BONTANG
                     LPG SALES AND PURCHASE CONTRACT
                                    
                                    
                                    
                                 BETWEEN
                                    
                                    
                                    
           PERUSAHAAN PERTAMBANGAN MINYAK DAN GAS BUMI NEGARA
                                AS SELLER
                                    
                                    
                                   AND
                                    
                                    
      NATIONAL FEDERATION OF AGRICULTURAL CO-OPERATIVE ASSOCIATIONS
                                (ZEN-NOH)
                                AS BUYER
                                    
                                    
                                  DATED
                                    
                            21 February 1992
                                    

                                     
                                    
                           TABLE  OF CONTENTS
                                    
                                                                     PAGE

Table of Contents                                                    i-iii

Preamble                                                                  1

ARTICLE  1   DEFINITION                                                 2-9

             1.1 Accepted Date Range(s)                                   2
             1.2 Accepted Quantities                                      2
             1.3 Affiliate                                                2
             1.4 Allowed Laytime                                          2
             1.5 Annual Demurrage Rate                                    2
             1.6 Annual Program                                           2
             1.7 Bontang Facilities                                       3
             1.8 Bontang LNG Facilities                                   3
             1.9 Bontang LPG Facilities                                   3
             1.10   Business Day                                          3
             1.11   Butane                                                3
             1.12   Buyer                                                 3
             1.13   Calculation Date                                      4
             1.14   Conditions of Use                                     4
             1.15   Contract                                              4
             1.16   Contract Sales Price                                  4
             1.17   Cubic Meter                                           4
             1.18   Delivery Point                                        4
             1.19   Fixed Quantities and Fixed 
                    Quantity                                              4
             1.20   Fixed Quantity Period                                 5
             1.21   Force Majeure                                         5
             1.22   Gas Supply Area                                       5
             1.23   Independent Surveyor                                  5
             1.24   Lifting Obligation                                    5
             1.25   LNG                                                   5
             1.26   Loading Port                                          5
             1.27   Loading Terminal                                      5
             1.28   LPG                                                   5
             1.29   LPG Tanker                                            6
             1.30   Metric Ton                                            6
             1.31   Named LPG Tanker                                      6
             1.32   Natural Gas                                           6
             1.33   Nominated Date Range                                  6
             1.34   Nominated Quantities                                  6
             1.35   Notice of Readiness                                   6
             1.36   Production Sharing 
                    Contract(s)                                           6
             1.37   Program Year                                          7
             1.38   Propane                                               7
             1.39   Quarter                                               7
             1.40   Quarterly Schedule                                    7
             1.41   Receiving Facilities                                  7
             1.42   Seller                                                8
             1.43   Shipment Month                                        8
             1.44   Shipment Quarter                                      8
             1.45   Suppliers                                             8
             1.46   Supply Agreements                                     8
             1.47   TBN                                                   8
             1.48   Terminal Procedures                                   8
             1.49   TOTAL Group                                           9
             1.50   Unlifted Quantities                                   9
             1.51   UNOCAL Group                                          9
             1.52   Used Laytime                                          9
             1.53   VICO Group                                            9

ARTICLE      2   SALE AND PURCHASE                                       10

ARTICLE      3   SOURCES OF SUPPL                                     11-13
              
             3.1 Relationship to LNG 
                 Processing                                              11
             3.2 Sources of Natural Gas                                  12

ARTICLE      4   COMMENCEMENT AND DURATION OF CONTRACT                  
14

ARTICLE      5   QUANTITIES                                           15-19

             5.1 Required Deliveries                                     15
             5.2 Delivery of Fixed Quantities                            15
             5.3 Buyer's Obligation to Lift                              16
             5.4 Allocation of Supplies Between Buyer and Other
                 Purchasers of LPG                                       19

ARTICLE      6   CONTRACT SALES PRICE                                 20-22

             6.1 Contract Sales Price                                    20
             6.2 Calculation of Contract Sales Price                     20
             6.3 Quantity and Price Statistics                           21

ARTICLE      7   QUALITY AND STATE                                       23

             7.1 Specifications                                          23
             7.2 Disclaimer of Warranties                                23

ARTICLE      8   TITLE AND RISK OF LOSS                                  24

ARTICLE      9   VERIFICATION AND MEASUREMENT                            25

             9.1 Inspection                                              25
             9.2 Measurement and Samples                                 25

ARTICLE      10   INVOICES AND PAYMENT                                26-29

             10.1 Invoices and Cargo Documents                           26
             10.2 Other Invoices                                         26
             10.3 Invoice Due Dates, etc.                                26
             10.4 Payment                                                27
             10.5 Seller's Rights Upon Buyer's Failure to Make
                  Payment                                                28
             10.6 Disputed Invoices                                      28

ARTICLE      11   PROGRAMMING AND SHIPPING MOVEMENTS                  30-35

             11.1 Annual Programs                                        30
             11.2 Quarterly Schedule                                     31
             11.3 Nominations                                            32
             11.4 Notification of Expected Arrivals                      34
             11.5 LPG Tanker to Arrive Precooled                         34
              
ARTICLE      12   DELIVERY                                            36-38

             12.1 Delivery                                               36
             12.2 Loading Terminal, LPG Tankers and Terminal
                  Procedures                                             36

ARTICLE      13   ARRIVAL, LOADING TIME AND DEMURRAGE                 39-42

             13.1 Notice of Arrival                                      39
             13.2 Notice of Readiness and Loading                        39
             13.3 Laytime                                                39
             13.4 Demurrage                                              41

ARTICLE      14   DEPARTURE, MISCELLANEOUS CHARGES AND
                  INSURANCE                                           43-44

             14.1 Departure                                              43
             14.2 Miscellaneous Charges                                  43
             14.3 Insurance and Conditions of Use                        43

ARTICLE      15   FORCE MAJEURE                                       45-49

             15.1 Events of Force Majeure                                45
             15.2 Notice, Resumption of Normal Performance               47
             15.3 Effect on Deliveries, Supplies, Term                   48

ARTICLE      16   EARLY TERMINATION                                      50

ARTICLE      17   ARBITRATION                                            51

ARTICLE      18   APPLICABLE LAW                                         52

ARTICLE      19   CONFIDENTIALITY                                     53-54

ARTICLE      20   NOTICES                                             55-57

ARTICLE      21   ASSIGNMENT                                             58

ARTICLE      22   AMENDMENTS                                             59

ARTICLE      23   ENTIRE AGREEMENT                                       60

ARTICLE      24   LANGUAGE OF THE CONTRACT                               61

ARTICLE      25   HEADINGS                                               62

ARTICLE      26   COUNTERPARTS                                        63-64

EXHIBIT       A   SPECIFICATIONS                                          1

EXHIBIT       B   PROCEDURE FOR CALCULATING ANNUAL DEMURRAGE 
                  RATE                                                    2

ATTACHMENT 1      MEASUREMENT AND SAMPLING PROCEDURES                 
i-iv

ATTACHMENT 2      TESTING METHOD OF LPG RESIDUAL MATTER               
1-8

ATTACHMENT 3      PRECISION FOR RESIDUAL MATTER                   (1a)&(1b)
                            
LPG SALES AND PURCHASE CONTRACT


THIS CONTRACT, dated as of the 21st day of February, 1992 is made
by and between PERUSAHAAN PERTAMBANGAN MINYAK DAN GAS BUMI NEGARA
("PERTAMINA"), a State Enterprise of the Republic of Indonesia,
on the one hand, and NATIONAL FEDERATION OF AGRICULTURAL CO-
OPERATIVE ASSOCIATIONS (ZEN-NOH), a corporation organized under
the laws of Japan, on the other hand.
In consideration of the mutual agreements contained herein the
parties hereto hereby agree as follows:

ARTICLE 1
DEFINITIONS


     The terms or expressions below shall have the following
meanings in this contract:

1.1  Accepted Date Range(s)

     Nominated Date Range(s) acceptable to Seller or date
range(s) established by Seller pursuant to Article 11.3.

1.2  Accepted Quantities

     Nominated Quantities acceptable to Seller or quantities
established by Seller in accordance with Article 11.3.

1.3  Affiliate

     In relation to a corporation or other entity, a corporation
or other entity which is controlled by, which controls, or which
is controlled by a corporation or other entity which also
controls, that corporation or other entity.

1.4  Allowed Laytime

     As defined in Article 13.3.

1.5  Annual Demurrage Rate

     As defined in Article 13.4.

1.6  Annual Program

     As defined in Article 11.1.

1.7  Bontang Facilities

     The Bontang LNG Facilities and the Bontang LPG Facilities.

1.8  Bontang LNG Facilities

     The LNG liquefaction plant facilities located in Bontang,
East Kalimantan, Indonesia, including liquefaction trains and LNG
storage, loading and related facilities and the Natural Gas
transmission pipelines to the liquefaction plant.

1.9  Bontang LPG Facilities

     The facilities in, at or near the Bontang LNG Facilities for
separation of LPG from Natural Gas and for liquefaction and
fractionation of LPG, as well as all related equipment and
facilities; Propane and Butane storage, loading and related
facilities including the Loading Terminal.

1.10 Business Day

     Every day other than a Saturday or Sunday or other day on
which commercial banks are authorized to close in the city in
which the bank designated by Seller or Buyer, as the case may be,
pursuant to Article 10.4 is located.

1.11 Butane

     A mixture predominantly of hydrocarbons, having the
specifications set out in Exhibit A.

1.12 Buyer

     NATIONAL FEDERATION OF AGRICULTURAL CO-OPERATIVE
ASSOCIATIONS (ZEN-NOH), a corporation organized under the laws of
Japan, or the successor(s) in interest of such corporation, or
the permitted assignees(s) of such corporation or such
successor(s) in interest.

1.13 Calculation Date

     As defined in Article 6.1.

1.14 Conditions of Use

     The conditions in effect at the Loading Port at any time as
applied by the operator of the Loading Terminal (including
requirements for undertakings as to liabilities of an LPG Tanker,
its owner, operator or charterer and Buyer) under which an LPG
Tanker is permitted to enter and use the Loading Port.

1.15 Contract

     This LPG Sales and Purchase Contract, including the Exhibits
and Attachments hereto, as it may from time to time be amended,
modified, varied or supplemented in accordance with the terms of
Article 22.

1.16 Contract Sales Price

     As defined in Article 6.1.

1.17 Cubic Meter

     A volume equal to the volume of a cube whose edge is one
meter.

1.18 Delivery Point

     The point at the Loading Port at which the flange coupling
of Seller's loading line joins the flange coupling of the loading
manifold on board Buyer's LPG Tanker.

1.19 Fixed Quantities and Fixed Quantity

     As defined in Article 5.1.

1.20 Fixed Quantity Period

     As defined in Article 5.1.

1.21 Force Majeure

     As defined in Article 15.1.

