Table of Contents






UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-Q
 
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF
THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended June 30, 2023March 31, 2024

or
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF
THE SECURITIES EXCHANGE ACT OF 1934
 
For the transition period from ____________________ to ____________________

Commission File Number: 001-5532-99

PORTLAND GENERAL ELECTRIC COMPANY
(Exact name of registrant as specified in its charter)

Oregon93-0256820
(State or other jurisdiction of
incorporation or organization)
     (I.R.S. Employer          
     Identification No.)          
121 SW Salmon Street
Portland, Oregon 97204
(503) 464-8000
(Address of principal executive offices, including zip code,
and registrant’s telephone number, including area code) 

Securities registered pursuant to Section 12(b) of the Act:
(Title of class)(Trading Symbol)(Name of exchange on which registered)
Common Stock, no par valuePORNew York Stock Exchange

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. [x] Yes [ ] No
  
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
[x] Yes x [ ] No
  
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filerAccelerated filer
Non-accelerated filerSmaller reporting company
Emerging growth company
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standard provided pursuant to Section 13(a) of the Exchange Act. [ ]

 
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes [x] No
 
Number of shares of common stock outstanding as of July 20, 2023April 19, 2024 is 101,094,514103,031,278 shares.
1

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
FORM 10-Q
FOR THE QUARTERLY PERIOD ENDED JUNE 30, 2023MARCH 31, 2024

TABLE OF CONTENTS

Item 1.
Item 2.
Item 3.
Item 4.
Item 1.
Item 1A.
Item 5.
Item 6.
2

Table of Contents

DEFINITIONS

The following abbreviations and acronyms are used throughout this document:

Abbreviation or AcronymDefinition
AFUDCAllowance for funds used during construction
AUTAnnual Power Cost Update Tariff
ColstripColstrip Units 3 and 4 coal-fired generating plant
EFSAEquity Forward Sale Agreement
EPAUnited States Environmental Protection Agency
FERCFederal Energy Regulatory Commission
FMBsFMBFirst Mortgage BondsBond
GAAPAccounting principles generally accepted in the United States of America
GRCGeneral Rate Case
IRPIntegrated Resource Plan
Moody’sMoody’s Investors Service
MWMegawatts
MWaAverage megawatts
MWhMegawatt hour
NasdaqNational Association of Securities Dealers Automated Quotations
NVPCNet Variable Power Costs
NYSENew York Stock Exchange
OPUCPublic Utility Commission of Oregon
PCAMPower Cost Adjustment Mechanism
ROERegulated return on equity
RPSRenewable Portfolio Standard
S&PS&P Global Ratings
SECUnited States Securities and Exchange Commission
3

Table of Contents

PART I FINANCIAL INFORMATION

Item 1.Financial Statements.
 
PORTLAND GENERAL ELECTRIC COMPANY AND SUBSIDIARIES
CONDENSED CONSOLIDATED STATEMENTS OF INCOME
AND COMPREHENSIVE INCOME
(Dollars in millions, except per share amounts)
(Unaudited)                            
Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Revenues:Revenues:
Revenues, net
Revenues, net
Revenues, netRevenues, net$646 $588 $1,391 $1,213 
Alternative revenue programs, net of amortizationAlternative revenue programs, net of amortization
Total revenuesTotal revenues648 591 1,396 1,217 
Operating expenses:Operating expenses:
Purchased power and fuel
Purchased power and fuel
Purchased power and fuelPurchased power and fuel220 168 524 370 
Generation, transmission and distributionGeneration, transmission and distribution101 85 194 175 
Administrative and otherAdministrative and other93 84 173 173 
Depreciation and amortizationDepreciation and amortization113 103 224 202 
Taxes other than income taxesTaxes other than income taxes40 39 83 79 
Total operating expensesTotal operating expenses567 479 1,198 999 
Income from operationsIncome from operations81 112 198 218 
Interest expense, netInterest expense, net41 38 85 76 
Other income:Other income:
Allowance for equity funds used during constructionAllowance for equity funds used during construction
Allowance for equity funds used during construction
Allowance for equity funds used during construction
Miscellaneous income, netMiscellaneous income, net— 17 — 
Other income, netOther income, net24 
Income before income tax expenseIncome before income tax expense49 77 137 148 
Income tax expenseIncome tax expense10 13 24 24 
Net incomeNet income39 64 113 124 
Other comprehensive incomeOther comprehensive income
Net income and Comprehensive incomeNet income and Comprehensive income$40 $65 $114 $125 
Weighted-average common shares outstanding (in thousands):Weighted-average common shares outstanding (in thousands):
Weighted-average common shares outstanding (in thousands):
Weighted-average common shares outstanding (in thousands):
Basic
Basic
BasicBasic97,087 89,225 94,478 89,310 
DilutedDiluted97,630 89,371 94,950 89,449 
Earnings per sharebasic and diluted
$0.39 $0.72 $1.19 $1.39 
Earnings per share:
Earnings per share:
Earnings per share:
Basic
Basic
Basic
Diluted
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
    
4

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY AND SUBSIDIARIES
CONDENSED CONSOLIDATED BALANCE SHEETS
(Dollars in millions)
(Unaudited)                            


June 30, 2023December 31, 2022
March 31, 2024March 31, 2024December 31, 2023
ASSETSASSETS
Current assets:Current assets:
Current assets:
Current assets:
Cash and cash equivalents
Cash and cash equivalents
Cash and cash equivalentsCash and cash equivalents$13 $165 
Accounts receivable, netAccounts receivable, net310 398 
InventoriesInventories108 95 
Inventories
Inventories
Regulatory assets—current
Regulatory assets—current
Regulatory assets—currentRegulatory assets—current88 54 
Other current assetsOther current assets157 498 
Total current assetsTotal current assets676 1,210 
Electric utility plant, netElectric utility plant, net8,841 8,465 
Regulatory assets—noncurrentRegulatory assets—noncurrent593 473 
Nuclear decommissioning trustNuclear decommissioning trust35 39 
Non-qualified benefit plan trustNon-qualified benefit plan trust36 38 
Other noncurrent assetsOther noncurrent assets189 234 
Total assetsTotal assets$10,370 $10,459 
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.


5

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY AND SUBSIDIARIES
CONDENSED CONSOLIDATED BALANCE SHEETS, continued
(Dollars in millions)
(Unaudited)                        


June 30, 2023December 31, 2022
March 31, 2024March 31, 2024December 31, 2023
LIABILITIES AND SHAREHOLDERS’ EQUITYLIABILITIES AND SHAREHOLDERS’ EQUITY
Current liabilities:Current liabilities:
Current liabilities:
Current liabilities:
Accounts payable
Accounts payable
Accounts payableAccounts payable$227 $457 
Liabilities from price risk management activities—currentLiabilities from price risk management activities—current98 118 
Short-term debtShort-term debt140 — 
Current portion of long-term debtCurrent portion of long-term debt— 260 
Current portion of finance lease obligation
Current portion of finance lease obligation
Current portion of finance lease obligationCurrent portion of finance lease obligation20 20 
Accrued expenses and other current liabilitiesAccrued expenses and other current liabilities276 641 
Total current liabilitiesTotal current liabilities761 1,496 
Long-term debt, net of current portionLong-term debt, net of current portion3,486 3,386 
Regulatory liabilities—noncurrentRegulatory liabilities—noncurrent1,409 1,389 
Deferred income taxesDeferred income taxes452 439 
Unfunded status of pension and postretirement plansUnfunded status of pension and postretirement plans171 170 
Liabilities from price risk management activities—noncurrentLiabilities from price risk management activities—noncurrent159 75 
Asset retirement obligationsAsset retirement obligations263 257 
Non-qualified benefit plan liabilitiesNon-qualified benefit plan liabilities79 83 
Finance lease obligations, net of current portionFinance lease obligations, net of current portion292 294 
Other noncurrent liabilitiesOther noncurrent liabilities98 91 
Total liabilitiesTotal liabilities7,170 7,680 
Commitments and contingencies (see notes)Commitments and contingencies (see notes)Commitments and contingencies (see notes)
Shareholders’ Equity:Shareholders’ Equity:
Preferred stock, no par value, 30,000,000 shares authorized; none issued and outstanding as of June 30, 2023 and December 31, 2022— — 
Common stock, no par value, 160,000,000 shares authorized; 98,863,827 and 89,283,353 shares issued and outstanding as of June 30, 2023 and December 31, 2022, respectively1,647 1,249 
Preferred stock, no par value, 30,000,000 shares authorized; none issued and outstanding as of March 31, 2024 and December 31, 2023
Preferred stock, no par value, 30,000,000 shares authorized; none issued and outstanding as of March 31, 2024 and December 31, 2023
Preferred stock, no par value, 30,000,000 shares authorized; none issued and outstanding as of March 31, 2024 and December 31, 2023
Common stock, no par value, 160,000,000 shares authorized; 103,023,507 and 101,159,609 shares issued and outstanding as of March 31, 2024 and December 31, 2023, respectively
Accumulated other comprehensive lossAccumulated other comprehensive loss(3)(4)
Retained earningsRetained earnings1,556 1,534 
Total shareholders’ equityTotal shareholders’ equity3,200 2,779 
Total shareholders’ equity
Total shareholders’ equity
Total liabilities and shareholders’ equityTotal liabilities and shareholders’ equity$10,370 $10,459 
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.

6

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY AND SUBSIDIARIES
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS
(In millions)
(Unaudited)    
                                                        
Three Months Ended March 31,Three Months Ended March 31,
202420242023
Cash flows from operating activities:
Net income
Net income
Net income
Adjustments to reconcile net income to net cash provided by operating activities:
Depreciation and amortization
Depreciation and amortization
Depreciation and amortization
Six Months Ended June 30,
20232022
Cash flows from operating activities:
Net income$113 $124 
Adjustments to reconcile net income to net cash provided by operating activities:
Depreciation and amortization224 202 
Deferred income taxes
Deferred income taxes
Deferred income taxesDeferred income taxes
Pension and other postretirement benefitsPension and other postretirement benefits
Allowance for equity funds used during constructionAllowance for equity funds used during construction(7)(6)
Allowance for equity funds used during construction
Allowance for equity funds used during construction
Decoupling mechanism deferrals, net of amortizationDecoupling mechanism deferrals, net of amortization(5)(4)
Decoupling mechanism deferrals, net of amortization
Decoupling mechanism deferrals, net of amortization
Regulatory assets
Regulatory assets
Regulatory assetsRegulatory assets(10)(35)
Regulatory liabilitiesRegulatory liabilities12 
2020 Labor Day wildfire earnings test reserve— 15 
Other non-cash income and expenses, net
Other non-cash income and expenses, net
Other non-cash income and expenses, netOther non-cash income and expenses, net28 26 
Changes in working capital:Changes in working capital:
Accounts receivable, net
Accounts receivable, net
Accounts receivable, netAccounts receivable, net82 37 
InventoriesInventories(13)(19)
Margin depositsMargin deposits90 
Accounts payable and accrued liabilitiesAccounts payable and accrued liabilities(233)(55)
Margin deposits from wholesale counterpartiesMargin deposits from wholesale counterparties(135)149 
Other working capital items, netOther working capital items, net
Other, netOther, net(21)(17)
Net cash provided by operating activities143 451 
Other, net
Other, net
Net cash provided by (used in) operating activities
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
7

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY AND SUBSIDIARIES
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS, continued
(In millions)
(Unaudited)        
Three Months Ended March 31,Three Months Ended March 31,
202420242023
Cash flows from investing activities:
Capital expenditures
Capital expenditures
Capital expenditures
Six Months Ended June 30,
20232022
Cash flows from investing activities:
Capital expenditures(573)(345)
Sales of Nuclear decommissioning trust securities— 
Purchases of Nuclear decommissioning trust securities— (3)
Proceeds from sale of properties
Proceeds from sale of properties
Proceeds from sale of propertiesProceeds from sale of properties12 
Other, netOther, net(3)(1)
Net cash used in investing activitiesNet cash used in investing activities(574)(334)
Cash flows from financing activities:Cash flows from financing activities:
Cash flows from financing activities:
Cash flows from financing activities:
Proceeds from issuance of common stock
Proceeds from issuance of common stock
Proceeds from issuance of common stockProceeds from issuance of common stock$392 $— 
Proceeds from issuance of long-term debtProceeds from issuance of long-term debt100 — 
Payments on long-term debtPayments on long-term debt(260)— 
Issuance of commercial paper, net140 — 
Proceeds from Pelton/Round Butte financing arrangement— 25 
Issuance (maturities) of commercial paper, net
Issuance (maturities) of commercial paper, net
Issuance (maturities) of commercial paper, net
Dividends paid
Dividends paid
Dividends paidDividends paid(84)(77)
Repurchase of common stock— (18)
OtherOther(9)(8)
Net cash provided by (used in) financing activities279 (78)
(Decrease) Increase in cash and cash equivalents(152)39 
Other
Other
Net cash provided by financing activities
Change in cash and cash equivalents
Cash and cash equivalents, beginning of periodCash and cash equivalents, beginning of period165 52 
Cash and cash equivalents, end of periodCash and cash equivalents, end of period$13 $91 
Supplemental cash flow information is as follows:Supplemental cash flow information is as follows:
Supplemental cash flow information is as follows:
Supplemental cash flow information is as follows:
Cash paid for interest, net of amounts capitalizedCash paid for interest, net of amounts capitalized$70 $63 
Cash paid for income taxes16 16 
Non-cash investing and financing activities:
Cash paid for interest, net of amounts capitalized
Cash paid for interest, net of amounts capitalized
Cash paid for income taxes, net
Assets obtained under leasing arrangements— 29 
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
See accompanying notes to condensed consolidated financial statements.
8

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

NOTE 1: BASIS OF PRESENTATION

Nature of Business

Portland General Electric Company (PGE or the Company) is a single, vertically-integrated electric utility engaged in the generation, purchase, transmission, distribution, and retail sale of electricity in the State of Oregon (State). The Company operates as a cost-based, regulated electric utility with revenue requirements and customer prices determined based on the forecasted cost to serve retail customers and a reasonable rate of return as determined by the Public Utility Commission of Oregon (OPUC). The Companyalso participates in the wholesale market under the regulation and authority of the Federal Energy Regulatory Commission (FERC) by purchasing and selling electricity and natural gas as well as buying and selling transmission products and services, in an effort to providemeet the needs of, and obtain reasonably-priced power for its retail customers.customers, manage risk, and administer it’s long-term wholesale contracts. In addition, PGE also performs portfolio management and wholesale market sales services for third parties in the region. In addition, PGE offersThe Company continues to develop products and service offerings for the benefit of retail and wholesale electricity transmission service pursuant to its Open Access Transmission Tariff, which contains rates, terms, and conditions of service, as filed with, and approved by, the FERC.customers. PGE operates as a single segment, with revenues and costs related to its business activities recorded and analyzed on a total electric operations basis. The Company owns unregulated, non-utility real estate comprised primarily of PGE’s corporate headquarters. The Company’s corporate headquarters is located in Portland, Oregon and its approximately 4,000 square mile, State-approved service area, entirely within the State, encompasses 51 incorporated cities. As of June 30, 2023,March 31, 2024, PGE served 928,000940,000 retail customers within a service area of 1.9 million residents.

PGE is subject to the jurisdiction of the Public Utility Commission of Oregon (OPUC) with respect to retail prices, utility services, accounting policies and practices, issuances of securities, and certain other matters. Retail prices are based on the Company’s cost to serve customers, including an opportunity to earn a reasonable rate of return, as determined by the OPUC. The Company is also subject to regulation by the Federal Energy Regulatory Commission (FERC) in matters related to wholesale energy transactions, transmission services, reliability standards, natural gas pipelines, hydroelectric project licensing, accounting policies and practices, short-term debt issuances, and certain other matters.

Condensed Consolidated Financial Statements

These condensed consolidated financial statements have been prepared pursuant to the rules and regulations of the United States Securities and Exchange Commission (SEC). Certain information and note disclosures normally included in financial statements prepared in conformity with accounting principles generally accepted in the United States of America (GAAP) have been condensed or omitted pursuant to such regulations, although PGE believes that the disclosures provided are adequate to make the interim information presented not misleading.

The financial information included herein as of and for the three and six months ended June 30,March 31, 2024 and 2023 and 2022 is unaudited; however, in the opinion of management, such information reflects all adjustments necessary to fairly present the condensed consolidated financial position, condensed consolidated income and comprehensive income, and condensed consolidated cash flows of the Company for these interim periods. All such adjustments are of a normal recurring nature, unless otherwise noted. The financial information as of December 31, 20222023 is derived from the Company’s audited consolidated financial statements and notes thereto for the year ended December 31, 2022,2023, included in Item 8 of PGE’s Annual Report on Form 10-K, filed with the SEC on February 16, 2023,20, 2024, which should be read in conjunction with the interim unaudited Financial Statements.

Comprehensive Income

No material change occurred in Other comprehensive income in the three and six months ended June 30,March 31, 2024 and 2023.


9

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Miscellaneous Income, Net

Miscellaneous income, net includes $3 million and $8 million in interest income from regulatory assets for the three months ended March 31, 2024 and 2023, respectively, and 2022.$2 million and $3 million realized and unrealized gains on the non-qualified benefit plan trust assets. The remaining activity is comprised of $1 million in other miscellaneous income in both 2024 and 2023.

Use of Estimates

The preparation of condensed consolidated financial statements in accordance with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, and disclosures of gain or loss contingencies, as of the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results experienced by the Company could differ materially from those estimates.
9

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)

Certain costs are estimated for the full year and allocated to interim periods based on estimates of operating time expired, benefit received, or activity associated with the interim period; accordingly, such costs may not be reflective of amounts to be recognized for a full year. Due to seasonal fluctuations in electricity sales, as well as the price of wholesale electricity and natural gas, interim financial results do not necessarily represent those to be expected for the year.

NOTE 2: REVENUE RECOGNITION

Disaggregated Revenue

The following table presents PGE’s revenue, disaggregated by customer type (in millions):
Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Retail:Retail:
Residential
Residential
ResidentialResidential$279 $250 $641 $558 
CommercialCommercial196 168 393 346 
IndustrialIndustrial87 73 169 142 
Direct access customersDirect access customers13 17 
SubtotalSubtotal569 500 1,216 1,063 
Alternative revenue programs, net of amortizationAlternative revenue programs, net of amortization
Other accrued revenues, netOther accrued revenues, net(4)— (3)— 
Total retail revenuesTotal retail revenues567 503 1,218 1,067 
Wholesale revenues*
Wholesale revenues*
62 65 150 121 
Other operating revenuesOther operating revenues19 23 28 29 
Total revenuesTotal revenues$648 $591 $1,396 $1,217 

* Wholesale revenues include $22$88 million and $14$34 million related to electricity commodity contract derivative settlements for the three months ended June 30,March 31, 2024 and 2023, and 2022, respectively, and $56 million and $33 million for the six months ended June 30, 2023 and 2022, respectively. Price risk management derivative activities are included within total revenues but do not represent revenues from contracts with customers as defined by GAAP. For further information, see Note 5, Risk Management.


10

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Retail Revenues

The Company’s primary revenue source is the sale of electricity to customers at regulated, tariff-based prices. Retail customers are classified as residential, commercial, or industrial. Residential customers include single-family housing, multiple-family housing (such as apartments, duplexes, and town homes), manufactured homes, and small farms. Residential demand is sensitive to the effects of weather, with demand highest during the winter heating and summer cooling seasons. Commercial customers consist of non-residential customers who accept energy deliveries at voltages equivalent to those delivered to residential customers and are also sensitive to the effects of weather, although to a lesser extent than residential customers. Commercial customers include most businesses, small industrial companies, and public street and highway lighting accounts. Industrial customers consist of non-residential customers who accept delivery at higher voltages than commercial customers. Demand from industrial customers is primarily driven by economic conditions, with weather having little impact on energy use by this customer class.

In accordance with state regulations, PGE’s retail customer prices are based on the Company’s cost of service and determined through general rate caseGeneral Rate Case (GRC) proceedings and various tariff filings with the OPUC. Additionally, the
10

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Company offers pricing options that include a daily market price option, various time-of-use options, and several renewable energy options.

Retail revenue is billed based on monthly meter readings taken at various cycle dates throughout the month. At the end of each month, PGE estimates and records the revenue earned from energy deliveries that have not yet been billed to customers. This amount, which is classified as unbilled revenues and included in Accounts receivable, net in the Company’s condensed consolidated balance sheets, is calculated based on actual net retail system load each month, the number of days from the last meter read date through the last day of the month, and current customer prices.

PGE’s obligation to sell electricity to retail customers generally represents a single performance obligation representing a series of distinct services that are substantially the same and have the same pattern of transfer to the customer that is satisfied over time as customers simultaneously receive and consume the benefits provided. The CompanyPGE applies the invoice method to measure its progress towards satisfactorily completing its performance obligations.
Pursuant to regulation by the OPUC, PGE is mandated to maintain several tariff schedules to collect funds from customers for programs that benefit the general public, such as conservation, low-income housing, energy efficiency, renewable energy programs, and privilege taxes. For such programs, the CompanyPGE generally collects the funds and remits the amounts to third party agencies that administer the programs. In these arrangements, PGE is considered to be an agent, as the Company’sPGE’s performance obligation is to facilitate a transaction between customers and the administrators of these programs. Therefore, such amounts are presented on a net basis withinand do not appear in Revenues, net within the condensed consolidated statements of income.

Alternative Revenues programsRevenues related to PGE’s decoupling mechanism and Renewable Adjustment Clause (RAC) are considered earned under alternative revenue programs, as these amounts represent contracts with the regulator and not with customers. Such revenues are presented separately from revenues from contracts with customers and classified as Alternative revenue programs, net of amortization on the condensed consolidated statements of income. The activity within this line item is comprised of current period deferral adjustments, which can either be a collection from or a refund to customers, and is net of any related amortization. When amounts related to alternative revenue programs are ultimately included in prices and customer bills, the amounts are included within Revenues, net, with an equal and offsetting amount of amortization recorded on the Alternative revenue programs, net of amortization line item. Under the RAC in 2024, the Company has deferred amounts related to the Clearwater Wind Development (Clearwater). For further information, see “Clearwater RAC” in the Regulatory Assets and Liabilities section of Note 3, Balance Sheet Components, in this Item 1.

11

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Wholesale Revenues

PGE participates in the wholesale electricity marketplace in order to balance its supply of power to meet the needs of, and secure reasonably priced power for, its retail customers.customers, manage risk, and administer its current long-term wholesale contracts. In addition, the Company performs portfolio management and wholesale market services for third parties in the region. Interconnected transmission systems in the western United States serve utilities with diverse load requirements and allow the CompanyPGE to purchase and sell electricity within the region depending upon among other things, the relative price and availability of power;power, hydro, solar and wind conditions; and daily and seasonal retail demand.
PGE’s Wholesale revenues are primarily short-term electricity sales to utilities and power marketers that consist of single performance obligations that are satisfied as energy is transferred to the counterparty. The Company may choose to net certain purchase and sale transactions in which it would simultaneously receive and deliver physical power with the same counterparty; in such cases, only the net amount of those purchases or sales required to meet retail and wholesale obligations will be physically settled and recorded in Wholesale revenues.

Other Operating Revenues

Other operating revenues consist primarily of gains and losses on the sale of natural gas volumes purchased that exceeded what was needed to fuel the Company’s generating facilities, as well as revenues from transmission services, excess transmission capacity resales, excess fuel sales, utility pole attachment revenues, and other electric services provided to customers.

Arrangements with Multiple Performance Obligations

Certain contracts with customers, primarily wholesale, may include multiple performance obligations. For such arrangements, PGE allocates revenue to each performance obligation based on its relative standalone selling price. The Company generally determines standalone selling prices based on the prices charged to customers.


11

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
NOTE 3: BALANCE SHEET COMPONENTS

Inventories

PGE’s inventories, which are recorded at average cost, consist primarily of materials and supplies for use in operations, maintenance, and capital activities, as well as fuel, which includes natural gas, coal, and oil, for use in the Company’s generating plants. Periodically, PGE assesses whether inventories are recorded at the lower of average cost or net realizable value.

Accounts Receivable, Net

Accounts receivable, net includes $117 million and $131 million of unbilled revenues as of June 30, 2023 and December 31, 2022, respectively. Accounts receivable, net includes an allowance for credit losses of $13 million and $12 million as of June 30, 2023 and December 31, 2022, respectively. The following summarizes activity in the allowance for credit losses (in millions):
Three Months Ended June 30,Six Months Ended June 30,
 20232023
Balance as of beginning of period$13 $12 
Increase in provision
Amounts written off(3)(6)
Recoveries
Balance as of end of period$13 $13 

Other Current Assets

Other current assets consist of the following (in millions):
June 30, 2023December 31, 2022
Prepaid expenses$56 $69 
Assets from price risk management activities75 313 
Margin deposits26 116 
Other current assets$157 $498 

Assets from price risk management activities and related unrealized gains as well as Margin deposits decreased during the six months ended June 30, 2023 due to decreases in wholesale natural gas and electricity prices. For further information, see Note 5, Risk Management.


