                                                                    Exhibit 10.9

                             COAL TRANSPORTATION
                                  AGREEMENT

                                   BETWEEN

                          LOUISIANA GENERATING, LLC

                                     AND

                     THE BURLINGTON NORTHERN AND SANTA FE
                               RAILWAY COMPANY

                                     AND

                          AMERICAN COMMERCIAL MARINE
                               SERVICE COMPANY
   2
                              TABLE OF CONTENTS



                                                                               Page
                                                                               ----
                                                                         
ARTICLE I        DEFINITIONS.................................................   2

ARTICLE II       FILING, APPROVAL, COMMENCEMENT OF SERVICE EFFECTIVE
                 DATE AND TERM...............................................   5
  Section 1.     Term........................................................   5
  Section 2.     Commencement of Service.....................................   5
                 A.    Effective Date of Agreement...........................   5
                 B.    Initiation of Service.................................   5

ARTICLE III      LG'S COAL TENDER COMMITMENT.................................   6
  Section 1.     Coal Tonnage Subject to this Agreement......................   6
  Section 2.     Minimum Volume Commitment...................................   6
  Section 3.     Volume Shortfall Payment....................................   7
  Section 4.     Shipment of Processed Coal..................................   8
  Section 5.     Reports.....................................................   8

ARTICLE IV       CARRIERS' OBLIGATION TO TRANSPORT COAL AND PROVIDE
                 EQUIPMENT...................................................   8
  Section 1.     Transportation Obligation...................................   8
  Section 2.     BN Equipment Supply.........................................   9
  Section 3.     ACMS Equipment Supply.......................................   9
                 A.    Equipment Supply......................................   9
                 B.    Requirements for Terminal.............................   9
                 C.    Storage Capacity......................................   9

ARTICLE V        LG'S OBLIGATION TO SUPPLY EQUIPMENT........................    10
  Section 1.     Supply of Equipment........................................    10
  Section 2.     Car Damage.................................................    10
  Section 3.     Car Destruction............................................    11
  Section 4.     Provision of Unloading Facilities..........................    12
  Section 5.     Provision of Harbor and Shift Boat.........................    13

ARTICLE VI       RAIL OPERATING AND SCHEDULING PROCEDURES...................    13
  Section 1.     Train Size.................................................    13
  Section 2.     Minimum Shipment Weight....................................    13
  Section 3.     Minimum Tender.............................................    14
  Section 4.     Advance Notice and Loading.................................    14
  Section 5.     Placement and Free Time - Origin...........................    14
  Section 6.     Rail Car Demurrage at Terminal.............................    16
  Section 7.     Constructive Placement.....................................    16
  Section 8.     Service Commitment.........................................    17
  Section 9.     Routing....................................................    19



                                       i
   3



                              TABLE OF CONTENTS




                                                                               Page
                                                                               ----
                                                                         
ARTICLE VII      SERVICE AND MAINTENANCE....................................    20
  Section 1.     Service and Maintenance of LG Railcars.....................    20
  Section 2.     Holding and Storage of Empty Or Loaded Unit Trains.........    22
  Section 3.     Weighing and Determination of Weights......................    24
  Section 4.     Overloaded Car(s)..........................................    24
  Section 5.     Release of Crews/Removal of Locomotives....................    25

ARTICLE VIII     TERMINAL AND BARGE OPERATING PROCEDURES....................    25
  Section 1.     Control of Loading and Unloading...........................    25
  Section 2.     Control of Service Performance.............................    25
  Section 3.     Notice of Barge ETA........................................    26
  Section 4.     Origin Demurrage...........................................    26
  Section 5.     Destination Demurrage......................................    26
  Section 6.     Free Time..................................................    27
                 A.    Alternate A - Standby Unloading......................    27
                 B.    Alternate B - Additional Set Of Barges Unloading.....    27
                 C.    Alternate C - Single Barge Unloading.................    27
                 D.    Designation of Alternates............................    28
  Section 7.     Computation of Free Time...................................    28
  Section 8.     Adjustment for Force Majeure...............................    29
  Section 9.     ACMS Operating Obligations.................................    29

ARTICLE IX       LG OPERATING PROCEDURES....................................    30
  Section 1.     Responsibility for Unloading...............................    30
  Section 2.     Berthing and Mooring.......................................    30
  Section 3.     Excess Return Tonnage......................................    30

ARTICLE X        RATES AND RATE ADJUSTMENT..................................    31
  Section 1.     Minimum Base Rate..........................................    31
  Section 2.     Effective Rate.............................................    32
  Section 3.     Adjustment to Rates and Charges............................    32

ARTICLE XI       BILLING PROCEDURES.........................................    34
  Section 1.     Transportation Billing.....................................    34
  Section 2.     Payment....................................................    34
  Section 3.     All Other Charges..........................................    35

ARTICLE XII      FORCE MAJEURE..............................................    35
  Section 1.     Definition.................................................    35
  Section 2.     Effect of Force Majeure....................................    36



                                       ii
   4



                              TABLE OF CONTENTS




                                                                               Page
                                                                               ----
                                                                         
ARTICLE XIII     INDEMNITY AND INSURANCE....................................   38
  Section 1.     Indemnity by ACMS..........................................   38
  Section 2.     Indemnity by LG............................................   38
  Section 3.     Insurance to be Maintained by ACMS.........................   39

ARTICLE XIV      COAL LOSS AND DAMAGE.......................................   40
  Section 1.     Liability for Loss of Coal Transported by BN...............   40
  Section 2.     Liability for Loss of Coal Transported by ACMS.............   40
  Section 3.     General Average............................................   41
  Section 4.     Disclaimer of Damages......................................   41
  Section 5.     Private Carriage...........................................   42

ARTICLE XV       TERMINATION................................................   42

ARTICLE XVI      ASSIGNMENT AND SUCCESSION..................................   42

ARTICLE XVII     AMENDMENT, MODIFICATION AND WAIVER.........................   43

ARTICLE XVIII    MISCELLANEOUS..............................................   44
  Section 1.     Subcontracting.............................................   44
  Section 2.     Independent Contractor.....................................   44
  Section 3.     Waivers and Remedies.......................................   44
  Section 4.     Notice.....................................................   44
  Section 5.     Severability, Effect of Agreement..........................   46
  Section 6.     Confidentiality............................................   46
  Section 7.     Representations and Warranties.............................   47
  Section 8.     Counterparts...............................................   48
  Section 9.     Remediation................................................   48
 Section 10.     Construction...............................................   49



                                      iii
   5
                        COAL TRANSPORTATION AGREEMENT


      THIS AGREEMENT (the "Agreement") is made as of the 22nd day of January,
1997, by and among the BURLINGTON NORTHERN AND SANTA FE RAIL COMPANY (BN), a
Delaware corporation; AMERICAN COMMERCIAL MARINE SERVICE COMPANY ("ACMS"), a
Delaware corporation; and LOUISIANA GENERATING, L.L.C. ("LG"), a Delaware
limited liability company.

                             W I T N E S S E T H
      WHEREAS, BN is a common carrier by rail with legal authority pursuant to
49 U.S.C. Section 10709 to enter into a binding contract to provide coal
transportation services to LG; and

      WHEREAS, ACMS owns and operates a coal receiving, storage and transfer
facility in St. Louis, Missouri and also owns, operates, and/or charters,
through affiliated companies, river vessels suitable for transportation of coal
on the Mississippi River; and

      WHEREAS, LG intends to purchase and operate the Big Cajun No. II
steam-electric generating plant and coal unloading dock, located at
approximately Mile 263 AHP near New Roads, Louisiana (the "LG Power Plant")
pursuant to the Asset Purchase Agreement as hereinafter defined; and

      WHEREAS, LG will require large quantities of coal for the operation of
the LG Power Plant; and

      WHEREAS, BN and ACMS have been the sole suppliers of transportation of
coal for the LG Power Plant under long term arrangements with the prior operator
of Big Cajun No. II commencing in 1979; and
   6
      WHEREAS, LG, BN and ACMS all desire that BN and ACMS continue to transport
for LG pursuant to the terms of this Agreement certain tonnages of coal from
mines in the Wyoming Powder River Basin to the LG Power Plant, and BN and ACMS
are willing to provide such transportation; and

      WHEREAS, pursuant to Cajuns Chapter 11 Case Number 94-11474 pending before
the United States Bankruptcy Court for the Middle District of Louisiana (the
"Chapter 11 Proceeding") and LG's planned purchase of the LG Power Plant and
related assets from Cajun Electric Power Cooperative, Inc., BN and ACMS have
each agreed to renegotiate their respective long-term arrangements on amended
terms set forth in this Agreement in order to continue to supply, on a joint
basis, all coal transportation requirements for the LG Power Plant.

      NOW, THEREFORE, in consideration of the premises, the mutual covenants
herein set forth, and other good and valuable consideration, the receipt of
which is hereby acknowledged, the parties do hereby agree as follows:

                                  ARTICLE I
                                 DEFINITIONS
                                 -----------
      The following terms shall have the following meanings for purposes of this
Agreement:

      "AAR" shall mean the Association of American Railroads.
      "AAR Interchange Rules" shall mean the rules set out in the Field
Manual and Office Manual of the Interchange rules adopted by the AAR, as amended
from time to time.

      "Agreement" shall have the meaning set forth in the premises clause.




                                       2
   7
      "Asset Purchase Agreement" shall mean the Amended and Restated Asset
Purchase and Reorganization Agreement among LG, the Trustee and, as to certain
specific sections of the Agreement only, NRG Energy, Inc., Zeigler Coal Holding
Company and Southern Electric International, Inc., as of September 30, 1996, as
the same may be amended from time to time.

      "Cajun" shall mean Cajun Electric Power Cooperative, Inc.

      "Calendar Year" shall mean a year commencing January 1 and ending
December 31.

      "Carrier" or "Carriers" shall mean collectively BN and ACMS.

      "Chapter 11 Proceeding" shall have the meaning set forth in the
Recitals.

      "Coal" shall mean crushed raw coal (2x0 in size) unprocessed and
classified as bituminous (including sub-bituminous) whose Standard
Transportation Commodity Code (STCC) is 11212, as set forth in the STCC Tariff
ICC STCC 6001 Series in effect on the date this Agreement is executed or its
successor. Coal greater than 2x0 may be shipped only upon mutual consent of
the parties which consent shall not be unreasonably withheld. The Coal may be
treated to prevent freezing or to suppress dusting after mutual determination by
the parties that the agents used for such treatment shall not adversely affect
the facilities or equipment of ACMS or BN, or the operation thereof.

