UNITED STATES SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549
 
 
 
 
Form 10-Q
 
   
(Mark One)  
 
þ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d)
OF THE SECURITIES EXCHANGE ACT OF 1934
  For the quarterly period ended OctoberApril 1, 20062007
or
o TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d)
OF THE SECURITIES EXCHANGE ACT OF 1934
  For the transition period from          to
 
Commission FileNo. 0-24993
 
LAKES ENTERTAINMENT, INC.
(Exact name of registrant as specified in its charter)
 
   
Minnesota
(State or other jurisdiction
of incorporation or organization)
 41-1913991
(I.R.S. Employer
Identification No.)
   
130 Cheshire Lane, Suite 101
Minnetonka, Minnesota
(Address of principal executive offices)
 55305
(Zip Code)
 
(952) 449-9092
(Registrant’s telephone number, including area code)
 
 
Indicate by check mark whether the registrantregistrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.  Yes þ     Noo
 
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of “accelerated filer and large accelerated filer” inRule 12b-2 of the Exchange Act. (Check one):
Large Accelerated Filer o     Accelerated Filer þ     Non Accelerated Filer o
 
Indicate by check mark whether the registrant is a shell company (as defined inRule 12b-2 of the Exchange Act).  Yes o     No þ
 
As of November 3, 2006,May 8, 2007, there were 22,902,80924,331,675 shares of Common Stock, $0.01 par value per share, outstanding.
 


 

 
LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
INDEX
 
       
    Page of
    Form10-Q
 
 FINANCIAL STATEMENTS  
 Condensed Consolidated Balance Sheets as of OctoberApril 1, 20062007 (Unaudited) and January 1,December 31, 2006 3
 Condensed Consolidated Statements of Earnings (Loss) and Comprehensive Earnings (Loss) (Unaudited) for the three months ended April 1, 2007 and nine months ended October 1,April 2, 2006 and October 2, 2005 4
Condensed Consolidated Statements of Shareholders’ Equity (Unaudited) for the nine months ended October 1, 2006 and October 2, 20055
 Condensed Consolidated Statements of Cash Flows (Unaudited) for the ninethree months ended OctoberApril 1, 20062007 and OctoberApril 2, 20052006 65
 Notes to Condensed Consolidated Financial Statements (Unaudited) 76
 MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS 2716
 QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK 6843
 CONTROLS AND PROCEDURES 6844
 
 LEGAL PROCEEDINGS 6945
 RISK FACTORS 7045
 EXHIBITS 7146
 302 Certification of CEO
 302 Certification of CFO
 906 Certification of CEO and CFOSection 1350 Certifications


2


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Condensed Consolidated Balance Sheets
October
April 1, 20062007 and January 1,December 31, 2006
 
                
 (Unaudited)
   April 1,
   
 October 1,
 January 1,
 2007
 December 31,
 
 2006 2006 (Unaudited) 2006 
 (In thousands) (In thousands) 
ASSETS
ASSETS
ASSETS
Current Assets:              
Cash and cash equivalents $10,107  $9,912  $8,925  $9,759 
(balance includes $9.0 million and $1.7 million of WPT Enterprises, Inc. cash)      
(balance includes $7.4 million and $8.4 million of WPT Enterprises, Inc. cash)        
Restricted cash     12,738 
Short-term investments  65,677   26,735   52,732   59,863 
(balance includes $30.8 million and $26.7 million of WPT Enterprises, Inc. short-term investments)      
Accounts receivable, net of allowance of $0.0 million and $0.1 million  2,794   3,072 
Prepaid expenses  880   614 
(balance includes $29.7 million and $31.3 million of WPT Enterprises, Inc. short-term investments)        
Accounts receivable  2,387   2,963 
Other current assets  1,755   1,810   3,489   2,706 
          
Total current assets  81,213   42,143   67,533   88,029 
          
Property and equipment, net  17,163   13,451   17,871   17,460 
     
Long-term assets related to Indian casino projects:              
Notes receivable from Indian tribes  149,221   87,062   68,643   164,308 
Land held for development  16,731   16,248   15,113   16,790 
Intangible assets related to Indian casino projects  54,063   46,088 
Intangible assets  56,842   54,279 
Other  4,856   3,360   7,091   8,450 
          
Total long-term assets related to Indian casino projects  224,871   152,758   147,689   243,827 
     
Other assets:              
Restricted cash  16,348   249   456   453 
Investments  2,936   10,640   2,923   2,923 
Deferred tax asset  4,526   6,852   6,360   6,248 
Debt issuance costs  2,073   19      1,972 
Other long-term assets  3,947   4,498   202   264 
          
Total other assets  29,830   22,258   9,941   11,860 
          
Total Assets
 $353,077  $230,610  $243,034  $361,176 
          
LIABILITIES AND SHAREHOLDERS’ EQUITY
LIABILITIES AND SHAREHOLDERS’ EQUITY
LIABILITIES AND SHAREHOLDERS’ EQUITY
Current Liabilities:              
Accounts payable $5,236  $8,394  $3,840  $5,345 
Income taxes payable  14,047   10,933   16,066   14,593 
Accrued payroll and related costs  2,031   1,125   1,284   2,480 
Deferred revenue  5,139   5,150   5,142   4,740 
Accrued interest     312 
Other accrued expenses  2,714   2,159   1,718   1,879 
          
Total current liabilities  29,167   27,761   28,050   29,349 
          
Long-term debt, related party     10,000 
Long-term debt, other, net of unamortized discount of $1.0 million  104,637    
Long-term debt, other, net of unamortized discount of $0.9 million at December 31, 2006     104,471 
          
Total Liabilities
  133,804   37,761   28,050   133,820 
          
Commitments and contingencies              
Minority interest in subsidiary  16,636   14,466   16,117   16,764 
Shareholders’ Equity:              
Series A preferred stock, $.01 par value; authorized 7,500 shares; 4,458 and 0 issued and outstanding at October 1, 2006 and January 1, 2006, respectively  45    
Common stock, $.01 par value; authorized 200,000 shares; 22,877 and 22,300 common shares issued and outstanding at October 1, 2006, and January 1, 2006, respectively  229   223 
Series A preferred stock, $.01 par value; authorized 7,500 shares; 4,458 issued and outstanding at April 1, 2007 and December 31, 2006  45   45 
Common stock, $.01 par value; authorized 200,000 shares; 23,007 and 22,949 issued and outstanding at April 1, 2007, and December 31, 2006, respectively  230   229 
Additional paid-in capital  174,519   154,301   177,792   176,419 
Retained earnings  28,541   13,410   20,826   34,357 
Accumulated other comprehensive earnings (loss)  (697)  10,449 
Accumulated other comprehensive loss  (26)  (458)
          
Total shareholders’ equity
  202,637   178,383   198,867   210,592 
          
Total Liabilities and Shareholders’ Equity
 $353,077  $230,610  $243,034  $361,176 
          
 
See notes to unaudited condensed consolidated financial statementsstatements.


3


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Condensed Consolidated Statements of Earnings (Loss) and Comprehensive Earnings (Loss)
 
        
                 Three Months Ended 
 Three Months Ended Nine Months Ended  April 1,
 April 2,
 
 October 1,
 October 2,
 October 1,
 October 2,
  2007 2006 
 2006 2005 2006 2005  (In thousands, except
 
 (In thousands, except per share data)  per share data)
 
 (Unaudited)  (Unaudited) 
Revenues:
                        
License fee income $4,672  $1,766  $18,098  $10,568  $3,768  $4,677 
Host fees, sponsorship and other  1,236   365   5,660   2,266 
Host fees, sponsorship, online gaming and other  755   1,789 
Management, consulting and development fees  449   165 
              
Total Revenues  5,908   2,131   23,758   12,834   4,972   6,631 
              
Costs and Expenses:
                        
Selling, general and administrative  8,772   6,936   26,787   20,368   9,741   9,176 
Production costs  1,737   561   8,333   8,125   2,152   2,420 
Net impairment losses     94      94   331    
Amortization of debt issuance costs  139      450    
Depreciation and amortization  164   133   437   337   195   133 
              
Total Costs and Expenses  10,812   7,724   36,007   28,924   12,419   11,729 
              
Net unrealized gains (losses) on notes receivable
  5,788   (2,120)  38,911   (241)
Net realized and unrealized gains on notes receivable
  165   15,476 
              
Earnings (Loss) From Operations
  884   (7,713)  26,662   (16,331)  (7,282)  10,378 
              
Other Income (Expense):
                        
Interest income  1,209   443   2,299   1,256   1,138   433 
Interest expense, related party        (137)        (137)
Interest expense, other  (3,210)     (5,044)     (2,588)  (531)
Amortization of debt issuance costs  (95)  (136)
Loss on extinguishment of debt        (6,821)     (3,830)   
Realized gain on sale of investment  4,541      10,216    
Gain on sale of investment     5,675 
Other  5      81      5   78 
              
Total other income, net  2,545   443   594   1,256 
Total other income (expense), net  (5,370)  5,382 
              
Earnings (loss) before income taxes, equity in earnings of unconsolidated investees and minority interest in net (earnings) loss of subsidiary
  3,429   (7,270)  27,256   (15,075)
Income taxes  2,195   354   8,742   1,061 
Earnings (loss) before income tax and minority interest in net (earnings) loss of subsidiary
  (12,652)  15,760 
Income tax  322   2,710 
              
Earnings (loss) before equity in earnings of unconsolidated investees and minority interest in net (earnings) loss of subsidiary
  1,234   (7,624)  18,514   (16,136)
Equity in earnings of unconsolidated investees, net of tax     1      7 
Earnings (loss) before minority interest in net (earnings) loss of subsidiary
  (12,974)  13,050 
Minority interest in net (earnings) loss of subsidiary  (1,035)  581   (3,383)  1,317   881   (1,367)
              
Net earnings (loss)
 $199  $(7,042) $15,131  $(14,812) $(12,093) $11,683 
Other comprehensive earnings (loss):
                
Unrealized gains (losses) on marketable securities, net of tax  125   (37)  (301)  (73)
     
Other comprehensive earnings:
        
Unrealized gains on marketable securities, net of tax  23   429 
Change in estimated fair value of derivatives  (468)     (629)     409    
              
Comprehensive earnings (loss)
 $(144) $(7,079) $14,201  $(14,885) $(11,661) $12,112 
              
Earnings (loss) per share — basic
 $0.01  $(0.32) $0.67  $(0.66) $(0.53) $0.52 
              
Earnings (loss) per share — diluted
 $0.01  $(0.32) $0.62  $(0.66) $(0.53) $0.48 
              
Weighted-average common shares outstanding — basic
  22,876   22,300   22,720   22,296   22,970   22,406 
              
Dilutive effect of common stock equivalents
  1,752      1,826         1,709 
              
Weighted-average common shares outstanding — diluted
  24,628   22,300   24,546   22,296   22,970   24,115 
              
 
See notes to unaudited condensed consolidated financial statementsstatements.


4


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Condensed Consolidated Statements of Shareholders’ EquityCash Flows
Nine months ended October 1, 2006 and October 2, 2005
                                 
                    Accumulated
    
              Additional
     Other
  Total
 
  Preferred Stock  Common Stock  Paid-In
  Retained
  Comprehensive
  Shareholders’
 
  Shares  Amount  Shares  Amount  Capital  Earnings  Earnings (Loss)  Equity 
  (In thousands)
 
  (Unaudited) 
 
2006
                                
Balances, January 1, 2006        22,300  $223  $154,301  $13,410  $10,449  $178,383 
Other comprehensive loss                    (930)  (930)
Realized gain on sale of investment                    (10,216)  (10,216)
Issuance of preferred stock and warrants  4,458  $45         4,709         4,754 
Issuance of stock on options exercised — net        577   6   3,232         3,238 
Subsidiary stock options issued to consultants and employees              1         1 
Shareholder trading settlement              2,805         2,805 
Effect of share-based compensation              4,312         4,312 
Income tax benefit of stock option exercises              3,945         3,945 
Net change in equity related to minority interest              1,214         1,214 
Net earnings                 15,131      15,131 
                                 
Balances, October 1, 2006  4,458  $45   22,877  $229  $174,519  $28,541  $(697) $202,637 
                                 
                 
2005
                                
Balances, January 2, 2005        22,253  $223  $157,895  $25,280  $(6) $183,392 
Other comprehensive loss                    (73)  (73)
Net proceeds from issuance of common stock by subsidiary              28         28 
Reduction of deferred compensation              4         4 
Issuance of stock on options exercised — net        47      150         150 
Subsidiary stock options issued to consultants and employees              714         714 
Subsidiary common stock subject to repurchase              643         643 
Subsidiary interest on common shares subject to repurchase              (24)        (24)
Net change in equity related to minority interest              (1,094)        (1,094)
Net loss                 (14,811)     (14,811)
                                 
Balances, October 2, 2005        22,300  $223  $158,316  $10,469  $(79) $168,929 
                                 
         
  Three Months Ended 
  April 1,
  April 2,
 
  2007  2006 
  (In thousands)
 
  (Unaudited) 
 
OPERATING ACTIVITIES:
        
Net earnings (loss) $(12,093) $11,683 
Adjustments to reconcile net earnings (loss) to net cash used in operating activities:        
Depreciation and amortization  278   269 
Amortization of debt issuance costs  95   165 
Amortization of debt discount  33    
Share-based compensation  1,232   2,381 
Loss on extinguishment of debt  2,783    
Net realized and unrealized gains on notes receivable  (1,227)  (15,476)
Gain on sale of investment     (5,675)
Minority interest in net earnings (loss) of subsidiary  (881)  1,367 
Deferred income taxes  (112)  2,264 
Net impairment losses  331    
Increases in operating (assets) liabilities:        
Accounts receivable  566   440 
Other current assets  (783)  (853)
Income taxes payable  34   420 
Accounts payable  (41)  (1,122)
Deferred revenue  403   4,250 
Accrued expenses  (1,669)  (167)
         
Net cash used in operating activities  (11,051)  (54)
         
INVESTING ACTIVITIES:
        
Purchase of short-term investments  (26,630)  (14,593)
Sale/maturity of short-term investments  33,785   5,410 
Collections on notes receivable  49    
Increases in long-term assets related to Indian casino projects  (6,598)  (4,340)
Proceeds from sale of investment     5,686 
Purchase of property and equipment  (614)  (804)
Increase in other long-term assets     (77)
         
Net cash used in investing activities  (8)  (8,718)
         
FINANCING ACTIVITIES:
        
Decrease in restricted cash  12,735    
Unrestricted cash proceeds from long-term debt     22,227 
Repayment of long-term debt  (105,000)   
Repayment of long-term debt, related party     (10,000)
Cash proceeds from issuance of common and preferred stock  376   3,157 
Shareholder trading settlement     2,805 
Cash proceeds from sale of participation notes  102,114    
         
Net cash provided by financing activities  10,225   18,189 
         
Net Increase (Decrease) in Cash and Cash Equivalents
  (834)  9,417 
Cash and Cash Equivalents — Beginning of Period
  9,759   9,912 
         
Cash and Cash Equivalents — End of Period
 $8,925  $19,329 
         
 
See notes to unaudited condensed consolidated financial statementsstatements.


5


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Condensed Consolidated Statements of Cash Flows
Nine months ended October 1, 2006 and October 2, 2005
         
  2006  2005 
  (In thousands)
 
  (Unaudited) 
OPERATING ACTIVITIES:
        
Net earnings (loss) $15,131  $(14,812)
Adjustments to reconcile net earnings (loss) to net cash (used in) operating activities:        
Depreciation and amortization  691   528 
Amortization of debt issuance costs  450    
Accretion of original issue discount  446    
Share-based compensation  4,973   772 
Loss on extinguishment of debt  6,821    
Net unrealized losses (gains) on notes receivable  (38,911)  241 
Realized gain on sale of investment  (10,216)   
Minority interest in net earnings (loss) of subsidiary  3,383   (1,317)
Equity in earnings of unconsolidated investees     (7)
Deferred income taxes  5,495   42 
Net impairment losses     94 
Increases in operating (assets) and liabilities:        
Accounts receivable  294   529 
Prepaid expenses  (266)  208 
Other current assets  214   (683)
Income taxes payable  3,114   5,162 
Accounts payable  (1,054)  (421)
Deferred revenue  (11)  1,484 
Accrued expenses  1,461   212 
         
Net Cash Used in Operating Activities  (7,985)  (7,968)
         
INVESTING ACTIVITIES:
        
Short-term investments, purchases  (78,202)  (36,873)
Short-term investments, sales/maturities  39,351   38,260 
Proceeds from sale of land held under contract for sale     5,000 
Collections on notes receivable  2,955    
Increases in long-term assets related to Indian casino projects  (37,412)  (9,284)
Advances to unconsolidated investees  (2,923)  (10)
Proceeds from unconsolidated investees     850 
Proceeds from sale of investment  10,236    
Payments for other long-term assets     (693)
(Increase) decrease in other long-term assets  (78)  197 
Purchase of property and equipment  (4,682)  (1,599)
         
Net Cash Used in Investing Activities  (70,755)  (4,152)
         
FINANCING ACTIVITIES:
        
Proceeds from issuance of common and preferred stock  3,283   126 
Debt issuance costs  (5,004)   
Shareholder trading settlement  2,805    
Repayment of debt  (35,000)   
Increase in restricted cash  (16,099)   
Restricted cash proceeds from long-term debt  19,090    
Unrestricted cash proceeds from long-term debt  109,860    
         
Net Cash Provided by Financing Activities  78,935   126 
         
Net Increase (Decrease) in Cash and Cash Equivalents
  195   (11,994)
Cash and Cash Equivalents — Beginning of Period
  9,912   28,717 
         
Cash and Cash Equivalents — End of Period
 $10,107  $16,723 
         
See notes to condensed consolidated financial statements


6


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Notes to Unaudited Condensed Consolidated Financial Statements
 
1.  Basis of Presentation:Presentation
 
The unaudited condensed consolidated financial statements of Lakes Entertainment, Inc., a Minnesota corporation (“Lakes” or the “Company)“Company”), have been prepared pursuant to the rules and regulations of the Securities and Exchange Commission (“SEC”) applicable to interim financial information. Accordingly, certain information normally included in the annual financial statements prepared in accordance with accounting principles generally accepted in the United States has been condensed or omitted. As of April 1, 2007, Lakes owned approximately 61% of WPT Enterprises, Inc. (“WPTE”). Lakes’ unaudited condensed consolidated financial statements include the results of operations of WPTE, and substantially all of Lakes’ revenues for the periods reported have been derived from WPTE’s business. For further information, please refer to the annual audited consolidated financial statements of the Company, and the related notes included within the Company’s Annual Report onForm 10-K for the year ended January 1,December 31, 2006, previously filed with the SEC on March 8, 2006,15, 2007, from which the balance sheet information as of that date is derived.
 
In the opinion of management, all adjustments considered necessary for a fair presentation have been included, consisting only of normal recurring adjustments. The results for the current interim period are not necessarily indicative of the results to be expected for the full year.
 
The Company has a 52- or53-week accounting period ending on the Sunday closest to December 31 of each year. The Company’s fiscal years for the periods shown on the accompanying consolidated balance sheet end on December 31, 2006 (2006) and January 1, 2006 (2005).
Certain minor reclassifications to amounts previously reported have been made to conform to the current period presentation. These reclassifications had no effect on net earnings (loss) or shareholders’ equity as previously presented.
 
2.  Long-Term Assets Related to Indian Casino Projects:Projects
 
At OctoberApril 1, 20062007 and January 1,December 31, 2006, long-term assets related to Indian casino projects are primarily related to three separate projects for the Pokagon Band of Potawatomi Indians (“Pokagon Band”), Shingle Springs Band of Miwok Indians (“Shingle Springs Tribe”) and the Jamul Indian Village (“Jamul Tribe”) as indicated in the following tables (in thousands):
 
                                           
 October 1, 2006    April 1, 2007 
   Shingle
            Shingle
       
 Pokagon
 Springs
 Jamul
        Pokagon
 Springs
 Jamul
     
 Band Tribe Tribe Other Total    Band Tribe Tribe Other Total 
Notes receivable, at estimated fair value $84,218  $33,776  $25,228  $5,999  $149,221      $  $42,934  $22,751  $2,958  $68,643 
Intangible assets related to Indian casino projects  23,573   20,158   8,623   1,709   54,063       23,573   21,750   10,623   896   56,842 
Land held for development     8,712   6,679   1,340   16,731          6,992   6,751   1,370   15,113 
Other  60   1,462   2,462   872   4,856       60   1,516   966   4,549   7,091 
                      
 $107,851  $64,108  $42,992  $9,920  $224,871      $23,633  $73,192  $41,091  $9,773  $147,689 
                      
 
                     
  December 31, 2006 
     Shingle
          
  Pokagon
  Springs
  Jamul
       
  Band  Tribe  Tribe  Other  Total 
 
Notes receivable, at estimated fair value $100,544  $40,912  $20,754  $2,098  $164,308 
Intangible assets related to Indian casino projects  23,573   20,387   9,760   559   54,279 
Land held for development     8,739   6,710   1,341   16,790 
Other  60   2,041   2,207   4,142   8,450 
                     
  $124,177  $72,079  $39,431  $8,140  $243,827 
                     


7


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

                         
  January 1, 2006    
     Shingle
             
  Pokagon
  Springs
  Jamul
          
  Band  Tribe  Tribe  Other  Total    
 
Notes receivable, at estimated fair value $44,028  $26,550  $12,957  $3,527  $87,062     
Intangible assets related to Indian casino projects  18,356   18,755   7,872   1,105   46,088     
Land held for development     8,836   6,643   769   16,248     
Other  93   1,600   828   839   3,360     
                         
  $62,477  $55,741  $28,300  $6,240  $152,758     
                         

The following table provides the key assumptions used to value the notes receivable at estimated fair value (dollars in thousands):
Pokagon Band:
     
  As of October 1, 2006 As of January 1, 2006
 
Face value of note (principal and interest) $100,352 $61,827
  $(71,176 principal and $29,176 interest) $(46,445 principal and $15,382 interest)
Estimated months until casino opens (weighted average of three scenarios) 13 months 32 months
Projected interest rate until casino opens 9.0% 8.2%
Projected interest rate during the loan repayment term 9.0% 8.2%
Discount rate 15% 15%
Repayment terms of note 60 months 60 months
Probability rate of casino opening (weighting of four scenarios) 99% 90%
The net unrealized gain on notes receivable related to the Pokagon Band casino project was $2.0 million and $1.5 million for the three months ended October 1, 2006 and October 2, 2005, respectively, and $19.6 million and $4.5 million for the nine months ended October 1, 2006 and October 2, 2005, respectively, and is included in the accompanying unaudited condensed consolidated statements of earnings (loss) and comprehensive earnings (loss).

86


 
LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

Shingle Springs Tribe:Pokagon Band.
 
     
  As of October 1, 2006 As of January 1, 2006
 
Face value of note (principal and interest) $53,640 $46,446
  $(41,423 principal and $12,217 interest) $(37,905 principal and $8,541 interest)
Estimated months until casino opens (weighted average of three scenarios) 36 months 37 months
Projected interest rate until casino opens 9.86% 9.2%
Projected interest rate during the loan repayment term 9.78% 9.1%
Discount rate 15% 15%
Projected repayment terms of note* 24 months 24 months
Probability rate of casino opening (weighting of four scenarios) 75% 70%
* PayableOn March 2, 2007 (the “Settlement Date”), Lakes contracted with a group of investors for their participation in varying monthly installments based on contract terms subsequentthe loans made by Lakes to the casino opening.
Pokagon Band for the development of the Four Winds Casino Resort (“Pokagon Casino”), which loans have been assumed by the Pokagon Gaming Authority. As of the Settlement Date, the face value of Lakes’ notes receivable was approximately $104.2 million, including accrued interest of approximately $33.0 million. On the Settlement Date, Lakes transferred 100% of the Pokagon Gaming Authority loans to the participants in exchange for cash proceeds of approximately $102.1 million based upon the accreted value of the Pokagon Gaming Authority loans less a two percent discount and incurred transaction fees of approximately $1.1 million. The transaction fees were recorded as a reduction of net realized and unrealized gaingains on notes receivable related to the Shingle Springs Tribe casino project was $2.6 million and $0.0 million for the three months ended October 1, 2006 and October 2, 2005, respectively, and $5.1 million and $0.3 million for the nine months ended October 1, 2006 and October 2, 2005, respectively, and is included in the accompanying unaudited condensed consolidated statements of earnings (loss) and comprehensive earnings (loss) (Note 16). Accordingly, based upon the previously recorded estimated fair value of the notes at December 31, 2006, Lakes realized a gain of $0.5 million as a result of the consummation of the participation agreement.
The participation agreements also allow the participants to pledge or exchange the notes receivable and Lakes no longer has any rights or obligations to the loans and is isolated, even in default, from liability. As a result, the Pokagon notes receivable participation transaction has been treated as a sale pursuant to Statement of Financial Accounting Standards No. 140,Accounting for Transfers and Servicing of Financial Assets and Extinguishment of Liabilities(“SFAS No. 140”). The sale does not have any effect on Lakes’ related management agreement with the Pokagon Band.
The participation agreements entitled Lakes to appoint an agent for purposes of servicing and administering of the loans. Lakes has appointed Bank of America, N.A. (“BofA”) as it agent for purposes of servicing and administering of the loans. Lakes pays BofA an annual fee of approximately $20,000 for this service.
Shingle Springs Tribe.
The following table provides the key assumptions used to value the notes receivable at estimated fair value (dollars in thousands):
     
  As of April 1, 2007 As of December 31, 2006
 
Face value of note (principal and interest) $62,391 $55,942
  ($46,627 principal and $15,764 interest) ($42,310 principal and $13,632 interest)
Estimated months until casino opens (weighted average of three scenarios) 25 months 28 months
Projected interest rate until casino opens 9.97% 9.98%
Projected interest rate during the loan repayment term 9.92% 9.76%
Discount rate 15% 15%
Repayment terms of note* 84 months 
Projected repayment terms of note**  24 months
Probability rate of casino opening (weighting of four scenarios) 85% 85%


97


 
LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

Jamul Tribe (Note 8):
 
     
  As of October 1, 2006 As of January 1, 2006
 
Face value of note (principal and interest) $28,606 $21,247
  $(21,496 principal and $7,110 interest) $(16,858 principal and $4,389 interest)
Estimated months until casino opens (weighted average of three scenarios) 34 months 34 months
Projected interest rate until casino opens 17.0% 9.2%
Projected interest rate during the loan repayment term 17.0% 9.2%
Discount rate 17.5% 15%
Projected repayment terms of note* 24 months 84 months
Probability rate of casino opening (weighting of four scenarios) 85% 80%
* Payable
*Note is payable in even monthly installments over the course of the management agreement subsequent to the casino opening.
**Note was previously payable in varying monthly installments based on contract terms subsequent to the casino opening.
Unrealized losses on notes receivable related to the Shingle Springs Tribe casino project were $0.9 million for the three months ended April 1, 2007, and unrealized gains on notes receivable related to the Shingle Springs Tribe casino project were $1.1 million for the three months ended April 2, 2006, respectively, and are included in the accompanying unaudited condensed consolidated statements of earnings (loss) and comprehensive earnings (loss).
Jamul Tribe.
The following table provides the key assumptions used to value the notes receivable at estimated fair value (dollars in thousands):
     
  As of April 1, 2007 As of December 31, 2006
 
Face value of note (principal and interest) $36,154 $32,952
  ($26,826 principal and $9,328 interest) ($24,509 principal and $8,443 interest)
Estimated months until casino opens (weighted average of three scenarios) 29 months 29 months
Projected interest rate until casino opens 9.97% 9.98%
Projected interest rate during the loan repayment term 10.06% 9.76%
Discount rate 15.75% 15.75%
Projected repayment terms of note 120 months 120 months
Probability rate of casino opening (weighting of four scenarios) 85% 85%
 
The net unrealized gain on notes receivable related to the Jamul Tribe casino project was $1.1$0.5 million and $0.4$6.4 million for the three months ended OctoberApril 1, 20062007 and OctoberApril 2, 2005, respectively, and $8.4 million and $0.8 million for the nine months ended October 1, 2006, and October 2, 2005, respectively, and is included in the accompanying unaudited condensed consolidated statements of earnings (loss) and comprehensive earnings (loss).
 
3.  Restricted Cash:
As of October 1, 2006, and January 1, 2006, Lakes has restricted cash of approximately $16.3 million and $0.2 million, respectively. As of October 1, 2006, approximately $15.9 million of the restricted cash represents a required interest reserve to fund interest payments related to the $105 million financing facility with Bank of America (“BofA”) (Note 5) through December 24, 2007.
4.  Long-Term Investments:
In March 2006, WPT Enterprises, Inc. (“WPTE”) sold 630,000 common shares of its then 12% interest in PokerTek, Inc. (“PokerTek”) at $9.03 per share, resulting in net cash proceeds of approximately $5.7 million. As a result of the sale, WPTE realized a gain of approximately $5.7 million in the first quarter of fiscal 2006. In September 2006, WPTE sold its remaining equity interest in PokerTek consisting of 450,000 shares at $10.11 per share that generated net cash proceeds of, and resulted in a realized gain of approximately $4.5 million in the third quarter of fiscal 2006.
On July 31, 2006, WPTE acquired a 10% ownership interest in 3G Scene Limited (“3G Scene”) for approximately $2.9 million. 3G Scene designs and operates software and other products which enable it or its licensees to offer gaming services to customers via mobile devices. Since WPTE has less than a 20% ownership interest and does not have the ability to exercise significant influence over 3G Scene, this investment is accounted for under the cost method and will be reviewed at least quarterly by management for declines in fair value that may be determined to beother-than-temporary, in accordance with Emerging Issues Task Force (“EITF”)03-1,The Meaning ofOther-Than-Temporary Impairment and Its Application to Certain Investments(“EITF 03-1”).