12

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Accounts Receivable, Net

Accounts receivable, net includes $132 million and $138 million of unbilled revenues as of March 31, 2024 and December 31, 2023, respectively. Accounts receivable, net includes an allowance for credit losses of $11 million as of March 31, 2024 and $9 million as of December 31, 2023. The following summarizes activity in the allowance for credit losses (in millions):
Three Months Ended March 31,
2024
Balance as of beginning of period$
Increase in provision
Amounts written off(3)
Recoveries
Balance as of end of period$11 

Other Current Assets

Other current assets consist of the following (in millions):
March 31, 2024December 31, 2023
Prepaid expenses$109 $68 
Assets from price risk management activities29 22 
Margin deposits65 92 
Other current assets$203 $182 

Electric Utility Plant, Net

Electric utility plant, net consists of the following (in millions):         
June 30, 2023December 31, 2022
March 31, 2024March 31, 2024December 31, 2023
Electric utility plant in-serviceElectric utility plant in-service$12,868 $12,421 
Construction work-in-progressConstruction work-in-progress568 467 
Total costTotal cost13,436 12,888 
Less: accumulated depreciation and amortizationLess: accumulated depreciation and amortization(4,595)(4,423)
Electric utility plant, netElectric utility plant, net$8,841 $8,465 

Accumulated depreciation and amortization in the table above includes accumulated amortization related to intangible assets of $530$576 million and $499$558 million as of June 30, 2023March 31, 2024 and December 31, 2022,2023, respectively. Amortization expense related to intangible assets was $15$18 millionand $14 million for the three months ended June 30,March 31, 2024 and 2023, and 2022, respectively, and $29 million for the six months ended June 30, 2023 and 2022.respectively. The Company’s intangible assets primarily consist of computer software development and hydro licensing costs.
Battery storage agreement—On April 26, 2023, PGE entered into a battery storage purchased power agreement (PPA) that will be accounted for as a lease upon commencement. The lease is expected to commence in December 2024 and has a term of 20 years. The total fixed contract consideration is expected to be $737 million over the lease term.


13

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Regulatory Assets and Liabilities

Regulatory assets and liabilities consist of the following (in millions):
March 31, 2024March 31, 2024December 31, 2023
CurrentCurrentNoncurrentCurrentNoncurrent
Regulatory assets:
Price risk management
Price risk management
Price risk management
Reliability contingency events
Pension and other postretirement plans
June 30, 2023December 31, 2022
Trojan decommissioning activities
CurrentNoncurrentCurrentNoncurrent
Regulatory assets:
Price risk management$23 $136 $— $
Pension and other postretirement plans— 95 — 95 
Trojan decommissioning activities
Debt issuance costs— 21 — 21 
Trojan decommissioning activitiesTrojan decommissioning activities— 134 — 133 
February 2021 ice storm and damageFebruary 2021 ice storm and damage12 60 10 64 
Power cost adjustment mechanism16 14 14 
January 2024 storm and damage
2020 Labor Day wildfire2020 Labor Day wildfire25 27 
COVID-1912 — 22 
2020 Labor Day wildfire
2020 Labor Day wildfire
Wildfire mitigation
Wildfire mitigation
Wildfire mitigationWildfire mitigation— 32 — 28 
OtherOther20 76 26 68 
Total regulatory assetsTotal regulatory assets$88 $593 $54 $473 
Regulatory liabilities:Regulatory liabilities:
Asset retirement removal costsAsset retirement removal costs$— $1,154 $— $1,136 
Asset retirement removal costs
Asset retirement removal costs
Deferred income taxesDeferred income taxes— 187 — 194 
Asset retirement obligations— 10 — 
Price risk management— — 195 — 
Boardman Refund— — 
Clearwater RAC
Clearwater RAC
Clearwater RAC
OtherOther21 55 39 52 
Total regulatory liabilitiesTotal regulatory liabilities$25 *$1,409 $234 *$1,389 
* Included in Accrued expenses and other current liabilities in the condensed consolidated balance sheets.

January 2024 storm and damageBeginning January 13, 2024, the Company’s service territory encountered a severe winter weather event that included snow, ice, and high winds over several days that caused catastrophic damage to physical assets and resulted in widespread customer power outages. As a result of the historic winter storm, Oregon’s Governor declared a state of emergency on January 19, 2024, which will allow PGE to seek recovery of incremental storm expenses through the OPUC pre-authorized emergency deferral mechanism. On February 9, 2024, PGE filed a Notice of Deferral with the OPUC, under Docket UM 2190, related to the emergency restoration costs for the January storm, and as of March 31, 2024, PGE’s deferred balance related to the January 2024 storm was $48 million. PGE believes amounts deferred as of March 31, 2024 are probable of recovery under the emergency deferral mechanism. The OPUC has significant discretion in making the final determination of recovery. The OPUC’s conclusion of overall prudence, including an earnings test, could result in a portion, or all, of PGE’s deferrals being disallowed for recovery. Such disallowance would be recognized as a charge to earnings.

Reliability contingency eventsA portion of the January 2024 storm also qualified as a Reliability Contingency Event (RCE) as approved by the OPUC in PGE’s 2024 GRC. Under the RCE mechanism, PGE is allowed to defer and recover 80% of prudent costs for RCEs above amounts forecasted in the Company’s Annual Power Cost Update Tariff, without application of an earnings test, with the remaining 20% flowing through operating expenses and subject to the existing PCAM. As of March 31, 2024, PGE’s deferred balance related to the 2024 RCE was $75 million. Full impacts cannot be determined until all settlements and invoices are received for the period to which the RCE applies. PGE files the results of the PCAM annually with the OPUC no later than July 1, initiating a regulatory review process that typically results in a final determination and order from the OPUC by the end of the year, with any resulting refund or collection impacting customer prices effective January 1 of the following year. Costs related to the RCE in January 2024 will be included in the Company’s PCAM for 2024, which the Company expects to file no later than July 1, 2025. The OPUC has significant discretion in making the final determination of
14

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
recovery. The OPUC’s conclusion of overall prudence could result in a portion, or all, of PGE’s deferrals being disallowed for recovery. Such disallowance would be recognized as a charge to earnings.

Wildfire Mitigation represents incremental costs and investments made by PGE related to intensifying efforts on its system to mitigate the risk of wildfire and improve resiliency to wildfire damage under Oregon Senate Bill (SB)SB 762, enacted in July 2021. These efforts include enhanced tree and brush clearing, hardening equipment, and making emergency plans in close partnership with various land and emergency management agencies to further expand the use of a public safety power shutoff, if the need should arise. PGE submitted its 2024 risk-based Wildfire Mitigation Plan to the OPUC in December 2023, and it is pending approval from the OPUC, which is expected no later than June 25, 2024.

As of March 31, 2024 and December 31, 2023, PGE’s deferred balance related to incremental wildfire mitigation operating expenses was $32 million and $29 million, respectively. The 2024 balance is comprised of:
Pre-AACPrior to establishing the collections noted below, PGE had deferred incremental costs related to wildfire mitigation and as of March 31, 2024 this balance is $22 million. On July 1, 2022, PGE filed an application for reauthorization of OPUC Docket UM 2019 to defer incremental wildfire mitigation costs that exceed the amount granted in base rates. On May 10, 2023, in Order No. 23-173, the OPUC approved an automatic adjustment clause mechanism to recover wildfire mitigation costs (capital and expense). PGE and certain parties agreed to a stipulation, which was passed inadopted by the 2021 legislative session with an effective dateOPUC on October 18, 2023, that allows PGE to begin amortizing $27 million comprised of July 19, 2021. SB 762 instructs public utilities$23 million related to develop, implement,the September 30, 2023 deferred operating expense balance of $31 million and execute a wildfire protection plan, in which reasonable costs can be recovered through the prices to all customers. $4 million for capital related revenue requirement.
2023 Base ratesThe outcome of PGE’s 2022 GRC provided an annual amount of $24 million to be collected in base rates for recovery of operating expenses related to wildfire mitigation efforts beginning May 9, 2022.2022, through December 31, 2023. As of June 30, 2023March 31, 2024, there was $1 million in the balancing account.
2024 AACBeginning January 1, 2024, and December 31, 2022, PGE’s deferred balancein conjunction with the Company’s 2024 GRC proceeding, PGE removed 2024 related to wildfire mitigation operating expenses was $32 million and $28 million, respectively. On July 1, 2022, PGE filed an applicationcollections for reauthorization of OPUC Docket UM 2019 to defer incremental wildfire mitigation costs that exceed the amount granted in base rates.

On May 10, 2023, in Order No. 23-173, the OPUC approved an automatic adjustment clause mechanism to recover wildfire mitigation costs (capital(for both capital and expense). PGE submitted its tariff filing on May 17, 2023, for new rates to take effect September 1, 2023, to recover: i) incremental expense from base prices and capital-related costs that has been deferred under OPUC Docket UM 2019 and ii)will include the forecasted costs based on a 2024 testfor current year (in PGE’s next general rate case it will remove collections related to wildfire mitigation costs from base rates and includespending within the automatic adjustment clause). This is currently undergoingclause in a separate tariff, with the final amount pending OPUC approval. Differences between actual expense and customer collections will be recorded as regulatory assets or liabilities within the automatic adjustment clause balancing account, which will be subject to a prudence review, bybut will not be subject to an earnings test. As of March 31, 2024, there was $9 million in the OPUC.balancing account.
The OPUC has significant discretion in making the final determination of recovery. The OPUC’s conclusionsconclusion of overall prudence could result in a portion, or all, of PGE’s deferraldeferrals being disallowed for recovery. Such disallowance would be recognized as a charge to earnings.

14

Table of ContentsClearwater RAC

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
COVID-19—The COVID-19 pandemic led Oregon’s GovernorRAC allows PGE to declarerecover prudently incurred costs of renewable resources through filings made each year, outside of a stateGRC. Under the RAC, during 2023, the Company submitted a filing for Clearwater, which estimated the annual revenue requirement, net of emergency on March 8, 2020. DueNVPC benefits to be a refund to customers of approximately $30 million that would be included in customers prices June 1, 2024. Pursuant to the adverse impactsfiling, PGE would defer the revenue requirement, net of COVID-19 on economic activity, PGE experienced an increaseNVPC benefits from the in-service date of January 2024 until Clearwater was reflected in bad debt expense, lost revenue, and other incremental costs. In March 2020, PGE filed an application withcustomer prices. On April 4, 2024, the OPUC for deferral of lost revenuerejected PGE and certain incremental costs, such as bad debt expense, relatedparties’ Stipulation regarding Clearwater and requested that PGE submit reply testimony responding to COVID-19. PGE’s deferral application was approvedthe arguments raised by the OPUC in October 2020 with final stipulations approved in November 2020.

Staff by April 25, 2024. The rejection order provided a new target rate effective date of August 1, 2024. As June 30, 2023 and Decemberof March 31, 2022, PGE’s deferred balance was $19 million and $22 million, respectively, comprised primarily of bad debt expense in excess of what is currently considered and collected in customer prices. PGE filed a request for amortization of deferred amounts in December 2022, which reflected a $12 million adjustment primarily related to bad debt write-offs being lower than estimated. During a March 14, 2023 public meeting, Staff recommended the OPUC approve PGE's filing of Advice No. 22-45 associated with the recovery of the COVID-19 deferral. On March 21, 2023, Advice No. 22-45 was approved by the OPUC, allowing for amortization of deferred amounts over a two-year period, which began April 1, 2023.

Deferral of Boardman revenue requirementIn October 2020, intervenors filed a deferral application with the OPUC that would require PGE to defer and refund the revenue requirement associated with the Company’s Boardman coal-fired generating plant (Boardman) then included in customer prices as established in the Company’s 2019 GRC. The application stated a deferral was required for customers to adequately capture the reduction in revenue requirement beginning on October 15, 2020, the date Boardman ceased operations. PGE estimated the revenue requirement for Boardman to be $14 million for the year ended December 31, 2020, an additional $66 million for the year ended December 31, 2021, and $23 million for the year ended December 31, 2022. In the 2022 GRC Order, the OPUC found that the deferral was warranted with amortization subject to an earnings test. On July 27, 2022,2024, the Company filed an application, which, subjecthad recorded a $10 million regulatory liability refund to customers. The OPUC approval, showed thathas significant discretion in making the Company did not exceed the earnings test thresholdfinal determination of recovery. The OPUC’s conclusion of overall prudence could result in a portion, or all, of PGE’s deferrals being disallowed for 2020 or 2021 and consequently, no refundrecovery. Such disallowance would be required for those years. Customer prices resulting from the 2022 GRC Order no longer included any revenue requirement related to Boardman after new customer prices took effect on May 9, 2022. On October 24, 2022, PGE and parties submittedrecognized as a stipulation with the OPUC reflecting an agreement that resolved all matters related to 2021 under this deferral and states that no refund remains necessary for that year. Based on the application of an earnings test, PGE had not previously recorded a refund related to Boardman for 2020, 2021, or 2022.

On May 30, 2023, PGE and parties submitted a second stipulation with the OPUC reflecting an agreement that resolved all matters related to 2020 and 2022 under this deferral. Parties agreed that PGE would refund $6.5 million to customers related to 2020. The refund amount, plus interest, will be amortized into customer prices over a two-year period beginning July 1, 2023. All parties agreed that there are no amounts to amortize for the 2022 deferral period. On June 5, 2023, the OPUC issued Order 23-195, which approved the stipulations.

Establishing the Boardman refund deferral resulted in an increase to regulatory liabilities with an offsetting charge to the condensed consolidated statements of income for the three months ended June 30, 2023.

earnings.
Accrued Expenses and Other Current Liabilities

Accrued expenses and other current liabilities consist of the following (in millions):
15

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
June 30, 2023December 31, 2022
Accrued employee compensation and benefits$58 $66 
Accrued taxes payable25 29 
Accrued interest payable33 31 
Accrued dividends payable48 42 
Regulatory liabilities—current25 234 
Margin deposits from wholesale counterparties140 
Other82 99 
Total accrued expenses and other current liabilities$276 $641 

Accrued Expenses and Other Current Liabilities

TheAccrued expenses and other current portionliabilities consist of Regulatory liabilities and Margin deposits from wholesale counterparties decreased during the six months ended June 30, 2023 due to decreases in wholesale natural gas and electricity prices. For further information, see Note 5, Risk Management.following (in millions):
March 31, 2024December 31, 2023
Accrued employee compensation and benefits$50 $74 
Accrued taxes payable29 30 
Accrued interest payable58 40 
Accrued dividends payable50 51 
Regulatory liabilities—current50 48 
Margin deposits from wholesale counterparties
Other114 107 
Total accrued expenses and other current liabilities$356 $355 

Credit Facilities

On August 18, 2023, PGE entered into an amendment of its existing revolving credit facility. As of June 30, 2023,March 31, 2024, PGE had a $650750 million revolving credit facility scheduled to expire in September 2027.2028. The Company has the ability to expand the revolving credit facility to $750850 million, if needed, subject to the requirements of the agreement. Pursuant to the terms of the agreement, the revolving credit facility may be used for general corporate purposes, including as backup for commercial paper borrowings and to permit the issuance of standby letters of credit. PGE may borrow for one, three, or six months at a fixed interest rate established at the time of the borrowing, or at a variable interest rate for any period up to the then remaining term of the applicable credit facility. The revolving credit facility contains a provision that requires annual fees based on the Companys unsecured credit ratings, and contains customary covenants and default provisions, including a requirement that limits consolidated indebtedness, as defined in the agreement, to 65% of total capitalization. As of June 30, 2023,March 31, 2024, PGE was in compliance with this covenant with a 54.0%56.9% debt-to-total capital ratio and had no outstanding balance on the revolving credit facility. As a result of the policy to backup commercial paper borrowings, the aggregate unused available credit capacity under the credit facility was $510$750 million. In addition, the credit facility offers the potential for adjustments to interest rate margins and fees based on PGE’s achievement of certain annual sustainability-linked metrics related to its non-emitting generation capacity and the percentage of management comprised of women and employees who identify as black, indigenous, and people of color. The Company believes these potential adjustments will have an immaterial impact on PGE’s results of operations.

The Company has a commercial paper program under which it may issue commercial paper for terms of up to 270 days. The Company has elected to limit its borrowings under the revolving credit facility in order to allow for coverage of any potential need to repay commercial paper that may be outstanding at the time. As of June 30, 2023,March 31, 2024, PGE had $140 millionno commercial paper outstanding.

PGE typically classifies borrowings under the revolving credit facility and outstanding commercial paper as Short-term debt on the condensed consolidated balance sheets.

In addition, PGE has threefour letter of credit facilities that provide a total capacity of $220$320 million under which the Company can request letters of credit for original terms not to exceed one year. The issuance of such letters of credit is subject to the approval of the issuing institution. Under these facilities, letters of credit for a total of $92$131 million were outstanding as of June 30, 2023.March 31, 2024. Letters of credit issued are not reflected on the Company’s condensed consolidated balance sheets.

16

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Pursuant to an order issued by the FERC, the Company is authorized to issue short-term debt in an aggregate amount of up to $900 million through February 6, 2024.
16

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
2026.

Long-term Debt

On October 21, 2022, PGE obtained a 366-day term loan from lenders in the aggregate principal of $260 million under a 366-Day Bridge Credit Agreement. The term loan bore interest for the relevant interest period at the Term Secured Overnight Financing Rate (SOFR) plus Term SOFR Adjustment Rate of 10 basis points and applicable margin of 87.5 basis points. The interest rate was subject to adjustment pursuant to the terms of the loan. On March 1, 2023, this term loan was repaid in full with proceeds from the Equity Forward Sale Agreement described in Note 7, Shareholders’ Equity.

On November 30, 2022,February 22, 2024, PGE entered into a Bond Purchase Agreement related to the sale of $200$450 million in First Mortgage Bonds (FMBs), the first half of which funded in 2022. The Bonds were issued and the remaining $100 million funded in full on January 13, 2023.February 22, 2024 and consist of:
a series, due in 2029, in the amount of $100 million that will bear interest from its issuance date at an annual rate of 5.15%;
a series, due in 2034, in the amount of $100 million that will bear interest from its issuance date at an annual rate of 5.36%; and
a series, due in 2054, in the amount of $250 million that will bear interest from its issuance date at an annual rate of 5.73%.

Defined Benefit Retirement Plan Costs

Components of net periodic benefit cost under the defined benefit pension plan are as follows (in millions):
Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Service costService cost$$$$
Interest cost*Interest cost*18 14 
Expected return on plan assets*Expected return on plan assets*(11)(12)(22)(24)
Amortization of net actuarial loss*— — 
Net periodic benefit costNet periodic benefit cost$$$$
Net periodic benefit cost
Net periodic benefit cost

* The net expense portion of non-service cost components are included in Miscellaneous income, net within Other income on the Company’s condensed consolidated statements of income and comprehensive income.


NOTE 4: FAIR VALUE OF FINANCIAL INSTRUMENTS

PGE estimated the fair value of financial asset and liability instruments as of June 30, 2023March 31, 2024 and December 31, 2022,2023, and classified these financial instruments based on a fair value hierarchy that is applied to prioritize the inputs to the valuation techniques used to measure fair value. The three levels of the fair value hierarchy and application to the Company are:

Level 1Quoted prices are available in active markets for identical assets or liabilities as of the measurement date;
Level 2Pricing inputs include those that are directly or indirectly observable in the marketplace as of the measurement date; and
Level 3Pricing inputs include significant inputs that are unobservable for the asset or liability.
Financial assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. The Company’s assessment of the significance of a particular input to the fair value measurement requires judgment, and may affect the valuation of assets and liabilities and their placement within the fair value hierarchy. Assets measured at fair value using net asset value (NAV) as a practical expedient are not
17

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
categorized in the fair value hierarchy. These assets are listed in the totals of the fair value hierarchy to permit the reconciliation to amounts presented in the financial statements.
17

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)

Changes to market liquidity conditions, the availability of observable inputs, or changes in the economic structure of a security marketplace may require transfer of the securities between levels.


18

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
The Company’s financial assets and liabilities whose values were recognized at fair value in the Company’s condensed consolidated balance sheets are as follows by level within the fair value hierarchy (in millions):

As of June 30, 2023
Level 1Level 2Level 3
Other (2)
Total
Assets:
Cash equivalents$— $— $— $— $— 
Nuclear decommissioning trust: (1)
Debt securities:
Domestic government10 — — 19 
Corporate credit— 10 — — 10 
Money market funds— — — 
Non-qualified benefit plan trust: (3)
Debt securities—domestic government— — — 
Money market funds— — — 
Equity securities— — — 
Price risk management activities: (1) (4)
Electricity— 29 23 — 52 
Natural gas— 43 — 46 
$16 $92 $26 $$140 
Liabilities:
Price risk management activities: (1) (4)
Electricity$— $36 $141 $— $177 
Natural gas— 57 23 — 80 
$— $93 $164 $— $257 
(1)Activities are subject to regulation, with certain gains and losses deferred pursuant to regulatory accounting and included in Regulatory assets or Regulatory liabilities as appropriate.
(2)Assets are measured at NAV as a practical expedient and not subject to hierarchy level classification disclosure.
(3)Excludes insurance policies of $29 million, which are recorded at cash surrender value.
(4)For further information, see Note 5, Risk Management.

19

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
As of December 31, 2022
Level 1Level 2Level 3
Other (2)
Total
As of March 31, 2024As of March 31, 2024
Level 1Level 1Level 2Level 3
Other (2)
Total
Assets:Assets:
Cash equivalentsCash equivalents$150 $— $— $— $150 
Cash equivalents
Cash equivalents
Nuclear decommissioning trust: (1)
Nuclear decommissioning trust: (1)
Debt securities:Debt securities:
Debt securities:
Debt securities:
Domestic government
Domestic government
Domestic governmentDomestic government10 — — 19 
Corporate creditCorporate credit— — — 
Money market fundsMoney market funds— — — 11 11 
Non-qualified benefit plan trust: (3)
Non-qualified benefit plan trust: (3)
Debt securities—domestic governmentDebt securities—domestic government— — — 
Debt securities—domestic government
Debt securities—domestic government
Money market fundsMoney market funds— — — 
Equity securities— — — 
Paid Leave Oregon Trust
Paid Leave Oregon Trust
Paid Leave Oregon Trust
Money market funds
Money market funds
Money market funds
Price risk management activities: (1) (4)
Price risk management activities: (1) (4)
ElectricityElectricity— 93 63 — 156 
Electricity
Electricity
Natural gasNatural gas— 225 — 231 
$166 $337 $69 $11 $583 
$
Liabilities:Liabilities:
Price risk management activities: (1) (4)
Price risk management activities: (1) (4)
Price risk management activities: (1) (4)
Price risk management activities: (1) (4)
Electricity
Electricity
ElectricityElectricity$— $53 $93 $— $146 
Natural gasNatural gas— 39 — 47 
$— $92 $101 $— $193 
$
 
(1)Activities are subject to regulation, with certain gains and losses deferred pursuant to regulatory accounting and included in Regulatory assets or Regulatory liabilities as appropriate.
(2)Assets are measured at NAV as a practical expedient and not subject to hierarchy level classification disclosure.
(3)Excludes insurance policies of $31 million, which are recorded at cash surrender value.
(4)For further information, see Note 5, Risk Management.

18

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
As of December 31, 2023
Level 1Level 2Level 3
Other (2)
Total
Assets:
Cash equivalents$— $— $— $— $— 
Nuclear decommissioning trust: (1)
Debt securities:
Domestic government— — 18 
Corporate credit— — — 
Money market funds— — — 
Non-qualified benefit plan trust: (3)
Debt securities—domestic government— — — 
Money market funds— — — 
Paid Leave Oregon Trust:
Money market funds— — — 
Price risk management activities: (1) (4)
Electricity— 14 — 22 
Natural gas— 11 — — 11 
$14 $35 $14 $$72 
Liabilities:
Price risk management activities: (1) (4)
Electricity$— $30 $43 $— $73 
Natural gas— 150 16 — 166 
$— $180 $59 $— $239 
(1)Activities are subject to regulation, with certain gains and losses deferred pursuant to regulatory accounting and included in Regulatory assets or Regulatory liabilities as appropriate.
(2)Assets are measured at NAV as a practical expedient and not subject to hierarchy level classification disclosure.
(3)Excludes insurance policies of $30 million, which are recorded at cash surrender value.
(4)For further information, see Note 5, Risk Management.

Cash equivalents are highly liquid investments with maturities of three months or less at the date of acquisition and primarily consist of money market funds. Such funds seek to maintain a stable net asset value and are comprised of short-term, government funds. Policies of such funds require that the weighted average maturity of securities holdings of such funds not exceed 90 days and provide investors with the ability to redeem shares of the funds daily at their respective net asset value. Cash equivalents are classified as Level 1 in the fair value hierarchy due to the availability of quoted prices for identical assets in an active market as of the measurement date. Principal markets for money market fund prices include published exchanges such as the National Association of Securities Dealers Automated Quotations (Nasdaq) and the New York Stock Exchange (NYSE).

