilla (UG)(4)
Mexico100%— — — 5,430 1.34 160.4 5,430 1.34 160.4 1,230 1.25 33.9 
12,802 1.21 340.6 169,078 0.93 3,459.3 181,880 0.95 3,799.9 32,670 1.00 719.5 
(1)Chinchillas Mineral Resources are calculated using a silver equivalent cut off value of 60.0 g/t that includes silver and lead attributable metal. Zinc process recovery is 81%. Metal price assumption for resources is $1.30/lb zinc.
(2)Piriquitas UG Mineral Resources are reported using a zinc price of $1.30/lb. The cut-off grade includes silver and lead attributable metal and is calculated at NSR $90-$100/t. Zinc process recovery is 85%. The project is currently undeveloped.
(3)Pitarilla Open Pit Mineral Resources are reported using a zinc price of $1.30/lb. The cut-off grade includes silver and lead metal and the NSR cut-off value is $16.38 per tonnes (leach) or $16.40 per tonne flotation. Zinc process recovery is 72%.
(4)Pitarilla UG Mineral Resources are reported using a zinc price of $1.30/lb. The cut-off grade includes silver and lead metal and the NSR cut-off value is $80 per tonne. Zinc process recovery is 72%.


8893


The following tables summarize the Company's estimated copper resources reflecting only the resources attributable to SSR Mining's ownership or economic interest as of December 31, 20212022 and 20202021 for each of its production and exploration assets:
Copper Resources as of December 31, 2021
Copper Resources as of December 31, 2022Copper Resources as of December 31, 2022
MeasuredIndicatedMeasured and IndicatedInferredMeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeCopperTonnesGradeCopperTonnesGradeCopperTonnesGradeCopperSSRTonnesGradeCopperTonnesGradeCopperTonnesGradeCopperTonnesGradeCopper
DepositDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)DepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Turkey77%3,306 0.03 2.1 88,948 0.15 296.7 92,254 0.15 298.8 103,154 0.13 285.6 
Çöpler (OP) (1)(2)(3)(4)(5)(6)(7)
Türkiye80%2,598 0.03 1.5 68,368 0.15 222.8 70,966 0.14 224.3 82,394 0.13 228.4 
3,306 0.03 2.1 88,948 0.15 296.7 92,254 0.15 298.8 103,154 0.13 285.6 2,598 0.03 1.5 68,368 0.15 222.8 70,966 0.14 224.3 82,394 0.13 228.4 
(1)Çöpler Mineral Resources include resources from Çöpler Mine, Cakmaktepe, ArdichÇakmaktepe Extension and Bayramdere.
(2)Mineral Resources shown are shown on a 100% basis. SSR Ownership is an average based on location of Mineral Resources (gold) relative to licenses: Çöplerownership share only. SSR owns 80% in both Anagold and Kartaltepe licenses. Cakmaktepe, Bayramdere and part of Ardich are on Anagold 80:20 ground of which SSR holds 80% rights, and Çakmaktepe Bayramdere and the remainder of Ardich are onExtension fall within Kartaltepe 50:50 ground of which SSR holds 50% rights. Total ownership percentages are weighted averages.license.
(3)All Mineral Resources for Çöpler were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual pit shells ($1,400/oz for gold and $19.00/oz for silver for Bayramdere).
(4)Oxide definitions: At Çöpler, oxide is defined as material <2% total sulfur and sulfide material is ≥2% total sulfur. At ArdichÇakmaktepe Extension and Çakmaktepe, oxide is comprised of low-sulfur (LS) oxide (<1% total sulfur) and high-sulfur oxide (≥1% and <2% total sulfur). At Bayramdere, oxide is defined as material <2% total sulfur.
(5)Sulfide definitions: At Ardich,Çakmaktepe Extension, sulfide is comprised of standard sulfide material (≥2% total sulfur) and sulfide-with-Cu material (sulfide with Cu>0.10%). There is no sulfide material at Çakmaktepe or Bayramdere.
(6)Mineral Resources are reported at the variable gold cut-off grades based on different metallurgical parameters: oxide cut-off grades 0.19-0.76 g/t gold, sulfide cut-off uses an NSR value in $/t based on a gold price of $1,750/oz, silver price of $22.00/oz, and copper price of $3.95/lb with allowances for payability, deductions, transport, and royalties.
(7)Copper oxide recoveries are 2% and sulphide recoveries are 65%.





8994


Copper Resources as of December 31, 2020
Copper Resources as of December 31, 2021Copper Resources as of December 31, 2021
MeasuredIndicatedMeasured and IndicatedInferredMeasuredIndicatedMeasured and IndicatedInferred
SSRTonnesGradeCopperTonnesGradeCopperTonnesGradeCopperTonnesGradeCopperSSRTonnesGradeCopperTonnesGradeCopperTonnesGradeCopperTonnesGradeCopper
DepositDepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)DepositCountryShare(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)(kt)(%)(Mlbs)
Çöpler (OP) (6)(7)
Çöpler (OP) (6)(7)
Turkey77%5,707 — 0.2 70,619 0.04 59.9 76,326 0.04 60.1 73,741 0.06 94.9 
Çöpler (OP) (6)(7)
Türkiye76%2,467 0.02 1.0 68,887 0.16 238.0 71,354 0.15 239.0 79,650 0.13 228.0 
5,707 — 0.2 70,619 — 59.9 76,326 0.04 60.1 73,741 0.06 94.9 2,467 0.02 1.0 68,887 0.16 238.0 71,354 0.15 239.0 79,650 0.13 228.0 
(1)Çöpler Mineral Resources include resources from Çöpler Mine, Cakmaktepe, ArdichÇakmaktepe Extension and Bayramdere.
(2)Mineral Resources shown are SSR ownership share only. SSR Ownership is an average based on location of Mineral Resources (gold) relative to licenses: Çöpler and part of Çakmaktepe Extension are on Anagold 80:20 ground on which SSR holds 80% rights, and Çakmaktepe, Bayramdere and the remainder of Çakmaktepe Extension are on Kartaltepe 50:50 ground on which SSR holds 50% rights. Total ownership percentages are weighted averages.
(3)All Mineral Resources for Çöpler were assessed for reasonable prospects for eventual economic extraction by reporting only material that fell within conceptual pit shells based on metal prices of $1,750/oz for gold ($1,400/oz for gold and $19.00/oz for silver for Bayramdere). The following parameters were used: gold metallurgical recoveries in oxide: Çöpler mine 62.3–78.4%, Çakmaktepe 38.0–80.0%, Ardich 40.0–73.0%, and Bayramdere 75.0%, and in sulfide: Çöpler 85.0%, and Ardich 82.9%; gold cut-off grades in oxide: Çöpler 0.32–0.41 g/t gold, Çakmaktepe 0.36–0.76 g/t gold, Ardich 0.30–0.55 g/t gold, and Bayramdere 0.35–0.50 g/t gold, and in sulfide: Çöpler 0.73 g/t gold and Ardich 0.77 g/t gold, (there are no credits for silver or copper in the cut-off grade calculations); allowances have been made for royalty payable.
(3)Mineral Resources are shown on a 100% basis. Çöpler Mineral Resources are located on ground held 80% by SSR, Çakmaktepe and Bayramdere Mineral Resources are located on ground held 50% by SSR, and approximately 96% of Ardich Mineral Resources are located on ground held 80% by SSR, with the remainder located on ground 50% held by SSR.
(4)Oxide definitions: At Ardich and Çakmaktepe, low-sulfur (LS)Çöpler, oxide is defined as material with <1% total sulfur, high-sulfur (HS) oxide is material with ≥1% and <2% total sulfur and sulfide material is ≥2% total sulfur.
(5) At Çakmaktepe Extension and Çakmaktepe, oxide is comprised of low-sulfur (LS) oxide (<1% total sulfur) and high-sulfur oxide (≥1% and <2% total sulfur). At Bayramdere, oxide is defined as material <2% total sulfur.
(5)Sulfide definitions: At Çakmaktepe Extension, sulfide is comprised of standard sulfide material (≥2% total sulfur) and sulfide-with-Cu material (sulfide with Cu>0.10%). There is no sulfide material at Çakmaktepe or Bayramdere.
(6)Mineral Resources are reported at the variable gold cut-off grades based on different metallurgical parameters: oxide cut-off grades 0.19-0.76 g/t gold, sulfide cut-off uses an NSR value in $/t based on a gold price of $1,750/oz, silver price of $22.00/oz, and copper price of $3.95/lb with allowances for payability, deductions, transport, and royalties.
(7)Copper oxide recoveries are 2% and sulphide recoveries are 65%.

9095


Operating Statistics
The following tables summarize operating statistics related to production of our operations for the yearsyear ended December 31, 2022, December 31, 2021 and December 31, 2020:
Year Ended December 31, 2021Year Ended December 31, 2022
ÇöplerMarigoldSeabeePunaÇöplerMarigoldSeabeePuna
Gold produced (oz)Gold produced (oz)329,276 235,282 118,888 — Gold produced (oz)191,366 194,668 136,125 — 
Gold sold (oz)Gold sold (oz)333,761 236,847 118,746 — Gold sold (oz)192,811 195,617 133,500 — 
Silver produced ('000 oz)Silver produced ('000 oz)— — — 8,010 Silver produced ('000 oz)— — — 8,397 
Silver sold ('000 oz)Silver sold ('000 oz)— — — 7,810 Silver sold ('000 oz)— — — 7,864 
Lead produced ('000 lb)Lead produced ('000 lb)— — — 37,695 Lead produced ('000 lb)— — — 41,004 
Lead sold ('000 lb)Lead sold ('000 lb)— — — 33,378 Lead sold ('000 lb)— — — 38,393 
Zinc produced ('000 lb)Zinc produced ('000 lb)— — — 13,642 Zinc produced ('000 lb)— — — 8,583 
Zinc sold ('000 lb)Zinc sold ('000 lb)— — — 10,751 Zinc sold ('000 lb)— — — 6,998 
Ore mined (kt)Ore mined (kt)9,750 19,999 384 1,449 Ore mined (kt)3,161 18,061 425 1,851 
Waste removed (kt)Waste removed (kt)15,015 79,885 272 9,594 Waste removed (kt)17,311 72,166 291 8,634 
Total material mined (kt)Total material mined (kt)24,765 99,884 656 11,043 Total material mined (kt)20,472 90,227 716 10,485 
Ore stacked - oxide (kt)Ore stacked - oxide (kt)1,786 19,999 — — Ore stacked - oxide (kt)459 18,061 — — 
Gold grade stacked - oxide (g/t)Gold grade stacked - oxide (g/t)1.240.41— — Gold grade stacked - oxide (g/t)1.06 0.56 — — 
Ore milled (kt)Ore milled (kt)2,325 — 382 1,643 Ore milled (kt)2,068 — 414 1,638 
Gold mill feed grade (g/t)Gold mill feed grade (g/t)3.71— 9.92— Gold mill feed grade (g/t)2.86 — 10.36 — 
Gold recovery (%)Gold recovery (%)91.0— 98.4— Gold recovery (%)87.0— 98.0— 
Silver mill feed grade (g/t)Silver mill feed grade (g/t)— — — 158.00 Silver mill feed grade (g/t)— — — 166.7
Lead mill feed grade (%)Lead mill feed grade (%)— — — 1.12 Lead mill feed grade (%)— — — 1.23 
Zinc mill feed grade (%)Zinc mill feed grade (%)— — — 0.57 Zinc mill feed grade (%)— — — 0.49 
Silver recovery (%)Silver recovery (%)— — — 95.8 Silver recovery (%)— — — 95.7 
Lead recovery (%)Lead recovery (%)— — — 93.0 Lead recovery (%)— — — 92.3 
Zinc recovery (%)Zinc recovery (%)— — — 65.6 Zinc recovery (%)— — — 48.7 

9196


Year Ended December 31, 2020
Çöpler (1)
MarigoldSeabeePuna
Gold produced (oz)102,616 234,443 81,686 — 
Gold sold (oz)108,283 229,892 75,600 — 
Silver produced ('000 oz)— — — 5,581 
Silver sold ('000 oz)— — — 4,411 
Lead produced ('000 lb)— — — 17,193 
Lead sold ('000 lb)— — — 14,179 
Zinc produced ('000 lb)— — — 6,988 
Zinc sold ('000 lb)— — — 5,111 
Ore mined (kt)2,535 23,556 256 817 
Waste removed (kt)5,573 62,038 219 4,879 
Total material mined (kt)8,108 85,594 475 5,696 
Ore stacked - oxide (kt)1,413 23,556 — — 
Gold grade stacked - oxide (g/t)1.200.39— — 
Ore milled (kt)669 — 255 1,118 
Gold mill feed grade (g/t)3.62— 10.10— 
Gold recovery (%)91.0— 98.4— 
Silver mill feed grade (g/t)— — — 164.00 
Lead mill feed grade (%)— — — 0.77 
Zinc mill feed grade (%)— — — 0.51 
Silver recovery (%)— — — 94.6 
Lead recovery (%)— — — 90.2 
Zinc recovery (%)— — — 55.5 
(1)The operating data presented in this column represents the period from September 16, 2020 to December 31, 2020, the period for which the Company was entitled to the economic benefits of Çöpler following the Company's acquisition of Alacer.
Year Ended December 31, 2021
ÇöplerMarigoldSeabeePuna
Gold produced (oz)329,276 235,282 118,888 — 
Gold sold (oz)333,761 236,847 118,746 — 
Silver produced ('000 oz)— — — 8,010 
Silver sold ('000 oz)— — — 7,810 
Lead produced ('000 lb)— — — 37,695 
Lead sold ('000 lb)— — — 33,378 
Zinc produced ('000 lb)— — — 13,642 
Zinc sold ('000 lb)— — — 10,751 
Ore mined (kt)9,750 19,999 384 1,449 
Waste removed (kt)15,015 79,885 272 9,594 
Total material mined (kt)24,765 99,884 656 11,043 
Ore stacked - oxide (kt)1,786 19,999 — — 
Gold grade stacked - oxide (g/t)1.24 0.41 — — 
Ore milled (kt)2,325 — 382 1,643 
Gold mill feed grade (g/t)3.71 — 9.92 — 
Gold recovery (%)91.0— 98.4— 
Silver mill feed grade (g/t)— — — 158.0
Lead mill feed grade (%)— — — 1.12 
Zinc mill feed grade (%)— — — 0.57 
Silver recovery (%)— — — 95.8 
Lead recovery (%)— — — 93.0 
Zinc recovery (%)— — — 65.6 
9297


Year Ended December 31, 2019Year Ended December 31, 2020
MarigoldSeabeePunaÇöplerMarigoldSeabeePuna
Gold produced (oz)Gold produced (oz)220,227 112,137 — Gold produced (oz)102,616 234,443 81,686 — 
Gold sold (oz)Gold sold (oz)226,823 104,527 — Gold sold (oz)108,283 229,892 75,600 — 
Silver produced ('000 oz)Silver produced ('000 oz)— — 7,674 Silver produced ('000 oz)— — — 5,581 
Silver sold ('000 oz)Silver sold ('000 oz)— — 7,204 Silver sold ('000 oz)— — — 4,411 
Lead produced ('000 lb)Lead produced ('000 lb)— — 23,957 Lead produced ('000 lb)— — — 17,193 
Lead sold ('000 lb)Lead sold ('000 lb)— — 22,886 Lead sold ('000 lb)— — — 14,179 
Zinc produced ('000 lb)Zinc produced ('000 lb)— — 8,392 Zinc produced ('000 lb)— — — 6,988 
Zinc sold ('000 lb)Zinc sold ('000 lb)— — 11,794 Zinc sold ('000 lb)— — — 5,111 
Ore mined (kt)Ore mined (kt)25,676 345 1,443 Ore mined (kt)2,535 23,556 256 817 
Waste removed (kt)Waste removed (kt)48,364 260 10,839 Waste removed (kt)5,573 62,038 219 4,879 
Total material mined (kt)Total material mined (kt)74,040 605 12,282 Total material mined (kt)8,108 85,594 475 5,696 
Total ore stacked (kt)25,676 — — 
Gold stacked grade (g/t)0.40— — 
Ore stacked - oxide (kt)Ore stacked - oxide (kt)1,413 23,556 — — 
Gold grade stacked - oxide (g/t)Gold grade stacked - oxide (g/t)1.20 0.39 — — 
Ore milled (kt)Ore milled (kt)— 334 1,394 Ore milled (kt)669 — 255 1,118 
Gold mill feed grade (g/t)Gold mill feed grade (g/t)— 9.56— Gold mill feed grade (g/t)3.62 — 10.10 — 
Gold mill recovery (%)— 98.2— 
Gold recovery (%)Gold recovery (%)91.0— 98.4— 
Silver mill feed grade (g/t)Silver mill feed grade (g/t)— — 184.00 Silver mill feed grade (g/t)— — — 164.0
Lead mill feed grade (%)Lead mill feed grade (%)— — 0.89 Lead mill feed grade (%)— — — 0.77 
Zinc mill feed grade (%)Zinc mill feed grade (%)— — 0.54 Zinc mill feed grade (%)— — — 0.51 
Silver mill recovery (%)— — 93.2 
Lead mill recovery (%)— — 85.8 
Zinc mill recovery (%)— — 49.2 
Silver recovery (%)Silver recovery (%)— — — 94.6 
Lead recovery (%)Lead recovery (%)— — — 90.2 
Zinc recovery (%)Zinc recovery (%)— — — 55.5 
9398


ITEM 3. LEGAL PROCEEDINGS
From time to time, the Company and its subsidiaries have become involved in litigation relating to claims arising out of operations in the normal course of business.business, including challenges to permits and approvals granted to the Company by various governmental or other regulatory bodies. Information regarding legal proceedings is contained in Note 2021 to the Consolidated Financial Statements contained in this Annual Report and is incorporated herein by reference.
ITEM 4. MINE SAFETY DISCLOSURES
The Company is required to report certain mine safety violations or other regulatory matters required by Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act and Item 104 of Regulation S-K, and that required information is included in Exhibit 95 to this Annual Report, which is incorporated herein by reference.
PART II
ITEM 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED SHAREHOLDER MATTERS AND ISSUER PURCHASE OF EQUITY SECURITIES
The Company’s common shares are listed under the ticker symbol “SSRM” on the Toronto Stock Exchange and Nasdaq Global Select Market. The Company’s CDIs are listed under the ticker symbol “SSR” on ASX. As of January 31, 2022,2023, there were approximately 1,2431,236 holders of record of the Company's common shares without par value, and approximately 3,5283,315 holders of record of the Company's CDIs.
On April 19, 2021,June 20, 2022, the Board of Directors authorized, and the Company announced that it received acceptanceapproval from the Toronto Stock ExchangeTSX to initiate, a new Normal Course Issuer Bid (the "NCIB""2022 NCIB") permitting the Company to purchase for cancellation up to 10,000,00010,600,000 common shares of the Company, representing 4.5%approximately 5.0% of the total issued and outstanding common shares, during the twelve-month period beginning April 21, 2021June 20, 2022 and ending April 20, 2022.June 19, 2023. In connection with the 2022 NCIB, the Company has entered into an automatic share purchase plan with a designated broker (the “ASPP”). The ASPP is intended to allow for the purchase of Common Shares under the NCIB at times when it would ordinarily not be permitted to purchase shares due to regulatory restrictions and customary self-imposed blackout periods. Through the end of September 2021, 8,800,700December 2022, 6,053,126 common shares were purchased under the 2022 NCIB via open market purchases through the ASPP.facilities of the TSX and Nasdaq at a weighted average price paid per common share of $16.53 for approximately $100.0 million. No shares were purchased in September 2022 or the fourth quarter of 2021.2022 under the 2022 NCIB.
On April 20, 2022, the Company's previous Normal Course Issuer Bid expired, which commenced on April 21, 2021 (the “2021 NCIB”). Under the 2021 NCIB, the Company was authorized to purchase for cancellation up to 10,000,000 common shares of the Company. SSR Mining purchased and cancelled 8,800,700 common shares via open market purchases through the facilities of the TSX and the Nasdaq at a weighted average price paid per common share of US$16.82 for US$148.1 million.
The following table summarizes purchases by the Company or an affiliated purchaser of the Company’s equity securities registered pursuant to Section 12 of the Exchange Act during the three months ended December 31, 2021:2022:
PeriodTotal Number of Shares Purchased (1)Average Price Paid Per Share (1)Total Number of Shares Purchased as Part of Publicly Announced Plans or Programs (2)Maximum Number of Shares that May Yet Be Purchased Under the Plans or Programs (2)
April 1 - April 30---10,000,000
May 1 - May 312,000,000$17.842,000,0008,000,000
June 1 - June 302,000,000$17.274,000,0006,000,000
July 1 - July 312,000,000$16.076,000,0004,000,000
August 1 - August 312,000,000$16.278,000,0002,000,000
September 1 - September 30800,700$16.508,800,7001,199,300
PeriodTotal Number of Shares Purchased (1)Average Price Paid Per Share (1)Total Number of Shares Purchased as Part of Publicly Announced Plans or Programs (2)Maximum Number of Shares that May Yet Be Purchased Under the Plans or Programs (2)
October 1 - October 314,546,874
November 1 - November 30 (4)4,546,874
December 1 - December 31 (4)4,546,874
(1) The total number of shares purchase (and the average price paid per share) reflects shares purchasepurchased pursuant to the repurchase program described2022 NCIB. No shares were purchased in (2) below.October, November or December pursuant to the 2022 NCIB.
99


(2) The Company's Board of Directors authorized a share repurchase program,the 2022 NCIB, under which the Company was authorized to repurchase up to 10,000,00010,600,000 common shares. SuchThe program was announced April 19, 2021commenced June 20, 2022 and will expire April 20, 2022. The Company repurchased 8,800,700 common shares during 2021 under such program. The extent to whichon August 16, 2022, the Company repurchases its shares, andhad repurchased the timing of such repurchases, will depend upon a variety of factors, including trading volume, market conditions, legal requirements, business conditions and other factors. The repurchase program may be discontinued at any time, and the program does not obligate the Company to acquire any specific numbermaximum value of shares authorized by the Board of its common stock.Directors.
94


Dividend Policy
On February 17, 2021, the Company’s Board of Directors approved its inaugural quarterly dividend payment of $0.05 per common share that was paid on March 31, 2021 to shareholders of record at the close of business on March 5, 2021. The quarterly dividend payment was subsequently increased to $0.07 per common share as approved by the Company's Board of Directors on February 22, 2022. During the year ended December 31, 2021,2022, the Company declared and paid cash dividends of $0.20$0.28 per common share in the aggregate amount of $43.2 million.of $58.8 million. The declaration and payment of future dividends is at the discretion of the Board of Directors and will be made based on the Company’s financial position and other factors relevant at the time. The Company expects to declare comparable cash dividends in the future, with increases to the amount of cash dividends declared as possible based on the Company's financial position going forward.
Performance Graph
The following performance graph compares the performance of our common shares during the period beginning December 31, 20162017 and ending December 31, 20212022 to the S&P 500 and the S&P 500 Gold Index. The graph assumes a $100 investment in our common shares and in each of the indexes since the beginning of the period, and a reinvestment of dividends paid on such investments on a quarterly basis throughout the period.
ssrm-20211231_g8.jpg
ssrm-20221231_g8.jpg

12/31/201612/31/201712/31/201812/31/201912/31/202012/31/202112/31/201712/31/201812/31/201912/31/202012/31/202112/31/2022
SSR Mining Inc.SSR Mining Inc.$100.00$98.54$135.54$215.92$225.45$201.02SSR Mining Inc.$100.00 $137.54 $219.11 $228.78 $203.99 $183.62 
S&P/TSX Global Gold IndexS&P/TSX Global Gold Index$100.00$100.62$96.16$134.52$162.38$150.31S&P/TSX Global Gold Index$100.00 $95.57 $133.68 $161.37 $149.38 $142.12 
S&P 500 Gold (Sub Ind)S&P 500 Gold (Sub Ind)$100.00$110.13$101.70$130.71$180.17$186.58S&P 500 Gold (Sub Ind)$100.00 $92.35 $118.69 $163.60 $169.42 $128.94 
The share performance information above is “furnished” and shall not be deemed to be “soliciting material” or subject to Rule 14A of the Exchange Act, shall not be deemed “filed” for purposes of Section 18 of the Exchange Act or otherwise subject to the liabilities of that section, and shall not be deemed incorporated by reference in any filing under the Securities Act or the Exchange Act, whether made before or after the date of this Annual Report and
100


irrespective of any general incorporation by reference language in any such filing, except to the extent that it specifically incorporates the information by reference.
Exchange Controls
Canada has no system of exchange controls. There are no Canadian restrictions on the repatriation of capital or earnings of a Canadian public company to non-resident investors. There are no laws in Canada or exchange restrictions affecting the remittance of dividends, profits, interest, royalties and other payments to non-resident holders of the Company’s securities, except as discussed in “Canadian Federal Income Tax Considerations” below.
95


There are no limitations under the laws of Canada or in the organizing documents of the Company on the right of foreigners to hold or vote securities of the Company, except that the Investment Canada Act may require review and approval by the Minister of Industry (Canada) of certain acquisitions of “control” of the Company by a “non-Canadian.” “Non-Canadian” generally means an individual who is not a Canadian citizen, or a corporation, partnership, trust or joint venture that is ultimately controlled by non-Canadians.
Certain United States Federal Income Tax Considerations for U.S. Holders
There may be material U.S. federal income tax consequences to U.S. holders in relation to an acquisition or disposition of common shares or other securities of the Company. U.S. holders should consult their own legal, accounting and tax advisors regarding such tax consequences under United States, state, local or foreign tax law regarding the acquisition or disposition of our common shares or other securities, in particular the tax consequences if the Company becomes a “passive foreign investment company” (commonly known as a “PFIC”) within the meaning of Section 1297 of the United States Internal Revenue Code.
U.S. Resident Holders whose shares are taxable Canadian property should consult their own tax advisors.

Canadian Federal Income Tax Considerations
This summary is applicable to a holder or prospective purchaser of common shares who, for the purposes of the Income Tax Act (Canada) and any applicable treaty and at all relevant times, is not (and is not deemed to be) resident in Canada, does not (and is not deemed to) use or hold the common shares in, or in the course of, carrying on a business in Canada, and is not an insurer that carries on an insurance business in Canada and elsewhere.
This summary is based on the current provisions of the Income Tax Act (Canada), the regulations thereunder, all specific proposals to amend such Act and regulations publicly announced by or on behalf of the Minister of Finance (Canada) prior to the date hereof and the Company’s understanding of the administrative policies and assessing practices published in writing by the Canada Revenue Agency prior to the date hereof. This summary does not otherwise take into account any change in law or administrative policy or assessing practice, whether by judicial, governmental, legislative or administrative decision or action, nor does it take into account other federal or provincial, territorial or foreign tax consequences, which may vary from the Canadian federal income tax considerations described herein.
Currency Conversion
For the purposes of the Income Tax Act (Canada), all amounts relating to the acquisition, holding or disposition of common shares, including dividends and proceeds of disposition must be determined in CAD based on the daily exchange rate of the Bank of Canada on the particular day, or such other rate of exchange as acceptable to the CRA.
Dividends on Common Shares
Canadian withholding tax at a rate of 25.0% (subject to reduction under the provisions of any applicable tax treaty) will be payable on dividends (or amounts paid or credited on account or in lieu of payment of, or in satisfaction of, dividends) paid or credited to a holder of common shares. Under the Canada - U.S. Income Tax Convention (1980), as amended (the “Canada - U.S. Income Tax Treaty”), the withholding tax rate is reduced to 15.0% for a holder who is entitled to the benefits of the Canada - U.S. Income Tax Treaty and who is the beneficial owner of the dividends (or to 5.0% if the holder is a company that owns at least 10.0% of the common shares).

96101


Capital Gains and Losses
Subject to the provisions of any relevant tax treaty, capital gains realized by a holder on the disposition or deemed disposition of common shares held as capital property will not be subject to Canadian tax unless the common shares are taxable Canadian property (as defined in the Income Tax Act (Canada)), in which case the capital gains will be subject to Canadian tax at rates which will approximate those payable by a Canadian resident. Common shares generally will not be taxable Canadian property to a holder provided that, at the time of the disposition or deemed disposition, the common shares are listed on a designated stock exchange (which currently includes the NYSE) unless at any time within the 60 month period immediately preceding such time (a) any combination of (i) such holder, (ii) persons with whom such holder did not deal at arm’s length or (iii) a partnership in which such holder or any such persons holds a membership interest either directly or indirectly through one or more partnerships, owned 25.0% or more of the issued shares of any class or series of shares of the Company and (b) more than 50% of the fair market value of the common shares was derived directly or indirectly from one or any combination of (i) real or immovable property situated in Canada, (ii) Canadian resource properties, (iii) timber resource properties, and (iv) options in respect of, or interests in, or for civil law rights in, property described in any of paragraphs (i) to (iii), whether or not the property exists. In certain circumstances set out in the Income Tax Act (Canada), the common shares may be deemed to be taxable Canadian property. Under the Canada - U.S. Income Tax Treaty, a holder who is entitled to the benefits of the Canada - U.S. Income Tax Treaty and to whom the common shares are taxable, Canadian property will not be subject to Canadian tax on the disposition or deemed disposition of the common shares unless at the time of disposition or deemed disposition, the value of the common shares is derived principally from real property situated in Canada.
ITEM 6. [RESERVE]RESERVED
Not applicable.

97102


ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The following Management’s Discussion and Analysis (“MD&A”) provides information that management believes is relevant to an assessment and understanding of the consolidated financial condition and results of operations of SSR Mining Inc. and its subsidiaries (collectively, the “Company”). The Company uses certain non-GAAP financial measures in this MD&A; for a description of each of these measures, please see the discussion under "Non-GAAP Financial Measures" in Part II, Item 7, Management’s Discussion and Analysis herein. This item should be read in conjunction with the Consolidated Financial Statements and the notes thereto included in this annual report.
The following MD&A discusses the Company's consolidated financial condition and results of operations for the years ended 2022 and 2021 and year-over-year comparisons between 2022 and 2021. Discussions of the consolidated financial condition and results of operations for the year ended 2020 and year-over-year comparisons between 2021 and 2020 are included in Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations, in the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2021, filed with the Securities and Exchange Commission on February 23, 2022.
During the fourth quarter of 2022, the Company revised the previously reported caption of Production costs to Cost of sales within its Consolidated Statements of Operations to provide a more accurate description of the costs and align with commonly used terminology by industry participants. Cost of sales does not include depreciation, depletion and amortization. No changes were made to the accounting policies or previously reported amounts.
Overview
SSR Mining is a precious metals mining company with four producing assets located in the United States, Turkey,Türkiye, Canada and Argentina. The Company is primarily engaged in the operation, acquisition, exploration and development of precious metal resource properties located in TurkeyTürkiye and the Americas. The Company produces gold doré as well as copper, silver and lead and zinc concentrates. SSR Mining'sThe Company’s diversified asset portfolio is comprised of high-margin, long-life assets located in some of the world's most prolific metal districts.
DuringOn November 17, 2022, the years ended December 31, 2021Company completed the acquisition of an additional 30.0% ownership in Kartaltepe Madencilik Sanayi ve Ticaret Anonim Şirketi (“Kartaltepe”) from joint venture partner Lidya Madencilik Sanayi ve Ticaret A.Ş (“Lidya”) for total consideration of $150.0 million in cash. The Company previously owned 50% of Kartaltepe and 2020,accounted for the COVID-19 pandemic negatively impactedinvestment as an equity method investment. Upon completion of the global economytransaction, the Company now owns 80% and certain financial markets. Seabee and Puna were placed into care and maintenance nearwill consolidate Kartaltepe. For further information regarding this transaction, see Note 3 to the Consolidated Financial Statements.
At the end of the firstsecond quarter of 20202022, Türkiye’s Ministry of Environment, Urbanization and restartedClimate Change (“Ministry of Environment”) temporarily suspended operations duringat the secondÇöpler mine pending implementation of improvement initiatives requested as a result of a leak of leach solution on June 21, 2022. The Company completed these initiatives and third quarters of 2020, respectively. Çöplerreceived the required regulatory approvals from Türkiye’s Government authorities on September 22, 2022 and Marigold'sall operations were uninterrupted during 2020. Whilerestarted at the lengthÇöpler mine. During the temporary suspension, Care and durationmaintenance expense was recorded in the Statements of Operations which represents direct costs and depreciation incurred at Çöpler.
On July 6, 2022, the Company completed the sale of the COVID-19 pandemic,Pitarrilla project in Durango, Mexico to Endeavour Silver Corp. ("Endeavour Silver") for consideration consisting of $35.0 million(1)1 in common shares of Endeavor Silver, $35.0 million in cash, and a 1.25% net smelter returns royalty on the Pitarrilla property. For further information, see Note 3 to the Condensed Consolidated Financial Statements.
The Company acquired all of the issued and outstanding common shares of Taiga Gold Corp. (“Taiga Gold”) at a price of CAD $0.265 per Taiga Gold share on April 14, 2022, representing total consideration of $24.8 million. The transaction materially expands the Company’s presence in Saskatchewan, Canada, a core jurisdiction, by adding five new properties, which provide new exploration targets stretching south from the Seabee mine to the Company’s 100%-owned Amisk property. Further, the acquisition consolidates a 100% interest in the Fisher property contiguous to the Seabee mine. The Company will leverage its existing teams and infrastructure to advance the exploration of these assets.
On October 21, 2021, the Company completed the sale of a portfolio of 16 royalties and various deferred consideration interests in Türkiye and the impactAmericas (the "Royalty Portfolio") to EMX Royalty Corporation
1 The fair value of any existing variant, continuesthe common shares of Endeavour Silver on July 6, 2022 was $25.6 million. See Note 3 to remain unknown, all sites have remained operational throughout 2021.the Condensed Consolidated Financial Statements for more information.
103


(“EMX”). The Company continuesreceived total consideration of $33.0 million in cash and $34.5 million in equity (12.3 million common shares at $2.80 per share). In addition, the Company will receive up to restrict non-essential travel, protect$34.0 million in contingent cash payments payable upon completion of certain milestones related to the health and safety of its employees and contractors and take necessary stepsYenipazar project. For further information, see Note 3 to reduce the risk of COVID-19 impacting its operations.Consolidated Financial Statements.
On September 16, 2020, the Company completed the business acquisition of Alacer Gold Corp. ("Alacer"). The Company acquired all of the issued and outstanding common shares of Alacer for total consideration of $2,180 million. The financial information included in the following discussion and analysis of financial condition and results of operations for the year ended December 31, 2020, compared to the same periods in 2019, includes the results of the Çöpler operation since September 16, 2020. For further information, see Note 3 to the Consolidated Financial Statements.
On October 21, 2021, the Company completed the sale of a portfolio of 16 royalties and various deferred consideration interests in Turkey and the Americas (the "Royalty Portfolio") to EMX Royalty Corporation (“EMX”). The Company received total consideration of $33.0 million in cash and $34.5 million in equity (12.3 million common shares at $2.80 per share). In addition, the Company will receive up to $34.0 million in contingent cash payments payable upon completion of certain milestones related to the Yenipazar project. For further information, see Note 3 to the Consolidated Financial Statements.
On December 2, 2021, the Company announced an agreement to acquire all the issued and outstanding common shares of Taiga Gold Corporation (“Taiga Gold”) at a price of CAD $0.265 per Taiga Gold share which implies an equity value of approximately $21.0 million. Taiga Gold has announced that it intends to call a meeting of shareholders to be held on or before March 15, 2022 to seek shareholder approval for the transaction. The transaction will require approval of (i) at least 66⅔% of the votes cast by Taiga Gold shareholders and (ii) a simple majority of the votes cast by certain Taiga Gold shareholders, which excludes votes from certain shareholders, as required under Canadian Multilateral Instrument 61-601 - Protection of Minority Securityholders in Special Transactions. The completion of the transaction is also subject to receipt of court, stock exchange and any other regulatory approvals, and is subject to customary closing conditions for transactions of this nature. The agreement provides for non-solicitation covenants with "fiduciary out" provisions that allow Taiga Gold to consider and accept a superior proposal, subject to a "right to match period" in favor of the Company. The agreement also provides for (i) a termination fee of $1.2 million to be paid by Taiga Gold to the Company if the agreement is terminated in certain specified circumstances; and (ii) and expense reimbursement fee of $0.3 million to be paid by the Company to Taiga Gold if the transaction fails to close as a result of specified breaches of the agreement by the Company. The transaction is expected to close in the first half of 2022. For further information, see Note 3 to the Consolidated Financial Statements.
On January 12, 2022, the Company entered into an agreement with Endeavour Silver Corp. ("Endeavour Silver") to sell its Pitarrilla project in Durango, Mexico for consideration consisting of $35.0 million in common shares of Endeavor Silver, $35.0 million in cash, and a 1.25% net smelter returns royalty on the Pitarilla property. The transaction is expected to close in the first half of 2022. Until closing, Pitarrilla will be included in the Company's Exploration, evaluation and development properties segment.
98