1.22 Gas Supply Area

     The contract areas of the VICO, TOTAL and UNOCAL Production
Sharing Contracts and such other nearby contract areas in East
Kalimantan, Indonesia as Seller may designate from time to time.

1.23 Independent Surveyor

     As defined in Article 9.1.

1.24 Lifting Obligation

     As defined in Article 5.3.

1.25 LNG

     Natural Gas in a liquid state at or below its boiling point
and at a pressure of approximately one atmosphere.

1.26 Loading Port

     The port at the Bontang Facilities.

1.27 Loading Terminal

     The facilities for delivery of LPG into vessels at the
Loading Port.

1.28 LPG
     Propane or Butane, or as the context requires, both Propane
and Butane. 

1.29 LPG Tanker

     An ocean-going vessel which is used by the Buyer for
transportation of LPG delivered under this Contract.

1.30 Metric Ton or MT

     A unit of weight equal to 1,000 kilograms.

1.31 Named LPG Tanker

     As defined in Article 11.3.

1.32 Natural Gas

     Any hydrocarbon or mixture of hydrocarbons, consisting
essentially of methane, other hydrocarbons, and non-combustible
gases in a gaseous state, which is extracted from the subsurface
of the earth in its natural state, separately or together with
liquid hydrocarbons.

1.33 Nominated Date Range

     As defined in Article 11.3.

1.34 Nominated Quantity

     As defined in Article 11.3.

1.35 Notice of Readiness

     As defined in Article 13.2.

1.36 Production Sharing Contract(s)

     As to PERTAMINA and the VICO Group, the Amended and Restated
Production Sharing Contract dated April 23, 1990, as may be
hereafter amended, between PERTAMINA, on the one hand, and the
members of the VICO Group on the other.

     As to PERTAMINA and the TOTAL Group, the Amended and
Restated Production Sharing Contract dated January 11, 1991, as
may be hereafter amended, between PERTAMINA, on the one hand, and
the members of the TOTAL Group, on the other.

     As to PERTAMINA and Unocal Indonesia Ltd. ("UNOCAL"), the
Amended and Restated Production Sharing Contract dated January
11, 1991, as may be hereafter amended, between PERTAMINA, on the
one hand, and UNOCAL, on the other.

1.37 Program Year

     As defined in Article 11.1.

1.38 Propane

     A mixture predominantly of hydrocarbons, having the
specifications set out in Exhibit A.

1.39 Quarter

     A period of three (3) calendar months commencing on January
1, April 1, July 1 or October 1.

1.40 Quarterly Schedule

     As defined in Article 11.2.

1.41 Receiving Facilities

     Any terminal(s) available to Buyer in Japan for discharge of
LPG, whether or not existing as of the date of this Contract.

1.42 Seller

     Perusahaan Pertambangan Minyak dan Gas Bumi Negara, a State
Enterprise of the Republic of Indonesia, or the successor in
interest of such enterprise, or the permitted assignee of such
entity or such successor in interest.

1.43 Shipment Month

     As defined in Article 11.3.

1.44 Shipment Quarter

     As defined in Article 11.2.

1.45 Suppliers

     The VICO Group, the TOTAL Group, the UNOCAL Group and
Seller, as suppliers of their respective shares of Natural Gas
produced under the VICO, TOTAL and UNOCAL Production Sharing
Contracts from areas within the Gas Supply Area, for the
production of LPG to be sold and delivered hereunder.

1.46 Supply Agreements

     As defined in Article 3.2.

1.47 TBN

     As defined in Article 11.3.

1.48 Terminal Procedures

     All procedures established or customarily practiced by the
operator of the Loading Terminal with respect to notifications,
nominations, berthing, lifting, loading, safety procedures for
ship and shore, documentation, departure, measurement and the
like (including, without limitation, Conditions of Use).

1.49 TOTAL Group

     Total Indonesie and Indonesia Petroleum, Ltd., and their
successors in interest.

1.50 Unlifted Quantities

     As defined in Article 5.3.

1.51 UNOCAL Group

     Unocal Indonesia Ltd. and Indonesia Petroleum Ltd., and
their successors in interest.

1.52 Used Laytime

     As defined in Article 13.3.

1.53 VICO Group

     Virginia International Company, Virginia Indonesia Company,
Ultramar Indonesia Limited, Union Texas East Kalimantan Limited,
Opicoil Houston, Inc. and Universe Gas & Oil Company, Inc.,  and
their successors in interest.


ARTICLE 2
SALE AND PURCHASE


     Seller agrees to sell and deliver at the Delivery Point, and
Buyer agrees to purchase, receive and pay for, LPG, in the
quantities and at the prices and in accordance with the other
terms and conditions set forth in this Contract.


ARTICLE 3
SOURCES OF SUPPLY


3.1  Relationship to LNG Processing

     The LPG to be sold hereunder will be produced from Natural
Gas in conjunction with the production and processing of Natural
Gas into LNG at the Bontang LNG Facilities. It is understood that
the production of LPG at the Bontang Facilities is dependent on
the processing of Natural Gas into LNG and that any interruption,
curtailment or suspension of LNG production or deliveries of LNG
at the Bontang Facilities will directly and adversely affect the
production and availability for export of LPG from such
facilities.

     Furthermore, Seller has entered into and made certain
commitments prior to the date hereof to its LNG buyers  in
respect of operational limitations, quantities and specifications
of LNG produced at the Bontang Facilities. The annual Fixed
Quantities have been determined as of the date hereof after
taking these quantities, specifications and limitations into
account. As soon as Seller becomes aware of any circumstances
which may require Seller to take action to meet the above LNG
commitments which would affect LPG production, Seller shall
promptly enter into good faith discussions with Buyer to
determine whether alternative action is available or possible
that could enable Seller to satisfy both its commitments to Buyer
as well as the LNG commitments referred to above. It is
understood that Seller shall take reasonable actions to avoid the
occurrence of any event which would affect LPG production.
However, if Seller nevertheless determines that it must take
action which affects LPG production, such circumstances will
constitute an event of Force Majeure under Article 15.

3.2  Sources of Natural Gas

     (a)  The Natural Gas from which LPG to be sold hereunder is
to be extracted is to be produced from the Gas Supply Area.
Nothing herein shall be construed, however, as conferring upon
Buyer any interest or right in the Gas Supply Area or in Natural
Gas or any hydrocarbon deposit or producing area. No warranty
express or implied is given, nor is there to be construed any
representation, as to the quantity of Natural Gas in, or its
recoverability from, the Gas Supply Area. If during the term of
this Contract Suppliers obtain information from their activities
which indicate unforeseen changes in the proved remaining
recoverable reserves of Natural Gas in the Gas Supply Area such
that Seller's ability to perform Seller's obligation hereunder
may be materially and adversely affected, Seller shall promptly
inform Buyer of such situation.

     (b)  Seller represents that Seller will maintain throughout
the term hereof the right to sell all quantities of LPG to be
sold hereunder. In this connection, Seller represents that it has
executed or will execute from time to time, as required in order
to maintain the right to sell all of the quantities of LPG to be
sold hereunder, agreements between itself and the other Suppliers
under which agreements ("Supply Agreements") Suppliers shall
supply Natural Gas from the Gas Supply Area for processing into
LPG at the Bontang LPG Facilities and shall make available, for
sale by Seller hereunder, their respective interest in the
quantities of LPG to be sold hereunder.

     (c)  It is understood that, by virtue of the Supply
Agreements, the VICO Group, the TOTAL Group and the UNOCAL Group,
as parties to such Supply Agreements, shall be third-party
beneficiaries of this Contract. The foregoing sentence shall not
be construed as discharging Seller of its obligation to supply
LPG to Buyer in accordance with the terms of this Contract.


ARTICLE 4
COMMENCEMENT AND DURATION OF CONTRACT


     This Contract shall come into full force and effect as of
and from the date hereof, and shall continue in full force and
effect thereafter until June 30, 1995, unless terminated sooner
pursuant to the terms of this Contract; provided, however, that
such provisions of this Contract as are required to give effect
to the rights and obligations of the parties which arise prior to
such date shall continue in full force and effect until the
expiration of the parties' respective obligations to sell and
purchase LPG hereunder.


ARTICLE 5
QUANTITIES


5.1  Required Deliveries

     During each annual period (each such period is hereinafter
referred to as a "Fixed Quantity Period") specified below, Seller
shall sell and deliver to Buyer, and Buyer shall purchase,
receive and pay for, at the applicable Contract Sales Price, the
quantity of LPG specified for Buyer for such period (each such
quantity is hereinafter individually referred to as a "Fixed
Quantity" and as "Fixed Quantities" when referring to more than
one such quantity) as follows :

            Fixed Quantity   Fixed Quantities for
            Period           Buyer in Thousands of
                             Metric Tons of Butane
            __________________________________________________
            July 1 - Dec. 31, 1992           12.5
            Jan. 1 - Dec. 31, 1993           25
            Jan. 1 - Dec. 31, 1994           25
            Jan. 1 - Jun. 30, 1995           12.5
            __________________________________________________
            
              5.2 Delivery of Fixed Quantities
  
   Within each calendar year the quantities to be delivered
  by Seller and received by Buyer shall be delivered and
  received at rates and intervals which are reasonably
  constant over the course of such period, after taking into
  consideration all commitments of Seller, the requirements of
  other purchasers of LPG from the Bontang LPG Facilities,
  constraints at the Loading Port and the Loading Terminal and
  fluctuations in production rates of LPG due to changes in
  production rates of LNG at the Bontang LNG Facilities, so as
  to ensure as nearly as practicable uninterrupted operation
  of the Bontang Facilities.
  
  5.3   Buyer's Obligation to Lift
  
   (a)  Buyer will be obligated to lift, in accordance with
  Article 11, the Fixed Quantity during each Fixed Quantity
  Period (such obligation is hereinafter referred to as the
  "Lifting Obligation" of Buyer). The Lifting Obligation of
  Buyer shall be reduced by the quantity of LPG which Buyer
  was unable to receive because of Force Majeure affecting
  Buyer's ability to receive LPG or because of Seller's
  failure to make such quantity available for delivery due to
  Force Majeure affecting Seller or due to breach by Seller of
  its obligations hereunder.
  
   (b)  If Buyer should fail to take delivery of LPG or if
  at any time Seller shall have reason to believe that Buyer
  will be unable to take delivery of LPG in accordance with
  Article 11, Seller shall so notify Buyer, specifying the
  quantities of LPG involved (quantities with respect to which
  Seller issues a notice pursuant to this paragraph (b) are
  hereinafter referred to as the "Unlifted Quantities"). Upon
  receipt of such notice from Seller, Buyer shall promptly
  advise Seller in writing whether Buyer wishes to reschedule
  the lifting of the Unlifted Quantities during the remainder
  of the Fixed Quantity Period in question, and if so,
  specifying a Nominated Date Range. If such rescheduling is
  acceptable to Seller, having regard to Seller's and the
  Loading Terminal's operations and schedules and, in
  particular, the provisions of Article 5.2 (a), Seller will
  so notify Buyer and the Unlifted Quantities will be
  rescheduled and lifted pursuant to Article 11 accordingly.
  