      "Coal Cars" shall mean LG supplied open-top rail cars equipped with rotary
couplers, having a capacity of not less than 204,000 pounds, suitable for use in
service between Origin and the Terminal, and suitable for use in service in the
Coal unloading equipment maintained by ACMS.

      "Designated Loading Point" shall mean that point on Origin mines' trackage
at which any further train movement is at the direction of the mine operator.



                                       3
   8
      "Destination" shall mean the private barge coal unloading facility at the
LG Power Plant at approximately mile 263 AHP near New Roads, LA.

      "Effective Date" shall mean the Effective Date under the Asset Purchase
Agreement.

      "Effective Rate" shall have the meaning set forth in Article I.

      "LG Power Plant" shall have the meaning set forth in the Recitals.

      "Origin" shall mean all existing BN-served Wyoming Powder River Basin
mines in Campbell and Converse Counties that are now operating and, with mutual
written consent of Carriers and LG, those mines that become operational during
the term of this Agreement.

      "Origin Loading Facilities" shall mean the equipment necessary to load
Unit Train shipments of Coal at Origin including but not limited to rail
trackage, Coal silos and/or hoppers, conveyor belts, preparation plants, and
storage facilities at or for Origin.

      "STB" shall mean the Surface Transportation Board or its successor agency
or body having the same or similar jurisdiction over common carriers by rail.

      "Tender" shall mean (a) with respect to a shipment of Coal by rail, to
make available for loading into Coal Cars; (b) with respect to Coal Cars, to
release Coal Cars into the control of BN; and (c) with respect to a shipment of
Coal by barge, to make available for unloading and loading into barges at the
Terminal.

      "Terminal" shall mean ACMS' Hall Street Terminal in St. Louis, Missouri.

      "Ton" shall mean a ton of 2,000 pounds, avoirdupois.

      "Transportation of Coal" shall mean movement of Coal from Origin to
Destination including rail transportation from Origin to the Terminal,
receiving, interim storage, loading to barge at the Terminal and barge
transportation from the Terminal to Destination.



                                       4
   9
      "Trustee" shall mean Ralph R. Mabey, as Chapter 11 Trustee of Cajun.

      "Trustee's Plan of Reorganization" shall mean the Trustee's Plan of
Reorganization as may be amended from time to time for Cajun, pending in the
Chapter 11 Proceeding.

      "Unit Train" shall mean an assembly of Coal Cars continuously cycling from
one Origin to the Terminal on one bill of lading.

                                  ARTICLE II
                  FILING, APPROVAL, COMMENCEMENT OF SERVICE
                           EFFECTIVE DATE AND TERM
                           -----------------------
      Section 1.  Term.
                  -----
      The term of this Agreement shall be for a period of five years, commencing
on the Effective Date (as defined below), and ending five years thereafter
except as provided in Article XII, Section 2.D.

      Section 2.  Commencement of Service.
                  ------------------------
      A.    Effective Date of Agreement.
            ----------------------------
      This Agreement is entered into and becomes binding upon the signatories
upon the Effective Date as defined in the Asset Purchase Agreement.

      B.    Initiation of Service.
            ----------------------
      Transportation service will initiate under this Agreement as of the first
train to commence loading at Origin on or after 12:01 a.m. on the calendar day
next following the Effective Date. Coal en route by train or barge or in transit
at the Terminal, prior to 12:01 a.m. of the day




                                       5
   10
following the Effective Date shall be transported to Destination under existing
Coal transportation arrangements between Carriers and Cajun.

                                 ARTICLE III
                         LG'S COAL TENDER COMMITMENT
                         ---------------------------

      Section 1.  Coal Tonnage Subject to this Agreement.
                  ---------------------------------------

      LG shall Tender to Carriers at Origin all Coal required for operation of
all of the Coal fired generation units at LG's Power Plant including the three
Coal fired generation units currently in operation, any additional Coal fired
generating unit(s) which might be constructed at LG's Power Plant during the
term of this Agreement, and all of the Coal required for maintaining a storage
pile of the proper size at the LG Power Plant, as determined by LG in its sole
discretion, from time to time.

      Section 2.  Minimum Volume Commitment.
                  --------------------------

      At least ninety (90) days prior to the beginning of each Calendar Year
(except 1997), LG shall provide to Carriers a declaration of the Tons of Coal
expected to be Tendered during the next Calendar Year ("Declared Tonnage").
Subject to the other provisions of this Agreement, the Declared Tonnage for a
Calendar Year shall represent LG's best estimate of the tonnage expected to be
Tendered for such Calendar Year. The Declared Tonnage for the portion of the
1997 Calendar Year that remains after the Effective Date shall be provided not
later than thirty (30) days after the Effective Date. Said declaration(s) shall
also include a shipping schedule of the amounts of Coal that LG expects to
Tender during each month of such year. During the Calendar Years 1998-2001, LG
shall Tender not less than {***} Tons per year (the "Minimum Volume
Commitment"). During the Calendar Years 1997 and 2002 (assuming an Effective
Date




                                       6
   11
in 1997), the Minimum Volume Commitment shall be prorated by multiplying a
ratio, the numerator of which is the number of days in a Calendar Year that
Transportation of Coal will be provided by Carriers under this Agreement and the
denominator is 365 days, multiplied by {***} Tons. LG shall Tender all shipments
of Coal on a ratable and mutually agreeable quarterly schedule taking into
consideration LG's seasonal Coal consumption. LG may increase or decrease the
Declared Tonnage for a Calendar Year quarter by as much as {***} of the
quarterly Declared Tonnage upon written notice to Carriers 60 days prior to the
beginning of the quarter. Neither the declaration of Declared Tonnage, the
amendment of such declaration or the ultimate accuracy of such declaration shall
be deemed to relieve LG of its obligation to Tender to Carriers the Coal tonnage
subject to this Agreement. If the Effective Date occurs after 1997, then all
dates and references to Calendar Years shall be adjusted as appropriate to give
effect to the five (5) year term provided for under Article II, Section 1.

      Section 3.  Volume Shortfall Payment.
                  -------------------------

      If in any Calendar Year, LG does not Tender Tons of Coal at least equal to
the Minimum Volume Commitment (for reasons other than an event of Force
Majeure), LG shall pay to Carriers, not as a penalty, but as compensation for
lost traffic in the form of liquidated damages, agreed upon as reasonable and in
full settlement for LG's failure to meet the Minimum Volume Commitment, an
amount equal to fifty {***} of the Effective Rate (as defined in Article X)
applicable for the fourth quarter of the Calendar Year in question, multiplied
by the number of Tons by which LG failed to meet the Minimum Volume Commitment
(the "Volume Shortfall Payment"). This Section shall not authorize LG to
transport any tonnage for any Calendar Year via any transportation mode other
than BN and ACMS.



                                       7
   12
      Section 4.  Shipment of Processed Coal.
                  ---------------------------

      The rates, terms and conditions of this Agreement apply to the
transportation of raw, untreated Coal and do not apply to the transportation of
artificially dried or processed Coal.

      Section 5.  Reports.
                  --------

      Within forty-five (45) days after the end of each Calendar Year (and
within forty-five (45) days after termination of this Agreement), LG shall send
a written notice to Carriers certifying for such year (A) the Minimum Volume
Commitment; (B) the number of Tons of Coal Tendered or caused to be Tendered by
LG for transportation hereunder; (C) the total number of Tons of Coal required
for operation of the LG Power Plant and the maintenance of the storage pile at
such plant; (D) the number of Tons of Coal transported hereunder by Carriers;
and (E) the dollar amount of any Volume Shortfall Payment due. If Carriers
accept LG's report or fail to advise LG of any exceptions within forty-five (45)
days of receipt of the report, the contents thereof shall be deemed final and
binding on the parties. If Carriers advise LG within forty-five (45) days of
their receipt of LG's report that they take exception to any portion thereof,
the parties shall meet in an attempt to resolve their differences in accordance
with Article XVIII, Section 9. Any Volume Shortfall Payment agreed to be owing
shall be paid by LG within thirty (30) days after the date such payment is
agreed or deemed to be agreed to be owing.

                                  ARTICLE IV
         CARRIERS' OBLIGATION TO TRANSPORT COAL AND PROVIDE EQUIPMENT
         ------------------------------------------------------------

      Section 1.  Transportation Obligation.
                  --------------------------

      Carriers agree to transport to Destination all Coal declared and
Tendered hereunder by LG during the term hereof, in accordance with the
procedures described herein.



                                       8
   13
      Section 2.  BN Equipment Supply.
                  -------------------
      BN hereby agrees to furnish all equipment, other than Coal Cars, that it
deems necessary in its sole discretion in order to transport the Tendered Coal
by rail from Origin to the Terminal in accordance with this Agreement and in
conformance with the rights, duties and obligations contained herein.

      Section 3.  ACMS Equipment Supply.
                  ---------------------
      A.    Equipment Supply.
            ----------------
      ACMS hereby agrees to furnish all equipment, including a sufficient number
of barges and towboats, that it deems necessary in its sole discretion in order
to transport the Tendered Coal by barge from the Terminal to Destination under
normal operating conditions and in accordance with this Agreement and in
conformance with the rights, duties and obligations contained herein.

      B.    Requirements for Terminal.
            -------------------------
      ACMS shall provide and operate the Terminal for the transfer of Coal from
Unit Trains to ACMS' barges. Such Terminal shall be capable of handling LG's
Coal requirements when Tendered in accordance with Article III, Section 2. The
Terminal will be equipped with rotary dumper equipment for the unloading of Unit
Trains. It will include sufficient area for the storage of Coal as provided
below in Paragraph C of this Section. Conveyors, stacking and reclaiming
equipment shall be provided, together with a complete loading dock for the high
speed loading of ACMS' barge tows.

      C.    Storage Capacity.
            ----------------
      ACMS shall maintain only one portion of the Terminal storage area for the
handling of LG's Coal. ACMS reserves the right to commingle Coal belonging to LG
originating from more




                                       9
   14
than one mine. The amount of storage used for LG's Coal shall be determined by
Carriers to efficiently manage BN and ACMS equipment and facilities and to best
accommodate LG's Declared Tonnage as provided in Article III, Section 2 hereof
up to a maximum of 150,000 Tons of storage. If LG requests that additional Tons
of Coal be stored at the Terminal and space is available, LG may be charged a
reasonable charge which shall be mutually agreed upon by the parties.

