EXHIBIT 10.11
                                                   -------------

  THE CADIZ GROUNDWATER STORAGE AND DRY-YEAR SUPPLY PROGRAM
   DEFINITIVE ECONOMIC TERMS AND RESPONSIBILITIES BETWEEN
METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA AND CADIZ INC.

                        March 6, 2001

1.   General Provisions

     1.1  The Cadiz Groundwater Storage and Dry-Year Supply
          Program (Program) shall have a life of 50 years.

     1.2  Except where otherwise noted, Cadiz Inc. or its
          successors (Cadiz) and The Metropolitan Water
          District of Southern California (Metropolitan) may
          not contract with any third party for the use of
          the Capital Facilities or the Cadiz or Fenner
          groundwater basins for storage or exportation of
          water during the life of the Program.

     1.3  Except as otherwise provided, Metropolitan has
          exclusive use of the Cadiz Program Capital
          Facilities.

     1.4  Year one of the program shall begin the first day
          after completion of facilities necessary for the
          storage of Colorado River water in the Cadiz Basin
          and ending on December 31st of that year.  Year
          two and all-subsequent years of the program shall
          begin on January 1st.  Year fifty of the program
          shall extend beyond December 31st up to the
          fiftieth anniversary of the first day after
          completion of facilities necessary for the storage
          of Colorado River water in the Cadiz-Fenner
          Groundwater Basin (Basin).

     1.5  Except as otherwise provided, all payments shall
          be made in quarterly installments and be due on
          the first day of each calendar year quarter
          (January 2nd, April 1st, July 1st, and October
          1st).  Except that the first payment, pursuant to
          Section 4.1, shall be due no earlier than 45 days
          from completion of facilities necessary for the
          storage of Colorado River water in the Cadiz
          Basin.

2.   Capital Facilities

     2.1  Metropolitan and Cadiz shall share equally the
          actual cost of Capital Facilities (mutually agreed
          estimates, at the time of execution of the
          contract, not to exceed $150,000,000) including
          spreading and recovery facilities and a conveyance
          pipeline including pump

                                  Page 1

	    facilities (all having a capacity to transport
          150,000 AF per year to and from the Colorado
          River Aqueduct and the Basin)and including the
          costs of design, construction and Program
          implementation cost of the Capital
          Facilities (including estimated mitigation capital
          costs, provided that these costs do not cause the
          total capital cost to exceed $150,000,000).  If
          one party desires to modify the Capital
          Facilities, and that modification increases costs,
          the requesting party shall bear the increased
          costs. If, when Metropolitan's Board authorizes
          execution of the definitive contract, estimated
          Capital Facilities costs listed above exceed
          $150,000,000, because the environmental documents
          and permits require mitigation measures that are
          not anticipated as of the date of issuance of the
          Supplement to the Draft EIR/EIS, then
          Metropolitan's Board shall consider the impact of
          these costs in determining whether to proceed with
          the Program. Cadiz may assume such increased costs
          or the parties shall meet to renegotiate the
          agreement.  If, after execution of the contract,
          actual Capital Facilities costs listed above
          exceed estimates due to construction costs
          overruns then these costs shall be shared equally.

     2.2  Metropolitan shall finance its portion of the
          Capital Facilities, as Metropolitan deems
          appropriate.

     2.3  Any operation of the Capital Facilities after the
          end of the 50 year Program term shall be
          negotiated at a future date and shall give fair
          compensation to Cadiz for any indigenous water or
          storage beyond the terms of this agreement or to
          Metropolitan for the use of the Capital Facilities
          by Cadiz.

     2.4  Cadiz shall pay for its portion of the Capital
          Facilities.  Prior to any payments by Metropolitan
          to Cadiz, Metropolitan shall have the right to
          review and reasonably approve the terms of Cadiz'
          financing for Cadiz' one-half share of the costs
          of the Capital Facilities.  Any security interest
          in the Capital Facilities created by Cadiz
          financing shall not encumber Metropolitan's
          ownership interest in, or interfere with
          Metropolitan's right to operate, the Capital
          Facilities.

                                  Page 2

     2.5  The parties shall jointly own the Capital
          Facilities. Except as otherwise provided, the
          parties shall equally share the cost of replacing
          any portion of the Capital Facilities that
          requires replacement during the term of the
          contract unless the replacement is required due to
          normal wear and tear or as a result of improper
          maintenance, in which case these costs will be
          paid by Metropolitan.  Metropolitan shall use due
          care in providing necessary maintenance of the
          Capital Facilities pursuant to Section 3.1.  Each
          party shall insure its interest in the Capital
          Facilities with reasonably acceptable commercial
          insurance or, in the case of Metropolitan, self-
          insurance.

3.   O&M and Energy Costs

     3.1  Except as otherwise provided, Metropolitan shall
          be responsible for any and all O&M and energy
          costs during the term of the contract to operate
          the Capital Facilities.  Metropolitan shall use
          ordinary care in the operation and maintenance of
          the Capital Facilities.  Cadiz shall be
          responsible for any and all costs, including but
          not limited to O&M and energy, of the Groundwater
          Monitoring and Management Plan (GWMMP) of the
          Program beyond the capital costs shared pursuant
          to Section 2.1.