   (c)  If Buyer fails promptly to provide notice as
  provided in paragraph (b) or if the rescheduling pursuant to
  paragraph (b) above is not acceptable to Seller, Seller may
  take at any time thereafter whatever steps Seller
  determines, in its sole discretion, are appropriate and may
  flare, sell, curtail LPG production, "spike" or combine such
  LPG with LNG or condensate or otherwise dispose of Unlifted
  Quantities. Seller shall use all reasonable efforts to sell
  such Unlifted Quantities to a third party. If Seller flares,
  sells, spikes or otherwise disposes or curtails production
  of LPG, Seller shall so notify Buyer and keep Buyer apprised
  of all such actions being taken and shall provide Buyer with
  reasonable access to plant operating data and records
  relating thereto, including Seller's records of sales to
  third parties.
  
   (d)  If Buyer fails to lift the Accepted Quantities
  within the Accepted Date Range, as the same may have been
  modified by Seller pursuant to paragraph (b) above, Buyer
  will pay to Seller the amount equivalent to the "Damages"
  determined in accordance with (i) below after the deduction
  of the sum of the "Credits" referred to in paragraph (ii)
  below; provided, however, that if the sum of such Credits
  equals or exceeds the Damages, Seller shall have no
  obligation to the Buyer to account for the Credits or any
  such excess.
  
        (i)  Damages shall be calculated as follows :
  
             D    =    (AQ x 95% - LQ) x P
             D    --   Damages
             AQ   --   Accepted Quantity (less any
                         quantities rescheduled by Seller).
             LQ   --   That proportion of Accepted
                         Quantities lifted by Buyer during the
                         Accepted Date Range.
             P    --   The Contract Sales Price for the
                         applicable grade of LPG in effect on
                         the last day of the Accepted Date
                         Range of the Accepted Quantity.
  
        (ii) Credits for any acts taken by Seller pursuant
  to paragraph (c) above in respect of Unlifted Quantities
  shall be calculated in accordance with the following :
  
             (A)  the amount of proceeds actually received
  by Seller for any sales made to a third party referred to in
  paragraph (c) above (after deducting direct expenses of the
  sale) up to the amount Seller would have received from Buyer
  based on the Contract Sales Prices in effect on the last day
  of the Accepted Date Range; and
  
             (B)  the value of Butane "spiked" with
  condensate from Natural Gas which is itself sold to third
  parties calculated on the basis of ninety percent (90%) of
  the Contract Sales Price for Butane in effect on the last
  day of the Accepted Date Range; and
  
             (C)  the value of LPG "spiked" with LNG or LPG
  not produced as a consequence of curtailed production
  ("Spiked and Not Produced LPG") calculated on the basis of
  fifty percent (50%) of the Contract Sales Price for the
  applicable grade of LPG in effect on the last day of the
  Accepted Date Range, provided, the aggregate quantity of
  Spiked and Not Produced LPG in the Fixed Quantity Period in
  question does not exceed ten percent (10%) of the Fixed
  Quantity. No credit will be given for Spiked and Not
  Produced LPG exceeding ten percent (10%) of the Fixed
  Quantity for such Fixed Quantity Period.
  
   (e)  The undertakings referred to in Article 11.3 (f)
  shall be deemed to have been discharged in case that the
  actual lifting is made within the plus or minus five percent
  (5%) operational lifting tolerance referred to in Article
  12.1 (d).
  
   (f)  Seller shall invoice the amount calculated on the
  basis of (d) above, to Buyer on the forty-fifth (45th) day
  of the next calendar year following the end of the year in
  which such failure to lift has occurred. Such invoice shall
  be payable by Buyer within fifteen (15) days of receipt.
  
  5.4   Allocation of Supplies Between Buyer and Other
        Purchasers of LPG
  
   If the supplies of Propane and/or Butane capable of being
  produced and loaded at the Bontang Facilities are or are
  reasonably anticipated to be in any period less than the
  commitments of Seller to supply the applicable grade of LPG
  to be shipped from the Loading Port in that period
  (including the commitment to Buyer hereunder), and such
  condition is due to an event of Force Majeure affecting the
  Loading Port or the Bontang Facilities or the Gas Supply
  Area, then the supplies of such grade of LPG which remain
  available will be allocated first to those commitments of
  Seller providing for deliveries of fixed contract quantities
  from the Loading Port over a term of at least ten (10)
  years.
    
ARTICLE 6
  CONTRACT SALES PRICE
  
  6.1   Contract Sales Price
  
   The prices applicable to quantities of Butane delivered
  hereunder and to quantities not taken by Buyer for which
  Buyer is subject to payment of Damages pursuant to Article
  5.3 are herein called the "Contract Sales Price", and are
  expressed in United States Dollars per Metric Ton ("U.S. $ /
  MT").  Buyer shall pay for Butane, in the manner provided in
  Article 10, at the Contract Sales Price calculated in
  accordance with Article 6.2 as of the bill of lading date,
  or, in the case of Butane not taken for which Buyer is
  subject to payment of Damages pursuant to Article 5.3, as of
  the last day of the applicable Accepted Date Range. Either
  such date is hereinafter referred to as the "Calculation
  Date".
  
  6.2   Calculation of Contract Sales Price
  
   The Contract Sales Price ("CSP") shall be calculated as
  of the Calculation Date in accordance with the following
  formula :
   CSP   =   A + U.S.$  X
   in which
   "CSP" =   The Contract Sales Price of Butane expressed in
  U.S. $ / Metric Ton.

     "A" =          P1Q1 + P2Q2 +P3Q3...+ PnQn    where,
                      Q1  + Q2  + Q3...+Qn

    P1, P2, P3...Pn =  The government selling price ("GSP")
  and/or official governmental price of each country which
  supplied Calculation Quantities (as defined below),
  prevailing on the Calculation Date.  The source of data for
  P1, P2, P3... Pn shall be Platt's LPG Gas Wire.
  
  Q1, Q2, Q3...Qn =    Quantities of Butane imported into
  Japan from those countries which have GSP's and/or official
  governmental prices for Butane prevailing on the Calculation
  Date, during the one (1) year period ending on the last day
  of the Quarter which commenced two (2) Quarters before the
  first day of the Quarter in which the bill of lading is
  dated, or, with respect to quantities not taken, in the
  Quarter in which the last day of the applicable Accepted
  Date Range falls (such quantities are hereinafter referred
  to as "Calculation Quantities").  The applicable quantities
  shall be based on the statistics published by the Japan LP-
  Gas Association.  Throughout the term of this Contract Buyer
  shall promptly submit to Seller for the purpose of
  calculating Contract Sales Price hereunder a copy of each
  issue of such publication as soon as it becomes available.
  
  For the purpose of the above calculation Butane imported
  from Indonesia and Das Island, Abu Dhabi shall be excluded.
  
  "X"=  (I)  For Fixed Quantity Period 1992,  20.00;  and
  
        (II) For each of Fixed Quantity Period 1993, 1994
               and 1995, such amount as Seller shall notify to
               Buyer having regard to prevailing market
               conditions for sales of quantities under
               similar circumstances.
  
  6.3   Quantity and Price Statistics
  
   (a)  If on a Calculation  Date any quantity or price
  statistic referred to in Article 6.2 is unavailable from the
  source specified therein, the parties shall jointly endeavor
  to obtain and agree upon the relevant statistic from another
  source.
  
   (b)  In the case the above GSP's and/or official
  governmental prices no longer reflect the actual market
  price of Butane imported into Japan under long term
  contracts or if such GSP's and/or official governmental
  prices are no longer available, then, by notice to the
  other, Seller and Buyer shall each promptly propose in
  writing to the other an alternative pricing method which
  would reflect such actual market price.  The parties shall
  meet to discuss in good faith and, within three (3) months
  of the date of the above notice, agree on an alternative
  pricing method.
  
        Until such time as the matter is finally determined,
  Seller shall invoice Buyer on the basis of Article 10.6 at
  the Contract Sales Price last calculated prior to the notice
  referred to above.
     
                
ARTICLE 7
  QUALITY AND STATE
  
  
  7.1   Specifications
  
   Butane purchased and sold hereunder shall be delivered to
  Buyer in a refrigerated liquid condition and shall have the
  specifications set forth in Exhibit A for Butane.
  
  7.2   Disclaimer of Warranties
  
   There are no guaranties or warranties express or implied
  of merchantability, fitness, suitability of the BUTANE for
  any particular purpose, or otherwise, or of its composition
  except as stated in Article 7.1.
     
           
ARTICLE 8
  TITLE AND RISK OF LOSS
  
  
   Delivery shall be deemed completed and title and risk of
  loss shall pass at the Loading Port as Butane reaches the
  Delivery Point at which point Seller's responsibility shall
  cease and Buyer shall assume all risk of loss, damage,
  deterioration or evaporation as to the Butane so delivered.
  It is expressly understood that the passage of title and
  risk as aforesaid is not conditioned on delivery of a bill
  of lading or other title document.
    
ARTICLE 9
  VERIFICATION AND MEASUREMENT
  
  
  9.1   Inspection
  
   The quality and quantity of each shipment of Butane
  hereunder shall be determined by measurement and
  calculations conducted at the Loading Port by an independent
  firm of inspectors (to be mutually agreed upon) in
  accordance with agreed sampling, measurement, and
  calculation procedures based on recognized good standard
  practice (such firm is hereinafter referred to as the
  "Independent Surveyor").  On completion of loading, the
  Independent Surveyor shall prepare and sign certificates
  stating the quality and quantity of Butane loaded, such
  certificates to conform to a mutually-agreed standard form
  for this purpose.  The Independent Surveyor shall promptly
  provide Seller with a copy of such certificates and Seller
  shall thereupon prepare a bill of lading in accordance with
  the reasonable instructions of Buyer.  The bill of lading
  shall be promptly signed and issued by the vessel's master
  or the authorized representative of the carrier.  The data
  in the certificates of quality and quantity prepared by the
  Independent Surveyor shall, absent fraud or manifest error,
  and subject to the provisions of Article 17, be binding and
  conclusive upon both parties, and shall be used by Seller in
  preparing the invoice.  Any costs attendant to utilizing the
  Independent Surveyor shall be borne equally by Seller and
  Buyer.
  
  9.2   Measurement and Samples
  
   Measurement of the quantities and the sampling and
  analysis for the purpose of determining the quality of the
  Butane in each shipment shall be carried out in accordance
  with the procedures set forth in Attachment 1 to this
  Contract, and samples shall be retained by Seller for at
  least ninety (90) days.
    