                                  ARTICLE V
                     LG'S OBLIGATION TO SUPPLY EQUIPMENT
                     -----------------------------------
      Section 1.  Supply of Equipment.
                  -------------------
      A. LG hereby agrees to supply sufficient Coal Cars including spare cars at
no cost to Carriers in order to transport the Coal Tendered pursuant to this
Agreement. LG shall supply enough Coal Cars such that each trainset shall be
comprised of at least {***} Coal Cars plus five (5) percent spare cars for each
trainset. Said Coal Cars to be furnished shall be approved for use by BN and
shall have a volume capacity of approximately 4,000 cubic feet and a net
capacity of not less than 102 tons per car in steel and 118 tons per car in
aluminum and shall be suitable for use at Origin and the Terminal.

      B. LG agrees that it will assume all owners' responsibility for Coal Cars
as designated in the AAR Interchange Rules and shall comply with the rules and
regulations of the Federal Railroad Administration (the "FRA") applicable to
such Coal Cars.

      Section 2.  Car Damage.
                  ----------
      If LG-provided Coal Cars are damaged while in the possession of Carriers
and on Carriers' trackage, BN or ACMS will give notice to LG promptly by
telephone or facsimile of




                                       10
   15
the damage or derailment giving car initial and number and will provide written
notice within thirty (30) days of the damage or derailment. LG will designate an
appropriate individual and location for such notification. If LG's Coal Cars are
damaged under conditions for which Carriers are liable under the AAR Interchange
Rules (except for damage due to defect in design, materials or workmanship or
the negligence of LG), Carriers will, if no LG spare Coal Cars are available,
furnish Coal Cars of not less than 100 tons marked capacity, if available, at no
additional cost to LG for a period of time not to exceed 120 days following the
date of damage. If suitable replacement Coal Cars are not available, the Minimum
Shipment Weight shall be adjusted pursuant to Article VI.

      In the event LG supplied cars are damaged and Carriers are liable pursuant
to this Section, Carriers shall:

                  a)    perform repairs to LG Coal Cars at a BN repair facility
                        at no charge to LG and pay for any transportation to and
                        from such facility; or if Carriers elect not to repair
                        LG Coal Cars at a BN repair facility;

                  b)    perform repairs at no charge to LG at a non-BN repair
                        facility designated by LG and acceptable to Carriers
                        (such acceptance shall not be unreasonably withheld by
                        Carriers), and pay for any transportation to and from
                        such facility. Such Coal Cars shall be transported by
                        Carriers as soon as practicable;

                  c)    perform all repair work on LG Coal Cars at either a BN
                        repair facility or a non-BN repair facility, in
                        accordance with all AAR and FRA requirements. All
                        damaged LG Coal Cars shall be repaired to a condition
                        equal to that before the damage occurred. Carriers shall
                        notify LG when repairs to LG Coal Cars have been
                        completed and returned to service.

      Section 3.  Car Destruction.
                  ---------------
      In the event LG-provided Coal Cars are destroyed while in the possession
of Carriers and on Carriers' trackage, BN or ACMS will give notice to LG
promptly by telephone or facsimile of



                                       11
   16
such destruction giving car initial and number and will provide written notice
within thirty (30) days of the destruction. LG will designate an appropriate
individual and location for such notification. If LG's Coal Cars are destroyed
under conditions for which Carriers are liable under the AAR Interchange Rules.
Carriers will, if no LG spare Coal Cars are available, furnish substitute Coal
Cars of not less than 100 tons marked capacity, if available, at no additional
cost to LG for a period not to exceed 120 days following settlement of claim for
such destroyed Coal Car, but in no event is this period to exceed 365 days
following date of actual destruction. If suitable replacement cars are not
available, the Minimum Shipment Weight shall be adjusted pursuant to Article VI.
Settlement for such destroyed Coal Car, if Carriers are liable, shall be on the
basis of cost of reproduction new less depreciation and salvage in accordance
with Rule 107 of the AAR Interchange Rules. Such amounts will be paid within
forty-five (45) days of receipt of LG's invoice. Carriers will not be liable for
such destruction that is the result of a defect in design, materials and/or
workmanship in the Coal Cars or the negligence of LG.

      Section 4.  Provision of Unloading Facilities.
                  ---------------------------------
      LG shall provide Destination facilities at the LG Power Plant capable of
unloading ACMS' individual barges at the rate of 3,000 tons per hour. For use in
conjunction with LG's dock at the Destination unloading facility. LG shall
provide a mooring area for holding of loaded tows and the make-up of outbound
empty tows. The mooring area shall be capable and suitable in all respects for
the handling of up to 35 loaded barges and 35 empty barges. Operation, repair
and maintenance of the Destination dock, unloading facility, and mooring area
shall be at the sole risk and expense of LG and shall be provided without cost
or other expense to ACMS.




                                       12
   17
      Section 5.  Provision of Harbor and Shift Boat.
                  ----------------------------------
      LG shall provide and operate at its sole risk and expense harbor and shift
boats sufficient to handle the shifting of loaded and empty barges to and from
the Destination dock and the mooring area and the rewiring of outbound empty
barges in a tow-like fashion as specified by ACMS.


                                  ARTICLE VI
                   RAIL OPERATING AND SCHEDULING PROCEDURES
                   ----------------------------------------
      Section 1.  Train Size.
                  ----------
      LG shall provide sufficient empty Coal Cars to assemble trains of at
least {***} cars. If an Origin mine is unable to load a train to the Minimum
Shipment Weight as a result of LG's failure to furnish a sufficient number of
Coal Cars, the Minimum Shipment Weight shall be applied.

      Section 2.  Minimum Shipment Weight.
                  -----------------------
      A. The "Minimum Shipment Weight" for trainloads of Coal Tendered by LG for
transportation under this Agreement shall be {***} tons for aluminum Coal Cars
and {***} tons for steel Coal Cars.

      B. For purposes of the billing of rates under Article X, Section 1, except
for LG's failure to provide sufficient empty Coal Cars as provided in Section 1
above, all trainloads of Coal Tendered by LG with a shipment weight of less than
the applicable Minimum Shipment Weight shall be assessed on the basis of the
Minimum Shipment Weight.



                                       13
   18
      C. The number of Tons upon which transportation charges are paid,
regardless of whether actually transported, shall be counted toward LG meeting
the Minimum Volume Commitment.



                                       14
   19
      Section 3.  Minimum Tender.
                  --------------
      A.    Each Unit Train for loading shall contain no less than {***} Coal
Cars except as provided for in this Section ("Minimum Tender").
      B. In the event LG is unable to furnish for loading at least {***} Coal
Cars because cars have been damaged, destroyed, or derailed by Carriers and have
been removed from service, and if Carriers are unable to substitute Carrier coal
cars pursuant to Article V, the per shipment Minimum Tender of {***} Coal Cars
shall be reduced by the number of coal cars Carriers are unable to substitute
under the provisions of Article V, but the minimum tender per shipment shall in
no case be less than {***} Coal Cars, unless mutually agreed upon by LG and BN.

      Section 4.  Advance Notice and Loading.
                  --------------------------
      A. LG will make Coal Cars available at Origin for loading without Carriers
or the mine operator ordering placement of Coal Cars. BN shall furnish the mine
operator not fewer than four (4) hours advance notice of the arrival of such
Coal Cars at Origin for loading.

      B. LG and the mine operator will be responsible for the loading of Coal
into the Coal Cars. The parties agree to cooperate with the mine operator to
provide for the complete and efficient loading of the Coal Cars at Origin. BN
shall provide locomotives and train crews to move trains through the Origin
Loading Facilities at a controlled speed which will allow for the full and
uniform loading of each Coal Car.

      Section 5.  Placement and Free Time -- Origin.
                  ---------------------------------
      A.    LG and the mine operator shall have {***} hours to load each
train ("Loading Free Time"). Loading Free Time shall commence when the
locomotives have arrived at the Designated Loading Point and the train crew has
requested loading instructions, or when the train is Constructively Placed, and
shall end when LG or the mine operator has released the train.



                                       15
   20
      B. LG shall pay BN an Origin Detention Charge of {***} for each hour or
fraction thereof that actual loading time exceeds its Loading Free Time;
PROVIDED, HOWEVER, that when a Loading Disability under Section 4 paragraph E of
this Article occurs during a train's Loading Free Time, LG's Loading Free Time
shall be extended for the duration of such Loading Disability; and, PROVIDED
FURTHER, that when a Loading Disability occurs (other than a cause directly
attributable to BN) after a train's Loading Free Time expires, LG shall be
required to pay an Origin Detention Charge during such Loading Disability. In
lieu of such Origin Detention Charges following the expiration of a train's
Loading Free Time, LG may request that BN release the locomotives and crew for
which LG shall pay a release charge of {***}. BN shall return the locomotives
and crew to the train at the expiration of the Loading Disability at no
additional charge to LG.

      C. If a train cannot be positioned on Origin trackage due to any cause
attributable to LG or its mine operator, that train shall be considered
Constructively Placed.

      D. If, due to any cause attributable to BN, a train arrives at Origin
before another train has been released, the second and subsequent train(s) shall
not be considered placed or Constructively Placed, and Loading Free Time for
such train shall not commence until the locomotives have arrived at the
Designated Loading Point on Origin trackage and the crew has requested loading
instructions.

      E. "Loading Disability" means any of the following events which results in
the inability to load Coal into the Coal Cars at Origin: (i) a cause directly
attributable to BN, (ii) an Act of God, (iii) a strike or other labor
disturbance, (iv) a riot or other civil disturbance, (v) unusual snow and/or ice
accumulation sufficient to immobilize train operations and prevent loading of
such train, (vi) governmental acts or regulations, or (vii) mechanical or
electrical



                                       16
   21
breakdown, explosion or fire, not reasonably within the control of LG or its
mine operator, in a Loading Facility. "Loading Disability Time" means the period
of time from which LG or the mine operator is prevented from loading a train at
Origin due to a Loading Disability. LG or the mine operator shall notify BN
immediately by telephone (i) as to the time and nature of commencement of the
Loading Disability and (ii) as to the time of termination of the Loading
Disability.

