EXHIBIT 10.4

                  UNIT REDEMPTION, RELEASE, AND SALE AGREEMENT

         This Unit Redemption, Release, and Sale Agreement ("Agreement") is
entered into by and among Touch America, Inc., a Montana corporation ("TA");
Sierra Pacific Communications, a Nevada corporation ("SPC"); and Sierra Touch
America LLC, a Nevada limited liability company ("STA"), as of the 9th day of
September, 2002, to be effective on the "Closing Date," as defined below.
Capitalized terms used but not otherwise defined herein shall have the meanings
given them in the Operating Agreement of STA, dated April 25, 2000 (the
"Operating Agreement"). Each party may be referred to individually as a "Party"
and collectively as the "Parties" in this Agreement.

         WHEREAS, SPC desires to purchase from STA certain of the
telecommunications assets and rights of STA, as described on Exhibit A (the
"Assets"), together with all necessary occupancy rights and rights of access to
and operation of the Assets (the "Related Rights"), in connection with the
following business elements

         (i)      The redemption of the SPC membership interest in STA,
                  effecting the relinquishment of and abandonment by
                  SPC of its ownership interest in STA;

         (ii)     Delivery of SPC's secured promissory note to STA;

         (iii)    STA's covenant to SPC to promptly complete the fiber optic
                  conduit system, which extends from Sacramento, California to
                  Salt Lake City, Utah (the "System"); and

         (iv)     STA's provision of collocation space to SPC, and STA's
                  maintenance of the System, as set forth in this Agreement, its
                  Exhibits and Attachments.

         WHEREAS, each Party to this Agreement acknowledges that the purchase
and conveyance of the Assets and redemption of the SPC membership interest in
STA shall not be consummated until the date that SPC has entered into a binding
and enforceable agreement to sell the First Conduit extending the entire System
route from Sacramento, California to Salt Lake City, Utah (the "First Conduit"),
which date shall be not more than sixty (60) days following the date of this
Agreement (the "Closing" or "Closing Date").

         WHEREAS, each Party to this Agreement acknowledges that SPC has been
and is currently negotiating with Qwest Communications Corporation for the sale
of the First Conduit to Qwest.

         NOW, THEREFORE, in consideration of the promises and covenants set
forth herein and other good and valuable consideration, the receipt and
sufficiency of which are mutually acknowledged, and intending to be legally
bound hereby, the Parties agree as follows:

I.       PURCHASE PRICE

The total purchase price for the Assets is Forty-Eight Million Five Hundred
Thousand Dollars ($48,500,000), as adjusted in Section II below, and payable as
set forth in Section III below (the "Purchase Price").
SPC shall be entitled to retain, free and clear of all material encumbrances,
any third-party deposits and other consideration previously received by it in
connection with the marketing of the First Conduit.

URRS Agreement                    Page 1               Dated: September 9, 2002

II.      REDEMPTION OF SPC'S MEMBERSHIP INTEREST

STA, SPC, and TA shall take all necessary limited liability company action to
redeem the SPC membership interest in STA, causing SPC to relinquish and abandon
its ownership units in STA. Such redemption shall be effected pursuant to the
terms and conditions of the Redemption Agreement in substantially the form of
Appendix A hereto. The Parties agree that the redemption price shall be Thirteen
Million Five Hundred Thousand Dollars ($13,500,000) (the "Redemption Price"),
which is equivalent to SPC's present cash investment in STA. The Redemption
Price shall be offset against the Purchase Price. At the Closing, STA and TA
shall execute an amendment to the Operating Agreement to reflect that SPC is no
longer a member of STA. SPC shall execute and deliver to TA and STA such
documentation, in addition to the Redemption Agreement, as may be reasonably
requested by TA or STA to evidence that the SPC membership interest has been
redeemed by STA as of the Closing Date.

III.     PAYMENT OF PURCHASE PRICE

After offset of the Redemption Price described in Section II, the Purchase Price
in the amount of Thirty-Five Million Dollars ($35,000,000) shall be evidenced by
a secured promissory note made by SPC to STA and is attached hereto as Appendix
B (the "Note"). Payment and performance of the Note shall be secured by a
security agreement wherein SPC shall grant to STA a security interest in all of
the Assets conveyed and transferred to SPC at Closing. The Security Agreement is
attached hereto as Appendix C (the "Security Agreement"). STA agrees to release
its security interest in specific Assets or rights conveyed or sold by SPC
promptly upon STA's receipt of payment equal to the full proceeds less directly
related transaction fees and expenses ("Net Proceeds") received by SPC from any
such sale. Any sale and release of security shall be in accordance with the
terms of the Security Agreement. The Note and Security Agreement shall be
executed and delivered at Closing.

SPC shall directly assign any and all payments it receives from the sale of the
First Conduit it intends to sell to Qwest Communications including but not
limited to the (i)Second Payment of Five Million Dollars ($5,000,000) payment
due on execution of the Amended and Restated Agreement for the Construction and
Sale of Conduit between SPC and Qwest, net payable to STA of $4,375,000; and
(ii) Final Payment, of $10,000,000 net of transaction fees of $750,000 for
$9,250,000. SPC agrees to appoint STA as its agent for the purpose of directly
collecting any payment due to STA from Qwest with full authority to direct the
manner in which any payment is made. SPC will be responsible for transaction
fees and only those proceeds actually received by STA will be deducted from
SPC's balance due under the Note.

IV.      ALLOCATION OF PURCHASE PRICE

The Purchase Price shall be allocated among the Assets in the manner set forth
in Exhibit A.

V.       TRANSFER AND CONVEYANCE OF ASSETS BY STA

         1.       ASSETS TO BE TRANSFERRED

         At the Closing, STA shall convey, transfer, and distribute to SPC the
         following:

URRS Agreement                    Page 2               Dated: September 9, 2002

                  (a)      the First Conduit; and

                  (b)      the Reno Metro Conduit; and

                  (c)      the Related Rights for (a) and (b) above

         Additionally at the Closing, STA shall convey, transfer, and distribute
to SPC the following assets, by conveying to SPC an indefeasible right of use
("IRU") for the useful life of such assets ("useful life" of an asset is defined
in Section 1.13 of the Conduit and Dark Fiber IRU and Sale Agreement, Appendix
E):

                  (d)      Sixty (60) strands of fiber extending between
                           Sacramento, California and Salt Lake City, Utah

                  (e)      Two (2) conduits extending between Reno, Nevada and
                           Spanish Fork, Utah ("IRU Conduits").

         2.       CONDUITS, AND RELATED RIGHTS

         At the Closing, STA shall convey to SPC ownership of the First Conduit
and transfer the Related Rights, by an assignment and bill of sale which is
attached hereto as Appendix D (the "Assignment and Bill of Sale"). STA shall
partially assign to SPC the Related Rights owned or secured by STA. Such partial
assignment of rights shall be of the same quality of title and duration as such
rights are vested in STA. If STA is unable to directly assign to SPC any Related
Right, then STA shall grant access rights to SPC - to the extent that such
rights are legally transferable - through license, IRU, or otherwise, so that
SPC has full rights of occupancy and access to the First Conduit. STA shall
cooperate with SPC in obtaining any required consents to such transfers from
private entities or governmental authorities, and each Party shall be
responsible for any annual recurring fees it is assessed or charged in
connection with its occupancy rights. If a governmental entity requires SPC or
its permitted assigns to obtain a separate license or permit, then SPC shall be
responsible to obtain such license or permit at SPC's sole cost and expense. STA
agrees to use commercially reasonable efforts in cooperating with SPC with
respect to SPC's efforts to secure such licenses or permits.

         STA shall assign to SPC all assignable contract, easement, and
other occupancy rights held by STA and necessary for SPC to occupy any Union
Pacific Railroad ("UPR") right of way along the entire System route. If the UPR
requires a separate agreement and additional compensation specific to the
placement of SPC's fiber in the First Conduit or the IRU Conduits, then SPC
shall be solely responsible to secure an agreement with the UPR and to pay any
additional compensation required by the UPR.

         3.       OP-AMP ("OA") SITES

         STA shall convey to SPC interests in real property on which STA's OA
Sites are situated. Such real property interests shall be of the same quality of
title as possessed by STA. The size and location of each parcel of real property
conveyed to SPC is set forth with particularity on Exhibit B attached hereto.
SPC understands and agrees that STA shall not convey to SPC any real property at
or near STA's OA Sites in Provo, UT, Auburn, CA; Blue Canyon, CA; or Truckee,
CA. SPC shall be solely responsible for all costs and expenses associated with
constructing SPC's OA facilities, including, but not limited to, costs and
expenses relating to site preparation, construction, and placement of conduit
and fiber.

         Notwithstanding any provision of this Agreement or any other agreement
entered into by

URRS Agreement                    Page 3               Dated: September 9, 2002

the Parties to the contrary, SPC specifically understands and agrees that STA's
obligation to deliver executed and transferable conveyance documents relating to
the First Conduit shall not arise until SPC pays to STA Thirteen Million Six
Hundred Twenty Five Thousand Dollars ($13,625,000) toward satisfaction and
reduction of the Purchase Price.

         The IRU Agreement shall also include provision for a Collocation
Agreement substantially in the form of Appendix G allowing SPC to purchase or
lease access to and space in Op-Amp sites owned by STA.

         The IRU will be delivered free and clear of all material liens,
security interests, pledges, easements, claims, conditions, covenants, and
restrictions that may have a material adverse effect on SPC's rights to use and
occupy the property conveyed by the IRU, subject to immaterial exceptions that
SPC approves and the security interest granted to STA in the Security Agreement.

VI.      SPC TRANSFER AND CONVEYANCE OF ASSETS

In addition to execution of the Note and Security Agreement, at Closing, SPC
shall transfer and convey by IRU to STA an interest in twelve (12) fibers from
the Reno metropolitan network and in four (4) fibers from the Las Vegas
metropolitan network The Parties shall execute a separate IRU Agreement (the
"Metro IRU Agreement"), Appendix K, to convey the above fibers. Such Metro IRU
shall be freely assignable by STA. SPC shall also provide to STA a detailed
route map, including, without limitation, streets and point-of-presence ("POP")
locations, and a detailed list showing the collocation space, POP space,
equipment, and related facilities needed for the use, operate, and maintenance
of such Metro fibers that relate to each fiber network.

VII.     STA COVENANTS

         1.       SYSTEM COMPLETION.

         STA acknowledges that SPC will negotiate the sale of the First Conduit
to Qwest Communications Corporation, substantially in the form of Appendix M
hereto (the "Qwest Agreement"). STA shall use its commercial best efforts to
promptly complete the System according to the schedule set forth on Exhibit E of
the Qwest Agreement, including without limitation, the construction, testing,
and maintenance thereof (including the maintenance and retention of all
licenses, permits, authorizations, and other rights, in whatever form necessary,
to access, operate, and maintain the System) and the payment of operational
costs related thereto, and shall perform such other obligations related thereto
and existing at the Effective Date. STA further agrees to promptly and in good
faith cooperate with SPC in the timely discharge of SPC's obligations under the
Qwest Agreement, where the character and time of performance of such obligations
require the assistance, collaboration, support, or consent of STA.

         2.       SUBSTITUTE BUILDER.

         STA agrees that if STA becomes unable to comply with its obligation to
complete the System described in section VII.1 above, or if SPC receives a
notice of default under section 4.01(a) of the Qwest Agreement and such default
is caused by STA's failure or inability to complete the System in accordance
with the Specifications and within the time period described therein, or if STA
does not send SPC a Notice of Completion on or before May 1, 2002, SPC shall

URRS Agreement                    Page 4               Dated: September 9, 2002

have the right, following notice to STA and without prejudice to any other
right or remedy, to cause the System to be completed in accordance with the
Specifications. In such event STA will recognize SPC or SPC's agent, designee,
or transferee (the "Substitute Builder") and will promptly consent to the
pledge and collateral assignment of STA's right, title and interest in, to, and
under any System construction or professional services agreements to the
Substitute Builder, and will acknowledge the right of the Substitute Builder to
make all demands, give all notices, take all actions and exercise all rights of
STA under such agreements; and will further undertake and assign, as necessary,
all actions required to permit the Substitute Builder to fully perform. It is
specifically agreed that all costs incurred by SPC as a result of causing the
system to be completed pursuant to this Section VII.2, which shall include but
not be limited to all gearing-up costs, labor, materials, handling and storage
costs, capital costs, contractors, administrative and general costs, related
overhead costs, penalties and other assessments, shall operate to reduce SPC's
indebtedness to STA under the Note.