Assets held in the Nuclear decommissioning trust (NDT) and Non-qualified benefit plan (NQBP) trusts are recorded at fair value in PGE’s condensed consolidated balance sheets and invested in securities that are exposed to interest rate, credit, and market volatility risks. These assets are classified within Level 1, 2, or 3 based on the following factors:
 
Debt securities—PGE invests in highly-liquid United States Treasury securities to support the investment objectives of the trusts. These domestic government securities are classified as Level 1 in the fair value hierarchy due to the availability of quoted prices for identical assets in an active market as of the measurement date.
2019

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Assets classified as Level 2 in the fair value hierarchy include domestic government debt securities, such as municipal debt, and corporate credit securities. Prices are determined by evaluating pricing data such as broker quotes for similar securities and adjusted for observable differences. Significant inputs used in valuation models generally include benchmark yields and issuer spreads. The external credit rating, coupon rate, and maturity of each security are considered in the valuation, as applicable.

Equity securities—Equity mutual fund and common stock securities are classified as Level 1 in the fair value hierarchy due to the availability of quoted prices for identical assets in an active market as of the measurement date. Principal markets for equity prices include published exchanges such as Nasdaq and the NYSE.

Money market funds—PGE invests in money market funds that seek to maintain a stable net asset value. These funds invest in high-quality, short-term, diversified money market instruments, short-term treasury bills, federal agency securities, certificates of deposits, and commercial paper. The Company believes the redemption value of these funds is likely to be the fair value, which is represented by the net asset value. Redemption is permitted daily without written notice.

The NQBP trust is invested in exchange-traded government money market funds and is classified as Level 1 in the fair value hierarchy due to the availability of quoted prices in published exchanges such as Nasdaq and the NYSE. The money market fund in the NDT is valued at NAV as a practical expedient and is not included in the fair value hierarchy.

Assets and liabilities from price risk management activities, recorded at fair value in PGE’s condensed consolidated balance sheets, consist of derivative instruments entered into by the Company to manage its risk exposure to commodity price and foreign currency exchange rates and reduce volatility in net variable power costs (NVPC) for the Company’s retail customers. For additional information regarding these assets and liabilities, see Note 5, Risk Management.

For those assets and liabilities from price risk management activities classified as Level 2, fair value is derived using present value formulas that utilize inputs such as forward commodity prices and interest rates. Substantially all of these inputs are observable in the marketplace throughout the full term of the instrument, can be derived from observable data, or are supported by observable levels at which transactions are executed in the marketplace. Instruments in this category include commodity forwards, futures, and swaps.

Assets and liabilities from price risk management activities classified as Level 3 consist of longer-term commodity forwards, futures, swaps, and options for which fair value is derived using one or more significant inputs that are not observable for the entire term of the instrument.

2120

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Quantitative information regarding the significant, unobservable inputs used in the measurement of Level 3 assets and liabilities from price risk management activities is presented below:
Fair ValueValuation TechniqueSignificant Unobservable InputPrice per Unit
Fair ValueFair ValueValuation TechniqueSignificant Unobservable InputPrice per Unit
Commodity ContractsCommodity ContractsAssetsLiabilitiesValuation TechniqueSignificant Unobservable InputLowHighWeighted AverageCommodity ContractsAssetsLiabilitiesLowHighWeighted Average
(in millions)
As of June 30, 2023
(in millions)
As of March 31, 2024
As of March 31, 2024
As of March 31, 2024
Electricity physical forwards
Electricity physical forwards
Electricity physical forwardsElectricity physical forwards$22 $140 Discounted cash flowElectricity forward price (per MWh)$31.90 $208.00 $93.59 
Natural gas financial swapsNatural gas financial swaps23 Discounted cash flowNatural gas forward price (per Decatherm)2.35 9.35 3.47 
Electricity financial futuresElectricity financial futuresDiscounted cash flowElectricity forward price (per MWh)57.00 206.00 97.99 
$26 $164 
As of December 31, 2022
$
As of December 31, 2023
As of December 31, 2023
As of December 31, 2023
Electricity physical forwards
Electricity physical forwards
Electricity physical forwardsElectricity physical forwards$52 $93 Discounted cash flowElectricity forward price (per MWh)$35.00 $270.00 $101.27 
Natural gas financial swapsNatural gas financial swapsDiscounted cash flowNatural gas forward price (per Decatherm)2.71 24.71 4.42 
Electricity financial futuresElectricity financial futures11 — Discounted cash flowElectricity forward price (per MWh)54.17 143.70 104.21 
$69 $101 
$

The significant unobservable inputs used in the Company’s fair value measurement of price risk management assets and liabilities are long-term forward prices for commodity derivatives. For certain long-term contracts, observable, liquid market transactions are not available for the duration of the delivery period. In such instances, the Company uses internally-developed long-term price curves that utilize observable data when available. When not available, regression techniques are used to estimate unobservable future prices.

The Company’s Level 3 assets and liabilities from price risk management activities are sensitive to market price changes in the respective underlying commodities. The significance of the impact is dependent upon the magnitude of the price change and PGE’s position as either the buyer or seller under the contract. Sensitivity of the fair value measurements to changes in the significant unobservable inputs is as follows:

Significant Unobservable InputPositionChange to InputImpact on Fair Value
Market priceBuyIncrease (decrease)Gain (loss)
Market priceSellIncrease (decrease)Loss (gain)


2221

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Changes in the fair value of net liabilities from price risk management activities (net of assets from price risk management activities) classified as Level 3 in the fair value hierarchy were as follows (in millions):

Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Balance as of the beginning of the periodBalance as of the beginning of the period$28 $52 $32 $85 
Net realized and unrealized losses/(gains)*
Net realized and unrealized losses/(gains)*
110 (19)99 (56)
Transfers from Level 3 to Level 2Transfers from Level 3 to Level 2— 
Transfers from Level 3 to Level 2
Transfers from Level 3 to Level 2
Balance as of the end of the periodBalance as of the end of the period$138 $35 $138 $35 
* Both realized and unrealized losses/(gains), of which the unrealized portions are offset by the effects of regulatory accounting until settlement of the underlying transactions, are recorded in Revenues, net or Purchased power and fuel expense in the condensed consolidated statements of income and comprehensive income. Includes no$1 million and $5 million in net realized gains or losses for the three months ended June 30,March 31, 2024 and 2023, and $2 million in net realized gains for the three months ended June 30, 2022. For the six-month periods ended June 30, 2023 and 2022, includes $3 million in net realized losses and $3 million in net realized gains, respectively.

Transfers out of Level 3 occur when the significant inputs become more observable, such as when the time between the valuation date and the delivery term of a transaction becomes shorter.

Long-term debt is recorded at amortized cost in PGE’s condensed consolidated balance sheets. The value of the Company’s FMBs and Pollution Control Revenue Bonds is classified as a Level 2 fair value measurement.

As of June 30, 2023,March 31, 2024, the carrying amount of PGE’s long-term debt was $3,4864,433 million, net of $13$15 million of unamortized debt expense, and its estimated aggregate fair value was $3,014$3,955 million. As of December 31, 2022,2023, the carrying amount of PGE’s long-term debt was $3,646$3,985 million, net of $13$14 million of unamortized debt expense, and its estimated aggregate fair value was $2,984$3,705 million.

NOTE 5: RISK MANAGEMENT

PGE participates in the wholesale marketplace to balance its supply of power, which consists of its own generation combined with wholesale market transactions, to meet the needs of its retail customers, manage risk, and administer the Company’s long-term wholesale contracts. Wholesale market transactions include purchases and sales of both power and fuel resulting from economic dispatch decisions with respect to Company-owned generation resources. The Company also performs portfolio management and wholesale market sales services for third parties in the region. As a result of this ongoing business activity, PGE is exposed to commodity price risk and foreign currency exchange rate risk, from which changes in prices and/or rates may affect the Company’s financial position, results of operations, or cash flows.

PGE utilizes derivative instruments to manage its exposure to commodity price risk and foreign exchange rate risk in order to reduce volatility in NVPC for its retail customers. Such derivative instruments, recorded at fair value on the condensed consolidated balance sheets, may include forwards, futures, swaps, and options contracts for electricity, natural gas, and foreign currency, with changes in fair value recorded in the condensed consolidated statements of income and comprehensive income. The Company also enters into non-exchange-traded weather contract options, which are accounted for using the intrinsic value method.In accordance with ratemaking and cost recovery processes authorized by the OPUC, PGE recognizes a regulatory asset or liability to defer the gains and losses from derivative activity until settlement of the associated derivative instrument. The Company may designate certain derivative instruments as cash flow hedges or may use derivative instruments as economic hedges. PGE does not intend to engage in trading activities for non-retail purposes.



23
22

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)


PGE’s Assets and Liabilities from price risk management activities consist of the following (in millions):
June 30, 2023December 31, 2022
March 31, 2024March 31, 2024December 31, 2023
Current assets:Current assets:
Commodity contracts:Commodity contracts:
Commodity contracts:
Commodity contracts:
Electricity
Electricity
ElectricityElectricity$37 $112 
Natural gasNatural gas38 201 
Total current derivative assets (1)
Total current derivative assets (1)
75 313 
Noncurrent assets:Noncurrent assets:
Commodity contracts:Commodity contracts:
Commodity contracts:
Commodity contracts:
Electricity
Electricity
ElectricityElectricity15 44 
Natural gasNatural gas30 
Total noncurrent derivative assets (1)
Total noncurrent derivative assets (1)
23 74 
Total derivative assets (2)
Total derivative assets (2)
$98 $387 
Total derivative assets (2)
Total derivative assets (2)
Current liabilities:Current liabilities:
Commodity contracts:Commodity contracts:
Commodity contracts:
Commodity contracts:
Electricity
Electricity
ElectricityElectricity$59 $93 
Natural gasNatural gas39 25 
Total current derivative liabilitiesTotal current derivative liabilities98 118 
Noncurrent liabilities:Noncurrent liabilities:
Commodity contracts:Commodity contracts:
Commodity contracts:
Commodity contracts:
Electricity
Electricity
ElectricityElectricity118 53 
Natural gasNatural gas41 22 
Total noncurrent derivative liabilitiesTotal noncurrent derivative liabilities159 75 
Total derivative liabilities (2)
Total derivative liabilities (2)
$257 $193 
Total derivative liabilities (2)
Total derivative liabilities (2)
(1) Total current derivative assets are included in Other current assets, and Total noncurrent derivative assets are included in Other noncurrent assets on the condensed consolidated balance sheets.
(2) As of June 30, 2023March 31, 2024 and December 31, 2022,2023, no derivative assets or liabilities were designated as hedging instruments.

PGE’s net volumes related to its Assets and Liabilities from price risk management activities resulting from its derivative transactions, which are expected to deliver or settle at various dates through 2035, were as follows (in millions):
June 30, 2023December 31, 2022
March 31, 2024March 31, 2024December 31, 2023
Commodity contracts:Commodity contracts:
Electricity
Electricity
ElectricityElectricityMWhsMWhsMWhsMWhsMWhsMWhs
Natural gasNatural gas219 Decatherms211 DecathermsNatural gas200 DecathermsDecatherms213 DecathermsDecatherms
Foreign currencyForeign currency$15 Canadian$10 Canadian
Foreign currency
Foreign currency$22 Canadian$20 Canadian
PGE has elected to report positive and negative exposures resulting from derivative instruments pursuant to agreements that meet the definition of a master netting arrangement gross on the condensed consolidated balance sheets. In the case of default on, or termination of, any contract under the master netting arrangements, such agreements provide for the net settlement of all related contractual obligations with a given counterparty through a single payment. These types of transactions may include non-derivative instruments, derivatives qualifying for scope exceptions, receivables and payables arising from settled positions, and other forms of non-cash collateral, such as letters of credit. As of June 30, 2023 and DecemberMarch 31, 2022,2024, gross amounts included as Price risk management liabilities subject to master netting agreements were$24 million, comprised of $21 million for natural gas and $3 million for electricity, for which PGE has posted no collateral. As of December 31, 2023, gross amounts included as Price risk
2423

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
management liabilities subject to master netting agreements were$12 $28 million, and $5 million, respectively, entirely for natural gas, for which PGE hashad posted no$1 million collateral. Of the gross amounts recognized as of December 31, 2023, $3 million was for electricity and $25 million was for natural gas.

Net realized and unrealized losses (gains) on derivative transactions not designated as hedging instruments are classified in Revenues, net or Purchased power and fuel, as applicable, in the condensed consolidated statements of income and comprehensive income and were as follows (in millions):
Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Commodity contracts:Commodity contracts:
ElectricityElectricity$88 $(14)$53 $(54)
Electricity
Electricity
Natural GasNatural Gas65 (27)197 (238)
Foreign currency exchange— — 

Net unrealized and certain net realized losses/(gains) presented in the table above are offset within the condensed consolidated statements of income and comprehensive income by the effects of regulatory accounting. Of the net amounts recognized in Net income for the three-month periods ended June 30,March 31, 2024 and 2023, and 2022, net lossesgains of $15749 million and $15net losses of $206 million, respectively, have been offset. Net losses of $363 million and net gains of $183 million have been offset for the six-month periods ended June 30, 2023 and 2022, respectively.

Assuming no changes in market prices and interest rates, the following table indicates the year in which the net unrealized loss/(gain) recorded as of June 30, 2023March 31, 2024 related to PGE’s derivative activities would become realized as a result of the settlement of the underlying derivative instrument (in millions):
20232024202520262027ThereafterTotal
202420242025202620272028ThereafterTotal
Commodity contracts:Commodity contracts:
Electricity
Electricity
ElectricityElectricity$20 $12 $17 $(2)$(2)$80 $125 
Natural gasNatural gas(7)19 13 — — 34 
Net unrealized loss/(gain)Net unrealized loss/(gain)$13 $31 $26 $11 $(2)$80 $159 

PGE’s secured and unsecured debt is currently rated at investment grade by Moody’s Investors Service (Moody’s) and S&P Global Ratings (S&P). Should Moody’s or S&P reduce their rating on the Company’s unsecured debt to below investment grade, PGE could be subject to requests by certain wholesale counterparties to post additional performance assurance collateral, in the form of cash or letters of credit, based on total portfolio positions with each of those counterparties. Certain other counterparties would have the right to terminate their agreements with the Company.

The aggregate fair value of derivative instruments with credit-risk-related contingent features that were in a liability position as of June 30, 2023March 31, 2024 was $244$177 million, for which PGE has posted $4265 million in collateral, consisting of $26$20 million of letters of credit and $16$45 million of cash. If the credit-risk-related contingent features underlying these agreements were triggered at June 30, 2023,March 31, 2024, the cash requirement to either post as collateral or settle the instruments immediately would have been $170117 million. As of June 30, 2023,March 31, 2024, PGE had $96 million cash collateral posted for derivative instruments with no credit-risk-related contingent features. Cash collateral for derivative instruments is classified as Margin deposits included in Other current assets on the Company’s condensed consolidated balance sheets.

25

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
As of June 30, 2023,March 31, 2024, PGE held from counterparties $1610 million in collateral, consisting of $11$5 million of letters of credit and $5 million of cash. Increases in margin deposits received from wholesale counterparties is primarily due to the increase in PGE’s natural gas derivative asset positions. The obligation to return cash collateral held for derivative instruments is included in Accrued expenses and other current liabilities on the Company’s condensed consolidated balance sheets.
24

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)

PGE is exposed to credit risk in its commodity price risk management activities related to potential nonperformance by counterparties. Credit risk may be concentrated to the extent the Company’s counterparties have similar economic, industry or other characteristics and due to direct or indirect relationships among the counterparties. PGE manages the risk of counterparty default according to its credit policies by performing financial credit reviews, setting limits and monitoring exposures, and requiring collateral (in the form of cash, letters of credit, and guarantees) when needed. The Company also uses standardized enabling agreements and, in certain cases, master netting agreements, which allow for the netting of positive and negative exposures under multiple agreements with counterparties.
See Note 4, Fair Value of Financial Instruments, for additional information concerning the determination of fair value for the Company’s Assets and Liabilities from price risk management activities.

NOTE 6: EARNINGS PER SHARE

Basic earnings per share are computed based on the weighted average number of common shares outstanding during the period. Diluted earnings per share are computed using the weighted average number of common shares outstanding and the effect of dilutive potential common shares outstanding during the period using the treasury stock method. Potential common shares consist of: i) employee stock purchase plan shares; ii) contingently issuable time-based and performance-based restricted stock units, along with associated dividend equivalent rights; and iii) shares issuable pursuant to the Equity Forward Sale Agreement (EFSA) and at the market offering program. See Note 7, Shareholders’ Equity, for additional information on the EFSA and at the market offering program and the resulting impact on earnings per share. Unvested performance-based restricted stock units and associated dividend equivalent rights are included in dilutive potential common shares only after the performance criteria have been met.

For the three and six months ended June 30, 2023,March 31, 2024, unvested performance-based restricted stock units and related dividend equivalent rights of 440507 thousand shares were excluded from the dilutive calculation because the performance goals had not been met, with 337413 thousand shares excluded for the three and six months ended June 30, 2022.March 31, 2023.

Net income is the same for both the basic and diluted earnings per share computations. The denominators of the basic and diluted earnings per share computations are as follows (in thousands):
Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Weighted-average common shares outstanding—basicWeighted-average common shares outstanding—basic97,087 89,225 94,478 89,310 
Dilutive effect of potential common shares543 146 472 139 
Dilutive effect of potential common shares *
Weighted-average common shares outstanding—dilutedWeighted-average common shares outstanding—diluted97,630 89,371 94,950 89,449 
* As of March 31, 2023, 577,479 incremental shares were included in the calculation of diluted EPS related to the securities under the EFSA. There was no dilutive impact from the EFSA in 2024 as it was settled in July 2023.



2625

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
NOTE 7: SHAREHOLDERS’ EQUITY

The activity in equity during the three- and six-monththree-month periods ended June 30,March 31, 2024 and 2023 and 2022 was as follows (dollars in millions, except per share amounts):
Common Stock
Common Stock
Common Stock
Shares
Shares
Shares
Balances as of December 31, 2023
Balances as of December 31, 2023
Balances as of December 31, 2023
Issuances of shares pursuant to equity-based plans
Issuances of shares pursuant to equity-based plans
Issuances of shares pursuant to equity-based plans
Issuances of shares pursuant to equity agreements
Issuances of shares pursuant to equity agreements
Issuances of shares pursuant to equity agreements
Common StockAccumulated
Other
Comprehensive
Loss
Retained
Earnings
SharesAmountTotal
Balances as of December 31, 202289,283,353 $1,249 $(4)$1,534 $2,779 
Issuances of shares pursuant to equity-based plans159,603 — — — — 
Issuances of shares pursuant to equity forward sales agreement7,178,016 300 — — 300 
Stock-based compensation(1)— — (1)
Dividends declared ($0.4750 per share)
Dividends declared ($0.4525 per share)— — — (40)(40)
Net income— — — 74 74 
Balances as of March 31, 202396,620,972 $1,548 $(4)$1,568 $3,112 
Issuances of shares pursuant to equity-based plans30,245 — — 
Issuances of shares pursuant to equity forward sales agreement2,212,610 92 — — 92 
Stock-based compensation— — — 
Other comprehensive income— — — 
Dividends declared ($0.4750 per share)
Dividends declared ($0.4750 per share)Dividends declared ($0.4750 per share)— — — (51)(51)
Net incomeNet income— — — 39 39 
Balances as of June 30, 202398,863,827 $1,647 $(3)$1,556 $3,200 
Net income
Net income
Other comprehensive income
Other comprehensive income
Other comprehensive income
Balances as of March 31, 2024
Balances as of March 31, 2024
Balances as of March 31, 2024
Balances as of December 31, 202189,410,612 $1,241 $(10)$1,476 $2,707 
Issuances of shares pursuant to equity-based plans163,291 — — — — 
Repurchase of common stock(350,000)(5)— (13)(18)
Dividends declared ($0.4300 per share)— — — (40)(40)
Net income— — — 60 60 
Balances as of March 31, 202289,223,903 $1,236 $(10)$1,483 $2,709 
Issuances of shares pursuant to equity-based plans18,769 — — 
Stock-based compensation— — — 
Other comprehensive income— — — 
Dividends declared ($0.4525 per share)— — — (41)(41)
Net income— — — 64 64 
Balances as of June 30, 202289,242,672 $1,241 $(9)$1,506 $2,738 
Balances as of December 31, 2022
Balances as of December 31, 2022
Balances as of December 31, 2022
Issuances of shares pursuant to equity-based plans
Issuances of shares pursuant to equity-based plans
Issuances of shares pursuant to equity-based plans
Issuances of shares pursuant to equity agreements
Issuances of shares pursuant to equity agreements
Issuances of shares pursuant to equity agreements
Stock-based compensation
Stock-based compensation
Stock-based compensation
Dividends declared ($0.4525 per share)
Dividends declared ($0.4525 per share)
Dividends declared ($0.4525 per share)
Net income
Net income
Net income
Balances as of March 31, 2023
Balances as of March 31, 2023
Balances as of March 31, 2023

27

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
At the MarketAt-the-Market Offering Program—On April 28, 2023, PGE entered into an equity distribution agreement under which it could sell up to $300 million of its common stock through at the market offering programs. As of June 30,In 2023, pursuant to the terms of the equity distribution agreement, PGE entered into separate forward sale agreements with forward counterparties and under such agreements,counterparties. In March 2024, the Company could have physically settled by delivering 172,033issued 1,714,972 shares pursuant to the counterpartyagreements and received net proceeds of $78 million, settling all forward sale agreements in exchange for cash of $8 million.place. Any proceeds from the issuances of common stock will be used for general corporate purposes and investments in renewables and non-emitting dispatchable capacity.

Equity Forward Sale Agreement—In 2022, PGE entered into an EFSA in connection with a public offering of 10,100,000 shares of its common stock. In March 2023, the Company issued 7,178,016 shares pursuant to the EFSA and received net proceeds of $300 million. In June 2023, the Company issued 2,212,610 shares pursuant to the EFSA and received net proceeds of $92 million.

Pursuant to the terms of the EFSA, the forward counterparties borrowed 11,615,000 shares of PGE’s common stock, including 1,515,000 shares in connection with the underwriters’ exercise of their option to purchase additional shares, from third parties in the open market and sold the shares to a group of underwriters for $43.00 per share, less an underwriting discount equal to $1.23625 per share. PGE receives proceeds from the sale of common stock when the EFSA is settled (described above), and at that time PGE records the proceeds, if any, in equity.

Under the terms of the EFSA, PGE may elect to settle the equity forward transactions by means of physical, cash or net share settlement, in whole or in part, at any time on or prior to October 25, 2024, except in specified circumstances or events that would require physical settlement. To the extent that the transactions are physically settled, PGE would be required to issue and deliver shares of PGE common stock to the forward counterparty at the then applicable forward sale price. The forward sale price was initially determined to be $43.00 per share at the time the EFSA was entered into, and the amount of cash to be received by PGE upon physical settlement of the EFSA is subject to certain adjustments in accordance with the terms of the EFSA.

PGE concluded that the EFSA was an equity instrument and that it qualified for an exception from derivative accounting because the EFSA was indexed to its own stock. PGE anticipates settling the EFSA through physical settlement on or before October 25, 2024.

At June 30, 2023, the Company could have physically settled the EFSA by delivering 2,224,374 shares to the forward counterparty in exchange for cash of $92 million.

On July 12, 2023, the Company issued 2,224,374 shares pursuant to the EFSA and received net proceeds of $92 million.

Prior to settlement, the potentially issuable shares pursuant to the EFSA will be reflected in PGE’s diluted earnings per share calculations using the treasury stock method. Under this method, the number of shares of PGE’s common stock used in calculating diluted earnings per share for a reporting period would be increased by the number of shares, if any, that would be issued upon physical settlement of the EFSA less the number of shares that could be purchased by PGE in the market with the proceeds received from issuance (based on the average market price during that reporting period). Share dilution occurs when the average market price of PGE’s stock during the reporting period is higher than the average forward sale price during the reporting period. As of the three and six months ended June 30, 2023, an incremental 335,507 and 291,550 shares, respectively, were included in the calculation of diluted EPS related to the securities under the EFSA. For additional information concerning the Company’s diluted earnings per share, see Note 6, Earnings Per Share.

28

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
NOTE 8: CONTINGENCIES

PGE is subject to legal, regulatory, and environmental proceedings, investigations, and claims that arise from time to time in the ordinary course of its business. Contingencies are evaluated using the best information available at the time the condensed consolidated financial statements are prepared. Legal costs incurred in connection with loss contingencies are expensed as incurred. The Company may seek regulatory recovery of certain costs that are incurred in connection with such matters, although there can be no assurance that such recovery would be granted.