ARTICLE 10
  INVOICES AND PAYMENT
  
  
  10.1  Invoices and Cargo Documents
  
   Promptly after completion of loading of each LPG Tanker,
  Seller shall furnish by telex or telegram to Buyer an
  invoice, stated in U.S. Dollars, in the amount of the
  Contract Sales Price for the number of Metric Tons
  delivered.  At the same time, Seller shall send to Buyer a
  signed copy of the invoice and relevant documents showing
  the basis for the calculation thereof, together with such
  other customary documents concerning the cargo as may be
  reasonably requested by Buyer for the purpose of Japanese
  customs clearance.
  
  10.2  Other Invoices
  
   Except as provided in Article 10.1, in the event that any
  moneys are due from one party to the other hereunder
  (including, without limitation, amounts payable pursuant to
  Article 5.3 on account of failure by Buyer to meet its
  Lifting Obligation) then the party to whom such moneys are
  due shall furnish or cause to be furnished an invoice
  therefor and relevant documents showing the basis for the
  calculation thereof.  Such invoice may be sent by telex or
  telegram, provided that signed copies of such invoice and
  such relevant documents are also sent at the same time.
  
  10.3  Invoice Due Dates, etc.
  
   (a)  Each invoice to Buyer referred to in Article 10.1
  shall become due and payable by Buyer on the thirtieth
  (30th) calendar day after the date of the bill of lading for
  the Butane cargo in question.  The failure by a vessel's
  master or authorized representative of the carrier to
  promptly sign and issue a bill of lading shall not
  constitute grounds for delay of payment by Buyer.  Each
  invoice referred to in Article 10.2 (except the invoice
  referred to in Article 5.3) shall become due and payable on
  the thirtieth (30th) calendar day after receipt thereof by
  the party to which it was sent.
  
   (b)  If any invoice would become due on a date which is
  not a Business Day, such invoice shall, notwithstanding the
  provisions of paragraph (a) above, become due and payable on
  the next succeeding Business Day.
  
   (c)  In the event the full amount of any invoice is not
  paid by either Seller or Buyer when due, any unpaid amount
  thereof shall bear interest from the due date until paid, at
  an interest rate, compounded annually, two (2) percentage
  points greater than the time-weighted average rate being
  charged during the period of delinquency by Citibank, N.A.,
  New York, New York, to its prime commercial customers for
  ninety (90) days loans.
  
  10.4  Payment
  
   Buyer shall pay, or cause to be paid, in U.S. Dollars by
  telegraphic transfer remittance in immediately-available
  funds, all amounts which become due and payable by Buyer
  pursuant to any invoice issued hereunder, to a bank account
  or accounts in the United States to be designated by Seller,
  provided that each such designation or change thereto shall
  be effective only upon the written consent of the VICO
  Group, the TOTAL Group and the UNOCAL Group, as third-party
  beneficiaries hereunder.  Seller shall pay, or cause to be
  paid, in U.S. Dollars by telegraphic transfer remittance in
  immediately-available funds, all amounts which become due
  and payable by Seller pursuant to any invoice issued
  hereunder, to a bank account designated by Buyer.  The
  paying party shall not be responsible for a designated
  bank's disbursement of amounts remitted to such bank, and a
  deposit in immediately-available funds of the full amount of
  each invoice with such bank shall constitute full discharge
  and satisfaction of the obligations under this Contract for
  which such amounts were remitted.  Each payment of any
  amount owing hereunder shall be in the full amount due
  without reduction or offset for any reason, including,
  without limitation, taxes, exchange charges or bank transfer
  charges.
  
  10.5  Seller's Rights Upon Buyer's Failure to Make Payment
  
   If payment of any invoice for quantities of Butane sold
  hereunder or for that portion of Buyer's Lifting Obligation
  for which Buyer is subject to payment of Damages pursuant to
  Article 5.3 (d) is not made within ten (10) days after the
  due date thereof, Seller shall be entitled, upon giving
  written notice to Buyer, to suspend subsequent shipments and
  sales to Buyer until the amount of such invoice and interest
  thereon has been paid.  Buyer shall not be entitled to any
  make-up rights in respect of such suspended shipments and
  sales.  If any such invoice is not paid within thirty (30)
  days after the due date thereof, then Seller shall have the
  right, at Seller's election, to terminate this Contract and
  such termination shall become effective upon the date of
  such notice of termination from Seller.  Seller's rights
  under this Article 10.5 and Seller's exercise of any of such
  rights shall be without prejudice to any other rights and
  remedies of Seller arising hereunder or by law or otherwise
  (including without limitation the right of Seller to demand
  adequate security of Buyer's performance under circumstances
  permitted by New York law, and to receive payment of all
  obligations and claims which arose or accrued prior to
  termination or by reason of default in payment by Buyer).
  
  10.6  Disputed Invoices
  
   In the event of disagreement concerning any invoice, the
  invoiced party shall make provisional payment of the total
  amount thereof and shall immediately notify the other party
  of the reasons for such disagreement, except that in the
  case of obvious error in computation the correct amount
  shall be paid disregarding such error. Invoices may be
  contested or modified only if, within a period of ninety
  (90) days after receipt thereof, Buyer or Seller serves
  notice on the other, questioning their correctness.  If no
  such notice is duly served, invoices shall be deemed correct
  and accepted by both parties.  Promptly after resolution of
  any dispute as to an invoice, the amount of any overpayment
  or underpayment shall be paid by Seller or Buyer to the
  other, as the case may be, plus interest at the rate
  provided in Article 10.3 from the date payment was due to
  the date of payment.
    
ARTICLE 11
  PROGRAMMING AND SHIPPING MOVEMENTS
  
  
  11.1  Annual Programs
  
   Not later than October fifteenth (15th) of each year,
  Seller shall give written notice to Buyer of the quantity of
  Butane available for delivery hereunder at the Loading Port
  during the next calendar year.
  
   On or before October twenty-fifth (25th) of each calendar
  year after receipt of the foregoing notice, Buyer shall
  advise Seller in writing of the portion (if any) of the
  Fixed Quantity Buyer wishes to take during each Quarter of
  the following year (the "Program Year") specifying the
  quantity of Butane it wishes to take in each such Quarter. 
  Seller and Buyer shall thereupon consult together with a
  view to reaching agreement, by November eighth (8th) of the
  year preceding the Program Year, upon a program for the
  quantity of Butane to be shipped hereunder from the  Loading
  Port during each Quarter during the Program Year (the
  "Annual Program").  If no such agreement shall have been
  reached as to an Annual Program by November eighth (8th) of
  the year preceding the Program Year, or if Buyer shall have
  not notified Seller of its requested quarterly quantities of
  Butane by October twenty-fifth (25th) of such year, Seller
  shall be entitled, using reasonable discretion, to establish
  upon notice made to Buyer by November tenth (10th) of the
  same year, the Annual Program for the Program Year.  In so
  doing, Seller shall take into consideration the contents of
  the above notice from Buyer, Seller's commitments to other
  purchasers of LPG from the Bontang LPG Facilities, the
  production ratio of Butane and Propane at the Loading Port
  and the provisions of Article 5.2.
  
   For the Program Year 1992, Seller and Buyer shall
  exchange the above information promptly upon execution of
  this Contract and shall thereupon consult together upon the
  Annual Program; but if the Annual Program is not agreed
  within 14 days after execution hereof Seller may establish
  the Annual Program on the basis provided in the foregoing
  paragraph.
  
  11.2  Quarterly Schedule
  
   (a)  Not later than the twenty-fifth (25th) day of the
  first month of each Quarter commencing with the Quarter
  immediately preceeding the Quarter in which deliveries under
  this Contract commence, Buyer shall advise Seller in writing
  of the quantity of Butane Buyer wishes to take during the
  succeeding Quarter (the "Shipment Quarter") based on the
  quantities established under the Annual Program for such
  Quarter; provided, however, that with respect to such notice
  given in the last Quarter of any calendar year, the
  quantities shall be based on Buyer's notice referred to in,
  and shall be subject to adjustment in accordance with,
  Article 11.1.
  
   (b)  Following receipt of the notice referred to in
  Article 11.2 (a), Seller and Buyer shall thereupon consult
  together with a view to reaching agreement upon, by the
  eighth (8th) day of the second month of the Quarter
  preceding the Shipment Quarter, a loading schedule for the
  Shipment Quarter, specifying the month in which the shipment
  of Butane is to be made in the Shipment Quarter and the
  quantity of Butane to be shipped ("Quarterly Schedule").  If
  no such agreement shall have been reached as to a Quarterly
  Schedule by the eighth (8th) day of the second month of the
  Quarter preceding the Shipment Quarter, or if Buyer shall
  have not issued a notice to Seller in accordance with
  Article 11.2 (a), Seller shall be entitled, using reasonable
  discretion, to establish, upon notice made to Buyer by the
  tenth (10th) day of the second month of the Quarter
  preceding the Shipment Quarter, the Quarterly Schedule.  In
  so doing, Seller shall take into consideration the contents
  of the notice from Buyer referred to in Article 11.2 (a),
  Seller's commitments to other purchasers of LPG from the
  Bontang LPG Facilities, and the provisions of Article 5.2.
  
   (c)  For the first Shipment Quarter in 1992, Buyer shall
  advise Seller of the information in paragraph (a) above
  promptly upon execution of this Contract and Buyer and
  Seller shall thereupon consult together upon the Quarterly
  Schedule; but if the Quarterly Schedule is not agreed within
  14 days after execution hereof Seller may establish the
  Quarterly Schedule on the basis provided in the foregoing
  paragraph.
  
  11.3  Nominations
  
   (a)  An Accepted Date Range shall be a five (5) day
  period of time determined in respect of each shipment
  hereunder in accordance with the provisions of this Article. 
  Each date range proposed by either party or established by
  the Seller as the Accepted Date Range shall, unless
  otherwise agreed, be a period of five (5) days.
  
   (b)  No later than the twentieth (20th) day of the second
  calendar month preceding each month in which shipments of
  Butane are projected to be made hereunder in accordance with
  the most recent Quarterly Schedule covering such month
  ("Shipment Month"), Buyer shall notify Seller of the
  range(s) of days which Buyer proposes ("Nominated Date
  Range(s)"), as to any shipment in that month, the quantity
  of Butane to be shipped ("Nominated Quantity") based on the
  quantities established in the Quarterly Schedule for such
  month, and the name of the LPG Tanker ("Named LPG Tanker")
  or that it is a "to be named" LPG Tanker ("TBN").
  
   (c)  Seller shall respond to Buyer's notice referred to
  in paragraph (b) above no later than the first (1st) day of
  the calendar month immediately preceding the Shipment Month
  as to whether Nominated Date Range(s), Nominated Quantity
  and other requests are acceptable, and if they are, the
  Nominated Date Range(s) and Nominated Quantity of Butane
  shall be the Accepted Date Range(s) and the Accepted
  Quantity for the Shipment Month.  If the Nominated Date
  Range(s) or Nominated Quantity or other requests are not
  acceptable to Seller, Seller shall propose the minimum
  modifications to Buyer's requests required to accommodate
  Seller's and the Loading Terminal's operations and
  schedules.  Buyer and Seller shall consult together with a
  view to reaching agreement upon, by the sixth (6th) day of
  the calendar month immediately preceding the Shipment Month,
  a mutually-acceptable schedule of shipments, quantities and
  date range(s).
  