         3.       APPROVAL OF STA TRANSACTIONS.

         STA agrees to hold meetings of its respective members and Management
Committee not later than September 10, 2002, for the purpose of approving the
terms of this Agreement, the Exhibits and Appendices, and the transactions
contemplated hereby and thereby.

VIII.    SPC COVENANTS

         1.       APPROVAL OF STA TRANSACTIONS.

         SPC, as a member of the Management Committee, shall undertake such
action and vote for the approval of such resolutions that may be presented to
the Management Committee to authorize, adopt, and approve the transactions
contemplated by this Agreement and the Appendices hereto.

         2.       OCCUPANCY AND ACCESS RIGHTS.

         At the Closing, SPC shall execute such instruments of conveyance,
assignment, and transfer necessary to convey or assign to STA all private and
public easements, licenses, government authorizations, permits (including
environmental permits), and access rights (collectively, "occupancy rights")
held by SPC for the System, to the extent such occupancy rights are legally
transferable. SPC shall, at its own cost and expense, obtain all necessary
"consents to assign" any occupancy rights to STA and use its commercial best
efforts to cause the occupancy rights held by SPC to be validly transferred to
STA.

         3.       SALE OF SPC ASSETS OR SALE OF SPC CAPITAL STOCK.

         As long as an outstanding balance remains on the Note, SPC shall
provide or cause to be provided to STA prompt written notice of any change in
control of all or substantially all of SPC assets. SPC shall make no cash or
other distributions to its parent company, Sierra Pacific Resources, a Nevada
corporation ("SPR"), or any other related entity prior to fully satisfying its
obligations under this Note, provided, however, that this prohibition shall not
act to prohibit SPC from raising additional capital necessary to build or
maintain SPC's business, including, without limitation, the receipt of
investment funds from SPR or a non-affiliated entity, the entering into of a
joint venture arrangement affecting SPC, or the entering into of a transaction
that dilutes SPR's ownership interest in SPC in exchange for cash associated
with SPC's operating or capital expenditure requirements, provided, further,
that SPC shall provide STA with at least thirty (30)

URRS Agreement                    Page 5               Dated: September 9, 2002

days' written notice of the intent to raise such additional capital. In the
event that any stock or equity interest in SPC is sold, conveyed, or transferred
by SPC's present owner, SPC covenants, and agrees that this Note shall be paid
in full before the transaction is consummated. SPC shall cause a legend to be
placed on the existing stock certificate of SPC held by SPR evidencing this
restriction. Until this note is paid in full, SPC shall provide on a quarterly
basis, financial statements including income statements, balance sheets, and
cash flow reports; and annually audited balance sheet and income statement
accurately and completely showing the financial condition of SPC.

IX.      TA COVENANTS

         1.       APPROVAL OF STA TRANSACTIONS.

         TA, as a member of the Management Committee, shall undertake such
action and vote for the approval of such resolutions that may be presented to
the Management Committee to authorize, adopt, and approve the transactions
contemplated by this Agreement and the Appendices hereto.

         2.       APPROVAL OF STA PERFORMANCE.

         TA, as the sole member and manager of STA after the Closing, shall
cause STA to perform its obligations set forth in the Agreement.

X.       ADDITIONAL AGREEMENTS

In addition to the Note to be executed by SPC at the Closing, Appendix B, and
the Security Agreement to be executed by SPC at Closing, Appendix C, SPC and STA
shall execute, at the Closing, the following documents except the Collocation
Agreement that will be executed when collocation services are ordered:

         1.       IRU AGREEMENT.

         A definitive IRU agreement, Appendix E, will be executed at the Closing
and which shall govern the Parties' rights and obligations relating to the sixty
(60) strands of fiber extending from Sacramento, CA to Salt Lake City, UT and
two (2) conduits extending from Reno, NV to Spanish Fork, UT. The Agreement
shall provide that, beginning on August 1, 2003, SPC shall pay to STA Twenty
Dollars ($20.00) per month, per route mile, for the entire System route from
Sacramento, CA to Salt Lake City, UT, for maintenance of the backbone route.

         2.       COLLOCATION AGREEMENT.

         A collocation agreement in substantially the form of Appendix G (the
"Collocation Agreement") shall establish the rights and responsibilities of the
Parties regarding collocation and interconnection of the Parties' facilities.
This sample agreement reflects current pricing available but is subject to
change. Collocation fees for space and services are set forth in the
Collocation Agreement. Such collocation fees are not part of the consideration
for this Agreement and are in addition to SPC's obligation to repay the Note.

         3.       MEMBERSHIP REDEMPTION AGREEMENT.

         A Membership Redemption Agreement, Appendix A (the "Membership
Interest

URRS Agreement                    Page 6               Dated: September 9, 2002

Redemption Agreement"), will be executed at Closing and shall establish the
rights and responsibilities of TA and SPC with respect to the redemption of
SPC's membership interest in STA and SPC's relinquishment and abandonment
thereof.

         4.       QUITCLAIM DEED.

         A definitive quitclaim deed, Appendix I (the "QuitClaim Deed Metro
Conduit"), will be executed at Closing and shall reflect the distribution of the
real-property portion of the Metro Conduit to SPC.

         5.       ASSIGNMENT AND BILL OF SALE.

         A definitive assignment and bill of sale, Appendix J (the "Metro
Conduit Assignment and Bill of Sale"), will be executed at Closing and shall
reflect the distribution of the personal-property portion of the Metro Conduit
to SPC.

         6.       METRO IRU AGREEMENT.

         A definitive IRU agreement, Appendix K, (the "Metro IRU Agreement"),
will be executed at Closing and shall establish the Parties' rights and
obligations with respect to twelve (12) fibers from the Reno metropolitan
network and four (4) fibers from the Las Vegas metropolitan network, shall be
executed by the Parties at Closing.

XI.      REPRESENTATIONS AND WARRANTIES

EACH of STA, SPC, and TA represents and warrants to each other (except with
respect to Item 6) as of the date hereof and shall represent and warrant on the
Closing Date that:

         1.       It has the full right and authority to enter into, execute,
                  deliver, and perform its obligations under this Agreement.

         2.       It has taken all requisite corporate action to approve the
                  execution, delivery, and performance of this Agreement.

         3.       This Agreement shall constitute a legal, valid, and binding
                  obligation enforceable against such party in accordance with
                  its terms, except as the enforceability thereof may be
                  affected by (i) applicable bankruptcy, insolvency,
                  reorganization, or other laws of general application relating
                  to or affecting the enforcement of creditors' rights
                  generally, and (ii) the effect of rules of law governing the
                  availability of equitable remedies.

         4.       Execution, delivery, and performance of this Agreement shall
                  not violate any of the organizational documents of such party,
                  applicable existing regulations, rules, statutes, or court
                  orders or any local, state, or federal government agency,
                  court or body or any agreement, document, indenture, or
                  instrument to which it is a party.

         5.       Except as set forth on Schedule I, there are no actions,
                  suits, claims, demands, or other proceedings or
                  investigations, either administrative or judicial, pending or
                  threatened, affecting the Assets or the transactions
                  contemplated by this Agreement, at law or in equity, before or
                  by any federal, state, municipal, or other governmental
                  department, that can reasonably be expected to result in any
                  materially adverse change (in the aggregate) in the condition
                  of the Assets.

         6.       STA shall represent and warrant to SPC that, as of the Closing
                  Sale, (i) STA, to its

URRS Agreement                    Page 7               Dated: September 9, 2002

                  knowledge, has good and marketable title to all of the Assets,
                  and except as otherwise disclosed on Schedule II, the Assets
                  are subject to no material liens, security interests, claims,
                  leases, or encumbrances; and (ii) STA has duly and validly
                  redeemed the SPC membership interest pursuant to applicable
                  Nevada law. STA agrees to pass on and assign to SPC or its
                  asigns any assignable warranties gven to STA by third party
                  vendors, supplies, contractors or manufacturers that relate
                  to construction of the System.

XII.     LIABILITIES

Except as otherwise expressly provided herein, and subject to the provisions of
Article XIII, SPC shall not assume or otherwise be responsible for any liability
or obligation previously disclosed by SPC relating to the System or claims of
such liability or obligation, matured or unmatured, liquidated or unliquidated,
fixed or contingent, or known or unknown, whether arising out of occurrences
prior to, at or after the date hereof. STA will retain all liabilities that are
not specifically assumed by SPC.

XIII.    INDEMNIFICATION

         1.       INDEMNIFICATION BY STA.

         STA shall indemnify, defend, and hold harmless SPC and SPC's successors
and assigns from and against any claim, demand, obligation, liability, loss,
cost, damage, or expense, including interest, penalties, and reasonable
attorneys' fees, caused by or arising out of (i) any breach or default in the
performance by STA of any obligation of STA contained in this Agreement; or (ii)
any liability arising out of the construction, management, ownership, or
operation of the System or otherwise asserted against STA as of, or arising
after, the Closing Date; provided, however, that if SPC shall have failed to
disclose to TA in writing any such claim, demand, obligation, liability, loss,
cost, damage or expense of which it had actual knowledge prior to the execution
of this Agreement, then SPC shall remain liable for fifty percent (50%) of the
total cost and expense (including attorneys fees) of defending and satisfying
such non-disclosed liability.

         2.       INDEMNIFICATION BY SPC.

         SPC shall indemnify, defend, and hold harmless STA and STA's successors
and assigns from and against any claim, demand, obligation, liability, loss,
cost, damage, or expense, including interest, penalties, and reasonable
attorneys' fees, caused by or arising out of (i) any breach or default in the
performance by SPC of any obligation of SPC contained in this Agreement; (ii)
the assumption in writing by SPC on or before the Closing Date of any liability;
(iii) any liability arising after the Closing date with respect to its ownership
and operation of the Assets or Related Rights; or (iv) any sale or transfer of
System, Assets or rights in the System by SPC to any third party including, but
not limited to, Qwest Communications Corporation.

         3.       COOPERATION BY SPC.

         SPC agrees, at its own cost and expense, to promptly and in good faith
cooperate with STA

URRS Agreement                    Page 8               Dated: September 9, 2002

in the defense and prosecution of any litigation whether currently pending or
arising in the future that relates to the System. This obligation includes, but
is not limited to, making available employees or persons under the control of
SPC or its affiliates available for testimony at depositions or at trials, the
production of documents and consultation with STA and its attorneys.
Additionally, should STA require support or assistance in further negotiations
or resolution of issues arising from SPC's activities associated with the
construction of the Assets, SPC shall at its own cost and expense promptly and
in good faith cooperate with STA in the resolution of said issues.

XIV.     CONDITION TO OBLIGATIONS OF TA AND STA

Notwithstanding anything to the contrary in this Agreement or in any Appendix
hereto, SPC agrees that a condition to the obligations of TA and STA to proceed
with the redemption of SPC's membership interest and to the other performance
obligations of TA and STA described herein are contingent on the payment by SPC
to STA of Four Million Three Hundred Seventy Five Thousand Dollars ($4,375,000),
paid promptly following the execution of the Qwest Agreement substantially in
the form of Exhibit M hereto. If SPC fails to make the above payment or fails to
reach a binding agreement with Qwest, or Qwest fails to perform such agreement,
TA and STA shall have the absolute right to terminate this Agreement or to
insist on specific performance of this Agreement.

XV.      MISCELLANEOUS

         1.       MUTUAL COOPERATION.

         The Parties agree and covenant to execute all documents and to take all
actions necessary to effectuate this Agreement in a prompt and timely manner, to
fully cooperate with each other to complete transactions with third parties
related to this Agreement, and to perform all other acts required hereby or
thereby.

         2.       CONFIDENTIALITY.

         EXCEPT in any filing required to be made by either Party, or as may be
required in connection with the submission or approvals by the Parties to any
regulatory agency or third party whose prior consent is required to effect the
proposed transaction, no Party shall make or cause to be made, any press release
or public announcement with respect to the proposed transaction or the execution
of this Agreement or otherwise communicate with any news media in respect
thereof without the prior written consent of the other Party, and the Parties
shall cooperate as to the timing and contents of any such press release or
public announcement.