Consolidated Results of Operations
A summary of the Company's consolidated financial and operating results for the years ended December 31, are presented below (in thousands):
Years Ended December 31,Change
2021202020192021 (%)2020 (%)
Financial Results
Revenue$1,474,199 $853,089 $606,850 72.8 %40.6 %
Operating income$444,375 $188,275 $118,395 136.0 %59.0 %
Production costs$671,374 $444,538 $349,619 51.0 %27.1 %
Net income$425,922 $157,162 $101,218 171.0 %55.3 %
Net income attributable to equity holders of SSR Mining$368,076 $151,535 $102,776 142.9 %47.4 %
Basic net income per share attributable to equity holders of SSR Mining$1.70 $1.00 $0.84 70.0 %19.0 %
Adjusted attributable net income(1)
$401,757 $193,401 $82,019 107.7 %135.8 %
Adjusted basic attributable net income per share (1)
$1.86 $1.28 $0.67 45.3 %91.0 %
Adjusted diluted attributable net income per share (1)
$1.78 $1.21 $0.63 47.1 %92.1 %
Operating Results
Gold produced (oz)683,446 418,745 331,120 63.2 %26.5 %
Gold sold (oz)689,354 413,775 331,350 66.6 %24.9 %
Silver produced ('000 oz)8,010 5,581 7,674 43.5 %(27.3)%
Silver sold ('000 oz)7,810 4,411 7,204 77.1 %(38.8)%
Lead produced ('000 lb) (2)
37,695 17,193 23,958 119.2 %(28.2)%
Lead sold ('000 lb) (2)
33,378 14,179 22,886 135.4 %(38.0)%
Zinc produced ('000 lb) (2)
13,642 6,988 8,392 95.2 %(16.7)%
Zinc sold ('000 lb) (2)
10,751 5,111 11,794 110.4 %(56.7)%
Gold equivalent produced (oz) (3)
794,456 484,153 421,828 64.1 %14.8 %
Gold equivalent sold (oz) (3)
797,602 465,471 415,383 71.4 %12.1 %
Average realized gold price ($/oz sold)$1,802 $1,812 $1,394 (0.6)%30.0 %
Average realized silver price ($/oz sold)$24.98 $21.23 $16.26 17.7 %30.6 %
Production cost per gold equivalent ounce sold$842 $955 $842 (11.8)%13.4 %
Cash cost per gold equivalent ounce sold (1, 3)
$698 $814 $787 (14.3)%3.4 %
AISC per gold equivalent ounce sold (1, 3)
$955 $1,193$1,078 (19.9)%10.7 %
104


Years Ended December 31,Change
2022202120202022 (%)2021 (%)
Financial Results
Revenue$1,148,033 $1,474,199 $853,089 (22.1)%72.8 %
Cost of sales (1)
$607,942 $671,374 $444,538 (9.4)%51.0 %
Operating income$190,268 $444,375 $188,275 (57.2)%136.0 %
Net income$210,428 $425,922 $157,162 (50.6)%171.0 %
Net income attributable to equity holders of SSR Mining$194,140 $368,076 $151,535 (47.3)%142.9 %
Basic net income per share attributable to equity holders of SSR Mining$0.92 $1.70 $1.00 (45.9)%70.0 %
Adjusted attributable net income(2)
$144,814 $401,757 $193,401 (64.0)%107.7 %
Adjusted basic attributable net income per share (2)
$0.69 $1.86 $1.28 (62.9)%45.3 %
Adjusted diluted attributable net income per share (2)
$0.67 $1.78 $1.21 (62.4)%47.1 %
Operating Results
Gold produced (oz)522,159 683,446 418,745 (23.6)%63.2 %
Gold sold (oz)521,928 689,354 413,775 (24.3)%66.6 %
Silver produced ('000 oz)8,397 8,010 5,581 4.8 %43.5 %
Silver sold ('000 oz)7,864 7,810 4,411 0.7 %77.1 %
Lead produced ('000 lb) (3)
41,004 37,695 17,193 8.8 %119.2 %
Lead sold ('000 lb) (3)
38,393 33,378 14,179 15.0 %135.4 %
Zinc produced ('000 lb) (3)
8,583 13,642 6,988 (37.1)%95.2 %
Zinc sold ('000 lb) (3)
6,998 10,751 5,111 (34.9)%110.4 %
Gold equivalent produced (oz) (4)
623,819 794,456 484,153 (21.5)%64.1 %
Gold equivalent sold (oz) (4)
617,135 797,602 465,471 (22.6)%71.4 %
Average realized gold price ($/oz sold)$1,811 $1,800 $1,812 0.6 %(0.7)%
Average realized silver price ($/oz sold)$19.58 $22.92 $21.23 (14.6)%8.0 %
Cost of sales per gold equivalent ounce sold (1)
$985 $842 $955 17.0 %(11.8)%
Cash cost per gold equivalent ounce sold (2, 4)
$928 $698 $814 33.0 %(14.3)%
AISC per gold equivalent ounce sold (2, 4)
$1,339 $955$1,193 40.2 %(19.9)%
(1)Excludes depreciation, depletion, and amortization.
(2)The Company reports non-GAAP financial measures including adjusted attributable net income, adjusted basic attributable net income per share, cash costs and AISC per ounce sold to manage and evaluate its operating performance at its mines. See "Non-GAAP Financial Measures" for an explanation of these financial measures and a reconciliation of these financial measures to net income and production costs,cost of sales, which are the comparable GAAP financial measures.
(2)(3)Data for lead production and sales relate only to lead in lead concentrate. Data for zinc production and sales relate only to zinc in zinc concentrate.
(3)(4)Gold equivalent ounces have been establishedare calculated using the silver ounces produced or sold multiplied by the ratio of the silver price to the gold price, using the average realized metalLondon Bullion Market Association (“LBMA”) prices per ounce of precious metals sold infor the period and applied to the recovered silver metal content produced by the mines. Zinc andperiod. The Company does not include copper, lead, productionor zinc as they are not included in gold equivalent ounces produced.considered by-products.
99105


Revenue
For the year ended December 31, 2021,2022, revenue increaseddecreased by $621.1$326.2 million, or 72.8%22.1%, to $1,474.2$1,148.0 million as compared to $853.1 million the year ended December 31, 2020. The increase was mainly due to an increase in gold equivalent ounces sold by 71.4%, partially offset by a 0.6% decrease in average realized gold prices. Changes in sales across the Company's operations were as follows: (i) gold sales at Çöpler increased $402.4 million, (ii) metal sales at Puna increased $123.5 million, (iii) gold sales at Seabee increased $78.6 million and (iv) gold sales at Marigold increased $16.6 million. At Çöpler, gold sales were 195.8% higher in 2021 due to a full year of operations and the results for the year ended December 31, 2020 represent only the results from September 16, 2020 to December 31, 2020, the period for which the Company was entitled to the economic benefits of Çöpler following the Company's acquisition of Alacer. At Seabee and Puna, the increase in revenues in 2021 was due to the impact of the temporary suspensions of operations related to COVID-19 during the year ended December 31, 2020. At Marigold, revenues remained relatively consistent for the year ended December 31, 2021 as compared to the year ended December 31, 2020.
Revenue increased by $246.2 million, or 40.6%, to $853.1$1,474.2 million for the year ended December 31, 2020, as compared to $606.9 million for the year ended December 31, 2019.2021. The increasedecrease was mainly due to an increasea 22.6% decrease in gold equivalent ounces sold of 12.1% coupled with a 30.0% increase in average realized gold prices. Changes in sales across the Company's operations were as follows: (i) $205.5 million insold. At Çöpler, gold sales at Çöpler, which was acquired in September 16, 2020, (ii) a $94.4decreased $248.1 million, increase in gold sales at Marigold, (iii) a decreaseor 41.3%, due to the temporary suspension of $42.9 million in silver sales at Puna and (iv) a decreaseoperations during the third quarter of $10.8 million in gold sales at Seabee. At Çöpler, revenue reflects the first period reporting results from Çöpler following the acquisition of Alacer on September 16, 2020.2022. At Marigold, gold sales revenue was 29.9% higher primarilydecreased $77.6 million, or 18.2%, as a result of fewer ounces leached due to slower leaching caused by fines in the ore from the north pits. At Seabee, gold sales increased $30.8 million as the result of high mill feed grade, increasing ounces sold by 12.4% which was slightly offset by a 28.2% increase14.4% decrease in the average realized gold price. At Puna, sales revenue was 29.5% lowerdecreased $26.6 million, or 11.8%, primarily due to a 38.8%14.6% decrease in the volume of silver ounces sold, partially offset by a 30.6% increase in the average realized silver price. At Seabee,
Cost of sales revenue was 7.4% lower due to a 27.7% decrease in the volume
Cost of gold ounces sold, offset partiallysales decreased by a 28.0% increase in the average realized gold price. The lower sales volumes at Seabee and Puna were due to the impact of the temporary suspensions of operations related to COVID-19.
Production costs
Production costs increased by $226.8$63.4 million, or 51.0%9.4%, to $607.9 million for the year ended December 31, 2022, as compared to $671.4 million for the year ended December 31, 2021, as compared to $444.52021. Çöpler cost of sales decreased $75.1 million, for the year ended December 31. 2020. The increase was primarilyor 28.3%, due to an additional $143.3 million in production costs at Çöpler during 2021, a 117.8% increase, reflecting a full yearthe temporary suspension of operations during the year ended December 31, 2021 as compared to partial year costs recorded in 2020 from September 16, 2020 through December 31, 2020, following the acquisitionthird quarter of Alacer. The remaining increase is2022. Costs of sales at Marigold decreased $13.0 million, or 5.9%, due to higher production costs of $25.8 million at Seabee, $55.1 million at Puna and $2.7 million at Marigold. At Seabee and Puna, production costs increased in 2021 as the sites did not shut down or temporarily suspend operations as the result of COVID-19 as had happened in the year ended December 31, 2020. At Marigold, production costs remained relatively consistent for the year ended December 31, 2021 as compared to the year ended December 31, 2020.
Production costs increased by $94.9 million, or 27.1%, to $444.5 million for the year ended December 31, 2020, as compared to $349.6 million for the year ended December 31, 2019. The increase in production costs was due to the inclusion of $121.6 million in new production costs from Çöpler and an increase of $24.3 million at Marigold,17.4% fewer ounces sold, partially offset by higher fuel costs. Cost of sales at Seabee increased $8.3 million, or 12.5%, due to a decrease12.4% increase in gold ounces sold. At Puna, cost of $45.0sales increased $16.3 million, at Puna and a decrease of $6.1 million at Seabee. At Çöpler, the production costs were new resulting from the acquisition of Alacer on September 16, 2020. At Marigold, production costs increasedor 13.5%, primarily due to a higher royalty as a result of more ounces produced at a higher average realized gold price. At Seabeeincreased cost pressures for fuel, electricity, and Puna, production costs decreased primarily due to the impact of the temporary suspensions of operations related to COVID-19 during the year ended December 31, 2020.

reagents in Argentina.
100106


Depreciation, depletion and amortization
Years Ended December 31,ChangeYears Ended December 31,Change
2021202020192021 (%)2020 (%)2022202120202022 (%)2021 (%)
Depreciation, depletion, and amortization ($000s)Depreciation, depletion, and amortization ($000s)$227,959 $109,258 $85,644108.6 %27.6 %Depreciation, depletion, and amortization ($000s)$181,447 $227,959 $109,258(20.4)%108.6 %
Gold equivalent ounces soldGold equivalent ounces sold797,602 465,471 415,38371.4 %12.1 %Gold equivalent ounces sold617,135 797,602 465,471(22.6)%71.4 %
Depreciation, depletion, and amortization per gold equivalent ounce soldDepreciation, depletion, and amortization per gold equivalent ounce sold$286 $235 $20621.7 %14.1 %Depreciation, depletion, and amortization per gold equivalent ounce sold$294 $286 $2352.8 %21.7 %
Depreciation, depletion, and amortization expense increaseddecreased by $118.7$46.5 million, or 108.6%20.4%, to $181.4 million for the year ended December 31, 2022 as compared to $228.0 million for the year ended December 31, 2021, as compared to $109.3 million for the year ended December 31, 2020. At Çöpler, the increase of $91.4 million reflected a full year of operations being included in the results for the year ended December 31, 2021 as compared to the period from September 16, 2020 to December 31, 2020, following the acquisition from Alacer. At Seabee and Puna, depreciation, depletion, and amortization increased primarily due to the impacta decrease in gold equivalent ounces sold as a result of the temporary suspensionssuspension of operations related to COVID-19 during the year ended December 31, 2020.
at Çöpler. Depreciation depletion, and amortization expense increased by $23.6 million, or 27.6%, to $109.3 million for the year ended December 31, 2020 as compared to $85.6 million for the year ended December 31, 2019. The increase is mainly due to the inclusion of $33.8 million of depreciation, depletion, and amortization from Çöpler, an increase of $0.2 million at Marigold, partially offset by decreases at Puna and Seabee of $2.4 million and $8.0 million, respectively. At Çöpler, the depreciation, depletion, and amortization expense reflects the addition of Çöpler following the acquisition of Alacer on September 16, 2020, adding additional depreciation, depletion and amortization to 2020. At Seabee and Puna, depreciation, depletion, and amortization decreased primarily due to the impact ofduring the temporary suspensionssuspension of operations related to COVID-19 during the year ended December 31, 2020.at Çöpler were included in Care and maintenance.
General and administrative expense
General and administrative expense for the year ended December 31, 20212022 was $56.6$71.7 million as compared to $33.6$56.6 million for the year ended December 31, 2020. 2021, an increase of $15.1 million. General and administrative expenses increased primarily due to a larger combined organization following the acquisition of Alacer that covers more locations and jurisdictions, partially offset by the decrease in stock-based compensation expense primarily related to mark-to-market adjustments for cash-settled units due to changes in the Company's common share price. Further, the insurance market has hardened in 2021 across almost all insurance policy types and the Company is experiencing increased rates as a result of the pricing change in the market.
General and administrative expense for the year ended December 31, 2020 was $33.6 $9.1 million as compared to $31.1 million for the year ended December 31, 2019. General and administrative expenses increased mainly due to the acquisition of Alacer, partially offset by a decrease in cash-settled stock-based compensation expense as a result of a smaller increase in the Company's common share price during the year ended December 31, 2020 as compared to the year ended December 31, 2019.salary and consulting expenses, and a $5.2 million increase in travel and computer expenses.
Exploration, evaluation and reclamation costs
Exploration, evaluation, and reclamation costs for the year ended December 31, 2021 were $42.4increased by $10.5 million as compared to $27.0$52.8 million for the year ended December 31, 2020. Exploration and evaluation activity in the year ended December 31, 2020 was restricted by COVID-19. The expenditures incurred during the year ended December 31, 2021 mainly relate to brownfield exploration work at Çöpler, particularly around the Saddle target and Ardich, in addition to work at the Trenton Canyon property of Marigold and work at Seabee. The expenditures incurred during the year ended December 31, 2020 mainly related to greenfield exploration work performed at the Trenton Canyon property of Marigold and Seabee.
Exploration, evaluation, and reclamation costs for the year ended December 31, 2020 were $27.0 million2022 as compared to $22.1$42.4 million for the year ended December 31, 2019.2021. The expenditures incurred duringincrease was due to $9.2 million for more exploration drilling and a $1.2 million increase in accretion expense compared to the year ended December 31, 2020 mainly related to greenfield exploration work performed at Trenton Canyon property of Marigold, as well as at Çöpler and Seabee. The expenditures incurred during the year ended December 31, 2019 mainly related to greenfield exploration work performed at Trenton Canyon and Seabee.
101


same period in 2021.
Care and maintenance expense
Care and maintenance expense for the year ended December 31, 20202022 was $29.6 million and no expenses were recognized for the years ended December 31, 2021 and 2019.$41.8 million. Care and maintenance expenses of $13.6 millionexpense incurred during 2022 represents direct costs and $16.0 million were recognizeddepreciation incurred at Seabee and Puna, respectively. These costs related to expenses incurred withÇöpler during the temporary suspension of the operations in response to COVID-19 during 2020. During the temporary suspensions, certain costs were incurred at each of the sites to provide care and maintenance activities. These costs were identified and recognized as care and maintenance expenses in the consolidated statements of income.operations.
Impairment of long-lived and other assets
ImpairmentThere was no impairment loss for the year ended December 31, 2021 was2022 as compared to $20.3 million and no loss was recognized for the year ended December 31, 2020.2021. The Company recognized an impairment loss related to the Royalty Portfolio sold on October 21, 2021, based on the difference between the carrying amount of the assets within the Royalty Portfolio, and the estimated net transaction price.
Transaction, integration and SEC conversion expenseOther operating expenses, net
Transaction, integration and SEC conversion expenseOther operating expenses, net for the year ended December 31, 2021 was $11.22022 were $2.1 million as compared to $20.8$11.2 million for the year ended December 31, 2020. During2021. The expenses incurred during 2022 were transaction costs related to the year ended December 31,sale of the Pitarrilla project. The expenses incurred during 2021 the Company incurred expenses of $6.9 million associated withrelated to the integration activities related tofollowing the 2020 merger with Alacer and $4.3 million related tocosts for the transitional requirements in connection with convertingtransition from a foreign private issuer to a domestic filer under SEC reporting requirements. Expenses for the year ended December 31, 2020 of $20.8 million were associated with the
Gain on acquisition of Alacer. No such expenses were incurred duringKartaltepe
Gain on acquisition of Kartaltepe in the 2022 year ended December 31, 2019.
Interest expense
Interest expense forwas $81.9 million. The gain represents the year ended December 31, 2021 was $19.1 million as compared to $13.9 million fordifference between: (i) the year ended December 2020. The increase is mainly due tofair value of consideration paid, the additionfair value of a full year of interest expense incurred in 2021 associated with the Term Loannoncontrolling interests, and the Air Liquide oxygen plant at Çöpler which were assumed as partreported amount of the acquisitionpreviously held 50% interest and (ii) the total amount of Alacer.
Interest expense for the year ended December 31, 2020 was $13.9 million as compared to $12.8 million for the year ended December 31, 2019. The increase is mainly due to the interest expense for the partial year on the Term Loan assumed in the acquisition of Alacer.net assets recognized at fair value.
Other income (expense)
Other expense for the year ended December 31, 2021 was $14.1 million as compared to income of $31.1 million for the year ended December 31, 2020. The change is mainly due to the fluctuation in fair value of marketable securities. For the years ended December 31, 2021 and 2020, the Company recognized a loss of $10.7 million and a gain of $21.4 million, respectively.
Other income for the year ended December 31, 20202022 was $31.1$20.3 million as compared to $39.2expense of $14.1 million for the year ended December 31, 2019.2021, an increase of $34.4 million. The decreasechange is mainlyprimarily due to the changean increase in fair value of marketable securities. For the years ended December 31, 2020 and 2019, the Company recognized a gain of $21.4 million and a gain of $34.6 million, respectively.

102107


interest and other finance income of $14.4 million earned principally through its investments, which consisted primarily of short-term investments and money market funds during 2022 and an increase in the gain on marketable securities of $14.8 million.
Foreign exchange gain (loss)
Foreign exchange gainloss for the year ended December 31, 20212022 was $3.6$32.5 million compared to a lossgain of $3.7$3.6 million for the year ended December 31, 2020.2021. The Company's main foreign exchange exposures are related to net monetary assets and liabilities denominated in TRY, ARS and CAD. During the year ended December 31, 2021, 2022, the foreign exchange gainloss was mainly due to a weakening of the TRY against the USD and its impact on TRY-denominated liabilities at Çöpler, partially offset by a weakening of the ARS against the USD and its impact on ARS-denominated assets at Puna.
Foreign exchange loss for the year ended December 31, 2020 was $3.7 million as compared to $5.1 million for the year ended December 31, 2019. During the year ended December 31, 2020, the foreign exchange loss was mainly due to aPuna, weakening of the ARSTRY against the USD and its impact on the ARS-denominatedTRY-denominated assets at Puna, offset partially by a foreign exchange gain on CAD-denominated liabilities during the first quarter of 2020, as the CAD weakened, in addition to a foreign exchange gain on cashÇöpler, and cash equivalents balance during the second and third quarters of 2020 as the CAD strengthened. During the year ended December 31, 2019, the foreign exchange loss was due mainly to a weakening of the ARSCAD against the USD and its impact on ARS denominatedCAD-denominated assets at Puna, as well as a strengthening of the CAD and its impact on CAD denominated assets.Seabee.
Income and mining tax benefit (expense)
Income and mining tax benefit for the year ended December 31, 2021 was $14.1 million as compared to expense of $43.2 million for the year ended December 31, 2020. The decrease in tax expense in the year ended December 31, 2021 was primarily a result of a remeasurement gain on non-monetary assets denominated in non-functional currencies, primarily resulting from Turkey. In particular there was a significant devaluation of the Lira relative to the U.S. dollar amounting to $116.8 million.
Income and mining tax expense for the year ended December 31, 20202022 was $43.2$30.1 million as compared to $35.4a benefit of $14.1 million for the year ended December 31, 2019.2021. The increase in tax expense for the year ended December 31, 2020 iswas primarily as a result of less devaluation of TRY relative to the USD, increased income from operations.withholding taxes on dividends and an uncertain tax position.
103108


Results of Operations

Çöpler, TurkeyTürkiye
Years Ended December 31,Years Ended December 31,Change
Operating DataOperating Data 2021
2020 (1)
Change (%)Operating Data20222021
2020(1)
2022 (%)2021 (%)
Gold produced (oz)Gold produced (oz)329,276 102,616 220.9 %Gold produced (oz)191,366 329,276 102,616 (41.9)%220.9 %
Gold sold (oz)Gold sold (oz)333,761 108,283 208.2 %Gold sold (oz)192,811 333,761 108,283 (42.2)%208.2 %
Average realized gold price ($/oz sold)Average realized gold price ($/oz sold)$1,800 $1,887 (4.6)%Average realized gold price ($/oz sold)$1,826 $1,800 $1,887 1.4 %(4.6)%
Production costs$264,889 $121,614 117.8 %
Production costs ($/oz gold sold)$794 $1,123 (29.3)%
Cost of sales (2)
Cost of sales (2)
$189,825 $264,889 $121,614 (28.3)%117.8 %
Cost of sales ($/oz gold sold) (2)
Cost of sales ($/oz gold sold) (2)
$985 $794 $1,123 24.1 %(29.3)%
Cash costs ($/oz gold sold) (2)(3)
Cash costs ($/oz gold sold) (2)(3)
$578 $623 (7.2)%
Cash costs ($/oz gold sold) (2)(3)
$969 $578 $623 67.6 %(7.2)%
AISC ($/oz gold sold) (2)(3)
AISC ($/oz gold sold) (2)(3)
$713 $749 (4.8)%
AISC ($/oz gold sold) (2)(3)
$1,328 $713 $749 86.3 %(4.8)%
(1)The operating data presented in this column represents the period from September 16, 2020 to December 31, 2020, the period for which the Company was entitled to the economic benefits of Çöpler following the Company's acquisition of Alacer.
(2)Excludes depreciation, depletion, and amortization.
(3)The Company reports the non-GAAP financial measures of cash costs and AISC per ounce of gold sold to manage and evaluate operating performance at Çöpler. See "Non-GAAP Financial Measures" for an explanation of these financial measures and a reconciliation to production costs,cost of sales, which are the comparable GAAP financial measure. CashFor the year ended December 31, 2022, cash costs and AISC per ounce of gold sold include the impact of any fair value adjustment on acquired inventories. For the years ended December 31, 2021 and 2020, cash costs and AISC per ounce of gold sold exclude the impact of any fair value adjustment on acquired inventories as of the date of the Company's acquisition of Alacer.inventories.
Production and Production CostsCost of sales
For the yearyears ended December 31, 20212022 and the period from September 16, 2020 to December 31, 2020,2021, Çöpler produced 329,276191,366 and 102,616329,276 ounces of gold, respectively. HigherCost of sales per ounce of gold sold for the years ended December 31, 2022 and 2021 were $985 and $794 respectively, an increase of 24.1%. Lower production and cost of sales for the year ended December 31, 2021 reflects a full year2022 are due to the temporary suspension of production following the acquisition of Alacer on September 16, 2020. The Çöpler flotation plant construction was completed duringoperations that occurred in the third quarter of 2021 on budget2022. Additionally, the cost of sales per ounce was impacted by higher electricity and schedule. The environmental impact assessment was approved in October 2021. Subsequent provincial permitting for the operation of the new facility was completed and the flotation plant was brought online in late December 2021 after the final permit was received.
Production costs for the year ended December 31, 2021 were $264.9 million, a 117.8% increase as compared to the year ended December 31, 2020. The production costs were higher due to the acquisition of Alacer on September 16, 2020.sulfuric acid unit costs.
Cash Costs
For the years ended December 31, 20212022 and 2020,2021, cash costs per ounce of gold sold were $578$969 and $623,$578, respectively. The decrease isincrease was mainly due to a higher strip ratio of 84.6% for the increase in ounces soldyear ended December 31, 2022 as compared to 60.6% for the year ended December 31, 2021. In addition to the higher strip ratio, higher reagent and electricity unit costs occurred during the year ended December 31, 2022 compared to same period in 2021.
AISC
For the years ended December 31, 20212022 and 2020,2021, AISC per ounce of gold sold were $713$1,328 and $749,$713, respectively. The decrease is mainlyincreases are due to the increase in42.2% fewer gold ounces sold during the year ended December 31, 2021.2022 compared to same period in 2021 as a result of the temporary suspension of operations that occurred for the majority of the third quarter of 2022 in addition to the increase in cash costs per ounce.

104109


Marigold, USA
Years Ended December 31,ChangeYears Ended December 31,Change
Operating DataOperating Data2021202020192021 (%)2020 (%)Operating Data2022202120202022 (%)2021 (%)
Gold produced (oz)Gold produced (oz)235,282 234,443 220,227 0.4 %6.5 %Gold produced (oz)194,668 235,282 234,443 (17.3)%0.4 %
Gold sold (oz)Gold sold (oz)236,847 229,892 226,823 3.0 %1.4 %Gold sold (oz)195,617 236,847 229,892 (17.4)%3.0 %
Average realized gold price ($/oz sold)Average realized gold price ($/oz sold)$1,804$1,783 $1,391 1.2 %28.2 %Average realized gold price ($/oz sold)$1,747$1,763$1,783(0.9)%(1.1)%
Production costs$219,035$216,358 $192,032 1.2 %12.7 %
Production costs ($/oz gold sold)$925 $941 $847 (1.7)%11.1 %
Cost of sales (1)
Cost of sales (1)
$206,014$219,035 $216,358 (5.9)%1.2 %
Cost of sales ($/oz gold sold) (1)
Cost of sales ($/oz gold sold) (1)
$1,053 $925 $941 13.8 %(1.7)%
Cash costs ($/oz gold sold) (1)(2)
Cash costs ($/oz gold sold) (1)(2)
$926$938$847(1.3)%10.7 %
Cash costs ($/oz gold sold) (1)(2)
$1,056$926$93814.0 %(1.3)%
AISC ($/oz gold sold) (1)(2)
AISC ($/oz gold sold) (1)(2)
$1,187$1,205$1,044(1.5)%15.4 %
AISC ($/oz gold sold) (1)(2)
$1,378$1,187$1,20516.1 %(1.5)%
(1)Excludes depreciation, depletion, and amortization.
(2)The Company reports the non-GAAP financial measures of cash costs and AISC per ounce of gold sold to manage and evaluate operating performance at Marigold. See "Non-GAAP Financial Measures" for an explanation of these financial measures and a reconciliation to production costs, which are the comparable GAAP financial measure.
Production and Production CostsCost of sales
Production ounces remained consistent duringFor the yearyears ended December 31, 2022 and 2021, compared to the same period in 2020. For the year ended December 31, 2020, Marigold produced 234,443194,668 and 235,282 ounces of gold, an increaserespectively. The production decrease in 2022 was primarily the result of 6.5% comparedslower leaching due to 220,227 ouncesfines in the ore from the north pits.
Cost of sales for the year ended December 31, 2019. The increase2022 was due to low stacking elevations throughout 2020 which contributed to faster leach times and a decrease in electrowinning cell inventory during 2020.
Production costs for the year ended December 31, 2021 were $219.0$206.0 million, a 1.2% increase5.9% decrease as compared to the year ended December 31, 2020. The production costs remained consistent with prior periods. Production2021. Cost of sales were lower due to fewer ounces sold, partially offset by higher cost of sales per ounce. Cost of sales per ounce sold were 13.8% higher due to higher fuel and reagent costs for ounces placed on the year ended December 31, 2020 were $216.4 million, a 12.7% increase compared toleach pad in the year ended December 31, 2019. The increase is primarily due to 35.0% higher royalty as a result of 6.5% more ounces produced at a 28.2% higher gold price compared to the prior year.period.
Cash Costs
CashFor the years ended December 31, 2022 and 2021, cash costs per ounce of gold sold for the year ended December 31, 2021 were $1,056 and $926, a 1.3% decrease compared to the year ended December 31, 2020.respectively. The increase in cash cost per ounce remained consistent withare the prior period.
Cash costsresult of the increase in cost of sales per ounce of gold sold fordue to higher fuel and reagent costs.
AISC
For the yearyears ended December 31, 2020 were $938, a 10.7% increase compared to the year ended December 31, 2019, primarily due to an increase in per unit royalty costs due to higher realized gold prices in 2020.
AISC
AISC remained consistent during the year ended December 31,2022 and 2021, compared to the same period in 2020.
For the year ended December 31, 2020, AISC per ounce of gold sold was $1,205, a 15.4% increase compared to the year ended December 31, 2019.were $1,378 and $1,187, respectively. The increase is primarilymainly due to higherthe increase in cash costs and an increase inper ounce from fewer ounces sold as well as higher sustaining capital expenditures per gold ounce sold. Capital expenditures were higher during the year ended December 31, 2020 comparedrelated to the prior period in 2019 due to mobile mine equipment replacements, increaseddewatering and leach pad construction and dewatering constructioncosts, partially offset by lower componentization costs.

105110


Seabee, Canada
Years Ended December 31,ChangeYears Ended December 31,Change
Operating DataOperating Data2021202020192021 (%)2020 (%)Operating Data2022202120202022 (%)2021 (%)
Gold produced (oz)Gold produced (oz)118,88881,686110,89345.5 %(26.3)%Gold produced (oz)136,125118,88881,68614.5 %45.5 %
Gold sold (oz)Gold sold (oz)118,74675,600104,52757.1 %(27.7)%Gold sold (oz)133,500118,74675,60012.4 %57.1 %
Average realized gold price ($/oz sold)Average realized gold price ($/oz sold)$1,804$1,790$1,3980.8 %28.0 %Average realized gold price ($/oz sold)$1,795$1,800$1,790(0.3)%0.6 %
Production costs$66,354 $40,575 $46,627 63.5 %(13.0)%
Production costs ($/oz gold sold)$559$537$4464.1 %20.4 %
Cost of sales (1)
Cost of sales (1)
$74,679 $66,354 $40,575 12.5 %63.5 %
Cost of sales ($/oz gold sold) (1)
Cost of sales ($/oz gold sold) (1)
$559$559$537— %4.1 %
Cash costs ($/oz sold) (1)(2)
Cash costs ($/oz sold) (1)(2)
$521$522$447(0.2)%16.8 %
Cash costs ($/oz sold) (1)(2)
$561$521$5227.7 %(0.2)%
AISC ($/oz sold) (1)(2)
AISC ($/oz sold) (1)(2)
$804$1,110$798(27.6)%39.1 %
AISC ($/oz sold) (1)(2)
$823$804$1,1102.4 %(27.6)%
(1)Excludes depreciation, depletion, and amortization.
(2)The Company reports the non-GAAP financial measures of cash costs and AISC per ounce of gold sold to manage and evaluate operating performance at Seabee. See "Non-GAAP Financial Measures" for an explanation of these financial measures and a reconciliation to production costs,cost of sales, which are the comparable GAAP financial measure.
Production and Production CostsCost of sales
For the year ended December 31, 2021,2022, Seabee produced 118,888136,125 ounces of gold, a 45.5%14.5% increase compared to the year ended December 31, 2020.2021. The increase was primarily due to a full yearhigher mill feed grade and increased mine and mill productivity levels.
Cost of mill operations in 2021 compared to the mill shut down from March 2020 through August 2020 due to the temporary suspension of operations as a result of COVID-19. For the year ended December 31, 2020, Seabee produced 81,686 ounces of gold, a 26.3% decrease compared to the year ended December 31, 2019. The decrease was primarily due to the mill shut down from March 2020 through August 2020 due to COVID-19 while the mill was fully operational in 2019. In response to the COVID-19 pandemic, Seabee was voluntarily placed into temporary care and maintenance on March 25, 2020 as a precautionary measure to protect the Company's employees, their families, and communities. Through this period, the mine was maintained in a state of operational readiness. The Company commenced a phased restart in June 2020 and the mine was operating at full capacity starting in August 2020.
Production costssales for the year ended December 31, 2021 were $66.42022 was $74.7 million, a 63.5%12.5% increase compared to the year ended December 31, 2020.2021. The increase was primarily due to higher gold ounces sold, and the temporary suspensioncost of operations in 2020. Production costs for thesales per ounce sold was consistent year ended December 31, 2020 were $40.6 million, a 13.0% decrease as compared to the year ended December 31, 2019. The decrease was primarily due to the temporary suspension of operations in 2020.over year.
Cash Costs
CashFor the years ended December 31, 2022 and 2021, cash costs per ounce of gold sold remained consistent during the year ended December 31, 2021, compared to the same period in 2020.     
Cash costs per ounce of gold sold for the year ended December 31, 2020 were $522 as compared to $447 for the year ended December 31, 2019.$561 and $521, respectively. The increase in cash costs was primarilyis mainly due to a 27.7% decrease in gold ounces sold, partially offset by a 13.0% decrease in production costs.inflationary cost pressures, operational and equipment maintenance costs, and increased utilization of contractors for higher production.
AISC
For the yearyears ended December 31, 2021,2022, AISC per ounce was $804,$823, a 27.6% decrease compared to the year ended December 31, 2020. The decrease is primarily due to a 57.1% increase in gold ounces sold.
For the year ended December 31, 2020, AISC per ounce of gold sold was $1,110, a 39.1%2.4% increase compared to the year ended December 31, 2019.2021. The increase is primarily due to a 27.7% decreasethe increase in gold equivalent ounces sold while the AISCcash costs remained consistent with the prior period.

per ounce, and was partially offset by lower sustaining capital per ounce.
106111


Puna, Argentina
Years Ended December 31,ChangeYears Ended December 31,Change
Operating DataOperating Data2021202020192021 (%)2020 (%)Operating Data2022202120202022 (%)2021 (%)
Silver produced ('000 oz)Silver produced ('000 oz)8,010 5,581 7,674 43.5 %(27.3)%Silver produced ('000 oz)8,397 8,010 5,581 4.8 %43.5 %
Silver sold ('000 oz)Silver sold ('000 oz)7,810 4,411 7,204 77.1 %(38.8)%Silver sold ('000 oz)7,864 7,810 4,411 0.7 %77.1 %
Lead produced ('000 lb)Lead produced ('000 lb)37,695 17,193 23,958 119.2 %(28.2)%Lead produced ('000 lb)41,004 37,695 17,193 8.8 %119.2 %
Lead sold ('000 lb)Lead sold ('000 lb)33,378 14,179 22,886 135.4 %(38.0)%Lead sold ('000 lb)38,393 33,378 14,179 15.0 %135.4 %
Zinc produced ('000 lb)Zinc produced ('000 lb)13,642 6,988 8,392 95.2 %(16.7)%Zinc produced ('000 lb)8,583 13,642 6,988 (37.1)%95.2 %
Zinc sold ('000 lb)Zinc sold ('000 lb)10,751 5,111 11,794 110.4 %(56.7)%Zinc sold ('000 lb)6,998 10,751 5,111 (34.9)%110.4 %
Gold equivalent sold ('000 oz) (2)(1)
Gold equivalent sold ('000 oz) (2)(1)
108,248 51,696 84,033 109.4 %(38.5)%
Gold equivalent sold ('000 oz) (2)(1)
95,207 108,248 51,696 (12.0)%109.4 %
Average realized silver price ($/oz)Average realized silver price ($/oz)$25.12 $21.23 $16.26 18.3 %30.6 %Average realized silver price ($/oz)$19.58 $22.92 $21.23 (14.6)%8.0 %
Production costs$121,096 $65,991 $110,960 83.5 %(40.5)%
Production costs ($/oz gold equivalent sold)$1,119 $1,277 $1,320 (12.4)%(3.3)%
Cost of sales (2)
Cost of sales (2)
$137,424 $121,096 $65,991 13.5 %83.5 %
Cost of sales ($/oz silver sold) (2)
Cost of sales ($/oz silver sold) (2)
$17.48 15.51 14.96 12.7 %3.7 %
Cost of sales ($/oz gold equivalent sold) (2)
Cost of sales ($/oz gold equivalent sold) (2)
$1,443 $1,119 $1,277 29.0 %(12.4)%
Cash costs ($/oz silver sold) (1)
$10.56 $12.72 $12.24 (17.0)%3.9 %
Cash costs ($/oz silver sold) (3)
Cash costs ($/oz silver sold) (3)
$13.23 $10.56 $12.72 25.3 %(17.0)%
Cash costs ($/oz gold equivalent sold)Cash costs ($/oz gold equivalent sold)$762 $1,085 $1,049 (29.8)%3.4 %Cash costs ($/oz gold equivalent sold)$1,093 $762 $1,085 43.4 %(29.8)%
AISC ($/oz silver sold) (1)
$12.40 $18.56 $13.81 (33.2)%34.4 %
AISC ($/oz silver sold) (3)
AISC ($/oz silver sold) (3)
$15.50 $12.40 $18.56 25.0 %(33.2)%
AISC ($/oz gold equivalent sold)AISC ($/oz gold equivalent sold)$897 $1,584 $1,184 (43.4)%33.8 %AISC ($/oz gold equivalent sold)$1,280 $895 $1,584 43.0 %(43.5)%
(1)Gold equivalent ounces are calculated using the silver ounces produced or sold multiplied by the ratio of the silver price to the gold price, using the average LBMA prices for the period. The Company does not include copper, lead, or zinc as they are considered by-products.
(2)Excludes depreciation, depletion, and amortization.
(3)The Company reports the non-GAAP financial measures of cash costs and AISC per ounce of silver sold to manage and evaluate operating performance at Puna. See "Non-GAAP Financial Measures" for an explanation of these financial measures and a reconciliation to production costs,cost of sales, which are the comparable GAAP financial measure.
(2)Gold equivalent ounces have been established using realized metal prices per ounce
Production and Cost of precious metal sold in the period and applied to the recovered metal content of the silver sold by Puna. The Company has not included lead and zinc as they are considered a by-product.
Productionsales
For the year ended December 31, 2021,2022, Puna produced 8.08.4 million ounces of silver, a 43.5%4.8% increase compared to the year ended December 31, 2020.2021. The increase is primarily due to a full year of production in 2021higher silver feed grade as compared to the temporary suspension of operationssame period in response to COVID-19 during the second and third quarters of 2020. Lead and zinc production were significantly higher2021. Silver ounces sold for the same reason. For the year ended December 31, 2020, Puna produced 5,581.2 million ounces of silver, a 27.3% decrease2022 was within 1% compared to the year ended December 31, 2019. The decrease is primarily2021 due to the temporary suspensiontiming of operations in response to COVID-19 during the second and third quartersconcentrate shipments.
Cost of 2020 and a full year of operations in 2019.
Production costssales for the year ended December 31, 2021 were $121.12022 was $137.4 million, a 83.5%13.5% increase compared to the year ended December 31, 2020.2021. The increase wasin cost of sales is primarily due to the temporary suspension of operationshigh inflationary pressure on inputs in 2020. ProductionArgentina, causing overall costs for the year ended December 31, 2020 were $66.0 million, a 40.5% decrease as compared to the year ended December 31, 2019.increase. The decrease was primarily due to the temporary suspension of operations in 2020.key operating inputs impacted include materials and supplies, fuel costs and reagent prices.

