UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
    QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended JuneSeptember 30, 2021
or
    TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from            to            
Commission file number 001-16383
lng-20210930_g1.gif
CHENIERE ENERGY, INC.
(Exact name of registrant as specified in its charter)
Delaware95-4352386
(State or other jurisdiction of incorporation or organization)(I.R.S. Employer Identification No.)
700 Milam Street, Suite 1900
Houston, Texas 77002
(Address of principal executive offices) (Zip Code)
(713) 375-5000
(Registrant’s telephone number, including area code)
Securities registered pursuant to Section 12(b) of the Act: 
Title of each classTrading SymbolName of each exchange on which registered
Common Stock, $ 0.003 par valueLNGNYSE American
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes    No 
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).  Yes     No 
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filerAccelerated filer
Non-accelerated filerSmaller reporting company
Emerging growth company
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes    No   
As of July 30,October 29, 2021, the issuer had 253,606,918253,588,453 shares of Common Stock outstanding.



CHENIERE ENERGY, INC.
TABLE OF CONTENTS

 
 
 
i


DEFINITIONS
As used in this quarterly report, the terms listed below have the following meanings: 

Common Industry and Other Terms
Bcfbillion cubic feet
Bcf/dbillion cubic feet per day
Bcf/yrbillion cubic feet per year
Bcfebillion cubic feet equivalent
DOEU.S. Department of Energy
EPCengineering, procurement and construction
FERCFederal Energy Regulatory Commission
FTA countriescountries with which the United States has a free trade agreement providing for national treatment for trade in natural gas
GAAPgenerally accepted accounting principles in the United States
Henry Hubthe final settlement price (in USD per MMBtu) for the New York Mercantile Exchange’s Henry Hub natural gas futures contract for the month in which a relevant cargo’s delivery window is scheduled to begin
IPMintegrated production marketing
LIBORLondon Interbank Offered Rate
LNGliquefied natural gas, a product of natural gas that, through a refrigeration process, has been cooled to a liquid state, which occupies a volume that is approximately 1/600th of its gaseous state
MMBtumillion British thermal units; one British thermal unit measures the amount of energy required to raise the temperature of one pound of water by one degree Fahrenheit
mtpamillion tonnes per annum
non-FTA countriescountries with which the United States does not have a free trade agreement providing for national treatment for trade in natural gas and with which trade is permitted
SECU.S. Securities and Exchange Commission
SPALNG sale and purchase agreement
TBtutrillion British thermal units; one British thermal unit measures the amount of energy required to raise the temperature of one pound of water by one degree Fahrenheit
Trainan industrial facility comprised of a series of refrigerant compressor loops used to cool natural gas into LNG
TUAterminal use agreement

1


Abbreviated Legal Entity Structure

The following diagram depicts our abbreviated legal entity structure as of JuneSeptember 30, 2021, including our ownership of certain subsidiaries, and the references to these entities used in this quarterly report:
lng-20210930_g2.jpg
Unless the context requires otherwise, references to “Cheniere,” the “Company,” “we,” “us” and “our” refer to Cheniere Energy, Inc. and its consolidated subsidiaries, including our publicly traded subsidiary, Cheniere Partners.
Unless the context requires otherwise, references to the “CCH Group” refer to CCH, HoldCo II, CCH HoldCo I, CCH, CCL and CCP, collectively.

2


PART I.    FINANCIAL INFORMATION 


ITEM 1.    CONSOLIDATED FINANCIAL STATEMENTS
CHENIERE ENERGY, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF OPERATIONS
(in millions, except per share data)
(unaudited)
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
20212020202120202021202020212020
RevenuesRevenuesRevenues
LNG revenuesLNG revenues$2,913 $2,295 $5,912 $4,863 LNG revenues$3,078 $1,373 $8,990 $6,236 
Regasification revenuesRegasification revenues67 68 134 135 Regasification revenues68 67 202 202 
Other revenuesOther revenues37 39 61 113 Other revenues54 20 115 133 
Total revenuesTotal revenues3,017 2,402 6,107 5,111 Total revenues3,200 1,460 9,307 6,571 
Operating costs and expensesOperating costs and expensesOperating costs and expenses
Cost of sales (excluding items shown separately below)Cost of sales (excluding items shown separately below)2,154 803 3,540 1,527 Cost of sales (excluding items shown separately below)4,868 768 8,408 2,295 
Operating and maintenance expenseOperating and maintenance expense385 355 707 671 Operating and maintenance expense350 317 1,057 988 
Development expenseDevelopment expenseDevelopment expense— 
Selling, general and administrative expenseSelling, general and administrative expense73 73 154 154 Selling, general and administrative expense70 70 224 224 
Depreciation and amortization expenseDepreciation and amortization expense258 233 494 466 Depreciation and amortization expense259 233 753 699 
Impairment expense and loss (gain) on disposal of assets(1)(1)
Impairment expense and loss on disposal of assetsImpairment expense and loss on disposal of assets— — 
Total operating costs and expensesTotal operating costs and expenses2,871 1,465 4,897 2,828 Total operating costs and expenses5,550 1,388 10,447 4,216 
Income from operations146 937 1,210 2,283 
Income (loss) from operationsIncome (loss) from operations(2,350)72 (1,140)2,355 
Other income (expense)
Other expenseOther expense
Interest expense, net of capitalized interestInterest expense, net of capitalized interest(368)(407)(724)(819)Interest expense, net of capitalized interest(364)(355)(1,088)(1,174)
Loss on modification or extinguishment of debtLoss on modification or extinguishment of debt(4)(43)(59)(44)Loss on modification or extinguishment of debt(36)(171)(95)(215)
Interest rate derivative loss, netInterest rate derivative loss, net(2)(25)(1)(233)Interest rate derivative loss, net(2)— (3)(233)
Other income, net10 14 
Other expense, netOther expense, net(24)(129)(14)(115)
Total other expenseTotal other expense(370)(470)(774)(1,082)Total other expense(426)(655)(1,200)(1,737)
Income (loss) before income taxes and non-controlling interestIncome (loss) before income taxes and non-controlling interest(224)467 436 1,201 Income (loss) before income taxes and non-controlling interest(2,776)(583)(2,340)618 
Less: income tax provision (benefit)Less: income tax provision (benefit)(93)63 (4)194 Less: income tax provision (benefit)(1,860)(75)(1,864)119 
Net income (loss)Net income (loss)(131)404 440 1,007 Net income (loss)(916)(508)(476)499 
Less: net income attributable to non-controlling interest198 207 376 435 
Less: net income (loss) attributable to non-controlling interestLess: net income (loss) attributable to non-controlling interest168 (45)544 390 
Net income (loss) attributable to common stockholdersNet income (loss) attributable to common stockholders$(329)$197 $64 $572 Net income (loss) attributable to common stockholders$(1,084)$(463)$(1,020)$109 
Net income (loss) per share attributable to common stockholders—basic (1)$(1.30)$0.78 $0.25 $2.27 
Net income (loss) per share attributable to common stockholders—diluted (1)$(1.30)$0.78 $0.25 $2.26 
Net income (loss) per share attributable to common stockholders—basic and dilutedNet income (loss) per share attributable to common stockholders—basic and diluted$(4.27)$(1.84)$(4.03)$0.43 
Weighted average number of common shares outstanding—basicWeighted average number of common shares outstanding—basic253.5 252.1 253.2 252.6 Weighted average number of common shares outstanding—basic253.6 252.2 253.3 252.5 
Weighted average number of common shares outstanding—dilutedWeighted average number of common shares outstanding—diluted253.5 252.4 254.7 253.3 Weighted average number of common shares outstanding—diluted253.6 252.2 253.3 253.2 
(1)    Earnings per share in the table may not recalculate exactly due to rounding because it is calculated based on whole numbers, not the rounded numbers presented.
The accompanying notes are an integral part of these consolidated financial statements.

3


CHENIERE ENERGY, INC. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS (1)
(in millions, except share data)
June 30,December 31,September 30,December 31,
2021202020212020
ASSETSASSETS(unaudited) ASSETS(unaudited) 
Current assetsCurrent assets  Current assets  
Cash and cash equivalentsCash and cash equivalents$1,806 $1,628 Cash and cash equivalents$2,203 $1,628 
Restricted cashRestricted cash424 449 Restricted cash419 449 
Accounts and other receivables, net of current expected credit lossesAccounts and other receivables, net of current expected credit losses613 647 Accounts and other receivables, net of current expected credit losses983 647 
InventoryInventory363 292 Inventory471 292 
Current derivative assetsCurrent derivative assets178 32 Current derivative assets266 32 
Margin depositsMargin deposits336 25 
Other current assetsOther current assets281 121 Other current assets185 96 
Total current assetsTotal current assets3,665 3,169 Total current assets4,863 3,169 
Property, plant and equipment, net of accumulated depreciationProperty, plant and equipment, net of accumulated depreciation30,288 30,421 Property, plant and equipment, net of accumulated depreciation30,318 30,421 
Operating lease assetsOperating lease assets1,698 759 Operating lease assets2,064 759 
Derivative assetsDerivative assets96 376 Derivative assets71 376 
GoodwillGoodwill77 77 Goodwill77 77 
Deferred tax assetsDeferred tax assets497 489 Deferred tax assets2,361 489 
Other non-current assets, netOther non-current assets, net431 406 Other non-current assets, net425 406 
Total assetsTotal assets$36,752 $35,697 Total assets$40,179 $35,697 
LIABILITIES AND STOCKHOLDERS’ EQUITYLIABILITIES AND STOCKHOLDERS’ EQUITYLIABILITIES AND STOCKHOLDERS’ EQUITY
Current liabilitiesCurrent liabilities  Current liabilities  
Accounts payableAccounts payable$83 $35 Accounts payable$73 $35 
Accrued liabilitiesAccrued liabilities1,197 1,175 Accrued liabilities1,787 1,175 
Current debt, net of discount and debt issuance costsCurrent debt, net of discount and debt issuance costs949 372 Current debt, net of discount and debt issuance costs1,047 372 
Deferred revenueDeferred revenue105 138 Deferred revenue187 138 
Current operating lease liabilitiesCurrent operating lease liabilities365 161 Current operating lease liabilities458 161 
Current derivative liabilitiesCurrent derivative liabilities822 313 Current derivative liabilities1,979 313 
Other current liabilitiesOther current liabilitiesOther current liabilities129 
Total current liabilitiesTotal current liabilities3,526 2,196 Total current liabilities5,660 2,196 
Long-term debt, net of premium, discount and debt issuance costsLong-term debt, net of premium, discount and debt issuance costs29,327 30,471 Long-term debt, net of premium, discount and debt issuance costs29,481 30,471 
Operating lease liabilitiesOperating lease liabilities1,332 597 Operating lease liabilities1,590 597 
Finance lease liabilitiesFinance lease liabilities57 57 Finance lease liabilities57 57 
Derivative liabilitiesDerivative liabilities145 151 Derivative liabilities2,158 151 
Other non-current liabilitiesOther non-current liabilitiesOther non-current liabilities20 
Stockholders’ equityStockholders’ equity  Stockholders’ equity  
Preferred stock, $0.0001 par value, 5.0 million shares authorized, NaN issued
Common stock, $0.003 par value, 480.0 million shares authorized; 275.0 million shares and 273.1 million shares issued at June 30, 2021 and December 31, 2020, respectively
Preferred stock, $0.0001 par value, 5.0 million shares authorized, none issuedPreferred stock, $0.0001 par value, 5.0 million shares authorized, none issued— — 
Common stock, $0.003 par value, 480.0 million shares authorized; 275.1 million shares and 273.1 million shares issued at September 30, 2021 and December 31, 2020, respectivelyCommon stock, $0.003 par value, 480.0 million shares authorized; 275.1 million shares and 273.1 million shares issued at September 30, 2021 and December 31, 2020, respectively
Treasury stock: 21.4 million shares and 20.8 million shares at June 30, 2021 and December 31, 2020, respectively, at cost(915)(872)
Treasury stock: 21.6 million shares and 20.8 million shares at September 30, 2021 and December 31, 2020, respectively, at costTreasury stock: 21.6 million shares and 20.8 million shares at September 30, 2021 and December 31, 2020, respectively, at cost(924)(872)
Additional paid-in-capitalAdditional paid-in-capital4,337 4,273 Additional paid-in-capital4,364 4,273 
Accumulated deficitAccumulated deficit(3,529)(3,593)Accumulated deficit(4,698)(3,593)
Total stockholders' deficitTotal stockholders' deficit(106)(191)Total stockholders' deficit(1,257)(191)
Non-controlling interestNon-controlling interest2,463 2,409 Non-controlling interest2,470 2,409 
Total equityTotal equity2,357 2,218 Total equity1,213 2,218 
Total liabilities and stockholders’ equityTotal liabilities and stockholders’ equity$36,752 $35,697 Total liabilities and stockholders’ equity$40,179 $35,697 
(1)Amounts presented include balances held by our consolidated variable interest entity (“VIE”), Cheniere Partners, as further discussed in Note 8—7 Non-controlling Interest and Variable Interest Entity. As of JuneSeptember 30, 2021, total assets and liabilities of Cheniere Partners, which are included in our Consolidated Balance Sheets, were $18.9$19.6 billion and $18.5$19.3 billion, respectively, including $1.2$1.7 billion of cash and cash equivalents and $0.1 billion of restricted cash.

The accompanying notes are an integral part of these consolidated financial statements.

4


CHENIERE ENERGY, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF STOCKHOLDERS’ EQUITY
(in millions)
(unaudited)
Three and Six Months Ended June 30, 2021
Three and Nine Months Ended September 30, 2021Three and Nine Months Ended September 30, 2021
Total Stockholders’ EquityTotal Stockholders’ Equity
Common StockTreasury StockAdditional Paid-in CapitalAccumulated DeficitNon-controlling InterestTotal
Equity
Common StockTreasury StockAdditional Paid-in CapitalAccumulated DeficitNon-controlling InterestTotal
Equity
SharesPar Value AmountSharesAmount SharesPar Value AmountSharesAmount
Balance at December 31, 2020Balance at December 31, 2020252.3 $20.8 $(872)$4,273 $(3,593)$2,409 $2,218 Balance at December 31, 2020252.3 $20.8 $(872)$4,273 $(3,593)$2,409 $2,218 
Vesting of restricted stock units and performance stock unitsVesting of restricted stock units and performance stock units1.8 Vesting of restricted stock units and performance stock units1.8 — — — — — — — 
Share-based compensationShare-based compensation— — 33 33 Share-based compensation— — — — 33 — — 33 
Issued shares withheld from employees related to share-based compensation, at costIssued shares withheld from employees related to share-based compensation, at cost(0.6)0.6 (42)(42)Issued shares withheld from employees related to share-based compensation, at cost(0.6)— 0.6 (42)— — — (42)
Net income attributable to non-controlling interestNet income attributable to non-controlling interest— — 178 178 Net income attributable to non-controlling interest— — — — — — 178 178 
Distributions to non-controlling interestDistributions to non-controlling interest— — (160)(160)Distributions to non-controlling interest— — — — — — (160)(160)
Net incomeNet income— — 393 393 Net income— — — — — 393 — 393 
Balance at March 31, 2021Balance at March 31, 2021253.5 21.4 (914)4,306 (3,200)2,427 2,620 Balance at March 31, 2021253.5 21.4 (914)4,306 (3,200)2,427 2,620 
Vesting of restricted stock units and performance stock unitsVesting of restricted stock units and performance stock units0.1 Vesting of restricted stock units and performance stock units0.1 — — — — — — — 
Share-based compensationShare-based compensation— — 31 31 Share-based compensation— — — — 31 — — 31 
Issued shares withheld from employees related to share-based compensation, at costIssued shares withheld from employees related to share-based compensation, at cost(1)(1)Issued shares withheld from employees related to share-based compensation, at cost— — — (1)— — — (1)
Net income attributable to non-controlling interestNet income attributable to non-controlling interest— — 198 198 Net income attributable to non-controlling interest— — — — — — 198 198 
Distributions to non-controlling interestDistributions to non-controlling interest— — (162)(162)Distributions to non-controlling interest— — — — — — (162)(162)
Net lossNet loss— — (329)(329)Net loss— — — — — (329)— (329)
Balance at June 30, 2021Balance at June 30, 2021253.6 $21.4 $(915)$4,337 $(3,529)$2,463 $2,357 Balance at June 30, 2021253.6 21.4 (915)4,337 (3,529)2,463 2,357 
Vesting of restricted stock units and performance stock unitsVesting of restricted stock units and performance stock units0.1 — — — — — — — 
Share-based compensationShare-based compensation— — — — 28 — — 28 
Issued shares withheld from employees related to share-based compensation, at costIssued shares withheld from employees related to share-based compensation, at cost(0.1)— 0.1 (3)(1)— — (4)
Shares repurchased, at costShares repurchased, at cost(0.1)— 0.1 (6)— — — (6)
Net income attributable to non-controlling interestNet income attributable to non-controlling interest— — — — — — 168 168 
Distributions to non-controlling interestDistributions to non-controlling interest— — — — — — (161)(161)
Dividends declared ($0.33 per common share)Dividends declared ($0.33 per common share)— — — — — (85)— (85)
Net lossNet loss— — — — — (1,084)— (1,084)
Balance at September 30, 2021Balance at September 30, 2021253.5 $21.6 $(924)$4,364 $(4,698)$2,470 $1,213 

    
Three and Six Months Ended June 30, 2020
Total Stockholders’ Equity
 Common StockTreasury StockAdditional Paid-in CapitalAccumulated DeficitNon-controlling InterestTotal
Equity
 SharesPar Value AmountSharesAmount
Balance at December 31, 2019253.6 $17.1 $(674)$4,167 $(3,508)$2,449 $2,435 
Vesting of restricted stock units and performance stock units2.1 
Share-based compensation— — 29 29 
Issued shares withheld from employees related to share-based compensation, at cost(0.7)0.7 (39)(39)
Shares repurchased, at cost(2.9)2.9 (155)(155)
Net income attributable to non-controlling interest— — 228 228 
Distributions to non-controlling interest— — (154)(154)
Net income— — 375 375 
Balance at March 31, 2020252.1 20.7 (868)4,196 (3,133)2,523 2,719 
Vesting of restricted stock units and performance stock units0.1 
Share-based compensation— — 31 31 
Issued shares withheld from employees related to share-based compensation, at cost(2)(2)
Net income attributable to non-controlling interest— — 207 207 
Distributions and dividends to non-controlling interest— — (156)(156)
Net income— — 197 197 
Balance at June 30, 2020252.2 $20.7 $(870)$4,227 $(2,936)$2,574 $2,996 
The accompanying notes are an integral part of these consolidated financial statements.

5


CHENIERE ENERGY, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF STOCKHOLDERS’ EQUITY—CONTINUED
(in millions)
(unaudited)
Three and Nine Months Ended September 30, 2020
Total Stockholders’ Equity
 Common StockTreasury StockAdditional Paid-in CapitalAccumulated DeficitNon-controlling InterestTotal
Equity
 SharesPar Value AmountSharesAmount
Balance at December 31, 2019253.6 $17.1 $(674)$4,167 $(3,508)$2,449 $2,435 
Vesting of restricted stock units and performance stock units2.1 — — — — — — — 
Share-based compensation— — — — 29 — — 29 
Issued shares withheld from employees related to share-based compensation, at cost(0.7)— 0.7 (39)— — — (39)
Shares repurchased, at cost(2.9)— 2.9 (155)— — — (155)
Net income attributable to non-controlling interest— — — — — — 228 228 
Distributions to non-controlling interest— — — — — — (154)(154)
Net income— — — — — 375 — 375 
Balance at March 31, 2020252.1 20.7 (868)4,196 (3,133)2,523 2,719 
Vesting of restricted stock units and performance stock units0.1 — — — — — — — 
Share-based compensation— — — — 31 — — 31 
Issued shares withheld from employees related to share-based compensation, at cost— — — (2)— — — (2)
Net income attributable to non-controlling interest— — — — — — 207 207 
Distributions to non-controlling interest— — — — — — (156)(156)
Net income— — — — — 197 — 197 
Balance at June 30, 2020252.2 20.7 (870)4,227 (2,936)2,574 2,996 
Vesting of restricted stock units and performance stock units0.1 — — — — — — — 
Share-based compensation— — — — 26 — — 26 
Issued shares withheld from employees related to share-based compensation, at cost(0.1)— 0.1 (2)— — — (2)
Net loss attributable to non-controlling interest— — — — — — (45)(45)
Reacquisition of equity component of convertible notes, net of tax— — — — (7)— — (7)
Distributions to non-controlling interest— — — — — — (158)(158)
Net loss— — — — — (463)— (463)
Balance at September 30, 2020252.2 $20.8 $(872)$4,246 $(3,399)$2,371 $2,347 
The accompanying notes are an integral part of these consolidated financial statements.

6


CHENIERE ENERGY, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
(in millions)
(unaudited)
Six Months Ended June 30,Nine Months Ended September 30,
2021202020212020
Cash flows from operating activitiesCash flows from operating activitiesCash flows from operating activities
Net income$440 $1,007 
Adjustments to reconcile net income to net cash provided by operating activities:
Net income (loss)Net income (loss)$(476)$499 
Adjustments to reconcile net income (loss) to net cash provided by operating activities:Adjustments to reconcile net income (loss) to net cash provided by operating activities:
Depreciation and amortization expenseDepreciation and amortization expense494 466 Depreciation and amortization expense753 699 
Share-based compensation expenseShare-based compensation expense63 57 Share-based compensation expense91 84 
Non-cash interest expenseNon-cash interest expense14 34 Non-cash interest expense16 43 
Amortization of debt issuance costs, premium and discountAmortization of debt issuance costs, premium and discount40 70 Amortization of debt issuance costs, premium and discount57 94 
Reduction of right-of-use assetsReduction of right-of-use assets172 166 Reduction of right-of-use assets269 222 
Loss on modification or extinguishment of debtLoss on modification or extinguishment of debt59 44 Loss on modification or extinguishment of debt95 215 
Total losses (gains) on derivatives, netTotal losses (gains) on derivatives, net748 (361)Total losses (gains) on derivatives, net4,230 (282)
Net cash provided by (used for) settlement of derivative instrumentsNet cash provided by (used for) settlement of derivative instruments(111)117 Net cash provided by (used for) settlement of derivative instruments(486)61 
Impairment expense and loss (gain) on disposal of assets(1)
Impairment expense and loss (income) on equity method investments(8)
Impairment expense and loss on disposal of assetsImpairment expense and loss on disposal of assets— 
Impairment expense and loss on equity method investmentsImpairment expense and loss on equity method investments16 130 
Deferred taxesDeferred taxes(7)192 Deferred taxes(1,872)115 
Repayment of paid-in-kind interest related to repurchase of convertible notesRepayment of paid-in-kind interest related to repurchase of convertible notes(190)Repayment of paid-in-kind interest related to repurchase of convertible notes(190)(911)
OtherOther
Changes in operating assets and liabilities:Changes in operating assets and liabilities:Changes in operating assets and liabilities:
Accounts and other receivables, net of current expected credit lossesAccounts and other receivables, net of current expected credit losses33 (155)Accounts and other receivables, net of current expected credit losses(338)101 
InventoryInventory(66)104 Inventory(174)31 
Margin depositsMargin deposits(311)(10)
Other current assetsOther current assets(163)(37)Other current assets(92)(27)
Accounts payable and accrued liabilitiesAccounts payable and accrued liabilities88 (369)Accounts payable and accrued liabilities612 (93)
Deferred revenueDeferred revenue(33)(138)Deferred revenue58 18 
Operating lease liabilitiesOperating lease liabilities(173)(145)Operating lease liabilities(285)(205)
Finance lease liabilitiesFinance lease liabilities— 
Other, netOther, net(26)(30)Other, net80 (26)
Net cash provided by operating activitiesNet cash provided by operating activities1,373 1,028 Net cash provided by operating activities2,057 765 
Cash flows from investing activitiesCash flows from investing activitiesCash flows from investing activities
Property, plant and equipmentProperty, plant and equipment(440)(983)Property, plant and equipment(761)(1,437)
Proceeds from sale of fixed assetsProceeds from sale of fixed assets68 Proceeds from sale of fixed assets68 — 
Investment in equity method investmentInvestment in equity method investment(100)Investment in equity method investment— (100)
OtherOther(11)(7)Other(14)(8)
Net cash used in investing activitiesNet cash used in investing activities(383)(1,090)Net cash used in investing activities(707)(1,545)
Cash flows from financing activitiesCash flows from financing activitiesCash flows from financing activities
Proceeds from issuances of debtProceeds from issuances of debt2,184 2,597 Proceeds from issuances of debt4,104 7,683 
Repayments of debtRepayments of debt(2,603)(2,380)Repayments of debt(4,276)(6,324)
Debt issuance and other financing costsDebt issuance and other financing costs(20)(59)Debt issuance and other financing costs(38)(124)
Debt modification or extinguishment costsDebt modification or extinguishment costs(41)(40)Debt modification or extinguishment costs(67)(170)
Distributions to non-controlling interestDistributions to non-controlling interest(322)(310)Distributions to non-controlling interest(483)(468)
Payments related to tax withholdings for share-based compensationPayments related to tax withholdings for share-based compensation(43)(41)Payments related to tax withholdings for share-based compensation(47)(43)
Repurchase of common stockRepurchase of common stock(155)Repurchase of common stock(6)(155)
OtherOtherOther— 
Net cash used in financing activities(837)(388)
Net cash provided by (used in) financing activitiesNet cash provided by (used in) financing activities(805)399 
Net increase (decrease) in cash, cash equivalents and restricted cashNet increase (decrease) in cash, cash equivalents and restricted cash153 (450)Net increase (decrease) in cash, cash equivalents and restricted cash545 (381)
Cash, cash equivalents and restricted cash—beginning of periodCash, cash equivalents and restricted cash—beginning of period2,077 2,994 Cash, cash equivalents and restricted cash—beginning of period2,077 2,994 
Cash, cash equivalents and restricted cash—end of periodCash, cash equivalents and restricted cash—end of period$2,230 $2,544 Cash, cash equivalents and restricted cash—end of period$2,622 $2,613 
Balances per Consolidated Balance Sheets:
JuneSeptember 30,
2021
Cash and cash equivalents$1,8062,203 
Restricted cash424419 
Total cash, cash equivalents and restricted cash$2,2302,622 
The accompanying notes are an integral part of these consolidated financial statements.