4.   Transfer Component Fees and Operations

     4.1  In years 1-5 of the Program (a total of 20
          calendar quarters), Metropolitan shall purchase a
          minimum of 30,000 acre-feet per year (7,500 AF per
          calendar quarter) of indigenous water for a
          minimum total of 150,000 acre-feet to be banked or
          withdrawn from the Cadiz basin at Metropolitan's
          option. This purchased indigenous water shall be
          guaranteed to Metropolitan in accordance with the
          provisions of Sections 4.8, 8.6, and 8.14,
          including through reduction in Cadiz' agricultural
          water production.  In years 6 through 25 of the
          Program (a total of 80 calendar quarters),
          Metropolitan shall purchase the balance of at
          least 750,000 AF of indigenous water not purchased
          by Metropolitan in years 1-5 of the Program,
          subject to adjustments as described in Sections
          4.6 and 4.8 (all water purchased by Metropolitan
          pursuant to this Section 4.1 shall hereafter be
          referred to as Firm Transfer Water).  Subject to
          Sections 4.6 and 4.8, Metropolitan shall build up
          a "water bank" by purchasing up to 30,000 AF per
          year (7,500 AF per quarter) of Firm

                                  Page 3

          Transfer Water.  Metropolitan shall pay Cadiz a
          "Transfer Fee" for the purchase of the Firm Transfer
          Water.

     4.2  The Transfer Fee shall initially be $230 per AF
          ("Base Rate") in year 1 of the Program and be
          redetermined to an "Adjusted Rate", if applicable,
          in years 2-25 of the Program as follows:

          4.2.1     Metropolitan and Cadiz shall determine a
     Fair Market Value through the process described in
     Attachment A, provided that the increase or decrease in
     the Fair Market Value shall not exceed 30% of the Fair
     Market Value in the immediately prior redetermination
     or 30% of the Base Rate in the initial redetermination;

          4.2.2     The Adjusted Rate shall equal the Base
     Rate plus one-half of the difference between the Fair
     Market Value and the Base Rate.  Example:  If the Fair
     Market Value is $350 per acre-foot, then the Transfer
     Fee would be $230 + .5* ($350 - $230) = $290 per acre-
     foot.  If the Fair Market Value is $130 per acre-foot,
     then the Transfer Fee would be $230 + .5* ($130 - $230)
     = $180 per acre-foot.

     4.3  The applicable Base Rate or Adjusted Rate shall be
          paid upon the earlier of (a) delivery of the Firm
          Transfer Water to the Colorado River Aqueduct or
          (b) in accordance with the payment schedule set
          forth in Section 4.1 in the year of payment,
          whichever is earlier. Any indigenous water for
          which Metropolitan has made payment but has not
          taken delivery shall become part of a Metropolitan
          "water bank" in the Basin and may be withdrawn by
          Metropolitan at any time during the Program.  Firm
          Transfer Water deliveries in excess of the above
          payment schedule shall be paid at the Base Rate or
          Adjusted Rate in effect in the year of delivery.
          Firm Transfer Water delivered and purchased ahead
          of the above payment schedule will directly offset
          subsequent scheduled purchases acre-foot for acre-
          foot with 50% applied to the next scheduled
          payment and 50% applied in inverse order from the
          last scheduled payment.

     4.4  Any payment for indigenous water constitutes the
          complete payment for such water and establishes a
          forward contract obligating Cadiz to deliver
          indigenous water on demand to

                                  Page 4

          the Capital Facilities, subject to Section 4.8.
          Deliveries of water shall be metered at the
          Colorado River Aqueduct.

     4.5  In each Program Year 1 through 25, Cadiz shall
          have the right to sell to third parties indigenous
          water (Third Party Indigenous Water) in an amount
          up to 30,000 AF per year (Potential Sale Option
          Amount) for sale and use in the Metropolitan
          service area, subject to Sections 4.6.1 and 8.11.
          Metropolitan shall deliver such water either
          through unused capacity in the Metropolitan
          conveyance system or through an Exchange (as
          described in Section 8.10) choosing the method of
          delivery at its sole discretion.  Cadiz shall pay
          a pro-rata share of direct O&M (O&M without
          overhead or G&A expense) costs of the Capital
          Facilities in the year of delivery to the Cadiz
          customer based on Cadiz' pro-rata use of the
          Capital Facilities to transfer indigenous water to
          a third party or, in the case of an Exchange, the
          amount that would have been paid for a third party
          transfer.

          4.5.1     In Program Years 1 through 25, Cadiz
     shall have the option (Put Option) to require
     Metropolitan to purchase in each year an amount of
     indigenous water (Put Transfer Water) that equals the
     difference between the Potential Sale Option Amount and
     the amount of Third Party Indigenous Water for such
     Program Year.  If required under this section,
     Metropolitan shall buy Put Transfer Water at a fixed
     rate of $230.00 per acre-foot.  Cadiz must inform
     Metropolitan in writing of its exercise of the Put
     Option no later than March 1st of each year.  In the
     event that Cadiz exercises the Put Option after January
     1st, Metropolitan shall not be required to make payment
     for the portion of Put Transfer Water delivered during
     the first quarter of that year until April 1st

          4.5.2     The annual Put Option shall expire if
     not exercised within the time allowed in this Section,
     and the Potential Sale Option Amount of water for sale
     shall not accumulate and carry-over from year to year.