107112


Cash Costs
Cash costs per ounce of silver sold for the year ended December 31, 20212022 were $10.56,$13.23, a 17.0% decrease as compared to the year ended December 31, 2020. The decrease is primarily due to the increased silver ounces produced partially offset by increases in operating costs due to increased productivity of mining equipment and higher average daily plant throughput.
Cash costs per ounce of silver sold for the year ended December 31,2020 were $12.72, a 3.9%25.3% increase as compared to the year ended December 31, 2019.2021. The increase wasis primarily due to higher mining unitincreased cost of sales, increased transportation costs offset by lower processing and overhead unit costs. Mining costs were higher due to operating inefficiencies through shutdownhigher prices for boat and start-up phasescontainer shipments, and an increase in maintenance work performed during the temporary suspensions.lower by-product credits that offset costs. The lower processing and overhead unit costsby-product credits are arelated to lower zinc sales as the result of higher average daily plant throughputlower zinc feed grade and the positive impact of the renegotiation of the natural gas contract.a lower zinc recovery rate.
AISC
For the year ended December 31, 2021,2022, AISC per ounce of silver sold was $12.40,$15.50, a 33.2% decrease25.0% increase compared to the year ended December 31, 2020.2021. The decreaseincreases in per ounce cost is primarily due to a significant increase in volumes produced and sold during 2021. Volumes increased in 2021 primarily due to the temporary suspension of operations in response to COVID-19 during the second and third quarters of 2020.
For the year ended December 31, 2020, AISC per ounce of silver sold was $18.56, a 34.4% increase as compared to the year ended December 31, 2019. The increase is primarily due to higher cash costscost per ounce sold, offset partially by loweras well as higher sustaining capital expenditures. The lower sustaining capital expenditures were mainly dueexploration expense related to the deferral of capital projects due to impacts of COVID-19.an increase in exploration drilling near Chinchillas.
Liquidity and Capital Resources
The Company manages its liquidity risk through a rigorous planning, budgeting and forecasting process, which is reviewed and updated on a regular basis, to help determine the funding requirements to support its current operations, expansion and development plans, and by managing its capital structure.
The Company's objectives when managing capital are to:
safeguard its ability to continue as a going concerninvest in order to develop and operate its current projects and pursue strategic growth initiatives;initiatives, return cash to shareholders, and
maintain a flexible capital structure which lowers its cost of capital.balance sheet strength and flexibility.
In assessing capital structure, the Company includes the components of shareholders’ equity, the 2019 Notes, the Term Loan and the Amended Credit Facility.Agreement. In order to facilitate the management of capital requirements, the Company prepares annual budgets and continuously monitors and reviews actual and forecasted cash flows. The annual budget is monitored and approved by the Company's Board of Directors. To maintain or adjust the capital structure, the Company may, from time to time, issue new shares or debt, repay debt, dispose of non-core assets, or buy back shares. The Company expects its current capital resources will be sufficient to meet its business requirements for a minimum of twelve months.
Cash Dividends
During the year ended December 31, 2022, we declared and paid cash dividends of $0.28 per common share in the aggregate amount of 58.8 million.
During the year ended December 31, 2021, we declared and paid cash dividends of $0.20 per common share in the aggregate amount of $43.2 million.

108


Share Repurchase Plan/ NCIB
On April 19, 2021,June 20, 2022 the Board of Directors authorized a shareNormal Course Issuer Bid under the requirements of the TSX (the “2022 NCIB”) to repurchase plan, pursuant to which the Company may purchase in open market transactions, from time to time over the 12-month period commencing April 21, 2021, up to an aggregate of 10,000,000 of our10,600,000 common shares on the Nasdaq, Global Select Market, the TSX and/or other exchanges and alternative trading systems in Canada and/or the United States, if eligible, subject to applicable law and stock exchange rules. The price thatIn connection with the 2022 NCIB, the Company will pay for common shares in open market transactions will be the market price at the time ofentered into an automated share purchase or such other price as may be permitted by applicable law or stock exchange rules.plan. During the year ended December 31, 2021,2022, the Company repurchased and cancelled common shares of 6,053,126 for $100.0 million at a weighted average price paid per common share of $16.53.
On April 20, 2022, the Normal Course Issuer Bid established as of April 21, 2021 (the “2021 NCIB”) expired. Under the 2021 NCIB, the Company was authorized by the TSX to the purchase of up to 10,000,000 common shares. Under the 2021 plan, the Company purchased and cancelled 8,800,700 common shares for $148.1 million undervia open market purchases through the 2021 Repurchase Plan.
The TSX approved the Company’s noticefacilities of intention to commence the NCIB pursuant to which the Company may purchase common shares over the TSX and Nasdaq for the period commencing April 21, 2021 until April 20, 2022 in accordance with the TSX's normal course issuer bid rules, including that such purchases are to be made at prevailing market prices or as otherwise permitted. Under the rules of the TSX, the maximum number of common shares that may be purchased in this period is 10,000,000 (representing 4.5% of the Company’s issued and outstanding common shares as of April 9, 2021), and the maximum number of common shares that may be purchased on a single day on the TSX is 144,221 common shares, which is 25.0% of 576,887 (the average daily trading volume for the common shares on the TSX for the six months ended prior to the TSX's acceptance of the notice of the NCIB), subject to certain exceptions for block purchases, subject in any case to the volume and other limitations under Rule 10b-18. Under the rules of the NASDAQ, the maximum number of common shares that can be purchased on a single day on the Nasdaq is 25.0%at a weighted average price paid per common share of the rolling 4-week average.$16.82 and a total repurchase value of $148.1 million.
113


Cash and Cash Equivalents
At December 31, 2021,2022, the Company had $1,017.6$655.5 million of cash and cash equivalents, an increasea decrease of $156.9$362.1 million from December 31, 2020,2021, mainly due to positivecash used in the Company’s investing and financing activities, and partially offset by cash flows generated at eachby the Company's operations. Refer to the Cash flows part of the Liquidity and Capital Resources section of the MD&A for additional detail of the Company's operations.cash flow activities. The Company held $975.0$566.0 million of its cash and cash equivalents balance in USD. Additionally, the Company held cash and cash equivalents of $24.5$43.8 million, $12.8$23.1 million and $3.0$20.6 million in ARS, CAD and TRY, respectively. All cash is invested in short-term investments or high interest savings accounts in accordance with the Company's investment policy with maturities of 90 days or less, providing the Company with sufficient liquidity to meet its foreseeable corporatecapital needs.
Debt
On June 7, 2021,As a result of the temporarily suspended operations at the Çöpler mine during most of the third quarter of 2022, the Company amended its previous Credit Facility which expired on June 8, 2021, increasingwas not in compliance with certain financial covenants in relation to the facility size from $75.0 million to $200.0 million and extendingTerm Loan as of September 30, 2022. During the maturity by four years to June 8, 2025. The Amended Credit Facility also includes an accordion feature that increased from $25.0 million to $100.0 million. The Amended Credit Facility may be used byfourth quarter of 2022, the Company received a waiver for working capital, reclamation bonding and other general corporate purposes. Amounts drawn under the Amended Credit Facility are subjectnon-compliance event. The Company is in compliance with its financial covenants in relation to variable interest rates at LIBOR plus an applicable margin ranging from 2.00% to 3.00%, based on the Company's net leverage ratio. The Amended Credit Facility contains fallback language that replaces LIBOR with an alternative benchmark rate based on either SOFR or another alternative benchmark rate when LIBOR ceases to exist. Undrawn amounts are subject to a standby fee ranging from 0.40% to 0.60%, based on the Company's net leverage ratio. The Amended Credit Facility is undrawn atTerm Loan as of December 31, 2021.2022. There were no other material changes to the Company’s debt and revolving credit facilities except as noted in Note 18 to the Consolidated Financial Statements.
The Company's working capital atas of December 31, 2021,2022, together with future cash flows from operations, are expected to be sufficient to fund planned activities and commitments.

109


Cash Flows
The following table summarizes the Company's cash flow activity for year ended December 31:
Year Ended December 31,Years Ended December 31,
202120202019202220212020
Net cash provided by operating activitiesNet cash provided by operating activities$608,986$307,098$118,139Net cash provided by operating activities$160,896$608,986$307,098
Cash (used in) provided by investing activitiesCash (used in) provided by investing activities(129,137)240,423 (114,881)Cash (used in) provided by investing activities(236,282)(129,137)240,423 
Cash (used in) provided by financing activitiesCash (used in) provided by financing activities(319,769)(158,374)81,469 Cash (used in) provided by financing activities(271,782)(319,769)(158,374)
Effect of foreign exchange rate changes on cash and cash equivalentsEffect of foreign exchange rate changes on cash and cash equivalents(3,136)789 12 Effect of foreign exchange rate changes on cash and cash equivalents(16,591)(3,136)789 
Increase in cash, cash equivalents and restricted cash156,944 389,936 84,739 
Increase (decrease) in cash, cash equivalents and restricted cashIncrease (decrease) in cash, cash equivalents and restricted cash(363,759)156,944 389,936 
Cash, cash equivalents, and restricted cash, beginning of periodCash, cash equivalents, and restricted cash, beginning of period895,921 505,985 421,246 Cash, cash equivalents, and restricted cash, beginning of period1,052,865 895,921 505,985 
Cash, cash equivalents, and restricted cash, end of periodCash, cash equivalents, and restricted cash, end of period$1,052,865$895,921$505,985Cash, cash equivalents, and restricted cash, end of period$689,106$1,052,865$895,921
Cash provided by operating activities
For the year ended December 31, 2021,2022, cash provided by operating activities was $609.0$160.9 million compared to $307.1$609.0 million for the year ended December 31, 2020.2021. The increasedecrease in cash provided by operating activities is mainly due to the impact of higherlower gold sales across all mine sites including a full yearat Çöpler, due to the temporary suspension of operations, and lower sales at Çöpler duringMarigold in addition to the net change in operating assets and liabilities for the year ended December 31, 2022 as compared to the year ended December 31, 2021.
114

For the year ended December 31, 2020, cash
provided by operating activities was $307.1 million compared to $118.1 million for the year ended December 31, 2019. The increase in cash provided by operating activities during 2020 was mainly due to the impact of increased gold production due to the acquisition of Alacer, as well as higher average realized gold prices.
Cash (used in) provided by investing activities
For the year ended December 31, 2021,2022, cash used in investing activities was $129.1$236.3 million compared to cash provided byused in investing activities of $240.4$129.1 million for the year ended December 31, 2020.2021. The increase in cash used in investing activities is mainly due to increased capital expendituresan increase in cash used for acquisitions of $25.8$170.1 million and a $85.7the 2021 proceeds on Royalty Portfolio sale of $32.6 million, reduction inpartially offset by lower additions to mineral properties, plant and equipment of $27.3 million, the 2022 proceeds from salesthe sale of the Pitarrilla project of $35.1 million, increased proceeds from the sale of marketable securities partially offset from theof $24.2 million, and 2022 proceeds of $32.6$8.4 million from the royalty portfolio sale in 2021. Furthermore, the Company acquired cash, cash equivalents, and restricted cash of $303.4 million in connection with the acquisition of Alacer during 2020.
For the year ended December 31, 2020, cash provided by investing activities was $240.4 million compared to cash used in investing activities of $114.9 million for the year ended December 31, 2019. The increase in cash provided is mainly duerelated to the acquisitionrepayment of cash, cash equivalents, and restricted cash on the acquisition of Alacer on September 16, 2021 and higher proceeds from marketable securities, partially offset by increased capital expenditures in 2020.

110


EMX note receivable.
Cash (used in) provided by financing activities
For the year ended December 31, 2021,2022, cash used in financing activities was $319.8$271.8 million compared to $158.4cash used in financing activities of $319.8 million for the years ended December 31, 2020.2021. The increasedecrease of $48.0 million in cash used in financing activities is mainly due to thelower repurchase and cancellation of common shares under the 2021 Repurchase Plan and dividends paid in 2021NCIB of $48.1 million as compared to the redemption of the 2013 Notes and higher debt paymentssame period in 2020.
For the year ended December 31, 2020, cash used in financing activities was $158.4 million compared to cash provided by financing activities of $81.5 million for the year ended December 31, 2019. The increase in cash used in financing activities is mainly due to the proceeds from the issuance of the 2019 Notes in 2019 and higher debt payments in 2020.2021.
Contractual Obligations
The Company enters into contracts in the normal course of business that give rise to commitments for future minimum payments. The following table summarizes the contractual obligations of the Company's financial liabilities, operating and capital commitments:
December 31, 2021 December 31, 2022
(in thousands)(in thousands)CurrentNon-currentTotal (in thousands)CurrentNon-currentTotal 
Accounts payable and accrued liabilitiesAccounts payable and accrued liabilities$179,506 $$179,506 Accounts payable and accrued liabilities$203,583 $$203,583 
Convertible notes (principal portion)Convertible notes (principal portion) 230,000230,000Convertible notes (principal portion) 230,000230,000
Term Loan and other debt (principal portion)Term Loan and other debt (principal portion) 70,00070,000140,000Term Loan and other debt (principal portion) 70,00070,000
Interest payments on debtInterest payments on debt 1,0939182,011Interest payments on debt 5,6185,618
Lease liabilitiesLease liabilities 14,677111,490126,167Lease liabilities 5,847119,404125,251
Reclamation liabilitiesReclamation liabilities 2,384122,660125,044Reclamation liabilities 10,075153,972164,047
Operating expenditure commitmentsOperating expenditure commitments 3,4567524,208Operating expenditure commitments 10,17974610,925
Capital expenditure commitmentsCapital expenditure commitments 12,3682,13714,505Capital expenditure commitments 11,32911,329
OtherOther Other 4,8755285,403
Total contractual obligationsTotal contractual obligations$283,484$537,957$821,441Total contractual obligations$321,506$504,650$826,156
The Company believes working capital as of December 31, 2021,2022, together with future cash flows from operations, are sufficient to support its commitments through 2022. 2023. 

111115


Non-GAAP Financial Measures
The Company has included certain non-GAAP financial measures to assist in understanding the Company's financial results. The non-GAAP financial measures are employed by the Company to measure its operating and economic performance and to assist in decision-making, as well as to provide key performance information to senior management. The Company believes that, in addition to conventional measures prepared in accordance with GAAP, certain investors and other stakeholders will find this information useful to evaluate the Company's operating and financial performance; however, these non-GAAP performance measures do not have any standardized meaning. These performance measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. These non-GAAP measures should be read in conjunction with the Company's consolidated financial statements.
Non-GAAP Measure - Cash Costs and AISC
The Company uses cash costs per ounce of precious metals sold to monitor its operating performance internally. The most directly comparable measure prepared in accordance with GAAP is production costs.Cost of sales. The Company believes this measure provides investors and analysts with useful information about its underlying cash costs of operations and the impact of by-product credits on its cost structure. The Company also believes it is a relevant metric used to understand its operating profitability and ability to generate cash flow. When deriving the production costscost of sales associated with an ounce of precious metal, the Company includes by-product credits. Thereby allowing management and other stakeholders to assess the net costs of gold and silver production. In calculating cash costs per ounce, the Company also excludes the impact of specific items that are significant, but not reflective of its underlying operations, including the impact of measuring inventories at fair value in connection with business combinations.
AISC includes total production costsCost of sales incurred at the Company's mining operations, which forms the basis of cash costs. Additionally, the Company includes sustaining capital expenditures, sustaining mine-site exploration and evaluation costs, reclamation cost accretion and amortization, and general and administrative expenses. This measure seeks to reflect the ongoing cost of gold and silver production from current operations; therefore, expansionary capital and non-sustaining expenditures are excluded. Certain other cash expenditures, including tax payments and financing costs are also excluded.
The Company believes that AISC represents the total costs of producing gold and silver from current operations and provides the Company and other stakeholders with additional information about its operating performance and ability to generate cash flows. It allows the Company to assess its ability to support capital expenditures and to sustain future production from the generation of operating cash flows.
When deriving the number of ounces of precious metal sold, the Company considers the physical ounces available for sale after the treatment and refining process, commonly referred to as payable metal, as this is what is sold to third parties.
AISC includes total production costs incurred at the Company's mining operations, which forms the basis of its cash costs and which are reconciled to reported production costs.

112116


The following tables provide a reconciliation of production costscost of sales to cash costs and AISC:


Year Ended December 31, 2021

Year Ended December 31, 2022
(in thousands, unless otherwise noted)(in thousands, unless otherwise noted)ÇöplerMarigoldSeabeePunaCorporateTotal(in thousands, unless otherwise noted)ÇöplerMarigoldSeabeePunaCorporateTotal
Production costs (GAAP)$264,889$219,035$66,354$121,096$$671,374
Cost of sales (GAAP) (1)
Cost of sales (GAAP) (1)
$189,825$206,014$74,679$137,424$$607,942
By-product creditsBy-product credits$(5,989)$(103)$(94)$(50,192)$$(56,378)By-product credits$(2,928)$(125)$(111)$(48,124)$$(51,288)
Treatment and refining chargesTreatment and refining charges$$956$394$15,724$$17,074Treatment and refining charges$$693$316$14,753$$15,762
Incremental COVID-19 related costs(1)
$$(649)$(4,786)$(4,151)$$(9,586)
Fair value adjustment on acquired inventories$(65,939)$$$$$(65,939)
Cash costs (non-GAAP)Cash costs (non-GAAP)$192,961$219,239$61,868$82,477$$556,545Cash costs (non-GAAP)$186,897$206,582$74,884$104,053$$572,416
Sustaining capital expendituresSustaining capital expenditures$35,015 $57,722 $33,010 $10,458 $$136,205 Sustaining capital expenditures$31,189 $53,514 $32,980 $10,446 $$128,129 
Sustaining exploration and evaluation expenseSustaining exploration and evaluation expense$992$1,572$$140$$2,704Sustaining exploration and evaluation expense$2,875$7,377$$5,372$$15,624
Care and maintenance (2)
Care and maintenance (2)
$31,067$$$$$31,067
Reclamation cost accretion and amortizationReclamation cost accretion and amortization$2,395$2,738$642$1,624$$7,399Reclamation cost accretion and amortization$1,320$2,181$1,983$1,726$$7,210
General and administrative expense and stock-based compensation expenseGeneral and administrative expense and stock-based compensation expense$6,664$(103)$(28)$2,165$50,072$58,770General and administrative expense and stock-based compensation expense$2,794$1$11$266$68,588$71,660
Total AISC (non-GAAP)Total AISC (non-GAAP)$238,027$281,168$95,492$96,864$50,072$761,623Total AISC (non-GAAP)$256,142$269,655$109,858$121,863$68,588$826,106
Gold sold (oz)Gold sold (oz)333,761 236,847 118,746 — — 689,354 Gold sold (oz)192,811 195,617 133,500 — — 521,928 
Silver sold (oz)Silver sold (oz)— — — 7,810,282 — 7,810,282 Silver sold (oz)— — — 7,863,646 — 7,863,646 
Gold equivalent sold (oz) (2)(3)
333,761 236,847 118,746 108,248— 797,602 
Gold equivalent sold (oz) (3)(4)
Gold equivalent sold (oz) (3)(4)
192,811 195,617 133,500 95,207— 617,135 
Production cost per gold equivalent ounce sold$794 $925 $559 $1,119 N/A$842 
Cost of sales per gold equivalent ounce sold (1)
Cost of sales per gold equivalent ounce sold (1)
$985 $1,053 $559 $1,443 N/A$985 
Cash cost per gold ounce soldCash cost per gold ounce sold$578 $926 $521 N/AN/AN/ACash cost per gold ounce sold$969 $1,056 $561 N/AN/AN/A
Cash cost per silver ounce soldCash cost per silver ounce soldN/AN/AN/A$10.56 N/AN/ACash cost per silver ounce soldN/AN/AN/A$13.23 N/AN/A
Cash cost per gold equivalent ounce soldCash cost per gold equivalent ounce sold$578 $926 $521 $762 N/A$698 Cash cost per gold equivalent ounce sold$969 $1,056 $561 $1,093 N/A$928 
AISC per gold ounce soldAISC per gold ounce sold$713 $1,187 $804 N/AN/AN/AAISC per gold ounce sold$1,328 $1,378 $823 N/AN/AN/A
AISC per silver ounce soldAISC per silver ounce soldN/AN/AN/A$12.40 N/AN/AAISC per silver ounce soldN/AN/AN/A$15.50 N/AN/A
AISC per gold equivalent ounce soldAISC per gold equivalent ounce sold$713$1,187$804$895N/A$955AISC per gold equivalent ounce sold$1,328$1,378$823$1,280N/A$1,339
(1)COVID-19 related costs include direct, incremental costs associated with COVID-19.Excludes depreciation, depletion, and amortization.
(2)Care and maintenance expense in the AISC calculation only includes direct costs, as depreciation is not included in the calculation of AISC.
(3)Gold equivalent ounces have been establishedare calculated using realized metal prices per ouncethe silver ounces produced or sold multiplied by the ratio of precious metal sold in the period and appliedsilver price to the recovered metal content ofgold price, using the gold and silver sold by Çöpler, Marigold, Seabee and Puna.average LBMA prices for the period. The Company hasdoes not includedinclude copper, lead, andor zinc as they are considered a by-product.by-products.
(3)(4)Gold equivalent ounces sold may not re-calculate based on amounts presented in this table due to rounding.

113117


Year Ended December 31, 2020Year Ended December 31, 2021
(in thousands, unless otherwise noted)(in thousands, unless otherwise noted)ÇöplerMarigoldSeabeePunaCorporateTotal(in thousands, unless otherwise noted)ÇöplerMarigoldSeabeePunaCorporateTotal
Production costs (GAAP)$121,614$216,358$40,575$65,991$$444,538
Cost of sales (GAAP) (1)
Cost of sales (GAAP) (1)
$264,889$219,035$66,354$121,096$$671,374
By-product creditsBy-product credits$(1,158)$(53)$(53)$(16,018)$$(17,282)By-product credits$(5,989)$(103)$(94)$(50,192)$$(56,378)
Treatment and refining chargesTreatment and refining charges$$214$153$6,601$$6,968Treatment and refining charges$$956$394$15,724$$17,074
Incremental COVID-19 related costs (1)(2)
Incremental COVID-19 related costs (1)(2)
$(1,014)$(769)$(1,189)$(475)$$(3,447)
Incremental COVID-19 related costs (1)(2)
$$(649)$(4,786)$(4,151)$$(9,586)
Fair value adjustment on acquired inventoriesFair value adjustment on acquired inventories$(51,931)$$$$$(51,931)Fair value adjustment on acquired inventories$(65,939)$$$$$(65,939)
Cash costs (non-GAAP)Cash costs (non-GAAP)$67,511$215,750$39,486$56,099$$378,846Cash costs (non-GAAP)$192,961$219,239$61,868$82,477$$556,545
Sustaining capital expendituresSustaining capital expenditures$12,893$55,563$30,325$6,323$$105,104Sustaining capital expenditures$35,015$57,722$33,010$10,458$$136,205
Sustaining exploration and evaluation expenseSustaining exploration and evaluation expense$162$2,463$$204$$2,829Sustaining exploration and evaluation expense$992$1,572$$140$$2,704
Care and maintenance$— $$13,644$15,949$$29,593
Reclamation cost accretion and amortizationReclamation cost accretion and amortization$306$2,756$344$1,771$$5,177Reclamation cost accretion and amortization$2,395$2,738$642$1,624$$7,399
General and administrative expense and stock-based compensation expenseGeneral and administrative expense and stock-based compensation expense$251$435$127$1,520$31,236$33,569General and administrative expense and stock-based compensation expense$6,664$(103)$(28)$2,165$50,072$58,770
Total AISC (non-GAAP)Total AISC (non-GAAP)$81,123$276,967$83,926$81,866$31,236$555,118Total AISC (non-GAAP)$238,027$281,168$95,492$96,864$50,072$761,623
Gold sold (oz)Gold sold (oz)108,283 229,892 75,600 — — 413,775 Gold sold (oz)333,761 236,847 118,746 — — 689,354 
Silver sold (oz)Silver sold (oz)— — — 4,411,087 — 4,411,087 Silver sold (oz)— — — 7,810,282 — 7,810,282 
Gold equivalent sold (oz) (2)( 3)
108,283 229,892 75,600 51,696 — 465,471 
Gold equivalent sold (oz) (3)(4)
Gold equivalent sold (oz) (3)(4)
333,761 236,847 118,746 108,248 — 797,602 
Production cost per gold equivalent ounce sold$1,123 $941 $537 $1,277 N/A$955 
Cost of sales per gold equivalent ounce sold (1)
Cost of sales per gold equivalent ounce sold (1)
$794 $925 $559 $1,119 N/A$842 
Cash cost per gold ounce soldCash cost per gold ounce sold$623 $938 $522 N/AN/AN/ACash cost per gold ounce sold$578 $926 $521 N/AN/AN/A
Cash cost per silver ounce soldCash cost per silver ounce soldN/AN/AN/A$12.72 N/AN/ACash cost per silver ounce soldN/AN/AN/A$10.56 N/AN/A
Cash cost per gold equivalent ounce soldCash cost per gold equivalent ounce sold$623 $938 $522 $1,085 N/A$814Cash cost per gold equivalent ounce sold$578 $926 $521 $762 N/A$698
AISC per gold ounce soldAISC per gold ounce sold$749 $1,205 $1,110 N/AN/AN/AAISC per gold ounce sold$713 $1,187 $804 N/AN/AN/A
AISC per silver ounce soldAISC per silver ounce soldN/AN/AN/A$18.56 N/AN/AAISC per silver ounce soldN/AN/AN/A$12.40 N/AN/A
AISC per gold equivalent ounce soldAISC per gold equivalent ounce sold$749$1,205$1,110$1,584N/A$1,193AISC per gold equivalent ounce sold$713$1,187$804$895N/A$955
(1)Excludes depreciation, depletion, and amortization.
(2)COVID-19 related costs include direct, incremental costs associated with COVID-19.
114


(2)(3)Gold equivalent ounces have been establishedare calculated using realized metal prices per ouncethe silver ounces produced or sold multiplied by the ratio of precious metal sold in the period and appliedsilver price to the recovered metal content ofgold price, using the gold and silver sold by Çöpler, Marigold, Seabee and Puna.average LBMA prices for the period. The Company hasdoes not includedinclude copper, lead, andor zinc as they are considered a by-product.by-products.
(3)Gold equivalent ounces sold may not re-calculate based on amounts presented in this table due to rounding.

Year Ended December 31, 2019(1)
(in thousands, unless otherwise noted)MarigoldSeabeePunaCorporateTotal
Production costs (GAAP)$192,032 $46,627 $110,960 $— $349,619 
By-product credits$(70)$(50)$(32,988)$— $(33,108)
Treatment and refining charges$259 $127 $10,199 $— $10,585 
Cash costs (non-GAAP)$192,221 $46,704 $88,171 $— $327,096 
Sustaining capital expenditures$40,363$33,558$6,672$— $80,593
Sustaining exploration and evaluation expense$1,250$2,622$786$— $4,658
Reclamation cost accretion and amortization$2,163$252$2,054$— $4,469
General and administrative expense and stock-based compensation expense$819$248$1,775$28,266$31,108
Total AISC (non-GAAP)$236,816$83,384$99,458$28,266$447,924
Gold sold (oz)226,823 104,527 — — 331,350 
Silver sold (oz)— — 7,204,312 — 7,204,312 
Gold equivalent sold (oz) (1)(2)
226,823 104,527 84,033 — 415,383 
Production cost per gold equivalent ounce sold$847 $446 $1,320 N/A$842 
Cash cost per gold ounce sold$847 $447 N/AN/AN/A
Cash cost per silver ounce soldN/AN/A$12.24 N/AN/A
Cash cost per gold equivalent ounce sold$847 $447 $1,049 N/A$787 
AISC per gold ounce sold$1,044$798N/AN/AN/A
AISC per silver ounce soldN/AN/A$13.81 N/AN/A
AISC per gold equivalent ounce sold$1,044$798$1,184N/A$1,078
(1)The operating data presented in this table present results for the entire year ended December 31, 2019. As the Company was not entitled to the economic benefits of Çöpler prior to the acquisition, financial data for the periods prior to September 16, 2020 are not provided.
(2)Gold equivalent ounces have been established using realized metal prices per ounce of precious metal sold in the period and applied to the recovered metal content of the gold and silver sold by Çöpler, Marigold, Seabee and Puna. The Company has not included lead and zinc as they are considered a by-product.
(3)(4)Gold equivalent ounces sold may not re-calculate based on amounts presented in this table due to rounding.
115118


Year Ended December 31, 2020
(in thousands, unless otherwise noted)ÇöplerMarigoldSeabeePunaCorporateTotal
Cost of sales (GAAP)(1)
$121,614 $216,358 $40,575 $65,991 $— $444,538 
By-product credits$(1,158)$(53)$(53)$(16,018)$— $(17,282)
Treatment and refining charges$— $214 $153 $6,601 $— $6,968 
Incremental COVID-19 related costs (2)
$(1,014)$(769)$(1,189)$(475)$$(3,447)
Fair value adjustment on acquired inventories$(51,931)$$$$— $(51,931)
Cash costs (non- GAAP)$67,511 $215,750 $39,486 $56,099 $— $378,846 
Sustaining capital expenditures$12,893$55,563$30,325$6,323$— $105,104
Sustaining exploration and evaluation expense$162$2,463$$204$— $2,829
Care and maintenance$$$13,644$15,949$— $29,593
Reclamation cost accretion and amortization$306$2,756$344$1,771$— $5,177
General and administrative expense and stock-based compensation expense$251$435$127$1,520$31,236$33,569
Total AISC (non-GAAP)$81,123$276,967$83,926$81,866$31,236$555,118
Gold sold (oz)108,283 229,892 75,600 — — 413,775 
Silver sold (oz)— — — 4,411,087 — 4,411,087 
Gold equivalent sold (oz) (3(4)
108,283 229,892 75,600 51,696 — 465,471 
Cost of sales per gold equivalent ounce sold(1)
$1,123 $941 $537 $1,277 N/A$955 
Cash cost per gold ounce sold$623 $938 $522 N/AN/AN/A
Cash cost per silver ounce soldN/AN/AN/A$12.72 N/AN/A
Cash cost per gold equivalent ounce sold$623 $938 $522 $1,085 N/A$814 
AISC per gold ounce sold$749$1,205$1,110N/AN/AN/A
AISC per silver ounce soldN/AN/AN/A$18.56 N/AN/A
AISC per gold equivalent ounce sold$749$1,205$1,110$1,584N/A$1,193
(1)Excludes depreciation, depletion, and amortization.
(2)COVID-19 related costs include direct, incremental costs associated with COVID-19.
(3)Gold equivalent ounces are calculated using the silver ounces produced or sold multiplied by the ratio of the silver price to the gold price, using the average LBMA prices for the period. The Company does not include copper, lead, or zinc as they are considered by-products.
(4)Gold equivalent ounces sold may not re-calculate based on amounts presented in this table due to rounding.
119


Non-GAAP Measure - Adjusted Attributable Net Income
Adjusted attributable net income and adjusted attributable net income per share are used by management and investors to measure the Company's underlying operating performance. The most directly comparable financial measures prepared in accordance with GAAP are netNet income attributable to equity holders of SSR Mining shareholdersand netNet income per share attributable to equity holders of SSR Mining.Mining shareholders. Adjusted attributable net income is defined as net income adjusted to exclude the after-tax impact of specific items that are significant, but not reflective of the Company's underlying operations, including the impact of measuring inventories and mineral properties at fair value in connection with business combinations; impairment adjustments and reversals;adjustments; foreign exchange (gains) losses and inflationary impacts on tax balances; transaction, integration and SEC conversion expenses;costs; changes in tax rate for fair value adjustments and other non-recurring items. SEC conversion costs are the costs associated with the Company's transition in 2022 from being a foreign private issuer to a domestic reporting issuer for purposes of the SEC's reporting and other requirements.
120


