THIRD AMENDED AND RESTATED

                       IMPLEMENTATION PROCEDURES FOR

                            CRUDE OIL LIFTINGS













                        THIRD AMENDED AND RESTATED
                       IMPLEMENTATION PROCEDURES FOR
                            CRUDE OIL LIFTINGS
                             TABLE OF CONTENTS

               ARTICLE                                 PAGE
I.   DEFINITIONS                                        2
II.  EFFECTIVE DATE                                     8
III. GENERAL PROVISIONS                                 8
IV.  ANNUAL NOMINATION                                 10
V.   NOTIFICATION OF ESTIMATED ENTITLEMENT             12
VI.  VESSEL NOMINATION AND SCHEDULING                  14
VII. LAYTIME AND DEMURRAGE                             22
VIII.                                  EMERGENCY DISPOSAL     23
IX.  YEAR END SETTLEMENTS                              25
X.   TAX RULING AND INTERIM PROCEDURES                 30
XI.  CONFLICTS AND ORDER OF PRECEDENCE                 30
XII. NOTICES                                           31
XIII.SUCCESSORS AND ASSIGNS                            33
XIV. GOVERNING LAW                                     33
XV.  CAPTIONS                                          33
XVI. ENTIRE AGREEMENT                                  33
XVII.AMENDMENTS                                        34
XVIII.WAIVER                                           34



                        THIRD AMENDED AND RESTATED
                       IMPLEMENTATION PROCEDURES FOR
                            CRUDE OIL LIFTINGS



     THESE THIRD AMENDED AND RESTATED IMPLEMENTATION PROCEDURES
are entered into by and among VIRGINIA INDONESIA COMPANY, LASMO
SANGA SANGA LIMITED, OPICOIL HOUSTON, INC.,  UNION TEXAS EAST
KALIMANTAN LIMITED, UNIVERSE GAS & OIL COMPANY, INC. AND VIRGINIA
INTERNATIONAL COMPANY.

                           W I T N E S S E T H :

     WHEREAS, pursuant to the Second Amended and Restated
Implementation Procedures,  Contractors (or their predecessors in
interest) established procedures pursuant to which each
Contractor lifts its crude oil entitlement under the Production
Sharing Contract dated August 8, 1968 (as heretofore and
hereafter amended, amended and restated or extended); and

     WHEREAS, Contractors wish to amend and restate the Second
Amended and Restated Implementation Procedures to provide for
certain revisions thereto.

     NOW, THEREFORE, in consideration of the mutual covenants
herein contained, Contractors hereby agree as follows:

ARTICLE I - DEFINITIONS

In this Agreement, the following terms shall have the meanings
set forth below:

       "Agreement" shall mean the Third Amended and Restated
       Implementation Procedures for Crude Oil Liftings.

       "Annual Crude Oil Gross Receipts" attributable to a Party
       shall mean the sum of the gross receipts determined for
       each Month of a Year by multiplying the number of Barrels
       a Party Lifted in a Month by the applicable  Crude Oil
       Price for such Month, plus or minus any payments made to
       or by such Party pursuant to Section 9.2 hereof.
 
       "Available Production" shall mean all Crude Oil produced
       and saved from the Contract Area in accordance with good
       oil field practice and available for delivery as of any
       given time at the Point of Lifting.
 
       "Barrel", "Crude Oil", "Operating Costs", "Petroleum",
       "Petroleum Operations", "Contract Area", "Year" and such
       other words not specifically defined herein shall have the
       meanings set forth in the PSC.

       "Contractors" shall mean VICO, LASMO Sanga Sanga Limited,
       OPICOIL Houston, Inc., Union Texas East Kalimantan
       Limited, Universe Gas and Oil Company, Inc. and Virginia
       International Company, collectively.  "Contractor" shall
       refer to any one of the Contractors.

       "Contractors' Share of Available Production" shall mean
       all Available Production, less any portion thereof
       attributable to the interests of Total/Inpex (whose Crude
       Oil is transported by VICO via its Badak Field facilities
       to the Santan Terminal) and any portion thereof nominated
       to be Lifted during the period under consideration as
       Pertamina Share Oil, Cost Oil or Domestic Market
       Obligation, as adjusted from time to time pursuant to
       Section 5.2 hereof.  

       "Contractors' Share Oil" shall mean the quantity of Crude
       Oil to which Contractors are entitled under Section 6.1.3
       of the PSC.

       "Cost Oil" shall mean the quantity of oil which is for
       recovery of Operating Costs under Section 6.1.2 of the PSC
       and the quantity of oil to which Contractors  are entitled
       under Section 6.1.7 of the PSC.  
       
       "Crude Oil Offtake Coordinator" shall have the meaning
       attributed to it in Section 3.4 hereof.

       "Crude Oil Price" shall mean the net realized price of
       Crude Oil in effect for a particular period as provided in
       Section 7.1.1(a) of the PSC used to determine the weighted
       average price of Crude Oil for a Year for purposes of
       calculating cost recovery pursuant to Section 6.1 of the
       PSC.

       "Domestic Market Obligation" shall mean the quantity of
       Available Production which Contractors are obligated to
       furnish to fulfill the obligation towards the supply of
       the domestic market in Indonesia under Section 5.1.2 (p)
       of the PSC.

       "Effective Date" shall mean the date specified in Article
II hereof.

       "Emergency Lifting Quantity" shall have the meaning
       attributed to it in Section 8.2 hereof.

       "Final Settlement" shall have the meaning attributed to it
       in Section 9.2 hereof.

       "4th Quarter Report" shall have the meaning attributed to
       it in Section 9.2 hereof.

       "Lift", "Lifted" and "Lifting" all refer to the act of
       taking Crude Oil at the Point of Lifting.

       "LNG" shall mean liquefied Natural Gas.

       "Month" shall mean a calendar month.

       "Offtake Procedure" shall mean the Crude Oil Offtake
       Procedure, Santan Terminal dated October 23, 1974, by and
       among VICO, on behalf of the Parties (or their respective
       predecessors in interest),  Unocal Indonesia, Ltd.,
       Indonesia Petroleum, Ltd. and Pertamina, as hereafter
       amended.

       "Operating Agreement" shall mean the Operating Agreement
       for the Contract Area by and among the Contractors (or
       their respective predecessors in interest) effective
       August 8, 1968, as heretofore and hereafter amended.  

       "Overlift(s)" shall mean, as of any given date, the
       cumulative amount, expressed in Barrels and measured from
       the Effective Date (or calculated for some other specified
       period), by which the quantity of Crude Oil a Party has
       Lifted exceeds that Party's Working Interest Share of
       Contractors' Share of Available Production theretofore
       actually Lifted. 

       "Parties" shall mean the Contractors collectively. 
       "Party" shall mean any one of the Parties.

       "Party's Availability" shall mean a Party's Working
       Interest Share of Contractors' Share of Available
       Production, as adjusted upward or downward, respectively,
       by such Party's then current Underlift or Overlift.