     4.6  In years 1-5 of the Program, Metropolitan and
          Cadiz shall operate the Program in a manner that
          will assist in the continuing assessment of
          recharge, safe yield, total volume of indigenous
          water available for transfer during the life of
          the Program, and the best mode of operations
          consistent with the Groundwater Monitoring and
          Management Plan.
                                  Page 5

          Prior to signing of an agreement, Cadiz and Metropolitan
          shall agree on this 5-year operating plan within the
          parameters of the GWMMP.  During this five-year period,
          Cadiz shall not pump water from nor add water to the
          basin except in a manner consistent with its
          current agricultural activities.  Based on the
          information gathered pursuant to the GWMMP and
          through the initial five years of operations,
          Cadiz and Metropolitan shall jointly determine the
          total expected yield of the Cadiz indigenous water
          over the life of the Program by consulting the
          GWMMP and ensuring compliance with applicable
          permit requirements. If the parties cannot agree
          upon the expected yield, the dispute will be
          referred to binding arbitration. Expected yield of
          indigenous water from the Program shall be
          reassessed on an ongoing basis every subsequent
          two years for the life of the Program.  The
          expected yield of the Program shall be determined
          after excluding (a) Cadiz' projected use of
          indigenous water, unless Cadiz has agreed on terms
          reasonably acceptable to Metropolitan not to use
          such indigenous water, and (b) the amount of
          indigenous water that any third party has the
          legal right to use and is reasonably expected to
          use.

          4.6.1     If an adjustment is made under Section
     4.6 decreasing the expected yield below 1,500,000 AF,
     then the Potential Sale Option Amount shall equal
     30,000 AF per year up to the positive difference, if
     any, of the expected yield less 750,000 AF.  If an
     adjustment is made under Section 4.6 decreasing the
     expected yield below 750,000 AF, Metropolitan shall
     continue to make scheduled water bank program purchases
     of Firm Transfer Water spread equally over the
     remaining years beginning with the Program year
     following the yield adjustment and continuing through
     year 25 of the Program.

     4.7  Upon 12 months notice of Cadiz indigenous water
          supplies above 1.70 MAF based on the process in
          Section 4.6, Metropolitan has the option to
          purchase one-half of such supply of water in
          excess of 1.70 MAF starting in Program Year 26 at
          a rate of 30,000 AF per year at the Base Rate or
          Adjusted Rate in effect in the year of payment.
          If Metropolitan exercises such option, then Cadiz
          may market to third parties within Metropolitan's
          service area one-half of this supply in excess of
          1.70 MAF at a rate of
                                  Page 6

          30,000 AF per year starting in Year 26 pursuant to
          Section 8.12.  If Metropolitan does not exercise this
          option, then Cadiz may market to third parties within
          Metropolitan's service area the entire supply in
          excess of 1.70 MAF at a rate of 60,000 AF per year
          starting in Year 26 pursuant to Section 8.12.
          Cadiz shall be responsible for obtaining all
          required approvals for the transfer of such water
          to third parties under this Section 4.7.
          Metropolitan shall deliver such excess water
          through the Capital Facilities and Metropolitan
          conveyance system only if there is unused
          capacity.

     4.8  Payments of Transfer Fees shall be suspended if
          the expected Program yield agreed upon between
          Metropolitan and Cadiz or determined by
          arbitration (pursuant to Section 4.6), is the same
          or less than the amount of indigenous water for
          which Metropolitan has paid Cadiz. Cadiz shall be
          obligated to repay Metropolitan for the
          difference, up to a maximum of 300,000 AF which
          shall be secured by Cadiz' obligations pursuant to
          Sections 8.6 and 8.14.  This repayment obligation
          shall first offset any remaining payment
          obligations for Puts and Takes, pursuant to
          Section 5.3 with the remainder repaid to
          Metropolitan dollar for dollar, within twelve
          months of notice by Metropolitan.  In the event
          that the amount of water that Metropolitan is
          entitled to be repaid for, or otherwise
          compensated for, exceeds Metropolitan's unpaid
          obligations for Puts and Takes and repayment for
          300,000 AF, Metropolitan shall receive credits for
          additional storage of water pursuant to Section
          5.5 at the storage rates in effect at the time the
          payments of the Transfer Fees were made.

5.   Storage Component Fees and Operations


     5.1  Metropolitan shall pay Cadiz $90 per AF, adjusted
          by CPI commencing upon Metropolitan's Board of
          Directors approval of contract "as to form", of
          CRA water Metropolitan cycles through the Capital
          Facilities and storage.  This amount consists of a
          rate of $50, adjusted by CPI commencing upon
          Metropolitan's Board of Directors approval of
          contract "as to form", to Put such water ("Put
          Fee") and $40, adjusted by CPI commencing upon
          Metropolitan's Board of Directors approval of
          contract "as to form", to Take such water ("Take
          Fee").
                                  Page 7

     5.2  At contract execution and subject to provisions
          under Sections 2.4, 8.1 through 8.5 and 8.15,
          Metropolitan shall pay at the rate set forth in
          Section 5.1 for the operation of 600,000 AF of Put
          and Take activity entitling Metropolitan to
          600,000 AF of movement in and 600,000 AF of
          movement out of the storage program.

     5.3  In addition to amounts set forth in Section 5.2,
          Metropolitan's minimum commitment for storage
          shall include an additional 300,000 AF of Put and
          Take activity for which Metropolitan must pay
          Cadiz at the earlier of (a) delivery or
          withdrawal; or (b) in accordance with the
          following schedule:  In each of Program Years 5
          through 14, Metropolitan shall pay for the
          operation of 30,000 AF of Put and Take activity
          entitling Metropolitan to 30,000 AF of movement in
          and 30,000 AF of movement out of the storage
          program for each year of payment.