The following table provides a reconciliation of net income attributable to equity holders of SSR Mining shareholders to adjusted net income attributable to equity holders of SSR Mining:Mining shareholders:
Years Ended December 31,Years Ended December 31,
(in thousands, except per share) (in thousands, except per share)202120202019 (in thousands, except per share)202220212020
Net income attributable to equity holders of SSR Mining (GAAP)$368,076 $151,535 $102,776 
Net income attributable SSR Mining shareholders (GAAP)Net income attributable SSR Mining shareholders (GAAP)$194,140 $368,076 $151,535 
Interest saving on convertible notes, net of taxInterest saving on convertible notes, net of tax4,889 4,883 3,392 Interest saving on convertible notes, net of tax4,910 4,889 4,883 
Net income used in the calculation of diluted net income per shareNet income used in the calculation of diluted net income per share$372,965 $156,418 $106,168 Net income used in the calculation of diluted net income per share$199,050 $372,965 $156,418 
Weighted-average shares used in the calculation of net income and adjusted net income per shareWeighted-average shares used in the calculation of net income and adjusted net income per shareWeighted-average shares used in the calculation of net income and adjusted net income per share
BasicBasic215,993 151,144 121,769 Basic209,883 215,993 151,144 
DilutedDiluted228,241 163,699 135,443 Diluted222,481 228,241 163,699 
Net income per share attributable to common stockholders (GAAP)
Net income per share attributable to SSR Mining shareholders (GAAP)Net income per share attributable to SSR Mining shareholders (GAAP)
BasicBasic$1.70 $1.00 $0.84 Basic$0.92 $1.70 $1.00 
DilutedDiluted$1.63 $0.96 $0.78 Diluted$0.89 $1.63 $0.96 
Adjustments:Adjustments:Adjustments:
Fair value adjustment on acquired assets(1)
Fair value adjustment on acquired assets(1)
$104,714 $48,893 $— 
Fair value adjustment on acquired assets(1)
$— $104,714 $48,893 
COVID-19 related costs (2)
COVID-19 related costs (2)
9,586 3,447 — 
COVID-19 related costs (2)
— 9,586 3,447 
Foreign exchange loss (gain)Foreign exchange loss (gain)(3,629)3,732 5,119 Foreign exchange loss (gain)32,460 (3,629)3,732 
Transaction, integration, and SEC conversion expense11,240 20,813 — 
Alacer transaction and integration costsAlacer transaction and integration costs— 8,595 20,813 
Gain on acquisition of KartaltepeGain on acquisition of Kartaltepe(81,852)— — 
Loss (gain) on sale of mineral properties, plant and equipmentLoss (gain) on sale of mineral properties, plant and equipment1,501 (412)2,804 
Pitarrilla transaction costsPitarrilla transaction costs1,561 — — 
SEC conversion costsSEC conversion costs1,255 2,645 — 
Impairment of long-lived and other assetsImpairment of long-lived and other assets20,275 — — Impairment of long-lived and other assets— 20,275 — 
Changes in fair value of investmentsChanges in fair value of investments10,741 (21,368)(34,630)Changes in fair value of investments(602)10,741 (21,368)
Loss (gain) on sale of mineral properties, plant and equipment(412)2,804 863 
Loss on redemption of convertible debt— — 3,044 
Income tax impact related to above adjustmentsIncome tax impact related to above adjustments(34,120)(15,144)3,197 Income tax impact related to above adjustments(966)(34,120)(15,144)
Foreign exchange (gain) loss and inflationary impacts on tax balancesForeign exchange (gain) loss and inflationary impacts on tax balances(97,288)(1,311)1,650 Foreign exchange (gain) loss and inflationary impacts on tax balances(14,128)(97,288)(1,311)
Other tax adjustments (3)
Other tax adjustments (3)
11,445 — — 
Impact of tax rate change on fair value adjustmentsImpact of tax rate change on fair value adjustments12,574 — — Impact of tax rate change on fair value adjustments— 12,574 — 
Adjusted net income attributable to equity holders of SSR Mining (Non-GAAP)$401,757$193,401$82,019
Adjusted net income attributable to SSR Mining shareholders (Non-GAAP)Adjusted net income attributable to SSR Mining shareholders (Non-GAAP)$144,814$401,757$193,401
Adjusted net income per share attributable to SSR Mining shareholders (Non-GAAP)Adjusted net income per share attributable to SSR Mining shareholders (Non-GAAP)Adjusted net income per share attributable to SSR Mining shareholders (Non-GAAP)
BasicBasic$1.86$1.28$0.67Basic$0.69$1.86$1.28
DilutedDiluted$1.78$1.21$0.63Diluted$0.67$1.78$1.21
(1)Fair value adjustments on acquired assets relate to the acquisition of Alacer's inventories and mineral properties.
(2)COVID-19 related costs include direct, incremental costs associated with COVID-19 at all operations.
(3)Represents charges related to a tax settlement and an uncertain tax position.
116
121


Non-GAAP Measure - Earnings Before Interest, Taxes, Depreciation and Amortization ("EBITDA") and Adjusted EBITDA
EBITDA represents net income before interest, taxes, depreciation, and amortization. EBITDA is an indicator of the Company's ability to generate liquidity by producing operating cash flow to fund working capital needs, service debt obligations, and fund capital expenditures.
Adjusted EBITDA represents net income before interest, taxes, depreciation, and amortization, adjusted to exclude the impact of specific items that are significant, but not reflective of the Company's underlying operations, including the impact of measuring inventories at fair value in connection with business combinations; impairment adjustments and reversals; foreign exchange gains (losses); transaction, integration and integration expenses; unrealized gains (losses) on derivatives;SEC conversion costs and other non-recurring items.
The most directly comparable financial measure prepared in accordance with GAAP to EBITDA and Adjusted EBITDA is netNet income attributable to equity holders of SSR Mining.Mining shareholders.
The following is a reconciliation of netNet income attributable to equity holders of SSR Mining shareholders to EBITDA and adjusted EBITDA:
Years Ended December 31,Years Ended December 31,
(in thousands)
(in thousands)
202120202019
(in thousands)
202220212020
Net income attributable to equity holders of SSR Mining (GAAP)$368,076 $151,535 $102,776 
Net income attributable to SSR Mining shareholders (GAAP)Net income attributable to SSR Mining shareholders (GAAP)$194,140 $368,076 $151,535 
Net income (loss) attributable to non-controlling interestsNet income (loss) attributable to non-controlling interests57,846 5,627 (1,558)Net income (loss) attributable to non-controlling interests16,288 57,846 5,627 
Depletion, depreciation and amortizationDepletion, depreciation and amortization227,959 109,258 85,644 Depletion, depreciation and amortization181,447 227,959 109,258 
Interest expenseInterest expense19,097 13,876 12,771 Interest expense19,116 19,097 13,876 
Income and mining tax expense (benefit)Income and mining tax expense (benefit)(14,116)43,203 35,439 Income and mining tax expense (benefit)30,068 (14,116)43,203 
EBITDA (non-GAAP)EBITDA (non-GAAP)658,862 323,499 235,072 EBITDA (non-GAAP)441,059 658,862 323,499 
Fair value adjustment on acquired inventories (1)
Fair value adjustment on acquired inventories (1)
65,939 51,931 — 
Fair value adjustment on acquired inventories (1)
— 65,939 51,931 
COVID-19 related costs (2)
COVID-19 related costs (2)
9,586 3,447 — 
COVID-19 related costs (2)
— 9,586 3,447 
Foreign exchange loss (gain)Foreign exchange loss (gain)(3,629)3,732 5,119 Foreign exchange loss (gain)32,460 (3,629)3,732 
Transaction, integration, and SEC conversion expense11,240 20,813 — 
Alacer transaction and integration costsAlacer transaction and integration costs— 8,595 20,813 
Gain on acquisition of KartaltepeGain on acquisition of Kartaltepe(81,852)— — 
Loss (gain) on sale of mineral properties, plant and equipmentLoss (gain) on sale of mineral properties, plant and equipment1,501 (412)2,804 
Pitarrilla transaction costsPitarrilla transaction costs1,561 — — 
SEC conversion costsSEC conversion costs1,255 2,645 — 
Impairment of long-lived and other assetsImpairment of long-lived and other assets20,275 — — Impairment of long-lived and other assets— 20,275 — 
Changes in fair value of investmentsChanges in fair value of investments10,741 (21,368)(34,630)Changes in fair value of investments(602)10,741 (21,368)
Loss (gain) on sale of mineral properties, plant and equipment(412)2,804 863 
Loss on redemption of convertible debt— — 3,044 
Adjusted EBITDA (non-GAAP)Adjusted EBITDA (non-GAAP)$772,602 $384,858 $209,468 Adjusted EBITDA (non-GAAP)$395,382 $772,602 $384,858 
(1)Fair value adjustments on acquired inventories relate to the acquisition of Alacer.
(2)COVID-19 related costs include direct, incremental costs associated with COVID-19 at all operations.


117122


Non-GAAP Measure - Free Cash Flow
The Company uses free cash flow to supplement information in its consolidated financial statements. The most directly comparable financial measures prepared in accordance with GAAP is cashCash provided by operating activities.activities. The Company believes that in addition to conventional measures prepared in accordance with US GAAP, certain investors and analysts use this information to evaluate the ability of the Company to generate cash flow after capital investments and build the Company's cash resources. The Company calculates free cash flow by deducting cash capital spending from cash generated by operating activities. The Company does not deduct payments made for business acquisitions.
The following table provides a reconciliation of cash provided by operating activities to free cash flow:
Year Ended December 31,Years Ended December 31,
(in thousands) (in thousands)202120202019 (in thousands)202220212020
Cash provided by operating activities (GAAP)Cash provided by operating activities (GAAP)$608,986$307,098$118,139Cash provided by operating activities (GAAP)$160,896$608,986$307,098
Expenditures on mineral properties, plant and equipment(164,810)(138,990)(110,624)
Less: Additions to mineral properties, plant and equipment1
Less: Additions to mineral properties, plant and equipment1
(137,515)(164,810)(138,990)
Free cash flow (non-GAAP)Free cash flow (non-GAAP)$444,176$168,108$7,515Free cash flow (non-GAAP)$23,381$444,176$168,108

(1)
Represents purchases of plant and equipment, excluding purchases of mineral properties.
Critical Accounting Estimates
MD&A is based on ourthe Company's consolidated financial statements, which have been prepared in conformity with US GAAP. The preparation of these statements requires that the Company makes estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses. The Company bases these estimates on historical experience and on assumptions that the Company considers reasonable under the circumstances; however, reported results could differ from those based on the current estimates under different assumptions or conditions. The areas requiring the use of management’s estimates are also discussed in Note 2 – Summary of Significant Accounting Policies. The policies identified as being critical to the understanding of ourthe business and results of operations and that require the application of significant management judgment are outlined below.
Recoverable metal in stockpiles and leach pads
The Company estimates the quantity of recoverable metal in stockpiled ore and onin leach padspad inventories using surveyed volumes of material, ore grades determined through sampling and assaying of blastholes,blast holes, and estimated recovery rates based on ore type. The quantity of recoverable metal and recovery rates varies based on ore mineralogy, ore grade, ore particle sizes and the percentage of cyanide soluble gold. The estimated recoverable gold ounces placed on the leach pads are periodically reconciled by comparing the related ore to the actual gold ounces recovered (metallurgical balancing). The ultimate recoverable metal or life-of-mine recovery rate is unknown until mining operations cease. Accounting for recoverable metal in stockpiled ore and onin leach padspad inventories represents a critical accounting estimate because (i) it is impracticable to determine metal contained in stockpiles and leach pads by physical count, thus requiring management to employ reasonable estimation methods and (ii) recovery rates from leach stockpilespads can vary significantly. A change in the recovery rate or the quantity of recoverable gold ounces in our stockpiles or orestockpiled ores on leach padspad inventories could materially impact ourthe financial statements.
Mineral reserves
Recoverable proven and probable reserves are the part of a mineral deposit that can be economically and legally extracted or produced at the time of the reserve determination. The determination of reserves involves numerous uncertainties with respect to the geology of the ore bodies, including quantities, grades and recovery rates. Estimating the quantity and grade of mineral reserves requires usthe Company to determine the size, shape and depth of ourthe ore bodies by analyzing geological data, such as samplings of drill holes, tunnels and other underground workings. In addition to the geology of ourthe Company's mines, assumptions are required to determine the economic feasibility of mining these reserves, including estimates of future commodity prices and demand, the mining methods we usethe Company uses and the related costs incurred to develop and mine our reserves. The Company's estimates of
123


recoverable proven and probable mineral reserves are prepared by and are the responsibility of its employees. These estimates are reviewed and verified regularly by independent experts in mining, geology and reserve determination.
118


As discussed in Note 2 – Summary of Significant Accounting Policies, the Company depreciates its mineral properties and mine development costs using the units-of-production method based on the estimated recoverable ounces in proven and probable reserves. Because the economic assumptions used to estimate mineral reserves may change from period to period and additional geological data is generated during the course of operations, estimates of reserves may change, which could have a significant impact on ourthe results of operations, including changes to prospective depreciation rates and impairments of long-lived asset carrying values.
Impairment of long-lived assets
The Company assesses the carrying value of its long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amounts of such assets may not be recoverable. Events or circumstances that could indicate that the carrying value of an asset or asset group may not be recoverable include, but are not limited to, significant adverse changes in the business climate including changes in future metal prices, significant changes to the extent or manner in which the asset is being used or its physical condition including significant decreases in production or mineral reserves, and significant decreases in the market price of the assets. In evaluating long-lived assets for recoverability, estimates of undiscounted future cash flows of the Company's mines are used. Estimates of future cash flows are derived from current business plans which are developed using short and long-term metal price assumptions; estimates of costs; resource, reserve and exploration potential estimates, including timing and costs to develop and produce the material; and the use of discount rates in the measurement of fair value. The Company believes its estimates and models used to determine fair value are similar to what a market participant would use.
Goodwill
Goodwill is allocated to reporting units and is tested for impairment annually as of December 31 and when events or circumstances indicate that the carrying value of a reporting unit exceeds its fair value. In testing for goodwill impairment, the Company first evaluatesmay elect to perform a qualitative factorsassessment to determine whether the existence of events or circumstances indicate that it is more likely than not that the fair value of a reporting unit is less than its carrying value. If the Company does not elect to perform a qualitative assessment or it is determined that it is more likely than not that the carryingfair value exceedsis less than the faircarrying value, then a quantitative goodwill impairment test is performed by determining the fair value of the reporting unit. The fair value of a reporting unit is determined using either the income approach by utilizing estimates of discounted future cash flows or the market approach utilizing recent transaction activity for comparable properties. Estimates of future cash flows are derived from current business plans which are developed using short and long-term metal price assumptions; estimates of costs; resource, reserve and exploration potential estimates, including timing and costs to develop and produce the material; and the use of discount rates in the measurement of fair value.
Income taxes
Deferred income taxes are accounted for using the asset and liability method. Under this method, deferred tax assets and liabilities are determined by applying the enacted statutory tax rates in effect at the end of a reporting period to the cumulative temporary differences between the tax basis of assets and liabilities and their reported amounts in the Company’s consolidated financial statements. The effect on deferred taxes for a change in tax rates is recognized in income in the period that includes the enactment date.
The Company's operations are in multiple jurisdictions where uncertainties arise in the application of complex tax regulations. Some of these tax regimes are defined by contractual agreements with the local government, while others are defined by general tax laws and regulations. The Company is subject to reviews of its income tax filings and other tax payments, and disputes can arise with the taxing authorities over the interpretation of its contracts or laws.

119124


The Company recognizes potential liabilities and records tax liabilities for anticipated tax audit issues based on ouran estimate of whether, and the extent to which, additional taxes will be due. These reserves are adjusted in light of changing facts and circumstances; however, due to the complexity of some of these uncertainties, the final resolution may result in a payment that is materially different from the current estimate of the tax liabilities. If the estimated tax liabilities prove to be less than the final assessment, an additional charge to expense would result. If the estimated tax liabilities prove to be greater than the final assessment, a tax benefit would result. In certain jurisdictions, the Company must pay a portion of the disputed amount to the local government in order to formally appeal the assessment. Such payment is recorded as a receivable if the Company believes the amount is ultimately collectible.
A valuation allowance for deferred tax assets is established when it is more likely than not that some portion of the benefit from deferred tax assets will not be realized. In determining the amount of the valuation allowance, the Company considers estimated future taxable income or loss as well as feasible tax planning strategies in each jurisdiction. If the Company determines all or a portion of ourits deferred income tax assets will not be realized, the valuation allowance will be increased. Conversely, if the Company determines all or a portion of the related benefits for which a valuation allowance has been provided will ultimately be realized, all or a portion of the related valuation allowance will be reduced.
Reclamation liabilities
The Company recognizes a liability for the fair value of estimated future reclamation costs when incurred. Reclamation liabilities are periodically adjusted to reflect changes in the estimated present value resulting from the passage of time and revisions to the estimates of either the timing or amount of reclamation costs. The estimated reclamation liability is based on when spending for an existing disturbance is expected to occur. The Company reviews, on an annual basis, unless otherwise deemed necessary, the reclamation obligation at each mine site.
Remediation costs are accrued based on the Company’s best estimate at the end of each period of the costs expected to be incurred at a site. Accounting for reclamation liabilities requires the Company to make estimates unique to each mining operation of the future costs we will incur to complete the reclamation work required to comply with existing laws and regulations. Any such changes in future costs, the timing of reclamation activities, scope, or the exclusion of certain costs not considered reclamation costs, could materially impact the amounts charged to earnings for reclamation. Additionally, future changes to environmental laws and regulations could increase the extent of reclamation work required.
Business combinations
The Company recognizes and measures the assets acquired and liabilities assumed in a business combination based on their estimated fair values at the acquisition date. Any excess of the purchase consideration when compared to the fair value of the net tangible and intangible assets acquired, if any, is recorded as goodwill. For material acquisitions, the Company engages third-party valuation specialists to assist with the determination of the fair value of assets acquired, liabilities assumed, non-controlling interest, if any, and goodwill, based on recognized business valuation methodologies. An income, market or cost valuation method may be utilized to estimate the fair value of the assets acquired, liabilities assumed, and non-controlling interest, if any, in a business combination. These valuation procedures require management to make assumptions and apply significant judgment to estimate the fair value of the assets acquired and liabilities assumed. Estimates of future cash flows are are developed using short and long-term metal price assumptions; estimates of costs; resource, reserve and exploration potential estimates, including timing and costs to develop and produce the material; and the use of discount rates in the measurement of fair value.
New Accounting Pronouncements
As of December 31, 2021,2022, the Company has adopted all accounting pronouncements affecting the Company.
Risks and Uncertainties
The mining industry involves many risks including global pandemics which are inherent to the nature of the business, global economic trends and economic, environmental and social conditions in the geographical areas of operation. As a result, the Company is subject to a number of risks and uncertainties, each of which could have an
125


adverse effect on its operating results, business prospects or financial position. The Company continuously assesses and evaluates these risks, seeking to minimize them by implementing high operating standards and processes to identify, assess, report and monitor risk across the organization.
For a comprehensive list of other known risks and uncertainties affecting the business, please refer to the section entitled “Risk Factors” in Part 1, Item 1A.

120126


ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
The Company is exposed to a variety of financial risks as a result of its operations, including market risk (which includes price risk, currency risk and interest rate risk), credit risk, liquidity risk and capital risk. The Company's overall risk management strategy seeks to reduce potential adverse effects on its financial performance. Risk management is carried out under policies approved by the Board of Directors. The Company may, from time to time, use foreign exchange contracts, commodity price contracts, equity hedges and interest rate swaps to manage its exposure to fluctuations in foreign currency, energy or diesel prices, marketable securities values and interest rates.
The risks associated with the Company's financial instruments, and the policies on how the Company mitigates those risks are set out below. This is not intended to be a comprehensive discussion of all risks. There were no significant changes to the Company's exposures to these risks or the management of its exposures during the year ended December 31, 2021.2022.
Market Risk
This is the risk that the fair values of financial instruments will fluctuate due to changes in market prices. The significant market risks to which the Company is exposed are price risk, currency risk and interest rate risk.
Price Risk
The Company sells concentrates produced from its Puna operation on a provisional basis. Provisional concentrate sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The embedded derivative is marked to market through earnings each period prior to final settlement. The Company's concentrate metal sales agreements are subject to pricing terms that settle within one to four months after delivery of concentrate.concentrate. This adjustment period represents the Company's exposure to commodity price risk on its trade receivables. A 10% increase or decrease in the silver price as of December 31, 2021,2022, with all other variables held constant, would have resulted in a $6.7$6.6 million increase or decrease to the Company's after-tax net income, respectively. 
Currency Risk
Currency risk is the risk that the fair values or future cash flows of the Company's financial instruments will fluctuate because of changes in foreign exchange rates. Exchange rate fluctuations affect the costs the Company incurs at its operations. Gold, silver, lead and zinc are sold in USD and the Company's costs are principally in USD, TRY, CAD and ARS. The appreciation or depreciation of foreign currencies against the USD can increase or decrease the cost of metal production and capital expenditures in USD terms. The Company is also exposed to currency risk arising from cash, cash equivalents and restricted cash held in foreign currencies, marketable securities, accounts receivable and other financial assets, trade and other payables, lease liabilities, other financial liabilities, and current and deferred income and other taxes denominated in foreign currencies. Further, the Company is exposed to currency risk through non-monetary assets and liabilities and tax bases of assets, liabilities and losses of entities whose taxable profit or tax loss are denominated in foreign currencies. All of our foreign operations use the USD as the functional currency and local currency monetary assets and liabilities are remeasured into USD with gains and losses resulting from foreign currency transactions included in current results of operations.
Effective September 2, 2019, Argentina introduced new Central Bank regulations which require export proceeds to be converted into ARS within five business days of such proceeds entering the country. These provisions were intended to be temporary until December 31, 2019; however, the provisions remained in effect as of December 31, 2021.2022. Additionally, Argentina introduced further currency control measures in 2022, including restrictions on the timing of payments to vendors in currencies other than ARS. While these provisions remain in effect, the Company is unable to hold funds in Argentina in USD, which has increased its exposure to the ARS.

The economies of Argentina and Türkiye are currently considered highly inflationary, which is defined as cumulative inflation rates exceeding 100 percent in the most recent three‑year period based on inflation data published by the respective governments. The volatility of exchange rates depends on many factors that we cannot forecast with reliable accuracy. The Company continuously monitors the effects of inflationary factors, such as increases in our cost of sales and operating expenses, which may adversely affect our results of operations.
121127


At December 31, 2022 and 2021, the Company was primarily exposed to currency risk through the following financial assets and liabilities denominated in foreign currencies: 
December 31, 2021 December 31, 2022
(in thousands) (in thousands)TRY CAD ARS  (in thousands)TRY CAD ARS 
Financial assetsFinancial assets   Financial assets   
Cash and cash equivalentsCash and cash equivalents$2,968 $12,763 $24,450 Cash and cash equivalents$20,575 $23,087 $43,822 
Marketable securitiesMarketable securities —  7,820  3,489 Marketable securities —  351  7,852 
Accounts receivable and other financial assets (1)
Accounts receivable and other financial assets (1)
 20,004  39  4,716 
Accounts receivable and other financial assets (1)
 24,875  588  12,566 
Financial liabilitiesFinancial liabilities   Financial liabilities   
Trade and other payablesTrade and other payables (26,782) (24,954) (14,374)Trade and other payables (27,898) (17,336) (18,350)
Lease liabilities (1)
Lease liabilities (1)
 (4,456) (278) — 
Lease liabilities (1)
 (4,562) (527) — 
Other financial liabilitiesOther financial liabilities (4,354) (236) — Other financial liabilities (314) (504) (27)
$(12,620)$(4,846)$18,281  $12,676 $5,659 $45,863 
 
December 31, 2020December 31, 2021
(in thousands) (in thousands)TRY CAD ARS  (in thousands)TRY CAD ARS 
Financial assetsFinancial assets   Financial assets   
Cash and cash equivalentsCash and cash equivalents$1,435 $4,556 $3,325 Cash and cash equivalents$2,968 $12,763 $24,450 
Marketable securitiesMarketable securities —  25,235  — Marketable securities —  7,820  3,489 
Accounts receivable and other financial assets (1)
Accounts receivable and other financial assets (1)
 11,435  362  2,670 
Accounts receivable and other financial assets (1)
 20,004  39  4,716 
Financial liabilitiesFinancial liabilities   Financial liabilities   
Trade and other payablesTrade and other payables (33,263) (38,569) (9,289)Trade and other payables (26,782) (24,954) (14,374)
Lease liabilities (1)
Lease liabilities (1)
 (6,389) (293) — 
Lease liabilities (1)
 (4,456) (278) — 
Other financial liabilitiesOther financial liabilities (3,195) (13,933) — Other financial liabilities (4,354) (236) — 
$(29,977)$(22,642)$(3,294) $(12,620)$(4,846)$18,281 
(1)Includes current and non-current portion. 
The Company assessed the impact of a 10% change in the USD exchange rate relative to the ARS and CAD and a 25% change in the USD exchange rate relative to the TRY as of December 31, 2021,2022, on the Company's net income based on the above net financial assets and liabilities. As of December 31, 2021,2022, depreciation of the TRY, CAD, and ARS against the USD would have resulted in an increase (decrease) to the Company's total net income as follows:
(in thousands)Year Ended December 31, 2021
TRY $2,524
CAD $441
ARS $(1,662)
(in thousands)Year Ended December 31, 2022
TRY $(4,169)
CAD $(514)
ARS $(2,535)

122128


Interest Rate Risk
Interest rate risk is the risk that the fair values or future cash flows of the Company's financial instruments will fluctuate because of changes in market interest rates. The Company manages interest rate risk by maintaining an investment policy for short-term investments and cash held in banks, which focuses on preservation of capital and liquidity. As of December 31, 2021,2022, the Company is exposed to interest rate cash flow risk arising from its cash and restricted cash in bank accounts that earn variable interest rates, and interest expense on variable rate borrowings. The Company's variable rate borrowings are comprised of the Term Loan, which is subject to a variable interest rate of LIBOR plus 3.50% to 3.70%, and the Amended Credit Facility,Agreement, which is subject to a variable interest rate of LIBOR plus 2% to 3%. The Term Loan and Amended Credit FacilityAgreement contain fallback language that replaces LIBOR with an alternative benchmark rate based on either SOFR or another alternative benchmark rate when LIBOR ceases to exist. The Amended Credit FacilityAgreement is undrawn at December 31, 2021.2022.
Future net cash flows from interest income on cash, restricted cash, and interest expense on variable rate borrowings will be affected by interest rate fluctuations. To mitigate exposures to interest rate risk, the Company may purchase short-term investments at market interest rates that result in fixed yields to maturity.
As of December 31, 2021,2022, a 1.0% increase or decrease in the LIBOR interest rate, assuming all other variables remained constant, would decrease or increase the Company's after-tax net income for the year ended December 31, 20212022 by $1.3$0.8 million. 
As of December 31, 20212022 and 2020,2021, the weighted average interest rate earned on the Company's cash and cash equivalents waswas 4.39% and 0.14% and 0.16%, respectively. With other variables unchanged, a 1.0% change in the annualized interest rate would impact the Company's after-tax net income byby $5.4 million and $6.4 million and $4.0 million for the years ended December 31, 20212022 and December 31, 2020,2021, respectively.
Credit risk
Credit risk is the risk that the counterparty to a financial instrument will cause a financial loss for the Company by failing to discharge its obligations under the terms of the financial contract. The Company's maximum exposure to credit risk as of December 31, 20212022 and December 31, 20202021 was as follows (in thousands):
December 31, December 31, 
20212020 20222021
Cash and cash equivalents Cash and cash equivalents $1,017,562 $860,633 Cash and cash equivalents $655,453 $1,017,562 
Trade receivables Trade receivables  73,656  38,456 Trade receivables  62,563  73,656 
Value added tax receivable Value added tax receivable  22,456  29,899 Value added tax receivable  32,535  22,456 
Restricted cash Restricted cash  35,303  35,288 Restricted cash  33,653  35,303 
Other current and non-current financial assets Other current and non-current financial assets  39,335  24,898 Other current and non-current financial assets  27,526  39,335 
$1,188,312 $989,174  $811,730 $1,188,312 
As of December 31, 2021,2022, no amounts were held as collateral except those discussed above related to other financial assets. 
In addition, the Company uses surety bonds to support certain environmental bonding obligations. As of December 31, 20212022 and 2020,2021, the Company had surety bonds totaling $117.0$117.4 million and $117.5$117.0 million, respectively, outstanding. 
123129



ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

Report of Independent Registered Public Accounting Firm
To the Shareholders and Board of Directors of SSR Mining Inc.
Opinions on the Financial Statements and Internal Control over Financial Reporting
We have audited the accompanying consolidated balance sheets of SSR Mining Inc. and its subsidiaries (together, the Company) as of December 31, 20212022 and 2020,2021, and the related consolidated statements of operations, cash flows and statement of changes in equity for each of the three years in the period ended December 31, 2021,2022, including the related notes (collectively referred to as the consolidated financial statements). We also have audited the Company'sCompany’s internal control over financial reporting as of December 31, 2021,2022, based on criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).
In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of the Company as of December 31, 20212022 and 2020,2021, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 20212022 in conformity with accounting principles generally accepted in the United States of America. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2021,2022, based on criteria established in Internal Control – Integrated Framework(2013) issued by the COSO.
Basis for Opinions
The Company'sCompany’s management is responsible for these consolidated financial statements, for maintaining effective internal control over financial reporting, and for its assessment of the effectiveness of internal control over financial reporting, included in Management's Report on Internal Control Overover Financial Reporting under item 9a.Item 9A. Our responsibility is to express opinions on the Company’s consolidated financial statements and on the Company'sCompany’s internal control over financial reporting based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) ("PCAOB")(PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud, and whether effective internal control over financial reporting was maintained in all material respects.
Our audits of the consolidated financial statements included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. Our audit of internal control over financial reporting included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and operating effectiveness of internal control based on the assessed risk. Our audits also included performing such other procedures as we considered necessary in the circumstances. We believe that our audits provide a reasonable basis for our opinions.
Definition and Limitations of Internal Control over Financial Reporting
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.
124130



Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
Critical Audit Matters
The critical audit mattermatters communicated below is a matterare matters arising from the current period audit of the consolidated financial statements that waswere communicated or required to be communicated to the audit committee and that (i) relatesrelate to accounts or disclosures that are material to the consolidated financial statements and (ii) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit mattermatters below, providing a separate opinionopinions on the critical audit mattermatters or on the accounts or disclosures to which it relates.they relate.
Fair value of mineral properties acquired on initial consolidation of a variable interest entity
As described in Note 3 to the consolidated financial statements, on November 17, 2022, the Company acquired an additional 30% ownership in Kartaltepe Madencilik Sanayi ve Ticaret Anonim Şirketi (“Kartaltepe”) from joint venture partner Lidya Madencilik Sanayi ve Ticaret A.Ş (“Lidya”) for total consideration of $150 million in cash. The Company previously owned 50% of Kartaltepe and accounted for its interest as an equity method investment. Upon completion of this transaction, the Company owns 80% of Kartaltepe and is considered the primary beneficiary of the variable interest entity (“VIE”) and consolidated Kartaltepe as an initial consolidation of a VIE that is not a business. As a result, management was required to determine the total amount of the net assets recognized at fair value. The assets acquired included mineral properties which, on a consolidated basis, were valued at $362 million. The fair value of the mineral properties was determined based on income and market valuation methods. Management applied significant judgment in determining the fair value of the mineral properties, including the use of significant assumptions such as future metal prices, estimated quantities of mineral reserves and mineral resources, in-situ multiples, future operating costs and discount rates. The Company’s estimated quantities of mineral reserves and mineral resources are based on information prepared by qualified persons (management’s specialists).
The principal considerations for our determination that performing procedures relating to the fair value of mineral properties acquired on initial consolidation of a VIE is a critical audit matter are (i) the significant judgment required by management, including the use of management’s specialists, in determining the fair value of the acquired mineral properties; (ii) a high degree of auditor judgment, subjectivity and effort in performing procedures and evaluating audit evidence relating to the fair value measurement of the acquired mineral properties, including significant assumptions such as future metal prices, estimated quantities of mineral reserves and mineral resources, in-situ multiples, future operating costs and discount rates; and (iii) the audit effort involved the use of professionals with specialized skills and knowledge.
Addressing the matter involved performing procedures and evaluating audit evidence in connection with forming our overall opinion on the consolidated financial statements. These procedures included testing the effectiveness of controls relating to the fair value of mineral properties acquired on initial consolidation of a VIE, including controls relating to the significant assumptions used in those management estimates. These procedures also included, among others, (i) testing management’s process for determining the fair value of the acquired mineral properties (ii) evaluating the appropriateness of the income and market valuation methods; (iii) testing the completeness and accuracy of the underlying data used in the cash flow models; and (iv) evaluating the reasonableness of the significant assumptions used by management, including the future metal prices, estimated quantities of mineral reserves and mineral resources, in-situ multiples, future operating costs and discount rates. Evaluating the reasonableness of the future metal prices involved comparing them to external market and industry data. Evaluating the reasonableness of future operating costs involved comparing them to historical results at the Çöpler Gold Mine. The work of management’s specialists was used in performing the procedures to evaluate the reasonableness of the estimated quantities of mineral reserves and mineral resources. As a basis for using this work, management’s specialists’ qualifications were understood and the Company’s relationship with management’s specialists was assessed. The procedures performed also included evaluation of the methods and assumptions used by management’s specialists, tests of the data used by management’s specialists and an evaluation of management’s specialists’ findings. Professionals with specialized skill and knowledge assisted us in evaluating the reasonableness of the discount rates and in-situ multiples.
Assessment of impairment indicators offor mineral properties, plant and equipment, net
As described in Note 2 to the consolidated financial statements, the carrying value of mineral properties, plant and equipment, net is reviewed for impairment whenever events or changes in circumstances indicate that the carrying amounts of the assets or asset groups may not be recoverable (impairment indicators). The carrying amount of the Company’s mineral properties, plant
131


and equipment, net was $3.2$3.5 billion as of December 31, 2021.2022. Management applies judgment to assess whether there are impairment indicators present that give rise to the requirement to conduct an impairment test. Events or changes in circumstances that could trigger an impairment test include (i) significant adverse changes in the business climate including changes in future metal prices; (ii) significant changes in the extent or manner in which the asset is being used or its physical condition including significant decreases in production or mineral reserves; and (iii) significant decreases in the market price of the assets.
The principal considerations for our determination that performing procedures relating to the assessment of impairment indicators of mineral properties, plant and equipment, net is a critical audit matter are that there was significant judgment by management when assessing whether there were impairment indicators of impairment related to the Company’s mineral properties, plant and equipment, net, specifically related to assessing whether there were (i) significant adverse changes in the business climate including changes in future metal prices; (ii) significant changes in the extent or manner in which the asset is being used or its physical condition including significant decreases in production or mineral reserves; and (iii) significant decreases in the market price of the assets. This in turn led to a high degree of auditor judgment, subjectivity and effort in performing procedures and evaluating audit evidence related to the judgments made by management in their assessment of impairment indicators that could give rise to the requirement to conduct an impairment test.
Addressing the matter involved performing procedures and evaluating audit evidence in connection with forming our overall opinion on the consolidated financial statements. These procedures included testing the effectiveness of controls relating to management’s assessment of impairment indicators of mineral properties, plant and equipment.equipment, net. These procedures also included, among others, (i) evaluating whether there were significant adverse changes in the business climate including changes in future metal prices by considering external market and industry data; (ii) evaluating whether there were any significant changes in the extent or manner in which the asset is being used or its physical condition including by assessing any significant decreases in production or mineral reserves by considering mineral reserve and resource technical reports and production results compared to historical actuals; and (iii) assessing whether there were significant decreases in the market price of the assets by considering any significant or prolonged declines in the Company’s share price, and evidence obtained in other areas of the audit.
/s/ PricewaterhouseCoopers LLP
Chartered Professional Accountants
Vancouver, Canada
February 23, 20222023
We have served as the Company's auditor since 1989.
125132

SSR Mining Inc.
Consolidated Statements of Operations
(in thousands)
Years Ended December 31,Years Ended December 31,
202120202019 202220212020
RevenueRevenue$1,474,199 $853,089 $606,850 Revenue$1,148,033 $1,474,199 $853,089 
Operating Costs and Expenses:Operating Costs and Expenses:Operating Costs and Expenses:
Production costs671,374 444,538 349,619 
Cost of sales (1)
Cost of sales (1)
607,942 671,374 444,538 
Depreciation, depletion, and amortizationDepreciation, depletion, and amortization227,959 109,258 85,644 Depreciation, depletion, and amortization181,447 227,959 109,258 
General and administrative expenseGeneral and administrative expense56,594 33,569 31,108 General and administrative expense71,660 56,594 33,569 
Exploration. evaluation, and reclamation costs42,382 27,043 22,084 
Care and maintenance expense— 29,593 — 
Exploration, evaluation, and reclamation costsExploration, evaluation, and reclamation costs52,846 42,382 27,043 
Care and maintenanceCare and maintenance41,800 — 29,593 
Impairment of long-lived and other assetsImpairment of long-lived and other assets20,275 — — Impairment of long-lived and other assets— 20,275 — 
Transaction, integration and SEC conversion expense11,240 20,813 — 
Other operating expenses, netOther operating expenses, net2,070 11,240 20,813 
Operating incomeOperating income444,375 188,275 118,395 Operating income190,268 444,375 188,275 
Other income (expense):Other income (expense):Other income (expense):
Interest expenseInterest expense(19,097)(13,876)(12,771)Interest expense(19,116)(19,097)(13,876)
Loss on redemption of convertible debt— — (3,044)
Gain on acquisition of KartaltepeGain on acquisition of Kartaltepe81,852 — — 
Other income (expense)Other income (expense)(14,149)31,124 39,196 Other income (expense)20,291 (14,149)31,124 
Foreign exchange gain (loss)Foreign exchange gain (loss)3,629 (3,732)(5,119)Foreign exchange gain (loss)(32,460)3,629 (3,732)
Total other income (expense)Total other income (expense)(29,617)13,516 18,262 Total other income (expense)50,567 (29,617)13,516 
Income before income and mining taxesIncome before income and mining taxes414,758 201,791 136,657 Income before income and mining taxes240,835 414,758 201,791 
Income and mining tax benefit (expense)Income and mining tax benefit (expense)14,116 (43,203)(35,439)Income and mining tax benefit (expense)(30,068)14,116 (43,203)
Equity income (loss) of affiliates(2,952)(1,426)— 
Equity loss of affiliatesEquity loss of affiliates(339)(2,952)(1,426)
Net incomeNet income425,922 157,162 101,218 Net income210,428 425,922 157,162 
Net loss (income) attributable to non-controlling interest(57,846)(5,627)1,558 
Net income attributable to non-controlling interestNet income attributable to non-controlling interest(16,288)(57,846)(5,627)
Net income attributable to SSR Mining shareholdersNet income attributable to SSR Mining shareholders$368,076 $151,535 $102,776 Net income attributable to SSR Mining shareholders$194,140 $368,076 $151,535 
Net income per share attributable to SSR Mining shareholdersNet income per share attributable to SSR Mining shareholdersNet income per share attributable to SSR Mining shareholders
BasicBasic$1.70 $1.00 $0.84 Basic$0.92 $1.70 $1.00 
DilutedDiluted$1.63 $0.96 $0.78 Diluted$0.89 $1.63 $0.96 