10


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

5.  Long-Term Debt:Debt

 
On February 15, 2006,March 2, 2007, Lakes closed onrepaid its $105 million credit agreement with BofA and certain lenders under a $50 million financing facility with PLKS Holdings, LLC, an affiliate of Prentice Capital Management, LP (“PLKS”(the “Credit Agreement”). An initial draw of $25 million was made under, using proceeds received from the facility. The $25 million outstanding principal balance together with accruedPokagon notes receivable participation transaction (Note 2) in addition to amounts previously included in a restricted interest was repaid in full on June 22, 2006, as discussed below. As consideration for the PLKS financing, Lakes issued to PLKS an aggregate of 4.46 million common stock purchase warrants at an exercise price of $7.50 per share that expire in February 2013, subject to customary anti-dilution protections. As of October 1, 2006, and as a result of repaying the PLKS loan in full without any additional draws under the financing facility, certain warrants remain exercisable for 1.25 million shares of common stock and the remaining 3.21 million warrants have lapsed and will not become exercisable. PLKS also has demand registration rights with respectreserve account related to the Credit Agreement. Lakes common stock underlyingincurred approximately $1.1 million in a prepayment penalty associated with the warrants. The holderspayoff of the warrants can require Lakes to redeem the warrants if Lakes fails to satisfy its registration obligationsCredit Agreement. The prepayment penalty, along with respect to the Lakes common stock underlying the warrants. Lakes has agreed to pay substantially all of the costs incurred in the preparation and filing of these registration statements. The 1.25 million warrants to purchase common stock were valued at $4.7 million using a Black-Scholes pricing model and were being amortized as interest expense over the three-year life of the financing facility. The variables used in the Black-Scholes model were the value of the underlying asset on which the option was written, the option’s exercise price, the number of years until the option expires, the expected price volatility of the underlying asset, the zero-coupon risk-free interest rate applicable to the period of time until the option’s expiration, and the present value of the expected distributions on the underlying asset during the term of the option. The unamortized portion of the warrants were reported as an in-substance debt discount. As a result of the PLKS debt repayment, the remaining unamortized portion of the warrants ($4.3 million) as well as therelated debt issuance costs and unamortized closing costs ($2.5 million)discount of approximately $1.8 million and $0.9 million, respectively, were included as part ofwritten off, which resulted in a loss on extinguishment of debt of approximately $3.8 million, which has been recorded by Lakes in the accompanying unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss) totaling approximately $6.8 million.
Additionally, as part of the PLKS transaction, the Lakes Board of Directors authorized the creation of a new class of Series A Convertible Preferred Stock, par value $0.01 per share. Lakes sold 4,457,751 shares of the preferred stock to PLKS for $44,578. These preferred shares have no dividend rights, no voting rights, and become convertible into common stock of Lakes (on a fixedone-to-one basis) only if and when the warrants are cancelled in accordance with the terms of the warrants.
On June 22, 2006, Lakes borrowed $105 million under a financing facility with BofA and certain lenders (the “Lenders”), pursuant to the terms and conditions of a Credit Agreement among Lakes, Lakes Gaming and Resorts, LLC, BofA and the Lenders. Funds drawn under the Credit Agreement bear interest at the rate of LIBOR plus 6.25% per annum, subject to adjustment or change as specified in the Credit Agreement, and are due and payable on the fourth anniversary of the closing date. A condition of the Credit Agreement required Lakes to negotiate an interest rate swap agreement (Note 15). The notional value of the interest rate swap must be equal to 100% of the financing facility for the first 18 months and 50% of the financing facility thereafter. The interest rate swap is used as a cash flow hedge to manage Lakes’ exposure to fluctuations in interest rates.
Subject to certain premiums, Lakes may prepay the facility in whole or in part at any time. Approximately $25.2 million of the initial draw was used to repay in full the aforementioned loan payable to PLKS. Pursuant to the terms of the Credit Agreement, Lakes paid a closing fee of $1.5 million to BofA and an additional $0.7 million in debt issuance costs primarily consisting of legal fees. The closing fee and debt issuance costs are being amortized over the term of the Credit Agreement using the effective interest method. Amortization of the BofA closing fee and other debt issuance costs was approximately $0.1 million and $0.0 million for the three months ended October 1, 2006 and October 2, 2005, respectively, and $0.2 million and $0.0 million for the nine months ended October 1, 2006 and October 2, 2005, respectively, and is recorded separately as amortization of debt issuance costs in the accompanying unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss). Lakes received net proceeds of approximately $103.9 million before the disbursements of the closing fee, other debt issuance costs and repayment of the PLKS loan. The debt discount of approximately $1.1 million will also be


118


 
LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

amortized over the life of the loan using the effective interest method. Amortization of debt discounts was approximately $0.1 million and $0.0 million for the three months and nine months ended, October 1, 2006 and October 2, 2005, respectively, and is recorded as interest expense in the accompanying unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss). Lakes is also obligated to pay a $50,000 annual administrative agent fee to BofA.
The loan underlying the Credit Agreement is secured by substantially all of the material assets of Lakes and its subsidiaries. However, although it is not currently Lakes’ intention, it is entitled to sell up to 3 million of the approximate 12.5 million WPTE shares it owns without application of the proceeds of such sale to reduction of the amount owing under the Credit Agreement. In the event Lakes sells more than 3 million WPTE shares, the proceeds of such sale over and above the amount realized on the 3 million shares would be required to be placed in a cash collateral account securing the loan under the Credit Agreement. In addition, Lakes and certain of its subsidiaries have guaranteed the repayment of the loan under the Credit Agreement pursuant to the terms of a Continuing Guaranty dated as of June 22, 2006.
The loan underlying the BofA Facility can be declared immediately due and payable upon the occurrence of an event of default that is not cured within any applicable cure period. An event of default will occur if any of the covenants contained in the Credit Agreement are violated. Management will routinely monitor all debt covenants to ensure compliance over the term of the financing facility.
 
6.4.  Kickapoo Settlement:Share-based Compensation
 
In April 2006, Lakes entered into a Letter of Settlement (“Settlement Agreement”) with the Kickapoo Traditional Tribe of Texas (“Kickapoo Tribe”) pursuant to which Lakes and the Kickapoo Tribe resolved all outstanding issues relating to the parties’ business relationship that was terminated in November 2005. During fiscal 2005, Lakes recorded a loss of approximately $6.3 million as a result of the terminated business relationship. In April 2006, pursuant to the Settlement Agreement, Lakes received a cash payment of approximately $2.6 million as reimbursement, for payments made directly by Lakes to vendors on behalf of the Kickapoo Tribe and the Kickapoo Tribe agreed to pay $0.6 million into an escrow to be released to Lakes at such time as Lakes transfers title to certain land owned by Lakes to the Kickapoo Tribe. The Company and the Kickapoo Tribe have agreed that title will transfer only after the Kickapoo Tribe assumes, settles or pays certain accounts payable to vendors related to the Kickapoo Tribe’s casino that remain as current liabilities on Lakes’ financial statements, and once Lakes receives full releases for any liability thereto. During the first nine months of fiscal 2006, Lakes received releases from vendors totaling $2.8 million related to services performed in connection with the Kickapoo casino project, which have been recorded as unrealized gains in the accompanying unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss). As of October 1, 2006, approximately $0.9 million of liabilities subject to the Settlement Agreement remain. The Company will not recognize further gains unless and until the remaining release is received from the vendor. However, the Company does not know or have an estimate of when or if this will occur.
7.  Regulatory Approval of Management Agreements:
Pokagon Band:
In March 2006, Lakes received notification from the National Indian Gaming Commission (“NIGC”) that it approved Lakes’ management agreement with the Pokagon Band to develop and manage the Four Winds Casino Resort on the Pokagon Band’s land in New Buffalo Township, Michigan (“Pokagon Casino”). On June 22, 2006 the Pokagon Band closed on a $305 million senior note financing agreement, in addition to a $75 million commitment for furniture, furnishings and equipment (“FF&E”) to fund the Four Winds Casino project. Amounts owed to Lakes under the management and development agreements are subordinated to the senior note financing.


12


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

The closing of third-party financing by the Pokagon Band during the second quarter of fiscal 2006 triggered a retroactive interest rate adjustment on the Company’s notes receivable, which required the recalculation of interest cost as if a fixed rate had been in effect for the entire period the loans were outstanding. The interest rate used in this calculation is prime rate plus one percentage point as of June 22, 2006 (approximately 9.0%).
Iowa Tribe:
In April 2006, Lakes received notification from the NIGC that it approved Lakes’ management agreement with the Iowa Tribe of Oklahoma (“Iowa Tribe”) to refurbish and manage the Cimarron Casino project on the Iowa Tribe’s land in Perkins, Oklahoma.
8.  Development Financing and Services Agreement with the Jamul Tribe:
Effective March 30, 2006, Lakes entered into a development financing and services agreement with the Jamul Tribe to assist the Jamul Tribe in developing a casino with related amenities/services (“Jamul Casino”) on its existing six-acre reservation which the Jamul Tribe will manage. As part of the agreement, Lakes will use its best efforts to obtain financing, from which advances will be made to the Jamul Tribe of up to $350 million to pay for the design and construction of the Jamul Casino. There can be no assurance that third party financing will be available with acceptable terms, and if Lakes is unable to obtain the appropriate amount of financing for this project, the project may not be completed as planned.
Under the development financing and services agreement, Lakes is entitled to receive a flat fee of $15 million for its development design services, and a flat fee of $15 million for its construction oversight services, payable evenly over the first five years after the opening date of the Jamul Casino. In connection with Lakes’ financing of the Jamul Casino, the Jamul Tribe is required to pay interest over a ten-year period on sums advanced by Lakes equal to the rate charged to Lakes for obtaining the necessary funds plus 5%. Amounts previously advanced by Lakes to the Jamul Tribe in connection with the Jamul Tribe’s proposed casino resort are included in the development financing and services agreement financing amount.
9.  Settlement Agreement with a Beneficial Owner:
As of March 17, 2006, Lakes entered into a Settlement Agreement with Deephaven Capital Management LLC (“Deephaven”) pursuant to which Deephaven paid Lakes approximately $2.8 million as repayment of short-swing profits under Section 16(b) of the Securities Exchange Act of 1934, as amended, in connection with one or more funds managed by Deephaven trading in shares of Lakes’ common stock prior to February 14, 2006. The payment has been recorded as an increase in additional paid-in capital in the accompanying unaudited condensed consolidated balance sheet.
10.  Stock Options and Awards:
Lakes Stock Option Plans:
Lakes has a Stock Option and Compensation Plan and a Director Stock Option Plan, which were carried forward from Lakes’ predecessor Grand Casinos, Inc. (“Grand Casinos”). All options granted under these plans were carried forward with the original terms and vesting and expiration dates.
Additionally, Lakes has a 1998 Stock Option and Compensation Plan and a 1998 Director Stock Option Plan (the “1998 Plans”), which upon resolution of the Compensation Committee, are approved to grant up to an aggregate of 5.0 million shares and 0.5 million shares, respectively, of incentive and non-qualified stock options to officers, directors, and employees. Stock options granted under the 1998 Plans vest in equal installments over four-year and five-year periods, beginning on the first anniversary of the date of each grant and continue on each subsequent anniversary date until the option is fully vested. The employee must be employed by Lakes on the anniversary date in order to vest in any shares that year. Vested options are exercisable for ten years from the date of


13


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

grant; however, if the employee is terminated (voluntarily or involuntarily), any unvested options as of the date of termination will be forfeited.
WPTE Stock Option Plan:
WPTE has adopted the shareholder-approved 2004 Stock Incentive Plan (the “2004 Plan”) that is authorized to grant stock awards to purchase up to 3,120,000 shares of common stock, including the options to purchase up to 1,120,000 shares of common stock issued to employees and consultants that were previously outstanding under a previous stock incentive plan at the time of conversion to a publicly-traded company. On May 31, 2006, the WPTE shareholders approved an amendment to the 2004 Plan to increase the number of shares of common stock reserved for issuance from 3,120,000 shares to 4,200,000 shares. Under the 2004 Plan, the options vest in equal installments over three-year and five-year periods beginning on the first anniversary of the date of each grant and continue on each subsequent anniversary date until the option is fully vested. The employee must be employed with WPTE on the anniversary date in order to vest in any shares for that year. Vested options are exercisable for ten years from the date of grant; however, if the employee is terminated (voluntarily or involuntarily), any unvested options as of the date of termination will be forfeited.
Lakes and WPTE issue new shares of common stock upon exercise of options.
Valuation and Expense Information under SFAS 123(R):
On January 2, 2006, the Company adopted Statement of Financial Accounting Standards (SFAS) No. 123(R),Share-Based Payment-Revised 2004, which requires the measurement and recognition of compensation expense for all share-based payment awards made to employees and directors including employee stock options and employee stock purchases based on estimated fair values.
SFAS 123(R) requires companies to estimate the fair value of share-based payment awards on the date of grant using an option-pricing model. The value of the portion of the award that is ultimately expected to vest is recognized as expense over the requisite service periods in the Company’s unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss). SFAS 123(R) supersedes the Company’s previous accounting for employee stock-based compensation for options granted prior to January 2, 2006, in accordance with Accounting Principles Board Opinion (APB) No. 25,Accounting for Stock Issued to Employees and related interpretations(APB 25). Accordingly, no accounting recognition was given in prior years to stock options granted at fair market value until they were exercised. Upon exercise, net proceeds, including tax benefits realized, were recorded in equity.
The Company adopted SFAS 123(R) using the “modified prospective transition method,” which requires the application of the accounting standard as of January 2, 2006, the first day of the Company’s fiscal year 2006. In accordance with the modified prospective transition method, the Company’s condensed consolidated financial statements for prior periods have not been restated to reflect, and do not include, the impact of SFAS 123(R). The effect of the change from APB 25 to SFAS 123(R) was to decrease net earnings for the three months and nine months ended October 1, 2006 by $1.3 million and $5.0 million, respectively, and basic and diluted earnings per share by $0.06 and $0.05, and $0.22 and $0.20, respectively. There was no share-based compensation expense related to employee stock options and employee stock purchases recognized in the Company’s unaudited condensed consolidated financial statements during the three months and nine months ended October 2, 2005. The following table summarizes the consolidated share-based compensation expense related to employee stock options and stock


14


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

purchases and non-vested shares under SFAS 123(R) for the three months ended April 1, 2007 and nine months ended October 1,April 2, 2006, respectively, which was allocated as follows:
 
        
         Three Months Ended 
 Three Months Ended
 Nine Months Ended
 April 1,
 April 2,
 
 October 1, 2006 October 1, 2006 2007 2006 
 (In thousands) (In thousands) 
Total cost of share-based payment plans $1,283.1  $4,959.7  $1,232  $1,602 
Amounts capitalized in deferred television costs  8.9   8.9   6   34 
Amounts charged against income, before income tax benefit $1,274.2  $4,950.8  $1,226  $1,568 
Amount of related income tax benefit recognized in income      
 
For the three months ended April 1, 2007 and nine months ended October 1,April 2, 2006, no income tax benefit was recognized in the Company’s unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss) for share-based compensation arrangements. Management assessed the likelihood that the deferred tax assets relating to future tax deductions from share-based compensation will be recovered from future taxable income and determined that a valuation allowance is necessary to the extent that management currently believes it is more likely than not that tax benefits will not be realized. Managements’ determination is based primarily on historical earnings volatility, the relatively short operating history of WPTE, and the Company’s relatively short operating history.current stages of planned operational activities.
 
The Company usesand WPTE use a Black-Scholes option-pricing model to value stock options, which requires the consideration of historical employee exercise behavior data and the use of a number of assumptions including volatility of the Company’scompanies’ stock price,prices, the weighted average risk-free interest rate, and the weighted average expected life of the options. As the Company doescompanies do not pay dividends, the dividend rate variable in the Black-Scholes model is zero. The following values represent the average per grant for the indicated variables used to value options granted during the three months ended April 1, 2007 and nine months ended October 1,April 2, 2006, and no significant changes to thesethe 2007 assumptions are expected during the remainder of 2006.2007.
 
Lakes’ valuation assumption summary:stock option plans:
 
                
 Three Months Ended
 Nine Months Ended
 Three Months Ended 
 October 1, 2006 October 1, 2006 April 1,
 April 2,
 
Key valuation assumptions:
 2007 2006 
Expected volatility  58.21%  59.99%  —*   66.20%
Expected dividend yield        —*    
Risk-free interest rate  4.72%  4.78%  —*   4.50%
Expected term (in years)  8.2 years   8.2 years   —*   8.2 years 
Weighted-average fair value per share $5.31  $6.84 
 
The volatility assumption is based on the historical weekly price data of Lakes’ stock over a two-year period. Management evaluated whether there were factors during that period which were unusual and which would distort the volatility figure if used to estimate future volatility and concluded that there were no such factors.
 
The risk free interest rate assumption is based on the U.S. Treasury yield curve in effect at the time of grant and with maturities consistent with the expected term of options.
*There were no options granted during the three months ended April 1, 2007.
 
The expected term of employee stock options represents the weighted-average period that the stock options are expected to remain outstanding. It is based upon an analysis of the historical behavior of option holders during the period from September 1995 to October 1, 2006. Management believes historical data is reasonably representative of future exercise behavior.
As share-based compensation expense recognized is based on awards ultimately expected to vest, expense for grants beginning upon adoption of SFAS 123(R) will be reduced for estimated forfeitures. SFAS 123(R) requires
• Expected volatility — The volatility assumption is based on the historical weekly price data of Lakes’ stock over a two-year period. Management evaluated whether there were factors during that period which were unusual and which would distort the volatility figure if used to estimate future volatility and concluded that there were no such factors.
• Forfeiture rate — As share-based compensation expense recognized is based on awards ultimately expected to vest, expense for grants beginning upon adoption of SFAS 123(R) will be reduced for estimated forfeitures. SFAS 123(R) requires forfeitures to be estimated at the time of grant and revised, if necessary, in subsequent periods if actual forfeitures differ from those estimates. The Company used historical data to estimate employee departure behavior in estimating future forfeitures.


159


 
LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

forfeitures
• Expected term — The expected term of employee stock options represents the weighted-average period that the stock options are expected to remain outstanding. It is based upon an analysis of the historical behavior of option holders during the period from September 1995 to April 2, 2006. Management believes historical data is reasonably representative of future exercise behavior.
• Risk free interest rate — The risk free interest rate assumption is based on the U.S. Treasury yield curve in effect at the time of grant and with maturities consistent with the expected term of options.
The following table summarizes Lakes’ stock option activity during the three months ended April 1, 2007 and April 2, 2006:
                 
     Number of Common Shares 
           Weighted-Avg.
 
  Options
     Available
  Exercise
 
  Outstanding  Exercisable  for Grant  Price 
 
2007
                
Balance at December 31, 2006
  4,716,400   3,712,350   35,500  $6.15 
Authorized               
Granted            
Forfeited/cancelled/expired            
Exercised  (112,500)        5.82 
                 
Balance at April 1, 2007
  4,603,900   4,025,750   35,500  $6.15 
                 
2006
                
Balance at January 1, 2006
  5,307,626   4,153,476   94,500  $6.03 
Authorized               
Granted  30,000      (30,000)  9.77 
Forfeited/cancelled/expired            
Exercised  (550,000)        5.65 
                 
Balance at April 2, 2006
  4,787,626   3,711,626   64,500  $6.10 
                 
The following table summarizes significant ranges of Lakes’ outstanding and exercisable options as of April 1, 2007:
                             
  Options Outstanding at April 1, 2007  Options Exercisable at April 1, 2007 
     Weighted-
                
     Average
     Aggregate
        Aggregate
 
  Number
  Remaining
  Weighted-Average
  Intrinsic
  Number
  Weighted-
  Intrinsic
 
Range of Exercise Prices
 Outstanding  Contractual Life  Exercise Price  Value  Exercisable  Average Price  Value 
 
$ (3.25 — 3.63)  286,200   4.2 years  $3.45  $2,201,730   286,200  $3.45  $2,201,730 
(3.64 — 5.45)  2,424,200   2.0 years   4.23   16,780,356   2,424,200   4.23   16,780,356 
(5.46 — 7.26)  60,000   6.7 years   7.18   238,500   45,000   7.18   178,875 
(7.27 — 9.08)  1,478,000   6.3 years   8.13   4,467,670   1,124,000   8.13   3,397,290 
(9.09 — 10.90)  102,000   5.0 years   10.43   73,300   27,050   10.48   18,083 
(10.91 — 12.71)  88,500   7.8 years   11.46   240   38,800   11.38    
(12.72 — 14.53)  95,000   7.9 years   14.00      43,500   14.04    
(14.54 — 16.34)  5,000   7.8 years   16.11      2,000   16.11    
(16.35 — 18.16)  65,000   7.0 years   17.91      35,000   17.97    
                             
   4,603,900   4.0 years  $6.15  $23,761,796   4,025,750  $5.64  $22,576,334 
                             


10


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

The aggregate intrinsic value in the preceding table represents the total pre-tax intrinsic value, based on Lakes’ closing stock price of $11.15 on March 30, 2007, which would have been received by the option holders had all option holders exercised their options as of that date. The total intrinsic value of options exercised during the three months ended April 1, 2007 and April 2, 2006 was $0.5 million and $2.0 million, respectively. As of April 1, 2007, Lakes’ unrecognized share-based compensation related to stock options was approximately $2.8 million, which is expected to be estimated at the timerecognized over a weighted-average period of grant and revised, if necessary, in subsequent periods if actual forfeitures differ from those estimates. The Company has reviewed the historical forfeitures which are minimal, and as such will amortize the grants to the end of the vesting period and will adjust for forfeitures at the end of the term.1.5 years.
 
WPTE valuation assumption summary:stock option plan:
 
        
         Three Months Ended 
 Three Months Ended
 Nine Months Ended
 April 1,
 April 2,
 
 October 1, 2006 October 1, 2006 2007 2006 
Expected volatility  77.31%  79.44%  73.84%  84.22%
Expected dividend yield            
Risk-free interest rate  4.62%  4.65%  4.47%  4.31%
Expected term (in years)  6.5 years   6.5 years   6 years   6.5 years 
Weighted-average fair value per share $2.96  $3.60 
WPTE uses a Black-Scholes option-pricing model to estimate the fair value and compensation cost associated with employee incentive stock options in accordance with SFAS 123(R). The bases for the key assumptions included in the model are as follows:
 
 • Expected volatility — As WPTE has a relatively short operating history and no definitive peer or peer groups, expected volatility was based on historical volatility of WPTE’s stock price since it began trading in August 2004.
 
 • Forfeiture rate — As share-based compensation expense recognized is based on awards ultimately expected to vest, expense for grants beginning upon adoption of SFAS 123(R) will be reduced for estimated forfeitures. SFAS 123(R) requires forfeitures to be estimated at the time of grant and revised, if necessary, in subsequent periods if actual forfeitures differ from those estimates. WPTE used historical data to estimate employee departure behavior in estimating future forfeitures.
 
 • Expected term — Due to WPTE’s limited operating history including stock option exercises and forfeitures, WPTE calculated expected term using the “Simplified Method” in accordance with Staff Accounting Bulletin 107.
 
 • Risk free interest rate — For periods consistent with the expected term of the share option,The risk free interest rate assumption is based on the U.S. Treasury yield curve in effect at the time of grant.grant and with maturities consistent with the expected term of options.
The following table summarizes Lakes’ stock option activity through the first nine months ended October 1, 2006 and October 2, 2005:
                 
     Number of Common Shares 
           Weighted-Avg.
 
  Options
     Available
  Exercise
 
  Outstanding  Exercisable  for Grant  Price 
 
2006
                
Balance at January 1, 2006
  5,307,626   4,153,476   94,500  $6.03 
Authorized               
Granted  30,000      (30,000)  9.77 
Forfeited/cancelled/expired            
Exercised  (550,000)        5.65 
                 
Balance at April 2, 2006
  4,787,626   3,711,626   64,500  $6.10 
Authorized               
Granted  5,000      (5,000)  12.10 
Forfeited/cancelled/expired  (5,000)     5,000   8.15 
Exercised  (25,000)        4.75 
                 


16


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

                 
     Number of Common Shares 
           Weighted-Avg.
 
  Options
     Available
  Exercise
 
  Outstanding  Exercisable  for Grant  Price 
 
Balance at July 2, 2006
  4,762,626   3,718,126   64,500  $6.11 
Authorized               
Granted  2,000      (2,000)  7.92 
Forfeited/cancelled/expired  (1,500)        5.67 
Exercised  (2,000)        8.25 
                 
Balance at October 1, 2006
  4,761,126   3,750,326   62,500  $6.11 
                 
2005
                
Balance at January 2, 2005
  5,193,676   3,591,276   266,000  $5.72 
Authorized               
Granted  155,000      (155,000)  15.75 
Forfeited/cancelled/expired            
Exercised  (57,550)        5.67 
                 
Balance at April 3, 2005
  5,291,126   3,641,326   111,000  $6.01 
Authorized               
Granted  10,000      (10,000)  13.22 
Forfeited/cancelled/expired            
Exercised            
                 
Balance at July 3, 2005
  5,301,126   3,641,326   101,000  $6.03 
Authorized               
Granted  6,500      (6,500)  12.61 
Forfeited/cancelled/expired            
Exercised            
                 
Balance at October 2, 2005
  5,307,626   3,762,726   94,500  $6.03 
                 

The following table summarizes significant ranges of Lakes’ outstanding and exercisable options as of October 1, 2006:
                             
  Options Outstanding at October 1, 2006          
     Weighted-
       Options Exercisable at October 1, 2006 
     Average
    Aggregate
        Aggregate
 
  Number
  Remaining
 Weighted-Average
  Intrinsic
  Number
  Weighted-
  Intrinsic
 
Range of Exercise Prices
 Outstanding  Contractual Life Exercise Price  Value  Exercisable  Average Price  Value 
 
$ (3.25 — 3.63)  287,000   4.8 years $3.45  $1,781,000   253,600  $3.48  $1,567,000 
  (3.64 — 5.45)  2,510,700   2.4 years  4.23   13,624,000   2,510,700   4.23   13,624,000 
  (5.46 — 7.26)  104,926   4.3 years  6.53   328,000   74,926   6.27   254,000 
  (7.27 — 9.08)  1,530,000   6.8 years  8.13   2,345,000   824,000   8.13   1,263,000 
  (9.09 — 10.90)  77,000   8.4 years  10.44      20,800   10.60    
 (10.91 — 12.71)  86,500   8.2 years  11.47      20,050   11.41    
 (12.72 — 14.53)  95,000   8.4 years  14.00      22,750   14.01    
 (14.54 — 16.34)  5,000   8.3 years  16.11      1,000   16.11    
 (16.35 — 18.16)  65,000   7.5 years  17.91      22,500   18.01    
                             
   4,761,126   4.4 years $6.11  $18,078,000   3,750,326  $5.30  $16,707,000 
                             

1711


 
LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

The aggregate intrinsic value in the preceding table represents the total pre-tax intrinsic value, based on Lakes’ closing stock price of $9.66 on September 29, 2006, which would have been received by the option holders had all option holders exercised their options as of that date. The total intrinsic value of options exercised during the three months and nine months ended October 1, 2006 was $0.0 million and $2.2 million, respectively. As of October 1, 2006, Lakes’ unrecognized share-based compensation related to stock options was approximately $3.9 million, which is expected to be recognized over a weighted-average period of 2.0 years.
 
The following table summarizes WPTE stock option activity throughduring the three months ended April 1, 2007 and nine months ended October 1, 2006 and OctoberApril 2, 20052006::
                 
     Number of Common Shares 
           Weighted-Avg.
 
  Options
     Available
  Exercise
 
  Outstanding  Exercisable  for Grant  Price 
 
2006
                
Balance at January 1, 2006
  2,158,000   620,333   283,667  $7.14 
Authorized               
Granted  219,000      (219,000)  6.20 
Forfeited/cancelled/expired  (159,333)     159,333   8.13 
Exercised  (115,000)        0.0049 
                 
Balance at April 2, 2006
  2,102,667   785,500   224,000  $7.36 
Authorized               
Granted  109,500      1,080,000   5.18 
Forfeited/cancelled/expired  (153,501)     (109,500)  10.07 
Exercised  (105,000)     153,501   0.0049 
                 
Balance at July 2, 2006
  1,953,666   619,333   1,348,001  $7.42 
Authorized               
Granted  249,000      (249,000)  4.22 
Forfeited/cancelled/expired  (15,333)     15,333   13.50 
Exercised            
                 
Balance at October 1, 2006
  2,187,333   1,043,167   1,114,334  $7.01 
                 


18


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)
                                
   Number of Common Shares    Number of Common Shares 
       Weighted-Avg.
        Weighted-Avg.
 
 Options
   Available
 Exercise
  Options
   Available
 Exercise
 
 Outstanding Exercisable for Grant Price  outstanding Exercisable for Grant Price 
2005
                
Balance at January 2, 2005
  2,561,000   560,000   559,000  $4.61 
2007
                
Balance at December 31, 2006
  2,318,166   1,050,200   983,501  $6.76 
Authorized                              
Granted  24,500      (24,500)  19.50   287,000      (287,000)  4.80 
Forfeited/cancelled/expired  (32,000)     32,000   8.60   (90,466)     90,466   8.49 
Exercised  (640,000)        0.0049             
                  
Balance at April 3, 2005
  1,913,500   200,000   566,500  $6.27 
Balance at April 1, 2007
  2,514,700   1,010,533   786,967  $6.47 
         
2006
                
Balance at January 1, 2006
  2,158,000   620,333   283,667  $7.14 
Authorized                              
Granted  34,000      (34,000)  17.25   219,000      (219,000)  6.20 
Forfeited/cancelled/expired  (31,500)     31,500   8.31   (159,333)     159,333   8.13 
Exercised  (35,000)        0.0049   (115,000)        0.0049 
                  
Balance at July 3, 2005
  1,881,000   165,000   564,000  $6.55 
Authorized               
Granted  355,000      (355,000)  12.26 
Forfeited/cancelled/expired  (90,000)     90,000   14.22 
Exercised  (3,333)        8.00 
Balance at April 2, 2006
  2,102,667   785,500   224,000  $7.36 
                  
Balance at October 2, 2005
  2,142,667   611,667   299,000  $7.17 
         
 
The following table summarizes significant ranges of WPTE outstanding and exercisable options as of OctoberApril 1, 2006:2007:
 
                                                        
 Options Outstanding Options Exercisable Options Outstanding Options Exercisable 
   Weighted-Avg.
 Weighted-
 Aggregate
     Aggregate
   Weighted-Avg.
 Weighted-
 Aggregate
     Aggregate
 
Range of
 Number
 Remaining
 Avg. Exercise
 Intrinsic
 Number
 Weighted-
 Intrinsic
 Number
 Remaining
 Avg. Exercise
 Intrinsic
 Number
 Weighted-
 Intrinsic
 
Exercise Prices
 Outstanding Contractual Life Price Value Exercisable Avg. Price Value Outstanding Contractual Life Price Value Exercisable Avg. Price Value 
$ 0.0049  225,000   5.40  $0.0049  $844,898   225,000  $0.0049  $844,898   225,000   4.91  $0.0049  $1,155,398   225,000  $0.0049  $1,155,398 
$ 3.93 - 4.26  249,000   9.92   4.22             
$ 3.93 - 4.80  713,000   9.71   4.43   503,600          
$ 5.18 - 9.92  1,458,833   8.20   7.59      758,334   8.05      1,333,366   7.73   7.56      720,533   7.95    
$11.95 - 14.51  225,000   8.85   12.23      48,333   12.41      224,000   8.36   12.22      56,000   12.70    
$15.05 - 19.50  29,500   8.83   15.54      11,500   15.79      19,334   8.36   15.28      9,000   15.38    
                              
  2,187,333   8.18  $7.01  $844,898   1,043,167  $6.60  $844,898   2,514,700   8.10  $6.47  $1,658,998   1,010,533  $6.51  $1,155,398 
                              
 
The aggregate intrinsic value in the preceding table represents the total pre-tax intrinsic value, based on WPTE’s closing stock price of $3.76$5.14 on September 29, 2006,March 30, 2007, which would have been received by the option holders had all option holders exercised their options as of that date. As of October 1, 2006, the total number of“in-the-money”No options exercisable was 225,000. The total intrinsic value of optionswere exercised during the first ninethree months ended OctoberApril 1, 2006 was $1.4 million.
For the nine months ended October 1, 2006, total compensation cost related to SFAS 123(R) was approximately $2.9 million2007. As of OctoberApril 1, 2006,2007, total compensation cost related to non-vested share-based options not yet recognized was $5.6$4.0 million, which is expected to be recognized over the next 3531 months on a weighted-average basis.
5.  Earnings (Loss) Per Share
For all periods, basic earnings (loss) per share is calculated by dividing net earnings (loss) by the weighted-average number of common shares outstanding during the applicable period. For the three months ended April 2,

19
12


 
LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

Consolidated pro forma information required under SFAS 123:
The following table illustrates the consolidated pro forma effect on net loss and net loss per share if the Company had retroactively applied the fair value recognition provisions of SFAS 123 for the 2005 periods presented.
         
  Three Months
  Nine Months
 
  Ended
  Ended
 
  October 2, 2005  October 2, 2005 
  (In thousands, except per
 
  share amounts) 
 
Net loss as reported $(7,042) $(14,812)
Less: total share-based compensation expense — fair value method  (1,132)  (3,176)
         
Pro forma net loss $(8,174) $(17,988)
         
Net loss per share — basic and diluted        
As reported $(0.32) $(0.66)
         
Pro forma $(0.37) $(0.81)
         
11.  Earnings (Loss) Per Share:
For all periods, basic earnings (loss) per share is calculated by dividing net earnings (loss) by the weighted-average number of common shares outstanding. For the three months and nine months ended October 1, 2006, diluted earnings per share reflects the effect of all potentially dilutive common shares outstanding by dividing net earnings by the weighted-average of all common and potentially dilutive shares outstanding. Stock options of approximately 1.9 million and 2.1 million have not been included in diluted loss per share for the three months and nine months ended October 2, 2005, respectively, as the effect would have been anti-dilutive as a result of net losses incurred in those periods.
 
12.6.  Income Taxes:Taxes
 
Management hasLakes evaluated itsthe ability to utilize deferred tax assets arising from net operating loss carry forwards, deferred tax assetscarryforwards, and other ordinary items and determined that a valuation allowance was appropriate at OctoberApril 1, 20062007 and January 1,December 31, 2006. ManagementLakes evaluated all evidence and determined net losses (excluding net realized and unrealized gains and losses on notes receivable) generated over the past threefive years outweighed the current positive evidence that the Company believes exists surrounding its ability to generate significant taxable income from its long-term assets inrelated to Indian casino projects. Therefore, to the extent that management currently believes it is more likely than not that tax benefits will not be realized, the Company has recorded a 100% valuation allowance against theseits deferred tax assets related to net operating losses and other ordinary items at OctoberApril 1, 2007, and December 31, 2006, and January 1, 2006.which is the primary reason that the Company’s effective tax rate is not comparable to the statutory federal rate of 35%.
 
