UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-Q

(Mark One)
x           QUARTERLY REPORT PURSUANT TO SECTION 13, 15(d), OR 37 OF THE
SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended March 31,June 30, 2010

OR

o           TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from ____ to ____

Commission file number 000-52313


TENNESSEE VALLEY AUTHORITY
(Exact name of registrant as specified in its charter)
   
A corporate agency of the United States
created by an act of Congress
(State or other jurisdiction of incorporation or organization)
 
62-0474417
(IRS Employer Identification No.)
   
400 W. Summit Hill Drive
Knoxville, Tennessee
(Address of principal executive offices)
 
37902
(Zip Code)

(865) 632-2101
(Registrant’s telephone number, including area code)

None
(Former name, former address and former fiscal year, if changed since last report)

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13, 15(d), or 37 of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes xNo o

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes oNo o

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company.  See the definitions of “large accelerated filer,” “accelerated filer,” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.  (Check one):
Large accelerated filer  o
Accelerated filer o
Non-accelerated filer    x
(Do not check if a smaller reporting company)
Smaller reporting company  o

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Yes o No x

 
1

 


3
4
5
  
  
6
6
7
8
9
11
  
38
38
39
43
46
5150
51
51
5253
5354
5354
5657
  
5758
  
5758
5758
5758
  
  
58
59
58
59
59
60
6061
6162


 
2





 
The following terms or acronyms frequently used in this Form 10-Q are defined below:
 
Term or Acronym Definition
ASLBARO Atomic Safety and Licensing BoardAsset retirement obligation
ART Asset retirement trust
AROASLB Asset retirement obligationAtomic Safety and Licensing Board
BEST Bellefonte Efficiency and Sustainability Team
BREDL Blue Ridge Environmental Defense League
CAA Clean Air Act
CCP Coal combustion products
CERCLA Comprehensive Environmental Response, Compensation, and Liability Act
CME Chicago Mercantile Exchange
CO2
 Carbon dioxide
CVA Credit valuation adjustment
CY Calendar year
EPA Environmental Protection Agency
FASB Financial Accounting Standards Board
FCA Fuel cost adjustment
FTP Financial Trading Program
GAAP Accounting principles generally accepted in the United States of America
GHG Greenhouse gas
KDAQ Kentucky Division for Air Quality
kWh Kilowatt hour(s)
LIBOR London Interbank Offered Rate
MD&A Management’s Discussion and Analysis of Financial Condition and Results of Operations
MtMMark-to-market
MWMegawatt
Moody’s Moody’s Investors Service, Inc.
mmBtu Million British thermal unit(s)
MtMMark-to-market
MWMegawatt
NDT Nuclear decommissioning trust
NEPA National Environmental Policy Act
NOV Notice of Violation
NOx
 Nitrogen oxides
NPDES National Pollutant Discharge Elimination System
NRC Nuclear Regulatory Commission
NSR New Source Review
PCB Polychlorinated biphenyls
REIT Real estate investment trust
SACE Southern Alliance for Clean Energy
SCR Selective catalytic reduction systems
SERP Supplemental executive retirement plan
Seven States Seven States Power Corporation
SO2
 Sulfur dioxide
SSSLSeven States Southaven, LLC
S&P Standard & Poor’s Rating Services
SSSLSeven States Southaven, LLC
TDEC Tennessee Department of Environment and Conservation


 
3



FORWARD-FORWARD-LOOKINGLOOKING INFORMATION

This Quarterly Report on Form 10-Q (“Quarterly Report”) contains forward-looking statements relating to future events and future performance.  All statements other than those that are purely historical may be forward-looking statements.  In certain cases, forward-looking statements can be identified by the use of words such as “may,” “will,” “should,” “expect,” “anticipate,” “believe,” “intend,” “project,” “plan,” “predict,” “assume,” “forecast,” “estimate,” “objective,” “possible,” “probably,” “likely,” “potential,” or other similar expressions.

Although the Tennessee Valley Authority (“TVA”) believes that the assumptions underlying the forward-looking statements are reasonable, TVA does not guarantee the accuracy of these statements.  Numerous factors could cause actual results to differ materially from those in the forward-looking statements.  These factors include, among other things:

New or changed laws, regulations, and administrative orders (“Laws”), including those related to environmental matters, and the costs of complying with these new or changed Laws as well as existing laws, regulations, and administrative orders;Laws;
UnplannedAdditional contributions to TVA’s pension or other post-retirement benefit plans or to TVA’s nuclear decommissioning trust (“NDT”);
Significant delays, cost increases, or cost overruns associated with the cleanup and recovery activities associated with the ash spill at TVA’s Kingston Fossil Plant (“Kingston”) or in construction of generation and transmission assets;
Fines, penalties, natural resource damages, and settlements associated with the Kingston ash spill;
The outcome of legal and administrative proceedings, including, but not limited to, proceedings involving the Kingston ash spill and the North Carolina public nuisance case;
Significant changes in demand for electricity;
Loss of customers;
The continued operation, performance, or failure of TVA’s generation, transmission, and related assets, including facilities such as coal combustion product (“CCP”) facilities;
The economics of modernizing aging coal-fired generating units and installing emission control equipment to meet anticipated emission-reduction requirements, which could make continued operation of certain coal-fired units uneconomical and lead to their removal from service, perhaps permanently;
Disruption of fuel supplies, which may result from, among other things, weather conditions, production or transportation difficulties, labor challenges, or environmental regulationsLaws affecting TVA’s fuel suppliers or shippers;
Purchased power price volatility and disruption of purchased power supplies;
Events atinvolving transmission lines and other facilities not operated by TVA, including those that affect the supply of water to TVA’s generation facilities;
Inability to obtain regulatory approval for the construction or operation of assets;
Weather conditions;
Events at a nuclear facility, even one that is not operated by or licensed to TVA;
Catastrophic events such as fires, earthquakes, solar events, floods, tornadoes, pandemics, wars, terrorist activities, and other similar events, especially if these events occur in or near TVA’s service area;
Reliability and creditworthiness of counterparties;
Changes in the market price of commodities such as coal, uranium, natural gas, fuel oil, crude oil, construction materials, electricity, and emission allowances;
Changes in the market price of equity securities, debt securities, and other investments;
Changes in interest rates, currency exchange rates, and inflation rates;
Rising pension and health care costs;
Increases in TVA’s financial liability for decommissioning its nuclear facilities and retiring other assets;
Changes in the market for TVA’s debt, changes in TVA’s credit rating, or limitations on TVA’s ability to borrow money;
Changes in the economy and volatility in financial markets;
Inability to eliminate identified deficiencies in TVA’s systems, standards, controls, and corporate culture;
Ineffectiveness of TVA’s disclosure controls and procedures and its internal control over financial reporting;
Changes in accounting standards including any change that would eliminate TVA’s ability to use regulatory accounting;

4


Problems attracting and retaining a qualified workforce;
Changes in technology;
Differences between estimates of revenues and expenses and actual revenues and expenses; and
Unforeseeable events.


4




See also Item 1A, Risk Factors, and Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations in TVA’s Annual Report on Form 10-K for the fiscal year ended September 30, 2009 (the “Annual Report”) and Part I, Item 2, Management’s Discussion and Analysis of Financial Condition and Results of Operations, and Part II, Item 1A, Risk Factors, in this Quarterly Report.  New factors emerge from time to time, and it is not possible for management to predict all such factors or to assess the extent to which any factor or combination of factors may impact TVA’s business or cause results to differ materially from those contained in any forward-looking statement.

TVA undertakes no obligation to update any forward-looking statement to reflect developments that occur after the statement is made.

GENERAL INFORMATION

Fiscal Year

Unless otherwise indicated, yearsYears (2010, 2009, etc.) in this Quarterly Report refer to TVA’s fiscal years ending September 30.  References to years that are preceded by “CY” are to calendar years.

Notes

References to “Notes” are to the Notes to Financial Statements contained in Part I, Item 1, Financial Statements in this Quarterly Report.

Property

TVA does not own real property.  TVA acquires real property in the name of the United States and such real property is entrusted to TVA as the agent of the United States to accomplish the purposes of the TVA Act.  TVA does acquireacquires personal property in the name of TVA.  Accordingly, unless the context indicates the reference is to TVA’s personal property, any statement in this Quarterly Report referring to TVA property shall be read as referring to the real property of the United States which has been entrusted to TVA as its agent.

TENNESSEE VALLEY AUTHORITY
(Exact name of registrant as specified in its charter)
A corporate agency of the United States
created by an act of Congress
(State or other jurisdiction of incorporation or organization)
62-0474417
(IRS Employer Identification No.)
400 W. Summit Hill Drive
Knoxville, Tennessee
(Address of principal executive offices)
37902
(Zip Code)

(865) 632-2101
Available Information(Registrant’s telephone number, including area code)

None
TVA's Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q,(Former name, former address and Current Reports on Form 8-K, andformer fiscal year, if changed since last report)

Indicate by check mark whether the registrant (1) has filed all amendmentsreports required to those reports, are available on TVA's web site, freebe filed by Section 13, 15(d), or 37 of charge, as soon as reasonably practicable after such material is electronically filed with or furnished to the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and Exchange Commission (“SEC”).  TVA's web(2) has been subject to such filing requirements for the past 90 days.
Yes xNo o

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, is www.tva.gov.  Information contained on TVA’s web site shall not be deemedif any, every Interactive Data File required to be incorporated into, orsubmitted and posted pursuant to be a partRule 405 of Regulation S-T (§232.405 of this Quarterly Report.  TVA's SEC reports are also availablechapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes oNo o

Indicate by check mark whether the public without charge fromregistrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company.  See the web site maintained by the SEC at www.sec.gov.  In addition, the public may readdefinitions of “large accelerated filer,” “accelerated filer,” and copy any reports or other information that TVA files with or furnishes to the SEC at the SEC’s Public Reference Room at 100 F Street NE, Washington, D.C. 20549.  The public may obtain information about the operation“smaller reporting company” in Rule 12b-2 of the Public Reference RoomExchange Act.  (Check one):
Large accelerated filer  o
Accelerated filer o
Non-accelerated filer    x
(Do not check if a smaller reporting company)
Smaller reporting company  o

Indicate by callingcheck mark whether the SEC at 1-800-SEC-0330.registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Yes o No x

 
1


3
4
5
6
6
7
8
9
11
38
38
39
43
46
50
51
51
53
54
54
57
58
58
58
58
59
59
60
61
62
2



The following terms or acronyms frequently used in this Form 10-Q are defined below:
Term or AcronymDefinition
AROAsset retirement obligation
ARTAsset retirement trust
ASLBAtomic Safety and Licensing Board
BESTBellefonte Efficiency and Sustainability Team
BREDLBlue Ridge Environmental Defense League
CAAClean Air Act
CCPCoal combustion products
CERCLAComprehensive Environmental Response, Compensation, and Liability Act
CMEChicago Mercantile Exchange
CO2
Carbon dioxide
CVACredit valuation adjustment
CYCalendar year
EPAEnvironmental Protection Agency
FASBFinancial Accounting Standards Board
FCAFuel cost adjustment
FTPFinancial Trading Program
GAAPAccounting principles generally accepted in the United States of America
GHGGreenhouse gas
KDAQKentucky Division for Air Quality
kWhKilowatt hour(s)
LIBORLondon Interbank Offered Rate
MD&AManagement’s Discussion and Analysis of Financial Condition and Results of Operations
Moody’sMoody’s Investors Service, Inc.
mmBtuMillion British thermal unit(s)
MtMMark-to-market
MWMegawatt
NDTNuclear decommissioning trust
NEPANational Environmental Policy Act
NOVNotice of Violation
NOx
Nitrogen oxides
NPDESNational Pollutant Discharge Elimination System
NRCNuclear Regulatory Commission
NSRNew Source Review
PCBPolychlorinated biphenyls
REITReal estate investment trust
SACESouthern Alliance for Clean Energy
SCRSelective catalytic reduction systems
SERPSupplemental executive retirement plan
Seven StatesSeven States Power Corporation
SO2
Sulfur dioxide
SSSLSeven States Southaven, LLC
S&PStandard & Poor’s Rating Services
TDECTennessee Department of Environment and Conservation

3



FORWARD-PART I – FINANCIALLOOKING INFORMATION

This Quarterly Report on Form 10-Q (“Quarterly Report”) contains forward-looking statements relating to future events and future performance.  All statements other than those that are purely historical may be forward-looking statements.  In certain cases, forward-looking statements can be identified by the use of words such as “may,” “will,” “should,” “expect,” “anticipate,” “believe,” “intend,” “project,” “plan,” “predict,” “assume,” “forecast,” “estimate,” “objective,” “possible,” “probably,” “likely,” “potential,” or other similar expressions.

ITEM 1.  FINANCIAL STATEMENTSAlthough the Tennessee Valley Authority (“TVA”) believes that the assumptions underlying the forward-looking statements are reasonable, TVA does not guarantee the accuracy of these statements.  Numerous factors could cause actual results to differ materially from those in the forward-looking statements.  These factors include, among other things:


New or changed laws, regulations, and administrative orders (“Laws”), including those related to environmental matters, and the costs of complying with these new or changed Laws as well as existing Laws;
TENNESSEE VALLEY AUTHORITY
Additional contributions to TVA’s pension or other post-retirement benefit plans or to TVA’s nuclear decommissioning trust (“NDT”);
STATEMENTS OF OPERATIONS (Unaudited)
Significant delays, cost increases, or cost overruns associated with the cleanup and recovery activities associated with the ash spill at TVA’s Kingston Fossil Plant (“Kingston”) or in construction of generation and transmission assets;
 (in millions)
Fines, penalties, natural resource damages, and settlements associated with the Kingston ash spill;

The outcome of legal and administrative proceedings, including, but not limited to, proceedings involving the Kingston ash spill and the North Carolina public nuisance case;
  Three Months Ended March 31  Six Months Ended March 31 
  2010  2009  2010  2009 
             
Operating revenues            
Sales of electricity            
Municipalities and cooperatives $2,218  $2,509  $4,163  $5,078 
Industries directly served  347   362   695   804 
Federal agencies and other  25   32   52   70 
Other revenue  32   30   61   58 
Total operating revenues  2,622   2,933   4,971   6,010 
                 
Operating expenses                
Fuel and purchased power  605   1,232   1,213   2,615 
Operating and maintenance  756   586   1,510   1,176 
Depreciation, amortization, and accretion  413   398   824   794 
Tax equivalents  101   137   206   285 
Environmental cleanup costs — Kingston ash spill     150      675 
Total operating expenses  1,875   2,503   3,753   5,545 
                 
Operating income  747   430   1,218   465 
                 
Other income (expense), net  8   20   14   11 
                 
Interest expense                
Interest on debt and leaseback obligations  337   321   673   655 
Amortization of debt discount, issue, and reacquisition costs, net  5   5   10   10 
Allowance for funds used during construction and nuclear fuel expenditures  (17)  (9)  (31)  (17)
Net interest expense  325   317   652   648 
                 
Net income (loss) $430  $133  $580  $(172)
 
 
The accompanying notes are an integral part of these financial statements.
 
Significant changes in demand for electricity;

Loss of customers;

The continued operation, performance, or failure of TVA’s generation, transmission, and related assets, including facilities such as coal combustion product (“CCP”) facilities;
The economics of modernizing aging coal-fired generating units and installing emission control equipment to meet anticipated emission-reduction requirements, which could make continued operation of certain coal-fired units uneconomical and lead to their removal from service, perhaps permanently;
Disruption of fuel supplies, which may result from, among other things, weather conditions, production or transportation difficulties, labor challenges, or environmental Laws affecting TVA’s fuel suppliers or shippers;
Purchased power price volatility and disruption of purchased power supplies;
Events involving transmission lines and other facilities not operated by TVA, including those that affect the supply of water to TVA’s generation facilities;
Inability to obtain regulatory approval for the construction or operation of assets;
Weather conditions;
Events at a nuclear facility, even one that is not operated by or licensed to TVA;
Catastrophic events such as fires, earthquakes, solar events, floods, tornadoes, pandemics, wars, terrorist activities, and other similar events, especially if these events occur in or near TVA’s service area;
Reliability and creditworthiness of counterparties;
Changes in the market price of commodities such as coal, uranium, natural gas, fuel oil, crude oil, construction materials, electricity, and emission allowances;
Changes in the market price of equity securities, debt securities, and other investments;
Changes in interest rates, currency exchange rates, and inflation rates;
Rising pension and health care costs;
Increases in TVA’s financial liability for decommissioning its nuclear facilities and retiring other assets;
Changes in the market for TVA’s debt, changes in TVA’s credit rating, or limitations on TVA’s ability to borrow money;
Changes in the economy and volatility in financial markets;
Inability to eliminate identified deficiencies in TVA’s systems, standards, controls, and corporate culture;
Ineffectiveness of TVA’s disclosure controls and procedures and its internal control over financial reporting;
Changes in accounting standards including any change that would eliminate TVA’s ability to use regulatory accounting;

 
64



Problems attracting and retaining a qualified workforce;
Changes in technology;
Differences between estimates of revenues and expenses and actual revenues and expenses; and
Unforeseeable events.

TENNESSEE VALLEY AUTHORITYSee also Item 1A, Risk Factors, and Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations in TVA’s Annual Report on Form 10-K for the fiscal year ended September 30, 2009 (the “Annual Report”) and Part I, Item 2, Management’s Discussion and Analysis of Financial Condition and Results of Operations, and Part II, Item 1A, Risk Factors, in this Quarterly Report.  New factors emerge from time to time, and it is not possible for management to predict all such factors or to assess the extent to which any factor or combination of factors may impact TVA’s business or cause results to differ materially from those contained in any forward-looking statement.

BALANCE SHEETSTVA undertakes no obligation to update any forward-looking statement to reflect developments that occur after the statement is made.

GENERAL (in millions)INFORMATION

ASSETS      
  March 31  September 30 
  2010  2009 
  (Unaudited)    
Current assets      
Cash and cash equivalents $202  $201 
Accounts receivable, net  1,150   1,303 
Inventories and other, net  1,047   961 
Total current assets  2,399   2,465 
         
Property, plant, and equipment        
Completed plant  41,485   41,286 
Less accumulated depreciation  (18,675)  (18,086)
Net completed plant  22,810   23,200 
Construction in progress  3,278   2,600 
Nuclear fuel and capital leases  1,080   961 
Total property, plant, and equipment, net  27,168   26,761 
         
Investment funds  1,053   983 
         
Regulatory and other long-term assets        
Deferred nuclear generating units  2,151   2,347 
Other regulatory assets  6,985   7,287 
Subtotal  9,136   9,634 
Other long-term assets  153   174 
Total regulatory and other long-term assets  9,289   9,808 
         
Total assets $39,909  $40,017 
         
 
LIABILITIES AND PROPRIETARY CAPITAL
        
         
Current liabilities        
Accounts payable and accrued liabilities $1,528  $2,108 
Environmental cleanup costs - Kingston ash spill  275   348 
Accrued interest  419   401 
Current portion of leaseback obligations  66   463 
Current portion of energy prepayment obligations  105   105 
Short-term debt, net  1,147   844 
Current maturities of long-term debt  1,008   8 
Total current liabilities  4,548   4,277 
         
Long-term liabilities        
Other long-term liabilities  4,534   4,805 
Regulatory liabilities  79   130 
Environmental cleanup costs - Kingston ash spill  242   354 
Asset retirement obligations  2,753   2,683 
Leaseback obligations  1,303   940 
Energy prepayment obligations  770   822 
Total long-term liabilities  9,681   9,734 
         
Long-term debt, net  20,827   21,788 
         
Total liabilities  35,056   35,799 
         
Proprietary capital        
Appropriation investment  4,693   4,703 
Retained earnings  3,871   3,291 
Accumulated other comprehensive loss  (5)  (75)
Accumulated net expense of nonpower programs  (3,706)  (3,701)
Total proprietary capital  4,853   4,218 
         
Total liabilities and proprietary capital $39,909  $40,017 
         
 
The accompanying notes are an integral part of these financial statements.
 
Fiscal Year


7



TENNESSEE VALLEY AUTHORITY
STATEMENTS OF CASH FLOWS (Unaudited)
For the six months ended March 31
(Years (2010, 2009, etc.) in millions)this Quarterly Report refer to TVA’s fiscal years ending September 30.  References to years that are preceded by “CY” are to calendar years.

  2010  2009 
       
Cash flows from operating activities      
Net income (loss) $580  $(172)
Adjustments to reconcile net income (loss) to net cash provided by operating activities        
   Depreciation, amortization, and accretion  834   804 
   Nuclear refueling outage amortization  58   60 
   Amortization of nuclear fuel  116   103 
   Non-cash retirement benefit expense  177   70 
   Prepayment credits applied to revenue  (53)  (52)
   Fuel cost adjustment deferral  (642)  678 
   Environmental cleanup costs - Kingston ash spill – non-cash  31   598 
Changes in current assets and liabilities        
   Accounts receivable, net  165   182 
   Inventories and other, net  (115)  (295)
   Accounts payable and accrued liabilities  (245)  92 
   Accrued interest  18   (30)
Refueling outage costs     (44)
Other, net  5   (4)
Net cash provided by operating activities  929   1,990 
         
Cash flows from investing activities        
Construction expenditures  (1,005)  (859)
Nuclear fuel expenditures  (235)  (302)
Change in restricted cash and investments     (17)
Change in collateral funds     (260)
Purchases of investments, net  5   4 
Loans and other receivables        
   Advances  (22)  (4)
   Repayments  10   5 
   Other, net  3    
Net cash used in investing activities  (1,244)  (1,433)
         
Cash flows from financing activities        
Long-term debt        
   Issues  116   619 
   Redemptions and repurchases  (29)  (2,558)
Short-term issues, net  303   1,436 
Payments on leases and leaseback financing  (57)  (27)
Financing costs, net  (3)  (7)
Payments to U.S. Treasury  (15)  (5)
Other  1   (17)
Net cash provided by (used in) financing activities  316   (559)
         
Net change in cash and cash equivalents  1   (2)
Cash and cash equivalents at beginning of period  201   213 
         
Cash and cash equivalents at end of period $202  $211 
         
 
The accompanying notes are an integral part of these financial statements.
 



8


TENNESSEE VALLEY AUTHORITY
STATEMENTS OF CHANGES IN PROPRIETARY CAPITAL (Unaudited)
For the three months ended March 31, 2010 and 2009
(in millions)Notes

  
  
 
 
Appropriation Investment
  
 
 
Retained Earnings
  Accumulated Other Comprehensive Loss  Accumulated Net Expense Stewardship Programs  
 
 
 
Total
  
 
 
Comprehensive Income (Loss)
 
                   
Balance at December 31, 2008 (Unaudited) $4,718  $2,264  $(210) $(3,695) $3,077    
Net income (loss)     136      (3)  133  $133 
Other comprehensive income                        
  Net unrealized gain on future cash flow hedges        41      41   41 
  Reclassification to earnings from cash flow hedges        15      15   15 
  Total other comprehensive income                      56 
Total comprehensive income                     $189 
Return on Power Facility Appropriation Investment     (4)        (4)    
Return of Power Facility Appropriation Investment  (5)      —      (5)    
Balance at March 31, 2009 (Unaudited) $4,713  $2,396  $(154) $(3,698) $3,257     
                         
Balance at December 31, 2009 (Unaudited) $4,698  $3,442  $(18) $(3,704) $4,418     
Net income (loss)     432      (2)  430  $430 
Other comprehensive income                        
  Net unrealized loss on future cash flow hedges        (46)     (46)  (46)
  Reclassification to earnings from cash flow hedges        59      59   59 
  Total other comprehensive income                      13 
Total comprehensive income                     $443 
Return on Power Facility Appropriation Investment     (3)        (3)    
Return of Power Facility Appropriation Investment  (5)           (5)    
Balance at March 31, 2010 (Unaudited) $4,693  $3,871  $(5) $(3,706) $4,853     
 
 
The accompanying notes are an integral part of these financial statements.
 
References to “Notes” are to the Notes to Financial Statements contained in Part I, Item 1, Financial Statements in this Quarterly Report.



Property

9

TableTVA does not own real property.  TVA acquires real property in the name of Contentsthe United States and such real property is entrusted to TVA as the agent of the United States to accomplish the purposes of the TVA Act.  TVA acquires personal property in the name of TVA.  Accordingly, unless the context indicates the reference is to TVA’s personal property, any statement in this Quarterly Report referring to TVA property shall be read as referring to the real property of the United States which has been entrusted to TVA as its agent.



TENNESSEE VALLEY AUTHORITY
(Exact name of registrant as specified in its charter)
A corporate agency of the United States
created by an act of Congress
(State or other jurisdiction of incorporation or organization)
62-0474417
(IRS Employer Identification No.)
400 W. Summit Hill Drive
Knoxville, Tennessee
(Address of principal executive offices)
37902
(Zip Code)

(865) 632-2101
(Registrant’s telephone number, including area code)

None
(Former name, former address and former fiscal year, if changed since last report)

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13, 15(d), or 37 of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes xNo o

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes oNo o

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company.  See the definitions of “large accelerated filer,” “accelerated filer,” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.  (Check one):
Large accelerated filer  o
Accelerated filer o
Non-accelerated filer    x
(Do not check if a smaller reporting company)
Smaller reporting company  o

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Yes o No x

1


3
4
5
6
6
7
8
9
11
38
38
39
43
46
50
51
51
53
54
54
57
58
58
58
58
59
59
60
61
62
2



The following terms or acronyms frequently used in this Form 10-Q are defined below:
Term or AcronymDefinition
AROAsset retirement obligation
ARTAsset retirement trust
ASLBAtomic Safety and Licensing Board
BESTBellefonte Efficiency and Sustainability Team
BREDLBlue Ridge Environmental Defense League
CAAClean Air Act
CCPCoal combustion products
CERCLAComprehensive Environmental Response, Compensation, and Liability Act
CMEChicago Mercantile Exchange
CO2
Carbon dioxide
CVACredit valuation adjustment
CYCalendar year
EPAEnvironmental Protection Agency
FASBFinancial Accounting Standards Board
FCAFuel cost adjustment
FTPFinancial Trading Program
GAAPAccounting principles generally accepted in the United States of America
GHGGreenhouse gas
KDAQKentucky Division for Air Quality
kWhKilowatt hour(s)
LIBORLondon Interbank Offered Rate
MD&AManagement’s Discussion and Analysis of Financial Condition and Results of Operations
Moody’sMoody’s Investors Service, Inc.
mmBtuMillion British thermal unit(s)
MtMMark-to-market
MWMegawatt
NDTNuclear decommissioning trust
NEPANational Environmental Policy Act
NOVNotice of Violation
NOx
Nitrogen oxides
NPDESNational Pollutant Discharge Elimination System
NRCNuclear Regulatory Commission
NSRNew Source Review
PCBPolychlorinated biphenyls
REITReal estate investment trust
SACESouthern Alliance for Clean Energy
SCRSelective catalytic reduction systems
SERPSupplemental executive retirement plan
Seven StatesSeven States Power Corporation
SO2
Sulfur dioxide
SSSLSeven States Southaven, LLC
S&PStandard & Poor’s Rating Services
TDECTennessee Department of Environment and Conservation

3



FORWARD-LOOKING INFORMATION

This Quarterly Report on Form 10-Q (“Quarterly Report”) contains forward-looking statements relating to future events and future performance.  All statements other than those that are purely historical may be forward-looking statements.  In certain cases, forward-looking statements can be identified by the use of words such as “may,” “will,” “should,” “expect,” “anticipate,” “believe,” “intend,” “project,” “plan,” “predict,” “assume,” “forecast,” “estimate,” “objective,” “possible,” “probably,” “likely,” “potential,” or other similar expressions.

Although the Tennessee Valley Authority (“TVA”) believes that the assumptions underlying the forward-looking statements are reasonable, TVA does not guarantee the accuracy of these statements.  Numerous factors could cause actual results to differ materially from those in the forward-looking statements.  These factors include, among other things:

New or changed laws, regulations, and administrative orders (“Laws”), including those related to environmental matters, and the costs of complying with these new or changed Laws as well as existing Laws;
Additional contributions to TVA’s pension or other post-retirement benefit plans or to TVA’s nuclear decommissioning trust (“NDT”);
Significant delays, cost increases, or cost overruns associated with the cleanup and recovery activities associated with the ash spill at TVA’s Kingston Fossil Plant (“Kingston”) or in construction of generation and transmission assets;
Fines, penalties, natural resource damages, and settlements associated with the Kingston ash spill;
The outcome of legal and administrative proceedings, including, but not limited to, proceedings involving the Kingston ash spill and the North Carolina public nuisance case;
Significant changes in demand for electricity;
Loss of customers;
The continued operation, performance, or failure of TVA’s generation, transmission, and related assets, including facilities such as coal combustion product (“CCP”) facilities;
The economics of modernizing aging coal-fired generating units and installing emission control equipment to meet anticipated emission-reduction requirements, which could make continued operation of certain coal-fired units uneconomical and lead to their removal from service, perhaps permanently;
Disruption of fuel supplies, which may result from, among other things, weather conditions, production or transportation difficulties, labor challenges, or environmental Laws affecting TVA’s fuel suppliers or shippers;
Purchased power price volatility and disruption of purchased power supplies;
Events involving transmission lines and other facilities not operated by TVA, including those that affect the supply of water to TVA’s generation facilities;
Inability to obtain regulatory approval for the construction or operation of assets;
Weather conditions;
Events at a nuclear facility, even one that is not operated by or licensed to TVA;
Catastrophic events such as fires, earthquakes, solar events, floods, tornadoes, pandemics, wars, terrorist activities, and other similar events, especially if these events occur in or near TVA’s service area;
Reliability and creditworthiness of counterparties;
Changes in the market price of commodities such as coal, uranium, natural gas, fuel oil, crude oil, construction materials, electricity, and emission allowances;
Changes in the market price of equity securities, debt securities, and other investments;
Changes in interest rates, currency exchange rates, and inflation rates;
Rising pension and health care costs;
Increases in TVA’s financial liability for decommissioning its nuclear facilities and retiring other assets;
Changes in the market for TVA’s debt, changes in TVA’s credit rating, or limitations on TVA’s ability to borrow money;
Changes in the economy and volatility in financial markets;
Inability to eliminate identified deficiencies in TVA’s systems, standards, controls, and corporate culture;
Ineffectiveness of TVA’s disclosure controls and procedures and its internal control over financial reporting;
Changes in accounting standards including any change that would eliminate TVA’s ability to use regulatory accounting;

4


Problems attracting and retaining a qualified workforce;
Changes in technology;
Differences between estimates of revenues and expenses and actual revenues and expenses; and
Unforeseeable events.

See also Item 1A, Risk Factors, and Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations in TVA’s Annual Report on Form 10-K for the fiscal year ended September 30, 2009 (the “Annual Report”) and Part I, Item 2, Management’s Discussion and Analysis of Financial Condition and Results of Operations, and Part II, Item 1A, Risk Factors, in this Quarterly Report.  New factors emerge from time to time, and it is not possible for management to predict all such factors or to assess the extent to which any factor or combination of factors may impact TVA’s business or cause results to differ materially from those contained in any forward-looking statement.

TVA undertakes no obligation to update any forward-looking statement to reflect developments that occur after the statement is made.

GENERAL INFORMATION

Fiscal Year

Years (2010, 2009, etc.) in this Quarterly Report refer to TVA’s fiscal years ending September 30.  References to years that are preceded by “CY” are to calendar years.

Notes

References to “Notes” are to the Notes to Financial Statements contained in Part I, Item 1, Financial Statements in this Quarterly Report.

Property

TVA does not own real property.  TVA acquires real property in the name of the United States and such real property is entrusted to TVA as the agent of the United States to accomplish the purposes of the TVA Act.  TVA acquires personal property in the name of TVA.  Accordingly, unless the context indicates the reference is to TVA’s personal property, any statement in this Quarterly Report referring to TVA property shall be read as referring to the real property of the United States which has been entrusted to TVA as its agent.