(1)    Excludes depreciation, depletion, and amortization.
The accompanying notes are an integral part of the Consolidated Financial Statements.
126133

SSR Mining Inc.
Consolidated Statements of Cash Flows
(in thousands)

Years Ended December 31, Years Ended December 31,
202120202019202220212020
Operating activitiesOperating activities  Operating activities  
Net incomeNet income$425,922 $157,162 $101,218 Net income$210,428 $425,922 $157,162 
Adjustments for:Adjustments for: Adjustments for: 
Depletion, depreciation, and amortizationDepletion, depreciation, and amortization227,959 109,258 85,644 Depletion, depreciation, and amortization181,447 227,959 109,258 
Amortization of debt discountAmortization of debt discount948 938 1,611 Amortization of debt discount976 948 938 
Reclamation costs4,821 3,815 3,729 
Reclamation accretion expenseReclamation accretion expense6,035 4,821 3,815 
Deferred income taxesDeferred income taxes(130,570)20,659 10,643 Deferred income taxes(67,932)(130,570)20,659 
Loss on redemption of convertible debt— — 3,044 
Stock-based compensationStock-based compensation14,799 15,851 14,424 Stock-based compensation6,473 14,799 15,851 
Equity pickup on investments in joint ventures2,952 1,426 — 
Equity loss of affiliatesEquity loss of affiliates339 2,952 1,426 
Unrealized loss (gain) on derivative instrumentsUnrealized loss (gain) on derivative instruments(5,093)5,215 (2,238)Unrealized loss (gain) on derivative instruments982 (5,093)5,215 
Change in fair value of marketable securitiesChange in fair value of marketable securities10,741 (21,368)(34,630)Change in fair value of marketable securities(602)10,741 (21,368)
Non-cash fair value adjustment on acquired inventoriesNon-cash fair value adjustment on acquired inventories65,939 51,930 — Non-cash fair value adjustment on acquired inventories13,853 65,939 51,930 
Loss (gain) on sale of mineral properties, plant and equipmentLoss (gain) on sale of mineral properties, plant and equipment(412)2,804 863 Loss (gain) on sale of mineral properties, plant and equipment1,501 (412)2,804 
Gain on acquisition of KartaltepeGain on acquisition of Kartaltepe(81,852)— — 
Impairment of long-lived and other assetsImpairment of long-lived and other assets20,275 — — Impairment of long-lived and other assets— 20,275 — 
Non-cash care and maintenanceNon-cash care and maintenance10,733 — — 
Loss (gain) on foreign exchangeLoss (gain) on foreign exchange25,785 — — 
Net change in operating assets and liabilitiesNet change in operating assets and liabilities(29,295)(40,592)(66,169)Net change in operating assets and liabilities(147,270)(29,295)(40,592)
Net cash provided by (used in) operating activitiesNet cash provided by (used in) operating activities608,986 307,098 118,139 Net cash provided by (used in) operating activities160,896 608,986 307,098 
Investing activitiesInvesting activities  Investing activities  
Additions to mineral properties, plant and equipmentAdditions to mineral properties, plant and equipment(164,810)(138,990)(110,624)Additions to mineral properties, plant and equipment(137,515)(164,810)(138,990)
Acquisitions, net (1)
Acquisitions, net (1)
(170,064)— 303,388 
Purchases of marketable securitiesPurchases of marketable securities(10,086)(29,550)(3,435)Purchases of marketable securities(9,004)(10,086)(29,550)
Proceeds on Royalty Portfolio saleProceeds on Royalty Portfolio sale32,600 — — Proceeds on Royalty Portfolio sale— 32,600 — 
Net proceeds from sales of marketable securities11,396 97,098 3,308 
Proceeds from sales of marketable securitiesProceeds from sales of marketable securities35,631 11,396 97,098 
Proceeds from repayment of note receivableProceeds from repayment of note receivable8,358 — — 
Proceeds from sale of mineral properties, plant and equipmentProceeds from sale of mineral properties, plant and equipment2,505  8,537  1,214 Proceeds from sale of mineral properties, plant and equipment35,067  2,505  8,537 
Acquisition of non-controlling interest— — (2,415)
Acquisition of Alacer, cash, cash equivalents and restricted cash— 303,388 — 
Other investing activitiesOther investing activities(742)(60)(2,929)Other investing activities1,245 (742)(60)
Net cash provided by (used in) investing activitiesNet cash provided by (used in) investing activities(129,137)240,423 (114,881)Net cash provided by (used in) investing activities(236,282)(129,137)240,423 
127134

SSR Mining Inc.
Consolidated Statements of Cash Flows
(in thousands)
Years Ended December 31,Years Ended December 31,
202120202019202220212020
Financing activitiesFinancing activities  Financing activities  
Repayment of debt, principalRepayment of debt, principal$(70,000)$(35,000)$— Repayment of debt, principal$(71,155)$(70,000)$(35,000)
Redemption of convertible notesRedemption of convertible notes (114,994)(152,250)Redemption of convertible notes  (114,994)
Proceeds from issuance of convertible notes, net of transaction costs—  — 222,932 
Proceeds from issuance of debtProceeds from issuance of debt— 3,087  — Proceeds from issuance of debt— —  3,087 
Purchase of common sharesPurchase of common shares(100,040) (148,075) — 
Proceeds from exercise of stock optionsProceeds from exercise of stock options8,778 6,545  7,875 Proceeds from exercise of stock options2,6288,7786,545
Purchase and cancellation of common shares(148,075) —  — 
Principal payments on finance leasesPrincipal payments on finance leases(10,091)(10,441)(3,623)
Non-controlling interest dividendNon-controlling interest dividend(34,520)(55,464)
Dividends paidDividends paid(43,233)— — Dividends paid(58,799)(43,233)— 
Settlement of restricted and performance share unitsSettlement of restricted and performance share units408 (14,389)60 Settlement of restricted and performance share units— 408 (14,389)
Funding from non-controlling interest— — 3,710 
Non-controlling interest dividend(55,464)— — 
Principal payments on finance leases(10,441)(3,623)(554)
Other financing activitiesOther financing activities(1,742)— (304)Other financing activities195 (1,742)— 
Net cash provided by (used in) financing activitiesNet cash provided by (used in) financing activities(319,769)(158,374)81,469 Net cash provided by (used in) financing activities(271,782)(319,769)(158,374)
Effect of foreign exchange rate changes on cash, cash equivalents and restricted cash(3,136) 789  12 
Effect of foreign exchange rate changes on cash and cash equivalentsEffect of foreign exchange rate changes on cash and cash equivalents(16,591) (3,136) 789 
Net increase (decrease) in cash, cash equivalents, and restricted cashNet increase (decrease) in cash, cash equivalents, and restricted cash156,944 389,936 84,739 Net increase (decrease) in cash, cash equivalents, and restricted cash(363,759)156,944 389,936 
Cash, cash equivalents, and restricted cash beginning of year895,921 505,985 421,246 
Cash, cash equivalents, and restricted cash end of year$1,052,865$895,921 $505,985 
Cash, cash equivalents, and restricted cash, beginning of yearCash, cash equivalents, and restricted cash, beginning of year1,052,865 895,921 505,985 
Cash, cash equivalents, and restricted cash, end of yearCash, cash equivalents, and restricted cash, end of year$689,106$1,052,865$895,921
Reconciliation of cash, cash equivalents, and restricted cash:Reconciliation of cash, cash equivalents, and restricted cash:Reconciliation of cash, cash equivalents, and restricted cash:
Cash and cash equivalentsCash and cash equivalents$1,017,562$860,633 $503,647 Cash and cash equivalents$655,453$1,017,562$860,633
Restricted cashRestricted cash35,30335,288 2,338 Restricted cash33,65335,30335,288
Total cash, cash equivalents, and restricted cashTotal cash, cash equivalents, and restricted cash$1,052,865$895,921 $505,985 Total cash, cash equivalents, and restricted cash$689,106$1,052,865$895,921

(1)    

Acquisitions, net
for the year ended December 31, 2022 is comprised of $24.8 million cash paid in the acquisition of Taiga Gold Corp., net of $4.7 million of cash and cash equivalents acquired, and $150.0 million cash paid in the acquisition of an additional 30% ownership in Kartaltepe. Acquisitions, net for the year ended December 31, 2020 is comprised of $303.4 million of cash, cash equivalents, and restricted cash acquired as part of the Alacer acquisition. Refer to Note 3 for further details.
The accompanying notes are an integral part of the Consolidated Financial Statements.

128135

SSR Mining Inc.
Consolidated Balance Sheets
(in thousands)
December 31, December 31,
2021202020222021
ASSETSASSETSASSETS
Cash and cash equivalentsCash and cash equivalents$1,017,562 $860,633 Cash and cash equivalents$655,453 $1,017,562 
Marketable securitiesMarketable securities 40,431 26,748 Marketable securities 40,280 40,431 
Trade and other receivablesTrade and other receivables121,356 83,218 Trade and other receivables117,675 121,356 
InventoriesInventories389,416 437,034 Inventories501,607 389,416 
Restricted cashRestricted cash33,653 — 
Prepaids and other current assetsPrepaids and other current assets31,549 16,162 Prepaids and other current assets27,767 31,549 
Total current assets Total current assets 1,600,314 1,423,795  Total current assets 1,376,435 1,600,314 
Mineral properties, plant and equipment, netMineral properties, plant and equipment, net3,249,764 3,469,739 Mineral properties, plant and equipment, net3,549,446 3,249,764 
InventoriesInventories221,617 135,200 Inventories218,999 221,617 
Restricted cashRestricted cash35,303 35,288 Restricted cash— 35,303 
Equity method investmentsEquity method investments4,918 7,782 Equity method investments395 4,918 
GoodwillGoodwill49,786 49,786 Goodwill49,786 49,786 
Deferred income tax assetsDeferred income tax assets8,501 15,072 Deferred income tax assets1,915 8,501 
Other non-current assetsOther non-current assets41,235 40,682 Other non-current assets57,681 41,235 
Total assetsTotal assets$5,211,438 $5,177,344 Total assets$5,254,657 $5,211,438 
LIABILITIESLIABILITIESLIABILITIES
Accounts payableAccounts payable$34,844 $42,923 Accounts payable$78,929 $34,844 
Accrued liabilities and otherAccrued liabilities and other165,108 131,781 Accrued liabilities and other124,654 165,108 
Finance lease liabilitiesFinance lease liabilities12,439 3,568 Finance lease liabilities3,872 12,439 
Current portion of debtCurrent portion of debt71,491 71,025 Current portion of debt71,797 71,491 
Total current liabilitiesTotal current liabilities283,882 249,297 Total current liabilities279,252 283,882 
DebtDebt295,493 366,612 Debt226,510 295,493 
Finance lease liabilitiesFinance lease liabilities105,965 109,544 Finance lease liabilities102,434 105,965 
Reclamation liabilitiesReclamation liabilities122,660 102,721 Reclamation liabilities153,972 122,660 
Deferred income tax liabilitiesDeferred income tax liabilities338,788 473,027 Deferred income tax liabilities342,401 338,788 
Other non-current liabilitiesOther non-current liabilities12,133 25,655 Other non-current liabilities23,889 12,133 
Total liabilitiesTotal liabilities1,158,921 1,326,856 Total liabilities1,128,458 1,158,921 
Contingently redeemable shares— 3,311 
EQUITYEQUITYEQUITY
Common shares – unlimited authorized common shares with no par value; 211,879 and 219,607 shares issued and outstanding as of December 31, 2021 and December 31, 2020, respectively3,140,189 3,242,821 
Common shares – unlimited authorized common shares with no par value; 206,653 and 211,879 shares issued and outstanding as of December 31, 2022 and December 31, 2021, respectivelyCommon shares – unlimited authorized common shares with no par value; 206,653 and 211,879 shares issued and outstanding as of December 31, 2022 and December 31, 2021, respectively3,057,920 3,140,189 
Retained earningsRetained earnings397,667 92,077 Retained earnings521,817 397,667 
SSR Mining’s shareholders’ equitySSR Mining’s shareholders’ equity3,537,856 3,334,898 SSR Mining’s shareholders’ equity3,579,737 3,537,856 
Non-controlling interestNon-controlling interest514,661 512,279 Non-controlling interest546,462 514,661 
Total equityTotal equity4,052,517 3,847,177 Total equity4,126,199 4,052,517 
Total liabilities and equityTotal liabilities and equity$5,211,438 $5,177,344 Total liabilities and equity$5,254,657 $5,211,438 
The accompanying notes are an integral part of the Consolidated Financial Statements.
129136

SSR Mining Inc.
Consolidated Statement of Changes of Equity
(in thousands)

Common shares Common shares
Number of sharesAmountRetained earnings (Accumulated Deficit)Total equity attributable to equity holders of SSR MiningNon-controlling interestTotal equity
 
 
 Contingently redeemable shares Number of sharesAmountRetained earnings (Accumulated Deficit)Total equity attributable to equity holders of SSR MiningNon-controlling interestTotal equity
 
 
 Contingently redeemable shares
Balance January 1, 2019120,740 $1,074,821 $(163,191)$911,630 $31,829 $943,459 $ 
Exercise of stock options1,094 7,875 — 7,875 — 7,875 — 
Settlement of RSUs60 — 60 — 60 — 
Acquisition of non-controlling interest1,246 19,681 — 19,681 (33,981)(14,300)— 
Equity-settled stock-based compensation— 3,397 — 3,397 — 3,397 — 
Transfer of equity-settled PSUs— 1,356 — 1,356 — 1,356 — 
Reclassification of contingently redeemable shares— (3,599)— (3,599)— (3,599)3,599 
Funding from non-controlling interest— — — — 3,710 3,710 — 
Net income (loss)— — 102,776 102,776 (1,558)101,218 — 
Balance December 31, 2019123,084$1,103,591$(60,415)$1,043,176$$1,043,176$3,599
Balance as of January 1, 2020Balance as of January 1, 2020123,084 $1,103,591 $(60,415)$1,043,176 $— $1,043,176 $3,599 
Acquisition of AlacerAcquisition of Alacer95,700 2,142,703 — 2,142,703 506,652 2,649,355 Acquisition of Alacer95,700 2,142,703 — 2,142,703 506,652 2,649,355 — 
Exercise of stock optionsExercise of stock options825 6,545 — 6,545 — 6,545 — Exercise of stock options825 6,545 — 6,545 — 6,545 — 
Settlement of RSUs and PSUsSettlement of RSUs and PSUs— (15,557)1,168 (14,389)— (14,389)— Settlement of RSUs and PSUs— (15,557)1,168 (14,389)— (14,389)— 
Transfer of cash-settled RSUs and PSUs— (4,138)900 (3,238)— (3,238)— 
Transfer of cash-settled RSUsTransfer of cash-settled RSUs— (4,138)900 (3,238)— (3,238)— 
Equity-settled stock-based compensationEquity-settled stock-based compensation— 8,677 — 8,677 — 8,677 — Equity-settled stock-based compensation— 8,677 — 8,677 — 8,677 — 
Reclassification of contingently redeemable sharesReclassification of contingently redeemable shares— 288 — 288 — 288 (288)Reclassification of contingently redeemable shares— 288 — 288 — 288 (288)
OtherOther(2)712 (1,111)(399)— (399)— Other(2)712 (1,111)(399)— (399)— 
Net income (loss)Net income (loss)— — 151,535 151,535 5,627 157,162 — Net income (loss)— — 151,535 151,535 5,627 157,162 — 
Balance December 31, 2020219,607 $3,242,821 $92,077$3,334,898$512,279$3,847,177$3,311
Balance as of December 31, 2020Balance as of December 31, 2020219,607$3,242,821$92,077$3,334,898$512,279$3,847,177$3,311
Repurchase of common sharesRepurchase of common shares(8,801)(129,052)(19,023)(148,075)— (148,075)— Repurchase of common shares(8,801)(129,052)(19,023)(148,075)— (148,075)— 
Exercise of stock optionsExercise of stock options818 8,778 — 8,778 — 8,778 — Exercise of stock options818 8,778 — 8,778 — 8,778 — 
Settlement of RSUs and PSUsSettlement of RSUs and PSUs255 408 — 408 — 408 — Settlement of RSUs and PSUs255 408 — 408 — 408 — 
Transfer of equity settled RSUs— 8,802 — 8,802 — 8,802 — 
Transfer of equity-settled RSUsTransfer of equity-settled RSUs— 8,802 — 8,802 — 8,802 — 
Equity-settled stock-based compensationEquity-settled stock-based compensation— 5,121 — 5,121 — 5,121 — Equity-settled stock-based compensation— 5,121 — 5,121 — 5,121 — 
Reclassification of contingently redeemable sharesReclassification of contingently redeemable shares— 3,311 — 3,311 — 3,311 (3,311)Reclassification of contingently redeemable shares— 3,311 — 3,311 — 3,311 (3,311)
Dividends paid to equity holders of SSR Mining— — (43,233)(43,233)— (43,233)— 
Dividends paid to shareholders of SSR MiningDividends paid to shareholders of SSR Mining— — (43,233)(43,233)— (43,233)— 
Dividends paid to non-controlling interestDividends paid to non-controlling interest— — — — (55,464)(55,464)— Dividends paid to non-controlling interest— — — — (55,464)(55,464)— 
OtherOther— — (230)(230)— (230)— Other— — (230)(230)— (230)— 
Net income (loss)Net income (loss)— — 368,076 368,076 57,846 425,922 — Net income (loss)— — 368,076 368,076 57,846 425,922 — 
Balance December 31, 2021211,879 $3,140,189 $397,667$3,537,856$514,661$4,052,517$
Balance as of December 31, 2021Balance as of December 31, 2021211,879 $3,140,189 $397,667 $3,537,856 $514,661 $4,052,517 $— 
Repurchase of common sharesRepurchase of common shares(6,053)(88,849)(11,191)(100,040)— (100,040)— 
Exercise of stock optionsExercise of stock options180 2,675 — 2,675 — 2,675 — 
Settlement of RSUsSettlement of RSUs647 — — — — — — 
Equity-settled stock-based compensationEquity-settled stock-based compensation— 3,905 — 3,905 — 3,905 — 
137

SSR Mining Inc.
Consolidated Statement of Changes of Equity
(in thousands)

Dividends paid to shareholders of SSR Mining— — (58,799)(58,799)— (58,799)— 
Acquisition of non-controlling interest— — — — 48,591 48,591 
Dividends paid to non-controlling interest— — — — (34,520)(34,520)— 
Contributions from non-controlling interest— — — — 1,442 1,442 — 
Net income (loss)— — 194,140 194,140 16,288 210,428 — 
Balance as of December 31, 2022206,653 $3,057,920 $521,817 $3,579,737 $546,462 $4,126,199 $— 
The accompanying notes are an integral part of the Consolidated Financial Statements.

130138

SSR Mining Inc.
Notes to Consolidated Financial Statements


1.THE COMPANY
SSR Mining Inc. and its subsidiaries (collectively, "SSR Mining," or the "Company”) is incorporated under the laws of the Province of British Columbia, Canada. The Company's common shares are listed on the Toronto Stock Exchange ("TSX") in Canada and the Nasdaq Global Select Market ("NASDAQ") in the United States under the symbol "SSRM" and the Australian Securities Exchange (ASX) in Australia under the symbol "SSR."
SSR Mining is a precious metals mining company with four producing assets located in the United States, Türkiye, Canada and Argentina. The Company is principally engaged in the operation, acquisition, exploration and development of precious metal resource properties located in TurkeyTürkiye and the Americas. The Company has 4 producing minesproduces gold doré as well as silver and lead and zinc concentrates. The Company’s diversified asset portfolio is comprised of high-margin, long-life assets located in Turkey,some of the United States, Canada, and Argentina.world's most prolific metal districts. The Company'sCompany’s focus is on safe, profitable gold and silver production from its Çöpler Gold Mine ("Çöpler") in Erzincan, Turkey,Türkiye, Marigold mine ("Marigold") in Nevada, USA, Seabee Gold Operation ("Seabee") in Saskatchewan, Canada, and Puna Operations ("Puna") in Jujuy, Argentina, and to advance, as market and project conditions permit, its principal development projects towards development and commercial production.
In December 2021, Türkiye began the move to change its internationally recognized official name in English from Turkey to Türkiye. In June 2022, the United Nations announced it would recognize the new name. The Company is pleased to adopt the new name.
At the end of the second quarter of 2022, Türkiye’s Ministry of Environment, Urbanization and Climate Change (“Ministry of Environment”) temporarily suspended operations at the Çöpler mine pending implementation of improvement initiatives requested as a result of a leak of leach solution on June 21, 2022. The Company completed these initiatives and received the required regulatory approvals from Türkiye’s Government authorities on September 22, 2022 and all operations were restarted at the Çöpler mine. During the temporary suspension, Care and maintenance expense was recorded in the Statements of Operations which represents direct costs and depreciation incurred at Çöpler.

2.SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
The significant accounting policies used in the preparation of these consolidated financial statements are as follows:
Risks and uncertainties
As a mining company, the revenue, profitability and future rate of growth of the Company are substantially dependent on the prevailing prices for gold, silver, zinclead and lead.zinc. The prices of these metals are volatile and affected by many factors beyond the Company’s control, and there can be no assurance that commodity prices will not be subject to wide fluctuations in the future. A substantial or extended decline in commodity prices could have a material adverse effect on the Company’s financial position, results of operations, cash flows, access to capital and the quantities of reserves that the Company can economically produce. The carrying value of the Company’s Mineral properties, plant and equipment; Inventories; Deferred income tax assets; and Goodwill are particularly sensitive to the outlook for commodity prices. A decline in the Company’s price outlook could result in material impairment charges related to these assets.
COVID-19
During the year ended December 31, 2021, the COVID-19 pandemic continued to impact global economic and financial markets, disrupting global supply chains and workforce participation. Many industries and businesses, including the Company, continue to be impacted by the COVID-19 pandemic and face operating challenges associated with the regulations and guidelines resulting from efforts to contain COVID-19.
The Company continues to restrict all non-essential travel and manage the contacts of its employees and contractors in order to reduce the risk of COVID-19 impacting its operations. The Company is operating its corporate offices at reduced capacity, with most employees working remotely.
The Company's mine sites remain operational with carefully managed COVID-19 based restrictions designed to protect communities and employees, including quarantining, testing, ensuring physical distancing and providing additional protective equipment.

131139

SSR Mining Inc.
Notes to Consolidated Financial Statements

BasisUse of preparationestimates
These consolidated financial statements have been prepared in accordance with accounting principles generally accepted in the United States of America (“U.S. GAAP”). Previously,The preparation of the Company prepared its consolidated financial statements under InternationalCompany's Consolidated Financial Reporting Standards ("IFRS") as permitted by securities regulators in Canada, as well as inStatements requires the United States under the status of a Foreign Private Issuer as defined by the United States Securities and Exchange Commission ("SEC"). As of June 30, 2021, the Company determined that it no longer qualified as a Foreign Private Issuer under the SEC rules. As a result, beginning January 1, 2022 the Company is required to report with the SEC on domestic forms and comply with domestic company rules in the United States. The transition to U.S. GAAP was made retrospectively for all periods from the Company’s inception. New accounting standards implemented subsequent to January 1, 2019 were adopted on their required adoption date.
Use of estimates
Preparing financial statements in accordance with U.S. GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. The more significant areas requiring the use of management’s estimates and assumptions relate to mineral reserves that are the basis for future cash flow estimates utilized in impairment calculations and units-of-production depreciation; reclamation liabilities; valuation of assets acquired and liabilities assumed in business combinations;combinations, asset acquisitions or the initial consolidation of variable interest entities ("VIEs"); estimates of fair value for certain reporting units and asset impairments (including impairments of long-lived assets and goodwill); estimates of recoverable metal in stockpile and leach pad inventories; estimates of the net realizable value of inventory, stockpilesstockpiled ore and ore on leach pads;pad inventory; and estimates of deferred tax assets and liabilities. The Company has based its estimates on historical experience and various other assumptions that it believes to be reasonable. Accordingly, actual results may differ materially from these estimates under different assumptions or conditions. Changes in facts and circumstances may alter such estimates and affect the results of operations and financial position in future periods.
Principles of consolidation
These consolidated financial statements include the accounts of SSR Mining Inc., its wholly owned subsidiaries, and variable interest entities (“VIEs”)VIEs in which it is the primary beneficiary. Intercompany assets, liabilities, equity, income, expenses, and cash flows between SSR Mining Inc. and its subsidiaries have been eliminated on consolidation. Investments in joint ventures in which the Company has significant influence and VIEs where the Company is not the primary beneficiary are accounted for under the equity method of accounting.
Operating segments
The Company has 5five reportable segments for financial reporting purposes: Çöpler, Marigold, Seabee, Puna and the exploration, evaluation and development properties. Çöpler, Marigold, Seabee and Puna segments represent the Company's 4four operating mine sites. The exploration, evaluation and development properties segment represents a portfolio of prospective exploration tenures, both near or adjacent to the existing operations (near-mine) and greenfield standalone prospects, across Turkey,Türkiye, the U.S., Canada, Mexico, and Peru. For further information refer to Note 4.
Business combinations
The Company recognizes and measures the assets acquired and liabilities assumed in a business combination based on their estimated fair values at the acquisition date, while transaction and integration costs are expensed as incurred. Any excess of the purchase consideration when compared to the fair value of the net tangible and intangible assets acquired, if any, is recorded as goodwill. For material acquisitions, the Company engages independentthird-party valuation specialists to assist with the determination of the fair value of assets acquired, liabilities assumed, non-controlling interest, if any, and goodwill, based on recognized business valuation methodologies. An income, market or cost valuation method may be utilized to estimate the fair value of the assets acquired, liabilities assumed, and non-controlling interest, if any, in a business combination. If the initial accounting for the business combination is incomplete by the end of the reporting period in which the acquisition occurs, an estimate will be recorded.
132

SSR Mining Inc.
Notes to Consolidated Financial Statements

Subsequent to the acquisition date, and not later than one year from the acquisition date, the Company will record any material adjustments to the initial estimate based on new information obtained that would have existed as of the date of the acquisition. Any adjustment that arises from information obtained that did not exist as of the date of the acquisition will be recorded in the period the adjustment arises.
Foreign currency transactions
The functional and reporting currency of SSR Mining and each of its subsidiaries is the USD. Accordingly, foreign currency transactions and balances of the Company’s subsidiaries are remeasured as follows: (i) monetary assets and liabilities denominated in currencies other than the USD (“foreign currencies”) are remeasured into USD at the
140

SSR Mining Inc.
Notes to Consolidated Financial Statements

exchange rates prevailing at the balance sheet date; and (ii) non-monetary assets denominated in foreign currencies and measured at other than fair value are remeasured using the rates of exchange at the transaction date. Foreign exchange gains and losses are recognized in Foreign exchange gain (loss) in the Consolidated Statements of Operations. Unrealized foreign exchange gains and losses on cash and cash equivalent balances denominated in foreign currencies are disclosed separately in the Consolidated Statements of Cash Flows.
Cash and cash equivalents
Cash and cash equivalents include cash on hand and held at banks and short-term investments with an original maturity of three months or less, which are readily convertible into a known amount of cash. Restricted cash is presented separately in Restricted cash in the Consolidated Balance Sheets. Restricted cash is deposited at banks and financial institutions and representsincludes both a debt service reserve account and reclamation reserve account.
Inventories
Stockpiled ore, leach pad inventory, work-in-process inventory, and finished goods are valued at the lower of average cost or net realizable value (“NRV”). NRV is calculated using the estimated price at the time of sale based on prevailing and forecasted metal prices, less estimated future production costs to convert the inventory into saleable form, depreciation, and all associated selling costs. Costs include all direct costs incurred in production, including direct labor and materials, freight, depletion and depreciation, and directly attributable overhead costs. Any write-downs of inventory to NRV are recognized within Production costsCost of sales and Depreciation, depletion, and amortization in the Consolidated Statements of Operations.
Stockpiled ore represents ore that has been extracted from the mine and is available for further processing. The cost of stockpiled ore is derived from the current mining costs incurred up to the point of stockpiling the ore and is removed at the weighted average cost as ore is processed. Quantities of stockpiled ore are verified by periodic surveys. Stockpiled ore that is not expected to be processed within the next twelve months is classified as non-current.
Leach pad inventory represents ore that has been mined and placed on leach pads where a solution is applied to the surface of the heap to dissolve the gold and by-products. The resulting solution is further processed in a plant to recover the gold. The cost of leach pad inventory is derived from current mining and leaching costs and is removed as ounces of gold are recovered at the weighted average cost per recoverable ounce of gold on the leach pads.pads as ounces of gold are recovered. Estimates of recoverable gold in the leach pads are calculated based on the quantities of ore placed on the leach pads (measured tonnes added to the leach pads), the grade of ore placed on the leach pads (based on assay data), and an estimated recovery percentage (based on estimated recovery assumptions from the block model). The nature of the leaching process inherently limits the ability to precisely monitor inventory levels. As a result, estimates are refined based on actual results and engineering studies over time. The final recovery of gold from leach pads will not be known until the leaching process is concluded at the end of the mine life. Ore on leach pads that is not expected to be recovered within the next twelve months is classified as non-current.

133141

SSR Mining Inc.
Notes to Consolidated Financial Statements

Work-in-process inventory represents material that is currently in the process of being converted to a saleable product, whether being processed in a mill or following recovery from a leach pad. Work-in-process inventory is determined based on assays of the material fed into the process and the projected recoveries of the respective processing plants. Work-in-process inventory is valued at the lower of average cost of the material fed into the process plus the in-process conversion costs, including applicable depreciation relating to the process facilities, or NRV.
Finished goods inventory includes metal concentrates at site and in transit, doré at a site or a refinery, or gold bullion and are valued at the lower of the average cost of the respective in-process inventories incurred prior to the refining process, plus applicable refining costs, or NRV. Costs are transferred from finished goods inventory and recorded as Production costsCost of sales and Depreciation, depletion and amortization in the Consolidated Statements of Operations upon sale.
Materials and supplies inventories are measured at the lower of average cost or NRV. A regular review is undertaken to determine the extent of any reserve for obsolescence.
Mineral properties, plant and equipment
Mineral properties
Mineral properties are capitalized at fair value at the acquisition date. Mineral properties may include mineral reserves, mineral resources and exploration potential. Mineral reserves represent the estimate of ore that can be economically and legally extracted from the Company's mining properties. Production stage mineral properties are operating properties that contain proven and probable reserves and are amortized using the units-of-production method based on the estimated recoverable ounces or pounds in proven and probable reserves. Development stage mineral properties are those under development that contain proven and probable reserves. Exploration stage mineral properties are those that potentially contain mineralized material,mineral resources, consisting of (i) areas adjacent to existing mineral resources and mineralization located within the immediate mine area; (ii) areas outside of immediate mine areas that are not part of mineral resources; and (iii) greenfield exploration potential that is not associated with any other production, development, or exploration stage property. Mineral properties in the development and exploration stage are not amortized until the property is converted to the production stage. Mineral exploration costs, including costs associated with prospecting, sampling, mapping, diamond drilling and other work involved in searching for mineral resources are charged to Exploration, evaluation and reclamation costs as incurred.
Mine development
Mine development costs include engineering and metallurgical studies, drilling and other related costs to delineate an ore body, the removal of overburden to initially expose an ore body at open pit surface mines and the building of access ways, shafts, lateral access, drifts, ramps and other infrastructure at underground mines. Capitalization of mine development project costs that meet the definition of an asset begins once mineralization is classified as proven and probable reserves.
Drilling and related costs are capitalized for an ore body where proven and probable reserves exist, and the activities are directed at obtaining additional information about the ore body or converting mineralized material to proven and probable reserves. All other drilling and related costs are expensed as incurred. Drilling costs incurred during the production phase for operational ore control are allocated to inventory costs and then included as a component of Production costsCost of sales.
The cost of removing overburden and waste materials to access the ore body at an open pit mine prior to the production phase are referred to as “pre-stripping costs.” Pre-stripping costs are capitalized during the development of an open pit mine. Where multiple open pits exist at a mining complex utilizing common processing facilities, pre-stripping costs are capitalized for each pit. The removal, production, and sale of de minimis saleable materials may occur during the development phase of an open pit mine and are assigned incremental mining costs related to the removal of that material.
134

SSR Mining Inc.
Notes to Consolidated Financial Statements

The production phase of an open pit mine commences when saleable minerals, beyond a de minimis amount, are produced. Stripping costs incurred during the production phase of a mine are variable production costscost of sales that are included
142

SSR Mining Inc.
Notes to Consolidated Financial Statements

as a component of inventory to be recognized in Production costsCost of sales in the same period as the revenue from the sale of inventory.
Mine development costs are amortized using the units-of-production method based on estimated recoverable ounces or pounds in proven and probable reserves. To the extent that these costs benefit an entire ore body, they are amortized over the estimated life of the ore body. Costs incurred to access specific ore blocks or areas that only provide benefit over the life of that area are amortized over the estimated life of that specific ore block or area.
Plant and equipment
Expenditures for new facilities or equipment and expenditures that extend the useful lives of existing facilities or equipment are capitalized and recorded at cost. Facilities and equipment acquired as part of a finance lease are capitalized and recorded as right-of-use ("ROU") assets based on the contractual lease terms. The carrying amounts of plant and equipment are depreciated to their estimated residual value over the estimated useful lives of the specific assets or the estimated life-of-mine ("LOM"), if shorter. Depreciation starts on the date when the asset is available for its intended use. Construction in process assets are not depreciated until available for their intended use. The major categories of plant and equipment are depreciated on a straight-line basis using the estimated lives indicated below:
Vehicles5 years - 7 years
Mining equipment3 years - 2120 years
Mobile equipment components2 years - 7 years
Buildings5 years - 2120 years
Mine plant equipment3 years - 2120 years
Underground infrastructure54 years - 216 years
ROU assets - plant and equipment (1)
10 years - 2120 years
(1)For ROU assets, the depreciation period indicated above represents the period from lease commencement date to the earlier of the end of the useful life of the underlying asset or the end of the lease term.
Impairment of long-lived assets
The Company assesses the carrying value of its long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amounts of such assets may not be recoverable. Events or circumstances that could indicate that the carrying value of an asset or asset group may not be recoverable include, but are not limited to, significant adverse changes in the business climate including changes in future metal prices, significant changes to the extent or manner in which the asset is being used or its physical condition including significant decreases in production or mineral reserves, and significant decreases in the market price of the assets. In evaluating long-lived assets for recoverability, estimates of undiscounted future cash flows of the Company's mines are used. An impairment is considered to exist if total estimated undiscounted future cash flows are less than the carrying amount of the asset. Once it is determined that an impairment exists, andan impairment loss is recognized based on the difference between the estimated fair value of the long-lived assets and their carrying amounts. Fair value is typically determined through the use of an income approach utilizing estimates of discounted future cash flows. Future cash flows are derived from current business plans which are developed using short and long-term metal price assumptions; estimates of costs; and resource, reserve and exploration potential estimates, including timing and costs to develop and produce the material and are considered Level 3 fair value measurements. The Company believes its estimates and models used to determine fair value are similar to what a market participant would use.