The CompanyLakes has recognizedrecorded deferred tax assets related to capital losses incurred during 2001 through 2005.losses. The realization of these benefits is dependantdependent on the generation of capital gains.gains during the applicable carryforward periods. The Company believes it will have sufficient capital gains in the foreseeable future to utilize these benefits due to significant appreciation in its investment in WPTE, which has a minimal cost basis and could be sold at a substantial gain. The Company owns approximately 12.5 million shares of WPTE common stock valued at approximately $47.8$64 million as of November 3, 2006April 1, 2007 based upon the closing stock price as reported by the Nasdaq Global MarketNASDAQ on March 30, 2007 of $3.83. Therefore, a sale of a portion or all of these shares would generate capital gains which could allow$5.14. Accordingly, the Company to utilize the capital loss carryforwards. However, Lakes doeshas not currently intend to sell shares of WPTE common stock and has determined that a deferred tax asset in the approximate amount of $0.3 million related to capital losses may expire before it can be utilized at the end of 2006, since it may not be possible for the Company to generate sufficient capital gains during the remainder of 2006. Therefore, to the extent that management currently believes it is more likely than not that the tax benefits will not be realized,established a valuation allowance has been recorded against this item as of October 1, 2006.


20


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
for these deferred tax assets.
 
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

The Company is currently under examinationadopted FASB Interpretation No. 48,Accounting for Uncertainty in Income Taxes(“FIN 48”), on January 1, 2007, the beginning of the Company’s 2007 fiscal year. Lakes recognized a cumulative effect adjustment of $1.4 million to retained earnings as a result of adopting FIN 48. However, the adoption of FIN 48 did not materially effect net operating loss carry forwards, the related deferred tax assets and valuation allowance thereon, or the current quarter’s income tax provision.
As of April 1, 2007 and January 1, 2007, Lakes had unrecognized tax benefits of $11.4 million. If recognized these unrecognized tax benefits would impact the effective income tax rate. Interest related to unrecognized tax benefits are recorded in income tax expense. The total amount of accrued interest was $7.2 million and $6.9 million as of April 1, 2007 and January 1, 2007, respectively, and has not been included in the total unrecognized tax benefits amount discussed above. No amount has been accrued for penalties.
The Company’s unrecognized tax benefits relate to ongoing examinations for income and franchise tax matters (Note 13).
13.  Commitments and Contingencies:
Lakes’ Commitments and Contingencies
Operating lease
The Company leases an airplane under a non-cancelable operating lease. The airplane lease was amended on May 1, 2005, which allows for a base term of one year and two one-year renewal terms. Under the lease agreement, the Company has the option of renewing the lease, purchasing the airplane at amounts which range from approximately $5.2 million to $5.8 million or facilitating the sale of the aircraft at the end of each term included in the up to three-year lease term; however at the conclusion of the lease, the Companymatters. Specifically, Lakes is required to either purchase the airplane or facilitate the sale of the airplane. The Company’s airplane lease contains a residual value guarantee of $5.2 million at the end of the three-year lease term.
IRS tax audit
The Company iscurrently under audit by the Internal Revenue Service (“IRS”) for the fiscal years ended 2001 and 2000. The IRS is challengingAdditionally, the treatment of income categorized as a capital gain. If the Company is unsuccessful in sustaining its position, the Company may be required to pay up to approximately $3.2 million plus accrued interest related to tax on ordinary income. The Company originally carried back capital losses to offset the capital gain. If the Company is unsuccessful in sustaining its capital gain position, it could use the capital losses in the future to offset future capital gains, if any, prior to their expiration. The Company owns approximately 12.5 million shares of WPTE common stock valued at approximately $47.8 million as of November 3, 2006 based upon the closing stock price as reported by the Nasdaq Global Market of $3.83. However, Lakes does not currently intend to sell shares of WPTE common stock. Therefore, if reinstated during 2006, these capital loss items could expire before they could be utilized at the end of 2006, due to insufficient capital gains. As a result, Lakes has recorded a liability related to this matter of approximately $2.6 million, including interest, due to the possibility that if reinstated, these capital loss items may expire before they could be utilized.
Grand Casinos, Inc. settlement
In connection with the establishment of Lakes as a public corporation on December 31, 1998, via a distribution of its common stock to the shareholders of Grand Casinos, the Company and Grand Casinos entered into an agreement governing the sharing or allocation of tax benefits accruing to Grand Casinos and certain affiliated companies of Grand Casinos. Lakes asserted claims against Grand Casinos for amounts to which Lakes believed it was entitled under the tax sharing agreement. On December 1, 2004, Lakes entered into a settlement agreement with Grand Casinos and its parent company, Park Place Entertainment Corporation (now known as “Harrah’s Entertainment, Inc.” or “Harrah’s”), pursuant to which Lakes received $11.3 million in December 2004 in satisfaction of its prior claim and its future rights to the tax benefits that were the subject of the dispute. Lakes will be required to provide reimbursement for its share of the disallowed benefits. This settlement income was recorded as other income in the accompanying unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss) in fiscal 2004. Lakes has not recorded any tax related to the settlement payment of $11.3 million, as Lakes believes this settlement is not taxable to Lakes.
Tribal commitments
The Company’s management, development, consulting and financing contracts with its tribal partners require the Company to provide financial support related to project development in the form of loans.


21


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

Tribal Casino Development Advances/Commitments
As of October 1, 2006
             
  Pre-Construction
 Land Held for
 Remaining
  Advances Development Commitment
  (In millions)
 
Jamul Tribe $21.5  $6.7  $ 
Shingle Springs Tribe  41.4   8.7    
Pokagon Band  71.2       
Iowa Tribe  1.6   0.7    
Wholly-owned subsidiaries of the Pawnee Tribal Development Corporation (“Pawnee TDC” referred to collectively as the “Pawnee Nation”)  5.2       
In March 2006, the Jamul Tribe and Lakes entered into a development financing and services agreement (Note 8).
The Company will be obligated to pay an amount to an unrelated third party once the Pokagon Casino is open and Lakes is the manager of the casino. The amount is payable quarterly for five years and is only payable if Lakes is the manager of the casino and the casino is open and operational. The payment is part of a settlement and release agreement associated with Lakes obtaining the management contract with the Pokagon Band. The maximum liability over the five-year period is approximately $11 million. The Company will also be obligated to pay approximately $3.3 million to a third party on behalf of the Pokagon Band in accordance with the management contract which is payable over 24 months, beginning when the casino opens.
Lakes may be required to provide a guarantee of tribal debt financing or otherwise provide support for the tribal obligations related to any of the projects. Any guarantees by Lakes or similar off-balance sheet liabilities will increase Lakes’ potential exposure in the event of a default by any of these tribes.
Unlawful Internet Gambling Enforcement Act
In October 2006, the Unlawful Internet Gambling Enforcement Act of 2006 (the “Act”) was signed into law. Among other things, the Act prohibits financial institutions from processing payments in connection with unlawful internet gambling pursuant to state or federal laws. Management believes that the Act is unlikely to have a direct adverse effect on WPTE, since it has always maintained a policy of not accepting online wagers from patrons within the United States. The Act could potentially result in increased competition to secure online gaming customers outside the United States; however, the long-term impact, if any, on WPTE’s business cannot currently be determined.
Legal proceedings
El Dorado County, California litigation
On January 3, 2003, El Dorado County filed an action in the Superior Court of the State of California (“Court”), seeking to prevent the construction of a highway interchange that was approved by a California state agency. The action, which was consolidated with a similar action brought by Voices for Rural Living (“VRL”) and others, does not seek relief directly against Lakes. However, the interchange is necessary to permit the construction of a casino to be developed and managed by Lakes through a joint venture. The casino will be owned by the Shingle Springs Tribe. The matter was tried to the court on August 22, 2003. On January 2, 2004, Judge Lloyd G. Connelly, Judge of the Court, issued his ruling on the matter denying the petition in all respects except one. As to the one exception, the Court sought clarification as to whether the transportation conformity determination used to determine the significance of the air quality impact of the interchange operations considered the impact on attainment of the state ambient air quality standard for ozone. The California Department of Transportation


22


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

(“CalTrans”) prepared and filed the clarification addendum sought by the court. Prior to the Court’s determination of the adequacy of the clarification, El Dorado County and VRL appealed Judge Connelly’s ruling to the California Court of Appeals (“Appeals Court”) on all of the remaining issues.
A ruling with respect to the addendum was issued June 21, 2004 by the Court. The ruling indicated that the addendum provided to the court by CalTrans did not provide a quantitative showing to satisfy the Court’s earlier request for a clarification on meeting the state ambient ozone standard. The Court recognized that the information provided by CalTrans does qualitatively show that the project may comply with the state standard, but concluded that a quantitative analysis is necessary even though the Court recognized that the methodology for that analysis “is not readily apparent”. In addition, the ruling specifically stated, “Moreover, such methodology appears necessary for the California Environmental Quality Act (“CEQA”) analysis of transportation projects throughout the state, including transportation projects for which respondents (“CalTrans”) have approval authority.” CalTrans, the Shingle Springs Tribe and Lakes responded to the Court with a revised submission in August 2004. Representatives of the California Air Resources Board and the Sacramento Area Council of Governments filed declarations supporting the revised submission to the Court. Opposition to that revised submission was filed, a hearing on the revised submission took place on August 20, 2004 and the Court again found the revised submission of CalTrans, the Shingle Springs Tribe and Lakes to be inadequate. That ruling was separately appealed to the Appeals Court and an oral argument for these appeals and the appeals of El Dorado County and VRL was held before the Court on August 29, 2005.
In November 2005, the Appeals Court ruled in favor of CalTrans’ appeal, rejecting the El Dorado County’s argument that the transportation conformity analysis did not conform to state standards. The Appeals Court also rejected all but two of the legal claims asserted in the appeal by El Dorado County and VRL against the environmental impact report (“EIR”) prepared by CalTrans for the interchange that will connect Highway 50 to the Shingle Springs Rancheria. For the remaining two issues, the Appeals Court held that CalTrans must supplement its environmental analysis by adding some discussion to the air quality chapter to further explain the project’s contribution to overall vehicular emissions in the region, and that CalTrans also must evaluate whether a smaller casino and hotel would reduce environmental impacts. The Appeals Court acknowledged CalTrans lacks jurisdiction to require the Shingle Springs Tribe to develop a smaller casino, but nevertheless required some discussion of this alternative in the supplemental EIR. On December 19, 2005, CalTrans filed a Petition for Review with the Supreme Court of the State of California, and on February 8, 2006 the Supreme Court denied the Petition for Review and ordered the Appeals Court decision to be depublished. CalTrans has complied with the Appeals Court and a supplemental EIR was issued in May 2006.
On September 28, 2006, the Shingle Springs Tribe and El Dorado County entered into a settlement agreement that requires the Shingle Springs Tribe to make voluntary mitigation payments to construct high occupancy vehicle (“HOV”) lanes on Highway 50, make payments for law enforcement services, collect and pay sales taxes on food and beverage revenues to El Dorado County, and contribute to the El Dorado County general fund. In return, El Dorado County agreed to request that the Federal Court dismiss with prejudice the El Dorado County’s current Federal law suit and join and support the Shingle Springs Tribe in the state lawsuit. Additionally, El Dorado County agreed to support the Shingle Springs Tribe’s efforts to obtain a new compact with the State of California, not to oppose in any way the anticipated Tribal EIR required by the new compact, work with the El Dorado Local Agency Formation Commission (“LAFCO”) to remove potential regulatory impediments and support the Shingle Springs Tribe obtaining domestic water services and future sewer treatment services from the El Dorado Irrigation District.
On November 3, 2006, the Court issued its decision upholding the Supplemental Environmental Impact Report (“SEIR”) pertaining to CalTrans’ proposed interchange that will connect Highway 50 to the Shingle Springs Tribe rancheria. The Court’s decision effectively dismisses the VRL lawsuit against CalTrans, the Shingle Springs Tribe and the Company. The Court also sustained CalTrans’ demurrer in VRL’s subsequent lawsuit, putting an end to that lawsuit as well. Finally, the Court denied VRL’s request to stay the project. Although VRL has filed for a motion requesting an injunction, the Court has not ruled whether it will even consider the motion. The Court did instruct


23


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

VRL that it could file its motion directly with the Appeals Court. The Court’s decision will allow CalTrans to issue the permit to allow construction of the interchange to commence.
The Company has not recorded any liability for this matter as management currently believes that the Court’s and Appeals Court’s rulings will ultimately allow the project to commence. However, there can be no assurance that the final outcome of this matter is not likely to have a material adverse effect upon the Company’s consolidated financial statements.
Louisiana Department of Revenue litigation tax matter
The Louisiana Department of Revenue maintains a position that Lakes owes additional Louisiana corporation income tax for the period ended January 3, 1999, and the tax years ended 1999 through 2001 and additional Louisiana corporation franchise tax for the tax years ended 2000 through 2002. This determinationExcluding these matters, Lakes is no longer subject to U.S. federal or state/local income tax examinations by tax authorities for years prior to 2003.
The Company believes it is reasonably possible that, within the next 12 months, it could recognize previously unrecognized tax benefits of between $0.6 million and $1.4 million as a result of an audit of Louisiana tax returns filed by Lakes for the tax periods at issue and relates to the reporting of income earned by Lakes in connection with the managing of two Louisiana-based casinos. On December 20, 2004, the Secretaryresolution of the Department of Revenue of the State of Louisiana filed a petition to collect taxes in the amount of $8.6 million, excluding interest, against Lakes in the 19th Judicial District Court, East Baton Rouge Parish, Louisiana (Docket No. 527596, Section 23). In the petition to collect taxes the Department of Revenue of the state of Louisiana asserts that additional corporation income tax and corporation franchise tax are due by Lakes for the taxable periods set forthIRS audit discussed above. Lakes maintains that it has remitted the proper Louisiana corporation income tax and Louisiana corporation franchise tax for the taxable periods at issue. On February 14, 2005, Lakes filed an answer to the petition to collect taxes asserting all proper defenses and maintaining that no additional taxes are owed and that the petition to collect taxes should be dismissed. Management intends to vigorously contest this action by the Louisiana Department of Revenue. Lakes may be required to pay up to the $8.6 million assessment plus interest if Lakes is not successful in this matter. The Company has recorded a liability for its estimated settlement related to this examination including accrued interest and fees, which is included as part of income taxes payable on the accompanying unaudited condensed consolidated balance sheets.
7.  Other Contingencies:
 
WPTE litigationlitigation.  
On July 19, 2006, a legal action was commenced against WPTE became a defendant in an actionby seven poker players (“Plaintiffs”) alleging, among other things, that itsan unfair business practice requiring playersof WPTE. On March 14, 2007 the Plaintiffs filed a motion for summary judgment in the case and on April 12, 2007 WPTE filed their opposition to execute certain participant releasesthe motion. The parties are currently engaged in connection with certain tournaments violate antitrust laws. WPTE intends to vigorously defend its practicediscovery and although unable at this time to estimate any minimum losses, if any, in connection with this matter, based on information now available,a trial date has been set for April 1, 2008. WPTE does not expect


13


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

any material adverse consequenceconsequences from this action. Accordingly, no provision has been made in the financial statements for any such losses.
 
Other litigationMiscellaneous legal matters.  
Lakes and its subsidiaries (including WPTE) are involved in various other inquiries, administrative proceedings, and litigation relating to contracts and other matters arising in the normal course of business. While any proceeding or litigation has an element of uncertainty, management currently believes based in part on advice from legal counsel, that neither the final outcome of these matters including the matters discussed above, nor the related legal defense costs areis not likely to have a material adverse effect upon the Company’s futureLakes’ consolidated financial position or results of operations beyond the amounts recorded.statements.
 
14.8.  Segment Information:Information
 
Lakes’ principal business is the development and management of gaming-related properties. Additionally, the Company is the majority owner of WPTE. Substantially all of Lakes’ and WPTE’s operations are conducted in the United States. Episodes of the World Poker Tour® television series are distributed internationally by a third party distributor. Lakes’ segments reported below (in millions) are the segments of the Company for which separate


24


LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

financial information is available and for which operating results are evaluated by the chief operating decision-maker in deciding how to allocate resources and in assessing performance. The total assets in “Corporate and Eliminations” below primarily relate to Lakes’ short-term investments, deferred tax assets, Lakes’ corporate office building and construction in progress related to a Company-owned casino project in Vicksburg, Mississippi. Costs in “Corporate and Eliminations” below have not been allocated to the other segments because these costs are not easily allocable and to do so would not be practical.
 
                                
 Industry Segments Industry Segments 
 Indian
       Indian
       
 Casino
 WPT
 Corporate and
 Total
 Casino
 WPT
 Corporate and
 Total
 
 Projects Enterprises, Inc. Eliminations Consolidated Projects Enterprises, Inc. Eliminations Consolidated 
Total assets as of October 1, 2006 $225.3  $51.4  $76.4  $353.1 
Total assets as of January 1, 2006 $155.2  $46.3  $29.1  $230.6 
For the three months ended October 1, 2006            
Total assets as of April 1, 2007 $144.4  $48.9  $49.7  $243.0 
Total assets as of December 31, 2006 $242.8  $51.3  $67.1  $361.2 
For the three months ended April 1, 2007                
Revenue $  $5.9  $  $5.9  $0.5  $4.5  $  $5.0 
Earnings (loss) from operations  5.6   (0.4)  (4.3)  0.9   1.0   (2.9)  (5.4)  (7.3)
Depreciation and amortization expense     0.1   0.2   0.3      0.1   0.1   0.2 
For the three months ended October 2, 2005            
Revenue $  $2.1  $  $2.1 
Loss from operations  1.9   (1.8)  (7.8)  (7.7)
Depreciation and amortization expense     0.1      0.1 
For the nine months ended October 1, 2006            
For the three months ended April 2, 2006                
Revenue $0.3  $23.4  $0.1  $23.8  $0.1  $6.5  $  $6.6 
Earnings (loss) from operations  38.1   1.0   (12.4)  26.7   15.4   (1.1)  (3.9)  10.4 
Depreciation and amortization expense     0.2   0.7   0.9      0.1      0.1 
For the nine months ended October 2, 2005            
Revenue $  $12.8  $  $12.8 
Earnings (loss) from operations  5.6   (4.3)  (17.6)  (16.3)
Depreciation and amortization expense     0.1   0.2   0.3 
 
15.9.  Derivative Financial Instruments:Instruments
Lakes’ interest rate swap agreement
 
From time to time the Company may elect to enter into derivative transactions to hedge exposures to interest rate fluctuations. The Company does not enter into derivative transactions for speculative purposes.
 
On August 9, 2006 Lakes entered into an interest rate swap as required byIn conjunction with the March 2, 2007 extinguishment of the $105 million Credit Agreement (Note 5)3), effective on June 22, 2006, that converted the floating rate interestLakes’ related to an aggregate of $105 million under the Credit Agreement to a fixed obligation. The interest rate swap for $105 million of notional value, carries a fixed interest rate of 11.9% per annum (including a 6.25% applicable margin) for a term of 18 months. Under the terms and conditions of the Credit Agreement, Lakes is required to maintain an interest rate swap agreement for a notional value of at least 50% of the credit facility after the initial 18 month interest rate swap agreement.was also terminated. The swap is considered to be a cash flow hedge and is also considered to be an effective hedge against changes in future interest payments of the floating rate debt obligation for both tax and accounting purposes. The interest rate swap has interest payment dates that are the same as the Credit Agreement.
Gains and losses related to the effective portiontermination of the interest rate swap are reported as a componentagreement resulted in additional interest expense of other comprehensive earnings (loss) and are reclassified into earningsapproximately $0.5 million which was recorded in the same period that the hedged transaction affects earnings. Asfirst quarter of Octoberfiscal 2007.
10.  Subsequent Events
WPTE change in broadcast partner.  Travel Channel, LLC (“TRV” or “Travel Channel”) had until April 1, 2006, the net earnings impact is zero, and the fair market value2007 to exercise its option to broadcast Season Six of the interest rateWPT television series. TRV did not exercise this option. On April 2, 2007, WPTE entered into an agreement with the Game Show Network, LLC (“GSN”), pursuant to


2514


 
LAKES ENTERTAINMENT, INC. AND SUBSIDIARIES
 
Notes to Unaudited Condensed Consolidated Financial Statements — (Continued)

swapwhich GSN agreed to license Season Six for $300,000 per episode. The agreement also provides GSN options for Seasons Seven and Eight.
WPTE online gaming software and support agreement.  On April 23, 2007, WPTE entered into a three year software supply and support agreement (the “CryptoLogic Agreement”) with CryptoLogic Inc., and its wholly-owned subsidiary WagerLogic Limited, collectively referred to as “CryptoLogic”, pursuant to which CryptoLogic will operate an online gaming site for WPTE featuring a poker room and casino games utilizing its proprietary software, in exchange for a percentage of the revenue generated from the site. WPTE will be entitled to approximately $0.6 million80% of net gaming revenues, from the operation of the site. WPTE will also be a member in a centralized online gaming network with several other licensees of CryptoLogic pursuant to which players will be able to play on WPTE’s branded gaming site on the online gaming network.
The CryptoLogic Agreement provides for the poker room to be operational and accessible to players by June 14, 2007, and by September 30, 2007, CryptoLogic is included asrequired to have five casino games available. WPTE also has an option, exercisable at any time prior to July 1, 2008, to require CryptoLogic to provide WPTE’s customers with access to a long-term liability infull suite of casino games within three months of such notice.
There is a one-time fee of $50,000 payable by WPTE for the unaudited condensed consolidated balance sheet, withinitial preparation and launch of the site, and WPTE is required to pay a corresponding offset in accumulated other comprehensive earnings (loss).monthly fee of $7,500 for the management of tournaments, collusion detection, customer support and overall management of the poker room. In addition, WPTE is obligated to contribute 4% of poker room revenue for certain marketing initiatives.
 
As a result of October 1, 2006, Lakes tested the interest rate swap for hedge effectiveness usingrecent decision to move away from the hypothetical derivative method. Based upon bothinternally-developed online gaming platform, WPTE will write-off certain property, equipment and other capitalized costs of approximately $2.0 million — $3.0 million during the retrospectivesecond quarter of 2007. These assets consist primarily of software and prospective testing Lakes expectscomputer equipment related to the cash flow hedge to be highly effective, and no amounts have been recorded in earnings for ineffectiveness. Management will continue to test for hedge effectivenessonline gaming site that WPTE was developing based on at least a quarterly basis.the CyberArts software platform.
 
16.  Subsequent Events:
Lakes stock warrant.  Pursuant to the terms and conditions of a financing agreement dated as of February 15, 2006 among Lakes, PLKS Funding, LLC and various subsidiaries of Lakes, PLKS Holdings, LLC (“PLKS”) was granted a warrant to purchase 1,250,000 common shares of Lakes at $7.50 per share (“Warrant”). During April 2007, PLKS exercised and purchased 102,500 shares underlying the Warrant at $7.50 per share and paid Lakes $0.8 million.
 
On November 3, 2006,May 4, 2007, Lakes and PLKS amended the Court issued its decision upholding the SEIR pertaining to CalTrans’ proposed interchange that will connect Highway 50 to the Shingle Springs Tribe rancheria. The Court’s decision effectively dismisses the VRL lawsuit against CalTrans, the Shingle Springs Tribe and the Company. The Court also sustained CalTrans’ demurrer in VRL’s subsequent lawsuit, putting an end to that lawsuit as well. Finally, the Court denied VRL’s request to stay the project. Although VRL has filed for a motion requesting an injunction, the Court has not ruled whether it will even consider the motion. The Court did instruct VRL that it could file its motion directly with the Appeals Court. The Court’s decision will allow CalTrans to issue the permit to allow constructionexercise price of the interchangeWarrant (“Amendment”). The Amendment reduced the exercise price of the Warrant from $7.50 per share to commence.
Prior to the Court issuing its decision, the Company’s financial statements$6.50 per share for the nine months ended October 1, 2006 had been issued in conjunction withremaining 1,147,500 shares underlying the Company’s earnings release based upon information made available to management at that time. Accordingly, the accompanying financial statements have not been adjustedWarrant. In consideration for the reduced exercise price, PLKS agreed to exercise and purchase the remaining 1,147,500 shares underlying the Warrant for an aggregate exercise price of $7.5 million, which was paid to Lakes on May 7, 2007. Lakes is currently evaluating the potential effectseffect this Amendment will have on its financial position and results of this decision, which will likely include an increase inoperations during the estimated probability of opening the project with the Shingle Springs Tribe. Had the Court’s decision been available prior to the issuance of the Company’s financial statements, it is likely that the expected increase in probability would have resulted in an increase in the estimated fair value of the Shingle Springs notes receivable and additional unrealized gains and net income for the thirdsecond quarter of fiscal 2006. However, there can be no assurance that the Court’s decision, when combined with the other key assumptions used to calculate the estimated fair value of the notes receivable, which will be further evaluated by management for the fourth quarter, will result in an overall increase in the estimated fair value of the related notes receivable as of December 31, 2006.2007.


2615


 
ITEM 2.  MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
 
Overview
 
We develop, finance and manage Indian-owned casino properties. We currently have development (which includes certain financing requirements) and management agreements with twofive separate tribes for one new casino development projectoperations in Michigan, one in California, and with two separate tribes in Oklahoma, for five variousa total of eight separate casino projects. We have agreements with a second tribe in California to develop and finance a new casino project.sites. We are also involved in other business activities including development of a non-Indian casino in Mississippi and the development of new table games for licensing to both Tribal and non-Tribal casinos. In addition, as of OctoberApril 1, 2006,2007, we owned approximately 61% of WPTE, a separate publicly held media and entertainment company principally engaged in the development, production and marketing of gaming themed televised programming, the licensing and sale of branded products and the sale of corporate sponsorships.company. Our unaudited condensed consolidated financial statements include the results of operations of WPTE, and in recent periods, our revenues have been derived primarily from WPTE’s business.
 
WPTE creates internationally branded entertainment and consumer products driven by the development, production and marketing of televised programming based on gaming themes. WPTE’sWPTE created the World Poker Tour®, or WPT, a television series,show based on a series of high-stakes poker tournaments that airs in the U.S. on the Travel ChannelUnited States and has been licensed to telecast in more than 150 territoriesmarkets globally. WPTE also operates a real-money online gaming website which prohibits wagers from players in the United States and other restricted jurisdictions. WPTE currently licenses its brand to companies in the business of poker equipment and instruction, apparel, publishing, electronic and wireless entertainment, DVD/home entertainment, casino games, and giftware. WPTE is also engaged in the sale of corporate sponsorships. WPTE has fourthree operating units:
 
WPT StudiosStudios.  , WPTE’s multi-media entertainment division, generates revenue from the domestic and international licensing of broadcast and telecast rights and through casino host fees. Since WPTE’s inception, the WPT Studios division has been responsible for approximately 75%74% of total revenue. WPTE licenseslicensed the WPT series Seasons One through Five to Thethe Travel Channel, L.L.C.LLC (“TRV” or “Travel Channel”) for telecast in the United States under an exclusive license agreement.agreement (“WPT Agreement”). On April 2, 2007, WPTE entered into an agreement (the “GSN Agreement”) with Game Show Network, LLC (“GSN”), pursuant to which GSN agreed to license Season Six for a $300,000 license fee per episode. WPTE received an average of $477,000 per episode for Season Five of the WPT television series from TRV. WPTE also has license agreements for the distribution of WPTE’s World Poker TourWPT episodes in over 150into international territories for which WPTE receives license fees, net of WPTE’s agent’s sales fee and agreed upon sales and marketing expenses. In addition, during January 2006, WPTE signed a license agreement with TRV to telecast WPTE’s new Professional Poker Tourtm, or PPT, series, which began airing in the third quarter of 2006. WPTE also collects annual host fees from member casinos that host World Poker TourWPT events (WPTE’s member casinos).
 
WPTE has entered into a series of agreements with TRV for the United States distribution of the World Poker Tour® television series (the “WPT Agreements”). Since WPTE’s inception, fees from TRV under the WPT AgreementsAgreement and an agreement with TRV relating to the PPTProfessional Poker Tour (“PPT”) series have been responsible for approximately 60%59% of WPTE’s total revenue. For each season covered by the WPT AgreementsAgreement and related options, TRV has exclusive rights to exhibit the episodes in that season an unlimited number of times on its television network (or any other television network owned by the Discovery Channel) in the United States for four years (three years for the episodes in Season One). WPTE has produced fourfive complete seasons of the World Poker TourWPT series under the WPT Agreements, and Season Five is currently in production. TRV continues to hold options to license Seasons Six and Seven.Agreement.
 
Under the WPT Agreements,Agreement, TRV pays fixed license fees for each episode WPTE produces, which are payable at various times during the pre-production, production and post-production process and are recognized upon TRV’s receipt and acceptance of the completed episode. Television production costs related to WPT episodes are generally capitalized and charged to cost of revenues as revenues are recognized. Therefore, the timing and number of episodes involved in the various seasons of the series affect the timing of the revenues and expenses of the WPT


2716


Studios business. The following table describes the timing of Seasons One through Five of the World Poker Tour series, including the delivery and exhibition of the episodes each season:
 
           
  Date of TRV
 Number of
    
  Agreement or
 Episodes
    
World Poker
 Option Forfor
 (including
 Production Period and Delivery
  
Tour Season
 Season specials) of Episodes to TRV Initial Telecast of Episodes in Season
 
Season One January 2003  15  February 2002 — June 2003 March 2003 — June 2003
Season Two August 2003  25  July 2003 — June 2004 December 2003 — September 2004
Season Three May 2004  21  May 2004 — April 2005 October 2004 — August 2005
Season Four March 2005  21  May 2005 — April 2006 October 2005 — June 2006
Season Five March 2006  22  May 2006 — April 2007
(expected)
 August 2006 — August 2007
(expected)
 
In January 2006, WPTE entered into an
The agreement with TRV forrelating to the U.S. distribution ofPPT series, which continues to cover the broadcast rights to Season One of the PPT, television series. Similarwas substantially similar in structure to the WPT Agreements and related options, TRV has exclusive rights to exhibit the PPT episodes in that season an unlimited number of times on its television network (or any other television network owned by the Discovery Channel) in the U.S. for four years. Under WPTE’s agreementAgreement with TRV regarding PPT, TRV had options to license the following three seasons (Seasons Two through Four). In accordance with WPTE’s accounting policy of not capitalizing production costs until a firm commitment for distribution is in place, WPTE expensed approximately $0.7 million and $3.6 million of production expenses related to the Professional Poker Tourtm during fiscal 2004 and fiscal 2005, respectively. With the execution ofexceptions: first, the PPT agreement has a different mechanism for selecting corporate sponsors that grants WPTE more flexibility than it has in the first quarter of 2006, WPTE began capitalizing additional expenses associated with the productionWPT Agreement. Second, upon termination of the PPT series that are now being expensed asagreement, Travel Channel’s revenue share percentage declines over the Season One episodes are delivered tofollowing four years. There is no revenue share percentage beginning in the Travel Channel. Duringfifth year following the first nine months of 2006, WPTE delivered nineteen episodes of Season Onetermination of the PPT series, resulting in revenue of $5.7 million and cost of revenues of $1.7 million.agreement.
 
On May 1, 2006, TRV notified WPTE that it had chosen to not exercise its options for Season Two and subsequent seasons of the PPT. The PPT’s first season, which includes 24two-hour episodes, has already been filmed and began to air on TRV in July 2006. WPTE is attempting to find a new broadcast partner for the PPT going forward.
Further, underUnder the WPT and PPT Agreements, TRV has the right to receive a percentage of WPTE’s adjusted gross revenues from international television licenses, product licensing and publishing, merchandising and certain other sources, after specified minimum amounts are met. For the three months and nine months ended July 2, 2006,April 1, 2007, WPTE recognized $0.2$0.1 million and $0.5 million, respectively, of Travel Channel participation expense that was recorded in cost of revenues.
 
WPT Consumer ProductsGlobal Marketing.  , WPTE’sIncludes branded consumer products, sponsorship, and event management divisions. WPTE branded consumer products division generates revenuesrevenue principally from royalties from the licensing of WPTE’sthe WPTE brand to companies seeking to use the World Poker TourWPT brand and logo in the retail sales of their consumer products. In addition, this business unit generates revenue from direct sales of company-producedWPTE-produced branded merchandise. WPTE has generated significant revenues from existing licensees, including Hands-On Mobile, US Playing Card, Hands-On Mobile, and MDI. WPTE also has a number of licensees that are developing new licensed products including electronic, casino-based, poker relatedpoker-related gaming machines from International Game Technology,IGT, and interactive television games from Pixel Play.
 
WPT Corporate Alliances, WPTE sponsorship and event management division generates revenue from corporate sponsorship and management of televised and live events. WPTE’sWPTE sponsorship program uses the professional sports model as a method to foster entitlement sponsorship opportunities and naming rights to major corporations. Anheuser-Busch has been the largest source of revenues fromthrough its sponsorship of Seasons Two, Three, Four and FourFive of the World Poker TourWPT series on TRV. During the third quarter of 2006, WPTE completed an agreement with Anheuser-Busch to continue its sponsorship for Season Five of the World Poker Tour. During the second quarter of 2006, WPTE finalizedalso has a sponsorship agreement with Xyience, Inc., a non-alcoholic energy drink developer and distributor, to promote its product as the “official energy drink” of Seasonsfor Season Five and Season Six of the World Poker Tour.WPT. In addition, WPTE had an agreement with Blue Diamond Almonds to sponsor the WPT Season Five Championship in April 2007 at the Bellagio. WPTE will recognize revenues from this agreementthese agreements when the Season Five programs are broadcast beginningwhich began in April 2007.