67

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(unaudited)


NOTE 1—NATURE OF OPERATIONS AND BASIS OF PRESENTATION

We operate 2 natural gas liquefaction and export facilities at Sabine Pass and Corpus Christi (respectively, the “Sabine Pass LNG Terminal” and “Corpus Christi LNG Terminal”).

Cheniere Partners owns the Sabine Pass LNG Terminal located in Cameron Parish, Louisiana, which has natural gas liquefaction facilities consisting of 5 operational natural gas liquefaction Trains and 1 additional Train under construction that is undergoing commissioning and expected to be substantially completed in the first halfquarter of 2022, for a total production capacity of approximately 30 mtpa of LNG (the “SPL Project”). The Sabine Pass LNG Terminal also has operational regasification facilities that include 5 LNG storage tanks, vaporizers and 2 marine berths, with an additional marine berth that is under construction. Cheniere Partners also owns a 94-mile pipeline that interconnects the Sabine Pass LNG Terminal with a number of large interstate pipelines (the “Creole Trail Pipeline”) through its subsidiary, CTPL. As of JuneSeptember 30, 2021, we owned 100% of the general partner interest and 48.6% of the limited partner interest in Cheniere Partners.

The Corpus Christi LNG Terminal is located near Corpus Christi, Texas. We currently operate 3 Trains, for a total production capacity of approximately 15 mtpa of LNG. We also own a 23-mile natural gas supply pipeline that interconnects the Corpus Christi LNG Terminal with several interstate and intrastate natural gas pipelines (the “Corpus Christi Pipeline” and together with the Trains, the “CCL Project”) through our subsidiary CCP, as part of the CCH Group. The CCL Project also contains 3 LNG storage tanks and 2 marine berths.

Additionally, separate from the CCH Group, we are developing an expansion of the Corpus Christi LNG Terminal adjacent to the CCL Project (“Corpus Christi Stage 3”) through our subsidiary CCL Stage III, for up to 7 midscale Trains with an expected total production capacity of approximately 10 mtpa of LNG. We received approval from FERC in November 2019 to site, construct and operate the expansion project.

We remain focused on operational excellence and customer satisfaction. Increasing demand for LNG has allowed us to expand our liquefaction infrastructure in a financially disciplined manner. We have increased available liquefaction capacity at the SPL Project and the CCL Project (collectively, the “Liquefaction Projects”) as a result of debottlenecking and other optimization projects. We hold significant land positions at both the Sabine Pass LNG Terminal and the Corpus Christi LNG Terminal which provide opportunity for further liquefaction capacity expansion. The development of these sites or other projects, including infrastructure projects in support of natural gas supply and LNG demand, will require, among other things, acceptable commercial and financing arrangements before we make a final investment decision (“FID”).

Basis of Presentation

The accompanying unaudited Consolidated Financial Statements of Cheniere have been prepared in accordance with GAAP for interim financial information and with Rule 10-01 of Regulation S-X. Accordingly, they do not include all of the information and footnotes required by GAAP for complete financial statements and should be read in conjunction with the Consolidated Financial Statements and accompanying notes included in our annual report on Form 10-K for the fiscal year ended December 31, 2020.

Results of operations for the three and sixnine months ended JuneSeptember 30, 2021 are not necessarily indicative of the results of operations that will be realized for the year ending December 31, 2021.

Recent Accounting Standards

In August 2020, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Update (“ASU”) 2020-06, Debt—Debt with Conversion and Other Options (Subtopic 470-20) and Derivatives and Hedging—Contracts in Entity’s Own Equity (Subtopic 815-40): Accounting for Convertible Instruments and Contracts in an Entity’s Own Equity. This guidance simplifies the accounting for convertible instruments primarily by eliminating the existing cash conversion and beneficial conversion models within Subtopic 470-20, which will result in fewer embedded conversion options being accounted for separately from the debt host. The guidance also amends and simplifies the calculation of earnings per share relating to convertible instruments. This guidance is effective for annual periods beginning after December 15, 2021, including interim periods within that reporting period, with earlier adoption permitted for fiscal years beginning after December 15, 2020, including interim periods within that reporting period, using either a full or modified retrospective approach. We plan to adopt
78


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
this guidance on January 1, 2022 using the modified retrospective approach. Preliminarily, we anticipate the adoption of ASU 2020-06 will primarily result in the reclassification of the previously bifurcated equity component associated with the 4.25% Convertible Senior Notes due 2045 (the “2045 Cheniere Convertible Senior Notes”) to debt as a result of the elimination of the cash conversion model. We currently estimate that the reclassification of the $194 million equity component will result in an approximate $190 million increase in the carrying value of our 2045 Cheniere Convertible Senior Notes, with the difference primarily impacting retained earnings as of January 1, 2022. We continue to evaluate the impact of the provisions of this guidance on our Consolidated Financial Statements and related disclosures. See Note 10—9Debt for further discussion on the 2045 Cheniere Convertible Senior Notes.

In March 2020, the FASB issued ASU 2020-04, Reference Rate Reform (Topic 848): Facilitation of the Effects of Reference Rate Reform on Financial Reporting. This guidance primarily provides temporary optional expedients which simplify the accounting for contract modifications to existing contracts expected to arise from the market transition from LIBOR to alternative reference rates. We have various credit facilities and interest rate swaps indexed to LIBOR, as further described in Note 6—Derivative Instruments and Note 10—9Debt. The optional expedients were available to be used upon issuance of this guidance but we have not yet applied the guidance because we have not yet modified any of our existing contracts for reference rate reform. Once we apply an optional expedient to a modified contract and adopt this standard, the guidance will be applied to all subsequent applicable contract modifications until December 31, 2022, at which time the optional expedients are no longer available.

NOTE 2—RESTRICTED CASH
 
Restricted cash consists of funds that are contractually or legally restricted as to usage or withdrawal and have been presented separately from cash and cash equivalents on our Consolidated Balance Sheets. As of JuneSeptember 30, 2021 and December 31, 2020, restricted cash consisted of the following (in millions):
June 30,December 31,September 30,December 31,
2021202020212020
Restricted cashRestricted cashRestricted cash
SPL ProjectSPL Project$65 $97 SPL Project$133 $97 
CCL ProjectCCL Project122 70 CCL Project59 70 
Cash held by our subsidiaries that is restricted to CheniereCash held by our subsidiaries that is restricted to Cheniere237 282 Cash held by our subsidiaries that is restricted to Cheniere227 282 
Total restricted cashTotal restricted cash$424 $449 Total restricted cash$419 $449 

Pursuant to the accounts agreements entered into with the collateral trustees for the benefit of SPL’s debt holders and CCH’s debt holders, SPL and CCH are required to deposit all cash received into reserve accounts controlled by the collateral trustees.  The usage or withdrawal of such cash is restricted to the payment of liabilities related to the Liquefaction Projects and other restricted payments. The majority of the cash held by our subsidiaries that is restricted to Cheniere relates to advance funding for operation and construction needs of the Liquefaction Projects.

NOTE 3—ACCOUNTS AND OTHER RECEIVABLES, NET OF CURRENT EXPECTED CREDIT LOSSES

As of JuneSeptember 30, 2021 and December 31, 2020, accounts and other receivables, net of current expected credit losses consisted of the following (in millions):
June 30,December 31,September 30,December 31,
2021202020212020
Trade receivablesTrade receivablesTrade receivables
SPL and CCLSPL and CCL$405 $482 SPL and CCL$584 $482 
Cheniere MarketingCheniere Marketing123 113 Cheniere Marketing272 113 
Other accounts receivable, net of current expected credit losses85 52 
Other accounts receivableOther accounts receivable127 52 
Total accounts and other receivables, net of current expected credit lossesTotal accounts and other receivables, net of current expected credit losses$613 $647 Total accounts and other receivables, net of current expected credit losses$983 $647 

89


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 4—INVENTORY

As of JuneSeptember 30, 2021 and December 31, 2020, inventory consisted of the following (in millions):
June 30,December 31,September 30,December 31,
2021202020212020
MaterialsMaterials$162 $150 Materials$168 $150 
LNG in-transitLNG in-transit102 88 LNG in-transit145 88 
LNGLNG61 27 LNG125 27 
Natural gasNatural gas36 26 Natural gas31 26 
OtherOtherOther
Total inventoryTotal inventory$363 $292 Total inventory$471 $292 

NOTE 5—PROPERTY, PLANT AND EQUIPMENT, NET OF ACCUMULATED DEPRECIATION
 
As of JuneSeptember 30, 2021 and December 31, 2020, property, plant and equipment, net of accumulated depreciation consisted of the following (in millions):
June 30,December 31,September 30,December 31,
2021202020212020
LNG terminalLNG terminal  LNG terminal  
LNG terminal and interconnecting pipeline facilitiesLNG terminal and interconnecting pipeline facilities$30,598 $27,475 LNG terminal and interconnecting pipeline facilities$30,617 $27,475 
LNG site and related costsLNG site and related costs343 324 LNG site and related costs441 324 
LNG terminal construction-in-processLNG terminal construction-in-process2,650 5,378 LNG terminal construction-in-process2,817 5,378 
Accumulated depreciationAccumulated depreciation(3,413)(2,935)Accumulated depreciation(3,663)(2,935)
Total LNG terminal, net of accumulated depreciationTotal LNG terminal, net of accumulated depreciation30,178 30,242 Total LNG terminal, net of accumulated depreciation30,212 30,242 
Fixed assets and otherFixed assets and other  Fixed assets and other  
Computer and office equipmentComputer and office equipment27 25 Computer and office equipment27 25 
Furniture and fixturesFurniture and fixtures20 19 Furniture and fixtures20 19 
Computer softwareComputer software120 117 Computer software122 117 
Leasehold improvementsLeasehold improvements45 45 Leasehold improvements45 45 
LandLand59 Land59 
OtherOther20 25 Other21 25 
Accumulated depreciationAccumulated depreciation(175)(164)Accumulated depreciation(181)(164)
Total fixed assets and other, net of accumulated depreciationTotal fixed assets and other, net of accumulated depreciation58 126 Total fixed assets and other, net of accumulated depreciation55 126 
Assets under finance leaseAssets under finance leaseAssets under finance lease
Tug vesselsTug vessels60 60 Tug vessels60 60 
Accumulated depreciationAccumulated depreciation(8)(7)Accumulated depreciation(9)(7)
Total assets under finance lease, net of accumulated depreciationTotal assets under finance lease, net of accumulated depreciation52 53 Total assets under finance lease, net of accumulated depreciation51 53 
Property, plant and equipment, net of accumulated depreciationProperty, plant and equipment, net of accumulated depreciation$30,288 $30,421 Property, plant and equipment, net of accumulated depreciation$30,318 $30,421 

The following table shows depreciation expense and offsets to LNG terminal costs during the three and sixnine months ended JuneSeptember 30, 2021 and 2020 (in millions):
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
20212020202120202021202020212020
Depreciation expenseDepreciation expense$258 $231 $492 $463 Depreciation expense$257 $231 $749 $694 
Offsets to LNG terminal costs (1)Offsets to LNG terminal costs (1)36 227 Offsets to LNG terminal costs (1)— — 227 — 
(1)We recognize offsets to LNG terminal costs related to the sale of commissioning cargoes because these amounts were earned or loaded prior to the start of commercial operations of the respective Trains of the Liquefaction Projects during the testing phase for its construction.

910


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 6—DERIVATIVE INSTRUMENTS
 
We have entered into the following derivative instruments that are reported at fair value:
interest rate swaps (“CCH Interest Rate Derivatives”) to hedge the exposure to volatility in a portion of the floating-rate interest payments on CCH’s amended and restated term loan credit facility (the “CCH Credit Facility”) and previously, to hedge against changes in interest rates that could impact anticipated future issuance of debt by CCH (“CCH Interest Rate Forward Start Derivatives” and, collectively with the CCH Interest Rate Derivatives, the “Interest Rate Derivatives”);
commodity derivatives consisting of natural gas supply contracts for the commissioning and operation of the Liquefaction Projects and potential future development of Corpus Christi Stage 3 (“Physical Liquefaction Supply Derivatives”) and associated economic hedges (“Financial Liquefaction Supply Derivatives,” and collectively with the Physical Liquefaction Supply Derivatives, the “Liquefaction Supply Derivatives”);
physical derivatives consisting of liquified natural gas contracts in which we have contractual net settlement (“Physical LNG Trading Derivatives”) and financial derivatives to hedge the exposure to the commodity markets in which we have contractual arrangements to purchase or sell physical LNG (collectively, “LNG Trading Derivatives”); and
foreign currency exchange (“FX”) contracts to hedge exposure to currency risk associated with cash flows denominated in currencies other than United States dollar (“FX Derivatives”), associated with both LNG Trading Derivatives and operations in countries outside of the United States.

We recognize our derivative instruments as either assets or liabilities and measure those instruments at fair value. None of our derivative instruments are designated as cash flow or fair value hedging instruments, and changes in fair value are recorded within our Consolidated Statements of Operations to the extent not utilized for the commissioning process, in which case it is capitalized.

The following table shows the fair value of our derivative instruments that are required to be measured at fair value on a recurring basis as of JuneSeptember 30, 2021 and December 31, 2020 (in millions):
Fair Value Measurements as ofFair Value Measurements as of
June 30, 2021December 31, 2020September 30, 2021December 31, 2020
Quoted Prices in Active Markets
(Level 1)
Significant Other Observable Inputs
(Level 2)
Significant Unobservable Inputs
(Level 3)
TotalQuoted Prices in Active Markets
(Level 1)
Significant Other Observable Inputs
(Level 2)
Significant Unobservable Inputs
(Level 3)
TotalQuoted Prices in Active Markets
(Level 1)
Significant Other Observable Inputs
(Level 2)
Significant Unobservable Inputs
(Level 3)
TotalQuoted Prices in Active Markets
(Level 1)
Significant Other Observable Inputs
(Level 2)
Significant Unobservable Inputs
(Level 3)
Total
CCH Interest Rate Derivatives liabilityCCH Interest Rate Derivatives liability$$(91)$$(91)$$(140)$$(140)CCH Interest Rate Derivatives liability$— $(67)$— $(67)$— $(140)$— $(140)
Liquefaction Supply Derivatives asset (liability)Liquefaction Supply Derivatives asset (liability)(7)(194)(197)(6)241 240 Liquefaction Supply Derivatives asset (liability)(21)(2,611)(2,629)(6)241 240 
LNG Trading Derivatives asset (liability)LNG Trading Derivatives asset (liability)20 (226)(195)(401)(3)(131)(134)LNG Trading Derivatives asset (liability)11 (444)(680)(1,113)(3)(131)— (134)
FX Derivatives liability(4)(4)(22)(22)
FX Derivatives asset (liability)FX Derivatives asset (liability)— — — (22)— (22)

We value our Interest Rate Derivatives using an income-based approach utilizing observable inputs to the valuation model including interest rate curves, risk adjusted discount rates, credit spreads and other relevant data. We value our LNG Trading Derivatives and our Liquefaction Supply Derivatives using a market or option-based approach incorporating present value techniques, as needed, using observable commodity price curves, when available, and other relevant data. We value our FX Derivatives with a market approach using observable FX rates and other relevant data.

The fair value of our Physical Liquefaction Supply Derivatives and LNG Trading Derivatives are predominantly driven by observable and unobservable market commodity prices and, as applicable to our natural gas supply contracts, our assessment of the associated events deriving fair value, including evaluating whether the respective market is available as pipeline infrastructure is developed. The fair value of our Physical Liquefaction Supply Derivatives incorporates risk premiums related to the satisfaction of conditions precedent, such as completion and placement into service of relevant pipeline infrastructure to accommodate marketable physical gas flow. As of JuneSeptember 30, 2021 and December 31, 2020, some of our Physical Liquefaction
1011


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Liquefaction Supply Derivatives existed within markets for which the pipeline infrastructure was under development to accommodate marketable physical gas flow.

We include our Physical LNG Trading Derivatives and a portion of our Physical Liquefaction Supply Derivatives as Level 3 within the valuation hierarchy as the fair value is developed through the use of internal models which incorporate significant unobservable inputs. In instances where observable data is unavailable, consideration is given to the assumptions that market participants would use in valuing the asset or liability. This includes assumptions about market risks, such as future prices of energy units for unobservable periods, liquidity, volatility and contract duration.

The Level 3 fair value measurements of our Physical LNG Trading Derivatives and the natural gas positions within our Physical Liquefaction Supply Derivatives could be materially impacted by a significant change in certain natural gas and international LNG prices. The following table includes quantitative information for the unobservable inputs for our Level 3 Physical Liquefaction Supply Derivatives and Physical LNG Trading Derivatives as of JuneSeptember 30, 2021:
Net Fair Value Liability
(in millions)
Valuation ApproachSignificant Unobservable InputRange of Significant Unobservable Inputs / Weighted Average (1)
Physical Liquefaction Supply Derivatives$(194)(2,611)Market approach incorporating present value techniquesHenry Hub basis spread$(0.573)(1.333) - $0.385$0.895 / $(0.009)$(0.006)
Option pricing modelInternational LNG pricing spread, relative to Henry Hub (2)137%158% - 297%516% / 175%224%
Physical LNG Trading Derivatives$(195)(680)Market approach incorporating present value techniquesInternational LNG pricing spread, relative to Henry Hub or TTF, as applicable (2)$(3.108)(11.275) - $7.078$23.458 / $5.161$17.777
(1)Unobservable inputs were weighted by the relative fair value of the instruments.
(2)Spread contemplates U.S. dollar-denominated pricing.

Increases or decreases in basis or pricing spreads, in isolation, would decrease or increase, respectively, the fair value of our Physical LNG Trading Derivatives and our Physical Liquefaction Supply Derivatives.

The following table shows the changes in the fair value of our Level 3 Physical LNG Trading Derivatives and Physical Liquefaction Supply Derivatives during the three and sixnine months ended JuneSeptember 30, 2021 and 2020 (in millions):
Three Months Ended June 30,Six Months Ended June 30,
2021202020212020
Balance, beginning of period$131 $674 $241 $138 
Realized and mark-to-market gains (losses):
Included in cost of sales(464)(84)(471)452 
Purchases and settlements:
Purchases(58)(4)(187)(3)
Settlements28 (1)
Transfers into Level 3, net (1)
Balance, end of period$(389)$590 $(389)$590 
Change in unrealized gains (losses) relating to instruments still held at end of period$(464)$(84)$(471)$452 
(1)Transferred into Level 3 as a result of unobservable market for the underlying natural gas purchase agreements.
Three Months Ended September 30,Nine Months Ended September 30,
2021202020212020
Balance, beginning of period$(389)$590 $241 $138 
Realized and mark-to-market gains (losses):
Included in cost of sales(2,982)(27)(2,898)454 
Purchases and settlements:
Purchases(657)
Settlements75 (31)23 (61)
Balance, end of period$(3,291)$533 $(3,291)$533 
Change in unrealized gains (losses) relating to instruments still held at end of period$(2,982)$(27)$(2,898)$454 

All counterparty derivative contracts provide for the unconditional right of set-off in the event of default. We have elected to report derivative assets and liabilities arising from our derivative contracts with the same counterparty on a net basis. The use of derivative instruments exposes us to counterparty credit risk, or the risk that a counterparty will be unable to meet its commitments in instances when our derivative instruments are in an asset position. Additionally, counterparties are at risk that we will be unable to meet our commitments in instances where our derivative instruments are in a liability position. We
11


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
incorporate both our own nonperformance risk and the respective counterparty’s nonperformance risk in fair value measurements. In adjusting the fair value of our derivative contracts for the effect of nonperformance risk, we have considered the impact of any applicable credit enhancements, such as collateral postings, set-off rights and guarantees.
12


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Interest Rate Derivatives

CCH has entered into interest rate swaps to protect against volatility of future cash flows and hedge a portion of the variable interest payments on the CCH Credit Facility. CCH previously also had interest rate swaps to hedge against changes in interest rates that could impact the anticipated future issuance of debt. In August 2020, we settled the outstanding CCH Interest Rate Forward Start Derivatives.

As of JuneSeptember 30, 2021, we had the following Interest Rate Derivatives outstanding:
Notional Amounts
JuneSeptember 30, 2021December 31, 2020Latest Maturity DateWeighted Average Fixed Interest Rate PaidVariable Interest Rate Received
CCH Interest Rate Derivatives$4.64.5 billion$4.6 billionMay 31, 20222.30%One-month LIBOR

The following table shows the gain (loss) from changes in the fair valueeffect and settlementslocation of our Interest Rate Derivatives recorded in interest rate derivative loss, net on our Consolidated Statements of Operations during the three and sixnine months ended JuneSeptember 30, 2021 and 2020 (in millions):
Gain (Loss) Recognized in Consolidated Statements of Operations
Three Months Ended June 30,Six Months Ended June 30,Consolidated Statements of Operations LocationThree Months Ended September 30,Nine Months Ended September 30,
2021202020212020Consolidated Statements of Operations Location2021202020212020
CCH Interest Rate DerivativesCCH Interest Rate Derivatives$(2)$(15)$(1)$(138)CCH Interest Rate Derivatives$(2)$— $(3)$(138)
CCH Interest Rate Forward Start DerivativesCCH Interest Rate Forward Start Derivatives(10)(95)CCH Interest Rate Forward Start DerivativesInterest rate derivative loss, net— — — (95)

Commodity Derivatives

SPL, CCL and CCL Stage III have entered into physical natural gas supply contracts and associated economic hedges, including those associated with our integrated production marketing (“IPM”)IPM transactions, to purchase natural gas for the commissioning and operation of the Liquefaction Projects and potential future development of Corpus Christi Stage 3, respectively, which are primarily indexed to the natural gas market and international LNG indices. The remaining terms of the index-based physical natural gas supply contracts range up to approximately 15 years, some of which commence upon the satisfaction of certain events or states of affairs. The terms of the Financial Liquefaction Supply Derivatives range up to approximately three years.

Commencing in first quarter of 2021, we have entered into physical LNG transactions that provide for contractual net settlement. Such transactions are accounted for as LNG Trading Derivatives, and are designed to economically hedge exposure to the commodity markets in which we sell LNG. We have entered into, and may from time to time enter into, financial LNG Trading Derivatives in the form of swaps, forwards, options or futures. The terms of LNG Trading Derivatives range up to approximately two years.

The following table shows the notional amounts of our Liquefaction Supply Derivatives and LNG Trading Derivatives (collectively, “Commodity Derivatives”):
June 30, 2021December 31, 2020
Liquefaction Supply DerivativesLNG Trading DerivativesLiquefaction Supply DerivativesLNG Trading Derivatives
Notional amount, net (in TBtu) (1)10,631 14 10,483 20 
September 30, 2021December 31, 2020
Liquefaction Supply DerivativesLNG Trading DerivativesLiquefaction Supply DerivativesLNG Trading Derivatives
Notional amount, net (in TBtu) (1)11,291 (14)10,483 20 
(1)Includes notional amounts for natural gas supply contracts that SPL and CCL have with related parties. See Note 13—12Related Party Transactions.

1213


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
The following table shows the gain (loss) from changes in the fair value, settlementseffect and location of our Commodity Derivatives recorded on our Consolidated Statements of Operations during the three and sixnine months ended JuneSeptember 30, 2021 and 2020 (in millions):
Gain (Loss) Recognized in Consolidated Statements of Operations
Consolidated Statements of Operations Location (1)Three Months Ended June 30,Six Months Ended June 30,Consolidated Statements of Operations Location (1)Three Months Ended September 30,Nine Months Ended September 30,
2021202020212020Consolidated Statements of Operations Location (1)2021202020212020
LNG Trading DerivativesLNG Trading DerivativesLNG revenues$(379)$(34)$(441)$106 LNG Trading DerivativesLNG revenues$(1,098)$13 $(1,539)$119 
LNG Trading DerivativesLNG Trading DerivativesCost of sales53 34 81 LNG Trading DerivativesCost of sales55 (5)136 (5)
Liquefaction Supply Derivatives (2)Liquefaction Supply Derivatives (2)LNG revenues(13)(14)Liquefaction Supply Derivatives (2)LNG revenues(4)21 (3)
Liquefaction Supply Derivatives (2)Liquefaction Supply Derivatives (2)Cost of sales(341)(62)(404)475 Liquefaction Supply Derivatives (2)Cost of sales(2,444)(103)(2,848)372 
(1)Fair value fluctuations associated with commodity derivative activities are classified and presented consistently with the item economically hedged and the nature and intent of the derivative instrument.
(2)Does not include the realized value associated with derivative instruments that settle through physical delivery.

FX Derivatives

Cheniere Marketing has entered into FX Derivatives to protect against the volatility in future cash flows attributable to changes in international currency exchange rates. The FX Derivatives economically hedge the foreign currency exposure arising from cash flows expended for both physical and financial LNG transactions that are denominated in a currency other than the United States dollar. The terms of FX Derivatives range up to approximately one year.

The total notional amount of our FX Derivatives was $267$499 million and $786 million as of JuneSeptember 30, 2021 and December 31, 2020, respectively.