       "Pertamina" shall mean PERUSAHAAN  PERTAMBANGAN  MINYAK 
       DAN  GAS  BUMI  NEGARA, the Indonesian State Enterprise
       established on the basis of Law No. 8/1971.

       "Pertamina Share Oil" shall mean the quantity of Crude Oil
       to which Pertamina is entitled under Section 6.1.3 of the
       PSC.

       "Point of Lifting" shall mean the flange between the
       Santan Terminal's delivery hose and cargo intake of a
       vessel at Santan Terminal.

       "PSC" shall mean the Amended and Restated Production
       Sharing Contract dated April 23, 1990, but effective
       August 8, 1968, and the Production Sharing Contract dated
       April 23, 1990, but effective August 8, 1998, both between
       Pertamina and the Contractors (or their predecessors in
       interest), as such contracts may be subsequently amended,
       amended and restated or extended. 

       "Quarter" shall mean a quarter of a Year beginning on the
       first day of January, April, July or October.

       "Santan Operating Agreement" shall mean the Santan
       Terminal Facilities Joint Operating Agreement dated
       October 22, 1974, by and among Unocal Indonesia, Ltd., as
       Terminal Operator, Indonesia Petroleum, Ltd. and VICO, as
       hereafter amended.

       "Santan Terminal" shall mean those facilities described in
       Section 1.1 of the Santan Operating Agreement.

       "Second Amended and Restated Implementation Procedures"
       shall mean the Second Amended and Restated Implementation
       Procedures for Crude Oil Liftings, effective as of January
       1, 1991, among the Contractors (or their predecessors in
       interest).

       "Settlement Year" shall mean each Year for which a
       settlement is made pursuant to Article IX hereof.

       "Terminal Operator" shall mean the party designated under
       the provisions of Section 3 of the Santan Operating
       Agreement to act as Operator thereunder.

       "Total/Inpex" shall mean Total Indonesie and Indonesia
       Petroleum, Ltd.

       "Underlift(s)" shall mean, as of any given date, the
       cumulative amount, expressed in Barrels and measured from
       the Effective Date (or calculated for some other specified
       period), by which a Party's Working Interest Share of
       Contractors' Share of Available Production theretofore
       actually Lifted exceeds the quantity of Crude Oil which
       such Party has Lifted.

       "VICO" shall mean Virginia Indonesia Company.

       "Working Interest Share" of a Party shall mean the
       Percentage of Interest of such Party as defined in the
       Operating Agreement.

ARTICLE II - EFFECTIVE DATE

Effective July 1, 1993 (the "Effective Date"), this Agreement
shall supersede and replace, in their entirety, the Second
Amended and Restated Implementation Procedures.  This Agreement
shall be deemed valid and binding on the Parties from the date of
its execution and delivery, although its terms regarding the
nomination of Crude Oil to be Lifted, the actual Lifting of Crude
Oil, and Year-end settlements shall not be implemented prior to
the Effective Date.  Nonetheless, the Parties shall take all
appropriate action, including in particular the giving of certain
of the notices specified in Articles IV, V and VI, which may be
reasonably required to implement this Agreement as of the
Effective Date. 

ARTICLE III - GENERAL PROVISIONS

3.1    Each Party shall have the right and obligation to take in
       kind and separately dispose of its Working Interest Share
       of Contractors' Share of Available Production.

3.2    Any Party shall have the right to nominate and Lift in any
       Month  any portion of Contractors' Share of Available
       Production not nominated for Lifting by any other Party as
       of the tenth (10th) day of the preceding Month . 

3.3    VICO is hereby appointed and authorized by the Parties to
       schedule and control all Crude Oil Liftings in conjunction
       with the Terminal Operator and to act on behalf of the
       Parties when dealing with Pertamina pursuant to the terms
       and conditions of the Offtake Procedure.

3.4    VICO shall appoint a representative to be designated as
       the Crude Oil Offtake Coordinator who shall coordinate the
       Liftings of Available Production between the Parties and
       at the same time endeavor to ensure that all Liftings are
       scheduled such that (i) the production of Natural Gas from
       the Contract Area and subsequent transformation thereof
       into LNG is not interrupted or otherwise adversely
       affected and (ii) planned Crude Oil production can at all
       times be contained within the limits of available storage.

3.5    Each Party shall consult with and seek advice and
       assistance from the Crude Oil Offtake Coordinator  on
       matters relating to scheduling of Crude Oil Liftings and
       shipments.

3.6    Title to and risk of loss of all Crude Oil shall pass to
       the Lifting Party at the Point of Lifting.

3.7    All deliveries of Available Production shall be made at
       the Santan Terminal to a vessel nominated pursuant to the
       terms of this Agreement.

3.8    All Lifting Contractors shall comply with the applicable
       Santan Port Rules which have been properly adopted
       pursuant to Sections 4.4 and 4.5 of the Santan Operating
       Agreement and attached thereto as Exhibit "E" in order to
       ensure the safe operation of the Santan Terminal and its
       harbor.  VICO shall provide copies of the Santan Port
       Rules to the Parties upon request and shall advise of any
       proposed and actual changes with respect thereto.

3.9    All consular, agency, towage, pilotage, customs,
       quarantine, tonnage and port fees, taxes, charges and
       expenses assessed against or with respect to a vessel
       shall be paid by the owner of the vessel or by the party
       chartering the vessel.

3.10   Except as otherwise provided in this Agreement, each Party
       shall be responsible for all taxes and other payments
       arising with respect to all Crude Oil Lifted by such
       Party.

ARTICLE IV - ANNUAL NOMINATION

4.1    On or before October 15th of each Year (Y), VICO shall
       notify all Parties of the quantity of estimated Available
       Production which can be produced and made available for
       disposal during each Month of the next ensuing Year (Y+1). 
       Such notice shall also include VICO's estimate of Crude
       Oil Price, Cost Oil, Pertamina Share Oil and Domestic
       Market Obligation for the next ensuing Year (Y+1).

4.2    On or before November 1st of each Year (Y), VICO shall
       notify the Parties of the estimated volume of Available
       Production allocated to each Party for Lifting during each
       Quarter of the following Year (Y+1).

4.3    Upon notification, if any, by Terminal Operator of the
       receipt from Pertamina of the notice issued pursuant to
       Section 4(c) of the Offtake Procedure, VICO shall send to
       each Party a notice detailing the following:

       a.   VICO's estimate of the volumes of Available
            Production for each Month of the following Year
            (Y+1);

       b.   Pertamina's estimate, if available, of the volumes of
            the Domestic Market Obligation and Pertamina Share
            Oil which Pertamina requires during each Quarter of
            the following Year (Y+1); and
       
        c.  VICO's estimate of Contractors' Share of Available
            Production for each Quarter of the Year (Y+1).