28


WPT Online GamingOnline.  , WPTE’s online poker and casino gaming division, generates revenue from WPTE’s agreement with WagerWorks, Inc. (“WagerWorks”) pursuant to which in January 2005, WPTE granted to WagerWorks a license to utilize the WPT brand to create a WPT-brandedWPT’s branded online gaming website, currently located at WPTonline.com, which features an online poker room and an online casino with a broad selection of slots and table games. In exchangeAlthough any Internet user can access WPTonline.com via the world wide web, WPTonline.com does not permit bets to be made from players in the United States and other restricted jurisdictions. This site showcases a WPT-branded poker room featuring ring games, as well as Sit and Go and multi-table tournaments for thepoker games including Texas Hold ’Em, Omaha, 7 Card Stud, and 7 Card Hi-Lo. Additionally, WPTonline.com features an online casino with a broad selection of slots and table games, including WagerWorks’ exclusive online titles Monopolytm, Wheel of Fortune®, and The Price is Righttm.
Since 2005, WPTE has operated WPTonline.com through a license agreement with WagerWorks, Inc. (“WagerWorks”), under which WPTE licenses its brand to WagerWorks of WPTE’s brand,and WagerWorks shares with WPTE a percentage of all net revenue it collects from the operation of the online poker room and online casino. Although any Internet user can access WPTonline.com via the World Wide Web, the website does not permit bets to be made from players in the U.S. and other restricted jurisdictions. WPTonline.com


17


generated approximately $2.6$0.6 million in revenues, which are presented gross of WagerWorks costs, for the ninethree months ended OctoberApril 1, 2006,2007, compared to costs of revenues of approximately $1.4$0.3 million.
 
In 2006, WPTE decided to develop its own software for anits online poker room. WPTE licensed a software platform from CyberArts Licensing, LLC, and hired 30 employees in Israel to develop software and a support operation. On June 21, 2006,April 23, 2007, WPTE entered into a three year software supply and executed a Source Code License and Service Agreement, effective as of June 16, 2006support agreement (the “CyberArts“CryptoLogic Agreement”) with CyberArts Licensing, LLC (“CyberArts”)CryptoLogic Inc., and its wholly-owned subsidiary WagerLogic Limited, collectively referred to as “CryptoLogic”, pursuant to which CyberArts grantedCryptoLogic will operate an online gaming site for WPTE featuring a perpetual, nonexclusivepoker room and nontransferable licensecasino games utilizing its proprietary software, in exchange for a percentage of the revenue generated from the site. WPTE will be entitled to approximately 80% of net gaming revenues, as defined below, from the operation of the site. Under the CryptoLogic Agreement, WPTE will also be a member in a centralized online gaming network with several other licensees of CryptoLogic pursuant to which players will be able to play on WPTE’s branded gaming site on the online gaming network.
The CryptoLogic Agreement provides for the object codepoker room to be operational and accessible to players by June 14, 2007, and by September 30, 2007, CryptoLogic is required to have five casino games available (the “Initial Casino”). WPTE also has an option, exercisable at any time prior to July 1, 2008, to require CryptoLogic to provide WPTE customers with access to a full suite of certain poker softwarecasino games within three months of such notice.
WPTE is entitled to the following percentages of net gaming revenue: (a) 78% of the first $150,000 per month, (b) 79% of revenue in excess of $150,000 but less than $500,000 per month; and related banking and cardroom management software tools (the “Software”)(c) 80% of the revenue in excess of $500,000 per month. CryptoLogic is entitled to earn the following annual minimum guaranteed revenues associated with WPTE’s online casino: $500,000 for the developmentInitial Casino and $2,500,000 for the full suite of WPTE’s own onlinecasino games. There is a one-time fee of $50,000 payable by WPTE for the initial preparation and launch of the site, and WPTE is required to pay a monthly fee of $7,500 for the management of tournaments, collusion detection, customer support and overall management of the poker room. WPTE paid CyberArts a one-time license fee of $1.3 million for the Software upon the execution of the Agreement, which is included in property and equipment and will be amortized on a straight-line basis over 36 months, as well as a payment of $180,000 for the first year of CyberArts’ support and maintenance for the Software. During the term of the CyberArts Agreement,In addition, WPTE is obligated to pay CyberArts an annual feecontribute 4% of $180,000, subject to annual increases of up to a maximum of 9% in each year,poker room revenue for continuing support and maintenance, payable oncertain marketing initiatives.
If, at any time after the nine month anniversary of the effectivego-live date, of the Agreement. WPTE alsomonthly gaming revenues fall below $500,000 for three consecutive months, CryptoLogic has the right to purchaseterminate the source code forCryptoLogic Agreement on 90 days written notice. However, WPTE may prevent any such termination through payment of the Softwareshortfall of CryptoLogic’s percentage of such gaming revenue within 30 days of receipt of CryptoLogic’s notice of termination. If at any time during the term of the CyberArtsCryptoLogic Agreement for an additional $2.7 million. The CyberArts agreement enablesthe average daily gross revenue, over a 90 day period, derived by CryptoLogic through the Network falls below $125,000, WPTE has the right to develop, manage, market and handle customer service forterminate the CryptoLogic Agreement.
As a result of the decision to move away from the online poker business fromgaming platform WPTE was developing based on the CyberArts software and stop development of WPTE’s own international headquarters.online gaming site, and sign an agreement with CryptoLogic, WPTE will write off certain property and equipment and related capitalized costs of approximately $2.0 million — $3.0 million during the second quarter of 2007.
 
On July 10, 2006, WPTE amended its agreement with WagerWorks to permit WPTE to (i) own and operate an online poker room, and (ii) offer multi-player real-money poker gaming via cellular phone using software provided by 3G Scene Limited. In addition, the Amendment specified a termination date for WagerWorks’ operation of WPTE’s online poker room (the “Poker Room”) on the earlier to occur of (i) August 1, 2007, (ii) thirty (30) days following WPTE’s request to terminate operation of the Poker Room, or (iii) sixty (60) days following WagerWorks’ notice that it will terminate its operation of the Poker Room. Furthermore, the parties agreed that WagerWorks could increase its share of revenue derived from the operation of the Poker Room to 75% from the original 25% to provide added incentive to WagerWorks to provide a quality online poker room during the transition by WPTE to the operation of WPTE’s online poker room. Also, all terms associated with the online casino that are contained within the original agreement will remain the same.
On July 12, 2006, WPTE entered into and executed a licensing agreement with 3G Scene Limited, whereby 3G Scene was granted a non-exclusive license to use the World Poker Tour brand in conjunction with the promotion of its real-money mobile gaming applications. Pursuant to the agreement, 3G Scene will offer real-money mobile games solely in jurisdictions where such gaming is not prohibited. In consideration for the license, WPTE shall be entitled to 50% of net revenues involving WPTE-related applications. In a separate agreement entered into on July 26, 2006, WPTE acquired an approximate 10% ownership interest in 3G Scene for approximately $2.9 million.
In October 2006, the Unlawful Internet Gambling Act of 2006 (the “Act”) was signed into law. Among other things, the Act prohibits financial institutions from processing payments in connection with unlawful internet gambling pursuant to state or federal laws. WPTE believes that the Act is unlikely to have a direct adverse effect on WPTE’sday-to-day operations, since WPTE has always maintained a policy of not taking online wagers from patrons within the United States of America. The Act could potentially result in increased competition to secure online gaming customers outside the United States of America; however, the long-term impact, if any, on WPTE’s business cannot currently be determined.


29


Financial Overview
In the three months and nine months ended October 1, 2006 and in the three months and nine months ended October 2, 2005, substantially all of our consolidated revenues were derived from the WPTE business, mainly from license fees for domestic and international telecast of World Poker Tour television episodes and product licensing fees associated with the World Poker Tour brand and logo. Domestic telecast license fees have depended on the number of episodes delivered in a particular period. Revenues from other parts of the WPTE business are relatively small but continue to grow.
Results of Operations
 
The following discussion and analysis should be read in conjunction with the unaudited condensed consolidated financial statements and notes thereto included elsewhere in this Quarterly Report onForm 10-Q for the three months ended April 1, 2007.
Three Months Ended Octobermonths ended April 1, 2006 Compared2007 compared to the Three Months Ended Octoberthree months ended April 2, 20052006
 
RevenuesRevenues.  
Total revenues increaseddecreased by $3.8$1.7 million during the third quarterthree months ended OctoberApril 1, 20062007 compared to the third quarterthree months ended OctoberApril 2, 2005.2006. Domestic television licensee fees increased $2.7decreased $0.6 million in the thirdfirst quarter of 20062007 compared to the 20052006 period. The increasedecrease was primarily a result of the delivery of ninefive episodes of Season OneFive of the PPTWPT television series in the thirdfirst quarter of 2007 versus nosix episodes of Season Four of the WPT and one episode of the PPT delivered in the 20052006 period. Online gaming, sponsorship and international television license revenues also increased $1.1decreased $1.5 million in the thirdfirst quarter of 20062007 compared to the 2005 period, primarily due to an increase2006 period. The decrease of $0.7$0.4 million from online gaming revenue during 2006, as WPTE had higher2007 was primarily due to lower levels of player activity versus the


18


prior year period. Sponsorship and event revenues decreased $0.7 million due primarily to the timing of not airing any Season Five episodes in the first quarter of 2007 versus the airing of five episodes of Season Four of the WPT in the prior year period. International television licensing revenues increaseddecreased by $0.2$0.5 million as a result of additionalfewer distribution agreements for Season Four ofin the WPT and Season One of the PPT.international marketplace. Product licensing revenues decreasedincreased by approximately $0.1 million in the thirdfirst quarter of 20062007 compared to the 20052006 period. The increase was primarily due to higher revenues fromHands-on-Mobile.
During the first quarter of 2007, casino management fees were approximately $0.4 million. There were no casino management fees recognized during the first quarter of 2006.
Selling, general and administrative expenses.  Selling, general and administrative expenses increased approximately $0.6 million in the first quarter of 2007 compared to the 2006 period. The increase primarily related to additional headcount and professional fees associated with project development.
Production costs.  Production costs decreased by approximately $0.3 million in the first quarter of 2007 compared to the 2006 period. The decrease was primarily due to lower revenues from Jakks Pacific and Radica Games, partially offset by increased mobile gaming sales fromHands-on-Mobile (formerly Mforma).
Costs and expenses
Productiona result of a decrease in production costs increased by approximately $1.2of $0.2 million as WPTE delivered fewer episodes in the third quarter of 2006 compared to the 2005 period. The increase was primarily the result of an increase in online gaming costs of $0.5 million as2007 period versus the 2006 period, had higher levelsas noted above. Overall gross margins were 52% in the first quarter of player activity versus2007 compared to 63% in the 2005first quarter of 2006. Domestic television licensing margins were 37% in the first quarter of 2007 compared to 44% in the same period increasing the amountin 2006. This decrease was principally because of the fees paiddelivery of an episode of WPTE’s PPT series in 2006 for which the production costs had been expensed in an earlier period. In addition, online gaming contributed to the service provider, which are based onoverall lower margin in the first quarter of 2007 as a percentageresult of gross revenues. Further, an amendment of the agreement with the service provider that was effective in July of 2006, which significantly increased the percentage of revenues paid to that party, which contributed to the increase. In addition, an increase of $0.4 million was the result of the delivery in the third quarter of 2006 of nine episodes of the PPT television series versus no episodes being delivered in the 2005 period. Overall gross margins were 70% in the third quarter of 2006 compared to 74% in the third quarter of 2005. Domestic television licensing margins were 73% in the third quarter of 2006 compared to 52% in the same period in 2005. This increase was primarily due to lower recognized PPT production costs, as WPTE began capitalizing these costs upon reaching a distribution agreement with the Travel Channel in the first quarter of 2006, versus previously expensing them during 2005. The overall higher margin in the prior year period was due to a larger margin contribution from the consumer products, international television and sponsorship divisions.party.
 
Selling, general and administrative expenses.Impairment losses.  
Selling, general and administrative expenses increased approximately $1.8Net impairment losses were $0.3 million in the third quarter of 2006 compared to the 2005 period. This increase was primarily due to the adoption of SFAS 123(R), which requires the measurement and recognition of compensation expense for all share-based payment awards made to employees and directors including stock options based on estimated fair values. For the three months ended OctoberApril 1, 2006, share-based compensation expense recognized under SFAS 123(R) related to employee and director stock options was approximately $1.3 million, of which approximately $0.6 million related to WPTE and $0.7 million related to Lakes.2007. There waswere no share-based compensation expense related to employee and director stock options and stock purchases recognized duringimpairments for the three months ended OctoberApril 2, 2005, pursuant2006. Future consulting fees related to the accounting guidance in effect during that time period. The remaining increase in selling, general and administrative expenses in the third quarter of 2006 as comparedTrading Post project are considered unlikely. As a result, Lakes recognized a $0.3 million impairment charge related to the same period of 2005 was due primarilyTrading Post casino project with the Pawnee Tribal Development Corporation (“Pawnee TDC”). The Pawnee TDC, together with its three wholly-owned subsidiaries are referred to increased headcountcollectively as the “Pawnee Nation”.
Net realized and legal fees associated with development, growth and regulatory compliance costs.


30


Net unrealized gains on notes receivablereceivable.  
Net realized and unrealized gains on notes receivable were $5.8$0.2 million and $15.5 million for the thirdthree months ended April 1, 2007 and April 2, 2006, respectively. The net realized and unrealized gains in the first quarter ended October 1, 2006, comparedof 2007 related primarily to netour notes receivable from the Pokagon Band, the Shingle Springs Tribe and the Jamul Tribe which are adjusted to estimated fair value based upon the current status of the related tribal casino projects.
Regarding the Pokagon Band, during March of 2007, Lakes contracted with a group of investors for their participation in the loans made by Lakes to the Pokagon Band (and assumed by the Pokagon Gaming Authority) at an agreed upon price of 98% of the face value of the loans as of the settlement date of March 2, 2007. Accordingly, as of March 2, 2007, the Pokagon notes receivable were adjusted to the negotiated participation price of 98% of principal and stated interest, which resulted in a gain of approximately $1.6 million during the first quarter of 2007, which was partially offset by transaction costs of approximately $1.1 million. This participation arrangement was accounted for as a sale during 2007; however, the sale did not have any effect on Lakes’ management agreement for the Pokagon casino resort project.
Regarding the Shingle Springs Tribe, the repayment terms of the notes receivable were revised and the notes will now be repaid over the life of the seven year management agreement rather than over approximately 24 months. This change resulted in unrealized losses on notes receivable of $2.1approximately $0.9 million for the thirdfirst quarter ended October 2, 2005. Net unrealized gains (losses) on notes receivables relate toof 2007.
During the adjustment to estimated fair valuefirst quarter of our notes receivable from Indian tribes. These fair value estimates are calculated based on current assumptions related to2006, the projects and management’s evaluation of critical milestones as discussed below under “Critical Accounting Policies and Estimates — Accounting for long-term assets related to Indian casino projects.” Of the $5.8 million in net unrealized gains on notes receivable during the third quarter of 2006, $2.6$15.5 million related primarily to increased probability of opening for the casino development projectprojects with the Shingle Springs Tribe. This increase wasPokagon Band and the Jamul Tribe due to favorable events occurring during the thirdfirst quarter of 2006, which increased the estimated probability of opening for this project. Specifically, during September of 2006, the Shingle Springs Tribe reached an agreement with El Dorado County that will provide El Dorado County with certain funding from the planned Shingle Springs Tribe casino operations. El Dorado County also agreed to seek dismissal of all of its existing litigation against the Shingle Springs Tribe and formally support the Shingle Springs Tribe interchange and casino projects.2006.
 
The remainderOther income (expense).  Other expense for the first quarter of 2007 was $5.4 million compared to other income of $5.4 million for the net unrealized gains duringfirst quarter of 2006. In March 2007, Lakes’ then existing $105 million Credit Agreement was repaid in conjunction with the three months ended October 1, 2006, related primarily to increases in fair value ofPokagon notes receivable related to the casino development projects with the Jamul Tribe and the Pokagon Band.participation transaction discussed above.


19


During the third quarter of 2005, net unrealized losses on notes receivable related primarily to the Kickapoo Tribe project. The Kickapoo Tribe and Lakes terminated their business relationship during 2005 whichThis repayment resulted in an unrealizeda loss on notes receivableextinguishment of $4.1debt of approximately $3.8 million during the three months ended October 2, 2005. This loss was partially offset by net unrealized gains associated with the Pokagon Band and Jamul Tribe projects during the thirdfirst quarter of 2005.2007.
 
Other income (expense)
Duringin the third2006 first quarter of 2006,period included a WPTE recognized $4.5 million in gain on sale of investment relatingsecurities of $5.7 million related to thea sale of its remaining630,000 shares of common stock in PokerTek. This was partially offset by interest expense incurred on our long-term debt.of PokerTek, Inc.
 
Income TaxesTaxes.  
The provision for income taxes was $2.2$0.3 million and $0.4$2.7 million for the thirdthree months ended April 1, 2007 and April 2, 2006, respectively. Our effective income tax rates were (3%) and 17% for the first quarter ended October 1,of 2007 and the corresponding period of 2006, and October 2, 2005, respectively. In the current year period, the provision consisted of $0.3 millionwas primarily related to Lakes and $1.9Lakes’ interest on a Louisiana tax audit matter. WPTE recorded a provision of $1.3 million related to WPTE. In the prior year period, the provision consisted of $0.4 million related to Lakes. Lakes’ provision consists primarily of interest accruals on the Louisiana and IRS tax matters for the third quarterthree months ended October 1,April 2, 2006 and the comparable year prior period. WPTE’s provision for income taxes is due toprimarily associated with positive taxable income that WPTE expects to generate during 2006, primarily fromin the saleprior period. The remainder of its interest in PokerTek, which will likely exceed WPTE’s net operating loss carryforward from 2005. A valuation allowance was previously recorded by WPTEthe provision for the netprior period is primarily related to Lakes’ reversal of a capital loss, which was reflected as a deferred tax asset, related to WPTE’s 2005 net operating loss carryforward. Additionally, in accordanceas a result of a settlement with SFAS No. 109,Accounting for Income Taxes, we have evaluated the ability to utilize deferred tax assets arising from net operating loss carry forwards (excluding WPTE) amounts, net deferred tax assets relating to our accounting for advances made to Indian tribes and other ordinary items. Based upon our evaluationKickapoo Traditional Tribe of all evidence, we have determined that a valuation allowance is necessary to the extent that management currently believes it is more likely than not that tax benefits will not be realized. Negative evidence considered includes net losses generated over the past four years, which we believe outweighs the current positive evidence regarding our ability to generate significant income from our long-term assets related to Indian casino projects.Texas.
 
Minority interestinterest.  
The minority interest in WPTE’s earnings (loss) was approximately $1.0($0.9) million and $(0.6)$1.4 million for the quartersthree months ended OctoberApril 1, 20062007 and OctoberApril 2, 2005,2006, respectively. WPTE’s net earnings (losses) were $2.7($2.3) million and ($1.6)$3.6 million for the quarters ended October 1, 2006 and October 2, 2005, respectively.


31


Nine Months Ended October 1, 2006 Compared to the Nine Months Ended October 2, 2005
Revenues
Total revenues increased by $10.9 million during the ninethree months ended OctoberApril 1, 2006 compared to the nine months ended October2007 and April 2, 2005. Domestic television licensee fees increased $7.5 million in the first nine months of 2006, compared to the 2005 period. The increase was primarily due to the delivery of 19 episodes of Season One of the PPT television series in the first nine months versus no episodes of the PPT delivered in the 2005 period, combined with the delivery of 16 episodes of Season Four and one episode of Season Five of the WPT television series (17 total episodes) versus the delivery of 13 episodes of Season Three and one episode of Season Four (14 total episodes) in the 2005 period. International television license fees increased $0.7 million due to more distribution agreements in place during the first nine months of 2006 compared to the 2005 period. Specifically, WPTE has expanded into additional territories and now have international distribution agreements for WPT Seasons One, Two, Three and Four. Online gaming, host fees and sponsorship revenues also increased $3.1 million in the first nine months of 2006 compared to the 2005 period, of which $2.5 million is due to increased online gaming revenues, as WPTE had higher levels of player activity during the first nine months of 2006 compared to the 2005 period, as well as increased sponsorship fees for Season Four versus Season Three. Product licensing revenues decreased $0.7 million in the first nine months of 2006 compared to the 2005 period. The decrease was primarily due to lower revenues from US Playing Cards, Jakks Pacific and WPTE’s lottery game partner, MDI. The decreases were a result of lower demand for chip sets and plug and play games in the consumer marketplace. The decreased revenues were partially offset by increased mobile gaming sales from Hands-On Mobile (formerly Mforma).
Costs and expenses
Production costs increased by approximately $0.2 million in the first nine months of 2006 compared to the 2005 period. The increase was primarily a result of an increase in online gaming costs of $1.3 million as the 2006 period had higher levels of player activity versus the 2005 period. The increased player activity generates greater revenues, which increases the level of WagerWorks’ share of such revenues, increasing the amount of fees paid to the service provider, which are based on a percentage of gross revenues. In addition, production costs increased $0.3 million as a result of the delivery in the first nine months of 16 episodes of Season Four and one episode of Season Five of the WPT television series (17 total episodes) versus the delivery of 13 episodes of Season Three and one episode of Season Four (14 total episodes) in the 2005 period. The increased costs were offset by lower PPT production costs of $1.5 million, as WPTE began capitalizing these costs in the first quarter of 2006 versus previously expensing them in 2005 since no distribution deal had been reached. Overall gross margins were 64% in the first nine months of 2006 compared to 37% in the first nine months of 2005. Domestic television licensing margins were 55% in the first nine months compared to negative 21% in the 2005 period, with the increase primarily due to the recognition of a larger portion of PPT production costs in 2005, since no distribution deal had been reached during the early stages of production, combined with increased PPT revenues as a result of the delivery of 19 episodes versus no episodes being delivered in the 2005 period. In addition, increased revenues from online gaming, sponsorship fees, and international distribution license fees helped contribute to the favorable gross margins.
Selling, general and administrative expenses
Selling, general and administrative expenses increased approximately $6.4 million in the first nine months of 2006 compared to the 2005 period. This increase was primarily due to the adoption of SFAS 123(R), which requires the measurement and recognition of compensation expense for all share-based payment awards made to employees and directors including stock options based on estimated fair values. For the first nine months ended October 1, 2006, share-based compensation expense recognized under SFAS 123(R) related to employee and director stock options was approximately $5.0 million, of which approximately $2.9 million related to WPTE and $2.1 million related to Lakes. There was no share-based compensation expense related to employee and director stock options and stock purchases recognized during the nine months ended October 2, 2005, pursuant to the accounting guidance in effect during that time period. The remaining increase in selling, general and administrative expenses in the first nine months of 2006 as compared to the same period of 2005 was due primarily to increased headcount and legal fees associated with development, growth and regulatory compliance costs.


32


Net unrealized gains on notes receivable
Net unrealized gains on notes receivable were $38.9 million for the nine months ended October 1, 2006 and net unrealized losses on notes receivable were $0.2 million for the nine months ended October 2, 2005, respectively. Net unrealized gains (losses) relate to the adjustment to estimated fair value of our notes receivable from Indian tribes. These fair value estimates are calculated based on current assumptions related to the projects and management’s evaluation of critical milestones as discussed below under “Critical Accounting Policies and Estimates — Accounting for long-term assets related to Indian casino projects.” Net unrealized gains for the nine months ended October 1, 2006 primarily related to the notes receivable from the Pokagon Band, the Jamul Tribe, and the Shingle Springs Tribe.
The net unrealized gains associated with the Pokagon Band notes are primarily related to increased probability of opening the casino development project in New Buffalo, Michigan, which is currently under construction and is on schedule, along with a retroactive interest rate adjustment on our notes receivable, triggered by the closing of third-party financing by the Pokagon Band during the second quarter of fiscal 2006. The retroactive interest rate adjustment required the recalculation of interest cost as if a fixed rate had been in effect for the entire period the loans were outstanding. The interest rate used in this calculation is prime rate plus one percentage point as of June 22, 2006 (approximately 9.0%).
The net unrealized gains associated with the Jamul Tribe primarily related to increased probability of opening the casino development project near San Diego, California as well as the increased interest rate charged on the notes with the Jamul Tribe as a result of the new development financing and services agreement entered into on March 30, 2006 with the Jamul Tribe.
The net unrealized gains associated with the Shingle Springs Tribe primarily related to increased probability of opening the casino development project due to a favorable agreement between the Shingle Springs Tribe and El Dorado County, in which El Dorado County has agreed to seek dismissal of all existing litigation against the Shingle Springs Tribe and formally support the Shingle Springs Tribe’s casino project.
In addition, the Kickapoo Tribe terminated their business relationship with us during fiscal 2005, which resulted in an unrealized loss on notes receivable of $5.9 million, which was partially offset in fiscal 2006 by approximately $5.4 million of notes receivable repayment and liability releases received from various vendors in the settlement with the Kickapoo Tribe (see following discussion under — “Liquidity and Capital Resources”).
Other income (expense)
During the second quarter of fiscal 2006, we refinanced substantially all of our long-term debt. As a result of the PLKS debt repayment, the remaining unamortized portion of the warrants ($4.3 million) as well as the unamortized closing costs ($2.5 million) were written off, resulting in a loss on extinguishment of debt of approximately $6.8 million. This loss was offset by a $10.2 million realized gain on sale of investments by WPTE in the first nine months of 2006, relating to the sale of WPTE’s stock in PokerTek.
Income Taxes
The provision for income taxes was $8.7 million and $1.1 million for the nine months ended October 1, 2006 and October 2, 2005, respectively. In the current year period, the provision consisted of $5.2 million related to Lakes and $3.5 million related to WPTE. Lakes’ provision includes approximately $2.0 million related to the IRS tax matter (see below) and $2.0 million related to the reversal of deferred tax assets related to the losses that were reversed during the period related to the Kickapoo Tribe. The remainder of Lakes’ provision consists of interest on the Louisiana tax matter in the approximate amount of $0.9 million, as well as the reversal of a capital loss item (see discussion below) in the amount of $0.3 million which may expire before it can be utilized at the end of 2006 due to the possibility that there may be insufficient gains to offset it against. The prior year period provision related to interest accruals for the period on the Louisiana and IRS tax matters. WPTE’s provision for income taxes is due to positive taxable income that WPTE expects to generate which will exceed WPTE’s operating loss carryforward from 2005. A valuation allowance was previously recorded by WPTE for the net deferred tax asset related to WPTE’s 2005 net operating loss carryforward. Additionally, in accordance with SFAS No. 109, we have evaluated


33


the ability to utilize deferred tax assets arising from net operating loss carry forwards (excluding WPTE) amounts, net deferred tax assets relating to our accounting for advances made to Indian tribes and other ordinary items. Based upon our evaluation of all evidence, we have determined that a valuation allowance is necessary to the extent that management currently believes it is more likely than not that tax benefits will not be realized. Negative evidence considered includes net losses generated over the past four years, which we believe outweighs the current positive evidence regarding our ability to generate significant income from our long-term assets related to Indian casino projects.
We have recorded deferred tax assets related to capital losses incurred during 2001 through 2005. The realization of these benefits is dependent on the generation of capital gains. We have determined that a deferred tax asset in the approximate amount of $0.3 million related to capital losses may expire before it can be utilized at the end of 2006 due to the possibility that there may be insufficient capital gains during 2006 that could be used to offset this loss item. Therefore, to the extent that management currently believes it is more likely than not that tax benefits will not be realized, a valuation allowance has also been recorded against this item as of October 1, 2006.
We are under audit by the IRS for the fiscal years ended 2001 and 2000. The IRS is challenging the treatment of income categorized as a capital gain. If we are unsuccessful in sustaining our position, we may be required to pay up to approximately $3.2 million plus accrued interest related to tax on ordinary income. We originally carried back capital losses to offset the capital gain. If we are unsuccessful in sustaining our capital gain position, we could use the capital losses in the future to offset future capital gains, if any, prior to their expiration. We own approximately 12.5 million shares of WPTE common stock valued at approximately $47.8 million as of November 3, 2006 based upon the closing stock price as reported by the Nasdaq Global Market of $3.83. However, we do not currently intend to sell shares of WPTE common stock. Therefore, if reinstated during 2006, these capital loss items could expire before they could be utilized at the end of 2006, due to insufficient capital gains. As a result, we have recorded a liability related to this matter of approximately $2.6 million, including interest, due to the possibility that if reinstated, these capital loss items may expire before they could be utilized.
Minority interest
The minority interest portion of WPTE’s earnings (loss) was approximately $3.4 million and $(1.3) million for the nine months ended October 1, 2006 and October 2, 2005, respectively. WPTE’s net earnings (losses) were $8.8 million and $(3.6) million for the nine months ended October 1, 2006 and October 2, 2005, respectively.
 
Liquidity and Capital Resources
 
On June 22, 2006, Lakes borrowed $105 million under a financing facility with BofA and certain Lenders pursuant to the terms and conditions of a Credit Agreement among Lakes, Lakes Gaming and Resorts, LLC, BofA and the Lenders. Funds drawn under the Credit Agreement bear interest at the rate of LIBOR plus 6.25% per annum, subject to adjustment or change as specified in the Credit Agreement, and are due and payable on the fourth anniversary of the closing date. Subject to certain premiums, Lakes may prepay the facility in whole or in part at any time. Approximately $25.2 million of the proceeds were used to repay in full our February 15, 2006 loan from PLKS. Pursuant to the terms of the Credit Agreement, we paid a closing fee of $1.5 million, incurred a discount on the initial draw of $1.1 million and are obligated to pay a $50,000 annual administrative agent fee to BofA. Lakes received net proceeds of approximately $78.1 million after costs and fees associated with the Credit Agreement and after repaying the PLKS financing facility. Approximately $22.4 million of the borrowings were used by Lakes to fulfill its remaining commitment to the Pokagon Band during June of 2006.
At OctoberApril 1, 2006,2007, our unaudited condensed consolidated balance sheet included unrestricted cash and cash equivalents and short-term investment balances of $75.8$61.7 million, comprised of ourLakes cash of $1.1$1.6 million, ourLakes short-term investments of $34.9$23.0 million, WPTE cash of $9.0$7.4 million and WPTE short-term investments of $30.8$29.7 million. WPTE cash and short-term investments will not be used in ourLakes’ business. Additionally, we established
On March 2, 2007 (the “Settlement Date”), Lakes contracted with a restricted cashgroup of investors for their participation in the loans made by Lakes to the Pokagon Band for the development of the Four Winds Casino Resort (“Pokagon Casino”), which loans have been assumed by the Pokagon Gaming Authority. As of the Settlement Date, the face value of Lakes’ notes receivable was approximately $104.2 million, including accrued interest reserve of approximately $15.9 million required by$33.0 million. On the Credit Agreement, which is held in an escrow account at BofA. These funds are held in trust forSettlement Date, Lakes transferred 100% of the sole purpose of paying the interest payments due over the next 18 months on amounts advanced under the Credit Agreement; however, we are entitledPokagon Gaming Authority loans to the interest earnings on our restrictedparticipants in exchange for cash balances and any interest earned on restricted cash is included in cash and cash equivalents.