The following table shows the gain (loss) from changes in the fair value, settlementseffect and location of our FX Derivatives recorded on our Consolidated Statements of Operations during the three and sixnine months ended JuneSeptember 30, 2021 and 2020 (in millions):
Consolidated Statements of Operations LocationThree Months Ended June 30,Six Months Ended June 30,
2021202020212020
FX DerivativesLNG revenues$(5)$$16 $27 
Gain (Loss) Recognized in Consolidated Statements of Operations
Consolidated Statements of Operations LocationThree Months Ended September 30,Nine Months Ended September 30,
2021202020212020
FX DerivativesLNG revenues$11 $(5)$27 $22 

1314


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Fair Value and Location of Derivative Assets and Liabilities on the Consolidated Balance Sheets

The following table shows the fair value and location of our derivative instruments on our Consolidated Balance Sheets (in millions):
June 30, 2021
CCH Interest Rate DerivativesLiquefaction Supply Derivatives (1)LNG Trading Derivatives (2)FX DerivativesTotal
Consolidated Balance Sheets Location
Current derivative assets$$53 $119 $$178 
Derivative assets96 96 
Total derivative assets149 119 274 
Current derivative liabilities(91)(201)(520)(10)(822)
Derivative liabilities(145)(145)
Total derivative liabilities(91)(346)(520)(10)(967)
Derivative liability, net$(91)$(197)$(401)$(4)$(693)
December 31, 2020September 30, 2021
CCH Interest Rate DerivativesLiquefaction Supply Derivatives (1)LNG Trading Derivatives (2)FX DerivativesTotalCCH Interest Rate DerivativesLiquefaction Supply Derivatives (1)LNG Trading Derivatives (2)FX DerivativesTotal
Consolidated Balance Sheets LocationConsolidated Balance Sheets LocationConsolidated Balance Sheets Location
Current derivative assetsCurrent derivative assets$$27 $$$32 Current derivative assets$— $88 $163 $15 $266 
Derivative assetsDerivative assets376 376 Derivative assets— 71 — — 71 
Total derivative assetsTotal derivative assets403 408 Total derivative assets— 159 163 15 337 
Current derivative liabilitiesCurrent derivative liabilities(100)(54)(134)(25)(313)Current derivative liabilities(67)(630)(1,276)(6)(1,979)
Derivative liabilitiesDerivative liabilities(40)(109)(2)(151)Derivative liabilities— (2,158)— — (2,158)
Total derivative liabilitiesTotal derivative liabilities(140)(163)(134)(27)(464)Total derivative liabilities(67)(2,788)(1,276)(6)(4,137)
Derivative asset (liability), netDerivative asset (liability), net$(140)$240 $(134)$(22)$(56)Derivative asset (liability), net$(67)$(2,629)$(1,113)$$(3,800)
December 31, 2020
CCH Interest Rate DerivativesLiquefaction Supply Derivatives (1)LNG Trading Derivatives (2)FX DerivativesTotal
Consolidated Balance Sheets LocationConsolidated Balance Sheets Location
Current derivative assetsCurrent derivative assets$— $27 $— $$32 
Derivative assetsDerivative assets— 376 — — 376 
Total derivative assetsTotal derivative assets— 403 — 408 
Current derivative liabilitiesCurrent derivative liabilities(100)(54)(134)(25)(313)
Derivative liabilitiesDerivative liabilities(40)(109)— (2)(151)
Total derivative liabilitiesTotal derivative liabilities(140)(163)(134)(27)(464)
Derivative asset (liability), netDerivative asset (liability), net$(140)$240 $(134)$(22)$(56)
(1)Does not include collateral posted with counterparties by us of $22$47 million and $9 million, which are included in margin deposits and other current assets in our Consolidated Balance Sheets as of JuneSeptember 30, 2021 and December 31, 2020, respectively. Includes derivative assets for natural gas supply contracts that SPL and CCL have with related parties. See Note 13—12Related Party Transactions.
(2)Does not include collateral posted with counterparties by us of $1$287 million and $7 million, which are included in margin deposits and other current assets in our Consolidated Balance Sheets as of JuneSeptember 30, 2021 and December 31, 2020, respectively.

1415


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Consolidated Balance Sheets Presentation

Our derivative instruments are presented on a net basis on our Consolidated Balance Sheets as described above. The following table shows the fair value of our derivatives outstanding on a gross and net basis (in millions):
CCH Interest Rate DerivativesLiquefaction Supply DerivativesLNG Trading DerivativesFX DerivativesCCH Interest Rate DerivativesLiquefaction Supply DerivativesLNG Trading DerivativesFX Derivatives
FX DerivativesCCH Interest Rate DerivativesLiquefaction Supply DerivativesLNG Trading Derivatives
As of June 30, 2021
As of September 30, 2021As of September 30, 2021
Gross assetsGross assets$$203 $131 $Gross assets$— $179 $174 $30 
Offsetting amountsOffsetting amounts(54)(12)(3)Offsetting amounts— (20)(11)(15)
Net assetsNet assets$$149 $119 $Net assets$— $159 $163 $15 
Gross liabilitiesGross liabilities$(91)$(401)$(614)$(37)Gross liabilities$(67)$(2,816)$(1,427)$(34)
Offsetting amountsOffsetting amounts55 94 27 Offsetting amounts— 28 151 28 
Net liabilitiesNet liabilities$(91)$(346)$(520)$(10)Net liabilities$(67)$(2,788)$(1,276)$(6)
As of December 31, 2020As of December 31, 2020As of December 31, 2020
Gross assetsGross assets$$452 $$Gross assets$— $452 $— $
Offsetting amountsOffsetting amounts(49)(1)Offsetting amounts— (49)— (1)
Net assetsNet assets$$403 $$Net assets$— $403 $— $
Gross liabilitiesGross liabilities$(140)$(184)$(163)$(62)Gross liabilities$(140)$(184)$(163)$(62)
Offsetting amountsOffsetting amounts21 29 35 Offsetting amounts— 21 29 35 
Net liabilitiesNet liabilities$(140)$(163)$(134)$(27)Net liabilities$(140)$(163)$(134)$(27)

NOTE 7—OTHER NON-CURRENT ASSETS, NET

As of June 30, 2021 and December 31, 2020, other non-current assets, net consisted of the following (in millions):
June 30,December 31,
20212020
Contract assets, net of current expected credit losses$105 $80 
Advances made to municipalities for water system enhancements82 84 
Equity method investments88 81 
Advances and other asset conveyances to third parties to support LNG terminals69 60 
Debt issuance costs and debt discount, net of accumulated amortization30 42 
Advances made under EPC and non-EPC contracts
Advance tax-related payments and receivables18 20 
Other37 30 
Total other non-current assets, net$431 $406 

Equity Method Investments

As of June 30, 2021, our equity method investment consists of our interest in Midship Holdings, LLC (“Midship Holdings”), which manages the business and affairs of Midship Pipeline Company, LLC (“Midship Pipeline”). Midship Pipeline is currently operating an approximately 200-mile natural gas pipeline project (the “Midship Project”) that connects production in the Anadarko Basin to Gulf Coast markets. The Midship Project commenced operations in April 2020.

Our investment in Midship Holdings, net of impairment losses, was $88 million and $80 million as of June 30, 2021 and December 31, 2020, respectively.

15


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 8—NON-CONTROLLING INTEREST AND VARIABLE INTEREST ENTITY

We own a 48.6% limited partner interest in Cheniere Partners in the form of 239.9 million common units, with the remaining non-controlling limited partner interest held by The Blackstone Group Inc., Brookfield Asset Management Inc. and the public. We also own 100% of the general partner interest and the incentive distribution rights in Cheniere Partners. Cheniere Partners is accounted for as a consolidated VIE. See Note 9—Non-Controlling Interest and Variable Interest Entity of our Notes to Consolidated Financial Statements in our annual report on Form 10-K for the fiscal year ended December 31, 2020 for further information.

16


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
The following table presents the summarized assets and liabilities (in millions) of Cheniere Partners, our consolidated VIE, which are included in our Consolidated Balance Sheets as of JuneSeptember 30, 2021 and December 31, 2020. The assets in the table below may only be used to settle obligations of Cheniere Partners. In addition, there is no recourse to us for the consolidated VIE’s liabilities. The assets and liabilities in the table below include third-party assets and liabilities of Cheniere Partners only and exclude intercompany balances that eliminate in consolidation.
June 30,December 31,September 30,December 31,
2021202020212020
ASSETSASSETS ASSETS 
Current assetsCurrent assets  Current assets  
Cash and cash equivalentsCash and cash equivalents$1,239 $1,210 Cash and cash equivalents$1,713 $1,210 
Restricted cashRestricted cash65 97 Restricted cash133 97 
Accounts and other receivables, net of current expected credit lossesAccounts and other receivables, net of current expected credit losses285 318 Accounts and other receivables, net of current expected credit losses358 318 
Other current assetsOther current assets236 182 Other current assets283 182 
Total current assetsTotal current assets1,825 1,807 Total current assets2,487 1,807 
Property, plant and equipment, net of accumulated depreciationProperty, plant and equipment, net of accumulated depreciation16,789 16,723 Property, plant and equipment, net of accumulated depreciation16,820 16,723 
Other non-current assets, netOther non-current assets, net289 287 Other non-current assets, net294 287 
Total assetsTotal assets$18,903 $18,817 Total assets$19,601 $18,817 
LIABILITIESLIABILITIES  LIABILITIES  
Current liabilitiesCurrent liabilities  Current liabilities  
Accrued liabilitiesAccrued liabilities$649 $658 Accrued liabilities$846 $658 
Current debt, net of premium, discount and debt issuance costsCurrent debt, net of premium, discount and debt issuance costs654 Current debt, net of premium, discount and debt issuance costs944 — 
Other current liabilitiesOther current liabilities154 171 Other current liabilities216 171 
Total current liabilitiesTotal current liabilities1,457 829 Total current liabilities2,006 829 
Long-term debt, net of premium, discount and debt issuance costsLong-term debt, net of premium, discount and debt issuance costs16,935 17,580 Long-term debt, net of premium, discount and debt issuance costs17,171 17,580 
Other non-current liabilitiesOther non-current liabilities95 126 Other non-current liabilities98 126 
Total liabilitiesTotal liabilities$18,487 $18,535 Total liabilities$19,275 $18,535 

NOTE 9—8—ACCRUED LIABILITIES
  
As of JuneSeptember 30, 2021 and December 31, 2020, accrued liabilities consisted of the following (in millions): 
June 30,December 31,September 30,December 31,
2021202020212020
Interest costs and related debt feesInterest costs and related debt fees$236 $245 Interest costs and related debt fees$360 $245 
Accrued natural gas purchasesAccrued natural gas purchases559 576 Accrued natural gas purchases900 576 
LNG terminals and related pipeline costsLNG terminals and related pipeline costs169 147 LNG terminals and related pipeline costs126 147 
Compensation and benefitsCompensation and benefits69 123 Compensation and benefits88 123 
Accrued LNG inventoryAccrued LNG inventory49 Accrued LNG inventory
Accrued dividendsAccrued dividends84 — 
Other accrued liabilitiesOther accrued liabilities115 80 Other accrued liabilities226 80 
Total accrued liabilitiesTotal accrued liabilities$1,197 $1,175 Total accrued liabilities$1,787 $1,175 
 
1617


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 10—9—DEBT
 
As of JuneSeptember 30, 2021 and December 31, 2020, our debt consisted of the following (in millions): 
June 30,December 31,September 30,December 31,
2021202020212020
Long-term debt:Long-term debt:Long-term debt:
SPL — 4.200% to 6.25% senior secured notes due between March 2022 and September 2037 and working capital facility (“2020 SPL Working Capital Facility”)(1)
SPL — 4.200% to 6.25% senior secured notes due between March 2022 and September 2037 and working capital facility (“2020 SPL Working Capital Facility”)(1)
$12,994 $13,650 
SPL — 4.200% to 6.25% senior secured notes due between March 2022 and September 2037 and working capital facility (“2020 SPL Working Capital Facility”)(1)
$13,128 $13,650 
Cheniere Partners 4.000% to 5.625% senior notes due between October 2025 and March 2031 and credit facilities (“2019 CQP Credit Facilities”)
4,100 4,100 
Cheniere Partners 3.250% to 5.625% senior notes due between October 2025 and January 2032 and credit facilities (“2019 CQP Credit Facilities”)
Cheniere Partners 3.250% to 5.625% senior notes due between October 2025 and January 2032 and credit facilities (“2019 CQP Credit Facilities”)
4,200 4,100 
CCH 3.52% to 7.000% senior secured notes due between June 2024 and December 2039 and CCH Credit Facility
10,216 10,217 
CCH 2.742% to 7.000% senior secured notes due between June 2024 and December 2039 and CCH Credit Facility
CCH 2.742% to 7.000% senior secured notes due between June 2024 and December 2039 and CCH Credit Facility
10,128 10,217 
Cheniere 4.625% senior secured notes due October 2028 (the “2028 Cheniere Senior Notes”), convertible notes, revolving credit facility (“Cheniere Revolving Credit Facility”) and term loan facility (“Cheniere Term Loan Facility”)
Cheniere 4.625% senior secured notes due October 2028 (the “2028 Cheniere Senior Notes”), convertible notes, revolving credit facility (“Cheniere Revolving Credit Facility”) and term loan facility (“Cheniere Term Loan Facility”)
2,625 3,145 
Cheniere 4.625% senior secured notes due October 2028 (the “2028 Cheniere Senior Notes”), convertible notes, revolving credit facility (“Cheniere Revolving Credit Facility”) and term loan facility (“Cheniere Term Loan Facility”)
2,625 3,145 
Unamortized premium, discount and debt issuance costs, net of accumulated amortizationUnamortized premium, discount and debt issuance costs, net of accumulated amortization(608)(641)Unamortized premium, discount and debt issuance costs, net of accumulated amortization(600)(641)
Total long-term debt, net of premium, discount and debt issuance costsTotal long-term debt, net of premium, discount and debt issuance costs29,327 30,471 Total long-term debt, net of premium, discount and debt issuance costs29,481 30,471 
Current debt:Current debt:Current debt:
SPL — current portion of 6.25% senior secured notes due March 2022 (“2022 SPL Senior Notes”) (1)
656 
SPL — current portion of 6.25% senior secured notes due March 2022 (the “2022 SPL Senior Notes”) (1) (2)
SPL — current portion of 6.25% senior secured notes due March 2022 (the “2022 SPL Senior Notes”) (1) (2)
522 — 
Cheniere Partners current portion of 5.625% senior notes due October 2026 (the “2026 CQP Senior Notes”) (3)
Cheniere Partners current portion of 5.625% senior notes due October 2026 (the “2026 CQP Senior Notes”) (3)
428 — 
CCH $1.2 billion CCH working capital facility (“CCH Working Capital Facility”) and current portion of CCH Credit Facility
CCH $1.2 billion CCH working capital facility (“CCH Working Capital Facility”) and current portion of CCH Credit Facility
132 271 
CCH $1.2 billion CCH working capital facility (“CCH Working Capital Facility”) and current portion of CCH Credit Facility
104 271 
Cheniere Marketing — trade finance facilities and letter of credit facility
Cheniere Marketing — trade finance facilities and letter of credit facility
30 
Cheniere Marketing — trade finance facilities and letter of credit facility
— — 
Cheniere — current portion of the 4.875% convertible unsecured notes due May 2021 (“2021 Cheniere Convertible Notes”) and Cheniere Revolving Credit Facility (2)
134 104 
Cheniere — current portion of the 4.875% convertible unsecured notes due May 2021 (“2021 Cheniere Convertible Notes”)
Cheniere — current portion of the 4.875% convertible unsecured notes due May 2021 (“2021 Cheniere Convertible Notes”)
— 104 
Unamortized discount and debt issuance costs, net of accumulated amortizationUnamortized discount and debt issuance costs, net of accumulated amortization(3)(3)Unamortized discount and debt issuance costs, net of accumulated amortization(7)(3)
Total current debt, net of discount and debt issuance costsTotal current debt, net of discount and debt issuance costs949 372 Total current debt, net of discount and debt issuance costs1,047 372 
Total debt, net of premium, discount and debt issuance costsTotal debt, net of premium, discount and debt issuance costs$30,276 $30,843 Total debt, net of premium, discount and debt issuance costs$30,528 $30,843 
(1)A portion of the 2022 SPL Senior Notes is categorized as long-term debt because the proceeds from the expected series of sales of approximately $347$482 million aggregate principal amount of senior secured notes due 2037 pursuant to executed note purchase agreements, expected to be issued in the second halffourth quarter of 2021, subject to customary closing conditions, will be used to strategically refinance a portion of the 2022 SPL Senior Notes and pay related fees, costs and expenses.
(2)    TheIn October 2021, $318 million of the 2022 SPL Senior Notes was redeemed with $100 million from the proceeds from Cheniere Partners’ issuance of the 3.250% senior notes due 2032 (the “2032 CQP Senior Notes”) and $218 million of cash on hand. See Issuances, Redemptions and Repayments section below for further discussion.
(3)In October 2021, Cheniere Partners redeemed the remaining outstanding balance underaggregate principal amount of the Cheniere Revolving Credit Facility as of June 30, 2021 was repaid2026 CQP Senior Notes that were not purchased pursuant to the tender offer and consent solicitation in July 2021September 2021. See Issuances, Redemptions and is categorized as short-term debt.Repayments section below for further discussion.

1718


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Issuances, Redemptions and Repayments

The following table shows the issuances, redemptions and repayments of long-term debt during the sixnine months ended JuneSeptember 30, 2021, excluding intra-quarter borrowings and repayments (in millions):
IssuancesPrincipal Amount Issued
Three Months Ended March 31, 2021
Cheniere Partners — 4.000% Senior Notes due 2031 (the “2031 CQP Senior Notes”) (1)
$1,500 
Three Months Ended June 30, 2021
Cheniere — Cheniere Term Loan Facility (2)
220 
Cheniere — Cheniere Revolving Credit Facility
134 
Six
Three Months Ended JuneSeptember 30, 2021
CCH — 2.742% Senior Notes due 2039 (the “2.742% CCH Senior Secured Notes”) (3)
750 
Cheniere Partners — 2032 CQP Senior Notes (4)
1,200 
Nine Months Ended September 30, 2021 total$1,8543,804 
Redemptions and RepaymentsPrincipal Amount Redeemed/Repaid
Three Months Ended March 31, 2021
Cheniere Partners — 5.250% Senior Notes due 2025 (the “2025 CQP Senior Notes”) (1)
$1,500 
Cheniere — Cheniere Term Loan Facility (3)(5)
148 
Three Months Ended June 30, 2021
Cheniere — 2021 Cheniere Convertible Notes (2)
476 
Cheniere — Cheniere Term Loan Facility (3)(2)
220 
SixThree Months Ended JuneSeptember 30, 2021
Cheniere — Cheniere Revolving Credit Facility
134 
CCH — CCH Credit Facility (3)
866 
Cheniere Partners — 2026 CQP Senior Notes (4)
672 
Nine Months Ended September 30, 2021 total$2,3444,016 
(1)ProceedsNet proceeds from the issuance of the 2031 CQP Senior Notes, together with cash on hand, were used to redeem all of CQP’sCheniere Partners’ outstanding 2025 CQP Senior Notes, resulting in the recognition of debt extinguishment costs of $54 million for the six months ended June 30, 2021of loss on extinguishment of debt relating to the payment of early redemption fees and write off of unamortized debt premium and issuance costs.
(2)In May 2021, theThe 2021 Cheniere Convertible Notes were repaid using a combination of borrowings under the Cheniere Term Loan Facility and cash on hand upon the maturity date at par value.
(3)AsNet proceeds of June 30,the 2.742% CCH Senior Secured Notes, together with cash on hand, were used to prepay a portion of the principal amount outstanding under the CCH Credit Facility, resulting in $9 million of loss on extinguishment of debt relating to the payment of early redemption fees and write off of unamortized issuance costs.
(4)Net proceeds from the issuance of the 2032 CQP Senior Notes were used to redeem a portion of the 2026 CQP Senior Notes in September 2021 pursuant to a tender offer and consent solicitation, resulting in $27 million of loss on extinguishment of debt relating to the payment of early redemption fees and write off of unamortized debt premium and issuance costs. In October 2021, the remaining net proceeds from the issuance of the 2032 CQP Senior Notes were used to redeem the remaining outstanding principal amount of the 2026 CQP Senior Notes and, together with cash on hand, redeem $318 million of the 2022 SPL Senior Notes.
(5)The remaining commitments under the Cheniere Term Loan Facility were terminated in accordance with the credit agreement, resulting in $4 million of loss on extinguishment of debt.debt relating to the write off of unamortized issuance costs.

1819


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Credit Facilities

Below is a summary of our credit facilities outstanding as of JuneSeptember 30, 2021 (in millions):
2020 SPL Working Capital Facility (1)2019 CQP Credit FacilitiesCCH Credit FacilityCCH Working Capital FacilityCheniere Revolving Credit Facility2020 SPL Working Capital Facility (1)2019 CQP Credit FacilitiesCCH Credit FacilityCCH Working Capital FacilityCheniere Revolving Credit Facility
Original facility sizeOriginal facility size$1,200 $1,500 $8,404 $350 $750 Original facility size$1,200 $1,500 $8,404 $350 $750 
Incremental commitmentsIncremental commitments1,566 850 500 Incremental commitments— — 1,566 850 500 
Less:Less:Less:
Outstanding balanceOutstanding balance2,627 134 Outstanding balance— — 1,761 — — 
Commitments prepaid or terminatedCommitments prepaid or terminated750 7,343 Commitments prepaid or terminated— 750 8,209 — — 
Letters of credit issuedLetters of credit issued396 293 Letters of credit issued396 — — 360 — 
Available commitmentAvailable commitment$804 $750 $$907 $1,116 Available commitment$804 $750 $— $840 $1,250 
Priority rankingPriority rankingSenior securedSenior securedSenior securedSenior securedSenior securedPriority rankingSenior securedSenior securedSenior securedSenior securedSenior secured
Interest rate on available balanceInterest rate on available balanceLIBOR plus 1.125% - 1.750% or base rate plus 0.125% - 0.750%LIBOR plus 1.25% - 2.125% or base rate plus 0.25% - 1.125%LIBOR plus 1.75% or base rate plus 0.75%LIBOR plus 1.25% - 1.75% or base rate plus 0.25% - 0.75%LIBOR plus 1.75% - 2.50% or base rate plus 0.75% - 1.50%Interest rate on available balanceLIBOR plus 1.125% - 1.750% or base rate plus 0.125% - 0.750%LIBOR plus 1.25% - 2.125% or base rate plus 0.25% - 1.125%LIBOR plus 1.75% or base rate plus 0.75%LIBOR plus 1.25% - 1.75% or base rate plus 0.25% - 0.75%LIBOR plus 1.75% - 2.50% or base rate plus 0.75% - 1.50%
Weighted average interest rate of outstanding balanceWeighted average interest rate of outstanding balancen/an/a1.85%n/a1.82%Weighted average interest rate of outstanding balancen/an/a1.83%n/an/a
Maturity dateMaturity dateMarch 19, 2025May 29, 2024June 30, 2024June 29, 2023December 13, 2022Maturity dateMarch 19, 2025May 29, 2024June 30, 2024June 29, 2023December 13, 2022
(1)The 2020 SPL Working Capital Facility contains customary conditions precedent for extensions of credit, as well as customary affirmative and negative covenants. SPL pays a commitment fee equal to an annual rate of 0.1% to 0.3% (depending on the then-current rating of SPL), which accrues on the daily amount of the total commitment less the sum of (1) the outstanding principal amount of loans, (2) letters of credit issued and (3) the outstanding principal amount of swing line loans.

Convertible Notes

Below is a summary of our convertible notes outstanding as of JuneSeptember 30, 2021 (in millions):
2045 Cheniere Convertible Senior Notes
Aggregate original principal$625 
Debt component, net of discount and debt issuance costs$319320 
Equity component$194 
Interest payment methodCash
Conversion by us (1)(2)
Conversion by holders (1)(3)
Conversion basisCash and/or stock
Conversion value in excess of principal$0 
Maturity dateMarch 15, 2045
Contractual interest rate4.25 %
Effective interest rate (4)9.4 %
Remaining debt discount and debt issuance costs amortization period (5)23.723.5 years
(1)Conversion is subject to various limitations and conditions, which have not been met as of the balance sheet date.
(2)Redeemable at any time at a redemption price payable in cash equal to the accreted amount of the $625 million aggregate principal amount of the 2045 Cheniere Convertible Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to such redemption date.
(3)Prior to December 15, 2044, convertible only under certain circumstances as specified in the indenture; thereafter, holders may convert their notes regardless of these circumstances. The conversion rate will initially equal 7.2265 shares of our common stock per $1,000 principal amount of the 2045 Cheniere Convertible Senior Notes,
1920


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
which corresponds to an initial conversion price of approximately $138.38 per share of our common stock (subject to adjustment upon the occurrence of certain specified events).
(4)Rate to accrete the discounted carrying value of the convertible notes to the face value over the remaining amortization period.
(5)We amortize any debt discount and debt issuance costs using the effective interest over the period through contractual maturity.

Restrictive Debt Covenants

The indentures governing our senior notes and other agreements underlying our debt contain customary terms and events of default and certain covenants that, among other things, may limit us, our subsidiaries’ and its restricted subsidiaries’ ability to make certain investments or pay dividends or distributions.

As of JuneSeptember 30, 2021, each of our issuers was in compliance with all covenants related to their respective debt agreements.