Loss contingencies are accrued, and disclosed if material, when it is probable that an asset has been impaired or a liability incurred as of the financial statement date and the amount of the loss can be reasonably estimated. If a
26

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
reasonable estimate of probable loss cannot be determined, a range of loss may be established, in which case the minimum amount in the range is accrued, unless some other amount within the range appears to be a better estimate.

A loss contingency will also be disclosed when it is reasonably possible that an asset has been impaired, or a liability incurred, if the estimate or range of potential loss is material. If a probable or reasonably possible loss cannot be reasonably estimated, then PGE: i) discloses an estimate of such loss or the range of such loss, if the Company is able to determine such an estimate; or ii) discloses that an estimate cannot be made and the reasons why the estimate cannot be made.

If an asset has been impaired or a liability incurred after the financial statement date, but prior to the issuance of the financial statements, the loss contingency is disclosed, if material, and the amount of any estimated loss is recorded in either the current or the subsequent reporting period, depending on the nature of the underlying event.

PGE evaluates, on a quarterly basis, developments in such matters that could affect the amount of any accrual, as well as the likelihood of developments that would make a loss contingency both probable and reasonably estimable. The assessment as to whether a loss is probable or reasonably possible, and as to whether such loss or a range of such loss is estimable, often involves a series of complex judgments about future events. Management is often unable to estimate a reasonably possible loss, or a range of loss, particularly in cases in which: i) the damages sought are indeterminate or the basis for the damages claimed is not clear; ii) the proceedings are in the early stages; iii) discovery is not complete; iv) the matters involve novel or unsettled legal theories; v) significant facts are in dispute; vi) a large number of parties are represented (including circumstances in which it is uncertain how liability, if any, would be shared among multiple defendants); or vii) a wide range of potential outcomes exist. In such cases, there may be considerable uncertainty regarding the timing or ultimate resolution, including any possible loss, fine, penalty, or business impact.

EPA Investigation of Portland Harbor

An investigation by the United States Environmental Protection Agency (EPA) of a segment of the Willamette River known as Portland Harbor that began in 1997 revealed significant contamination of river sediments. The EPA subsequently included Portland Harbor on the National Priority List pursuant to the federal Comprehensive Environmental Response, Compensation, and Liability Act as a federal Superfund site. PGE has been included among more than one hundred Potentially Responsible Parties (PRPs), as it historically owned or operated property near the river.

A Portland Harbor site remedial investigation was completed pursuant to an agreement between the EPA and several PRPs known as the Lower Willamette Group (LWG), which did not include PGE. The LWG funded the remedial investigation and feasibility study and stated that it had incurred $115 million in investigation-related costs. The Company anticipates that such costs will ultimately be allocated to PRPs as a part of the allocation process for remediation costs of the EPA’s preferred remedy.

29

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
The EPA finalized a feasibility study, along with athe remedial investigation, and the results provided the framework for the EPA to determine a clean-up remedy for Portland Harbor that was documented in a Record of Decision (ROD) issued in 2017. The ROD outlined the EPA’s selected remediation plan for clean-up of Portland Harbor that had an undiscounted estimated total cost of $1.7 billion, comprised of $1.2 billion related to remediation construction costs and $0.5 billion related to long-term operation and maintenance costs. Remediation construction costs were estimated to be incurred over a 13-year period, with long-term operation and maintenance costs estimated to be incurred over a 30-year period from the start of construction. Stakeholders have raised concerns that the EPA’s cost estimates are understated, and PGE estimates undiscounted total remediation costs for Portland Harbor per the ROD could range from $1.9 billion to $3.5 billion. The EPA acknowledged the estimated costs were
27

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
based on data that was outdated and that pre-remedial design sampling was necessary to gather updated baseline data to better refine the remedial design and estimated cost.

A small group of PRPs performed pre-remedial design sampling to update baseline data and submitted the data in an updated evaluation report to the EPA for review. The evaluation report concluded that the conditions of Portland Harbor hadhave improved substantially with the passage of time. In response, the EPA indicated that while it would use the data to inform implementation of the ROD, the EPA’s conclusions remained materially unchanged. With the completion of pre-remedial design sampling, Portland Harbor is now in the remedial design phase, which consists of additional technical information and data collection to be used to design the expected remedial actions. Certain PRPs, not including PGE, have entered into consent agreements to perform remedial design and the EPA has indicated it will take the initial lead to perform remedial design on the remaining areas. The Company anticipates that remedial design costs will ultimately be allocated to PRPs as a part of the allocation process for remediation costs of the EPA’s preferred remedy. The entirety of Portland Harbor iscontinues under an active engineering design phase.

PGE continues to participate in a voluntary process to determine an appropriate allocation of costs amongst the PRPs. Significant uncertainties remain surrounding facts and circumstances that are integral to the determination of such an allocation percentage, including conclusion of remedial design, a final allocation methodology, and data with regard to property specific activities and history of ownership of sites within Portland Harbor that will inform the precise boundaries for clean-up. It is probable that PGE will share in a portion of the costs related to Portland Harbor. Based on the above facts and remaining uncertainties in the voluntary allocation process, PGE does not currently have sufficient information to reasonably estimate the amount, or range, of its potential liability or determine an allocation percentage that would represent PGE’s portion of the liability to clean-up Portland Harbor. However, the Company may obtain sufficient information, prior to the final determination of allocation percentages among PRPs, to develop a reasonable estimate, or range, of its potential liability that would require recording of the estimate, or low end of the range. The Company’s liability related to the cost of remediating Portland Harbor could be material to PGE’s financial position.

In cases in which injuries to natural resources have occurred as a result of releases of hazardous substances, federal and state natural resource trustees may seek to recover for damages at such sites, which are referred to as Natural Resource Damages (NRD). The EPA does not manage NRD assessment activities but does provide claims information and coordination support to the NRD trustees. NRD assessment activities are typically conducted by a Council made up of the trustee entities for the site. The Portland Harbor NRD trustees consist of the National Oceanic and Atmospheric Administration, the U.S. Fish and Wildlife Service, the State, the Confederated Tribes of the Grand Ronde Community of Oregon, the Confederated Tribes of Siletz Indians, the Confederated Tribes of the Umatilla Indian Reservation, the Confederated Tribes of the Warm Springs Reservation of Oregon, and the Nez Perce Tribe.

The NRD trustees may seek to negotiate legal settlements or take other legal actions against the parties responsible for the damages. Funds from such settlements must be used to restore injured resources and may also compensate the trustees for costs incurred in assessing the damages. PGE’s portion of NRD liabilities related to Portland Harbor will not have a material impact on its results of operations, financial position, or cash flows.
30

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)

The impact of costs related to EPA and NRD liabilities on the Company’s results of operations is mitigated by the Portland Harbor Environmental Remediation Account (PHERA) mechanism. As approved by the OPUC in 2017, the PHERA allows the Company to defer estimated liabilities and recover incurred environmental expenditures related to Portland Harbor through a combination of third-party proceeds, including but not limited to insurance recoveries, and, if necessary, through customer prices. The mechanism established annual prudency reviews of environmental expenditures and third-party proceeds. Annual expenditures in excess of $6 million, excluding expenses related to contingent liabilities, are subject to an annual earnings test and would be ineligible for recovery
28

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
to the extent PGE’s actual regulated return on equity exceeds its return on equity as authorized by the OPUC in PGE’s most recent GRC. PGE’s results of operations may be impacted to the extent such expenditures are deemed imprudent by the OPUC or ineligible per the prescribed earnings test. The Company plans to seek recovery of any costs resulting from EPA’s determination of liability for Portland Harbor through application of the PHERA. At this time, PGE is not collecting any Portland Harbor cost from the PHERA through customer prices.

Governmental Investigations

In March, April, and May 2021, the Division of Enforcement of the Commodity Futures Trading Commission (the "CFTC")(CFTC), the Division of Enforcement of the SEC, and the Division of Enforcement of the FERC, respectively, informed the Company they are conducting investigations arising out of the energy trading losses the Company previously announced in August 2020. The Company is cooperating with the CFTC, the SEC, and the FERC. Management cannot predict the eventual scope or outcome of these matters.

Colstrip-Related Litigation

The Company has a 20% ownership interest in the Colstrip Units 3 and 4 coal-fired generating plant (Colstrip), which is located in the state of Montana and operated by one of the co-owners, Talen Montana, LLC (Talen). In May 2022, Talen’s parent company, Talen Energy Supply, LLC filed for chapter 11 bankruptcy protection, although Colstrip continues to operate and generate electricity for PGE customers and others. Various business disagreements have arisen amongst the co-owners regarding interpretation of the Ownership and Operation (O&O) Agreement and other matters. An arbitration process has been initiated to address such business disagreements and, has resulted in several legal proceedings, which, along with other matters related to Colstrip, are summarized below.

Arbitration—In March 2021, co-owner NorthWestern Corporation (NorthWestern) initiated arbitration against all other co-owners of Colstrip to determine whether co-owners representing 55% or more of the ownership shares can vote to close one or both units of Colstrip, or, alternatively, whether unanimous consent is required. The O&O Agreement among the parties states that any dispute shall be submitted for resolution to a single arbitrator with appropriate expertise. ThisThe parties had agreed to stay the arbitration through April 1, 2024 and are now in the process was initially stayed as a result of the bankruptcy filing of Talen’s parent company, but that stay was liftedreengaging in August 2022, by a voluntary stipulation. The arbitration discussions. An arbitration date has not yet been stayed through September 29, 2023, by agreement of the parties.scheduled. PGE cannot predict the ultimate outcome of the arbitration process.

Petition to compel arbitration—In April 2021, co-owners Avista Corporation, Puget Sound Energy Inc., PacifiCorp, and PGE (the Petitioners) petitioned in Spokane County Superior Court, Washington, Case No. 21201000-32, against NorthWestern and Talen to compel the arbitration initiated by NorthWestern that is described above. In May 2021, Talen removed the case to Federal Court (Eastern District of Washington Case No. 2:21-cv-00163-RMP). Following a hearing in July 2021, Talen’s motion to transfer the case to the U.S. District Court for the District of Montana was granted. This matter was temporarily stayed, during the bankruptcy proceeding of Talen’s parent company.

Complaint to implement Montana Senate Bill 265 (MSB 265)—On May 4, 2021, Talen filed a complaint against the Petitioners and NorthWestern, in the Thirteenth Judicial District Court in the State of Montana, as an attempt to
31

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
implement Montana laws when determining the language of the O&O Agreement based on the recent enactment of MSB 265. The case was subsequently removed to the U.S. District Court - Montana, Billings Division, Case No. 1:21-cv-00058-SPW-TJC. This matter was temporarily stayed, during the bankruptcy proceeding of Talen’s parent company.

Richard Burnett; Colstrip Properties Inc., et al v. Talen Montana, LLC; PGE, et al.—In December 2020, the original claim was filed in the Montana Sixteenth Judicial District Court, Rosebud County, Cause No. CV-20-58. The plaintiffs allege they have suffered adverse effects from the defendants’ coal dust. In August 2021, the claim was amended to add PGE as a defendant. Plaintiffs are seeking economic damages, costs and disbursements, punitive damages, attorneys’ fees, and an injunction prohibiting defendants from allowing coal dust to blow onto plaintiffs’ properties, as determined by the Court.This matter was stayedcase is currently set for a time as a result of the bankruptcy filing of Talen’s parent company, but litigation has resumed and the parties are working through discovery issues. The Court has entered a procedural schedule that leads to a trial which would beginon November 6,5, 2024.

Since these lawsuits are in early stages, the The Company is unable to predict outcomesthe outcome or estimate a range of reasonablyany possible losses.loss in this matter.

Westmoreland Mine PermitsTwo lawsuits have beenwere commenced by the Montana Environmental Information Center, challenging certain permits relating to the operation of the Westmoreland Rosebud Mine, which provides coal to Colstrip. In the first, the Montana District Court for Rosebud County issued an order vacating a permit for one area of the mine. This case was appealed and on November 22, 2023, the Supreme Court of Montana reinstated the Montana District Court vacating the permit and affirming the lower court order to return to the Board of Environmental Review for additional permit review considerations. In the second, the Montana Federal District Court issued findings and recommended that a decision approving expansion of the mine into a new area should be vacated, but recommendingrecommended the decision not take effect for 365 days from the date of a final order. Both decisions mayOn November 24, 2023, the Ninth Circuit Court of Appeals dismissed the appeal by Westmoreland for lack of appellate jurisdiction, and noted that the appropriate venue to raise issues will be subject to appellate review.the U.S. Office of Surface Mining during the remand
29

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
process. PGE is not a party to either of these proceedings, but is continuing to monitor the progress of both lawsuits and assess the impact, if any, of the proceedings on Westmoreland’s ability to meet its contractual coal supply obligations.

Regulatory Matters

Faraday—On February 15, 2023, PGE filed with the OPUC a General Rate Case based on a 2024 test year (2024 GRC) requesting an increase that, when including Colstrip-related adjustments through a supplemental tariff, results in an overall average increase of approximately 14.0% in customer prices for 2024.

The Company’s 2024 GRC filing seeks recovery of capital investments made across the business to meet growing demand, improve reliability, resiliency, and capability to deliver safe, reliable, clean electricity to customers. A significant portion of the Company’s capital is related to the continued investment in the transmission and distribution system to meet evolving customer expectations and growing demand while also replacing aging infrastructure.

PGE’s request also includes recovery of $188 million in capital costs associated with the project to repower the original 1907 Faraday hydro facility. The upgrade project was placed into service January 31, 2023. Certain parties to the 2024 GRC proceeding have challenged the prudence of aspects of PGE’s investment in the Faraday project and have recommended rate base reductions and disallowances. The Company cannot predict the ultimate outcome of the remaining regulatory process, nor can PGE estimate a range of reasonably possible disallowance. The OPUC has significant discretion in making the final determination of the GRC that may result in the disallowance of certain costs for recovery in customer prices, which could be material to PGE’s financial position, results of operations, and cash flows. Costs directly disallowed for recovery in customer prices, if any, would be charged to expense at the time such disallowance becomes probable and reasonably estimable. Regulatory review of the 2024 GRC (OPUC Docket UE 416) will continue throughout 2023, with a final order expected to be issued by the OPUC in December 2023, for new customer prices effective January 1, 2024.

32

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Other Matters

PGE is subject to other regulatory, environmental, and legal proceedings, investigations, and claims that arise from time to time in the ordinary course of business that may result in judgments against the Company. Although management currently believes that resolution of such known matters, individually and in the aggregate, will not have a material impact on its financial position, results of operations, or cash flows, these matters are subject to inherent uncertainties, and management’s view of these matters may change in the future.

NOTE 9: GUARANTEES

PGE enters into financial agreements for, and purchase and sale agreements involving physical delivery of, both power and natural gas that include indemnification provisions relating to certain claims or liabilities that may arise relating to the transactions contemplated by these agreements. Generally, a maximum obligation is not explicitly stated in the indemnification provisions and, therefore, the overall maximum amount of the obligation under such indemnifications cannot be reasonably estimated. PGE periodically evaluates the likelihood of incurring costs under such indemnities based on the Company’s historical experience and the evaluation of the specific indemnities. As of June 30, 2023,March 31, 2024, management believes the likelihood is remote that PGE would be required to perform under such indemnification provisions or otherwise incur any significant losses with respect to such indemnities. The Company has not recorded any liability on the condensed consolidated balance sheets with respect to these indemnities.


33

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
NOTE 10: INCOME TAXES

Income tax expense for interim periods is based on the estimated annual effective tax rate, which includes tax credits, regulatory flow-through adjustments, and other items, applied to the Company’s year-to-date, pre-tax income. The significant differences between the Federal statutory tax rate and PGE’s effective tax rate are reflected in the following table:
Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Federal statutory tax rateFederal statutory tax rate21.0 %21.0 %21.0 %21.0 %Federal statutory tax rate21.0 %21.0 %
Federal tax credits*
Federal tax credits*
(11.2)(9.5)(10.0)(10.0)
State and local taxes, net of federal tax benefit
State and local taxes, net of federal tax benefit
State and local taxes, net of federal tax benefitState and local taxes, net of federal tax benefit8.3 9.0 8.8 9.0 
Flow-through depreciation and cost basis differencesFlow-through depreciation and cost basis differences(0.6)0.6 0.5 0.6 
Amortization of excess deferred income taxAmortization of excess deferred income tax(3.8)(4.1)(3.7)(4.3)
OtherOther7.1 (0.1)0.9 (0.1)
Effective tax rateEffective tax rate20.8 %16.9 %17.5 %16.2 %Effective tax rate10.7 %15.9 %
* Federal tax credits primarily consist of production tax credits (PTCs) earned from Company-owned wind-powered generating facilities. PTCs are earned based on a per-kilowatt hour rate and, as a result, the annual amount of PTCs earned will vary based on weather conditions and availability of the facilities. PTCs are earned for 10 years from the in-service dates of the corresponding facilities. PGE’s PTC generation will end at various dates through 2033.2034.


30

Table of Contents

PORTLAND GENERAL ELECTRIC COMPANY
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS, continued
(Unaudited)
Carryforwards

Federal tax credit carryforwards as of June 30, 2023March 31, 2024 and December 31, 20222023 were $100$94 million and $102$73 million, respectively. These credits primarily consist of PTCs, which will expire at various dates through 2043.2044. PGE included anticipated proceeds from the sale of tax credits in determining the need for a valuation allowance. PGE believes that it is more likely than not that its deferred income tax assets as of June 30, 2023March 31, 2024 will be realized; accordingly, norealized, however a valuation allowance has been recorded for the expected discount on the sale of tax credits. The valuation allowance as of March 31, 2024 was $1 million and was deferred as a regulatory asset. As of December 31, 2023, no material valuation allowance was recorded. As of June 30, 2023,March 31, 2024, and December 31, 2022,2023, PGE had no material unrecognized tax benefits.

Inflation Reduction Act of 2022

The Inflation Reduction Act of 2022 (IRA) was signed into law on August 16, 2022. There was no immediate impact of the IRA to PGE’s results of operations for the three and six months ended June 30, 2023. PGE is closely monitoring guidance from the IRS regarding the enhanced energy credits available under the IRA. PGE expects to be able to generate and utilize increased energy credits in future periods, and continues to hold that it is more likely than not that the deferred income tax assets will be realized.

Item 2.Management’s Discussion and Analysis of Financial Condition and Results of Operations.
 
Forward-Looking Statements

The information in this report includes statements that are forward-looking within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements include, but are not limited to, statements that relate to expectations, beliefs, plans, assumptions, and objectives concerning future results of operations, business prospects, loads, outcome of litigation and regulatory proceedings, capital expenditures, market conditions, events or performance, and other matters. Words or phrases such as “anticipates,” “believes,”
34

Table of Contents
“estimates, “estimates,” “expects,” “intends,” “plans,” “predicts,” “projects,” “will likely result,” “will continue,” “should,” “based on,” “conditioned upon,” “considers,” “could,” “expected,” “forecast,” “goals,” “needs,” “promises,” “subject to,” “targets,” or similar expressions are intended to identify such forward-looking statements.

Forward-looking statements are not guarantees of future performance and involve risks and uncertainties that could cause actual results or outcomes to differ materially from those expressed. PGE’s expectations, beliefs, and projections are expressed in good faith and are believed by the Company to have a reasonable basis including, but not limited to, management’s examination of historical operating trends and data contained either in internal records or available from third parties, but there can be no assurance that PGE’s expectations, beliefs, or projections will be achieved or accomplished.

In addition to any assumptions and other factors and matters referred to specifically in connection with forward-looking statements, factors that could cause actual results or outcomes for PGE to differ materially from those discussed in such forward-looking statements include:

governmental policies, legislative action, and regulatory audits, investigations, and actions, including those of the Federal Regulatory Energy Commission (FERC), the Public Utility Commission of Oregon, (OPUC), the United States Securities and Exchange Commission (SEC), and the Division of Enforcement of the Commodity Futures Trading Commission (CFTC), with respect to allowed rates of return, financings, electricity pricing and price structures, acquisition and disposal of facilities and other assets, construction and operation of plant facilities, transmission of electricity, recovery of power costs, operating expenses, deferrals, timely recovery of costs and capital investments, energy trading activities, and current or prospective wholesale and retail competition;
economic conditions that result in decreased demand for electricity, reduced revenue from sales of excess energy during periods of low wholesale market prices, impaired financial stability of vendors and service providers, and elevated levels of uncollectible customer accounts;
inflation and volatility in interest rates;
changing customer expectations and choices that may reduce customer demand for PGE’s services may impact the Company’s ability to make and recover its investments through rates and earn its authorized
31

Table of Contents
return on equity, including the impact of growing distributed and renewable generation resources, changing customer demand for enhanced electric services, and an increasing risk that customers procure electricity from registered Electricity Service Suppliers (ESSs) or the adoption of community choice aggregation;
the timing or outcome of legal and regulatory proceedings and issues including, but not limited to, the matters described in Regulatory Matters of the “Overview” in this Item 2, and Note 8, Contingencies in the Notes to the Condensed Consolidated Financial Statements in Item 1. Financial Statements of this Quarterly Report on Form 10-Q;
natural or human-caused disasters and other risks, including, but not limited to, earthquake, flood, ice, drought, extreme heat, lightning, wind, fire, accidents, equipment failure, acts of terrorism, computer system outages, and other events that disrupt PGE operations, damage PGE facilities and systems, cause the release of harmful materials, cause fires, and subject the Company to liability;
cybersecurity attacks, data security breaches, physical attacks and security breaches, or other malicious acts that cause damage to the Company’s generation, transmission, or distribution facilities, information technology systems, inhibit the capability of equipment or systems to function as designed or expected, or result in the release of confidential customer, vendor, employee, or Company information;
the effects of climate change, whether global or local in nature, including unseasonable or extreme weather and other natural phenomena that may affect energy costs or consumption, increase the Company’s costs, cause damage to PGE facilities and system, or adversely affect its operations;
unseasonable or severe weather and other natural phenomena, such as the greater size and prevalence of wildfires in Oregon in recent years, which could affect public safety, customers’ demand for power, and PGE’s ability and cost to procure adequate power and fuel supplies to serve its customers, access the wholesale energy market, or operate its generating facilities and transmission and distribution systems, and the Company’s costs to maintain, repair, and replace such facilities and systems, and recovery of such costs;
PGE’s ability to effectively implement a public safety power shutoff (PSPS) and de-energize its system in the event of heightened wildfire risk or implement effective system hardening programs, the inability of which could lead to potential liability if energized systems are involved in wildfires that cause harm;
35

Tableharm, as well as the risk that damages from wildfires may not be recoverable through rates or insurance, resulting in impact to the financial condition, results of Contentsoperations, or reputation of the Company;
operational factors affecting PGE’s power generating facilities and battery storage facilities, including forced outages, fires, unscheduled delays, hydro and wind conditions, and disruption of fuel supply, any of which may cause the Company to incur repair costs or purchase replacement power at increased costs;
default or nonperformance on the part of any parties from whom PGE purchases fuel, capacity, or energy, which may cause the Company to incur costs to purchase replacement power and related renewable attributes at increased costs;
complications arising from PGE’s jointly-owned plant, including changes in ownership, adverse regulatory outcomes or legislative actions, or operational failures that result in legal or environmental liabilities or unanticipated costs related to replacement power or repair costs;
delays in the supply chain and increased supply costs, failure to complete capital projects on schedule or within budget, inability to complete negotiations on contracts for capital projects, failure of counterparties to perform under agreements, or the abandonment of capital projects, any of which could result in the Company’s inability to recover project costs or impact PGE’s competitive position, market share, or results of operations in a material way;
volatility in wholesale power and natural gas prices, including but not limited to volatility caused by macroeconomic and international issues, that could require PGE to post additional collateral or issue additional letters of credit pursuant to power and natural gas purchase agreements;
32

Table of Contents
changes in the availability and price of wholesale power and fuels, including natural gas and coal, and the impact of such changes on the Company’s power costs;
capital market conditions, including availability of capital, volatility of interest rates, reductions in demand for investment-grade commercial paper, volatility of equity markets as well as changes in PGE’s credit ratings, any of which could have an impact on the Company’s cost of capital and its ability to access the capital markets to support requirements for working capital, construction of capital projects, the repayments of maturing debt, and stock-based compensation plans, which are relied upon in part to retain key executives and employees;
future laws, regulations, and proceedings that could increase the Company’s costs of operating its thermal generating plants, or affect the operations of such plants by imposing requirements for additional emissions controls or significant emissions fees or taxes particularly with respect to coal-fired generating facilities, in order to mitigate carbon dioxide, mercury, and other gas emissions;
changes in, and compliance with, environmental laws and policies, including those related to threatened and endangered species, fish, and wildlife;
the effects of climate change, whether global or local in nature, including unseasonable or extreme weather and other natural phenomena that may affect energy costs or consumption, increase the Company’s costs, cause damage to PGE facilities and system, or adversely affect its operations;
changes in residential, commercial, or industrial customer growth, or demographic patterns, including changes in load resulting in future transmission constraints, in PGE’s service territory;
the effectiveness of PGE’s risk management policies and procedures;
cybersecurity attacks, data security breaches, physical attacks and security breaches, or other malicious acts that cause damage to the Company’s generation, transmission, or distribution facilities, information technology systems, inhibit the capability of equipment or systems to function as designed or expected, or result in the release of confidential customer, vendor, employee, or Company information;
employee workforce factors, including potential strikes, work stoppages, transitions in senior management, the ability to recruit and retain key employees and other talent, and turnover due to macroeconomic trends
36

Table of Contents
such as voluntary resignation of large numbers of employees similar to that experienced by other employers and industries since the beginning of the COVID-19 pandemic;
new federal, state, and local laws that could have adverse effects on operating results;
failure to achieve the Company’s greenhouse gas emission goals or being perceived to have either failed to act responsibly with respect to the environment or effectively respond to legislative requirements concerning greenhouse gas emission reductions, any of which could lead to adverse publicity and have adverse effects on the Company's operations and/or damage the Company's reputation;
social attitudes regarding the electric utility and power industries;
political and economic conditions;
the impact of widespread health developments and responses to such developments (such as voluntary and mandatory quarantines, including government stay at home orders, as well as shut downs and other restrictions on travel, commercial, social and other activities), which could materially and adversely affect, among other things, demand for electric services, customers’ ability to pay, supply chains, personnel, contract counterparties, liquidity, and financial markets;
changes in financial or regulatory accounting principles or policies imposed by governing bodies;
risks and uncertainties related to current or future All-Source Request For Proposals (RFP) projects, including, but not limited to regulatory processes, legal actions, transmission capabilities, system interconnections, inflationary impacts, supply chain constraints, supply cost increases (including application of tariffs impacting solar module imports), permitting and construction delays, and legislative uncertainty; and
acts of war or terrorism.