34


In April 2006, we entered into a Settlement Agreement with the Kickapoo Tribe pursuant to which we and the Kickapoo Tribe resolved all outstanding issues relating to the parties’ business relationship that was terminated in November 2005. During fiscal 2005, we recorded a lossproceeds of approximately $6.3$102.1 million based upon the accreted value of the Pokagon Gaming Authority loans less a two percent discount and incurred transaction fees of approximately $1.1 million. The transaction fees were recorded as a reduction of net realized and unrealized gains on notes receivable in the accompanying unaudited condensed consolidated statements of earnings (loss) and comprehensive earnings (loss). Accordingly, based upon the previously recorded estimated fair value of the notes at December 31, 2006, Lakes realized a gain of $0.5 million as a result of the terminated business relationship. In April 2006,consummation of the participation agreement.
The participation agreements also allow the participants to pledge or exchange the notes receivable and Lakes no longer has any rights or obligations to the loans and is isolated, even in default, from liability. As a result, the Pokagon notes receivable participation transaction has been treated as a sale pursuant to Statement of Financial Accounting Standards No. 140,Accounting for Transfers and Servicing of Financial Assets and Extinguishment of Liabilities(“SFAS No. 140”). The sale does not have any effect on Lakes’ related management agreement with the SettlementPokagon Band.
Also on March 2, 2007, Lakes repaid its $105 million loan with BofA and certain lenders under the Credit Agreement, weusing proceeds received from the Pokagon notes receivable participation transaction in addition to amounts previously included in a cash payment of approximately $2.6 million as reimbursement for payments made directly by us to vendors on behalf of the Kickapoo Tribe and the Kickapoo Tribe agreed to pay $0.6 million into an escrow to be released to us at such time as we transfer title to certain land owned by us to the Kickapoo Tribe. We and the Kickapoo Tribe have agreed that title will transfer only after the Kickapoo Tribe assumes, settles or pays certain accounts payable to vendorsrestricted interest reserve account related to the Kickapoo Tribe’s casino that remain as current liabilitiesCredit Agreement. Lakes incurred approximately $1.1 million in a prepayment penalty associated with the payoff of the Credit Agreement. This amount, along with the remaining unamortized portion of the Credit Agreement debt issuance costs of approximately $1.8 million and the unamortized discount of approximately $0.9 million, were written off, which resulted in a loss on our financial statements, and once we receive full releases for any liability thereto. During the first nine monthsextinguishment of fiscal 2006 we received releases from vendors totalingdebt of approximately $2.8$3.8 million, that havewhich has been recorded as unrealized gains. As a resultby Lakes in the accompanying unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss).
In conjunction with the extinguishment of the $2.6$105 million payment, we revaluedCredit Agreement, Lakes’ related interest rate swap agreement was also terminated. The termination of the note receivable from the Kickapoo Tribe at $2.6interest rate swap agreement resulted in additional interest expense of approximately $0.5 million as of April 2, 2006, and an unrealized gain of that amountwhich was recognizedrecorded in the first quarter of 2006.fiscal 2007.


20


Pursuant to the terms and conditions of a financing agreement dated as of February 15, 2006 among Lakes, PLKS Funding, LLC and various subsidiaries of Lakes, PLKS Holdings, LLC (“PLKS”) was granted a warrant to purchase 1,250,000 common shares of Lakes at $7.50 per share (“Warrant”). During April 2007, PLKS exercised and purchased 102,500 shares underlying the Warrant at $7.50 per share and paid Lakes $0.8 million.
On May 4, 2007, Lakes and PLKS amended the exercise price of the Warrant (“Amendment”). The Amendment reduced the exercise price of the Warrant from $7.50 per share to $6.50 per share for the remaining 1,147,500 shares underlying the Warrant. In consideration for the reduced exercise price, PLKS agreed to exercise and purchase the remaining 1,147,500 shares underlying the Warrant for an aggregate exercise price of $7.5 million, which was paid to Lakes on May 7, 2007. Lakes is currently evaluating the potential effect this Amendment will have on its financial position and results of operations during the second quarter of fiscal 2006, the $2.6 million payment was applied to the note. Therefore, there is no remaining value associated with the note receivable from the Kickapoo Tribe as of October 1, 2006. The land transfer and remaining release of liabilities will be recognized in the period they occur. As of October 1, 2006, approximately $0.9 million of liabilities subject to the Settlement Agreement remain. We will not recognize further gains unless and until the remaining release is received from the vendor. However, we do not know or have an estimate of when or if this will occur.
Also during the first quarter ended April 2, 2006, we settled a short-swing profit matter, which resulted in a payment to us of approximately $2.8 million, which was recorded as an increase in equity and did not impact our earnings.2007.
 
Our agreements with our tribal partners require that we provide certain financing for project development in the form of loans. These loans are interest bearing; however, the loans and related interest are not due until the casino is built and has established profitable operations. In the event that the casinos are not built, our only recourse is to attempt to liquidate assets of the development, if any, excluding any land in trust. Approximately $10.9 million of the loans due from the Pokagon Band was used by the Pokagon Band to purchase the project site. Our first deed of trust against this property was relinquished when the Bureau of Indian Affairs (“BIA”) placed the land into trust in January 2006.
 
We believe that our casino development projects currently in progress and included in the table below will be constructed and achieve profitable operations; however, no assurance can be made that this will occur. If this does not occur, it is likely that we would incur substantial or complete losses on our notes receivable from Indian tribes and related intangible assets associated with the acquisition of the management, development, consulting and financing contracts. In addition, if our current casino development projects are not completed or, upon completion, fail to successfully compete in the highly competitive market for gaming activities, we may lack the funds to compete for and develop future gaming or other business opportunities and our business could be adversely affected to the extent that we may be forced to cease our operations entirely.


35


Following is a table summarizing remaining contractual obligations as of OctoberApril 1, 20062007 (in millions):
 
                                       
 Payment Due by Period  Payment Due by Period 
   Less than
     More than
    Less than
     More than
 
Contractual Obligations
 Total 1 year 1-3 years 3-5 years 5 years  Total 1 year 1-3 years 3-5 years 5 years 
Remaining Casino Development Commitment(1)                                        
Jamul Tribe(2) $  $  $  $  $  $  $  $  $  $ 
Shingle Springs Tribe(3)                              
Pokagon Band(4)                              
Pawnee Nation of Oklahoma (“Pawnee Nation”) — Travel Plaza(5)               
Iowa Tribe — Ioway Project(6)               
Operating leases(7)  1.3   0.8   0.5       
BofA financing facility(8)  105.0         105.0    
WPTE operating leases(9)  4.1   0.8   1.7   1.6    
Iowa Tribe of Oklahoma (“Iowa Tribe”) — Ioway Project(5)               
Lakes operating leases(6)  0.9   0.8   0.1       
WPTE operating leases(7)  3.8   0.9   1.8   1.1    
WPTE purchase obligations(8)  3.1   1.0   1.8   0.3    
                      
 $110.4  $1.6  $2.2  $106.6  $  $7.8  $2.7  $3.7  $1.4  $ 
                      
 
 
(1)We may be required to provide a guarantee of tribal debt financing or otherwise provide support for the tribal obligations related to any of the projects.projects (see (2), (3) and (5) below). Any guarantees by us or similar off-balance sheet liabilities will increase our potential exposure in the event of a default by any of these tribes. No such guarantees or similar off-balance sheet liabilities existed at OctoberApril 1, 2006.2007.
 
(2)Effective March 30, 2006, we entered into a development financing and services agreement with the Jamul Tribe. As part of the agreement, we will use our best efforts to obtain financing from which advances will be made to the Jamul Tribe of up to $350 million to pay for the design and construction of a casino project. It has been determined that the project. There can be no assurance that third party financingproposed gaming facility will be available. If we are unablereduced in size and scope. The current plan is for the gaming facility to obtain the appropriate amount of financing for this project, the project maydecrease in size and become a solely class II electronic gaming device facility which will not be completed as planned. Thisrequire a compact. The agreement will help assist the Jamul Tribe in developing a casino with related amenities/services (“Jamul Casino”) on its existing six-acre reservation whichbetween Lakes and the Jamul Tribe will manage. We will receive a flat fee of $15 million for our development design services, and a flat fee of $15 million for our construction oversight services, payable evenly overbe modified to reflect the first five years after the opening datenew economics of the Jamul Casino. In connection with our financingrevised casino plan but will not be subject to approval by the State of California or the Jamul Casino, the Jamul Tribe will pay interest over a ten year period on sums advanced by us equal to the rate charged to us for obtaining the funds necessary plus 5%. Amounts previously advanced by us to the Jamul Tribe in connection with the Jamul Tribe’s proposed casino resort are included in the development financing and services agreement financing amount.NIGC.


21


(3)WeThe development agreement, as amended, increases the amount of the pre-construction advances Lakes may increase our commitmentmake to the Shingle Springs Tribe byin the form of a transition loan and land loan up to $10.0a maximum combined amount of $75.0 million, subjectbut it does not contractually require us to amendment of the development loan agreement and approval by the NIGC, which is currently in progress.make such advances.
 
(4)We will be obligated to pay an amount to an unrelated third party once the Pokagon Casino is open and we are the manager of the casino. The amount is payable quarterly for five years and is only payable if we are the manager and the casino is open and operational. The payment is part of a settlement and release agreement associated with our obtaining the management contract with the Pokagon Band. The maximum liability over the five-year period is approximately $11 million. We will also be obligated to pay approximately $3.3 million to a different third party on behalf of the Pokagon Band;Band in accordance with the management contract which is payable once the casino opens over 24 months.
 
(5)Lakes made a commitment of $1.0 million to the Pawnee Nation related to the Travel Plaza project based upon an approved budget. In addition to the information in the above table, we have been advancing funds to the Pawnee Nation related to the Chilocco project. The funding amount is based upon an approved budget, yet to be finalized. Additional amounts are expected to be advanced to the Pawnee Nation for the new casino project and Travel Plaza project based upon an approved budget yet to be finalized.
(6)We have agreed to make advances to the Iowa Tribe subject to a project budget to be agreed upon by us and the Iowa Tribe and certain other conditions. The development loan will be for preliminary development costs under the Ioway project budget. We have also agreed to use reasonable efforts to assist the Iowa Tribe in obtaining permanent financing for any projects developed under the Iowa consulting agreement.


36


(7)(6)We lease an airplane under a non-cancelable operating lease that expires on May 1, 2008.
 
(8)On June 22, 2006, we closed on a $105 million financing facility. Any funds drawn on the facility bear interest at the rate of LIBOR plus 6.25% per annum, interest payable in arrears quarterly, and are due and payable in full on the fourth anniversary of the closing date.
(9)(7)WPTE operating lease obligations include rent payments for WPTE corporate offices pursuant to two lease agreements. For the first lease, monthly lease payments began at approximately $38,000 and escalate to approximately $45,000 over the six-year lease term. For the second lease, monthly payments began at approximately $28,000 and escalate up to approximately $33,000 over the five year lease term. The lease obligations presented include rent payments for WPTE’s Israel office facilities in Nahariya and Jerusalem. The amounts set forth in the table above assumesinclude monthly lease payments through June 2011.
(8)WPTE purchase obligations include the operational expenses associated with the development of WorldPokerTour.com. These expenses relate to the gaming (includes commitments for the internally created software platform and the CryptoLogic network) and non-gaming aspects of the website. Additionally, included in purchase obligations are open purchase orders of approximately $0.3 million as of April 1, 2007. These liabilities are included in other accrued expenses within the unaudited condensed consolidated financial statements.
 
We have incurred cumulative development and land development costs of approximately $6.3$6.4 million and $1.7$1.9 million, respectively, relating to ourthe development of a Company-owned non-Indian casino that we are developing in Vicksburg, Mississippi. These costs are included in property and equipment as construction in progress and land, respectively. We are working toward obtaining all necessaryhave received various regulatory approvals to move forward with this project. We dodevelop our own casino near Vicksburg, Mississippi. Lakes does not expect to have access to the capital necessary to makepursue further development of this a viable project for us until such time that one of our other casino projects is open and therefore, this is now planned to be a 2007 project.2008.
 
Our unrestricted cash balance and short-term investments, excluding WPTE cash and short-term investments, was approximately $36 million as of October 1, 2006. Our major use of cash over the past three years has been pre-construction financing provided to our tribal partners and on-going corporate costs. While the funds provided by the $105We may be required to pay taxes up to approximately $12 million credit agreement with BofA allow usplus interest and fees in fiscal 2007 related to move forward with our various casino development projects, wetwo tax matters. We anticipate that we will incur additional pre-construction costs which willour operational and development needs may require us to obtain additional sources of financing during fiscal 2007 to meet our operational and development needs.financing. Therefore, we will explore additional financing alternatives as needed.needed, which may include debt, equity or a combination thereof.
 
If the financing is in the form of equity financing it will be dilutive to our shareholders, and any debt financing may involve additional restrictive covenants. We may raise additional capital through either public or private financings or the sale of some or all of our shares of WPTE, although it is not currently our intent to sell all of our interest in WPTE. An inability to raise such funds when needed might require us to delay, scale back or eliminate some of our expansion and development goals.
 
Our cash requirements do not include construction-related costs that will be incurred when any of the projects begin construction. The construction of our Indian casino projects maywill depend on the ability of the tribes to obtain financing for the projects. If such financing cannot be obtained on acceptable terms, it may not be possible to complete these projects, which could have a material adverse effect on our results of operations and financial condition. In order to assist the tribes, we may be required to guarantee the tribes’ debt financing or otherwise provide support for the tribes’ obligations. Guarantees by us, if any, will increase our potential exposure in the event of a default by any of these tribes.


22


 
Critical Accounting Policies and Estimates
 
This Management’s Discussion and Analysis of Financial Condition and Results of Operations discusses our unaudited condensed consolidated financial statements which have been prepared in accordance with U.S. generally accepted accounting principles. The preparation of these financial statements requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the balance sheet date and reported amounts of revenue and expenses during the reporting period. On an ongoing basis, we evaluate our estimates and judgments, including those related to revenue recognition, long-term assets related to Indian casino projects, deferred television costs, investments, litigation costs, income taxes, share-based compensation and derivative financial instruments. We base our estimates and judgments on historical experience and on various other factors that are reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates.
 
We believe the following critical accounting policies involve the more significant judgments and estimates used in the preparation of our unaudited condensed consolidated financial statements.


37


Revenue recognition:  Revenue from the management of Indian-owned casino gaming facilities is recognized in accordance with our policy described below under the caption “Accounting for long-term assets related to Indian casino projects.”
 
Revenue from the domestic and international distribution of WPTE’sWPTE television series is recognized as earned under the following criteria established by the American Institute of Certified Public Accountants Statement of Position (SOP)No. 00-2,Accounting by Producers or Distributors of Films(SOP 00-2”)00-2):
 
 • Persuasive evidence of an arrangement exists;
 
 • The show/episode is complete, and in accordance with the terms of the arrangement, has been delivered or is available for immediate and unconditional delivery;
 
 • The license period has begun and the customer can begin its exploitation, exhibition or sale;
 
 • The seller’s price to the buyer is fixed and determinable; and
 
 • Collectibility is reasonably assured.
 
In accordance with the terms of the WPT and PPT agreements,Agreement, WPTE recognizesrecognize domestic television license revenues upon the receipt and acceptance of completed episodes. However, due to restrictions and practical limitations applicable to WPTE’s operating relationships with foreign networks, WPTE currently does not consider collectibility of international television license revenues to be reasonably assured, and accordingly, WPTE does not recognize such revenue until the distributor has received payment. Additionally, WPTE presents international distribution license fee revenues net of the distributor’s fees, as the distributor is the primary obligor in the transaction with the ultimate customer pursuant to EITF Emerging Issues Task Force (EITF)99-19,Reporting Revenue Gross as a Principal versus Net as an Agent(EITF 99-19”)99-19).
 
Product licensing revenues are recognized when the underlying royalties from the sales of the related products are earned. WPTE recognizes minimum revenue guarantees ratably over the term of the license or as earned royalties based on actual sales of the related products, if greater. WPTE presents product licensing fees gross of licensing commissions, which are recorded as selling and administrative expenses asbecause WPTE is the primary obligor in the transaction with the ultimate customer pursuant toEITF 99-19.
 
Online gaming revenues are recognized monthly based on detailed statements received from WagerWorks, WPTE’s online gaming service provider, for online poker and casino activity.activity during the previous month. In accordance withEITF 99-19, WPTE presents online gaming revenues gross of WagerWorks costs, including WagerWorks management fee, royalties, credit card processing and chargebacks that are recorded as cost of revenues. Sincerevenues, because WPTE has the ability to adjust price and specifications of the online gaming site, WPTE bears the majority of the credit risk and WPTE is responsible for the sales and marketing of the gaming site. WPTE includes certain promotional expenses related to free bets and deposit bonuses along with customer charge backschargebacks as deductions of revenue. All other promotional expenses are generally recorded as sales and marketing expenses.


23


 
Event hosting fees are paid by host casinos for the privilege of hosting the events and are recognized as the episodes that feature the host casino are aired. Sponsorship revenues are recognized as the episodes that feature the sponsor are aired. Licensing advances and guaranteed payments collected, but not yet earned, by WPTE, as well as casino host fees and sponsorship receipts collected prior to the airing of episodes, are classified as deferred revenue in the accompanying unaudited condensed consolidated balance sheets.
Travel Channel (“TRV”) participation:  WPTE accounts for royalty payments to TRV in accordance with the WPTE and PPT agreements, in which TRV retains a right to 15% of adjusted gross revenues from the exploitation of the World Poker Tour brand. WPTE records these amounts in production costs as revenues from international television, consumer products licensing, home entertainment and merchandise are recognized.
 
Deferred television costs:  WPTE accounts for deferred television costs in accordance withSOP 00-2. Deferred television costs include capitalizable direct costs, production overhead and development costs and are stated at the lower of cost or net realizable value based on anticipated revenue. WPTE has not currently anticipated any revenues in excess of those subject to existing contractual relationships, because WPTE has insufficient operating history to enable such anticipation. In January 2006, WPTE signed an agreement for the PPT with


38


Discovery Communications, Inc, the parent company of the Travel Channel, therefore, PPT television costs began capitalization during the first quarter of fiscal 2006 and are expensed as episodes are delivered to the Travel Channel. Marketing, distribution and general and administrative costs are expensed as incurred. Capitalized television production costs for each episode are expensed as revenues are recognized upon delivery and acceptance by the Travel ChannelTRV of the completed episode. WPTEWPTE’s management currently estimates that 64%100% of the $1.4approximately $2.0 million in capitalized deferred television costs at OctoberApril 1, 2006,2007 are expected to be expensed in connection with episode deliveries by the end of fiscal 2006.
Investments:  In March 2006, WPTE sold 630,000 common shares of its then 12% interest in PokerTek at $9.03 per share, resulting in net cash proceeds of approximately $5.7 million. As a result of the sale, WPTE realized a gain of approximately $5.7 million in the first quarter of fiscal 2006. In September 2006, WPTE sold its remaining equity interest in PokerTek consisting of 450,000 shares at $10.11 per share that generated net cash proceeds of, and resulted in a realized gain of approximately $4.5 million in the third quarter of fiscal 2006.
On July 31, 2006, WPTE acquired a 10% ownership interest in 3G Scene for approximately $2.9 million. 3G Scene designs and operates software and other products the enable it or its licensees to offer gaming services to customers via mobile devices. Since WPTE has less than a 20% ownership interest and does not have the ability to exercise significant influence over 3G Scene, this investment is accounted for under the cost method and will be reviewed at least quarterly by management for declines in fair value that may be determined to beother-than-temporary, in accordance withEITF 03-1.2007.
 
Share-Based Compensation Expense:  On January 2, 2006, we adoptedWe measure share-based compensation expense pursuant to the Financial Accounting Standards Board (“FASB”) Statement of Financial Accounting Standard (“SFAS”)SFAS No. 123(R) (“SFAS 123(R)”)123®, which requires the measurement and recognition of compensation expense for all share-based payment awards made to employees and directors including employee and director stock options and employee and director stock purchases based on estimated fair values. In March 2005, the SEC issued Staff Accounting Bulletin (“SAB”) No. 107 relating to SFAS No. 123(R) and we have applied certain provisions of SAB 107 in our adoption of SFAS 123(R).
 
SFAS No. 123(R) requires companies to estimate the fair value of share-based payment awards on the date of grant using an option-pricing model. The value of the portion of the award that is ultimately expected to vest is recognized as expense over the requisite service periods in our unaudited consolidated statement of earnings (loss) and comprehensive earnings (loss). SFAS No. 123(R)supersedes our previous accounting under the provisions of SFAS No. 123,Accounting for Stock-Based Compensation(“SFAS No. 123”). As permitted by SFAS No. 123, we measured compensation cost for options granted prior to January 2, 2006, in accordance with Accounting Principles Board Opinion (“APB”) No. 25,Accounting for Stock Issued to Employeesand related interpretations. Accordingly, no accounting recognition is given to stock options granted at fair market value until they are exercised. Upon exercise, net proceeds, including tax benefits realized, are credited to equity.
 
We adopted SFAS 123(R) using the modified prospective transition method, which requires the application of the accounting standard as of January 2, 2006, the first day of our fiscal year 2006. In accordance with the modified prospective transition method, our unaudited condensed consolidated financial statements for prior periods have not been restatedPursuant to reflect, and do not include, the impact of SFAS 123(R). Share-based compensation expense recognized during the period is based on the value of the portion of share-based payment awards that is ultimately expected to vest during the period. Share-based compensation expense recognized in our unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss) was approximately $1.3 million and $5.0 million for the three months and nine months ended October 1, 2006, respectively and included both compensation expense for share-based payment awards granted prior to, but not yet vested as of January 1, 2006 based on the grant date fair value estimated in accordance with the pro forma provisions of SFAS No. 123 and compensation expense for the share-based payment awards granted subsequent to January 1, 2006. There was no share-based compensation expense related to employee and director stock options and employee and director stock purchases recognized during the three months and nine months ended October 2, 2005.
Upon adoption of SFAS 123(R), we continued the use of the Black-Scholes option pricing method that we had used to establish fair value of options granted prior to January 2, 2006.options. Our determination of fair value of share-based payment awards on the date of grant using an option-pricing model is affected by our stock price as well as assumptions regarding a number of highly complex and subjective variables. These variables include, but are not


39


limited to our expected stock price volatility and actual and projected employee stock option exercise behaviors. Any changes in these assumptions may materially affect the estimated fair value of the share-based award.
 
Income taxes:In November 2005, the FASB issued FASB Staff Positionaccordance with SFAS No. FAS 123(R)-3109,, Transition Election Related to Accounting for the Tax Effects of Share-Based Payment AwardsIncome Taxes,(“FSP 123R-3”SFAS 109”). FSP 123R-3 provides a simplified alternative method we evaluated the ability to calculate the beginning pool of excess tax benefits against which excess futureutilize deferred tax assets (that result when the compensation cost recognized for an award exceeds the ultimate tax deduction) could be written off under SFAS 123(R). The guidance in FSP 123R-3arising from net operating loss carryforwards, and other ordinary items and determined that a valuation allowance was effective on November 10, 2005,appropriate at April 1, 2007 and we may make a one-time election to adopt the transition method described in FSP 123R-3 before the end of our fiscal year ending December 31, 2006. We are currently evaluatingevaluated all evidence and determined net losses (excluding net realized and unrealized gains and losses on notes receivable) generated over the available transition alternatives of FSP 123R-3.past five years outweighed the current positive evidence that we believe exists surrounding our ability to generate significant income from our long-term assets related to Indian casino projects. Therefore, we have recorded a 100% valuation allowance against these items at April 1, 2007, and December 31, 2006.
 
Derivative Financial Instruments:  We are required to maintain an interest rate swap agreement under the terms and condition of our Credit Agreement. The derivative is part of our risk management strategy to manage exposure to fluctuations in interest rates and to manage the overall cost of our debt. The derivative is recognized as either an asset or liability and is measured at fair value. We have elected hedge accountingrecorded deferred tax assets related to capital losses. The realization of these benefits is dependent on the generation of capital gains during the applicable carryforward periods. We believe we will have sufficient capital gains in the foreseeable future to utilize these benefits due to significant appreciation in our investment in WPTE, which has a minimal cost basis and could be sold at a substantial gain. We own approximately 12.5 million shares of WPTE common stock valued at approximately $64 million as of April 1, 2007 based upon the closing stock price as reported by NASDAQ on March 30, 2007 of $5.14.


24


WPTE’s current growth plans potentially may include international expansion primarily related to WPTE’s online gaming business, expansion of television and product licensing businesses, industry consolidation and acquisitions and entry into new branded gaming businesses. Although WPTE anticipates that all potential strategies will be accretive to earnings, WPTE is aware of the risks involved with an aggressive growth strategy. Therefore, based on WPTE’s limited and volatile earnings history combined with WPTE’s cautious optimism, WPTE has determined that a valuation allowance is necessary to the extent that management currently believes it is more likely than not that tax benefits related to stock option exercises will not be realized.
See Note 6 to the unaudited condensed consolidated financial statements included in Item 1 of this Quarterly ReportForm 10-Q above, for a discussion of the interest rate swap under SFASeffects of adopting FASB Interpretation No. 133,48,Accounting for Derivative Instruments and Hedging Activities, as amended.Uncertainty in Income Taxes
Changes(“FIN 48”) in the fair valuefirst quarter of the instrument are reflected in accumulated other comprehensive earnings (loss) until the hedged item is recognized in earnings. Changes in fair value of the cash flow hedge determined to arise from ineffectiveness of the instrument, as determined through the hypothetical derivative method, will be immediately recorded in earnings.
As of October 1, 2006, we tested the interest rate swap for hedge effectiveness using the hypothetical derivative method. Based upon both the retrospective and prospective testing we expect the cash flow hedge to be highly effective. No amounts were recorded in earnings for ineffectiveness. Management will continue to test for hedge effectiveness on at least a quarterly basis.fiscal 2007.
 
Accounting for long-term assets related to Indian casino projects:
 
Notes receivable:receivable.  
We are involved as the exclusive developer and manager or consultant of Indian-owned casino projects. We have formal procedures governing our evaluation of opportunities for potential development projects that we follow before entering into agreements to provide financial support for the development of these properties.Indian owned casino projects. We determine whether there is probable future economic benefit prior to recording any asset related to the Indian casino project. No asset related to an Indian casino project is recognized unless it is considered probable that the project will be built and result in an economic benefit to us sufficient to recover the asset. We initially evaluate the following six factors involving critical milestones that affect the probability of developing and operating a casino:
 
 • Has the U.S. Government’s Bureau of Indian Affairs federally recognized the tribe as a tribe?
 
 • Does the tribe hold or have the right to acquire land to be used for the casino site?
 
 • Has the Department of the Interior put the land into trust for purposes of being used as a casino site?
 
 • Has the tribe entered into a gaming agreement with the state in which the land is located, if required by the state?
 
 • Has the tribe obtained approval by the National Indian Gaming Commission of the management agreement?
 
 • Do other legal and political obstacles exist that could block development of the project and, if so, what is the likelihood of the tribe successfully prevailing?
In addition to the above factors, we also consider economic and qualitative factors affecting our future economic benefits from the project, including the following:
 • An evaluation by management of the financial projections of the project given the project’s geographic location and the feasibility of the project’s success given such location;
 
 • The structure and stability of the tribal government;


40


 • The scope of the proposed project, including the physical scope of the contemplated facility and the expected financial scope of the related development;
 
 • An evaluation of the proposed project’s ability to be built as contemplated and the likelihood that financing will be available; and
 
 • The nature of the business opportunity to us, including whether the project would be a financing, developmentand/or management opportunity.
 
The development phase of each relationship commences with the signing of the respective contracts and continues until the casinos open for business; thereafter, the management phase or consulting phase of the relationship, governed by the contract, continues for a period of up to seven years. We, as developerand/or manager, have the exclusive right and obligation to develop, manage or provide consulting services, operate and maintain the casino and to train tribal members and others in the operation and maintenance of the casino during the term of the contract. We also make advances to the tribes to fund certain portions of the projects, which bear interest generally at prime plus 1% or 2%. Repayment of the advances and accrued interest is only required if the casino is successfully opened and distributable profits are available from the casino operations. Under the management contract we typically earn a management fee calculated as a percentage of the net income of the operations. In addition, repayment of the loans and the manager’s fees under the management contracts are subordinated to certain other financial obligations of the respective operations. Generally, the order of priority of payments from the casinos’ cash flows is as follows: a certain minimum monthly priority payment to the tribe, repayment of various senior debt associated with construction and equipping of the casino with interest accrued thereon, repayment of various debt with interest accrued thereon due to us, management fees to us, and other obligations, with the remaining funds distributed to the tribe.
We account for our advances tonotes receivable from and service contracts with the tribes and our management or consulting contracts as separate elements.assets. The estimated fair value of the advances made to the tribes are accounted for as in-substance structured notes in accordance with the guidance contained in EITFNo. 96-12. Because repayment of the notes is required only if a casino is successfully opened, our advances may be at risk for reasons other than failure of the borrower to pay the contractual amounts due because if the casinos are not built the amounts due will not become contractually due. Accordingly, pursuant to the guidance in EITFEmerging Issues Task Force ConsensusNo. 96-12,Recognition of Interest Income and Balance Sheet Classification of Structured Notes(“EITFNo. 96-12”). . Under their terms, the notes do not become due and payable unless and until the projects are completed and operational. However, in the event our development activity is terminated prior to completion, we record our advancesgenerally retain the right to tribes at estimated fair value.collect in the event of completion by another developer. Because the stated rate of the notes receivable alone is not commensurate with the risk inherent in these projects (at least prior to commencement of operations), the estimated fair value of the notes receivable is generally less than the amount advanced. Costs incurred related to Indian casino projects are not considered


25


advanced to the tribe until actually paid by us. At the date of each advance, the difference between the estimated fair value of the note receivable and the actual amount advanced is recorded as an intangible asset related to the acquisition of the management, consulting or financing contract. Subsequent to the initial recording, the two assets are accounted for separately.asset.
 
Subsequent to its initial recording at estimated fair value, the note receivable portion of the advance is adjusted to its current estimated fair value at each balance sheet date based onusing then current assumptions related toincluding typical market discount rates, and expected repayment terms as may be affected by estimated future interest rates and opening dates, with the projects.latter affected by changes in project-specific circumstances such as ongoing litigation, the status of regulatory approvals and other factors previously noted. The notes receivable are not adjusted to an amount in excessa fair value estimate that exceeds the face value of the contractual amount due. Changesnote plus accrued interest, if any. Due to uncertainties surrounding the projects, no interest income is recognized during the development period, but changes in estimated fair value of the notes receivable still held as of the balance sheet date are recorded as unrealized gains or losses on notes receivable in our unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss).
 
The determination of estimated fair value requires that assumptions be made and judgments be applied regarding casinoUpon opening dates, interest rates, discount rates and probabilities of the projects opening based on a review of critical milestones. If casino, opening dates, interest rates, discount rates orany difference between the probabilities of the projects opening change significantly, thethen estimated fair value of the related note receivable is adjusted accordingly and we could experience unrealized gains or losses that could be material.
Upon opening of the casino we may conclude that it is no longer reasonably possible that the advances to Indian tribes would be at risk to not be repaid for reasons other than failure of the borrower to pay the contractual amounts due. In such situations, the notes receivable will be accounted for under the effective interest method upon opening of the casino and will no longer be adjusted to fair value at each balance sheet date. Any difference between the then fair value of the advances and the amount contractually due under the notes will be amortized into income using the effective interest method over the remaining term of the note. Such notes would then be evaluated for impairment pursuant to SFASStatement of Financial Accounting Standards No. 114,Accounting by Creditors for Impairment of a Loan.


41


Intangible assets related to Indian casino projects:projects.  
Intangible assets related to the acquisition of the management, development, consulting or financing contracts are accounted for using the guidance in SFAS No. 142Goodwill and Other Intangible Assets(“SFAS No. 142”). Pursuant to that guidance, the assets are periodically evaluated for impairment based on the estimated cash flows from the contract on an undiscounted basis. In the event the carrying value of the intangible assets, in combination with the carrying value of land held for development and other assets associated with the Indian casino projects described below, were to exceed the undiscounted cash flow, an impairment would be recorded. Such an impairment would be measured based on the difference between the fair value and carrying value of the assets. In accordance with SFAS No. 142, we will amortize the intangible assets related to the acquisition of the management, development, consulting or financing contracts under the straight-line method over the lives of the contracts which will commence when the related casinos open. In addition to the intangible asset associated with the cash advances to tribes described above, these assets include actual costs incurred to acquire our interest in the projects from third parties. During the nine months ended October 1, 2006 and October 2, 2005, impairment of intangible assets related to Indian casino projects were approximately $0.0 million and $0.1 million, respectively.
 
Land held for developmentdevelopment.  
Included in land held for development is land held for possible transfer to Indian tribes for use in certain of the future casino resort projects. In the event that this land is not transferred to the tribes, we can sell it. We evaluate these assets for impairment in combination with intangible assets related to acquisition of management, development, consulting or financing contracts and other assets related to the Indian casino projects as discussed above.
 
OtherOther.  
Included in this category are costs incurred related to the Indian casino projects, which have not yet been included as part of the notes receivable because of timing of the payment of these costs. TheseWhen paid, these amounts will ultimately be allocated between notes receivable and intangible assets related to the acquisition of management, development, consulting or financing contracts and will be evaluated for changes in fair value or impairment, respectively, as described above. These amounts vary from period to period due to timing of payment of these costs. Also included in this category are receivables from related parties that are directly related to the development and opening of Lakes’ Indian casino projects.
 
In addition, we incur certain costs related to the projects that are not included in notes receivable, which are expensed as incurred. These costs include salaries, travel and certain legal costs.