     5.4  Metropolitan's minimum commitment for storage is
          900,000 AF of Put and Take activity, provided that
          Metropolitan's storage obligations under the
          Program shall be in accordance with the GWMMP.

     5.5  Additional operations of the Program above amounts
          set forth in Sections 5.2 and 5.3 shall be paid at
          rates listed in Section 5.1.

     5.6  Program storage capacity shall be a minimum of
          1,000,000 AF at any one time.

     5.7  Evaporative and conveyance losses of stored water
          shall initially be set to 10% and shall be reset
          to actual losses through a biannual
          redetermination in accordance with the GWMMP.

6.   Water Quality Payment

     6.1  The Principles of Agreement anticipated an avoided
          cost payment to Cadiz for any benefit in reducing
          salinity in the Metropolitan service area.  In
          consideration of the other terms and conditions
          set forth herein, no water quality payment shall
          be made. Currently, all constituent levels of
          indigenous water in the Program area are below
          state and federal Maximum Contaminant Levels
          ("MCLs"). Except as provided below, Cadiz will pay
          the cost of treating all water introduced into the
          Metropolitan delivery system if necessary so that
          it meets all federal and state standards
          applicable to the Colorado River Aqueduct as

                                  Page 8

          established by the California Department of Health
          Services or other permitting authority.  Due to
          consideration of water quality benefits and
          increases in supply reliability and subject to
          approval through a public process for the
          introduction of water into the Metropolitan
          System, indigenous water introduced by Cadiz into
          the Metropolitan delivery system shall not be
          required to meet ambient conditions. With respect
          to the Cadiz Program, this public process shall
          take the form and run concurrently with the public
          review by Metropolitan's Board of the Cadiz
          Program.  Action by the Metropolitan Board
          approving the water quality provision of the Cadiz
          Program shall be determinative and shall not be
          subject to subsequent Board action establishing
          any general policies.  Further, Metropolitan shall
          not impose any future ambient quality standards if
          Cadiz continues to meet all federal and state
          water quality standards at Cadiz' expense.  Cadiz
          may elect to have Metropolitan provide any
          treatment required to meet federal and state water
          quality standards and requirements provided that
          Cadiz shall pay all costs incurred by Metropolitan
          for providing such treatment.  Metropolitan will
          ensure that water it delivers for storage in the
          Cadiz/Fenner groundwater basin shall, at a
          minimum, meet all federal and state standards
          applicable at the time of delivery to the Colorado
          River Aqueduct as established by the California
          Department of Health Services or other permitting
          authority.  If these federal or state standards
          change as to any constituent in the water
          Metropolitan delivered for storage so that the
          stored water would not have met the changed
          standards when it was delivered for storage, then
          Metropolitan and Cadiz shall share the cost of
          treatment for water withdrawn by Metropolitan from
          the basin for that particular constituent based on
          the proportion of the levels of the regulated
          constituent above the changed regulatory standard
          in Metropolitan's storage water to the levels of
          the regulated constituent above the changed
          regulatory standard in the indigenous groundwater
          in the basin, if any.

7.   Groundwater Management Plan

     7.1  All withdrawals of water from the Basin shall be
     made in accordance with the GWMMP.

                                  Page 9

8.   Other Provisions

     8.1  The legal structure of the agreement between Cadiz
          and Metropolitan shall have provisions to protect
          Metropolitan's interest in the program.  These
          provisions shall include appropriate security
          interests described in the attachment hereto
          (Attachment B).  Cadiz may propose alternative
          security interests or agreement structures that
          achieve the same results as those described in the
          attachment.  If Metropolitan determines that the
          alternatives proposed by Cadiz do not provide the
          same level of security as those described in the
          attachment, Metropolitan, in its sole reasonable
          discretion, may reject the proposed alternatives
          and require the security interests in the form
          described in the attachment as a condition to
          proceeding with the program.

     8.2  Any costs imposed by third parties for the use of
          the Cadiz or Fenner groundwater basins or
          exportation of transfer water shall be borne
          exclusively by Cadiz.

     8.3  Metropolitan shall have no obligation to make any
          payments to Cadiz, acquire any project lands or
          rights-of-way or pay for or perform any
          construction work on the Capital Facilities until
          the California Department of Health Services
          approves the introduction of Program water into
          the Colorado River Aqueduct.

     8.4  Metropolitan shall have no obligation to make any
          payments to Cadiz, pay for or perform any
          construction work on the Capital Facilities until
          all rights-of-way, use permits, or easements
          necessary for the construction and maintenance of
          the Capital Facilities have been obtained from the
          Bureau of Land Management.

     8.5  Metropolitan shall not execute the contract for
          the Program prior to thirty (30) days after the
          filing of a Notice of Determination by
          Metropolitan as required by the California
          Environmental Quality Act or the issuance of a
          Record of Decision by the Bureau of Land
          Management as required by the National
          Environmental Policy Act, whichever is later.  In
          the event any litigation is filed challenging any
          aspect of the Program's environmental compliance
          or the authority or right of any party to perform
          its obligations under the contract, then
          Metropolitan and Cadiz shall jointly defend such
          litigation.  Counsel shall be selected by mutual
          agreement, and all costs of litigation shall be
          shared equally.