      Section 6.  Rail Car Demurrage at Terminal.
                  ------------------------------
      LG shall pay BN a terminal detention charge of {***} for each hour or
fraction thereof that actual unloading is delayed for reasons attributable to
LG.

      Section 7.  Constructive Placement.
                  ----------------------
      A. If a train cannot be positioned on mine operator's trackage at Origin
due to any cause attributable to LG or its mine operator, that train shall be
considered "Constructively Placed".

      B. A Constructively Placed train shall be held at the nearest available
hold point as determined by BN. Immediately upon arrival of the train at the
hold point, BN shall notify the mine operator or LG by radio, telephone, wire or
other reasonable means, of the date and hour that hold time begins. Immediately
upon departure of the train from the hold point, BN shall notify the mine
operator or LG by radio, telephone, wire or other reasonable means, of the date
and hour that the hold time ends.

      C.    For purposes of computing the loading or unloading time of a
Constructively Placed train:
                  a)    the time elapsed while transporting a Constructively
                        Placed train from the hold point to Origin shall be
                        excluded from Loading Free Time.



                                       17
   22
                  b)    If the train must reverse direction to reach the nearest
                        available hold point, the time required for the train to
                        return to the point of reverse direction shall be
                        included in Loading Free Time.

      Section 8.  Service Commitment.
                  ------------------
      A. BN will operate Unit Trains between Origin and the Terminal during each
Calendar Year of this Agreement on an average round trip cycle time that shall
be calculated by application of the following formulas ("Annual Service
Standard"):

            1)    For mines located North of Reno Junction:


                  a)    {***}
                  b)    {***}
                  c)    {***}
                  d)    {***}
                  e)    {***}

            2)    For mines located South of Reno Junction:


                  a)    {***}
                  b)    {***}
                  c)    {***}
                  d)    {***}
                  e)    {***}

            For Example:  If LG Tenders 6,100,000 tons from mines located
            north of Reno Junction, the calculation would be as follows:

                  {***}



The average cycle time shall not include:



                                       18
   23
            (i) Loading at Origin;

            (ii) Time elapsed for delays that are the result of a Force Majeure;
      for purposes of this Section such delays shall not be subject to the 24
      hour provision set forth in Article XII; and

            (iii) Time elapsed for delays that are attributable to LG, including
      but not limited to, delays resulting from removal of excess Coal under
      Article VII, release or hold time under Article VI and miscellaneous
      handling of Coal Cars under Article VII, and

            (iv) Time elapsed for trains held due to bunching at Origin mine or
      the Terminal; PROVIDED, HOWEVER, that elapsed transit time for bunching at
      Origin shall be included if LG has allowed BN the option of routing an
      empty train from its original Origin to an alternate Origin and the
      alternate Origin has Coal available for loading.

The cycle time of such additional trainset put into service to transport deficit
tonnage, described below, shall not be included in determining whether or not BN
has met the Annual Service Standard.

      B. In the event BN fails to meet the Annual Service Standard during any
Calendar Year due to causes other than those described in this Section, such as
to prevent the delivery of LG's Minimum Volume Commitment as provided in Article
III, Section 2, and if LG has complied with its obligations to supply sufficient
Coal Cars to transport its Minimum Volume Commitment, LG shall give notice to BN
in writing within fifteen (15) days after the end of the Calendar Year of the
amount of the deficit tonnage for that year resulting from BN's inability to
meet the Annual Service Standard. If the deficit is due to BN's failure to meet
the Annual Service Standard. BN shall, without additional charge to LG, take all
reasonable steps, including the addition of locomotives and Coal Cars, to
transport the deficit tonnage in the quarter or quarters designated by LG which
in no case shall be later than 6 months from the end of the



                                       19
   24
Calendar Year in which the deficit occurred and at a schedule consistent with
the ability of BN and the Origin mine(s) to load. In addition, Carriers may at
any time provide Carrier-owned or leased train sets, without additional charge
to LG, for Transportation of Coal pursuant to this Agreement, consistent with
the ability of the Origin mine(s) to load the Coal. If Carriers are unable to
furnish Coal Cars, LG may, with Carriers' consent, furnish Coal Cars and
Carriers shall reimburse LG for the reasonable cost of providing such Coal Cars.
The freight charges for transporting said deficit tonnage shall be the rate in
effect for the fourth quarter of the year during which the deficit occurs. If LG
does not provide timely notice of claimed deficit tonnage, Carriers will have no
obligation to transport said tonnage.

      C. Deficit tonnage incurred during one Calendar Year and delivered during
the following Calendar Year will be deemed to be Tons received during the prior
Calendar Year.

      Section 9.  Routing.
                  -------
      A. Loaded trains under this Agreement shall be transported via BN from
Origin to the Terminal via Alliance and Lincoln, Nebraska, and West Quincy,
Illinois ("Route-Of-Movement"); PROVIDED, HOWEVER, that BN may use alternate
routes at its discretion; PROVIDED, FURTHER that BN's decision to use alternate
routes other than for reasons of Force Majeure shall not reduce BN's obligation
to comply with the Annual Service Standard. In Force Majeure situations, BN
shall have the right to either declare its right to suspend its obligations
pursuant to Article XII hereof or to mitigate Force Majeure events through
reroute operations. In such event, LG may be charged a reasonable reroute charge
which shall be mutually agreed upon by the parties.



                                       20
   25
      B.    Transportation of Empty Trains.
            ------------------------------
      As part of the Transportation provided under this Agreement BN shall, at
no additional charge to LG, transport empty trains to Origin from the Terminal
or points intermediate on the Route-Of-Movement for the purpose of subsequent
loading under the terms of this Agreement.

      C.    Delivery of New Trains.
            ----------------------
      LG may deliver, from time to time, newly purchased or leased trainsets
(not currently in service under this Agreement) to BN. In the case of a newly
leased trainset, if the trainset is in BN's PRB revenue service immediately
prior to its lease by LG, BN will transport such trainset to Origin {***}. In
the case of a newly-purchased trainset, the following shall apply:

            1)    If LG delivers the trainset to a point on the BN system but
                  not on the Route-Of-Movement, BN will transport such trainset
                  to Origin [***] and in consideration of that transportation
                  will be entitled to use such trainset for one complete cycle
                  from the PRB to a destination of BN's choice and back to
                  Origin {***}; BN may exercise its right to cycle such trainset
                  to a destination of its choice at any time within six (6)
                  months of delivery of such trainset, subject to LG's agreement
                  to the schedule for its use.

            2)    If LG delivers the newly purchased trainset to a point on the
                  Route-Of-Movement, BN will transport such trainset to Origin
                  {***}, and will not be entitled under this Agreement to use
                  such trainset in non-LG service.

                                 ARTICLE VII
                           SERVICE AND MAINTENANCE
                          -------------------------

      Section 1.  Service and Maintenance of LG Railcars.
                  --------------------------------------
      A.    Upon reasonable request from LG, BN will stop a Unit Train of
Coal Cars on the return empty movement at a maintenance facility at an
intermediate point on BN's Route-Of-


                                       21
   26
Movement between the Terminal and Origin where trackage is available to
accommodate such Unit Train. For removal and replacement of Coal Cars in said
Unit Train, LG shall pay BN a charge of {***} per hour or fraction thereof for
such services. The time will be computed from the time the Unit Train stops for
removal or replacement of Coal Cars until such time as the last Coal Car is
removed from the Unit Train. This paragraph will also apply to switching of Coal
Cars into or out of an empty Unit Train at Origin or the Terminal.

      B. If, upon delivery of such an empty Unit Train of Coal Cars at the car
maintenance facility, BN is instructed by LG to leave the entire Unit Train of
empty Coal Cars and remove the locomotives, a charge of {***} per train will be
assessed in addition to the charges set out in Paragraph A. Upon request from
LG, BN will remove the entire Unit Train of empty Coal Cars from the car
maintenance facility and return it to Unit Train service at no additional
charge.

      C. If the car maintenance facility is served by another rail carrier which
necessitates a switch movement of the entire Unit Train of empty Coal Cars or a
lesser number of Coal Cars to or from a connecting railroad, BN will provide
services and be paid charges as outlined in Paragraph A and B, Article VII,
Section 1; PROVIDED, HOWEVER, that any switching or other charges imposed by the
connecting railroad shall be paid by LG. The switching and handling time will be
continuous from the time the Unit Train is made available for delivery until
such time as the locomotives have been attached to the empty Unit Train or empty
Coal Cars are available for movement or until such time as the locomotives have
been detached from the empty Unit Train or empty Coal Cars.

      D. If during the term of this Agreement, LG's car maintenance facility is
on trackage served by BN or on trackage served by another rail carrier, but is
located at a point which is not on the Route-Of-Movement, BN will provide
services and be paid charges as outlined in




                                       22
   27
Paragraphs A and B of Article VII, Section 1 herein, which shall be in addition
to a line haul charge covering any out-of-route movement. The line haul charges
covering out-of-route movement are as follows:



        Rates in Cents
      Per Car Per Mile,               Number of Cars
       Minimum 75 Miles                   Per Tender
       ----------------               --------------
                                   
            {***}                        25 or less
            {***}                         26 to 75
            {***}                      More than 75



The charge set out in this paragraph will not apply to Coal Cars damaged under
circumstances for which Carriers are liable under Article V (except for Coal
Cars damaged due to a defect or defects in design, materials, or workmanship or
the negligence of LG).

      Section 2.  Holding and Storage of Empty Or Loaded Unit Trains.
                  --------------------------------------------------
      A.    If BN-owned trackage is available at a location on the
Route-Of-Movement and upon request of LG, BN will, on the return movement from
the Terminal to Origin, place an entire Unit Train of empty Coal Cars on such
trackage for storage. Upon subsequent request from LG, BN will remove the Unit
Train from such storage and return it to service. BN will be paid {***} in total
for its services in placing and removing such Unit Train. In addition, storage
charges of {***} shall be paid by LG for each 24-hour period or fraction thereof
that such Unit Train is stored.

      B. Upon request of LG, BN will, on the return movement from the Terminal
to Origin, place an entire Unit Train of empty Coal Cars on a privately-owned or
leased storage track if located on the Route-Of-Movement. Upon subsequent
request of LG, BN will remove




                                       23
   28
the entire Unit Train from such storage track and return it to service. BN will
be paid {***} in total for its services in placing and removing such Unit Train
and returning it to service.