135143

SSR Mining Inc.
Notes to Consolidated Financial Statements

Goodwill
Under the acquisition method of accounting for business combinations, the identifiable assets acquired and liabilities assumed are recognized at their estimated fair value as of the date of acquisition. The excess of the fair value of consideration paid over the fair value of the identifiable net assets acquired is recognized as Goodwill and allocated to the reporting units.
Goodwill is allocated to reporting units and assessed for impairment annually as of December 31 and when events or circumstances indicate that the carrying value of a reporting unit exceeds its fair value. In testing for goodwill impairment, the Company first evaluatesmay elect to perform a qualitative factorsassessment to determine whether the existence of events or circumstances indicate that it is more likely than not that the fair value of a reporting unit is less than its carrying value. If the Company does not elect to perform a qualitative assessment or it is determined that it is more likely than not that the fair value is less than the carrying value, then a quantitative goodwill impairment test is performed by determining the fair value of the reporting unit. The fair value of a reporting unit is determined using either the income approach by utilizing estimates of discounted future cash flows or the market approach utilizing recent transaction activity for comparable properties. These approaches are considered Level 3 fair value measurements. If the carrying amount of a reporting unit exceeds the fair value, an impairment loss is recognized in the current period in an amount equal to the excess.
Stock-based compensation
The Company determines the fair value on the grant date for stock-based compensation awards and expenses the awards in the Consolidated Statements of Operations over the vesting period on a straight-line basis. Based on the terms of the award, and the Company’s intent and past practice for settlement in cash or shares, the awards are classified as liabilities or equity. The Company recognizes forfeitures as they occur.
Cash-settled stock-based compensation arrangements; including Deferred Share Units (“DSUs”), DSU Replacement Units, Performance Stock Units (“PSUs”), and PSU Replacement Units are remeasured at fair value at the end of each reporting period and at the date of settlement, with any changes in fair value recognized in profit or loss for the period.
For equity-settled stock options, the fair value at the grant date is estimated using the Black-Scholes option pricing model. For Restricted Share Units (“RSUs”) and RSU Replacement Units, the fair value at the grant date is estimated based on the quoted market price of the Company’s common stock.
Income taxes
The income tax and mining tax expense for the period is comprised of current tax expense and deferred tax expense, and is recognized in the Consolidated Statements of Operations.
Current income tax
Current tax for each of the Company's taxable entities is based on the local taxable profit for the period at the local statutory tax rates enacted at the date of the Consolidated Balance Sheets as well as the available double tax treaty rates as ratified. Management periodically evaluates positions taken in tax returns in situations in which applicable tax regulation is subject to interpretation. The Company establishes provisions where appropriate on the basis of amounts expected to be paid to tax authorities. Any uncertain tax positions must meet a more-likely-than-not realization threshold to be recognized and any potential accrued interest and penalties related to unrecognized tax benefits are recognized within Income tax benefit (expense).

136144

SSR Mining Inc.
Notes to Consolidated Financial Statements

Deferred tax
Deferred income taxes are accounted for using the asset and liability method. Under this method, deferred tax assets and liabilities are determined by applying the enacted statutory tax rates in effect at the end of a reporting period to the cumulative temporary differences between the tax bases of assets and liabilities and their reported amounts in the Company’s consolidated financial statements. Deferred income tax assets are recognized for all deductible temporary differences to the extent that it is more likely than not that taxable profits will be available to be utilized against those deductible temporary differences. A valuation allowance for deferred tax assets is established when it is more likely than not that some portion of the benefit from deferred tax assets will not be realized. The extent to which deductible temporary differences, unused tax losses and other income tax deductions are expected to be realized are reassessed at the end of each reporting period. The effect on deferred taxes forof a change in tax rates is recognized in income during the period that the enactment date is effective.
Deferred tax assets are recognized for investment incentive tax credits in TurkeyTürkiye in the period earned as expenditures that are more likely than not to be accepted as eligible spend occur and it is more likely than not that taxable profits will be available to be utilized against those credits, which can be applied to current and future year income tax payments. The Company accounts for the investment incentive tax credit in TurkeyTürkiye using the flow-through method. Under this method, the investment incentive tax credit is treated as a reduction of income taxes in the year in which the credit arises. Deferred income tax liabilities are not recognized for taxable temporary differences associated with investments in subsidiaries and associates, and interests in joint ventures, unless it becomes apparent that the excess book over tax basis difference is expected to reverse in the foreseeable future. Accordingly, deferred income tax assets and liabilities are recognized for future withholding taxes payable where it has been determined that the amount would reasonably be payable in the foreseeable future.
Deferred tax assets and liabilities are offset when there is a legally enforceable right to offset the current tax assets against the current tax liabilities, when they relate to income taxes levied by the same taxation authority, and the Company intends to settle its current tax assets and liabilities on a net basis.
Mining taxes and other tax arrangements
Mining taxes or royalties and other arrangements are treated as taxation arrangements when they have the characteristics of an income tax. This is the case when they are imposed under government authority and the amount payable is calculated by reference to an income measure. Obligations arising from royalty arrangements that do not satisfy these criteria are recognized as current liabilities and included within Production costsCost of sales.
Investments
The Company has investments in debt securities and marketable equity securities. The Company determines the appropriate classification of debt securities at the time of purchase and re-evaluates such determinations at each reporting date. Current investments include marketable equity securities and held to maturity and available for sale debt securities. Marketable equity securities are carried at fair value. Held to maturity securities, classified based on the intent and ability to hold the securities to maturity, are carried at amortized cost. Marketable debt securities are categorized as available for sale and carried at fair value.
Gains and losses on the sale of securities are recognized on a specific identification basis. Unrealized gains and losses are included in Other income (expense) on the Consolidated Statements of Operations.

137145

SSR Mining Inc.
Notes to Consolidated Financial Statements

Derivative financial instruments
The Company is exposed to various market risks, including the effect of changes in metal prices and foreign exchange rates, and from time to time uses derivatives to manage financial exposures that occur in the normal course of business. The Company recognizes derivatives as either assets, presented in the Consolidated Balance Sheets in Prepaid and other current assets or Other non-current assets, or liabilities, presented in the Consolidated Balance Sheets in Accrued liabilities and other or Other non-current liabilities, and measures those instruments at fair value. These are considered Level 2 fair value measurements. Changes in the value of derivative instruments are recorded each period in Production CostsCost of sales or Other income (expense) on the Consolidated Statements of Operations. Management applies judgment in estimating the fair value of instruments that are highly sensitive to assumptions regarding commodity prices, market volatilities, and foreign currency exchange rates. The Company currently does not apply hedge accounting.
Reclamation liabilities
The Company recognizes a liability for the fair value of estimated future reclamation costs when incurred. The liability is accreted over time through periodic charges to Exploration, evaluation and reclamation costs in the Consolidated Statements of Operations. In addition, the asset retirement cost is capitalized as part of the asset's carrying value and amortized over the life of the related asset. Reclamation liabilities are periodically adjusted to reflect changes in the estimated present value resulting from the passage of time and revisions to the estimates of either the timing or amount of reclamation costs. Changes in the estimate of reclamation costs may result from changes in legal or regulatory requirements, increased obligations arising from additional mining and exploration activities, and changes to cost estimates. Changes in reclamation estimates at mines that are not currently operating, as the mine or portion of the mine site has entered the closure phase and has no substantive future economic value, are reflected in Exploration, evaluation and reclamation costs in the Consolidated Statements of Operations. The estimated reclamation obligation is based on when spending for an existing disturbance is expected to occur. The Company reviews, on an annual basis, unless otherwise deemed necessary, the reclamation obligation at each mine site.
Leases
The Company has entered into lease contracts under which it is the lessee. The Company determines whether an arrangement is, or contains, a lease based on the substance of the arrangement at its inception. If the contract is determined to be a lease, the Company classifies the lease as either an operating or financing lease. Operating lease right of use ("ROU") assets are included in Other non-current assets and lease obligations are included in Accrued liabilities and other and Other non-current liabilities in the Consolidated Balance Sheets. Finance lease ROU assets are included in Mineral properties, plant and equipment and lease obligations are included in Finance lease liabilities in the Consolidated Balance Sheets.
ROU assets represent the Company’s right to use the underlying assets for the lease term and the corresponding lease liabilities represent its obligations to make lease payments arising from the leases. Operating and finance lease ROU assets and liabilities are recognized at the commencement date based on the present value of the expected lease payments over the lease term. When the rate of interest implicit in the lease cannot be readily determined, the Company uses its incremental borrowing rate in determining the present value of future lease payments.
Operating lease costs are recognized on a straight-line basis over the lease term. Finance lease costs are recognized based on the effective interest method for the lease liability and straight-line amortization of the ROU asset, resulting in more cost being recognized in earlier periods. Variable lease payments are recognized in the period in which they are incurred.
The Company has elected certain practical expedients including the short-term lease recognition exemption for all classes of underlying assets. Accordingly, leases with a term of one year or less have not and will not be recognized on the Consolidated Balance Sheets. The Company has also elected the practical expedient to not separate lease and non-lease components such as taxes and common area maintenance charges, in certain classes of assets such as its office facilities.
138146

SSR Mining Inc.
Notes to Consolidated Financial Statements

Most of the Company’s leasing arrangements include extension and termination options, all of which provide the Company flexibility in retaining the underlying facilities and equipment, as well as some protection from future price variability. The Company has applied judgment to determine the lease term, which is the non-cancelable period in the contract, plus the period beyond that cancellation period that the Company believes it is reasonably certain it will need the equipment for operational purposes.
Revenue recognition
The Company generates revenue by selling gold, copper, silver, lead and zinc produced from its mining operations. The majority of the Company’s sales come from the sale of refined gold bullion; however, the end product at the Company’s gold operations is generally doré bars. The Company also sells silver-lead and zinc concentrate to smelters for further treatment and refining.
Gold sales
Doré is sent to refiners to produce bullion that meets the required market standard of 99.95% gold. Under the terms of the Company’s refining agreements, the doré bars are refined for a fee, and the Company’s share of the refined gold and separately recovered silver is credited to its bullion account. Doré produced at Marigold and Seabee is sold primarily to bullion banks in the London spot market. Doré produced at Çöpler is sold primarily on the Istanbul Gold Exchange. Under legislation commenced in TurkeyTürkiye in 2018, the Central Bank of the Republic of TurkeyTürkiye has the first right of refusal for all gold produced by mining operations in Turkey.Türkiye.
The Company generally recognizes revenue for gold from doré production when it satisfies the performance obligation of transferring gold bullion credits to the customer, as this is the point at which the customer obtains the ability to direct the use of and hold the remaining benefits of ownership of the asset. The transaction price is fixed on the date of sale based on the London Bullion Market Association's (“LBMA”) gold fix price or spot price and number of ounces delivered. Payment is due upon delivery of gold bullion credits to the customer’s account.
Concentrate sales
Metals produced at Puna are sold in concentrate form to smelters and traders. The Company recognizes revenue for silver-lead and zinc concentrate, net of treatment and refining costs, when it satisfies the performance obligation of transferring control of the concentrate to the customer. This generally occurs as material passes over the vessel’s rail at the port of loading or unloading, as the customer has the risk of loss and ability to direct the use of and obtain substantially all of the remaining benefits of the material. The Company has elected to account for shipping and handling costs for concentrate contracts as fulfillment activities and not as promised goods or services; therefore, these activities are not considered separate performance obligations.
The initial sales price of concentrate metal sales is determined on a provisional basis at the date of sale as the final selling price is subject to movements in the monthly average London Metal Exchange (“LME”) or LBMA prices up to the date of final pricing. The period between provisional invoicing and final pricing, or settlement period, is typically between 30 and 120 days.
The Company’s accounts receivable from provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates measured at the forward price at the time of sale. The embedded derivative is adjusted to fair value through Revenue each period until the date of final metal settlement.
Income per share
Basic net income per share is calculated by dividing the net income or loss attributable to common stockholders of the Company by the weighted average number of common shares outstanding during the period. Diluted net income per share is determined by including the basic weighted average number of common shares outstanding adjusted for the effects of all potential dilutive shares of common stock, unless their effect would be anti-dilutive.
139147

SSR Mining Inc.
Notes to Consolidated Financial Statements

Reclassifications
Certain amounts and disclosures in prior years have been reclassified to conform to the current year presentation.
Consolidated Statement of Operations: updated caption
During the fourth quarter of 2022, the Company revised the previously reported caption of Production costs to Cost of sales within its Consolidated Statements of Operations to provide a more accurate description of the costs and align with commonly used terminology by industry participants. Cost of sales does not include depreciation, depletion and amortization. No changes were made to the accounting policies or previously reported amounts.
During the third quarter of 2022, the Company revised the previously reported caption of Transaction, integration, and SEC conversion expense to Other operating expenses, net within its Consolidated Statements of Operations. No changes were made to the accounting policies or previously reported amounts.
148

SSR Mining Inc.
Notes to Consolidated Financial Statements

3.ACQUISITIONS AND DIVESTITURES
Acquisitions
Acquisition of additional 30% ownership in Kartaltepe
On November 17, 2022, the Company, through its wholly owned subsidiary Alacer Gold Madencilik A.S., completed the acquisition of an additional 30% ownership in Kartaltepe Madencilik Sanayi ve Ticaret Anonim Şirketi (“Kartaltepe”) from joint venture partner Lidya Madencilik Sanayi ve Ticaret A.Ş (“Lidya”) (the “Transaction) for total consideration of $150.0 million in cash. The Company previously owned 50% of Kartaltepe and accounted for its interest as an equity method investment with a reported amount of $4.2 million. Upon completion of the Transaction, the Company now owns 80% of Kartaltepe and is considered the primary beneficiary of the VIE and will consolidate Kartaltepe under ASC 810. The Company's acquisition of Kartaltepe is included in the Çöpler mine operating segment. The Transaction provides increased exposure for the Company to potential exploration success on the geologically prospective Kartaltepe licenses, including Çakmaktepe Extension, Çakmaktepe, and the Mavialtin Porphyry Belt. Additionally, the Transaction is expected to deliver material synergies through the remainder of Ҫӧpler’s mine life.
The Company concluded that Kartaltepe was not a business based on its assessment under ASC 805 and accounted for the acquisition as an initial consolidation of a VIE that is not a business under ASC 810. As a result of the Transaction the Company recognized a gain of $81.9 million during the fourth quarter of 2022, included in Gain on acquisition of Kartaltepe in the Consolidated Statements of Operations. The gain represents the difference between: (i) the fair value of consideration paid, the fair value of the non-controlling interests, and the reported amount of the previously held interest and (ii) the total amount of the net assets recognized at fair value.
At acquisition, the Company recognized all assets acquired and liabilities assumed at an aggregate fair value of $284.7 million, primarily consisting of $361.6 million in Mineral properties, plant and equipment, net2 and $72.3 million in Deferred tax liabilities3 on the Consolidated Balance Sheets. The fair value of Lidya’s 20% interest of $48.6 million was recognized as Non-controlling interest on the Consolidated Balance Sheets. The Company retained a third-party appraiser to assist in determining the fair value of the assets acquired, liabilities assumed, and non-controlling interest as of the acquisition date. The fair value estimates were based on income and market valuation methods1. Fair value is a market-based measurement and does not include entity-specific synergies.
Acquisition of Taiga Gold CorporationCorp.
On December 2, 2021,April 14, 2022, the Company announced an agreement to acquirecompleted the purchase of all the issued and outstanding common shares of Taiga Gold CorporationCorp. (“Taiga Gold”) at a price of CAD $0.265 per Taiga Gold share, which implies an equity value of approximately $21.0 million. Taiga Gold has announced that it intends to call a meeting of shareholders to be held on or before March 15, 2022 to seek shareholder approval forholds the Transaction. The transaction will require approval of (i) at least 66⅔% of the votes cast by Taiga Gold shareholdersexploration and (ii) a simple majority of the votes cast by certain Taiga Gold shareholders, which excludes votes from certain shareholders, as required under Canadian Multilateral Instrument 61-601 - Protection of Minority Securityholders in Special Transactions. The completion of the transaction is also subject to receipt of court, stock exchange and any other regulatory approvals, and is subject to customary closing conditions for transactions of this nature. The agreement provides for non-solicitation covenants with "fiduciary out" provisions that allow Taiga Gold to consider and accept a superior proposal, subject to a "right to match period" in favor of the Company. The agreement also provides for (i) a termination fee of $1.2 million to be paid by Taiga Gold to the Company if the agreement is terminated in certain specified circumstances; and (ii) and expense reimbursement fee of $0.3 million to be paid by the Company to Taiga Gold if the transaction fails to close as a result of specified breaches of the agreement by the Company. The transaction is expected to close in the first half of 2022.
The transaction materially expands the Company’s presenceevaluation stage resources in Saskatchewan, Canada in proximity to the Company’s Seabee mine and Fisher project. The transaction was accounted for as an asset acquisition for total consideration of $24.8 million. The total consideration was allocated to the assets acquired and liabilities assumed based on their estimated fair values on the acquisition date, which consisted primarily of cash and cash equivalents of $4.7 million, exploration and evaluation assets of $27.8 million, and a core jurisdiction, by adding 5 new properties, which provide new exploration targets stretching south fromrelated deferred tax liability of $7.5 million. The assets are included in the Seabee mine to the Company’s 100%-owned Amisk property. Further, the acquisition consolidates a 100% interest in the Fisher property contiguous to the Seabee mine, currently operated under joint venture comprised of the Company's 80% and Taiga Gold's 20%. The Company will leverage its existing teams and infrastructure to advance the development of these assets.operating segment.
Acquisition of Alacer Gold Corporation
On September 16, 2020 (“Acquisition Date”), the Company acquired all of the issued and outstanding common shares of Alacer Gold Corp. ("Alacer"). The acquisition of Alacer created a diversified portfolio of high quality, long-life mines across four mining-friendly jurisdictions.
The Company acquired all of the issued and outstanding common shares of Alacer, with Alacer shareholders receiving 0.3246 of the Company’s common stock for every one Alacer share (the "Exchange Ratio"). The
2 The fair value of mineral properties, plant and equipment is based on applying the income and market valuation methods and includes a provision for the estimated fair value of asset retirement obligations related to the long-lived tangible assets. The significant assumptions include future metal prices, estimated quantities of mineral reserves and mineral resources, future operating costs, discount rates, and in-situ multiples.
3 Deferred income tax liabilities represent the future tax expense associated with the differences between the fair value allocated to assets and liabilities and the historical carryover tax basis of these assets and liabilities.
149

SSR Mining Inc.
Notes to Consolidated Financial Statements

transaction resulted in the issuance of 95,699,911 of the Company’s common stock to the former shareholders of Alacer. All outstanding RSUs, PSUs and DSUs of Alacer that were not exercised prior to the Acquisition Date were replaced with the Company units (the RSU Replacement Units, the PSU Replacement Units, and the DSU Replacement Units, respectively), with the number of such securities issued adjusted by the Exchange Ratio.
Upon closing of the transaction, the Company and former Alacer shareholders owned 57% and 43%, respectively, of the shares of the combined entity. Upon the completion of the transaction, Alacer became a wholly-owned subsidiary of the Company. Alacer holds an 80% interest in Anagold Madencilik Sanayi ve Ticaret Anonim Şirketi ("Anagold"), the owner and operator of Çöpler, a large-scale open pit gold mine in east-central Turkey.Türkiye. The 20% non-controlling interest in Anagold is held by Lidya Madencilik Sanayi ve Ticaret Anonim Şirketi ("Lidya Mining").Lidya.
Based upon the September 15, 2020 closing stock price of the Company's common stock, the total purchase price consideration of the acquisition was $2.2 billion.billion The Company incurred transaction and integration costs of $6.9 million and $20.8 million which included $11.0 million for severance and termination payments to executives, for the years ended December 31, 2021 and 2020, respectively. These costs were recognized in Transaction, integration and SEC conversion expenseOther operating expenses, net in the Consolidated Statements of Operations.

140

SSR Mining Inc.
Notes to Consolidated Financial Statements

The acquisition of Alacer was accounted for as a business combination which requires the measurement of acquired assets and liabilities assumed at their respective fair values at the date of acquisition. The Acquisition Date fair value of the consideration transferred consists of the following (in thousands):
Share consideration (1)
$2,127,284 
RSU, PSU and DSU consideration (2)
52,363 
Total consideration$2,179,647 
(1)The fair value of 95,699,911 common shares issued to Alacer shareholders was determined using the Company's common share price of $22.22 per share on September 15, 2020.
(2)The fair value of 3,570,261 RSU, 3,463,023 PSU and 1,158,071 DSU consideration units issued was determined using the Alacer share price of $7.21 on September 15, 2020, adjusted for the Exchange Ratio. Of the amount relating to the RSU, PSU and DSU consideration, $15.4 million was recognized in equity and $23.8 million and $13.2 million were recognized in Accrued liabilities and other and Other non-current liabilities, respectively.
150

SSR Mining Inc.
Notes to Consolidated Financial Statements

The table below presents the fair values of the assets acquired and liabilities assumed at the Acquisition Date (in thousands):
ASSETS
Cash and cash equivalents$270,445 
Trade and other receivables17,218 
Inventories224,992 
Prepaids and other current assets6,039 
Mineral properties, plant and equipment2,789,832 
Inventories124,775 
Restricted cash32,943 
Equity method investments9,148 
Other non-current assets9,575 
Total assets$3,484,967 
LIABILITIES
Accounts payable and accrued liabilities$71,861
Current portion of debt70,000 
Debt175,000 
Reclamation liabilities(1)
26,154 
Lease liabilities - non-current114,820 
Deferred income tax liabilities (2)
337,752 
Other non-current liabilities3,081 
Non-controlling interest (3)
506,652 
Total liabilities1,305,320 
Total net assets$2,179,647 
(1)The fair value of reclamation costs is based on the expected amounts and timing of cash flows for closure activities and discounted to present value using a credit-adjusted risk-free rate as of the Acquisition Date. Key assumptions include the costs and timing of key closure activities based on the life of mine plans.
(2)Deferred income tax liabilities are net of a deferred income tax asset of $182.9 million relating to investment incentive tax credits at Çöpler and includes a deferred income tax liability of $29.2 million for withholding tax on distributable earnings of the Turkish entities.
(3)The fair value of non-controlling interest is measured based on a discounted cash flow model.

141151

SSR Mining Inc.
Notes to Consolidated Financial Statements

The fair values of inventories were determined based on an NRV approach, whereby the future estimated cash flows from sales of payable metal produced are adjusted for costs to complete. The fair values of mineral properties have been estimated using discounted cash flow models and the fair values of plant and equipment have been estimated using a depreciated replacement cost approach. A market approach was used to estimate the fair values of certain exploration assets with reference to a public company comparable analysis. Expected future cash flows are based on estimates of future metal prices, production based on current estimates of mineral reserves and recoverable mineral resources, future operating costs and capital expenditures, and discount rates. The valuationamount of net deferred tax liabilities recognized includes an amount recognized for deferred tax assets relating to investment incentive tax credits for which the Company has determined it is more likely than not to be accepted as eligible spend occurs and it is more likely than not that taxable profits will be available to utilize against those credits.
Consolidated revenue for the year ended December 31, 2020 includes revenue from the assets acquired in the acquisition of Alacer of $205.5 million. Consolidated net income for the year ended December 31, 2020 includes net income attributable to SSR Mining shareholders from Alacer ofof $24.1 million.
Pro forma financial information
The following table provides unaudited pro forma financial information for the yearsyear ended December 31, 2020, and 2019, as if Alacer had been acquired as of January 1, 20192020 (in thousands):
 Years Ended December 31,
 20202019
Revenue$1,215,145 $1,077,093 
Net income attributable to SSR Mining shareholders$264,390 $219,068 
Years Ended December 31,
2020
Revenue$1,215,145 
Net income attributable to SSR Mining shareholders$264,390 
AcquisitionDivestitures
Divestiture of non-controlling interest in PunaPitarrilla
On September 18, 2019,July 6, 2022, the Company acquired a 25% interest in Puna from Golden Arrow Resources Corporation ("Golden Arrow") for aggregate consideration of $32.4 million, consisting of $2.3 million of cash,completed the extinguishmentsale of the loanPitarrilla project in Durango, Mexico, included in the Exploration, evaluation and development properties segment, to Golden Arrow and related interestEndeavour Silver Corp. ("Endeavour Silver"). The consideration received included cash of $11.4$35.0 million, the issuance of $18.2 million of the Company'sEndeavour Silver common shares and the transfer of shares in Golden Arrow held by the Company, with a fair value on the closing date of $0.5$25.6 million for cancellation.
As (8,577,380 shares at $2.99 per share), and a 1.25% net smelter returns royalty on the acquisition did not resultPitarrilla property. A gain of $0.6 million was recognized, included in a changeOther operating expenses, net in the Consolidated Statements of control,Operations, calculated as the acquisition was accounted for as an equity transaction wherebydifference between the consideration received and the carrying amount of the non-controlling interest of $33.9 million in Puna prior to the acquisition was adjusted to zero in the Consolidated Balance Sheets. Further, the difference of $1.5 million between the carrying amount of the non-controlling interest in Puna at the time of acquisition and the fair value of the consideration paid to Golden Arrow of $32.4 million was recognized in equity. Transaction costs incurred in connection with the transaction of $0.2 million were recognized as a reduction of equity.net assets sold.
Divestiture of royalty assets
On October 21, 2021, the Company completed the sale of a portfolio of royalty interests and deferred consideration (the "Royalty Portfolio") to EMX Royalty Corporation ("EMX") with a carrying value of $83.9 million. The total consideration received included cash, EMX common shares, and deferred consideration in the form of contingent payments of cash payable upon completion of certain project milestones related to one of the royalties totaling approximately $87.9 million. The fair value of the deferred consideration was estimated based on the present value of the projected future cash inflows using a discount rate of 12.5%. The projected future cash inflows are affected by assumptions related to the achievement of the development milestones. At June 30, 2021, following the negotiation of the Royalty Portfolio sale, the Company recorded an impairment loss of $22.3 million on the Royalty Portfolio, calculated based on the difference between the estimated fair value of the Royalty Portfolio and its carrying amount prior to the impairment. The impairment loss was recognized in the Company's Exploration, evaluation and development properties segment. The Company recognized a gain on closing of the Royalty Portfolio sale to EMX of $2.1 million, net of $0.3 million of transaction costs, which has been recorded against the impairment loss.loss.
142152

SSR Mining Inc.
Notes to Consolidated Financial Statements

4.OPERATING SEGMENTS 
The Company currently has 4four producing mines and a portfolio of precious and base metal dominant projects. Each individual operating mine site along withand the Company's exploration, evaluation and development properties are considered reportable segments. Operating results of operating segments are reviewed by the Company's chief operating decision maker ("CODM") to make decisions about resources to be allocated to the segments and to assess their performance. The Company's business activities that not included within the reportable segments are included in Corporate and other. Although they are not required to be included in this footnote, they are provided for reconciliation purposes.
In connection with the acquisition of Alacer, the Company added Çöpler as a new operating mine site for the year ended December 31, 2020. Çöpler is an operating mine site, therefore it is considered a reportable segment.
The following tables provide a summary of financial information related to the Company's segments (in thousands):
Year Ended December 31, 2021
ÇöplerMarigoldSeabeePunaExploration, evaluation 
and development properties
Corporate and other (1)
Total
Revenue $607,887 $426,391 $213,860 $226,061 $— $— $1,474,199 
Production costs$264,889 $219,035 $66,354 $121,096 $— $— $671,374 
Depletion, depreciation and amortization $125,220 $35,410 $45,334 $21,995 $— $— $227,959 
Exploration, evaluation and reclamation costs$10,868 $2,979 $11,867 $1,764 $13,027 $1,877 $42,382 
Care and maintenance expense (1) 
$— $— $— $— $— $— $— 
Transaction, integration and SEC conversion expense$— $— $— $— $— $11,240 $11,240 
Impairment of long-lived and other assets$— $— $— $— $20,275 $— $20,275 
Operating income$201,302 $169,070 $90,332 $79,043 $(33,302)$(62,070)$444,375 
Capital expenditures$34,699 $55,861 $40,553 $10,458 $— $— $141,571 
Total assets as of December 31, 2021 $2,290,367 $566,015 $479,370 $293,470 $923,204 $659,012 $5,211,438 

Year Ended December 31, 2022
ÇöplerMarigoldSeabeePunaExploration, evaluation 
and development properties
Corporate and other (1)
Total
Revenue $355,070 $348,817 $244,692 $199,454 $— $— $1,148,033 
Cost of sales (2)
$189,825 $206,014 $74,679 $137,424 $— $— $607,942 
Depletion, depreciation and amortization $76,628 $34,255 $49,445 $21,119 $— $— $181,447 
Exploration, evaluation and reclamation costs$3,684 $3,746 $14,104 $7,098 $22,465 $1,749 $52,846 
Care and maintenance (3)
$41,800 $— $— $— $— $— $41,800 
Operating income (loss)$40,340 $104,802 $106,453 $33,546 $(21,839)$(73,034)$190,268 
Capital expenditures$35,729 $58,795 $38,193 $10,446 $— $— $143,163 
Total assets as of December 31, 2022$2,465,066 $630,795 $581,574 $315,059 $857,709 $404,454 $5,254,657 
(1)Corporate and other consists of business activities that are not included within the reportable segments and provided for reconciliation purposes.
(2)Excludes depreciation, depletion, and amortization.
(3)Care and maintenance expense represents direct costs and depreciation incurred at Çöpler during the temporary suspension of operations in the third quarter of 2022.
153

SSR Mining Inc.
Notes to Consolidated Financial Statements

Year Ended December 31, 2021
ÇöplerMarigoldSeabeePunaExploration, evaluation 
and development properties
Corporate and other (1)
Total
Revenue$607,887 $426,391 $213,860 $226,061 $— $— $1,474,199 
Cost of sales (2)
$264,889 $219,035 $66,354 $121,096 $— $— $671,374 
Depletion, depreciation and amortization$125,220 $35,410 $45,334 $21,995 $— $— $227,959 
Exploration. evaluation, and reclamation costs$10,868 $2,979 $11,867 $1,764 $13,027 $1,877 $42,382 
Impairment of long-lived and other assets$— $— $— $— $20,275 $— $20,275 
Operating income (loss)$201,302 $169,070 $90,332 $79,043 $(33,302)$(62,070)$444,375 
Capital expenditures$34,699 $55,861 $40,553 $10,458 $— $— $141,571 
Total assets as of December 31, 2021$2,290,367 $566,015 $479,370 $293,470 $923,204 $659,012 $5,211,438 
(1)Corporate and other consists of business activities that are not included within the reportable segments and provided for reconciliation purposes.
(2)Excludes depreciation, depletion, and amortization.

154

SSR Mining Inc.
Notes to Consolidated Financial Statements

Year Ended December 31, 2020
ÇöplerMarigoldSeabeePunaExploration, evaluation 
and development properties
Corporate and other (1)
Total
Revenue$205,535 $409,799 $135,230 $102,525 $— $— $853,089 
Cost of sales (2)
$121,614 $216,358 $40,575 $65,991 $— $— $444,538 
Depletion, depreciation and amortization$33,793 $34,619 $28,341 $12,505 $— $— $109,258 
Exploration, evaluation and reclamation costs$3,560 $3,742 $6,390 $(373)$13,186 $538 $27,043 
Care and maintenance expense (3)
$— $— $13,644 $15,949 $— $— $29,593 
Operating income (loss)$46,546 $154,645 $46,152 $6,937 $(13,186)$(52,819)$188,275 
Capital expenditures$22,883 $55,567 $32,782 $10,962 $— $— $122,194 
Total assets as of December 31, 2020$2,254,320 $601,804 $454,484 $225,033 $1,018,801 $622,902 $5,177,344 
(1)Corporate and other consists of business activities that are not included within the reportable segments and provided for reconciliation purposes.
(2)Excludes depreciation, depletion, and amortization.
(3)Care and maintenance expense consists of operating costs and depreciation incurred while a site is placed into care and maintenance or operating at reduced levels in response to the COVID-19 pandemic.
143

SSR Mining Inc.
Notes to Consolidated Financial Statements

Year Ended December 31, 2020
ÇöplerMarigoldSeabeePunaExploration, evaluation 
and development properties
Corporate and other (1)
Total
Revenue$205,535 $409,799 $135,230 $102,525 $— $— $853,089 
Production costs$121,614 $216,358 $40,575 $65,991 $— $— $444,538 
Depletion, depreciation and amortization$33,793 $34,619 $28,341 $12,505 $— $— $109,258 
Exploration. evaluation, and reclamation costs$3,560 $3,742 $6,390 $(373)$13,186 $538 $27,043 
Care and maintenance expense (1) 
$— $— $13,644 $15,949 $— $— $29,593 
Transaction, integration and SEC conversion expense$— $— $— $— $— $20,813 $20,813 
Impairment of long-lived and other assets$— $— $— $— $— $— $— 
Operating income$46,546 $154,645 $46,152 $6,937 $(13,186)$(52,819)$188,275 
Capital expenditures$22,883 $55,567 $32,782 $10,962 $— $— $122,194 
Total assets as  of December 31, 2020 $2,254,320 $601,804 $454,484 $225,033 $1,018,801 $622,902 $5,177,344 
(1)Care and maintenance expense consists of operating costs and depreciation incurred while a site is placed into care and maintenance or operating at reduced levels in response to the COVID-19 pandemic.
144

SSR Mining Inc.
Notes to Consolidated Financial Statements

Year Ended December 31, 2019 (1)
MarigoldSeabeePunaExploration, evaluation 
and development properties
Corporate and other (1)
Total
Revenue$315,413 $146,059 $145,378 $— $— $606,850 
Production costs$192,032 $46,627 $110,960 $— $— $349,619 
Depletion, depreciation and amortization$34,372 $36,345 $14,927 $— $— $85,644 
Exploration, evaluation and reclamation costs$2,672 $8,763 $2,840 $7,130 $679 $22,084 
Care and maintenance expense (2) 
$— $— $— $— $— $— 
Transaction, integration and SEC conversion expense$— $— $— $— $— $— 
Impairment of long-lived and other assets$— $— $— $— $— $— 
Operating income$85,519 $54,077 $15,457 $(7,130)$(29,528)$118,395 
Capital expenditures$46,390 $34,010 $16,721 $— $— $97,121 
Total assets as of December 31, 2019 $487,958 $482,085 $253,835 $111,227 $356,413 $1,691,518 
(1)The operating data presented in this table present results for the year ended December 31, 2019. As the Company was not entitled to the economic benefits of Çöpler prior to the acquisition, financial data for the periods prior to September 16, 2020 are not provided.
(2)Care and maintenance expense consists of operating costs and depreciation incurred while a site is placed into care and maintenance or operating at reduced levels in response to the COVID-19 pandemic.
Geographic area
The following are non-current assets, excluding GoodwillRestricted cash and Deferred income taxes, by location as of December 31 (in thousands): 
December 31,
2021  2020
Turkey $2,744,707  $2,899,724 
Canada  292,264   306,253 
United States  307,857   271,894 
Argentina  123,834   126,386 
Mexico  48,345   48,619 
Peru  527   527 
Total$3,517,534 $3,653,403 

December 31,
2022 2021
Türkiye $3,064,482  $2,744,707 
Canada  311,937   292,264 
United States  321,423   307,857 
Argentina  127,661   123,834 
Mexico  536   48,345 
Peru  482   527 
Total$3,826,521 $3,517,534 
145155

SSR Mining Inc.
Notes to Consolidated Financial Statements

The following is revenue information by geographic area based on the location of production as offor the years ended December 31, (in thousands): 
Years Ended December 31Years Ended December 31,
2021 202020192022 20212020
Turkey $607,887  $205,535  $— 
Türkiye Türkiye $355,070  $607,887  $205,535 
Canada Canada  213,860  135,230  146,059 Canada  244,692  213,860  135,230 
United States United States  426,391  409,799  315,413 United States  348,817  426,391  409,799 
Argentina Argentina  226,061  102,525  145,378 Argentina  199,454  226,061  102,525 
Total Total $1,474,199  $853,089  $606,850 Total $1,148,033  $1,474,199  $853,089 
5.REVENUE 
The following table represents revenues by product (in thousands): 
Years Ended December 31,Years Ended December 31,
202120202019 202220212020
Gold doré salesGold doré salesGold doré sales
Copler$600,790 $205,535 $— 
ÇöplerÇöpler$352,740 $600,790 $205,535 
MarigoldMarigold426,288 409,746 315,350 Marigold348,692 426,288 409,746 
SeabeeSeabee213,766 135,177 146,016 Seabee244,581 213,766 135,177 
Concentrate salesConcentrate salesConcentrate sales
PunaPuna229,959 105,350 144,839 Puna201,859 229,959 105,350 
Other (1)
Other (1)
Other (1)
Copler7,097 — — 
ÇöplerÇöpler2,330 7,097 — 
MarigoldMarigold103 53 69 Marigold125 103 53 
SeabeeSeabee94 53 49 Seabee111 94 53 
PunaPuna(3,898)(2,825)527 Puna(2,405)(3,898)(2,825)
TotalTotal$1,474,199 $853,089 $606,850 Total$1,148,033 $1,474,199 $853,089 
(1)Other revenue includes: changes in the fair value of concentrate trade receivables due to changes in silver and base metal prices; and silver and copper by-product revenue arising from the production and sale of gold doré.
Revenue by metal
Revenue by metal type for the years ended December 31, 2021, 2020 and 2019 are as follows (in thousands): 
Years Ended December 31,Years Ended December 31,
202120202019202220212020
Gold Gold $1,240,844 $750,458 $461,366 Gold $946,013 $1,240,844 $750,458 
Silver Silver 183,378 92,260 115,640 Silver 153,280 183,378 92,260 
Lead Lead 33,070 8,815 19,541 Lead 37,519 33,070 8,815 
Zinc Zinc 13,511 4,275 9,658 Zinc 11,060 13,511 4,275 
OtherOther3,396 (2,719)645 Other161 3,396 (2,719)
Total Total $1,474,199 $853,089 $606,850 Total $1,148,033 $1,474,199 $853,089 
Çöpler, MarigoldDuring 2022, sales to Central Bank of Türkiye, CIBC, and Seabee produce gold doré.Bank of Montreal accounted for 31%, 28% and 16% of the Company's total revenues, respectively. During 2021, sales to Istanbul Gold RefineryCentral Bank of Türkiye and CIBC accounted for 41% and 30% of the Company's total revenues, respectively. During 2020, sales to CIBC, Istanbul Gold Refinery,Central Bank of Türkiye, and Bank of Montreal accounted for 45%, 24%, and 14%, of the Company's total revenues, respectively. During 2019, sales to CIBC, Bank of Nova Scotia, and Bank of Montreal accounted for 37%, 22%, and 17% of the Company's total revenues, respectively.
146156

SSR Mining Inc.
Notes to Consolidated Financial Statements

Puna sells lead and zinc concentrate with high silver content to smelters and traders located in Asia and Europe. The concentrates are sold under supply contracts updated annually or as needed through spot sales, with processing fees based on the demand for these concentrates in the global marketplace.
Provisional metal sales
For the years ending ended December 31, 2022, 2021 and 2020, changes in the fair value of the Company's embedded derivatives relating to provisional concentrate metal sales was an increase (decrease)of $2.8 million, a decrease of $(1.0) million and a decrease of $(1.5) million respectively, which has been recorded in Revenue.
At December 31, 2021, the2022, the Company had silver sales of 3.90$4.4 million ounces at an average price of $23.49$20.59 per ounces,ounce, zinc sales of 6.33$2.0 million pounds at an average price of $1.46$1.39 per pound, and lead sales of 19.23$19.1 million pounds at an average price of $1.02$0.91 per pound, subject to final pricing per the contractual terms over the next several months.
6.RECLAMATION LIABILITIES 
The Company is subject to various domestic and international laws and regulations governing the protection of the environment. These laws and regulations are continually changing and are generally becoming more restrictive. Estimated future reclamation costs are based principally on current legal and regulatory requirements.
Changes in Reclamation liabilities during the years ended December 31 were as follows (in thousands): 
2021 202020222021
Balance, beginning of year Balance, beginning of year $104,744 $80,838 Balance, beginning of year $125,044 $104,744 
Liabilities assumed on the acquisition of Alacer (1)
— 26,154 
Reclamation expenditures Reclamation expenditures (243)(2,447)Reclamation expenditures (1,221)(243)
Accretion expense Accretion expense 4,821 3,815 Accretion expense 6,035 4,821 
Additions, changes in estimate and otherAdditions, changes in estimate and other15,722 (3,616)Additions, changes in estimate and other34,189 15,722 
Balance, end of year Balance, end of year $125,044 $104,744 Balance, end of year $164,047 $125,044 
Less: current portion Less: current portion (2,384)(2,023)Less: current portion (10,075)(2,384)
Non-current reclamation liabilitiesNon-current reclamation liabilities$122,660 $102,721 Non-current reclamation liabilities$153,972 $122,660 
(1)On September 16, 2020,During the Company acquired Alacer, includingyear ended December 31, 2022, reclamation adjustments related to changes in estimate were primarily comprised of $3.8 million at Çöpler. Please referpler, $3.6 million at Marigold, $12.5 million at Seabee, and $12.9 million at Puna. These adjustments were related to Note 3increases in unit cost rates for further details. The consideration included the assumptionlabor and equipment as well as additional scope of reclamation liabilitiesand closure activities due to disturbance.
During the year ended December 31, 2021, reclamation adjustments related to changes in estimate were primarily comprised of $26.2 million.$4.7 million at Çöpler, $4.8 million at Marigold and $5.6 million at Puna. These adjustments are related to increases in water treatment costs and unit cost rates as well as additional scope of reclamation and closure activities due to disturbance.