Available Information

TVA's Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, and Current Reports on Form 8-K, and all amendments to those reports, are available on TVA's web site, free of charge, as soon as reasonably practicable after such material is electronically filed with or furnished to the Securities and Exchange Commission (“SEC”).  TVA's web site is www.tva.gov.  Information contained on TVA’s web site shall not be deemed to be incorporated into, or to be a part of, this Quarterly Report.  TVA's SEC reports are also available to the public without charge from the web site maintained by the SEC at www.sec.gov.  In addition, the public may read and copy any reports or other information that TVA files with or furnishes to the SEC at the SEC’s Public Reference Room at 100 F Street NE, Washington, D.C. 20549.  The public may obtain information about the operation of the Public Reference Room by calling the SEC at 1-800-SEC-0330.

5



PART I – FINANCIAL INFORMATION

ITEM 1.  FINANCIAL STATEMENTS


TENNESSEE VALLEY AUTHORITY
STATEMENTS OF OPERATIONS(Unaudited)
 (in millions)

  Three Months Ended June 30  Nine Months Ended June 30 
  2010  2009  2010  2009 
             
Operating revenues            
Sales of electricity            
Municipalities and cooperatives $2,204  $2,201  $6,367  $7,279 
Industries directly served  324   306   1,019   1,110 
Federal agencies and other  31   31   83   101 
Other revenue  28   28   89   86 
Total operating revenues  2,587   2,566   7,558   8,576 
                 
Operating expenses                
Fuel and purchased power  786   1,043   1,999   3,658 
Operating and maintenance  757   599   2,267   1,775 
Depreciation, amortization, and accretion  416   397   1,240   1,191 
Tax equivalents  114   128   320   413 
Environmental cleanup costs — Kingston ash spill     258      933 
Total operating expenses  2,073   2,425   5,826   7,970 
                 
Operating income  514   141   1,732   606 
                 
Other income (expense), net  6   2   20   13 
                 
Interest expense                
Interest on debt and leaseback obligations  338   316   1,011   971 
Amortization of debt discount, issue, and reacquisition costs, net  5   5   15   15 
Allowance for funds used during construction and nuclear fuel expenditures  (22)  (11)  (53)  (28)
Net interest expense  321   310   973   958 
                 
Net income (loss) $199  $(167) $779  $(339)
 
The accompanying notes are an integral part of these financial statements.
 



6



TENNESSEE VALLEY AUTHORITY
BALANCE SHEETS
(in millions)

ASSETS      
  June 30  September 30 
  2010  2009 
  (Unaudited)    
Current assets      
Cash and cash equivalents $198  $201 
Accounts receivable, net  1,383   1,303 
Inventories and other, net  1,115   961 
Total current assets  2,696   2,465 
         
Property, plant, and equipment        
Completed plant  42,221   41,286 
Less accumulated depreciation  (18,962)  (18,086)
Net completed plant  23,259   23,200 
Construction in progress  3,048   2,600 
Nuclear fuel and capital leases  1,105   961 
Total property, plant, and equipment, net  27,412   26,761 
         
Investment funds  986   983 
         
Regulatory and other long-term assets        
Deferred nuclear generating units  2,054   2,347 
Other regulatory assets  7,431   7,287 
Subtotal  9,485   9,634 
Other long-term assets  132   174 
Total regulatory and other long-term assets  9,617   9,808 
         
Total assets $40,711  $40,017 
         
 
LIABILITIES AND PROPRIETARY CAPITAL
        
         
Current liabilities        
Accounts payable and accrued liabilities $1,526  $2,108 
Environmental cleanup costs - Kingston ash spill  237   348 
Accrued interest  323   401 
Current portion of leaseback obligations  74   463 
Current portion of energy prepayment obligations  105   105 
Short-term debt, net  834   844 
Current maturities of long-term debt  1,042   8 
Total current liabilities  4,141   4,277 
         
Long-term liabilities        
Other long-term liabilities  4,961   4,805 
Regulatory liabilities  56   130 
Environmental cleanup costs - Kingston ash spill  364   354 
Asset retirement obligations  2,821   2,683 
Leaseback obligations  1,282   940 
Energy prepayment obligations  743   822 
Total long-term liabilities  10,227   9,734 
         
Long-term debt, net  21,363   21,788 
         
Total liabilities  35,731   35,799 
         
Proprietary capital        
Appropriation investment  4,685   4,703 
Retained earnings  4,071   3,291 
Accumulated other comprehensive loss  (67)  (75)
Accumulated net expense of nonpower programs  (3,709)  (3,701)
Total proprietary capital  4,980   4,218 
         
Total liabilities and proprietary capital $40,711  $40,017 
         
 
The accompanying notes are an integral part of these financial statements.
 
 


7



TENNESSEE VALLEY AUTHORITY
STATEMENTS OF CASH FLOWS (Unaudited)
For the nine months ended June 30
(in millions)

  2010  2009 
       
Cash flows from operating activities      
Net income (loss) $779  $(339)
Adjustments to reconcile net income (loss) to net cash provided by operating activities        
   Depreciation, amortization, and accretion  1,255   1,206 
   Nuclear refueling outage amortization  82   91 
   Amortization of nuclear fuel  177   155 
   Non-cash retirement benefit expense  268   105 
   Prepayment credits applied to revenue  (79)  (79)
   Fuel cost adjustment deferral  (808)  778 
   Environmental cleanup costs - Kingston ash spill – non-cash  47   790 
Changes in current assets and liabilities        
   Accounts receivable, net  (89)  151 
   Inventories and other, net  (137)  (284)
   Accounts payable and accrued liabilities  (212)  59 
   Accrued interest  (78)  (151)
Refueling outage costs     (113)
Other, net  5   45 
Net cash provided by operating activities  1,210   2,414 
         
Cash flows from investing activities        
Construction expenditures  (1,491)  (1,286)
Nuclear fuel expenditures  (282)  (338)
Change in restricted cash and investments     (17)
Purchases of investments, net  5   4 
Loans and other receivables        
   Advances  (23)  (10)
   Repayments  14   9 
Other, net  4   1 
Net cash used in investing activities  (1,773)  (1,637)
         
Cash flows from financing activities        
Long-term debt        
   Issues  679   734 
   Redemptions and repurchases  (35)  (2,626)
Short-term issues, net  (10)  1,108 
Proceeds from sale/leaseback financing  9   95 
Payments on leases and leaseback financing  (79)  (67)
Bond premium received  28    
Financing costs, net  (4)  (7)
Payments to U.S. Treasury  (25)  (25)
Other  (3)  (1)
Net cash provided by (used in) financing activities  560   (789)
         
Net change in cash and cash equivalents  (3)  (12)
Cash and cash equivalents at beginning of period  201   213 
         
Cash and cash equivalents at end of period $198  $201 
         
 
The accompanying notes are an integral part of these financial statements.
 

8



TENNESSEE VALLEY AUTHORITY
STATEMENTS OF CHANGES IN PROPRIETARY CAPITAL (Unaudited)
For the three months ended June 30, 2010 and 2009
(in millions)

  
  
 
 
Appropriation Investment
  
 
 
Retained Earnings
  Accumulated Other Comprehensive Loss  Accumulated Net Expense Stewardship Programs  
 
 
 
Total
  
 
 
Comprehensive Income (Loss)
 
                   
Balance at March 31, 2009  (Unaudited) $4,713  $2,396  $(154) $(3,698) $3,257    
Net income (loss)     (166)     (1)  (167) $(167)
Other comprehensive income (loss)                        
  Net unrealized gain on future cash flow hedges        218      218   218 
  Reclassification to earnings from cash flow hedges        (126)     (126)  (126)
  Total other comprehensive income (loss)                      92 
Total comprehensive income (loss)                     $(75)
Return on Power Facility Appropriation Investment     (3)        (3)    
Return of Power Facility Appropriation Investment  (5)      —      (5)    
Balance at June 30, 2009 (Unaudited) $4,708  $2,227  $(62) $(3,699) $3,174     
                         
Balance at March 31, 2010 (Unaudited) $4,693  $3,871  $(5) $(3,706) $4,853     
Net income (loss)     202      (3)  199  $199 
Other comprehensive income (loss)                        
  Net unrealized loss on future cash flow hedges        (76)     (76)  (76)
  Reclassification to earnings from cash flow hedges        14      14   14 
  Total other comprehensive income (loss)                      (62)
Total comprehensive income (loss)                     $137 
Return on Power Facility Appropriation Investment     (2)        (2)    
Return of Power Facility Appropriation Investment  (8)           (8)    
Balance at June 30, 2010 (Unaudited) $4,685  $4,071  $(67) $(3,709) $4,980     
 
The accompanying notes are an integral part of these financial statements.
 






9



TENNESSEE VALLEY AUTHORITY
STATEMENTS OF CHANGES IN PROPRIETARY CAPITAL (Unaudited)
For the sixnine months ended March 31,June 30, 2010 and 2009
(in millions)

 
 
 
Appropriation Investment
  
 
 
Retained Earnings
  Accumulated Other Comprehensive Loss  Accumulated Net Expense Stewardship Programs  
 
 
 
Total
  
 
 
Comprehensive Income (Loss)
 
 
 
 
Appropriation Investment
  
 
 
Retained Earnings
  Accumulated Other Comprehensive Loss  Accumulated Net Expense Stewardship Programs  
 
 
 
Total
  
 
 
Comprehensive Income (Loss)
                   
Balance at September 30, 2008 $4,723  $2,571  $(37) $(3,694) $3,563     $4,723  $2,571  $(37) $(3,694) $3,563    
Net income (loss)     (168)     (4)  (172) $(172)     (334)     (5)  (339) $(339)
Other comprehensive income (loss)                                                
Net unrealized loss on future cash flow hedges        (323)     (323)  (323)        (105)     (105)  (105)
Reclassification to earnings from cash flow hedges        206      206   206         80      80   80 
Total other comprehensive income (loss)                      (117)                      (25)
Total comprehensive loss                     $(289)
Total comprehensive income (loss)                     $(364)
Return on Power Facility Appropriation Investment     (7)        (7)         (10)        (10)    
Return of Power Facility Appropriation Investment  (10)      —      (10)      (15)      —      (15)    
Balance at March 31, 2009 (Unaudited) $4,713  $2,396  $(154) $(3,698) $3,257     
Balance at June 30, 2009 (Unaudited) $4,708  $2,227  $(62) $(3,699) $3,174     
                                                
Balance at September 30, 2009 $4,703  $3,291  $(75) $(3,701) $4,218      $4,703  $3,291  $(75) $(3,701) $4,218     
Net income (loss)     585      (5)  580  $580      787      (8)  779  $779 
Other comprehensive income (loss)                                                
Net unrealized gain on future cash flow hedges        21      21   21 
Net unrealized loss on future cash flow hedges        (55)     (55)  (55)
Reclassification to earnings from cash flow hedges        49      49   49         63      63   63 
Total other comprehensive income (loss)                      70                       8 
Total comprehensive income (loss)                     $650                      $787 
Return on Power Facility Appropriation Investment     (5)        (5)         (7)        (7)    
Return of Power Facility Appropriation Investment  (10)           (10)      (18)           (18)    
Balance at March 31, 2010 (Unaudited) $4,693  $3,871  $(5) $(3,706) $4,853     
Balance at June 30, 2010 (Unaudited) $4,685  $4,071  $(67) $(3,709) $4,980     
The accompanying notes are an integral part of these financial statements.
The accompanying notes are an integral part of these financial statements.
 
The accompanying notes are an integral part of these financial statements.
 



 
10




 
NOTES TO FINANCIAL STATEMENTS (Unaudited)
(Dollars in millions except where noted)
Note No.   Page No.   Page No.
1  11  11
2  12  12
3  14  14
4  14  14
5  14  14
6  15  14
7  16  15
8  17  17
9  17  17
10  18  18
11  19  19
12  20  20
13  27  27
14  32  32
15  32  32
16  33  33
17  37  37
        

1.  Summary of Significant Accounting Policies

General

In response to a proposalrequest by President Franklin D. Roosevelt, in 1933, the U.S. Congress createdin 1933 enacted legislation creating the Tennessee Valley Authority (“TVA”), a government corporation.  TVA was created, among other things, to improve navigation on the Tennessee River, reduce the damage from destructive flood waters within the Tennessee River system and downstream on the lower Ohio and Mississippi Rivers, further the economic development of TVA’s service area in the southeastern United States, and sell the electricity generated at the facilities TVA operates.

Today, TVA operates the nation’s largest public power system and supplies power in most of Tennessee, northern Alabama, northeastern Mississippi, and southwestern Kentucky and in portions of northern Georgia, western North Carolina, and southwestern Virginia to a population of over nine million.

TVA also manages the Tennessee River and its tributaries — the United States’s fifth largest river system — to provide, among other things, year-round navigation, flood damage reduction, and affordable and reliable electricity.  Consistent with these primary purposes, TVA also manages land, shoreline and tributaries to provide recreational opportunities, adequate water supply, improved water quality, and economic development.  TVA performs these management duties in cooperation with other federal and state agencies whowhich have jurisdiction and authority over certain aspects of the river system.  TVA’s management of the Tennessee River and its tributaries was initially funded in part by appropriated funds and in part by power revenues.  TVA’s management of the Tennessee River and its tributa ries will sometimes be referred to as TVA’s “stewardship” programs.

The power program has historically been separate and distinct from the stewardship programs.  TVA is required to be self-supporting from power revenues and proceeds from power financings, such as proceeds from the issuance of bonds, notes, and other evidences of indebtedness (“Bonds”).  Although TVA does not currently receive congressional appropriations, it is required to make annual payments to the U.S. Treasury in repayment of, and as a return on, the government’s appropriation investment in TVA power facilities (the “Power Facility Appropriation Investment”).  In the 1998 Energy and Water Development Appropriations Act, Congress directed TVA to fund essential stewardship activities related to its management of the Tennessee River system and related properties with power fund s in the event that there were insufficient appropriations or other available funds to pay for such activities in any fiscal year.  Congress has not provided any appropriations to TVA to fund such activities since 1999.  Consequently, during 2000, TVA began paying for essential stewardship activities primarily with power revenues, with the remainder funded with user fees and other forms of revenues derived in connection with those activities.  Thesethese activities related to essential stewardship properties do not meet the criteria of an operating segment under the accounting principles generally accepted in the United States of America (“GAAP”).  Accordingly, thesestewardship assets and propertiesactivities are included as part of the power program, TVA’s only operating segment.



 
11



Power rates are established by the TVA Board of Directors (“TVA Board”) as authorized by the Tennessee Valley Authority Act of 1933, as amended, 16 U.S.C. §§ 831-831ee (as amended, the “TVA Act”).  The TVA Act requires TVA to charge rates for power that will produce gross revenues sufficient to provide funds for operation, maintenance, and administration of its power system; payments to states and counties in lieu of taxes; debt service on outstanding indebtedness; payments to the U.S. Treasury in repayment of and as a return on the Power Facility Appropriation Investment; and such additional margin as the TVA Board may consider desirable for investment in power system assets, retirement of outstanding Bonds in advance of maturity, additional redu ction of the Power Facility Appropriation Investment, and other purposes connected with TVA’s power business.  In setting TVA’s rates, the TVA Board is charged by the TVA Act to have due regard for the primary objectives of the TVA Act, including the objective that power shall be sold at rates as low as are feasible.  Rates set by the TVA Board are not subject to review or approval by any state or federal regulatory body.

Basis of Presentation

TVA prepares its interim financial statements in conformity with GAAP for interim financial information.  Accordingly, TVA’s interim financial statements do not include all of the information and notes required by GAAP for completeannual financial statements.  Because the accompanying interim financial statements do not include all of the information and footnotes required by GAAP for complete financial statements,As such, they should be read in conjunction with the audited financial statements for the year ended September 30, 2009, and the notes thereto, which are contained in TVA’s Annual Report on Form 10-K for the year ended September 30, 2009 (the “Annual Report”).  In the opinion of management, all adjustments (consisting of items of a normal re curringrecurring nature) considered necessary for fair presentation are included.

Use of Estimates

The preparation of financial statements requires TVA to estimate the effects of various matters that are inherently uncertain as of the date of the financial statements.  Although the financial statements are prepared in conformity with GAAP, management is required to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities, and the amounts of revenues and expenses reported during the reporting period.  Each of these estimates varies in regard to the level of judgment involved and its potential impact on TVA’s financial results.  Estimates are deemed critical either when a different estimate could have reasonably been used, or where changes in the estimate are reasonably likely to occur from period to period, and such use or change would materially impact TVA’s financial condition, results of operations, or cash flows.  TVA’s critical accounting policies are also discussed in Note 1 of the Notes to the Financial Statements contained in the Annual Report.

Fiscal Year

TVA’s fiscal year ends September 30.  Unless otherwise indicated, yearsYears (2010, 2009, etc.) refer to TVA’s fiscal years. References to years that are preceded by “CY” are to calendar years.


2.  Impact of New Accounting Standards and Interpretations


The following accounting standards and interpretations became effective for TVA during 2010.

Fair Value Measurements.  In September 2006, the Financial Accounting Standards Board (“FASB”) issued guidance for measuring assets and liabilities that currently require fair value measurement.  The guidance also responds to investors’ requests for expanded information about the extent to which companies measure assets and liabilities at fair value, the information used to measure fair value, and the effect of fair value measurements on earnings.  The guidance applies whenever other standards require (or permit) assets or liabilities to be measured at fair value but does not expand the use of fair value in any new circumstances.  The guidance establishes a fair value hierarchy that prioritizes the information used to develop measurement assumptions.  In February 2008, FASB issued guidance that delayed the effective date of the fair value accounting changes for nonfinancial assets and nonfinancial liabilities except for items that are recognized or disclosed at fair value in the financial statements on a recurring basis.  Effective October 1, 2009, TVA adopted these fair value accounting changes for its nonfinancial assets and nonfinancial liabilities.  The adoption of this guidance did not materially impact TVA’s financial condition, results of operations, or cash flows.


 
12



In August 2009, FASB issued guidance regarding fair value measurements of liabilities.liabilities.  The guidance clarifies how the fair value of a liability should be measured when a quoted price in an active market for the identical liability either is or is not available.  Additionally, the guidance clarifies how to consider a restriction when estimating the fair value of a liability and the appropriate level within the fair value disclosure hierarchy in which the various measurement techniques result.  These changes became effective for TVA on October 1, 2009.  The adoption of this guidance did not materially impact TVA’s financial condition, results of operations, or cash flows.

In September 2009, FASB issued guidance regarding fair value measurements for certain alternative investments, such as interests in hedge funds, private equity funds, real estate funds, venture capital funds, offshore fund vehicles, and funds of funds.  The guidance allows reporting entities to use net asset value per share to estimate the fair value of these investments as a practical expedient.  The guidance also requires disclosures by major category of investment about the attributes of the investments, such as the nature of any restrictions on the investor's ability to redeem its investments at the measurement date, any unfunded commitments, and the investment strategies of the investees.  These changes became effectivee ffective for TVA on October 1, 2009.  The adoption of this guidance did not ma teriallymaterially impact TVA’s financial condition, results of operations, or cash flows.

Business Combinations.  In December 2007, FASB issued guidance that changes the accounting for business combinations.  The guidance establishes principles and requirements for determining how an enterprise recognizes and measures the fair value of certain assets and liabilities acquired in a business combination, including non-controlling interests, contingent consideration, and certain acquired contingencies.  The guidance also requires acquisition-related transaction expenses and restructuring costs to be expensed as incurred rather than capitalized as a component of the business combination.  In April 2009, FASB issued additional guidance to amend and clarify the initial recognition and measurement, subsequent measurement and accounting, and related disclosures arising from contingencies in a business combination. This guidanceThese changes became effective for TVA on October 1, 2009.  The adoption of this guidance did not materially impact TVA’s financial condition, results of operations, or cash flows but will impact the accounting for any future business acquisitions.

Noncontrolling Interests.  In December 2007, FASB issued guidance that introduces significant changes in the accounting for noncontrolling interests (formerly minority interests) in a partially-owned consolidated subsidiary.  The guidance also changes the accounting for and reporting for the deconsolidation of a subsidiary.  The guidance requires that a noncontrolling interest in a consolidated subsidiary be displayed in the consolidated statement of financial position as a separate component of equity.  The guidance also requires that earnings attributed to the noncontrolling interests be reported as part of consolidated earnings, and requires disclosure of the attribution of consolidat ed earningsconsolidated e arnings to the controlling and noncontrolling interests on the face of the consolidated income statement.  These changes became effective for TVA on October 1, 2009.  The adoption of this guidance did not materially impact TVA’s financial condition, results of operations, or cash flows but will impact the accounting for any future noncontrolling interests.

The following accounting standards have been issued, but as of March 31,June 30, 2010, were not effective and had not been adopted by TVA.

Transfers of Financial Assets.  In June 2009, FASB issued guidance regarding accounting for transfers of financial assets.  This guidance eliminates the concept of a qualifying special-purpose entity (“QSPE”) and subjects those entities to the same consolidation guidance as other variable interest entities (“VIEs”).  The guidance changes the eligibility criteria for certain transactions to qualify for sale accounting and the accounting for certain transfers.  The guidance also establishes broad disclosure objectives and requires extensive specific disclosures related to the transfers.  These changes will become effective for TVA for any transfers of fina ncial assets occurring on or after October 1, 2010.  TVA does not believe adoption of this guidance will materially affect its financial condition, results of operations, or cash flows.

Variable Interest Entities.  In June 2009, FASB issued guidance that changes the consolidation guidance for VIEs.  The guidance eliminates the consolidation scope exception for QSPEs.  The statement amends the triggering events to determine if an entity is a VIE, establishes a primarily qualitative model for determining the primary beneficiary of the VIE, and requires on-going assessments of whether the reporting entity is the primary beneficiary.  These changes will become effective for TVA on October 1, 2010, and will apply to all entities determined to be VIEs as of and subsequent to the date of adoption.  TVA does not believe adoption of this guidance will materially affect its financial condition, results of operations, or cash flows.


 
13



3.  Accounts Receivable

Accounts receivable primarily consist of amounts due from customers for power sales.  The table below summarizes the types and amounts of receivables:

Accounts Receivable
Accounts Receivable
 
Accounts Receivable
 
 At March 31, 2010  At September 30, 2009  At June 30, 2010  At September 30, 2009 
            
Power receivables billed $251  $309  $337  $309 
Power receivables unbilled  858   940   1,023   940 
Total power receivables  1,109   1,249   1,360   1,249 
                
Other receivables  42   56   25   56 
Allowance for uncollectible accounts  (1)  (2)  (2)  (2)
Net accounts receivable $1,150  $1,303  $1,383  $1,303 

44..  Inventories and Other, Net

The table below summarizes the types and amounts of TVA’s inventories and other current assets:

Inventories and Other, Net
Inventories and Other, Net
 
Inventories and Other, Net
 
 At March 31, 2010  At September 30, 2009  At June 30, 2010  At September 30, 2009 
            
Fuel inventory $592  $535  $601  $535 
Materials and supplies inventory  441   422   465   422 
Emission allowance inventory  12   12   11   12 
Allowance for inventory obsolescence  (52)  (50)  (24)  (50)
Inventories, net  993   919   1,053   919 
Prepaids and other  54   42   62   42 
Inventories and other, net $1,047  $961  $1,115  $961 


The $26 million reduction in the allowance for inventory obsolescence is primarily due to changes in assumptions based on a detailed inventory observation study completed during the quarter ended June 30, 2010.

5.  Other Long-Term Assets

The table below summarizes the types and amounts of TVA’s Other long-term assets:
Other Long-Term Assets
Other Long-Term Assets
 
Other Long-Term Assets
 
 At June 30, 2010  At September 30, 2009 
 At March 31, 2010  At September 30, 2009       
Loans and long-term receivables, net $89  $77  $85  $77 
Currency swap assets  16   7      7 
Coal contract derivative assets  43   87   40   87 
Other long-term assets  5   3   7   3 
Total other long-term assets $153  $174  $132  $174 
 

14


6.  Cost-Based Regulation
 
Regulatory assets generally represent incurred costs that have been deferred because such costs are probable of future recovery in customer rates.  These regulatory assets are included in Deferred nuclear generating units and Other regulatory assets on the March 31,June 30, 2010, and September 30, 2009 Balance Sheets.  Regulatory liabilities generally represent obligations to make refunds to customers for previous collections for costs that are not likely to be incurred or deferral of gains that will be credited to customers in future periods.  These regulatory liabilities are included in Accounts payable and accrued liabilities a ndan d Regulatory liabilities on the March 31,June 30, 2010, and September 30, 2009 Balance Sheets.  Components of Other regulatory assets and Regulatory liabilities are summarized in the table below.

TVA Regulatory Assets and Liabilities
 
 
  At March 31, 2010  At September 30, 2009 
Regulatory Assets:      
Deferred other post-retirement benefit costs $287  $298 
Deferred pension costs  3,661   3,764 
Nuclear decommissioning costs  884   909 
Non-nuclear decommissioning costs  379   351 
Debt reacquisition costs  185   195 
Unrealized losses relating to TVA’s Financial Trading Program  243   85 
Unrealized losses on coal contract derivatives  40   70 
Unrealized losses on certain swap and swaption contracts  284   498 
Environmental cleanup costs - Kingston ash spill  902   933 
Deferred outage costs  87   144 
Other  33   40 
   Subtotal  6,985   7,287 
Deferred nuclear generating units  2,151   2,347 
   Total $9,136  $9,634 
         
Regulatory Liabilities:        
Unrealized gains on coal contract derivatives $43  $87 
Capital lease liabilities  16   26 
Unrealized gains relating to TVA’s Financial Trading Program  20   17 
   Subtotal  79   130 
Reserve for future generation  65   67 
Accrued tax equivalents  19   81 
Fuel cost adjustment liability: short-term  180   822 
         
   Total $343  $1,100 


TVA Regulatory Assets and Liabilities
 
 
  At June 30, 2010  At September 30, 2009 
Regulatory Assets:      
Deferred other post-retirement benefit costs $281  $298 
Deferred pension costs  3,600   3,764 
Nuclear decommissioning costs  973   909 
Non-nuclear decommissioning costs  393   351 
Debt reacquisition costs  180   195 
Unrealized losses relating to TVA’s Financial Trading Program  203   85 
Unrealized losses on coal contract derivatives  27   70 
Unrealized losses on certain swap and swaption contracts  603   498 
Environmental cleanup costs - Kingston ash spill  1,078   933 
Deferred outage costs  63   144 
Other  30   40 
   Subtotal  7,431   7,287 
Deferred nuclear generating units  2,054   2,347 
   Total $9,485  $9,634 
         
Regulatory Liabilities:        
Unrealized gains on coal contract derivatives $40  $87 
Capital lease liabilities  12   26 
Unrealized gains relating to TVA’s Financial Trading Program  4   17 
   Subtotal  56   130 
Reserve for future generation  64   67 
Accrued tax equivalents     81 
Fuel cost adjustment liability: short-term  15   822 
   Total $135  $1,100 
         
         

Fuel Cost Adjustment.  The fuel cost adjustment (“FCA”) provides a mechanism to regularly increase or decrease rates to reflect changing fuel and purchased power costs.  There is typically a lag between the occurrence of a change in fuel and purchased power costs and the reflection of the change in rates.  As of March 31, 2010, TVA had recognized a short-term regulatory liability of $180 million with no long-term regulatory liability related to the FCA.  This short-term regulatory liability represents excess revenue collected to offset fuel and purchased power costs.  The excess revenue results from market prices for fuel-related commodities being lower than those forecasted.  This short-term FCA regulatory lia bility balance is included in Accounts payable and accrued liabilities on the Balance Sheet at March 31, 2010.

In August 2009, the TVA Board approved a revision to the FCA formula.  Starting with the October 1, 2009 billing period, all adjustments to the FCA have been made on a monthly basis instead of a quarterly basis.  This allows the FCA rate to be more closely aligned with TVA’s costs.  The FCA formula also contains a deferred account which is used to reconcile the difference between actual and forecasted fuel and purchased power costs in the FCA.costs.  The difference between the amounts is included in the deferred account, and starting with the October 1, 2009 billing period, 50 percent of the account has been disbursed or collected on a monthly basis instead of a quarterly basis.  This change to a monthly FCA formula is expected to resulthas resulted in smaller reconciliations and faster liquidation o fof any balances ini n the account.  With the change to the monthly FCA formula on October 1, 2009, the remaining balance in the existing deferred liability account balance at that date of approximately $822 million is beingwas liquidated over a nine-month period from October 1, 2009, through June 30, 2010.


15

Table The liability of Contents$15 million at June 30, 2010, represents the overcollection of FCA revenues related to the current year as computed under the new methodology.


Deferred Outage Costs.  TVA’s investment in the fuel used in its nuclear units is being amortized and accounted for as a component of fuel expense.  Nuclear refueling outage and maintenance costs already incurred have historically been deferred and amortized on a straight-line basis over the estimated period until the next refueling outage.  In August 2009, the TVA Board approved a change in the accounting for deferred outage costs.  Beginning October 1, 2009, outage costs are no longer deferred as a regulatory asset and are being expensed as incurred.  Previously deferred outage costs continue to be amortized as the remaining amounts are collected in rates.


7.  Kingston Fossil Plant Ash Spill

The Event.  On December 22, 2008, approximately fiveone of the ash cells at the Kingston Fossil Plant (“Kingston”) failed.  Approximately 5 million cubic yards of water and coal fly ash flowed out of the ash pond at the Kingston Fossil Plant (“Kingston”)  onto approximately 300 acres, primarily into the Emory River channel portion of the Watts Bar Reservoir and onto shoreline property owned by the United States and managed by TVA, butand also structurally damaged three homes, interrupted utility service, and blocked a road.  Fly ash is a coal combustion product of a coal-fired plant.  Kingston used wet ash containment impoundments for fly ash.

TVA is conducting cleanup and recovery efforts in conjunction with federal and state agencies.  Under the May 11, 2009 Administrative Order and Agreement on Consent (“Order and Agreement”) entered into by TVA and the Environmental Protection Agency (“EPA”) under the Comprehensive Environmental Response, Compensation, and Liability Act (“CERCLA”), TVA retains its status as a lead federal agency, but TVA's work is subject to review and approval by the EPA, in consultation with the Tennessee Department of Environment and Conservation (“TDEC”).



               Under the Order and Agreement, response actions are classified into three categories: time-critical removal; non-time-critical removal; and remedial actions.  Generally, removal of the ash from the Emory River is time-criti cal.was considered time-critical.  However, the EPA concluded that TVA’s dredging operations should be conducted in a manner that seeks to maximize ash removal while minimizing disturbance to native sediments in the river.  Accordingly, some residual ash will remain in the Emory River, and, except for this residual ash, TVA estimates that this work will be completed the removal of the ash from the river during the third quarter of 2010.  Removal of the remaining ash is considered to be non-time-critical.  TVA estimates that this workw ork will be substantially completed in 2013.2014.  Once the removal actions are completed, TVA will be required to assess the site and determine whether any additional actions may be needed at Kingston or the surrounding impacted area.  This assessment and any additional activities found to be necessary are consideredconstitute the remedial actions.

On March 5, 2010, the EPA issued a memorandum that concluded that TVA’s dredging operations should be conducted in a manner that seeks to maximize ash removal while simultaneously minimizing disturbance to native sediments in the river.  Accordingly, some residual ash will remain in the Emory River.

Insurance.  TVA has property and excess liability insurance programs in place that may cover some of the Kingston ash spill costs.  The insurers for each of these programs have been notified of the event.  Three of the insurers that provide liability insurance have denied coverage, and three other liability insurers issued reservation of rights letters.  All of the property insurers have denied coverage.  TVA is providing informationand the insurance companies that have denied coverage continue to the insurers about the event and its cause.  TVA is discussing with the insurers why TVA believes the policies providediscuss coverage and its estimates of covered costs.  TVA continues to provide information to the liability insurance companies that have issued reservation of rights letters but have not denied coverage.  No estimate for potential insuranceinsuran ce recovery has been accrued.