         3.       ENTIRE AGREEMENT; INAPPLICABILITY OF "DEADLOCKS" PROVISIONS OF
                  OPERATING AGREEMENT OF STA.

         This Agreement, and all exhibits, constitute the only agreement among
the Parties with respect to the acquisition of SPC's interest in STA by TA, and
the related transactions described herein. This Agreement, and all exhibits,
supersede all prior oral and written agreements with respect to the subject
matter hereof. This Agreement, and all exhibits, may not be modified except by a
written instrument executed by all of the Parties. No dispute arising out of or
relating to this Agreement, the Note, the Security Agreement, any related
agreements or instruments, or brought

URRS Agreement                    Page 9               Dated: September 9, 2002

under applicable law, shall be subject to the provisions of Article X
("Deadlocks"), or any other provisions, of the Operating Agreement of STA dated
as of April 25, 2000.

         4.       LIMITATION OF LIABILITY.

         In no event shall either Party be liable for any punitive,
consequential, incidental, indirect, or special damages or lost profits incurred
or alleged to have to been incurred by anyone whether arising out of tort,
breach of contract, breach of warranty, strict liability, or any other claim.

         5.       JOINT WORK PRODUCT.

         This Agreement is the joint work of the Parties; accordingly, in the
event of an ambiguity, no presumption shall be imposed against any Party for
reason of document preparation.

         6.       NOTICES.

         Any notice or other communication required or which may be given
hereunder shall be in writing and shall be delivered personally, telegraphed,
telexed or telecopied, or sent by certified, registered mail, postage prepaid,
and shall be deemed given when so delivered personally, telegraphed, telexed, or
telecopied (with a confirming telephone call) or if mailed, four days after the
date of mailing, as follows (or to such successor entity or such new address as
a party may notify to the other):

      SPC:
      Richard Coyle                             Mark Backus
      President                                 Attorney
      5860 S. Pecos, Bldg. G, Ste. 100          6226 West Sahara Avenue
      Reno, NV 89120                            Las Vegas, NV 89151
      Tele: 702.949.7910                        Tele: 702.367.5692
      Fax: 702.949.7928                         Fax: 702.227.2069

      TA:
      Mike Zimmerman                           Tom Joyce
      Vice President                           Attorney
      130 North Main                           130 North Main
      Butte, MT 59701                          Butte, MT 59701
      Tele: 406-497-5426                       Tele: 406-497-5521
      Fax: 406-497-5240                        Fax: 406-497-5203

         7.       APPLICABLE LAW; JURISDICTION AND VENUE.

         This Agreement shall be governed and construed in accordance with the
laws of the State of Nevada.

         8.       NO ASSIGNMENT.

         This Agreement and any right hereunder may not assigned by any Party
without the prior written consent of the other Parties, except by operation of
law.

         9.       NO THIRD PARTY RIGHTS.

         This Agreement is not intended and shall not be construed to create any
rights in any parties

URRS Agreement                    Page 10              Dated: September 9, 2002

other than SPC and TA and STA, and no person shall assert any rights as
third-party beneficiary hereunder.

         10.      SEVERABILITY.

         If any provision of this Agreement is held to be invalid, illegal, or
unenforceable, the validity, legality, and enforceability of the remaining
provisions shall not in any way be affected, impaired, or invalidated thereby.

         11.      COUNTERPARTS AND FACSIMILE COPIES.

         This Agreement may be executed in two or more counterparts, each of
which shall be deemed an original but all of which together shall constitute on
and the same instrument. The Parties agree that facsimile copies may be accepted
as original signatures.

         12.      HEADINGS.

         The headings in this Agreement are intended solely for convenience of
reference and shall be given no effect in the interpretation of this Agreement.

         13.      APPENDICES.

         Terms of appendices referenced or attached hereto govern the rights and
responsibilities of the Parties with respect to the subject matter thereof.

         14.      EXPENSES.

         Each Party will bear its own costs and expenses with respect to this
Agreement and any other transactions contemplated herein including, without
limitation, legal fees and fees of other advisors.

URRS Agreement                    Page 11              Dated: September 9, 2002

IN WITNESS WHEREOF, and intending to be bound hereby, the Parties have caused
this Agreement to be executed by their duly authorized representatives as of the
date set forth above.

SIERRA PACIFIC COMMUNICATIONS,
A NEVADA CORPORATION

By:  ________________________
     RICHARD J. COYLE, JR.
     Its President

TOUCH AMERICA, INC.,
A MONTANA CORPORATION

By:  ________________________
     MICHAEL J. MELDAHL
     Its President

SIERRA TOUCH AMERICA LLC,
A NEVADA LIMITED LIABILITY COMPANY

By:  _______________________                   By:  ___________________________
     RICHARD COYLE, MANAGER                         MICHAEL J. MELDAHL, MANAGER

By:  _______________________                   By:  ___________________________
     PETER FENNEY, MANAGER                          KEVIN DENNEHY, MANAGER

URRS Agreement                    Page 12              Dated: September 9, 2002

                                    EXHIBIT A

                     ASSETS AND ALLOCATION OF PURCHASE PRICE

         1.       One (1) of the original six (6) conduits installed for the
         System and which extends the full length of the System route as
         follows:

                  (i)      one (1) one-and-one-quarter inch (1.25") conduit of
                           approximately one hundred forty-six (146) miles in
                           length between Sacramento, California and Reno,
                           Nevada ("Leg One");

                  (ii)     one (1) two inch (2") conduit of approximately three
                           hundred fifty (350) miles in length between Reno,
                           Nevada and Ely, Nevada ("Leg Two");

                  (iii)    one (1) two inch (2"") conduit of approximately
                           three hundred sixteen (316) miles in length between
                           Ely, Nevada and Salt Lake City, Utah ("Leg Three").

         for Twenty Million Dollars ($20,000,000).

         2.       An Indefeasible Right of Use (IRU) for the useful life of the
         asset in two (2) additional conduits in excess of the original six (6)
         conduits installed for the System and which extend in that segment of
         the System route from Reno, Nevada to Spanish Fork, Utah, for Seven
         Million Dollars ($7,000,000).

         3.       All Reno metropolitan area conduits in the System route in
         excess of the original six (6) conduits installed for the System, for
         Ten Million Five Hundred Thousand Dollars ($10,500,000).

         4.       An IRU for the useful life of the asset in sixty (60) strands
         of System fiber, which extend the full length of the System route from
         Sacramento, California to Salt Lake City, Utah, for Nine Million
         Dollars ($9,000,000).

         5.       One full, equally sized quadrant at each OA site on the real
         property on which STA's OA sites are situated, as well as easements
         through the remaining quadrants as set forth on Exhibit B (and subject
         to the qualifications therein and herein), for a one-time fee of Two
         Million Dollars ($2,000,000). STA will be under no obligation to convey
         land for OA sites in the following locations at or near: Provo, Utah;
         Auburn, California; Blue Canyon, California; and Truckee, California.

URRS Agreement                    Page 13              Dated: September 9, 2002
Exhibit A

                                    EXHIBIT B

                          DESCRIPTION OF REAL PROPERTY
                              TO BE CONVEYED TO SPC

                     VERDI, NEVADA TO SACRAMENTO, CALIFORNIA

         This portion of the route consists of approximately 131 miles
(691,680') in length. The telecommunications system along the route from the
Union Pacific Railroad milepost 227, approximately 8/10 of a mile east of the
California - Nevada State Line near Verdi Nevada to Hirshdale Road UPRR MP
218.3, approximately 11 miles (58,080'). From Hirshdale Road to West Truckee,
approximately 16.5 miles (87,120'). West Truckee to Soda Spring, approximately
6.8 miles (35,904'). Soda Springs to Cisco Grove approximately 9.1 miles
(48,048'). Cisco Grove to Blue Canyon approximately 12 miles (63,360'). Blue
Canyon to Colfax UPRR MP 142, approximately 21 miles (110,880'). UPRR MP 142 to
Sacramento UPRR MP 89 approximately 53.7 mile (283,536'). Sacramento UPRR MP 89
to 1005 North B Street approximately 1 mile (5280').

                                   RENO METRO

         The fiber optic cable line will start .8 of a mile from the California
border into Nevada and ties in with a Williams handhole between UPRR and 1-80
and ends at the Wells Fargo building at 200 South Virginia Street. Phase II
begins at 200 South Virginia Street, Wells Fargo building, and ends at South
Meadows Parkway.

                                    LONG HAUL

         The fiber optic cable line will start at the intersection of South
Meadows Parkway and South Virginia Street in Reno and follow the highway
right-of-way south from Reno along U.S. highway 395 to East Lake Boulevard. From
East Lake Boulevard, the cable will continue southward along a corridor to Goni
Road and then to Arrowhead Drive in Carson City. At Arrowhead Drive it will head
eastward to US Highway 50 and continue east crossing the rest of Nevada, passing
through the cities of Fallon, Austin, Eureka, and Ely and continuing into Delta
Utah. At Delta the route would follow US Highway 6 northeastward to State Route
132 In Lynndyl, Utah. At State Route 132 the cable would continue northeast to
just west of Nephi, Utah, where it would intersect State Route 91. On State
Route 91 the fiber optic cable would continue northward through Mona to
Santaquin, Utah. The cable would then head northeast, following side roads and a
portion of State Route 115 on the west side of Interstate 15 (1-15). Just north
of Spanish Fork the fiber optic cable would cross under 1-15 and tie in with
another fiber optic cable system on 4800 South, approximately 0.2 miles east of
1-15. The route would then continue north on I-15 to Provo, UT, run along city
streets into the Provo POP located at the corner of East 100 and North 100, then
along city streets to I-15, then north on I-15 to the vicinity of the Bangerter
Highway, north to west 700 south, along city streets to 161 Regent Street, north
on Regent Street to the termination point at 100 South State Street.

                                   CALIFORNIA

- -        Verdi Nevada on UPRR MP 227 to MP 218.3 at Hirshdale Rd. spread 5.1.

- -        Hirshdale Rd. to West Truckee, spread 5.2.

- -        West Truckee to Soda Springs, spread 5.3

- -        Soda Springs to Cisco Grove, spread 5.4

- -        Cisco Grove to Blue Canyon, spread 5.5

- -        Blue Canyon to Colfax UPRR MP 142, spread 5.6

- -        Colfax UPRR MP 142 to Sacramento UPRR 89, spread 6

URRS Agreement                    Page 14              Dated: September 9, 2002
Exhibit B

- -        Sacramento UPRR 89 to 1005 North "B" Street, Sacramento Ca, spread 7

                                     NEVADA

- -        Reno Metro, Phase 1 is approximately 74,406 feet

- -        Phase 2 is approximately 51,069 feet.

- -        Spread 1, South Meadow Parkway to Lyon County line Is approximately
         321,496 feet.

- -        Spread 2, Churchill County line to the Lander County line is
         approximately 567,791 feet.

- -        Spread 3, Lender County line to the White Pine County line is
         approximately 578,458 feet.

- -        Spread 4, White Pine County to Utah border is approximately 702,319
         feet.

                                      UTAH

- -        Spread 5, Millard County at the Nevada/Utah border to Juab County line
         is approximately 616,238 feet.

- -        Spread 6, Juab County line to north of Spanish Fork approximately 0.2
         miles east of 1-15 end is approximately 355,097 feet.

- -        Spanish Fork to Provo, UT approximately 7.95 miles (42,000 feet).

- -        Provo north to Salt Lake City, UT approximately 59.14 miles (312,265
         feet).

URRS Agreement                    Page 15              Dated: September 9, 2002
Exhibit B

                            MAP OF THE RIGHT-OF-WAY

                                   [GRAPHIC]

URRS Agreement                    Page 16              Dated: September 9, 2002
Exhibit B

                                   SCHEDULE I

                                   LITIGATION

         1.       Bayport Pipeline, Inc. v. STA and Mastec North America, Inc.;
                  Case No. CV-02-0187-HDM (VPC); United States District Court
                  for the District of Nevada; alleged breach of contract
                  action.

         2.       Cleveland Inspection Services, Inc. v. Sierra Pacific
                  Communications and Touch America, Inc.; Cause No. 0020905259;
                  Salt Lake City, UT; lien foreclosure action.

         3.       Sorensen Construction, Inc. v. STA; Cause No. 020901281; Salt
                   Lake City, UT; lien foreclosure action.