Interest Expense

Total interest expense, net of capitalized interest, including interest expense related to our convertible notes, consisted of the following (in millions):
Three Months Ended June 30,Six Months Ended June 30, Three Months Ended September 30,Nine Months Ended September 30,
20212020202120202021202020212020
Interest cost on convertible notes:Interest cost on convertible notes:Interest cost on convertible notes:
Interest per contractual rateInterest per contractual rate$11 $57 $23 $120 Interest per contractual rate$$20 $29 $140 
Amortization of debt discountAmortization of debt discount20 34 Amortization of debt discount41 
Amortization of debt issuance costsAmortization of debt issuance costsAmortization of debt issuance costs— — 
Total interest cost related to convertible notesTotal interest cost related to convertible notes14 81 31 161 Total interest cost related to convertible notes28 38 189 
Interest cost on debt and finance leases excluding convertible notesInterest cost on debt and finance leases excluding convertible notes387 388 787 779 Interest cost on debt and finance leases excluding convertible notes391 388 1,178 1,167 
Total interest costTotal interest cost401 469 818 940 Total interest cost398 416 1,216 1,356 
Capitalized interestCapitalized interest(33)(62)(94)(121)Capitalized interest(34)(61)(128)(182)
Total interest expense, net of capitalized interestTotal interest expense, net of capitalized interest$368 $407 $724 $819 Total interest expense, net of capitalized interest$364 $355 $1,088 $1,174 

Fair Value Disclosures

The following table shows the carrying amount and estimated fair value of our debt (in millions):
June 30, 2021December 31, 2020 September 30, 2021December 31, 2020
Carrying
Amount
Estimated
Fair Value
Carrying
Amount
Estimated
Fair Value
Carrying
Amount
Estimated
Fair Value
Carrying
Amount
Estimated
Fair Value
Senior notes Level 2 (1)
Senior notes Level 2 (1)
$24,700 $27,503 $24,700 $27,897 
Senior notes Level 2 (1)
$25,978 $28,565 $24,700 $27,897 
Senior notes Level 3 (2)
Senior notes Level 3 (2)
2,771 3,350 2,771 3,423 
Senior notes Level 3 (2)
2,771 3,317 2,771 3,423 
Credit facilities — Level 3 (3)Credit facilities — Level 3 (3)2,791 2,791 2,915 2,915 Credit facilities — Level 3 (3)1,761 1,761 2,915 2,915 
2021 Cheniere Convertible Notes — Level 3 (2)2021 Cheniere Convertible Notes — Level 3 (2)476 480 2021 Cheniere Convertible Notes — Level 3 (2)— — 476 480 
2045 Cheniere Convertible Senior Notes — Level 1 (4)2045 Cheniere Convertible Senior Notes — Level 1 (4)625 527 625 496 2045 Cheniere Convertible Senior Notes — Level 1 (4)625 538 625 496 
(1)The Level 2 estimated fair value was based on quotes obtained from broker-dealers or market makers of these senior notes and other similar instruments.
(2)The Level 3 estimated fair value was calculated based on inputs that are observable in the market or that could be derived from, or corroborated with, observable market data, including our stock price and interest rates based on debt issued by parties with comparable credit ratings to us and inputs that are not observable in the market. 
21


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
(3)The Level 3 estimated fair value approximates the principal amount because the interest rates are variable and reflective of market rates and the debt may be repaid, in full or in part, at any time without penalty.
(4)The Level 1 estimated fair value was based on unadjusted quoted prices in active markets for identical liabilities that we had the ability to access at the measurement date.
20


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 11—10—LEASES

Our leased assets consist primarily of LNG vessel time charters (“vessel charters”) and additionally include tug vessels, office space and facilities and land sites. All of our leases are classified as operating leases except for our tug vessels supporting the Corpus Christi LNG Terminal, which are classified as finance leases.

The following table shows the classification and location of our right-of-use assets and lease liabilities on our Consolidated Balance Sheets (in millions):
June 30,December 31,September 30,December 31,
Consolidated Balance Sheets Location20212020Consolidated Balance Sheets Location20212020
Right-of-use assets—OperatingRight-of-use assets—OperatingOperating lease assets$1,698 $759 Right-of-use assets—OperatingOperating lease assets$2,064 $759 
Right-of-use assets—FinancingRight-of-use assets—FinancingProperty, plant and equipment, net of accumulated depreciation52 53 Right-of-use assets—FinancingProperty, plant and equipment, net of accumulated depreciation51 53 
Total right-of-use assetsTotal right-of-use assets$1,750 $812 Total right-of-use assets$2,115 $812 
Current operating lease liabilitiesCurrent operating lease liabilitiesCurrent operating lease liabilities$365 $161 Current operating lease liabilitiesCurrent operating lease liabilities$458 $161 
Current finance lease liabilitiesCurrent finance lease liabilitiesOther current liabilitiesCurrent finance lease liabilitiesOther current liabilities
Non-current operating lease liabilitiesNon-current operating lease liabilitiesOperating lease liabilities1,332 597 Non-current operating lease liabilitiesOperating lease liabilities1,590 597 
Non-current finance lease liabilitiesNon-current finance lease liabilitiesFinance lease liabilities57 57 Non-current finance lease liabilitiesFinance lease liabilities57 57 
Total lease liabilitiesTotal lease liabilities$1,756 $817 Total lease liabilities$2,107 $817 

The following table shows the classification and location of our lease costs on our Consolidated Statements of Operations (in millions):
Consolidated Statements of Operations LocationThree Months Ended June 30,Six Months Ended June 30,Consolidated Statements of Operations LocationThree Months Ended September 30,Nine Months Ended September 30,
2021202020212020Consolidated Statements of Operations Location2021202020212020
Operating lease cost (a)Operating lease cost (a)Operating costs and expenses (1)$145 $98 $296 $239 Operating lease cost (a)$145 $77 $441 $316 
Finance lease cost:Finance lease cost:Finance lease cost:
Amortization of right-of-use assetsAmortization of right-of-use assetsDepreciation and amortization expenseAmortization of right-of-use assetsDepreciation and amortization expense— — 
Interest on lease liabilitiesInterest on lease liabilitiesInterest expense, net of capitalized interestInterest on lease liabilitiesInterest expense, net of capitalized interest
Total lease costTotal lease cost$149 $102 $303 $246 Total lease cost$147 $79 $450 $325 
(a) Included in operating lease cost:(a) Included in operating lease cost:(a) Included in operating lease cost:
Short-term lease costsShort-term lease costs$30 $16 $81 $51 Short-term lease costs$22 $$103 $60 
Variable lease costsVariable lease costs11 13 Variable lease costs20 12 
(1)Presented in cost of sales, operating and maintenance expense or selling, general and administrative expense consistent with the nature of the asset under lease.

2122


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Future annual minimum lease payments for operating and finance leases as of JuneSeptember 30, 2021 are as follows (in millions): 
Years Ending December 31,Years Ending December 31,Operating Leases (1)Finance LeasesYears Ending December 31,Operating Leases (1)Finance Leases
20212021$227 $2021$139 $
20222022397 10 2022515 10 
20232023358 10 2023479 10 
20242024313 10 2024433 10 
20252025213 10 2025243 10 
ThereafterThereafter448 127 Thereafter510 127 
Total lease paymentsTotal lease payments1,956 172 Total lease payments2,319 170 
Less: InterestLess: Interest(259)(113)Less: Interest(271)(111)
Present value of lease liabilitiesPresent value of lease liabilities$1,697 $59 Present value of lease liabilities$2,048 $59 
(1)Does not include $984$758 million of legally binding minimum lease payments primarily for vessel charters which were executed as of JuneSeptember 30, 2021 but will commence in future periods primarily in the next year and have fixed minimum lease terms of up to seven years.

The following table shows the weighted-average remaining lease term and the weighted-average discount rate for our operating leases and finance leases:
June 30, 2021December 31, 2020September 30, 2021December 31, 2020
Operating LeasesFinance LeasesOperating LeasesFinance LeasesOperating LeasesFinance LeasesOperating LeasesFinance Leases
Weighted-average remaining lease term (in years)Weighted-average remaining lease term (in years)6.417.28.217.7Weighted-average remaining lease term (in years)5.916.98.217.7
Weighted-average discount rate (1)Weighted-average discount rate (1)4.1%16.2%5.4%16.2%Weighted-average discount rate (1)3.6%16.2%5.4%16.2%
(1)The finance leases commenced prior to the adoption of the current leasing standard under GAAP. In accordance with previous accounting guidance, the implied rate is based on the fair value of the underlying assets.

The following table includes other quantitative information for our operating and finance leases (in millions):
Six Months Ended June 30,Nine Months Ended September 30,
2021202020212020
Cash paid for amounts included in the measurement of lease liabilities:Cash paid for amounts included in the measurement of lease liabilities:Cash paid for amounts included in the measurement of lease liabilities:
Operating cash flows used in operating leasesOperating cash flows used in operating leases$201 $157 Operating cash flows used in operating leases$331 $226 
Operating cash flows used in finance leasesOperating cash flows used in finance leasesOperating cash flows used in finance leases
Right-of-use assets obtained in exchange for operating lease liabilitiesRight-of-use assets obtained in exchange for operating lease liabilities1,112 246 Right-of-use assets obtained in exchange for operating lease liabilities1,575 412 

LNG Vessel Subcharters

From time to time, we sublease certain LNG vessels under charter to third parties while retaining our existing obligation to the original lessor. As of Juneboth September 30, 2021 and December 31, 2020, we had $4 million and 0, respectively, inno future minimum sublease payments to be received from LNG vessel subcharters. The following table shows the sublease income recognized in other revenues on our Consolidated Statements of Operations (in millions):
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
20212020202120202021202020212020
Fixed incomeFixed income$$15 $11 $52 Fixed income$17 $$28 $61 
Variable incomeVariable income23 Variable income15 21 24 
Total sublease incomeTotal sublease income$13 $23 $17 $75 Total sublease income$32 $10 $49 $85 

2223


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 12—11—REVENUES FROM CONTRACTS WITH CUSTOMERS

The following table represents a disaggregation of revenue earned from contracts with customers during the three and sixnine months ended JuneSeptember 30, 2021 and 2020 (in millions):
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
20212020202120202021202020212020
LNG revenues (1)LNG revenues (1)$3,297 $2,340 $6,336 $4,744 LNG revenues (1)$4,169 $1,344 $10,505 $6,088 
Regasification revenuesRegasification revenues67 68 134 135 Regasification revenues68 67 202 202 
Other revenuesOther revenues24 16 44 38 Other revenues22 10 66 48 
Total revenues from customersTotal revenues from customers3,388 2,424 6,514 4,917 Total revenues from customers4,259 1,421 10,773 6,338 
Net derivative gain (loss) (2)Net derivative gain (loss) (2)(384)(45)(424)119 Net derivative gain (loss) (2)(1,091)29 (1,515)148 
Other (3)Other (3)13 23 17 75 Other (3)32 10 49 85 
Total revenuesTotal revenues$3,017 $2,402 $6,107 $5,111 Total revenues$3,200 $1,460 $9,307 $6,571 
(1)LNG revenues include revenues for LNG cargoes in which our customers exercised their contractual right to not take delivery but remained obligated to pay fixed fees irrespective of such election. During the three and sixnine months ended JuneSeptember 30, 2020, we recognized $708$171 million and $761$932 million, respectively, in LNG revenues associated with LNG cargoes for which customers notified us that they would not take delivery, of which $458$47 million would have been recognized subsequent to JuneSeptember 30, 2020 had the cargoes been lifted pursuant to the delivery schedules with the customers. LNG revenues during the three months ended JuneSeptember 30, 2021 and 2020 excluded zero and six$458 million, respectively, and LNG revenues during the nine months ended JuneSeptember 30, 2021 and 2020 excluded $53$38 million and $38 million,zero, respectively, that would have otherwise been recognized during the quarterperiod if the cargoes were lifted pursuant to the delivery schedules with the customers. We did 0tnot have revenues associated with LNG cargoes for which customers notified us that they would not take delivery during the three and sixnine months ended JuneSeptember 30, 2021. Revenue is generally recognized upon receipt of irrevocable notice that a customer will not take delivery because our customers have no contractual right to take delivery of such LNG cargo in future periods and our performance obligations with respect to such LNG cargo have been satisfied.
(2)See Note 6—Derivative Instruments for additional information about our derivatives.
(3)Includes revenues from LNG vessel subcharters. See Note 11—10Leases for additional information about our subleases.

Contract Assets and Liabilities

The following table shows our contract assets, net of current expected credit losses, which are classified as other current assets and other non-current assets, net on our Consolidated Balance Sheets (in millions):
June 30,December 31,
20212020
Contract assets, net of current expected credit losses$109 $80 
September 30,December 31,
20212020
Contract assets, net of current expected credit losses$123 $80 

Contract assets represent our right to consideration for transferring goods or services to the customer under the terms of a sales contract when the associated consideration is not yet due. Changes in contract assets during the sixnine months ended JuneSeptember 30, 2021 were primarily attributable to revenue recognized due to the delivery of LNG under certain SPAs for which the associated consideration was not yet due.

The following table reflects the changes in our contract liabilities, which we classify as deferred revenue and other non-current liabilities on our Consolidated Balance Sheets (in millions):
SixNine Months Ended JuneSeptember 30, 2021
Deferred revenue, beginning of period$138 
Cash received but not yet recognized in revenue105196 
Revenue recognized from prior period deferral(138)
Deferred revenue, end of period$105196 

2324


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Transaction Price Allocated to Future Performance Obligations

Because many of our sales contracts have long-term durations, we are contractually entitled to significant future consideration which we have not yet recognized as revenue. The following table discloses the aggregate amount of the transaction price that is allocated to performance obligations that have not yet been satisfied as of JuneSeptember 30, 2021 and December 31, 2020:
June 30, 2021December 31, 2020September 30, 2021December 31, 2020
Unsatisfied Transaction Price (in billions)Weighted Average Recognition Timing (years) (1)Unsatisfied Transaction Price (in billions)Weighted Average Recognition Timing (years) (1)Unsatisfied Transaction Price (in billions)Weighted Average Recognition Timing (years) (1)Unsatisfied Transaction Price (in billions)Weighted Average Recognition Timing (years) (1)
LNG revenuesLNG revenues$101.1 10$102.3 10LNG revenues$100.6 10$102.3 10
Regasification revenuesRegasification revenues2.0 42.1 5Regasification revenues1.9 42.1 5
Total revenuesTotal revenues$103.1 $104.4 Total revenues$102.5 $104.4 
(1)The weighted average recognition timing represents an estimate of the number of years during which we shall have recognized half of the unsatisfied transaction price.

We have elected the following exemptions which omit certain potential future sources of revenue from the table above:
(1)We omit from the table above all performance obligations that are part of a contract that has an original expected duration of one year or less.
(2)The table above excludes substantially all variable consideration under our SPAs and TUAs. We omit from the table above all variable consideration that is allocated entirely to a wholly unsatisfied performance obligation or to a wholly unsatisfied promise to transfer a distinct good or service that forms part of a single performance obligation when that performance obligation qualifies as a series. The amount of revenue from variable fees that is not included in the transaction price will vary based on the future prices of Henry Hub throughout the contract terms, to the extent customers elect to take delivery of their LNG, and adjustments to the consumer price index. Certain of our contracts contain additional variable consideration based on the outcome of contingent events and the movement of various indexes. We have not included such variable consideration in the transaction price to the extent the consideration is considered constrained due to the uncertainty of ultimate pricing and receipt. Approximately 53%61% and 26%37% of our LNG revenues from contracts included in the table above during the three months ended JuneSeptember 30, 2021 and 2020, respectively, and approximately 52%56% and 34%35% of our LNG revenues from contracts included in the table above during the sixnine months ended JuneSeptember 30, 2021 and 2020, respectively, were related to variable consideration received from customers. During each of the three and sixnine months ended JuneSeptember 30, 2021, approximately 5% of our regasification revenues were related to variable consideration received from customers and during each of the three and sixnine months ended JuneSeptember 30, 2020, approximately 6% of our regasification revenues were related to variable consideration received from customers.

We may enter into contracts to sell LNG that are conditioned upon one or both of the parties achieving certain milestones such as reaching FID on a certain liquefaction Train, obtaining financing or achieving substantial completion of a Train and any related facilities. These contracts are considered completed contracts for revenue recognition purposes and are included in the transaction price above when the conditions are considered probable of being met.

NOTE 13—12—RELATED PARTY TRANSACTIONS

Natural Gas Supply Agreements

SPL and CCL are party to natural gas supply agreements with related parties in the ordinary course of business, to obtain a fixed minimum daily volume of feed gas for the operation of the Liquefaction Projects. These related parties are partially owned by The Blackstone Group Inc., who also partially owns Cheniere Partners’ limited partner interests.

24


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
SPL Natural Gas Supply Agreement

The term of the SPL agreement is for five years, which can commence no earlier than November 1, 2021 and no later than November 1, 2022, following the achievement of contractually-defined conditions precedent. As of both JuneSeptember 30, 2021
25


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
and December 31, 2020, the notional amount for this agreement was 99 TBtu and 91 TBtu, respectively. As of both September 30, 2021 and December 31, 2020, the agreement had a fair value of 0.zero.

CCL Natural Gas Supply Agreement

The term of the CCL agreement extends through March 2022. Under this agreement, CCL recorded $19 million and $13 million in accrued liabilities, as of both JuneSeptember 30, 2021 and December 31, 2020.2020, respectively.

The Liquefaction Supply Derivatives related to this agreement are recorded on our Consolidated Balance Sheets as follows (in millions, except notional amount):
June 30,December 31,September 30,December 31,
2021202020212020
Current derivative assetsCurrent derivative assets$$Current derivative assets$$
Derivative assetsDerivative assetsDerivative assets10 
Notional amount (in TBtu)Notional amount (in TBtu)132 60 Notional amount (in TBtu)119 60 

We recorded the following amounts on our Consolidated Statements of Operations during the three and sixnine months ended JuneSeptember 30, 2021 and 2020 related to this agreement (in millions):
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
20212020202120202021202020212020
Cost of sales (a)Cost of sales (a)$36 $25 $71 $48 Cost of sales (a)$53 $29 $124 $77 
(a) Included in costs of sales:(a) Included in costs of sales:(a) Included in costs of sales:
Liquefaction Supply Derivative gainLiquefaction Supply Derivative gain$$$$Liquefaction Supply Derivative gain$$(5)$13 $(3)

Natural Gas Transportation and Storage Agreements

SPL is party to various natural gas transportation and storage agreements and CTPL is party to an operational balancing agreement with a related party in the ordinary course of business for the operation of the SPL Project, with initial primary terms of up to 10 years with extension rights. This related party is partially owned by Brookfield Asset Management, Inc., who indirectly acquired a portion of Cheniere Partners’ limited partner interests in September 2020. We recorded operating and maintenance expense of $12 million and $22$34 million and cost of sales of $1 millionzero and $1 million during the three and sixnine months ended JuneSeptember 30, 2021, respectively, and accrued liabilities of $5 million and $4 million as of September 30, 2021 and December 31, 2020, respectively, with this related party.

CCL is party to natural gas transportation agreements with Midship Pipeline Company, LLC (“Midship Pipeline”) in the ordinary course of business for the operation of the CCL Project, for a period of 10 years which began in May 2020. We account for our investment in Midship Holdings, LLC (“Midship Holdings”), which manages the business and affairs of Midship Pipeline, as an equity method investment. We recorded operating and maintenance expense of $2 million during both Junethe three months ended September 30, 2021 and 2020 and $7 million and $4 million during the nine months ended September 30, 2021 and 2020, respectively. Additionally, we recorded accrued liabilities of $1 million as of both September 30, 2021 and December 31, 2020 with this related party.

Operation and Maintenance Service Agreements

Cheniere LNG O&M Services, LLC (“O&M Services”), our wholly owned subsidiary, provides the development, construction, operation and maintenance services to Midship Pipeline pursuant to agreements in which O&M Services receives an agreed upon fee and reimbursement of costs incurred. O&M Services recorded $1$2 million and $3 million in each of the three months ended JuneSeptember 30, 2021 and 2020 respectively, and $3$5 million and $6$8 million in the sixnine months ended JuneSeptember 30, 2021 and 2020, respectively, of other revenues and $1 million and $2 million of accounts receivable as of JuneSeptember 30, 2021 and December 31, 2020, respectively, for services provided to Midship Pipeline under these agreements.

26
NOTE 14—INCOME TAXES

We recorded an income tax benefit of $93 million and $4 million during the three and six months ended June 30, 2021, respectively, and an income tax provision of $63 million and $194 million during the three and six months ended June 30, 2020, respectively. The effective tax rates for the three and six months ended June 30, 2021 were 41.5% and (0.9)%, respectively, and do not bear a customary relationship to statutory income tax rates due to a combination of factors including income
25


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
allocated to non-controlling interest that is not taxable to Cheniere and a $58 million discreteNOTE 13—INCOME TAXES

We recorded an income tax benefit related to releasing a portion of our valuation allowance caused by a change in$1,860 million and $1,864 million during the three and nine months ended September 30, 2021, respectively, and an income tax law allowing for indefinite Louisiana net operating loss (“NOL”) carryover. benefit of $75 million and income tax provision of $119 million during the three and nine months ended September 30, 2020, respectively.

The effective tax rates for the three and sixnine months ended JuneSeptember 30, 2021 were 67.0% and 79.7%, respectively. Our effective tax rate is based on income (loss) before income taxes and non-controlling interest and is significantly impacted by non-controlling interest that is not taxable to Cheniere. Our effective tax rate experienced volatility during the three and nine months ended September 30, 2021 due to variability in our earnings and the proportion of such earnings attributable to non-controlling interest. The variability in earnings in the three and nine months ended September 30, 2021 were mainly the result of approximately $3.5 billion and $4.2 billion, respectively, of pre-tax derivative losses, primarily on our commodity derivatives as a result of unfavorable shifts in international forward commodity curves.

The effective tax rates for the three and nine months ended September 30, 2020 were 13.5%12.9% and 16.2%19.3%, respectively, which were lower than the 21% federal statutory tax rate primarily due to income allocated to non-controlling interest that is not taxable to Cheniere, and in the nine months ended September 30, 2020, it was partially offset by a $38 million discrete tax expense related to an internal restructuring.

NOTE 15—14—SHARE-BASED COMPENSATION
  
We have granted restricted stock shares, restricted stock units, performance stock units and phantom units to employees and non-employee directors under the 2011 Incentive Plan, as amended (the “2011 Plan”) and the 2020 Incentive Plan.Plan (the “2020 Plan”). For the sixnine months ended JuneSeptember 30, 2021, we granted 1.51.6 million restricted stock units and 0.3 million performance stock units at target performance under the 2020 Plan to certain employees. Additionally, 0.2 million incremental shares of our common stock were issued based on performance results from previously-granted performance stock unit awards.

Restricted stock units are stock awards that vest over a service period of three years and entitle the holder to receive shares of our common stock upon vesting, subject to restrictions on transfer and to a risk of forfeiture if the recipient terminates employment with us prior to the lapse of the restrictions. Performance stock units provide for cliff vesting after a period of three years with payouts based on metrics dependent upon market and performance achieved over the defined performance period compared to pre-established performance targets. The settlement amounts of the awards are based on market and performance metrics which include cumulative distributable cash flow per share, and in certain circumstances, absolute total shareholder return (“ATSR”) of our common stock. Where applicable, the compensation for performance stock units is based on fair value assigned to the market metric of ATSR using a Monte Carlo model upon grant, which remains constant through the vesting period, and a performance metric, which will vary due to changing estimates regarding the expected achievement of the performance metric of cumulative distributable cash flow per share. The number of shares that may be earned at the end of the vesting period ranges from 0% up to 300% of the target award amount. Both restricted stock units and performance stock units will be settled in Cheniere common stock (on a one-for-one basis) and are classified as equity awards, however, a portion of the performance stock units granted in 2021 will partially settle in cash, subject to individual limits. The portion of performance stock units expected to settle in Cheniere common stock (on a one-for-one basis) are classified as equity awards and the portion of performance stock units expected to settle in cash are classified as liability awards.

Total share-based compensation consisted of the following (in millions):
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
20212020202120202021202020212020
Share-based compensation costs, pre-tax:Share-based compensation costs, pre-tax:Share-based compensation costs, pre-tax:
Equity awardsEquity awards$31 $31 $64 $60 Equity awards$28 $26 $92 $86 
Liability awardsLiability awardsLiability awards
Total share-based compensationTotal share-based compensation32 32 66 61 Total share-based compensation29 27 95 88 
Capitalized share-based compensationCapitalized share-based compensation(1)(3)(3)(4)Capitalized share-based compensation(1)— (4)(4)
Total share-based compensation expenseTotal share-based compensation expense$31 $29 $63 $57 Total share-based compensation expense$28 $27 $91 $84 
Tax benefit associated with share-based compensation expenseTax benefit associated with share-based compensation expense$$$27 $19 Tax benefit associated with share-based compensation expense$$$30 $21 

27


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 16—15—NET INCOME (LOSS) PER SHARE ATTRIBUTABLE TO COMMON STOCKHOLDERS

Basic net income (loss) per share attributable to common stockholders (“EPS”) excludes dilution and is computed by dividing net income (loss) attributable to common stockholders by the weighted average number of common shares outstanding during the period. Diluted EPS reflects potential dilution and is computed by dividing net income (loss) attributable to common stockholders by the weighted average number of common shares outstanding during the period increased by the number of additional common shares that would have been outstanding if the potential common shares had been issued. The dilutive effect of unvested stock is calculated using the treasury-stock method and the dilutive effect of convertible securities is calculated using the if-converted method.

26


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
The following table reconciles basic and diluted weighted average common shares outstanding for the three and sixnine months ended JuneSeptember 30, 2021 and 2020 (in millions, except per share data):
Three Months Ended June 30,Six Months Ended June 30,
2021202020212020
Net income (loss) attributable to common stockholders$(329)$197 $64 $572 
Weighted average common shares outstanding:  
Basic253.5 252.1 253.2 252.6 
Dilutive unvested stock0.3 1.5 0.7 
Diluted253.5 252.4 254.7 253.3 
Net income (loss) per share attributable to common stockholders—basic (1)$(1.30)$0.78 $0.25 $2.27 
Net income (loss) per share attributable to common stockholders—diluted (1)$(1.30)$0.78 $0.25 $2.26 
(1)    Earnings per share in the table may not recalculate exactly due to rounding because it is calculated based on whole numbers, not the rounded numbers presented.
Three Months Ended September 30,Nine Months Ended September 30,
2021202020212020
Net income (loss) attributable to common stockholders$(1,084)$(463)$(1,020)$109 
Weighted average common shares outstanding:  
Basic253.6 252.2 253.3 252.5 
Dilutive unvested stock— — — 0.7 
Diluted253.6 252.2 253.3 253.2 
Net income (loss) per share attributable to common stockholders—basic and diluted$(4.27)$(1.84)$(4.03)$0.43 

Potentially dilutive securities that were not included in the diluted net income (loss) per share computations because their effects would have been anti-dilutive were as follows (in millions):
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
20212020202120202021202020212020
Unvested stock (1)Unvested stock (1)1.5 2.8 2.5 Unvested stock (1)1.8 3.1 1.6 2.4 
2045 Cheniere Convertible Senior Notes2045 Cheniere Convertible Senior Notes4.5 4.5 4.5 4.5 2045 Cheniere Convertible Senior Notes4.5 4.5 4.5 4.5 
Total potentially dilutive common sharesTotal potentially dilutive common shares6.0 7.3 4.5 7.0 Total potentially dilutive common shares6.3 7.6 6.1 6.9 
(1)Includes the impact of unvested shares containing performance conditions to the extent that the underlying performance conditions are satisfied based on actual results as of the respective dates.