Claims and Litigation.  Fifty-sevenSixty lawsuits based on the Kingston ash spill have been filed, and twofiled.  Two of these have been voluntarily dismissed.dismissed and three of the class actions have been consolidated into one action.  All of the remaining cases are pending in the United States District Court for the Eastern District of Tennessee.  See Note 16— Legal Proceedings Related to Kingston Ash Pond Spill.

TVA received an order from TDEC on June 14, 2010, that assessed penalties of approximately $12 million against TVA in connection with the ash spill.  The TDEC order stated that the penalties address violations of the Tennessee Water Quality Control Act and the Tennessee Solid Waste Disposal Act.  TVA does not plan to appeal the order.  During the third quarter of 2010, TVA paid TDEC $3 million to reimburse it for oversight costs, and TVA paid TDEC an additional $3 million on July 15, 2010.

Financial Impact.  TVA has recorded an estimate in the amount of $933 million$1.1 billion for the cost of cleanup related to this event.  In 2009, TVA originally charged a portion of this amount to expense in 2009 as follows:  $525 million, $150 million, and $258 million during the three months ended December 31, 2008, March 31, 2009, and June 30, 2009, respectively.  However, due to actions ofin August 2009 the TVA Board in August 2009, $933 million was reclassified all amounts previously expensed as a regulatory asset duringand the fourth quarter of 2009 andamount is being charged to expense as it is collected in future rates over 15 years, beginning October 1, 2009.  As the estimate changes, additional costs may be deferred and charged to expense prospectively as they are collected in future rates.

During the three months ended June 30, 2010, TVA increased the estimate for the cost of cleanup related to this event by $192 million.  The change in estimate is due to increased scope of work to be performed at the site as defined in the Engineering Evaluation Cost Analysis (“EE/CA”) work order plan which was prepared in accordance with the EPA’s Guidance on Conducting Non-Time-Critical Removal Actions under CERCLA.  In May 2010, the EPA approved TVA’s ash disposal plan, which clarified the amount of ash to be removed from the site and the final design and closure of ash ponds on site.  The plan involves moving less ash offsite than was originally assumed, which results in potential cost savings.  These potential savings are more than offset, however, by the costs of other elements of the plan, including the required expansion of the failed cell and the closure and capping of all cells on the plant site that hold wet ash.  The potential savings are also offset by the costs of handling the ash under CERCLA requirements and recently assessed penalties and regulatory oversight costs.  TVA has reevaluated thealso found that certain previously estimated cost categories, such as dredging, were more expensive than originally estimated due to more equipment and staffing being needed to ensure timely completion of removal of time-critical ash from the cleanup over the courseriver.  Final designs of the project consistent with receipt of better informationholding cells and dikes are more robust than originally estimated as the remedi ation work has progressed.well.

As work continues to progress and more information is available, TVA will review its estimates and revise them as appropriate.  Although management has developed a detailed work plan and cost estimate based on the ash disposal plan, the estimate could be subject to volatility until design plans are completed and contracts are finalized.  The design of the lateral expansion of the failed cell and the closure and capping of all ash cells is still in process.  TVA currently estimates the recovery process will be substantially completed in 2013.2014.  As such, TVA has accrued a portion of the estimated cost in current liabilities, with the remaining portion shown as a long-term liability on TVA’s Balance Sheets.  Costs incurred since the event through March 31,June 30, 2010, totaled $416$524 million, of which $100$108 million and $185$293 million were incurred during the three and sixnine months ended March 31,June 30, 2010, respectively.  The remaining estimated liability at March 31,June 30, 2010, was $517$601 million.


 
16



The $933 million$1.1 billion estimate currently includes, among other things, a reasonable estimate of costs related to ash dredging and processing, ash disposition, infrastructure repair, dredge cell repair, root cause analysis, certain legal and settlement costs, environmental impact studies and remediation, human health assessments, community outreach and support, regulatory oversight, cenosphere recovery, skimmer wall installation, construction of temporary ash storage areas, dike reinforcement, project management, and certain other remediation costs associated with the cleanup.  If the actual amount of ash removed is more or less than the estimate, the expense could change significantly as this affects the largest cost components of the estimate.  The cost of the removal of the ash is in large part dependent on the final disposal plan, which is still in development by TVA and regulatory authorities.

Because of the uncertainty at this time of the amount offinal costs to complete the work prescribed by the ash to be removed and the final methods of disposal plan, a range of reasonable estimates has been developed by cost category and either the known amounts, most likely scenarios, or low end of the range for each category has been accumulated and evaluated to determine the total estimate.  The costs related to loading, transport, and disposal of all time critical ash and final disposition of dredge cell closures are the ones most subject to change.  The range of estimated costs varies from approximately $933 million$1.1 billion to approximately $1.2 billion.

TVA has not included the following categories of costs in the above estimate since it has determined that these costs are currently either not probable or not reasonably estimable, or not appropriately accounted for as part ofestimable: penalties (other than the estimate accrual: fines orpenalties set out in the TDEC order), regulatory directives, natural resources damages, outcome of lawsuits, future claims, long-term environmental impact costs, final long-term disposition of ash processing area, costs associated capital asset purchases, ash handlingwith new laws and disposition from current plant operations,regulations, or costs of remediating any discovered mixed waste during ash removal process, andprocess.  There are certain other costs that will be incurred that have not meeting the recognition criteria.  As ash removal continues, it is possible that other environmentally sensitive material potentiallybeen included in the river sediment beforeestimate as they are appropriately accounted for in other areas of the ash spill may be uncovered.  If other materialsfinancial statements.  Associated capital asset purchases are identified, a dditional remediationrecorded in property, plant, and equipment.  Ash h andling and disposition from current plant operations are recorded in operating expenses.  A portion of the pond and dredge cell closure costs are also not included in the above estimates may be required.estimate as those costs are included in the non-nuclear asset retirement obligation liability.

On January 26, 2010, the owners of the landfill in Perry County, Alabama, that is receiving the ash dredged from the Emory River filed a voluntary proceeding under Chapter 11 of the U.S. Bankruptcy Code.  At this time it is unclear whether this filing will cause TVA to incurhas not incurred any additional costs.costs as a result of the filing, and the landfill has continued to receive ash since the filing.

In June 2010, a group of Perry County residents filed two lawsuits challenging the operation of the landfill in the Perry County, Alabama.  One lawsuit was filed in state court and the other lawsuit was filed in federal court.  TVA has not been named in the lawsuits.

8.  Other Long-Term Liabilities

The table below summarizes the types and amounts of liabilities:

Other Long-Term Liabilities
Other Long-Term Liabilities
 
Other Long-Term Liabilities
 
 At June 30, 2010  At September 30, 2009 
 At March 31, 2010  At September 30, 2009       
Currency swap liabilities $39  $51  $99  $51 
Swaption liability  448   592   674   592 
Interest rate swap liabilities  216   287   308   287 
Coal contract derivative liabilities  43   80   27   80 
Post-retirement and postemployment benefit obligations  3,697   3,678   3,751   3,678 
Other long-term liability obligations  91   117   102   117 
Total other long-term liabilities $4,534  $4,805  $4,961  $4,805 

9. 9. Asset Retirement Obligations

During the second quartersthird quarter of 2010, and 2009, TVA'sTVA’s total asset retirement obligationobligations (“ARO”) liability increased $68 million. The increase was comprised of $31 million of new revisions in the estimated lives and cost estimates related to Kingston’s ash storage areas and $37 million in ARO accretion. During the third quarter of 2009, the ARO liability increased $33 million due primarily to accretion. The nuclear and non-nuclear accretion werewas deferred as regulatory assets. During the three and sixnine months ended March 31,June 30, 2010, $14 million and $27$41 million, respectively, of the related regulatory assets were amortized into expense since these amounts were collected in rates. The nuclear ARO liability as of March 31,June 30, 2010, was $1,888 million.$1.9 billion. The non-nuclear ARO liability as of March 31,June 30, 2010, was $865wa s $907 million.



 
17


 

Reconciliation of Asset Retirement Obligation Liability
Reconciliation of Asset Retirement Obligation Liability
 Reconciliation of Asset Retirement Obligation Liability 
 
 Three Months Ended March 31  Six Months Ended March 31  Three Months Ended June 30  Nine Months Ended June 30 
 2010  2009  2010  2009  2010  2009  2010  2009 
                        
Balance at beginning of period $2,717  $2,350  $2,683  $2,318  $2,753  $2,382  $2,683  $2,318 
                                
Changes in nuclear estimates to future cash flows            
Non-nuclear additional obligations        (3)     31      28    
  2,717   2,350   2,680   2,318   2,784   2,382   2,711   2,318 
                                
Add ARO accretion:                                
Nuclear accretion  26   24   52   48   26   25   78   73 
Non-nuclear accretion  10   8   21   16   11   8   32   24 
  36   32   73   64   37   33   110   97 
                                
Balance at end of period $2,753  $2,382  $2,753  $2,382  $2,821  $2,415  $2,821  $2,415 

10.  Debt

Debt Outstanding

The TVA Act authorizes TVA to issue Bonds in an amount not to exceed $30 billion outstanding at any time.  Debt outstanding at March 31,June 30, 2010, and September 30, 2009, including translation gainsthe effect of $18 million and losses of $30 million, respectively,translations related to Bonds denominated in foreign currencies, consisted of the following:

Debt Outstanding
Debt Outstanding
 
Debt Outstanding
 
 At March 31, 2010  At September 30, 2009  At June 30, 2010  At September 30, 2009 
Short-term debt            
Discount notes (net of discount) $1,147  $844  $834  $844 
Current maturities of long-term debt  1,008   8   1,042   8 
Total short-term debt, net  2,155   852   1,876   852 
                
Long-term debt                
Long-term debt  21,051   22,012   21,560   22,012 
Unamortized discount  (224)  (224)  (197)  (224)
Total long-term debt, net  20,827   21,788   21,363   21,788 
                
Total outstanding debt $22,982  $22,640  $23,239  $22,640 






 
18


Debt Securities Activity

The table below summarizes TVA’s long-term Bond activity for the period from October 1, 2009, to March 31,June 30, 2010.

Date Amount  Interest Rate Date Amount  Interest Rate 
Issuances:              
electronotes®
First Quarter 2010 $82   4.38%First Quarter 2010 $82   4.38%
Second Quarter  2010  34   4.11%Second Quarter  2010  34   4.11%
  $116     Third Quarter  2010  63   4.16%
2009 Series C ReopeningMay 2010  500   5.25%
  $679     
Redemptions/Maturities:                  
electronotes®
First Quarter 2010 $1   3.24%First Quarter 2010 $1   3.24%
Second Quarter 2010  25   4.50%Second Quarter 2010  25   4.50%
Third Quarter 2010  3   3.49%
2009 Series ANovember 2009  2   2.25%
2009 Series BDecember 2009  1   3.77%
2009 Series ANovember 2009  2   2.25%May 2010  2   2.25%
2009 Series BDecember 2009  1   3.77%June 2010  1   3.77%
  $29       $35     
                  

TVA also has access to a financing arrangement with the U.S. Treasury pursuant to the TVA Act.  TVA and the U.S. Treasury entered into a memorandum of understanding under which the U.S. Treasury provides TVA with a $150 million credit facility.  This credit facility matures on September 30, 2010, and is expected to be renewed.  Access to this credit facility or other similar financing arrangements has been available to TVA since the 1960s.  TVA plans to use the U.S. Treasury credit facility as a secondary source of liquidity.  The interest rate on any borrowing under this facility is based on the average rate on outstanding marketable obligations of the United States with maturities from date of issue of one year or less.  There were no outstanding borrowings under the credit fa cility at March 31,June 30, 2010, and September 30, 2009.

TVA also has short-term funding available in the form of two short-term revolving credit facilities of $1.0 billion each, one of which matures on May 12,November 8, 2010, and the other of which matures on November 8, 2010.May 11, 2011.  The credit facilities also accommodate the issuance of letters of credit.  The interest rate on any borrowing and the fees on any letter of credit under these facilities areis variable based on market factors and the rating of TVA’s senior unsecured long-term non-credit enhanced debt.  TVA is required to pay an unused facility fee on the portion of the total $2.0 billion which TVA has not borrowed or committed under letters of credit.  TheThis fee, along with letter of credit fees, fluctuates depending on the non-enhanced credit ratings on T VA’srating of TVA’s senior unsecuredunsec ured long-term non-credit enhanced debt.  At March 31,June 30, 2010, and September 30, 2009, there were $29$133 million and $103 million, respectively, of letters of credit outstanding under the facilities, and there were no outstanding borrowings.

11.  Seven States Power Corporation Obligation

Seven States Power Corporation (“Seven States”), through its subsidiary, Seven States Southaven, LLC (“SSSL”), exercised Seven States’s option to purchase an undivided 90 percent90-percent interest in a combined cycle combustion turbine facility in Southaven, Mississippi. As part of interim joint-ownership arrangements, Seven States has the right at any time during the interim period, and for any reason, to require TVA to buy back the Seven StatesStates’ interest in the facility.  TVA would have bought back

The interim period under the Seven States interest if long-term operational and power sales arrangements for the facility among TVA, Seven States, and SSSL, or alternative arrangements, were not in place byoriginal agreements was to expire on April 30, 2010. TVA’s buy-back obligation would have terminated if such long-term arrangements were in place by that date.  In the event of a buy-back, TVA would re-acquire the Seven States interest in the facility and the related assets.

On April 22, 2010, TVA and Seven States, through its subsidiary, SSSL, amended the joint ownership agreement, lease agreement, and buy-back arrangements to extend the term of the interim arrangements by approximately three years, until April 23, 2013. The other material terms and conditions of the agreementsagreement were not changed and remain in full force and effect.  As a result ofUnder the extension ofamended agreements, TVA will buy back the interim arrangements, the leaseback obligation is presented on TVA’s Balance Sheets in accordance with the terms of the new agreement.  As of March 31, 2010, the carrying amount of the obligation was approximately $416 million.Seven States interest if long-term

 
19



operational and power sales arrangements for the facility among TVA, Seven States, and SSSL, or alternative arrangements, are not in place by April 23, 2013. TVA’s buy-back obligation will terminate if such long-term arrangements are in place by that date. In the event of a buy-back, TVA will re-acquire the Seven States interest in the facility and the related assets. As of June 30, 2010, the carrying amount of the obligation was approximately $413 million.

12.  Risk Management Activities and Derivative Transactions

TVA recognizes certain of its derivative instruments as either assets or liabilities on its Balance Sheets at fair value.  The accounting for changes in the fair value of these instruments depends on (1) whether TVA uses regulatory accounting to defer the derivative gains and losses, (2) whether the derivative instrument has been designated and qualifies for hedge accounting treatment and (2)(3) if so, the type of hedge relationship (e.g., cash flow hedge).

TVA is exposed to various market risks.  These market risks include risks related to commodity prices, investment prices, interest rates, currency exchange rates, inflation, and counterparty credit risk.  To help manage certain of these risks, TVA has entered into various derivative transactions, principally commodity option contracts, forward contracts, swaps, swaptions, futures, and options on futures.  Other than certain derivative instruments in investment funds, it is TVA’s policy to enter into these derivative transactions solely for hedging purposes and not for speculative purposes.

Overview of Accounting Treatment

The following tables summarize the accounting treatment that certain of TVA’s financial derivative transactions receive.

Summary of Derivative Instruments That Receive Hedge Accounting Treatment (part 1)
Summary of Derivative Instruments That Receive Hedge Accounting Treatment (part 1)
Summary of Derivative Instruments That Receive Hedge Accounting Treatment (part 1)
 
Derivatives in Cash Flow Hedging Relationship Objective of Hedge Transaction 
Accounting for Derivative
Hedging Instrument
 
Amount of Mark-to-Market (Loss) Gain Recognized in Other Comprehensive Income (Loss) (“OCI”)
Three Months Ended
March 31
 
Amount of Mark-to-Market
(Loss) Gain Recognized
in OCI
Six Months Ended
March 31 (a)
Objective of Hedge Transaction
Accounting for Derivative
Hedging Instrument
 
Amount of Mark-to-Market (Loss) Gain Recognized in Other Comprehensive Income (Loss) (“OCI”)
Three Months Ended
June 30
  
Amount of Mark-to-Market (Loss) Gain Recognized
in OCI
Nine Months Ended
June 30 (a)
 
     2010 2009 2010 2009  2010  2009  2010  2009 
                         
Currency swaps To protect against changes in cash flows caused by changes in foreign currency exchange rates (exchange rate risk) Cumulative unrealized gains and losses are recorded in OCI and reclassified to interest expense to the extent they are offset by cumulative gains and losses on the hedged transaction 
 
$  (46)
 
 
$  41
 
 
$ 21
 
 
$ (323)
To protect against changes in cash flows caused by changes in foreign currency exchange rates (exchange rate risk)Cumulative unrealized gains and losses are recorded in OCI and reclassified to interest expense to the extent they are offset by cumulative gains and losses on the hedged transaction $(76) $218  $(55) $(105)
 




Summary of Derivative Instruments That Receive Hedge Accounting Treatment (part 2)
 
Derivatives in Cash Flow
Hedging Relationship
 
Amount of Exchange
Gain Reclassified from
OCI to  Interest Expense
Three Months Ended
March 31 (a)
 
Amount of Exchange
Gain Reclassified from
OCI to Interest Expense
Six Months Ended
March 31 (a)
  2010 2009 2010 2009
         
Currency swaps 
 
$  59
 
 
$  15
 
 
$ 49
 
 
$ 206
 
Note
(a)  There were no ineffective portions or amounts excluded from effectiveness testing for any of the periods presented.
       Also see Note 13.




Summary of Derivative Instruments That Receive Hedge Accounting Treatment (part 2)
 
 
Derivatives in Cash Flow
Hedging Relationship
 
Amount of Exchange
Gain (Loss) Reclassified from
OCI to Interest Expense
Three Months Ended
June 30 (a)
  
Amount of Exchange
Gain (Loss) Reclassified from
OCI to Interest Expense
Nine Months Ended
June 30 (a)
 
  2010  2009  2010  2009 
             
Currency swaps $14  $(126) $63  $80 
Note
(a) There were no ineffective portions or amounts excluded from effectiveness testing for any of the periods presented.
 Also see Note 13.
 


 
20



Summary of Derivative Instruments That Do Not Receive Hedge Accounting Treatment
Summary of Derivative Instruments That Do Not Receive Hedge Accounting Treatment
Summary of Derivative Instruments That Do Not Receive Hedge Accounting Treatment 
Derivative Type Objective of Derivative Accounting for Derivative Instrument 
Amount of Gain
(Loss) Recognized in
Income on Derivatives
Three Months Ended
March 31 (a)
 
Amount of Gain
(Loss) Recognized in
Income on Derivatives
Six Months Ended
March 31 (a)
Objective of DerivativeAccounting for Derivative Instrument 
Amount of Gain
(Loss) Recognized in Income on Derivatives
Three Months Ended
June 30 (a)
  
Amount of Gain
(Loss) Recognized in
Income on Derivatives
Nine Months Ended
June 30 (a)
 
     2010 2009 2010 2009   2010  2009  2010  2009 
Swaption
 
 
To protect against decreases in value of the embedded call (interest rate risk)
 
 
Gains and losses are recorded as regulatory assets or liabilities until settlement, at which time the gains/losses (if any) are recognized in gain/loss on derivative contracts.
 
$   —
 $          — 
$   —
 
$   —
 
To protect against decreases in value of the embedded call (interest rate risk)
 
Gains and losses are recorded as regulatory assets or liabilities until settlement, at which time the gains/losses (if any) are recognized in gain/loss on derivative contracts.
 $  $  $  $ 
                              
Interest rate swaps
 
 
To fix short-term debt variable rate to a fixed rate (interest rate risk)
 
 
Gains and losses are recorded as regulatory assets or liabilities until settlement, at which time the gains/losses (if any) are recognized in gain/loss on derivative contracts.
    
 
To fix short-term debt variable rate to a fixed rate (interest rate risk)
 
Gains and losses are recorded as regulatory assets or liabilities until settlement, at which time the gains/losses (if any) are recognized in gain/loss on derivative contracts.
            
                              
Coal contract derivatives
 
 
To protect against fluctuations in market prices of purchased coal (price risk)
 
 
Gains and losses are recorded as regulatory assets or liabilities.  They are recognized in fuel and purchased power expense when the related coal is used in production.(b)
    
 
To protect against fluctuations in market prices of purchased coal (price risk)
 
Gains and losses are recorded as regulatory assets or liabilities.  They are recognized in fuel and purchased power expense when the related coal is used in production.(b)
     (27)     (27)
                              
Commodity derivatives
under Financial Trading Program
 
 
To protect against fluctuations in market prices of purchased commodities (price risk)
 
 
Realized gains and losses are recorded in earnings as fuel and purchased power expense.  Unrealized gains and losses are recorded as a regulatory asset/liability.
 
 (22) (89) (71) (159)
 
To protect against fluctuations in market prices of purchased commodities (price risk)
 
Realized gains and losses are recorded in earnings as fuel and purchased power expense.  Unrealized gains and losses are recorded as a regulatory asset/liability.
 
  (26)  (132)  (98)  (289)
Notes
(a) All of TVA’s derivative instruments that do not receive hedge accounting treatment have unrealized gains (losses) that would otherwise be recognized in income but instead are deferred as regulatory assets and liabilities. As such, there was no related gain (loss) recognized in income for these unrealized gains (losses) for the three and six months ended March 31, 2010, and 2009.
(b) Settlement fees associated with early contract termination are recognized in fuel and purchased power expense in the period incurred. Settlement fees with early contract terminations that qualify for regulatory accounting are recorded as regulatory assets.
Note
(a) All of TVA’s derivative instruments that do not receive hedge accounting treatment have unrealized gains (losses) that would otherwise be recognized in income but instead are deferred as regulatory assets and liabilities. As such, there was no related gain (loss) recognized in income for these unrealized gains (losses) for the three and nine months ended June 30, 2010, and 2009.
(b) Settlement fees associated with early contract termination are recognized in fuel and purchased power expense in the period incurred. Settlement fees with early contract terminations that qualify for regulatory accounting are recorded as regulatory assets.
Note
(a) All of TVA’s derivative instruments that do not receive hedge accounting treatment have unrealized gains (losses) that would otherwise be recognized in income but instead are deferred as regulatory assets and liabilities. As such, there was no related gain (loss) recognized in income for these unrealized gains (losses) for the three and nine months ended June 30, 2010, and 2009.
(b) Settlement fees associated with early contract termination are recognized in fuel and purchased power expense in the period incurred. Settlement fees with early contract terminations that qualify for regulatory accounting are recorded as regulatory assets.
 







 
21


Mark-to-Market Values of TVA Derivatives
 
  At March 31, 2010 At September 30, 2009
 
Derivatives that Receive Hedge Accounting Treatment:
 
  Balance Balance Sheets Presentation Balance Balance Sheets Presentation
Currency swaps:        
 
£200 million Sterling
 $(35)Other long-term liabilities $(33)Other long-term liabilities
 
£250 million Sterling
  16  Other long-term assets  7   Other long-term assets
 
£150 million Sterling
  (4)Other long-term liabilities  (18)Other long-term liabilities
 
 
Derivatives that do Not Receive Hedge Accounting Treatment:
 
 
  Balance Balance Sheets Presentation Balance Balance Sheets Presentation
 
Swaption:
          
 
$1.0 billion notional
 $(448)Other long-term liabilities $(592)Other long-term liabilities
           
Interest rate swaps:          
$476 million notional  (207)Other long-term liabilities  (276)Other long-term liabilities
$42 million notional  (9)Other long-term liabilities  (11)  Other long-term liabilities
Coal contract derivatives   
 
 
  Other long-term assets $43,
Other long-term
      liabilities ($43)
  7 
 
 
  Other long-term assets $87,
Other long-term
      liabilities ($80)
           
Commodity derivatives under Financial Trading Program:          
Margin cash account*  15 Inventories and other, net  28 Inventories and other, net
Unrealized losses, net  (223)
 
 
Other regulatory assets ($243),
Regulatory
liabilities $20
  (68)
 
 
Other regulatory assets ($85),
Regulatory
liabilities $17
 
Note
* In accordance with certain credit terms, TVA uses leveraging to trade financial instruments under the Financial Trading Program. Therefore, the margin cash account balance does not represent 100 percent of the net market value of the derivative positions outstanding as shown in the Commodity Derivatives Under Financial Trading Program table below.



Mark-to-Market Values of TVA Derivatives
 
  At June 30, 2010 At September 30, 2009
 
Derivatives that Receive Hedge Accounting Treatment:
 
  Balance Balance Sheets Presentation Balance Balance Sheets Presentation
Currency swaps:        
 
£200 million Sterling
 $(51)Other long-term liabilities $(33)Other long-term liabilities
 
£250 million Sterling
  (15) Other long-term liabilities  7   Other long-term assets
 
£150 million Sterling
  (33)Other long-term liabilities  (18)Other long-term liabilities
 
Derivatives that Do Not Receive Hedge Accounting Treatment:
 
  Balance Balance Sheets Presentation Balance Balance Sheets Presentation
 
Swaption:
          
 
$1.0 billion notional
 $(674)Other long-term liabilities $(592)Other long-term liabilities
           
Interest rate swaps:          
$476 million notional  (295)Other long-term liabilities  (276)Other long-term liabilities
$42 million notional  (13)Other long-term liabilities  (11)  Other long-term liabilities
Coal contract derivatives  13 
 
  Other long-term assets $40,
Other long-term
 liabilities ($27)
  7 
 
  Other long-term assets $87,
Other long-term
  liabilities ($80)
           
Commodity derivatives under Financial Trading Program:          
Margin cash account*  19 Inventories and other, net  28 Inventories and other, net
Unrealized losses, net  (199)
 
Other regulatory assets ($203), Regulatory liabilities $4
  (68)
 
Other regulatory assets ($85), Regulatory liabilities $17
Note
* In accordance with certain credit terms, TVA leverages financial instruments under the Financial Trading Program. Therefore, the margin cash account balance does not represent 100 percent of the net market value of the derivative positions outstanding as shown in the Commodity Derivatives Under Financial Trading Program table below.






Cash Flow Hedging Strategy for Currency Swaps

To protect against the exchange rate risk related to three British pound sterling denominated Bond transactions, TVA entered into foreign currency hedges at the time the Bond transactions occurred.  TVA has the following currency swaps outstanding as of March 31,June 30, 2010:

Currency Swaps Outstanding
As of March 31, 2010
Currency Swaps Outstanding
As of June 30, 2010
Currency Swaps Outstanding
As of June 30, 2010
Effective Date of Currency
Swap Contract
Associated TVA Bond Issues – Currency Exposure
Expiration Date
of Swap
Overall Effective
Cost to TVA
Associated TVA Bond Issues – Currency Exposure
Expiration Date
of Swap
Overall Effective
Cost to TVA
2003£150 million20434.96%£150 million20434.96%
2001£250 million20326.59%£250 million20326.59%
1999£200 million20215.81%£200 million20215.81%

When the dollar strengthens against the British pound sterling, the exchangetransaction gain on the Bond liability is offset by an exchange loss on the swap contract.  Conversely, when the dollar weakens, the exchangetransaction loss on the Bond liability is offset by an exchange gain on the swap contract.  All such exchange gains or losses on the Bond liability are included in Long-term debt, net.  The offsetting exchange losses or gains on the swap contracts are recognized in Accumulated other comprehensive loss.  If any loss (gain) were to be incurred as a result of the early termination of the foreign currency swap contract, any resulting charge (income) would be amortized over the remainingrema ining life of the associated Bond as a component of interest expense.

Derivatives Not Receiving Hedge Accounting Treatment

Swaption and Interest Rate Swaps

TVA has entered into four swaption transactions to monetize the value of call provisions on certain of its Bond issues.  A swaption grants a third party the right to enter into a swap agreement with TVA under which TVA receives a floating rate of interest and pays the third party a fixed rate of interest equal to the interest rate on the Bond issue whose call provision TVA has monetized.

In 2003, TVA monetized the call provisions on a $1.0 billion Bond issue by entering into a swaption agreement with a third party in exchange for $175 million (the “2003A Swaption”).
In 2003, TVA also monetized the call provisions on a $476 million Bond issue by entering into a swaption agreement with a third party in exchange for $81 million (the “2003B Swaption”).
In 2005, TVA monetized the call provisions on two electronotes® issues ($42 million total par value) by entering into swaption agreements with a third party in exchange for $5 million (the “2005 Swaptions”).

In February 2004, the counterparty to the 2003B Swaption exercised its option to enter into an interest rate swap with TVA, effective April 10, 2004, requiring TVA to make fixed rate payments to the counterparty of 6.875 percent and the counterparty to make floating payments to TVA based on London Interbank Offered Rate (“LIBOR”).  These payments are based on the notional principal amount of $476 million and began on June 15, 2004.

In February 2008, the counterparty to the 2005 Swaptions exercised its options to enter into interest rate swaps with TVA, effective March 11, 2008.  Under the swaps, TVA is required to make fixed rate payments to the counterparty at 6.125 percent, and the counterparty is required to make floating payments to TVA based on LIBOR.  These payments are based on a combined notional amount of $42 million and began on April 15, 2008.

TVA uses regulatory accounting treatment to defer the mark-to-market gains and losses on these swap and swaption agreements and includes the gain or loss in the ratemaking formula when these transactions settle.  The values of the swap and swaption agreements and related deferred unrealized gains and losses are recorded on TVA’s Balance sheets with realized gains or losses, if any, recorded on TVA’s Statements of operations.  There were no realized gains or losses for the three and sixnine months ended March 31,June 30, 2010, and 2009.

 
23


For the three and sixnine months ended March 31,June 30, 2010, the changes in market value resulted in deferred unrealized (losses) gains on the value of the interest rate swaps and swaption of $(5)$(318) million and $214$(105) million, respectively.  For the three and sixnine months ended March 31,June 30, 2009, the changes in market value resulted in deferred unrealized gains (losses) on the value of the interest rate swaps and swaption of $206$380 million and $(549)$(169) million, respectively.  All net deferred unrealized gains (losses) are reclassified as regulatory liabilities (assets) on the Balance sheets.

Coal ContractCommodity Derivatives

TVA enters into certain coal supply contracts for coal and natural gas that require delivery of fixed quantities of coal (base tons) at fixed prices.  Most of theseThe natural gas contracts and certain coal contracts are not required to be marked to market because (1) they are probable of physical delivery and (2) early net settlement is not probable.  Coal contracts that do not qualify for this exception are marked to market on a quarterly basis as coal contract derivatives.  Additionally, certain coal contracts contain options that permit TVA to either increase or reduce the amounts of coal delivered within specified guidelines.  Essentially, the option to take more or less coal represents a purchased option that is combined with the forward coal contract in a single supply contract.  TVA marks to market the value of these contracts on a quarterly basis as coal contract derivatives.

At March 31,June 30, 2010, and September 30, 2009, TVA’s coal contract derivatives had net market values of less than $1$13 million and $7 million, respectively, which TVA deferred as regulatory assets and liabilities on a gross basis.  TVA will defer all unrealized gains or losses related to these contracts and record only realized gains or losses as fossil fuel expense at the time the coal is used in production.  The net market value of TVA’s coal contract derivatives at March 31, 2010, also included a $3 million expected net settlement related to early termination of a coal supply contract.  At March 31,June 30, 2010, TVA’s coal contract derivatives had terms of up to three2 years.