URRS Agreement                    Page 17              Dated: September 9, 2002
Schedule I

                                   SCHEDULE II

                     MATERIAL LIENS, ENCUMBRANCES AND CLAIMS

         1.       Bayport Pipeline, Inc. obtained a Writ of Attachment from the
                  Federal District Court in the amount of $793,000 on the fiber
                  optic system constructed by STA in Lyon, Carson City,
                  Churchill, and Washoe Counties in Nevada.

         2.       Cleveland Inspection Services, Inc. filed a lien in Salt Lake
                  City, Utah against property that STA has an interest pursuant
                  to a construction contract with Adesta, Inc. in the amount of
                  $663,723.75.

         3.       Sorensen Construction, Inc. filed a lien in Salt Lake County,
                  Utah on property that STA has an interest pursuant to a
                  construction contract with America Fiber Systems, Inc. in
                  the amount of $415,945.00.

         4.       Master Construction, Inc. and Master Professional Services,
                  Inc. claim STA owes them approximately $5,000,000. STA
                  disputes these claims. No liens have been filed or legal
                  action taken to date.

         5.       STA entered into a contract with Adesta Communications whereby
                  Adesta agreed to build install conduits and associated
                  facilities, along the Route. Adesta failed to fully perform
                  the contract and filed bankruptcy. STA paid Adesta $634,790
                  and would have owed Adesta $1,903,790 if the contract as
                  completed. Adesta rejected all of its contracts in Utah in
                  bankruptcy and no longer has an interest in the conduits.
                  The liens filed by Clevland and Sorensen resulted from
                  Adesta's nonpayment and failure to complete its project.

SPC Material Liens

         Upon closing of this transaction, the only lien or security interest
SPC has granted will be the security interests granted to Qwest Communications
Corporation as set forth in Appendix M "Amended and Restated Agreement to
Purchase Conduit System" Section 2.05 subject to the default provisions set
forth in Section 4.01.

URRS Agreement                    Page 18              Dated: September 9, 2002
Schedule II

                                   APPENDIX A

                    MEMBERSHIP INTEREST REDEMPTION AGREEMENT

         This Membership Interest Redemption Agreement (the "Agreement") is
entered into and shall be effective as of September 9, 2002 by and among SIERRA
TOUCH AMERICA LLC, a Nevada limited liability company, (the "Company")], SIERRA
PACIFIC COMMUNICATIONS, a Nevada corporation (the "Withdrawing Member"), a
member of the Company, and TOUCH AMERICA, INC., a Montana corporation the
continuing member of the Company (the "Continuing Member). The Withdrawing
Member, the Continuing Member, and the Company are sometimes referred to
individually as a "Party" and collectively as the "Parties".

                                    RECITALS

A.       The Withdrawing Member and the Continuing Member formed the
Company under Chapter 86 of the Nevada Revised Statutes (the "Act") pursuant to
those certain Articles of Organization filed with the Nevada Secretary of State
on April 24, 2000, and the Operating Agreement of the Company dated April 25,
2000 (the "Operating Agreement").

B.       The Parties have agreed that the Withdrawing Member's entire
right, title, and interest in the Company (the "Interest") shall be redeemed by
the Company and the Withdrawing Member shall withdraw from the Company, all as
set forth herein.

         Based on the foregoing, and in consideration of the mutual agreements,
covenants, and conditions contained herein, and for other good and valuable
consideration, the receipt and adequacy of which are hereby acknowledged, the
Parties hereby agree as follows:

1.       REDEMPTION OF INTEREST

         The Interest shall be redeemed by the Company effective as of the close
of business on September 9, 2002, (the "Effective Date"), all in accordance with
the provisions set forth in this Agreement. The Withdrawing Member shall sell,
assign, and transfer the entire Interest to the Company as of the close of
business on the Effective Date.

2.       WITHDRAWAL

         Upon completion of the sale, assignment, and transfer of the Interest
to the Company as set forth herein, the Withdrawing Member shall withdraw from
the Company as of the close of business on the Effective Date.

3.       CONSIDERATION

         In consideration for the redemption of the Interest, to which the
Parties have agreed has a value of $13,500,000.00, and other good and valuable
consideration to be received by the Company, the Company agrees to distribute to
the Withdrawing Member the Assets and Related Rights, each as defined in that
certain Unit Redemption, Release and Sale Agreement of even date herewith among
the Parties (the "Sale Agreement"). Upon consummation of the transactions
contemplated in the Sale Agreement, the Withdrawing Member shall not retain an
interest in, or be entitled to receive distributions of, any other assets of the
Company.

URRS Agreement                    Page 19              Dated: September 9, 2002
Appendix A

4.       INDEMNIFICATION

         The Parties hereto shall indemnify, defend and hold each other harmless
to the extent and pursuant to the provisions of Article XIII in the Sale
Agreement.

5.       CONTINUATION OF COMPANY

         The Parties hereby agree that the Company shall continue and shall not
be dissolved because of the redemption of the Interest or the withdrawal of the
Withdrawing Member.

6.       REPRESENTATIONS, WARRANTIES, AND COVENANTS

         6.1.     REPRESENTATIONS AND WARRANTIES OF EACH PARTY

                  The Company, the Withdrawing Member, and the Continuing Member
         each hereby represents and warrants to and covenants to each other
         Party that:

         (a)      Neither the execution nor the delivery of this Agreement, the
         incurrence of the obligations herein set forth, the consummation of the
         transactions herein contemplated, nor the compliance with the terms of
         this Agreement will conflict with, or result in a breach of, any of the
         terms, conditions, or provisions of, or constitute a default under, any
         bond, note, or other evidence or indebtedness or any contract,
         indenture, mortgage, deed of trust, loan agreement, lease, or other
         agreement or instrument to which such Party is a party or by which such
         Party may be bound.

         (b)      Such Party has the right, power, legal capacity, and authority
         to execute and enter into this Agreement and to execute all other
         documents and perform all other acts as may be necessary in connection
         with the performance of this Agreement.

         (c)      No approval or consent not heretofore obtained by any person
         or entity is necessary in connection with the execution of this
         Agreement by such Party or the performance of such Party's obligations
         under this Agreement.

         (d)      Such Party has received independent tax and legal advice from
         its attorneys with respect to the advisability of executing this
         Agreement.

         (e)      Such Party has made such investigation of the facts pertaining
         to this Agreement, and all of the matters pertaining thereto, as he
         deems necessary.

         (f)      Except as expressly provided herein, no person has made any
         statement or representation to such Party regarding any fact relied
         upon by such Party in entering into this Agreement and each Party
         specifically does not rely upon any statement, representation, or
         promise of any other person in executing this Agreement.

         (g)      Such Party will not take any action which would interfere with
         the performance of this Agreement by any other Party or which would
         adversely affect any of the rights provided for herein.

         6.2.     TITLE TO INTEREST

                  The Withdrawing Member hereby represents and warrants to and
         covenants to each other Party that the Withdrawing Member owns the
         Interest free and clear of any and all liens, claims, encumbrances,
         and adverse equities.

URRS Agreement                    Page 20              Dated: September 9, 2002
Appendix A

         6.3.     COMPANY ASSETS

                  The Parties have agreed to value the Withdrawing Member's
         interest in the Company's assets at US $ 13,500,000.00

         6.4.     WITHDRAWING MEMBER'S DISTRIBUTIVE SHARE OF CURRENT COMPANY
                  INCOME

                  The Withdrawing Member's distributive share of the Company's
         income,gain, loss, and deduction for taxable year of the Company that
         includes the Effective Date shall be determined on the basis of an
         interim closing of the books of the Company as of the close of
         business on the Effective Date and shall not be based upon a
         proration of such items for the entire taxable year. The Withdrawing
         Member shall not be allocated a distributive share of any Company
         items for any subsequent year except to the extent such allocations
         are required by or are consistent with the provisions set forth in
         this Agreement.

         6.5.     TAX RETURNS

                  The Parties shall each file all required Federal, state, and
         local income tax returns and related returns and reports in a manner
         consistent with the foregoing provisions of this Section 6. In the
         event a Party does not comply with the preceding sentence, the
         noncomplying Party shall indemnify and hold the other Parties wholly
         and completely harmless from all cost, liability, and damage that such
         other Parties may incur (including, without limitation, incremental tax
         liabilities, legal fees, accounting fees, and other expenses) as a
         consequence of such failure to comply.

         6.6.     FILINGS AND NOTICES

                  The Company may prepare and file fictitious business name
         statements and such other statements or documents as the Continuing
         Member deems appropriate to reflect the withdrawal of the Withdrawing
         Member from the Company and the continuation of the business of the
         Company.

7.       MISCELLANEOUS

         7.1.     ATTORNEYS' FEES

                  In the event any Party shall maintain or commence any action,
         proceeding, or motion against any other Party to enforce this Agreement
         or any provision thereof, the prevailing Party therein shall be
         entitled to recover his actual attorneys' fees and costs therein
         incurred. Each Party agrees that if such Party hereafter commences,
         joins in, or in any manner asserts against any other Party any of the
         claims released hereunder, then it will pay to the other Party, in
         addition to any other damages caused to the other Party thereby, all
         actual attorneys' fees and costs incurred in defending or otherwise
         responding to such suit or claim.

         7.2.     SURVIVAL

                  All of the terms, representations, warranties, and other
         provisions of this Agreement shall survive and remain in effect after
         the Effective Date.

URRS Agreement                    Page 21              Dated: September 9, 2002
Appendix A

         7.3.     EXECUTION OF DOCUMENTS

                  Each Party agrees to execute all documents necessary to carry
         out the purpose of this Agreement and to cooperate with each other for
         the expeditious filing of any and all documents and the fulfillment of
         the terms of this Agreement.

         7.4.     SUCCESSORS AND ASSIGNS

                  This Agreement shall inure to the benefit of the transferees,
         successors, assigns, heirs, beneficiaries, executors, administrators,
         members, agents, employees, and representatives of each Party.

         7.5.     GOVERNING LAW

                  This Agreement has been entered into in the State of Nevada
         and the Agreement, including any rights, remedies, or obligations
         provided for thereunder, shall be construed and enforced in accordance
         with the laws of the State of Nevada and the Act.

         7.6.     NOTICES

                  Any notice, payment, demand, or communication required or
         permitted to be given by any provision of this Agreement shall be in
         writing and shall be delivered personally to the Party or to an officer
         of the Party to whom the same is directed, or sent by regular,
         registered, or certified mail, addressed to the person to whom directed
         at the following address, or to such other address as such Party may
         from time to time specify by notice to the Parties:

         (a)      If to the Company or the Continuing Member:

                      Mike Zimmerman                    Tom Joyce
                      Vice President                    Attorney
                      130 North Main                    130 North Main
                      Butte, MT 59701                   Butte, MT 59701
                      Tele: 406-497-5426                Tele: 406-497-5521
                      Fax: 406-497-5240                 Fax: 406-497-5203

         (b)      If to the Withdrawing Member:

                      Richard Coyle                     Mark Backus
                      President                         Attorney
                      5860 S. Pecos, Bldg. G, Ste. 100  6226 West Sahara Avenue
                      Las Vegas, NV 89120               Las Vegas, NV 89151
                      Tele: 702.949.7910                Tele: 702.367.5692
                      Fax: 702.949.7928                 Fax: 702.227.2069

                  Any such notice shall be deemed to be delivered, given,
         and received for all purposes as of the date so delivered, if delivered
         personally or if sent by regular mail, or as of the date on which the
         same was deposited in a regularly maintained receptacle for the deposit
         of United States mail, if sent by registered or certified mail, postage
         and charges prepaid. Any Party may from time to time specify a
         different address by choice to the other Parties.

         7.7.     AMENDMENTS

URRS Agreement                    Page 22              Dated: September 9, 2002
Appendix A

                  Any amendment to this Agreement shall be in writing and
         executed by each Party hereto.

         7.8.     ENTIRE AGREEMENT

                  This Agreement contains the entire understanding among the
         Parties with respect to the subject matter hereof and supersedes any
         prior written or oral agreements between them respecting the subject
         matter of this Agreement. There are no representations, agreements,
         arrangements, or understandings, oral or written, between the Parties
         relating to the subject matter of this Agreement that are not fully set
         forth herein. This Agreement amends and restates the Operating
         Agreement with respect to the subject matter of this Agreement, and
         shall be considered part of the Operating Agreement for all purposes
         under the Act.