      C. If LG's owned or leased storage track is served by another rail carrier
which necessitates a switch movement at an intermediate point on the
Route-Of-Movement of an empty Unit Train to or from a connecting railroad, then
upon request of LG, BN will switch said Unit Train to or from the other carrier.
BN will be paid {***} for each such service to or from a connecting carrier. In
addition, LG shall pay BN {***} for each hour, or fraction thereof, required for
any switching. Any switching or other charges imposed by the connecting railroad
shall be paid by LG.

      D. If LG's owned or leased storage track is located at a point which is
not on the Route-Of-Movement, BN will move the empty Unit Train to and from such
storage track and be paid charges as outlined in Paragraphs D and E of this
Section, which shall be in addition to the line haul charges for any such
out-of-route movement. The line haul charges covering out-of-route movement are
as follows:



        Rates in Cents
      Per Car Per Mile,               Number of Cars
       Minimum 75 Miles                   Per Tender
       ----------------               --------------
                                   
            {***}                        25 or less
            {***}                         26 to 75
            {***}                      More than 75



      E. If LG requests BN to hold a train and if trackage is available, LG
shall pay to BN a Hold Charge of {***} for each hour or fraction thereof that
each Unit Train is held; PROVIDED, HOWEVER, that such Hold Charge shall not
apply (i) to a train being held during




                                       24
   29
Loading Free Time; (ii) to a train subject to a Detention Charge; or (iii) where
a train is held because it cannot be placed for reasons set forth in Article VI,
Section 7.

      Section 3.  Weighing and Determination of Weights.
                  -------------------------------------

      A.    The parties agree that the weight of the Coal in the Coal Cars will
be determined at Origin by the mine operator. Carriers shall not be responsible
for such weight determination. Weighing shall be performed on scales inspected
and certified in accordance with the specifications of the then-current
Institute of Standards and Technology (Handbook - 44) for such scales, subject
to supervision and/or verification by Carriers or their agent, and the results
furnished to LG and Carriers.

      B. If any Unit Train cannot be weighted due to a breakdown of scales, the
lading weight per car of such train shall be determined by averaging the lading
weight per car of the last five (5) trains of like equipment (i.e., aluminum or
steel Coal Cars) under this Agreement weighted at that Origin prior to such
breakdown. If fewer than five (5) trains under this Agreement were weighed at
that Origin prior to the breakdown, the weight per car shall be determined by
averaging the weight per car of the train(s) (of like equipment) under this
Agreement weighed at that Origin prior to the breakdown as well as the lading
weight per car of train(s) under the Agreement first weighed at that Origin
after the scales are repaired, so as to comprise a five (5) weighted train
average.

      Section 4.  Overloaded Car(s).
                  -----------------
      Unless LG is notified by BN that heavier weights are acceptable, if a
loaded Coal Car is found by BN, as determined by the weighing procedures in
Section 2 hereof, to weigh in excess of maximum gross weight on rail of 286,000
pounds for shipment in aluminum Coal Cars, or 268,000 pounds for shipments in
steel Coal Cars (plus or minus one-half of one percent), BN




                                       25
   30
may, at its discretion, switch said overloaded Coal Cars and remove them from
the train. LG or the mine operator shall then cause excess Coal to be removed
from the overloaded Coal Car, and BN shall replace the Coal Car into the train.
A charge of {***} per car will be assessed by BN for removal and reinsertion of
overloaded cars en route. If the excess Coal can be removed during the Loading
Free Time applicable under Article VI without removing the Coal Car from the
train, it shall be done without the assessment by BN of any additional charges
to LG.

      Section 5.  Release of Crews/Removal of Locomotives.
                  ---------------------------------------
      If upon request from LG, for reasons other than fault of BN or Force
Majeure, BN releases crews and/or removes locomotives from a train at a point
along the Route-Of-Movement where trackage is available or, at LG's direction,
at the Terminal, LG will pay a release charge of {***} for each such occurrence,
which charge shall include the subsequent return of crews and/or addition of
locomotives to the train and return of the train to service.

                                 ARTICLE VIII
                   TERMINAL AND BARGE OPERATING PROCEDURES
                   ---------------------------------------

      Section 1.  Control of Loading and Unloading.
                  --------------------------------
      ACMS shall be responsible for unloading of Coal Cars, Coal transfer,
storage and loading of LG's Coal into barges at the Terminal.

      Section 2.  Control of Service Performance.
                  ------------------------------
      ACMS shall have exclusive control of the methods of loading Coal into
barges at the Terminal and transporting and delivering the Coal by barge to the
Destination. The barges will move only at the convenience of ACMS along the
direct Mississippi River route and either singly or with one or more other
craft. ACMS shall have the right to shift or interchange the tow



                                       26
   31
from one to another towing vessel as frequently as it may find it convenient to
do so, or to procure towage from any other vessel, including vessels not owned
or operated by ACMS, to tie off the tow at any point and for any purpose, and to
deviate from its route, and visit any port whether or not on said route and in
any order.

      Section 3.  Notice of Barge ETA.
                  -------------------
      ACMS will use commercially reasonable efforts to give LG advance telephone
or facsimile notice of the expected time of arrival of each of its tows at
Destination, such notice to be given at least 24 hours in advance of arrival. LG
will at all times keep ACMS advised of persons authorized to receive such
notices and at all times shall have at least one such authorized individual
available to receive such notices at the unloading dock or Destination.

      Section 4.  Origin Demurrage.
                  ----------------
      If, by reason of act or omission solely attributable to LG, ACMS' barge
tows or single barge units, as described herein, are delayed in loading at the
Terminal, then demurrage shall accrue at the rate of (i) {***} per hour or part
thereof for each tow operating under Alternate A or Alternate B, and (ii) {***}
per day for each barge operating under Alternate C, for such period of time that
each tow or each barge, respectively, is thereby delayed in beginning or
completing loading.

      Section 5.  Destination Demurrage.
                  ---------------------
      Unless otherwise specified by ACMS in accordance with this Article, ACMS
will deliver LG's Coal in tows consisting of 15 to 30 barges. ACMS will allow
those hours of free time specified in subsections (A) through (C) below for
unloading and makeup of each tow. After expiration of the allowed free time,
demurrage will accrue for all time used in excess of the allowed free time at
the rate of {***} per hour or part thereof for Alternates A and B described





                                       27
   32
below and at the rate of {***} per day or part thereof for Alternate C
(collectively, the "Demurrage Rates"). These Demurrage Rates will be adjusted
under the provisions of Article X hereof.

      Section 6.  Free Time.
                  ---------
      A.    Alternate A -- Standby Unloading
            --------------------------------
      For standby unloading at Destination, ACMS will allow three hours free
time plus one hour free time per barge for each tow, for unwiring, unloading,
positioning and rewiring of each tow. In the event two or more tows are at the
LG Power Plant within a 24 hour period, free time for the second and succeeding
tows will commence at the expiration of free time for the preceding tow or when
such tow has completed discharge, whichever first occurs.

      B.    Alternate B -- Additional Set Of Barges Unloading.
            -------------------------------------------------
      If an additional set of barges is utilized so that the arriving towboat
may deliver a loaded tow and pick up the empty barges from the previous tow,
ACMS will allow three hours free time for landing the inbound towboat and its
tow and preparing the outbound empty tow for departure. In the event two or more
tows arrive at the LG Power Plant within a 24 hour period, the three hour free
time for the second and succeeding towboats will commence upon completion of
unloading and rewiring of the preceding tow or at the end of a period of time
beginning upon arrival of the preceding tow as described in Section 7 below, and
equal to one hour for each barge contained in such tow, whichever first occurs.

      C.    Alternate C -- Single Barge Unloading.
            -------------------------------------
      ACMS may elect to deliver LG's Coal in single barge increments
containing approximately I 500 net Tons. Under this Alternate C, lay time shall
be computed from the first 7:00 a.m. following placement, actual or
constructive, of one or more such single barges for




                                       28
   33
unloading. Following such commencement of lay time, ACMS will allow one day free
time to unload any such barge then on placement. After expiration of the allowed
free time, demurrage shall accrue at the rate specified above until the barge
has completed unloading and is ready for departure.

      D.    Designation of Alternates.
            -------------------------
      The Alternate B unloading procedure, as described in Section 6 above,
shall be the normal and preferred unloading procedure; however, ACMS may, at any
time and in its sole judgment, upon providing 24 hour notice to LG, utilize the
Alternate A unloading procedure described in Section 6 above. ACMS may also use
the Alternate C unloading procedure at any time, PROVIDED, HOWEVER, that ACMS
will provide reasonable advance notice to LG.

      Section 7.  Computation of Free Time.
                  ------------------------
      For purposes of free time and demurrage for Section 6, free time shall be
computed from the time and date ACMS lands its inbound tow alongside the
destination dock, or mooring area, or in the event the dock is blocked, the time
and date the master of the tow signifies his readiness to land alongside the
dock. Computation of free time and demurrage thereafter shall cease when either
(a) the towboat is faced up to the outbound empty tow and the master of the
towboat establishes that the empty tow is properly made up and ready for
departure, or (b) when the outbound empty tow is properly made up for departure
and the towboat commences standing by for repairs, maintenance or other
circumstances deemed necessary by ACMS. If a deficiency exists in the make-up of
the outbound tow, free time and demurrage thereafter shall continue until such
deficiency is corrected by LG. In the event ACMS is required to make-up an
outbound tow or correct deficiencies in a tow improperly made up by LG, free
time and demurrage thereafter shall continue until such deficiencies are
corrected.



                                       29
   34
      Section 8.  Adjustment for Force Majeure.
                  ----------------------------
      ACMS charges for demurrage as provided herein shall be subject to
adjustment by reason of Force Majeure, except that demurrage will continue to
apply to all tows and single barges which have loaded but not completed
unloading and rewiring prior to receipt of the Force Majeure notice.

      Section 9.  ACMS Operating Obligations.
                  --------------------------
      ACMS shall be responsible for any damage to LG's Coal Cars while in ACMS'
care, custody and control at the Terminal, except for damage due to defect in
design, materials and workmanship or the negligence of LG, PROVIDED, HOWEVER,
that such disclaimer shall not relieve ACMS from duties of care it may have by
custom of trade or industry while conducting operations at the Terminal. Upon
arrival of each Unit Train at the Terminal, ACMS shall:

      1)    Verify the number of Coal Cars from a listing of the Coal Car
            numbers to be provided in writing to ACMS by LG at least twelve (12)
            hours prior to arrival at the Terminal. The verification process
            will take place as the Coal Cars are placed for unloading.