4.4    VICO shall immediately notify the Parties of the receipt
       from Pertamina of any notice of its decision to market the
       Parties' Cost Oil Entitlement under Section 7.1.1(d) of
       the PSC.  Within twenty (20) days of receipt of VICO's
       notice of Pertamina's decision, each Party shall notify
       VICO if it elects to match the sales price designated by
       Pertamina for such Cost Oil and the volume of Cost Oil it
       plans to Lift.  All annual nominations of the Parties
       shall be subject to revision in the event Pertamina should
       exercise its right to and does, in fact, market the
       Parties' Cost Oil Entitlement pursuant to Section 7.1.1(d)
       of the PSC.
  
  4.5  VICO shall issue each Month a revised estimate of
       Contractors' Share of Available Production for the current
       Year (Y) by Quarters reflecting changes, if any, in the
       estimated Available Production, the applicable Crude Oil
       Price or in any other factor used by a Contractor to
       calculate the volume of Cost Oil. 
       
ARTICLE V - NOTIFICATION OF ESTIMATED ENTITLEMENT

5.1    On or before the first (1st) day of each Month (M), VICO
       shall send to each Party a notice setting out the
       following:

       a.   Estimated Overlift or Underlift position of each
            Party and estimated overlift or underlift position of
            Pertamina at the end of the preceding Month (M-1);

       b.   Available Production estimated to be in inventory at
            the Santan Terminal attributable to the Parties,
            Pertamina and Total/Inpex at the end of the preceding
            Month (M-1);

       c.   The estimated quantity of additions to Available
            Production  during the Month (M), the following Month
            (M+1) and a provisional forecast for the succeeding
            two (2) Months (M+2 and M+3);

       d.   Pertamina's and each Party's Liftings for the Year to
            date and cargo nominations for the Month (M); and

       e.   Each Party's Availability for the following Month
            (M+1) and the quantity of Available Production which
            is available for Lifting by Pertamina and Total/Inpex
            during  such  Month (M+1).  For purposes of
            calculating a Party's Availability for the following 
            Month (M+1) under this subsection, a Party shall be
            deemed to have Lifted the quantity of Available
            Production equal to its accepted nomination, if any,
            for the  Month (M).

5.2    In the event VICO determines that there is a significant
       increase or decrease in the Cost Oil being attributed to
       the Contractors, VICO may choose to allocate such
       increased or decreased volumes to the Contractors in
       varying increments over any given period of Months
       (thereby increasing or reducing Contractors' Share of
       Available Production for such Months) in order to avoid
       any problems associated with a significant one-time
       alteration in the amount of Crude Oil available for
       Lifting by the Contractors or Pertamina.

ARTICLE VI - VESSEL NOMINATION AND SCHEDULING

6.1    Subject to the following qualification, the principle
       governing Crude Oil Liftings shall be that, to the extent
       practicable, all Crude Oil Lifted by the Parties shall be
       taken evenly throughout each Year, and that a reasonable
       balance shall be maintained between each Party's Working
       Interest Share of Contractors' Share of Available
       Production and the quantity of Crude Oil Lifted by such
       Party throughout each Year.  The Parties recognize that of
       primary importance in the operation of the Contract Area
       as well as the Santan Terminal is the  uninterrupted
       production of Natural Gas and its subsequent
       transformation into LNG at the Bontang liquefaction
       facilities in order to meet contractual obligations and
       market demands therefor.

6.2    The Lifting of Crude Oil by the Parties shall be scheduled
       by VICO in conjunction with the Terminal Operator which is
       the party ultimately responsible pursuant to the terms of
       the Santan Operating Agreement for coordinating the
       shipping program at the Santan Terminal.  The actual
       Lifting of Crude Oil at the Santan Terminal shall be
       governed by the provisions of the Santan Operating
       Agreement (including the Offtake Procedure) and, as
       between the Parties , the terms and conditions set forth
       herein, to the extent they do not conflict with the Santan
       Operating Agreement.

6.3    Not later than the fifth (5th) day of each Month (M), each
       Party shall advise VICO of its requested nomination(s) for
       the forthcoming Month (M+1) and its provisional
       nominations for the following two (2) Months (M+2 and
       M+3).  With respect to Month (M+1), such nomination(s)
       shall include the following:

       a.   The name of each vessel nominated to be loaded at
            Santan Terminal (the designation "TBN" being
            acceptable);

       b.   The quantity to be delivered to each vessel, such
            quantity not to exceed or be lower than,
            respectively, the applicable maximum or minimum
            established for an individual Lifting by Terminal
            Operator; and

       c.   The date range for each vessel, which range shall be
            two (2) days before and two (2) days after the
            expected arrival date.

6.4    If, in the opinion of VICO, cargo nominations received
       from the Parties exceed the estimated Contractors' Share
       of Available Production for any Month (M+1), then VICO
       shall  endeavor to bring such amounts into balance by
       consultation between the Parties.  Should such endeavor be
       unsuccessful, then each nominating Party shall be
       allocated an amount equal to such Party's Availability or
       the amount of its nomination, whichever is less.   For
       purposes of this Section 6.4, a Party's Availability shall
       be deemed to be zero (0) if it is otherwise determined to
       be a negative number.  If the aggregate of the amounts so
       allocated exceeds the estimated Contractors' Share of
       Available Production for Month (M+1), then such available
       amount shall be allocated based on the lesser of the
       following:

       a.   A Party's nomination; or

       b.   An amount determined for each nominating Party by
            multiplying the Contractors' Share of Available
            Production for Month (M+1) by a fraction having a
            numerator equal to such Party's Availability for
            Month (M+1) and a denominator equal to the sum of all
            nominating Parties' Availabilities for such Month.

6.5    Any balance of Crude Oil available for Lifting following
       the procedure set out in Section 6.4  hereof shall be
       allocated to the nominating Parties in the following order
       of priority:

       a.   First, to a Party with a positive Party's
            Availability for Month (M+1) in an amount not
            exceeding such Party's nomination (or the balance
            thereof, as the case may be), and if there is more
            than one such Party, priority shall be established in
            sequence commencing first with the nomination
            submitted by the Party with the greatest Party's
            Availability for such Month; and

       b.   Second, to a Party with a negative Party's
            Availability for Month (M+1) in an amount not
            exceeding such Party's nomination (or the balance
            thereof, as the case may be), and if there is more
            than one such Party, first priority shall be
            established in sequence commencing with the
            nomination submitted by the Party with the smallest
            negative Party's Availability for such Month.

       Should two or more Parties have Availabilities of
       identical size, whether positive or negative, the highest
       ranking shall be given to the Party whose last Lifting
       (including, for this purpose, scheduled Liftings for the
       remainder of the Month) prior to the end of the Month (M)
       was earliest in time.

6.6    A Party whose Lifting has been reduced in accordance with
       Sections 6.4 and 6.5  hereof shall have the right to
       withdraw its nomination by notice given promptly to VICO. 
       In the event of such withdrawal, VICO shall reapply the
       priorities according to Sections 6.4 and 6.5  hereof to
       all other nominations.  With respect to any Month (M+1),
       all the adjustments, if any, which are to be made pursuant
       to Sections 6.4 and 6.5  hereof and to this Section 6.6 to
       the Parties' nominations shall be taken into account
       before it is determined whether any conflict exists as
       described in Section 6.7  hereof.