                                  Page 10

          8.5.1     If litigation challenging any aspect of
     the Program's environmental compliance or the authority
     or right of a party to perform its obligations under
     the contract has been commenced, and the issuance of
     any permits required for the Program or the performance
     of any obligation required under the contract is
     enjoined or withheld by a court or agency with
     authority to do so, the performance of all other
     obligations under the contract shall be suspended until
     such permits are issued or such injunction is
     permanently lifted.  If such suspension is not lifted
     within five years the parties' shall meet to negotiate
     in good faith any future obligation under the contract.

          8.5.2     If litigation challenging any aspect of
     the Program's environmental compliance or the authority
     or right of any party to perform its obligations under
     the contract has commenced, but the issuance of any
     permits required for the Program or the performance of
     any obligations required under the contract has not
     been enjoined or withheld by a court or agency with
     authority to do so, the parties shall confer to
     determine reasonably and in good faith whether there is
     merit to the legal challenges which requires further
     environmental review or other legal authority to
     proceed with the Program.  Either party may elect, if
     it is reasonable to do so under all the circumstances,
     to suspend performance of the contract pending
     resolution of such legal challenge.  If such suspension
     exceeds five years from the election to suspend
     performance, the parties' shall meet to negotiate in
     good faith any future obligations under the contract.

          8.5.3     If, after the parties have commenced
     performance under the contract, the Program or any
     permit required for the Program is permanently
     suspended or terminated by the action of a court or
     agency with authority to do so, then Metropolitan shall
     not be required to proceed with further obligations
     without the prior approval of its Board of Directors.
     If the litigation or other legal challenge results in a
     final determination that precludes the operation of the
     Program, then:

               8.5.3.1   Cadiz shall reimburse Metropolitan
          the amount paid by Metropolitan for the right to
          transfer indigenous water that Metropolitan has
          paid for or banked and cannot transfer up to
          300,000 AF of water;

                                  Page 11

               8.5.3.2   Cadiz shall reimburse Metropolitan
          the amount paid by Metropolitan for the right to
          store water that Metropolitan cannot store or that
          Metropolitan has stored but cannot retrieve from
          the basin; and

               8.5.3.3   Such reimbursement shall be paid by
          Cadiz to Metropolitan within twelve (12) months
          following the final determination.

     8.6  If, for any reason, Cadiz is unable or unwilling
          to perform under the term of the agreement then
          Metropolitan shall have the right to operate the
          Program at its discretion without further payment
          to Cadiz.  This right shall include the right to
          enter upon Cadiz land for operation and
          maintenance of Capital Facilities.  If the lack of
          performance includes unrealizable water supplies
          or moneys due to Metropolitan, then Metropolitan
          shall have the right to take all or partial
          possession and ownership of Cadiz lands in the
          Cadiz and Fenner Valleys.  Offsets as expressed in
          Section 4.8 shall also apply.  Cadiz shall provide
          Metropolitan with a security interest in the Cadiz
          share of the Capital Facilities and its land,
          improvements and water rights related to the
          groundwater basin in a form reasonably acceptable
          to Metropolitan as a condition to Metropolitan's
          performance of its obligations; provided, however,
          that upon termination of the Program and
          satisfaction of any surviving Cadiz obligations
          such security interest shall be terminated.  The
          security interest in the Cadiz share of the
          Capital Facilities shall be subordinate only to
          direct construction liens on the Capital
          Facilities and the security interest in the Cadiz
          lands, improvements and water rights shall be
          subordinate only to liens approved in accordance
          with Section 8.8 and in an amount that shall not
          exceed $25,500,000 during the term of the Program.

     8.7  If Metropolitan executes the contract for the
     Program:

          8.7.1     Cadiz shall not increase its use of
     Colorado River water on lands that it owns or controls
     within the Palo Verde Mesa or Valley without the
     consent of Metropolitan.

          8.7.2     Cadiz shall take no action, and shall
     use its reasonable good faith efforts to cause its
     subsidiaries, affiliates, successors, directors,
     officers, employees, shareholders and

                                  Page 12

     agents to refrain from taking any action, to interfere
     with any cooperative water supply program between Palo
     Verde Irrigation District and Metropolitan.

          8.7.3     Cadiz shall take no action, and shall
     use its reasonable good faith efforts to cause its
     subsidiaries, affiliates, successors, directors,
     officers, employees, shareholders and agents to refrain
     from taking any action, to reduce or cause the
     reduction of Colorado River water available to
     Metropolitan or to increase the cost of Colorado River
     water to Metropolitan with respect to:  (1) Priority 1,
     2 and 3(b) (Palo Verde Mesa lands) lands; (2) Present
     Perfected Rights lands (miscellaneous rights holders or
     tribal lands); and (3) Surplus Criteria.

     8.8  Cadiz shall not deed or encumber ownership of its
          properties in the Cadiz or Fenner Valleys, during
          the life of the Program, without the written
          permission of Metropolitan except as allowed under
          Section 8.6.  Such permission shall not be
          unreasonably withheld.

     8.9  Section 4.5 permits Metropolitan to perform an
          exchange in response to a Cadiz request for
          delivery of indigenous water to a third party.
          Metropolitan may instead deliver water other than
          indigenous water to such third party ("Exchange").
          In such an event, an amount of indigenous water
          equal to the amount of water subject to the
          Exchange ("Exchange Water") shall be banked in the
          Cadiz basin for later extraction by Metropolitan
          without additional Transfer or Storage Fees.
          Cadiz shall be responsible to deliver Metropolitan
          banked Exchange Water upon demand.  If Exchange
          Water is not available and it is concluded through
          subsequent determinations of the GWMMP that the
          Exchange Water was not available for transfer,
          Cadiz shall have the obligation to repay
          Metropolitan for such Exchange Water.
          Notwithstanding the above, if the Exchange Water
          is not available due to a subsequent event, not
          the result of Cadiz' intentional or negligent act
          or omission, but in accordance with the GWMMP was
          available for transfer at the time of Exchange,
          Cadiz shall not be obligated to repay Metropolitan
          for the Exchange Water.  Cadiz shall provide
          Metropolitan with a property interest in a form
          reasonably acceptable to Metropolitan for the
          purpose of recovering any exchange water.