26


 
As of OctoberApril 1, 20062007 and January 1,December 31, 2006, the consolidated balance sheets include long-term assets related to Indian casino projects of $224.9$147.7 million and $152.8$243.8 million, respectively, primarily related to three separate projects.respectively. The amounts are as follows by project (in thousands):
 
                                        
 October 1, 2006  April 1, 2007 
   Shingle
          Shingle
       
 Pokagon
 Springs
 Jamul
      Pokagon
 Springs
 Jamul
     
 Band Tribe Tribe Other Total  Band Tribe Tribe Other Total 
Notes receivable, at estimated fair value $84,218  $33,776  $25,228  $5,999  $149,221  $  $42,934  $22,751  $2,958  $68,643 
Intangible assets related to Indian casino projects  23,573   20,158   8,623   1,709   54,063   23,573   21,750   10,623   896   56,842 
Land held for development     8,712   6,679   1,340   16,731      6,992   6,751   1,370   15,113 
Other  60   1,462   2,462   872   4,856   60   1,516   966   4,549   7,091 
                      
 $107,851  $64,108  $42,992  $9,920  $224,871  $23,633  $73,192  $41,091  $9,773  $147,689 
                      
 


42


                                        
 January 1, 2006  December 31, 2006 
   Shingle
          Shingle
       
 Pokagon
 Springs
 Jamul
      Pokagon
 Springs
 Jamul
     
 Band Tribe Tribe Other Total  Band Tribe Tribe Other Total 
Notes receivable, at estimated fair value $44,028  $26,550  $12,957  $3,527  $87,062  $100,544  $40,912  $20,754  $2,098  $164,308 
Intangible assets related to Indian casino projects  18,356   18,755   7,872   1,105   46,088   23,573   20,387   9,760   559   54,279 
Land held for development     8,836   6,643   769   16,248      8,739   6,710   1,341   16,790 
Other  93   1,600   828   839   3,360   60   2,041   2,207   4,142   8,450 
                      
 $62,477  $55,741  $28,300  $6,240  $152,758  $124,177  $72,079  $39,431  $8,140  $243,827 
                      
 
The key assumptions and criteria used in the determination of the estimated fair value of the notes receivable are estimated casino opening date, projected interest rates, discount rates and probability of projects opening. The estimated casino opening date used in the valuation reflects the weighted-average of three scenarios: a base case (which is based on our forecasted casino opening date) and one and two years out from the base case. The projected interest rates are based upon the one year U.SU.S. Treasury Bill spot yield curve per Bloomberg and the specific assumptions on contract term, stated interest rate and casino opening date. The discount rate for the projects is based on the yields available on certain financial instruments at the valuation date, the risk level of equity investments in general, and the specific operating risks associated with open and operating gaming enterprises similar to each of the projects. In estimating this discount rate, market data of other public gaming related companies is considered. The probability applied to each project is based upon a weighting of four different scenarios with the fourth scenario assuming the casino never opens. The first three scenarios assume the casino opens but applies different opening dates as discussed above. The probability weighting applied to each scenario captures the element of risk in these projects and is based upon the status of each project, review of the critical milestones and likelihood of achieving the milestones.


27


 
The following table provides the key assumptions used to value the notes receivable at estimated fair value (dollars in thousands):
 
Pokagon Band:
     
  As of October 1, 2006 As of January 1, 2006
 
Face value of note (principal and interest) $100,352 $61,827
  ($71,176 principal and $29,176 interest) ($46,445 principal and $15,382 interest)
Estimated months until casino opens (weighted-average of three scenarios) 13 months 32 months
Projected interest rate until casino opens 9.0% 8.2%
Projected interest rate during the loan repayment term 9.0% 8.2%
Discount rate 15% 15%
Repayment terms of note 60 months 60 months
Probability rate of casino opening (weighting of four scenarios) 99% 90%
See discussion included below under “Description of each Indian casino project and evaluation of critical milestones — Pokagon Band.”

43


Shingle Springs Tribe:
 
                    
 As of October 1, 2006 As of January 1, 2006     As of April 1, 2007 As of December 31, 2006
Face value of note (principal and interest) $53,640  $46,446        $62,391 $55,942
 ($41,423 principal and $12,217 interest) ($37,905 principal and $8,541 interest)       ($46,627 principal and $15,764 interest) ($42,310 principal and $13,632 interest)
Estimated months until casino opens (weighted-average of three scenarios)  36 months   37 months        25 months 28 months
Projected interest rate until casino opens  9.86%   9.2%        9.97% 9.98%
Projected interest rate during the loan repayment term  9.78%   9.1%        9.92% 9.76%
Discount rate  15%   15%        15% 15%
Projected repayment terms of note*  24 months   24 months       
Repayment terms of note* 84 months 
Projected repayment terms of note**  24 months
Probability rate of casino opening (weighting of four scenarios)  75%   70%        85% 85%
 
 
*PayableNote is payable in even monthly installments over the course of the management agreement subsequent to the casino opening.
**Note was previously payable in varying monthly installments based on contract terms subsequent to the casino opening.
 
See discussion included below under “Description of each Indian casino project and evaluation of critical milestones — Shingle Springs.”
 
Jamul Tribe (Note 8):Tribe:
 
            
 As of October 1, 2006 As of January 1, 2006 As of April 1, 2007 As of December 31, 2006
Face value of note (principal and interest) $28,606  $21,247  $36,154 $32,952
 $(21,496 principal and $7,110 interest) $(16,858 principal and $4,389 interest) ($26,826 principal and $9,328 interest) ($24,509 principal and $8,443 interest)
Estimated months until casino opens (weighted-average of three scenarios)  34 months   34 months 
Estimated months until casino opens (weighted average of three scenarios) 29 months 29 months
Projected interest rate until casino opens  17.0%   9.2%  9.97% 9.98%
Projected interest rate during the loan repayment term  17.0%   9.2%  10.06% 9.76%
Discount rate  17.5%   15%  15.75% 15.75%
Projected repayment terms of note*  24 months   84 months 
Projected repayment terms of note 120 months 120 months
Probability rate of casino opening (weighting of four scenarios)  85%   80%  85% 85%
*Payable in varying monthly installments based on contract terms subsequent to the casino opening.
 
See discussion below included under the caption “Description of each Indian casino project and evaluation of critical milestones — Jamul Tribe”.
 
The following table represents a sensitivity analysis prepared by us of the notes receivable from the Jamul Tribe Pokagon Band and Shingle Springs Tribe, based upon a change in the probability rate of the casino opening by five


4428


by five percentage points and the estimated casino opening date by one year (probability will not be adjusted in excess of 100%):
 
                                                        
 October 1, 2006
              April 1, 2007
             
 Estimated Fair
 Sensitivity Analysis  Estimated Fair
 Sensitivity Analysis 
 Value Notes
 5% Less
 One Year
   5% Increased
 One Year
    Value Notes
 5% Less
 One Year
   5% Increased
 One Year
   
 Receivable Probable Delay Both Probability Sooner Both  Receivable Probable Delay Both Probability Sooner Both 
 (In thousands)  (In thousands) 
Pokagon $84,218  $79,976  $80,114  $76,080  $85,066  $88,532  $89,424 
Shingle Springs $33,776  $29,246  $32,393  $28,046  $36,042  $35,218  $37,580  $42,934  $40,423  $41,241  $38,829  $45,445  $44,697  $47,312 
Jamul $25,228  $23,756  $25,417  $23,934  $26,699  $25,040  $26,500  $22,751  $21,416  $21,710  $20,436  $24,086  $23,842  $25,242 
                              
 $143,222  $132,978  $137,924  $128,060  $147,807  $148,790  $153,504  $65,685  $61,839  $62,951  $59,265  $69,531  $68,539  $72,554 
                              
 
                                                        
 January 1, 2006
              December 31, 2006
             
 Estimated Fair
 Sensitivity Analysis  Estimated Fair
 Sensitivity Analysis 
 Value Notes
 5% Less
 One Year
   5% Increased
 One Year
    Value Notes
 5% Less
 One Year
   5% Increased
 One Year
   
 Receivable Probable Delay Both Probability Sooner Both  Receivable Probable Delay Both Probability Sooner Both 
 (In thousands)  (In thousands) 
Pokagon $44,028  $41,751  $41,591  $39,449  $46,305  $46,620  $49,040 
Shingle Springs $26,550  $24,633  $25,187  $23,367  $28,467  $27,985  $30,005  $40,912  $38,469  $39,269  $36,923  $43,355  $42,623  $45,166 
Jamul $12,957  $12,176  $12,322  $11,581  $13,739  $13,626  $14,450  $20,754  $19,548  $19,815  $18,664  $21,960  $21,738  $23,002 
                              
 $83,535  $78,560  $79,100  $74,397  $88,511  $88,231  $93,495  $61,666  $58,017  $59,084  $55,587  $65,315  $64,361  $68,168 
                              
 
The assumption changes used in the sensitivity analysis above are hypothetical. The effect of the variation in the probability assumption and estimated opening date on the estimated fair value of the notes receivable from Indian tribes was calculated without changing any other assumptions; in reality, changes in these factors may result in changes in another. For example, the change in probability could be associated with a change in discount rate, which might magnify or counteract the sensitivities.
 
The following table represents the nature of the advances to the tribes. The table represents the total amount of advances, which represent the principal amount of the notes receivable, as of OctoberApril 1, 20062007 and January 1,December 31, 2006. The notes receivable are carried on the unaudited condensed consolidated balance sheets at OctoberApril 1, 20062007 and January 1,December 31, 2006 at their estimated fair values of $149.2$68.6 million and $87.1$63.8 million, respectively.
 
                                    
 Balance at October 1, 2006  Balance at April 1, 2007 
   Shingle
        Shingle
       
 Pokagon Springs Jamul Other Total 
Advances Principal Balance
 Springs Jamul Other Total 
 (In thousands)  (In thousands) 
Note receivable, pre-construction(a),(c) $47,070  $41,423  $20,546  $6,302  $115,341  $46,176  $25,876  $2,794  $74,846 
Note receivable, non-gaming land(b)  13,176            13,176 
Note receivable, land(b),(c)  10,930      950   776   12,656   451   950   811   2,212 
                    
 $71,176  $41,423  $21,496  $7,078  $141,173  $46,627  $26,826  $3,605  $77,058 
                    
 
                                    
 Balance at January 1, 2006  Balance at December 31, 2006 
   Shingle
        Shingle
       
 Pokagon Springs Jamul Other Total 
Advances Principal Balance
 Springs Jamul Other Total 
 (In thousands)  (In thousands) 
Note receivable, pre-construction(a),(c) $22,344  $37,905  $15,908  $3,904  $80,061  $42,310  $23,559  $1,386  $67,255 
Note receivable, non-gaming land(b)  13,176            13,176 
Note receivable, land(b),(c)  10,925      950   570   12,445      950   756   1,706 
                    
 $46,445  $37,905  $16,858  $4,474  $105,682  $42,310  $24,509  $2,142  $68,961 
                    
 
 
(a)We fund certain costs incurred to develop the casino project. These costs relate to construction costs, legal fees in connection with various regulatory approvals and litigation, environmental costs and design consulting, and


45


we, in order to obtain the development agreement and management contract, agree to advance a monthly amount used by the tribe for a variety of tribal expenses.
 
(b)We purchased land to be used and transferred to the tribe in connection with the casino project. With respect to the Pokagon Casino project, a portion of the land will be used by the tribe separate from the casino project land.


29


(c)Amounts listed under the other column represents amounts advanced under the agreements with the Iowa Tribe and Pawnee Nation.Tribe.
 
The notes receivable pre-construction advances consist of the following principal amounts advanced to the tribes at OctoberApril 1, 20062007 and January 1,December 31, 2006 (in thousands):
 
                
 October 1,
 January 1,
  April 1,
 December 31,
 
Pokagon Band
 2006 2006 
Shingle Springs Tribe
 2007 2006 
Monthly stipend $12,000  $9,625  $8,215  $7,690 
Construction  23,411   2,635   1,673   1,657 
Legal  1,898   1,634   14,161   13,790 
Environmental  652   650   1,717   1,680 
Design  9,109   7,800   11,814   9,554 
Gaming license  3,676   3,626 
Lobbyist  4,920   4,313 
          
 $47,070  $22,344  $46,176  $42,310 
          
 
         
  October 1,
  January 1,
 
Shingle Springs Tribe
 2006  2006 
 
Monthly stipend $7,290  $6,390 
Construction  1,644   1,623 
Legal  13,524   12,195 
Environmental  1,663   1,588 
Design  9,528   9,306 
Gaming license  3,576   3,426 
Lobbyist  4,198   3,377 
         
  $41,423  $37,905 
         
                
 October 1,
 January 1,
  April 1,
 December 31,
 
Jamul Tribe
 2006 2006  2007 2006 
Monthly stipend $4,297  $3,841  $4,606  $4,451 
Construction  516   326   714   649 
Legal  3,474   3,340   3,832   3,675 
Environmental  1,796   1,668   2,246   1,985 
Design  7,323   4,168   11,164   9,578 
Gaming license  607   511   676   641 
Lobbyist  2,533   2,054   2,638   2,580 
          
 $20,546  $15,908  $25,876  $23,559 
          
 
Evaluation of impairment related to our long-term assets related to Indian casino projects, excluding the notes receivable, which are valued at fair value:
 
Management periodically evaluates the intangible assets, land held for development and other costs associated with each of the projects for impairment. The assets are periodically evaluated for impairment based on the estimated cash flows from the management contract on an undiscounted basis. In the event the carrying value of the intangible assets, in combination with the carrying value of land held for development and other assets associated with the Indian casino projects were to exceed the undiscounted cash flow, an impairment would be recorded. Such impairment would be measured based on the difference between the fair value and carrying value of the assets.


46


The financial models prepared by management for each project are based upon the scope of each of the projects, which are supported by a feasibility study as well as a market analysis where the casino will be built. We (as predecessor to Grand Casinos Inc.) began developing Indian casino projects in 1990 and demonstrated success from the day the first Indian casino opened in 1991 through the expiration of the Coushatta management contract in 2002. This success legitimizes many of the key assumptions supporting the financial models. Projections for each applicable casino development were developed based on analysis of published information pertaining to the particular markets in which our Indian casinos will be located. In addition, we have many years of casino operations experience, which provides a basis for our revenue expectations. The projections were prepared by us not for purposes of the valuation at hand but rather for purposes of our and the tribes’ business planning.


30


 
The primary assumptions included within management’s financial model for each Indian casino project is as follows:
 
Pokagon Band
 
        
 October 1, 2006 January 1, 2006 April 1, 2007 December 31, 2006
No. of Class III slot machines 3,000 3,000 3,000 3,000
No. of Table games 90 90 90 90
No. of Poker tables 20 20 20 20
Win/Class III slot machine/day — 1st year $282 $275 $282 $282
Win/Table game/day — 1st year $1,481 $1,444 $1,481 $1,481
Win/Poker game/day — 1st year $1,025 $1,000 $1,025 $1,025
Expected increase in management fee cash flows Year 2 — 26.5% Year 2 — 2.1% Year 2 — 26.5% Year 2 — 26.5%
 Year 3 — 4.3% Year 3 — 1.9% Year 3 — 4.3% Year 3 — 4.3%
 Year 4 — 3.8% Year 4 — 3.6% Year 4 — 3.8% Year 4 — 3.8%
 Year 5 — 4.1% Year 5 — 2.8% Year 5 — 4.1% Year 5 — 4.1%
 
With regard to the Pokagon Casino project in southwest Michigan, the competitive market consists primarily of five Northern Indiana riverboats. The state of Indiana publicly reports certain results from these riverboat casinos which supports the underlying assumptions in our projections. Specifically, the Northern Indiana trailing twelve months market average for slot machine revenue has consistently been above $300 win per unit per day or greater than $105,000 per machine per year which exceeds the $282 win per unit per day that we used in our Pokagon Casino projections. Of the five casinos in the market, two locations produced a win per unit less than our projections with three casinos producing win per unit revenue amounts greater than our forecast. The closest casino to our location consistently produces approximately $330 win per unit per day.
 
Jamul Tribe
 
         
  October 1,
  January 1,
 
  2006  2006 
 
No. of Class III slot machines  349   349 
No. of Class II slot machines  1,651   1,651 
No. of Table games  65   65 
No. of Poker tables  10   10 
Win/Class III slot machine/day — 1st year    $307 
Win/Class II slot machine/day — 1st year    $220 
Win/Class II & III slot machine/day — 1st year $235    
Win/Table game/day — 1st year $1,100  $1,100 
Win/Poker table/day — 1st year $650  $650 
We and the Jamul Tribe have consulted with third party advisors as to the architectural feasibility of a plan to build a casino with related amenities such as parking on the six acres of reservation land held by the Jamul Tribe and have concluded that such a project could be successfully built assuming adequate financing can be obtained. As of April 1, 2007, we have included assumptions within our financial model that reflect current discussions with the Jamul Tribe to reduce the size of the planned casino facility as a result of comments received from various state agencies including representatives from the California Governor’s office related to the Jamul Tribe’s project. The gaming facility is currently planned to be a class II electronic gaming device facility which will not require a compact. The agreement between Lakes and the Jamul Tribe will also be modified to reflect the new economics of the revised casino plan but will not be subject to approval by the State of California or the NIGC.
         
  April 1,
  December 31,
 
  2007  2006 
 
No. of Class II electronic gaming devices  1,000   1,000 
No. of Table games  20   20 
No. of Poker tables  5   5 
Win/Class II electronic gaming devices/day — 1st year $250  $250 
Win/Table game/day — 1st year $900  $900 
Win/Poker table/day — 1st year $650  $650 


47


The San Diego market contains other Indian-owned casinos in the surrounding area, each of which is self-managed. Because of the proprietary nature of those operations no public information is readily attainable. However, based on the apparent successful nature of their operations (large casinos which continually expand, new


31


hotel developments, new golf courses, etc.) coupled with our knowledge of their operations, we feel that our forecast of operations is within the revenue metrics of the market.a successful operation can be built.
 
Shingle Springs Tribe
 
     
  October 1, 2006 January 1, 2006
 
No. of Class III slot machines 349 349
No. of Class II slot machines 1,651 1,651
No. of Table games 100 100
No. of Poker tables 20 20
Win/Class III slot machine/day — 1st year  $350
Win/Class II slot machine/day — 1st year  $250
Win/Class II & III slot machine/day — 1st year $350 
Win/Table game/day — 1st year $1,275 $1,275
Win/Poker table/day — 1st year $624 $624
Expected increase (decrease) in management fee cash flows Year 2 — 6.0% Year 2 — 5.5%
  Year 3 — 5.1% Year 3 — 4.3%
  Year 4 — 3.6% Year 4 — 3.0%
  Year 5 — 5.0% Year 5 — 5.1%
  Year 6 — (20.1)% Year 6 — (17.0)%
  (management fees
were reduced
in years six and
seven)
 (management fees
were reduced
in years six and
seven)
  Year 7 — 1.7% Year 7 — 1.5%
     
  April 1, 2007 December 31, 2006
 
No. of Class III slot machines 349 349
No. of Class II electronic gaming devices 1,651 1,651
No. of Table games 100 100
Win/Class II & III electronic gaming devices/slot machine/day — 1st year $350 $350
Win/Table game/day — 1st year $1,275 $1,275
Expected increase (decrease) in management fee cash flows Year 2 — 20.5% Year 2 — 8.0%
  Year 3 — 11.6% Year 3 — 7.5%
  Year 4 — 8.5% Year 4 — 7.1%
  Year 5 — 9.3% Year 5 — 6.4%
  Year 6 — 1.4% Year 6 — (12.3)%
  (management fees (management fees
  were reduced in were reduced in
  year six) year six)
  Year 7 — 11.5% Year 7 — 11.7%
 
In the Shingle Springs Sacramento market, there is one other Indian casino that is managed by another public company. Management considered the available information related to this other Indian casino when projecting management fees from the Shingle Springs Casino. Based on the apparent successful nature of their operations coupled with our knowledge of their operations, we feel that our forecast of operations is within the revenue metrics of the market.
 
As of OctoberApril 1, 20062007 and January 1,December 31, 2006 no impairment was recognized on the Pokagon Band, Shingle Springs Tribe or Jamul Tribe projects.
 
Description of each Indian casino project and evaluation of critical milestones:
 
Pokagon Band
Business arrangement:
In July 1999, we entered into a development agreement and management contract, which have been subsequently amended, with the Pokagon Band, a federally recognized tribe with a compact with the State of Michigan, to develop and manage a casino on approximately 675 acres in southwest Michigan. The first phase of the casino is planned to include approximately 3,000 slot machines, 90 table games, a 20 table poker room, various restaurant and bar venues, a hotel, enclosed parking, a childcare facility and arcade, and various other resort amenities.
The development agreement, as amended, provided for us to advance approximately $71.7 million for purchase of land and for the initial development phase of the project. Repayment of these advances is subordinated to the senior indebtedness of the Pokagon Casino.


48


We will receive approximately 24% of net income up to a certain level and 19% of the net income over that level, as a management fee. The term of the management contract, as amended, is currently planned for five years beginning when the casino opens to the public and may extend for a total of seven years under certain circumstances. Payment of our management fee is subordinated to senior indebtedness of the Pokagon Casino. The Pokagon Band may terminate the management contract after five years from the opening of the casino if any of certain required elements of the project have not been developed or certain financial commitments to the Pokagon Band have not been met. The Pokagon Band may also buy out the management contract provisions after two years from the opening date. The buyout amount is calculated based upon the previous 12 months of management fees earned multiplied by the remaining number of years under the management contract, discounted back to the present value at the time the buyout occurs. The NIGC approved the management contract in March of this year. The casino could open as early as third quarter of fiscal 2007.
We will be obligated to pay an amount to an unrelated third party once the Pokagon Casino is open and we are the manager of the casino. The amount is payable quarterly for five years and is only payable if we are the manager and the casino is open and operational. The payment is part of a settlement and release agreement associated with our obtaining the management contract with the Pokagon Band. The maximum liability over the five-year period is approximately $11 million. We will also be obligated to pay approximately $3.3 million to a third party on behalf of the Pokagon Band; in accordance with the management contract which is payable once the casino opens over 24 months. In accordance with the management contract, we contributed $1 million to the Pokagon Band scholarship fund in April 2006 because the land was taken into trust and the management contract was approved by the NIGC.
Our evaluation of critical milestones:
The following table outlines the status of each of the following primary milestones necessary to complete the Pokagon project as of the end of the third quarter of fiscal 2006, fiscal year 2005 and fiscal year 2004. Both the positive and negative evidence was reviewed during our evaluation of the critical milestones.
 Critical MilestoneOctober 1, 2006January 1, 2006January 2, 2005
Federal recognition of the tribeYesYesYes
Possession of usable land corresponding with needs based on our project planYesYesYes


49


 Critical MilestoneOctober 1, 2006January 1, 2006January 2, 2005
Usable land placed in trust by Federal governmentYesYes — The additional information was submitted by the BIA in August 2004 and the lawsuit was still pending resolution as of January 1, 2006. In March 2005 the federal judge dismissed the last remaining issue filed by Taxpayers of Michigan Against Casinos (‘TOMAC”) and ruled in favor of the Pokagon Band allowing the land to be placed into trust by the BIA. During the required 60 day waiting period, TOMAC filed for an appeal. The appeal hearing date was held on December 8, 2005. On January 6, 2006 the United States Court of Appeals for the District of Columbia Circuit ruled in favor of the Pokagon Band by affirming the Federal District Court’s grant of summary judgment in the lawsuit by TOMAC versus the U.S. Department of the Interior. On January 27, 2006, the Federal Government took official action to acquire the Pokagon Band’s675-acre parcel of land in New Buffalo Township, Michigan, into trust for the Pokagon Band. This official action by the Department of the Interior paves the way for the Pokagon Band to move forward with their Four WindsCasino Resort project.No — The additional information was submitted by the BIA in August 2004 and the lawsuit was still pending resolution as of January 2, 2005.
Usable county agreement, if applicableYesYesYes

50


 Critical MilestoneOctober 1, 2006January 1, 2006January 2, 2005
Usable state compact that allows for gaming consistent with that outlined in our project planYesYesYes
NIGC approval of management contract in current and desired formYesNo, submitted to the NIGC for review in 2000 and approval is expected in April 2006 as the land was taken into trust by the BIA on January 27, 2006.No, submitted to the NIGC for review in 2000 and approval is expected at approximately the same time the land is being placed into trust by the BIA.
Resolution of all litigation and legal obstaclesNo, The Michigan Supreme Court has now agreed to hear the appeal by TOMAC of its claims against various defendants, but not the Pokagon Band, that the Compact entered into with the State of Michigan is invalid. The Michigan Court of Appeals (lower court) refused to hear TOMAC’s argument. TOMAC is arguing that the Compact is invalid as the 8% payment to the Michigan Strategic Fund is unconstitutional and invalid (in that it illegally bypasses the appropriation requirement).No. However on January 6, 2006 the United States Court of Appeals for the District of Columbia Circuit ruled in favor of the Pokagon Band by affirming the Federal District Court’s grant of summary judgment in the lawsuit by TOMAC versus the U.S. Department of the Interior.No, pending litigation regarding land in trust.
Financing for constructionYes. Financing for the project was completed on June 22, 2006. A $305 million senior note financing and $75 million FF&E credit facility were completed on this date.No, however the Tribe engaged an investment banker to assist with obtaining financing, which we expect to occur as early as mid 2006.No, however the Tribe engaged an investment banker to assist with obtaining financing.
Any other significant project milestones or contingencies, the outcome of which could have a material affect on the probability of project completion as plannedNo others known at this time by Lakes.No others known at this time by Lakes.No others known at this time by Lakes.

51


Our evaluation and conclusion regarding the above critical milestones and progress:
Approximately $10.9 million of the loans due from the Pokagon Band were used by the Pokagon Band to purchase real property comprising the project site. Our first deed of trust against the gaming land portion of this property was relinquished when the BIA placed the land into trust in January 2006.
The estimated probability rate was increased from 75% to 90% in fiscal 2005 due to an evaluation of all critical milestones and due to the favorable federal judge ruling issued in March 2005 that allowed the land to be taken into trust by the Federal Government. TOMAC filed for an appeal and the appeal was heard on December 8, 2005. On January 6, 2006 the United States Court of Appeals for the District of Columbia Circuit ruled in favor of the Pokagon Band by affirming the Federal District Court’s grant of summary judgment in the lawsuit by TOMAC versus the U.S. Department of the Interior. On January 27, 2006, the Federal Government took official action to acquire the Pokagon Band’s675-acre parcel of land in New Buffalo Township, Michigan, into trust for the Pokagon Band.
The estimated probability rate was increased from 90.0% to 99.0% in the first nine months of fiscal 2006, as the management contract was approved by the NIGC in March 2006 and the appeal deadline passed for TOMAC to appeal the January 6, 2006 favorable federal judge ruling that allowed the land to be taken into trust by the Federal Government. In a separate matter, the Michigan Supreme Court has now agreed to hear the appeal by TOMAC of its claims against various defendants, but not the Pokagon Band, that the Compact entered into with the State of Michigan is invalid even though the Michigan Court of Appeals (lower court) refused to hear TOMAC’s argument. TOMAC is arguing that the Compact is invalid because the 8% payment to the Michigan Strategic Fund is unconstitutional and invalid (in that it illegally bypasses the appropriation requirement).
On June 22, 2006, the Pokagon Band closed on a $305 million senior note financing in addition to a $75 million commitment for furniture, furnishings and equipment to fund the remainder of the Four Winds Casino project. Construction of the casino began during June 2006, and is currently on schedule and on budget.
Due to the status of the critical milestones as described above, the weighted-average estimated casino opening date was moved ahead from October 2008 to August 2007 during the nine months ended October 1, 2006.
Shingle Springs Tribe
 
Business arrangement:arrangement.  
Plans for the Shingle Springs Casino project include an approximately 1,100,000278,000 square-foot facility (including approximately 85,00089,000 square feet of casinogaming space) to be located adjacent to the planned Shingle Springs Rancheria exit, approximately 35 miles east of downtown Sacramento, on U.S. Highway 50. The Shingle Springs Casino is currently planned to feature approximately 2,000 gaming devices and approximately 100 table games, 20 poker table games, as well as restaurants, enclosed parking and other facilities.
 
We acquired our initial interest in the development and management contracts for the Shingle Springs Casino from Kean Argovitz Resorts- Shingle Springs, LLC (“KAR — Shingle Springs”) in 1999 and formed a joint venture, in which the contracts were held, between us and KAR — Shingle Springs. On January 30, 2003, we purchased the remaining KAR — Shingle Springs’ partnership interest in the joint venture. In connection with the purchase transaction, we entered into separate agreements with the two individual owners of KAR — Shingle Springs (Kevin M. Kean and Jerry A. Argovitz). Under the agreement with Mr. Kean, he may elect to serve as a consultant to us during the term of the casino management contract if he is found suitable by relevant gaming regulatory authorities. In such event, Mr. Kean will be entitled to receive annual consulting fees equal to 15% of the management fees received by us from the Shingle Springs Casino operations, less certain costs of these operations. If Mr. Kean is not found suitable by relevant gaming regulatory authorities or otherwise elects not to serve as a consultant, he will be entitled to receive annual payments of $1 million from the Shingle Springs Casino project during the term of the respective casino management contract (but not during any renewal term of such management contract).


32


 
Under the agreement with Mr. Argovitz, if he is found suitable by relevant gaming regulatory authorities he may elect to re-purchase his respective original equity interest in our subsidiary and then be entitled to obtain a 15%


52


equity interest in our entity that holds the rights to the management contract with the Shingle Springs Casino. If he is not found suitable or does not elect to purchase equity interests in our subsidiary, Mr. Argovitz would receive annual payments of $1 million from the Shingle Springs Casino project from the date of election through the term of the respective casino management contract (but not during any renewal term of such management contract).
 
The development agreement, as amended, provides for us to make certain pre-construction advances to the Shingle Springs Tribe in the form of a transition loan and land loan up to a maximum combined amount of $50.0$75.0 million. The transition loan currently calls for a maximum of $40.0 million of pre-construction advances. We may increase our commitment to the Shingle Springs Tribe by up to $10 million, subject to amendment of theamended development loan agreement and approval by the NIGC, which is currently in progress . Although we are not required to fund these amounts, if we discontinue the funding prior to fulfilling the obligation, we would forfeit the rights under the management contract.
The agreementalso provides for us to arrange for financing or, at our discretion, loan funds to the Shingle Springs Tribe in the form of a facility loan, for the costs of construction and initial costs of operation up to a maximum of $300 million.$600 million, subject to NIGC approval. In addition, we will assist in the design, development and construction of the facility as well as manage the pre-opening, opening and continued operations of the casino and related amenities for a period of seven years. As compensation for our management services, we will receive a management fee between 21% and 30% of net income of the operations annually for the first five years with a declining percentage in years six and seven, as that term is defined by the management contract. Payment of our management fee will be subordinated to senior indebtedness of the Shingle Springs Casino and minimum priority payment to the Shingle Springs Tribe. The Shingle Springs Tribe may terminate the agreement after five years from the opening of the casino if any of certain required elements of the project have not been developed. The management contract includes provisions that allow the Shingle Springs Tribe to buy out the management contract after four years from the opening date. The buyout amount is calculated based upon the previous twelve months of management fees earned multiplied by the remaining number of years under the contract, discounted back to the present value at the time the buyout occurs.


53


Our Evaluationevaluation of the Critical Milestones:critical milestones.  
The following table outlines the status of each of the following primary milestones necessary to complete the Shingle Springs project as of the end of the thirdfirst quarter of fiscal 2006,2007, fiscal year 20052006 and fiscal year 2004.2005. Both the positive and negative evidence was reviewed during Lakes’our evaluation of the critical milestones.
 
          
 Critical Milestone  OctoberApril 1, 2007December 31, 2006  January 1, 2006January 2, 2005
Federal recognition of the tribe  Yes  Yes  Yes
Possession of usable land corresponding with needs based on ourLakes’ project plan  Yes  Yes  Yes
Usable land placed in trust by Federal government  Not necessary, as land is
reservation land.
  Not necessary, as land is
reservation land.
  Not necessary, as land is
reservation land.
Usable county agreement, if applicable  Yes  N/AYes  N/A
Usable state compact that allows for gaming consistent with that outlined in ourLakes’ project plan  Yes  Yes  Yes
NIGC approval of management contract in current and desired form  Yes — approval received in 2004.  Yes — approval received in 2004.  Yes — approval received in 2004.