   (d)  If no agreement shall have been reached as to date
  range(s) and/or quantities by the sixth (6th) day of the
  calendar month immediately preceding the Shipment Month,
  Seller shall be entitled, using reasonable discretion, to
  establish, upon notice to Buyer by the eighth (8th) day of
  the calendar month immediately preceding the Shipment Month,
  the necessary date range(s) for shipments hereunder, which
  shall be deemed to be the Accepted Date Range(s), and/or the
  quantity of Butane to be shipped in relation to each such
  range, which shall be deemed to be the Accepted Quantity,
  for the Shipment Month.
  
   (e)  For the first Shipment Month, if so required due to
  the Quarterly Schedule proposed by Buyer pursuant to Article
  11.2, Buyer shall advise Seller of the information in
  paragraph (b) above promptly upon execution of this Contract
  and Buyer and Seller shall thereupon consult together upon a
  mutually-acceptable schedule of shipments, quantities and
  date range(s); but if such schedule is not agreed within
  fourteen (14) days after execution hereof Seller may
  establish such schedule on the basis provided in the
  foregoing paragraph.
  
   (f)  Buyer and Seller shall be deemed to have undertaken
  to receive and to deliver, respectively, the Accepted
  Quantity during the Accepted Date Range(s).
  
  11.4  Notification of Expected Arrivals
  
   Not later than seven (7) days prior to the first day of
  each Accepted Date Range, Buyer shall notify Seller of the
  expected date of arrival of the LPG Tanker scheduled to
  receive the Butane, and written instructions regarding the
  making up and disposition of bills of lading and orders for
  port(s) of discharge, which, if reasonable, shall be
  complied with by Seller.  Buyer shall notify Seller of the
  name of any LPG Tanker previously advised as a TBN as soon
  as possible but in no event later than the last day for the
  naming of a vessel under Terminal Procedures.  Buyer may
  thereafter substitute another LPG Tanker of similar class,
  type, size, capacity and position, provided all other
  provisions hereof are complied with and further provided
  that the advice of substitution is timely under Terminal
  Procedures.
  
  11.5  LPG Tanker to Arrive Precooled
  
   Upon arrival at the Loading Port, any LPG Tanker which
  does not have its cargo tanks adequately precooled, or is in
  any other way not fit or ready for the receipt of the Butane
  as required by the Terminal Procedures will, if scheduling
  and other operational considerations permit, be cooled down
  at the berth at Buyer's expense.  Laytime will be extended
  for any time required for cooldown, such time to begin when
  the vessel starts to receive Butane for cooling and to end
  when the required loading temperature is reached. Cooldown
  Butane will be measured in the same manner as Butane for
  delivery and charged at the Contract Sales Price in effect
  at the time of delivery.  Should the extended berth time
  cause a conflict with LNG delivery schedules, Buyer shall
  cause the LPG Tanker to vacate the berth and return later to
  continue cooldown or loading, as the case may be.  All
  laytime, harbor fees and port charges for vacating and
  returning to the berth under these circumstances will be for
  Buyer's account.
    
ARTICLE 12
  DELIVERY
  
  
  12.1  Delivery
  
   (a)  Delivery of the Butane shall be made F.O.B. by
  Seller to Buyer at the Loading Terminal in bulk into LPG
  Tankers arranged by Buyer. The Butane shall be transported
  to and unloaded at the Receiving Facilities.
  
   (b)  Buyer shall return to Seller free of charge the
  vapor from Buyer's LPG Tankers during loading and cooling
  operations.
  
   (c)  It is intended that all deliveries will be made in
  full LPG Tanker cargo lots.  However, Seller and Buyer will
  endeavor to accommodate the other party's request for part-
  cargo shipments if such accommodation is possible taking
  into account shipping and production schedules and ullage at
  the Bontang Facilities.
  
   (d)  Buyer shall take delivery of the Accepted Quantity
  of Butane scheduled to be loaded, subject to a plus or minus
  five percent (5%) operational lifting tolerance to account
  for operational limitations of LPG Tankers.
  
  12.2  Loading Terminal, LPG Tankers and Terminal
        Procedures
  
   (a)  Buyer shall provide LPG Tankers at the Loading Port
  to take delivery of Butane which have the following general
  specifications and such other specifications as may be
  required pursuant to paragraph (b) below:
  
          LPG Tanker capacity   : 15,000 to 100,000 Cubic Meters
          Total deadweight      : up to 65,000 metric tons
          Length overall        : 159 to 255 meters
          Beam extreme          : up to 40 meters
          Maximum draft         : up to 12.5 meters
    
   (b)  Seller shall provide at the Loading Terminal a
  berth, mooring or other area capable of handling LPG Tankers
  which are within the specifications set out in paragraph (a)
  above and Article 12.1 (c). Seller shall furnish with
  reasonable dispatch, upon Buyer's request therefore, all
  necessary information concerning restrictions applicable at
  the Loading Port and the Loading Terminal with respect to
  maximum draft, length and the like in addition to those set
  out in paragraph (a) above, Terminal Procedures relevant to
  LPG Tanker operations, and special or non-customary
  requirements of governmental authorities at the Loading Port
  with respect to LPG Tanker operations therein.  Buyer shall
  be deemed to be fully familiar with such restrictions,
  Terminal Procedures, and requirements, provided that Seller
  has furnished and Buyer has received such information as has
  been requested as aforesaid.  Buyer shall not nominate or
  furnish an LPG Tanker which does not conform to the
  aforesaid restrictions, Terminal Procedures, and
  requirements.  Buyer acknowledges that the Terminal
  Procedures and regulations of governmental authorities with
  jurisdiction over the Loading Port apply to the loading and
  receipt of the Butane and to Buyer's LPG Tankers thereat. 
  If Buyer's LPG Tanker does not conform to the Terminal
  Procedures or the requirements or regulations of the
  governmental authorities with respect to safety, size, age
  of the vessel, vessel movements, navigation and operating
  standards, discharge, and the like, or the master of the LPG
  Tanker fails to execute Conditions of Use then employed at
  the Loading Port, Seller may refuse to berth or load the LPG
  Tanker and any delays or expenses of Seller and Buyer due to
  such non-conformance, whether Seller so refuses or proceeds
  with berthing or loading, shall be for Buyer's account.
  
   (c)  Each of Buyer's LPG Tankers shall be designed and at
  all times be equipped and manned so as to safely receive, at
  the Delivery Point, Propane and Butane simultaneously for
  loading at a rate for each grade of LPG of not less than
  1,700 Cubic Meters per hour or, if loading one grade of LPG
  through two loading arms (if the LPG Tankers' manifold
  configuration so permits), 3,400 Cubic Meters per hour, or
  if loading Butane and Propane sequentially, at a rate of not
  less than 1,700 Cubic Meters per hour.
  
   (d)  The provisions of this Contract applicable to LPG
  Tankers shall apply whether an LPG Tanker is owned or
  operated by Buyer or otherwise employed by Buyer.
  
    
ARTICLE 13
  ARRIVAL, LOADING TIME AND DEMURRAGE
  
  
  13.1  Notice of Arrival
  
   (a)  Buyer shall arrange for each LPG Tanker to report by
  radio to the Loading Terminal or to Seller at the Loading
  Port a notice of the LPG Tanker's estimated time of arrival,
  initially within seventy-two (72) hours prior to the LPG
  Tanker's arrival at the Loading Port.  Such notice shall
  include a statement of the expected temperature of the
  bottom of the cargo tanks on arrival.
  
   (b)  Buyer shall arrange for each LPG Tanker to report by
  radio to the Loading Terminal or to Seller at the Loading
  Port forty-eight (48) and twenty-four (24) hours before
  arrival thereat (or at such other times as Buyer may be
  advised by Seller), stating the estimated time of arrival.
  
  13.2  Notice of Readiness and Loading
  
   As soon as the LPG Tanker arrives at the sea buoy of the
  Loading Port, the master shall give notice of readiness to
  Seller ("Notice of Readiness"); provided, however, that in
  the event an LPG Tanker should arrive at the Loading Port
  prior to the first day of the Accepted Date Range, Notice of
  Readiness shall be deemed effective at the earlier of (i)
  06.00 a.m. local time on the first day of the Accepted Date
  Range or such earlier time as applicable port regulations
  designate that vessels are permitted to proceed to berth, or
  (ii) the time loading commences.
  
  13.3  Laytime
  
   (a)  The allowed laytime for Seller to load each LPG
  Tanker ("Allowed Laytime") shall be four (4) hours plus
  either (i) one hour for every 1,700 Cubic Meters comprising
  the Accepted Quantity, if loading Propane or Butane
  sequentially, or (ii) one hour for every 3,400 Cubic Meters
  comprising the Accepted Quantity, if loading Propane and
  Butane simultaneously or if loading Butane through two
  loading arms, subject to adjustment as provided below and in
  Article 12.1 (d).
  
   (b)  The actual laytime for each LPG Tanker ("Used
  Laytime") shall commence (i) six (6) hours after the time
  when the Notice of Readiness is tendered by the LPG Tanker's
  master or six (6) hours after the Notice of Readiness is
  deemed effective pursuant to Article 13.2, whichever is
  later, or (ii) when the LPG Tanker is "all fast alongside"
  the berth and ready to receive cooldown Butane or cargo,
  whichever of the foregoing first occurs, and shall end when
  the loading and return lines of the LPG Tanker are
  disconnected from the Loading Terminal's loading and return
  lines.  Where delay is caused to an LPG Tanker getting into
  berth after giving Notice of Readiness for any reason over
  which neither Seller nor the Loading Terminal has control,
  such delay shall not count as Used Laytime.  If an LPG
  Tanker's  Notice of Readiness is tendered on a date later
  than the last day of the Accepted Date Range, the LPG Tanker
  shall await its turn to load in accordance with Terminal
  Procedures, and Used Laytime shall commence when the LPG
  Tanker is "all fast alongside" the berth and ready to
  receive LPG.  Any delay due solely to the LPG Tanker's
  condition or breakdown or inability of the LPG Tanker's
  facilities to load Butane within the time allowed or at the
  rate set forth in Article 12.2 (c) shall not count as Used
  Laytime or time on demurrage.
  