                                  Page 13

     8.10 The rate charged to Cadiz for the use of the
          Metropolitan conveyance system for the delivery at
          Cadiz' request of indigenous water pursuant to
          Section 4.5, either through conveyance or
          Exchange, shall be Metropolitan's posted wheeling
          rate for "as available" capacity.  In addition,
          Cadiz shall pay power costs as charged to member
          agencies for wheeling or to third parties in long-
          term (greater than 12 months) wheeling agreements,
          and any water treatment costs for delivery of
          treated water (which shall be provided, if
          requested, at the water treatment rates as
          uniformly charged to all purchasers of water
          treated by Metropolitan's same treatment plant).
          Cadiz shall also pay any water stewardship fees
          that are uniformly charged on water delivered
          through the Metropolitan conveyance system by
          Metropolitan to all member agencies and third
          party wheelers, excluding agreements negotiated
          prior to the approval by Metropolitan's Board of
          this Proposal "as to form."

     8.11 The rate charged to Cadiz for the use of the
          Metropolitan conveyance system for the delivery at
          Cadiz' request of indigenous water pursuant to
          Section 4.7, shall be Metropolitan's best
          available wheeling rate offered to third parties
          under equivalent terms and conditions.  In
          addition, Cadiz shall pay power costs as charged
          to member agencies for wheeling or to third
          parties in long-term (greater than 12 months)
          wheeling agreements, and any water treatment costs
          for delivery of treated water (which shall be
          provided, if requested, at the water treatment
          rates as uniformly charged to purchasers of water
          treated by Metropolitan's same treatment plant).
          Cadiz shall also pay any water stewardship fees
          that are uniformly charged on water delivered
          through the Metropolitan conveyance system by
          Metropolitan to all member agencies and third
          party wheelers excluding agreements negotiated
          prior to the approval by Metropolitan's Board of
          this Proposal "as to form."

     8.12 Metropolitan shall take no action, and shall use
          its reasonable good faith efforts to cause its
          directors, officers, employees, agents and member
          agencies to refrain from taking action, to
          interfere with Cadiz' ability to market and
          deliver the newly developed water supply as
          described in Sections 4.5 and 4.7; provided that
          the discretion and authority of

                                  Page 14

          Metropolitan, its directors, officers, and employees
          to perform their duties and obligations authorized
          by law shall not be impaired in any way.  Actions taken
          by Metropolitan within its authority, and actions
          taken by its directors, officers, and employees
          within the scope of their office or employment,
          shall not be considered as actions which interfere
          with Cadiz' ability to market and deliver the
          newly developed water supply.  However,
          interference in breach of this provision shall
          include actions taken by Metropolitan's directors,
          officers, employees and agents acting
          independently of the policy or direction of
          Metropolitan's Board to prevent a purchaser from
          entering into a transaction to purchase Cadiz
          indigenous water.

     8.13 At Metropolitan's option, and in accordance with
          the expected Program yield as determined under
          Section 4.6 and security interest under Section
          4.8, Cadiz shall manage agricultural production in
          the Cadiz/Fenner Valleys to ensure the
          availability of at least the first 300,000 AF of
          transfer water (including by adjusting the amount
          of agricultural production).  Cadiz shall not
          increase its use of water for agricultural
          production or other purposes in the Cadiz or
          Fenner Valleys without the consent of
          Metropolitan.

     8.14 Cadiz shall grant to Metropolitan rights of
          easement necessary for the construction and
          maintenance of the Capital Facilities.

     8.15 A final contract for the Project would be subject
          to approval of Metropolitan's Board of Directors
          and shall be in conformance with the terms and
          conditions of any mitigation plan adopted by
          Metropolitan's Board pursuant to CEQA.

                                  Page 15

                                                ATTACHMENT A

           TRANSFER FEE REDETERMINATION PROCEDURE

1.   GENERAL

  To ensure that payments for indigenous water made under
  the Cadiz Groundwater Storage and Dry-Year Supply Program
  ("Program") represent the fair market value for
  transfers, a Transfer Fee Redetermination provision is
  included as part of this Agreement.  The purpose of this
  provision is to adjust on a periodic basis the Transfer
  Fee for Cadiz indigenous groundwater to ensure
  consistency with prevailing market values for water
  transfers with reasonably equivalent long term supply
  reliability benefits to Metropolitan's Service Area.

2.   TIMING AND FREQUENCY

  In any year 2 through 25 of the Program in which
  Metropolitan purchases indigenous groundwater from Cadiz,
  either party may request a Transfer Fee Redetermination.
  Such request shall be made in writing ("Transfer Fee
  Redetermination Notice").  Within ninety (90) days
  following such request, the parties shall exchange any
  and all data relied upon by each party to calculate or
  support the fair market value of transfers.  Within
  thirty (30) days following the exchange of data, the
  parties shall negotiate in good faith to establish the
  fair market value of Cadiz indigenous groundwater
  purchased under this Program ("FMV").  The increase or
  decrease in the FMV shall not exceed thirty-percent (30%)
  from the FMV in the immediately prior redetermination, or
  from the Base Rate in the initial redetermination.  The
  Adjusted Rate, calculated in accordance with Section
  4.2.2, shall become effective as of January 1 of the year
  in which the applicable Transfer Fee Redetermination
  Notice is delivered.