33


 Critical MilestoneApril 1, 2007December 31, 2006January 1, 2006
Resolution of all litigation and legal obstaclesNo — See below.  No — See below.  No, Federal and state litigation regarding approval of highway interchange, environmental issues and other issues.
— See below.
No, Federal and state litigation regarding approval of highway interchange, environmental issues
and other issues.
— See below.
Financing for construction  No, however the
Shingle Springs Tribe has engaged investment banks to assist with obtaining financing.
  No, however the
Shingle Springs Tribe has engaged investment banks to assist with obtaining financing.
  No, however the
Shingle Springs Tribe has engaged investment banks to assist with obtaining financing.
Any other significant project milestones or contingencies, the outcome of which could have a material affect on the probability of project completion as planned  No others known at this time by Lakes.  No others known at this time by Lakes.  No others known at this time by Lakes.
          
 
Our evaluation and conclusion regarding the above critical milestones and progress:
The Shingle Springs Tribe is a federally recognized tribe, has a compact with the State of California and owns approximately 160 acres of reservation land on which the casino can be built. During July 2004, we received


54


notification from the NIGC that the development and management contract between the Shingle Springs Tribe and us, allowing us to manage a Class II and Class III casino, was approved by the NIGC.
 
The Shingle Springs Casino is currently planned to open with 349 Class III slot machines and approximately 1,650 Class II electronic gaming devices. Under the form of tribal-state compact first signed by the State of California with both the Jamul and Shingle Springs tribesTribe in 1999, each tribethe Shingle Springs Tribe is allowed to operate up to 350 Class III slot machines without licenses from the state. This form of compact allows California tribes to operate up to an additional 1,650 Class II slot machines by obtaining licenses for the devices from the state.electronic gaming devices. Under these tribal-state compacts, there is a state-wide limitation on the aggregate number of Class III slot machine licenses that are available. Tribes who have entered into new tribal-state compacts or amendments to the 1999 form of tribal-state compact in general are allowed to operate an unlimited number of Class II slot machineselectronic gaming devices without the need for obtaining additional licenses, subject to the payment of additional fees to the state, including, in recent cases, fees based on a percentage of slot “net win.” Currently, neither the Jamul Tribe nor the Shingle Springs Tribe havehas not amended theirits tribal-state compacts.compact. If the compacts arecompact is not renegotiated and amended, the tribestribe could operate under theirits existing compactscompact which allows for up to 350 Class III gaming devices and an unlimited number of Class II electronic gaming devices. Management believes that this number of gaming devices is adequate to equip the planned developments. Therefore, we believedevelopment, and therefore, the availability of additional slot licenses is not an issue that could prevent the projectsproject from progressing. The Shingle Springs project is currently planned to open with 349 Class III slot machines and approximately 1,650 Class II devices.
 
The most significant milestone yetOn February 1, 2007, a subsidiary of Lakes transferred to be achieved for this project is commercial access to the reservation on which the casino will be built. The Shingle Springs Tribe received state regulatory approval of a necessary interchange to access the tribal land during 2002. Neighboring El Dorado County and another local group commenced litigation in federal and state courts against the California regulatory agencies attempting to block the approval of the interchange. During January of 2004, the Court ruled in favor of the CalTrans on all of El Dorado County’s claims challenging CalTrans’ environmental review of the proposed casino project except that the court asked for clarification on one issue. The one remaining issue in the state case questions the state standards for ozone requirements of all of CalTrans projects throughout California. El Dorado County, VRL, CalTrans and the Shingle Springs Tribe filed an appeal and oral arguments on these appeals was heardapproximately 5.6 acres of property located in August 2005. In November 2005, the Appeals Court issued its decision on these appeals. The Appeals Court ruled in favor of CalTrans’ appeal, rejecting El Dorado County’s argument that the transportation conformity analysis did not conform to state standards. The Appeals Court also rejected all but two of the legal claims asserted in the appeal by El Dorado County, and VoicesCalifornia for Rural Living againsta purchase price of approximately $0.5 million, which was added to the EIR prepared by CalTransoutstanding loan balance from the Shingle Springs Tribe. The transfer allows the Shingle Springs Tribe necessary access to land needed for the interchange that will connectcommencement of the construction process, subject to all remaining governmental and regulatory approvals. The land transfer was recorded in the first quarter of Lakes’ fiscal 2007.
A construction permit for the U.S. Highway 50 interchange, which will provide direct access to the Shingle Springs Rancheria. For the remaining two issues, the Appeals Court held that CalTrans must supplement its environmental analysis by adding some discussion to the air quality chapter to further explain the project’s contribution to overall vehicular emissions in the region, and that CalTrans also must evaluate whether a smaller casino and hotel would reduce environmental impacts. On December 19, 2005, CalTrans filed a Petition for Review with the Supreme Court of the State of California, andRancheria on February 8, 2006 the Supreme Court denied the Petition for Review and ordered the Appeals Court decision to be depublished. The Appeals Court acknowledged CalTrans lacks jurisdiction to requirewhich the Shingle Springs Tribe to develop a smaller casino, but nevertheless required some discussion of this alternative inCasino will be built, was issued on April 30, 2007 and construction began on the supplemental EIR.
The Supplemental EIR was completed and published for public review and commentU.S. Highway 50 interchange on May 18, 2006. A public review meeting was held and final public comments were subsequently received. Responses to comments were prepared and the final Supplemental EIR was issued in August, 2006. CalTrans issued an updated Finding of No Significant Impact (“FONSI”) and the documents were submitted on August 9, 2006 to the trial court for confirmation that the Appeals Court order has been met. In September 2006, one of the plaintiff’s, VRL, filed a second state suit in the CEQA case alleging that CalTrans did not properly process the Supplemental EIR. No briefing or hearing dates have yet been set on this issue.
On September 28, 2006, the Shingle Springs Tribe and El Dorado County entered into a settlement agreement that requires the Shingle Springs Tribe to make voluntary mitigation payments to construct HOV lanes on Highway 50, make payments for law enforcement services, collect and pay sales taxes on food and beverage revenues to El Dorado County, and contribute to the El Dorado County general fund. In return, El Dorado County agreed to request that the Federal Court dismiss with prejudice the El Dorado County’s current Federal law suit and join and support the Shingle Springs Tribe in the state lawsuit. Additionally, El Dorado County agreed to support the Shingle Springs Tribe’s efforts to obtain a new compact with the State of California, not to oppose in any way the anticipated7, 2007.


5534


Tribal EIR required by the new compact, work with LAFCO to remove potential regulatory impediments and support the Shingle Springs Tribe obtaining domestic water services and future sewer treatment services from the El Dorado Irrigation District.
On November 3, 2006, the Court issued its decision upholding the SEIR pertaining to CalTrans’ proposed interchange that will connect Highway 50 to the Shingle Springs Tribe rancheria. The Court’s decision effectively dismisses the VRL lawsuit against CalTrans, the Shingle Springs Tribe and Lakes. The Court also sustained CalTrans’ demurrer in VRL’s subsequent lawsuit, putting an end to that lawsuit as well. Finally, the Court denied VRL’s request to stay the project. Although VRLLakes has filed for a motion requesting an injunction, the Court has not ruled whether it will even consider the motion. The Court did instruct VRL that it could file its motion directly with the Appeals Court. The Court’s decision will allow CalTrans to issue the permit to allow construction of the interchange to commence.
We have an agreement with the Shingle Springs Tribe which has been approved by the NIGC, to develop and manage the casino and are ready to proceed with securing financing and starting construction whennow that the permit is issuedfor the interchange has been issued.
El Dorado County and Voices for Rural Living (“VRL”) commenced litigation in 2003 against the construction plans are finalized.California regulatory agencies attempting to block the approval of the interchange. The litigation has resulted in various decisions in favor of the California regulatory agencies to proceed with the interchange and subsequent appeals by El Dorado County and VRL of those decisions over the next several years. For a more complete discussion of the history of this litigation see Item 3 of our Annual Report onForm 10-K for the fiscal year ended December 31, 2006.
 
As a result of achieving the critical milestones as described above, construction of the interchange and casino could begin as early as mid fiscal 2007 with an estimated opening date approximately 14 months after the start of the construction. Duringconstruction on the nine months ended October 1, 2006, the weighted-average estimated casino opening date was moved from February 2009 to October 2009.casino.
 
Jamul Tribe
 
Business arrangement:arrangement.  
The Jamul Tribe has an approximatesix-acre reservation on which the casino project is currently planned to be built. The reservation is located near San Diego, California. Plans
Lakes acquired its initial interest in the development financing and services agreement contracts for the Jamul casino include approximately 2,000from Kean Argovitz Resorts-Jamul, LLC (“KAR — Jamul”) in 1999 and formed a joint venture in which the contracts were held between Lakes and KAR — Jamul. This development agreement and a management contract have been submitted to the NIGC for approval. On January 30, 2003, Lakes purchased the remaining KAR — Jamul’s partnership interest in the joint venture. In connection with the purchase transaction, Lakes entered into separate agreements with the two individual owners of KAR — Jamul (Mr. Kean and Mr. Argovitz). The term of the contract is expected to be five or seven years. Under the current agreement with Mr. Kean, Mr. Kean may elect to serve as a consultant to Lakes during the term of the casino agreement if he is found suitable by relevant gaming devicesregulatory authorities. In such event, Mr. Kean will be entitled to receive annual consulting fees equal to 20% of the management fees received by Lakes from the Jamul Casino operations, less certain costs of these operations. If Mr. Kean is not found suitable by relevant gaming regulatory authorities or otherwise elects not to serve as a consultant, he will be entitled to receive annual payments of $1 million from the Jamul Casino project during the term of the respective casino agreement (but not during any renewal term of such agreement).
Under the current agreement with Mr. Argovitz, if he is found suitable by relevant gaming regulatory authorities he may elect to re-purchase his respective original equity interest in the Lakes subsidiary and approximately 75 table games, alongthen be entitled to obtain a 20% equity interest in the Lakes entity that holds the rights to the development financing and services agreement with various restaurants and related amenities.the Jamul Tribe. If he is not found suitable or does not elect to purchase equity interests in the Lakes’ subsidiary, Mr. Argovitz may elect to receive annual payments of $1 million from the Jamul Casino project from the date of election through the term of the respective casino agreement (but not during any renewal term of such agreement).
 
Effective March 30, 2006, weLakes entered into a development financing and services agreement with the Jamul Tribe.Tribe to assist the Jamul Tribe in developing the Jamul Casino which the Jamul Tribe will manage. As part of the current agreement, weLakes will use ourits best efforts to obtain financing from which advances will be made to the Jamul Tribe of up to $350 million to pay for the design and construction of the project.Jamul Casino. There can be no assurance that third party financing will be available. If we areavailable with acceptable terms, and if Lakes is unable to obtain the appropriate amount of financing for this project, the project may not be completed as planned. This agreement will help assist the Jamul Tribe in developing a first class casino with related amenities/services on its existing six acre reservation which the Jamul Tribe will manage.
 
We willUnder the current development financing and services agreement, Lakes is entitled to receive a flat fee of $15 million for ourits development design services, and a flat fee of $15 million for ourits construction oversight services. Each of these fees will beservices, payable to us evenly over the first five years after the opening date of the Jamul Casino. In connection with ourLakes’ financing of the Jamul Casino, the Jamul Tribe willis required to pay interest over a ten yearten-year period on sums advanced by usLakes equal to the rate charged to usLakes for obtaining the necessary funds necessary plus 5%. Amounts previously advanced by Lakes to the Jamul Tribe in connection with the Jamul Tribe’s proposed casino resort are to be included in the financing for the Jamul Casino.
Prior to entering into the 2006 development financing and services agreement we and the Jamul Tribe entered into a development agreement and management contract in 1999, which has been submitted to the NIGC for approval.financing amount.


5635


Under the current compact that the Jamul Tribe has with the State of California (the “State”) and based upon requirements in other compacts approved by the State in 2004, the Jamul Tribe completed a Tribal Environmental Impact Statement/Report that was approved by the Jamul Tribe’s General Council with a record of decision issued by the Jamul Tribe on December 16, 2006. Since that time, the Jamul Tribe has received comments from various state agencies including the representative from the California Governor’s office. The Jamul Tribe and the State have met on several occasions in an attempt to address the State’s comments related to compact requirements. Based on the most recent meeting with the State, Lakes and the Jamul Tribe evaluated the Jamul Tribe’s alternatives of pursuing a new compact, complying with certain requirements in their existing compact or building and operating a casino based solely on class II electronic gaming devices. Since resolution of any requests by the State related to the Jamul Tribe’s existing compact or a proposed new compact may take more time than is within acceptable limits to the Jamul Tribe, it has been determined that the proposed gaming facility will be reduced in size and scope. The current plan is for the gaming facility to decrease in size and become a solely class II electronic gaming device facility which will not require a compact. The agreement between Lakes and the Jamul Tribe will also be modified to reflect the new economics of the revised casino plan but will not be subject to approval by the State of California or the NIGC.
OurLakes’ Evaluation of the Critical Milestones:Milestones.  
The following table outlines the status of each of the following primary milestones necessary to complete the Jamul project as of the end of the thirdfirst quarter of fiscal 2006,2007, fiscal year 20052006 and fiscal year 2004.2005. Both the positive and negative evidence was reviewed during ourLakes’ evaluation of the critical milestones.
 
          
 Critical Milestone  OctoberApril 1, 2007December 31, 2006  January 1, 2006January 2, 2005
Federal recognition of the tribe  Yes  Yes  Yes
Possession of usable land corresponding with needs based on ourLakes’ project plan  Yes  Yes  Yes
Usable land placed in trust by Federal governmentNot necessary, as land is reservation land.  Not necessary, as land is reservation land.  Yes, six acres is reservation land held by the Jamul Tribe on which the casino will be built. There is an additional 82 acres contiguous to the reservation land pending BIA approval to be placed into trust that could be used for additional development of the project. The Jamul Tribe and Lakes prepared an EIS and trust application, which has been submitted to, reviewed and recommended for approval by the regional office of the BIA. The Washington, D.C. office of the BIA is currently reviewing the submission.
  Yes, six acres is reservation land held by the Jamul Tribe on which the casino will be built. There is an additional 82 acres contiguous to the reservation land pending BIA approval to be placed into trust that could be used for additional development of the project. The Jamul Tribe and Lakes prepared an EIS and trust application, which has been submitted to, reviewed and recommended for approval by the regional office of the BIA. The Washington, D.C. office of the BIA is currently reviewing the submission.


36


 Critical MilestoneApril 1, 2007December 31, 2006January 1, 2006
Usable county agreement, if applicable  N/A  N/A  N/A
Usable state compact that allows for gaming consistent with that outlined in ourLakes’ project plan  Yes  Yes  Yes


57


 Critical MilestoneOctober 1, 2006January 1, 2006January 2, 2005
NIGC approval of management contract in current and desired formN/A as the Jamul Tribe and Lakes entered into a development financing and services agreement in March 2006, which does not need to be approved by the NIGC.  N/A as the Jamul Tribe and Lakes entered into a development financing and services agreement in March 2006, which does not need to be approved by the NIGC.  No, submitted for approval by the NIGC in 2000. We are in communication with the NIGC and have responded to initial comments. Approval is not expected until the process to place land in trust by the BIA is complete.No, submitted for approval by the NIGC in 2000. We are in communication with the NIGC and have responded to initial comments. Approval is not expected until the process to place land in trust by the BIA is complete.
Resolution of all litigation and legal obstacles  N/A, there has been some local opposition regarding the project, although no formal legal action has been taken.project.  N/A, there has been some local opposition regarding the project, although no formal legal action has been taken.project.  N/A, there has been some local opposition regarding the project, although no formal legal action has been taken.
Financing for construction  No, however, preliminary discussions with investment bankers regarding assisting in obtaining financing have taken place.  No, however, preliminary discussions with investment bankers regarding assisting in obtaining financing have taken place.  No, however, preliminary discussions with investment bankers regarding assisting in obtaining financing have taken place.

37


 Critical MilestoneApril 1, 2007December 31, 2006January 1, 2006
Any other significant project milestones or contingencies, the outcome of which could have a material affect on the probability of project completion as planned  No others known at this time by Lakes.Yes. The Jamul Tribe and the State of California have had a series of recent meetings to discuss what requirements the State has to either allow the project to be built as currently planned or to enter into a new compact similar to those approved in 2004 for other tribes in the State. The Jamul Tribe has decided to move forward with building a casino based solely on class II electronic gaming devices. This plan will decrease the size and scope of the project, but will allow it to move forward.  No others known at this time by Lakes.Yes. The Jamul Tribe and the State of California have had a series of recent meetings to discuss what requirements the State has to either allow the project to be built as currently planned or to enter into a new compact similar to those approved in 2004 for other tribes in the State. Based on these discussions, the Jamul Tribe is evaluating which of any of these requirements are acceptable or in lieu of a compact, building a casino based solely on class II electronic gaming devices.  No others known at this time by Lakes.
          
 
OurLakes’ evaluation and conclusion regarding the above critical milestones and progress:progress.  We entered into a development financing and services agreement with the Jamul Tribe in March 2006 as discussed above which eliminated the need for land contiguous to the reservation land being taken into trust. There is no requirement that the NIGC approve the development financing and services agreement. The Jamul Casino is planned to be built on the Jamul Tribe’s existing six acres of reservation land. Reservation land qualifies for gaming without going through a land in trust process. The execution of the development financing services agreement increased the probability of opening the casino development project from 80% to 85% during fiscal 2006.
 
Under the form of tribal-state compact first signed by the State of California with both the Jamul and Shingle Springs tribesTribe in 1999, each tribethe Jamul Tribe is allowed to operate up to 350 Class III slot machines without licenses from the state. This form of compact also allows California tribes to operate up to an additional 1,650 Class II slot machines by obtaining licenses for the devices from the state.electronic gaming devices. Under these tribal-state compacts, there is a state-wide limitation on the aggregate number of Class III slot machine licenses that are available to tribes. Certain tribes have entered into new tribal-state compacts or amendments to the 1999 form of tribal-state compact that allow them to operate an unlimited number of Class II slot machineselectronic gaming devices without the need for obtaining additional licenses, subject to the payment of additional fees to the state, including in recent cases, fees based on a percentage of slot “net win.” Currently, neither the Jamul tribe nor the Shingle Springs tribe haveTribe has not amended theirits tribal-state compacts.compact. If the compacts arecompact is not renegotiated and amended the tribesJamul Tribe believes it could operate under their existing compacts which allow for up to 350 Class III gaming devices and an unlimited number of Class II electronic gaming devices.devices or the Jamul Tribe could choose to operate only class II gaming devices without a compact and currently plan to do so. This number of gaming devices is adequate under either approach to equip the planned developments. Therefore,development and therefore, we believe the availability of additional slot licenses should not prevent the projectsproject from progressing. The Jamul project is currently planned to open with 349 Class III slot machines and approximately 1,650 Class II devices.
 
The process of getting the land contiguous to the reservation placed into trust has been slow. Therefore, during August of 2005, we and the Jamul Tribe and ourselves formally announced plans to build the casino on the approximately six acres of reservation land held by the Jamul Tribe. The approximate size of the casino and related guest amenities will not change in total, as the casino was always planned to be built on the reservation land. The approximate six-

58


acre project would be built on various levels to accommodate essentially all of the same amenities that were planned for the project on the larger parcel of land. Therefore, the design of the project would changewas changed significantly from a complex of lower-level buildings spread out over a larger area to a multi-level resort built on a smaller parcel of land. Neither the total square footage nor the nature or cost of the project are expected to change significantly as it will be primarily the same project being built on a smaller footprint.
 
We have consulted with third-party advisors as to the architectural feasibility of the alternative plan and have been assured that the project can be successfully built on the reservation land. We haveLakes has completed economic

38


models for each alternativevarious alternatives and concluded that eithereach alternative would result in a successful operation assuming that adequate financing can be obtained. Therefore, we believe this project will be successfully completed.
 
AlthoughWe and the leaders of the Jamul Tribe is only required to prepare their current Compact-mandated environmental evaluation of the off-reservation impacts, the decision was made to complete a Tribal Environmental Impact Report/Statement (“TEIR/S”) in accordance with the newer 2004 Compacts approved by the State of California. The Jamul Tribe has entered into discussions with the State of California to negotiate a new compact and all prior new compacts have required the more extensive TEIR/S. The Jamul Tribe issued a Notice of Preparation (“NOP”) that provided the public an opportunity to comment on the preparation of the TEIR/S. Comments on the NOP were received in July 2006. The Jamul Tribe received comments, incorporated them into the draft TEIR/S and on August 25, 2006, published the reportare currently evaluating plans for public comment. Comments were received and incorporated into the issuance of the final TEIR/S.
We anticipate construction of the casino facility to begin in mid-2007 with an estimated opening date in late 2008.
We entered into a development financingdetermine when construction will start and services agreement with the Jamul Tribe in March 2006 (Note 8) which eliminated the need for land contiguous to the reservation land being taken into trust. There is no requirement that the NIGC approve the development financing and services agreement. Thewhen casino operations will be built on the Jamul Tribe’s existing six acres of reservation land. Reservation land qualifies for gaming without going through a land in trust process. The execution of the development financing services agreement increased the probability of opening the casino development project from 80% to 85% during the first quarter of fiscal 2006.begin.
 
Pawnee Nation of Oklahoma
Business arrangement:
In January 2005, we entered into three gaming development and consulting agreements (collectively “Pawnee Development and Consulting Agreements”) and three separate management contracts (collectively “Pawnee Management Contracts”) with three wholly-owned subsidiaries of the Pawnee Tribal Development Corporation (“Pawnee TDC),” referred to collectively as the “Pawnee Nation,” in connection with assisting the Pawnee Nation in developing, equipping and managing three separate casino destinations.
The largest of the casino resort developments, referred to as the “Chilocco Casino”, will be located on approximately 800 acres of Indian gaming land owned by the Pawnee Nation in northern Oklahoma near the Kansas border. This project is planned to include a large first class casino, hotel and meeting space, multiple restaurants and bar venues, an entertainment and event center, a golf course and various other casino resort amenities. The first phase of the project is planned to include approximately 1,200 gaming devices, 24 table games, a poker room, various restaurants and bars, a 150-room hotel and parking.
The Pawnee Nation currently operates a “Travel Plaza” at the intersection of U.S. Highway 412 and State Highway 18, approximately 25 miles from Stillwater, Oklahoma. The Pawnee Nation intends to expand the Travel Plaza to include gaming and has engaged us to assist with this project. When expanded, the planned project will open with approximately 200 gaming devices and a full service restaurant.
As compensation for the performance of its obligations under the management contract for each of these two locations, we shall be entitled to receive a fee of 30% of net income of the respective casino (as defined in the contracts) for a period of five to seven years, depending on the scope of the facilities, less any amounts earned by any of our affiliates for consulting on the two projects. The management contracts are subject to approval of the NIGC and certain other conditions.


59


The Pawnee Nation also operates its “Trading Post” Casino, which currently includes approximately 65 gaming devices along with a retail convenience store and gas station in the town of Pawnee, Oklahoma. We will assist in the management of this project and in its expansion if the Pawnee Nation decides to expand the casino. As compensation for our management services on this project, we will receive a management fee of approximately 30% of net income, as defined in the agreement, based on the incremental net income produced at this location during the length of the management contract, expected to be from five to seven years, depending on the scope of the facilities, less any amounts earned by any of our affiliates for consulting on the two projects subject to regulatory approval and certain other conditions.
Prior to the approval of the Pawnee Management Contracts by the NIGC, we will provide services under the Pawnee Development and Consulting Agreements to each of the three Pawnee casino projects. Under these agreements we will provide advances to the Pawnee Nation, if needed, from time to time to each particular project for preliminary development costs as agreed to by Lakes and the Pawnee Nation. Any advances made will accrue interest at prime plus two percent and be repayable in 24 equal monthly installments beginning on the 25th day following the opening date for the project if the loan has not previously been repaid through the project permanent financing. The Pawnee Development and Consulting Agreements are for 12 years from the effective date of the agreements or until the project development fees and the project preliminary development loans have been fully paid, whichever date is later, subject to early termination. In addition to interest earned on the project preliminary development loan, we will receive a development fixed fee equal to three percent of project costs at each location and a monthly consulting flat fee for each of the three projects of $5,000 for the Trading Post location, $25,000 for the Travel Plaza location and $250,000 for the new casino, per month for 120 months. The above development fixed fees shall be paid on the opening date of each of the projects. No monthly consulting fixed fee is earned or paid prior to the opening date of the project. After the opening date of the project the monthly consulting fixed fee shall be due and paid commencing on the 25th day of the following calendar month and each successive month.
The Pawnee Development and Consulting Agreements and Pawnee Management Contracts are subject to NIGC review and include provisions for an early buyout of the Pawnee Development and Consulting Agreements and the Pawnee Management Contracts by the Pawnee Nation.
In March 2005, the fully executed management contracts and related transaction documents for the three planned Pawnee Nation projects were submitted by us and the Pawnee Nation to the NIGC for review and approval under the Indian Gaming Regulatory Act (“IGRA”). NIGC staff have reviewed the documents and requested certain modifications to the documents prior to issuing NIGC approval. We and the Pawnee Nation have made such modifications to the documents as the NIGC has deemed necessary and anticipate submitting the revised agreements to the NIGC for final review and approval. Although the revised agreements have been approved by the tribal gaming subsidiaries which will own and operate the projects, submission of the revised project documentation has been delayed for several months due to a dispute between members of the Pawnee Business Council. It is uncertain at this time what action, if any, the Pawnee Business Council will take in connection with approving the submission of the revised documentation to the NIGC, and it is unclear what impact these circumstances will have on final NIGC approval of each project’s management contract.
Arrangement with Consultant.  We have executed an agreement stipulating that Kevin Kean will be compensated for his consulting services (relating to the Pawnee Nation) rendered to us. Under this arrangement, subject to Mr. Kean obtaining certain regulatory approvals, Mr. Kean will receive 20% of our fee compensation earned under the Pawnee Development and Consulting Agreements and Pawnee Management Contracts with the Pawnee Nation (i.e., six percent of the incremental total net income or 20% of our 30% share). This agreement provides that payments will be due to Mr. Kean when we are paid by the Pawnee Nation.


60


Our Evaluation of the three Pawnee Nation Projects:
The following table outlines the status of each of the following primary milestones necessary to complete the Pawnee Nation projects as of October 1, 2006:
 Critical MilestoneChilocco Casino ProjectTravel PlazaTrading Post
Federal recognition of the tribeYesYesYes
Possession of usable land corresponding with needs based on our project planYes, the Pawnee Nation currently holds land in trust where the Chilocco casino will be built.Yes, the Pawnee Nation is currently leasing land from tribal members, which is held in trust for the individual tribal members by the United States Government. The BIA approved the lease documents on January 13, 2006.Yes, the Trading Post is currently open.
Usable land placed in trust by Federal governmentYes, the Pawnee Nation currently holds land in trust where the Chilocco Casino will be built.Yes, the Pawnee Nation is currently leasing land from tribal members, which is held in trust for the individual tribal members by the United States Government. The BIA approved the lease documents on January 13, 2006.Yes, the Trading Post is currently open.
Usable county agreement, if applicableN/AN/AN/A
Usable state compact that allows for gaming consistent with that outlined in our project planYesYesYes
NIGC approval of management contract in current and desired formNo, the EA for Chilocco was completed and published for comments as of November 26, 2005. The comment period ended January 3, 2006 with no comments received. The NIGC has issued the FONSI and is expected to approve the management contract when it is in its final form.No, the NIGC approved the Final EA and issued the FONSI. Upon agreement on the management and collateral document language the NIGC is free to approve the contract. The NIGC has stated they will complete this process approximately 30 days following approval of the Lakes Trading Post contract.No, submitted to the NIGC for review on March 22, 2005. The NIGC had provided a second set of comments to which the Pawnee Nation and Lakes have provided a response.
Resolution of all litigation and legal obstaclesNone at this time.None at this time.None at this time.


61


 Critical MilestoneChilocco Casino ProjectTravel PlazaTrading Post
Financing for constructionNo, preliminary discussions with lending institutions has occurred and the Pawnee Nation has issued a request for proposal. Several responses to the request for proposal have been received. A lender has not yet been selected.No, The Pawnee Nation has received and approved, subject to minor negotiations, a commitment for financing from a lender for the desired amount.None needed.
Any other significant project milestones or contingencies, the outcome of which could have a material affect on the probability of project completion as plannedNo others known at this time by Lakes.No others known at this time by Lakes.No others known at this time by Lakes.
Our evaluation and conclusion regarding the above critical milestones and progress:
Long-term assets have been recorded as it is considered probable that the three Pawnee Nation Projects will result in economic benefit to us sufficient to recover our advances. Based upon the above status of all primary milestones and the projected fees to be earned under the consulting agreements and management contracts, no impairment has been recorded. The Pawnee Trading Post is currently open and operating and the refurbishments were completed in the fourth quarter of fiscal 2005. The Pawnee Travel Plaza is currently open and expansion could be completed to include gaming as early as the second quarter of fiscal 2007. The Chilocco Casino project could open as soon as early 2008.
Iowa Tribe
 
Business arrangement:arrangement.  
On March 15, 2005, we,Lakes, through ourits wholly-owned subsidiaries, entered into consulting agreements and management contracts with the Iowa Tribe of Oklahoma, a federally recognized Indian Tribe, and The Iowa Tribe of Oklahoma, a federally-chartered corporation.corporation (collectively, the “Iowa Tribe”). The agreements are effective as of January 27, 2005. WeLakes will provide consulting services to assist the Iowa Tribe with two separate casino destinations in Oklahoma including (i) assisting in developing a new first class casino and ancillary amenities and facilities to be located on Indian land approximately 25 miles northeast of Oklahoma City along Route 66 (the “Ioway Project”Casino”); and (ii) assisting with operational efforts at the Iowa Tribe’s existing Cimarron Casino, located in Perkins Oklahoma (the “Cimarron Casino”). WeLakes will also provide management services for the Tribe’s casino operations at each location subject to regulatory approval.
 
Each of the projects has a gaming consulting agreement (“Iowa Consulting Agreement”) and a management contract (“Iowa Management Contract”), independent of the other project. Key terms relating to the agreements for the projects are as follows:
 
Ioway Project.Casino.    The proposed development would have an initial phase of approximately 1,500 slot machines, four restaurants, a KidsQuest, 250 hotel rooms and parking. Future development would include additional gaming, hotel rooms, meeting space, special events center, golf course and other market driven amenities. For ourits gaming development consulting services under the Iowa Consulting Agreement related to the Ioway Project, weCasino, Lakes will receive a development fee of two percent of the project costs of the Ioway Project,$4 million paid upon the opening of the Ioway Project,Casino, and a flat monthly fee of $500,000 for a period of 120 months commencing upon the opening of the project.

62


We haveLakes has agreed to make advances to the Iowa Tribe, subject to a project budget to be agreed upon by usLakes and the Iowa Tribe and certain other conditions. The development loan will be for preliminary development costs under the Ioway ProjectCasino budget. We haveLakes has also agreed to use reasonable efforts to assist the Iowa Tribe in obtaining permanent financing for any projects developed under the Iowa Consulting Agreement.
 
The Iowa Management Contract for the Ioway ProjectCasino is subject to the approval of the NIGC and certain other conditions. For ourits performance under the Iowa Management Contract, weLakes will be entitled to receive management fees of approximately 30% of net income, as defined in the agreement, for each month during the term of the Iowa Management Contract less any amounts earned by any of our affiliates for consulting on the Ioway Project.Contract. The Iowa Management Contract term is seven years from the first day that we areLakes is able to commence management of the Ioway ProjectCasino gaming operations under all legal and regulatory requirements (the “Commencement Date”), provided that the Iowa Tribe has the right to buy out the remaining term of the Iowa Management Contract after the Ioway ProjectCasino has been in continuous operation for 60 months,four years, for an amount based on the then present value of estimated future management fees. If the Iowa Tribe elects to buy-out the contract, all outstanding amounts owed to usLakes become immediately due and payable if not already paid. Subject to certain conditions, we agreeLakes agreed to make advances for the Ioway Project’sCasino’s working capital requirements, if needed, during the first six monthsmonth after the Commencement Date. The advances are to be repaid through an operating note payable from revenues generated by future operations of the Ioway ProjectCasino bearing interest at two percent over the prime rate. WeLakes also agreeagrees to fund any shortfall in certain minimum monthly Ioway ProjectCasino payments to the Iowa Tribe by means of non-interest bearing advances under the same operating note.
 