6.7    If VICO receives two or more nominations, as adjusted
       pursuant to Sections 6.4, 6.5 and 6.6, which in terms of
       loading date conflict (which shall include being
       insufficiently separated in time to allow for the
       accumulation at Santan Terminal of Available Production
       necessary to supply in full the accepted nominations of
       the Parties during the period under consideration), VICO
       shall endeavor to resolve such conflict (by means of one
       or more loading date alterations or loading quantity
       reductions, or both) by consultation between the Parties. 
       Should such endeavor be unsuccessful, then the nomination
       having the highest ranking (as determined in accordance
       with Section 6.5 hereof) shall be accepted and the
       nomination(s) conflicting with it rejected.  Any Party
       whose nomination is so rejected shall promptly be notified
       accordingly by VICO and shall have the right to submit,
       within two (2) working days of such notice, a further
       nomination for a date range in Month (M+1) other than (but
       which may overlap with) the date range for which it
       originally nominated and for a quantity of Crude Oil not
       greater than the quantity accepted by VICO in respect of
       the original nomination.  The foregoing provisions of this
       Section 6.7 shall be applied to any conflict between such
       further nomination and any other nomination with respect
       to Month (M+1).  Notwithstanding the above, should the
       terms and provisions of the Offtake Procedure, including
       Exhibit 1 attached thereto, conflict with the scheduling
       priorities as determined above, the provisions of the
       Offtake Procedure shall control.

6.8    With respect to Month (M+1), if insufficient nominations
       are received from the Parties to enable, in VICO's
       reasonable opinion, a shipping program for that Month to
       be compiled which will keep available Crude Oil stocks
       within available storage capacity of the Santan Terminal,
       then VICO shall endeavor through consultation with the
       Parties to achieve a sufficient increase in such
       nominations.  If such endeavor is unsuccessful, VICO shall
       determine the minimum acceptable level of production and,
       should the aforesaid nominations be insufficient to permit
       that level of production to be maintained,  one or more of
       the Parties with a positive Party's Availability shall be
       deemed to have nominated a quantity (or an additional
       quantity) of Crude Oil, beginning with the Party with the
       largest positive Party's Availability and followed
       successively, as necessary, by the Party(ies) with the
       next largest positive Party's Availability, equal to the
       lesser of (i) the difference between the Party's
       Availability of such Party and its nomination submitted
       for the Month (M+1), or (ii) the remaining Barrels
       required to be Lifted to maintain the acceptable level of
       production.  No Party shall be required to nominate a
       volume of Crude Oil pursuant to this provision which, when
       combined with any existing nomination of such Party, would
       be less than any minimum lift requirement imposed by
       Terminal Operator.

6.9    Parties may nominate for less than full cargoes of Crude
       Oil, and the nominations of more than one Party may be
       Lifted and loaded onto the same vessel.  

6.10    Within one (1) day of receipt by VICO of the shipping
       program from Terminal Operator pursuant to Section 1.4 of
       Exhibit 1 to the Offtake Procedure [but no later than the
       18th day of each Month (or, in the case of February, the
       16th day of such Month), assuming the proper and timely
       notice is given by Terminal Operator], VICO shall notify
       each Party of the accepted shipping program for the Month
       (M+1) and provisional programs for the following two (2)
       Months (M+2 and M+3) together with an expected loading
       date for the Month (M+1) within the five (5) day date
       range notified under Section 6.3 hereof (or applicable
       under Section 6.7 or 6.8 hereof).  

6.11   At least twelve (12) days prior to the expected loading
       date(s) referred to in Section 6.10, each Contractor
       Lifting in Month (M+1) shall:

       a.   Establish with VICO a firmly scheduled three (3) day
            date range(s) of arrival at the Santan Terminal
            (within the date range(s) specified in Section 6.3.c
            hereof) for the Lifting(s) during Month (M+1) of
            nominations which are acceptable to the Lifting
            Contractor and VICO; and

       b.   Submit to VICO the following information for each
            such Lifting in order that such information can be
            conveyed to Terminal Operator:
            i.   Designation of the tanker, including both its
                 name and size (the designation "TBN" being
                 acceptable only if it is acceptable to Terminal
                 Operator);
            ii.  Date range of the Lifting(s) (as established
                 pursuant to a. above);
            iii. Quantity of Crude Oil to be loaded on each
                 tanker;
            iv.  Designation of the Consignor and Consignee
                 along with the required number of documentation
                 copies needed for each (the standard
                 documentation passing from Jakarta to the
                 Santan Terminal to include a Bill of Lading
                 reading "Freight Payable as Arranged",
                 Certificate of Quantity, Certificate of
                 Quality, Certificate of Origin, Cargo Manifest,
                 Ullage Report, Tanker Time and Loading Report,
                 the Master's Receipt for Sample, the Master's
                 Receipt for Shipping Documents, the Dry
                 Certificate and the Notice of Readiness);
            v.   Destination of the tanker(s); and
            vi.  Name of the Lifting Party or Parties.
            
       The failure of a Lifting Party to provide the above-
       referenced information (with the exception of the name of
       the designated tanker) shall result in VICO having the
       right to invoke the emergency sale provisions of Article
       VIII hereof for the exclusive account  of  such  Party, 
       notwithstanding  any  provisions  thereof to the 
       contrary.   Except as otherwise provided below, such
       accepted program for the forthcoming Month (M+1) shall be
       considered final and binding.

6.12   If as a result of circumstances arising after the
       establishment of a firm shipping program for a Month (M+1)
       such program becomes infeasible, VICO may, in consultation
       with Terminal Operator and the Parties, make such
       equitable revisions to the scheduled Lifting(s) of one or
       more Parties as are necessary to restore the feasibility
       of the program, always subject to the consent of each
       Party whose Lifting is to be revised (which consent shall
       not be unreasonably withheld).

6.13   In order to ensure continuous production, VICO shall be
       further empowered to request alterations to the programs
       notified pursuant to Section 6.10 hereof.

6.14   Any Party may at any time request changes to its scheduled
       Lifting and VICO shall endeavor to implement such changes
       to the extent practicable under the terms of the Offtake
       Procedure, provided such changes do not jeopardize the
       scheduled Lifting of any other Party or cause a reduction
       of production.

6.15   All other matters concerning the actual Lifting of Crude
       Oil at Santan Terminal, whether or not specifically
       addressed in this Agreement, including, but not limited
       to, substitution of vessels, changes in Lifting date
       ranges, notification requirements and other harbor
       procedures, applicable safety regulations and Santan
       Terminal documentation requirements, shall be governed by
       the Santan Operating Agreement and the Offtake Procedure
       attached thereto (including the Tanker Nomination
       Procedure which is attached as Exhibit 1 thereto), all of
       which are incorporated herein by reference as though fully
       set forth herein.  The actual Liftings shall be ultimately
       scheduled and implemented by Terminal Operator; therefore,
       any notices required to be given to Terminal Operator by a
       Lifting Party shall be first submitted to VICO within a
       reasonable time prior to the date such notice is due under
       the applicable terminal procedures to allow VICO to relay
       such notice to Terminal Operator as required.  VICO shall
       use its best efforts to relay by the appropriate time any
       notice to Terminal Operator on behalf of a Party but shall
       in no way be held responsible for a failure to do so.