  Both parties agree the following guidelines should be
  considered (including by any arbitration panel) in
  establishing the FMV.

3.   ELIGIBILITY CRITERIA

   (a)  INFORMATION AVAILABILITY: The data exchanged by each
        party must include a complete copy of any underlying
        contract, financial information, and similar
        documents reflecting the terms, conditions and
        costs, of water supplies upon which each party
        relied as a basis for the Transfer Fee
        Redetermination.

   (b)  VOLUNTARY NEGOTIATED TRANSFER: Each transfer must be
        the result of a voluntary process between willing
        participants establishing the terms, conditions and
        costs of such transfer.

   (c)  AG-TO-AG WATER TRANSFERS: Transactions between
        agricultural water users are eligible when either of
        the following two conditions are met: 1) the ag-to-
        ag transfer is the result of a general offer to sell
        and the seller's water district has made general
        offers to sell that resulted in a transaction
        between the seller and a municipal and industrial
        user or supplier in the past five years; or 2) the
        area of origin is outside of Metropolitan's Service
        Area and the transferred water will be applied to
        agricultural operations within the Service Area.

   (d)  GEOGRAPHY: The source of water or water rights must
        be capable of being used for domestic, municipal and
        industrial, or agricultural use within
        Metropolitan's Service Area.

   (e)  WATER QUALITY: The quality of the source of water,
        when subjected to ordinary and customary treatment
        in the Metropolitan Service Area, would fall within
        the controlling Federal and State maximum
        contaminant levels for potable water.

   (f)  WATER TRANSFERS: Transactions must be water transfer
        agreements between arms-length participants executed
        within five years of the price redetermination, but
        not prior to the execution of this agreement.  This
        specifically excludes, groundwater conjunctive use
        projects in

                                  Page 16

        Metropolitan's service area, desalination projects,
        or water recycling projects.


   (g)  SIZE AND DURATION: Eligible transactions must be
        sales of at least 20,000 acre-feet per transaction
        and last a minimum duration of 4 years.

4.   CALCULATION OF TRANSFER FEE

     The initial FMV is a firm non-escalating $230 per acre-
     foot until sufficient evidence is found to redetermine
     the FMV. Sufficient evidence is defined as at least
     five (5) transactions meeting the eligibility criteria
     in Section 3 in the five years immediately preceding
     redetermination.  If sufficient information is found
     then the FMV shall be calculated as the five-year
     volume-weighted rolling average of eligible
     transactions.  Once a FMV has been established, it
     shall persist for five years or until further
     information exists to redetermine the FMV.  If, five
     years after a price redetermination has occurred, there
     is insufficient information to re-estimate a FMV then
     the parties shall negotiate to establish the FMV or
     submit to arbitration to determine the appropriate
     methodology for determining FMV.

     A methodology for determining the delivered cost per
     acre-foot, including necessary adjustments to reflect
     differences in payment schedules, transport costs (1),
     and treatment costs shall be developed and mutually
     agreed to by both parties prior to the first price
     redetermination.  This methodology shall be adhered to
     for all subsequent price redeterminations to ensure
     consistency over time in the estimates of the delivered
     cost per acre-foot of comparable transfers.

     FN (1)  For the purposes of the Cadiz transactions,
     transportation costs shall include, among other costs,
     1/2 of the capital cost paid by Metropolitan for the
     development and construction of the Cadiz Program

5.   FMV DISPUTE RESOLUTION

     In the event the parties are not able to agree upon the
     FMV within 90 days of entering into good faith
     negotiations as described in Section 2, then the FMV
     shall be resolved by arbitration in accordance with the
     Commercial Arbitration Rules of the American
     Arbitration Association ("AAA").

     Any such dispute will be referred to one (1) arbitrator
     agreed to by the parties within fifteen (15) days after
     submission of the dispute to arbitration; provided,
     however, that if the parties are unable to agree upon
     the selection of an arbitrator, such dispute will be
     referred to three (3) arbitrators.  In such an event,
     each party shall select one of the three arbitrators.
     The third arbitrator will be selected by the two party-
     appointed arbitrators; provided, however, if the two
     party-appointed arbitrators are unable to agree upon
     the third arbitrator, then the third arbitrator shall
     be appointed by the AAA.  Each arbitrator must have
     expertise in California water issues and natural
     resource valuation.  Each arbitrator, including party-
     appointed arbitrators, is subject to disclosure and
     disqualification pursuant to Rule R-19 of the
     Commercial Arbitration Rules.

     Based on a schedule to be set by the arbitrator(s),
     Cadiz and Metropolitan will each prepare a written
     claim specifying its proposal for the FMV (denominated
     in dollars per acre-foot of water) and written
     documentation supporting its proposal, not to exceed
     100 pages.  No party may submit data or documentation
     for any transfer that was not exchanged during the
     negotiations between the parties.  Metropolitan and
     Cadiz each may also file a rebuttal to the other
     party's submission, which shall not exceed 25 pages.
     Except for disputes arising out of Section 6 below, the
     only issue to be decided by the arbitrator(s) is which
     of the two proposed amounts for the FMV (i.e., the
     amount proposed by Metropolitan or the amount proposed
     by Cadiz) is closest to the actual FMV.  The proposed
     amount chosen by the arbitration panel shall be the FMV
     for purposes of calculating the Adjusted Rate for the
     Transfer Fee as described in Sections 2 and 4.