         7.9.     DESCRIPTIVE HEADINGS

                  The descriptive headings of the several sections contained in
         this Agreement are included for convenience only and shall not control
         or affect the meaning or construction of any of the provisions hereof.

URRS Agreement                    Page 23              Dated: September 9, 2002
Appendix A

         IN WITNESS WHEREOF, the Parties hereto have approved and executed this
Agreement as of the date first set forth above.

THE COMPANY:                                 THE WITHDRAWING MEMBER:

SIERRA TOUCH AMERICA LLC                     SIERRA PACIFIC COMMUNICATIONS, INC.

By: ________________________                 By: ___________________________
Name: MICHAEL J. MELDAHL                     Name: RICHARD J. COYLE, JR.
Title: Manager                               Title: President

THE CONTINUING MEMBER:

TOUCH AMERICA, INC.

By: _____________________
Name: MICHAEL J. MELDAHL
Title: President

URRS Agreement                    Page 24              Dated: September 9, 2002
Appendix A

                                   APPENDIX B

                             SECURED PROMISSORY NOTE

$35,000,000.00                                                Butte, Montana
                                                              September 9, 2002

1.       PROMISE TO PAY. The undersigned, Sierra Pacific Communications, a
Nevada corporation ("Maker"), hereby promises to pay to the order of Sierra
Touch America, LLC, a Nevada limited liability company, or its successors
("Holder"), at such place as the Holder may designate in writing, in lawful
money of the United States of America, the principal sum of Thirty-Five Million
Dollars ($35,000,000), with interest on the unpaid principal, on the terms and
conditions set forth herein. This Note and the rights and obligations of Maker
hereunder are subject to the terms and conditions of that certain Unit
Redemption, Release, and Sale Agreement among Maker, Holder, and Touch America,
Inc., a Montana corporation, dated as of September 9, 2002 (the "Agreement") and
that certain Security Agreement between Maker and Holder dated as of September
9, 2002 (the "Security Agreement").

2.       INTEREST RATE. This Note shall bear interest at the rate of eight
percent (8%) per annum (the "Interest Rate"), calculated monthly on the
outstanding balance and beginning on the date hereof.

3.       PAYMENT. Principal and interest shall be paid as follows:

         If Maker makes no prepayments during the term of this Note, the
balance of all unpaid principal and interest on this Note shall be paid in
twelve (12) equal monthly installments of Three Million Two Hundred
Ninety-Seven Thousand Two Hundred Ninety-Five Dollars ($3,297,295) commencing
on July 31, 2003 and on the last day of each and every succeeding calendar
month thereafter until the unpaid principal and interest is paid in full, with
the twelfth (12th) and final payment due and owing on June 30, 2004. The
parties acknowledge and agree that this twelfth (12th) and final payment of the
unpaid balance of principal and interest shall be in an amount to retire all
indebtedness hereunder. If Maker makes prepayments during the term of this
Note, the parties acknowledge and agree that Maker shall not be in default as
long as Maker has made payments sufficient to reduce principal amounts
outstanding in accordance, at all times, with the amortization schedule
developed on Attachment A hereto that will fully amortize the remaining
indebtedness in equal monthly installments over the succeeding twelve (12)
month period beginning July 31, 2003. Any payments made in addition to such
installments after July 31, 2003 will operate to reduce the principal owed and
shorten the term of indebtedness, but shall not relieve Maker of making any
installment payments as provided in the amortization schedule. Maker and
Holder agree that, if Maker receives funds required to be applied toward
prepayment of this Note, the amortization schedule on Attachment A shall be
adjusted to reflect the outstanding balance owed as of July 31, 2003.

4.       PREPAYMENT. Maker shall have the right to prepay, without penalty,
this Note in full or in part at any time, provided, however, that Maker
covenants and agrees that, during the term of this Note, it shall apply all net
proceeds derived from (a) sales of any assets held by Holder prior to Maker's
September 9, 2002 exit from Holder, (b) sales of any assets of Maker, including,
without limitation, Maker's metropolitan-area network, and (c) transactions
described in Paragraph 6 hereof, toward prepayment of the Note.

URRS Agreement                    Page 25              Dated: September 9, 2002
Appendix B

5.       APPLICATION OF PAYMENTS. Payments made hereunder shall be applied first
to accrued interest, and then to principal.

6.       COVENANTS OF MAKER AND MAKER'S PARENT COMPANY. Maker shall make no cash
or other distributions to its parent company, Sierra Pacific Resources, a Nevada
corporation ("SPR"), or any other related entity prior to fully satisfying its
obligations under this Note, provided, however, that this prohibition shall not
act to prohibit SPR or Maker from raising additional capital necessary to build
or maintain Maker's business, including, without limitation, the receipt of
investment funds from SPR or a non-affiliated entity, the entering into of a
joint venture arrangement affecting Maker, or the entering into of a transaction
that dilutes SPR's ownership interest in Maker in exchange for cash associated
with Maker's operating or capital expenditure requirements, provided, further,
that Holder shall be provided with at least thirty (30) days' written notice of
the intent of SPR or Maker, as applicable, to raise such additional capital, and
the raising of such additional capital shall be subject to Holder's sole and
absolute discretion. In the event that any stock or equity interest in Maker is
sold, conveyed, or transferred by Maker's present owner, Maker covenants, and
agrees that this Note shall be paid in full before the transaction is
consummated. SPC shall cause a legend to be placed on the existing stock
certificate of SPC held by SPR evidencing this restriction.

7.       ACCELERATION; CROSS-DEFAULT; DEFAULT INTEREST RATE. This Note shall be
in default if payment of any installment is not made when due or if there occurs
any failure or default in Maker's observance or performance of any covenants,
terms, or provisions of (1) the Agreement, provided, however, that such failure
or default shall remain unremedied for fifteen (15) days after Maker has become
aware of such failure or default; (2) the Security Agreement; (3) any other
instruments relating to or securing this Note executed by Maker; or (4) any
instruments evidencing, securing, or relating to any other indebtedness of Maker
to Holder. Upon such default or at any time thereafter, the whole sum of
principal and accrued interest hereunder shall, at the option of Holder, become
immediately due and payable, anything herein or any instrument securing this
Note to the contrary notwithstanding, time being of the essence. As long as this
Note is in default, then, at the option of Holder, without prior notice, this
Note shall bear interest at a rate equal to the lesser of eighteen percent (18%)
per annum or the maximum rate permitted by applicable law (the "Default Interest
Rate").

8.       CURING OF MONETARY DEFAULTS. A default in payment of any amount due
hereunder may be cured, at the sole and absolute discretion of Holder, only by
payment in full of the installment or installments in default, plus the
additional interest due at the Default Interest Rate, plus any late charges that
may be due hereunder or under any other instrument evidencing, securing, or
relating to Maker's debt to Holder, plus any reasonable attorneys' fees incurred
by Holder by reason of such default.

9.       NONWAIVER. Failure to exercise any right Holder may have or be entitled
to in the event of any default hereunder shall not constitute a waiver of such
right or any other right in the event of any subsequent default. No dispute
arising out of or relating to this Note, the Security Agreement, the Agreement,
any related agreements or instruments, or brought under applicable law, shall be
subject to the provisions of Article X ("Deadlocks"), or any other provisions,
of the Operating Agreement of Holder dated as of April 25, 2000.

10.      WAIVER OF PRESENTMENT. Maker waives presentment for payment, protest
and demand, notice of protest, demand, dishonor, or nonpayment of this Note, and
consents that Holder may extend the time of payment or otherwise modify the
terms of payment of any part or the whole of the debt evidenced by this Note, by
agreement between Holder and Maker, and such consent shall not

URRS Agreement                    Page 26              Dated: September 9, 2002
Appendix B

alter or diminish the liability of Maker or the enforceability of this Note.
Except as otherwise provided, each and every party signing or endorsing this
Note binds itself as a principal and not as a surety. In any action or
proceeding to recover any sum herein provided for, no defense of adequacy of
security or that resort must first be had to security or to any other person
shall be asserted. Except as otherwise provided, this Note shall bind the
undersigned and its or their successors and assigns, jointly and severally.

11.      SECURITY OF NOTE. This Note is secured by the Security Agreement,
which covers all of Maker's property including, without limitation, furniture,
fixtures, equipment, accounts receivable, contract rights, and general
intangibles. Maker understands and agrees that the Security Agreement provides
inspection rights for Holder with respect to Maker's books and records during
the term of this Note, and that it obligates Maker to provide financial and
operating certain reports to Holder.

12.      COLLECTION COSTS. Maker agrees to pay all costs, including reasonable
attorneys' fees, incurred by Holder in any suit, action, or appeal therefrom,
with or without suit, in connection with collection hereof or foreclosure under
the Security Agreement.

13.      DEFINITIONS. All capitalized terms used but not defined herein shall
have the meanings defined in the Agreement.

14.      NOTICE. Any demand or notice to be made or given under the terms hereof
or any instrument now or hereafter securing this Note by Holder hereof to Maker
shall be effective when mailed or delivered in the manner specified in the
Agreement.

15.      APPLICABLE LAW; JURISDICTION AND VENUE. This Note shall be governed by
the laws of the State of Nevada.

                                     MAKER:

                                     SIERRA PACIFIC COMMUNICATIONS,
                                     a Nevada corporation

                                     By: ___________________________
                                         RICHARD J. COYLE JR., PRESIDENT

URRS Agreement                    Page 27              Dated: September 9, 2002
Appendix B

                                   APPENDIX B

                             SECURED PROMISSORY NOTE

                                  ATTACHMENT A



                   OUTSTANDING        INTEREST         OUTSTANDING       PAYMENT        OUTSTANDING
                     BALANCE       ON OUTSTANDING    BALANCE (P + I)     MADE AT          BALANCE
PAYMENT   PAYMENT  AT BEGINNING      BALANCE FOR         AT END            END             AT END
DUE DATE  NUMBER    OF PERIOD          PERIOD          OF PERIOD        OF PERIOD        OF PERIOD
- --------  ------    ---------          ------          ---------        ---------        ---------
                                                                     
07/31/02    -    $   35,000,000     $   233,333      $  35,233,333              -      $  35,233,333
08/31/02    -    $   35,233,333     $   234,889      $  35,468,222              -      $  35,468,222
09/30/02    -    $   35,468,222     $   236,455      $  35,704,677              -      $  35,704,677
10/31/02    -    $   35,704,677     $   238,031      $  35,942,708              -      $  35,942,708
11/30/02    -    $   35,942,708     $   239,618      $  36,182,326              -      $  36,182,326
12/31/02    -    $   36,182,326     $   241,216      $  36,423,542              -      $  36,423,542
01/31/03    -    $   36,423,542     $   242,824      $  36,666,365              -      $  36,666,365
02/28/03    -    $   36,666,365     $   244,442      $  36,910,808              -      $  36,910,808
03/31/03    -    $   36,910,808     $   246,072      $  37,156,880              -      $  37,156,880
04/30/03    -    $   37,156,880     $   247,713      $  37,404,592              -      $  37,404,592
05/31/03    -    $   37,404,592     $   249,364      $  37,653,956              -      $  37,653,956
06/30/03    -    $   37,653,956     $   251,026      $  37,904,983              -      $  37,904,983
07/31/03    1    $   37,904,983     $   252,700      $  38,157,683      3,297,295      $  34,860,388
08/31/03    2    $   34,860,388     $   232,403      $  35,092,790      3,297,295      $  31,795,495
09/30/03    3    $   31,795,495     $   211,970      $  32,007,465      3,297,295      $  28,710,170
10/31/03    4    $   28,710,170     $   191,401      $  28,901,572      3,297,295      $  25,604,277
11/30/03    5    $   25,604,277     $   170,695      $  25,774,972      3,297,295      $  22,477,677
12/31/03    6    $   22,477,677     $   149,851      $  22,627,528      3,297,295      $  19,330,233
01/31/04    7    $   19,330,233     $   128,868      $  19,459,101      3,297,295      $  16,161,807
02/28/04    8    $   16,161,807     $   107,745      $  16,269,552      3,297,295      $  12,972,257
03/31/04    9    $   12,972,257     $    86,482      $  13,058,739      3,297,295      $   9,761,444
04/30/04   10    $    9,761,444     $    65,076      $   9,826,520      3,297,295      $   6,529,225
05/31/04   11    $    6,529,225     $    43,528      $   6,572,753      3,297,295      $   3,275,459
06/30/04   12    $    3,275,459     $    21,836      $   3,297,295      3,297,295      $           -


URRS Agreement                    Page 28              Dated: September 9, 2002
Appendix B

                                   APPENDIX C

                               SECURITY AGREEMENT

         THE UNDERSIGNED, Sierra Pacific Communications, a Nevada corporation
(referred to as "Debtor"), hereby grants to Sierra Touch America, LLC, a Nevada
limited liability company (referred to as "Secured Party"), a security interest
in all right, title, and interest, whether now owned or hereafter acquired,
including the proceeds thereof, in and to the following property of Debtor:

         (a)      Subject to Section 9 herein, all of Debtor's right, title, and
interest in any property of whatever nature that was previously owned by Secured
Party and distributed to Debtor, (b) all property described on Exhibit A to the
Unit Redemption, Release, and Sale Agreement dated September 9, 2002 among
Debtor; Secured Party; and Touch America Inc., and (c) all property and property
rights that relate in any way to the telecommunications system being constructed
by Secured Party from Sacramento, CA to Salt Lake City, UT. The secured property
includes, without limitation, accounts, inventory, equipment, fixtures, contract
rights, general intangibles, instruments, documents, and other property.