NOTE 16—STOCKHOLDERS’ EQUITY

Share Repurchase Programs

On June 3, 2019, we announced that our Board of Directors (the “Board”) authorized a three-year, $1.0 billion share repurchase program. On September 7, 2021, the Board authorized an increase in the share repurchase program to $1.0 billion, inclusive of any amounts remaining under the previous authorization as of September 30, 2021, for an additional three years beginning on October 1, 2021. The following table presents information with respect to repurchases of common stock during the three and nine months ended September 30, 2021 and 2020 (in millions, except per share data):
Three Months Ended September 30,Nine Months Ended September 30,
2021202020212020
Aggregate common stock repurchased0.1 — 0.1 2.9 
Weighted average price paid per share$83.97 $— $83.97 $53.88 
Total amount paid$$— $$155 

As of September 30, 2021, we had up to $589 million of the share repurchase program available, which increased to $1.0 billion as of October 1, 2021.
28


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Dividends

On September 7, 2021, we declared a quarterly dividend of $0.33 per share that is payable on November 17, 2021 to shareholders of record as of November 3, 2021. As of September 30, 2021, we had $85 million accrued related to this obligation, which is included in accrued liabilities and other non-current liabilities in our Consolidated Balance Sheets.
NOTE 17—CUSTOMER CONCENTRATION
  
The following table shows external customers with revenues of 10% or greater of total revenues from external customers and external customers with accounts receivable, net of current expected credit losses and contract assets, net of current expected credit losses balances of 10% or greater of total accounts receivable, net of current expected credit losses from external customers and contract assets, net of current expected credit losses from external customers:customers, respectively:
Percentage of Total Revenues from External CustomersPercentage of Accounts Receivable, Net and Contract Assets, Net from External CustomersPercentage of Total Revenues from External CustomersPercentage of Accounts Receivable, Net and Contract Assets, Net from External Customers
Three Months Ended June 30,Six Months Ended June 30,June 30,December 31,Three Months Ended September 30,Nine Months Ended September 30,September 30,December 31,
202120202021202020212020202120202021202020212020
Customer ACustomer A14%15%15%15%*14%Customer A12%*14%13%*14%
Customer BCustomer B12%12%12%10%*12%Customer B15%11%13%10%*12%
Customer CCustomer C*10%11%***Customer C11%15%11%11%**
Customer DCustomer D11%13%*10%**
Customer ECustomer E****17%*
Customer FCustomer F****12%*
* Less than 10%

27


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 18—SUPPLEMENTAL CASH FLOW INFORMATION

The following table provides supplemental disclosure of cash flow information (in millions): 
Six Months Ended June 30,
20212020
Cash paid during the period for interest on debt, net of amounts capitalized$675 $750 
Cash paid for income taxes, net of refunds

The balance in property, plant and equipment, net of accumulated depreciation funded with accounts payable and accrued liabilities was $264 million and $222 million as of June 30, 2021 and 2020, respectively.
Nine Months Ended September 30,
20212020
Cash paid during the period for interest on debt, net of amounts capitalized$902 $977 
Cash paid for income taxes, net of refunds
Non-cash investing and financing activities:
Property, plant and equipment, net of accumulated depreciation funded with accounts payable and accrued liabilities234 262 
Accrued and declared dividends on common stock85 — 

2829


ITEM 2.    MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
 
Information Regarding Forward-Looking Statements
This quarterly report contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). All statements, other than statements of historical or present facts or conditions, included herein or incorporated herein by reference are “forward-looking statements.” Included among “forward-looking statements” are, among other things: 
statements that we expect to commence or complete construction of our proposed LNG terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions or portions thereof, by certain dates, or at all;
statements regarding future levels of domestic and international natural gas production, supply or consumption or future levels of LNG imports into or exports from North America and other countries worldwide or purchases of natural gas, regardless of the source of such information, or the transportation or other infrastructure or demand for and prices related to natural gas, LNG or other hydrocarbon products;
statements regarding any financing transactions or arrangements, or our ability to enter into such transactions;
statements regarding the amountrelating to Cheniere’s capital deployment, including intent, ability, extent, and timing of capital expenditures, debt repayment, dividends, and share repurchases;
statements relating to the construction of our Trains and pipelines, including statements concerning the engagement of any EPC contractor or other contractor and the anticipated terms and provisions of any agreement with any EPC or other contractor, and anticipated costs related thereto;
statements regarding any SPA or other agreement to be entered into or performed substantially in the future, including any revenues anticipated to be received and the anticipated timing thereof, and statements regarding the amounts of total LNG regasification, natural gas liquefaction or storage capacities that are, or may become, subject to contracts;
statements regarding counterparties to our commercial contracts, construction contracts and other contracts;
statements regarding our planned development and construction of additional Trains or pipelines, including the financing of such Trains or pipelines;
statements that our Trains, when completed, will have certain characteristics, including amounts of liquefaction capacities;
statements regarding our business strategy, our strengths, our business and operation plans or any other plans, forecasts, projections, or objectives, including anticipated revenues, capital expenditures, maintenance and operating costs and cash flows, any or all of which are subject to change;
statements regarding legislative, governmental, regulatory, administrative or other public body actions, approvals, requirements, permits, applications, filings, investigations, proceedings or decisions;
statements regarding our anticipated LNG and natural gas marketing activities;
statements regarding the outbreak of COVID-19 and its impact on our business and operating results, including any customers not taking delivery of LNG cargoes, the ongoing credit worthiness of our contractual counterparties, any disruptions in our operations or construction of our Trains and the health and safety of our employees, and on our customers, the global economy and the demand for LNG; and
any other statements that relate to non-historical or future information.
All of these types of statements, other than statements of historical or present facts or conditions, are forward-looking statements. In some cases, forward-looking statements can be identified by terminology such as “may,” “will,” “could,” “should,” “achieve,” “anticipate,” “believe,” “contemplate,” “continue,” “estimate,” “expect,” “intend,” “plan,” “potential,” “predict,” “project,” “pursue,” “target,” the negative of such terms or other comparable terminology. The forward-looking statements contained in this quarterly report are largely based on our expectations, which reflect estimates and assumptions made by our management. These estimates and assumptions reflect our best judgment based on currently known market
30


conditions and other factors. Although we believe that such estimates are reasonable, they are inherently uncertain and involve
29


a number of risks and uncertainties beyond our control. In addition, assumptions may prove to be inaccurate. We caution that the forward-looking statements contained in this quarterly report are not guarantees of future performance and that such statements may not be realized or the forward-looking statements or events may not occur. Actual results may differ materially from those anticipated or implied in forward-looking statements as a result of a variety of factors described in this quarterly report and in the other reports and other information that we file with the SEC, including those discussed under “Risk Factors” in our annual report on Form 10-K for the fiscal year ended December 31, 2020. All forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by these risk factors. These forward-looking statements speak only as of the date made, and other than as required by law, we undertake no obligation to update or revise any forward-looking statement or provide reasons why actual results may differ, whether as a result of new information, future events or otherwise.

Introduction
 
The following discussion and analysis presents management’s view of our business, financial condition and overall performance and should be read in conjunction with our Consolidated Financial Statements and the accompanying notes. This information is intended to provide investors with an understanding of our past performance, current financial condition and outlook for the future. Our discussion and analysis includes the following subjects: 
Overview of Business 
Overview of Significant Events 
Results of Operations 
Liquidity and Capital Resources
Off-Balance Sheet Arrangements  
Summary of Critical Accounting Estimates 
Recent Accounting Standards

Overview of Business
 
Cheniere, a Delaware corporation, is a Houston-based energy infrastructure company primarily engaged in LNG-related businesses. We provide clean, secure and affordable LNG to integrated energy companies, utilities and energy trading companies around the world. We aspire to conduct our business in a safe and responsible manner, delivering a reliable, competitive and integrated source of LNG to our customers.

We own and operate the Sabine Pass LNG terminal in Louisiana, one of the largest LNG production facilities in the world, through our ownership interest in and management agreements with Cheniere Partners, which is a publicly traded limited partnership that we created in 2007. As of JuneSeptember 30, 2021, we owned 100% of the general partner interest and 48.6% of the limited partner interest in Cheniere Partners. We also own and operate the Corpus Christi LNG terminal in Texas, which is wholly owned by us.

Cheniere Partners owns the Sabine Pass LNG terminal located in Cameron Parish, Louisiana, which has natural gas liquefaction facilities consisting of five operational natural gas liquefaction Trains and one additional Train under construction that is undergoing commissioning and expected to be substantially completed in the first halfquarter of 2022, for a total production capacity of approximately 30 mtpa of LNG (the “SPL Project”). The Sabine Pass LNG terminal also has operational regasification facilities that include five LNG storage tanks with aggregate capacity of approximately 17 Bcfe, two existing marine berths and one under construction that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters and vaporizers with regasification capacity of approximately 4 Bcf/d. Cheniere Partners also owns a 94-mile pipeline through its subsidiary, CTPL, that interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines.

We also own the Corpus Christi LNG terminal near Corpus Christi, Texas, and currently operate three Trains for a total production capacity of approximately 15 mtpa of LNG. Additionally, we operate a 23-mile natural gas supply pipeline that interconnects the Corpus Christi LNG terminal with several interstate and intrastate natural gas pipelines (the “Corpus Christi Pipeline” and together with the Trains, the “CCL Project”) through our subsidiaries CCL and CCP, respectively, as part of the
31


CCH Group. The CCL Project also contains three LNG storage tanks with aggregate capacity of approximately 10 Bcfe and two marine berths that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters.
30


We have contracted approximately 85% of the total production capacity from the SPL Project and the CCL Project (collectively, the “Liquefaction Projects”) on a term basis, with approximately 17 years of weighted average remaining life as of June 30, 2021. This includes volumes contracted under SPAs in which the customers are required to pay a fixed fee with respect to the contracted volumes irrespective of their election to cancel or suspend deliveries of LNG cargoes, as well as a portion of volumes contracted under integrated production marketing (“IPM”) gas supply agreements.

Additionally, separate from the CCH Group, we are developing an expansion of the Corpus Christi LNG terminal adjacent to the CCL Project (“Corpus Christi Stage 3”) through our subsidiary CCL Stage III for up to seven midscale Trains with an expected total production capacity of approximately 10 mtpa of LNG. We received approval from FERC in November 2019 to site, construct and operate the expansion project. CCL Stage III has entered into various IPM gas supply agreements.

We have contracted our production capacity under SPAs, in which the customers are generally required to pay a fixed fee with respect to the contracted volumes irrespective of their election to cancel or suspend deliveries of LNG cargoes, and under IPM gas supply agreements, in which the gas producer sells gas on a global LNG index price, less a fixed liquefaction fee, shipping and other costs. We have contracted approximately 90% of the total production capacity from the SPL Project and the CCL Project (collectively, the “Liquefaction Projects”), including those executed to support Corpus Christi Stage 3. Substantially all of our contracted capacity is from contracts with terms exceeding 10 years. Excluding contracts with terms less than 10 years, our SPAs and IPM gas supply agreements had approximately 17.5 years of weighted average remaining life as of September 30, 2021.

We remain focused on operational excellence and customer satisfaction. Increasing demand for LNG has allowed us to expand our liquefaction infrastructure in a financially disciplined manner. We have increased available liquefaction capacity at our Liquefaction Projects as a result of debottlenecking and other optimization projects. We hold significant land positions at both the Sabine Pass LNG terminal and the Corpus Christi LNG terminal which provide opportunity for further liquefaction capacity expansion. The development of these sites or other projects, including infrastructure projects in support of natural gas supply and LNG demand, will require, among other things, acceptable commercial and financing arrangements before we can make a final investment decision (“FID”).

Additionally, we are committed to the responsible and proactive management of our most important environmental, social and governance (“ESG”) impacts, risks and opportunities. We published our 2020 Corporate Responsibility (“CR”) report, which details our strategy and progress on ESG issues, as well as our efforts on integrating climate considerations into our business strategy and taking a leadership position on increased environmental transparency, including conducting a climate scenario analysis and our plan to provide LNG customers with Cargo Emission Tags. In August 2021, we also announced a peer-reviewed LNG life cycle assessment study which allows for improved greenhouse gas emissions assessment, which was published in the American Chemical Society Sustainable Chemistry & Engineering Journal. Our CR report is available at cheniere.com/IMPACT. Information on our website, including the CR report, is not incorporated by reference into this Quarterly Report on Form 10-Q.

Overview of Significant Events

Our significant events since January 1, 2021 and through the filing date of this Form 10-Q include the following:

Strategic
In September 2021, our Board of Directors approved a long-term capital allocation plan which includes (i) the repurchase, repayment or retirement of approximately $1.0 billion of existing indebtedness of the Company each year through 2024 with the intent of achieving consolidated investment grade credit metrics, (ii) initiation of a quarterly dividend for third quarter 2021 at $0.33 per share, payable November 17, 2021 to shareholders of record as of November 3, 2021 and (iii) the authorization of an increase in the share repurchase program to $1.0 billion, inclusive of any amounts remaining under the previous authorization as of September 30, 2021, for a three-year term effective October 1, 2021.
In July 2021, CCL Stage III entered into an IPM gas supply agreement with Tourmaline Oil Marketing Corp. to purchase 140,000 MMBtu per day of natural gas at a price based on the Platts Japan Korea Marker (“JKM”), for a term of approximately 15 years beginning in early 2023.
32


OnIn July 1, 2021, the board of directors of the Company (the “Board”) appointed Mses. Patricia K. Collawn and Lorraine Mitchelmore to serve as members of the Board. Ms. Collawn was appointed to the Audit Committee and the Compensation Committee of the Board, and Ms. Mitchelmore was appointed to the Audit Committee and the Governance and Nominating Committee of the Board.
Our subsidiaries entered into SPAs with multiple counterparties for portfolio volumes aggregating approximately 1234 million tonnes of LNG to be delivered between 2021 and 2032.2035, inclusive of long-term SPAs entered into with ENN LNG (Singapore) Pte Ltd. and a subsidiary of Glencore plc.
Operational
As of JulyOctober 31, 2021, approximately 1,675over 1,800 cumulative LNG cargoes totaling approximately 115over 135 million tonnes of LNG have been produced, loaded and exported from the Liquefaction Projects.
In September 2021, feed gas was introduced to Train 6 of the SPL Project.
On March 26, 2021, substantial completion of Train 3 of the CCL Project was achieved.
Financial
We completed the following financing transactions:
In October 2021, we amended and restated our $1.25 billion Cheniere Revolving Credit Facility (“Cheniere Revolving Credit Facility”) to, among other things, (1) extend the maturity through October 2026, (2) reduce the interest rate and commitment fees, which can be further reduced based on our credit ratings and may be positively or negatively adjusted up to five basis points on the interest rate and up to one basis point on the commitment fees based on the achievement of defined ESG milestones and (3) make certain other changes to the terms and conditions of the existing revolving credit facility.
In September 2021, Cheniere Partners issued an aggregate principal amount of $1.2 billion of 3.25% Senior Notes due 2032 (the “2032 CQP Senior Notes”). Net proceeds of the 2032 CQP Senior Notes were used to redeem a portion of the outstanding $1.1 billion aggregate principal amount of the 5.625% Senior Notes due 2026 (the “2026 CQP Senior Notes”) in September 2021 pursuant to a tender offer. In October 2021, the remaining net proceeds of the 2032 CQP Senior Notes were used to redeem the remaining outstanding principal amount of the 2026 CQP Senior Notes and, together with cash on hand, redeem $318 million of the 6.25% Senior Secured Notes due 2022 (the “2022 SPL Senior Notes”).
In August 2021, CCH issued an aggregate principal amount of $750 million of fully amortizing 2.742% Senior Secured Notes due 2039 (the “2.742% CCH Senior Secured Notes”). The net proceeds of the 2.742% CCH Senior Secured Notes were used to prepay a portion of the principal amount outstanding under CCH’s amended and restated term loan credit facility (the “CCH Credit Facility”).
During 2021, SPL entered into a series of note purchase agreements for the sale of approximately $347$482 million aggregate principal amount of Senior Secured Notes due 2037, on a private placement basis (the “2037 SPL Private Placement Senior Secured Notes”) on a private placement basis.. The 2037 SPL Private Placement Senior Secured Notes are expected to be issued in the second halffourth quarter of 2021, subject to customary closing conditions, and the net proceeds will be used to strategically refinanceredeem a portion of SPL’s outstanding 6.25%the 2022 SPL Senior Secured
31


Notes due 2022 and pay related fees, costs and expenses. The 2037 SPL Private Placement Senior Secured Notes will be fully amortizing, with a weighted average life of over 10 years.years and a weighted average interest rate of 3.07%.
In March 2021, Cheniere Partners issued an aggregate principal amount of approximately $1.5 billion of 4.000% Senior Notes due 2031 (the “2031 CQP Senior Notes”). The net proceeds of the 2031 CQP Senior Notes, along with cash on hand, were used to refinanceredeem the 5.250% Senior Notes due 2025 (the “2025 CQP Senior Notes”) and to pay fees and expenses in connection with the refinancing.redemption.
DuringIn July 2021, share repurchase activities recommenced pursuant to the six months ended June 30, 2021, in2019 repurchase plan, with 77,100 shares repurchased during the third quarter.
In line with our previously announced capital allocation priorities,plan, we have repaid $750 million of debt with available cash during the nine months ended September 30, 2021 as follows: (1) fully repaid the $624$148 million of total outstanding indebtedness under Cheniere’s term loan facility (“Cheniere(the “Cheniere Term Loan Facility”) and $476 million of Cheniere’s 4.875% convertible notes due May 2021 (“2021 Cheniere Convertible Notes”) with $500 million of available cash and the remainder from
33


borrowings under the Cheniere Revolving Credit Facility.Facility, (2) $134 million repayment of the Cheniere Revolving Credit Facility with available cash and (3) $116 million repayment of the CCH Credit Facility with available cash.
In JanuaryApril 2021, S&P Global Ratings changed the term commenced onoutlook of Cheniere Marketing International LLP’s 25 year SPA with CPC Corporation, Taiwan.and Cheniere Partners’ ratings to positive from negative.
In February 2021, Fitch Ratings (“Fitch”) changed the outlook of SPL’s senior secured notes rating to positive from stable and the outlook of Cheniere Partners’ long-term issuer default rating and senior unsecured notes rating to positive from stable.
In AprilJanuary 2021, S&P Global Ratings changed the outlook ofterm commenced on Cheniere and Cheniere Partners’ ratings to positive from negative.Marketing International LLP’s 25 year SPA with CPC Corporation, Taiwan.

Results of Operations

The following charts summarize the total revenues and total LNG volumes loaded from our Liquefaction Projects (including both operational and commissioning volumes) during the sixnine months ended JuneSeptember 30, 2021 and 2020:
lng-20210630_g3.jpglng-20210630_g4.jpglng-20210930_g3.jpglng-20210930_g4.jpg

The following table summarizes the volumes of operational and commissioning LNG cargoes that were loaded from the Liquefaction Projects, which were recognized on our Consolidated Financial Statements during the three and sixnine months ended JuneSeptember 30, 2021:
Three Months Ended June 30, 2021Six Months Ended June 30, 2021Three Months Ended September 30, 2021Nine Months Ended September 30, 2021
(in TBtu)(in TBtu)OperationalCommissioningOperationalCommissioning(in TBtu)OperationalCommissioningOperationalCommissioning
Volumes loaded during the current periodVolumes loaded during the current period499 — 947 28 Volumes loaded during the current period500 — 1,447 28 
Volumes loaded during the prior period but recognized during the current periodVolumes loaded during the prior period but recognized during the current period32 26 Volumes loaded during the prior period but recognized during the current period23 — 26 
Less: volumes loaded during the current period and in transit at the end of the periodLess: volumes loaded during the current period and in transit at the end of the period(23)— (23)— Less: volumes loaded during the current period and in transit at the end of the period(34)— (34)— 
Total volumes recognized in the current periodTotal volumes recognized in the current period508 950 31 Total volumes recognized in the current period489 — 1,439 31 

3234


Net income (loss) attributable to common stockholders
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
(in millions, except per share data)(in millions, except per share data)20212020Change20212020Change(in millions, except per share data)20212020Change20212020Change
Net income (loss) attributable to common stockholdersNet income (loss) attributable to common stockholders$(329)$197 $(526)$64 $572 $(508)Net income (loss) attributable to common stockholders$(1,084)$(463)$(621)$(1,020)$109 $(1,129)
Net income (loss) per share attributable to common stockholders—basic(1.30)0.78 (2.08)0.25 2.27 (2.02)
Net income (loss) per share attributable to common stockholders—diluted(1.30)0.78 (2.08)0.25 2.26 (2.01)
Net income (loss) per share attributable to common stockholders—basic and dilutedNet income (loss) per share attributable to common stockholders—basic and diluted(4.27)(1.84)(2.43)(4.03)0.43 (4.46)

Net income attributable to common stockholders decreased by $526$621 million and $508 million$1.1 billion during the three and sixnine months ended JuneSeptember 30, 2021, respectively, from the comparable periods in 2020, primarily as a result of a $472 million and $886 milliondue to the increase in derivative-related after-taxderivative losses attributable to common stockholders forfrom changes in fair value and settlements of$3.4 billionand $4.5 billion (pre-tax and excluding the impact of non-controlling interest) between the three and sixnine months ended June 30, 2021, respectively. The derivative-related losses in the three and six months ended June 30, 2021 were mainly the result of $674 million and $748 million,periods, respectively, of pre-tax derivative losses, primarily on our commodity derivatives as a result of unfavorable shifts in international forward commodity curves. Additionally, during the three months ended June 30, 2021 compared to the comparable period in 2020, margins declined due to the non-recurrence, during the three months ended June 30, 2021, of accelerated revenues recognized from LNG cargoes for which customers notified us that they would not take delivery, which were partially offset by increased revenue on increased volume of LNG delivered. During the six months ended June 30, 2021, the decrease in net income attributable to common stockholders due to losses in derivativesfurther described below. This impact was partially offset by increased commodity margins per MMBtu on volumes delivered, due to both increasedvolume and revenue per MMBtu of LNG delivered of $1.3 billion and volumes delivered,$2.2 billion (pre-tax and excluding the impact of non-controlling interest) during the three and nine months ended September 30, 2021, respectively, from the comparable periods in 2020, as well as higher than normal contributions from LNGthe volatility in our effective tax rate during the three and natural gas portfolio optimization activitiesnine months ended September 30, 2021 due to significant volatilityvariability in LNGour earnings and natural gas markets during the six months ended June 30, 2021. This was partially offset by the non-recurrence, during the six months ended June 30, 2021,proportion of accelerated revenues recognized from LNG cargoes for which customers notified us that they would not take delivery.such earnings attributable to non-controlling interest.

We enter intoSubstantially all after-tax derivative losses relate to the use of commodity derivative instruments, principally those indexed to manageinternational LNG prices. While operationally we utilize commodity derivatives to mitigate price volatility for commodities procured or sold over a period of time, as a result of significant appreciation in forward international LNG commodity curves during the three and nine months ended September 30, 2021, we recognized $3.2 billion and $4.0 billion, respectively, of non-cash unfavorable changes in fair value attributed to positions indexed to such prices (pre-tax and excluding the impact of non-controlling interest), including our IPM gas supply agreements and certain physical and financial derivatives entered into economically hedge exposure to (1) changing interest rates, (2)commodity markets in which we have contractual agreements to purchase or sell physical LNG.

Derivative instruments, which in addition to managing exposure to commodity-related marketing and price risks including those associated with our IPM transactions,are utilized to manage exposure to changing interest rates and (3) foreign exchange volatility. Derivative instrumentsvolatility, are reported at fair value on our Consolidated Financial Statements.In some cases, the underlying transactions being economically hedged are accounted for under the accrual method of accounting, whereby revenues and expenses are recognized only upon delivery, receipt or realization of the underlying transaction.Because the recognition of derivative instruments at fair value has the effect of recognizing gains or losses relating to future period exposure, and given the significant volumes, long-term duration and volatility in price basis for certain of our derivative contracts, use of derivative instruments may increase theresult in continued volatility of our results of operations based on changes in market pricing, counterparty credit risk and other relevant factors.factors, notwithstanding the operational intent to mitigate risk exposure over time.

Revenues
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
(in millions)(in millions)20212020Change20212020Change(in millions)20212020Change20212020Change
LNG revenuesLNG revenues$2,913 $2,295 $618 $5,912 $4,863 $1,049 LNG revenues$3,078 $1,373 $1,705 $8,990 $6,236 $2,754 
Regasification revenuesRegasification revenues67 68 (1)134 135 (1)Regasification revenues68 67 202 202 — 
Other revenuesOther revenues37 39 (2)61 113 (52)Other revenues54 20 34 115 133 (18)
Total revenuesTotal revenues$3,017 $2,402 $615 $6,107 $5,111 $996 Total revenues$3,200 $1,460 $1,740 $9,307 $6,571 $2,736 

Total revenues increased during the three and sixnine months ended JuneSeptember 30, 2021 from the comparable periods in 2020, primarily as a result of increased revenues per MMBtu and higher volume of LNG delivered between the periods due to the non-recurrence of notification by our customers to not take delivery of scheduled LNG during the three and sixnine months ended JuneSeptember 30, 2021. Revenues per MMBtu of LNG was higher due to improved market prices recognized by our integrated marketing function and as a result of variable fees that are received in addition to fixed fees when the customers take delivery of the cargo as opposed to exercising their contractual right to not take delivery. During the three and sixnine months ended JuneSeptember 30, 2020, we recognized $708$171 million and $761$932 million, respectively, in LNG revenues associated with LNG cargoes for which customers notified us that they would not take delivery, of which $458$47 million would have been recognized subsequent to JuneSeptember 30, 2020 had the cargoes been lifted pursuant to the delivery schedules with the customers. LNG
35


revenues during the three months ended JuneSeptember 30, 2020 and sixnine months ended JuneSeptember 30, 2021 excluded $53$458 million and $38 million, respectively, that would have otherwise been recognized during the quarter if the cargoes were lifted pursuant to the delivery schedules with the
33


customers. We did not have revenues associated with LNG cargoes for which customers notified us that they would not take delivery during the three and sixnine months ended JuneSeptember 30, 2021.