ARTICLE VII - LAYTIME AND DEMURRAGE

The provisions of Part II of Exhibit 1, Tanker Nomination
Procedure, to the Offtake Procedure concerning laytime and
demurrage shall be specifically incorporated herein for all
purposes, including, but not limited to, the calculation of
laytime and amounts due for demurrage, if any.

ARTICLE VIII - EMERGENCY DISPOSAL

8.1    If the production of Crude Oil or Natural Gas from the
       Contract Area is in jeopardy because insufficient Crude
       Oil has been Lifted or scheduled for Lifting and if, in
       the opinion of VICO, an emergency has thereby arisen, then
       VICO may take such action as may be reasonably necessary,
       including arranging for the disposition of sufficient
       Crude Oil so as to maintain the production of Crude Oil
       and Natural Gas at an acceptable rate.  Such Crude Oil
       shall be sold by VICO through an independent broker
       selected by VICO on an F.O.B. Santan Terminal basis.  VICO
       shall use its best efforts to receive the current market
       price for such Crude Oil sold, but in no way warrants its
       ability or the ability of the broker to do so.  The
       quantities allocated to the Parties as set forth below
       shall be sold by VICO for the separate accounts of the
       respective Parties concerned.

8.2    Except as otherwise provided in Section 6.11 and in this
       Section 8.2, the quantity of Crude Oil in each Lifting
       under this Article VIII (the "Emergency Lifting Quantity")
       shall be allocated to those Parties (if any) which are
       underlifted as of a time immediately prior to the Lifting
       in question.  However, if a Party has been scheduled to
       make a Lift pursuant to an accepted shipping program
       during a Month in which VICO deems an emergency to exist
       hereunder but such Lift has not occurred or been
       completed, or if a Party's nomination for the Month in
       which an emergency Lift occurs had been rejected pursuant
       to Section 6.7 hereof and was not rescheduled for such
       Month despite the best efforts of such Party to do so, the
       Barrels such Party is scheduled to Lift, or the Barrels
       attributable to such Party's rejected nomination, shall be
       subtracted from the Underlift attributable to such Party,
       if any, when determining the existence or size of a
       Party's Underlift for purposes of this Section 8.2.  In
       addition, notwithstanding the foregoing, if a Party is
       underlifted at the time of an emergency Lift but has a
       positive  Party's Availability at the beginning of the
       month in which such Lift occurs which is less than the
       minimum Lift requirement imposed by Terminal Operator, the
       Barrels comprising such Party's Underlift shall not be
       considered for purposes of allocating to such Party an
       Emergency Lifting Quantity hereunder.  The Emergency
       Lifting Quantity (or a portion thereof) shall first be
       allocated to the Party having the largest Underlift.  The
       number of Barrels allocated to such Party shall equal the
       number of Barrels that, when subtracted from such Party's
       Underlift, reduces such Underlift to the extent that it
       equals the Underlift of the second most underlifted Party. 
       Thereafter, any remaining Emergency Lifting Quantity shall
       be allocated to both such underlifted Parties equally, on
       a Barrel per Barrel basis, until their respective
       Underlifts, when reduced by the number of Barrels
       allocated hereunder, equal the size of the Underlift of
       the third most underlifted Party.  This process shall
       continue in similar fashion until the entire Emergency
       Lifting Quantity has been allocated or until all
       Underlifts attributable to the Parties have been
       eliminated.  If the combined Underlifts of the Parties
       pursuant to this Section 8.2 is less than the Emergency
       Lifting Quantity, the volume in excess of such combined
       Underlifts shall be allocated to each respective Party
       based on such Party's Working Interest Share.  Those
       Barrels allocated to a Party hereunder comprising a
       portion of the Emergency Lifting Quantity shall be
       considered as having been Lifted by such Party under the
       terms of this Agreement.

8.3    The proceeds from the sale of the Emergency Lifting
       Quantity (after deduction of all related costs, including
       the fee charged by the above-mentioned broker) shall be
       distributed to the Parties in the proportion in which the
       Emergency Lifting Quantity was allocated to the Parties in
       Section 8.2 hereof.

8.4    VICO shall immediately advise each Party by means of
       facsimile transmission or telex whenever VICO decides to
       make a Lifting in accordance with this Article VIII.  Upon
       confirmation of an emergency sale, VICO shall immediately
       advise each Party by means of facsimile transmission or
       telex of the terms of the sale, including the price,
       credit terms and the volume sold.

ARTICLE IX - YEAR END SETTLEMENTS

9.1    If a payment is required by the Parties or Pertamina under
       Section 13 of the Offtake Procedure, each Party shall
       contribute to or share in such payment based on its actual
       Liftings during the Year (Y) as set forth in Section 9.2
       hereof.

9.2    Within sixty (60) days after the end of each Year (Y),
       VICO shall send each Party a notice setting forth the
       respective underlift or overlift position of the Parties
       and Pertamina, as documented in that certain report filed
       by VICO each year with Pertamina/BPPKA, entitled "Fourth
       Quarter Financial Status Report for East Kalimantan Area"
       (the "4th Quarter Report").  For purposes of this Article
       IX, any payment owed by either the Parties or Pertamina
       for a Year (Y) based on the applicable underlift or
       overlift position described in the 4th Quarter Report
       shall be referred to as the "Final Settlement" for such
       Year (Y).  If, according to that notice, either Pertamina
       or the Parties are deemed to be a Net Overlifter or Net
       Underlifter (as such terms are defined under the Offtake
       Procedure) and, therefore, a payment from one to the other
       is required, VICO shall at the same time notify the
       Parties of the following additional information:

       a.   The actual quantities of Available Production Lifted
            by each Party during the Year (Y) plus its final
            Overlift or minus its final Underlift from the prior
            Year (Y-1) as shown pursuant to Section 9.2.d hereof
            in the notice which was issued with respect to Year
            (Y-1);

       b.   Each Party's Working Interest Share of Contractors'
            Share  of Available Production Lifted during the Year
            (Y);

       c.   Overlift or Underlift position of each Party as at
            the end of Year (Y), as adjusted for each Party's
            Working Interest Share of Final Settlement converted
            to Barrels at the price per Barrel utilized in the
            4th Quarter Report; and

       d.   Final Overlift or Underlift position of each Party as
            at the end of Year (Y) after making adjustments in
            accordance with Section 9.3 hereof for payments due
            to or from Pertamina.