         All such collateral is collectively referred to herein as the
"Property".

         This Security Agreement is given to secure the payment and performance
of all indebtedness, obligations, terms, and conditions imposed upon Debtor by
virtue of the following documents and agreements:

         (i).     the Unit Redemption, Release, and Sale Agreement dated as of
                  September 9, 2002 among Debtor, Secured Party, and Touch
                  America, Inc., a Montana corporation ("Agreement");

         (ii).    the Promissory Note from Debtor to Secured Party in the amount
                  of Thirty-Five Million Dollars ($35,000,000) dated September
                  9, 2002 ("Promissory Note"); and

         (iii).   this Security Agreement.

         Default in the payment of any indebtedness or the performance of any
obligations under the above-referenced agreements shall constitute a default
under this Security Agreement.

         DEBTOR REPRESENTS, COVENANTS, AND AGREES WITH SECURED PARTY AS FOLLOWS:

1.       DEBTOR AND COLLATERAL LOCATION. The address appearing under Debtor's
signature below is the address of Debtor's chief executive office. If the
Property is not located at the Debtor's address appearing below, it shall be
located at the following locations:

In the states of California, Nevada, and Utah: In each and every county where
the fiber optic facilities subject to this Security Agreement are located.
Debtor shall give Secured Party prior written notice of any change in either the
Debtor's chief executive office or the location of the Property.

URRS Agreement                    Page 29              Dated: September 9, 2002
Appendix C

2.       NOTICES; APPOINTMENT OF AGENT; COLLECTION. The accounts receivable and
general intangibles which constitute the collateral under this Security
Agreement include accounts receivable, customer lists, supplier lists, computer
data, and other materials. In the event of a default, Secured Party is
authorized to notify the parties who have a relationship with the Debtor
represented by the collateral, and to effect direct collection of any amounts
due to Debtor pursuant to those relationships. At the request of Secured Party,
Debtor agrees to enter into appropriate notices to such parties. In the event of
default, Secured Party is irrevocably appointed Debtor's attorney-in-fact and
may in Debtor's name and place make demand, collect, receive, and give
acquittance for any and all amounts that may be or become due pursuant to those
relationships and in its discretion may file any claim, commence a proceeding,
or take any action to enforce or collect payment. Secured Party shall not be
obligated to perform any duty or obligation to such parties.

3.       OWNERSHIP AND LIENS. Subject to Section 9 (Limited Release of Security
Interest on Sale of Property), Debtor owns the Property and the same is free and
clear of all security interests and encumbrances of every nature created by
Debtor. Debtor shall not create nor permit the existence of any lien or security
interest other than that created hereby on the Property without the prior
written consent of Secured Party, which consent can be withheld in Secured
Party's sole and absolute discretion.

4.       ACCOUNTING AND INSPECTION OF BOOKS.

         a.       Debtor agrees to keep adequate records and books of account
covering the collateral and to deliver to Secured Party such books if so
requested by Secured Party after an event of default.

         b.       Debtor agrees to deliver to Secured Party on demand, or upon
the termination of the Debtor's authority to collect by Secured Party, all of
the papers in Debtor's possession relating to the collateral covered by this
Security Agreement which will facilitate collection or enforcement thereof by
Secured Party, including, but not limited to, correspondence, invoices, shipping
documents and records, sales slips, orders and order acknowledgements,
contracts, and all other instruments relating thereto.

         c.       Secured Party or its authorized agent may at reasonable times
and upon reasonable notice examine and make copies of and abstract from books of
account and other written records evidencing the collateral.

5.       TAXES. Debtor shall pay before delinquency all taxes or other
governmental charges that are or may become a lien or charge on the Property and
shall pay any tax which may be levied on any obligation secured hereby (except
claims whose validity or amount is being contested in good faith by Debtor in
appropriate proceedings with provisions having been made to the satisfaction of
Secured Party for the payment thereof in the event the contest is determined
adversely to Secured Party).

6.       REPAIRS AND INSPECTIONS. Debtor shall keep the Property in
reasonably good working order and condition, except ordinary wear and tear and
casualty losses, and will make needed repairs.

7.       INSURANCE. Debtor shall keep the Property continuously insured by an
insurer approved by Secured Party against fire, theft, and other hazards
designated at any time by Secured Party, in an amount equal to the full
insurable value thereof or to all sums secured hereby. In the event of loss,
Secured Party shall have full power to collect any and all insurance upon the
Property and to apply the same at its option to any obligation secured hereby,
whether or not matured, or to the restoration

URRS Agreement                    Page 30              Dated: September 9, 2002
Appendix C

or repair of the Property. Secured Party shall have no liability whatsoever for
any loss that may occur by reason of the omission or lack of coverage of any
such insurance.

8.       REMOVAL OR SALE. Without the prior written consent of Secured Party,
which can be withheld in Secured Party's sole and absolute discretion, Debtor
shall not remove the Property from the locations described in Section 1 of this
Security Agreement, and Debtor will not sell or lease the Property or such
portion as constitutes, in the reasonable opinion of Secured Party, a
substantial portion. This restriction shall not apply to disposition or
replacement in the ordinary course of business.

9.       LIMITED RELEASE OF SECURITY INTEREST ON SALE OF PROPERTY.
Notwithstanding any provision of this Security Agreement, the Agreement, the
Promissory Note, or any related agreements to the contrary, if the Debtor (after
obtaining the prior written consent of Secured Party, which consent can be
withheld in Secured Party's sole and absolute discretion) sells a portion of the
Property and remits the entire proceeds from such sale to Secured Party, Secured
Party shall release its security interest in the portion of the Property sold to
allow the purchaser to obtain clear title thereto. In such event, Secured Party
agrees to execute a lien release or other appropriate instrument to release its
security interest in the portion of the Property sold.

         Debtor and Secured Party acknowledge that, contemporaneous with the
distribution and conveyance of the Property from STA to SPC, SPC will enter into
an agreement with Qwest Communications Corporation ("Qwest") for the sale of a
conduit from the Property of approximately eight hundred seventeen (817) miles
in length from Sacramento, California to Salt Lake City, Utah; such conduit is
described as the "First Conduit" in the Unit Redemption, Release, and Sale
Agreement. Upon (i) the consummation of such agreement between Debtor and Qwest
and (ii) SPC's payment of Four Million Three Hundred Seventy Five Thousand
Dollars ($4,375,000) to Secured Party promptly following the execution of such
agreement, Secured party shall remise and release its security interest in Legs
One and Two of the Conduit System.

         As long as STA is not in default and completes construction of the
First Conduit, its security interest in Leg Three of the Conduit System will not
be released until SPC pays STA a total of Thirteen Million Six Hundred
Twenty-Five Thousand Dollars ($13,625,000) for the First Conduit on the Note.

10.      EXPENSES INCURRED BY SECURED PARTY. Secured Party is not required to,
but may at its option, pay any tax or other charge or expense payable by Debtor
and any filing or recording fees and any amounts so paid shall be repayable by
Debtor upon demand. Debtor shall also repay upon demand all of Secured Party's
expenses incurred in collecting, insuring, conserving, or protecting the
collateral or in any inventories, audits, inspections, or other examinations by
Secured Party in respect of the collateral. All such sums shall bear interest at
the Default Interest Rate under the Promissory Note from the date of payment by
the Secured Party until repaid by Debtor and such sums and interest thereon
shall be secured hereby. The rights granted by this paragraph are not a waiver
of any other rights of Secured Party in the event of default.

11.      WAIVERS. This Security Agreement shall not be qualified or supplemented
by course of dealing. No waiver or modification by Secured Party of any of the
terms or conditions hereof shall be effective unless in writing signed by
Secured Party. No waiver nor indulgence by Secured Party as to any required
performance by Debtor shall constitute a waiver as to any subsequent required
performance or other obligations of Debtor hereunder.

URRS Agreement                    Page 31              Dated: September 9, 2002
Appendix C

12.      DEFAULT. Time is of the essence in this Security Agreement, and any of
the following events shall constitute "Events of Default":

         a.       Any failure to pay when due principal, interest, or taxes
under the Promissory Note; or

         b.       Any default or breach under this Security Agreement or the
Agreement, provided, however, that such default or breach shall remain
unremedied for fifteen (15) days after Debtor has become aware of such default
or breach after Debtor has received notice of such failure or default from
Secured Party; or

         c.       The falsity in any material respect of any representation by
Debtor in this Security Agreement, the Agreement, or in any financial statement
given by Debtor to Secured Party as a basis for any extension of credit secured
hereby; or

         d.       If the Property should be seized or levied upon under any
legal or governmental process against Debtor or against the Property; or

         e.       If Debtor becomes insolvent or is the subject of a petition in
bankruptcy, either voluntary or involuntary, or in any other proceeding under
the federal bankruptcy laws, or makes an assignment for the benefit of
creditors, or if Debtor is named in or the Property is subjected to a suit for
the appointment of a receiver; or

         f.       Loss, substantial damage to, or destruction of any material
portion of the Property which is uninsured; or

         g.       Dissolution or liquidation of Debtor.

         If any of such Events of Default are not remedied, the entire amount of
indebtedness secured hereby shall then or at any time thereafter, at the option
of Secured Party, become immediately due and payable without notice or demand,
and Secured Party shall have an immediate right to pursue the remedies set forth
in this Security Agreement.

13.      REMEDIES. In the event of a default hereunder, Secured Party shall have
all remedies provided by law and, without limiting the generality of the
foregoing, shall be entitled as follows:

         a.       Debtor agrees to put Secured Party in possession of the
Property on demand; and

         b.       Secured Party is authorized to enter any premises where the
Property is situated and take possession of the Property without notice or
demand and without legal proceedings; and

         c.       At the request of Secured Party, Debtor will assemble the
Property and make it available to Secured Party at a place designated by Secured
Party which is reasonably convenient to both parties; and

         d.       Debtor agrees that a period of fifteen (15) days from the time
notice is sent, by first-class mail or otherwise, shall be a reasonable period
of notification of a sale or other disposition of Property;

         e.       Debtor agrees that any notice or other communication by
Secured Party to Debtor shall be sent to the address of the Debtor stated herein
or such other address as Debtor may notify Secured

URRS Agreement                    Page 32              Dated: September 9, 2002
Appendix C

Party in writing; and

         f.       Debtor agrees to pay on demand the amount of all expenses
reasonably incurred by Secured Party in protecting or realizing on the Property
in the event that this Security Agreement or any obligation secured by it is
referred to an attorney for protecting or defending the priority of Secured
Party's interest or for collection or realization procedures. Debtor agrees to
pay reasonable attorneys' fees, including fees incurred in both trial and
appellate courts, or fees incurred without suit, and expenses of title search
and all court costs and costs of public officials. The sum agreed to be paid in
this subparagraph shall be secured hereby; and

         g.       If Secured Party disposes of the Property, Debtor agrees to
pay any deficiency remaining after application of net proceeds to any
indebtedness secured hereby.

         h.       No dispute arising out of or relating to this Security
Agreement, the Agreement, the Promissory Note, any related agreements or
instruments, or brought under applicable law, shall be subject to the provisions
of Article X ("Deadlocks"), or any other provisions, of the Operating Agreement
of Secured Party dated as of April 25, 2000.