Coal Contract DerivativesCoal Contract Derivatives 
Coal Contract Derivatives
 At March 31, 2010  At September 30, 2009 At June 30, 2010 At September 30, 2009
 
Number of
Contracts
 
Notional Amount
(in tons)
 
Fair Value (MtM)
 (in millions)
  Number of Contracts 
Notional Amount
(in tons)
 
Fair Value (MtM)
 (in millions)
 
Number of
Contracts
Notional Amount
(in tons)
Fair Value (MtM)
 (in millions)
 Number of Contracts
Notional Amount
(in tons)
Fair Value (MtM)
 (in millions)
                 
Coal Contract Derivatives  10 28 million $   7 29 million $7 1025 million$ 13 729 million$ 7

Commodity Derivatives Under Financial Trading Program

TVA has a Financial Trading Program (“FTP”) under which it can purchase and sell futures, swaps, options, and combinations of these instruments (as long as they are standard in the industry) to hedge TVA'sTVA’s exposure to (1) the price of natural gas, fuel oil, electricity, coal, emission allowances, nuclear fuel, and other commodities included in TVA’s FCA calculation, (2) the price of construction materials, and (3) contracts for goods priced in or indexed to foreign currencies.  The combined transaction limit for the FCA and construction material transactions is $130 million (based on one-day value at risk).  In addition, the maximum hedge volume for the construction material transactions is 75 percent of the underlying net notional volume of the materia lt he material that TVA anticipates using in approved TVA projects, and the market value of all outstanding hedging transactions involving construction materials is limited to $100 million at the execution of any new transaction.  The portfolio value at risk limit for the foreign currency transactions is $5 million and is separate and distinct from the $130 million transaction limit discussed above.  Under the FTP, TVA is prohibited from trading financial instruments for speculative purposes.

At March 31,June 30, 2010, the only risks hedged under the FTP were the economic risks associated with the prices of natural gas, fuel oil, and crude oil.  Futures contracts and option contracts under the FTP had remaining terms of less than two years.  Swap contracts under the FTP had remaining terms of less than four years.years or less.




 
24




Commodity Derivatives Under Financial Trading Program
Commodity Derivatives Under Financial Trading Program
 
Commodity Derivatives Under Financial Trading Program
 
 At March 31, 2010  At September 30, 2009  At June 30, 2010  At September 30, 2009 
 
Notional
Amount
  
Fair Value (MtM)
(in millions)
  
Notional
Amount
  
Fair Value (MtM)
(in millions)
  
Notional
Amount
  
Fair Value (MtM)
(in millions)
  
Notional
Amount
  
Fair Value (MtM)
(in millions)
 
Natural gas (mmBtu)      
      
Futures contracts  21,360,000   (48)  30,020,000   (25)  14,130,000   (28)  30,020,000   (25)
Swap contracts  130,312,500   (182)  115,307,500   (36)  130,987,500   (162)  115,307,500   (36)
Option contracts  550,000   (1)  7,300,000   1   5,600,000      7,300,000   1 
                                
Natural gas financial positions  152,222,500  $(231)  152,627,500  $(60)  150,717,500  $(190)  152,627,500  $(60)
                                
Fuel oil/crude oil (in barrels)                                
                                
Futures contracts  174,000  $4   398,000  $3   147,000  $2   398,000  $3 
Swap contracts  1,812,000   16   1,660,000   7   1,917,000      1,660,000   7 
Option contracts  750,000      1,236,000   3   675,000   1   1,236,000   3 
Fuel oil/crude oil financial positions  2,736,000  $20   3,294,000  $13   2,739,000  $3   3,294,000  $13 
Note
Due to the right of setoff and method of settlement, TVA elects to record commodity derivatives under the FTP based on its net commodity position with the broker or other counterparty. Notional amounts disclosed represent the net absolute value of contractual amounts.
Note
Due to the right of setoff and method of settlement, TVA elects to record commodity derivatives under the FTP based on its net commodity position with the broker or other counterparty. Notional amounts disclosed represent the net absolute value of contractual amounts.
 
Note
Due to the right of setoff and method of settlement, TVA elects to record commodity derivatives under the FTP based on its net commodity position with the broker or other counterparty. Notional amounts disclosed represent the net absolute value of contractual amounts.
 

TVA defers all FTP unrealized gains (losses) as regulatory liabilities (assets) and records realized gains or losses to match the delivery period of the underlying commodity product.  In addition to the open commodity derivatives disclosed above, TVA had fixed derivative contracts with market values of $(12) million and $(21) million, at March 31,June 30, 2010, and at September 30, 2009, respectively, which were recorded as regulatory assets.

Natural Gas

At March 31,June 30, 2010, TVA had natural gas hedges with notional volumes equivalent to 152,222,500150,717,500 (in mmBtu), the market value of which was a net loss of $231$190 million. The net unrealized gains of $41 million and net unrealized losses of $131 million and $171$130 million for the three and sixnine months ended March 31,June 30, 2010, respectively, were deferredrecorded as a decrease and an increase, respectively, to the regulatory asset. For the three and sixnine months ended March 31,June 30, 2010, TVA recognized realized losses on natural gas hedges of $25$30 million and $80$110 million, respectively, which were recorded as increases to purchased power expense.

At September 30, 2009, TVA had natural gas hedges with notional volumes equivalent to 152,627,500 (in mmBtu), the market value of which was a net loss of $60 million.  The unrealized loss of $63 million and unrealized gain of $3 million for the year ended September 30, 2009, were deferred as a regulatory asset and a regulatory liability, respectively.  For the three and sixnine months ended March 31,June 30, 2009, TVA recognized realized losses on natural gas hedges of $87$132 million and $157$289 million, respectively, which were recorded as increases to purchased power expense.

Fuel Oil/Crude Oil

At March 31,June 30, 2010, TVA had notional volumes of fuel oil/crude oil hedges equivalent to 2,736,0002,739,000 (in barrels), the market value of which was a net gain of $20$3 million.  The net unrealized losslosses of $2$17 million and net unrealized gain of $7$10 million for the three and sixnine months ended March 31,June 30, 2010, respectively, were deferredrecorded as decreases to the regulatory liabilities.liability.  For the three and sixnine months ended March 31,June 30, 2010, TVA recognized realized gains on fuel oil/crude oil hedges of $3 million and $9$12 million, respectively, which were recorded as reductions of fossil fuel expense.

At September 30, 2009, TVA had notional volumes of fuel oil/crude oil hedges equivalent to 3,294,000 (in barrels), the market value of which was a net gain of $13 million.  The unrealized loss of $1 million and unrealized gain of $14 million for the year ended September 30, 2009, were deferred as a regulatory asset and a regulatory liability, respectively.  For the three and sixnine months ended March 31,June 30, 2009, TVA recognized realized losses on fuel oil/crude oil hedges of $2 million, and $2 million, respectively, which were recorded as increases to fossil fuel expense.  There were no realized gains or losses on fuel oil/crude oil hedges for the three months ended June 30, 2009.




 
25



Other Derivative Instruments

Other Commodity Derivatives

TVA enters into forward contracts that hedge cash flow exposures to market fluctuations in the price and delivery of certain commodities including coal, natural gas, fuel oil, crude oil, electricity, uranium, and construction commodities.  TVA expects to take or make delivery, as appropriate, under certain forward contracts.  Accordingly, these contracts qualify for normal purchases and normal sales accounting and are not required to be marked-to-market each reporting period.

Investment Fund Derivatives

Investment funds consist primarily of funds held in trusts designed to fund nuclear decommissioning requirements, AROs, and the supplemental executive retirement plan (“SERP”).  All securities in the trusts are classified as trading.  See Note 13 for a discussion of the trusts’ objectives and the types of investments included in the various trusts.  Derivative instruments in these trusts include swaps, futures, options, forwards, and other instruments.  As of March 31,June 30, 2010, and September 30, 2009, the fair value of derivative instruments in these trusts was immaterial.

Collateral

TVA’s interest rate swaps, two of its currency swaps, and its swaption contain contract provisions that require a party to post collateral (in a form such as cash or a letter of credit) when the party’s liability balance under the agreement exceeds a certain threshold.  These derivative instruments contain provisions which may adjust these thresholds based on the credit rating of TVA’s debt per Standard & Poor’s Rating Service (“S&P”) or Moody’s Investors Service, Inc. (“Moody’s”) and TVA’s continued status as a majority-owned U.S. government entity.  If these credit risk-related contingent features were triggered, TVA could be required by its counterparties to provide additional collateral on these derivative instruments in net liability positi ons.

As of March 31,June 30, 2010, the aggregate fair value of all derivative instruments with credit-risk related contingent features that were in a liability position was $668 million.$1.0 billion.  TVA’s collateral obligation as of March 31,June 30, 2010, under these arrangements was less than $1$225 million, for which TVA had posted $29$133 million under a letter of credit.  The difference between the obligation and the collateral amount is due to the timing of the collateral posting.  Postings under the letter of credit reduce the available balance of TVA’s revolving credit facilities.  TVA’s assessment of the risk of its nonperformance includes a reduction in its exposure under the contract as a result of this posted collateral.  If the credit risk-related co ntingentcontingent features underlying these agreements were triggered at March 31,June 30, 2010, TVA would have been required to post up to $641$897 million of additional collateral with its counterparties.

Credit Risk

Credit risk is the exposure to economic loss that would occur as a result of a counterparty’s nonperformance of its contractual obligations.  Where exposed to credit risk, TVA analyzes the counterparty’s financial condition prior to entering into an agreement, establishes credit limits, monitors the appropriateness of those limits, as well as any changes in the creditworthiness of the counterparty on an ongoing basis, and employs credit mitigation measures, such as collateral or prepayment arrangements and master purchase and sale agreements, to mitigate credit risk.

Credit of Customers

The majority of TVA’s credit risk is limited to trade accounts receivable from delivered power sales to municipal and cooperative distributor customers, all located in the Tennessee Valley region.  To a lesser extent, TVA is exposed to credit risk from industries and federal agencies directly served and from exchange power arrangements with a small number of investor-owned regional utilities related to either delivered power or the replacement of open positions of longer-term purchased power or fuel agreements.  Power sales to the United States Enrichment Corporation (“USEC”), TVA’s largest industrial customer directly served, represented sixfive percent and seven percent of TVA’s total operating revenues for the three and sixnine months ended March 31,Jun e 30, 2010, respectively.  USEC’s senior unsecured credit ratings are currently ‘CCC’ by S&P’s and ‘Caa2’ by Moody’s.  As a result of its credit ratings, USEC has provided credit assurance to TVA under the terms of its power contract. TVA had concentrations of accounts receivable from seven customers that represented 36 percent and 41 percent of total outstanding accounts receivable at March 31,June 30, 2010 and September 30, 2009, respectively.

 
26



Credit of Derivative Counterparties

TVA has entered into derivative contracts for hedging purposes, and TVA’s NDT and pension fund have entered into derivative contracts for investment purposes.  If a counterparty to one of TVA’s hedging transactions defaults, TVA might incur substantial costs in connection with entering into a replacement hedging transaction.  If a counterparty to the derivative contracts into which the NDT and the pension fund have entered for investment purposes defaults, the value of the investment could decline significantly, or perhaps become worthless.  TVA has concentrations of credit risk from the banking and coal industries because multiple companies in these industries serve as counterparties to TVA in various derivative transactions.  As of March 31,June 30, 2010, the swaption and all of TVA’s currency swaps, interest rates swaps, and commodity derivatives under the FTP were with counterparties whose Moody’s credit rating was “A2” or higher.  As of March 31,June 30, 2010, all of the coal tonnage associated with TVA’s coal contract derivatives waswere with counterparties whose Moody’s credit rating, or TVA’s internal analysis when such information was unavailable, was “B2” or higher.

Credit of Suppliers

If one of TVA’s fuel or purchased power suppliers fails to perform under the terms of its contract with TVA, TVA might lose the money that it paid to the supplier under the contract and have to purchase replacement fuel or power on the spot market, perhaps at a significantly higher price than TVA was entitled to pay under the contract.  In addition, TVA might not be able to acquire replacement fuel or power in a timely manner and thus might be unable to satisfy its own obligations to deliver power.  To help ensure a reliable supply of coal, TVA had coal contracts with 1914 different suppliers at March 31,June 30, 2010.  The contracted supply of coal is sourced from multiple geographic regions of the United States and is to be delivered via various transportation me thodsmet hods (e.g., barge, rail, and truck).  TVA purchases all of its natural gas requirements from a variety of suppliers under short-term contracts.

As mentioned in Item 1, Business — Current Power Supply — Purchased Power and Other Agreements in the Annual Report, TVA has a power purchase agreement with Choctaw Generation, L.P. (“Choctaw”) that expires on March 31, 2032.  Choctaw’s senior secured credit ratings are currently ‘BB-’ by Standard & Poor’s and ‘Ba3’‘B2’ by Moody’s.  As a result of its credit ratings, Choctaw has provided credit assurance to TVA per the terms of its agreement.  Additionally, USEC is TVA’s largest supplier of uranium enrichment services.  Any nonperformance or credit default by USEC could result in TVA incurring additional costs.


13.  Fair Value Measurements

Fair value is determined based on the exchange price that would be received for an asset or paid to transfer a liability (an exit price) in TVA’s principal market or, in the absence of a principal market, the most advantageous market for the asset or liability in an orderly transaction between market participants.  TVA uses market or observable inputs as the preferred source of values, followed by assumptions based on hypothetical transactions in the absence of market inputs.

Valuation Techniques

There are three main approaches to measuring the fair value of assets and liabilities: (1) the market approach; (2) the income approach; and (3) the cost approach.  The market approach uses prices and other relevant information generated from market transactions involving identical or comparable assets or liabilities.  The income approach uses valuation techniques to convert future amounts to a single present value amount.  The measurement is based on the value indicated by current market expectations about those future amounts of income.  The cost approach is based on the amount that would currently be required to replace an asset.  TVA uses the market approach and the income approach in its fair value measurements.


 
27




The valuation techniques used to measure fair value are based upon observable and unobservable inputs. Observable inputs reflect market data obtained from independent sources, while unobservable inputs reflect TVA’s market assumptions.  These two types of inputs create the following fair value hierarchy:

Level 1 
Unadjusted quoted prices in active markets accessible by the reporting entity for identical assets or liabilities.  Active markets are those in which transactions for the asset or liability occur with sufficient frequency and volume to provide pricing.
 
Level 2
 
 
 
Pricing inputs other than quoted market prices included in Level 1 that are based on observable market data and that are directly or indirectly observable for substantially the full term of the asset or liability.  These include quoted market prices for similar assets or liabilities, quoted market prices for identical or similar assets in markets that are not active, adjusted quoted market prices, inputs from observable data such as interest rate and yield curves, volatilities and default rates observable at commonly quoted intervals, and inputs derived from observable market data by correlation or other means.
 
Level 3
 
 
Pricing inputs that are unobservable, or less observable, from objective sources.  Unobservable inputs are only to be used to the extent observable inputs are not available.  These inputs maintain the concept of an exit price from the perspective of a market participant and should reflect assumptions of other market participants.  An entity should consider all market participant assumptions that are available without unreasonable cost and effort.  These are given the lowest priority and are generally used in internally developed methodologies to generate management's best estimate of the fair value when no observable market data is available.
 

A financial instrument's level within the fair value hierarchy (where Level 3 is the lowest and Level 1 is the highest) is based on the lowest level of input significant to the fair value measurement.

The following sections describe the valuation methodologies TVA uses to measure different financial instruments at fair value.  AllExcept for gains and losses on SERP assets, all changes in fair value of these assets and liabilities have been reflected as changes in regulatory assets, regulatory liabilities, or accumulated other comprehensive loss on TVA’s Balance sheet as of March 31,June 30, 2010, and Statements of changes in proprietary capital for the three and sixnine months ended March 31,June 30, 2010.  ThereExcept for gains and losses on SERP assets, there has been no impact to the Statements of operations or the Statements of cas hcash flows related to these fair value measurements.

Investments

At March 31,June 30, 2010, TVA’s investment funds were composed of $1.1 billion$984 million of securities classified as trading and measured at fair value and $2 million of equity investments not required to be measured at fair value.  TVA holds tradingTrading securities are held in itsthe nuclear decommissioning trust (“NDT”), asset retirement trust (“ART”), and SERP.  The NDT holds funds for the ultimate decommissioning of its nuclear power plants.  The ART holds funds for the costs related to the future closure and retirement of TVA’s long-lived assets.  TVA established a SERP for certain executives in critical positions to provide supplemental pension benefits tied to compensation that is not creditable under the qualified pension plan.  Th eThe NDT and SERP are invested in securities generally designed to achieve a return in line with broad equity market performance.  The ART is presently invested to achieve a return in line with fixed-income market performance.

The NDT, ART, and SERP are composed of multiple types of investments and are managed by external institutional managers.  Most U.S. and international equities, Treasury inflation-protected securities, real estate investment trust (“REIT”) securities, and cash securities, and certain derivative instruments are measured based on quoted exchange prices in active markets and are classified as Level 1 valuations.  Fixed-income investments, high-yield fixed-income investments, currencies, and most derivative instruments are non-exchange traded and are classified as Level 2 valuations.  These measurements are based on market and income approaches with observable market inputs.  Private partnership investments may include venture  capita l, buyout, mezzanine or subordinated debt, restructuring or distressed debt, and special situations.  These investments are classified as Level 3 valuations.  Commingled funds containrepresent investment funds comprising multiple individual financial instruments.  The commingled funds held by the NDT and SERP consist either of a single class of security, such as equity, fixed income, and derivative securit ies.debt or foreign currency securities, or multiple classes of securities.  All underlying positions in the commingled funds are either exchange traded (Level 1) or measured using observable inputs for similar instruments (Level 2).  The fair value of commingled funds areis based on net asset values (“NAV”("NAV") per fund share            (the

28


(the unit of account), derived from the prices of the underlying securities in the funds.  These commingled funds can be liquidated at the measurement date NAV price and are classified as Level 2 valuations.  Required notification periods range from zero to 30 days.  The funds can be redeemed unless doing so would violate regulations to which the fund is subject, would be unreasonable or impracticable, or would be seriously prejudicial to the fund. As of March 31,June 30, 2010, TVA did not have any unfunded commitments related to the commingled funds.  The NDT had unfunded commitments related to commingled funds of $48 million at June 30, 2010, and these commitments will be funded by NDT assets.


28

Gains and losses on trading securities are recognized in current earnings and are based on average cost.  The SERP had unrealized losses of $2 million for the three months ended June 30, 2010, and had unrealized gains of $2 million for the three months ended June 30, 2009. The gains and losses of the NDT and ART are subsequently reclassified to a regulatory liability or asset account in accordance with TVA’s regulatory accounting policy.  The NDT had unrealized gainslosses of $21$61 million for the three months ended March 31,June 30, 2010, and had unrealized lossesgains of $18$85 million for the three months ended March 31,June 30, 2009.  The ART had unrealized gains of less than $1 million for the three months ended March 31,June 30, 2010, and had unrealized losses of less than $1 million for the three months ended March 31, 2009.  The SERP had unrealized gains of $2 million for the three months ended March 31, 20 10, and had unrealized losses of $2 million for the three months ended March 31,June 30, 2009.

Currency Swaps, Swaption, and Interest Rate Swaps

See Note 12 — Cash Flow Hedging Strategy for Currency Swaps and Derivatives Not Receiving Hedge Accounting Treatment for a discussion of the nature, purpose, and contingent features of TVA’s currency swaps, swaption, and interest rate swaps.

The currency swaps and interest rate swaps are classified as Level 2 valuations and are valued based on income approaches using observable market inputs for similar instruments.  The swaption is classified as a Level 3 valuation and is valued based on an income approach.  The valuation is computed using a broker-provided pricing model utilizing interest and volatility rates.  While most of the fair value measurement is based on observable inputs, volatility for TVA’s swaption is generally unobservable.  Therefore, the valuation is derived from an observable volatility measure with adjustments.

Coal Contract Derivatives and Commodity Derivatives Under TVA’s Financial Trading Program

See Note 12 — Derivatives Not Receiving Hedge Accounting Treatment — Coal Contract Derivatives and Commodity Derivatives Under Financial Trading Program for a discussion of the nature and purpose of coal contract derivatives and commodity derivatives under TVA’s Financial Trading Program.

Coal Contract Derivatives. These contracts are classified as Level 3 valuations and are valued based on income approaches.  TVA develops an overall coal price forecast using widely-used short-term market data from an external pricing specialist, long-term price forecasts developed with the assistance of a third-party valuation service, and other internal estimates.  To value the volume option component of applicable coal contracts, TVA uses a Black-Scholes pricing model which includes inputs from the overall coal price forecast, contract-specific terms, and other market inputs.

Commodity Derivatives Under Financial Trading Program.  These contracts are valued based on market approaches which utilize Chicago Mercantile Exchange (“CME”) quoted prices and other observable inputs.  Futures and options contracts settled on the CME are classified as Level 1 valuations.  Swap contracts are valued using a pricing model based on CME inputs and are subject to nonperformance risk outside of the exit price.  These contracts are classified as Level 2 valuations.

Nonperformance Risk

The impact of nonperformance risk, which includes credit risk, considers changes in current market conditions, readily available information on nonperformance risk, letters of credit, collateral, other arrangements available, and the nature of master netting arrangements.  TVA is a counterparty to currency swaps, a swaption, interest rate swaps, commodity contracts, and other derivatives which subject TVA to nonperformance risk.  Nonperformance risk on the majority of investments and certain exchange-traded instruments held by TVA is incorporated into the exit price that is derived from quoted market data that is used to mark the investment to market.

29



Nonperformance risk for most of TVA’s derivative instruments is an adjustment to the initial asset/liability fair value.  TVA adjusts for nonperformance risk, both of TVA (for liabilities) and the counterparty (for assets), by applying a credit valuation adjustment (“CVA”).  TVA determines an appropriate CVA for each applicable financial instrument based on the term of the instrument and TVA’s or the counterparty’s credit rating as obtained from Moody’s.  For companies that do not have an observable credit rating, TVA uses internal analysis to assign a comparable rating to the company.  TVA discounts each financial instrument using the historical default rate (as reported by Moody’s for CY 1983 to CY 2009) for companies with a similar credit rating over a time period consistent with the remaining term of the contract as of March 31,June 30, 2010.  The application of CVAs resulted in a $2$1 million decrease in the fair value of assets measured and a $1$2 million decrease in the fair value of liabilities.liabilities as of June 30, 2010.


29

The following table sets forth by level, within the fair value hierarchy, TVA's financial assets and liabilities that were measured at fair value on a recurring basis as of March 31,June 30, 2010.  Financial assets and liabilities have been classified in their entirety based on the lowest level of input that is significant to the fair value measurement.  TVA's assessment of the significance of a particular input to the fair value measurement requires judgment and may affect the determination of the fair value of the assets and liabilities and their classification in the fair value hierarchy levels.

Fair Value Measurements
 
 
  As of June 30, 2010  As of September 30, 2009 
 
Assets
 
Quoted Prices in Active Markets for
Identical Assets
(Level 1)
  
Significant Other
Observable Inputs
(Level 2)
  
Significant
Unobservable
Inputs
(Level 3)
  
Netting1
  Total  Total 
Description                  
Investments:                  
Equity securities $60  $  $  $  $60  $83 
Debt securities-U.S. government corporations and agencies  134   68         202   111 
Corporate debt securities     160         160   203 
Residential mortgage-backed securities     19         19   18 
    Commercial mortgage-backed securities     1         1   2 
Collateralized debt obligations     5         5   6 
Commingled funds2:
                        
Equity security commingled funds     305         305   328 
Debt security commingled funds     179         179   185 
Foreign currency commingled funds     12         12   11 
Other commingled funds     39         39   34 
Private partnerships        2      2    
Total investments  194   788   2      984   981 
Currency swaps                 7 
Coal contract derivatives        40      40   87 
Commodity derivatives under FTP:                        
Futures contracts  2            2   3 
Swap contracts     7      (5)  2   12 
        Option contracts                 2 
Total commodity derivatives under FTP  2   7      (5)  4   17 
Total $196  $795  $42  $(5) $1,028  $1,092 
 
Liabilities
 Quoted Prices in Active Markets for Identical Assets (Level 1)  
Significant Other
Observable Inputs
(Level 2)
  
Significant
Unobservable Inputs
(Level 3)
  
Netting1
  Total  Total 
Description                        
Currency swaps $  $99  $  $  $99  $51 
Interest rate swaps     308         308   287 
Swaption        674      674   592 
Coal contract derivatives        27      27   80 
Commodity derivatives under FTP:                        
Futures contracts  28            28   25 
Swap contracts     168      (5)  163   40 
Option contracts                 (2)
Total commodity derivatives under FTP  28   168      (5)  191   63 
Total $28  $575  $701  $(5) $1,299  $1,073 
Notes
(1)  Due to the right of setoff and method of settlement, TVA elects to record commodity derivatives under the FTP based on its net commodity position with the broker or other counterparty.
(2)  Commingled funds represent investment funds comprising multiple individual financial instruments and are classified in the table based on their existing investment portfolio as of the measurement date. Commingled funds exclusively composed of one class of security are classified in that category (e.g., equity, debt, or foreign currency securities). Commingled funds comprising multiple classes of securities are classified as “other commingled funds.”
 
 
Fair Value Measurements 
  As of March 31, 2010  As of September 30, 2009 
 
Assets
 
 
Quoted Prices in Active Markets for
Identical Assets
(Level 1)
  
Significant Other
Observable Inputs
(Level 2)
  
Significant
Unobservable
Inputs
(Level 3)
  
Netting1
  Total  Total 
Description                  
Investments:                  
Equity securities $92  $  $  $  $92  $83 
Debt securities-U.S. government corporations and agencies  114   69         183   111 
Corporate debt securities     180         180   203 
Residential mortgage-backed securities     16         16   18 
Commercial mortgage-backed securities     1         1   2 
Collateralized debt obligations     6         6   6 
Commingled funds2:
                        
Equity security commingled funds     341         341   328 
Debt security commingled funds     185         185   185 
Foreign currency commingled funds     12         12   11 
Other commingled funds     35         35   34 
Total investments  206   845         1,051   981 
Currency swaps     16         16   7 
Coal contract derivatives        43      43   87 
Commodity derivatives under FTP:                        
Futures contracts  5         (1)  4   3 
Swap contracts     18      (2)  16   12 
Option contracts                 2 
Total commodity derivatives under FTP  5   18      (3)  20   17 
Total $211  $879  $43  $(3) $1,130  $1,092 
 
 
Liabilities
 
 
Quoted Prices in Active Markets for Identical Assets
(Level 1)
  
Significant Other
Observable Inputs
(Level 2)
  
Significant
Unobservable Inputs
(Level 3)
  
Netting1
  Total  Total 
Description                        
Currency swaps $  $39  $  $  $39  $51 
Interest rate swaps     216         216   287 
Swaption        448      448   592 
Coal contract derivatives        43      43   80 
Commodity derivatives under FTP:                        
Futures contracts  49         (1)  48   25 
Swap contracts     184      (2)  182   40 
Option contracts  1            1   (2)
Total commodity derivatives under FTP  50   184      (3)  231   63 
Total $50  $439  $491  $(3) $977  $1,073 
 
Notes
(1)  Due to the right of setoff and method of settlement, TVA elects to record commodity derivatives under the FTP based on its net commodity position with the broker or other counterparty.
(2)  Commingled funds represent investment funds comprising multiple individual financial instruments and are classified in the table based on their existing investment portfolio as of the measurement date.
Commingled funds exclusively composed of one class of security are classified in that catergory (e.g., equity, debt, or forgeign currency securities).  Commingled funds comprising multiple classes of securities
are clasified as “other commingled funds.”
 



 
30


 
The following table presents a reconciliation of all assets and liabilities measured at fair value on a recurring basis using significant unobservable inputs (Level 3) for the three and sixnine months ended March 31,June 30, 2010:


Fair Value Measurements Using Significant Unobservable Inputs
Fair Value Measurements Using Significant Unobservable Inputs
 
Fair Value Measurements Using Significant Unobservable Inputs
 
 
For the Three Months
Ended March 31, 2010
  
For the Six Months
Ended March 31, 2010
  
For the Three Months
Ended June 30, 2010
  
For the Nine Months
Ended June 30, 2010
 
 Coal Contract Derivatives  Swaption  Coal Contract Derivatives  Swaption  Private Partnerships  Coal Contract Derivatives  Swaption  Private Partnerships  Coal Contract Derivatives  Swaption 
Balances at beginning of period $6  $(455) $7  $(592) $  $  $(448) $  $7  $(592)
Purchases, issuances, and settlements  2         2       
Total gains or losses (realized or unrealized):                                        
Net unrealized gains (losses) deferred as regulatory assets and liabilities  (6)  7   (7)  144      13   (226)     6   (82)
Balances at March 31, 2010 $  $(448) $  $(448)
Balances at June 30, 2010 $2  $13  $(674) $2  $13  $(674)

There were no realized gains or losses related to the instruments measured at fair value using significant unobservable inputs that affected earnings during the three and sixnine months ended March 31,June 30, 2010.  All unrealized gains and losses related to these instruments have been reflected as increases or decreases in regulatory assets and liabilities.

Other Financial Instruments Not Recorded at Fair Value

TVA uses the methods and assumptions described below to estimate the fair value of each significant class of financial instruments.instrument.  The fair market value of the financial instruments held at March 31,June 30, 2010, and September 30, 2009, may not be representative of the actual gains or losses that will be recorded when these instruments mature or are called or presented for early redemption.  The estimated values of TVA'sTVA’s financial instruments not recorded at fair value at March 31,June 30, 2010, and September 30, 2009, were as follows:


Estimated Values of Financial Instruments
Estimated Values of Financial Instruments
 
Estimated Values of Financial Instruments
 
 At June 30, 2010  At September 30, 2009 
 At March 31, 2010  At September 30, 2009  Carrying Amount  Fair Value  Carrying Amount  Fair Value 
 Carrying Amount  Fair Value  Carrying Amount  Fair Value             
Cash and cash equivalents $202  $202  $201  $201  $198  $198  $201  $201 
Loans and other long-term receivables  89   79   77   68   85   76   77   68 
Short-term debt, net  1,147   1,147   844   844   834   834   844   844 
Long-term debt (including current portion), net  21,835   23,359   21,796   23,757   22,405   25,111   21,796   23,757 

Because of the short-term maturity of cash and cash equivalents, restricted cash and investments, and short-term debt, net, the carrying amounts of these instruments approximate their fair values.

Fair value of long-term debt traded in the public market is determined by multiplying the par value of the debt by the indicative market price at the date of the respective balance sheets.
 
Fair values for loans and other long-term receivables are estimated by determining the present value of future cash flows using discount rates equal to the interest rates for similar loans made to borrowers with similar credit ratings and for similar remaining maturities, where applicable.

 
31




14.  Other Income (Expense), Net

Other income (expense), net is comprised of the following:


Other Income (Expense), Net
Other Income (Expense), Net
 
Other Income (Expense), Net
 
 Three Months Ended March 31  Six Months Ended March 31  Three Months Ended June 30  Nine Months Ended June 30 
 2010  2009  2010  2009  2010  2009  2010  2009 
                        
Interest income $1  $2  $3  $5  $1  $2  $4  $7 
Gains (losses) on investments  2   (2)  3   (15)  (2)  2   1   (13)
External services  4   8   6   5   3   4   9   9 
Claims settlement     4      4            4 
Miscellaneous  1   8   2   12   4   (6)  6   6 
                                
Total other income (expense), net $8  $20  $14  $11  $6  $2  $20  $13 

15.  Benefit Plans

TVA sponsors a qualified defined benefit pension plan that covers most of its full-time employees, a qualified defined contribution plan that covers most of its full-time employees, two unfunded post-retirement health care plans that provide for non-vested contributions toward the cost of certain retirees’ medical coverage, other postemployment benefits such as workers’ compensation, and the SERP.

The following table provides the components of net periodic benefit cost for the plans for the three and sixnine months ended March 31,June 30, 2010, and 2009.