Prior to substantial completion of a Train, amounts received from the sale of commissioning cargoes from that Train are offset against LNG terminal construction-in-process, because these amounts are earned or loaded during the testing phase for the construction of that Train. During the three and sixnine months ended JuneSeptember 30, 2021, we realized offsets to LNG terminal costs of $36 million and $227$227 million, corresponding to 6 and 31 TBtu, respectively, that were related to the sale of commissioning cargoes from Train 3 of the Liquefaction Projects.CCL Project. We did not realize any offsets to LNG terminal costs during the three and six months ended JuneSeptember 30, 2021 and three and nine months ended September 30, 2020.

Also included in LNG revenues are sales of certain unutilized natural gas procured for the liquefaction process and other revenues, which was $94 million and $243 million during the three months ended September 30, 2021 and 2020, respectively, and $241 million and $397 million during the nine months ended September 30, 2021 and 2020, respectively. Additionally, LNG revenues include gains and losses from derivative instruments, which include the realized value associated with a portion of derivative instruments that settle through physical delivery. We recognized revenues (offsets to revenues) of $(340)$(1,092) million and $61$29 million during the three months ended JuneSeptember 30, 2021 and 2020, respectively, and $(276)$(1,515) million and $273$148 million during the sixnine months ended JuneSeptember 30, 2021 and 2020, respectively, related to these transactions.the gains and losses from derivative instruments due to shifts in forward commodity curves.

We expect our LNG revenues to increase in the future with Train 3 of the CCL Project now fully operational and upon Train 6 of the SPL Project becoming operational.operational, which is expected in the first quarter of 2022.

The following table presents the components of LNG revenues and the corresponding LNG volumes sold:delivered:
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
2021202020212020 2021202020212020
LNG revenues (in millions):
LNG revenues (in millions):
LNG revenues (in millions):
LNG from the Liquefaction Projects sold under third party long-term agreements (1)LNG from the Liquefaction Projects sold under third party long-term agreements (1)$2,482 $1,244 $4,801 $3,151 LNG from the Liquefaction Projects sold under third party long-term agreements (1)$2,887 $780 $7,688 $3,931 
LNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreementsLNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreements683 150 1,202 475 LNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreements1,075 65 2,277 540 
LNG procured from third partiesLNG procured from third parties88 132 185 203 LNG procured from third parties115 85 300 288 
LNG revenues associated with cargoes not delivered per customer notification (2)LNG revenues associated with cargoes not delivered per customer notification (2)— 708 — 761 LNG revenues associated with cargoes not delivered per customer notification (2)— 171 — 932 
Other revenues and net derivative gains (losses)(340)61 (276)273 
Net derivative gains (losses)Net derivative gains (losses)(1,092)29 (1,515)148 
Other revenuesOther revenues93 243 240 397 
Total LNG revenuesTotal LNG revenues$2,913 $2,295 $5,912 $4,863 Total LNG revenues$3,078 $1,373 $8,990 $6,236 
Volumes delivered as LNG revenues (in TBtu):
Volumes delivered as LNG revenues (in TBtu):
Volumes delivered as LNG revenues (in TBtu):
LNG from the Liquefaction Projects sold under third party long-term agreements (1)LNG from the Liquefaction Projects sold under third party long-term agreements (1)403 253 784 619 LNG from the Liquefaction Projects sold under third party long-term agreements (1)386 145 1,170 764 
LNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreementsLNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreements105 52 166 145 LNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreements103 23 269 168 
LNG procured from third partiesLNG procured from third parties14 34 28 48 LNG procured from third parties10 31 38 79 
Total volumes delivered as LNG revenuesTotal volumes delivered as LNG revenues522 339 978 812 Total volumes delivered as LNG revenues499 199 1,477 1,011 
(1)Long-term agreements include agreements with an initial tenure of 12 months or more.
(2)LNG revenues include revenues with no corresponding volumes due to revenues attributable to LNG cargoes for which customers notified us that they would not take delivery.

3436


Operating costs and expenses
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
(in millions)(in millions)20212020Change20212020Change(in millions)20212020Change20212020Change
Cost of salesCost of sales$2,154 $803 $1,351 $3,540 $1,527 $2,013 Cost of sales$4,868 $768 $4,100 $8,408 $2,295 $6,113 
Operating and maintenance expenseOperating and maintenance expense385 355 30 707 671 36 Operating and maintenance expense350 317 33 1,057 988 69 
Development expenseDevelopment expense(2)Development expense— — 
Selling, general and administrative expenseSelling, general and administrative expense73 73 — 154 154 — Selling, general and administrative expense70 70 — 224 224 — 
Depreciation and amortization expenseDepreciation and amortization expense258 233 25 494 466 28 Depreciation and amortization expense259 233 26 753 699 54 
Impairment expense and loss (gain) on disposal of assets(1)— (1)(1)(6)
Impairment expense and loss on disposal of assetsImpairment expense and loss on disposal of assets— — (5)
Total operating costs and expensesTotal operating costs and expenses$2,871 $1,465 $1,406 $4,897 $2,828 $2,069 Total operating costs and expenses$5,550 $1,388 $4,162 $10,447 $4,216 $6,231 

Our total operating costs and expenses increased during the three and sixnine months ended JuneSeptember 30, 2021 from the comparable periods in 2020, primarily as a result of increased cost of sales.

Cost of sales includes costs incurred directly for the production and delivery of LNG from the Liquefaction Projects, to the extent those costs are not utilized for the commissioning process. Cost of sales increased during the three and sixnine months ended JuneSeptember 30, 2021 from the comparable 2020 periods, primarily due to increased pricing of natural gas feedstock as a result of higher US natural gas prices and increased volume of LNG produced,delivered, as well as unfavorable changes in our commodity derivatives to secure natural gas feedstock for the Liquefaction Projects driven by unfavorable shifts in international forward commodity curves. Partially offsetting these increases were decreases in netCost of sales also includes costs associated with the sale of certain unutilized natural gas procured for the liquefaction process and a portion of derivative instruments that settle through physical delivery. Cost of sales also includesdelivery, port and canal fees, variable transportation and storage costs, net of margins from the sale of natural gas procured for the liquefaction process and other costs to convert natural gas into LNG.

We expect our operating costs and expenses to generally increase in the future upon Train 6 of the SPL Project achieving substantial completion in the first quarter of 2022, although we expect certain costs will not proportionally increase with the number of operational Trains as cost efficiencies will be realized.

Other expense (income)
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
(in millions)(in millions)20212020Change20212020Change(in millions)20212020Change20212020Change
Interest expense, net of capitalized interestInterest expense, net of capitalized interest$368 $407 $(39)$724 $819 $(95)Interest expense, net of capitalized interest$364 $355 $$1,088 $1,174 $(86)
Loss on modification or extinguishment of debtLoss on modification or extinguishment of debt43 (39)59 44 15 Loss on modification or extinguishment of debt36 171 (135)95 215 (120)
Interest rate derivative loss, netInterest rate derivative loss, net25 (23)233 (232)Interest rate derivative loss, net— 233 (230)
Other income, net(4)(5)(10)(14)
Other expense, netOther expense, net24 129 (105)14 115 (101)
Total other expenseTotal other expense$370 $470 $(100)$774 $1,082 $(308)Total other expense$426 $655 $(229)$1,200 $1,737 $(537)

Interest expense, net of capitalized interest, decreasedincreased during the three and six months ended JuneSeptember 30, 2021 from the comparable 2020 periodsperiod primarily due to the completion of construction of the final Train of the CCL Project in March 2021, which eliminated the portion of total interest costs that was eligible for capitalization. Interest expense, net of capitalized interest, decreased during the nine months ended September 30, 2021 from the comparable 2020 period as a result of lower interest costs as a result of refinancing higher cost debt.debt and repayment of debt in accordance with our capital allocation plan, partially offset by the portion of total interest costs that was eligible for capitalization. During the three months ended JuneSeptember 30, 2021 and 2020, we incurred $401$398 million and $469$416 million of total interest cost, respectively, of which we capitalized $33$34 million and $62$61 million, respectively, which was primarily related to interest costs incurred for the construction of the Liquefaction Projects. During the sixnine months ended JuneSeptember 30, 2021 and 2020, we incurred $818$1,216 million and $940$1,356 million of total interest cost, respectively, of which we capitalized $94$128 million and $121$182 million, respectively, which was primarily related to interest costs incurred for the construction of the Liquefaction Projects.

37


Loss on modification or extinguishment of debt decreased during the three and nine months ended June 30, 2021 and increased during the six months ended JuneSeptember 30, 2021 from the respective comparable periods in 2020. During2020 due to a lower amount of senior notes and convertible notes repaid or redeemed between the three months ended June 30, 2021, we recognized $4 millionperiods, as well as a lower amount of debt extinguishment costs relating to the terminationborrowings prepaid under our credit facilities, as further described in Liquidity and Capital ResourcesSources and Uses of the Cheniere Term Loan FacilityCash—Proceeds from Issuances of Debt, Repayments of Debt, Debt Issuance and in the six months ended June 30, 2021, we further recognized $54 million of debt extinguishment costs relating to the payment of early redemption feesOther Financing Costs and premiums and write off of unamortized debt issuance costs with the redemption of the 2025 CQP Senior Notes. Loss on modificationDebt Modification or extinguishment of debt recognized in 2020 was primarily attributable to $43 million of debt extinguishment costs relating to the payment of early redemption fees and write off of unamortized debt premiums and issuance costs associated with the 5.625% Senior Secured Notes due 2021 (“2021 SPL Senior Notes”)Extinguishment Costs.
35


Interest rate derivative loss, net decreased during the three and sixnine months ended JuneSeptember 30, 2021 compared to the comparable 2020 periods,period, primarily due to a favorable shift in the long-term forward LIBOR curve between the periods and the settlement of certain outstanding derivatives in August 2020.2020 that were in an unfavorable position.

Other expense, net decreased during the three and nine months ended September 30, 2021 compared to the three and nine months ended September 30, 2020 primarily due to lower other-than-temporary impairment losses related to our investment in Midship Holdings that were recognized between the periods.

Income tax provision (benefit)
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
(in millions)(in millions)20212020Change20212020Change(in millions)20212020Change20212020Change
Income (loss) before income taxes and non-controlling interestIncome (loss) before income taxes and non-controlling interest$(224)$467 $(691)$436 $1,201 $(765)Income (loss) before income taxes and non-controlling interest$(2,776)$(583)$(2,193)$(2,340)$618 $(2,958)
Income tax provision (benefit)Income tax provision (benefit)(93)63 (156)(4)194 (198)Income tax provision (benefit)(1,860)(75)(1,785)(1,864)119 (1,983)
Effective tax rateEffective tax rate41.5 %13.5 %(0.9)%16.2 %Effective tax rate67.0 %12.9 %79.7 %19.3 %

The effective tax rates for the three and nine months ended September 30, 2021 were 67.0% and 79.7%, respectively. Our effective tax rate is based on income (loss) before income taxes and non-controlling interest and is significantly impacted by non-controlling interest that is not taxable to Cheniere. Our effective tax rate experienced volatility during the three and nine months ended September 30, 2021 due to variability in our earnings and the proportion of such earnings attributable to non-controlling interest. The variability in earnings in the three and nine months ended September 30, 2021 were mainly the result of approximately $3.5 billionand $4.2 billion, respectively, of pre-tax derivative losses, primarily on our commodity derivatives as a result of unfavorable shifts in international forward commodity curves.

The effective tax rates for the three and sixnine months ended June 30, 2021 were 41.5% and (0.9)%, respectively, and do not bear a customary relationship to statutory income tax rates due to a combination of factors including income allocated to non-controlling interest that is not taxable to Cheniere and a $58 million discrete tax benefit related to releasing a portion of our valuation allowance caused by a change in tax law allowing for indefinite Louisiana net operating loss (“NOL”) carryover. The effective tax rates for the three and six months ended JuneSeptember 30, 2020 were 13.5%12.9% and 16.2%19.3%, respectively, which were lower than the 21% federal statutory tax rate primarily due to income allocated to non-controlling interest that is not taxable to Cheniere, and in the nine months ended September 30, 2020, it was partially offset by a $38 million discrete tax expense related to an internal restructuring. Our effective tax rate may continue to experience volatility prospectively due to variability in our pre-tax and taxable earnings and the proportion of such earnings attributable to non-controlling interests.

Net income (loss) attributable to non-controlling interest
Three Months Ended June 30,Six Months Ended June 30,Three Months Ended September 30,Nine Months Ended September 30,
(in millions)(in millions)20212020Change20212020Change(in millions)20212020Change20212020Change
Net income attributable to non-controlling interest$198 $207 $(9)$376 $435 $(59)
Net income (loss) attributable to non-controlling interestNet income (loss) attributable to non-controlling interest$168 $(45)$213 $544 $390 $154 

Net income attributable to non-controlling interest decreasedincreased during the three and sixnine months ended JuneSeptember 30, 2021 from the three and sixnine months ended JuneSeptember 30, 2020 primarily due to a decreasean increase in consolidated net income recognized by Cheniere Partners, which decreasedincreased from $406a net loss of $67 million in the three months ended JuneSeptember 30, 2020 to $395net income of $381 million in the three months ended JuneSeptember 30, 2021 and decreasedincreased from $841net income of $774 million in the sixnine months ended JuneSeptember 30, 2020 to $742$1,123 million in the sixnine months ended JuneSeptember 30, 2021.

38


Liquidity and Capital Resources

Although results are consolidated for financial reporting, SPL, Cheniere Partners, CCH Group and Cheniere operate with independent capital structures. Our capital requirements include capital and investment expenditures, repayment of long-term debt and repurchase of our shares. We expect the cash needs for at least the next twelve months will be met for each of these independent capital structures as follows:
SPL through operating cash flows, project debt and borrowings and equity contributions from Cheniere Partners;
Cheniere Partners through operating cash flows from SPLNG, SPL and CTPL, debt or equity offerings and borrowings;
CCH Group through operating cash flows from CCL and CCP, project debt and borrowings and equity contributions from Cheniere; and
Cheniere through existing unrestricted cash, debt and equity offerings by us or our subsidiaries, operating cash flows, borrowings, services fees from our subsidiaries and distributions from our investment in Cheniere Partners.

36


The following table provides a summary of our liquidity position at JuneSeptember 30, 2021 and December 31, 2020 (in millions):
June 30,December 31,September 30,December 31,
2021202020212020
Cash and cash equivalents (1)Cash and cash equivalents (1)$1,806 $1,628 Cash and cash equivalents (1)$2,203 $1,628 
Restricted cash designated for the following purposes:Restricted cash designated for the following purposes:Restricted cash designated for the following purposes:
SPL ProjectSPL Project65 97 SPL Project133 97 
CCL ProjectCCL Project122 70 CCL Project59 70 
OtherOther237 282 Other227 282 
Available commitments under the following credit facilities:Available commitments under the following credit facilities:Available commitments under the following credit facilities:
$1.2 billion Working Capital Revolving Credit and Letter of Credit Reimbursement Agreement (the “2020 SPL Working Capital Facility”)$1.2 billion Working Capital Revolving Credit and Letter of Credit Reimbursement Agreement (the “2020 SPL Working Capital Facility”)804 787 $1.2 billion Working Capital Revolving Credit and Letter of Credit Reimbursement Agreement (the “2020 SPL Working Capital Facility”)804 787 
CQP Credit Facilities executed in 2019 (“2019 CQP Credit Facilities”)CQP Credit Facilities executed in 2019 (“2019 CQP Credit Facilities”)750 750 CQP Credit Facilities executed in 2019 (“2019 CQP Credit Facilities”)750 750 
$1.2 billion CCH Working Capital Facility (“CCH Working Capital Facility”)$1.2 billion CCH Working Capital Facility (“CCH Working Capital Facility”)907 767 $1.2 billion CCH Working Capital Facility (“CCH Working Capital Facility”)840 767 
$1.25 billion Cheniere Revolving Credit Facility (“Cheniere Revolving Credit Facility”)1,116 1,126 
Cheniere Revolving Credit FacilityCheniere Revolving Credit Facility1,250 1,126 
Cheniere Term Loan FacilityCheniere Term Loan Facility— 372 Cheniere Term Loan Facility— 372 
(1)Amounts presented include balances held by our consolidated variable interest entity, (“VIE”), Cheniere Partners, as discussed in Note 8—7Non-controlling Interest and Variable Interest Entity of our Notes to Consolidated Financial Statements. As of both JuneSeptember 30, 2021 and December 31, 2020, assets of Cheniere Partners, which are included in our Consolidated Balance Sheets, included $1.2$1.7 billion of cash and cash equivalents.

39


Sabine Pass LNG Terminal

Liquefaction Facilities

The SPL Project is one of the largest LNG production facilities in the world. Through Cheniere Partners, we are currently operating five Trains and two marine berths at the SPL Project, and are constructingundergoing commissioning of one additional Train that is expected to be substantially completed in the first halfquarter of 2022 and constructing a third marine berth. We have achieved substantial completion of the first five Trains of the SPL Project and commenced commercial operating activities for each Train at various times starting in May 2016. The following table summarizes the project completion and construction status of Train 6 of the SPL Project as of JuneSeptember 30, 2021:
SPL Train 6
Overall project completion percentage89.6%97.1%
Completion percentage of:
Engineering99.7%100.0%
Procurement99.9%100.0%
Subcontract work70.2%95.8%
Construction79.3%92.9%
Date of expected substantial completion1H1Q 2022

We received approval from FERC to site, construct and operate up to a combined total equivalent of approximately 1,661.94 Bcf/yr (approximately 33 mtpa) of natural gas from the SPL Project. The DOE has has issued threemultiple orders authorizing the export of domestically produced LNG by vessel from the Sabine Pass LNG terminal through December 31, 2050 to FTA countries and non-FTA countries through December 31, 2050, up to a combined total equivalent of approximatelyfor 1,509.3 Bcf/yr (approximately 30 mtpa) of natural gas.gas, and an additional 152.64 Bcf/yr (approximately 3 mtpa) of natural gas to FTA countries only, with the authorization for the additional volume to non-FTA countries pending.

In December 2020, the DOE announced a new policy in which it would no longer issue short-term export authorizations separately from long-term authorizations. Accordingly, the DOE amended each of SPL’s long-term authorizations to include short-term export authority, and vacated the short-term orders.

An application was filed in September 2019 seeking authorization to make additional exports from the SPL Project to FTA countries for a 25-year term and to non-FTA countries for a 20-year term in an amount up to the equivalent of approximately 153 Bcf/yr of natural gas, for a total SPL Project export capacity of approximately 1,662 Bcf/yr. The terms of the authorizations are requested to commence on the date of first commercial export from the SPL Project of the volumes contemplated in the application. In April 2020, the DOE issued an order authorizing SPL to export to FTA countries related to this application, for which the term was subsequently extended through December 31, 2050, but has not yet issued an order authorizing SPL to export to non-FTA countries for the corresponding LNG volume. A corresponding application for
37


authorization to increase the total LNG production capacity of the SPL Project from the currently authorized level to approximately 1,662 Bcf/yr was also submitted to the FERC and is currently pending.

Customers

SPL has entered into fixed price long-term SPAs with third-parties, generally with terms of 20 years (plus extension rights) and with a weighted average remaining contract length of approximately 1716 years (plus extension rights) for Trains 1 through 6 of the SPL Project. Under these SPAs, the customers will purchase LNG from SPL for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG generally equal to approximately 115% of Henry Hub. The customers may elect to cancel or suspend deliveries of LNG cargoes, with advance notice as governed by each respective SPA, in which case the customers would still be required to pay the fixed fee with respect to the contracted volumes that are not delivered as a result of such cancellation or suspension. We refer to the fee component that is applicable regardless of a cancellation or suspension of LNG cargo deliveries under the SPAs as the fixed fee component of the price under SPL’s SPAs. We refer to the fee component that is applicable only in connection with LNG cargo deliveries as the variable fee component of the price under SPL’s SPAs. The variable fees under SPL’s SPAs were generally sized at the time of entry into each SPA with the intent to cover the costs of gas purchases and transportation and liquefaction fuel to produce the LNG to be sold under each such SPA. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA generally commences upon the date of first commercial delivery of a specified Train.

In aggregate, the annual fixed fee portion to be paid by the third-party SPA customers is approximately $2.9 billion for Trains 1 through 5. After giving effect to an SPA that Cheniere has committed to provide to SPL and upon the date of first commercial delivery of Train 6, the annual fixed fee portion to be paid by the third-party SPA customers is expected to increase to at least $3.3 billion.

In addition, Cheniere Marketing has an agreement with SPL to purchase, at Cheniere Marketing’s option, any LNG produced by SPL in excess of that required for other customers. See Marketing section for additional information regarding agreements entered into by Cheniere Marketing.
40


Natural Gas Transportation, Storage and Supply

To ensure SPL is able to transport adequate natural gas feedstock to the Sabine Pass LNG terminal, it has entered into transportation precedent and other agreements to secure firm pipeline transportation capacity with CTPL and third-party pipeline companies. SPL has entered into firm storage services agreements with third parties to assist in managing variability in natural gas needs for the SPL Project. SPL has also entered into enabling agreements and long-term natural gas supply contracts with third parties in order to secure natural gas feedstock for the SPL Project. As of JuneSeptember 30, 2021, SPL had secured up to approximately 5,0255,033 TBtu of natural gas feedstock through long-term and short-term natural gas supply contracts with remaining terms that range up to 10 years, a portion of which is subject to conditions precedent.

Construction

SPL entered into lump sum turnkey contracts with Bechtel Oil, Gas and Chemicals, Inc. (“Bechtel”) for the engineering, procurement and construction of Trains 1 through 6 of the SPL Project, under which Bechtel charges a lump sum for all work performed and generally bears project cost, schedule and performance risks unless certain specified events occur, in which case Bechtel may cause SPL to enter into a change order, or SPL agrees with Bechtel to a change order.

The total contract price of the EPC contract for Train 6 of the SPL Project is approximately $2.5 billion, including estimated costs for the third marine berth that is currently under construction. As of JuneSeptember 30, 2021, we have incurred $2.1$2.2 billion under this contract.

Regasification Facilities
 
The Sabine Pass LNG terminal has operational regasification capacity of approximately 4 Bcf/d and aggregate LNG storage capacity of approximately 17 Bcfe. Approximately 2 Bcf/d of the regasification capacity at the Sabine Pass LNG terminal has been reserved under two long-term third-party TUAs, under which SPLNG’s customers are required to pay fixed monthly fees, whether or not they use the LNG terminal.  Each of TotalTotalEnergies Gas & Power North America, Inc. (“Total”) and
38


Chevron U.S.A. Inc. (“Chevron”) has reserved approximately 1 Bcf/d of regasification capacity and is obligated to make monthly capacity payments to SPLNG aggregating approximately $125 million annually, prior to inflation adjustments, for 20 years that commenced in 2009. Total S.A. has guaranteed Total’s obligations under its TUA up to $2.5 billion, subject to certain exceptions, and Chevron Corporation has guaranteed Chevron’s obligations under its TUA up to 80% of the fees payable by Chevron.

The remaining approximately 2 Bcf/d of capacity has been reserved under a TUA by SPL. SPL is obligated to make monthly capacity payments to SPLNG aggregating approximately $250 million annually, prior to inflation adjustments, continuing until at least May 2036. SPL entered into a partial TUA assignment agreement with Total, whereby upon substantial completion of Train 5 of the SPL Project, SPL gained access to substantially all of Total’s capacity and other services provided under Total’s TUA with SPLNG. This agreement provides SPL with additional berthing and storage capacity at the Sabine Pass LNG terminal that may be used to provide increased flexibility in managing LNG cargo loading and unloading activity, permit SPL to more flexibly manage its LNG storage capacity and accommodate the development of Train 6. Notwithstanding any arrangements between Total and SPL, payments required to be made by Total to SPLNG will continue to be made by Total to SPLNG in accordance with its TUA. During each of the three months ended JuneSeptember 30, 2021 and 2020, SPL recorded $33$32 million as operating and duringmaintenance expense under this partial TUA assignment agreement. During each of the sixnine months ended JuneSeptember 30, 2021 and 2020, SPL recorded $65$97 million, as operating and maintenance expense under this partial TUA assignment agreement.

Under each of these TUAs, SPLNG is entitled to retain 2% of the LNG delivered to the Sabine Pass LNG terminal.

Capital Resources

We currently expect that SPL’s capital resources requirements with respect to the SPL Project will be financed through project debt and borrowings, cash flows under the SPAs, project debt and borrowings and equity contributions from Cheniere Partners. We believe that with the net proceeds of borrowings, available commitments under the 2020 SPL Working Capital Facility and 2019 CQP Credit Facilities, cash flows from operations and equity contributions from Cheniere Partners, SPL will have adequate financial resources available to meet its currently anticipated capital, operating and debt service requirements with respect to Trains 1 through 6 of the SPL Project. Additionally, SPLNG generates cash flows from the TUAs, as discussed above.
41


The following table provides a summary of our capital resources from borrowings and available commitments for the Sabine Pass LNG terminal, excluding equity contributions to our subsidiaries and cash flows from operations (as described in Sources and Uses of Cash), at JuneSeptember 30, 2021 and December 31, 2020 (in millions):
June 30,December 31,September 30,December 31,
20212020 20212020
Senior notes (1)Senior notes (1)$17,750 $17,750 Senior notes (1)$18,278 $17,750 
Letters of credit issued (2)Letters of credit issued (2)396 413 Letters of credit issued (2)396 413 
Available commitments under credit facilities (2)Available commitments under credit facilities (2)1,554 1,537 Available commitments under credit facilities (2)1,554 1,537 
Total capital resources from borrowings and available commitments (3)Total capital resources from borrowings and available commitments (3)$19,700 $19,700 Total capital resources from borrowings and available commitments (3)$20,228 $19,700 
(1)Includes SPL’s 4.200% to 6.25% Senior Secured Notessenior secured notes due between March 2022 5.625% Senior Secured Notes due 2023, 5.75% Senior Secured Notes due 2024, 5.625% Senior Secured Notes due 2025, 5.875% Senior Secured Notes due 2026 (the “2026 SPL Senior Notes”), 5.00% Senior Secured Notes due 2027 (the “2027 SPL Senior Notes”), 4.200% Senior Secured Notes due 2028 (the “2028 SPL Senior Notes”), 4.500% Senior Secured Notes due 2030 (the “2030 SPL Senior Notes”) and 5.00% Senior Secured Notes dueSeptember 2037 (the “2037 SPL Senior Notes”) (collectively, the “SPL Senior Notes”), as well as theCheniere Partners’ 3.250% to 5.625% senior notes due between October 2025 CQP Senior Notes, $1.1 billion of 5.625% Senior Notes due 2026 (the “2026 CQP Senior Notes”), the 4.500% Senior Notes due 2029 (the “2029 CQP Senior Notes”) and the 2031 CQP Senior NotesJanuary 2032 (collectively, the “CQP Senior Notes”).
(2)Consists of 2020 SPL Working Capital Facility and 2019 CQP Credit Facilities.
(3)Does not include equity contributions that may be available from Cheniere’s borrowings and available cash and cash equivalents.