14.      CONSTRUCTION. This Security Agreement, with the Agreement, the
Promissory Note, and the associated Uniform Commercial Code Financing Statements
(the preparation and filing of which Debtor agrees to facilitate), represent the
entire agreement among the parties with respect to the transactions contemplated
thereby and supersede all prior agreements, written or oral, with respect
thereto. In the event of any conflict between this Security Agreement and the
Agreement, the latter shall control.

15.      APPLICABLE LAW; JURISDICTION AND VENUE. This Security Agreement shall
be governed by the laws of the State of Nevada. Debtor hereby irrevocably
submits to the jurisdiction of the Secured Judicial District Court sitting in
Reno, Nevada and agrees that venue in any suit or action hereunder may, at the
election of any holder hereof, be in any court having jurisdiction and that
Debtor shall not claim that any such forum selected by Secured Party is an
inconvenient forum.

         SIGNED this 9th day of September 2002.

                                        SIERRA PACIFIC COMMUNICATIONS,
                                        a Nevada corporation

                                        By _______________________________
                                           RICHARD J. COYLE JR., PRESIDENT

                                        Address:
                                        5860 S. Pecos, Bldg. G, Ste. 100
                                        Las Vegas, NV  89120

URRS Agreement                    Page 33              Dated: September 9, 2002
Appendix C

                                   APPENDIX D

                           ASSIGNMENT AND BILL OF SALE

         SIERRA TOUCH AMERICA, LLC., a Nevada limited liability company (the
"Seller"), for good and valuable consideration paid to it by SIERRA PACIFIC
COMMUNICATIONS, a Nevada corporation (the "Purchaser"), pursuant to a Unit
Redemption, Release, and Sale Agreement dated as of September 9, 2002 between
Seller and Purchaser (the "Agreement"), and for other good and valuable
consideration, receipt and sufficiency of which are hereby mutually
acknowledged, does hereby sell, assign, transfer, convey, and deliver to
Purchaser, its successors and assigns, the following:

         The property and assets described or identified in Section V.2 of the
Agreement, or on schedules relating thereto, free and clear of any and all
material claims, liens, and encumbrances except as specifically identified or
assumed by Purchaser as set forth in the Agreement.

         Seller hereby covenants and agrees that it will warrant and defend the
sale of these assets against each and every person or persons whomsoever
claiming against any or all of the same.

         This instrument shall be binding upon, inure to the benefit of, and be
enforceable by, Seller and Purchaser and their respective successors and
permitted assigns.

         IN WITNESS WHEREOF, the undersigned have executed this Assignment and
Bill of Sale as of this 9th day of September 2002.

                                        SELLER:

                                        SIERRA TOUCH AMERICA LLC,
                                        a Nevada limited liability company

                                        By ____________________________________
                                           MICHAEL J. MELDAHL,
                                           Manager

                                        PURCHASER:

                                        SIERRA PACIFIC COMMUNICATIONS,
                                        a Nevada corporation

                                        By ___________________________________
                                           RICHARD J. COYLE JR., President

URRS Agreement                    Page 34              Dated: September 9, 2002
Appendix D

                                   APPENDIX E

                  CONDUIT AND DARK FIBER IRU AND SALE AGREEMENT

          This CONDUIT AND DARK FIBER IRU AND SALE AGREEMENT (the "Agreement")
is made as of September 9, 2002, between SIERRA TOUCH AMERICA LLC, a Nevada
limited liability company, with offices at 130 North Main, Butte, Montana 59701
("Owner"), and SIERRA PACIFIC COMMUNICATIONS, LLC, a Nevada corporation, with
offices at 5860 S. Pecos, Bldg. G, Suite 100, Las Vegas, NV, ("SPC").

         WHEREAS, Owner has commenced construction of a fiber optic
communication system along the route of Sacramento, California to Salt Lake
City, Utah via Reno, Nevada, including optical amplifier and regenerator sites,
described in Exhibit B hereto (the "Description of Real Property"), and

         WHEREAS, upon the terms and conditions set forth below and set forth in
the Unit Redemption, Release, and Sale Agreement between Touch America, Inc.,
Sierra Pacific Communications, and Sierra Pacific Resources, and Sierra Touch
America LLC, dated September 9, 2002 (the "URRS Agreement"), SPC desires to
acquire from Owner and Owner desires to convey to SPC (a) legal title to one (1)
fiber optic conduit installed along the entire Route ("First Conduit"); (b) an
indefeasible right of use or IRU in two (2) additional fiber optic conduits
installed along the Route between Reno, Nevada and Spanish Fork, Utah (" IRU
Conduit"), (c) and an IRU in sixty (60) strands of dark fiber installed along
the entire length of the Route; and (d) an interest in Owner's occupancy rights
and Owner's OA Sites.

         NOW, THEREFORE, in consideration of the mutual promises set forth
below, the Parties hereby agree as follows:

1.       DEFINITIONS

         As used in this Agreement:

         1.1.     Authorized Use means a business purpose of SPC's optical
         fiber telecommunications network for telecommunication traffic of SPC
         or SPC's Customers.

         1.2.     Fiber Optic Facilities means fiber optic cable and a number of
         conduit.

         1.3.     Strands means individual fiber optic strands within the Fiber
         Optic Facilities.

         1.4.     Dark Fiber means one or more Strands subject to this Agreement
         through which an associated light, signal or light communication
         transmission must be provided to furnish service.

         1.5.     SPC Conduit means the (a) one (1) fiber optic conduit
         installed along the entire Route ("First Conduit") and (b) two (2)
         additional fiber optic conduits installed along the Route between Reno,
         Nevada and Spanish Fork, Utah ("IRU Conduit"), as designated by Owner.

         1.6.     SPC Strands means sixty (60) strands, as designated by Owner,
         of Dark Fiber of the Fiber Optic Facilities.

URRS Agreement                    Page 35              Dated: September 9, 2002
Appendix E

         1.7.     Indefeasible Right of Use or IRU means an exclusive right to
         use SPC's Strands and Conduit.

         1.8.     Environmental, Health, or Safety Complaint means any
         complaint, summons, citation, notice, directive, order, claim,
         litigation, investigation, proceeding, judgment, letter or
         communication from any federal, state, or municipal authority or any
         other private party involving a Hazardous Discharge from, in or at or
         along Owner's Route or Owner's facilities installed in the Route or any
         violation related to Owner's Route or its facilities installed in the
         Route of any order, permit, or Environmental, Health and Safety Law.

         1.9.     Environmental, Health and Safety Laws means any federal,
         state, or local statute, regulation, rule, ordinance or applicable
         governmental order, decree, or settlement agreement, or principle or
         requirement of common law, regulating or protecting the environment
         or human health or safety, including without limitation the
         Comprehensive Environmental Response, Compensation, and Liability Act
         (42 U.S.C. Section 9601 et seq.), as amended, the Resource
         Conservation and Recovery Act (42 U.S.C. Section 6901 et seq.), as
         amended, and the Occupational Safety and Health Act (29 U.S.C.
         Section 651 et seq.), as amended, and regulations promulgated
         thereunder.

         1.10.    Hazardous Discharge means any release, spill, leak, pumping,
         emission, discharge, injection, leaching, pouring, disposing or
         dumping of a Hazardous Substance.

         1.11.    Hazardous Substance means any pollutant or contaminant or any
         hazardous or toxic chemical, waste, material, or substance, including
         without limitation any defined as such under Environmental, Health
         and Safety Laws, and including without limitation asbestos, petroleum
         products and wastes, polychlorinated biphenyl's, and radon gas.

         1.12.    Service Provider or SP means Owner and Service Recipient or SR
         means SPC.

         1.13.    Useful Life means the period from the Acceptance Date of SPC's
         Strands and SPC's Conduit until the date they are no longer capable
         of producing commercial revenues.

2.       SALE

         Pursuant to the terms of the URRS Agreement, Owner has agreed to convey
to SPC ownership of the First Conduit.

3.       GRANT OF IRU

         3.1.     Upon the terms, covenants and conditions contained in this
         Agreement and subject to the terms and conditions contained in URRS
         Agreement, Owner grants to SPC and SPC accepts from Owner an
         Indefeasible Right of Use of SPC Strands and the IRU Conduit solely
         for Authorized Use (the "IRU") during the term of the IRU as provided
         in this Agreement. Except for an interest in the Occupancy Rights
         and OA Sites as described herein and in the URRS Agreement, SPC shall
         have no further right, title or other interest in Owner's Route, its
         Fiber Optic Facilities or SPC's Strands. Owner shall have the right
         to grant and renew rights to any entity to use Owner's Route, the
         Fiber Optic Facilities or any other property of Owner (exclusive of
         the SPC Strands and the

URRS Agreement                    Page 36              Dated: September 9, 2002
Appendix E

         SPC Conduit during the term of the IRU).

         3.2.     It is understood and agreed as between the Parties that the
         grant of the IRUs shall be treated for federal and all applicable
         state and local tax purposes as the sale and purchase of the SPC
         Strands and the SPC Conduit, and that on or after the exercise of its
         IRU, SPC shall be treated as the owner of the SPC Strands and the SPC
         Conduit for such purposes. The parties agree to file their respective
         income tax returns, property tax returns and other returns and
         reports for their respective Assessments on such basis and, except as
         otherwise required by law, not to take any positions inconsistent
         therewith.

4.       CONSTRUCTION

         4.1.     Owner shall use reasonable efforts to provide, construct and
         install the Fiber Optic Facilities on or before May 1, 2003.

         4.2.     Owner shall test all SPC's Strands in accordance with the
         procedures specified in Schedule C ("Fiber Cable Splicing, Testing,
         and Acceptance Procedures ") to verify that SPC's Strands are
         installed and operational in accordance with the specifications
         described in Schedule C. Fiber Acceptance Testing shall progress span
         by span along each segment as cable splicing progresses, so that test
         results may be reviewed in a timely manner. Owner shall provide SPC
         reasonable advance notice of the date and time of each Fiber
         Acceptance Testing such that SPC shall have the opportunity to have a
         person or persons present to observe Owner's Fiber Acceptance
         Testing. When Owner has determined that the results of the Fiber
         Acceptance Testing with respect to a particular span show that the
         SPC's Strands so tested are installed and operating in conformity
         with the applicable specifications as set forth in Schedules B and C,
         Owner shall promptly provide SPC with a copy of such test result.

         4.3.     If and when Owner gives written notice to SPC that the test
         results of the Fiber Acceptance Testing are within parameters of the
         specifications in Schedules B and C with respect to an entire
         segment, SPC shall provide Owner with written notice accepting (or
         rejecting by specifying the defect or failure in the Fiber Acceptance
         Testing that is the basis for such rejection) SPC's Strands. If SPC
         fails to notify Owner of its acceptance or rejection of the final
         test results with respect to SPC's Strands comprising a segment
         within twenty (20) days after SPC's receipt of notice of such test
         results, SPC shall be deemed to have accepted such segment. If,
         during the course of such construction, installation and testing, any
         material deviation from the specifications set forth in Schedules B
         and C is discovered, the construction or installation of the affected
         portion of the segment shall be repaired to such specification by
         Owner at Owner's sole cost and expense. The date of such notice of
         acceptance (or deemed acceptance) of SPC's Strands for all segments
         along the Route shall be the "Acceptance Date" for the Route.

5.       CONSIDERATION

         5.1.     As consideration for the SPC Conduit and the SPC Strands, SPC
         shall pay to Owner the sums set forth in the URRS Agreement and in
         accordance with the provisions of the URRS Agreement, and related
         documents.

         5.2.     Beginning on August 1, 2003, SPC shall pay to Owner an annual
         maintenance fee

URRS Agreement                    Page 37              Dated: September 9, 2002
Appendix E

         of Two Hundred Forty dollars ($240.00) per route mile
         each year during the term of this Agreement for maintenance of the
         SPC's Strands and the SPC Conduit. Thereafter, SPC shall pay the annual
         maintenance fee on or before the anniversary date of this Agreement
         each year. This amount shall be adjusted annually to reflect changes in
         the U.S. Producer Price Index (Bureau of Labor Standards "All Finished
         Goods" Series ID WPUSOP3000), but in no event shall such amount be less
         than $20 per actual route mile per month.