33

Table of Contents
Any forward-looking statement speaks only as of the date on which such statement is made and, except as required by law, PGE undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made or to reflect the occurrence of unanticipated events. New factors emerge from time to time and it is not possible for management to predict all such factors or assess the impact of any such factor on the business or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-looking statement.

34

Table of Contents

OVERVIEW

Management’s Discussion and Analysis of Financial Condition and Results of Operations (MD&A) is intended to provide an understanding of the business environment, results of operations, and financial condition of PGE. MD&A should be read in conjunction with the Company’s condensed consolidated financial statements contained in this report, and other periodic and current reports filed with the SEC.

PGE is a vertically-integrated electric utility engaged in the generation, transmission, distribution, and retail sale of electricity in the State. The Company participates in wholesale markets by purchasing and selling electricity and natural gas in an effort to meet the needs of, and obtain reasonably-priced power for, its retail customers, manage risk, and administer its long-term wholesale contracts. In addition, PGE continues to develop products and service offerings for the benefit of retail and wholesale customers. The Company generates revenues and cash flows primarily from the sale and distribution of electricity to retail customers in its service territory. In addition, PGE continues to develop products and service offerings for the benefit of retail and wholesale customers.

Company Strategy

The Company exists to power the advancement of society. PGE energizes lives, strengthens communities, and fosters energy solutions that promote social, economic, and environmental progress. The Company is committed to being a clean energy leader and delivering steady growth and returns to shareholders. PGE is focused on working
37

Table of Contents
with customers, communities, policy makers, and other stakeholders to deliver affordable, safe, reliable electricity service to all, while increasing opportunities to deliver clean and renewable energy, reducing greenhouse gas emissions, and responding to evolving customer expectations. At the same time, the Company is building an increasingly smart, integrated, and interconnected grid that spans from residential customers to other utilities within the region. PGE is transforming all aspects of its business to empower its workforce to be even more results oriented to serve customers well. To create a clean energy future, PGE is focused on the following strategic initiatives:imperatives:
Decarbonize Power—Reduce greenhouse gas (GHG) emissions associated with electricity served to retail customers by at least 80% by 2030 and 100% by 2040;
Electrify the Economy—Increase beneficial electricity use to capture the benefits of new technologies while building an increasingly clean, flexible, and reliable grid; and
Advance Performance—Improve safety, efficiency, and system and equipment reliability while maintaining affordable energy service and growing earnings per share 5% to 7% annually.

Climate Change

State-mandated GHG emissions reduction targets—In June 2021, the Oregon legislature passed House Bill (HB) 2021, establishing a 100% clean electricity by 2040 framework for PGE and other investor-owned utilities and electric service suppliers in the State. A number of provisions in the bill align with PGE’s strategic direction and highlight Oregon’s ambitious, economy-wide goals to combat climate change. The GHG emissions reduction targets applicable to these regulated entities are an 80% reduction in GHG emissions by 2030, 90% by 2035, and 100% by 2040 and every year thereafter. For more information regarding HB 2021 and the baseline to which the target reductions apply, see “HB 2021” in the “Laws and Regulations” section of this Overview.

Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 235229 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100 percent100% clean and renewable electricity by 2035 and 100 percent% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.

35

Table of Contents
The Company implemented a customer subscription option, the Green Future Impact Program, which is a renewable energy program that allows large business and municipality customers to have a choice in how they source their electricity. Under the Green Future Impact Program, customers can enroll in a Customer-Supplied Option (CSO) or PGE-Supplied Option (PSO). Under the CSO, participants are responsible for finding a renewable energy facility that meets established requirements and bringing those resources to PGE. Under the PSO, customers who enrolled in Phase I can receive energy from PGE-provided purchased power agreements (PPAs) for renewable resources and customers who enroll in Phase II can receive energy either from either PGE-provided PPAs for renewable resources or energy from renewable resources that are PGE owned, under certain conditions.

As of June 30, 2023,March 31, 2024, the Green Future Impact Program has an approved capacity of 750 Megawatts (MW)MW nameplate. Through this voluntary program, the Company seeks to support the customers’ clean energy acceleration, achieve PGE sustainability goals, mitigate cost and manage risk, and reliably integrate power.

The Climate Pledge—In 2021, PGE joined The Climate Pledge, a commitment to be net-zero annual carbon emissions by 2040, which is a decade ahead of the Paris Agreement’s goal of 2050. As a signatory to The Climate Pledge, PGE agrees to: i) measure and report GHG emissions on a regular basis; ii) implement decarbonization strategies in line with the Paris Agreement through real business changes and innovations, including efficiency improvements, renewable energy, materials reductions, and other carbon emission elimination strategies; and iii) neutralize any remaining emissions with additional, quantifiable, real, permanent, and socially-beneficial offsets.
38

Table of Contents

Severe weather—In recent years, PGE’s territory has experienced unprecedented heat, historic ice and snowstorms, and wildfires. On January 13, 2024, the Company’s service territory encountered the first of a series of severe winter weather events, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather events, see “Declared States of Emergency” within this Overview section of this Item 2.August 2023 experienced a record-breaking heat wave with temperatures in the region reaching all-time recorded highs for the month. This resulted in a peak load demand of 4,498 MW, beating the Company’s previous all-time peak load demand, and surpassing the prior summer peak load by nearly 6%. The increase and severity of extreme weather events highlights the importance of combating the effects of climate change through decarbonizing the power supply and investing in a more reliable and resilient grid.

Investing in a Clean Energy Future

The Resource Planning Process— PGE’s resource planning process includes working with customers, stakeholders, and regulators to chart the course toward a clean, affordable, and reliable energy future. With the passage of HB 2021, PGE preparedcreated a Clean Energy Plan (CEP), which articulates the Company’s strategy to meet the 2030, 2035, and 2040 emission reduction targets through an equitable transition to a decarbonized grid. The CEP is based on, and was filed in connection with, the Company’s 2023 IRP. PGE filed its first combined IRP and CEP with the OPUC onin March 31, 2023. That filing projectsprojected PGE’s resource and capacity needs over the next 20 years and proposesproposed an Action Plan to meet near-term needs, subject to the new HB 2021 emissions reduction requirements.

PGE filed an Addendum to the 2023 CEP and IRP with the OPUC on July 7, 2023. This addendum includes a portfolio analysis refresh. As part of the CEP and IRP refresh, PGE estimates a total resource need of approximately 3,500 to 4,500 MW of renewable energy and non-emitting capacity in order to meet the Company’s 2030 emissions reduction target. Through the 2021 All-Source RFP, PGE procured 311 MW of wind resources and 475 MW of capacity, leaving a remaining need to procure approximately 2,700 to 3,700 MW.

On January 25, 2024, the OPUC acknowledged PGE’s IRP, subject to certain conditions, providing regulatory support for the Company to pursue the near-term resource additions articulated in the Action Plan. However, the OPUC declined to acknowledge the CEP, directing the Company to provide additional forecast of its emission reductions based on new analysis in the CEP/IRP Update to be filed in January 2025. PGE will continue to pursue its 2023 All-Source RFP while revising forecasts of emissions in the CEP


36

Table of Contents
2021 All-Source RFP
In 2021, PGE initiated itsPursuant to the 2021 All-Source RFP public process, seeking approximately 1,000 MW of renewable resources and non-emitting dispatchable capacity, to fill the need identified in the 2019 IRP action plan and to meet a portion of the Company’s estimated 2030 need.

Pursuant to the 2021 All-Source RFP process, PGE has entered into agreements to acquire the following:resources as follows:
Clearwater Wind Development—PGE and NextEra Energy Resources, LLC, a subsidiary of NextEra Energy, Inc. entered into agreements to construct a 311 MW wind energy facility which will be part of the larger Clearwater Wind development in Eastern Montana. PGE will ownowns 208 MW of production capacity of the 311 MW in these agreements, with an initial expected investment of approximately $415 million, excluding an allowance for funds used during construction (AFUDC).facility. Subsidiaries of NextEra Energy Resources, LLC, will ownwhich operates the facility, owns the remaining 103 MW of production capacity and will sellsells their portion of the output to PGE under a 30-year PPA. Subsidiaries of NextEra Energy Resources, LLC plan to design, build, and operate the facility. The project has an estimated commercial operation datewas placed in-service during the first quarter of December2024 with a total cost of $424 million, including AFUDC, as of March 31, 2023.2024.
Seaside Grid—PGE entered into an agreement to construct a 200 MW Battery Energy Storage System (BESS) in Portland, Oregon. PGE will own the resource, with an investment of approximately $360 million, excluding AFUDC. The project has an estimated commercial operation date of June 30, 2025. As of March 31, 2024, the Company has recorded $92 million, including AFUDC, in CWIP for the Seaside Grid.
Troutdale Grid—PGE entered into a storage capacity agreement for a 200 MWConstable BESS in Troutdale, Oregon. The project was subsequently acquired by NextEra Energy Resources, LLC, who will own the resource and will sell the capacity to PGE under a 20-year storage capacity agreement. The project has an estimated commercial operation date of December 31, 2024.
Evergreen Facility(formerly Evergreen)—PGE entered into an agreement to construct a 75 MW BESS in Hillsboro, Oregon. PGE will own the resource, with an investment of approximately $150 million, excluding AFUDC. The project has an estimated commercial operation date of December 31, 2024. As of March 31, 2024, the Company has recorded $48million, including AFUDC, in CWIP for the Constable BESS.
Troutdale Grid—PGE entered into a storage capacity agreement for a 200 MW BESS in Troutdale, Oregon. NextEra Energy Resources, LLC, will own the resource and will sell the capacity to PGE under a 20-year storage capacity agreement. The project has an estimated commercial operation date of December 31, 2024.

39

Table of Contents
The Clearwater agreements and all BESS agreements represent the final projects to be procuredprocurement from the 2021 All-Source RFP. Resources required to meet the remaining 2030 need are anticipated to be procured through future acquisition processes, including, but not limited to, the 2023 All-Source RFP and future RFPs.

All BESS projects will be emissions-free dispatchable capacity resources directly interconnected to PGE’s system. Emissions associated with energy used to charge the BESS agreementsare accounted for when they are emitted from the generating facility. BESS projects do not add incremental emissions to the grid, and therefore, are non-emitting dispatchable capacity resources. The BESS projects will qualify for the federal investment tax credit (ITC). The Clearwater agreements will qualify for the federal production tax credit (PTC)credits (PTCs) and will be eligible under Oregon’s Renewable Portfolio Standard (RPS). The agreements will be subject to prudency review by the OPUC.

In February 2022, NewSun Energy LLC (NewSun) filed a petition for judicial review in the Marion County Circuit Court against the OPUC challenging the scoring methodology in the 2021 All-Source RFP. PGE joined in the case as an intervenor. NewSun also filed a motion to stay the 2021 All-Source RFP process, which the Court subsequently denied. The OPUC filed a motion to dismiss the case and PGE joined the OPUC’s motion to dismiss. NewSun opposed the motion. In May 2022, the Court granted the motion to dismiss to which NewSun responded in June 2022 by filing a notice of appeal with the Court of Appeals of the State of Oregon. After receiving multiple extensions, NewSun filed its opening brief in the appeal in February 2023 and PGE filed a response brief in June 2023. In August 2023, PGE filed a notice asking the Court to dismiss the case. That motion remains pending. Oral argument in this case occurred March 18, 2024. The parties await a decision from the Court.

OnIn October 28, 2022, NewSun filed a petition in Deschutes County Circuit Court seeking review of the OPUC order acknowledging, with conditions, PGE’s 2021 All-Source RFP shortlist. PGE has intervened in this case and, onin March 16, 2023, filed a motion to dismiss. In September 2023, the judge granted PGE’s motion to dismiss. In November 2023, NewSun filed a notice of appeal in the Court of Appeals of the State of Oregon. Opening briefs in the Appeal were filed March 1, 2024, with PGE to respond by May 9, 2024.

37

Table of Contents
PGE cannot predict the outcome of the NewSunthese proceedings or potential impact, if any.any, to its 2021 All-Source RFP process.

2023 All-Source RFP

PGE filed notice with the OPUC onin January 31, 2023 that an RFP in 2023 iswas needed to procure resources to meet a forecasted 2026 capacity shortfall and to make continued progress toward decarbonization targets under HB 2021’s decarbonization targets.2021. These actions arewere consistent with the 2023 IRP Action Plan and CEP. The filing includesincluded PGE’s request for a partial waiver of the OPUC’s competitive bidding rules, which was approved by the OPUC onin April 18, 2023, and outlinesoutlined PGE’s recommended timeline for obtaining necessary regulatory approvals and issuing the RFP to the market in the third quarter of 2023. PGE desires to select a final shortlist and submit a request for acknowledgment to the OPUC simultaneously with potential Commission acknowledgment of an energy or capacity need within the IRP/CEP, which is currently projected to be in the first quarter of 2024.approvals. PGE filed the draft 2023 All-Source RFP with the OPUC in May 2023 and regulatory approval was granted in January 2024. The Company issued the RFP to market on May 19, 2023.February 2, 2024, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation. The submission deadline for proposals is in April 2024. Bids will be evaluated based on the OPUC-approved scoring methodology. Following determination of a final shortlist, PGE plans to file for acknowledgement in mid-2024 with a final selection in the third or fourth quarter of 2024.

Transmission Upgrades

In alignment with local and regional transmission plans, the 2023 IRP Action Plan, and CEP, PGE is evaluating and implementing upgrades to existing transmission resources and expansions of current transmission networks. Transmission resource actions are intended to alleviate congestion, improve regional adequacy and reliability, enable decarbonization goals, and address growing customer demand.

Building a resilient grid—To serve communities with clean energy, PGE’s grid of the future will need to be smart and adaptive. Highlights of PGE’s key investments and plans for building a resilient grid include:
Wildfire MitigationPGE’s Wildfire Mitigation & Resiliency organization plans and implements thePGE has a Wildfire Mitigation Program developingunder which an annual Wildfire Mitigation Plan (WMP) is developed and coordinatingsubmitted to the OPUC to coordinate activities across the company.Company and with state-wide stakeholders. The 2024 WMP forecasts $45 million in operations and maintenance costs and an additional $43 to $49 million in capital investments in the current year to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by reducing the risk that PGE’sthe Company’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. As of June 30, 2023,In the three months ended March 31, 2024, PGE completed approximately $12invested $3 million in capital projects related to wildfire mitigation and resiliency and utility asset management, in the current year, consistent with the 2023 Wildfire Mitigation Plan.2024 WMP.
Virtual Power Plant (VPP)PGE’s VPP is a production resource comprised of Distributed Energy Resources (DERs) and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to energy efficiency and flexible load programs, rooftop solar, battery storage, and electric vehicle charging solutions aim to support grid reliability and increase portfolio flexibility and resource diversity. These distributed energy resourcesDERs and flexible loads are the foundation of PGE’s VPP that will provide a growing suite of grid and system services over time. When coordinated through a VPP platform, distributed energy resourcesthe Company’s DER Management Systems, the various DERs and flexible loads can help the Company
40

Table of Contents
achievesupport cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enableenhance PGE’s distribution system plan (DSP) visionoperation of a dynamic two-way system. In 2023, PGE saw record energy demand of 4,498 MW on August 14. Customer actions that day, orchestrated through the VPP, reduced load by more than 90 MW, helping avoid customer service interruptions and reducing exposure to scarcity pricing in energy markets.
Distribution System Plan—In 2021 and 2022, PGE filed its inaugural DSP which lays out plans to build a grid that empowers customers to make energy management choices to support decarbonization and supports a two-way energy ecosystem with resources like batteries, EV charging, and solar panels where communities, especially underserved Oregonians, need them. The plan consists ofin two parts, the first of which waswere accepted by the OPUC onin March 8, 2022. Part Two was filed on August 15, 2022 and accepted byFebruary 2023, respectively. While the OPUC on February 28, 2023.Staff is in the
38

Table of Contents
process of reviewing whether to modify the current DSP guidelines, PGE plans to file its next DSP in the fourth quarter of 2024. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as electric vehicles (EVs) and Solar Photovoltaic installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in meeting PGE’s clean energy goals.

Electrify the economy—To help Oregon reach its decarbonization goals, PGE is working to build a safe, reliable, and affordable, economy-wide, clean energy future. The Company is committed to increasing electrification of buildings and supports the accelerating pace of vehicle electrification for our customers, as well as its own vehicle fleet.

Transportation electrification is one of the most significant ways to reduce GHG emissions in Oregon. PGE is engaged with customers and communities to manage electric vehicle (EV) charging load, develop infrastructure projects aimed at improving accessibility to electric vehicle charging stations, build fleet partnerships, and offer programs to encourage customers to advance transportation electrification.

In 2019, PGE filed with the OPUC its first Transportation Electrification (TE) plan, which considers current and planned activities, along with both existing and potential system impacts, in relation to Oregon’s GHG emissions reduction goals. In 2020, the OPUC accepted the plan and related costs and revenues associated with the Transportation Electrification and Electric Vehicle Charging pilot programs. In 2021, the Oregon legislature enacted HB 2165, ensuring the OPUC has clear and broad authority to allow electric company investments in infrastructure to support transportation electrification.

On June 1,In 2023, PGEPGE’s second Transportation Electrification (TE) plan was filed and accepted by the OPUC. This second TE plan considers current and planned activities, along with the OPUC its draftforecasted EV loads and potential system impacts. The 2023 TE plan which represents a continuation of the approach strategy, and programmatic efforts found within PGE’s 2019 TE plan. plan while also outlining the Company’s current strategy to integrate TE into utility business in order to plan, service, and manage EV load.

In the 2023-20252023 to 2025 period covered by the 2023 TE Plan,plan, capital expenditures are expected to be approximately $24 million, pending regulatory approval. PGE anticipates an OPUC decision of acceptance of the$25 million. The final 2023 TE plan inwith its planned activities was accepted by the fourth quarter ofOPUC on October 17, 2023.

Businesses and families continue to turn to electricity to serve their home and workplace needs. PGE continues to pursue advanced technologies to enhance the grid, pursue distributed generation and energy storage, and develop microgrids and the use of data and analytics to better predict demand and support energy-saving customer programs.

Laws and Regulations

HB 3143—On June 25, 2023, the Oregon Legislature passed HB 3143, which, if signed by the Governor, would allow the OPUC to authorize the State’s investor-owned utilities, including PGE, to issue bonds and securitize debt for expenses associated with declared emergency events. The bill would enable PGE, after a public process and rigorous review and approval by the OPUC, to issue the highest-rated, lowest-interest bonds to pay for the unexpected costs of declared emergencies.

Federal Grants—In November 2021, the $1.2 trillion Infrastructure Investment and Jobs Act (IIJA), which includes approximately $550 billion of new federal spending, was signed into law. PGE is pursuingcontinues to pursue multiple areas under the IIJA, and other state, federal, and private programs, for potential grant funding of projects. These projects target improvements in electrical system reliability and resiliency, wildfire situational awareness and mitigation, greater communications capabilities, advancements in
41

Table of Contents
customer usage analytics using artificial intelligence, renewable resources and advanced electrical grid support, hydro generation operations, hydrogen production, utility workforce development, and regional transmission capacity constraints.

Building Resilient Infrastructure and Communities (BRIC) is a Federal Emergency Management Agency (FEMA) grant program that supports states, local communities, tribes and territories as they undertake hazard mitigation projects, reducing the risks they face from disasters and natural hazards. PGE is pursuing federal grant funding for projects under the FEMA (BRIC) program. Current areas of focus for these projects include wildfire mitigation. grid resiliency, and grid modernization.

As of June 30, 2023,March 31, 2024, PGE has submitted seven27 full federal grant applications.applications and has been awarded 11 grants totaling $317.8 million, including the following:
U.S. DOE Bethel-Round Butte Transmission Line Upgrade—The U.S. DOE selected the Confederated Tribes of Warm Springs (CTWS), in partnership with PGE, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The project will accelerate the development of transmission capacity, enabling new carbon-free generation in Central and Eastern Oregon to reach customer demand loads in Western Oregon. The added capacity and associated upgrades will also increase resiliency of the transmission system as well as resiliency of the CTWS Tribal communities by increasing
39

Table of Contents
resources available to the Tribes to support adaptation and response strategies. The U.S DOE and PGE are negotiating the final funding and scope for the line upgrade as part of a multi-year process.
U.S. DOE Smart Grid Chip—The U.S. DOE selected a PGE led consortium for a $50 million grant for the Smart Grid Chip project. The project will enable real-time information at each meter to improve the visibility of the electrical system to grid operators, providing detection of potential operational problems and shorten outage times, ultimately helping to anticipate and mitigate the impacts of extreme weather on grid resiliency. The DOE and PGE are negotiating the final funding and scope for the line upgrade as part of a multi-year process.

PGE is in the process of assessing the impacts of these federal grants on the Company’s results of operations. Although PGE continues to apply for additional grants, the Company cannot predict the ultimate timing and success of securing funding from federal programs.

Inflation Reduction Act of 2022—The Inflation Reduction Act of 2022 (IRA) was signed into law in August 2022 with a majority of the provisions effective for tax years beginning after December 31, 2022. Among other provisions, the bill includes:
an excise tax of 1% of the fair market value of any stock which is repurchased, reduced by any stock issued during the taxable year; and
significant tax incentives for energy and climate initiatives, including:
A three-year extension and modification of PTCs for facilities that begin construction before December 31, 2024;
An opt-out of ITC normalization requirements on certain stand-alone storage projects;
The ability to transfer or sell PTCs and ITCs to other taxpayers;
Reestablishment of solar PTCs; which would allow PGE the opportunity to be competitive in owning solar resources in renewable RFPs;
Replacement of the traditional resource-specific PTCs and ITCs beginning January 1, 2025, with technology-neutral clean electricity credits, which would retain critical normalization alternatives; and
Several provisions supporting expanded transportation electrification.

The Company does not expect the excise tax on stock repurchasesUnited States Treasury and the new CAMTInternal Revenue Service released extensive rules addressing credit transfer eligibility and application, including but not limited to, have an impact on the Company’s results of operations.required registration, filing, and documentation for transferors and transferees to elect and claim a credit transfer. On December 12, 2023, PGE will closely monitor guidancereceived approval from the IRS regardingOPUC to transfer 2023 production tax credits and record any difference in the enhanced energy creditsfull value and the discounted value in a property balancing account. Consistent with options available under the IRA. IRA, PGE transferred 2023 credits with the final transfer occurring in the first quarter of 2024. On April 16, 2024, PGE received approval from the OPUC to transfer 2024 and 2025 PTCs and record any difference in the full value and the discounted value in a property balancing account. PGE has entered into an agreement to transfer 2024 and 2025 PTCs and expects to generate and transfer approximately $55 million in PTCs in 2024.

Compared to previous resource planning processes, the Company believes the new tax incentives will provide additional investment opportunities for PGE and result in lower customer prices. Increased capital expenditures in such investment opportunities would likely result in additional financing needs through debt and equity instruments.