147157

SSR Mining Inc.
Notes to Consolidated Financial Statements


7. STOCK-BASED COMPENSATIONEQUITY
The Company has awards outstanding under its 2017, 2020 and 2021 Share Compensation Plans which include stock options, DSUs, RSUs and PSUs up to an aggregate total of 4.5% of the Company’s issued and outstanding common stock. There are 8,137,9418,177,272 shares available for issuance under the Share Compensation Plans.
Stock-based compensation expense
Stock-based compensation expense has been recognized as follows (in thousands):
Years Ended December 31,
202120202019
Production costs$1,105 $2,164 $1,451 
General and administrative expense11,867 8,500 12,814 
Exploration, evaluation and reclamation expense105 169 159 
Transaction and integration expense1,722 5,018 — 
Income tax benefits recognized— — — 
$14,799 $15,851 $14,424 
Years Ended December 31,
202220212020
Cost of sales (1)
$797 $1,105 $2,164 
General and administrative expense5,579 11,867 8,500 
Exploration, evaluation and reclamation expense97 105 169 
Other operating expenses, net— 1,722 5,018 
$6,473 $14,799 $15,851 
(1)    Excludes depreciation, depletion, and amortization.

Stock options
The Company grants stock options to executives and eligible employees. Stock options issued under the Company’s incentive plans vest over three years and are exercisable over a period of time not to exceed the earlier of seven years after the grant date and the latest date permitted under the rules of the regulatory authorities. The exercise price of each option is set at the date of grant and shall not be less than the closing market price of the Company's common stock at the date of grant. New shares from treasury are issued on the exercise of stock options.
The following table summarizes the changes in stock options outstanding during the year ended December 31, 20212022 (in thousands except per share amounts):
Number of OptionsWeighted Average Exercise Price Per ShareWeighted Average Remaining Contractual Term (years)Aggregate Intrinsic ValueNumber of OptionsWeighted Average Exercise Price Per ShareWeighted Average Remaining Contractual Term (years)Aggregate Intrinsic Value
Balance at January 1, 2021 1,405 $13.54  
Balance as of January 1, 2022Balance as of January 1, 2022 261 $16.32  
GrantedGranted —  —   Granted —  —  
ExercisedExercised (818) 10.14  Exercised (180) 13.68  
ForfeitedForfeited (318) 20.12  Forfeited (4) 21.13  
ExpiredExpired (8) 8.57  Expired (4) 21.48  
Balance at December 31, 2021 261 16.324.1$774
Vested and exercisable at December 31, 2021200 15.593.9$677
Balance as of December 31, 2022Balance as of December 31, 2022 73 18.53 4.0$60 
Vested and exercisable at December 31, 2022Vested and exercisable at December 31, 202264 18.08 3.9$60 
148158

SSR Mining Inc.
Notes to Consolidated Financial Statements

There were no stock options granted in 2022 or 2021. The fair value of stock options granted during the yearsyear ended December 31.31, 2020 and 2019 were determined using the Black-Scholes option pricing model. The following table includes the assumptions used and other information related to stock options during the years ended December 31:
202120202019202220212020
Expected dividend yield (%)Expected dividend yield (%) N/A— — Expected dividend yield (%) N/AN/A— 
Risk-free interest rate (%)Risk-free interest rate (%) N/A1.31 1.78 Risk-free interest rate (%) N/AN/A1.31 
Expected life (years)Expected life (years) N/A4.204.20Expected life (years) N/AN/A4.20
Expected volatility (%)Expected volatility (%) N/A45.80 45.80 Expected volatility (%) N/AN/A45.80 
Weighted-average grant-date fair value (per option)Weighted-average grant-date fair value (per option) N/A$17.76 $11.75 Weighted-average grant-date fair value (per option) N/A$N/A$17.76
Intrinsic value of options exercised (in thousands)Intrinsic value of options exercised (in thousands)$4,814 $9,780 $8,382 Intrinsic value of options exercised (in thousands)$840 $4,814 $9,780 
Fair value of options vested (in thousands)Fair value of options vested (in thousands)$1,430 $5,006 $1,828 Fair value of options vested (in thousands)$337 $1,430 $5,006 
As of December 31, 2021,2022, there was $0.1 millionan insignificant amount of unrecognized compensation cost related to unvested stock options expected to be recognized over a weighted average period of approximately 0.90.2 years. During the year ended December 31, 2021,2022, the amount of cash received from stock option exercises was $8.8$2.6 million and the tax benefit from stock options exercised was $1.3$0.2 million.
Deferred Share Unitsshare units
Non-executive directors may elect to receive all or a portion of their annual compensation in the form of DSUs which are linked to the value of the Company's common stock. DSUs are issued on a quarterly basis at the market value of the Company's common stock at the date of grant. DSUs vest immediately and are redeemable in cash. 50% of a director's DSUs will be automatically redeemed on each of the following dates: (i) three months following the date the eligible director ceases to be a director of the Company and (ii) the earlier of fifteen months following, or December 31 of the calendar year following the date the eligible director ceases to be a director of the Company. In connection with the acquisition of Alacer, the Company issued DSU Replacement Units to replace the outstanding DSUs of Alacer. Each DSU Replacement Unit entitles the director to receive a payment in cash for the equivalent value of one common share on the date the director ceases to be a director.
The fair value of the outstanding DSUs and DSU Replacement Units at the end of each reporting period was recognized as a liability and included in Accrued liabilities and other.
During the years ended December 31, 2022, 2021, 2020, and 20192020 total cash paid to settle DSUs and DSU Replacement Units was $3.4 million, $2.7 million, $3.1 million, and $—$3.1 million, respectively. As of December 31, 2022, 2021, 2020, and 2019,2020, the fair value of DSUs and DSU Replacement Units granted and vested was $1.2 million, $1.4 million, $10.7 million and $1.9$10.7 million, respectively.
The following table summarizes the changes in DSUs and DSU Replacement Units outstanding during the year ended December 31, 20212022 (in thousands except per share amounts):
Number of SharesWeighted Grant Date Fair Value Per ShareAggregate Intrinsic ValueNumber of SharesWeighted Grant Date Fair Value Per ShareAggregate Intrinsic Value
Balance at January 1, 2021 748 $21.76 
Balance as of January 1, 2022Balance as of January 1, 2022 682 $23.95  
GrantedGranted 89  15.75 Granted 69  17.31  
Exercised/ReleasedExercised/Released(165)9.07Exercised/Released(229)15.74 
Canceled/ForfeitedCanceled/Forfeited —  —  Canceled/Forfeited —  —  
ReinvestedReinvested 10  14.51 Reinvested 10  15.13  
Balance at December 31, 2021 682 23.95$12,072 
Balance as of December 31, 2022Balance as of December 31, 2022 532 26.46 $8,331 
149159

SSR Mining Inc.
Notes to Consolidated Financial Statements


Restricted Share Unitsshare units
The Company grants RSUs to executives and eligible employees which vest over a period of three years. In connection with the acquisition of Alacer, the Company issued RSU Replacement Units, with terms similar to RSUs, to replace the outstanding unexcercised RSUs of Alacer which vest over a period of three years.
As of December 31, 2020, RSUs and RSU Replacement Units vesting in 2022 and 2023 were classified as liabilities and included in Accrued liabilities and other and Other non-current liabilities. RSU Replacement Units vesting in 2021 were classified as equity and presented in Contingently Redeemable Shares due to certain provisions included in the 2017 and 2020 Share Compensation plans that specifies the termination of an employee within 12 months after a change of control event would result in all RSU Replacement Units issued under the plans to immediately vest and become redeemable in either cash or shares at the option of the award holder.
On February 10, 2021, the Company’s Board of Directors indicated its intention to settle all RSUs and RSU Replacement Units in common shares when vested. As of the years ended December 31, 2022 and 2021, RSUs and RSU Replacement Units are classified as equity and presented in Common shares.
During the years ended December 31, 2022, 2021 2020 and 2019,2020, total cash paid to settle RSUs and RSU Replacement Units was $— million, $4.6$— million, and $0.9$4.6 million, respectively. The fair value of RSUs and RSU Replacement Units granted was $7.3 million, $7.2 million, $25.4 million and $2.7$25.4 million, for the years ended December 31, 2022, 2021 2020 and 2019,2020, respectively. The fair value of RSUs and RSU Replacement Units vested was $14.0 million, $3.3 million, $14.1 million, and $1.6$14.1 million, during the years ended December 31, 2022, 2021, 2020, and 2019,2020, respectively. As of December 31, 2021,2022, there was $2.9$5.3 million of total unrecognized compensation cost related to unvested RSUs and RSU Replacement Units expected to be recognized over approximately 2.92.7 years.
The following table summarizes the changes in RSUs and RSU Replacement Units outstanding during the year ended December 31, 20212022 (in thousands except per share amounts):
Number of SharesWeighted Average Grant Date Fair ValueAggregate intrinsic valueNumber of SharesWeighted Average Grant Date Fair ValueAggregate intrinsic value
Balance at January 1, 2021 749 $23.42 
Balance as of January 1, 2022Balance as of January 1, 2022 869 $23.10  
GrantedGranted 388  18.63 Granted 412  17.83  
Exercised/ReleasedExercised/Released (197) 16.81 Exercised/Released (650) 21.48  
Canceled/ForfeitedCanceled/Forfeited (82) 19.82 Canceled/Forfeited (62) 17.63  
ReinvestedReinvested 11  21.34 Reinvested 10  18.18  
Balance at December 31, 2021

869 23.10 $15,370 
Balance as of December 31, 2022Balance as of December 31, 2022

579 21.49 $9,071 

150160

SSR Mining Inc.
Notes to Consolidated Financial Statements

Performance Share Unitsshare units
PSUs are granted to senior executives and vest after a performance period of three years. The vesting of these awards is based on the Company's actual production and return on investment compared to budget and total shareholder return in comparison to its peer group and awardsgroup. Awards vested range from 0% to 200% of initial PSUs granted. In connection with the acquisition of Alacer, the Company issued PSU Replacement Units to replace the outstanding unexcercised PSUs of Alacer. Each PSU Replacement Unit entitles the participant, at the end of the applicable performance period, to receive a payment in cash for the equivalent value of common shares earned, provided: (i) the participant continues to be employed or engaged by the Company or any of its affiliates; and (ii) all other terms and conditions of the grant have been satisfied, including the performance metrics associated with each PSU Replacement Unit. The vesting of these awards is based on actual production and costs against budget, and the performance of the Company's share price relative to its peer group. Awards vested range from 0% to 200% of initial PSU Replacement Units granted.
As of December 31, 2020, PSUs vesting in 2021 were classified as equity and presented in Contingently Redeemable Shares due to certain provisions included in the 2017 and 2020 Share Compensation Plans. PSUs and PSU Replacement Units vesting in 2022 and 2023 were classified as liabilities and included in Other non-current liabilities.
As of December 31, 2021, PSUs and PSU Replacement Units were classified as liabilities. On February 10, 2021, the Company's Board of Directors indicated its intention to settle all PSUs and PSU Replacement Units issued under the Company's plans in cash when vested. As of the years ended December 31, 2022 and 2021, PSUs and PSU Replacement Units were classified as liabilities and included in Accrued liabilities and other.
During the years ended December 31, 2022, 2021 2020 and 2019,2020, total cash paid to settle PSUs and PSU Replacement Units was $10.5 million, $14.3 million, $12.0 million, and $4.1$12.0 million, respectively. The fair value of PSUs and PSU Replacement Units granted was $5.5 million, $11.5 million, $24.8 million and $2.4$24.8 million for the years ended December 31, 2022, 2021, 2020, and 2019,2020, respectively. The fair value of PSUs and PSU Replacement Units vested was $9.4 million, $17.4 million, $4.4 million, and $2.0$4.4 million, during the years ended December 31, 2022, 2021, 2020, and 2019,2020, respectively. As of December 31, 2021,2022, there was $4.9$4.7 million of total unrecognized compensation cost related to unvested PSUs and PSU Replacement Units expected to be recognized over approximately 2.32.2 years.
The following table summarizes the changes in PSUs and PSU Replacement Units outstanding during the year ended December 31, 2021:2022:
Number of SharesWeighted Average Grant Date Fair ValueAggregate Intrinsic ValueNumber of SharesWeighted Average Grant Date Fair ValueAggregate Intrinsic Value
Balance at January 1, 2021 1,114 $24.69 
Balance as of January 1, 2022Balance as of January 1, 2022 800 $25.34  
GrantedGranted 560  20.52 Granted 305  18.06  
Exercised/ReleasedExercised/Released (813) 21.34 Exercised/Released (432) 21.83  
Canceled/ForfeitedCanceled/Forfeited (71) 22.35 Canceled/Forfeited (36) 19.07  
ReinvestedReinvested 10  21.70  Reinvested 12  18.98  
Balance at December 31, 2021

800 25.34 $14,169 
Balance as of December 31, 2022Balance as of December 31, 2022

649 24.49 $10,182 
Repurchase of common shares
On June 20, 2022, the Company received approval of its Normal Course Issuer Bid (the "NCIB") to purchase for cancellation up to 10.6 million of its common shares through the facilities of the TSX, Nasdaq or other Canadian and U.S. marketplaces over a twelve month period beginning June 20, 2022 and ending June 19, 2023.
During the year ended December 31, 2022, the Company purchased 6,053,126 of its outstanding common shares pursuant to the NCIB at an average share price of $16.53 per share for total consideration of $100.0 million. All shares were cancelled upon purchase. The difference of $11.2 million between the total amount paid and the amount deducted from common shares of $88.8 million was recorded as a direct charge to retained earnings. The amount deducted from common shares was determined based on the average paid in capital per common share outstanding prior to the repurchase date.
151161

SSR Mining Inc.
Notes to Consolidated Financial Statements

During the year ended December 31, 2021, the Company purchased 8,800,700 of its outstanding common shares pursuant to the NCIB at an average share price of $16.82 per share for total consideration of $148.1 million. All shares were cancelled upon purchase. The difference of $19.0 million between the total amount paid and the amount deducted from common shares of $129.1 million was recorded as a direct charge to retained earnings. The amount deducted from common shares was determined based on the average paid in capital per common share outstanding prior to the repurchase date.
8.INCOME AND MINING TAXES
The following tables represent the major components of Income before taxes and Income and mining tax benefit (expense) recognized in the Consolidated Statements of Operations (in thousands):
Years ended December 31,Years Ended December 31,
202120202019202220212020
Income before income and mining taxes components:Income before income and mining taxes components:     Income before income and mining taxes components:     
United StatesUnited States$138,230 $119,654 $61,198 United States$75,762 $138,230 $119,654 
CanadaCanada26,752 26,207 71,537 Canada(21,831)26,752 26,207 
Turkey 186,971  41,385  — 
TürkiyeTürkiye 108,373  186,971  41,385 
Other ForeignOther Foreign62,805 14,545 3,922 Other Foreign78,531 62,805 14,545 
Total income before incomes taxesTotal income before incomes taxes$414,758 $201,791 $136,657 Total income before incomes taxes$240,835 $414,758 $201,791 
Years Ended December 31,Years Ended December 31,
202120202019202220212020
Current income tax provision:Current income tax provision:Current income tax provision:
United StatesUnited States$15,603 $13,945 $6,003 United States$15,149 $15,603 $13,945 
CanadaCanada27,672 5,720 18,367 Canada33,408 27,672 5,720 
Turkey49,851 1,805 — 
TürkiyeTürkiye23,515 49,851 1,805 
Other ForeignOther Foreign23,328 1,074 426 Other Foreign25,928 23,328 1,074 
Total current income tax provisionTotal current income tax provision116,454 22,544 24,796 Total current income tax provision98,000 116,454 22,544 
Deferred income tax provision (benefit):Deferred income tax provision (benefit):Deferred income tax provision (benefit):
United StatesUnited States13,288 8,265 7,145 United States7,092 13,288 8,265 
CanadaCanada(230)765 520 Canada(4,183)(230)765 
Turkey(131,456)19,205 — 
TürkiyeTürkiye(57,227)(131,456)19,205 
Other foreignOther foreign(12,172)(7,576)2,978 Other foreign(13,614)(12,172)(7,576)
Total deferred income tax provision (benefit)Total deferred income tax provision (benefit)(130,570)20,659 10,643 Total deferred income tax provision (benefit)(67,932)(130,570)20,659 
Total income tax provision (benefit)Total income tax provision (benefit)$(14,116)$43,203 $35,439 Total income tax provision (benefit)$30,068 $(14,116)$43,203 

152162

SSR Mining Inc.
Notes to Consolidated Financial Statements

Income and mining tax expense differs from the amount that would be computed by applying the Canadian statutory rate of 27%, 27%, and 27% for each of the years ended December 31, 2022, 2021 2020 and 2019,2020, respectively, to income before income and mining taxes. The reasons for the differences are as follows (in thousands):
Years Ended December 31,Years Ended December 31,
202120202019202220212020
Income before income and mining taxesIncome before income and mining taxes$414,758$201,791$136,657Income before income and mining taxes$240,835$414,758$201,791
Statutory tax rateStatutory tax rate27 %27 %27 %Statutory tax rate27 %27 %27 %
Expected income and mining tax expenseExpected income and mining tax expense111,98554,48436,897Expected income and mining tax expense65,025111,98554,484
Increase (decrease) attributable to:Increase (decrease) attributable to:Increase (decrease) attributable to:
Non-taxable itemsNon-taxable items(4,379)(22,236)(7,518)Non-taxable items(11,358)(4,379)(22,236)
Foreign exchange and inflationForeign exchange and inflation(124,946)(676)1,650Foreign exchange and inflation(20,531)(124,946)(676)
Differences in foreign and future tax ratesDifferences in foreign and future tax rates738(10,641)(8,699)Differences in foreign and future tax rates(13,248)738(10,641)
Investment incentive tax creditsInvestment incentive tax credits(14,082)1,983Investment incentive tax credits(10,126)(14,082)1,983
Mining taxes and overseas withholding taxMining taxes and overseas withholding tax17,52817,00610,207Mining taxes and overseas withholding tax38,25117,52817,006
Expired losses1,4551,129738
Impact of gain on acquisition of KartaltepeImpact of gain on acquisition of Kartaltepe(18,826)
Change in estimates in respect of prior yearsChange in estimates in respect of prior years(2,046)(1,616)(2,316)Change in estimates in respect of prior years(3,630)(2,046)(1,616)
Changes in recognition of deferred tax assetsChanges in recognition of deferred tax assets1,0863,5504,074Changes in recognition of deferred tax assets2,6021,0863,550
OtherOther(1,455)220406Other1,9091,349
Total income and mining tax expenseTotal income and mining tax expense$(14,116)$43,203$35,439Total income and mining tax expense$30,068$(14,116)$43,203

153163

SSR Mining Inc.
Notes to Consolidated Financial Statements

The significant components of Deferred income tax assets and Deferred income tax liabilities were (in thousands):
December 31,December 31,
2021202020222021
Deferred income tax assetsDeferred income tax assetsDeferred income tax assets
Deductible temporary differences relating to:Deductible temporary differences relating to:  Deductible temporary differences relating to:  
Marketable securitiesMarketable securities$634 $— Marketable securities$2,397 $634 
Inventories— 3,245
Reclamation liabilitiesReclamation liabilities 27,608 20,117Reclamation liabilities 31,080  27,608 
Lease liabilitiesLease liabilities 23,895 24,307Lease liabilities 28,730  23,895 
Deductibility of other taxesDeductibility of other taxes 9,299 10,770Deductibility of other taxes 10,224  9,299 
Stock-based compensation
 7,247 11,410
Stock-based compensationStock-based compensation 2,931  7,247 
Other itemsOther items 16,595 7,873Other items 13,286  16,595 
 85,278 77,722  88,648  85,278 
Investment incentive tax credits (1)
Investment incentive tax credits (1)
 46,354  168,447 
Investment incentive tax credits (1)
 18,772  46,354 
Tax loss carryforwardsTax loss carryforwards 25,395  22,597 Tax loss carryforwards 43,384  25,395 
Less: Valuation allowance Less: Valuation allowance  (38,496) (37,410)Less: Valuation allowance  (61,101) (38,496)
Total deferred income tax assetsTotal deferred income tax assets$118,531 $231,356 Total deferred income tax assets$89,703 $118,531 
    
Deferred income tax liabilitiesDeferred income tax liabilities  Deferred income tax liabilities 
Taxable temporary differences relating to:Taxable temporary differences relating to:  Taxable temporary differences relating to: 
Marketable securitiesMarketable securities$(270)$(2,041)Marketable securities$— $(270)
InventoriesInventories (17,768) (47,484)Inventories (49,004) (17,768)
Mineral properties, plant and equipmentMineral properties, plant and equipment (365,793) (566,922)Mineral properties, plant and equipment (332,886) (365,793)
Convertible notesConvertible notes (359) (414)Convertible notes (95) (359)
Mineral taxMineral tax (38,452) (39,575)Mineral tax (41,803) (38,452)
Foreign withholding taxForeign withholding tax (17,080) (32,875)Foreign withholding tax —  (17,080)
Other itemsOther items (9,096) — Other items (6,401) (9,096)
Total deferred income tax liabilitiesTotal deferred income tax liabilities$(448,818)$(689,311)Total deferred income tax liabilities$(430,189)$(448,818)
      
Balance sheet presentationBalance sheet presentation  Balance sheet presentation   
Deferred income tax assetsDeferred income tax assets$8,501 $15,072 Deferred income tax assets$1,915 $8,501 
Deferred income tax liabilitiesDeferred income tax liabilities (338,788) (473,027)Deferred income tax liabilities (342,401) (338,788)
Deferred income tax liabilities, netDeferred income tax liabilities, net$(330,287)$(457,955)Deferred income tax liabilities, net$(340,486)$(330,287)
(1)The Company receives investment incentive tax credits for qualifying capital expenditures at Çöpler. The application of these tax credits, which are denominated in Turkish Lira, reduced income and mining tax expense and cash tax payments for the year ended December 31, 20212022 and are expected to offset future cash tax payments. Reviews of eligible expenditures for tax credits by local tax authorities occur periodically and can result in adjustments to the recognition of investment incentive tax credits.
As of December 31, 2021 and 2020, an aggregate2022, the Company had deferred tax liability of $10.7 million and $14.1 million, respectively, for temporary differences of $35.6 million and $47.0 million, respectively,liabilities related to investments in subsidiaries wasthat were not recognized as the Company controls the dividend policy of its subsidiaries (i.e., the Company controls the timing of reversal of the related taxable temporary differences and is satisfied that they will not reverse in the foreseeable future). It is not practicable to determine the amount of the unrecognized deferred tax liabilities at this time.
154164

SSR Mining Inc.
Notes to Consolidated Financial Statements

Valuation of deferred tax assets
The Company recognizes tax benefits on losses or other deductible amounts generated in countries where it determines that it is more likely than not that taxable profits will be available to be utilized against those temporary differences. The Company's deferred tax valuation allowance related primarily to tax losses in foreign jurisdictions which do not meet the “more-likely-than-not” standard under current accounting guidance due to insufficient positive taxable income to utilize available tax losses.
When there is a change in judgment concerning the recovery of deferred tax assets in future periods, a valuation allowance is recorded into earnings during the quarter in which the change in judgment occurs. During 2021,The Company has not made any judgement changes with respect to its already established positions. The valuation allowance increased in 2022 by $22.6 million mainly related to an increase in net operating and capital loss carryforwards in entities where the Company made adjustmentsdoes not expect to its deferred tax assets and corresponding valuation allowances. The net change to the valuation allowance consisted ofrealize a$1.1 million increase related to reclamation liabilities with no future tax benefit and the generation of losses.benefit.
Tax loss carryforwards
As of December 31, 2021,2022, the Company had the following estimated tax operating and capital losses (in thousands) available to reduce future taxable income, including both losses for which deferred tax assets are utilized to offset applicable deferred tax liabilities and losses for which deferred tax assets are not recognized as listed in the table above.have a valuation allowance against. Losses expire at various dates and amounts between 20222023 and 2041. There were no operating losses generated in Turkey.2042.
December 31, 2021Expiration Year
Mexico$34,695 2022 - 2031
Canada$42,632 2040 - 2041
U.S.A.$7,797 Indefinite
Argentina$5,146 2026
December 31, 2022Expiration Year
Mexico$511 2023-2032
Canada$179,935 2040-2042
U.S.A.$7,382 2023-Indefinite
Argentina$5,692 2026-2027
Türkiye$7,621 2026-2027
Peru$263 Indefinite
Unrecognized tax benefits
The Company records uncertain tax positions on the basis onof a two-step process in which (1) the Company determines whether it is more likely than not that the tax positions will be sustained on the basis of the technical merits of the position and (2) for those tax positions meeting the “more-likely-than-not” recognition threshold, the Company recognizes the largest amount of tax benefit that is more than 50% likely to be realized upon ultimate settlement with the related tax authority.
The Company determined that no liability forA reconciliation of the beginning and ending amount of gross unrecognized tax benefits, for uncertaininclusive of interest and penalties, is as follows during the years ended December 31 (in thousands):
20222021
Balance as of January 1$— $— 
Increase associated with tax positions taken during the current year— — 
Increase (decrease) associated with tax positions taken during a prior year (1)
9,200 — 
Settlements(626)— 
Decrease associated with lapses in statutes of limitation— — 
Balance as of December 31$8,574 $— 

(1) Of the gross unrecognized tax positions was requiredbenefits, $8.6 million were recognized as current liabilities in Condensed Consolidated Balance Sheet as of December, 31, 2021. In addition,2022.
165

SSR Mining Inc.
Notes to Consolidated Financial Statements

As of December 31, 2022 and December 31, 2021, $8.6 million and $0, respectively, represent the amount of unrecognized tax benefits, inclusive of interest and penalties that, if recognized, would impact the Company’s effective income tax rate.
As of December 31, 2022, the total amount of accrued income-tax-related interest and penalties included in the Condensed Consolidated Balance Sheets was $5.2 million. The Company does not believe that it has any tax positions for whichbelieves it is reasonably possible that it will be required to record a significant liability for previously recognized tax benefits within the next twelve months. Iftotal amount of the Company were to record an unrecognized tax benefit of $8.6 million will be settled in the next 12 months. During the year ended December 31, 2022, the Company will recognize applicablerecorded $6.6 million of interest and penalties related to income tax matters in incomeIncome and mining tax expense.benefit (expense) in the Condensed Consolidated Statements of Operations. No amounts were accrued during the year ended December 31, 2021.
The Company files income tax returns in the U.S. federal jurisdiction, Canada, Turkey,Türkiye, Argentina and various state, provincial and foreign jurisdictions. With few exceptions, the Company is no longer subject to U.S. Federal, state and local, and non-US income tax examinations for years before 2016.2017. The Company is currently litigating with Turkey for the years 2016 through 2020 relatedrespect to withholding tax on distributions from its Turkish operation.





155
166

SSR Mining Inc.
Notes to Consolidated Financial Statements


9.OTHER OPERATING EXPENSES, NET

The following table includes the components of Other operating expense, net:
Years Ended December 31,
202220212020
Alacer transaction and integration costs$— $8,595 $20,813 
Pitarrilla transaction costs1,561 — — 
SEC Conversion costs1,255 2,645 — 
Gain on sale of Pitarrilla and other(746)— — 
Total$2,070 $11,240 $20,813 
10.OTHER INCOME (EXPENSE)
The following table includes the components of Other income (expense):
Years Ended December 31,Years Ended December 31,
202120202019202220212020
Interest incomeInterest income$1,939 $6,545 $11,882 Interest income$16,311 $1,939 $6,545 
Gain (loss) on marketable securities(10,741) 21,368  34,630 
Change in fair value of marketable securitiesChange in fair value of marketable securities602  (10,741) 21,368 
Gain (loss) on derivative instrumentsGain (loss) on derivative instruments(12) 383  1,486 Gain (loss) on derivative instruments—  (12) 383 
Gain (loss) on sale of mineral properties, plant, and equipmentGain (loss) on sale of mineral properties, plant, and equipment412  (2,804) (863)Gain (loss) on sale of mineral properties, plant, and equipment(2,130) 412  (2,804)
OtherOther(5,747) 5,632  (7,939)Other5,508  (5,747) 5,632 
TotalTotal$(14,149)$31,124 $39,196 Total$20,291 $(14,149)$31,124 
10.11.INCOME (LOSS) PER SHARE
The Company calculates basic net income per share using, as the denominator, the weighted average number of common shares outstanding during the period. Diluted net income per share uses, as its denominator, the weighted average number of common shares outstanding during the period plus the effect of potential dilutive shares during the period.
Potential dilutive common shares include stock options, PSUs and PSU ReplacementRestricted Share Units RSUs and(“RSUs”), RSU Replacement Units, and convertible notes for periods in which the Company has reported net income.income (loss).
The calculations of basic and diluted net income per share attributable to stockholders of SSR Mining shareholders for the years ended December 31 were based on the following (in thousands):
Years Ended December 31,
202120202019
Net Income$425,922 $157,162 $101,218 
Net (income) loss attributable to non-controlling interest(57,846) (5,627) 1,558 
Net income attributable to stockholders of SSR Mining368,076  151,535  102,776 
Interest saving on convertible notes, net of tax4,889  4,883  3,392 
Net income used in the calculation of diluted net income per share$372,965 $156,418 $106,168 
      
Weighted average number of common shares issued215,993  151,144  121,769 
Adjustments for dilutive instruments:     
Stock options38  453  1,224 
PSUs and PSU Replacement Units—  —  
RSUs and RSU Replacement Units58   — 
Convertible notes12,152  12,101  12,445 
Diluted weighted average number of shares outstanding228,241  163,699  135,443 
      
Net income per share attributable to common stockholders     
Basic$1.70 $1.00 $0.84 
Diluted$1.63 $0.96 $0.78 
167

SSR Mining Inc.
Notes to Consolidated Financial Statements

Years Ended December 31,
202220212020
Net income$210,428 $425,922 $157,162 
Net income attributable to non-controlling interest(16,288) (57,846) (5,627)
Net income attributable to SSR Mining shareholders194,140  368,076  151,535 
Interest saving on convertible notes, net of tax4,910  4,889  4,883 
Net income used in the calculation of diluted net income per share$199,050 $372,965 $156,418 
      
Weighted average number of common shares issued209,883  215,993  151,144 
Adjustments for dilutive instruments:     
Stock options 38  453 
Restricted share units39  58  
Convertible notes12,554  12,152  12,101 
Diluted weighted average number of shares outstanding222,481  228,241  163,699 
      
Net income per share attributable to SSR Mining shareholders     
Basic$0.92 $1.70 $1.00 
Diluted$0.89 $1.63 $0.96 

156168

SSR Mining Inc.
Notes to Consolidated Financial Statements

11.12.FAIR VALUE MEASUREMENTS AND FINANCIAL INSTRUMENTS
Fair value accounting establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy are described below:
Level 1 - Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities;
Level 2 - Quoted prices in markets that are not active, quoted prices for similar assets or liabilities in active markets, quoted prices or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability and model-based valuation techniques (e.g. the Black-Scholes model) for which all significant inputs are observable in the market or can be corroborated by observable market data for substantially the full term of the assets or liabilities; and
Level 3 - Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by little or no market activity).
As required by accounting guidance, assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. The following tables set forth the Company’s assets and liabilities measured at fair value on a recurring (at least annually) and nonrecurring basis by level within the fair value hierarchy (in thousands).
Fair value at December 31, 2021 Fair value at December 31, 2022
Level 1 (1)
Level 2 (2) 
Level 3 (3) 
Total 
Level 1 (1)
Level 2 (2) 
Level 3 (3) 
Total 
Assets:Assets: Assets: 
CashCash$1,017,562 $— $— $1,017,562 Cash$655,453 $— $— $655,453 
Restricted cashRestricted cash35,303 — — 35,303 Restricted cash33,653 — — 33,653 
Marketable securitiesMarketable securities46,923 — — 46,923 Marketable securities44,841 — — 44,841 
Trade receivablesTrade receivables— 72,634— 72,634 Trade receivables— 117,675 — 117,675 
Derivative asset — 987— 987
Deferred considerationDeferred consideration — — 22,610 22,610 Deferred consideration — — 24,369 24,369 
$1,099,788 $73,621 $22,610 $1,196,019  $733,947 $117,675 $24,369 $875,991 