                                  Page 17

6.   RE-FORMULATION OF THE TRANSFER FEE REDETERMINATION METHODOLOGY

     If at any time during the course of this Agreement a
     regularly published water transfer market index
     accurately representing the relevant markets of
     transfers for Metropolitan becomes available, either
     party has the option to request the use of this index.
     If both parties agree to the use of the index, it shall
     replace the Transfer Fee Redetermination procedure set
     forth in this Attachment.  Disputes arising over the
     substitution of an index meeting the above conditions
     shall be addressed under the dispute resolution
     provisions of this Agreement.

                                  Page 18

                                                ATTACHMENT B

         ATTACHMENT RE FINANCING AND SECURITY ISSUES
           FOR A METROPOLITAN-CADIZ WATER STORAGE
                 AND DRY-YEAR SUPPLY PROGRAM

1.   Bankruptcy Remoteness.  Cadiz shall establish a
     separate single-purpose, "bankruptcy remote" corporate
     entity for the purpose of owning its interest in the
     Capital Facilities and the Program Agreement, the
     property, water rights and other appurtenant rights
     related to the Program and securing its obligations
     under the Agreement.  Cadiz would also guarantee
     performance and payment of such subsidiary's
     obligations under the Agreement.  In connection with
     the above, Cadiz shall comply with "bankruptcy remote"
     structures by limiting the activities and liabilities
     of the subsidiary, appointing an independent director
     to the subsidiary's board of directors, and requiring
     unanimous director approval to borrow money, dissolve,
     sell all or substantially all of its assets, merge or
     reorganize, file bankruptcy, or amend the articles of
     incorporation.

     *  Single purpose subsidiary:
          - No other liabilities.
          - No other activities.
          - Independent director.
          - Unanimous vote for bankruptcy/winding-up/dissolution.

     *  Consent by senior Cadiz lender to assignment.

     *  Guarantee of performance by Cadiz:
          - limit on other indebtedness of Cadiz/Cadiz subsidiary.
          - Material Adverse Change standard.
          - Limitation on other transactions.

     * Title insurance/project-easement absolute.

2.   SECURITY FOR PERFORMANCE.  As collateral security for
     Cadiz' performance of all contract provisions (to
     deliver water and storage), a deed of trust on its
     interests would be a condition of the Program.  The
     deed of trust would address:

     *  A junior lien on Cadiz' share of improvements.

     *  A junior lien on land.

     *  The priority to be determined, depends on other lenders
        rights/agreements in the event of default and termination.

3.   SEPARATE PROFITS AND EASEMENTS.  The Program documents
     should be separated into discrete packages of rights
     and obligations for:

     *  Purchase of indigenous ground water.

     *  Storage of Colorado River surplus water.

     This would keep the rights and conditions separate and
     clean in case for any reason the supply arrangement was
     terminated but the storage continued or was taken over
     by MWD.

4.   CONDITIONS PRECEDENT - The Program shall be subject to
     the satisfaction of specific conditions precedent,
     including:

     *   Obtaining environmental clearance for the Program
         and all aspects of the removal and storage of water.

     *   The negotiation, approval and concurrent effectiveness
         of all collateral security documents.

     *   The satisfaction of all Cadiz senior lender issues:

          - The consent by Cadiz senior lender of the Program,
            including the single-purpose entity and the easement
            and profit.

          - Dollar limitation on the senior indebtedness.

          - Notice/cure rights granted in favor of MWD.

          - Off-set rights.

          - A purchase option granted in favor of MWD to
            acquire the senior loan at a predetermined price.

     *  The availability and approval of Cadiz' project financing commitment.

                                  Page 19

     *  The receipt of all permits and easements necessary or desirable
        for the project.

     *  Joint approval of the Plan:

          - To build the project, the EPC contract, Plans for the
            project, the budget for the project.

          - To operate the storage and removal Program, the
            groundwater management plan

     *  No Material Adverse Change.

     *  The truthfulness of all representations, warranties
        and covenants regarding the Program.

5.   CADIZ PROJECT FINANCING.  MWD's right to review and
     approve the Cadiz financing shall include the right to
     review and approve the establishment and structure of
     the separate corporate entity and to obtain consent
     from Cadiz' project lender on terms approved by MWD.
     Any security interest in the Capital Facilities created
     by Cadiz financing shall not encumber MWD's ownership
     interest in, or interfere with MWD's right to operate,
     the Capital Facilities, and shall acknowledge MWD's
     rights under and in this Agreement.  Cadiz's project
     loan shall also:

     *  Be adequate to cover Cadiz's share of capital budget.

     *  Provide for an outside dollar limitation and set
        forth the requirements for any equity investment.

     *  Be secured by a lien on Cadiz contract payments and
        other Cadiz assets

     *  Be a firm commitment - ready to close.

     *  MWD protections to include:
          - Subordination/acknowledgment of MWD rights in
            contract and non-disturbance.

          - Provide for notice/cure rights in favor of MWD.

          - Provide for off-set rights.

           - Acknowledge MWD's right to take over facilities
             in certain circumstances, free of project lien.

                                  Page 20