      2)    Identify the Coal Car numbers not received at the Terminal and
            notify LG in writing within twenty-four (24) hours after the entire
            Unit Train is unloaded, except for Friday evenings and weekends, in
            which case the advice will be sent the next working day.

      3)    Report damage as noted during the unloading process. LG acknowledges
            that ACMS will not be responsible for checking or inspecting Coal
            Cars for damage.

      4)    Operate the thawing operation.

      5)    Uncouple and recouple cars at the Terminal when the Unit Train is
            split.

      6)    Maintain coal inventory records at the Terminal; PROVIDED, HOWEVER,
            that ACMS makes no representations or warranties as to the accuracy
            or completeness of such records, and such undertaking is subject to
            the disclaimer set forth in Article XIV, Section 2.



                                       30
   35
                                  ARTICLE IX
                           LG OPERATING PROCEDURES
                           -----------------------

      Section 1.  Responsibility for Unloading.
                  ----------------------------
      The Destination dock, unloading facility, mooring area and shifting and
harbor boat at the LG Power Plant shall be available as required for ACMS' use
and without cost or charge to ACMS. LG shall be responsible for any damage to
ACMS' floating equipment while in LG's care, custody or control, except for
damage due to defect in design, materials and workmanship or the negligence of
ACMS; PROVIDED, HOWEVER, that such disclaimer shall not relieve LG from duties
of care it may have by custom of trade or industry. LG shall also be responsible
for any loss or damage to rigging and mooring lines and shall equip the
unloading facility with portable pumps which shall be used to pump any barge
which may have been damaged in transit or while at dock. LG shall operate and
maintain the Destination dock, unloading facility and mooring area in a
commercially reasonable manner consistent with the normal industry practices so
as to facilitate the efficient utilization of ACMS' barging equipment and the
unloading of each barge as completely as practicable.

      Section 2.  Berthing and Mooring.
                  --------------------
      LG shall provide ACMS barges with a safe berth at the Destination mooring
area, dock, and unloading facility free of wharfage, dockage, port or other
charges. LG will also maintain at least a 10 foot channel dredged between such
areas and the sailing line. While barges are in the care, custody or control of
LG, or its agents, contractors or subcontractors, all applicable U.S. Coast
Guard Regulations shall be complied with, and in the event that ACMS should in
any manner be held responsible for any act or omission of LG in such compliance,
then LG agrees to indemnify, save and hold ACMS harmless for all such
responsibility and liability.



                                       31
   36
      Section 3.  Excess Return Tonnage.
                  ---------------------
      It is essential to proper maintenance and operation of hopper Coal barges
that all Coal be removed at the time of each unloading. In the event that LG
leaves excessive Coal in barges, ACMS shall be entitled to charge and collect an
additional transportation charge of {***}/Ton of Coal returned. Estimates of
Coal left in the barges shall be made by LG and ACMS by visual observation. If
this method of estimation becomes a recurring problem, then Coal remaining in a
barge shall be shoveled out and weighed periodically whenever a barge is taken
out of service for repairs in order to compare the actual weighed tonnage with
the visual estimate and thereafter corrections will be made as appropriate. In
such event, demurrage charges, as provided herein, shall apply.

                                  ARTICLE X
                          RATES AND RATE ADJUSTMENT
                          -------------------------
      Section 1.  Minimum Base Rate.
                  -----------------
      The Base Rate for transportation of Coal in aluminum Coal Cars operating
with net lading of at least 118 Tons Under this Agreement shall be {***} per
Ton, as of January 1, 1997. The Base Rate for transportation of Coal in steel
Coal Cars with net lading of at least 102 Tons under this Agreement shall be
{***} per Ton, as of January 1, 1997. There shall be a surcharge paid directly
to BN of {***} per Ton on all Tons moving in steel Coal Cars. Under no
circumstances shall application of the rate adjustment mechanism contained in
this Article cause the Effective Rate to fall below the Base Rate.



                                       32
   37
      Section 2.  Effective Rate.
                  --------------
      The Base Rate, as adjusted pursuant to Section 3 of this Article, shall be
the "Effective Rate." All other charges and surcharges provided in this
Agreement shall be adjusted at such times and in the same manner as the Base
Rate and the Effective Rate. The Effective Rate, together with the other charges
specified in this Agreement, shall constitute the entire compensation payable to
Carriers for all Transportation of Coal provided under this Agreement. The
adjustment mechanism specified in Section 3 of this Article shall constitute the
sole means of adjusting the rates and other charges specified in this Agreement
during the term hereof. If LG requests Carriers to perform services not
specified under this Agreement, charges for such services shall be established
by separate agreement.

      Section 3.  Adjustment to Rates and Charges.
                  -------------------------------
      A.    Commencing on April 1, 1997, the Effective Rates and other
charges provided for in the Agreement shall be adjusted quarterly, upward or
downward as provided herein. Adjustments shall be made through application of
the following formula:

            AR = a x [{***}(b) + {***}(d) + {***}(1)
                           ---        ---        ---
                                       c          l

in which,
      "AR" is the adjusted rate;
      "a" is the Base Rate;
      "b" is the most currently available [***], as published by the United
      States Department of Commerce, for two quarters



                                       33
   38
      prior to the quarter of adjustment (e.g., for the quarter beginning April
      1, 1997, the {***} for the fourth quarter of 1996 shall apply);

      "c" is the final {***} for the second quarter of 1996;

      "d" is the {***} for the quarter immediately prior to the quarter of
      adjustment (e.g., for the quarter beginning April 1, 1997, the first
      quarter 1997 average shall apply) PROVIDED, HOWEVER, at no time shall "d"
      be less than {***};

      "e" is {***}.

      B. The adjustment process described in Paragraph A shall be repeated on
every July 1, October 1, January 1, and April 1 thereafter during the term of
this Agreement, with the new Effective Rate and other charges for the three
month period following each such "Adjustment Date" being determined by
application of the formula described in Paragraph A for that Adjustment Date to
the Base Rate and other charges.

      C. In computing the quarterly adjustment under Paragraph A, all published
indices shall be rounded to the nearest thousandth of an index point, all
calculated indices shall be rounded to the nearest tenth of an index point, and
all rates and charges shall be rounded to the nearest whole cent. If there is no
nearest thousandth of an index point, tenth of an index point or whole cent, as
the case may be, indices, rates and charges shall be rounded to the nearest even
thousandth of an index point, tenth of an index point or whole cent. For
example, $15.935 and $15.945 would be rounded to $15.94.

      D. LG shall reimburse ACMS for any taxes paid on fuel used in commercial
transportation on inland waterways pursuant to 26 U.S.C. Section 4042, its
successor statutes, or any similar taxes imposed upon fuel use or related
commercial use of the Mississippi River



                                       34
   39
system, above and in excess of the {***} currently being levied and paid by
ACMS. LG shall reimburse ACMS quarterly for the amount of such tax paid by ACMS
in providing river transportation service under this Agreement. For purposes of
such quarterly billings, ACMS shall determine from its Boat History Report the
total number of taxable vessel operating hours in LG's service. The ratio of
such taxable hours in LG's service to all vessel operating hours in taxable
service shall be applied to ACMS' monthly vessel fuel consumption reports to
establish total taxable fuel consumption of vessels operating in LG's service.
Fuel burned in generators, heaters, boilers and in exempt waters is not
presently subject to this taxation and shall not be billed to LG. ACMS shall
provide LG all documentation to support billings with respect to the Federal Tax
on inland waterways.

                                  ARTICLE XI
                              BILLING PROCEDURES
                              ------------------

      Section 1.  Transportation Billing.
                  ----------------------
      Carriers shall bill LG for Transportation of Coal based upon the greater
of (i) the actual weight of Coal per train (as determined under Article VII) or
(ii) the applicable Minimum Shipment Weight. For purposes of determining the
actual weight, all shipments hereunder shall take place under a BN bill of
lading that recites that the transportation is governed by this Agreement, but
does not state the rate.

      Section 2.  Payment.
                  -------
      All payments for amounts due hereunder must be made by wire to Carriers'
designated bank account within {***} days from the date the invoice is received.
If LG fails to make payment within {***} days from the date the invoice is
received, LG shall pay a late charge




                                       35
   40
in the amount of 1/365th of the sum of {***} on the date the payment becomes
overdue times the amount due and unpaid, commencing from the expiration of said
{***} day period until such amount is paid.

      Section 3.  All Other Charges.
                  -----------------
      Carriers shall each bill LG for ancillary services based upon the adjusted
charges provided elsewhere in this Agreement. Payment for said charges shall be
remitted to the applicable invoicing party. Interest shall be applied in the
manner set forth in Section 2 of this Article.

                                 ARTICLE XII
                                FORCE MAJEURE
                                -------------

      Section 1.  Definition.
                  ----------
      Except as otherwise expressly provided in this Agreement, no party shall
be liable for any loss or damage resulting from failure to perform or the delays
in performance resulting from and occasioned by an event of Force Majeure. The
term "Force Majeure" or an event of Force Majeure as used herein shall mean any
cause beyond the reasonable control of the party affected which by exercise of
due diligence it shall be unable to overcome, including, without limitation, by
enumeration, allocations, expropriations, requisitions, priorities, boycotts,
embargos, restraint or other acts of courts or governmental or civil, military
or naval authorities (whether acting legally or otherwise); Acts of God; lock or
river-outages, perils or accidents of the sea or other water; defects, failures
or breakage in hull, turbines, generators, machinery, equipment or appliances;
acts of war, hostilities, blockages, interferences of public enemies or
belligerents,



                                       36
   41
rebellion, civil strife, or commotion; sabotage, vandalism or malicious
mischief; fire or explosion from any cause or wheresoever occurring; epidemics,
pestilence or quarantine; labor stoppage, riots, disorders, storms, landslides,
floods, washouts, earthquake, lightning, unusual snow accumulations,
inoperability of facilities at Origin, the Terminal or Destination or electrical
generation, transmission or distribution facilities, shortage of diesel fuel for
locomotives or towboats, derailments, failure of LG's coal suppliers to supply
Coal, or from any other cause whatsoever and wheresoever occurring beyond the
reasonable control of the respective parties, whether of the kind enumerated
herein or otherwise. It shall not, however, include any change in demand or
projected demand for electrical power or for transportation not due to events of
Force Majeure, whether foreseeable or not.