TVA Benefit Plan
 
 
TVA Benefit Plan
 
 
Three Months Ended March 31 Six Months Ended March 31 Three Months Ended June 30  Nine Months Ended June 30 
Pension Benefits Other Benefits Pension Benefits Other Benefits Pension Benefits  Other Benefits  Pension Benefits  Other Benefits 
20102009 20102009 20102009 20102009 2010  2009  2010  2009  2010  2009  2010  2009 
                               
Service cost
$    25
$    21
 
$      3
$      2
 
$    50
$    43
 
$      6
$      4
 $24  $20  $3  $2  $74  $63  $9  $6 
Interest cost128145 9 256291 18  128   145   10   9   384   436   28   27 
Expected return on plan assets(132)(136)  (264)(272)   (140)  (135)        (404)  (407)      
Amortization of prior service cost (credit)(6)9 1 (12)18 32  (6)  9   1   2   (18)  27   4   4 
Recognized net actuarial loss
51
4
 
5
2
 
102
8
 
9
4
  41   3   4   1   143   11   13   5 
Net periodic benefit cost as actuarially determined6643 1814 13288 3628  47   42   18   14   179   130   54   42 
Amount charged (capitalized) due to actions of regulator
7
(20)
 
 
14
(41)
 
  24   (21)        38   (62)      
Net periodic benefit cost recognized
$    73
$    23
 
$    18
$    14
 
$146
$    47
 
$    36
$    28
 $71  $21  $18  $14  $217  $68  $54  $42 


During the sixnine months ended March 31,June 30, 2010, TVA did not make contributions to its pension plans.plan.  TVA does not separately set aside assets to fund other benefit costs, but rather funds such costs on an as-paid basis.  TVA provided approximately $15$27 million and $13$21 million for other benefit costs during the sixnine months ended March 31,June 30, 2010, and 2009, respectively.  Net amounts capitalized due to actions of the regulator include amounts that have been deemed probable of recovery in future rates.

32




TVA made a contribution to the defined benefit pension plan on September 24, 2009, of $1.0 billion as an advance on its contributions through 2013.  However, withThe pension plan is required to pay substantial benefits required to be paid out each year,year.  TVA is unable to determinehas not decided at this time whether it will make additional contributions will need to be made throughbefore 2013.  The plan currently remains underfunded with obligations recognized in the Balance sheets as follows:

Obligations and Funded Status
Recognized Amounts
 
 
  Pension Benefits  Other Post-retirement Benefits 
  March 31, 2010  September 30, 2009  March 31, 2010  September 30, 2009 
             
Regulatory assets $3,661  $3,764  $287  $298 
Accrued liabilities  (5)  (5)  (36)  (35)
Other long-term liabilities  (2,655)  (2,618)  (650)  (630)
32



Obligations and Funded Status
Recognized Amounts
 
 
  Pension Benefits  Other Post-retirement Benefits 
  June 30, 2010  September 30, 2009  June 30, 2010  September 30, 2009 
             
Regulatory assets $3,600  $3,764  $281  $298 
Accrued liabilities  (5)  (5)  (35)  (35)
Other long-term liabilities  (2,668)  (2,618)  (639)  (630)


Estimated benefit payments under the benefit plans by fiscal year are as follows:

Estimated Future Benefits Payments
Estimated Future Benefits Payments
 
Estimated Future Benefits Payments
 
 PensionBenefits  Other Post-retirement Benefits  
Pension
Benefits
  Other Post-retirement Benefits 
2010 $694  $37 
      
2011  683   41   683   41 
2012  678   45   678   45 
2013  678   46   678   46 
2014  678   48   678   48 
2015 - 2019  3,394   245   3,394   245 

Currently, TVA does not expect to make additional contributions to the defined benefit pension plan in 2010.


16.  Legal Proceedings

From time to time, TVA is a party to or otherwise involved in lawsuits, claims, proceedings, investigations, and other legal matters (“Legal Proceedings”) that have arisen in the ordinary course of conducting TVA’s activities, as a result of catastrophic events or otherwise.  These Legal Proceedings include the matters discussed below.  TVA had accrued approximately $13 million with respect to Legal Proceedings as of March 31,June 30, 2010.  No assurance can be given that TVA will not be subject to significant additional claims and liabilities.  If actual liabilities significantly exceed the estimates made, TVA’s results of operations, liquidity, and financial condition could be materially adversely affected.

Legal Proceedings Related to Kingston Ash Pond Spill.  Fifty-sevenSixty lawsuits based on the Kingston ash spill have been filed and two of these have been voluntarily dismissed.  All of the remaining cases are pending in the United States District Court for the Eastern District of Tennessee.  The lawsuits, fourTwo of which are proposed classthose actions have been voluntarily dismissed.  The lawsuits, filed by residents, businesses, and property owners in the Kingston area.  The plaintiffs generallyarea, allege various causes of action based in tort – including nuisance, and strict liability, personal injury, and property damage andas well as inverse condemnation, and generally seek unspecified compensatory and punitive damages, court orders to clean up the plaintiffs’ properties and surrounding properties, and oth erother relief.  With regard toFour of the lawsuits are proposed class actions, and three of the propos ed class actions have been consolidated.  TVA is the sole defendant in all actions except one of the proposed class actions, in which Geosyntec Consultants, Inc., and certain other suits, TVA filed several motions, including motions to dismiss some or all of the claims.Worley Parsons Corporation are also defendants.  On March 26, 2010, the court issued its decision on these motions.  TheTVA’s motions to dismiss the first seven actions that had been filed – the proposed class actions and three other cases filed on behalf of named individuals.  In those cases, the court dismissed (1) the tort claims related to TVA’s decisiondecisions to build and operate the ash pond the claims related toand TVA’s recovery and remediation activities, and(2) the demandsplantiffs’ demand for punitive damages, and (3) the plantiffs’ demand for a jury trial.  The court denied TVA’s motionmotions with regard to plantiffs’ tort claims concerning TVA's use, maintenance and upkeep of the ash pond, along with the inverse condemnation claims raised by certain ofplaintiffs.  The court has scheduled the plaintiffs.first sev en filed actions for trial beginning on September 13, 2011.

33




TVA is the sole defendant in all suits but one proposed class action, and the plaintiffs in that case have named several TVA employees as defendants.  On March 24, 2010, the court dismissed these employees from the case.

TVA has received several notices of intent to sue under various environmental statutes from both individuals and environmental groups.  In addition, TVA has received substantial other claims from individuals and companies allegedly affected by the ash spill, and may receive additional claims.

Civil Penalty for the Kingston Ash Spill.  On June 14, 2010, TDEC issued a civil penalty order of approximately $12 million to TVA for the Kingston ash spill, citing violations of the Tennessee Solid Waste Disposal Act and the Tennessee Water Quality Control Act.  Of the $12 million, TVA has already satisfied $6 million of the obligation and may also be credited up to $2 million for performing environmental projects approved by TDEC.  The remaining obligation will be paid in installments through July 2012.

33


Case Brought by North Carolina Alleging Public Nuisance.  On January 30, 2006, North Carolina filed suit against TVA in the United States District Court for the Western District of North Carolina, alleging that TVA’s operation of its coal-fired power plants in Tennessee, Alabama, and Kentucky constitutes a public nuisance.  North Carolina sought caps on emissions of certain pollutants from TVA’s coal-fired plants that were equivalent to caps on emissions imposed by North Carolina law on North Carolina’s two largest electric utilities.  On January 13, 2009, the court held that emissions from Bull Run Fossil Plant (“Bull Run”), Kingston, and John Sevier Fossil Plant ( 220;(“John Sevier”), all located in Tennessee, and Widows Creek Fossil Plant (“Widows Creek”), located in Alabama, constitute a public nuisance. The court declined to order any relief as to the remainder of TVA’s coal-fired plants, holding that their emissions did not significantly impact North Carolina.

The court ordered that:
Theissued an order that required TVA to operate existing flue gas scrubbers and selective catalytic reduction systems (“SCRs”) currently operating at Bull Run be properly maintained and operated year round.
The scrubbers under construction at Kingston be completed by December 31, 2010, and that Kingston’s scrubbers and SCRs be properly maintained and operated year-round.
Scrubbers and SCRs be installed and in operation for all fourthe units, at John Sevier by December 31, 2011.
TVA complete its plan to modernize the two existing scrubbers at Widows Creek, and installadd scrubbers and SCRs at Widows Creek Units 1-6the units that did not have them by December 31, 2013.
The plantscertain dates, and to meet specified emission rates and annual tonnage caps for nitrogen oxides (“NOx”) and sulfur dioxide (“SO2”) after the applicable operation dates for the scrubbers.

TVA’s Chief Executive Officer make semi-annual reports to the court of TVA’s progress in complying with the order.
TVA had already made capital expenditure commitments to decrease emissions from some of the facilities, but the court ordered significant additional investments and in some instances compliance within a time frame that is shorter than TVA had planned.  Actions required by the court with respect to Kingston and Bull Run were already included in TVA’s clean air plans and installation of equipment is substantially complete.  The additional estimated costs of taking the actions required by the court at John Sevier and Widows Creek would be approximately $1.7 billion from 2010 to 2014.  Management is evaluating alternatives related to these plants which could change this estimate in the future.  Compliance with the court’s order could also have other cost implications, including impacts on f uel expense, variable operation and maintenance expense, and fixed operation and maintenance expense, and those costs are under evaluation.

On May 29, 2009, TVA appealed the district court’s decision to the United States Court of Appeals for the Fourth Circuit (“Fourth Circuit”), and oral argumenton July 26, 2010, the Fourth Circuit reversed the holding of the district court and directed the district court to dismiss the action against TVA.  In its decision, the Fourth Circuit held that state laws, including nuisance laws, could not be used to bypass the regulatory structure established by Congress and the EPA for controlling emissions; the district court improperly applied North Carolina law to power plants located in Alabama and Tennessee; and the plant operations in Alabama and Tennessee could not be considered as nuisances because both states had specifically approved these operations. 

At this time, it is scheduled for May 14, 2010.not clear whether North Carolina will seek additional review of the Fourth Circuit’s decision.

Case Involving Alleged Violations of the New Source Review Regulations at Bull Run.  The National Parks Conservation Association and the Sierra Club filed suit against TVA on February 13, 2001, in the United States District Court for the Eastern District of Tennessee, alleging that TVA did not comply with the New Source Review (“NSR”) requirements of the Clean Air Act (“CAA”) when TVA repaired Bull Run.  The trial was completed the week of July 7, 2009, and onOn March 31, 2010, the court ruled in TVA’s favor, holding that two maintenance projects at Bull Run were “routine” and therefore did not require NSR permits.




Case Involving the General Waste Products Sites.  In July 2008, a third-party complaint under CERCLA was filed against TVA in the District Court for the Southern District of Indiana, alleging that TVA and several other defendants (General Waste Products, General Electric Company, Indianapolis Power and Light, National Tire and Battery, Old Ben Coal Co., Solar Sources Inc., Whirlpool, White County Coal, PSI, Tell City Electric Department, Frontier Kemper, Speed Queen, Allan Trockman (the former operator ofdisposed, or arranged the site), and the City of Evansville) disposeddisposal, of hazardous materials at two General Waste Products sites in Evansville, Indiana.  TVA was named in the complaint based on allegations that TVA arranged for the disposal of contaminated materials at the sites.  The complaint also includes a claim under state law for the release of hazardous materials.  This action was brought by a group of potentially responsible parties in order to require the third-party defendants to contribute to, or pay for, the remediation of the sites.  As of March 31,June 30, 2010, the total remediation cost for both sites was expected to exceed $10 million.  A subpoena sent toTVA has entered into a settlement agreement with the third-party pla intiffs which dismisses all claims made against TVA in 2003the case.  The settlement agreement must be approved by the owner ofcourt before TVA is dismissed from the sites reflects that the primary issues involve lead from batteries and polychlorinated biphenyls (“PCBs”) from transformers, but TVA has found no records indicating that it arranged for disposal of these types of hazardous substances at the sites.  Trial iscase.  The trial, previously scheduled to begin on July 12, 2010.2010, has been postponed indefinitely.

Proceedings Regarding Bellefonte Nuclear Plant Units 1 and 2.  On March 9, 2009, in response to a request by TVA, the Nuclear Regulatory Commission (“NRC”) issued an order reinstating the construction permits for Bellefonte Nuclear Plant (“Bellefonte”) Units 1 and 2 and returning Bellefonte to a terminated status.  On March 30,May 8, 2009, the Blue Ridge Environmental Defense League (“BREDL”) filed a petition in the United States Court of Appeals for the District of Columbia Circuit (“D.C. Circuit”) asking the court to review the NRC’s decision to reinstate the construction permits.  The petition challenged the NRC’s authority to reinstate the construction permits and alleged that the NRC fa iled to follow the requirements of the National Environmental Policy Act (“NEPA”).  On May 6, 2009, the D.C. Circuit granted TVA’s motion to intervene in this proceeding.  On May 8, 2009, BREDL,, the Bellefonte Efficiency and Sustainability Team (“BEST”), and the Southern Alliance for Clean Energy (“SACE”) filed a petition to intervene in the NRC construction permit proceeding, raising several contentions regarding reinstatement of the construction permits. 60; Holding their other contentions in abeyance, the NRC directed BREDL, BEST, SACE, TVA, and NRC staff to submit briefs addressing whether the threshold question ofNRC has the NRC’s statutory authority to reinstate the construction permits.  On June 11, 2009, the D.C. Circuit issued an order holding the case in abeyance pending further order of the court.  On January 7, 2010, the NRC issued a decision holding that the NRC has legal authority to reinstate the construction permi ts,permits, dismissing the first two contentions submitted by BREDL, BEST, and SACE.  The NRC referred the remainder of the contentions to an Atomic Safety and Licensing Board (“ASLB”) for further proceedings.  On April 2, 2010, the ASLB issued its decision, finding that although BREDL and SACE established standing, they failed to proffer an admissible contention, and the ASLB dismissed their hearing petition.  On April 20, 2010, BREDL and SACE filed a motion for additional time to file an appeal of the ASLB’s April 2, 2010 decision.decision and also filed the appeal itself.  On April 30, 2010, TVA intendsfiled its answer opposi ng the motion for additional time and filed a brief in opposition to oppose the motion.  Barring further action,appeal.  A decision by the decision will become final after the expiration of a 40 day period that began April 2, 2010.NRC is pending.


On March 30, 2009, BREDL filed a petition in the United States Court of Appeals for the District of Columbia Circuit (“D.C. Circuit”) challenging the NRC’s authority to reinstate the construction permits and alleging that the NRC failed to follow the requirements of the National Environmental Policy Act (“NEPA”).  On May 6, 2009, the D.C. Circuit granted TVA’s motion to intervene in this proceeding.  On June 11, 2009, the D.C. Circuit issued an order holding the case in abeyance pending further order of the court.  On March 8, 2010, BREDL filed a second petition in the D.C. Circuit, again challenging NRC’s compliance with NEPA and the NRC’s authority to reinstate the construction permits.  TVA has movedTVA’s motion to intervene was granted and TVA filed a mo tion for the court to dismiss BREDL’s second petition.  On July 26, 2010, the D.C. Circuit issued an order consolidating the two BREDL petitions and continuing the stay of the case.  This consolidation effectively grants TVA’s request to dismiss the second petition; further action in this proceeding as well.case is not expected until the NRC addresses BREDL’s appeal of the ASLB’s April 2, 2010 decision, described above.

Administrative Proceeding Regarding Bellefonte Units 3 and 4.  TVA submitted its Combined Construction and Operating License Application for two Advanced Passive 1000 reactors at Bellefonte Units 3 and 4 to the NRC in October 2007.  On June 6, 2008, BEST, BREDL, and SACE submitted to the NRC a joint petition for intervention and a request for a hearing.  The petition raised 20 potential contentions with respect to TVA’s Combined Construction and Operating License Application.  The ASLB presiding over the proceeding subsequently denied standing to BEST and admitted four of the 20 contentions submitted by BREDL and SACE.  The NRC later reversed the ASLB’s decision to admit two of the four contentions, leaving only two contentions to be litigated by the admitted parties in a future hearing.  No hearing will take place until the NRC issues a final Environmental Impact Statement and Final Safety Evaluation Report for the units, which are not anticipated until the fall of 2011.  The two remaining contentions(which involve questions aboutab out the estimated costs of the new nuclear plant and the impact of the facility’s operations, in particular the plant intake, on aquatic ecology.ecology) to be litigated in a future hearing.  No hearing will take place until the NRC issues a final Environmental Impact Statement and final Safety Evaluation Report for the units, which is not anticipated until the fall of 2011.

Administrative Proceeding Regarding Watts Bar Nuclear Plant Unit 2.  On July 13, 2009, SACE, the Tennessee Environmental Council, the Sierra Club, We the People, and BREDL filed a request for a hearing and petition to intervene in the NRC administrative process reviewing TVA’s application for an operating license for Watts Bar Nuclear Plant (“Watts Bar”) Unit 2.  The petitioners raised seven contentions related to TVA’s environmental review of the project and the NRC’s basis for confidence in the availability of safe storage options for spent nuclear fuel.  TVA and the NRC staff responded to these contentions in August 2009, arguing that none met the standards for adm issibility under the NRC’s regulations.  On November 19, 2009, the ASLB granted SACE’s request for hearing, admitted two of SACE'sSACE’s seven contentionscont entions for hearing, and denied the request for hearing submitted on behalf of the other four petitioners.  The other four petitioners appealed toASLB subsequently dismissed one of the NRCtwo admitted contentions, and the ASLB's decision to deny themsole remaining contention concerns the opportunity to participate in the proceeding, andeffects of two-unit operation on nearby aquatic resources.  On March 26, 2010, the NRC affirmed the ASLB'sASLB’s decision denying the other petitioners the opportunity to participate.  After providing additional information to the NRC on this matter.  Also,April 9, 2010, which addressed one of the two admitted contentions, TVA submitted a motion asking the ASLB to dismiss the contention as moot.  The motion was unopposed by SACE and on June 2, 2010, the ASLB granted TVA’s motion to dismiss the contention.  A hearing on the remaining contention is scheduled to take place between July and September 2011.  SACE has also asked the ASLB to waive the NRC'sNRC’s longstanding regulations establishing that, for the purposes of NEPA, need for power andan d alternative energy sources issues will not be considered in operating license proceedings.  On June 29, 2010, the ASLB denied this request and declined to refer the waiver petition to the NRC for consideration.  Subsequently, on July 15, 2010, SACE filed a petition for interlocutory review of this decision with the NRC.  TVA filed its answer opposing this petition July 26, 2010.

Case Arising out of Hurricane Katrina.  In April 2006, TVA was added as a defendant to a class action lawsuit brought in the United States District Court for the Southern District of Mississippi by 14 Mississippi residents allegedly injured by Hurricane Katrina.  The plaintiffs sued seven large oil companies and an oil company trade association, three large chemical companies and a chemical trade association, and 31 large companies involved in the mining and/or burning of coal.  The plaintiffs allege that the defendants’ greenhouse gas (“GHG”) emissions contributed to global warming and were a proximate and direct cause of Hurricane Katrina’s increased destructive force.  The plaintiffs are seekingplainti ffs seek monetary dam agesdamages among other relief.  The district court dismissed the case on the grounds that the plaintiffs lacked standing.  The plaintiffs appealed the dismissal to the United States Court of Appeals for the Fifth Circuit (“Fifth Circuit”).  In October 2009, the Fifth Circuit decided thatreversed the plaintiffs have standing to assert theirdismissal of the public and private nuisance, trespass, and negligence claims, and that noneaffirmed the dismissal of these claims present political questions, but also concluded that theirthe unjust enrichment, fraudulent misrepresentation, and civil conspiracy claims, must be dismissed for standing reasons.  Accordingly, the Fifth Circuit reversed the district court’s judgment in part, dismissed the plaintiffs’ suit in part, and remanded the case to the district court for further proceedings.  TVA and the other defendants filed a petition seeking a rehearing by the entire Fifth Circuit, which the Fifth Circuit granted, vacating the lower court’s decision.  Oral argumentgranted.  The case had been scheduled for rehearing before the entire court, but on April 30, 2010, the Fifth Circuit issued an order stating that it lost the necessary quorum to rehear the appeal.  On May 28, 2010, the court determined that it had no viable way to rehea r the case and concluded that the Fifth Circuit’s original decision was vacated.  The result is scheduled forthat the weekdistrict court’s ruling dismissing the case was reinstated.




Global Warming Cases, Southern District of New York.  On July 21, 2004, two lawsuits were filed in the United States District Court for the Southern District of New York against TVA and other companies that generate power from fossil-fuel electric generating facilities alleging that global warming is a public nuisance and that carbon dioxide (“CO2”) emissions from fossil-fuel electric generating facilities should be ordered abated because they contribute to causing the nuisance.  The first case was filed by various states (California, Connecticut, Iowa, New Jersey, New York, Rhode Island, Vermont, and Wisconsin) and the Ci ty of New York against TVA and other power suppliers.  The second case, which also alleges private nuisance, was filed against the same defendants by Open Space Institute, Inc., Open Space Conservancy, Inc., and the Audubon Society of New Hampshire.  The plaintiffs seek a court order requiring each defendant to cap its CO2 emissions and then reduce these emissions by an unspecified percentage each year for at least a decade.  In September 2005, the district court dismissed both lawsuits because they raised political questions that should not be decided by the courts.  The plaintiffs appealed to the United States Court of Appeals for the Second Circuit (“Second Circuit”).  On September 21, 2009, the Second Circuit reversed the district court’s decision holding, among other things, that the claims can be heard by the courts and do not raise political questions.  60;The Second Circuit remanded the cases to the district court for further proceedings.  On November 5, 2009, TVA and the other defendants filed a petition seeking a rehearing by the entire Second Circuit.  OnCircuit, which petition was denied on March 5, 2010, the Second Circuit denied the petition for a rehearing.  On March 16, 2010,2010.  Thereafter, the Second Circuit granted defendants’ motions to stay the mandates in the cases pending the filing of petitions for review by the U.S. Supreme Court.

Paradise Fossil Plant Clean Air Act Permit.  On December 21, 2007, the Sierra Club, the Center for Biological Diversity, Kentucky Heartwood, Preston Forsythe, and Hilary Lambert filed a petition with the EPA raising objections to the conditions of TVA’s current CAA permit at Paradise Fossil Plant (“Paradise”).  Among other things, the petitioners allege that activities at Paradise triggered the NSR requirements for NOx and that the monitoring of opacity at Units 1 and 2 of the plant is deficient.  In an order issued in July 2009, the EPA agreed that the permit failed to include a proper analysis of NOx for the plant’s three main boilers, that the permit failed to require adequate monitoring systems for opacity and NOx, and that the monitoring of soot emissions from the coal washing and handling plant was inadequate.  TVA’s permit at Paradise is issued by the Kentucky Division for Air Quality (“KDAQ”), and if it is changed, it must be changed by KDAQ.  In November 2009, KDAQ determined that the actions at Paradise had not triggered NSR requirements and reissued the operating permit without including NSR compliance milestones.  Judicial review of KDAQ’s decision about the permit is a possibility.  The current permit continues to remain in effect.

Information Request from the EPA.  On April 25, 2008, TVA received a request from the EPA under section 114 of the CAA requesting extensive information about projects at and the operations of 14 of TVA’s 59 coal-fired units.  These 14 units are located in Alabama, Kentucky, and Tennessee.  TVA has responded to this request.  This request for information is similar to but broader than section 114 requests that other companies have received during the EPA’s NSR enforcement initiative.  TVA cannot predict whether the EPA will consider the maintenance, capital improvement, or other activities at these 14 units to have violated NSR requirements because of the uncertain interpretation of this program and recent court d ecisions.  If violations are confirmed, TVA could be required to install new pollution control equipment in addition to the modifications that have already been completed or planned, and TVA could become liable for other payments or penalties.  The EPA'sEPA’s request could be the first step in an administrative proceeding against TVA that could then result in litigation onin the courts.



Notice of Violation at Widows Creek Unit 7.  On July 16, 2007, TVA received a Notice of Violations ("NOV"Violation (“NOV”) from the EPA alleging, among other violations, that TVA failed to properly maintain ductwork at Widows Creek Unit 7.  TVA repaired the ductwork in 2005.  The EPA is discussing a potential monetary sanction against TVA.  Additionally, the EPA may require TVA to give up emission allowances.  On March 5, 2008, TVA and Alabama entered into an agreed order in which TVA agreed to pay the state $100,000.  TVA is unable to estimate the amount of potential monetary sanctions from the EPA for which TVA may be liable in connection with the NOV.

Kingston NPDES Permit Appeal.  The Sierra Club has challenged the National Pollutant Discharge Elimination System (“NPDES”) permit issued by Tennessee for the scrubber-gypsum pond discharge at Kingston.  This is the second such challenge nationally.  In addition to its allegation that Tennessee violated the Clean Water Act by failing to set specific limits on certain toxic pollutants, the Sierra Club alleges that no discharges from the pond infrastructure should be allowed because zero-discharge scrubbers exist.  TDEC is the defendant in the challenge, which was heard by the Tennessee Water Quality Control Board in March 2010.  The other similar challenge involves a n Allegheny Power NPDES permit for its scrubber discharge at a Pennsylvania plant.

Employment Proceedings.  TVA is engaged in various administrative and legal proceedings arising from employment disputes.  These matters are governed by federal law and involve issues typical of those encountered in the ordinary course of business of a utility.  They may include allegations of discrimination or retaliation (including retaliation for raising nuclear safety or environmental concerns), wrongful termination, and failure to pay overtime under the Fair Labor Standards Act.  Adverse outcomes in these proceedings would not normally be material to TVA’s financial condition, results of operations, and cash flows, although it is possible that some outcomes could require TVA t o change how it handles certain personnel matters or operates its plants.

Case Involving Tennessee Valley Authority Retirement System Board Members.  On March 5, 2010, eight current and former participants in and beneficiaries of the Tennessee Valley Authority Retirement System (“TVARS”) filed suit in the United States District Court for the Middle District of Tennessee against the six current members of the TVARS Board of Directors (“TVARS Board”).  The lawsuit challenges the TVARS Board’s decision to (1) reduce the calculation for cost of living adjustment (“COLA”) benefits for calendar yearsCY 2010 through CY 2013, (2) reduce the interest crediting rate for the fixed fund accounts, (3) increase the eligibility age to receive COLAs to age 60, and (4) suspend the TVA contribution requireme ntsrequirements for fiscal years 20102 010 through 2013.  The plaintiffs allege that the amendments violated the TVARS Board members’ fiduciary duties to the plaintiffs (and the purported class) and the plaintiffs’ contractual rights, among other claims.  The plaintiffs seek damages, an order directing the TVARS Board to rescind the amendments, and other relief.  Five of the six individual defendants have filed motions to dismiss the lawsuit, while the remaining defendant filed an answer to the complaint.  Another group may file a similar lawsuit.


17.  SubsequentSubsequent Events

     Issuance of Debt

In April 2010, TVA sold a $39 million issue of electronotes® with an interest rate of 4.100 percent which mature in 2020 and are callable beginning in 2012.

Contract Extension

As discussed in Note 11, on AprilOn July 22, 2010, TVA entered into a new $1.0 billion revolving credit facility with five lenders that matures on May 11, 2011. This credit facility replaces TVA’s previous $1.0 billion credit facility maturing on August 10, 2010.  The credit facility also accommodates the issuance of letters of credit.  The interest rate on any borrowing under this facility is variable based on market factors and Seven States Power Corporation through its subsidiary, Seven States Southaven, LLC, amended the joint ownership agreement, lease agreement, and buy-back arrangementsrating of TVA’s senior unsecured long-term noncredit enhanced debt. TVA is required to extendpay an unused facility fee on the termportion of the interim agreements by approximately three years, until April 23, 2013.


$1.0 billion against which TVA has not borrowed or committed under letters of credit. This fee, along with letter of credit fees, may fluctuate depending on the rating of TVA’s senior unsecured long-term non-credit enha nced debt.  TVA anticipates renewing this credit facility or replacing it with a different credit facility as it matures.





ITEM 2.  MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

(Dollars in millions except where noted)

Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) explains the results of operations and general financial condition of TVA.  The MD&A should be read in conjunction with the accompanying financial statements and TVA’s Annual Report on Form 10-K for the fiscal year ended September 30, 2009 (the “Annual Report”).

EExecutive Summaryxecutive Overview

TVA saw somecontinued to see improvement in business conditions during the quarter ended March 31,June 30, 2010, while continuing to experienceface certain challenges.  Overall sales of electricity increased nearly tenover six percent for the secondthird quarter of 2010 compared to the secondthird quarter of 2009 primarily due to increased demand resulting from cooler weatherwarmer weather.  The improvement in 2010.  Economic weaknessthe economic conditions in the TVA service area also eased slightly, andresulted in sales to industrial customers showed an increase of nearlyincreasing over 12 percent, in spite of the loss of sales toeven though one of TVA’s larger directly served customers which reduced production in 2009.its purchases.  Despite the six percent increase in overall sales, revenues decreased 11increased less than one percent in the secondthird quarter of 2010 compared to the secondthird quarter of 2009, primarily due to lower fuel cost adjustment (“FCA”) revenues resulting from a decrease in the FCA rate decreasesin the third q uarter of 2010, which includes the liquidation of FCA amounts that were overcollected in prior periods, as compared to compensate for the over collectionsame period of the FCA during 2009.  The over collection resulted from market prices for fuel-related commodities being lower than forecasted.prior year.  Lower FCA revenue was mitigated in part by a base rate increase of nine percent that became effective on October 1, 2009.  The base rate increase has provided additional revenue of $484 million for the first nine months of 2010 and is expected to provide an estimated $800additional $300 million for the remaining three months of additional revenue for 2010.

The overcollection of the FCA during 2009 resulted from market prices for fuel-related commodities being lower than forecasted.  Starting with the October 1, 2009 billing period, the FCA formula changed from a quarterly to a monthly basis.  This change to a monthly FCA formula is expected to resulthas resulted in smaller reconciliations and faster liquidation of any balances.  At September 30, 2009, there was a balance that represented an over collectionovercollection through the FCA of $822 million, whereas at June 30, 2010, the FCA related to the current year, as computed under the new methodology, had been overcollected by only $15 million.

The current period FCA adjustments duringrate increased in each of June, July, and August of 2010 as compared to the six months ended March 31, 2010, haveprevious month.  These increases resulted in credits being given to customers.  The 5.3a 5.0 percent, FCA3.0 percent, and 1.5 percent increase for March 2010 reflects, in part, a decline in the credit for this overcollection.  Additional FCA rate increases for April 2010 (5.9 percent) and May 2010 (1.0 percent) are also reflective of this declining credit.overall wholesale rates, respectively.

 
Net income for the three months ended March 31,June 30, 2010, was $430$199 million as compared to $133a net loss of $167 million for the same period in the prior year.  The results for the secondthird quarter of 2009 included $150$258 million of expenses related to the ash spill at the Kingston Fossil Plant (“Kingston”) in December 2008, which was reclassified as a regulatory asset with the approval of the TVA Board of Directors (“TVA Board”) in August 2009.
 

Sales of electricity increased nearly threefour percent for the sixnine months ended March 31,June 30, 2010, compared to the sixnine months ended March 31,June 30, 2009, with comparable increases in sales to both municipalities and cooperatives and directly served industries.  Despite the increase in sales, revenues decreased 17nearly 12 percent in the first sixnine months of 2010 compared to the same period of 2009, primarily due to lower FCA revenue resulting from a decrease in the FCA rate, decreases to compensate forwhich includes the overcollectionliquidation of the FCA during 2009.amounts that were overcollected in prior periods.  Lower FCA revenue was mitigated in part by a base rate increase of nine percent that became effective on October 1, 2009.

Net income for the sixnine months ended March 31,June 30, 2010, was $580$779 million as compared to a net loss of $172$339 million for the same period in the prior year.  The loss in the sixnine months ended March 31,June 30, 2009, included $675$933 million of expenses related to the ash spill at Kingston, which was subsequently reclassified as a regulatory asset.asset in the fourth quarter of 2009.

DuringFinancial markets experienced significant volatility during the three and sixnine months ended March 31, 2010, TVA experienced some encouraging circumstances related to its business environment.  Financial market conditions continued to gradually improve during the first six months ofJune 30, 2010.  InvestmentsHowever, investments in TVA’s nuclear decommissioning trust (“NDT”), asset retirement trust (“ART”), and pension funds all experienced modest gains during this period and TVA’s NDT was fully funded at March 31, 2010.period. 