OnHB 3143—In June 14, 2023, the United States TreasuryOregon Legislature passed HB 3143, which was signed by the Governor on August 1, 2023. HB 3143 allows the OPUC to authorize the State’s investor-owned utilities, including PGE, to issue bonds and securitize debt for expenses associated with declared emergency events. The bill enables PGE, after a public process and rigorous review and approval by the Internal Revenue Service released extensive rules addressing credit transfer eligibility and application, including but not limitedOPUC, to required registration, filing, and documentationissue, at a minimum, investment grade bonds to pay for transferors and transferees to elect and claim a credit transfer. PGE believes it has qualified credits that can be transferred and intends to monetize them in line with options available under the IRA. However, PGE cannot currently estimate the impact it may have to 2023.costs of declared emergencies.

HB 2021—In June 2021, the Oregon Legislature passed HB 2021, which, among other things, requires retail electricity providers to reduce GHG emissions associated with serving Oregon retail electricity consumers 80% by 2030, 90% by 2035, and 100% by 2040, compared to their baseline emissions levels. For PGE, the baseline levels are the average annual emissions for the years 2010, 2011, and 2012 associated with the electricity sold to its retail electricity consumers as reported to the Oregon Department of Environmental Quality (ODEQ).
42

Table of Contents

HB 2021 requires utilities to develop a CEP for meeting the targets, concurrent with each IRP, that results in an affordable, reliable, and to develop a DSP that establishes reasonable costs for retail electricity consumers.clean electric system. In reviewing a CEP, the OPUC must ensure that utilities create a plan for equitable implementation,that is in the public interest, demonstrate continual progress toward meeting the targets, and take actions as soon as practicable that facilitate rapid reduction of GHG emissions. Regulated entities will continue to report

Under the law, retail electricity providers utilize the existing, required, annual reporting of GHG emissions to the ODEQ, as they are required to do today.ODEQ. In thresholdthe target years of 2030, 2035, and 2040, and every year thereafter in the target period, the OPUC will use the data reported to the ODEQ for that compliance year to determine whether the reduction targets are met.

Utilizing the methodology per the ODEQ’s Greenhouse Gas Reporting Protocol for investor-owned utilities, PGE’s preliminary percentage
40

Table of 2023 retail load served by non-emitting resources is 40 percent as of June 30, 2023.

Contents
Governor executive order—In 2020, the Governor of Oregon issued Executive Order 20-04 that directed State agencies to integrate climate change and the State’s GHG emissions reduction goals into their plans, budgets, investments, and decisions to the extent allowed by law. Among other things, Executive Order 20-04, which remains in place until withdrawn or superseded:
directed the OPUC to encourage electric companies to support transportation electrification infrastructure;
directed the ODEQ to adopt a program to cap and reduce GHG emissions within the State from large stationary sources, transportation fuels, and other liquid or gaseous fuels including natural gas. In response, in 2021, the ODEQ adopted the Climate Protection Plan, which among various provisions, included an exemption for electricity generation from the Company’s natural gas-fired resources; and
modified the reduction goals of the State’s Clean Fuels Program and extended the program while increasing the required reduction in average carbon intensity of transportation fuels.

PGE continues to monitor activities of State agencies that have utilized Executive Order 20-04 to shape State policy or seek to implement it through their own regulatory authority.

RPS standards and other laws—In 2016, Oregon Senate Bill (SB) 1547 set a benchmarkincreased the 2007 benchmarks for the percentage of electricity that must come from renewable sources by dates certain and required the elimination of coal as a fuel for generation of electricity used to serve Oregon utility customers no later than 2030.

PGE ceased coal fired operation at its Boardman generating facility (Boardman) in 2020 and continuesdecommissioning of the process of decommissioning the plant.plant is substantially complete. The Company has a 20% ownership share in Colstrip Units 3 and 4 coal-fired generation plant (Colstrip) and, in response to SB 1547 PGE filed a tariff request in 2016 with the OPUC and received approval to accelerate recovery of the Company’s investment in Colstrip from 2042 to 2030.

Effective May 9, 2022, PGE’s depreciation rates and associated customer prices changed as approved by the OPUC in the Company’s 2022 General Rate Case (GRC) to reflect furtherhas accelerated depreciation of Colstrip from 2030 to December 31, 2025. In order to meet PGE’s regulatory and legislative requirements, the Company continues to evaluate the possibility of exiting ownership in Colstrip. See Note 8, Contingencies, in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements” for information regarding legal proceedings related to Colstrip.

Any reduction in generation from Colstrip has the potential to provide additional capacity availability on the Colstrip transmission facilities, which stretch from eastern Montana to near the western end of that state to serve markets in the Pacific Northwest and neighboring states. PGE has an approximate 15% ownership interest in, and capacity on, the Colstrip transmission facilities. See “Investing in a Clean Energy Future” in this Overview for information regarding development in eastern Montana.

Other provisions of SB 1547:
43

Table of Contents
establishestablished RPS thresholds of 27% by 2025, 35% by 2030, 45% by 2035, and 50% by 2040;
limitlimited the life of renewable energy credits (RECs) generated from facilities that become operational after 2022 to five years, but continue unlimited lifespan for all existing RECs and allow for the generation of additional unlimited RECs for a period of five years for projects online before December 31, 2022; and
provideprovided opportunity to pursue recovery of energy storage costs related to renewable energy in the Company’s Renewable Adjustment Clause (RAC) filings.
PGE believes it is on track to meet the 2025 RPS threshold.

Regulatory Matters

PGE focuses on providing reliable, clean power to customers at affordable prices while providing a fair return to investors. To achieve this goal the Company must execute effectively within its regulatory framework and maintain prudent management of key financial, regulatory, and environmental matters that may affect customer prices and investor returns. The following discussion provides detail on such matters.

General Rate Case—On February 15, 2023,29, 2024, PGE filed with the OPUC a GRC based on a 20242025 test year (2024(2025 GRC) requestingthat seeks a $225 million increase in the annual revenue requirement related primarily to recovery of costs associated with non-emitting battery projects, an increase that, when including Colstrip-related adjustments through a supplemental tariff, results in an overall average increase of approximately 14.0%base business costs for upgrades to PGE's transmission and distribution system, and investments in customer prices for 2024. The requested price increase includes an approximate 4.5% increase as a result of higher net variable power costs (NVPC) expected in 2024. The NVPC projection will be updated periodically during 2023.

The Company’s 2024 GRC filing seeks recovery of capital investments made acrossstrengthening and safeguarding the businessgrid to meet growing customer demand and bolster reliability. PGE continues to build a modern grid designed to withstand severe weather and allow energy to flow from more resources to improve reliability, resiliency, and capability to deliver safe, reliable, clean electricity to customers. A significant portionThe total increase in annual revenue requirement includes an increase in annual revenue requirement of the Company’s capital investments is related to continued improvement$37 million as a result of higher net variable power costs expected in the transmission and distribution system to meet evolving customer expectations and growing demand while also replacing aging infrastructure.

PGE is seeking recovery of operations and maintenance expenses critical for preserving the ability to deliver safe, reliable, affordable power amid a period of record inflation. The Company has seen cost pressures2025, as reflected in various areas of the business, including labor, wholesale electricity and natural gas commodity prices, and the increased cost-of-debt associated with higher interest rates on its long-term debt.

The Company is also proposing key changes to its power cost adjustment mechanism (PCAM) and modifications to the Annual Power Cost Update Tariff (AUT) to better address highly dynamic and volatile power market uncertainties and evolving regional fundamental drivers.filed, separately, with the OPUC February 29, 2024 (OPUC Docket UE 436). The NVPC projection will be updated periodically during 2024.

WithOther key items in the 20242025 GRC PGE has requestedfiling include requests for a Renewable Automatic Adjustment Clause mechanism for standalone energy storage and an investment recovery mechanism.


41

Table of Contents
The proposed net increase in annual revenue requirement in the 2025 GRC was based upon a:
capital structure of 50% debt and 50% equity;
return on equity of 9.8%9.75%;
cost of capital of 7.06%, which reflects updates for actual and forecasted debt costs;7.189%; and
rate base of $6.3$7.5 billion.

Settlement discussions in the 2024 GRC have been productive and PGE and parties have arrived at several agreements in principle that would settle items related to a portion of PGE’s transmission and distribution capital request, a capital structure of 50% debt and 50% equity, several core business issues, such as the treatmentRegulatory review of the transfer and sale of PTCs, and certain NVPC matters. Parties are preparing the respective term sheets and testimony related2025 GRC is expected to the partial stipulations, which the Company expects to file with the OPUC in the third quarter. Remaining unresolved issues include cost of capital, adjustments to the PCAM, and recovery of certain other capital projects.

44

Table of Contents
Among the matters that remain unresolved is PGE’s request to recover $188 million in capital costs associated with the repowering of the original 1907 Faraday hydro facility. The upgrade project was placed into service January 31, 2023. Certain parties to the 2024 GRC proceeding have challenged the prudence of aspects of PGE’s investment in the Faraday project and have recommended rate base reductions and disallowances.continue throughout 2024. The Company cannot predict the ultimate outcome of the remaining regulatory process, nor can PGE estimate a range of reasonably possible disallowance. The OPUC has significant discretion in making the final determination of the GRC that may result in the disallowance of certain costs for recovery in customer prices, which could be material to PGE’s financial position, results of operations, and cash flows. Costs directly disallowed for recovery in customer prices, if any, would be charged to expense at the time such disallowance becomes probable and reasonably estimable.

Regulatory review, including approval of any related stipulations, of the 2024 GRC (OPUC Docket UE 416) will continue throughout 2023, with aprocess. A final order expectedon the 2025 GRC is targeted to be issued by the OPUC in December 2023, forby the end of 2024, with new customer prices effectiveto take effect January 1, 2024.2025.

The 2025 GRC filing (OPUC Docket UE 435) and the 2025 AUT filing, including copies of direct testimony and exhibits, are available on the OPUC website at www.oregon.gov/puc.

COVID-19 impacts—Declared states of emergencyIn March 2020, PGE filed an application with2021, the OPUC forissued an order that approved a pre-authorized deferral of lost revenuecosts associated with declared states of emergency. Qualifying events would include federal or state declared emergencies with impacts on PGE’s service territory. Previously the Company had to file a request for deferred accounting when an event of that nature occurred, and certainhad to seek OPUC approval of such deferred accounting applications to be effective. With this order, PGE would provide notice of an event that qualifies and would not need to seek OPUC approval to apply deferred accounting treatment for incremental costs such as bad debt expense, related to COVID-19. PGE’s deferral application was approved by the emergency. The OPUC maintains responsibility to review utility requests to amortize deferred amounts in October 2020customer prices, including a review of utility prudence in a future proceeding, among other requirements.

Beginning January 13, 2024, the Company’s service territory encountered a severe winter weather event that included snow, ice, and high winds over several days that caused catastrophic damage to physical assets and resulted in widespread customer power outages. Along with final stipulations approved in November 2020.over a dozen mutual assistance crews, PGE repaired damage and restored power to over 500,000 customers throughout the storm and the days that followed.

As of June 30, 2023March 31, 2024, PGE incurred $60 million in incremental costs to repair damage to PGE’s transmission and December 31, 2022,distribution systems and restore power to customers, with $48 million of that representing operating expenses associated with transmission and distribution. PGE expects to incur and defer additional costs subsequent to the storm related to addressing vegetation and other debris and hazards both in and outside of PGE’s deferred balance was $19 millionproperty and $22 million, respectively, comprised primarilyright-of-way, however the Company does not expect these costs to be material. As a result of bad debt expense in excessthe historic winter storm, Oregon’s Governor declared a state of what was collected in customer prices. emergency on January 18, 2024, which allows PGE to seek recovery of incremental storm expenses through the previously filed emergency deferral. On February 9, 2024, PGE filed a request for amortizationNotice of deferred amounts on December 16, 2022, which reflected a $12 million adjustment primarilyDeferral with the OPUC, under Docket UM 2190, related to bad debt write-offs being lower than estimated. the emergency restoration costs for the January storm and as of March 31, 2024 has deferred $48 million of these costs as regulatory assets. For further information, see “DuringJanuary 2024 storm and damage” in the March 14, 2023 public meeting, Staff recommendedRegulatory Assets and Liabilities section of Note 3, Balance Sheet Components in the OPUC approve PGE's filing of Advice No. 22-45 associated with the recovery of the COVID-19 deferral. On March 21, 2023, Advice No. 22-45 was approved by the OPUC, allowing for amortization of deferred amounts over a two-year period beginning April 1, 2023.Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements.”

Wildfire mitigationRepresents incremental costs and investments made by PGE related to intensifying efforts on its system to mitigate the risk of wildfire and improve resiliency to wildfire damage under SB 762, enacted in July 2021. These efforts include enhanced tree and brush clearing, hardening equipment, and making emergency plans in close partnership with local, state, and federal land and emergency management agencies to further expand the use of a PSPS, if the need should arise. Pursuant to SB 762, PGE submitted its 2023 risk-based wildfire mitigation plan to the OPUC in December 2022 and it was approved in Order 23-221 on June 26, 2023.The outcome of PGE’s 2022 GRC provided an annual amount of $24 million to be collected in base rates in regards to wildfire mitigation efforts.As of June 30, 2023 and December 31, 2022, PGE’s deferred balance related to wildfire mitigation was $32 million and $28 million, respectively. On July 1, 2022, PGE filed an application for reauthorization of OPUC Docket UM 2019 to defer incremental wildfire mitigation costs that exceed the amount granted in base rates.

On May 10, 2023, in Order No. 23-173, the OPUC approved an automatic adjustment clause mechanism to recover wildfire mitigation costs (capital and expense). PGE submitted its tariff filing on May 17, 2023, for new rates to take effect September 1, 2023, to recover: i) incremental expense and capital-related costs that has been deferred under OPUC Docket UM 2019 and ii) forecasted costs based on a 2024 test year (in PGE’s next general rate case it will remove collections related to wildfire mitigation costs from base rates and include within the automatic adjustment clause). This is currently undergoing prudence review by the OPUC. The OPUC’s conclusions of overall prudence could result in a portion of PGE’s deferral being disallowed for recovery. Such disallowance would be recognized as a charge to earnings.
45

Table of Contents
Power costsPursuant to the AUT process, PGE annually files an estimate of power costs for the following year. As approved by the OPUC, the 20232024 AUT included a final increase in power costs for 2023,2024, and a corresponding increase in annual revenue requirement, of $186$216 million from 20222023 levels, which were reflected in customer prices effective January 1, 2023.2024.

Portland Harbor Environmental Remediation Account (PHERA) mechanismThe EPA has listed PGE as one of over one hundred Potentially Responsible Parties (PRPs) related to the remediation of the Portland Harbor Superfund site. As of June 30, 2023,March 31, 2024, significant uncertainties still remained concerning the precise boundaries for clean-up, the assignment of responsibility for clean-up costs, the final selection of a proposed remedy by the EPA, and the method of allocation of costs amongst PRPs. It is probable that PGE will share in a portion of these costs. In
42

Table of Contents
a Record of Decision (ROD) issued in 2017, the EPA outlined its selected remediation plan for clean-up of the Portland Harbor site, which had an estimated total cost of $1.7 billion. Stakeholders have raised concerns that EPA’s cost estimates are understated, and PGE estimates undiscounted total remediation costs for Portland Harbor per the ROD could range from $1.9 billion to $3.5 billion. The Company does not currently have sufficient information to reasonably estimate the amount, or range, of its potential costs for investigation or remediation of Portland Harbor. However, the Company may obtain sufficient information, prior to the final determination of allocation percentages among PRPs, to develop a reasonable estimate, or range, of its potential liability that would require recording an estimate, or low end of the range. The Company’s liability related to the cost of remediating Portland Harbor could be material to PGE’s financial position. The impact of such costs to the Company’s results of operations is mitigated by the PHERA mechanism. As approved by the OPUC, the Company’s recovery mechanism allows the Company to defer and recover estimated liabilities and incurred environmentallegal and technical analysis expenditures related to the Portland Harbor Superfund Site through a combination of third-party proceeds, including, but not limited to, insurance recoveries, and customer prices, as necessary. The mechanism established annual prudency reviews of environmental expenditures and third-party proceeds, and annual expenditures in excess of $6 million, excluding contingent liabilities, are subject to an annual earnings test. PGE’s results of operations may be impacted to the extent such expenditures were to be deemed imprudent by the OPUC or disallowed per the prescribed earnings test. For further information regarding the PHERA mechanism, see “EPA Investigation of Portland Harbor” in Note 8, Contingencies in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements.”

DecouplingThe decoupling mechanism, previously authorized by the OPUC through 2022, was intended to provide for recovery of margin lost as a result of a reduction in electricity sales attributable to energy efficiency, customer-owned generation, and conservation efforts by residential and certain commercial customers. The mechanism provided for collection from (or refund to) customers if weather-adjusted use per customer was less (or more) than that projected in the Company’s most recent GRC.

In the 2022 GRC, parties reached an agreement that eliminated PGE’s decoupling mechanism upon the effective date of new customer prices that resulted in May 2022. Pursuant to the 2022 GRC Order, the OPUC adopted the agreement such that deferrals would not occur after 2022, although amortization of then previously recorded deferrals iswas to continue as scheduled until collected or refunded in future customer prices. For the year ended December 31, 2022, with OPUC approval, PGE is collecting $5 million in customer prices over a one-year period that began January 1, 2024.

In the 2024 GRC filing, the Company has included a concept proposal that could lead to resuming decoupling, with certain modifications. As stipulated in the 2024 GRC settlement agreement, PGE made a tariff filing on January 26, 2024 that proposes weather-normalized decoupling, which would sunset after December 31, 2025, for residential and small non-residential customers. The proposal seeks a 3% annual limit on collections or refunds and a balancing account, which would carry forward to subsequent years for refund or recovery, to capture any amounts that exceed the limit. The Company subsequently agreed to extend the requested effective date from April 1, 2024 with certain modifications.

Forto May 1, 2024. However, PGE is now requesting to extend the year ended December 31, 2022, PGE had recorded a total estimated collection of $3 million that, subjecteffective date to July 1, 2024. An OPUC approval,decision on the proposal is expected to be refunded to customers over a one-year period beginning January 1, 2024.

Deferral of Boardman revenue requirementIn October 2020, intervenors filed a deferral application with the OPUC that would require PGE to defer and refund the revenue requirement associated with Boardman then included in customer prices as established in the Company’s 2019 GRC. The application stated a deferral was required for customers to adequately capture the reduction in revenue requirement beginning on October 15, 2020,
46

Table of Contents
the date Boardman ceased operations. PGE estimated the revenue requirement for Boardman to be $14 million for the year ended December 31, 2020,at an additional $66 million for the year ended December 31, 2021, and $23 million for the year ended December 31, 2022. In the 2022 GRC Order, the OPUC found that the deferral was warranted with amortization subject to an earnings test. On July 27, 2022, the Company filed an application, which, subject to OPUC approval, showed that the Company did not exceed the earnings test threshold for 2020 or 2021 and consequently, no refund would be required for those years. Customer prices resulting from the 2022 GRC Order no longer included any revenue requirement related to Boardman after new customer prices took effect on May 9, 2022. On October 24, 2022, PGE and parties submitted a stipulation with the OPUC reflecting an agreement that resolved all matters related to 2021 under this deferral and states that no refund remains necessary for that year. Based on the application of an earnings test, PGE had not previously recorded a refund related to Boardman for 2020, 2021, or 2022.

On May 30, 2023, PGE and parties submitted a second stipulation with the OPUC reflecting an agreement that resolved all matters related to 2020 and 2022 under this deferral. Parties agreed that PGE would refund $6.5 million to customers related to 2020. The refund amount, plus interest, will be amortized over a two-year period beginning July 1, 2023. All parties agreed that there are no amounts to amortize for the 2022 deferral period. On June 5, 2023, the OPUC issued Order 23-195, which approved the stipulations.

Establishing the Boardman refund deferral resulted in an increase to regulatory liabilities with an offsetting charge to the condensed consolidated statements of income for the three months ended June 30, 2023.upcoming public meeting.

Renewable recovery frameworkAs previously authorized by the OPUC, the RAC is a primary method available to recover costs associated with renewable resources. The RAC allows PGE to recover prudently incurred costs of renewable resources through filings made each year, outside of a GRC. Although no significant filings have been made underUnder the RAC, during 2023, the Company expects to submitsubmitted a RAC filing for Clearwater, which went into service in January 2024. See “Clearwater RAC” in Note 3, Regulatory Assets and Liabilities, in the Clearwater Wind Development beforeNotes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements,” for more information regarding the endtiming of 2023.

In the 2019 GRC Order, the OPUC authorized the inclusion of prudent costs of energy storage projects associated with renewables in future RAC filings, under certain conditions. PGE is requesting within its 2024 GRC that the OPUC clarify that standalone energy storage used to integrate renewables on a utility’s system qualifies as associated energy storage.tariff, annual revenue requirement, and related deferral.

Operating Activities

43

Table of Contents
In addition to electricity provided by PGE’s own generation portfolio, to meet retail load requirements and balance energy supply with customer demand, the Company purchases and sells electricity in the wholesale market. To fuel its generation portfolio, the Company purchases natural gas in the United States and Canada and sells excess gas back into the wholesale market. PGE also performs portfolio management and wholesale market sales services for third parties in the region.

The Company participates in the California Independent System Operator's (CAISO) western Energy Imbalance Market (EIM), which allows, among other things, more renewable energy integration into the grid by better complementing the variable output of renewable resources. PGE recently announced plans to join the CAISO’s Extended Day-Ahead Market (EDAM) to build on the success of the western EIM and help provide the Company and its customers access to more affordable, reliable and clean energy. Utilities that participate in the EDAM, expected to begin operating in 2026, will bid their anticipated energy demand and generating resources into the market a day ahead of expected usage. The EDAM will then optimize generation resources and the energy needed for all market participants, allowing them to receive the least costly and cleanest energy to meet their energy needs. The EDAM takes advantage of existing technology and systems PGE has deployed and leverages the Company’s transmission system to connect regional resources across a common market, such as hydropower and wind facilities in the Pacific Northwest and solar facilities in California and the desert Southwest.

In its ongoing effort to benefit retail and wholesale customers, in 2023, PGE is now participating injoined the Western Power Pool’s resource adequacy program for the region known as the WRAP, the binding period forWestern Resource Adequacy Program (WRAP), which could startbecome a binding commitment in 2025 at the earliest.2026 or 2027. The WRAP represents an efforta regional framework to increasemore effectively address resource adequacy, enhance reliability, andintegrate clean energy, in the regionand manage costs through resource diversification and loadcapacity sharing while managing overall costs. The Company also purchases natural gas inacross a wide geographic footprint and broad pool of participants across the United States and Canada to fuel its generation portfolio and sells excess gas back into the wholesale market.West.

PGE generates revenues and cash flows primarily from the sale and distribution of electricity to its retail customers. The impact of seasonal weather conditions on demand for electricity can cause the Company’s revenues, cash flows, and income from operations to fluctuate from period to period. Historically, PGE has experienced its highest MWa deliveries and retail energy sales during the winter heating season and did record a new winter peak load in December 2022. Summer peak deliveries have continued to exceed those of the winter months for several years,
47

Table of Contents
generally resulting from air conditioning demand and the trend toward a warmer overall climate. During the summer of 2021,In August 2023, demand reached a new all-time high, surpassing the previous mark, which was a winter peak.set in summer 2021. Retail customer price changes and customer usage patterns, which can be affected by the economy and recently, by changes resulting from COVID-19, also have an effect on revenues. Wholesale power availability and price, hydro and wind generation, and fuel costs for thermal plants can also affect income from operations. PGE has taken measures to help ensure the availability of supply chain-constrained items that are needed to serve new and existing customers, such as advance ordering of critical materials, pre-securing manufacturing capacity with strategic partners, and evaluating availability with established and new suppliers. PGE has also taken measures to help mitigate cost increases through long termlong-term agreements, supplier engagement, and expanding the supply base.