Fair value at December 31, 2020 Fair value at December 31, 2021
Level 1 (1)
Level 2 (2) 
Level 3  (3) 
Total 
Level 1 (1)
Level 2 (2) 
Level 3  (3) 
Total 
Assets:Assets: Assets: 
CashCash$860,633 $— $— $860,633 Cash$1,017,562 $— $— $1,017,562 
Restricted cashRestricted cash35,288 — — 35,288 Restricted cash35,303 — — 35,303 
Marketable securitiesMarketable securities26,748 — — 26,748 Marketable securities46,923 — — 46,923 
Trade receivablesTrade receivables— 36,856 — 36,856 Trade receivables— 72,634 — 72,634 
Derivative assetDerivative asset — 1,243 — 1,243 Derivative asset — 987 — 987 
Deferred considerationDeferred consideration — — 21,46021,460Deferred consideration — — 22,610 22,610 
$922,669 $38,099 $21,460 $982,228 $1,099,788 $73,621 $22,610 $1,196,019 
Liabilities:
Derivative liabilities$— $(3,881)$— $(3,881)
$— $(3,881)$— $(3,881)
1)Marketable securities of publicly quoted companies, consisting of investments, are valued using a market approach based upon unadjusted quoted prices in an active market obtained from securities exchanges.
2)At times, the Company manages a portion of its exposure to fluctuation in diesel prices and foreign currency exchange rates through hedges; however, as of December 31, 2022 the Company does not have any outstanding hedge positions. In periods when the Company has open hedge positions, the derivative asset and liabilities are valued using pricing models with inputs derived from observable market data,
157169

SSR Mining Inc.
Notes to Consolidated Financial Statements

2)The Company manages its exposure to fluctuation in diesel prices and foreign currency exchange rates through hedges. The Company’s derivative asset and liabilities are valued using pricing models with inputs derived from observable market data, including quoted prices in active markets. The Company’s provisional metal sales contracts, included in Trade and other receivables in the Consolidated Balance Sheets, are valued using inputs derived from observable market data, including quoted commodity forward prices. The inputs do not involve significant management judgment. Such instruments are classified within Level 2 of the fair value hierarchy.
3)Certain items of deferred consideration related to the sale of of exploration and evaluation assets and the EMX divestiture are included in Level 3, as certain assumptions used in the calculation of the fair value are not based on observable market data. Deferred consideration is included in Other non-current assets in the Consolidated Balance Sheets.
The following table reconciles the beginning and ending balances for financial instruments that are recognized at fair value using significant unobservable inputs (Level 3) in the consolidated financial statements (in thousands):
20212020 20222021
Beginning Balance as of January 1Beginning Balance as of January 1$21,460 $13,984 Beginning Balance as of January 1$22,610 $21,460 
RevaluationsRevaluations 930  (1,059)Revaluations 1,759  930 
Receipt of deferred consideration 20,911  8,535 
Acquisition of deferred considerationAcquisition of deferred consideration —  20,911 
Disposition of deferred considerationDisposition of deferred consideration (20,691) — Disposition of deferred consideration —  (20,691)
Ending balance as of December 31Ending balance as of December 31$22,610 $21,460 Ending balance as of December 31$24,369 $22,610 
The fair value of the deferred consideration was estimated using the discounted cash flow method. The discount rate used to calculate the Company's deferred consideration assets was between 11.0% and 12.5% at December 31, 2022 and between 8.0% and 12.5% at December 31, 2021 and between 8.0% and 20.0% at December 31, 2020.2021. Increases to the discount rate will cause a decrease in the the estimated value of the deferred consideration. The timing of achievement of development milestones were considered in determining the fair value of the deferred consideration.
Fair values of financial assets and liabilities not already measured at fair value 
The fair value of the 2019 Notes and Term Loan as compared to the carrying amounts were as follows: 
December 31,December 31,
2021 202020222021
Level Carrying amount Fair valueCarrying amount  Fair value Level Carrying amount Fair valueCarrying amount  Fair value 
2019 Notes (1)
2019 Notes (1)
1$225,534 $286,207 $224,586 $317,538 
2019 Notes (1)
1$226,510 $257,025 $225,534 $286,207 
Term Loan (2)
Term Loan (2)
2140,000 144,871 210,000 221,943 
Term Loan (2)
270,000 71,419 140,000 144,871 
Total borrowings Total borrowings  $365,534 $431,078 $434,586 $539,481 Total borrowings  $296,510 $328,444 $365,534 $431,078 
(1)The fair value disclosed for the Company's 2019 Notes is included in Level 1 as the basis of valuation uses a quoted price in an active market.
(2)The fair value disclosed for the Company's Term Loan is included in Level 2 as the fair value is determined by an independent third-party pricing source.
158170

SSR Mining Inc.
Notes to Consolidated Financial Statements


12.13.TRADE AND OTHER RECEIVABLES
Trade and other receivables was composed of the following (in thousands):
December 31,December 31,
2021202020222021
Trade receivablesTrade receivables$86,124 $38,456 Trade receivables$62,563 $86,124 
Value added tax receivablesValue added tax receivables 20,723  24,189 Value added tax receivables 30,893  20,723 
Income tax receivableIncome tax receivable 9,374  14,130 Income tax receivable 14,316  9,374 
Other taxes receivableOther taxes receivable 1,866  4,249 Other taxes receivable 6,750  1,866 
OtherOther 3,269  2,194 Other 3,153  3,269 
TotalTotal$121,356 $83,218 Total$117,675 $121,356 
No provision for credit loss was recognized as of December 31, 20212022 or 2020.2021. All trade receivables are expected to be settled within twelve months.     
13.14.INVENTORIES
The components of Inventories were as follows (in thousands):
December 31,December 31,
2021202020222021
Materials and suppliesMaterials and supplies$79,372 $85,766 Materials and supplies$103,380 $79,372 
Stockpiled oreStockpiled ore 27,589 25,582 Stockpiled ore 54,504 27,589 
Leach pad inventoryLeach pad inventory243,627 282,793 Leach pad inventory300,715 243,627 
Work-in-processWork-in-process 4,951 4,368 Work-in-process 7,549 4,951 
Finished goodsFinished goods33,877 38,525 Finished goods35,459 33,877 
Total current inventoriesTotal current inventories$389,416 $437,034 Total current inventories$501,607 $389,416 
    
Stockpiled oreStockpiled ore 220,324 133,500 Stockpiled ore 217,154 220,324 
Materials and suppliesMaterials and supplies1,293 1,700 Materials and supplies1,845 1,293 
Total non-current inventories Total non-current inventories $221,617 $135,200 Total non-current inventories $218,999 $221,617 
As of December 31, 20212022 and 2020,2021, the Company has recognized a reserve of $8.1$11.8 million and $7.2$8.1 million for obsolete materials and supplies inventory, respectively.
No write-downs of stockpiled ore inventories were recognized for the years ended December 31, 2022 and 2021. During the year ended December 31, 2021, 2020, and 2019, the Company recognized write-downs of stockpiled ore inventories of $— million, $12.1 million and $11.8 million respectively, classified as components of Production CostsCost of sales and Depreciation, depletion and amortization.
159171

SSR Mining Inc.
Notes to Consolidated Financial Statements


14.15.MINERAL PROPERTIES, PLANT AND EQUIPMENT, NET
The components of Mineral properties, plant and equipment, net were as follows (in thousands):
December 31,December 31,
2021202020222021
Plant and equipment (1)
Plant and equipment (1)
$1,762,833 $1,640,705 
Plant and equipment (1)
$1,793,914 $1,762,833 
Construction in processConstruction in process 36,841  40,290 Construction in process 58,704  36,841 
Mineral properties subject to depletionMineral properties subject to depletion

1,331,615 1,282,208 Mineral properties subject to depletion

1,452,850 1,331,615 
Mineral properties not yet subject to depletionMineral properties not yet subject to depletion 141,629  222,938 Mineral properties not yet subject to depletion 848,281  141,629 
Exploration and evaluation assetsExploration and evaluation assets

927,176 930,606 Exploration and evaluation assets

515,070 927,176 
Total mineral properties, plant, and equipmentTotal mineral properties, plant, and equipment 4,200,094  4,116,747 Total mineral properties, plant, and equipment 4,668,819  4,200,094 
Accumulated depreciation, plant and equipmentAccumulated depreciation, plant and equipment

(529,635)(423,326)Accumulated depreciation, plant and equipment

(621,323)(529,635)
Accumulated depreciation, mineral propertiesAccumulated depreciation, mineral properties(420,695)(223,682)Accumulated depreciation, mineral properties(498,050)(420,695)
Mineral properties, plant, and equipment, netMineral properties, plant, and equipment, net$3,249,764 $3,469,739 Mineral properties, plant, and equipment, net$3,549,446 $3,249,764 
(1)As of December 31, 20212022 and 2020,2021, plant and equipment includes finance lease right-of-use assets with a carrying amount of $114.9$101.7 million and $112.8 million,$114.9, respectively.
15.16.GOODWILL
The excess of the fair value of consideration paid over the fair value of the identifiable net assets acquired is recognized as goodwill and allocated to the reporting units. The Company has goodwill which arose from the acquisition of Seabee in 2016.
Balance of Goodwill recorded at Seabee (in thousands):
December 31,
20212020
Goodwill$49,786$49,786
December 31,
20222021
Goodwill$49,786$49,786

16.17.ACCRUED LIABILITIES AND OTHER
Accrued liabilities and other are comprised of the following items (in thousands):
December 31,December 31,
2021 2020 2022 2021
Accrued liabilitiesAccrued liabilities$51,544  $44,503 Accrued liabilities$68,254  $51,544 
Royalties payableRoyalties payable 32,383  36,019 Royalties payable 16,012  32,383 
Stock-based compensation liabilitiesStock-based compensation liabilities 22,652  30,050 Stock-based compensation liabilities 10,493  22,652 
Derivative liabilities —  3,764 
Income taxes payableIncome taxes payable 52,206  9,194 Income taxes payable 16,374  52,206 
Lease liabilitiesLease liabilities 2,238  1,954 Lease liabilities 1,976  2,238 
Reclamation liabilitiesReclamation liabilities10,075 2,384 
OtherOther 4,085  6,297 Other 1,470  1,701 
Total accrued liabilities and otherTotal accrued liabilities and other$165,108  $131,781 Total accrued liabilities and other$124,654  $165,108 
160172

SSR Mining Inc.
Notes to Consolidated Financial Statements


17.18.DEBT
The following tables summarize the Company’s debt balances (in thousands):
December 31,December 31,
20212020   20222021
2019 Notes (1)
2019 Notes (1)
$225,534 $224,586 
2019 Notes (1)
$226,510 $225,534 
Term LoanTerm Loan140,000 210,000 Term Loan70,000 140,000 
OtherOther1,450 3,051 Other1,797 1,450 
Total carrying amountTotal carrying amount$366,984 $437,637 Total carrying amount$298,307 $366,984 
         
Current portionCurrent portion $71,491  $71,025 Current portion $71,797  $71,491 
Non-current portionNon-current portion $295,493  $366,612 Non-current portion $226,510  $295,493 
(1)Amount is net of discount and debt issuance costs of $4.5$3.5 million and $5.4$4.5 million, respectively.
Convertible debt
2013 Notes
On January 16, 2013 the Company issued $265.0 million of its 2.875% senior convertible notes due 2033 (the "2013 Notes").
On March 19, 2019, the Company repurchased $150.0 million of its 2.875% senior convertible notes due in 2033 for a cash payment of $152.2 million. The redemption amount was based on the fair value of the debt of $148.0 million, estimated using a discounted cash flow model and a discount rate of 4.95%. The difference of $3.0 million between the $149.2 million amortized value and the cash paid was recognized in Loss on redemption of convertible debt in the Consolidated Statements of Operations along with the related tax recovery of $0.4 million.
On January 31, 2020, pursuant to the put option under the terms of the 2013 Notes, $49.0 thousand aggregate principal amount of the 2013 Notes was redeemed at the option of the holders and $4.0 thousand of debt was converted to equity.
On March 30, 2020, pursuant to the call option under the terms of the 2013 Notes, the Company redeemed all of its remaining outstanding 2013 Notes consisting of an aggregate principal amount plus accrued interest in exchange for a cash payment of $115.5 million and equity of $2.0 thousand.
2019 Notes
On March 19, 2019, the Company issued $230.0 million of 2.50% convertible senior notes due in 2039 (the “2019 Notes”) for net proceeds of $222.9$222.9 million after payment of commissions and expenses related to the offering of $7.1 million. The 2019 Notes mature on April 1, 2039 and bear an interest rate of 2.50% per annum, payable semi-annually in arrears on April 1 and October 1 of each year. The 2019 Notes are convertibleconvertible into the Company's common shares at a fixed conversion rate, subject to certain anti-dilution adjustments. In addition, if certain fundamental changes occur, holders of the 2019 Notes may be entitled to an increased conversion rate. The
As a result of ongoing dividends and in accordance with the 2019 Notes are convertible intoagreement, during the Company's common shares at an initialfourth quarter of 2022 the conversion rate of 54.1082was adjusted to 55.6750 common shares per $1,000 principal amount of 2019 Notes converted, representing an initial conversion price of $18.48 per common share.converted.
Prior to April 1, 2023, the Company may not redeem the 2019 Notes, except in the event of certain changes in Canadian tax law. On or after April 1, 2023 and prior to April 1, 2026, the Company may redeem all or part of the 2019 Notes for cash, but only if the last reported sales price of its common stock for 20 or more trading days in a period of 30 consecutive trading days exceeds 130% of the conversionconversion price in effect on each such trading day. On or after April 1, 2026, the Company may redeem the 2019 Notes in full or in part, for cash.
161

SSR Mining Inc.
Notes to Consolidated Financial Statements

Holders of the 2019 Notes have the right to require the Company to repurchase all or part of their 2019 Notes on April 1 of each of 2026, 2029 and 2034, or upon certain fundamental corporate changes. The repurchase price will be equal to par plus accrued and unpaid interest.
The Company does not have any financial covenants in relation to the 2019 Notes.
Term Loan
InOn September 16, 2020, in connection with the acquisition of Alacer (see Note 3)the Çöpler mine, the Company assumed a term loan (the "Term Loan"), with a fair value of $245.0 million at the date of acquisition, with a syndicate of lenders (BNP Paribas (Suisse) SA, ING Bank NV, Societe Generale Corporate & Investment Banking and UniCredit S.P.A.). The Term Loan bears interest at the London Inter-bank Offered Rate ("LIBOR") plus a fixed interest rate margin in the range of 3.50% to 3.70% depending on the tranche. On October 12, 2021, the Company amended its existing agreement and agreed to replacement of the LIBOR screen rate with an alternative screen rate when LIBOR ceases to exist. The Term Loan has no mandatory hedging or cash sweep requirements, no prepayment penalties, and final repayment is scheduled in the fourth quarter of 2023.
In addition
173

SSR Mining Inc.
Notes to the Term Loan, the Company assumed LIBOR interest rate swap contracts with underlying notional amounts of approximately 37% of the outstanding Term Loan balance as of December 31, 2020 through the duration of the interest rate management program, which ended in 2021.Consolidated Financial Statements

Restricted cash accounts must be maintained while the Term Loan is outstanding. As of December 31, 2022 and 2021, and 2020, $32.9$33.7 million and $32.9 million of restricted cash relates to the Term Loan, respectively. Restricted cash is not available for use within one year and is classified as Restricted casha current asset in the Consolidated Balance Sheets.Sheets as of December 31, 2022.
Under the terms of the Term Loan, the Company is required to comply with the following financial covenants:
historic and forecast debt service cover ratio greater than or equal to 1.20:1;1;
loan life cover ratio greater than or equal to 1.30:1;1; and
minimum tail reserves as a percentage of total reserves greater than or equal to 30%.
As a result of December 31, 2021,the temporarily suspended operations at the Çöpler mine during most of the third quarter of 2022, the Company was not in compliance with its externally imposedcertain financial covenants in relation to the Term Loan and Credit Facility.as of September 30, 2022. During the fourth quarter of 2022, the Company received a waiver for the non-compliance event. The Company does not have anyis in compliance with its financial covenants in relation to the 2019 Notes.Term Loan as of December 31, 2022.
Amended Credit FacilityAgreement
On August 4, 2015, the Company entered into a $75.0 million senior secured revolving credit facility (the "Credit Facility") with a syndicate of banks. The Credit Facility may be used for reclamation bonding, working capital and other general corporate purposes but can only be used to fund activities of entities that were in the SSR Mining group prior to the acquisition of Alacer (see Note 3). During 2017, the Company extended the maturity of the Credit Facility to June 8, 2020, and concurrently reduced applicable margins, increased covenant flexibility and added a $25.0 million accordion feature.
On June 7, 2021, the Company amended its existing Credit Facility to extend its maturity to June 8, 2025 and increase the Credit FacilityAgreement to $200.0 million with a $100.0 million accordion feature (the "Amended Credit Facility"Agreement"). Amounts drawn under the Amended Credit FacilityAgreement are subject to variable interest rates at LIBOR plus an applicable margin ranging from 2.0% to 3.0%, based on the Company's net leverage ratio.ratio. The Amended Credit FacilityAgreement contains fallback language that replaces LIBOR with an alternative benchmark rate based on either SOFR or another alternative benchmark rate when LIBOR ceases to exist. Undrawn amounts are subject to a standby fee ranging from 0.4% to 0.6%, based on the Company's net leverage ratio.
The Amended Credit FacilityAgreement also providesprovides for financialnon-financial letters of credit at 66.0% of the applicable margin, undrawn fees are subject to a utilization fee of 0.25%, and standby fees are calculated as 25% of the drawn applicable margin plus a utilization fee ranging from 0.25% to 0.75%.
162

SSR Mining Inc.
Notes to Consolidated Financial Statements

margin.
All debts, liabilities and obligations under the Credit Facility are guaranteed by the Company's material subsidiaries and secured by certain of the Company's assets and material subsidiaries, and pledges of the securities of the Company's material subsidiaries, excluding Alacer entities. In connection with the Credit Facility,Agreement, the Company must also maintain certain net tangible worth and ratios for interest coverage and net leverage. As of December 31, 2021,2022, the Company was in compliance with these covenants.
As of December 31, 2021 and 2020, the amount2022, no borrowings were outstanding on the Amended Credit Facility, included in Agreement,Accrued liabilities $196.6 million of borrowing capacity was available and otheroutstanding letters of credit total, was $0.9 million and $0.7 million, respectively.ed $3.4 million.
Scheduled minimum debt repayments are as follows (in thousands):
2022$71,093 
20232023$70,918 2023$70,033 
20242024$— 2024$— 
20252025$— 2025$— 
20262026$— 2026$— 
20272027$— 
ThereafterThereafter$230,000 Thereafter$230,000 

18.19.LEASES
The Company’s operating leases consist primarily of leases for office space, vehicles, and plant and mining equipment. These leases have a range of terms between three monthsone year to twentyeleven years with renewal terms included in the contracts. Some are automatic renewals, and some are at the option of the Company. There are no restrictions placed upon the lessee by entering into these leases. The Company’s finance leases consist primarily of equipment.
174

SSR Mining Inc.
Notes to Consolidated Financial Statements

The Company's principal finance lease relates to its right to use the oxygen plant supplied by Air Liquide Gaz Sanayi ve Ticaret A.S. (the "Air Liquide Plant") at Çöpler which was assumed on the acquisition of Alacer (see Note 3). The Air Liquide Plant is used for the production, transportation and delivery of oxygen and liquid oxygen to support mining operations at Çöpler. Under the terms of the Air Liquide Plant lease, the Company pays variable monthly lease payments that depend on an index. In addition, the Company is subject to variable payments based on consumption and use which have been accounted for as non-lease components and included in Production costsCost of sales. The Air Liquide Plant lease contains a non-cancellable period of 15 years ending in 2033 with options to extend for consecutive 2-year periods. The lease term used in the measurement of the Company's lease liability and right-of-use asset includes 4four consecutive 2-year extension periods ending in 2041 for which the Company is reasonably certain to exercise its option in line with the Çöpler LOM.
The Company uses its incremental borrowing rate as the discount rate to determine the present value of the lease payments, as the leases do not have readily determinable implicit discount rates. The Company’s incremental borrowing rate is the rate of interest that it would have to borrow on a collateralized basis over a similar term and amount in a similar economic environment to pay its lease obligations. The Company determines the incremental borrowing rates for its leases by adjusting the local risk-free interest rate with a credit risk premium corresponding to its credit rating. From time to time, the Company may enter into arrangements for the construction or purchase of an asset and then enter into a financing arrangement to lease the asset. The Company recognizes leased assets and liabilities under these arrangements when it obtain control of the asset.
163175

SSR Mining Inc.
Notes to Consolidated Financial Statements

The components of the Company’s leases presented in the Consolidated Balance Sheets were as follows (in thousands):
December 31,December 31,
20212020   20222021
Finance lease right-of-use assets, net (included in Mineral properties, plant and equipment, net)
Finance lease right-of-use assets, net (included in Mineral properties, plant and equipment, net)
$114,882 $112,808 
Finance lease right-of-use assets, net (included in Mineral properties, plant and equipment, net)
$101,705 $114,882 
Operating lease right-of-use assets (included in Other non-current assets)
Operating lease right-of-use assets (included in Other non-current assets)
7,530 9,362 
Operating lease right-of-use assets (included in Other non-current assets)
17,946 7,530 
Total lease right-of-use-assetsTotal lease right-of-use-assets$122,412 $122,170 Total lease right-of-use-assets$119,651 $122,412 
         
Short-term finance lease liabilities (included in Finance lease liabilities)
Short-term finance lease liabilities (included in Finance lease liabilities)
$12,439 $3,568 
Short-term finance lease liabilities (included in Finance lease liabilities)
$3,872 $12,439 
Short-term operating lease liabilities (included in Accrued liabilities and other)
Short-term operating lease liabilities (included in Accrued liabilities and other)
2,238 1,954 
Short-term operating lease liabilities (included in Accrued liabilities and other)
1,976 2,238 
Long-term finance lease liabilities (included in Finance Lease liabilities)
Long-term finance lease liabilities (included in Finance Lease liabilities)
 105,965  109,544 
Long-term finance lease liabilities (included in Finance Lease liabilities)
 102,434  105,965 
Long-term operating lease liabilities (included in Other non-current liabilities)
Long-term operating lease liabilities (included in Other non-current liabilities)
 5,525  7,530 
Long-term operating lease liabilities (included in Other non-current liabilities)
 16,969  5,525 
Total lease liabilitiesTotal lease liabilities$126,167 $122,596 Total lease liabilities$125,251 $126,167 
The components of the Company’s leases presented in the Consolidated Statements of Operations for the years ended December 31 were as follows (in thousands):
Years Ended December 31,Years Ended December 31,
20212020   2019202220212020
Operating leasesOperating leases$2,986 $1,260 $521 Operating leases$4,134 $2,986 $1,260 
         
Finance leases:Finance leases:Finance leases:
Amortization of lease costAmortization of lease cost 2,517  92  70 Amortization of lease cost 5,346  2,517  92 
Interest expense on lease liabilitiesInterest expense on lease liabilities274 12 14 Interest expense on lease liabilities4,830 274 12 
Variable and short-term leasesVariable and short-term leases 10,661  3,615 — Variable and short-term leases 1,740  10,661 3,615 
TotalTotal$16,438 $4,979 $605 Total$16,050 $16,438 $4,979 
For finance leases, amortization and interest expense is included in Interest expense. For operating leases, lease expense is included in Production costsCost of sales for entities with production and General and administrative expense for entities without production.corporate entities.
The components of the Company’s leases presented in the statements of cash flows for the years ended December 31 were as follows (in thousands):
Years Ended December 31,Years Ended December 31,
20212020   2019202220212020
Operating leases within cash flows from operating activitiesOperating leases within cash flows from operating activities$2,986 $1,260 $521 Operating leases within cash flows from operating activities$4,134 $2,986 $1,260 
Finance leases within cash flows from financing activitiesFinance leases within cash flows from financing activities$10,441 $3,623 $554 Finance leases within cash flows from financing activities$10,091 $10,441 $3,623 

164176

SSR Mining Inc.
Notes to Consolidated Financial Statements

The following is a schedule of weighted-average discount rates used to determine lease liabilities and remaining lease terms for the years ended December 31:
Years Ended December 31,Years Ended December 31,
20212020   20222021
Weighted-average remaining lease term - operating leases (in years)Weighted-average remaining lease term - operating leases (in years)5.55.9Weighted-average remaining lease term - operating leases (in years)8.45.5
Weighted-average remaining lease term - finance leases (in years)Weighted-average remaining lease term - finance leases (in years)19.120.7Weighted-average remaining lease term - finance leases (in years)18.119.1
Weighted-average discount rate - operating leasesWeighted-average discount rate - operating leases8.6 %9.4 %Weighted-average discount rate - operating leases5.2 %8.6 %
Weighted-average discount rate - finance leasesWeighted-average discount rate - finance leases4.5 %4.6 %Weighted-average discount rate - finance leases4.5 %4.5 %
The following is a schedule of future minimum lease payments under noncancellable finance and operating leases as of December 31, 20212022 (in thousands):
Operating LeasesFinance LeasesOperating LeasesFinance Leases
2022$2,950 $16,907 
202320231,520 8,532 2023$2,683 $8,532 
202420241,374 8,532 20242,780 8,532 
202520251,218 8,532 20252,659 8,532 
202620261,234 8,532 20262,709 8,532 
202720272,708 8,532 
ThereafterThereafter1,548 122,023 Thereafter9,371 112,416 
Total minimum lease paymentsTotal minimum lease payments$9,844 $173,058 Total minimum lease payments$22,910 $155,076 
Less: amounts representing interestLess: amounts representing interest2,081 54,654 Less: amounts representing interest3,965 48,770 
Present value of net minimum lease paymentsPresent value of net minimum lease payments7,763 118,404 Present value of net minimum lease payments18,945 106,306 
Less: current portion of lease liabilitiesLess: current portion of lease liabilities2,238 12,439 Less: current portion of lease liabilities1,976 3,872 
Long-term lease liabilities Long-term lease liabilities $5,525 $105,965 Long-term lease liabilities $16,969 $102,434 
19.20.SUPPLEMENTAL CASH FLOW INFORMATION
Net change in operating assets and liabilities during the years ended December 31 were as follows (in thousands):
Years Ended December 31,Years Ended December 31,
2021 20202019 2022 20212020
Decrease (increase) in operating assets:Decrease (increase) in operating assets:   Decrease (increase) in operating assets:   
Trade and other receivablesTrade and other receivables$(38,138)$5,132 $(44,465)Trade and other receivables$(11,704)$(38,138)$5,132 
InventoriesInventories (20,848)  (21,660)(11,368)Inventories (108,183)  (20,848)(21,660)
Other operating assetsOther operating assets (1,516)  17,781 1,375 Other operating assets (6,121)  (1,516)17,781 
Increase (decrease) in operating liabilities:Increase (decrease) in operating liabilities:   Increase (decrease) in operating liabilities:   
Accounts payableAccounts payable (6,882)  7,761 16,732 Accounts payable 40,815   (6,882)7,761 
Accrued liabilities 38,761   (1,574)(401)
Accrued liabilities and otherAccrued liabilities and other (60,856)  38,332 (47,159)
Reclamation liabilitiesReclamation liabilities (243)  (2,447)(3,568)Reclamation liabilities (1,221)  (243)(2,447)
Other operating liabilities(429)(45,585)(24,474)
$(29,295) $(40,592)$(66,169) $(147,270) $(29,295)$(40,592)
165177

SSR Mining Inc.
Notes to Consolidated Financial Statements

Other cash information during the years ended December 31 were as follows (in thousands):
Years Ended December 31,Years Ended December 31,
2021 20202019 2022 20212020
Interest paidInterest paid$(12,512)$(13,638)$(11,646)Interest paid$(22,579)$(12,512)$(13,638)
Interest receivedInterest received$5,315 $3,665 $9,697 Interest received$6,633 $5,315 $3,665 
Income taxes paidIncome taxes paid$(58,000)$(43,744)$(20,850)Income taxes paid$(145,549)$(58,000)$(43,744)
20.21.COMMITMENTS AND CONTINGENCIES
General
Estimated losses from loss contingencies are accrued by a charge to income when information is available prior to the issuance of the financial statements that indicates it is probable that a liability could be incurred, and the amount of the loss can be reasonably estimated. Legal expenses associated with the loss contingency are expensed as incurred. If a loss contingency is not probable or reasonably estimable, disclosure of the loss contingency is made in the financial statements when it is at least reasonably possible that a material loss could be incurred.
Environmental matters
The Company uses surety bonds to support certain environmental bonding obligations. As of December 31, 20212022 and 2020,2021, the Company had surety bonds totaling $117.0$117.4 million and $117.5$117.0 million outstanding, respectively.
Other commitments and contingencies
The Company is involved in legal proceedings related to its course of business. Management does not believe that these legal cases will have a material effect on the Company’s financial condition or results of the operation.
21.SUBSEQUENT EVENTS
Disposal
On January 12, 2022, the Company entered into an agreement with Endeavour Silver Corp. ("Endeavour Silver") to sell its Pitarrilla project in Durango, Mexico, included in the Company's Exploration, evaluation and development properties segment, in exchange for consideration including $35.0 million in common shares of Endeavour Silver, $35.0 million in cash, and a 1.25% net smelter returns royalty on the Pitarrilla property. The transaction is expected to close in the first half of 2022.
Dividend
On February 22, 2022, the Company declared a quarterly cash dividend of $0.07 per common share, payable on April 4, 2022 to holders of record at the close of business on March 7, 2022.
166178

SSR Mining Inc.
Notes to Consolidated Financial Statements

ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE
None.
ITEM 9A. CONTROLS AND PROCEDURES
Evaluation of Disclosure Controls and Procedures
The Management of the Company is responsible for establishing and maintaining adequate internal controls over financial reporting. Internal controls over financial reporting is defined in Rule 13a-15(f) or 15d-15(f) under the Securities Exchange Act of 1934 as a process designed by, or under the supervision of, the Company’s principal executive and principal financial officers and effected by the Company’s Board of Directors, Management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles (GAAP) and includes those policies and procedures that:
Pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of the Company’s assets;
Provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the Company are being made only in accordance with authorizations of Management and directors of the Company; and
Provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the Company’s assets that could have a material effect on the financial statements.
Definition and Limitations of Internal Control Over Financial Reporting
Because of its inherent limitations, internal controls over financial reporting may not prevent or detect misstatements. Projections of any evaluation of effectiveness to future periods are subject to risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
Management's Report on Internal Control Over Financial Reporting
The Company’s Management assessed the effectiveness of the Company’s internal controls over financial reporting as of December 31, 2021.2022. In making this assessment, the Company’s Management used the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission ("COSO") in Internal Control-Integrated Framework 2013. Based upon its assessment, Management concluded that, at December 31, 2021,2022, the Company’s internal controls over financial reporting were effective.
PricewaterhouseCoopers LLP, an independent registered public accounting firm, has audited our financial statements included in this Annual Report and issued its attestation report on the effectiveness of our internal control over financial reporting as of December 31, 2021,2022, which is included herein.
Changes in Internal Control Over Financial Reporting
There were no changes in our internal control over financial reporting (as such term is defined in Rules 13a–15(f) and 15d–15(f) under the Exchange Act) that occurred during our most recent quarter, that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.
ITEM 9B. OTHER INFORMATION
None.
ITEM 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS
Not applicable.
167179


PART III
ITEM 10.    DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
Information concerning this item is contained in the Company's definitive Proxy Statement for its Annual Meeting of Shareholders to be filed with the Securities and Exchange Commission pursuant to Regulation 14A or, if such definitive Proxy Statement is not filed with the Securities and Exchange Commission within 120 days after the close of the Company’s fiscal year, an amendment to this Annual Report filed under cover of Form 10-K/A.
ITEM 11.    EXECUTIVE COMPENSATION
Information concerning this item is contained in the Company's definitive Proxy Statement for its Annual Meeting of Shareholders to be filed with the Securities and Exchange Commission pursuant to Regulation 14A or, if such definitive Proxy Statement is not filed with the Securities and Exchange Commission within 120 days after the close of the Company’s fiscal year, an amendment to this Annual Report filed under cover of Form 10-K/A.
ITEM 12.    SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
Information concerning this item is contained in the Company's definitive Proxy Statement for its Annual Meeting of Shareholders to be filed with the Securities and Exchange Commission pursuant to Regulation 14A or, if such definitive Proxy Statement is not filed with the Securities and Exchange Commission within 120 days after the close of the Company’s fiscal year, an amendment to this Annual Report filed under cover of Form 10-K/A.
ITEM 13.    CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE
Information concerning this item is contained in the Company's definitive Proxy Statement for its Annual Meeting of Shareholders to be filed with the Securities and Exchange Commission pursuant to Regulation 14A or, if such definitive Proxy Statement is not filed with the Securities and Exchange Commission within 120 days after the close of the Company’s fiscal year, an amendment to this Annual Report filed under cover of Form 10-K/A.
ITEM 14.    PRINCIPAL ACCOUNTING FEES AND SERVICES
Information concerning this item is contained in the Company's definitive Proxy Statement for its Annual Meeting of Shareholders to be filed with the Securities and Exchange Commission pursuant to Regulation 14A or, if such definitive Proxy Statement is not filed with the Securities and Exchange Commission within 120 days after the close of the Company’s fiscal year, an amendment to this Annual Report filed under cover of Form 10-K/A.


168180



PART IV
ITEM 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES
(a) The following documents are filed as a part of this Annual Report:
1.    Consolidated financial statements: the consolidated financial statements and the Report of Independent Registered Public Accounting Firm (PCAOB ID 271) are included in Item 8. Financial Statements and Supplementary Data, of this Annual Report on Form 10-K.
2.    Financial statement schedules: All schedules have been omitted because they are inapplicable, not required, or the information is included in the above referenced consolidated financial statements or the notes thereto.
3.    Exhibits furnished pursuant to the requirements of Form 10-K:
Exhibit Number
2.1
3.1Memorandum, Articles and Certificate of Incorporation (incorporated by reference to Exhibit 1.1 to the Registrant’s Registration Statement on Form 20-F (File No. 0-26424), filed on July 13, 1995).
3.2
4.1
4.2
4.3 +
4.4
10.1 +
10.2 +
10.3 +
169181


10.4 +
10.5 +
10.6 +
10.7
10.710.8
10.9 *
10.810.10 *
10.910.11 *
10.1010.12 *
10.1110.13 *
10.1210.14 *
10.13 +10.15 *
10.16
10.14 +10.17
10.15 +10.18
10.16 +10.19
10.17 +10.20
182


10.18 +10.21
10.19 +10.22
10.2010.23
10.24 *
10.2110.25 *
10.2210.26 *
10.2310.27 *
170


21 +
23.1 +
23.2 +
23.3 +
23.4 +
23.5 +
23.6 +
23.7 +
31.1 +
31.2 +
32.1++
32.2++
95 +
96.1 +
96.2 +
96.3 +
96.4 +
101 +The following materials from the Registrant’s Annual Report on Form 10-K for the fiscal year ended December 31, 2021 formatted in Inline XBRL: (i) the Consolidated Balance Sheets; (ii) the Consolidated Statements of Operations; (iii) the Consolidated Statements of Comprehensive Income; (iv) the Consolidated Statements of Shareholders’ Equity; (v) the Consolidated Statements of Cash Flows; and (vi) the Notes to the Consolidated Financial Statements.
104 +++Cover Page Interactive Data File (embedded within the Inline XBRL document).
+Filed herewith
++ ++Furnished herewith
*Indicates a previously filed management contract or compensatory plan or arrangement.

ITEM 16. FORM 10-K SUMMARY.
None.
171183



SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
SSR MINING INC.
Registrant
Date:    February 23, 202222, 2023/s/ Rodney P. Antal
Name:    Rodney P. Antal
Title:    President and Chief Executive Officer

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated.
172184


NamePositionDate
   
/s/ Rodney P. AntalPresident, Chief Executive Officer and DirectorFebruary 23, 202222, 2023
Rodney P. Antal(Principal Executive Officer) 
   
/s/ Alison WhiteExecutive Vice President, Chief Financial OfficerFebruary 23, 202222, 2023
Alison White(Principal Financial Officer) 
/s/ Russell FarnsworthVice President, ControllerFebruary 23, 202222, 2023
Russell Farnsworth(Principal Accounting Officer)
/s/ A.E. Michael AnglinChairman of the Board of DirectorsFebruary 23, 202222, 2023
A.E. Michael Anglin 
   
/s/ Thomas Bates, Jr.DirectorFebruary 23, 202222, 2023
Thomas Bates, Jr.  
/s/ Brian R. BoothDirectorFebruary 23, 202222, 2023
Brian R. Booth
/s/ Edward Dowling Jr.DirectorFebruary 23, 2022
Edward Dowling Jr.  
   
/s/ Simon A. FishDirectorFebruary 23, 202222, 2023
Simon A. Fish  
/s/ Leigh Ann FisherDirectorFebruary 22, 2023
Leigh Ann Fisher
 
/s/ Alan P. KrusiDirectorFebruary 23, 202222, 2023
Alan P. Krusi  
 
/s/ Kay PriestlyDirectorFebruary 23, 202222, 2023
Kay Priestly  
/s/ Karen SwagerDirectorFebruary 22, 2023
Karen Swager


173185