       Any Final Settlement payment received from Pertamina shall
       be distributed by VICO within a reasonable time after
       receipt thereof to those Parties who Lifted less than
       their Working Interest Share of Contractors' Share Oil and
       Cost Oil in the proportion that their respective
       Underlifts bear to the total of all Underlifts as
       calculated above.  Any Final Settlement due to Pertamina
       by the Parties shall be borne by such Parties who Lifted
       more than their Working Interest Share of Contractors'
       Share Oil and Cost Oil in the proportion that their
       respective Overlifts bear to the total of all Overlifts as
       calculated above.  Upon VICO's request, each Party shall
       advance to VICO its respective share of any payment due
       Pertamina pursuant to this Section 9.2. 

9.3    If the Parties make a payment to Pertamina or Pertamina
       makes a payment to the Parties pursuant to this Article IX
       with respect to the Year (Y), the amount of Available
       Production Lifted by each Party during the Year (Y) and
       the Overlift or Underlift position of each Party at the
       end of the Year (Y) as notified under Section 9.2.c 
       hereof shall be adjusted, provided that the corresponding
       unadjusted positions shall be considered valid for the
       purposes of applying the provisions of this Agreement
       until the Parties are notified of the adjusted positions. 
       If the Parties make a payment to Pertamina, the amount of
       Available Production Lifted by each Party during the Year
       (Y) shall be reduced by the number of Barrels determined
       by dividing the amount (expressed in United States
       Dollars) a Party contributed to the payment to Pertamina
       by the price per Barrel utilized in the 4th Quarter
       Report, being the weighted average of each Crude Oil Price
       in effect during such Year.  If Pertamina makes a payment
       to the Parties, the amount of Available Production Lifted
       by each Party during the Year (Y) shall be increased by
       the number of Barrels determined by dividing the amount
       (expressed in United States Dollars) a Party received by
       the price per Barrel utilized in the 4th Quarter Report.

9.4    Any Year-end imbalances among the Parties shall be carried
       forward to the following Year.
                                     
9.5    When the Final Settlement position between the Parties and
       Pertamina is determined, a settlement between Parties
       shall be made to ensure that the amount of Indonesian
       income taxes paid by each Party corresponds as nearly as
       possible to  the tax liability on Crude Oil Lifted by such
       Party.  The amount of Indonesian income taxes incurred on
       Crude Oil Lifted by a Party shall be computed as if such
       Party's Indonesian tax return were prepared taking into
       consideration such Party's Annual Crude Oil Gross Receipts
       but excluding therefrom such Party's Working Interest
       Share of cost recovery and investment credit.  For
       purposes of the above computation,  the Domestic Market
       Obligation adjustment shall be allocated to  the Parties
       based on their respective Working Interest Shares.    
       Each Party's income tax liability as determined above
       shall be compared to actual Indonesian income taxes paid
       on Crude Oil Lifted, including each Party's share of taxes
       paid on Domestic Market Obligation receipts.  As soon as
       practicable after the end of a Year, VICO shall notify the
       Parties of the amount of taxes owed and paid by each Party
       with respect to such Year, and if during the course of
       such Year a Party has paid an amount in taxes which is
       below or in excess of its income tax liability, an
       appropriate adjustment shall be made with respect to such
       Party in the following month's tax cash call.

 9.6   Once production of Crude Oil ceases or the Contract Area
       is returned to Pertamina, or at such earlier time as shall
       be agreed by the Parties, the Parties shall, within sixty
       (60) days of such date, make an interim settlement pending
       Final Settlement with Pertamina.  The interim settlement
       shall be based upon VICO's calculated Overlift and
       Underlift positions for the Parties adjusted for each
       Party's share of Pertamina's overlifted or underlifted
       position.  Final settlement among the Parties will be made
       thirty (30) days after a Final Settlement has been reached
       with Pertamina.  The settlement price among the Parties
       shall be the weighted average of each Crude Oil Price for
       Crude Oil produced from the Contract Area, excluding
       Domestic Market Obligation, which was Lifted by the
       Parties within the calendar Year prior to the date
       production of Crude Oil ceased, the date the Contract Area
       was returned to Pertamina or the settlement date agreed
       upon by the Parties, as the case may be.  

ARTICLE X - TAX RULING AND INTERIM PROCEDURES

10.1   VICO, on behalf of the Parties, shall prepare and submit
       to the appropriate Indonesian government tax authority a
       request for a ruling to the effect that each Party may
       legally calculate Indonesian taxes due and file Indonesian
       tax returns based on the number of Barrels of Crude Oil
       actually Lifted by a Party during a particular Year.  Such
       request shall be acceptable in form and content to all
       Parties. 

10.2   Pending receipt of the tax ruling referred to in Section
       10.1, the Interim Procedures which are attached hereto as
       Addendum "A" and made a part hereof shall apply and be
       effective during the periods described therein,
       notwithstanding any other provision of this Agreement to
       the contrary.

ARTICLE XI - CONFLICTS AND ORDER OF PRECEDENCE
11.1   The Operating Agreement notwithstanding, the provisions of
       this Agreement shall be controlling as among the Parties 
       with regard to the matters referred to herein.

11.2   Should the provisions of this Agreement be inconsistent
       with the provisions of the Santan Operating Agreement, the
       Santan Operating Agreement shall be controlling.

ARTICLE XII - NOTICES

12.1   All notices related to this Agreement shall be in writing
       and delivered by certified mail, return receipt requested,
       or transmitted by telex or facsimile communication to the
       designated addresses listed below:

            LASMO SANGA SANGA LIMITED
            c/o Lasmo Trading Limited
            100, Liverpool Street   
            London EC2M 2BB          
            United Kingdom
            Attention:  David Barter
            Fax No.:  (011-44) 71-606-2893
            Telex No.:  8812970

            w/c.c.  LASMO SANGA SANGA LIMITED
            c/o The LASMO Companies in Indonesia
            10th Floor, Landmark Centre, Tower A
            Jalan Jenderal Sudirman No. 1
            P. O. Box 3415/Jkt.
            Jakarta 12910, Indonesia
            Attention:  Graeme A. Jamieson 
            Fax No.:  (011-62) 21-571-1004
            Telex No.:  45218 LOMSL 1A

            OPICOIL HOUSTON, INC.
            2801 Post Oak Blvd., Suite 300
            Houston, Texas 77056
            Attention:  Charles C.J. Chu
            Fax No.:  713-297-8108
            
            UNION TEXAS EAST KALIMANTAN LIMITED
            c/o Union Texas Petroleum Corporation
            1330 Post Oak Boulevard
            P. O. Box 2120
            Houston, Texas 77252
            Attention:  Crude Oil Marketing Department
            Fax No.:  713-968-3606
            Telex No.:  203109