44

Table of Contents
Customers and Demand—The following tables present total energy deliveries and the average number of retail customers by customer type for the periods indicated:
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
2024
2024
2024
Three Months Ended June 30,% Increase (Decrease) in Energy
Deliveries
Six Months Ended June 30,% Increase (Decrease) in Energy
Deliveries
2023202220232022
Energy deliveries (MWhs in thousands):
Energy deliveries (MWhs in thousands):
% Increase (Decrease) in Energy
Deliveries
Energy deliveries (MWhs in thousands):Energy deliveries (MWhs in thousands):
Retail:Retail:
Retail:
Retail:
Residential
Residential
ResidentialResidential1,730 1,724 — %4,057 3,940 %
CommercialCommercial1,595 1,552 %3,252 3,186 %
Commercial
Commercial
Industrial
Industrial
IndustrialIndustrial1,140 998 14 %2,211 1,972 12 %
SubtotalSubtotal4,465 4,274 %9,520 9,098 %
Subtotal
Subtotal
Direct access:
Direct access:
Direct access:Direct access:
CommercialCommercial154 133 16 %283 264 %
Commercial
Commercial
Industrial
Industrial
IndustrialIndustrial430 441 (2)%866 854 %
SubtotalSubtotal584 574 %1,149 1,118 %
Subtotal
Subtotal
Total retail
Total retail
Total retailTotal retail5,049 4,848 %10,669 10,216 %
WholesaleWholesale1,453 1,425 %2,849 2,932 (3)%
Wholesale
Wholesale
Total
Total
TotalTotal6,502 6,273 %13,518 13,148 %


Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Average number of retail customers:Average number of retail customers:
Average number of retail customers:
Average number of retail customers:
Residential
Residential
ResidentialResidential814,41988 %809,00288 %814,187 88 %807,77788 %824,239 88 88 %813,95588 %
CommercialCommercial112,19012 112,09012 112,333 12 111,87912 
IndustrialIndustrial196— 193— 195 — 192— 
Direct accessDirect access539— 553— 541 — 552— 
TotalTotal927,344 100 %921,838 100 %927,256 100 %920,400 100 %Total937,826 100 100 %927,166 100 100 %

Total retail energy deliveries for the sixthree months ended June 30, 2023 increased 4%March 31, 2024 decreased 1% compared with the sixthree months ended June 30, 2022, driven by continued growthMarch 31, 2023, as decreases in demandresidential and commercial deliveries more than offset the increase in seen from the industrial customer class.customers.

Residential weather-adjusted deliveries saw average usage per customer 0.7% lower during the first three months of 2024 compared with 2023, while the average number of residential customers was 1.3% greater during 2024 than 2023.

The impact of weather on Total Retail deliveries was negative with overall warmer than average and considerably warmer than the prior year temperatures experienced in the three-month period ended March 31, 2024 compared to the same three months of 2023. The industrial class continues to show growth in energy deliveries, up 14%5% in the three months ended June 30March 31, 2024 compared to the same period in 2022, due primarily to ongoing2023, reflecting strength in the high-tech and digital services sectors. The impact of weather on Total Retail deliveries was positive with colder than normal temperatures experienced in the three-month period ended March 31, 2023 compared to the same three months of 2022. In the three-month
48

Table of Contents
period ended June 30, 2023, weather again increased deliveries, as a greater number of cooling degree-days more than offset the decline in heating degree-days, compared to the same three months of 2022.sector.


4945

Table of Contents
The following table indicates the number of heating and cooling degree-days for the three and six months ended June 30,March 31, 2024 and 2023, and 2022, along with the current 15-year averages based on weather data provided by the National Weather Service, as measured at Portland International Airport:
Heating Degree-daysCooling Degree-days
20232022Avg.20232022Avg.
First Quarter1,927 1,761 1,840 — — — 
April404 454 371 12 — 
May105 242 185 87 — 23 
June45 65 73 96 75 76 
Second Quarter554 761 629 195 75 101 
Year-to-date2,481 2,522 2,469 195 75 101 
Increase/(decrease) from the 15-year average— %%93 %(26)%
Heating Degree-days
20242023Avg.
January759 667 704 
February539 658 606 
March457 602 528 
Year-to-date1,755 1,927 1,838 
(Decrease) increase from the 15-year average(5)%%

After adjusting for the effects of weather, total retail energy deliveries for the six months ended June 30, 2023 increased 2.4% compared to the same period of 2022. The increase reflects 8.3% higher industrial delivery volumes, commercial delivery volumes that were up 1.0%, and are partially offset by 0.7% lower residential deliveries when compared to the prior year. Residential weather-adjusted deliveries saw average usage per customer 1.5% lower during the first six months of 2023 compared with 2022, while the average number of residential customers was 0.8% greater during 2023 than 2022.

The Company’s cost-of-service opt-out program caps participation by customers in the fixed three-year and minimum five-year opt-out programs, which account for the majority of energy delivered to Direct Access customers who purchase their energy from ESSs. Had the cap limit been fully subscribed and utilized, 12% of PGE’s total retail energy deliveries for the first sixthree months of 20232024 would have been to these customers.

In 2020, PGE began offering service to customers under an OPUC created New Large Load Direct Access program for unplanned, large, new loads and large load growth at existing customer sites. With the adoption of the New Large Load Direct Access program, which is capped at 119 MWa, as much as 17%16% of the Company’s energy deliveries could have been supplied by ESSs to Direct Access customers. Actual deliveries to Direct Access customers of energy supplied by ESSs represented 11%9% of PGE’s total retail energy deliveries for the first sixthree months of 20232024 and 2022.2023.

Power Operations—PGE utilizes a combination of its own generating resources and wholesale market transactions to meet the energy needs of its retail customers. The Company participates in wholesale markets by purchasing and selling electricity and natural gas in an effort to meet the needs of, and obtain reasonably-priced power for, its retail customers. PGE continuously makes economic dispatch decisions based on numerous factors, such as plant availability, customer demand, river flows, wind conditions, and current wholesale prices. As a result, the amount of power generated and purchased in the wholesale market to meet the Company’s retail load requirement can vary from period to period and impacts NVPC and income from operations.


50

Table of Contents
The following table provides information regarding the performance of the Company’s generating resources for the sixthree months ended June 30, 2023March 31, 2024 and 2022:2023:
Plant availability (1)
Actual energy provided compared to projected levels (2)
Actual energy provided as a percentage of total retail load
202320222023202220232022
Generation:Generation:
Generation:
Generation:
Thermal:
Thermal:
Thermal:Thermal:
Natural gasNatural gas80 %84 %93 %78 %45 %33 %
Natural gas
Natural gas
Coal (3)
Coal (3)
Coal (3)
Coal (3)
89 83 93 91 10 10 
Wind (4)
Wind (4)
98 74 97 80 11 
Wind (4)
Wind (4)
Hydro
Hydro
HydroHydro91 96 65 81 
(1)Plant availability represents the percentage of the period plants were available for operations, which is impacted by planned maintenance and forced, or unplanned, outages.
(2)Projected levels of energy are included as part of PGE’s AUT. Such projections establish the power cost component of retail prices for the following calendar year. Any shortfall is generally replaced with power from higher cost sources, while any excess generally displaces power from higher cost sources.
46

Table of Contents
(3)Plant availability reflects Colstrip, which PGE does not operate.
(4)Plant availability includes Wheatridge Renewable Energy Facility and Clearwater Wind Development, which PGE does not operate.

Energy received from PGE-owned and jointly-owned thermal plants during the sixthree months ended June 30, 2023March 31, 2024 compared to 20222023 increased 32%2%. This increase is primarily driven by economic dispatch decisions. Energy expected to be received from thermal resources is projected annually in the AUT based on forecast market prices, variable costs to run the plant, and the constraints of the plant. PGE’s thermal generating plants require varying levels of annual maintenance, which is generally performed during the second quarter of the year.

Total energy received from hydroelectric generation sources, both PGE-owned generation and purchased, decreasedincreased 23%42% during the sixthree months ended June 30, 2023March 31, 2024 compared to 20222023 primarily due to less favorablethe addition of capacity under two purchased hydro conditionscontracts in the current period.2024. Energy purchased from mid-Columbia and other regional hydroelectric projects decreased 30%increased 45% while energy generated by the Company-owned facilities increased 18% in33% during the sixthree months ended June 30, 2023.March 31, 2024. Energy expected to be received from hydroelectric resources is projected annually in the AUT based on a modified hydro study, which utilizes 80 years of historical stream flow data. See “Purchased power and fuel” in the Results of Operations section in this Item 2, for further detail on regional hydro results.

Energy received from PGE-owned wind resources and under contracts increased 15%26% during the sixthree months ended June 30, 2023March 31, 2024 compared to 20222023 primarily due to unplanned plant outagesthe addition of the Clearwater Wind Development in 2022 that did not reoccur.2024. Energy expected to be received from wind generating resources is projected annually in the AUT based on historical generation. Wind generation forecasts are developed using a 5-year rolling average of historical wind levels or forecast studies when historical data is not available.

Under PGE’s PCAM, the Company may share with customers a portion of cost variances associated with NVPC. Customer prices can be adjusted annually to absorb a portion of the difference between the forecasted NVPC included in customer prices (baseline NVPC) and actual NVPC for the year, if such differences exceed a prescribed “deadband” limit, which ranges from $15 million below to $30 million above baseline NVPC. To the extent actual NVPC, subject to certain adjustments, is outside the deadband range, the PCAM provides for 90% of the excess variance to be collected from, or refunded to, customers. Pursuant to a regulated earnings test, a refund will occur only to the extent that it results in PGE’s actual regulated return on equity (ROE) for the given year being no less than 1% above the Company’s latest authorized ROE, while a collection will occur only to the extent that it results in PGE’s actual regulated ROE for that year being no greater than 1% below the Company’s authorized ROE. The
51

Table of Contents
following is a summary of the results of the Company’s PCAM as calculated for regulatory purposes for the sixthree months ended June 30,March 31, 2024 and 2023, and 2022, respectively:

For the sixthree months ended June 30, 2023,March 31, 2024, actual NVPC was $19 million abovebelow baseline NVPC. Based on forecast data, NVPC for the year ending December 31, 20232024 is currently estimated to be below the baseline and outsidenear the established deadband range.limit of the deadband. Pursuant to the PCAM and related earnings test, because PGE’s preliminary regulatory ROE is estimated to be below 10.5%, there is no estimated refund to customers expected under the PCAM for 2023.2024.

For the sixthree months ended June 30, 2022,March 31, 2023, actual NVPC was $32$13 million belowabove baseline NVPC. For the year ended December 31, 2022,2023, actual NVPC was $23$5 million above baseline NVPC, which was within the established deadband range. Accordingly, no estimated collection from customers was recorded for 2022.2023.

A portion of the January 2024 storm also qualified as a Reliability Contingency Event (RCE) as approved by the OPUC in PGE’s 2024 GRC. Under the RCE mechanism, PGE is allowed to pursue recovery of 80% of costs for RCEs above amounts forecasted in the Company’s AUT, with the remaining 20% flowing through operating expenses and subject to the existing PCAM. For more on the 2024 RCE, see “Regulatory Assets and Liabilities” in Note 3, Balance Sheet Components in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements.”
47

Table of Contents

Results of Operations

The following tables provide financial and operational information to be considered in conjunction with management’s discussion and analysis of results of operations.

The results of operations are as follows for the periods presented (dollars in millions):
Three Months Ended June 30,% Increase (Decrease)Six Months Ended June 30,% Increase (Decrease)
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
2024
2024
2024
Total revenues
Total revenues
Total revenuesTotal revenues$648 $591 10 %$1,396 $1,217 15 %
Operating expenses:Operating expenses:
Operating expenses:
Operating expenses:
Purchased power and fuel
Purchased power and fuel
Purchased power and fuelPurchased power and fuel220 168 31 524 370 42 
Generation, transmission and distributionGeneration, transmission and distribution101 85 19 194 175 11 
Generation, transmission and distribution
Generation, transmission and distribution
Administrative and other
Administrative and other
Administrative and otherAdministrative and other93 84 11 173 173 — 
Depreciation and amortizationDepreciation and amortization113 103 10 224 202 11 
Depreciation and amortization
Depreciation and amortization
Taxes other than income taxes
Taxes other than income taxes
Taxes other than income taxesTaxes other than income taxes40 39 83 79 
Total operating expensesTotal operating expenses567 479 18 1,198 999 20 
Total operating expenses
Total operating expenses
Income from operations
Income from operations
Income from operationsIncome from operations81 112 (28)198 218 (9)
Interest expense, net*Interest expense, net*41 38 85 76 12 
Interest expense, net*
Interest expense, net*
Other income:
Other income:
Other income:Other income:
Allowance for equity funds used during constructionAllowance for equity funds used during construction33 17 
Allowance for equity funds used during construction
Allowance for equity funds used during construction
Miscellaneous income, net
Miscellaneous income, net
Miscellaneous income, netMiscellaneous income, net— — 17 — — 
Other income, netOther income, net200 24 300 
Other income, net
Other income, net
Income before income tax expense
Income before income tax expense
Income before income tax expenseIncome before income tax expense49 77 (36)137 148 (7)
Income tax expenseIncome tax expense10 13 (23)24 24 — 
Income tax expense
Income tax expense
Net income
Net income
Net incomeNet income39 64 (39)113 124 (9)
Other comprehensive incomeOther comprehensive income— — 
Other comprehensive income
Other comprehensive income
Net income and Comprehensive income
Net income and Comprehensive income
Net income and Comprehensive incomeNet income and Comprehensive income$40 $65 (38)%$114 $125 (9)%
* Includes an allowance for borrowed funds used during construction of $3$4 million and $1$2 million for the three months ended June 30,March 31, 2024 and 2023, and 2022, respectively, and $5 million and $3 million for the six months ended June 30, 2023 and 2022, respectively.
52

Table of Contents

Net income for the three months ended June 30, 2023 declinedMarch 31, 2024 increased $35 million compared to the three months ended June 30, 2022. Total Revenues were higher, although increases in various Operating expenses also occurred.March 31, 2023. Retail revenues were up not only as a result of several factors, includinggeneral price increases but also as a result of an increase in customer prices to cover anticipated higher net variable power costs, as authorized by the OPUC in the AUT, and a 4% increase in total retail energy deliveries over the prior year quarter. Total operating expenses increased compared to the prior year, reflecting higherAUT. Purchased power and fuel expense more run hoursrose considerably over the same period of 2023, as expected, although the Company was able to sell power into the wholesale market at PGE’s generation facilities,higher prices also, which contributed to increased revenues and increasedthus minimized the overall increase in NVPC. The increase in Administrative and general expense reflects increases in various categories including wages, outside services, regulatory expenses, and an increase in bad debt expense, that is partially attributablewhich was largely due to the amortization of the Covid-19 deferral, which beganpreviously deferred COVID-19 expenses now being collected in 2023customer prices and is offset in revenues. An increase in Depreciation and amortization expense resulted fromwas driven by higher depreciable asset balances and the accelerated depreciation of Colstrip, which is offset in retail revenues, and was approved by the OPUC in the Company’s 2022 GRC.balances. Interest expense, net increased primarily due to higher long-term debt balances. Other income, net increasedreflects a decrease in 2023 as a result of gains on Non-qualified benefit trust plan assets and higher2024, due to the lower interest income recorded on regulatory assets.balances. Income tax expense decreased as the Company benefited from higher PTC benefits.

Net income for the six months ended June 30, 2023 was slightly lower than during the same period of 2022. Retail revenues increased due to both higher prices and a 4% increase in Total Retail deliveries. In 2023, increases in Retail revenues reflect the increase in customer prices to cover anticipated higher net variable power costs, as authorized by the OPUC in the AUT, which were anticipated to be offset by higher power costs. The impact of higher natural gas and electricity prices coupled with increased customer demand also drove Purchased power and fuel expense up. In 2022, Operating expenses reflect the additional charges that resulted pursuant to the earnings tests outlined in OPUC Order 22-129 related to prior deferrals.
53

Table of Contents

Total revenues consist of the following for the periods presented (dollars in millions):
48


Table of Contents
Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Retail:Retail:
Retail:
Retail:
Residential
Residential
ResidentialResidential$279 44 %$250 42 %$641 46 %$558 46 %$415 45 45 %$362 48 48 %
CommercialCommercial196 30 168 28 393 28 346 29 
IndustrialIndustrial87 13 73 12 169 12 142 12 
Subtotal Subtotal562 87 491 82 1,203 86 1,046 87 
Direct access:Direct access:
Commercial
Commercial
CommercialCommercial— — — 
IndustrialIndustrial11 
SubtotalSubtotal13 17 
Subtotal RetailSubtotal Retail569 88 500 84 1,216 87 1,063 88 
Alternative revenue programs, net of amortizationAlternative revenue programs, net of amortization— — — 
Other accrued revenues, netOther accrued revenues, net(4)(1)— — (3)— — — 
Total retail revenuesTotal retail revenues567 87 503 85 1,218 87 1,067 88 
Wholesale revenuesWholesale revenues62 10 65 11 150 11 121 10 
Other operating revenuesOther operating revenues19 23 28 29 
Total revenuesTotal revenues$648 100 %$591 100 %$1,396 100 %$1,217 100 %Total revenues$929 100 100 %$748 100 100 %


Total retail revenues—The following items contributed to the increase in Total retail revenues for the three and six months ended June 30, 2023March 31, 2024 compared to the same periodsperiod in 20222023 as follows (in millions):
Three Months EndedSix Months Ended
June 30, 2022$503 $1,067 
Change in prices as a result of the AUT, approved by the OPUC (partially offset in Purchased power and fuel)32 67 
Retail energy deliveries driven by customer load growth16 42 
Average price of energy deliveries due primarily to customer price increases and the relative mix of deliveries among customer classes
    Colstrip depreciation life adjustment
    Wildfire mitigation revenue (offset in Generation, transmission and distribution)
    Recovery of deferrals for 2020 Wildfire and 2021 ice storm11 
Boardman settlement refund(7)(7)
PCAM collection, offset in Purchased power and fuel expense
Combination of various supplemental tariffs and adjustments
June 30, 2023$567 $1,218 
Change in Total retail revenues$64 $151 
Three Months Ended
March 31, 2023$651 
Change in prices as a result of the AUT, approved by the OPUC (partially offset in Purchased power and fuel)54 
Average price of energy deliveries due primarily to customer price increases48 
     Recovery of deferrals for 2020 Wildfire, 2021 ice storm, and COVID-19
Change in Decoupling amortization(2)
Retail energy deliveries driven by changes in customer load(4)
Clearwater RAC deferral(10)
Combination of various supplemental tariffs and adjustments(2)
March 31, 2024$740 
Change in Total retail revenues$89 

Wholesale revenues result from sales of electricity to utilities and power marketers made in the Company’s efforts to secureobtain reasonably priced power for its retail customers, manage risk, and administer its long-term wholesale contracts. Such sales can vary significantly from year to year as a result of economic conditions, power and fuel prices, hydro and wind availability, and customer demand.
54

Table of Contents

For the three months ended June 30, 2023, Wholesale revenues decreased $3 million, or 5%, from the three months ended June 30, 2022 as a $4 million decrease from a 7% decline in average wholesale sales price was partially offset by a $1 million increase due to a 2% increase in sales volumes.

Wholesale revenues for the sixthree months ended June 30, 2023March 31, 2024 increased $29$88 million, or 24%100%, from the sixthree months ended June 30, 2022,March 31, 2023, as a 56% increase in sales volumes added $50 million to revenues and the average wholesale sales price was up 27%, contributing $32another $38 million toward the increase. Partially offsetting the increase was a 3% decline in

49

Table of Contents
Higher average wholesale sales volumes, which reduced revenues by $3 million. The higher sales prices during 2024 have resulted from the timing of market sales combined with several regional factors, that have contributed to overall higher market prices during 2023, including reduced hydro generation, in the region, the economic recovery, strong demand, ongoing capacity limitations, in the region, and the ongoing impact on natural gas prices resulting from global macroeconomic factors impacting the energy commodity markets.severe weather events experienced.

Other operating revenues decreased $4 million for the three months ended June 30, 2023 compared with the same period in 2022. Market conditions resulted in the Company selling excess natural gas at a greater gain in the three months ended June 30, 2022 than in the comparable period of 2023.

In the six months ended June 30, 2023, Other operating revenues decreased $1March 31, 2024 were up $4 million compared to the same period of 20222023, as market conditions allowedtransmission related revenues drove the Company to sell excess natural gas at a greater gain in 2022 than in 2023.increase.

Purchased power and fuel expense includes the cost of power purchased and fuel used to generate electricity to meet PGE’s retail load requirements, as well as the cost of settled electric and natural gas financial contracts.

The following items contributed to the change in Purchased power and fuel for the three and six months ended June 30, 2023March 31, 2024 compared to the same periodsperiod in 20222023 (dollars in millions, except for average variable power cost per Megawatt hour (MWh)):
Three Months EndedSix Months Ended
June 30, 2022$168 $370 
Average variable power cost per MWh67 185 
Total system load(19)(38)
2021 PCAM deferral amortization
June 30, 2023220 524 
Change in Purchased power and fuel$52 $154 
Average variable power cost per MWh:
June 30, 2022$28.40 $29.43 
June 30, 2023$35.19 $40.01 
Total system load (MWhs in thousands):
June 30, 20225,94612,594
June 30, 20236,13812,922
Three Months Ended
March 31, 2023$304 
Average variable power cost per MWh125 
Total system load51 
2024 RCE deferral(75)
March 31, 2024405 
Change in Purchased power and fuel$101 
Average variable power cost per MWh:
March 31, 2023$44.25 
March 31, 2024$62.58 
Total system load (MWhs in thousands):
March 31, 20236,784
March 31, 20247,610

For the three months ended June 30, 2023,March 31, 2024, the $67$125 million increase related to the change in average variable power cost per MWh was driven by a 21%39% increase in the average cost of purchased power and a 179% increase in the average cost for the Company’s own generation, driven primarily by price risk management activity. The $19 milliondecrease resulting from the overall mix of purchased power and generation used to meet total system load
55

Table of Contents
was primarily due to a 16% decrease in deliveries of energy obtained from purchased power, offset by a 35% increase in the Company’s own generation.

For the six months ended June 30, 2023, the $185 million increase related to the change in average variable power cost per MWh was driven by a 45% increase in the average cost of purchased power and an 88%28% increase in the average cost for the Company’s own generation, driven primarily by higher physical power and natural gas costs.prices due to severe weather events in the quarter. The $38$51 million decreaseincrease related to total system load was primarilydriven by higher wholesale sales. The change due to total system load was comprised of a 19% decrease22% increase in deliveries of energy obtained from purchased power, offset byand a 29%6% increase in the Company’s own generation.

50

Table of Contents
PGE’s sources of energy, total system load, and retail load requirement are as follows for the periods presented:
Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Sources of energy (MWhs in thousands):Sources of energy (MWhs in thousands):
Generation:Generation:
Generation:
Generation:
Thermal:Thermal:
Thermal:
Thermal:
Natural gas
Natural gas
Natural gasNatural gas1,624 26 %1,086 18 %4,520 35 %3,235 26 %3,028 40 40 %2,896 43 43 %
CoalCoal432 356 1,028 966 
Total thermalTotal thermal2,056 33 1,442 24 5,548 43 4,201 34 
HydroHydro374 293 669 566 
WindWind602 10 516 1,083 908 
Total generationTotal generation3,032 49 2,251 38 7,300 56 5,675 45 
Purchased power:Purchased power:
Hydro
Hydro
HydroHydro1,412 23 2,002 33 2,492 19 3,564 27 
WindWind244 250 476 445 
SolarSolar394 216 539 329 
Natural GasNatural Gas— — — — 11 — — 
Waste, Wood, and Landfill GasWaste, Wood, and Landfill Gas38 42 81 79 
Source not specifiedSource not specified1,018 17 1,185 20 2,023 16 2,500 20 
Total purchased powerTotal purchased power3,106 51 3,695 62 5,622 44 6,919 55 
Total system loadTotal system load6,138 100 %5,946 100 %12,922 100 %12,594 100 %Total system load7,610 100 100 %6,784 100 100 %
Less: wholesale salesLess: wholesale sales(1,453)(1,425)(2,849)(2,932)
Retail load requirementRetail load requirement4,685 4,521 10,073 9,662 
Retail load requirement
Retail load requirement

Purchased power in the table above includes power received from qualifying facilities under the Public Utility Regulatory Policies Act of 1978 (PURPA) as follows:
Three Months Ended June 30,Six Months Ended June 30,
2023202220232022
Three Months Ended March 31,
Three Months Ended March 31,
Three Months Ended March 31,
202420242023
Sources of energy (MWhs in thousands):Sources of energy (MWhs in thousands):
PURPA purchased power:PURPA purchased power:
PURPA purchased power:
PURPA purchased power:
Hydro
Hydro
HydroHydro11 19 14 
WindWind14 13 
SolarSolar201 178 303 282 
Waste, Wood, and Landfill GasWaste, Wood, and Landfill Gas30 24 58 45 
TotalTotal250 218 394 354 



56

Table of Contents

5751

Table of Contents
The following table presents the forecast April-to-September 20232024 and actual 20222023 runoff at particular points of major rivers relevant to PGE’s hydro resources:
Runoff as a Percent of Normal*
Runoff as a Percent of Normal*Runoff as a Percent of Normal*
LocationLocation2023 Forecast2022 ActualLocation2024 Forecast2023 Actual
Columbia River at The Dalles, OregonColumbia River at The Dalles, Oregon83 %107 %Columbia River at The Dalles, Oregon81 %83 %
Mid-Columbia River at Grand Coulee, WashingtonMid-Columbia River at Grand Coulee, Washington78 110 
Clackamas River at Estacada, OregonClackamas River at Estacada, Oregon100 139 
Deschutes River at Moody, OregonDeschutes River at Moody, Oregon100 92 
* Volumetric water supply forecasts and historical averages for the Pacific Northwest region are prepared by the Northwest River Forecast Center, with the Natural Resources Conservation Service and other cooperating agencies.