   (c)  The periods mentioned below shall be reduced from
  Used Laytime and shall not count as time on demurrage:
  
        (i)  any period during which proceeding from the
  anchorage, berthing, loading or clearing the LPG Tanker to
  proceed to sea after completion of loading is delayed,
  hindered or suspended by Buyer, the LPG Tanker's owner, the
  LPG Tanker's master, or any third party or governmental
  authority for reasons of safety, weather or for other
  reasons over which Seller has no control;
  
        (ii) any period of delay attributable to the
  operation of the LPG Tanker including the period of time
  such LPG Tanker awaits a berth by reason of the LPG Tanker
  being unable to receive Butane under this Contract or under
  the Terminal Procedures; 
  
        (iii)  any period during which the LPG Tanker's
  tanks are being cooled to a temperature that will permit
  continuous loading of Butane in accordance with Terminal
  Procedures;
  
        (iv) any period in excess of Allowed Laytime
  required to load the LPG Tanker due to the LPG Tanker's
  inability to load at the Loading Terminal's normal
  operational loading rate due to limitations placed on the
  loading rate by the LPG Tanker; and
  
        (v)  any period during which the LPG Tanker is
  waiting for all necessary port clearances.
  
  13.4  Demurrage
  
   (a)  If Used Laytime exceeds Allowed Laytime (as adjusted
  in accordance with Article 13.3) in loading any LPG Tanker,
  Seller shall pay to Buyer demurrage at the "Annual Demurrage
  Rate" per day in effect in the calendar year in which Used
  Laytime commenced for the LPG Tanker.  The "Annual Demurrage
  Rate" for each calendar year shall be the rate (in U.S.
  Dollars per day) to be determined in accordance with the
  procedures set out in Exhibit B, and such rate shall be
  notified to Buyer as soon as possible after it has been
  determined.
  
   (b)  If demurrage shall be incurred at the Loading Port
  by reason of fire, explosion, storm or by a strike, lockout,
  stoppage or restraints of labour or by breakdown of
  machinery or equipment in or about the plant of Seller,
  demurrage shall be reduced by one-half of the amount set out
  in Exhibit B.  Seller shall not be liable for any demurrage
  for delay caused by strike, lockout, stoppage or restraints
  of labour for master, officers and crew of the LPG Tanker or
  tugboat or pilots.
  
   (c)  Buyer shall invoice Seller for amounts due under
  this Article 13.4 and Seller shall pay the invoice in
  accordance with the terms of Article 10.
    
ARTICLE 14
  DEPARTURE, MISCELLANEOUS CHARGES AND INSURANCE
  
  
  14.1  Departure
  
   Each LPG Tanker shall vacate the berth as soon as loading
  is completed, subject to and in accordance with the Terminal
  Procedures.  Any loss or damage incurred by Seller as a
  result of the LPG Tanker's failure promptly to vacate the
  berth, except for any cause over which Buyer has no control,
  shall be paid by Buyer to Seller.
  
  14.2  Miscellaneous Charges
  
   Dues and other charges on the Butane loaded shall be paid
  by Seller.  Dues and other charges on the LPG Tanker,
  whether or not such dues or charges are based on the
  quantity of Butane loaded or the freight and regardless of
  who is initially required to pay or withhold such dues and
  charges, shall be paid or borne by Buyer.  Any taxes on
  freight shall be borne by Buyer.
  
  14.3  Insurance and Conditions of Use
  
   Buyer shall ensure that all LPG Tankers shall be entered
  in a reputable P & I Club acceptable to Seller for all
  risks, including, without limitation, those provided for in
  the Conditions of Use.  All costs related to entering LPG
  Tankers with reputable P & I Clubs shall be at Buyer's
  expense.  Buyer shall ensure that the owner, operator or
  charterer and master of each LPG Tanker shall accept the
  Conditions of Use. The Conditions of Use shall be modified
  by an Omnibus Agreement between Seller, Seller's Suppliers
  and Buyer's Transporter (the "Omnibus Agreement") and a
  Waiver Agreement between Seller, Seller's Suppliers, Buyer's
  Transporter and Buyer (the "Waiver Agreement") in the same
  form and substance as hitherto executed in connection with
  the use of the Loading Port by other LNG and/or LPG vessels.
  Prior to the first sale and delivery of Butane under this
  Contract, Seller shall sign and cause Seller's Suppliers to
  sign the Omnibus Agreement and Waiver Agreement, Buyer shall
  sign and cause Buyer's Transporter to sign the Waiver
  Agreement, and Buyer shall cause Buyer's Transporter to sign
  the Omnibus Agreement.
  
    
ARTICLE 15
  FORCE MAJEURE
  
  
  15.1  Events of Force Majeure
   (a)  Neither Seller nor Buyer shall be liable for any
  delay or failure in performance hereunder if and to the
  extent such delay or failure in performance is directly
  caused by any of the following causes or events (any such
  cause or event is hereinafter referred to as an event of
  "Force Majeure"):
  
        (i)  As to the Bontang Facilities and the Receiving
  Facilities:
             (A)  fire, flood, atmospheric disturbance,
  lightning, storm, typhoon, tornado, earthquake, landslide,
  soil erosion, subsidence, washout or epidemics;
             (B)  war, riot, civil war, blockade,
  insurrection, sabotage, acts of public enemies or civil
  disturbances;
             (C)  strike, lockout or other industrial
  disturbances;
             (D)  accidental damage to Natural Gas
  reservoirs or Natural Gas production facilities in the Gas
  Supply Area or to the facilities for transportation of
  Natural Gas from the Gas Supply Area;
  
             (E)  accidental damage to any of the Bontang
  LPG Facilities or the Bontang LNG Facilities;
  
             (F)  accidental damage to the Receiving
  Facilities capable of receiving the LPG cargo(es) in
  question;
             (G)  inability or reduced capacity of
  facilities to produce or ship LNG or other hydrocarbons, in
  either case, requiring a cessation, suspension, interruption
  or curtailment in production or transmission of Natural Gas,
  LPG or LNG;
             (H)  depletion, reduction or insufficiency of
  reserves of, or a change in the characteristics of Natural
  Gas from, or a change in the reservoir characteristics of,
  the Gas Supply Area such that the contractual quantities of
  Butane hereunder cannot be produced in a commercial manner;
  or
             (I)  act of government or governmental
  authorities or any law, decree, order or the like, or taking
  or confiscation whether or not acting under color of law,
  that directly affects the ability of a party to perform any
  obligation hereunder other than the obligation to remit
  payments as provided in Article 10.4 hereof on account of
  Butane delivered and taken or not taken and subject to
  payment of Damages under this Contract.
        (ii) As to Named LPG Tankers:
  
             (A)  loss of Named LPG Tanker or serious damage
  thereto;
             (B)  closing of harbors, ports or other
  facilities;
             (C)  accident of navigation or perils of the
  sea;
             (D)  fire, flood, atmospheric disturbance,
  lightning, storm, typhoon, tornado, or epidemics;
  
             (E)  war, riot, civil war, blockade,
  insurrection, acts of public enemies, or civil disturbance;
  
             (F)  strike or other industrial disturbance
  occurring aboard a Named LPG Tanker; or
  
             (G)  acts of government.
  
        (iii)     As to the Bontang Facilities, the
  Receiving Facilities and Named LPG Tankers: any event or
  cause whether or not of the same type or class as described
  above and whether or not foreseeable, reasonably beyond the
  control of the party affected which by the exercise of due
  diligence that party is unable to overcome.
  
   (b)  Notwithstanding the provisions of paragraph (a)
  above:
        (i)  Buyer shall in no event be relieved of its
  obligations to pay Seller for Butane sold and delivered to
  it hereunder or for payment of Damages pursuant to Article
  5.2 for Butane not taken;
  
        (ii) neither party shall be relieved from any other
  obligations to make payments required hereunder to the other
  party; and
        (iii)     neither party shall be relieved from its
  obligation to make payments in immediately available U.S.
  Dollars in the place or places otherwise provided for
  herein.
  
   (c)  Settlement of strikes, lockouts or other industrial
  disturbances shall be entirely within the discretion of the
  party experiencing such situations, and nothing herein shall
  require such party to settle industrial disputes by yielding
  to demands made on it when it considers such action
  inadvisable.
  
  15.2  Notice, Resumption of Normal Performance
  
   (a)  Immediately upon the occurrence of an event of Force
  Majeure that gives a party warning that the event may delay
  or prevent the performance by Seller or Buyer of any of its
  obligations hereunder, the party affected shall give notice
  thereof to the other party describing such event and stating
  the obligations the performance of which are, or are
  expected to be, delayed or prevented, and (either in the
  original or in supplemental notices) stating (i) the
  estimated period during which performance may be suspended
  or reduced, including, to the extent known or ascertainable,
  the estimated extent of such reduction in performance, and
  (ii) the particulars of the program to be implemented to
  ensure full resumption of normal performance hereunder.
  
   (b)  In order to promote resumption of normal performance
  of this Contract within the shortest practicable time, the
  party affected by an event of Force Majeure shall take all
  measures to that end which are reasonable in the
  circumstances, taking into account the consequences
  resulting from such event of Force Majeure, provided that
  such party shall not be required to take measures which
  would involve it in material additional expense or in a
  material departure from its normal practices.  Prior to
  resumption of normal performance the parties shall continue
  to perform their obligations under this Contract to the
  extent not prevented by such event of Force Majeure.
  
  15.3  Effect on Deliveries, Supplies, Term
  
   (a)  No curtailment or suspension of deliveries or
  receipt of deliveries shall operate to extend the duration
  of this Contract or to terminate this Contract (except as
  specified in paragraph (c) below).  Neither Buyer nor Seller
  shall be obliged to make up shipments omitted due to Force
  Majeure, whether affecting Seller or Buyer.
  
   (b)  Under no circumstances shall Seller be obliged to
  purchase or otherwise obtain Butane lost or not produced as
  the result of Force Majeure, or to replace or supplement the
  Gas Supply Area as the source of supply of Natural Gas for
  Butane or to replace or supplement the Bontang LPG
  Facilities for production of Butane.  Should Seller obtain
  or acquire alternate Butane supplies, Seller shall not be
  obligated to allocate any such supplies to Buyer.
  
   (c)  If either Buyer's or Seller's performance hereunder
  is delayed or prevented by Force Majeure for more than one
  hundred and eighty (180) consecutive days, the other party
  shall have the right to terminate this Contract upon sixty
  (60) days' prior notice after expiration of such period of
  one hundred and eighty (180) days to the other party
  provided that such event of Force Majeure is not remedied
  within such period of notice.
    
ARTICLE 16
  EARLY TERMINATION
  
  
   If Buyer shall become insolvent or unable to pay its
  debts as they mature, or commits or suffers any act of
  bankruptcy (including filing or failing to have discharged
  any petition in bankruptcy, reorganization, winding-up,
  liquidation or similar proceeding, the appointment of a
  receiver or trustee of Buyer or its assets, and assignment
  for the benefit of its creditors or similar composition),
  then Buyer shall be in material breach hereunder and (in
  addition to such other remedies as it may have) Seller shall
  have the right to terminate this Contract forthwith upon
  notice to Buyer.
  