Above normal rainfall during the latter part of 2009 and first part of 2010 allowed TVA to increase lower-cost hydroelectric generation by 3236 percent, or 1,0973,300 gigawatt hours (“GWh”), in the second quarter of 2010 as compared to the second quarter of 2009 and 82 percent, or 4,608 GWh, in the first sixnine months of 2010 as compared to the first sixnine months of 2009.  The increased hydroelectric generation displaced generation by fossil fuel plants, which helped reduce fuel costs.

Other positive developments include TVA’s receipt of a favorable court ruling related to its alleged violation of the New Source Review regulations at its Bull Run Fossil Plant (“Bull Run”) and a revision to itsduring 2010 sales forecast to be nearly three percent higher than 2009 sales primarily due to the slight improvement of economic conditions and colder than normal weather.include:

•  TVA’s receipt of favorable court rulings related to (1) its alleged violation of the New Source Review regulations at its Bull Run Fossil Plant (“Bull Run”) and (2) the North Carolina public nuisance case;
38
•  Revision to its 2010 sales forecast to be nearly four percent higher than 2009 sales primarily due to the slight improvement of economic conditions and more favorable weather;

•  TVA’s completion of the removal of the time-critical ash from the Emory River during the third quarter of 2010; and
•  Completion of the installation of the Kingston scrubbers.


In spite of these improving conditions, TVA continues to face many challenges and expects to undertake initiatives to address thesealso faces challenges through the remainder of 2010 and for several years to come, including:

•  EvenThe economic recovery is still uncertain, even with the increased sales during the quarter ended March 31, 2010, the uncertainty of the economic recovery is still of concern to TVA.June 30, 2010.
•  The cleanup and recovery efforts related to the Kingston ash spill are ongoing.  TVA expects the Environmental Protection Agency (“EPA”) to make a decision during the third quarter of 2010 that will affect the amount of cleanup and recovery work that will be done.
•  The January 2009 order of the U.S. District Court for the Western District of North Carolina requiring TVA to install certain equipment to decrease emissions from four of its coal-fired power plants will be a challenge both in terms of timing and cost.
•  Like other utilities, TVA is capital intensive; therefore, obtaining theintensive and, like other utilities, must obtain large amounts of capital to maintain TVA’sits aging power system infrastructure while investingand invest in new power assets, will beyet at the same time TVA has a challenge especially in light of the $30 billion limit on the amount of TVA’sits outstanding bonds, notes, and other evidences of indebtedness (“Bonds”).
•  Laws may be passed or regulations may go into effect that will require electric utilities to reduce greenhouse gas (“GHG”) emissions, further reduce hazardous air pollutant emissions, obtain a specified portion of their power supply from renewable resources, and install caps and synthetic liners at existing and new coal combustion product (“CCP”) landfills.
•  As new environmental regulations are passed andThese new laws are considered,and regulations may also negatively affect the economics of every coal unit may be affected negatively.units.
•  Efforts to end the wet storage of fly ash, bottom ash, and gypsum at TVA’s coal-fired plants will involve significant investment.
•  Although financial markets forThe pension fund assets, continue to recover,as impacted by recent financial market volatility, experienced negative returns during the three months ended June 30, 2010, while experiencing positive returns for the nine months ended June 30, 2010.  The pension fund remains underfunded at March 31,June 30, 2010.
•  TVA has been discussing with its distributor customers moving from TVA’s current end-use rate structure to a new wholesale rate structure.
•  TVA may potentially remove from service some of its coal-fired power plants or units.
•  Due to the age and condition of some of its generation facilities, TVA may incur significant costs to operate and maintain these facilities.

Some of these items are discussed in more detail below.

As discussed in the Annual Report and elsewhere in this Quarterly Report, TVA’s capital budget for 2010 includes expenditures for construction of environmental controls, new generation sources, and CCP dry storage facilities.  TVA expects to meet its financial requirements in 2010 with power revenue and additional borrowing.

Challenges and Key Initiatives During 2010

Kingston Ash Spill

TVA continues cleanup and recovery efforts related to the Kingston ash spill.  Underspill in conjunction with federal and state agencies.  TVA completed the May 11, 2009 Administrative Order and Agreement on Consent (“Order and Agreement”) entered into by TVA and the EPA under the Comprehensive Environmental Response, Compensation, and Liability Act (“CERCLA”), TVA retains its status as a lead federal agency, but TVA's work is subject to review and approval by the EPA, in consultation with the Tennessee Department of Environment and Conservation (“TDEC”).  Under the Order and Agreement, response actions are classified into three categories: time-critical removal; non-time-critical removal; and remedial actions.  Generally, removal of thetime-critical ash from the Emory River is time-critical.  TVA estimates that this work will be completed du ringriver during the third quarter of 2010.  Removal of the remaining ash is considered to be non-time-critical.  TVA estimates that this work will be substantially completed in 2013.2014.  Once the removal actions are completed, TVA will be required to assess the site and determine whether any additional actions may be needed at Kingston or the surrounding impacted area.  This assessment and any additional activities found to be necessary are considered the remedial actions.

On March 5, 2010, the EPA issued a memorandum that concluded that TVA’s dredging operations should be conducted in a manner that seeks to maximize ash removal while simultaneously minimizing disturbance to native sediments in the river.  Accordingly, some residual ash will remain in the Emory River.

TVA has recorded an estimate in the amount of $933 million$1.1 billion for the cost of cleanup related to this event.  TheIn 2009, TVA originally charged a portion of this amount wasto expense as follows:  $525 million, $150 million, and $258 million during the three months ended December 31, 2008, March 31, 2009, and June 30, 2009, respectively.  However, the TVA Board reclassified all amounts previously expensed as a regulatory asset with the approval of the TVA Board during the fourth quarter of 2009 and will bethe amount is being charged to expense as it is collected in future rates over 15 years.  Inyears, beginning October 2009, TVA began collecting $16 million per quarter in rates for these costs.  As work continues1, 2009.  Any estimate changes will also be deferred and charged to progress and more information is available, TVA regularly reevaluates the estimate and may revise the estimated cost of the cleanup, which will impact the regulatory asset and the amountexpense prospectively as they are collected in rates in the future.future rates.



During the three months ended June 30, 2010, TVA increased the estimate for the cost of cleanup related to this event by $192 million.  The change in estimate is due to increased scope of work to be performed at the site as defined in the Engineering Evaluation Cost Analysis (“EE/CA”) work order plan which was prepared in accordance with the EPA’s Guidance on Conducting Non-Time-Critical Removal Actions under CERCLA.  In May 2010, the EPA approved TVA’s ash disposal plan, which clarified the amount of ash to be removed from the site and the final design and closure of ash ponds on site.  The plan involves moving less ash offsite than was originally assumed, which results in potential cost savings.  These potential savings are more than offset, however, by the costs of other elements of the plan, including the required expansion of the failed cell and the closure and capping of all cells on the plant site that hold wet ash.  The potential savings are also offset by costs of handling the ash under CERCLA requirements and recently assessed penalties and regulatory oversight costs.  TVA has also found that certain previously estimated cost categories, such as dredging, were more expensive than originally estimated due to more equipment and staffing being needed to ensure timely completion of removal of time critical ash from the river.  Final designs of holding cells and dikes are more robust than originally estimated as well.

As work continues to progress and more information is available, TVA will review its estimates and revise them as appropriate.  TVA currently estimates the recovery process will be substantially completed in 2014.  As such, TVA has not included the following categories of costs in the above estimate since it has determined that these costs are currently not probable, not reasonably estimable, or not appropriately accounted for as partaccrued a portion of the estimate accrual: fines or regulatory directives, outcomeestimated cost in current liabilities, with the remaining portion shown as a long-term liability on TVA’s Balance Sheets.  Costs incurred since the event through June 30, 2010, totaled $524 million, of lawsuits, future claims, long-term environmental impact costs, final long-term disposition of ash processing area, associated capital asset purchases, ash handlingwhich $108 million and disposition from current plant operations, costs of remediating any discovered mixed waste$293 million were incurred during the ash removal process,three and othernine months ended June 30, 2010, respectively.  The remaining estimated liability at June 30, 2010, was $601 million.

Because of the uncertainty at this time of the final costs not meetingto complete the recognition criteria.  As ash removal continues, it is possible that other environmentally sensitive material potentially in the river sediment beforework prescribed by the ash spill may be uncovered.  If other materials are identified, addi tional remediation not included indisposal plan, a range of reasonable estimates has been developed by cost category and either the above estimates may be required.known amounts, most likely scenarios, or low end of the range for each category has been accumulated and evaluated to determine the total estimate.  The range of estimated costs varies from approximately $1.1 billion to approximately $1.2 billion.  See Note 7.

TVA has contracted with laboratories to review various samples collected at the Kingston fly ash release site.  The low volume airborne particulate analyses performed by one of these laboratories were not consistent with a required EPA protocol.  As a result, these analyses performed by the laboratory from September 2009 to mid-January 2010 may be unreliable.  The EPA noted in a January 25, 2010 memorandum that “other data collected as part of the overall air monitoring strategy, however, indicate that public health was protected during the time period in question.”

Case Brought by North Carolina Alleging Public Nuisance

On January 30, 2006, North Carolina filed suit against TVA in the United States District Court for the Western District of North Carolina alleging that TVA’s operation of its coal-fired power plants in Tennessee, Alabama, and Kentucky constitutes a public nuisance.  On January 13, 2009, the court held that emissions from Bull Run, Kingston, and John Sevier Fossil Plant (“John Sevier”), all located in Tennessee, and Widows Creek Fossil Plant (“Widows Creek”), located in Alabama, constitute a public nuisance.  The court ordered that:

•  The flue gas scrubbers and selective catalytic reduction systems (“SCRs”) currently operating at Bull Run be properly maintained and operated year round.
•  The scrubbers under construction at Kingston be completed by December 31, 2010, and that Kingston’s scrubbers and SCRs be properly maintained and operated year-round.
•  Scrubbers and SCRs be installed and in operation for all four units at John Sevier by December 31, 2011.
•  TVA complete its plan to modernize the two existing scrubbers at Widows Creek, and install scrubbers and SCRs at Widows Creek Units 1-6 by December 31, 2013.
•  
The plants meet specified emission rates and annual tonnage caps for nitrogen oxides (“NOx”) and sulfur dioxide (“SO2”) after the applicable operation dates for the scrubbers.
•  TVA’s Chief Executive Officer make semi-annual reports to the court of TVA’s progress in complying with the order.

TVA had already made capital expenditure commitments to decrease emissions from some of the facilities, but the court ordered significant additional investments and in some instances compliance within a time frame that is shorter than TVA had planned.  Actions required by the court with respect to Kingston and Bull Run were already included in TVA’s clean air plans and installation of equipment is substantially complete.  The additional estimated costs of taking the actions required by the court at John Sevier and Widows Creek would be approximately $1.7 billion from 2010 to 2014.  Management is evaluating alternatives related to these plants that could change this estimate in the future.  Compliance with the court’s order could also have other cost implications, including impacts on fu el expense, variable operation and maintenance expense, and fixed operation and maintenance expense, and those costs are under evaluation.

Coal Combustion Product Facilities

TVA retained an independent third-party engineering firm to perform a multi-phased evaluation of the overall stability and safety of all existing embankments associated with TVA’s CCP facilities.  The first phase of the evaluation involved a detailed inspection of all CCP facilities, a detailed documentation review, and a determination of any immediate actions necessary to mitigate risks.  The second phase of the evaluation, which is ongoing, includes geotechnical explorations, stability analysis, studies, and risk mitigation steps such as performance monitoring, designing repairs, developing planning documents, obtaining permits, and implementing the lessons learned from the Kingston ash spill at TVA’s other CCP facilities.  As a part of this effort, an ongoing monitoring program with third-part y oversight is being implemented, and TVA employees are receiving additional training in dam safety and monitoring.

TVA is converting its wet fly ash, bottom ash, and gypsum facilities to dry collection facilities and remediating or eliminating the CCP facilities that were classified as “high” risk during the preliminary reassessment.  The classifications, such as "high" do not“high,” do not measure the structural integrity of the facility or the possibility of whether a failure could occur.  Rather, they are designed to identify where loss of life ofor significant economic or environmental damage could occur in the event of a failure.  The expected cost of the CPPCCP work is between $1.5 billion and $2.0 billion, and the work is expected to take between eight and 10 years.

Coal-Fired Generation

Future environmental regulations could result in significant increases in capital expenditures and operating costs, which, in turn, could lead to increased liquidity needs and financing requirements.  TVA currently has approximately 15,000 MW of coal-fired generation.  Approximately 6,800 MW of this capacity are from units that do not have scrubbers or, in some cases, other emission controls.  Current and future environmental laws and judicial actions may require TVA to install scrubbers and other emission controls to continue operating these units.  TVA is reviewing its options with respect to the units without emission control devices and these options include, among other things, installing scrubbers or other emission controls or removing the units from service, perhaps permanently.  Currently, the net book value of all the units without emission controls totals approximately $1 billion.  TVA may begin to make decisions about some of these units in the near future.



On July 14, 2010, Unit 5 at Widows Creek Fossil Plant was removed from service due to a suspected generator fault experienced during unit start-up.  It may prove uneconomical to fully repair the unit due to its age, its general material condition, and TVA’s expectations for power demand.  In this case, the unit could be considered for permanent removal from service during the early part of 2011.

Browns Ferry Nuclear Plant

On January 20, 2010, the Nuclear Regulatory Commission (“NRC”)NRC issued a fire protection inspection report for TVA’s Browns Ferry Nuclear Plant (“Browns Ferry”).  The report identified three apparent violations related to Browns Ferry’s fire protection program of greater than very low safety significance.  Two of the apparent violations primarily related to a failure to ensure that some cables associated with equipment required for safe shutdown, and for maintaining a safe shutdown condition, were adequately protected in the event of fire as specified in the NRC’s regulations.  The third apparent violation involved an inappropriate revision to Browns Ferry’s instructions relating to safe shutdowns after fire that could have delayed a proper response to a fire event.

The NRC determined that none of the apparent violations presented an immediate safety concern because TVA implemented compensatory measures to protect the plant in the event of a fire while longer-term corrective actions are being implemented.  TVA met with the NRC on February 22, 2010, to discuss TVA’s perspective on the facts and assumptions used by NRC to arrive at the findings, as well as their significance.  On April 19, 2010, the NRC issued its final determination regarding the apparent violations.  The NRC combined the first two violations and concluded that this finding should be characterized as having substantial safety significance requiring additional inspections by the NRC.  The second violation was determined to be of low to moderate significance and will also require additional NRC inspection.  By letter dated June 17, 2010, the NRC documented its acceptance of TVA's response to the violations.  TVA has put compensatory measures in place at Browns Ferry that willdesigned to maintain at a low level theof risk due to fire.  Browns Ferry is in the process of transitioning to the use of National Fire Protection Association Standard 805.  This is a multi-year effort that is estimated to cost $12 million to $15 million.
 
Seven States Power Corporation Obligation
 
Seven States Power Corporation (“Seven States”), through its subsidiary, Seven States Southaven, LLC (“SSSL”), exercised Seven States’s option to purchase an undivided 90 percent interest in a combined cycle combustion turbine facility in Southaven, Mississippi.  As part of interim joint-ownership arrangements, Seven States has the right at any time during the interim period, and for any reason, to require TVA to buy back the Seven States interest in the facility.  TVA would have bought back

The interim period under the Seven States interest if long-term operational and power sales arrangements for the facility among TVA, Seven States, and SSSL, or alternative arrangements, were not in place byoriginal agreements was to expire on April 30, 2010. TVA’s buy-back obligation would have terminated if such long-term arrangements were in place by that date.  In the event of a buy-back, TVA would re-acquire the Seven States interest in the facility and the related assets.

On April 22, 2010, TVA and Seven States, through its subsidiary, SSSL, amended the joint ownership agreement, lease agreement, and buy-back arrangements to extend the term of the interim arrangements by approximately three years, until April 23, 2013. The other material terms and conditions of the agreements were not changed and remain in full force and effect.  AsUnder the amended agreements, TVA will buy back the Seven States interest if long-term operational and power sales arrangements for the facility among TVA, Seven States, and SSSL, or alternative arrangements, are not in place by April 23, 2013. TVA’s buy-back obligation will terminate if such long-term arrangements are in place by that date. In the event of a result ofbuy-back, TVA will re-acquire the extension ofSeven States interest in the interim arrangements,facility and the leaseback obligation is presented on TVA’s Balance Sheets in accordance with the terms of the new agreement.related assets. As of March 31,June 30, 2010, the carrying amount of the obligation was approximately $416$413 million.

Organizational Effectiveness Initiative

Following the Kingston ash spill, the TVA Board directed management to develop a plan to improve TVA’s control systems, operating standards, and corporate culture.  TVA has embarked on an agency-wide organizational effectiveness initiative to transform TVA into a more effective and accountable operation.  Organizational design changes were made in the first sixnine months of 2010 and further changes are expected as implementation of the initiative continues.  Management expects that the initiative will result in a more effective operating structure for TVA in the future.
Resource Planning

            In September 2010, TVA plans to issue a draft of its Integrated Resource Plan (“IRP”) and associated Environmental Impact Statement (“EIS”) for public comment.  The final IRP and EIS are expected to be released in the spring of 2011.  The IRP will present multiple strategies and related generation portfolios considering a broad range of supply-and-demand-side resource options.  The EIS will analyze the impacts of each resource option and resource strategy on a programmatic level.  The IRP and EIS will help inform TVA and its Board in strategic planning activities.


Renewable and Clean Energy

In accordance with TVA’s 2008 Environmental Policy, TVA is working towardstoward obtaining additional power supply from clean or renewable sources by 2020.  TVA defines its clean energy portfolio as energy that has a zero or near-zero carbon dioxide (“CO2”) emission rate, including nuclear and renewables such as energy production that is sustainable and often naturally replenished.




In October 2009, TVA has entered into two 20-yearseven contracts for the purchase of up to 4501,380 megawatts (“MW”) of renewable wind energy fromenergy.  The wind farmsresources are located in North Dakota, South Dakota, Illinois, Kansas, and South Dakota.  PowerIowa.  TVA began receiving 300 MW of the wind energy in May 2010 and expects to receive an additional 115 MW beginning in the fall of 2010.  The remaining wind resources are under these contracts is scheduled to be deliveredconstruction with expected deliveries beginning in CY 2012.  In November 2009, TVA entered into two additional 20-year contracts for the purchase of renewable wind energy.  The two contractsThese deliveries are expected to provide a total of up to 350 MW from wind projects located in Illinois, both beginning in January 2012.  In December 2009, TVA entered into two more 20-year contracts for the purchase of renewable wind energy.  One of these contracts will provide up to 165 MW of wind energy from a wind project in Kansas, beginning as early as January 2012.  The other contract is for the delivery of up to 300 MW from Illinois, starting in mid-2010. Construction is scheduled or under way on all of these projects.  During February 2010, TVA entered a 20-year contract for up to an additional 115 MW of renewable wind energy from Iowa beginning in September 2010.  With the execution of these contracts, TVA now has up to an additional 1,380 MW of wind power under contract.  Power delivery is subject to applicable environmental requirements and firm transmission paths being secured.

Peak Power Reduction Program

On July 13, 2010, TVA executed an agreement with EnerNOC, Inc. ("EnerNOC"), a leading provider of clean and intelligent energy management applications and services, for a demand response program that will provide up to 560 MW of peak load reduction.  Under the program, TVA’s electricity requirements during periods of highest demand can be reduced by the equivalent capacity of up to three new gas-fired combustion turbine units.  The agreement with EnerNOC provides for payments from TVA to EnerNOC as the aggregator of the load of participating commercial and industrial facilities.

Wholesale Rate Changes

Over the last several months, TVA has been discussing with its distributors and directly-served customers movinga move from TVA’s current end-use rate structure to a new wholesale rate structure.structure, which includes seasonal and time-of-use rates.  TVA anticipates that the initial implementation of the rate change will begin in 2011.  The purpose of a transition to seasonal and time-of-use rate structures is to more closely align TVA’s revenue recovery with its costs that vary by season and time of day.  The new wholesale rates are designed to be revenue neutral to TVA, so this change in structure will not materially impact TVA’s annual revenue recovery.  There will, however, be some seasonal structural changes that may impact the timing of the revenue recovery between seasons.  The TVA BoardBo ard must approve the new rates before t heythey can take effect.

Pension Fund

On September 24, 2009, TVA contributed $1.0 billion to TVA’s pension plan for 2010 through 2013. As of September 30, 2009, TVA's pension plan had assets of $6.6 billion compared towith liabilities of $9.3 billion.  As of March 31, 2010, the plan’s assets had increased to $6.8 billion, helped by gains in the financial markets during 2010.  However, TVA's plan still remains underfunded at March 31, 2010, primarily due to the market losses sustained by the portfolio during the recent global economic recession of 2008 and 2009.recession.   TVA’s plan remained underfunded at June 30, 2010.   Assets in the plan at June 30, 2010 were approximately $6.3 billion.  The ability of the plan’s funded status to quickly improve will be limited because given the current maturity of the plan, there are almost twice as many retirees as current employee participants.  The plan currently has over 22,000 retirees receiving benefits in excess of approximately $650$500 million per year.  At this time, TVA does not have plans to make additional contributionscont ributions to the plan for 2010.

Pension benefits for eligible retired members or beneficiaries may be subject to cost-of-living adjustments (“COLAs”), capped at 5 percent annually, based on the change in the 12-month average of the Consumer Price Index, provided such change is greater than 1 percent.  However, the Tennessee Valley Authority Retirement System ("TVARS") Board of Directors recently amended the plan to make the following COLA changes:

•  For CY 2010, the COLA will be zero.
•  For CY 2011, the COLA will be capped at 3 percent.
•  For CY 2012, the COLA will be zero.
•  For CY 2013, the COLA will be capped at 2.5 percent.
•  The eligibility age for COLAs will increase to age 60 for employees who retire on or after January 1, 2010.

In addition, the TVARS Board of Directors reduced the rate for crediting interest on employee fixed-fund balances and future contributions to the plan to 6 percent effective January 1, 2010.  All of these amendments were made to reduce plan liabilities and help improve the funded status of the plan.


On March 5, 2010, eight current and former participants in and beneficiaries of TVARS filed suit in the United States District Court for the Middle District of Tennessee against the six current members of the TVARS Board of Directors alleging that the plan amendments described above and the suspension of TVA’s required contributions for 2010 through 2013 violated the TVARS Board members' fiduciary duties to the plaintiffs (and the purported class) and the plaintiffs' contractual rights, among other claims.  The plaintiffs seek damages, an order directing the TVARS Board of Directors to rescind the amendments, and other relief.  Another group may file a similar lawsuit.  See Note 16 — Case Involving Tennessee Valley Authority Retirement System Boar d Members.




Cyber Security

Cyber security and the protection of TVA operations and activities are a priority.  Because it is subject to several regulatory requirements specific to cyber security, TVA uses a defense-in-depth security model in an effort to prevent, detect, respond to, and recover from threats against its systems.  TVA modifiesplans to modify and upgradesupgrade its protections as technology advances and threat environments and business requirements change.  TVA currently plans to spend approximately $20 million to $40 million in cyber security updates between 2010 and 2013.

Liquidity and Capital Resources

Sources of Liquidity

TVA uses various sources of liquidity to meet short-term cash needs and contingencies.  TVA’s primary sources of liquidity are cash from operations and proceeds from the issuance of short-term and long-term debt.  TVA’s current liabilities exceed current assets because accounts payable significantly exceed accounts receivable and because TVA uses short-term debt to fund short-term cash needs and scheduled maturities of long-term debt.  The majority of TVA’s balance of cash on hand is typically invested in short-term investments.  The daily balance of cash and cash equivalents maintained is based on near-term expectations for cash expenditures and funding needs.

In addition to cash from operations and proceeds from the issuance of short-term and long-term debt, TVA’s sources of liquidity include a $150 million credit facility with the U.S. Treasury, two credit facilities totaling $2.0 billion, with a national bank, and occasional proceeds from other financing arrangements.  Management expects these sources to provide adequate liquidity to TVA for the foreseeable future.  However, the limit on the amount of Bonds TVA may have outstanding at any one time is $30 billion.  The level of the capital investments TVA anticipates that may be needed to meet strategic planning goals over the next decade is such that TVA expects that it will not be able to use debt to finance all of its costs.  Capital spending requirements could be met with a combination of fina ncing,financing, additional powerpow er sales, cost reductions, and rate increases, or in other ways.  Certain sources of liquidity are discussed below.

Issuance of Debt. TVA issues power bonds with maturities of one to 50 years, primarily to refinance previously-issued power bonds as they mature.  In the first sixnine months of 2010, TVA issued $116$179 million of electronotes®, including $12$39 million with an interest rate of 3.754.10 percent and $22$23 million with an interest rate of 4.304.25 percent during the quarter ended March 31,June 30, 2010.  In AprilMay 2010, TVA issued $39an additional $500 million of electronotes®2009 Series C power bonds with an interest rate of 4.100%.5.25 percent. See Not eNote 10 — Debt Securities Activity and Note 17 — Issuance of Debt for more information related to TVA’s debt activities.

Credit Facility Agreements.  Pursuant to the TVA Act, TVA and the U.S. Treasury have entered into a memorandum of understanding under which the U.S. Treasury provides TVA with a $150 million credit facility.  This credit facility matures on September 30, 2010, and is expected to be renewed.  Access to this credit facility or other similar financing arrangements has been available to TVA since the 1960s.  TVA plans to use the U.S. Treasury credit facility as a secondary source of liquidity.  The interest rate on any borrowing under this facility is based on the average rate on outstanding marketable obligations of the United States with maturities from date of issue of one year or less.  There were no outstanding borrowingsbo rrowings under the credit facility at March 31,June 30, 2010, and September 30, 2009.

TVA also has short-term funding available in the form of two short-term revolving credit facilities of $1.0 billion each.  These credit facilities will mature on May 12,November 8, 2010, and November 8, 2010.May 11, 2011.  The credit facilities also accommodate the issuance of letters of credit.  The interest rate on any borrowing and the fees on any letter of credit under these facilities areis variable based on market factors and the rating of TVA’s senior unsecured long-term non-credit enhanced debt.  TVA is required to pay an unused facility fee on the portion of the total $2.0 billion which TVA has not borrowed or committed under letters of credit.  TheThis fee, along with letter of credit fees, may fluctuate depending on the non-enhanced credit ratings onrating of TVA’s senior unsecured long-term non-credit enhanced debt.  At March 31,June 30, 2010, there were $29$133 million of letters of credit outstanding under the facilities, and there were no outstanding borrowings.  TVA anticipates renewing each credit facility or replacing it with a different credit facility as it matures.  See Note 10 — Short-Term Debt.


Call Monetization Transactions. From time to time TVA has entered into swaption transactions to monetize the value of call provisions on certain of its Bond issues.  A swaption grants a third party the right to enter into a swap agreement with TVA under which TVA receives a floating rate of interest and pays the third party a fixed rate of interest equal to the interest rate on the Bond issue whose call provision TVA monetized.  As a result of an inversion of the swap yield curve and volatility in global financial markets, coupled with a decrease in swap rates to historically low rates, beginning December 1, 2008, TVA was required to post collate ralco llateral with a counterparty under the terms of a swaption agreement ($1 billion notional).  Due to improving market conditions, theThe value of the swaption at March 31,June 30, 2010, was such that TVA'sTVA’s collateral obligation was less than $1$225 million and collateral postings were $29$133 million.  See Note 12 — Other Derivative InstrumentsCollateral for a discussion of collateral related to TVA’s derivative liabilities.


Summary Cash Flows. A summary of cash flow components for the sixnine months ended March 31,June 30, 2010, and 2009, follows:

Summary Cash Flows
For the Six Months Ended March 31
 
Summary Cash Flows
For the Nine Months Ended June 30
Summary Cash Flows
For the Nine Months Ended June 30
 
 2010  2009  2010  2009 
Cash provided by (used in):            
Operating activities $929  $1,990  $1,210  $2,414 
Investing activities  (1,244)  (1,433)  (1,773)  (1,637)
Financing activities  316   (559)  560   (789)
Net change in cash and cash equivalents $1  $(2) $(3) $(12)


Operating Activities.  Net cash flows from operating activities decreased $1.1 billion to $929 million from $2$1.2 billion for the sixnine months ended March 31, 2010, and 2009, respectively.June 30, 2010.  This decrease resulted primarily from a decrease in operating revenues primarily due to FCA rate decreases.  See Results of Operations.

Investing Activities.  Net cash flows used in investing activities decreased from $1.4 billion to $1.2 billionincreased $136 million for the sixnine months ended March 31, 2009,June 30, 2010.  The increase resulted primarily from an additional $205 million spent on major projects in process including new combined cycle and 2010, respectively.  Thecombustion turbine plants, as well as the new unit at Watts Bar Nuclear Plant (“Watts Bar”).  This increase was partially offset by a decrease primarily reflects the absence of collateral posted by TVA with a counterparty pursuant to the terms of a swap agreement during the first six months of 2010 compared to a $260$56 million use of cash from posting collateral funds with a counterparty during the same period of 2009.  The decrease also reflects a $67 million decrease in expenditures for the uranium enrichment and fabrication of nuclear fuel related to the normal year-to-year variability resulting from the timing of refueling outages at the nuclear plants.  These decreases were partially offset by a $146 million increase in capital investments.  Major projects in process this year included new combined cycle and combustion turbine plants as well as the new units at Watts Bar Nuclear Plant (“Watts Bar”).

Financing Activities.  Net cash flows provided by financing activities were $316$560 million during the nine months ended June 30, 2010, as compared to net cash flows used by financing activities of $789 million during the same period of the prior year.  The change was primarily due to net issuances of long-term debt of $644 million during the first sixnine months of 2010 as compared to net cash used by financing activitiesredemptions and repurchases of $559 million$1.9 billion during the same period ofin 2009.  The $875 million change was primarily due to a decrease of $2.5 billion in redemptions and repurchases of long-term debt partially offset by a decrease of $1.1 billion in net issuances of short-term debt and a decrease of $503 million in long-term debt issues.  The increasesincrease in debt reflectissuance reflects the need for cash to fund the payback of the FCA overcollection from the prior yearcapital expenditures and to fund capital investments.other investing activities that was not fully provided by operating activity cash flows.


 
44




Cash Requirements and Contractual Obligations

The estimated cash requirements and contractual obligations for TVA as of March 31,June 30, 2010, are detailed in the following table.

Commitments and Contingencies
Payments due in the year ending September 30
Commitments and Contingencies
Payments due in the year ending September 30
 
Commitments and Contingencies
Payments due in the year ending September 30
 
  20101  2011   2012   2013   2014  Thereafter  Total   20101  2011   2012   2013   2014  Thereafter  Total 
                                                    
Debt2
 $1,151  $1,008  $1,523  $2,308  $32  $17,202  $23,224  $834  $1,008  $1,523  $2,308  $32  $17,763  $23,468 
Interest payments relating to debt  751   1,265   1,237   1,093   1,007   18,207   23,560   244   1,294   1,266   1,122   1,036   18,883   23,845 
Lease obligations                                                        
Capital  53   92   43   383      3   574   14   92   43   384      3   536 
Non-cancelable operating  25   45   37   33   28   195   363   13   49   41   39   29   196   367 
Purchase obligations                                                        
Power  143   271   255   203   197   6,195   7,264   72   274   250   198   191   4,542   5,527 
Fuel  1,241   1,644   1,179   941   837   1,847   7,689   795   1,530   1,013   928   766   1,857   6,889 
Other  37   63   58   31   29   111   329   25   82   119   128   123   2,753   3,230 
Expenditures for emission control commitments3
  461   376   455   325   109      1,726      837   455   325   109      1,726 
Litigation settlement     3   3   3   3      12      3   3   3   3      12 
Environmental cleanup costs-Kingston ash spill  145   260   73   39         517 
Environmental cleanup costs- Kingston ash spill  78   220   124   97   82      601 
Payments on other financings  33   94   98   99   100   817   1,241   17   94   98   99   100   817   1,225 
Payments to U.S. Treasury                                                        
Return of Power Facility
Appropriation Investment
  20   20   20   20   10      90   20   20   20   20   10      90 
Return on Power Facility
Appropriation Investment
  9   21   22   21   19   253   345   9   21   22   20   19   253   344 
Total $4,069  $5,162  $5,003  $5,499  $2,371  $44,830  $66,934  $2,121  $5,524  $4,977  $5,671  $2,500  $47,067  $67,860 
Notes
(1) Period April 1 – September 30, 2010
(2) Does not include noncash items of foreign currency valuation gain of $18 million and net discount on sale of Bonds of $224 million.
(3) Expenditures for emission control commitments represent TVA’s current estimate of costs that may be incurred as a result of the court order in the case brought by North Carolina alleging public nuisance. Management is evaluating alternatives which could change these amounts in the future. See Note 16 — Case Brought by North Carolina Alleging Public Nuisance.
 