Actual NVPC for the three and six months ended June 30, 2023March 31, 2024 increased compared to the same periodsperiod in 20222023 as follows (in millions):
Three Months EndedSix Months Ended
June 30, 2022$103 $249 
Purchased power and fuel expense48 147 
Wholesale revenues(29)
2021 PCAM deferral amortization$
June 30, 2023$158 $374 
Change in NVPC$55 $125 
Three Months Ended
March 31, 2023$216 
Purchased power and fuel expense176 
Wholesale revenues(88)
2024 RCE deferral(75)
March 31, 2024$229 
Change in NVPC$13 

For further information regarding NVPC in relation to the PCAM, see “Purchased power and fuel expense” and “Revenues” within this “Results of Operations” for more details.

For the three months ended June 30,March 31, 2024 and 2023, and 2022, actual NVPC was$5 million above and $23 million below baseline NVPC, respectively. For the six months ended June 30, 2023 and 2022, actual NVPC was $19 million abovebelow and $32$13 million belowabove baseline NVPC, respectively.

Based on forecast data, NVPC for the year ending December 31, 20232024 is currently estimated to be below the baseline and outsidenear the limit of the deadband. Pursuant to the PCAM’sPCAM and related earnings test, because PGE’s preliminary regulatory ROE is expectedestimated to be below 10.5%, there is no estimated refund to customers expected under the PCAM for 2023.2024.

58

Table of Contents
Generation, transmission and distribution increased as follows for the three and six months ended June 30, 2023March 31, 2024 compared to the same periodsperiod in 20222023 (in millions):
Three Months EndedSix Months Ended
June 30, 2022$85 $175 
Generating facility expenses driven by increased run hours and major maintenance activities12 
Vegetation management, inspection, wildfire mitigation, and distribution maintenance expenses10 
Amortizations of previously deferred 2020 wildfire and 2021 ice storm costs11 
Service restoration and storm response costs(3)(3)
Release of deferred amounts pursuant to earnings test in 2022— (16)
Miscellaneous expenses
June 30, 2023$101 $194 
Change in Generation, transmission and distribution$16 $19 
Three Months Ended
March 31, 2023$93 
Generating facility expenses driven by increased major maintenance activities
Vegetation management, inspection, wildfire mitigation, and distribution maintenance expenses
Service restoration and storm response costs
Miscellaneous expenses(5)
March 31, 2024$99 
Change in Generation, transmission and distribution$



52

Table of Contents
Administrative and other increased $9 millionas follows for the three months ended June 30, 2023 and remained flat for the six months ended June 30, 2023March 31, 2024 compared to the same periodsperiod in 2022 as follows2023 (in millions):
Three Months EndedSix Months Ended
June 30, 2022$84 $173 
Professional services— (3)
Employee compensation and benefits(3)
Bad debt expense
Miscellaneous expenses
June 30, 2023$93 $173 
Change in Administrative and other$$— 
Three Months Ended
March 31, 2023$80 
Amortization of COVID-19 bad debt expense deferral
Professional services
Employee compensation and benefits
Miscellaneous expenses
March 31, 2024$95 
Change in Administrative and other$15 

PGE commenced amortization of previously deferred COVID-19 related bad debt expenses on April 1, 2023. For the three months ended March 31, 2024, the Company amortized $4 million of COVID-19 related bad debt expense that was offset in revenues.

Depreciation and amortization expense increased $10 million for three months ended June 30, 2023March 31, 2024 compared to the same periodsperiod in 2022.2023. The increase was primarily due to higher utility plant balances, accelerated depreciation of Colstrip as approved by the OPUC’s 2022 GRC Order and commenced in May 2022, and regulatory amortizations. The $22 million increase for the six months ended June 30, 2023, compared to the same period in 2022, was driven by accelerated depreciation of Colstrip, regulatory amortizations and deferral activity, and higher plant in-service balances resulting from capital additions.balances.

Taxes other than income taxes increased $1 million and $4 million respectively, in the three and six months ended June 30, 2023,March 31, 2024, compared to the same periodsperiod in 2022.2023. The increases were driven by higher property taxes and franchise fees.

Interest expense, net increased $3$7 million and $9 million, respectively,in the three and six months ended June 30, 2023March 31, 2024 compared to the same periodsperiod in 20222023 primarily due to higher long-term debt and commercial paper balances.

Other income, net increased $6 million and $18decreased $4 million for the three and six months ended June 30, 2023, respectively,March 31, 2024, compared to the same periodsperiod in 2022.2023. The three-month increasedecrease was primarily driven by $4 million in favorable market changes on the non-qualified benefit trust. The six-month increase was primarily driven by $10 million in favorable market changes on the non-qualified benefit trust as well as the recognition of $5 million of
59

Table of Contents
previously deferred equitylower regulatory interest income in conjunction with amortization of regulatory deferrals that began in 2023.income.

Income tax expense decreased $3$1 million for the three months ended June 30, 2023,March 31, 2024, compared to the same period in 2022,2023, driven by lower$12M higher production tax credit benefits offset by higher tax expense driven by higher pre-tax income. For the six months ended June 30, 2023, income tax expense was comparable to the same period of 2022.

Critical Accounting Policies and Estimates

There have been no material changes to the Company’s critical accounting policies and estimates as previously disclosed in Item 7 of the Company’s Annual Report on Form 10-K for the year ended December 31, 2022,2023, filed with the SEC on February 16, 2023.20, 2024.

LIQUIDITY AND CAPITAL RESOURCES

Liquidity

PGE’s access to short-term debt markets, including revolving credit from banks, helps provide necessary liquidity to support the Company’s current operating activities, including the purchase of power and fuel. Long-term capital requirements are driven largely by capital expenditures for distribution, transmission, and generation facilities to support both new and existing customers, repairs from major storm damage, information technology systems, and debt refinancing activities. PGE’s liquidity and capital requirements can also be significantly affected by other working capital needs, including margin deposit requirements related to wholesale market activities, which can vary depending upon the Company’s forward positions and the corresponding price curves.

The following summarizes PGE’s cash flows for the periods presented (in millions):

Six Months Ended June 30,
20232022
Cash and cash equivalents, beginning of period$165 $52 
Net cash provided by (used in):
Operating activities143 451 
Investing activities(574)(334)
Financing activities279 (78)
(Decrease) increase in cash and cash equivalents(152)39 
Cash and cash equivalents, end of period$13 $91 


6053

Table of Contents

Three Months Ended March 31,
20242023
Cash and cash equivalents, beginning of period$$165 
Net cash provided by (used in):
Operating activities175 (39)
Investing activities(331)(276)
Financing activities327 162 
Increase (decrease) in cash and cash equivalents171 (153)
Cash and cash equivalents, end of period$176 $12 

Cash Flows from Operating Activities—Cash flows from operating activities are generally determined by the amount and timing of cash received from customers and payments made to vendors, as well as the nature and amount of non-cash items, including depreciation and amortization, deferred income taxes, and pension and other postretirement benefit costs included in net income during a given period. The following items contributed to the net change in cash flows from operations for the sixthree months ended June 30, 2023March 31, 2024 compared with the sixthree months ended June 30, 2022March 31, 2023 (in millions):
Increase/
(Decrease)
Net income$(11)35 
Accounts receivable and Unbilled revenue45 (39)
Margin deposits activity(197)81 
Accounts payable(178)198 
Regulatory deferral activity28 (125)
Depreciation and amortization2210 
Deferred income taxes33 
Other miscellaneous changes(17)21 
Net change in cash flow from operations$(308)214 

For the six months ended June 30, 2023 operating cash flows were significantly impacted by changes in working capital from December 31, 2022, primarily related to Accounts payable for purchased power and fuel costs and related margin deposits activity. In December 2022, PGE experienced elevated natural gas and power prices due to volatility in the wholesale markets, which led to increased cash used in operating activities for 2023 as cash payments for physical commodity purchases and related margin activity were made.

PGE estimates that non-cash charges for depreciation and amortization in 20232024 will range from $445$475 million to $465$525 million. Combined with other sources, total cash expected to be provided by operations is estimated to range from $525$700 million to $575$800 million.

Cash Flows from Investing Activities—Net cash used in investing activities for the sixthree months ended June 30, 2023March 31, 2024 increased $240$55 million when compared with the sixthree months ended June 30, 2022.March 31, 2023. Cash flows used in investing activities consist primarily of capital expenditures related to new construction and improvements to PGE’s distribution, transmission, and generation facilities, which increased $228 million, and $10 million related to proceeds from the sale of property.$51 million.

Excluding AFUDC, the Company plans to make capital expenditures of $1.5$1.3 billion in 2023,2024, which it expects to fund with cash to be generated from operations during 2023,2024, as discussed above, the issuance of short- and long-term debt securities, and issuances of shares pursuant to the at the marketat-the-market offering program or the EFSA.program. For additional information, see “Debt and Equity Financings” in this Liquidity and Capital Resources section of Item 2.

Cash Flows from Financing Activities—During the sixthree months ended June 30, 2023,March 31, 2024, net cash provided by financing activities was primarily the result of $392the funding of $450 million in First Mortgage Bonds (FMBs) and $78 million in proceeds from the issuance of common stock pursuant to the EFSA, funding of $100 million in First Mortgage Bonds (FMBs), and $140 million due to the issuance of commercial paper,at-the-market offering program. This was partially offset by a $260$146 million repayment of a term loanin commercial paper maturities and payment of $84$48 million of dividends.
54


61

Table of Contents

Capital Requirements

The following table presents PGE’s estimated capital expenditures and contractual maturities of long-term debt for 20232024 through 20282027,, excluding AFUDC (in millions):
20232024202520262027
202420242025202620272028
Ongoing capital expenditures(1)
Ongoing capital expenditures(1)
$945 $810 $800 $800 $800 
Transmission
Clearwater Wind projectClearwater Wind project415 — — — — 
BESS projectsBESS projects115 240 155 — — 
Total capital expenditures(2)
Total capital expenditures(2)
$1,475 $1,050 $955 $800 $800 
Long-term debt maturitiesLong-term debt maturities$260 $80 $— $— $160 
(1) Consists primarily of upgrades to, and replacement of, generation, transmission, and distribution infrastructure, as well as new customer connections. Includes accrued capital additions, preliminary engineering, removal costs, and certain intangible working capital assets.
(2) Amounts are estimates as of the date of this report and may be affected by economic conditions, including but not limited to, impacts of inflation, changes to the cost of materials and labor, and financing costs.

Debt and Equity Financings

PGE’s ability to secure sufficient short- and long-term capital at a reasonable cost is determined by its financial performance and outlook, credit ratings, capital expenditure requirements, alternatives available to investors, market conditions, and other factors, such as the volatility in the capital markets in response to inflationary pressures and interest rate increases by the federal reserve. Management believes that the availability of its revolving credit facility, the expected ability to issue short- and long-term debt and equity securities, and cash expected to be generated from operations provide sufficient cash flow and liquidity to meet the Company’s anticipated capital and operating requirements for the foreseeable future.

For 2023,2024, PGE expects to fund estimated capital requirements with cash from operations, which is expected to range from $525700 million to $575$800 million, and issuances of long-term debt securities of up to $600$750 million. PGE plans to fund any shortfall through the combination of issuance of common stock and the issuance of short-term debt or commercial paper, as needed. The actual timing and amount of any such issuances of debt, equity, and commercial paper will be dependent upon the timing and amount of capital expenditures and debt payments.

Short-term Debt. Pursuant to an order issued by the FERC in January 2022,2024, PGE has authorization to issue short-term debt up to a total of $900 million through February 6, 2024.2026. The following table shows available liquidity as of June 30, 2023March 31, 2024 (in millions):
As of June 30, 2023
CapacityOutstandingAvailable
As of March 31, 2024As of March 31, 2024
CapacityCapacityOutstandingAvailable
Revolving credit facility (1)
Revolving credit facility (1)
$650 $140 $510 
Letters of credit (2)
Letters of credit (2)
220 92 128 
Total creditTotal credit$870 $232 $638 
Cash and cash equivalentsCash and cash equivalents13 
Total liquidityTotal liquidity$651 
(1)Scheduled to expire September 2027.2028.
(2)PGE has threefour letter of credit facilities under which the Company can request letters of credit for an original term not to exceed one year.

6255

Table of Contents

On August 18, 2023, PGE entered into an amendment of its existing revolving credit facility. As of June 30, 2023March 31, 2024, PGE had a $650750 million unsecured revolving credit facility scheduled to expire in September 20272028. The facility allows for unlimited extension requests, provided that lenders with a pro-rata share of more than 50% of the facility approve the extension request. The revolving credit facility supplements operating cash flows and provides a primary source of liquidity. In addition, the credit facility offers the potential for adjustments to interest rate margins and fees based on PGE’s achievement of certain annual sustainability-linked metrics related to its non-emitting generation capacity and the percentage of management comprised of women and employees who identify as black, indigenous, and people of color. Pursuant to the terms of the agreement, the revolving credit facility may be used as backup for commercial paper borrowings, to permit the issuance of standby letters of credit, and to provide cash for general corporate purposes. PGE may borrow for one, three, or six months at a fixed interest rate established at the time of the borrowing, or at a variable interest rate for any period up to the remaining term of the applicable credit facility. As of June 30, 2023,March 31, 2024, PGE had no outstanding balance on the revolving credit facility.

The Company has a commercial paper program under which it may issue commercial paper for terms of up to 270 days, limited to the unused amount of credit under the revolving credit facility. As of June 30, 2023,March 31, 2024, PGE had $140 million ofno commercial paper outstanding. The aggregate unused available credit capacity under the revolving credit facility was $510$750 million. The Company has elected to limit its borrowings under the revolving credit facility in order to allow coverage for the potential need to repay any commercial paper that may be outstanding at the time.

Long-term Debt. As of June 30, 2023,March 31, 2024, PGE’s total long-term debt outstanding, net of $13$15 million of unamortized debt expense, was $3,4864,433 million.

In November 2022,On February 22, 2024, PGE entered into a Bond Purchase Agreement related to the sale of $200$450 million in FMBs. The Bonds were issued and funded in full on February 22, 2024 and consist of:
a series, due in 2029, in the amount of $100 million that will bear interest from its issuance date at an annual rate of 5.47%5.15%;
a series, due in 2034, in the amount of $100 million that will bear interest from its issuance date at an annual rate of 5.36%; and
a series, due in 2033,2054, in the amount of $100$250 million that will bear interest from its issuance date at an annual rate of 5.56%5.73%.

The 2029 and 2033 series were issued in 2022 and funded in full on November 30, 2022 and January 13, 2023, respectively.

On October 21, 2022, PGE obtained a 366-day term loan from lenders in the aggregate principal of $260 million under a 366-Day Bridge Credit Agreement. The term loan bore interest for the relevant interest period at the Term Secured Overnight Financing Rate (SOFR) plus Term SOFR Adjustment Rate of 10 basis points and Applicable Margin of 87.5 basis points. The interest rate was subject to adjustment pursuant to the terms of the loan. On March 1, 2023, this term loan was repaid in full with proceeds from the Equity Forward Sale Agreement described below.

Equity—On April 28, 2023, PGE entered into an equity distribution agreement under which it could sell up to $300 million of its common stock through at the marketat-the-market offering programs. As of June 30,In 2023, pursuant to the terms of the equity distribution agreement, PGE entered into separate forward sale agreements with forward counterparties and under such agreements,counterparties. In March 2024, the Company could have physically settled by delivering 172,033issued 1,714,972 shares pursuant to the counterpartyagreements and received net proceeds of $78 million, settling all forward sale agreements in exchange for cash of $8 million.place. Any proceeds from the issuances of common stock will be used for general corporate purposes and investments in renewables and non-emitting dispatchable capacity.

In 2022, PGE entered into an EFSA in connection with the public offering of 10,100,000 shares of its common stock. Effective October 28, 2022, pursuant to the terms of the EFSA, the forward counterparties borrowed 11,615,000 shares of PGE’s common stock with an initial value of $499 million, including 1,515,000 shares in connection with the underwriters’ exercise of their option to purchase additional shares, from third parties in the open market and sold the shares to a group of underwriters. PGE receives proceeds from the sale of the common stock when the EFSA is physically settled. In March 2023, the Company issued 7,178,016 shares pursuant to the EFSA and received net proceeds of $300 million. In June 2023, the Company issued 2,212,610 shares pursuant to the EFSA and received net proceeds of $92 million.

63

Table of Contents
As of June 30, 2023, the Company could have physically settled the EFSA by delivering 2,224,374 shares of PGE common stock to the forward counterparty in exchange for cash of $92 million. On July 12, 2023, the Company issued 2,224,374 shares pursuant to the EFSA and received net proceeds of $92 million. For additional information on the EFSA,at-the-market offering programs, see Note 7, Shareholders’ Equity, in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements.”

Capital Structure. PGE’s financial objectives include maintaining a common equity ratio (common equity to total consolidated capitalization, including current debt maturities and excluding lease obligations) of approximately 50% over time. Achievement of this objective helps the Company maintain investment grade credit ratings and provides access to long-term capital at favorable interest rates. The Company’s common equity ratio was 46.9%43.8% and 43.3%44.6% as of June 30, 2023March 31, 2024 and December 31, 20222023 respectively.


56

Table of Contents
Credit Ratings and Debt Covenants

PGE’s secured and unsecured debt is rated investment grade by Moody’s Investors Service (Moody’s) and S&P Global Ratings (S&P), with current credit ratings and outlook as follows:
Moody’sS&P
Issuer credit ratingA3BBB+
Senior secured debtA1A
Commercial paperP-2A-2
OutlookStableStable

In the event Moody’s or S&P reduce their credit rating on PGE’s unsecured debt below investment grade, the Company could be subject to requests by certain of its wholesale, commodity, and transmission counterparties to post additional performance assurance collateral in connection with its price risk management activities. The performance assurance collateral can be in the form of cash deposits or letters of credit, depending on the terms of the underlying agreements, are based on the contract terms and commodity prices, and can vary from period to period. Cash deposits that PGE provides as collateral are classified as Margin deposits in PGE’s condensed consolidated balance sheets, while any letters of credit issued are not reflected on the condensed consolidated balance sheets.

As of June 30, 2023,March 31, 2024, PGE had posted $5190 million of collateral with these counterparties, consisting of $2565 million in cash and $2625 million in letters of credit. Based on the Company’s energy portfolio, estimates of energy market prices, and the level of collateral outstanding as of June 30, 2023,March 31, 2024, the amount of additional collateral that could be requested upon a single agency downgrade to below investment grade is $22$54 million, and decreases to $1615 million by December 31, 2023.2024 and to$5 million by December 31, 2025. The amount of additional collateral that could be requested upon a dual agency downgrade to below investment grade is $93$163 million and decreases to $8887 million by December 31, 20232024 and to $6551 million by December 31, 2024.2025.

PGE’s financing arrangements do not contain ratings triggers that would result in the acceleration of required interest and principal payments in the event of a ratings downgrade. However, the cost of borrowing and issuing letters of credit under the credit facilities would increase.

The indenture securing PGE’s outstanding FMBs constitutes a direct first mortgage lien on substantially all regulated utility property, other than expressly excepted property. Interest is payable semi-annually on FMBs. The issuance of FMBs requires that PGE meet earnings coverage and security provisions set forth in the Indenture of Mortgage and Deed of Trust (Indenture) securing the bonds. PGE estimates that on June 30, 2023,March 31, 2024, under the most restrictive issuance test in the Indenture, the Company could have issued up to $814$628 million of additional FMBs. Any issuances of FMBs would be subject to market conditions and amounts could be further limited by regulatory authorizations or by covenants and tests contained in other financing agreements. PGE also has the ability to release
64

Table of Contents
property from the lien of the Indenture under certain circumstances, including bond credits, deposits of cash, or certain sales, exchanges, or other dispositions of property.

PGE’s revolving credit facility contains customary covenants and credit provisions, including a requirement that limits consolidated indebtedness, as defined in the credit agreements, to 65.0% of total capitalization (debt-to-total capital ratio). As of June 30, 2023,March 31, 2024, the Company’s debt-to-total capital ratio, as calculated under the credit agreement, was 54.0%56.9%.

Item 3.Quantitative and Qualitative Disclosures About Market Risk.

PGE is exposed to various forms of market risk, consisting primarily of fluctuations in commodity prices, foreign currency exchange rates, and interest rates, as well as credit risk. Any variations in the Company’s market risk or
57

Table of Contents
credit risk may affect its future financial position, results of operations, or cash flows. There have been no material changes to market risks, or credit risk, affecting the Company from those set forth in Part II, Item 7A of the Company’s Annual Report on Form 10-K for the year ended December 31, 2022,2023, filed with the SEC on February 16, 2023.20, 2024.

Item 4.Controls and Procedures.
 
Disclosure Controls and Procedures

PGE’s management, under the supervision and with the participation of its Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of the Company’s disclosure controls and procedures as required by Exchange Act Rule 13a-15(b) as of the end of the period covered by this report. Based on that evaluation, PGE’s Chief Executive Officer and Chief Financial Officer have concluded that, as of June 30, 2023,March 31, 2024, these disclosure controls and procedures were effective.

Changes in Internal Control over Financial Reporting

In April 2023, PGE implemented a major upgrade to our customer information system that stores customer data and processes metering, billing and payment transactions. This system implementation improves the efficiency of PGE’s retail billing processes and resulted in a material change in PGE’s internal control over financial reporting. Other than PGE’s upgraded customer information system, thereThere were no changes in PGE’s internal control over financial reporting that occurred during the period covered by this quarterly reportquarter ended March 31, 2024 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

PART II - OTHER INFORMATION

Item 1.Legal Proceedings.

See Note 8, Contingencies in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements,” for information regarding legal proceedings.

Item 1A.Risk Factors.

There have been no material changes to PGE’s risk factors set forth in Part I, Item 1A of the Company’s Annual Report on Form 10-K for the year ended December 31, 2022,2023, filed with the SEC on February 16, 2023.

20, 2024.

6558

Table of Contents
Item 5.Other Information.

Rule 10b5-1 Trading Arrangements

During the three months ended March 31, 2024, the following officer (as defined in Rule 16a-1(f) of the Exchange Act) adopted a “Rule 10b5-1 trading agreement,” as the term is defined in Item 408(c) of Regulation S-K:

Name
(Title)
Action Taken (Date of Action)Type of Trading ArrangementDuration of Trading ArrangementAggregate Number of Securities to be Purchased or Sold
Joseph Trpik (Senior Vice President, Finance and Chief Financial Officer)Adoption (March 14, 2024)Rule 10b5-1 trading arrangementUntil March 14, 2025, or such earlier date upon which all transactions are completed or expire without executionUp to 13,057 shares of common stock

59

Table of Contents
Item 6.Exhibits.
Exhibit
Number
Description
3.1
Third Amended and Restated Articles of Incorporation of Portland General Electric Company (incorporated by reference to Exhibit 3.1 to the Company’s Current Report on Form 8-K filed May 9, 2014).
3.2
EleventhTwelfth Amended and Restated Bylaws of Portland General Electric Company (incorporated by reference to Exhibit 3.2 to the Company’s AnnualQuarterly Report on Form 10-K10-Q filed February 15, 2019)October 27, 2023).
10.1
Portland General Electric Company 2007 Employee Stock Purchase Plan as amended and restated effective April 30, 2024 (incorporated by reference to Appendix A to Portland General Electric Company’s definitive proxy statement on Schedule 14A filed March 6, 2024).
31.1
31.2
32
101.INSXBRL Instance Document. The instance document does not appear in the interactive data file because its XBRL tags are embedded within the inline XBRL document.
101.SCHXBRL Taxonomy Extension Schema Document.
101.CALXBRL Taxonomy Extension Calculation Linkbase Document.
101.DEFXBRL Taxonomy Extension Definition Linkbase Document.
101.LABXBRL Taxonomy Extension Label Linkbase Document.
101.PREXBRL Taxonomy Extension Presentation Linkbase Document.
104Cover page information from Portland General Electric Company’s Quarterly Report on Form 10-Q filed July 28, 2023,April 26, 2024, formatted in iXBRL (Inline Extensible Business Reporting Language).

Certain instruments defining the rights of holders of other long-term debt of the Company are omitted pursuant to Item 601(b)(4)(iii)(A) of Regulation S-K because the total amount of securities authorized under each such omitted instrument does not exceed 10% of the total consolidated assets of the Company and its subsidiaries. The Company hereby agrees to furnish a copy of any such instrument to the SEC upon request.
60

Table of Contents



SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

PORTLAND GENERAL ELECTRIC COMPANY
(Registrant)
Date:July 27, 2023April 25, 2024              By:/s/ Joseph R. Trpik
Joseph R. Trpik
Senior Vice President, Finance
and Chief Financial Officer
(duly authorized officer and principal financial officer)
6661