            UNIVERSE GAS & OIL COMPANY, INC.
            Akasaka Twin Tower, East Wing
            17-22, Akasaka 2-chome
            Minato-ku, Tokyo 107
            Japan
            Attention:  Hitoshi Yamatoya
            Fax No.:  Tokyo 03 (3585) 1486
            Telex No.:  UGOTOK J2422211

            w/c.c. Houston Liaison Office
            c/o Japex (U.S.) Corporation
            Geosource Plaza
            2700 Post Oak Blvd.
            Suite 1200
            Houston, Texas 77056
            Attention:  Masao Toyosaki
            Fax No.:  713-871-9619

            VIRGINIA INDONESIA COMPANY
            P. O. Box 1551
            Houston, Texas 77251-1551
            Attention:  Crude Oil Offtake Coordinator
            Fax No.:  713-754-6998
            Telex No.:  166100

            VIRGINIA INTERNATIONAL COMPANY
            c/o The LASMO Companies
            One Houston Center
            1221 McKinney, Suite 600
            Houston, Texas 77010-2015
            Attention:  Ian D. Brown
            Fax No.:  713-654-8527
            
            w/c.c. Virginia International Company
            c/o Union Texas Petroleum Corporation
            1330 Post Oak Boulevard
            P. O. Box 2120
            Houston, Texas 77252
            Attention:  Crude Oil Marketing Department
            Fax No.:  713-968-3606
            Telex No.:  203109


12.2   A Party may change its address or designated addressee(s)
       by written notice to the other Parties.

ARTICLE XIII - SUCCESSORS AND ASSIGNS

This Agreement shall be binding upon each of the Parties hereto
and their respective successors and assigns.

ARTICLE XIV - GOVERNING LAW

This Agreement shall be governed by and interpreted in accordance
with the laws of the State of Texas.  Any dispute relating to the
interpretation of or performance under this Agreement shall be
finally settled by arbitration in accordance with Section 9 of
the Joint Venture Agreement, dated August 8, 1968, as amended,
among the Parties  (or their predecessors in interest).

ARTICLE XV - CAPTIONS

All captions, headings or titles appearing within the body of
this Agreement are used solely for the purpose of identification
and are not to be used in interpreting the rights, duties and
obligations of the Parties.

ARTICLE XVI - ENTIRE AGREEMENT

This Agreement constitutes the entire agreement  among the
Parties and supersedes all previous negotiations, commitments and
writings with respect to the subject matter hereof.

ARTICLE XVII - AMENDMENTS

This Agreement may not be changed or modified in any manner,
except by an instrument executed by the Parties, in writing, and
signed by each Party's duly authorized officer or representative.

ARTICLE XVIII - WAIVER

No waiver of any breach of this Agreement shall be held to be a
waiver of any other or subsequent breach.

       IN WITNESS WHEREOF, each of the Parties has caused this
Agreement to be executed by its duly authorized officer this 1st
day of July, 1993.
VIRGINIA INDONESIA COMPANY          LASMO SANGA SANGA LIMITED



By _______/s/__________________     By _______/s/_______________



OPICOIL HOUSTON, INC.               UNION TEXAS EAST KALIMANTAN   
                                    LIMITED



By ________/s/__________________    By _______ /s/_______________


UNIVERSE GAS & OIL COMPANY, INC.    VIRGINIA INTERNATIONAL
COMPANY



By ________/s/__________________    By __________/s/____________
                              ADDENDUM "A"

                            INTERIM PROCEDURES


Attached to and made a part of the Third Amended and Restated
Implementation Procedures for Crude Oil Liftings effective July
1, 1993 among Virginia Indonesia Company, LASMO Sanga Sanga
Limited, OPICOIL Houston, Inc., Union Texas East Kalimantan
Limited, Universe Gas & Oil Company, Inc. and Virginia
International Company. 


    The Parties hereby agree that the following terms and
provisions of this Addendum "A" shall apply and be effective
during the periods hereafter specified:

    1.    All defined terms used herein shall have the meanings
attributed to them in the Third Amended and Restated
Implementation Procedures for Crude Oil Liftings to which this
Addendum "A" is attached.

    2.    Information otherwise to be provided pursuant to
Article IV covering an entire Year or periods of time within such
Year shall, with respect to 1993, be provided for the period of
July 1, 1993 through December 31, 1993 only.

    3.    For purposes of Subsection 5.1(a), none of the Parties
shall be in an Overlift or Underlift position as of July 1, 1993.

    4.    These Interim Procedures shall be applicable for any
Year (or, with respect to 1993, the period from July 1 through
December 31) during which an acceptable tax ruling as described
in Section 10.1 (the "Tax Ruling") is not received.  In the event
the Tax Ruling is obtained, these Interim Procedures shall become
void and inapplicable effective as of the first day of the Year
in which it is received (or July 1 in the event such ruling is
received on or before December 31, 1993).  For purposes of this
Addendum "A", the period of time from July 1, 1993 through
December 31, 1993 and any Year thereafter during which an
acceptable Tax Ruling is not received shall be referred to as a
"Settlement Period", with the first six month period being
referred to as the "First Settlement Period" and the yearly
periods following thereafter being referred to as "Subsequent
Settlement Periods".  

    5.    The following settlement shall be effected among the
Parties as of the last day of any Settlement Period:

    a.    For the First Settlement Period, the Parties having an
    Overlift position as of the end of such time shall pay to
    each Party with an Underlift an amount determined by
    multiplying the number of Barrels comprising such Party's
    Underlift which accrued during the applicable period by an
    amount in United States dollars equalling the arithmetic
    average of the Crude Oil Price in effect for each Month of
    the First Settlement Period, adjusted as needed to reflect
    any penalties incurred pursuant to paragraph 6 below.  This
    payment to each Party with an Underlift shall be made by
    each Party with an Overlift in the proportion that such
    Party's Overlift bears to the total Overlifts of all Parties
    as of the last day of the Settlement Period.  The amounts to
    be paid hereunder shall be calculated by the Operator and
    all Parties shall be provided with such information by
    January 15th following the end of the Settlement Period. 
    Actual payments required shall be made on or before January
    31st following the end of such period.

    b.    For any Subsequent Settlement Period for which these
    Interim Procedures are applicable, the procedure set forth
    below shall be followed:

          (i)  a record shall be maintained by the Operator of
          each Party's Overlift or Underlift which accrued
          during each four-month period beginning on the first
          day of January, May and September of each Year;

          (ii)  a monetary liability in U.S. dollars shall be
          calculated for each four-month period for each Party
          with an Overlift to each Party with an Underlift in
          the manner described in a. above (including any
          penalties incurred pursuant to paragraph 6 below),
          with the exception that the price attributed to each
          Underlifted Barrel shall be determined by computing
          the arithmetic average of the applicable Crude Oil
          Price in effect for each Month of the four-month
          periods in question;

          (iii)  as of the end of each Subsequent Settlement
          Period, the Operator shall determine the net liability
          of each Party to the other, if any, by totaling the
          monetary results of each four month period's
          calculation as set forth in b.(ii) above; and

          (iv)  the Parties shall be notified of the results of
          the calculation described in b.(iii) above as of
          January 15th following the end of a Subsequent
          Settlement Period, and the required payments shall be
          made by the appropriate Parties on or before the
          following January 31st.

    c.    Settlements made pursuant to 5.a and 5.b above shall
    increase or decrease the number of Barrels deemed Lifted and
    sold or purchased by each Party over the applicable
    Settlement Period to the extent of the number of Barrels
    comprising such Party's Underlift or Overlift as well as
    increase or decrease each Party's Annual Crude Oil Gross
    Receipts for such period.  Such a settlement shall
    constitute a sale and purchase of Crude Oil among the
    Parties with Overlifts and Underlifts during the Settlement
    Period. 
                        