      Section 2.  Effect of Force Majeure.
                  -----------------------
      A. If because of an event of Force Majeure that endures for twenty-four
(24) continuous hours or more, a party is unable to carry out any of its
obligations under this Agreement, and if such party promptly, but not to exceed
ten (10) calendar days from commencement of the event of Force Majeure, gives
the other parties written notice of such Force Majeure, then the obligation of
the party giving such notice shall be suspended to the extent made necessary by
the Force Majeure and during its continuance (including the original 24-hour
period); PROVIDED, HOWEVER, that the aforementioned 24-hour rule shall not apply
in the case of derailments; and PROVIDED, FURTHER, that an event of Force
Majeure shall not reduce LG's Minimum Volume Commitment for any Calendar Year
unless an event or events of Force Majeure have occurred during such Calendar
Year for an aggregate number of days exceeding 15 days in which case the Minimum
Volume Commitment for such year shall be



                                       37
   42
reduced by a percentage equal to the ratio of the number of days of Force
Majeure during such Calendar Year in excess of {***} over 365.

      B. The party experiencing Force Majeure shall take prompt actions to
remove such causes of Force Majeure insofar as practicable, with all reasonable
dispatch, and its performance shall be resumed immediately after such causes
have been removed; PROVIDED, HOWEVER, that nothing contained in this Section 2
shall cause the party affected by the Force Majeure to submit to what it
considers to be an unfavorable labor agreement.

      C. When the Force Majeure condition has terminated, the party claiming the
Force Majeure shall notify the other parties in writing as soon as practicable,
but not to exceed ten (10) days, certifying that the amount of time expended due
to the Force Majeure.

      D. Notwithstanding the foregoing or any other provision of this Agreement,
in the event a single Force Majeure condition claimed by LG extends for a period
of 90 days or more, the original term of this Agreement shall be deemed to have
been extended for an equivalent time period.

      E. In the event a single Force Majeure condition claimed by Carriers has
existed for a period of {***} days or more, and has substantially prevented
performance during such period, LG may acquire and transport fuel via a mode
other than Carriers for the remaining duration of the condition of Force
Majeure; PROVIDED, HOWEVER, that if Carriers declare a Force Majeure the effect
of which is expressly limited to achievement of the Annual Service Standard,
this paragraph shall not apply as long as Coal supply at the Terminal, en route
in barges and at the LG Power Plant exceeds 14 days bum; PROVIDED, FURTHER, that
if rerouting of any aspect of the transportation service, including the use of
an alternative terminal will enable either or both of Carriers to continue to
participate in the transportation despite the event of Force



                                       38
   43
Majeure. LG will take all commercially reasonable steps necessary to permit
continued service by either or both of Carriers; PROVIDED, FURTHER, that LG is
not required to incur out of pocket expense to take such steps, except to the
extent that the parties hereto may otherwise mutually agree. Carriers will not
be responsible for any expense whatsoever incurred by LG as a result of such
transportation via a mode other than Carriers.

                                 ARTICLE XIII
                           INDEMNITY AND INSURANCE
                           -----------------------

      Section 1.  Indemnity by ACMS.
                  -----------------
      ACMS agrees to indemnify and save harmless LG from any and all suits,
actions, causes of action and claims of action of whatever character which may
be brought or made against LG by ACMS' agents, servants, employees or any third
party on account of injuries or damages sustained or alleged to have been
sustained while ACMS, such agents, servants or employees were performing any act
or thing required to be done under the provisions of this Agreement whether
caused by the sole act, negligence or default of LG or otherwise.

      Section 2.  Indemnity by LG.
                  ---------------
      A. LG agrees to indemnify and save harmless Carriers, their
subcontractors, affiliates and the vessels employed by ACMS, in the performance
of Coal transfer, storage and transportation hereunder, from any and all suits,
actions, causes of action and claims of action of whatever character which may
be brought or made against Carriers, their subcontractors, affiliates and said
vessels by LG's agents, servants or employees on account of injuries or damages
sustained or alleged to have been sustained while such agents, servants or
employees




                                       39
   44
were performing any act or thing required to be done under the provisions of
this Agreement whether caused by sole act, negligence or default of ACMS or
otherwise.

      B. LG hereby agrees to release, indemnify and save harmless ACMS, its
subcontractors, its affiliates and vessels employed by it or them in the
performance of the Coal transfer, storage and transportation hereunder from or
against any loss or damage to the Coal transferred, stored and transported under
this Agreement, whether such loss or damage is caused by AMCS' negligence or
not.

      C. If an ACMS towing vessel or barge comes into collision with another
vessel or object, LG agrees to indemnify ACMS, its subcontractors, its
affiliates and vessels employed by it or them in the performance of the
transportation movements hereunder, with respect to any payment which LG
receives or may be entitled to receive from such other vessel or object.

      Section 3.  Insurance to be Maintained by ACMS.
                  ----------------------------------
      ACMS shall, at its own expense, carry and maintain collision and
protection and indemnity insurance with waiver of subrogation against LG, or
other insurance covering the liability of the vessels and their owners against
loss of life and personal injury to members of their crews or to any third
party, including transportation, wages, maintenance and cure. The deductibles,
if any, applicable under said policies are to be borne by ACMS. All policies
pursuant to which such insurance is provided shall name LG as assured or
additional assured under such policy.



                                       40
   45
                                 ARTICLE XIV
                             COAL LOSS AND DAMAGE
                             --------------------

      Section 1.  Liability for Loss of Coal Transported by BN.
                  --------------------------------------------
      Liability for damage to or loss of Coal transported by BN pursuant to
this Agreement shall be determined as if BN were providing transportation
hereunder as a common carrier pursuant to the Interstate Commerce Commission
Termination Act, as amended. BN will not be, liable for Coal loss or damage
caused by improper loading at Origin or defects in the design or manufacture of
Coal Cars, except for Coal Cars supplied by BN.

      Section 2.  Liability for Loss of Coal Transported by ACMS.
                  ----------------------------------------------
      LG warrants that ACMS shall not be held accountable or otherwise liable
for any discrepancy in Coal inventories; any loss, shrinkage or damage to LG's
Coal shall be borne by LG, whether occurring during storage, transfer,
affreightment, unloading or otherwise; and whether such loss, shrinkage or
damage was caused, directly or indirectly, by ACMS' negligence. LG shall, at its
own expense, obtain and keep in full force and effect during the term of this
Agreement or any extension thereof, insurance on the full value of all Coal
received, stored, transferred and transported by ACMS under this Agreement. All
policies pursuant to which such insurance is provided shall name ACMS, its
subcontractors, its affiliates and the vessels employed by it or them in the
performance of the Coal transfer, storage and transportation hereunder as
assured or as additional assureds under such policy, which shall also be
endorsed to waive rights or subrogation against said parties. The deductibles,
if any, applicable under any of said insurance policies are to be borne by LG.
Full evidence of such insurance in form and substance satisfactory to ACMS shall
be provided to ACMS prior to the




                                       41
   46
first delivery of Coal to the Terminal. LG shall also, at its own expense, carry
and maintain Longshoremen's and Harbor Worker's Compensation Act insurance
covering its employees.

      Section 3.  General Average.
                  ---------------
      General average shall be payable according to York-Antwerp Rules, 1950,
and as to matters not therein provided for according to the laws and usage of
the Port of New York. The general average in each instance shall be prepared by
average adjusters selected by ACMS and consented to by LG. In the event of
accident, danger, damage or disaster, before or after commencement of the
voyage, resulting from any cause whatsoever, whether due to negligence or not,
for which, or for the consequence of which ACMS is not responsible, by statute,
contract, or otherwise, the goods, shippers, consignees, or owners of the goods
shall contribute with ACMS in general average to the payment of any sacrifices,
losses, or expenses of a general average nature that may be made or incurred and
shall pay salvage and special charges incurred in respect of the goods. If a
salving ship is owned or operated by ACMS, salvage shall be paid for in full as
if such salving ship or ships belonged to strangers. Such deposit as ACMS or its
agents may deem sufficient to the estimated contribution of goods, or any
salvage, or special charges thereon, shall, if required, be made by the goods,
shippers, consignees or owners of the goods to ACMS before delivery. This
section shall not give rise to any liability of BN.

      Section 4.  Disclaimer of Damages.
                  ---------------------
      In no event shall BN, ACMS or LG be liable for special or consequential
damages or lost profits relating to this Agreement.



                                       42
   47
      Section 5.  Private Carriage.
                  ----------------
      ACMS and its affiliated marine companies are private carriers in respect
to this Agreement, therefore, nothing set forth in this Agreement or performance
hereunder shall be deemed to subject ACMS to the jurisdiction of the STB.

                                  ARTICLE XV
                                 TERMINATION
                                 -----------

      If any party shall default in any material obligation of this Agreement
which is not excused as Force Majeure, and continues in such default for a
period of sixty (60) days after written notice thereof is given by any
non-defaulting party to such defaulting party of the existence of such default,
or, if more than sixty (60) days are required to correct with reasonable
diligence the matters complained of in said notice and such defaulting party
shall fail within said sixty (60) day period to commence the action necessary to
correct such matters and thereafter prosecute the same to completion with
reasonable diligence, the non-defaulting party may, at its option, and without
prejudice to its other rights and remedies hereunder, at law or in equity,
terminate this Agreement by written notice to the party in default.

                                 ARTICLE XVI
                          ASSIGNMENT AND SUCCESSION
                          -------------------------

      No party may assign this Agreement or any of its rights or obligations
hereunder, in whole or in part, without the prior written consent of the other
parties which consent shall not be unreasonably withheld. Such consent shall not
be required where the assignment is made to a purchaser or assignee of
substantially all of the assets of such party by way of merger, consolidation,
transfer, sale or lease of substantially all of its assets, divestiture pursuant
to an



                                       43
   48
order or decree of court, or similar court reorganization; PROVIDED, HOWEVER,
that no assignment shall be effective until and unless the assignee agrees in
writing to assume all obligations of the assignor hereunder. Any party hereto
may assign any receivables due them under this Agreement without the consent of
the other parties; PROVIDED, HOWEVER, such assignment shall not relieve the
assignor of any of its rights or obligations under this Agreement. ACMS may,
without the consent of LG or BN, assign this Agreement in whole or in part to
American Commercial Lines, Inc., or one of its wholly-owned subsidiaries; and
upon such assignee expressly assuming in writing, to the extent of such
assignment, the obligations of ACMS hereunder, and if each such assignee has a
net worth equal to that ACMS, LG shall, to the extent of such assignment,
release ACMS from all further obligations under this Agreement. Subject to the
foregoing, this Agreement shall bind and inure to the benefit of the parties,
their successors, and assigns.

