MEMORANDUM OF UNDERSTANDING

                  This Memorandum is made and entered into as of the 22nd day of
March, 1996 by and between ROSE HILLS MEMORIAL PARK ASSOCIATION, a California
Nonprofit Mutual Benefit Corporation (the "Association") and INTERNATIONAL
BUDDHIST PROGRESS SOCIETY, a California Nonprofit Religious Corporation (the
"Temple").

                                   I - RECITAL

Association and Temple have entered into a written Agreement dated March 1,
1994, as amended by and Amendment thereto dated September 1, March 15, 1995, May
1995, and October 15, 1995, pertaining to the development and use of a portion
of the Rose Hills Memorial Park, commonly known as 3888 South Workman Mill Road,
County of Los Angeles, State of California, consisting of Parcel "A" ("Project
Site") and Parcel "B" ("Adjacent Site").

With respect to Parcel "A", the Agreement provides, in part, as follows:

1.1      Association shall deliver control of the Site to Temple,
         prior to the commencement of the Work, in the condition as a
         "finished lots.

1.2      The "finished lot" shall include without limitation, all required
         on-site and off-site improvements, such as paved access roads, water,
         sewer (by septic tank), electrical power, telephone, gas, drainage
         improvements, landscape, street lights, curbs and gutters, and rough
         grading, so as to permit the construction of the Complex by Temple
         without further material site improvement.

1.3      Association shall be responsible, at its sole costs and expense, for
         the preparation of the engineering and for the construction of all
         infra-structures associated with the forty-two (42) foot wide access
         road (the "Association access road"), and other improvements described
         in Item 1.2 above, from the starting point (near Mariposa Terrace) to
         the proposed entry gate of the Buddhist Memorial Complex.

1.4      Temple shall pay (or on demand reimburse Association for) the costs of
         the remaining site improvements contemplated by Item 1.2 above,
         including the twenty-six (26) foot wide access road from the proposed
         entry gate of the Buddhist Memorial Complex to the Project Site and
         Adjacent Site (the "Temple access road"), and the other improvements
         within the Sites described in Item 1.2 above, up to a maximum amount of
         six hundred fifty thousand dollars ($650,000.00).

1.5      In the event that the actual construction costs for the improvements
         described in Item 1.4 above exceed the sum of six hundred fifty
         thousand dollars ($650,000.00), the excess amount shall be shared
         equally by Association and Temple. However, Association's share of the
         excess amount shall not






                                                                               2

         exceed the sum of five hundred thousand dollars ($500,000.00),
         regardless of the total overrun amount.

1.6      No payment shall be required from Temple until such time as
         all required permits for the construction of the Complex
         have been issued.  Thereafter, payment shall be made by
         Temple on a progress basis as the work specified in Item 1.4
         above is performed.  Temple shall advance the entire of the
         construction costs, including Association's share of the
         costs overruns.  Association shall reimburse Temple for
         Association's share of the cost overruns on or prior to the
         earlier date of (a) Temple's exercise of its option to
         purchase the Adjacent Site, or (b) prior to the seventh
         (7th) anniversary date of the original Agreement - March 1,
         2001.

                                2 - UNDERSTANDING

2.1      Association has completed the final design of the off-site and
         infrastructure improvements and is in the process of obtaining permits
         from the Los Angeles County Public Works Department. At the same time,
         Association has completed grading of building pad, Stupa Garden area,
         and Temple Access Road and is in the process of installing water,
         electrical power, telephone, drainage improvements, and curbs and
         gutters.

2.2      The estimated cost for the construction of the improvements described
         in Item 1.4 above is approximately $980,000.00 (see the attached
         detailed cost breakdown). This estimated construction cost will be
         updated at the completion of all construction activities.

2.3      Association is currently paying for all construction costs
         per conditions described in Item 1.6 above.

2.4      At Association's request, Temple has agreed to advance a $300,000.00
         payment on 3/26/96 to Association for the payment of improvements
         described in Item 1.4 above. The remaining balance shall be paid for by
         Temple upon receiving all required permits for the construction of the
         Complex and completion of construction activities for the improvements
         described in Item 1.4 above.

2.5      Association shall reimburse Temple the $300,000.00 advance payment in
         the event Association was unable to obtain all required permits for the
         construction of the Complex.




                                                                               3


IN WITNESS WHEREOF the parties have executed this Memorandum of Understanding as
of 22nd day of March, 1996.

INTERNATIONAL BUDDHIST PROGRESS        ROSE HILLS MEMORIAL PARK
SOCIETY, a California nonprofit        ASSOCIATION, a California
religious corporation                  mutual benefit corporation


By:                                    By:
   ---------------------------            -------------------------

Name:                                  Name:
     -------------------------              -----------------------


Its: Designated Representative         Its: Designated Representative