Notes
(1) Period July 1 – September 30, 2010
(2) Does not include noncash items of foreign currency valuation gain of $32 million and net discount on sale of Bonds of $197 million.
(3) Expenditures for emission control commitments represent TVA’s current estimate of costs that may be incurred as a result of the court order in the case brought by North Carolina alleging public nuisance. See Note 16 — Case Brought by North Carolina Alleging Public Nuisance.
Notes
(1) Period July 1 – September 30, 2010
(2) Does not include noncash items of foreign currency valuation gain of $32 million and net discount on sale of Bonds of $197 million.
(3) Expenditures for emission control commitments represent TVA’s current estimate of costs that may be incurred as a result of the court order in the case brought by North Carolina alleging public nuisance. See Note 16 — Case Brought by North Carolina Alleging Public Nuisance.
 

In addition to the cash requirements above, TVA has contractual obligations in the form of revenue discounts related to energy prepayments.


Energy Prepayment Obligations
Energy Prepayment Obligations
 
Energy Prepayment Obligations
 
  20101  2011   2012   2013   2014  Thereafter  Total   20101  2011   2012   2013   2014  Thereafter  Total 
Energy Prepayment Obligations $53  $105  $105  $102  $100  $410  $875  $26  $105  $105  $102  $100  $410  $848 
Note
(1) Period April 1 – September 30, 2010
 
Note
(1) Period July1 - September 30, 2010
Note
(1) Period July1 - September 30, 2010
 


 
45



Results of Operations

Sales of Electricity

The following table compares TVA’s electricity sales statistics for the three and sixnine months ended March 31,June 30, 2010, and 2009:

Sales of Electricity
(Millions of kWh)
Sales of Electricity
(Millions of kWh)
 
Sales of Electricity
(Millions of kWh)
 
 Three Months Ended March 31  Six Months Ended March 31  Three Months Ended June 30  Nine Months Ended June 30 
 2010  2009  Percent Change  2010  2009  Percent Change  2010  2009  Percent Change  2010  2009  Percent Change 
                                    
Sales of electricity                                    
Municipalities and cooperatives  36,632   33,407   9.7%  68,022   65,981   3.1%  33,004   31,465   4.9%  101,026   97,446   3.7%
Industries directly served  8,541   7,638   11.8%  17,025   16,585   2.7%  7,242   6,448   12.3%  24,267   23,033   5.4%
Federal agencies and other  478   481   (0.6%)  974   1,022   (4.7%)  505   485   4.1%  1,479   1,507   (1.9%)
                                                
Total sales of electricity  45,651   41,526   9.9%  86,021   83,588   2.9%  40,751   38,398   6.1%  126,772   121,986   3.9%
                                                
Heating degree days  2,206   1,776   24.2%  3,549   3,165   12.1%  119   230   (48.3%)  3,668   3,395   8.0%
Cooling degree days  1   11   (90.9%)  21   82   (74.4)%  847   666   27.2%  868   748   16.0%
Combined degree days  2,207   1,787   23.5%  3,570   3,247   9.9%  966   896   7.8%  4,536   4,143   9.5%


The 4.12.4 billion kilowatt-hour (“kWh”) increase in sales for the three months ended March 31,June 30, 2010, compared to the same period in 2009, was primarily due to a 3.21.5 billion kWh increase in sales to Municipalities and cooperatives as a result of colder weather.hotter weather, particularly during the months of May and June 2010.  The average temperatures for the Tennessee Valley were 3.84.9 degrees colderhotter than normal for the three months ended March 31,June 30, 2010, and 5.13.4 degrees colderhotter than the three months ended March 31,June 30, 2009.  Additionally, as a result of a cold wave during the first week of January 2010, TVA set a daily energy demand record on January 8, 2010, and a weekly energy demand record for the se ven-day period ended January 10, 2010.  Sales to Industries directly served also increased 903794 million kWh forf or the three months ended March 31,June 30, 2010, compared to the same period in 2009, as a result of improving economic conditions.

The 2.44.8 billion kWh increase in sales for the sixnine months ended March 31,June 30, 2010, was primarily due to a 2.03.6 billion kWh increase in sales to Municipalities and cooperatives primarily due to an increase in residential sales as a result of the colderfavorable weather experienced during the second quarterfirst nine months of 2010.   Additionally, sales to Industries directly served increased 440 million kWh.  The increased volume1.2 billion kWh as a result of improving economic conditions was partially offset byconditions.  Despite the loss ofincrease in sales to one of TVA’s largest direct served customers which reduced production in 2009 and has not yet r eturned to full production.  Although demand from Industries directly served and the commercial and industriali ndustrial customers of TVA’s distributors increased compared to the sixnine months ended March 31,June 30, 2009, sales to these customers are significantlywere lower than sales levels prior to the economic downturn.

Financial Results

The following table compares operating results for the three and sixnine months ended March 31,June 30, 2010, and 2009:
 
Summary Statements of OperationsSummary Statements of Operations Summary Statements of Operations 
            
 Three Months Ended March 31  Six Months Ended March 31  Three Months Ended June 30  Nine Months Ended June 30 
 2010  2009  2010  2009  2010  2009  2010  2009 
Operating revenues $2,622  $2,933  $4,971  $6,010  $2,587  $2,566  $7,558  $8,576 
Operating expenses  (1,875)  (2,503)  (3,753)  (5,545)  (2,073)  (2,425)  (5,826)  (7,970)
Operating income  747   430   1,218   465   514   141   1,732   606 
Other income, net  8   20   14   11   6   2   20   13 
Interest expense, net  (325)  (317)  (652)  (648)  (321)  (310)  (973)  (958)
Net (loss) income $430  $133  $580  $(172)
Net income (loss) $199  $(167) $779  $(339)


 
46




Operating Revenues.  Operating revenues for the three and sixnine months ended March 31,June 30, 2010, and 2009, consisted of the following:

Operating Revenues
Operating Revenues
 
Operating Revenues
 
 Three Months Ended March 31  Six Months Ended March 31  Three Months Ended June 30  Nine Months Ended June 30 
 2010  2009  Percent Change  2010  2009         Percent Change              2010              2009  Percent Change               2010              2009         Percent Change 
Sales of electricity                                    
Municipalities and cooperatives
 $2,218  $2,509   (11.6%) $4,163  $5,078   (18.0%) $2,204  $2,201   0.1% $6,367  $7,279   (12.5%)
Industries directly served
  347   362   (4.1%)  695   804   (13.6%)  324   306   5.9%  1,019   1,110   (8.2%)
Federal agencies and other
  25   32   (21.9%)  52   70   (25.7%)  31   31   0.0%  83   101   (17.8%)
Other revenue  32   30   6.7%  61   58   5.2%  28   28   0.0%  89   86   3.5%
                                                
Total $2,622  $2,933   (10.6%) $4,971  $6,010   (17.3%) $2,587  $2,566   0.8% $7,558  $8,576   (11.9%)

Operating revenues decreased $311increased $21 million, or 10.60.8 percent, and decreased $1.0 billion, or 17.311.9 percent, for the three and sixnine months ended March 31,June 30, 2010, respectively, compared to the same periodperiods in 2009 due to the following:


  Three Month Change  Nine Month Change 
       
FCA rate changes $(258) $(1,777)
Base rate changes  149   484 
Volume  130   272 
Other revenue  0   3 
Total $21  $(1,018)
         
  Three Month Change  Six Month Change 
       
FCA rate changes $(720) $(1,520)
Base rate changes  168   335 
Volume  239   143 
Other revenue  2   3 
Total $(311) $(1,039)
         


A quarterly FCA increase of 16.9 percent became effective onStarting with the October 1, 2008.  This FCA increase was followed by quarterly FCA reductions of 6.0 percent, 7.0 percent, and 4.1 percent, respectively, on January 1, 2009 April 1, 2009, and July 1, 2009, respectively.  In addition, in its August 20, 2009 meeting, the TVA Board approved a revision tobilling period, the FCA formula so that adjustments would be made onchanged from a quarterly to a monthly rather than quarterly basis.  From October 1, 2009, through March 31, 2010, theThis change to a monthly FCA adjustmentsformula has resulted in credits to customers assmaller reconciliations and faster liquidation of any balances.  At September 30, 2009, there was a resultFCA liability balance of the over collection$822 million that represented an overcollection of fuel and purchased power costs in 2009 when fuelthese costs were lower than TVA had forecasted.  The $822 million was liquidated over the nine-month period from October 1, 2009 through June 30, 2010.  The FCA rates for the three and nine month periods ended June 30, 2010, which included the liquidation of FCA amounts that were overcollected in prior periods, were lower than the FCA rates in the same periods of 2009.

Significant items contributing to the $311$21 million decreaseincrease in operating revenues for the three months ended March 31,June 30, 2010, compared to the same period in 2009 included:

A $291$3 million decreaseincrease in revenues from Municipalities and cooperatives primarily due to the FCA rate decreases, which reduced revenues by $646 million.  This decrease was partially offset by an increase in average base rates of 6.66.5 percent due to base rate increases effective October 1, 2009, which provided $152$134 million in revenues, and an increase in sales volume of 9.74.9 percent, which increased revenues an additional $203$97 million.  These increases were partially offset by FCA rate decreases which reduced revenues by $228 million.

A $15An $18 million decreaseincrease in revenues from Industries directly served primarily due to FCA rate decreases, which reduced revenues by $66 million.   This decrease was partially offset by an increase in average base rates of 3.94.4 percent, which provided $14$13 million in revenues, and an increase in sales volume of 11.812.3 percent, which increased revenues an additional $37$32 million.

A $7 million decrease in revenues from Federal agencies and other as a result of a $7 million decrease in revenues from federal agencies directly served primarily due to the  These increases were partially offset by FCA rate decreases, and decreased sales volume of 3.8 percent.which reduced revenues by $27 million

 
47




Significant items contributing to the $1.0 billion decrease in operating revenues for the sixnine months ended March 31,June 30, 2010, compared to the same period in 2009 included:

A $915$912 million decrease in revenues from Municipalities and cooperatives primarily due to the FCA rate decreases, which reduced revenues by $1.3$1.6 billion.  This decrease was partially offset by an increase in average base rates of 7.27.0 percent due to base rate increases effective October 1, 2009, which provided $305$439 million in revenues, and an increase in sales volume of 3.13.7 percent, which increased revenues an additional $127$223 million.

A $109$91 million decrease in revenues from Industries directly served primarily due to FCA rate decreases, which reduced revenues by $155$182 million.  This decrease was partially offset by an increase in average base rates of 4.04.1 percent, which provided $28$41 million in revenues, and an increase in sales volume of 2.75.4 percent, which increased revenues an additional $18$50 million.

An $18 million decrease in revenues from Federal agencies and other as a result of an $18 million decrease in revenues from federal agencies directly served primarily due to the FCA rate decreases and decreased sales volume of 3.81.2 percent.  This decrease was partially offset by an increase in average base rates of 5.2 percent.

Operating Expenses. Operating expenses for the three and sixnine months ended March 31,June 30, 2010, and 2009, consisted of the following:

Operating Expenses
Operating Expenses
 
Operating Expenses
 
 Three Months Ended March 31  Six Months Ended March 31  Three Months Ended June 30  Nine Months Ended June 30 
 2010  2009      Percent Change  2010  2009       Percent Change            2010            2009  Percent Change             2010             2009     Percent Change 
Fuel and purchased power $605  $1,232   (50.9%) $1,213  $2,615   (53.6%) $786  $1,043   (24.6%) $1,999  $3,658   (45.4%)
Operating and maintenance  756   586   29.0%  1,510   1,176   28.4%  757   599   26.4%  2,267   1,775   27.7%
Depreciation, amortization, and accretion  413   398   3.8%  824   794   3.8%  416   397   4.8%  1,240   1,191   4.1%
Tax equivalents  101   137   (26.3%)  206   285   (27.7%)  114   128   (10.9%)  320   413   (22.5%)
Environmental cleanup costs - Kingston ash spill
     150         675         258         933    
Total operating expenses
 $1,875  $2,503   (25.1%) $3,753  $5,545   (32.3%) $2,073  $2,425   (14.5%) $5,826  $7,970   (26.9%)

Operating expenses decreased $628$352 million for the three months ended March 31,June 30, 2010, and $1.8$2.1 billion for the sixnine months ended March 31,June 30, 2010, compared to the same periods in 2009.  A significant driver for the decreases in operating expenses is related to the Environmental cleanup cost – Kingston ash spill expenses of $150$258 million and $675$933 million recognized for the three and sixnine months ended March 31,June 30, 2009, respectively, not present in the three and six months ended March 31, 2010.  During the first three quarters of 2009, estimates of costs to clean up the site were recorded as expense.respectively.  During August 2009, the TVA Board approved the recovery of Kingston ash spill costs in future rates, and the amount previously expensed was reclassified as a regulatory asset to be amortized over a period of 15 years.years so that only the amortization (described below) appears in the three and nine-month periods of 2010.  See Note 7.  Other significant drivers for the changes in operating expenses are described below.

Other significant drivers contributing to the $628$352 million decrease in operating expenses for the three months ended March 31,June 30, 2010, compared to the same period in 2009 are described below:

Fuel and purchased power expense decreased $627$257 million due to:

A $713$262 million decrease in fuel and purchased power expense related to the FCA mechanism.  This decrease was primarily the result of amortization to expense of previously over-collected fuel and purchased power costs as part ofa decrease in theFCA rate, which included the FCA.  During the three months ended March 31, 2010, TVA refunded a portion of these fuel and purchased power costs through the FCA in the formliquidation of FCA rate decreases.amounts that were overcollected in prior periods.

48


A $67$35 million increase in fuel expense resulting from an increase in net thermal generation of 3.7 percent, which increased fuel expense by $40 million, and a 6.7 percent increase in the aggregate fuel cost per kilowatt-hour of net thermal generation, which resulted in an increase of $27 million in fuel expense.  The increase in net thermal generation was due to higher electricity sales and the higher fuel cost was primarily due to higher prices for coal and natural gas.
A $19 million increasedecrease in purchased power expense comprised primarily of a $102 million decrease in net realized losses related to natural gas derivatives for the three months ended June 30, 2010, compared to the same period in 2009.  This decrease was partially offset by an increase in purchased power volume of 31.515.4 percent for the three months ended March 31,June 30, 2010, compared to the same period in 2009, which increased purchased power expense by $72$35 million.  The average price of purchased power increased 3.011.9 percent for the quarter from the comparable quarter of 2009, which increased expense by $9$32 million.  While average prices were slightly higher this quarter, the rates were still economically favorable, which is why TVA decided to purchase more power during the quarter.  These increases werethird quarter of 2010 when compared to the same quarter during 2009.

48


A $40 million increase in fuel expense resulting from an increase in net thermal generation of 9.8 percent, which increased fuel expense by $44 million, partially offset by a $62 millionslight decrease in the aggregate fuel cost per kilowatt-hours of net realized losses relatedthermal generation, which decreased fuel expense by $4 million.  The increase in net thermal generation was primarily due to natural gas derivatives forhigher electricity sales during the three months ended March 31, 2010, compared to the same period in 2009.June 30, 2010.

Operating and maintenance expense increased $170$158 million primarily due topartially as a $56result of a $54 million increase in operating and maintenance expense at nuclear plants due in part to a change in TVA’s accounting for nuclear refueling outages.  Historically, nuclear refueling outage and maintenance costs were deferred and amortized on a straight-line basis over the estimated period until the next refueling outage.  Beginning in 2010, outage costs are no longer deferred as a regulatory asset and are expensed as incurred, although previously deferred outage costs continue to be amortized as the remaining amounts are collected in rates.  Pensionpension and postretirement benefit expense increased $54 million primarily d uedue to recent asset lossesmarket declines combined with a reduction in the assumed discount rate used to estimate the pension and postretirement liabilities.  Postemployment benefit costs increased $23 million primarily due to an increase in the accrual based on an actuarial study that indicates workers’ compensation claims are ultimately costing more than previous studies predicted, and other benefit costs increased $21 million.  TVA recognized $16 million in expense due to amortization of the Environmental cleanupcle anup costs - Kingston ash spill regulatory asset, and this expense was not present for the three months ended March 31,June 30, 2009.  Additionally, TVA experienced increased costs of $18$14 million to support energy efficiency and demand response initiatives, and a $17operating and maintenance expense increased $10 million at coal-fired and combustion turbine plants primarily due to an increase in benefit costs.forced maintenance outages during the third quarter of 2010.

Depreciation, amortization, and accretion expense increased $15$19 million primarily because of an increase in net plant additions.

Tax equivalents expense decreased $36$14 million.  This change primarily reflects a decrease in the accrued tax equivalent expense related to the FCA.  The accrued tax equivalent expense is equal to five percent of the FCA revenues and decreased for the three months ended March 31,June 30, 2010, since the FCA revenues for the secondthird quarter of 2010 were lower than the FCA revenues for the three months ended March 31,third quarter of June 30, 2009.

Other significant drivers contributing to the $1.8$2.1 billion decrease in operating expenses for the sixnine months ended March 31,June 30, 2010, compared to the same period in 2009 are described below:

Fuel and purchased power expense decreased $1.4$1.7 billion due to:

A $1.3$1.6 billion decrease in fuel and purchased power expense related to the FCA mechanism.  This decrease was primarily the result of amortization to expense of previously over-collected fuel and purchased power costs as part of the FCA.  During the six months ended March 31, 2010, TVA refunded a portion of these fuel and purchased power costs throughdecrease in the FCA inrate, which included the formliquidation of FCA rate decreases.amounts that were overcollected in prior periods.

A $76$36 million decrease in fuel expense resulting from a decrease in net thermal generation of 8.12.8 percent, which decreased fuel expense by $135$91 million.  The decrease in net thermal generation was primarily due to increased hydroelectric generation of 4,608 GWh,3.3 billion KWh, or 81.536.3 percent, and an increase in purchased power during the sixnine months ended March 31,June 30, 2010, due to economically favorable prices for purchased power.  This decrease was partially offset by a slight increase in the aggregate fuel cost per kilowatt-hour of net thermal generation, which resulted in an increase of $59$55 million in fuel expense.

A $60 million decrease in purchased power expense comprised primarily of a decrease in the average price of purchased power of 7.0 percent for the nine months ended June 30, 2010, compared to the same period in 2009, which reduced expense by $61 million.  In addition, net realized losses related to natural gas derivatives were $179 million lower for the nine months ended June 30, 2010, compared to the same period in 2009.  These decreases were partially offset by an increase in purchased power volume of 26.1 percent, which increased purchased power expense by $180 million.

Operating and maintenance expense increased $492 million for the nine months ended June 30, 2010.  The primary drivers for the increase were a $161 million increase in pension and postretirement benefit expense due to recent market declines and a reduction in the assumed discount rate and a $139 million increase in operating and maintenance expense at nuclear plants due in part to a change in TVA’s accounting for nuclear refueling outages.  Historically, nuclear refueling outages and maintenance costs were deferred and amortized on a straight-line basis over the estimated period until the next routine outage.  Beginning in 2010, however, outage costs have been expensed as incurred, although pr eviously-deferred outage costs continue to be amortized as the remaining amounts are collected in rates.  Additional items contributing to the increase in Operating and maintenance expense included an increase in benefit costs of $47 million, recognition of $47 million in expense due to amortization of the Environmental cleanup costs - Kingston ash spill regulatory asset, a $37 million increase in costs to support energy efficiency and demand response initiatives, a $28 million increase in postemployment benefit costs primarily due to the results of the actuarial study relating to workers’ compensation claims, and a $13 million increase in expense associated with on-going studies related to future uses of the Bellefonte Nuclear Plant site.

 
49



 
A $24 million decrease in purchased power expense comprised primarily of a decrease in the average price of purchased power of 16.3 percent for the six months ended March 31, 2010, compared to the same period in 2009, which reduced expense by $100 million.  In addition, net realized losses related to natural gas derivatives were $76 million lower for the six months ended March 31, 2010, compared to the same period in 2009.  These decreases were partially offset by an increase in purchased power volume of 33.1 percent, which increased purchased power expense by $152 million.

Operating and maintenance expense increased $334 million for the six months ended March 31, 2010.  The drivers for the increase in operating and maintenance expense for the six month period were primarily the same as the items identified above for the increase in the three months ended March 31, 2010.  Operating and maintenance expense increased $129 million at nuclear plants, pension and postretirement benefit expense increased $108 million,  TVA recognized $31 million in expense due to amortization of the Environmental cleanup costs - Kingston ash spill regulatory asset, costs to support energy efficiency and demand response initiative s increased $23 million, and benefit costs increased $30 million.  Additionally, for the six months ended March 31, 2010, operating and maintenance expense increased $9 million due to on-going studies related to future uses of the Bellefonte Nuclear Plant site.

Depreciation, amortization, and accretion expense increased $30$49 million primarily because of an increase in net plant additions.

Tax equivalents expense decreased $79$93 million.  This change primarily reflects a decrease in the accrued tax equivalent expense related to the FCA.  The accrued tax equivalent expense is equal to five percent of the FCA revenues and decreased for the sixnine months ended March 31,June 30, 2010, since the FCA revenues in the first two quartersnine months of 2010 were lower than the FCA revenues for the sixnine months ended March 31, 2009.

Other Income (Expense), Net.  The $12 million decrease in Other income (expense), net for the three months ended March 31, 2010, resulted primarily from a decrease in income on external business services compared to the three months ended March 31, 2009, and proceeds received from a claims settlement in the second quarter of 2009, not present in the same period in 2010.

The $3 million increase in Other income (expense), net for the six months ended March 31, 2010, resulted primarily from a slight gain on TVA’s supplemental executive retirement plan (“SERP”) assets and restricted investments related to the collateral held by TVA compared to a loss on these investments for the six months ended March 31,June 30, 2009.

Interest Expense.  Interest expense and interest rates for the three and sixnine months ended March 31,June 30, 2010, and 2009, consisted of the following:

Interest Expense
Interest Expense
 
Interest Expense
 
 Three Months Ended March 31  Six Months Ended March 31  Three Months Ended June 30  Nine Months Ended June 30 
 2010  2009             Perecent Change  2010  2009               Percent Change  2010  2009  Percent Change  2010  2009  Percent Change 
Interest on debt and leaseback obligations $337  $321   5.0% $673  $655   2.7% $338  $316   7.0% $1,011  $971   4.1%
Amortization of debt discount, issue, and
reacquisition costs, net
  5   5   0.0%  10   10   0.0%  5   5   0.0%  15   15   0.0%
Allowance for funds used during construction & nuclear fuel expenditures  (17)  (9)  88.9%  (31)  (17)  82.4%  (22)  (11)  100.0%  (53)  (28)  89.3%
Net interest expense $325  $317   2.5% $652  $648   0.6% $321  $310   3.5% $973  $958   1.6%
                                                
 (Percent)  (Percent)  (Percent)  (Percent) 
Interest rates (average)  2010   2009       Percent Change   2010   2009      Percent Change   2010   2009  Percent Change   2010   2009  Percent Change 
Long-term  5.95   6.04   (1.5%)  5.95   5.85   1.7%  5.92   5.99   (1.2%)  5.90   5.80   1.7%
Discount notes  0.05   0.11   (54.5%)  0.05   0.46   (89.1%)  0.12   0.12   0%  0.07   0.37   (81.1%)
Blended  5.68   5.56   2.2%  5.71   5.40   5.7%  5.67   5.62   0.9%  5.66   5.39   5.0%
                                                


50




Significant items contributing to the $8The $11 million increase in net interest expense for the three months ended March 31,June 30, 2010, was primarily due to an increase in interest on debt as a result of an increase in the average balance of long-term debt for the three months ended March 31,June 30, 2010, compared to the same period in 2009.  This increase was partially offset by the greater amounts of capitalized interest for the three months ended March 31,June 30, 2010, compared to the same period of 2009 due to an increase in the construction work in progress base used to calculate allowance for funds used during construction (“AFUDC”) as a result of ongoing construction activities at Watts Bar Unit 2.

The $4$15 million increase in net interest expense for the sixnine months ended March 31,June 30, 2010, was primarily attributable to the same items identified above for the three months ended March 31,June 30, 2010.

CriticalCritical Accounting Policies and Estimates

The preparation of financial statements requires TVA to estimate the effects of various matters that are inherently uncertain as of the date of the financial statements.  Although the financial statements are prepared in conformity with accounting principles generally accepted in the United States of America (“GAAP”), TVA is required to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities, and the amounts of revenues and expenses reported during the reporting period.  Each of these estimates varies in regard to the level of judgment involved and its potential impact on TVA’s financial results.  Estimates are deemed critical either when a different estimat e could have reasonably been used, or where changes in the estimate are reasonably likely to occur from period to period, and such use or change would materially impact TVA’s financial condition, results of operations, or cash flows.  TVA’s critical accounting policies are also discussed in Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations — Critical Accounting Policies and Estimates and Note 1 in the Annual Report.

50


Environmental Cleanup Costs - Kingston Ash Spill

Environmental clean-up costs related to the Kingston ash spill are based upon estimates of the incremental direct costs of the remediation effort, including costs of compensation and benefits for those employees who are expected to devote a significant amount of time directly to the remediation effort.  Such amounts are included in the estimate when it is probable that a liability has been incurred as of the financial statement date and the amount of loss can be reasonably estimated. When both of those recognition criteria are met and the estimated loss is a range, TVA accrues the amount that appears to be a better estimate than any other estimate within the range, or accrues the minimum amount in the range if no amount within the range is a better estimate than any other amount.  If the actual costs materially differ from the estimate, TVA’s results of operations, financial condition, and cash flows could be materially affected.

As of June 30, 2010, the costs included in the environmental cleanup estimate for Kingston included ash dredging and processing, ash disposition, infrastructure repair, dredge cell repair, root cause analysis, certain legal and settlement costs, environmental impact studies and remediation, human health assessments, community outreach and support, regulatory oversight, cenosphere recovery, skimmer wall installation, construction of temporary ash storage areas, dike reinforcement, project management, and certain other remediation costs associated with the clean up.  As of June 30, 2010, TVA estimates that these costs will range from $1.1 billion to $1.2 billion.  Based on the likelihood of multiple scenarios, TVA has accrued $1.1 billion of remediation costs.  TVA has deferred the cost estimate as a regulatory asset and is amortizing such costs into operating expenses over a 15-year period beginning in 2010 as such amounts are collected in rates.

The following categories could have a significant effect on estimates related to the Kingston ash spill remediation costs:

•  Final Closure Design – TVA is still in the process of designing the final closure of the failed dredge cell, other cells on-site, and the lateral expansion of the failed cell.  Until the final design is completed and contracts for the work are awarded, costs estimates are subject to change. 

•  
Excluded Costs – TVA has not included the following categories of costs because it has determined that these costs are currently either not probable or not reasonably estimable: penalties (other than the penalties set out in the TDEC order) or regulatory directives, natural resource damages, outcome of lawsuits, future claims, long-term environmental impact costs, final long-term disposition of ash processing area, costs associated with new laws and regulations, or costs of remediating any discovered mixed waste during the ash removal process.  See Note 7.

Changes in RatemakingRatemaking Impacting Accounting

Fuel Cost Adjustment

In August 2009,At June 30, 2010, the TVA Board approved a revisionFCA related to the FCA formula.current year, as computed under the new methodology, had been overcollected by $15 million.  Starting with the October 1, 2009 billing period, all adjustments to the FCA have been made on a monthly basis instead of a quarterly basis.  This allows the FCA rate to be more closely aligned with TVA’s costs.  The FCA formula also contains a deferred account which is used to reconcile the difference between actual and forecasted fuel and purchased power costs in the FCA.  The difference between the amounts is included in the deferred account and starting with the October 1, 2009 billing period, 50 percent of the account has been disbursed or collected on a monthly basis instead of a quarterly basis.  This change to a monthly FCA for mula will result in smaller reconciliations and faster liquidation of any balances in the account.  With the change to the monthly FCA formula on October 1, 2009, the remaining balance in the existing deferred liability account balance of approximately $822 million is being liquidated over a nine-month period from October 1, 2009 through June 30, 2010.  At March 31, 2010, $180 million remained to be liquidated.
 
New Accounting StandardsStandards and Interpretations

The following accounting standards and interpretations became effective for TVA during 2010.

Fair Value Measurements.  In September 2006, the Financial Accounting Standards Board (“FASB”) issued guidance for measuring assets and liabilities that currently require fair value measurement.  The guidance also responds to investors’ requests for expanded information about the extent to which companies measure assets and liabilities at fair value, the information used to measure fair value, and the effect of fair value measurements on earnings.  The guidance applies whenever other standards require (or permit) assets or liabilities to be measured at fair value but does not expand the use of fair value in any new circumstances.  The guidance establishes a fair value hierarchy that prioritizes the information used to develop measurement assumptions.  In February 2008, FASB issued guidance that delayed the effective date of the fair value accounting changes for nonfinancial assets and nonfinancial liabilities except for items that are recognized or disclosed at fair value in the financial statements on a recurring basis.  Effective October 1, 2009, TVA adopted these fair value accounting changes for its nonfinancial assets and nonfinancial liabilities.  The adoption of this guidance did not materially impact TVA’s financial condition, results of operations, or cash flows.

51


In August 2009, FASB issued guidance regarding fair value measurements of liabilities.  The guidance clarifies how the fair value of a liability should be measured when a quoted price in an active market for the identical liability either is or is not available.  Additionally, the guidance clarifies how to consider a restriction when estimating the fair value of a liability and the appropriate level within the fair value disclosure hierarchy in which the various measurement techniques result.  These changes became effective for TVA on October 1, 2009.  The adoption of this guidance did not materially impact TVA'sTVA’s financial condition, results of operations.operations, or cash flows.

51



In September 2009, FASB issued guidance regarding fair value measurements for certain alternative investments, such as interests in hedge funds, private equity funds, real estate funds, venture capital funds, offshore fund vehicles, and funds of funds.  The guidance allows reporting entities to use net asset value per share to estimate the fair value of these investments as a practical expedient.  The guidance also requires disclosures by major category of investment about the attributes of the investments, such as the nature of any restrictions on the investor's ability to redeem its investments at the measurement date, any unfunded commitments, and the investment strategies of the investees.  These changes became effective for TVA on October 1, 2009.  The adoption of this guidance did not materia lly impact TVA’s financial condition, results of operations, or cash flows.

Business Combinations.  In December 2007, FASB issued guidance that changes the accounting for business combinations.  The guidance establishes principles and requirements for determining how an enterprise recognizes and measures the fair value of certain assets and liabilities acquired in a business combination, including non-controlling interests, contingent consideration, and certain acquired contingencies.  The guidance also requires acquisition-related transaction expenses and restructuring costs to be expensed as incurred rather than capitalized as a component of the business combination.  In April 2009, FASB issued additional guidance to amend and clarify the initial recognition and measurement, subsequent measurement and accounting, and related disclosures arising from contingencies in a business combination. This guidanceThese changes became effective for TVA on October 1, 2009.  The adoption of this guidance did not materially impact TVA’s financial condition, results of operations, or cash flows but will impact the accounting for any future business acquisitions.