Cimarron Casino.  The Iowa Tribe historically operated a 240 gaming machine and 200-seat bingo parlor located on the northern edge of Perkins, Oklahoma, approximately eight miles south of Stillwater, Oklahoma. The existing facility is being renovated to provide for space for approximately 350 compacted gaming devices including table games and poker, and a new snack bar. We haveLakes has entered into a separate gaming consulting agreement (“Cimarron Consulting Agreement”) and management contract (“Cimarron Management Contract”) with the Iowa Tribe with respect to the Cimarron Casino. TheLakes operated under the Cimarron Consulting agreement until the NIGC approved the Cimarron Management Contract on May 1, 2006, and Lakes is currently managing the Cimarron Casino under that agreement. The annual fee under the Cimarron Management Contract is 30% of net income in April 2006.excess of $4 million. The fee under the Cimarron Consulting Agreement, which terminated when the management agreement became effective in May of 2006, consisted entirely of a limited flat monthly fee of $50,000. The annual fee under the Cimarron Management Contract will be 30% of net income in excess of $4 million (reduced by any amounts earned by any of our affiliates for consulting services under the Cimarron Consulting Agreement).
 
Arrangement with Consultant.  We have executedLakes has an agreement stipulating thatwith Kevin Kean that will be compensatedcompensate him for his consulting services (relating to the Iowa Tribe) rendered to us.Lakes. Under this arrangement, subject to Mr. Kean obtaining certain regulatory approvals, Mr. Kean will receive 20%20 percent of ourLakes’ fee compensation that is received under the Iowa Consulting Agreement, Cimarron Consulting Agreement, Iowa Management Contract and Cimarron Management Contract with the


39


Iowa Tribe (i.e., six percent of the incremental total net income or 20% of ourLakes’ 30% share). This agreement provides that payments will be due to Mr. Kean when we areLakes is paid by the Iowa Tribe.


63


OurLakes’ Evaluation of the two Iowa Tribe Projects:Ioway casino project.  
The following table outlines the status of each of the following primary milestones necessary to complete the Iowa Tribe projectsIoway Casino project as of October 1, 2006:the end of the first quarter of fiscal 2007, fiscal 2006 and fiscal 2005. Both the positive and negative evidence was reviewed during Lakes’ evaluation of the critical milestones:
 
       
   Ioway ProjectApril 1, 2007  Cimarron CasinoDecember 31, 2006January 1, 2006
Federal recognition of the tribeYes  Yes  Yes
Possession of usable land corresponding with needs based on ourLakes’ project planYes, the Iowa Tribe has members that own a74-acre allotment on US Route 66 midway between the access points to Warwick and Chandler, Oklahoma from I44. The Iowa Tribe has acquired a majority interest in 59 acres of this parcel and is in the process of obtaining a majority interest in the remaining 15 acres. An additional 100 acres of fee land has been acquired to provide the necessary site area for the beginning of the project.Yes, the Iowa Tribe has members that own a74-acre allotment on US Route 66 midway between the access points to Warwick and Chandler, Oklahoma from I44. The Iowa Tribe has obtained the rights to purchaseand/or lease this parcel from the allottees. An additional 100 acres of fee land has been optioned to provide the necessary site area for the beginning of the project.  Yes, the Iowa Tribe is currently leasing and acquiring land from tribal members, which is held in trust for the individual tribal members by the United States Government. The Iowa Tribe has acquired signatures on deeds andThese transactions will need to be approved by the BIA has approved the transfers of title from more than 70% percent of the allottees to transfer their land interests to the Iowa Tribe. The remaining interests will be acquired through the Indian Lands Consolidation Act.Yes, currently an open casino.BIA.
Usable land placed in trust by Federal government  Yes, the Iowa Tribe is currently leasing and acquiring land from tribal members, which is held in trust for the individual tribal members by the United States Government. The Iowa Tribe has acquired signatures on deeds andThese transactions will need to be approved by the BIA has approved the transfers of title from more than 70% percent of the allottees to transfer their land interests to the Iowa Tribe. The remaining interests will be acquired through the Indian Lands Consolidation Act.BIA.  Yes, the Iowa Tribe is currently an open casino.leasing and acquiring land from tribal members, which is held in trust for the individual tribal members by the United States Government. These transactions will need to be approved by the BIA.Yes, the Iowa Tribe is currently leasing and acquiring land from tribal members, which is held in trust for the individual tribal members by the United States Government. These transactions will need to be approved by the BIA.
Usable county agreement, if applicableN/A  N/A  N/A
Usable state compact that allows for gaming consistent with that outlined in ourLakes’ project plan  Yes  YesYes


40


April 1, 2007December 31, 2006January 1, 2006
NIGC approval of management contract in current and desired form  No, submitted to the NIGC for review on April 22, 2005. An EA will beis currently being prepared in orderand is necessary for the management contract to be approved, whichapproved. Completion of the EA is expected to be completed in late 2006.by Summer 2007. There have been no comments on the consulting agreement from the NIGC and is therefore considered operative.  Yes,No, submitted to the NIGC approvedfor review on April 22, 2005. An EA is currently being prepared and is necessary for the management contract in April 2006.
to be approved. Completion of the EA is expected by Spring 2007. There have been no comments on the consulting agreement from the NIGC and is therefore considered operative.  


64


Ioway ProjectCimarron CasinoNo, submitted to the NIGC for review on April 22, 2005. An EA will be prepared in order for the management contract to be approved.
Resolution of all litigation and legal obstacles  None at this time, the acquisition of other tribal land is currently in process.time.  None at this time. The first part of the refurbished casino opened in May 2006.None at this time.
Financing for construction  No, preliminary discussions with lending institutions has occurred.  Permanent financing was obtained from aNo, preliminary discussions with lending institution in December 2005 and Lakes was repaid all amounts outstanding under the business improvement loan.institutions has occurred.No, preliminary discussions with lending institutions has occurred.
Any other significant project milestones or contingencies, the outcome of which could have a material affect on the probability of project completion as planned  No others known at this time by Lakes.  No others known at this time by Lakes.No others known at this time by Lakes.
       
 
OurLakes’ evaluation and conclusion regarding the above critical milestones and progress:progress.  
Long-term assets have been recorded as it is considered probable that the two Iowa Tribe ProjectsIoway Casino project will result in economic benefit to us sufficient to recover our investment. Based upon the above status of all primary milestones and the projected fees to be earned under the consulting agreements and management contracts, no impairment has been recorded. The CimarronIoway Casino is currently open and refurbishment of the casino was completed during the third quarter of fiscal 2006. The Ioway Project could open as early as the firstfourth quarter of fiscal 2008.
 
Kickapoo TribePawnee Nation of Oklahoma
 
Business arrangement.  In April 2006,January 2005, we entered into three gaming development and consulting agreements (collectively “Pawnee Development and Consulting Agreements”) and three separate management contracts (collectively “Pawnee Management Contracts”) with three wholly-owned subsidiaries of the Pawnee Nation in connection with assisting the Pawnee Nation in developing, equipping and managing three separate casino destinations.
On December 1, 2006, we announced that the Pawnee Business Council declined to approve a Settlement Agreementproposed updated tribal agreement with the Kickapoo Tribe pursuant to which we and the Kickapoo Tribe resolved all outstanding issuesour subsidiary relating to the parties’ business relationshipPawnee Trading Post Casino. The consulting agreement and management contract were originally entered into in January 2005, and since then several new members have been appointed to the Pawnee Business Council which has resulted in a substantial change in the Pawnee Business Council’s membership. We, the Pawnee TDC and its gaming subsidiaries (the tribal entities that wasown and operate the tribal casinos), which support approving the updated tribal agreement and our involvement in the projects, are

41


evaluating how they wish to proceed with their current project agreements given this action, including perhaps terminating the project agreements.
For our consulting services, we received monthly fees of $5,000 related to the Trading Post Casino project and were to receive monthly fees of $25,000 and $250,000 from the Travel Plaza Casino and Chilocco Casino projects, respectively, upon their completion. We had also planned to manage each of these facilities under management contracts, subject to regulatory approvals.
As of April 1, 2007, we had advanced approximately $5 million to the Pawnee TDC related to the Chilocco Casino, Travel Plaza and Trading Post projects under the existing agreements. We intend to work with the Pawnee TDC to resolve all of the financial terms of the contracts including repayment of the advances if the project agreements are in fact terminated in November 2005. During fiscal 2005, we recorded a loss of approximately $6.3 million as a result of the Pawnee Business Council’s decision. However, if the agreements are terminated, business relationship. Inthere can be no assurance that we will receive any future fees related to these projects or that we will be repaid in full for our advances. As of April 2006, pursuant to1, 2007, the Settlement Agreement, we received a cash payment of approximately $2.6 million as reimbursement for payments made directly by us to vendors on behalfcompletion of the Kickapoo Tribe,Chilocco Casino and the Kickapoo Tribe agreed to pay $0.6 million into an escrow to be released to us at such time as we transfer title to certain land owned by us to the Kickapoo Tribe. We and the Kickapoo Tribe have agreed that title will transfer only after the Kickapoo Tribe assumes, settles or pays certain accounts payable to vendorsTravel Plaza projects is unlikely. Future consulting fees related to the Kickapoo Tribe’s casino that remainTrading Post project are considered unlikely as current liabilities on our financial statements, and once we receive full releases for any liability thereto. Duringwell. Therefore, during the first nine months of fiscal 2006quarter ended April 1, 2007, we received releases from vendors totaling approximately $2.8 million that have been recorded as unrealized gains. As a result of the $2.6 million payment, we revalued theimpaired our remaining note receivable from the Kickapoo Tribe at $2.6 million as of April 2, 2006, and an unrealized gain of that amount was recognizedPawnee TDC in the first quarter of 2006. During the second quarter of fiscal 2006, the $2.6 million payment was applied to the note. Therefore, there is no remaining value associated with the note receivable from the Kickapoo Tribe as of October 1, 2006. The land transfer and remaining release of liabilities will be recognized in the period they occur. As of October 1, 2006, approximately $0.9 million of liabilities subject to the Settlement Agreement remain. We will not recognize further gains unless and until the remaining release is received from the vendor. However, we do not know or have an estimate of when or if this will occur.
Litigation defense costs:  We do not accrue for estimated future litigation defense costs, if any, to be incurred by us in connection with outstanding litigation and other disputed matters but instead, record such costs as the related legal and other services are rendered.
Income taxes:  In accordance with SFAS No. 109, we evaluated the ability to utilize deferred tax assets arising from net operating loss carry forwards (excluding WPTE) amounts and net deferred tax assets relating to our accounting for advances made to Indian tribes and other ordinary items. Based upon our evaluation of all evidence, we have determined that a valuation allowance is necessary to the extent that management currently believes it is more likely than not that tax benefits will not be realized. Negative evidence considered includes net losses

65


generated over the past four years, which we believe outweighs the current positive evidence regarding our ability to generate significant income from our long-term assets related to Indian casino projects.
We have recorded deferred tax assets related to capital losses during 2001 and 2005. The realization of these benefits is dependent on the generation of capital gains. We have determined that a deferred tax asset in the approximate amount of $0.3 million related to capital losses may expire before it can be utilized at the end of 2006 due to the possibility that there may be insufficient capital gains during 2006 that could be used to offset this loss item. Therefore, to the extent that management currently believes it is more likely than not that tax benefits will not be realized, a valuation allowance has also been recorded against this item as of October 1, 2006.
We are under audit by the IRS for the fiscal years ended 2001 and 2000. The IRS is challenging the treatment of income categorized as a capital gain. If we are unsuccessful in sustaining our position, we may be required to pay up to approximately $3.2 million plus accrued interest related to tax on ordinary income. We originally carried back capital losses to offset the capital gain. If we are unsuccessful in sustaining our capital gain position, we could use the capital losses in the future to offset
future capital gains, if any, prior to their expiration. We own approximately 12.5 million shares of WPTE common stock valued at approximately $47.8 million as of November 3, 2006 based upon the closing stock price as reported by the Nasdaq Global Market of $3.83. However, currently, we do not intend to sell shares of WPTE common stock. Therefore, if reinstated during 2006, these capital loss items could expire before they could be utilized at the end of 2006, due to insufficient capital gains. As a result, we have recorded a liability related to this matter of approximately $2.6 million, including interest due to the possibility that if reinstated, these capital loss items may expire before they could be utilized.
WPTE’s current growth plans potentially may include international expansion, primarily related to WPTE’s online gaming business, expansion of WPTE’s television and product licensing businesses, industry consolidation and acquisitions and entry into new branded gaming businesses. Although WPTE anticipates that all potential strategies will be accretive to earnings, WPTE is aware of the risks involved with an aggressive growth strategy. Therefore, based on its limited and volatile earnings history combined with its cautious optimism, WPTE has determined that a valuation allowance is necessary to the extent that its management currently believes it is more likely than not that tax benefits related to stock option exercises will not be realized.Trading Post project.
 
Recently issued accounting pronouncements
 
In September 2006, the FASB issued SFAS No. 157,Fair Value Measurements, which defines fair value, establishes a framework for measuring fair value and expands disclosures about fair value measurements. SFAS No. 157 will become effective for financial statements issued for fiscal years beginning after November 15, 2007. In February 2007, the FASB issued SFAS No. 159,The Fair Value Option for Financial Assets and Financial Liabilities — Including an amendment of FASB Statement No. 115, which will permit the option of choosing to measure certain eligible items at fair value at specified election dates and report unrealized gains and losses in earnings. SFAS No. 159 will become effective for financial statements issued for fiscal years beginning after November 15, 2007. We are currently evaluating the effect that SFAS No.Nos. 157 and 159, if any, will have on our financial position, results of operations and operating cash flows.
 
In June 2006, the FASB issued Interpretation (FIN) No. 48,Accounting for Uncertainty in Income Taxes, which interprets FASB No. 109,Accounting for Income Taxes. FIN 48 prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken in a tax return. FIN 48 also provides guidance on derecognition, classification, interest and penalties, accounting in interim periods, disclosure, and transition. FIN 48 will be effective for fiscal years beginning after December 15, 2006. We are currently evaluating the effect that FIN 48 will have on our financial position, results of operations and operating cash flows.
In February 2005, the FASB issued SFAS No. 155,Accounting for Certain Hybrid Instrumentsamending the guidance in SFAS No. 133,Accounting for Derivative Instruments and Hedging Activities,and SFAS No. 140,Accounting for Transfers and Servicing of Financial Assets and Extinguishments of Liabilities. SFAS No. 155 allows financial instruments that have embedded derivatives to be accounted for as a whole (eliminating the need to bifurcate the derivative from its host) if the holder elects to account for the whole instrument on a fair value basis. SFAS No. 155 will become effective for financial instruments acquired or issued by us during the fiscal year beginning after September 15, 2006. We presently do not expect SFAS No. 155 to be applicable to any instruments we are likely to acquire or issue.


66


Seasonality
 
We believe that the operations of all casinos to be managed by us will be affected by seasonal factors, including holidays, weather and travel conditions. WPTE’s license revenues are affected by the timetable for delivery of episodes to TRV.
 
Regulation and taxes
 
We and the casinos to be managed by us are subject to extensive regulation by state gaming authorities. We will also be subject to regulation, which may or may not be similar to current state regulations, by the appropriate authorities in any jurisdiction where we may conduct gaming activities in the future. Changes in applicable laws or regulations could have an adverse effect on us.
 
The gaming industry represents a significant source of tax revenues to regulators. From time to time, various federal legislators and officials have proposed changes in tax law, or in the administration of such law, affecting the gaming industry. It is not possible to determine the likelihood of possible changes in tax law or in the administration of such law. Such changes, if adopted, could have a material adverse effect on our future financial position, results of operations and cash flows.
 
Off-balance sheet arrangements
 
We have no off-balance sheet arrangements that have or are reasonably likely to have a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to investors, except for the financing commitments previously discussed.


42


 
Private Securities Litigation Reform Act
 
The Private Securities Litigation Reform Act of 1995 provides a “safe harbor” for forward-looking statements. Certain information included in this QuarterlyAnnual Report onForm 10-Q10-K and other materials filed or to be filed by usLakes with the SECUnited States Securities and Exchange Commission (“SEC”) as well as information included in oral statements or other written statements made or to be made by usLakes contain statements that are forward-looking, such as plans for future expansion and other business development activities as well as other statements regarding capital spending, financing sources and the effects of regulation (including gaming and tax regulation) and competition.
 
Such forward looking information involves important risks and uncertainties that could significantly affect the anticipated results in the future and, accordingly, actual results may differ materially from those expressed in any forward-looking statements made by or on behalf of us.Lakes.
 
These risks and uncertainties include, but are not limited to, need for current financing to meet ourLakes’ future operational and development needs; those relating to the inability to complete or possible delays in completion of ourLakes’ casino projects, including various regulatory approvals and numerous other conditions which must be satisfied before completion of these projects; possible termination or adverse modification of management or development contracts; we operateLakes operates in a highly competitive industry; possible changes in regulations; reliance on continued positive relationships with Indian tribes and repayment of amounts owed to Lakes by Indian tribes; continued contracts with the Pawnee Nation as a result of the change in its business council membership; possible need for future financing to meet ourLakes’ expansion goals; risks of entry into new businesses; reliance on ourLakes’ management; and the fact that WPTEthe WPT Enterprises, Inc. (NASDAQ: WPTE) (“WPTE”) shares held by usLakes are currently not liquid assets, and there is no assurance that weLakes will be able to realize value from these holdings equal to the current or future market value of WPTE common stock. There are also risks and uncertainties relating to WPTE that may have a material effect on ourLakes’ consolidated results of operations or the market value of the WPTE shares held by us,Lakes, including WPTE’s significant dependence on theThe Travel Channel, L.L.C. as a source of revenue; the potential that WPTE’s television programming will fail to maintain a sufficient audience; difficulty of predicting the growth of WPTE’s online casino business, which is a relatively new industry with an increasing number of market entrants; reliance on the potential thatefforts of CryptoLogic to develop and maintain the recently passed Unlawful Internet Gambling Act could adversely effect WPTE’s online gaming business; the increased time costwebsite in compliance with WPTE’s business model and expense of developing and maintaining WPTE’s own onlineapplicable gaming software;laws; the risk that WPTE may not be able to protect its entertainment concepts, current and future brands and other intellectual property rights; the risk that competitors with greater


67


financial resources or marketplace presence might develop television programming that would directly compete with WPTE’s television programming; risks associated with future expansion into new or complementary businesses; the termination or impairment of WPTE’s relationships with key licensing and strategic partners; and WPTE’s dependence on its senior management team. For more information, review ourLakes’ filings with the SEC.Securities and Exchange Commission. For further information regarding the risks and uncertainties, see the “Risk Factors” section in Item 1A of our Annual Report onForm 10-K for the fiscal year ended January 1,December 31, 2006.
 
ITEM 3.  QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
 
Our financial instruments include cash and cash equivalents and marketable securities. Our main investment objectives are the preservation of investment capital and the maximization of after-tax returns on our investment portfolio. Consequently, we invest with only high-credit-quality issuers and limit the amount of credit exposure to any one issuer. We do not use derivative instruments for speculative or investment purposes.
 
Our cash and cash equivalents are not subject to significant interest rate risk due to the short maturities of these instruments. As of OctoberApril 1, 2006,2007, the carrying value of our cash and cash equivalents approximates fair value. We also hold short-term investments consisting of marketable debt securities (principally consisting of commercial paper, corporate bonds, and government securities) having a weighted-average duration of one year or less. Consequently, such securities are not subject to significant interest rate risk.
 
Our primary exposure to market risk associated with changes in interest rates involves our long-term assets related to Indian casino projects in the form of notes receivable due from our tribal partners for the development and construction of Indian-owned casinos. The loans earn interest based upon a defined reference rate. The floating


43


interest rate will generate more or less interest income if interest rates rise or fall. Our notes receivable from Indian tribes related to properties under development bear interest generally at prime plus one percent or two percent, however, the interest is only payable if the casino is successfully opened and distributable profits are available from casino operations. We record our notes receivable at fair value and subsequent changes in fair value are recorded as unrealized gains or losses in our unaudited condensed consolidated statement of earnings (loss) and comprehensive earnings (loss). As of OctoberApril 1, 2006,2007, we had $38.3$68.6 million of notes receivable, at fair value with a floating interest rate (principal amount of $46.9$77.1 million). Based on the applicable current reference rates and assuming all other factors remain constant, interest income for a twelve month period would be approximately $4.8$7.9 million. A reference rate increase of 100 basis points would result in an increase in interest income of $0.5$0.8 million. A 100 basis point decrease in the reference rate would result in a decrease of $0.5$0.8 million in interest income over the same twelve-month period.
We are exposed to interest rate risk as a result of the $105 million Credit Agreement entered into on June 22, 2006, that has a variable interest rate equal to3-month LIBOR plus 6.25%. We have entered into an interest rate swap agreement as required by our Credit Agreement to manage the variability of the cash flows in the interest payments due to changes in the LIBOR interest rate. The interest rate swap will effectively convert our variable-rate debt to a fixed rate. The notional value of the interest rate swap must be equal to 100% of the financing facility for the first 18 months and 50% of the financing facility thereafter.
 
ITEM 4.  CONTROLS AND PROCEDURES
 
Under the supervision and with the participation of our management, including our chief executive officer and chief financial officer, we conducted an evaluation of our disclosure controls and procedures, as such term is defined underRules 13a-15(e) and Rule 15d — 15(e) promulgated under the Securities Exchange Act of 1934, as of the end of the period covered by this quarterly report. Based on their evaluation, our chief executive officer and chief financial officer concluded that Lakes Entertainment, Inc.’s disclosure controls and procedures are effective.
 
There have been no significant changes (including corrective actions with regard to significant deficiencies or material weaknesses) in our internal control over financial reporting during the thirdfirst quarter ended OctoberApril 1, 20062007 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.


6844


 
Part II.

Other Information
 
ITEM 1.  LEGAL PROCEEDINGS
 
El Dorado County, California litigationlitigation.
 
On January 3, 2003, El Dorado County filed an action in the Superior Court of the State of California (“Superior Court”), seeking to prevent the construction of a highway interchange that was approved by a California state agency. The action, which was consolidated with a similar action brought by VRLVoices for Rural Living (“VRL”) and others, does not seek relief directly against us.Lakes. However, the interchange is necessary to permit the construction of a casino to be developed and managed by usLakes through a joint venture. The casino will be owned by the Shingle Springs Tribe. The matter was tried to the court on August 22, 2003. On January 2, 2004, Judge Lloyd G. Connelly, Judge of the Court, issued his ruling on the matter denying the petitionThis litigation resulted in all respects except one. As to the one exception, the Court sought clarification as to whether the transportation conformity determination used to determine the significance of the air quality impact of the interchange operations considered the impact on attainment of the state ambient air quality standard for ozone. CalTrans prepared and filed the clarification addendum sought by the Court. Prior to the Court’s determination of the adequacy of the clarification, El Dorado County and VRL appealed Judge Connelly’s ruling to the Appeals Court on all of the remaining issues.
A ruling with respect to the addendum was issued June 21, 2004 by the Court. The ruling indicated that the addendum provided to the court by CalTrans did not provide a quantitative showing to satisfy the court’s earlier request for a clarification on meeting the state ambient ozone standard. The court recognized that the information provided by CalTrans does qualitatively show that the project may comply with the state standard, but concluded that a quantitative analysis is necessary even though the court recognized that the methodology for that analysis “is not readily apparent”. In addition, the ruling specifically stated, “Moreover, such methodology appears necessary for the CEQA analysis of transportation projects throughout the state, including transportation projects for which respondents (i.e., CalTrans) have approval authority.” CalTrans, the Shingle Springs Tribe and Lakes responded to the court with a revised submissionvarious decisions in August 2004. Representativesfavor of the California Air Resources Boardregulatory agencies to proceed with the interchange and the Sacramento Area Council of Governments filed declarations supporting the revised submission to the Court. Opposition to that revised submission was filed, a hearing on the revised submission took place on August 20, 2004 and the Court again found the revised submission of CalTrans, the Shingle Springs Tribe and Lakes to be inadequate. That ruling was separately appealed to the Appeals Court and an oral argument for thesesubsequent appeals and the appeals of El Dorado County and VRL was held before the Court on August 29, 2005.
The Appeals Court issued its decision on the appeals on November 8, 2005. The Appeals Court ruled in favor of CalTrans’ appeal, rejecting the El Dorado County’s argument that the transportation conformity analysis did not conform to state standards. The Appeals Court also rejected all but two of the legal claims asserted in the appeal by El Dorado County and VRL againstof those decisions over the EIR prepared by CalTransnext several years. For a more complete discussion of the history of this litigation see Item 3 of our Annual Report onForm 10-K for the interchange that will connect Highway 50fiscal year ended December 31, 2006.
On December 15, 2006, VRL filed two Notice of Appeals to the California Court of Appeals (“Appeals Court”), the first one appealing Superior Court Judge Connelly’s Judgment discharging the Peremptory Writ of Mandate in the VRL and Shingle Springs Rancheria. ForNeighbors for Quality Living v. CalTrans, et al, case, and the remaining two issues, the Appeals Court held that CalTrans must supplement its environmental analysis by adding some discussionsecond one appealing Judge Connelly’s (1) Order denying appellants’ Motion for Preliminary Injunction and (2) Order sustaining Respondents’ Demurrers Without Leave to the air quality chapter to further explain the project’s contribution to overall vehicular emissionsAmend in the region,VRL, Chrysan Dosh, et al v. CalTrans, et al, case. No briefs have been filed and that CalTrans also must evaluate whether a smaller casino and hotel would reduce environmental impacts. The Appeals Court acknowledged CalTrans lacks jurisdiction to require the Shingle Springs Tribe to develop a smaller casino, but nevertheless required some discussion of this alternative in the supplemental EIR.no hearing date has been set. On December 19, 2005, CalTransFebruary 16, 2007, VRL filed a Petitionmotion for Review with the Supreme Court of the State of California, and on February 8, 2006 the Supreme Court denied the Petition for Review and ordered the Appeals Court decision to be depublished. CalTrans has compliedstay, pending appeal with the Appeals Court order and a supplemental EIR was issued in May 2006.
seeking to stay any construction during the pendency of the appeal. On September 28, 2006,March 2, 2007, the Shingle Springs Tribe and El Dorado County entered into a settlement agreement that requires the Shingle Springs Tribe to make voluntary mitigation payments to construct HOV lanes on Highway 50, make payments for law enforcement services, collect and pay sales taxes on food and beverage revenues to El Dorado County, and contribute to the El Dorado County general fund. In return, El Dorado County agreed to request that the Federal Court dismiss with prejudice the El Dorado County’s current Federal law suit and join and support the Shingle Springs Tribe in the state lawsuit. Additionally, El Dorado County agreed to support the Shingle Springs


69


Tribe’s efforts to obtain a new compact with the State of California, not to oppose in any way the anticipated Tribal EIR required by the new compact, work with LAFCO to remove potential regulatory impediments and support the Shingle Springs Tribe obtaining domestic water services and future sewer treatment services from the El Dorado Irrigation District.
On November 3, 2006, the Court issued its decision upholding the SEIR pertaining to CalTrans’ proposed interchange that will connect Highway 50 to the Shingle Springs Tribe rancheria. The Court’s decision effectively dismisses the VRL lawsuit against CalTrans, the Shingle Springs Tribe and Lakes. The Court also sustained CalTrans’ demurrer in VRL’s subsequent lawsuit, putting an end to that lawsuit as well. Finally, theAppeals Court denied VRL’s request to stay the project. Although VRL has filed for a motion requesting an injunction, the Court has not ruled whether it will even consider the motion. The Court did instruct VRL that it could file its motion directly with the Appeals Court. The Court’s decision will allow CalTrans to issue the permit to allow construction of the interchange to commence.
 
We haveLakes has not recorded any liability for this matter as management currently believes that the Superior Court’s and Appeals Court’s rulings will ultimately allow the project to commence. In addition, a construction permit for the interchange was issued on April 30, 2007 and construction began on May 7, 2007. However, there can be no assurance that the final outcome of this matter is not likely to have a material adverse effect upon ourLakes’ consolidated financial statements.
 
WPTE litigationlitigation.
 
On July 19, 2006, a legal action was commenced against WPTE became a defendant in an action alleging,by seven poker players (“Plaintiffs”) that alleges, among other things, that itsan unfair business practice requiring playersof WPTE. On March 14, 2007, Plaintiffs filed a motion for summary judgment in the case and on April 12, 2007 WPTE filed its opposition to execute certain participant releasesthe motion. The parties are currently engaged in connection with certain tournaments violate antitrust laws. WPTE intends to vigorously defend its practicediscovery and although unable at this time to estimate any minimum losses, if any, in connection with this matter, based on information now available,a trial date has been set for April 1, 2008. WPTE does not expect any material adverse consequenceconsequences from this action. Accordingly, no provision has been made in the financial statements for any such losseslosses.
 
Other litigationlitigation.
 
WeLakes and ourits subsidiaries are involved in various other inquiries, administrative proceedings, and litigation relating to contracts and other matters arising in the normal course of business. While any proceeding or litigation has an element of uncertainty, management currently believes based in part on advice from legal counsel, that neither the final outcome of these matters, including the matters discussed above, nor the related legal defense costs areis not likely to have a material adverse effect upon the our futureLakes’ consolidated financial position or results of operations beyond the amounts recorded.statements.
 
ITEM 1A.  RISK FACTORS
 
There have been no material changes to our risk factors identified in the “Risk Factors” section in Item 1A of our Annual Report onForm 10-K for the fiscal year ended January 1, 2006 except the following:December 31, 2006.
• We are no longer subject to the risk that our common stock may not be re-listed on the Nasdaq Global Market, formerly the Nasdaq National Market. As previously announced, our common stock resumed trading on the Nasdaq Global Market on March 23, 2006 under the symbol “LACO.”
• On June 22, 2006, Lakes borrowed $105 million under a financing facility with BofA and the Lenders pursuant to the terms and conditions of a Credit Agreement among Lakes, Lakes Gaming and Resorts, LLC, BofA and the Lenders. Approximately $25.2 million of the initial draw was used to repay in full the aforementioned loan payable to PLKS. (Note 5) While the funds provided by the $105 million credit agreement with BofA allow us to move forward with our various casino development projects, we anticipate that we will incur additional pre-construction costs which will require us to obtain additional sources of financing during fiscal 2007 to meet our operational and development needs. Therefore, we will explore additional financing alternatives as needed. The financing is discussed in greater detail in Item 2 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of this Quarterly Report onForm 10-Q.


7045


• We are no longer subject to the risk of financing all phases of the Pokagon Casino project as the Pokagon Band closed on a $305 million senior note financing in addition to a $75 million commitment for furniture, furnishings and equipment to fund the remainder of the Four Winds Casino project. The financing is discussed in greater detail in Item 2 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of this Quarterly Report on Form10-Q.
• Warrants to purchase 3.21 million shares of common stock previously issued to PLKS have lapsed and are no longer exercisable.
• We cannot guarantee the financial results of the expansion of the World Poker Tour business, which may negatively impact our financial results. We can provide no assurance that WPTE will achieve its forecasted revenues, that WPTE will be able to expand its business, or that WPTE’s operations will positively impact our financial results because WPTE’s business is subject to many risks and uncertainties. These risks include, but are limited to, WPTE’s short operating history, WPTE’s dependence on its agreement with TRV, continued public acceptance of the World Poker Tour programming and brand, protection of WPTE’s intellectual property rights, and WPTE’s ability to successfully expand into new and complementary businesses, including internet gambling. The Unlawful Internet Gambling Enforcement Act of 2006 prohibits online gambling in the United States of America. Congress’ passing of the Unlawful Internet Gambling Enforcement Act or future government regulation of online gaming in the United States may restrict the activities or affect the financial results of WPTE’s online gaming venture currently operating and WPTE’s new online gaming venture in development.
 
ITEM 6.  EXHIBITS
 
(a) Exhibits
     
 31.1 Certification of CEO pursuant to Securities Exchange ActRules 13a-15(e) and15d-15(e) as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 31.2 Certification of CFO pursuant to Securities Exchange ActRules 13a-15(e) and15d-15(e) as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 32.1 Certification of Chief Executive Officer and Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
     
Exhibits
 
Description
 
 31.1 Certification of CEO pursuant to Securities Exchange ActRules 13a-15(e) and15d-15(e) as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 31.2 Certification of CFO pursuant to Securities Exchange ActRules 13a-15(e) and15d-15(e) as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 32.1 Certification of Chief Executive Officer and Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002


7146


SIGNATURES
 
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report onForm 10-Q to be signed on its behalf by the undersigned, thereunto duly authorized.
 
LAKES ENTERTAINMENT, INC.
Registrant
 
/s/  LYLE BERMAN
/s/  LYLE BERMAN
Lyle Berman
Chairman of the Board and
Chief Executive Officer
(Principal Executive Officer)
 
/s/  TIMOTHY J. COPE
Timothy J. Cope
President and Chief Financial Officer
(Principal Financial and Accounting Officer)
 
Dated: November 9, 2006May 11, 2007


7247