                                 ARTICLE XVII
                      AMENDMENT, MODIFICATION AND WAIVER
                      ----------------------------------
      Any amendment, modification, or waiver of any provision of this
Agreement, or any consent to any departure therefrom, shall not be effective in
any event unless the same is in writing and signed by the proper party or
parties, and then such modification, wavier, or consent shall be effective only
in the specific instance and for the specific purpose given.



                                       44
   49
                                ARTICLE XVIII
                                MISCELLANEOUS
                                -------------

      Section 1.  Subcontracting.
                  --------------
      It is understood that nothing herein contained shall prevent ACMS from
subleasing or from subcontracting for any of the services provided for herein,
but ACMS shall remain responsible to LG for the performance of all such
services.

      Section 2.  Independent Contractor.
                  ----------------------
      Nothing herein contained shall be construed as a contract by LG for
chartering, hiring or leasing of any barge, towboat, railroad locomotive or rail
car or other equipment of ACMS or BN nor shall any of the agents, servants or
employees of ACMS or BN be regarded as employees of LG, it being understood that
ACMS and BN are in all respects independent contractors and that LG shall
exercise no control over such barges, towboats, railroad locomotives or rail
cars or other equipment, or the agents, servants or employees of ACMS or BN
except as specifically provided herein.

      Section 3.  Waivers and Remedies.
                  --------------------
      The failure of one of the parties hereto to insist in any one or more
instances upon strict performance of any of the obligations of the other party
pursuant to this Agreement or to take advantage of any of its rights hereunder
shall not be construed as a waiver of the performance of any such obligation or
the relinquishment of any such rights for the future, but the same shall
continue and remain in full force and effect.

      Section 4.  Notice.
                  ------
      Any notice, election or correspondence required or permitted hereunder
shall become effective upon receipt and, except invoices and payments, shall be
deemed to have been properly




                                       45
   50
given or delivered when made in writing and delivered personally to the parry to
whom directed, or when sent by United States mail, overnight or express
delivery, with all necessary postage and charges fully prepaid and delivery
verified, and addressed to the party to whom directed at its specified address:


               
      To LG:      NRG Energy, Inc.
                  1221 Nicolett Mall, Suite 700
                  Minneapolis, MN  55403
                  Attention:  Vice President, U.S. Business Development

                  Zeigler Coal Holding Company
                  50 Jerome Lane
                  Fairview Heights, Illinois  62208
                  Attention:  Alan D. Williams, Manager, Business Development

                  Southern Electric International, Inc.
                  Suite 500
                  900 Ashwood Parkway
                  Atlanta, GA  30338
                  Attention:  Gary Kubick, Project Director

      To BN:      Burlington Northern Railroad Company
                  2650 Lou Menk Drive
                  Fort Worth, TX  76131-2830
                  Attention:  Coal Business Unit

      To ACMS:    American Commercial Marine Service Company
                  P.O. Box 610
                  1701 East Market Street
                  Jeffersonville, IN  47130
                  Attention:  Senior Vice President - Sales and Marketing


or to such other addresses as may have been furnished in writing by any of the
foregoing to the other persons named above. Any notice pertaining to matters of
an emergency or an operating nature may be delivered by mail, messenger,
telephone, telefax or by any other reasonable means, to such representative of
the party hereto being notified as may be appropriate, and such



                                       46
   51
notice shall be effective upon receipt. If given by telephone or verbally, the
notice shall be confirmed in writing as soon as practicable thereafter.

      Section 5.  Severability, Effect of Agreement.
                  ---------------------------------
      A. Any provisions of this Agreement prohibited or unenforceable by reason
of any applicable law of any jurisdiction shall, as to such jurisdiction, be
ineffective to the extent of such prohibition or unenforceability without
invalidating the remaining provisions hereof, and any such prohibition or
unenforceability in any jurisdiction shall not invalidate or render
unenforceable such provision in any other jurisdiction. Where, however, the
conflicting provisions of any such applicable law may be waived, they are hereby
waived by the parties hereto to the full extent permitted by law, to the end
that this Agreement shall be enforced as written.

      B. This Agreement exclusively and completely states the rights and
obligations that Carriers have with respect to LG, and that LG has with respect
to Carriers, concerning the subject matter of this Agreement and supersedes all
other Agreements, oral or written, with respect hereto.

      C. This Agreement supersedes and replaces in their entirety that certain
Revised and Restated Agreement No. 42875 (January 1, 1984 through December 31,
1994) previously entered between ACMS and Cajun, and that certain Coal
Transportation Agreement ICC-BN-C-0774 between BN and Cajun dated November 30,
1983 (as amended).

      Section 6.  Confidentiality.
                  ---------------
      Except to the extent that disclosure is required by law, court order or
decision, or applicable regulatory requirements, the provisions of this
Agreement shall not be disclosed to or discussed with any third party other than
counsel or consultants retained by Carriers or LG, all of



                                       47
   52
whom shall be advised of the confidential nature of this Agreement and
information related to it; PROVIDED, HOWEVER, that LG may make only necessary
disclosures in connection with the Chapter 11 Proceeding provided that it
obtains confidential treatment to the extent permitted by the bankruptcy court
and the presiding judge; PROVIDED, FURTHER, that LG shall be permitted to
disclose the provisions of Article VI, Sections 1-7 to Coal suppliers that agree
in writing to maintain the confidentiality of such information, where such
disclosure is required for the proper administration of Coal supply
arrangements. Where disclosure of information is required, the affected party
shall give written notice thereof to the other parties as far in advance as
practicable, shall confer with such other parties, and shall take such
reasonable actions as are available under applicable to law to attempt to
preserve the confidentiality of the material disclosed.

      Section 7.  Representations and Warranties.
                  ------------------------------
      A. Carriers and LG represent and warrant to one another that: (i) they are
duly organized and validly exist in good standing under the laws of their
governing jurisdictions and/or states of incorporation, and have all requisite
power and authority to enter into this Agreement and to carry out the terms and
provisions thereof; (ii) the person(s) executing this Agreement on behalf of
each party are duly authorized and empowered to bind their respective parties to
this Agreement; and (iii) there is no action, proceeding, or investigation
current or pending other than the Chapter 11 Proceeding and no term or provision
of any charter, by-law, certificate, license, mortgage, indenture, contract,
agreement, judgment, decree, order, statute, rule or regulation which in any way
prevents, hinders, or otherwise adversely affects, or would be violated by,
entering into and performing this Agreement.



                                       48
   53
      B. Each person executing this Agreement on behalf of his respective party
represents and warrants the execution of this Agreement and that he personally
has authority to sign on behalf of the party that he represents.

      Section 8.  Counterparts.
                  ------------
      This Agreement may be executed in any number of counterparts, each of
which so executed shall be deemed to be an original, and such counterparts
together, shall constitute but one and the same instrument, which shall be
sufficiently evidenced by any such original counterpart.

      Section 9.  Remediation.
                  -----------
      If a party receiving a notice of default pursuant to Article XV does not
agree that it has failed to comply with or perform any of the terms, covenants
or conditions of this Agreement to be complied with or performed by it, in any
material respect, such party may, within thirty (30) days after receipt of such
notice of default, notify the other parties in writing of such disagreement (a
"Notice of Contest"). Upon such Notice of Contest being given, no termination of
this Agreement shall be effective unless and until a determination has been made
that a default has occurred and the provisions of this Section have been
implemented.

      The parties agree that any dispute arising in connection with the
interpretation of this Agreement or the performance of any party under this
Agreement or otherwise relating to this Agreement shall be treated in accordance
with the procedures set forth in this Section, prior to the resort by any party
to litigation in connection with such dispute. The dispute shall be referred for
resolution first to each parties' senior corporate officers with the power to
bind such parties. Such procedure shall be invoked by any party presenting to
the other a "Notice of Request for Resolution of Dispute" (a "Resolution
Notice") identifying the issues and dispute sought to be




                                       49
   54
addressed hereunder. A conference of the appointed officers of each of the
parties shall be held as soon as possible but in no event later than (30) days
after the delivery of the Resolution Notice. In the event that the conference
between such individuals does not resolve the dispute, it may be litigated in
any state or federal court of competent jurisdiction.

      Section 10. Construction.
                  ------------
      This Agreement is the product of arm's-length negotiations between the
parties. No provision of this Agreement shall be construed against any party be
virtue of that party being the drafter thereof. Use of the singular form shall
be deemed, where appropriate, to include the plural, and use of the masculine
gender shall be deemed to include the feminine. The terms of this Agreement and
all rights and obligations hereunder shall be construed in accordance with the
laws of the State of Missouri and, when appropriate, Federal law.



                                       50
   55
      IN WITNESS WHEREOF, the parties have cause this Agreement to be executed
as of the date first hereinabove written.


                                     
                                        BURLINGTON NORTHERN AND SANTA FE
                                        RAILWAY COMPANY

ATTEST:                                 BY: /s/ Gregory T. Swinton
                                           _________________________________

/s/ [illegible]                         ITS: Senior Vice President Coal and
______________________________               Agricultural Commodities
                                             _______________________________


                                        AMERICAN COMMERCIAL MARINE SERVICE
                                        COMPANY

ATTEST:                                 BY: /s/ Daniel J. Marquitz
                                           _________________________________

/s/ [illegible]                         ITS: Senior Vice President
______________________________              ________________________________


                                        LOUISIANA GENERATING LLC

                                           BY:  ZENERGY, INC.

                                           BY: /s/ Alan D. Williams
                                              ______________________________
                                               ITS: President

                                           BY:  NRG ENERGY, INC.

                                           BY: /s/ Craig A. Mataczynski
                                              ______________________________
                                               ITS: Member

                                           BY:  SOUTHERN ENERGY CAJUN, INC.

                                           BY: /s/ G.J. Kubick
                                              ______________________________
                                               ITS: Vice President