39


SPL Senior Notes

The SPL Senior Notes are governed by a common indenture (the “SPL Indenture”) and the terms of the 5.00% Senior Secured Notes due 2037 (the “2037 SPL Senior NotesNotes”) are governed by a separate indenture (the “2037 SPL Senior Notes Indenture”). Both the SPL Indenture and the 2037 SPL Senior Notes Indenture contain terms and events of default and certain covenants that, among other things, limit SPL’s ability and the ability of SPL’s restricted subsidiaries to incur additional indebtedness or issue preferred stock, make certain investments or pay dividends or distributions on capital stock or subordinated indebtedness or purchase, redeem or retire capital stock, sell or transfer assets, including capital stock of SPL’s restricted subsidiaries, restrict dividends or other payments by restricted subsidiaries, incur liens, enter into transactions with affiliates, dissolve, liquidate, consolidate, merge, sell or lease all or substantially all of SPL’s assets and enter into certain LNG sales contracts. Subject to permitted liens, the SPL Senior Notes are secured on a pari passu first-priority basis by a security interest in all of the membership interests in SPL and substantially all of SPL’s assets. SPL may not make any distributions until, among other requirements, deposits are made into debt service reserve accounts as required and a debt service coverage ratio test of 1.25:1.00 is satisfied.

At any time prior to threesix months before the respective dates of maturity for each series of the SPL Senior Notes (except for the 20262022 SPL Senior Notes, 20275.625% Senior Secured Notes due 2023 (the “2023 SPL Senior Notes”), 5.75% Senior Secured Notes 2028due 2024 (the “2024 SPL Senior Notes”) and 5.625% Senior Notes 2030due 2025 (the “2025 SPL Senior Notes and 2037 SPL Senior Notes,Notes”), in which case the time period is sixthree months before the respective dates of maturity), SPL may redeem all or part of such series of the SPL Senior Notes at a redemption price equal to the ‘make-whole’ price (except for the 2037 SPL Senior Notes, in which case the redemption price is equal to the “optional redemption” price) set forth in the respective indentures governing the SPL Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. SPL may also, at any time within threesix months of the respective maturity dates for each series of the SPL Senior Notes (except for the 20262022 SPL Senior Notes, 20272023 SPL Senior Notes, 2028 SPL Senior Notes, 20302024 SPL Senior Notes and 20372025 SPL Senior Notes, in which case the time period is within sixthree months of the respective dates of maturity), redeem all or part of such series of the SPL Senior Notes at a redemption price equal to 100% of the principal amount of such series of the SPL Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the date of redemption.

SPL may incur additional indebtedness in the future, including by issuing additional notes, and such indebtedness could be at higher interest rates and have different maturity dates and more restrictive covenants than the current outstanding indebtedness of SPL, including the SPL Senior Notes and the 2020 SPL Working Capital Facility. Semi-annual principal payments for the 2037 SPL Senior Notes are due on March 15 and September 15 of each year beginning September 15, 2025 and are fully amortizing according to a fixed sculpted amortization schedule.

During 2021, SPL entered into a series of note purchase agreements for the sale of approximately $347$482 million aggregate principal amount of the 2037 SPL Private Placement Senior Secured Notes on a private placement basis. The 2037 SPL Private Placement Senior Secured Notes are expected to be issued in the second halffourth quarter of 2021, subject to customary closing conditions, and the net proceeds will be used to strategically refinance a portion of SPL’s outstanding 6.25%the 2022 SPL Senior Secured Notes due 2022 and pay related
42


fees, costs and expenses. The 2037 SPL Private Placement Senior Secured Notes will be fully amortizing, with a weighted average life of over 10 years.years and a weighted average interest rate of 3.07%.

2020 SPL Working Capital Facility

In March 2020, SPL entered into the 2020 SPL Working Capital Facility with aggregate commitments of $1.2 billion, which replaced the $1.2 billion Amended and Restated SPL Working Capital Facility (the “2015 SPL Working Capital Facility”). The 2020 SPL Working Capital Facility is intended to be used for loans to SPL, swing line loans to SPL and the issuance of letters of credit on behalf of SPL, primarily for (1) the refinancing of the 2015 SPL Working Capital Facility, (2) fees and expenses related to the 2020 SPL Working Capital Facility, (3) SPL and its future subsidiaries’ gas purchase obligations and (4) SPL and certain of its future subsidiaries’ general corporate purposes. SPL may, from time to time, request increases in the commitments under the 2020 SPL Working Capital Facility of up to $800 million. As of JuneSeptember 30, 2021 and December 31, 2020, SPL had $804 million and $787 million of available commitments and $396 million and $413 million aggregate amount of issued letters of credit, respectively. As of both JuneSeptember 30, 2021 and December 31, 2020, SPL had no outstanding borrowings under the 2020 SPL Working Capital Facility.

The 2020 SPL Working Capital Facility matures on March 19, 2025, but may be extended with consent of the lenders. The 2020 SPL Working Capital Facility provides for mandatory prepayments under customary circumstances.

40


The 2020 SPL Working Capital Facility contains customary conditions precedent for extensions of credit, as well as customary affirmative and negative covenants. SPL is restricted from making certain distributions under agreements governing its indebtedness generally until, among other requirements, satisfaction of a 12-month forward-looking and backward-looking 1.25:1.00 debt service reserve ratio test. The obligations of SPL under the 2020 SPL Working Capital Facility are secured by substantially all of the assets of SPL as well as a pledge of all of the membership interests in SPL and certain future subsidiaries of SPL on a pari passu basis by a first priority lien with the SPL Senior Notes.

Cheniere Partners

CQP Senior Notes

The CQP Senior Notes are jointly and severally guaranteed by each of Cheniere Partners’ subsidiaries other than SPL and, subject to certain conditions governing its guarantee, Sabine Pass LP (each a “Guarantor” and collectively, the “CQP Guarantors”). The CQP Senior Notes are governed by the same base indenture (the “CQP Base Indenture”). The 20264.500% Senior Notes due 2029 (the “2029 CQP Senior Notes are further governed by the Second Supplemental Indenture, the 2029 CQP Senior NotesNotes”) are further governed by the Third Supplemental Indenture, and the 2031 CQP Senior Notes are further governed by the Fifth Supplemental Indenture and the 2032 CQP Senior Notes are further governed by the Sixth Supplemental Indenture. The indentures governing the CQP Senior Notes contain terms and events of default and certain covenants that, among other things, limit the ability of Cheniere Partners and the CQP Guarantors to incur liens and sell assets, enter into transactions with affiliates, enter into sale-leaseback transactions and consolidate, merge or sell, lease or otherwise dispose of all or substantially all of the applicable entity’s properties or assets.

At any time prior to October 1, 2021 for the 2026 CQP Senior Notes, October 1, 2024 for the 2029 CQP Senior Notes, and March 1, 2026 for the 2031 CQP Senior Notes and January 31, 2027 for the 2032 CQP Senior Notes, Cheniere Partners may redeem all or a part of the applicable CQP Senior Notes at a redemption price equal to 100% of the aggregate principal amount of the CQP Senior Notes redeemed, plus the “applicable premium” set forth in the respective indentures governing the CQP Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. In addition, at any time prior to October 1, 2021 for the 2026 CQP Senior Notes, October 1, 2024 for the 2029 CQP Senior Notes, and March 1, 2024 for the 2031 CQP Senior Notes and January 31, 2025 for the 2032 CQP Senior Notes, Cheniere Partners may redeem up to 35%, and in the case of the 2032 CQP Senior Notes, up to 40%, of the aggregate principal amount of the CQP Senior Notes with an amount of cash not greater than the net cash proceeds from certain equity offerings at a redemption price equal to 105.625% of the aggregate principal amount of the 2026 CQP Senior Notes, 104.5% of the aggregate principal amount of the 2029 CQP Senior Notes, and 104.000% of the aggregate principal amount of the 2031 CQP Senior Notes and 103.250% of the aggregate principal amount of the 2032 CQP Senior Notes redeemed, plus accrued and unpaid interest, if any, to the date of redemption. Cheniere Partners also may at any time on or after October 1, 2021 through the maturity date of October 1, 2026 for the 2026 CQP Senior Notes, October 1, 2024 through the maturity date of October 1, 2029 for the 2029 CQP Senior Notes, and March 1, 2026 through the maturity date of March 1, 2031 for the 2031 CQP Senior Notes and January 31, 2027 through maturity date of January 31, 2032 for the 2032 CQP Senior Notes, redeem the CQP Senior Notes, in whole or in part, at the redemption prices set forth in the respective indentures governing the CQP Senior Notes.

43


The CQP Senior Notes are Cheniere Partners’ senior obligations, ranking equally in right of payment with Cheniere Partners’ other existing and future unsubordinated debt and senior to any of its future subordinated debt. In the event that the aggregate amount of Cheniere Partners’ secured indebtedness and the secured indebtedness of the CQP Guarantors (other than the CQP Senior Notes or any other series of notes issued under the CQP Base Indenture) outstanding at any one time exceeds the greater of (1) $1.5 billion and (2) 10% of net tangible assets, the CQP Senior Notes will be secured to the same extent as such obligations under the 2019 CQP Credit Facilities. The obligations under the 2019 CQP Credit Facilities are secured on a first-priority basis (subject to permitted encumbrances) with liens on substantially all the existing and future tangible and intangible assets and rights of Cheniere Partners and the CQP Guarantors and equity interests in the CQP Guarantors (except, in each case, for certain excluded properties set forth in the 2019 CQP Credit Facilities). The liens securing the CQP Senior Notes, if applicable, will be shared equally and ratably (subject to permitted liens) with the holders of other senior secured obligations, which include the 2019 CQP Credit Facilities obligations and any future additional senior secured debt obligations.

2019 CQP Credit Facilities

Cheniere Partners has a $750 million revolving credit facility under the 2019 CQP Credit Facilities. Borrowings under the 2019 CQP Credit Facilities will beare being used to fund the development and construction of Train 6 of the SPL Project and for general corporate purposes, subject to a sublimit, and the 2019 CQP Credit Facilities are also available for the issuance of letters of credit. As of both JuneSeptember 30, 2021 and December 31, 2020, Cheniere Partners had $750 million of available commitments and no letters of credit issued or loans outstanding under the 2019 CQP Credit Facilities.

41


The 2019 CQP Credit Facilities mature on May 29, 2024. Any outstanding balance may be repaid, in whole or in part, at any time without premium or penalty, except for interest rate breakage costs. The 2019 CQP Credit Facilities contain conditions precedent for extensions of credit, as well as customary affirmative and negative covenants, and limit Cheniere Partners’ ability to make restricted payments, including distributions, to once per fiscal quarter and one true-up per fiscal quarter as long as certain conditions are satisfied.
The 2019 CQP Credit Facilities are unconditionally guaranteed and secured by a first priority lien (subject to permitted encumbrances) on substantially all of Cheniere Partners’ and the CQP Guarantors’ existing and future tangible and intangible assets and rights and equity interests in the CQP Guarantors (except, in each case, for certain excluded properties set forth in the 2019 CQP Credit Facilities).

Corpus Christi LNG Terminal

Liquefaction Facilities

We are currently operating three Trains and two marine berths at the CCL Project. We completed construction of Trains 1, 2 and 3 of the CCL Project and commenced commercial operating activities in February 2019, August 2019 and March 2021, respectively. We received approval from FERC to site, construct and operate up to a combined total equivalent of approximately 875.16 Bcf/yr (approximately 17 mtpa) of natural gas from the CCL Project.

Separate from the CCH Group, we are also developing Corpus Christi Stage 3 through our subsidiary CCL Stage III, adjacent to the CCL Project. We received approval from FERC in November 2019 to site, construct and operate seven midscale Trains with an expected total production capacity of up to approximately 1011.45 mtpa of LNG.

The following orders have been issued by the DOE authorizing the export of domestically produced LNG by vessel from the Corpus Christi LNG terminal:
CCL Project—FTA countries and non-FTA countries through December 31, 2050, up to a combined total of the equivalent of approximately 767 Bcf/yr (approximately 15 mtpa) of natural gas.gas, and an additional 108.16 Bcf/yr (approximately 2 mtpa) to FTA countries only, with the authorization for the additional volume to non-FTA countries pending.
Corpus Christi Stage 3—FTA countries and non-FTA countries through December 31, 2050 in an amount equivalent to approximately 582.14 Bcf/yr (approximately 11 mtpa) of natural gas.

44


In December 2020, the DOE announced a new policy in which it would no longer issue short-term export authorizations separately from long-term authorizations. Accordingly, the DOE amended each of CCL’s long-term authorizations to include short-term export authority, and vacated the short-term orders.

An application was filed in September 2019 to authorize additional exports from the CCL Project to FTA countries for a 25-year term and to non-FTA countries for a 20-year term in an amount up to the equivalent of approximately 108 Bcf/yr of natural gas, for a total CCL Project export of 875.16 Bcf/yr. The terms of the authorizations are requested to commence on the date of first commercial export from the CCL Project of the volumes contemplated in the application. In April 2020, the DOE issued an order authorizing CCL to export to FTA countries related to this application, for which the term was subsequently extended through December 31, 2050, but has not yet issued an order authorizing CCL to export to non-FTA countries for the corresponding LNG volume. A corresponding application for authorization to increase the total LNG production capacity of the CCL Project from the currently authorized level to approximately 875.16 Bcf/yr was also submitted to the FERC and is currently pending.

Customers

CCL has entered into fixed price long-term SPAs with third-parties, generally with terms of 20 years (plus extension rights) and with a weighted average remaining contract length of approximately 18 years (plus extension rights) for Trains 1 through 3 of the CCL Project. Under these SPAs, the customers will purchase LNG from CCL on a free on board (“FOB”) basis for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG equal to approximately 115% of Henry Hub. The customers may elect to cancel or suspend deliveries of LNG cargoes, with advance notice as governed by each respective SPA, in which case the customers would still be required to pay the fixed fee with respect to the contracted volumes that are not delivered as a result of such cancellation or suspension. We refer to the fee component that is applicable regardless of a cancellation or suspension of LNG cargo deliveries under the SPAs as the fixed fee component of the price under our SPAs. We refer to the fee component that is applicable only in
42


connection with LNG cargo deliveries as the variable fee component of the price under our SPAs. The variable fee under CCL’s SPAs entered into in connection with the development of the CCL Project was sized at the time of entry into each SPA with the intent to cover the costs of gas purchases and transportation and liquefaction fuel to produce the LNG to be sold under each such SPA. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA generally commences upon the date of first commercial delivery for the applicable Train, as specified in each SPA.
In aggregate, the minimum annual fixed fee portion to be paid by the third-party SPA customers is approximately $1.8 billion for Trains 1 through 3.

In addition, Cheniere Marketing has agreements with CCL to purchase: (1) approximately 15 TBtu per annum of LNG with a term through 2043, (2) any LNG produced by CCL in excess of that required for other customers at Cheniere Marketing’s option and (3) approximately 44 TBtu of LNG with a maximum term up to 2026 associated with the IPM gas supply agreement between CCL and EOG Resources, Inc. See Marketing section for additional information regarding agreements entered into by Cheniere Marketing.

Natural Gas Transportation, Storage and Supply

To ensure CCL is able to transport adequate natural gas feedstock to the Corpus Christi LNG terminal, it has entered into transportation precedent agreements to secure firm pipeline transportation capacity with CCP and certain third-party pipeline companies. CCL has entered into a firm storage services agreement with a third party to assist in managing variability in natural gas needs for the CCL Project. CCL has also entered into enabling agreements and long-term natural gas supply contracts with third parties, and will continue to enter into such agreements, in order to secure natural gas feedstock for the CCL Project. As of JuneSeptember 30, 2021, CCL had secured up to approximately 2,9802,798 TBtu of natural gas feedstock through long-term natural gas supply contracts with remaining terms that range up to 10 years, a portion of which is subject to the achievement of certain project milestones and other conditions precedent.

CCL Stage III has also entered into long-term natural gas supply contracts with third parties, and anticipates continuing to enter into such agreements, in order to secure natural gas feedstock for Corpus Christi Stage 3. As of JuneSeptember 30, 2021, CCL Stage III had secured up to approximately 2,3613,128 TBtu of natural gas feedstock through long-term natural gas supply contracts with remaining terms that range up to approximately 15 years, which is subject to the achievement of certain project milestones and other conditions precedent.

A portion of the natural gas feedstock transactions for CCL and CCL Stage III are IPM transactions, in which the natural gas producers are paid based on a global gas market price less a fixed liquefaction fee and certain costs incurred by us.

45


Construction

CCL entered into separate lump sum turnkey contracts with Bechtel for the engineering, procurement and construction of Trains 1 through 3 of the CCL Project under which Bechtel charged a lump sum for all work performed and generally bore project cost, schedule and performance risks unless certain specified events occurred, in which case Bechtel may have caused CCL to enter into a change order, or CCL agreed with Bechtel to a change order.

Final Investment Decision for Corpus Christi Stage 3

FID for Corpus Christi Stage 3 will be subject to, among other things, entering into an EPC contract, obtaining additional commercial support for the project and securing the necessary financing arrangements.
    
Pipeline Facilities

In November 2019, the FERC authorized CCP to construct and operate the pipeline for Corpus Christi Stage 3. The pipeline will be designed to transport 1.5 Bcf/d of natural gas feedstock required by Corpus Christi Stage 3 from the existing regional natural gas pipeline grid.
43


Capital Resources

The following table provides a summary of the capital resources of the CCH Group from borrowings and available commitments for the CCL Project, excluding equity contributions from Cheniere, at JuneSeptember 30, 2021 and December 31, 2020 (in millions):
June 30,December 31,September 30,December 31,
20212020 20212020
Senior notes (1)Senior notes (1)$7,721 $7,721 Senior notes (1)$8,471 $7,721 
Credit facilities outstanding balance (2)Credit facilities outstanding balance (2)2,627 2,767 Credit facilities outstanding balance (2)1,761 2,767 
Letters of credit issued (2)Letters of credit issued (2)293 293 Letters of credit issued (2)360 293 
Available commitments under credit facilities (2)Available commitments under credit facilities (2)907 767 Available commitments under credit facilities (2)840 767 
Total capital resources from borrowings and available commitments (3)Total capital resources from borrowings and available commitments (3)$11,548 $11,548 Total capital resources from borrowings and available commitments (3)$11,432 $11,548 
(1)Includes CCH’s 2.742% to 7.000% Senior Secured Notessenior secured notes due between June 2024 5.875% Senior Secured Notes due 2025, 5.125% Senior Secured Notes due 2027, 3.700% Senior Secured Notes due 2029, 4.80% Senior Secured Notes dueand December 2039 3.925% Senior Secured Notes due 2039 and 3.52% CCH Senior Secured Notes (collectively, the “CCH Senior Notes”).
(2)Includes CCH’s amended and restated credit facility (the “CCHthe CCH Credit Facility”)Facility and the CCH Working Capital Facility.
(3)Does not include equity contributions that may be available from Cheniere’s borrowings and available cash and cash equivalents.

CCH Senior Notes

The CCH Senior Notes are jointly and severally guaranteed by CCH’s subsidiaries, CCL, CCP and Corpus Christi Pipeline GP, LLC (each a “CCH Guarantor” and collectively, the “CCH Guarantors”). The indentures governing the CCH Senior Notes contain customary terms and events of default and certain covenants that, among other things, limit CCH’s ability and the ability of CCH’s restricted subsidiaries to: incur additional indebtedness or issue preferred stock; make certain investments or pay dividends or distributions on membership interests or subordinated indebtedness or purchase, redeem or retire membership interests; sell or transfer assets, including membership or partnership interests of CCH’s restricted subsidiaries; restrict dividends or other payments by restricted subsidiaries to CCH or any of CCH’s restricted subsidiaries; incur liens; enter into transactions with affiliates; dissolve, liquidate, consolidate, merge, sell or lease all or substantially all of the properties or assets of CCH and its restricted subsidiaries taken as a whole; or permit any CCH Guarantor to dissolve, liquidate, consolidate, merge, sell or lease all or substantially all of its properties and assets. The covenants included in the respective indentures that govern the CCH Senior Notes are subject to a number of important limitations and exceptions.

The CCH Senior Notes are CCH’s senior secured obligations, ranking senior in right of payment to any and all of CCH’s future indebtedness that is subordinated to the CCH Senior Notes and equal in right of payment with CCH’s other existing and future indebtedness that is senior and secured by the same collateral securing the CCH Senior Notes. The CCH Senior Notes are secured by a first-priority security interest in substantially all of CCH’s and the CCH Guarantors’ assets.
46


At any time prior to six months before the respective dates of maturity for each of the CCH Senior Notes, CCH may redeem all or part of such series of the CCH Senior Notes at a redemption price equal to the “make-whole” price set forth in the appropriate indenture, plus accrued and unpaid interest, if any, to the date of redemption. At any time within six months of the respective dates of maturity for each of the CCH Senior Notes, CCH may redeem all or part of such series of the CCH Senior Notes, in whole or in part, at a redemption price equal to 100% of the principal amount of the CCH Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the date of redemption.

CCH Credit Facility

CCH has total commitments under the CCH Credit Facility of $6.1 billion. The obligations of CCH under the CCH Credit Facility are secured by a first priority lien on substantially all of the assets of CCH and its subsidiaries and by a pledge by Cheniere CCH HoldCoHoldco I, LLC of its limited liability company interests in CCH. As of both JuneSeptember 30, 2021 and December 31, 2020, CCH had no available commitments and $1.8 billion and $2.6 billion, respectively, of loans outstanding under the CCH Credit Facility.

44


The CCH Credit Facility matures on June 30, 2024, with principal payments due quarterly commencing on the earlier of (1) the first quarterly payment date occurring more than three calendar months following the completion of the CCL Project as defined in the common terms agreement and (2) a set date determined by reference to the date under which a certain LNG buyer linked to the last Train of the CCL Project to become operational is entitled to terminate its SPA for failure to achieve the date of first commercial delivery for that agreement. Scheduled repayments will be based upon a 19-year tailored amortization, commencing the first full quarter after the completion of Trains 1 through 3 and designed to achieve a minimum projected fixed debt service coverage ratio of 1.50:1.

Under the CCH Credit Facility, CCH is required to hedge not less than 65% of the variable interest rate exposure of its senior secured debt. CCH is restricted from making certain distributions under agreements governing its indebtedness generally until, among other requirements, the completion of the construction of Trains 1 through 3 of the CCL Project, funding of a debt service reserve account equal to six months of debt service and achieving a historical debt service coverage ratio and fixed projected debt service coverage ratio of at least 1.25:1.00.

CCH Working Capital Facility

CCH has total commitments under the CCH Working Capital Facility of $1.2 billion. The CCH Working Capital Facility is intended to be used for loans to CCH (“CCH Working Capital Loans”) and the issuance of letters of credit on behalf of CCH for certain working capital requirements related to developing and operating the CCL Project and for related business purposes. Loans under the CCH Working Capital Facility are guaranteed by the CCH Guarantors. CCH may, from time to time, request increases in the commitments under the CCH Working Capital Facility of up to the maximum allowed for working capital under the Common Terms Agreement that was entered into concurrently with the CCH Credit Facility. As of JuneSeptember 30, 2021 and December 31, 2020, CCH had $907$840 million and $767 million of available commitments, and zero and $140 million of loans outstanding under the CCH Working Capital Facility, respectively. CCH hadand $360 million and $293 million aggregate amount of issued letters of credit under the CCH Working Capital Facility as of both JuneSeptember 30, 2021 and December 31, 2020.2020, respectively.

The CCH Working Capital Facility matures on June 29, 2023, and CCH may prepay the CCH Working Capital Loans and loans made in connection with a draw upon any letter of credit (“CCH LC Loans”) at any time without premium or penalty upon three business days’ notice and may re-borrow at any time. CCH LC Loans have a term of up to one year. CCH is required to reduce the aggregate outstanding principal amount of all CCH Working Capital Loans to zero for a period of five consecutive business days at least once each year.

The CCH Working Capital Facility contains conditions precedent for extensions of credit, as well as customary affirmative and negative covenants. The obligations of CCH under the CCH Working Capital Facility are secured by substantially all of the assets of CCH and the CCH Guarantors as well as all of the membership interests in CCH and each of the CCH Guarantors on a pari passu basis with the CCH Senior Notes and the CCH Credit Facility.

47


Cheniere

Senior Notes

We have an aggregate principal amount of $2.0 billion of the 4.625% Senior Secured Notes due 2028 (the “2028 Cheniere Senior Notes”), the proceeds of which were used to prepay a portion of the outstanding indebtedness under the Cheniere Term Loan Facility and to pay related fees and expenses. The associated indentures (“Cheniere Indenture”) contain customary terms and events of default and certain covenants that, among other things, limit our ability to create liens or other encumbrances, enter into sale-leaseback transactions and merge or consolidate with other entities or sell all or substantially all of our assets. The Cheniere Indenture covenants are subject to a number of important limitations and exceptions.