    6.    Notwithstanding any language of paragraph 5 to the
contrary, for any six-month or four-month period addressed
therein during which a Party's Underlift is greater than fifteen
percent (15%) of such Party's Working Interest Share of
Contractors' Share of Available Production for such period, any
settlement payment to be made by a Party having an Overlift
position attributable to such period to a Party having an
Underlift shall be calculated based on the following:  

    a.    With respect to the Barrels comprising the Party's
    Underlift up to and including fifteen percent (15%) of such
    Party's Working Interest Share of Contractors' Share of
    Available Production for such period, a price equal to the
    arithmetic average of the Crude Oil Price in effect for each
    Month during such period; and

    b.    With respect to the Barrels comprising such Party's
    Underlift in excess of fifteen percent (15%) of its Working
    Interest Share of Contractors' Share of Available Production
    for such period, a price equal to ninety percent (90%) of
    the average Crude Oil Price calculated in 6.a above.

However, in the event a Party is excused for reasons of Force
Majeure (as defined in the PSC) from Lifting a certain number of
Barrels during such period, those Barrels shall not be considered
when determining the size of a Party's Underlift for purposes of
applying this penalty position.  By way of example and not by
limitation, the inability of a Party to schedule a Lifting after
a good faith attempt to do so because of the operation of the
terms of this Agreement or the Offtake Procedure shall be
considered a Force Majeure event.

    7.    For any Year during which an acceptable Tax Ruling is
not received, the Indonesian tax liability of each Party shall be
based on such Party's Annual Crude Oil Gross Receipts.  Each
Party's share of any Final Settlement with Pertamina owing to or
received by the Parties shall be calculated based on its Working
Interest Share.  In addition, there shall be no Year-end
imbalances among the Parties, and each Party shall begin each
Subsequent Settlement Period in balance with neither an Overlift
nor Underlift position.

                               July 1, 1993

Mr. Ian D. Brown                   Mr. Chris J. Biggs
LASMO Sanga Sanga Limited               Union Texas East Kalimantan
Ltd.
Virginia International Company     c/o Union Texas Petroleum
Corp.
One Houston Center                 1330 Post Oak Blvd.
1221 McKinney, Suite 600           P. O. Box 2120
Houston, Texas  77010              Houston, Texas  77252

Mr. Charles C. J. Chu              Mr. H. Yamatoya
OPICOIL Houston, Inc.              Universe Gas & Oil Company,
Inc.
2801 Post Oak Blvd., Suite 300     Akasaka Twin Tower, East Wing
Houston, Texas  77056              17-22, Akasaka 2-chome
                                   Minato-ku, Tokyo 107
                                   Japan

                 Re:  Establishment of Lifting Groups;
                      Side Letter to Third Amended and
                      Restated Implementation Procedures
                      for Crude Oil Liftings

Gentlemen: 

     For purposes hereof, please refer to the Third Amended and
Restated Implementation Procedures for Crude Oil Liftings (the
"Agreement") dated effective July 1, 1993, by and among the
undersigned.  All references to article and section numbers
herein are to the corresponding provisions in the Agreement, and
all the terms used herein shall have the meanings attributed to
them in the Agreement.

     The Parties hereby agree that, for the period herein stated,
the right and obligation to Lift the Working Interest Share of
Contractors' Share of Available Production attributable to
Virginia International Company ("Virginia International") and
Virginia Indonesia Company ("VICO") under the terms and
provisions of the Agreement shall be allocated and transferred in
equal portions to LASMO Sanga Sanga Limited ("LASMO") and Union
Texas East Kalimantan Limited ("UTP").  These two combinations of
interests shall be referred to respectively as the "LASMO Lifting
Group" and "UTP Lifting Group".

     The interests of those Parties comprising each of the LASMO
Lifting Group and UTP Lifting Group shall be combined, and each
group shall be considered as a Party under the Agreement, for
purposes of determining or allocating, as the case may be,
Working Interest Share, Party's Availability, Overlifts,
Underlifts, annual and monthly nominations and entitlements,
Emergency Lifting Quantity, Final Settlement and Domestic Market
Obligation, subject to the further provisions hereof. 
Notwithstanding the foregoing, each of the Parties shall continue
to prepare its individual tax returns based on its specific
interest and shall be entitled to receive all notices as
specified in Article XII. 

     As among the members of the two lifting groups created
hereby, the nominations and Liftings of such groups shall be
allocated based on a Party's prorata share of the combined
interests of the lifting group participants.  These percentages
are as follows:

           LASMO or UTP. . . . . . . . . . . 69.42148%

           Virginia International. . . . . . 20.66116%

           VICO. . . . . . . . . . . . . . .  9.91736%

     The agreement set forth herein shall remain in effect for so
long as (i) each of LASMO plc and Union Texas Petroleum Holdings,
Inc., directly or indirectly through their respective
subsidiaries, continues to own fifty percent (50%) of the Unimar
Company, which in turn indirectly owns Virginia International and
VICO or (ii) the Agreement is terminated, whichever first occurs.

     If the foregoing fully and accurately sets forth our
agreement, please indicate your acceptance of this letter in the
appropriate space below.

                                   Sincerely,

                                   VIRGINIA INDONESIA COMPANY 



                                   By:              /s/          

                                        Richard P. Bergsieker
                                        Vice President, Technical
                                        and Commercial Planning





RPB/sfw

File 246-2

ACCEPTED and AGREED to                                                    
this ________ day of _______________, 1993
 
LASMO SANGA SANGA LIMITED 

By:_______/s/_____________________________



ACCEPTED and AGREED to                                                   
this ________ day of _______________, 1993
 
OPICOIL HOUSTON, INC.

By:_______/s/_____________________________



ACCEPTED and AGREED to                                                   
this ________ day of _______________, 1993
 
UNION TEXAS EAST KALIMANTAN LIMITED

By:_______/s/_____________________________



ACCEPTED and AGREED to                                                   
this ________ day of _______________, 1993
 
UNIVERSE GAS & OIL COMPANY, INC.

By:_______/s/_____________________________









ACCEPTED and AGREED to                                                   
this ________ day of _______________, 1993
 
VIRGINIA INTERNATIONAL COMPANY

By:_______/s/_____________________________



ACCEPTED and AGREED to                                                   
this ________ day of _______________, 1993
 
VIRGINIA INDONESIA COMPANY

By:_______/s/_____________________________