    
ARTICLE 17
  ARBITRATION
  
  
   Any dispute between Seller and Buyer in connection with
  this Contract or the interpretation, performance or non-
  performance hereof shall be finally settled by arbitration
  pursuant to the Rules of Conciliation and Arbitration of the
  International Chamber of Commerce ("ICC"), in effect at that
  time, by three (3) arbitrators appointed in accordance with
  said Rules.  The place at which such arbitration proceedings
  shall be held shall be Paris, France and the arbitrators
  shall be bound to apply the laws of the State of New York in
  determination of the dispute.  The award rendered by the
  arbitrators shall be final and binding upon the parties, and
  may be entered and enforced in any court having
  jurisdiction.  The arbitration proceedings shall be
  conducted in the English language.
    
ARTICLE 18
  APPLICABLE LAW
  
  
   This Contract shall be governed by and interpreted in
  accordance with the laws of the State of New York, United
  States of America.
    
ARTICLE 19
  CONFIDENTIALITY
  
  
   Information or documents furnished by a party to the
  other party hereunder in connection with the performance of
  this Contract, and which the disclosing party identifies as
  confidential may not be used or communicated to third
  parties without the agreement of Seller, in the case of
  information and documents furnished to Buyer, and of Buyer,
  in the case of information and documents furnished to
  Seller. This restriction shall not apply to information or
  documents which:
  
   (a)  have fallen into the public domain otherwise than
  through the act or failure to act of the party that has
  received them;
  
   (b)  are communicated to any Supplier or any Affiliate of
  a party or a Supplier, with the obligation of the receiving
  persons to maintain confidentiality;
  
   (c)  are communicated to legal counsel, accountants,
  other professional consultants or advisers, underwriters or
  lenders of a party of a Supplier, or other persons that are
  participating in the implementation of sales of LPG from the
  Bontang Facilities, with the obligation of the receiving
  persons to maintain confidentiality;
  
   (d)  are communicated to contractors for or operators of
  the Bontang Facilities, the Loading Port, any LPG Tanker, or
  the Loading Terminal, provided that such communication is
  necessary for the performance by a party of the obligations
  under this Contract and provided further that said
  contractors and operators shall be subject to an obligation
  to maintain confidentiality; or 
  
   (e)  are communicated to any governmental authorities of
  Japan or the Republic of Indonesia, or the United States of
  America, or the country of incorporation of any Supplier
  claiming authority to require such disclosure, in accordance
  with that authority.
  
   The foregoing obligations of the parties shall survive
  termination of this Contract.
    
ARTICLE 20
  NOTICES
  
  
   All notices and other communications for purposes of this
  Contract shall be in English and in writing, which shall
  include transmission by telex, cable, or other electronic
  means such as facsimile transmission, except that notices
  given from ships at sea may be by radio in English.  Notices
  and other communications given by telex, cable or other
  electronic means shall be confirmed by air mail unless
  otherwise agreed by the parties.  Notices and communications
  shall be directed as follows:
   
  A.    To Seller at the following:
     
          PERUSAHAAN PERTAMBANGAN MINYAK DAN GAS BUMI NEGARA
       (PERTAMINA)
     
          (Mail address)      P.O. BOX 12 / JKT
                              Jl. Medan Merdeka Timur 1 A
                              Jakarta Pusat, Indonesia
     
          (Cable address)     PERTAMINA
                              JAKARTA, INDONESIA VIA RCA
     
          (Telex address)     PERTAMINA
                              44302 or 44152
                              JAKARTA, INDONESIA
     
          (Facsimile address) 62-21-355271
     
          In each case marked for the attention of:
          Head of Gas Marketing Department
           
B. To Buyer at the following:
     
          NATIONAL FEDERATION OF AGRICULTURAL CO-OPERATIVE
       ASSOCIATIONS (ZEN-NOH)
     
          (Mail address)      NOHKYO BLDG.
                              8-3, 1-Chome Ohtemachi
                              Chiyoda-Ku
                              Tokyo
                              JAPAN
       
     (Telephone address)      81-3-3245-7332

          (Telex address)          3222-3686 ZENNO J
       
     (Facsimile address)      81-3-3270-3807
        Either party may designate additional addresses for
  particular communications as required from time to time, and
  may change any address, by notice given thirty (30) days in
  advance of such addition or change.  Immediately upon
  receiving communications by telex, cable, facsimile or radio,
  a party shall acknowledge receipt by the same means (or may
  acknowledge receipt of facsimile by telex or cable), and may
  request a repeat transmittal of the entire communication or
  confirmation of particular matters.
  
   If the sender receives no acknowledgement of receipt
  within twenty-four (24) hours, or receives a request for
  repeat transmittal or confirmation, said party shall repeat
  the transmittal or answer the particular request.  Unless
  otherwise expressly provided herein, all notices hereunder
  shall become effective upon receipt, and for the purposes
  hereof, "receipt" in the case of a telex shall refer to a
  message sent for which an "answer-back" was received by the
  sender. Prior to the first Shipment Month, the parties shall
  establish radio channels, frequencies and procedures for all
  communications between LPG Tankers, the Bontang Facilities
  and the authorities for the Loading Port and Loading
  Terminal.
    
ARTICLE 21
  ASSIGNMENT
  
  
   Neither this Contract nor any rights or obligations
  hereunder may be assigned by Buyer without the prior written
  consent of Seller, or by Seller without the prior written
  consent of Buyer.
    
ARTICLE 22
  AMENDMENTS
  
  
   This Contract may not be amended, modified, varied or
  supplemented except by an instrument in writing signed by
  the President-Director or other duly authorized
  representative of Seller and by a Director or other duly
  authorized representative of Buyer.
  
   Performance of any condition or obligation to be
  performed hereunder shall not be deemed to have been waived
  or postponed except by an instrument in writing signed by an
  authorized signatory, as specified in the preceding
  paragraph, of the party who is claimed to have granted such
  waiver or postponements.
    
ARTICLE 23
  ENTIRE AGREEMENT
  
  
   This Contract constitutes the entire agreement between
  the parties relating to the subject matter hereof and
  supersedes and replaces any provisions on the same subject
  contained in any other agreement or communications between
  the parties prior to the execution of this Contract, whether
  written or oral.
    
ARTICLE 24
  LANGUAGE OF THE CONTRACT
  
  
   This Contract has been made and executed only in the
  English language.
    
ARTICLE 25
  HEADINGS
  
  
   The headings and captions in this Contract are inserted
  solely for the sake of convenience and shall not affect the
  interpretation or construction of this Contract.
    
ARTICLE 26
  COUNTERPARTS
  
  
   This Contract has been executed in two (2) identical
  counterparts, each of which shall have the force and dignity
  of an original, and both of which shall constitute but one
  and the same Contract.
    
        IN WITNESS WHEREOF, each of the parties has caused
  this Contract to be executed in Jakarta by its duly
  authorized representative as of the date first written
  above.
    
  
  SELLER:                          BUYER:
  
  PERUSAHAAN PERTAMBANGAN MINYAK   NATIONAL FEDERATION OF 
  DAN GAS BUMI NEGARA (PERTAMINA)  AGRICULTURAL CO-OPERATIVE   
                                   ASSOCIATIONS ("ZEN-NOH")
  
  
    By :     F. ABDA'OE                    By : M. SHIGAKI
        PRESIDENT DIRECTOR                 CHAIRMAN AND
          PRESIDENT
Attachment 1
  Measurement and Sampling Procedures
  
  
  (A)   Sampling 
  
   Sampling shall be in accordance with GPA Publication 2174
  latest revisions and Appendix B of API Chapter 14.1.  Should
  other approved sampling methods be adopted by Seller, Buyer
  will be notified.
  
  (B)   Measurement
  
   (i)  Seller shall, at its sole cost, risk and expense,
  install or caused to be installed metering facilities of a
  standard make for the purpose of metering each grade of LPG.
  Said metering and sampling facilities shall meet Seller's
  specifications and shall be approved by the Government of
  Indonesia and shall be installed shoreside in a manner and
  at a location approved by Seller and shall be operated and
  maintained by Seller for Seller's account.  Buyer, in the
  presence of a member of Seller's staff, shall at reasonable
  times have access to the said metering facilities for the
  purpose of inspection, checking and reading.
  
   (ii) Equipment and Procedures
  
        1.   Detail engineering of the metering system shall
  be done by the contractor and is anticipated to be equipped
  with the following devises:
  
             Densitometer, de-aerator and strainer, turbine
  meters, pressure and temperature indicator, automatic
  sampler, electronic computer, ticket printer, system of
  valves and meter prover, all of which shall be
  approved/calibrated by MIGAS.  All measurements shall be in
  the metric system.
  
        2.   Loading lines shall be fully filled and cooled
  by circulation prior to loading.
  
        3.   Meters shall be proved each time a shipment is
  made and it shall be acceptable to prove meters either
  before, during or after tanker loading.  Testing of the
  meters with the meter prover shall be conducted during
  loading at loading rates that are normal for the LPG Tanker
  being loaded.  At least five runs shall be made with the
  meter prover.  At least three consecutive runs must achieve
  0.05% repeatability.  Data obtained shall be recorded on the
  meter proving report which shall be signed by the operators
  present during the proving procedure.  If the meter factor
  changes by more than 0.2% from the previous test the
  metering system shall be thoroughly examined.
  
        4.   Correction factors shall be first approved by
  the Customs & Excises Officer and the meter factor shall
  become certified by the Customs & Excises Officer signing
  the meter proving report.  The Customs & Excises Officer
  shall witness the entry of said meter factor into the
  computer and shall seal the door of the meter panel in use
  during loading.
  
        5.   Samples of each grade of LPG delivered shall be
  taken with an automatic sampler.  The samples obtained shall
  be analyzed in accordance with test methods specified in
  Exhibit A.  The results of these analyses shall determine
  the quality of LPG delivered.  Samples shall be kept for 90
  days.
  
        6.   The mass of each grade of LPG delivered shall
  be read from the delivery ticket that has been produced by
  the totalizer of the ticket printer.
  
        7.   The results shall be recorded on the Quantity
  Certificate and Quality Certificate referred to in Article
  9.1.
  
        8.   Should the meter prover be out of service, so
  that meters can not be tested with the meter prover, the
  meter factor of a meter during a delivery shall be
  determined from an average of at least two previous meter
  provings at comparable rates.
  
   (iii)     Accuracy
  
        The accuracy of the measuring equipment shall be
  verified by Direktorat Jenderal Minyak dan Gas Bumi
  ("MIGAS") of Indonesia at Seller's cost at intervals
  specified by Government regulations.  Upon demand of Buyer
  any meter shall be tested for accuracy of measurement and if
  found to be correct, or if found to be in error of not more
  than 1/2 of one percent (1/2%) with respect to liquid
  measurement, the expense of such testing shall be borne by
  Buyer, but the expense shall be borne by Seller if found
  incorrect by more than 1/2 of one percent (1/2%) with
  respect to liquid measurement.  In any event meters shall be
  adjusted properly at once to record accurately.
  