At any time prior to October 15, 2023, we may redeem all or a part of the 2028 Cheniere Senior Notes at a redemption price equal to 100% of the aggregate principal amount thereof, plus the “applicable premium” and accrued and unpaid interest, if any, to but not including the date of redemption. We also may, at any time prior to October 15, 2023, redeem up to 40% of the aggregate principal amount of the 2028 Cheniere Senior Notes with an amount of cash not greater than the net cash proceeds from certain equity offerings at a redemption price equal to 104.625% of the aggregate principal amount of the notes being redeemed, plus accrued and unpaid interest, if any, to but not including, the date of redemption. At any time on or after October 15, 2023 through the maturity date of October 15, 2028, we may redeem all or part of the 2028 Cheniere Senior Notes at the redemption prices described in the Cheniere Indenture.
45


The 2028 Cheniere Senior Notes are our general senior obligations and rank senior in right of payment to all of our future obligations that are, by their terms, expressly subordinated in right of payment to the 2028 Cheniere Senior Notes and equally in right of payment with all of our other existing and future unsubordinated indebtedness. The 2028 Cheniere Senior Notes became unsecured in June 2021 concurrent with the repayment of all outstanding obligations under the Cheniere Term Loan Facility and may, in certain instances become secured in the future in connection with the incurrence of additional secured indebtedness by us. When required, the 2028 Cheniere Senior Notes will be secured on a first-priority basis by a lien on substantially all of our assets and equity interests in our direct subsidiaries (other than certain excluded subsidiaries), which liens rank pari passu with the liens securing the Cheniere Revolving Credit Facility. As of JuneSeptember 30, 2021, the 2028 Cheniere Senior Notes are not guaranteed by any of our subsidiaries. In the future, the 2028 Cheniere Senior Notes will be guaranteed by our subsidiaries who guarantee our other material indebtedness.

Convertible Notes

We have $625 million aggregate principal amount of 4.25% Convertible Senior Notes due 2045 (the “2045 Cheniere Convertible Senior Notes”). We have the right, at our option, at any time after March 15, 2020, to redeem all or any part of the 2045 Cheniere Convertible Senior Notes at a redemption price equal to the accreted amount of the 2045 Cheniere Convertible Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to such redemption date. Prior to December 15, 2044, the 2045 Cheniere Convertible Senior Notes are convertible only under certain circumstances as specified in the indenture; thereafter, holders may convert their notes regardless of these circumstances. The conversion rate will initially equal 7.2265 shares of our common stock per $1,000 principal amount of the 2045 Cheniere Convertible Senior Notes, which corresponds to an initial conversion price of approximately $138.38 per share of our common stock (subject to adjustment upon the occurrence of certain specified events).

We have the option to satisfy the conversion obligation for the 2045 Cheniere Convertible Senior Notes with cash, common stock or a combination thereof.

Cheniere Revolving Credit Facility

We have total commitments under the Cheniere Revolving Credit Facility of $1.25 billion. The Cheniere Revolving Credit Facility is intended to fund, through loans and letters of credit, equity capital contributions to Cheniere CCH Holdco II, LLC (“CCH HoldCo IIII”) and its subsidiaries for the development of the CCL Project and, provided that certain conditions are met, for general corporate purposes. As of both JuneSeptember 30, 2021 and December 31, 2020, we had $1.3 billion and $1.1 billion of available commitments and $134 million and zero, respectively, of loans outstanding under the Cheniere Revolving Credit Facility. We had zero and $124 million aggregate amount of issued letters of credit under the Cheniere Revolving Credit Facility, as of June 30, 2021 and December 31, 2020, respectively. In July 2021, theWe had no loans outstanding balance under the Cheniere Revolving Credit Facility was repaid.as of both September 30, 2021 and December 31, 2020.

48


The Cheniere Revolving Credit Facility matures on December 13, 2022 and contains representations, warranties and affirmative and negative covenants customary for companies like us with lenders of the type participating in the Cheniere Revolving Credit Facility that limit our ability to make restricted payments, including distributions, unless certain conditions are satisfied, as well as limitations on indebtedness, guarantees, hedging, liens, investments and affiliate transactions. Under the Cheniere Revolving Credit Facility, we are required to ensure that the sum of our unrestricted cash and the amount of undrawn commitments under the Cheniere Revolving Credit Facility is at least equal to the lesser of (1) 20% of the commitments under the Cheniere Revolving Credit Facility and (2) $200 million (the “Liquidity Covenant”). However, at any time that the aggregate principal amount of outstanding loans plus drawn and unreimbursed letters of credit under the Cheniere Revolving Credit Facility is greater than 30% of aggregate commitments under the Cheniere Revolving Credit Facility, the Liquidity Covenant will not apply and we will instead be governed by a quarterly non-consolidated leverage ratio covenant not to exceed 5.75:1.00 (the “Springing Leverage Covenant”).

The Cheniere Revolving Credit Facility is secured by a first priority security interest (subject to permitted liens and other customary exceptions) in substantially all of our assets, including our interests in our direct subsidiaries (excluding CCH HoldCo II and certain other subsidiaries).

46


Cash Receipts from Subsidiaries

Our ownership interest in the Sabine Pass LNG terminal is held through Cheniere Partners. As of JuneSeptember 30, 2021, we owned a 48.6% limited partner interest in Cheniere Partners in the form of 239.9 million common units. We also own 100% of the general partner interest and the incentive distribution rights in Cheniere Partners. We are eligible to receive quarterly equity distributions from Cheniere Partners related to our ownership interests and our incentive distribution rights.

We also receive fees for providing management services to some of our subsidiaries. We received $57$88 million and $53$83 million in total service fees from these subsidiaries during the sixnine months ended JuneSeptember 30, 2021 and 2020, respectively.

Capital Allocation Plan

In September 2021, our Board of Directors approved a long-term capital allocation plan which includes (i) repurchase, repayment or retirement of approximately $1.0 billion of existing indebtedness of the Company each year through 2024, (ii) initiation of a quarterly dividend for third quarter 2021 at $0.33 per share, payable November 17, 2021 to shareholders of record as of November, 3, 2021 and (iii) the authorized reset of the share repurchase program, as further explained below.

Share Repurchase Program

On June 3, 2019, we announced that our Board authorized a 3-year, $1.0 billion share repurchase program. On September 7, 2021, the Board authorized an increase in the share repurchase program to $1.0 billion, inclusive of any amounts remaining under the previous authorization as of September 30, 2021, for an additional three years beginning on October 1, 2021. During the sixthree and nine months ended JuneSeptember 30, 2021, we repurchased an aggregate of 0.1 shares of our common stock for $6 million, for a weighted average price per share of $83.97. During the nine months ended September 30, 2020, we repurchased an aggregate of 2.9 million shares of our common stock for $155 million, for a weighted average price per share of $53.88. We did not make any repurchases during the three months ended June 30, 2021 and 2020 or the six months ended June 30, 2021. As of JuneSeptember 30, 2021, we had $596up to $589 million of the share repurchase program available.available, which increased to $1.0 billion as of October 1, 2021. Under the share repurchase program, repurchases can be made from time to time using a variety of methods, which may include open market purchases, privately negotiated transactions or otherwise, all in accordance with the rules of the SEC and other applicable legal requirements. The timing and amount of any shares of our common stock that are repurchased under the share repurchase program will be determined by our management based on market conditions and other factors.  The share repurchase program does not obligate us to acquire any particular amount of common stock, and may be modified, suspended or discontinued at any time or from time to time at our discretion.

Marketing

We market and sell LNG produced by the Liquefaction Projects that is not required for other customers through our integrated marketing function. We have, and continue to develop, a portfolio of long-, medium- and short-term SPAs to transport and unload commercial LNG cargoes to locations worldwide. These volumes are expected to be primarily sourced by LNG produced by the Liquefaction Projects but supplemented by volumes procured from other locations worldwide, as needed. As of JuneSeptember 30, 2021, we have sold or have options to sell approximately 5,0025,085 TBtu of LNG to be delivered to customers
49


between 2021 and 2045, including volume from an SPA Cheniere Marketing has committed to provide to SPL.  The cargoes have been sold either on a FOB basis (delivered to the customer at the Sabine Pass LNG terminal or the Corpus Christi LNG terminal, as applicable) or a delivered at terminal (“DAT”) basis (delivered to the customer at their specified LNG receiving terminal). We have chartered LNG vessels to be utilized for cargoes sold on a DAT basis.

Cheniere Marketing has uncommitted trade finance facilities with available credit of $240$124 million as of JuneSeptember 30, 2021, primarily to be used for the purchase and sale of LNG for ultimate resale in the course of its operations. The finance facilities are intended to be used for advances, guarantees or the issuance of letters of credit or standby letters of credit on behalf of Cheniere Marketing. As of JuneSeptember 30, 2021 and December 31, 2020, Cheniere Marketing had $5$101 million and $34 million, respectively, in standby letters of credit and guarantees outstanding under the finance facilities. As of Juneboth September 30, 2021 and December 31, 2020, there were $30 million and zero loans outstanding respectively, under the finance facilities. Cheniere Marketing pays interest or fees on utilized commitments.

Cheniere Marketing also has an uncommitted letter of credit facility with no available credit of $35 million as of JuneSeptember 30, 2021, for the issuance of letters of credit in the course of its operations. As of JuneSeptember 30, 2021, Cheniere Marketing had $35 million ofno letters of credit issued under the facility. Cheniere Marketing pays fees on utilized commitments.

Corporate and Other Activities
 
We are required to maintain corporate and general and administrative functions to serve our business activities described above.  The development of our sites or other projects, including infrastructure projects in support of natural gas supply and LNG demand, will require, among other things, acceptable commercial and financing arrangements before we make an FID.

47


We have made an equity investment in Midship Holdings, LLC (“Midship Holdings”), which manages the business and affairs of Midship Pipeline Company, LLC (“the Midship Pipeline”). Midship Pipeline operates the Midship Projectan approximately 200-mile natural gas pipeline project (the “Midship Project”) with current capacity of up to 1.1 million Dekatherms per day that connects new gas production in the Anadarko Basin to Gulf Coast markets, including markets serving the Liquefaction Projects. The Midship Project was placed in service in April 2020.

Restrictive Debt Covenants

As of JuneSeptember 30, 2021, each of our issuers was in compliance with all covenants related to their respective debt agreements.

LIBOR

The use of LIBOR is expected to be phased out by June 2023. It is currently unclear whether LIBOR will be utilized beyond that date or whether it will be replaced by a particular rate. We intend to continue working with our lenders and counterparties to pursue any amendments to our debt and derivative agreements that are currently subject to LIBOR following LIBOR cessation and will continue to monitor, assess and plan for the phase out of LIBOR.

50


Sources and Uses of Cash

The following table summarizes the sources and uses of our cash, cash equivalents and restricted cash for the sixnine months ended JuneSeptember 30, 2021 and 2020 (in millions). The table presents capital expenditures on a cash basis; therefore, these amounts differ from the amounts of capital expenditures, including accruals, which are referred to elsewhere in this report. Additional discussion of these items follows the table. 
Six Months Ended June 30,Nine Months Ended September 30,
2021202020212020
Sources of cash, cash equivalents and restricted cash:Sources of cash, cash equivalents and restricted cash:Sources of cash, cash equivalents and restricted cash:
Net cash provided by operating activitiesNet cash provided by operating activities$1,373 $1,028 Net cash provided by operating activities$2,057 $765 
Proceeds from sale of fixed assetsProceeds from sale of fixed assets68 — Proceeds from sale of fixed assets68 — 
Proceeds from issuances of debtProceeds from issuances of debt2,184 2,597 Proceeds from issuances of debt4,104 7,683 
OtherOther— Other— 
$3,633 $3,625 $6,237 $8,448 
Uses of cash, cash equivalents and restricted cash:Uses of cash, cash equivalents and restricted cash:Uses of cash, cash equivalents and restricted cash:
Property, plant and equipmentProperty, plant and equipment$(440)$(983)Property, plant and equipment$(761)$(1,437)
Investment in equity method investmentInvestment in equity method investment— (100)Investment in equity method investment— (100)
Repayments of debtRepayments of debt(2,603)(2,380)Repayments of debt(4,276)(6,324)
Debt issuance and other financing costsDebt issuance and other financing costs(20)(59)Debt issuance and other financing costs(38)(124)
Debt modification or extinguishment costsDebt modification or extinguishment costs(41)(40)Debt modification or extinguishment costs(67)(170)
Distributions to non-controlling interestDistributions to non-controlling interest(322)(310)Distributions to non-controlling interest(483)(468)
Payments related to tax withholdings for share-based compensationPayments related to tax withholdings for share-based compensation(43)(41)Payments related to tax withholdings for share-based compensation(47)(43)
Repurchase of common stockRepurchase of common stock— (155)Repurchase of common stock(6)(155)
OtherOther(11)(7)Other(14)(8)
(3,480)(4,075)(5,692)(8,829)
Net increase (decrease) in cash, cash equivalents and restricted cashNet increase (decrease) in cash, cash equivalents and restricted cash$153 $(450)Net increase (decrease) in cash, cash equivalents and restricted cash$545 $(381)

Operating Cash Flows

Our operating cash net inflows during the sixnine months ended JuneSeptember 30, 2021 and 2020 were $1,373$2,057 million and $1,028$765 million, respectively. The $345$1,292 million increase in operating cash inflows in 2021 compared to 2020 was primarily related to increased cash receipts from the sale of LNG cargoes due to higher revenue per MMBtu and higher volume of LNG delivered, as well as from higher than normal contributions from LNG and natural gas portfolio optimization activities due to significant volatility in LNG and natural gas markets during the sixnine months ended JuneSeptember 30, 2021. Partially offsetting these operating cash inflows were higher operating cash outflows due to higher natural gas feedstock costs and payment of paid-in-kind interest on our convertible notes.

48


Proceeds from Sale of Fixed Assets

During the sixnine months ended JuneSeptember 30, 2021, we received proceeds from the sale of fixed assets of $68 million from divestment of non-core land holdings.

Proceeds from IssuanceIssuances of Debt, Repayments of Debt, Debt Issuance and Other Financing Costs and Debt Modification or Extinguishment Costs

During the sixnine months ended JuneSeptember 30, 2021, Cheniere Partnerswe issued an$3,450 million aggregate principal amount of $1.5 billionsenior notes and borrowed an aggregate amount of the 2031 CQP Senior Notes and incurred $20$654 million of debt issuance costs related to this issuance.under our credit facilities. The proceeds from this issuance,these issuances and borrowings, together with cash on hand, were used to redeem all$2,172 million aggregate principal amount of the outstanding 2025 CQP Senior Notes, and Cheniere Partners paid $40senior notes, repay $476 million of debt extinguishment costs, mainly related to premiums associated with this redemption. Additionally, in line with our previously announced capital allocation priorities, we repaid $624 million of total outstanding indebtedness under the Cheniere Term Loan Facility and 2021 Cheniere Convertible Notes with $500 million of available cash and the remainder from borrowings under the Cheniere Revolving Credit Facility. We paid $2 million of debt extinguishment costs as a result of the repayment of the 2021 Cheniere Convertible Notes. Additionally, net repayments of $100Notes and prepay $1,808 million were made onaggregate outstanding borrowings under our credit facilities duringfacilities. We incurred $38 million of debt issuance costs related to these issuances, and incurred $67 million of debt modification or extinguishment costs related to these redemptions and repayments, primarily for the six months ended June 30, 2021.payment of early redemption fees and write off of unamortized issuance costs.

During the sixnine months ended JuneSeptember 30, 2020, SPLwe issued an$4,769 million aggregate principal amount of $2.0 billionsenior notes and borrowed an aggregate amount of the 2030 SPL Senior Notes, which along$2,919 million under our credit facilities. The proceeds from these issuances and borrowings, together with cash on hand, was used to redeem all of the outstanding 2021 SPL Senior Notes. During the six months ended June 30, 2020, borrowings of $0.6 billion under our credit facilities were used to redeem the 11% Convertible$2.0 billion aggregate principal amount of 2021 SPL Senior Secured Notes, due 2025 (the “2025 CCH HoldCo II Convertible Senior Notes”), to fundredeem or repurchase $1,513 million of our working capital requirements or for general corporate purposes.convertible notes and prepay $2,811 million aggregate outstanding
51


borrowings under our credit facilities. We incurred $59$124 million of debt issuance costs primarily related to up-front fees paid uponthese issuances and the closing of the 2020 SPL Working Capital Facility, and 2030 SPL Senior Notes and premiums paid for partially redeeming the 2025 CCH HoldCo II Convertible Senior Notes. We incurred $40$170 million of debt modification or extinguishment costs primarily related to these redemptions and repayments, primarily for the payment of early redemption fees and write off of the 2021 SPL Senior Notes.unamortized issuance costs.

Property, Plant and Equipment

Cash outflows for property, plant and equipment were primarily for the construction costs for the Liquefaction Projects. These costs are capitalized as construction-in-process until achievement of substantial completion. Additionally, we purchased land adjacent to the CCL Project for potential future expansion purposes.

Distributions to Non-controlling Interest

We own a 48.6% limited partner interest in Cheniere Partners, with the remaining non-controlling interest held by The Blackstone Group Inc., Brookfield Asset Management Inc. and the public, to whom Cheniere Partners paid distributions during the three and sixnine months ended JuneSeptember 30, 2021 and 2020.

Repurchase of Common Stock

During the sixnine months ended JuneSeptember 30, 2021 and 2020, we paid $6 million and $155 million, respectively, to repurchase approximately 0.1 million shares and 2.9 million shares, respectively of our common stock under theour share repurchase program. There were no share repurchases paid in cash during the six months ended June 30, 2021.

Off-Balance Sheet Arrangements
 
As of JuneSeptember 30, 2021, we had no transactions that met the definition of off-balance sheet arrangements that may have a current or future material effect on our consolidated financial position or operating results.

Summary of Critical Accounting Estimates

The preparation of Consolidated Financial Statements in conformity with GAAP requires management to make certain estimates and assumptions that affect the amounts reported in the Consolidated Financial Statements and the accompanying notes. There have been no significant changes to our critical accounting estimates from those disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 2020.

49


Recent Accounting Standards

For a summary of recently issued accounting standards, see Note 1—Nature of Operations and Basis of Presentation of our Notes to Consolidated Financial Statements.

ITEM 3.    QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
 
Marketing and Trading Commodity Price Risk

We have entered into commodity derivatives consisting of natural gas supply contracts for the commissioning and operation of the SPL Project, the CCL Project and potential future development of Corpus Christi Stage 3 (“Liquefaction Supply Derivatives”). We have also entered into physical and financial derivatives to hedge the exposure to the commodity markets in which we have contractual arrangements to purchase or sell physical LNG (collectively, “LNG Trading Derivatives”). In order to test the sensitivity of the fair value of the Liquefaction Supply Derivatives and the LNG Trading Derivatives to changes in underlying commodity prices, management modeled a 10% change in the commodity price for natural gas for each delivery location and a 10% change in the commodity price for LNG, respectively, as follows (in millions):
June 30, 2021December 31, 2020September 30, 2021December 31, 2020
Fair ValueChange in Fair ValueFair ValueChange in Fair ValueFair ValueChange in Fair ValueFair ValueChange in Fair Value
Liquefaction Supply DerivativesLiquefaction Supply Derivatives$(197)$246 $240 $204 Liquefaction Supply Derivatives$(2,629)$763 $240 $204 
LNG Trading DerivativesLNG Trading Derivatives(401)49 (134)44 LNG Trading Derivatives(1,113)168 (134)44 

See Note 6—Derivative Instruments for additional details about our derivative instruments.
52


Interest Rate Risk

We are exposed to interest rate risk primarily when we incur debt related to project financing. Interest rate risk is managed in part by replacing outstanding floating-rate debt with fixed-rate debt with varying maturities. CCH has entered into interest rate swaps to hedge the exposure to volatility in a portion of the floating-rate interest payments under the CCH Credit Facility (“CCH Interest Rate Derivatives”). In order to test the sensitivity of the fair value of the CCH Interest Rate Derivatives to changes in interest rates, management modeled a 10% change in the forward one-month LIBOR curve across the remaining terms of the CCH Interest Rate Derivatives as follows (in millions):
June 30, 2021December 31, 2020
Fair ValueChange in Fair ValueFair ValueChange in Fair Value
CCH Interest Rate Derivatives$(91)$$(140)$
September 30, 2021December 31, 2020
Fair ValueChange in Fair ValueFair ValueChange in Fair Value
CCH Interest Rate Derivatives$(67)$— $(140)$

See Note 6—Derivative Instruments for additional details about our derivative instruments.

Foreign Currency Exchange Risk

We have entered into foreign currency exchange (“FX”) contracts to hedge exposure to currency risk associated with operations in countries outside of the United States (“FX Derivatives”). In order to test the sensitivity of the fair value of the FX Derivatives to changes in FX rates, management modeled a 10% change in FX rate between the U.S. dollar and the applicable foreign currencies as follows (in millions):
June 30, 2021December 31, 2020
Fair ValueChange in Fair ValueFair ValueChange in Fair Value
FX Derivatives$(4)$— $(22)$
September 30, 2021December 31, 2020
Fair ValueChange in Fair ValueFair ValueChange in Fair Value
FX Derivatives$$$(22)$

See Note 6—Derivative Instruments for additional details about our derivative instruments.

50


ITEM 4.    CONTROLS AND PROCEDURES
 
We maintain a set of disclosure controls and procedures that are designed to ensure that information required to be disclosed by us in the reports filed by us under the Exchange Act, is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. As of the end of the period covered by this report, we evaluated, under the supervision and with the participation of our management, including our Chief Executive Officer and our Chief Financial Officer, the effectiveness of our disclosure controls and procedures pursuant to Rule 13a-15 of the Exchange Act. Based on that evaluation, our Chief Executive Officer and our Chief Financial Officer concluded that our disclosure controls and procedures are effective.
 
During the most recent fiscal quarter, there have been no changes in our internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting. 
5153


PART II.    OTHER INFORMATION

ITEM 1.    LEGAL PROCEEDINGS

We may in the future be involved as a party to various legal proceedings, which are incidental to the ordinary course of business. We regularly analyze current information and, as necessary, provide accruals for probable liabilities on the eventual disposition of these matters. Other than discussed below, there have been no material changes to the legal proceedings disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 2020.

In February 2018, the Pipeline and Hazardous Materials Safety Administration (“PHMSA”) issued a Corrective Action Order (the “CAO”) to SPL in connection with a minor LNG leak from one tank and minor vapor release from a second tank at the Sabine Pass LNG terminal. These two tanks have been taken out of operational service while we conduct analysis, repair and remediation. On April 20, 2018, SPL and PHMSA executed a Consent Agreement and Order (the “Consent Order”) that replaces and supersedes the CAO. On July 9, 2019, PHMSA and FERC issued a joint letter setting out operating conditions required to be met prior to SPL returning the tanks to service. In July 2021, PHMSA issued a Notice of Probable Violation (“NOPV”) and Proposed Civil Penalty to SPL alleging violations of federal pipeline safety regulations relating to the 2018 SPL tank incident and proposing civil penalties totaling $2,214,900. We continueOn September 16, 2021, PHMSA issued an Amended NOPV that reduced the proposed penalty to $1,458,200. On October 12, 2021, SPL responded to the Amended NOPV, electing not to contest the alleged violations in the Amended NOPV and electing to pay the proposed reduced penalty. SPL continues to coordinate with PHMSA and FERC to address the matters relating to the February 2018 leak, including repair approach and related analysis. We do not expect that the Consent Order and related analysis, repair and remediation or resolution of the NOPV will have a material adverse impact on our financial results or operations.

ITEM 1A.    RISK FACTORS
 
There have been no material changes from the risk factors disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 2020.

ITEM 2.    UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

Purchase of Equity Securities by the Issuer and Affiliated Purchasers

The following table summarizes stock repurchases for the three months ended JuneSeptember 30, 2021:
PeriodTotal Number of Shares Purchased (1)Average Price Paid Per Share (2)Total Number of Shares Purchased as a Part of Publicly Announced PlansApproximate Dollar Value of Shares That May Yet Be Purchased Under the Plans (3)
April 1 - 30, 20214,734$72.83$595,952,809
May 1 - 31, 20212,624$77.52$595,952,809
June 1 - 30, 2021$—$595,952,809
Total7,358$74.50
PeriodTotal Number of Shares Purchased (1)Average Price Paid Per Share (2)Total Number of Shares Purchased as a Part of Publicly Announced PlansApproximate Dollar Value of Shares That May Yet Be Purchased Under the Plans (3)
July 1 - 31, 202193,008$85.3144,100$592,272,032
August 1 - 31, 202132,019$84.6230,500$589,692,332
September 1 - 30, 20212,500$85.432,500$589,478,717
Total127,527$85.1477,100
(1)Includes issued shares surrendered to us by participants in our share-based compensation plans for payment of applicable tax withholdings on the vesting of share-based compensation awards. Associated shares surrendered by participants are repurchased pursuant to terms of the plan and award agreements and not as part of the publicly announced share repurchase plan.
(2)The price paid per share was based on the average trading price of our common stock on the dates on which we repurchased the shares.
(3)On June 3, 2019, we announced that our Board authorized a 3-year, $1$1.0 billion share repurchase program. On September 7, 2021, the Board authorized an increase in the share repurchase program to $1.0 billion, inclusive of any amounts remaining under the previous authorization as of September 30, 2021, for an additional three years beginning on October 1, 2021. For additional information, see Share Repurchase Program in Liquidity and Capital Resources.

5254


ITEM 6.    EXHIBITS
Exhibit No.Description
10.1*†4.1
10.2*4.2
10.3*
10.4*10.1*
10.2*
10.3
10.4
10.5
31.1*
31.2*
32.1**
32.2**
101.INS*XBRL Instance Document
101.SCH*XBRL Taxonomy Extension Schema Document
101.CAL*XBRL Taxonomy Extension Calculation Linkbase Document
101.DEF*XBRL Taxonomy Extension Definition Linkbase Document
101.LAB*XBRL Taxonomy Extension Labels Linkbase Document
101.PRE*XBRL Taxonomy Extension Presentation Linkbase Document
104*Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)
*Filed herewith.
**Furnished herewith.
Management contract or compensatory plan or arrangement.
5355



SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. 
CHENIERE ENERGY, INC.
  
Date:August 4,November 3, 2021By:/s/ Zach Davis
Zach Davis
Senior Vice President and Chief Financial Officer
(on behalf of the registrant and
as principal financial officer)
Date:August 4,November 3, 2021By:/s/ Leonard E. Travis
Leonard E. Travis
Senior Vice President and Chief Accounting Officer
 (on behalf of the registrant and
as principal accounting officer)
5456