Noncontrolling Interests.  In December 2007, FASB issued guidance that introduces significant changes in the accounting for noncontrolling interests (formerly minority interests) in a partially owned consolidated subsidiary.  The guidance also changes the accounting for and reporting for the deconsolidation of a subsidiary.  The guidance requires that a noncontrolling interest in a consolidated subsidiary be displayed in the consolidated statement of financial position as a separate component of equity.  The guidance also requires that earnings attributed to  the noncontrolling interests be reported as par tpart of consolidated earnings, and requires disclosure of the attribution of consolidatedcon solidated earnings to the controlling and noncontrolling interests on the face of the consolidated income statement.  These changes became effective for TVA on October 1, 2009.  The adoption of this guidance did not materially impact TVA’s financial condition, results of operations, or cash flows but will impact the accounting for any future noncontrolling interests.

The following accounting standards have been issued, but as of March 31,June 30, 2010, were not effective and had not been adopted by TVA.

Transfers of Financial Assets.  In June 2009, FASB issued guidance regarding accounting for transfers of financial assets.  This guidance eliminates the concept of a qualifying special-purpose entity (“QSPE”) and subjects those entities to the same consolidation guidance as other variable interest entities (“VIEs”).  The guidance changes the eligibility criteria for certain transactions to qualify for sale accounting and the accounting for certain transfers.  The guidance also establishes broad disclosure objectives and requires extensive specific disclosures related to the transfers.  These changes will become effective for TVA for any transfers of fina ncial assets occurring on or after October 1, 2010.  TVA does not believe adoption of this guidance will materially affect its financial condition, results of operations, or cash flows.

Variable Interest Entities.  In June 2009, FASB issued guidance that changes the consolidation guidance for VIEs.  The guidance eliminates the consolidation scope exception for QSPEs.  The statement amends the triggering events to determine if an entity is a VIE, establishes a primarily qualitative model for determining the primary beneficiary of the VIE, and requires on-going assessments of whether the reporting entity is the primary beneficiary.  These changes will become effective for TVA on October 1, 2010, and will apply to all entities determined to be VIEs as of and subsequent to the date of adoption.  TVA does not believe adoption of this guidance will materially affect its financial condition, results of operations, or cash flows.

52


Corporate GovernanceGovernance

After serving as chairman of the TVA Board for a year, on April 16, 2010, Robert M. “Mike” Duncan asked the TVA Board to select a new chairman, citing his new duties as leader of a recently formed organization called American Crossroads.  The Board voted unanimously to name Director Dennis Bottorff of Nashville, Tennessee, as TVA'sTVA’s new chairman.  Mr. Bottorff will assumeassumed the position of chairman of the TVA Board on May 18, 2010, upon the end of Mr. Duncan's service as chairman.2010.  Mr. Duncan planscontinues to remainserve on the TVA Board.



The TVA Board after his serviceapproved a revised Board committee structure and committee appointments at its June 10, 2010, meeting.  The revised Board committees and their members are as chairman ends.follows:

Audit, Risk, and Regulation Committee
Thomas Gilliland (Chair)
Robert Duncan
Dennis Bottorff
Finance, Rates, and Portfolio Committee
Howard Thrailkill (Chair)
Thomas Gilliland
Dennis Bottorff
Customer and External Relations Committee
Robert Duncan (Chair)
William Graves
Dennis Bottorff
People and Performance Committee
William Graves (Chair)
Howard Thrailkill
Dennis Bottorff

Among other responsibilities, the Audit, Risk, and Regulation Committee acts as TVA’s audit committee, evaluates TVA’s risk identification and mitigation process, and reviews and monitors TVA’s policies with regard to resale rates of and use of power revenues by the distributors of TVA power.

Among other responsibilities, the Finance, Rates, and Portfolio Committee oversees the financial health of TVA, recommends to the TVA Board the electricity rates to be charged by TVA, and reviews TVA’s portfolio of generation assets.

Among other responsibilities, the Customer and External Relations Committee reviews the relationships with TVA’s various stakeholders, evaluates TVA’s environmental policies, goals, and strategies, reviews policies pertaining to land stewardship, reviews TVA’s renewable energy program, and monitors TVA’s economic development policies and strategies.

Among other responsibilities, the People and Performance Committee oversees TVA’s performance targets, TVA’s health and safety policies, and TVA’s nuclear safety performance; reviews and recommends performance goals for TVA executives; ensures adequate CEO succession planning; and makes recommendations to the TVA Board regarding compensation.

The Board decided not to use a committee to vet matters associated with strategic planning and governance but to consider these matters at the Board level.

At its June 10, 2010 meeting, the TVA Board also amended the TVA Bylaws to address the time required to appoint a successor Chairman, the committee appointment process, the retention and dismissal of outside advisors, and the process for amendment of the Bylaws.

 
5253




Legislative and Regulatory Matters

Recently Enacted Legislation

Two inter-related major health care reform bills have recently been enacted into law.  The first, the Patient Protection and Affordable Care Act (H.R. 3590 -- Public Law No. 111-148), was enacted on March 23, 2010, and was followed by the enactment on March 30, 2010, of the Health Care and Education Reconciliation Act of 2010 (H.R. 4872 – Public Law No. 111-152), which amended the earlier act.  The new laws are complex, and TVA is in the process of analyzing them in terms of potential effects.  TVA’s final analysis as to potential impacts will not be completed until future rulemakings are undertaken and finalized by the various federal agencies which have been given regulatory responsibilities under the new laws.

The President signed the Dodd-Frank Wall Street Reform and Consumer Protection Act on July 21, 2010.  The act instructs regulatory agencies to determine many of the specific requirements related to the broad areas of reform.  The legislation will make changes in many financial sectors, including how certain types of derivatives are structured, traded, and used.  Depending upon how the so-called “end user exemption” and other provisions are ultimately interpreted and implemented by regulators, this legislation could impact the ability of TVA (as well as other electric suppliers and other “end users”) to use certain derivatives to hedge various risks and might increase the costs of doing so.  See Note 12 for a discussion of TVA’s use of derivatives to hedge various risks .

Proposed Legislation and Regulation

On February 2, 2010, the Senate Environment and Public Works Committee reported S.1733, the Clean Energy Jobs and American Power Act, out of the Committee.  This bill, which addresses GHG and climate change issues, is expected to be further revised before being considered by the Senate as a whole.

Congress is currently considering S. 3217 (the “Restoring American Financial Stability Act of 2010”), legislation which would increase regulatory oversight of financial markets in various respects, including providing for new regulations and restrictions on the use of over-the-counter derivatives.  S. 3217 was reported from the Senate Banking, Housing, and Urban Affairs Committee on April 15, 2010.  However, the Senate Agriculture, Nutrition, and Forestry Committee has developed its own legislation with somewhat different provisions regarding the regulation of over-the-counter derivatives.  Efforts are underway in the Senate to resolve varying perspectives on this legislation, and should the Senate approve this legislation, it will then go to the House of Representatives for additional considerat ion and possibly further changes.  TVA uses derivatives to hedge various risks.  Accordingly, if this proposed legislation becomes law, it could impact TVA’s ability to use derivatives to hedge various risks and increase the costs of doing so.

For a discussion of additional legislation and regulation, see Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations — Legislative and Regulatory Matters in the Annual Report.

TVA cannot accurately predict whether the initiatives discussed above and in the Annual Report will become law in the future and, if so, in what form and what their impact would be on TVA.  Moreover, given the nature of the legislative process, it is possible that new legislation or a change to existing legislation that has a significant impact on TVA’s activities could become law with little or no advance notice.  As a federal entity, TVA’s ownership structure or mission could be changed by legislation.  For a discussion of the potential impact of legislation and regulation on TVA, see Item 1A, Risk Factors in the Annual Report.

EnvEnvironmentalironmental Matters

TVA’s power generation activities, like those across the utility industry and in other industrial sectors, are subject to most federal, state, and local environmental laws and regulations.  Major areas of regulation affecting TVA’s activities include air quality control, water quality control, management and disposal of solid and hazardous wastes, and climate change.

Air Quality Control Developments

Nitrogen Oxides.  Utility NOx emissions continue to be regulated under state programs to achieve and maintain the EPA’s National Ambient Air Quality Standard (“NAAQS”) for ozone and fine particles, the Federal Acid Rain Program, and the regional haze program.  On January 22, 2010, the EPA signed a new NAAQS for nitrogen dioxide (“NO2”).  The EPA set the new one-hour NO2 standard at the level of 100 parts per billion (“ppb”).  Th is level defines the maximum allowable concentration anywhere in an area.  To determine compliance with the new standard, the EPA is establishing new ambient air monitoring requirements near major roads as well as in other locations where maximum concentrations are expected.  Although existing air quality monitors do not currently show exceedances of this new standard in the TVA region, new non-attainment areas are expected with the additional community and roadside monitoring.  The EPA intends to re-designate areas in CY 2016 or CY 2017, as appropriate, based on the air quality data from the new monitoring network.  Designation of new nonattainment areas within the TVA region could impact TVA'sTVA’s permitting of new or modified emissions sources in the future.

 
5354



 
TVA contributes to ambient ozone levels primarily as a result of NOx emissions from fossil fuel power plants. As a result of its emission reduction program, TVA’s summertime NOx emissions have declined substantially.  Since 1995, TVA has reduced its annual NOx emissions by 89 percent by installing various controls, including low-NOx burners and/or combustion controls on 58 of its 59 coal-fired units and installing SCRs on 21 of the largest units.

In 2005, TVA installed selective non-catalytic reduction (“SNCR”) systems, which generally have lower NOx removal capabilities than SCRs, on two units, Unit 1 at the Johnsonville Fossil Plant (“Johnsonville”) and Unit 1 at the Shawnee Fossil Plant (“Shawnee”), to demonstrate long-term technology capability, and continues to operate the SNCR at Johnsonville Unit 1 in west Tennessee.  Due to operational issues, the Shawnee SNCR was removed from service in August 2008.  TVA also is operating High Energy Reagent Technology (“HERT”) systems on the four units at John Sevier, and on Units 2, 3 and 4 at Johnsonville. HERT is similar to SNCR technology but has higher removal capabilities.  TVA is evaluating plans to install SCRs at John Sevier by 2015.

Fine Particulates.  On October 8, 2009, the EPA made final designations of areas throughout the U.S. as "non-attainment" and “unclassifiable/attainment" for the 24-hour NAAQS for fine particulates with a size of up to 2.5 micrometers (“PM2.5”).  One hundred twenty counties or parts of counties were designated as non-attainment based on the recommendations provided by states and tribes, as well as additional supporting information provided by states, tribes, and the public.  In the Tennessee Valley region, Anderson, Blount, Knox, and Loudon Counties in Tennessee, and a portion of Roane County, also in Tennessee, were designated as non-attainment.  60;TVA operates coal-fired power plants in Anderson and Roane Counties.  State and local governments will be required to take steps to control fine particulate pollution in these non-attainment areas.  Those steps may include stricter controls on industrial facilities, including TVA’s power plants, and additional planning requirements for transportation-related sources.  States must submit their plans to the EPA within three years after the EPA makes final designations.  Areas are required to attain the standard no later than five years after the effective date of the designations.  The EPA may grant attainment date extensions for up to five additional years in areas with more severe PM2.5 problems as well as in areas where emissions control measures are not available or feasible.

Sulfur Dioxide.  Utility SO2 emissions are currently regulated under the Federal Acid Rain Program and state programs designed to meet NAAQS for SO2 and PM2.5. Looking forward, these programs, as well as implementation of the regional haze program, will result in additional regulation of SO2 emissions.  The regional haze program establishes timelines for states to improve visibility in national parks and wilderness a reas throughout the United States.  The regional haze program will require certain types of older sources of SO2 emissions to install best available retrofit technology to control NOx, SO2, and particulate matter emissions.  Through CY 2009, TVA had reduced its SO2 emissions by 91 percent from the peak 1977 level by switching to lower-sulfur coals, continuing to operate an Atmospheric Fluidized Bed Combustion unit at Shawnee, and operating scrubbers on seven larger units.

On June 2, 2010, EPA announced that it was setting a new one-hour SO2 health standard at 75 ppb, and revoking the current 24 hour and annual SO2 health standards (annual 0.03 ppm and 24 hour 0.14 ppm).  EPA expects to “designate” areas as attainment, non-attainment, or unclassifiable by January 2012 based on the existing monitoring network and modeling.  Non-attainment designations are expected to result in lower SO2 emission limits for units in or near those areas.  Several areas in the TVA region are expected to be designated non-attainment.

TVA has completed the constructioninstallation of the two flue gas scrubberscertain clean air controls at Kingston.  TVA expects to start testing the scrubbers in May 2010.  Operating scrubbers at Kingston is one of the actions required by the court in its decision in the lawsuit brought by the State of North Carolina against TVA.  See Note 16 — Case Brought by North Carolina Alleging Public Nuisance.

EPA Transport Rule.  On July 6, 2010, EPA issued a proposed Transport Rule (CAIR Replacement Rule) to limit emissions from electric generating plants in 32 states in the eastern United States that affect the ability of downwind states to attain and maintain compliance with the 1997 and 2006 fine particulate matter (PM2.5) NAAQS and the 1997 ozone NAAQS. The Transport Rule identifies a preferred approach (remedy) with four distinct cap-and-trade programs: two for annual SO2, one for annual NOx, and one for ozone season NOx, with state caps and limited interstate trading.  Potential impacts to TVA are currently being evaluated. EPA expects to issue a final rule in Spring 2011.

Greenhouse Gases.  On December 15, 2009, the EPA published two final findings regarding GHGs under section 202(a) of the Clean Air Act (“CAA”): (1) an endangerment finding that current and projected atmospheric concentrations of six key GHGs — carbon dioxide, methane, nitrousnitrogen oxide, hydrofluorocarbons, perfluorocarbons, and sulfur hexafluoride — threaten the public health and welfare of current and future generations, and (2) a cause or contribute finding that the combined emissions of these GHGs from new motor vehicles and new motor vehicle engines contribute to the GHG pollution which threatens public health and welfare.  These findings do not themselves impose any requirements on industry or other entities, including TVA.  However, related EPA actions are expected to trigger other sections of the CAA, and these other actions are expected to result in GHG emission requirements affecting industry, including TVA.

On October 27, 2009, the EPA published a proposed rule requiring large industrial facilities that emit at least 25,000 tons of GHGs per year to obtain construction and operating permits covering these emissions.  Once finalized, this rule would be expected to require newly constructed or modified industrial facilities, including power plants, to demonstrate the use of best available control technologies and energy efficiency measures to minimize GHG emissions.  The potential costs of this rulemaking to TVA are not known at this time.

 
5455


On May 7, 2010, EPA and the National Highway Traffic Safety Administration finalized standards for light-duty motor vehicles to reduce GHG emissions and improve fuel economy.  This action was expected and is a critical step leading to the regulation of GHG under the CAA beginning in 2011.


On June 3, 2010, EPA Administrator, Lisa P. Jackson, issued a letter on February 22, 2010, outlining several decisions she will make through upcoming implementation ofthe final "tailoring" rule addressing which stationary sources and modification projects become subject to permitting requirements for GHG emissions under the Prevention of Significant Deterioration (“PSD”) regulationsand Title V programs of the Clean Air Act.  Beginning on January 2, 2011, PSD or Title V requirements will apply to sources’ GHG emissions only if the sources are subject to PSD or Title V anyway due to their non-GHG pollutants. Therefore, EPA will not require sources or modifications to evaluate whether they are subject to PSD or Title V requirements solely on account of their GHG emissions.  Beginning on July 1, 2011, EPA will phase in additional large sources of GHG emissions so that new sources as well as existing sources not already subject to Title V that emit, or have the potential to emit, at least 100,000 tons per year CO2 equivalent (“tpy CO2e”) will become subject to the PSD and Title V requirements. In addition, sources that emit or have the potential to emit at least 100,000 tpy CO2e and that undertake a modification that increases net emissions of GHGs by at least 75,000 tpy CO2e will also be subject to PSD requirements. This action will require TVA to account for GHGs.  She indicated that:

•  No facility will be required to address GHG emissions in CAA permitting of new construction or modifications before CY 2011;
•  The EPA will phase-in permit requirements and regulation of GHGs for large stationary sources beginning in CY 2011;
•  
In the first half of CY 2011, only those facilities that already must apply for CAA permits as a result of their non-GHG emissions (e.g. NOxGHG emissions according to this schedule., SO2, or PM) will need to address their GHG emissions in their permit applications;
•  The EPA is considering raising its proposed 25,000 ton GHG threshold substantially for stipulating emission levels that trigger PSD permitting; and
•  The EPA does not intend to subject smaller facilities to CAA permitting for GHG emissions any sooner that CY 2016.

The potential costs of this rulemaking to TVA are not known at this time.

Climate Change

In December 2009, President Obama attended the 15th Conference of the Parties to the United Nations Framework Convention on Climate Change.  At this conference in Copenhagen, the President pledged that the United States will reduce its emissions of GHG “in the range of” 17 percent below CY 2005 levels by CY 2020.  This reduction is in line with a climate bill that passed the U.S. House of Representatives in June 2009.  The impact on TVA of this stated reduction goal is not known at this time.

Executive Order 13514, signed by President Obama on October 5, 2009, requires that the federal agency Strategic Sustainability Performance Plans and Greenhouse Gas Target be submitted to the Council on Environmental Quality and the Office of Management and Budget byannually.  TVA submitted its report on June 2, 2010, and annually thereafter.  TVA plans to submit its report in June 2010.

Water Quality Control Developments

As reported above, TVA completed construction and began testing of a flue gas scrubber at Kingston.  In preparation for the scrubber startup, TVA applied for and was granted a Clean Water Act permit by TDEC on October 16, 2009, to discharge wastewaters from the scrubber into the Clinch River.  On November 12, 2009, several environmental groups jointly appealed the Kingston permit to the Tennessee Water Quality Control Board.  The outcome and potential impacts of this appeal are uncertain at this time.  See Note 16 — Kingston NPDES Permit Appeal.

Coal-Combustion Products

The EPA has announced that it plans to propose new regulations for the management of coal combustion products,CCP, and the regulations are expected to be finalized in late CY 2010.  To meet anticipated, more stringent regulations requiring the installation of caps and liners at existing and new CCP landfills and to convert its CCP handling systems from wet to dry systems, TVA currently estimates that the expected cost of the CCP work will be between $1.5 billion and $2.0 billion, and the work is expected to take between eight and 10 years.

 
5556




Estimated Required Environmental Expenditures

The following table contains information about TVA’s current estimates on projects related to environmental laws and regulations.  This table excludes items already recognized on the Balance Sheets at March 31,June 30, 2010.

TVA Air, Water, and Waste Quality Estimated Potential Environmental Expenditures
As of March 31, 2010
 
TVA Air, Water, and Waste Quality Estimated Potential Environmental Expenditures
As of June 30, 2010
TVA Air, Water, and Waste Quality Estimated Potential Environmental Expenditures
As of June 30, 2010
 
 Estimated Timetable  Total Estimated Expenditures  Estimated Timetable  Total Estimated Expenditures 
            
North Carolina lawsuit1
  2010-2014  $1,726   2010-2014  $1,726 
Site environmental remediation costs2
  2010+  20   2010+  20 
CCP conversion and remediation3
  2010-2020   1,500   2010-2020   1,451 
Proposed clean air projects4
  2011-2018   4,948   2011-2018   4,948 
Clean Water Act requirements5
  2015-2020  TBD*   2015-2020  TBD* 
                
Notes
(1) As a result of the North Carolina lawsuit seeking caps on emissions of certain pollutants from TVA’s coal-fired plants, TVA has estimated the total costs of taking all actions required by the court. TVA is currently determining how to comply with the court’s final ruling. See Note 16 - Case Brought by North Carolina Alleging Public Nuisance.
(2) Estimated liability for cleanup and similar environmental work for those sites for which sufficient information is available to develop a cost estimate.
(3) Includes closure of impoundments, construction of lined landfills, and construction of dewatering systems.
(4) Includes air quality projects that TVA is currently planning to undertake to comply with existing and proposed air quality regulations, but does not include any projects that may be required to comply with potential greenhouse gas regulations.
(5) Compliance plans to meet the requirements of a revised or new implementing rule under Section 316(b) of the Clean Water Act and the EPA’s decision to revise the steam electric effluent guidelines will be determined upon finalization of the rules.
* TBD – to be determined as regulations become final
 
Notes
(1) As a result of the North Carolina lawsuit seeking caps on emissions of certain pollutants from TVA’s coal-fired plants, TVA has estimated the total costs of taking all actions required by the court. Although the Fourth Circuit recently reversed the district court’s decision, the possibility of appeal adds to the uncertainty of estimating these expenditures. See Note 16 - Case Brought by North Carolina Alleging Public Nuisance.
(2) Estimated liability for cleanup and similar environmental work for those sites for which sufficient information is available to develop a cost estimate.
(3) Includes closure of impoundments, construction of lined landfills, and construction of dewatering systems.
(4) Includes air quality projects that TVA is currently planning to undertake to comply with existing and proposed air quality regulations, but does not include any projects that may be required to comply with potential greenhouse gas regulations.
(5) Compliance plans to meet the requirements of a revised or new implementing rule under Section 316(b) of the Clean Water Act and the EPA’s decision to revise the steam electric effluent guidelines will be determined upon finalization of the rules.
* TBD – to be determined as regulations become final
Notes
(1) As a result of the North Carolina lawsuit seeking caps on emissions of certain pollutants from TVA’s coal-fired plants, TVA has estimated the total costs of taking all actions required by the court. Although the Fourth Circuit recently reversed the district court’s decision, the possibility of appeal adds to the uncertainty of estimating these expenditures. See Note 16 - Case Brought by North Carolina Alleging Public Nuisance.
(2) Estimated liability for cleanup and similar environmental work for those sites for which sufficient information is available to develop a cost estimate.
(3) Includes closure of impoundments, construction of lined landfills, and construction of dewatering systems.
(4) Includes air quality projects that TVA is currently planning to undertake to comply with existing and proposed air quality regulations, but does not include any projects that may be required to comply with potential greenhouse gas regulations.
(5) Compliance plans to meet the requirements of a revised or new implementing rule under Section 316(b) of the Clean Water Act and the EPA’s decision to revise the steam electric effluent guidelines will be determined upon finalization of the rules.
* TBD – to be determined as regulations become final
 

Other Events

Kingston Ash Pond Spill.  On June 14, 2010, TDEC announced the issuance of a Commissioner’s Order against TVA and issued a penalty of approximately $12 million in response to the Kingston coal ash release on December 22, 2008.  The penalties address violations of the Tennessee Water Quality Control Act and the Tennessee Solid Waste Disposal Act.  Additional penalties may be assessed by EPA.

Widows Creek Gypsum Pond.  TVA and Alabama Department of Environmental Management agreed to finalize the Consent Order issued on April 3, 2009, and the order was signed on October 13, 2009.

Ocoee Hydro Plant.  TVA continues to work with TDEC to addresshas resolved the issues identified in the TDEC Director’s Order datedof January 12, 2009.  Subsequent to the close of the recreation seasonBased on the upper Ocoee River, in conjunction with TDEC, TVA planned and conductedresults of a test drawdown on November 3-5, 2009, designed to identify optimum operating conditions and best management practices to limit sediment transport downstream during future drawdown operations.  Based on the resultsTDEC has approved TVA’s Best Management Practices for operation of the tests, TVA has proposed best management practices to TDEC and continues to work with TDEC on the development of an operating policy for Ocoee No. 3.  TVA has received TDEC permission to use the Ocoee No. 3 s luice gates as required for recreation and flood control releases through October 2010.when conducting future drawdowns.

Browns Ferry Nuclear Plant.  On April 7, 2010,, approximately 350 gallons of water containing the radioactive isotope tritium spilled from a water storage tank at the Browns Ferry Nuclear Plant.  The leak, which was reported to the NRC and other authorities under the industry’s voluntary reporting guidelines, was stopped, and the dirt into which the water soaked was collected to beand sent to a containment facility in Utah.disposal facility.  The leak was well below any regulatory limit and there was no danger to any employee or the public.

For a discussion of additional environmental matters affecting TVA, see Item 1, Business - Environmental Matters in the Annual Report.

LegLegalal

From time to time, TVA is party to or otherwise involved in lawsuits, claims, proceedings, investigations, and other legal matters (“Legal Proceedings”) that have risenarisen in the ordinary course of conducting its activities, as a result of catastrophic events or otherwise.  TVA had accrued approximately $13 million with respect to Legal Proceedings as of March 31,June 30, 2010.  No assurance can be given that TVA will not be subject to significant additional claims and liabilities.  If actual liabilities significantly exceed the estimates made, TVA’s financial condition, results of operations, and cash flows could be materially adversely affected.

For a discussion of certain current Legal Proceedings involving TVA, see Note 16, which discussion is incorporated by reference into this Item 2, Management'sManagement’s Discussion and Analysis of Financial Condition and Results of Operations.Operations.

 
5657




ITEM 3.  QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

There are no material changes related to market risk from the market risks disclosed under Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations — Risk Management Activities in the Annual Report.  See Note 12 for more information regarding TVA’s derivative transactions and risk management activities.


ITEM 4.  CONTROLSCONTROLS AND PROCEDURES

Disclosure Controls and Procedures

TVA’s management, including the President and Chief Executive Officer and members of the disclosure control committee (including the Interim Chief Financial Officer and Executive Vice President, Financial Services and the Vice President, Controller and Chief Risk Officer), evaluated the effectiveness of TVA disclosure and controls procedures (as defined in Rule 13a-15(e) under the Securities Exchange Act of 1934 (“Exchange Act”)) as of March 31,June 30, 2010.  Based on this evaluation, TVA’s management, including the President and Chief Executive Officer and members of the disclosure control committee (including the Interim Chief Financial Officer and Executive Vice President, Financial Services and the Vice President, Controller and Chief Risk Officer), concluded that TVA’s disclosure controls and procedures were effective as of March 31,June 30, 2010, to ensure that information required to be disclosed by TVA in reports that it files or submits under the Exchange Act, is recorded, processed, summarized, and reported, within the time periods specified in the Securities and Exchange Commission’s rules and forms, and include controls and procedures designed to ensure that information required to be disclosed by TVA in such reports is accumulated and communicated to TVA’s management, including the President and Chief Executive Officer and members of the disclosure control committee (including the Interim Chief Financial Officer and Executive Vice President, Financial Services and the Vice President, Controller and Chief Risk Officer), as appropriate, to allow timely decisions regarding required disclosure.

Changes in Internal Control over Financial Reporting

During the quarter ended March 31,June 30, 2010, there were no changes in TVA’s internal control over financial reporting that materially affected, or are reasonably likely to materially affect, TVA’s internal control over financial reporting.


 
5758



PART II – OTHER INFORMATION


ITEM 1.  LEGAL PROCEEDINGS

From time to time, TVA is party to or otherwise involved in Legal Proceedings that have arisen in the ordinary course of conducting its activities, as a result of catastrophic events or otherwise.  While the outcome of the Legal Proceedings to which TVA is a party cannot be predicted with certainty, any adverse outcome to a Legal Proceeding involving TVA may have a material adverse effect on TVA’s financial condition, results of operations, and cash flows.

For a discussion of certain current Legal Proceedings involving TVA, see Note 16, which discussion is incorporated by reference into this Item 1, Legal Proceedings.


ITEM 1A.  RISK FACTORSFACTORS

There are no material changes related to risk factors from the risk factors disclosed in Item 1A, Risk Factors in the Annual Report.



 
5859



ITEM 6.  EXHIBITSEXHIBITS

Exhibit No. 
Description
3.1TVA’s Bylaws adopted by the TVA Board on May 18, 2006, as amended on April 3, 2008, May 19, 2008, and June 10, 2010
10.1Amendment dated as of May 11, 2010, to $1,000,000,000 Spring Maturity Credit Agreement Dated as of March 26, 2009, and Amended as of May 13, 2009, Among TVA, Bank of America, N.A., as Administrative Agent, Bank of America, N.A., as a Lender, and the Other Lenders Party Thereto (Incorporated by reference to Exhibit 99.1 to TVA’s Current Report on Form 8-K filed on May 12, 2010, File No. 000-52313)
10.2Supplement No. 4 Dated as of April 22, 2010, to the Joint Ownership Agreement Dated as of April 30, 2008, Between Seven States Power Corporation and TVA
10.3Second Amendment Dated as of April 22, 2010, to Lease Agreement Dated September 30, 2008, Between TVA and Seven States Southaven, LLC
10.4Amended and Restated Buy-Back Arrangements Dated as of April 22, 2010, Among TVA, JPMorgan Chase Bank, National Association, as Administrative Agent and a Lender, and the Other Lenders Referred to Therein
10.5Spring Maturity Credit Agreement Dated as of July 22, 2010, Among TVA, Bank of America, N.A., as Administrative Agent and Letter of Credit Issuer, Bank of America, N.A., as a Lender, and the Other Lenders Party Thereto
10.6Overview of Compensation Arrangements for John M. Thomas, III
10.7 Deferral Agreement Between TVA and Ashok S. BhatnagarJohn M. Thomas, III, Dated as of January 27, 2010December 4, 2009
31.1 Rule 13a-14(a)/15d-14(a) Certification Executed by the Chief Executive Officer
31.2 Rule 13a-14(a)/15d-14(a) Certification Executed by the Interim Chief Financial Officer
32.1 Section 1350 Certification Executed by the Chief Executive Officer
32.2 Section 1350 Certification Executed by the Interim Chief Financial Officer













 
5960




SIGNATURESSIGNATURES
 
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.



Date: April 30,August 2, 2010                                                                      TENNESSEE VALLEY AUTHORITY
(Registrant)


By: /s/ Tom Kilgore
 Tom Kilgore
 President and Chief Executive Officer
 (Principal Executive Officer)
  
  
  
By: /s/ John M. HoskinsThomas, III
 John M. HoskinsThomas, III
 Interim Chief Financial Officer and Executive
Vice President, Financial Services
 (Principal Financial Officer)




 
6061





EXEXHIBITHIBIT INDEX

Exhibit No. 
Description
3.1TVA’s Bylaws adopted by the TVA Board on May 18, 2006, as amended on April 3, 2008, May 19, 2008, and June 10, 2010
10.1Amendment dated as of May 11, 2010, to $1,000,000,000 Spring Maturity Credit Agreement Dated as of March 26, 2009, and Amended as of May 13, 2009, Among TVA, Bank of America, N.A., as Administrative Agent, Bank of America, N.A., as a Lender, and the Other Lenders Party Thereto (Incorporated by reference to Exhibit 99.1 to TVA’s Current Report on Form 8-K filed on May 12, 2010, File No. 000-52313)
10.2Supplement No. 4 Dated as of April 22, 2010, to the Joint Ownership Agreement Dated as of April 30, 2008, Between Seven States Power Corporation and TVA
10.3Second Amendment Dated as of April 22, 2010, to Lease Agreement Dated September 30, 2008, Between TVA and Seven States Southaven, LLC
10.4Amended and Restated Buy-Back Arrangements Dated as of April 22, 2010, Among TVA, JPMorgan Chase Bank, National Association, as Administrative Agent and a Lender, and the Other Lenders Referred to Therein
10.5Spring Maturity Credit Agreement Dated as of July 22, 2010, Among TVA, Bank of America, N.A., as Administrative Agent and Letter of Credit Issuer, Bank of America, N.A., as a Lender, and the Other Lenders Party Thereto
10.6Overview of Compensation Arrangements for John M. Thomas, III
10.7 Deferral Agreement Between TVA and Ashok S. BhatnagarJohn M. Thomas, III, Dated as of January 27, 2010December 4, 2009
31.1 Rule 13a-14(a)/15d-14(a) Certification Executed by the Chief Executive Officer
31.2 Rule 13a-14(a)/15d-14(a) Certification Executed by the Interim Chief Financial Officer
32.1 Section 1350 Certification Executed by the Chief Executive Officer
32.2 Section 1350 Certification Executed by the Interim Chief Financial Officer
























 
6162