        In the event measuring equipment is out of service
  or out of repair, so that the volume being measured is not
  correctly indicated during any period by the reading
  thereof, the quantities attributable to such period shall be
  estimated and agreed upon the basis of the best data
  available, using the first of the following methods which is
  feasible:
  
        (a)  By using the registration of any check
  measuring equipment, if installed and accurately
  registering, or failing;
  
        (b)  By correcting the error if the percentage of
  error is ascertained by calibrations, test, or mathematical
  calculations, or failing;
  
        (c)  By shoreside tank gauging or failing;
  
        (d)  By ship tank gauging, or failing;
  
        (e)  By estimating on the basis of actual quantities
  measured during the preceding periods under similar
  conditions when the meter was registering accurately.
  
        Operators shall preserve and make available for
  inspection by Buyer all original test data, charts, and
  other similar records for a period of at least twenty six
  (26) months after the Year to which the data relates.
  
   (iv) Basis or Method of Measurement
  
        Notwithstanding any provisions of this Contract to
  the contrary, if in order to comply with or by reason of any
  present or future law, rule, regulation or order of any
  governmental authority having jurisdiction therein, now or
  hereafter, in effect during the term of this Contract, the
  basis or method of measurement hereunder is changed, or in
  the event Seller elects to measure by an alternate method of
  measurement which has been approved by the appropriate
  agency of the Government of Indonesia, then measurement
  procedures shall be adjusted to compensate for the change in
  the basis or method of measurement, such that the same
  selling price for the same quantity shall remain in effect,
  except as such selling price may be varied in accordance
  with the provisions of this Contract.
  
  (C)   Seller shall inspect LPG on a regular basis as it is
  produced and, in case the inspection results do not comply
  with the specifications set forth in Exhibit A pursuant to
  Article 7, Seller shall promptly advise Buyer of such
  results.
    
  Attachment 2
  
  Testing Method of LPG Residual Matter (Mass Analysis Method)
  
  1.    Scope
  
   This Standard provides for the testing method of LPG
  residual matter.
  
  2.    Summary of Method
  
   After approximately 1 kg of liquid sample is evaporated
  in an atmosphere by using the prescribed testing apparatus,
  it is evaporated for 20 minutes in constant temperature
  water bath at 75oC, and then the residual matter is weighed. 
  It is evaporated for 30 minutes in oven at 105oC, and then
  the residual matter is weighed, so as to obtain the residual
  matter at respective temperature.
  
  3.    Residual Matter Testing Equipment
  
   The equipment consists of apparatus (1) through (6)
  described below, and its assembly drawing is shown in Figure
  1.
  
   Figure 1: Assembly Drawing of Residual Matter
             Testing Equipment
  
   (1)  Sample Cylinder
        This is of a construction shown in Figure 2.  It is
  a cylinder made of stainless steel, steel or aluminum alloy,
  withstanding a pressure of more than 31 kgf/cm2 {3.04 MPa},
  equipped with two or one nozzle opening (s) and capable of
  connecting a sample introduction pipe thereto.  The cylinder
  valve should be equipped with a gas filling nozzle of a
  construction set forth in JIS BS245 (Valve for LPG
  Cylinder).
  
   Figure 2: Sample Cylinder [One Example]
  
   (2)  Connecting Pipe
  
        This is a pipe of approximately 5 mm in diameter,
  made of stainless steel or aluminum alloy, withstanding a
  pressure of more than 80 kgf/cm2.  It is provided with a
  connector to the sample cylinder on one end and with a
  connector to the cooler on the other end.
  
   (3)  Cooling Bath
  
        This is of a type set forth in Figure 3.
  
   Figure 3: Cooling Bath
  
   (4)  Filter
  
        Wire netting of stainless steel; 400 mesh
  
   (5)  Evaporation Cylinder and Upper Evaporation Pipe
  
        These are of glass with Class 1 hardness, and are of
  dimensions and a form shown in Figure 4
  
        Figure 4: Evaporation Cylinder and Upper Evaporation
                  Pipe
  
  
        (6)  Graduated Test Tube (with Plug)
  
        This is of glass with Class 1 harness, and is of a
  construction shown in Figure 5
  
        Figure 5: Graduated Test Tube and Plug
  
  4.    Constant-Temperature Water Bath and Others
  
   (1)  Constant-Temperature Water Bath
  
        This shall be capable of immersing the graduated
  cylinder down to the graduation line of 100 ml, and also
  capable of holding the bath temperature at 37.8 + 0.5o C,
  and also capable of holding it at 75+ 1o C.
  
   (2)  Platform Scale
  
        It shall have graduations of 0.01 kg or less
  
   (3)  Oven
  
        It shall be capable of holding the temperature at
  105+ 20o C, and shall not be provided with an ignition
  source.
  
  5.    Preparation for Testing
  
   (1)  Glass apparatus, etc. to be used in the testing
  shall be washed with cleaning solvents, such as acetone,
  etc., and water and foreign matters are removed therefrom.
  
   (2)  A piece of zeolite (one piece of ceramics, etc. of
  approximately 2 mm in diameter) is put into the graduated
  test tube and the tube is plugged.  Then the tube is held in
  the oven at 105o C for 30 min., and cooled in the decicator
  for another 30 min., the mass is measured to the digit of
  0.1 mg. often opening the plug once and closing it again.
  
   (3)  The evaporation cylinder and the graduated test tube
  are assembled in a manner as shown in Figure 1, and all of
  the ground glass joints are clamped with springs.
  
  6.    Collection of Sample
  
   (1)  Dry ice and isopropanol are put into the cooling
  bath, so as to spiral tube.
     (2)     Sample cylinder, connecting pipe, cooler and filters
  are connected as shown in Figure 1 (1).

        Then, the valves are opened in the order of the
  sample cylinder valve, sample valve and needle valve, and
  the connecting pipe, spiral tube and filter are co-washed
  with the liquid sample.

        Note (1):  In making connections, all places which
  will contact with the sample shall be of stainless steel or
  aluminum alloy.  When connections are made with rubber pipe,
  the connecting portions shall not be annointed with grease
  or lubricating oil.

   (3)  Sample cylinder valve is closed, and then the
  connecting pipe is removed from the sample cylinder.  The
  mass of sample cylinder is weighed to the digit of 0.01 kg.

   (4)  After the connecting pipe is attached to the sample
  cylinder, the sample cylinder valve is opened, and the
  sample is let into the evaporation cylinder in liquid state. 
  At this time, the sample is supplied little by little until
  the evaporation cylinder cools down.  Needle valve should be
  used in adjusting the flow of the sample.

   (5)  When approximately 2 liters of liquid sample is let
  into the evaporation cylinder, the sample cylinder valve is
  closed, and the sample cylinder is left as it is for
  approximately one minute.

   (6)  Then the connecting pipe is disconnected from the
  sample cylinder, and the mass of sample cylinder is weighed
  to the digit of 0.01 kg.  Then, the collected quantity of
  sample is calculated from the difference between this weight
  and the weight measured in item (3) above.
    
  7.    Preliminary Evaporation of Sample

   (1)  Upper evaporation pipe is attached to the
  evaporation cylinder and is fastened with springs.

   (2)  While cautioning that sudden boiling will not occur
  (2), the evaporation cylinder is exposed to atmosphere thus
  the sample will be evaporated until it is reduced to
  approximately 5 ml.
  
        Note (2): Evaporation shall be carried out so that
  bubbles will come out uniformly from the bottom of the
  graduated test tube.  If bubbles are not generated
  uniformly, it is recommended that the upper evaporation pipe
  is removed and the tip of copper wire (approximately 2 mm in
  diameter and 500 - 550 mm in length) is polished with rough-
  faced file and inserted from the top of the evaporation
  cylinder.  When evaporation speed is low, the graduated test
  tube shall be immersed in water bath of below 20o C.

        Remarks:  When the evaporation work is conducted
  outdoors, a place with good ventilation but without direct
  sunlight should be selected.  Adequate consideration shall
  also be made for fire, explosion and offensive odor.  When
  the work is conducted indoors, measures shall be taken to
  disposal Safety the evaporated gas from the upper
  evaporation pipe.

   (3)  After the test tube is immersed in the constant-
  temperature water bath at 37.8oC up to its shoulder for 20
  minutes, the graduated test tube is taken out of the
  constant-temperature water bath.
  
  8.    Measurement of Residual Matter at 75o C

   (1)  The graduated test tube is removed from the
  evaporation cylinder (3), and the graduated test tube is
  immersed into the constant temperature water bath at 75o C
  down to the 100 ml graduation line.  After being held there
  for accurately 20 minutes, air is blown into the same test
  tube for accurately 10 seconds at a rate of 3 l./minute (4),
  and the gas in the test tube is replaced by air.
  
        Note (3): Before removing the test tube, the water
  drops between the graduated test tube and the connecting
  portion of the evaporation cylinder shall be wiped off.

                  Note (4): Method of blowing the air into the test
  tube shall be in accordance with Figure 6.
    
        Figure 6: Method of Blowing Air into Test Tube 
  
        (2)  The graduated test tube is taken out the
  constant temperature water bath, and it is immediately
  plugged.  Water adhered to the graduated test tube should be
  wiped off.

             After being left cooling in the desicator for 30 minutes,
  opening plug once and closing it again in order to prevent
  vacuum situation, the graduated test tube is weighed to the
  digit of 0.1 mg.

    9.  Measurement of Residual Matter at 105o C
  
   (1)  Upon completing the operation in Section 8, the plug
  on the graduated test tube is removed, and the graduated
  test tube is horizontally placed in the oven at 1050o C for
  30 minutes, and then air is blown into the graduated test
  tube for accurately 10 seconds at a rate of 3 l./minute (3),
  and the gas in the test tube is replaced by air.
   (2)  The graduated test tube is taken out of the oven. 
  After being left cooling in the desicator for 30 minutes,
  the mass of the graduated test tube, together with the plug,
  is weighed to the digit of 0.1 mg.
    
  10.   Calculation and Results
  
          The residual matter is calculated in accordance with the
       following equation, and the result is rounded to an
       integer.  Each of the results will carry an additional
       remark of evaporation temperature.
         
               S    =    (A - B) X 10 3
                              M
                  where:    S:   Residual Matter (mass in ppm)
             A:   Mass (g) of the graduated test tube (with
                  plug) after evaporation at 75o C or 105o C
             B:   Mass (g) of the graduated test tube (with
                  plug)
             M:   Collected amount of the sample (kg)
  
        Remarks:  When foreign matters, such as rust, etc.
  are found at the inspection of the filter, such effects
  should be recorded.
  
    
Attachment 3
                               
  Precision for Residual Matter
  
  
  1.    Repeatability
  
   Duplicate results by the same operator should be
  considered suspect if they differ by more than the amounts
  shown in Figure 1 and 2 for repeatability.
  
  2.    Reproducibility
  
   The results of two laboratories should be considered
  suspect if the two results differ by more than the amounts
  shown in Figure 1 and 2 for reproducibility.