         5.3.     Except as otherwise specifically provided, SPC shall pay all
         applicable fees and charges provided for in this Agreement, within
         thirty (30) days after receipt of invoice.

         5.4.     All payments not made within thirty (30) days of the due date
         shall bear a late payment charge of one (1%) percent per month of the
         unpaid balance or the highest lawful rate, whichever is less.

         5.5.     The parties acknowledge that pursuant to the URRS Agreement,
         SPC has granted Owner a security interest in the SPC Strands and the
         SPC Conduit and any proceeds thereof.

6.       TERM.

         6.1.     As to the SPC Strands and the IRU Conduit, the Term of this
         Agreement shall begin on the date first above written and shall end
         upon the expiration of the Useful Life of the SPC Strands and the IRU
         Conduits.

         6.2.     Upon the expiration of the Term of this Agreement, SPC's IRU
         in the SPC Strands and the IRU Conduit shall immediately terminate
         and all rights of SPC to use the SPC Strands and the IRU Conduit, or
         any part thereof, shall cease and Owner shall owe SPC no additional
         duties or consideration.

7.       OCCUPANCY RIGHTS.

         OCCUPANCY RIGHTS FOR THE FIRST CONDUIT.

         7.1.     Owner has obtained certain easements, leases, licenses, fee
         interests, rights-of-way, permits, authorizations and other rights
         necessary to allow Owner to install and operate the Fiber Optic
         Facilities ("Occupancy Rights"). Subject to the terms of the URRS
         agreement and as provided therein, Owner shall partially assign to
         SPC the Occupancy Rights it owns or has secured for SPC's use in
         accessing the First Conduit. If Owner is unable to directly assign
         to SPC Occupancy Rights, then Owner shall grant, to the extent it is
         able, access rights to SPC through license, IRU, or otherwise. If a
         governmental entity requires SPC or its permitted assigns to obtain a
         separate license or permit, then SPC shall be responsible to obtain
         such license or permit at its sole cost and expense. Owner agrees to
         use commercially reasonable efforts in cooperating with SPC with
         respect to SPC's efforts to secure such licenses or permits.

         7.2.     Owner shall assign to SPC the Occupancy Rights for the First
         Conduit held by Owner to occupy any Union Pacific Railroad
         right-of-way.

         7.3.     For those Occupancy Rights for the First Conduit that Owner
         is unable to partially assign to SPC, Owner shall use commercially
         reasonable efforts to cause the Occupancy rights to remain effective
         throughout the term of this IRU. Owner's failure to cause

URRS Agreement                    Page 38              Dated: September 9, 2002
Appendix E

         Occupancy Rights to remain effective does not constitute a breach of
         any warranty, representation or covenant of Owner.

         7.4.     SPC shall pay Owner SPC's proportionate share of any recurring
         fees, including but limited to any renewal or extension
         fees, related to the Owner Occupancy Rights that Owner cannot
         partially assign to SPC. SPC's proportionate share shall be
         determined as provided in Section 8.14. SPC is responsible directly
         to third parties for any recurring fees, including but not limited to
         renewal or extension fees, associated with the Occupancy Rights that
         Owner partially assigns to SPC.

         OCCUPANCY RIGHTS FOR THE IRU CONDUITS AND SPC FIBER.

         7.5.     Owner shall provide the right of access to IRU Conduits and
         SPC Fiber as set forth herein and in the attached Schedule D. SPC shall
         comply with provisions and procedures set forth in the Maintenance
         Agreement as a condition to the access provided in this Section 7.5.

                  7.5.1.   SPC shall have the exclusive right of use of the
                  IRU Conduit, including the exclusive right to have SPC
                  Facilities installed within the IRU Conduit, and to use such
                  SPC Facilities in the conduct of the SPC's business, which
                  shall include without limitation sub-leasing or otherwise
                  allowing use by third parties of any or all of the SPC's
                  Facilities

                  7.5.2    SPC shall have the right to replace the SPC
                  Facilities at SPC's cost and expense. SPC shall request, in
                  writing, permission from Owner before attempting to access the
                  IRU Conduit and SPC Fiber or SPC Facilities within the Route,
                  which request shall be granted by Owner in its sole
                  discretion, reasonably exercised. SPC shall have the right to
                  have the IRU Conduits connected to other facilities owned or
                  controlled by SPC at any location approved by Owner along the
                  SPC Route.

8.       MAINTENANCE AND OPERATION

         8.1.     Owner shall maintain the SPC Strands and the SPC Conduit in
         accordance with the requirements and procedures set forth in Schedule
         D ("Maintenance Specifications and Procedures"). SPC shall cooperate
         with and assist, as may be reasonably required, Owner in performing
         said maintenance.

         8.2.     In the event of service outages, Owner agrees to use
         commercially diligent efforts to respond promptly and restore SPC's
         Strands within the parameters of the specifications in Schedule B;
         provided however, that SPC shall solely be responsible, at its own
         expense, for restoring an outage caused by a failure of light, signal
         or light communication transmission. SPC shall also be solely
         responsible, at its own expense, for the operation, maintenance and
         repair of all terminal equipment and facilities required in
         connection with the use of SPC's Strands.

         8.3.     Owner shall provide SPC access to SPC's Strands by cable
         stub taken by Owner from the Fiber Optic Facilities and delivered to
         SPC at a splice point or, as mutually agreed to by the parties, in
         selected Owner OA Sites at the fiber distribution panel. SPC

URRS Agreement                    Page 39              Dated: September 9, 2002
Appendix E

         shall designate in writing within 30 days of the Acceptance Date of
         the SPC's Strands, all splice points along the Route through which it
         wants access to the SPC Strands. If a splice point is not located at
         an Owner manhole/handhole, Owner shall, if mutually agreed,
         construct, at SPC's expense, a manhole/handhole for SPC. All other
         splice points shall be located at an Owner manhole/handhole. SPC is
         permitted to request access to additional splice points in the
         future, provided SPC reimburses Owner for any costs it incurs in
         providing access to such additional splice points.

                  8.3.1.   Owner shall accomplish sheath opening and stub out of
         SPC's Strands at the splice points in SPC's and Owner's
         manholes/handholes. SPC may splice its own fiber optic cable to SPC's
         Strands only in SPC's manholes/handholes. Owner shall splice SPC's
         fiber optic cable to SPC's Strands in Owner's manhole/handholes.

                  8.3.2.   The parties may enter into a Collocation Agreement
         pursuant to which Owner may sell or lease collocation space to SPC at
         Owner's OA Sites along the Route, such space and related services to
         be specifically defined in the Collocation Agreement. Should SPC
         subsequently request additional space in Owner facilities along the
         Route not identified in the Collocation Agreement, Owner agrees to
         provide such space if it is available at the time SPC requests such
         additional space. All billings for collocation space shall be made
         under the Collocation Agreement, and not this Agreement.

         8.4.     Within thirty (30) days after the Acceptance Date, Owner
         shall provide to SPC as-built drawings for the Route. The drawings
         shall contain ROW detail, splice locations, manhole/handhole
         locations.

         8.5.     In exercising its rights under this Agreement, both parties
         shall at their own expense comply with all applicable Environmental,
         Health and Safety Laws; the requirements and specifications of the
         National Electrical Code and the National Electrical Safety Code (all
         of the foregoing collectively referred to as "EHS Requirements");
         other applicable governmental laws, regulations, ordinances, rules,
         codes, orders, guidance, permits, and approvals; and applicable
         easement or license conditions. Any notice, report, correspondence,
         or submissions made by SPC to federal, state, or municipal
         environmental, safety, or health authorities related to the Owner's
         Route or Fiber Optic Facilities shall be provided by SPC to Owner
         promptly, and in no case later than twenty-four (24) hours. SPC also
         shall promptly provide to Owner a copy of any Environmental, Health
         or Safety Complaint received by SPC, and in no case late than three
         (3) business days after SPC's receipt of same. SPC shall ensure that
         its employees are trained in the proper procedures for entering and
         operating in the Owner's Route and in its Fiber Optic Facilities,
         optical amplifier sites and regenerator sites.

         8.6.     SPC agrees to reimburse Owner the reasonable cost of Owner (i)
         constructing manholes/handholes for SPC; (ii) accomplishing all sheath
         openings and stub out of SPC's Strands; and (iii) splicing SPC's fiber
         optic cable to SPC's Strands. Such charges shall be at Owner's fully
         loaded labor rates then in effect and Owner's cost of material plus
         fifteen (15%) per cent.

         8.7.    Should SPC's splices or other work not be placed and
         maintained in accordance with the provisions of this Agreement, Owner
         may at its option correct said condition. Owner shall notify SPC in
         writing prior to performing such work whenever practicable. However,
         when such conditions pose an immediate safety threat, interfere with
         the

URRS Agreement                    Page 40              Dated: September 9, 2002
Appendix E

         (performance of Owner's service obligations, or pose an immediate
         threat to the physical integrity of Owner's facilities, Owner, may
         perform such work and take such action that it deems necessary without
         first giving notice to SPC. As soon as practicable thereafter, Owner
         shall advise SPC of the work performed and the action taken and shall
         endeavor to arrange for re-accommodation of SPC's Strands so affected.
         SPC shall promptly reimburse Owner for all reasonable costs incurred
         by Owner for all such work, action, and re-accommodation performed by
         Owner.

         8.8.     In the event a Hazardous Discharge or other conditions are
         discovered or created at or near work being performed by SPC in on or
         around Owner's Route that may require (i) investigation or
         remediation or (ii) unforeseen measures to protect the environment,
         health or safety (collectively "Adverse EH&S Conditions"), the party
         discovering the condition shall immediately notify the other party.
         The party in the best position to do so (or, if the parties are
         equally situated, SPC) shall then immediately take reasonable
         measures to temporarily contain or otherwise avoid exacerbation of or
         exposure to the Adverse EH&S Conditions. Unless Owner affirmatively
         notifies SPC otherwise, SPC shall also take such other actions as
         applicable EH&S Requirements prescribe.

         8.9.     SPC shall be responsible for obtaining and maintaining, at its
         sole expense, from the appropriate public or quasi-public authority,
         any franchises, licenses, permits or other similar authorizations
         required to enter upon the property where Owner's Route is located and
         to operate and maintain the SPC Strands and the SPC Conduit in the
         Owner's Route.

         8.10.    SPC, at its sole cost and expense, shall (i) use SPC's Strands
         and (ii) conduct all work in or around Owner's Route in a safe
         condition and in a manner reasonably acceptable to Owner, so as not to
         physically, electronically or inductively conflict or interfere or
         otherwise adversely affect Owner's Route or the facilities placed
         therein by Owner, joint users, or other authorized SPC's. Owner agrees
         to operate its facilities in the Owner's Route in a similar manner.

         8.11.    SPC must obtain prior written authorization from Owner
         approving any future work and the party performing such work before
         SPC shall perform any work in or around Owner's Route.

         8.12.    In the event SPC receives information that Owner's Route or
         the Fiber Optic Facilities are damaged, it shall notify Owner of said
         damage by phone at: 877-638-6621.

         This is a 24 hour, 7 day per week notification number. In the event
         Owner receives information that SPC's Strands are damaged, Owner will
         notify SPC of said damage by phone at SPC's emergency telephone
         number. The call shall be directed to the Supervisor on Duty, and the
         caller shall provide the following information.

                  8.12.1.  Name of Company making report.

                  8.12.2.  Location reporting problem.

                  8.12.3.  Name of contact person reporting problem.

                  8.12.4.  Telephone number to call back with progress report.

                  8.12.5.  Description of the problem in as much detail as
                  possible.

URRS Agreement                 Page 41                 Dated: September 9, 2002
Appendix E

                  8.12.6.  Time and date the problem occurred or began.

                  8.12.7.  State whether or not the problem presents a jeopardy
         situation to Owner's Route, the Fiber Optic Facilities or SPC's Strands

         8.13.    Owner shall designate the particular Strands of Dark Fiber
         that will constitute the SPC Strands and the particular conduits that
         will constitute the SPC Conduit and the location and manner in which
         they will enter and exit Owner's Route

         8.14.    If Owner moves, replaces or changes the location, alignment
         or grade of Owner's Route ("Relocation"), Owner shall concurrently
         relocate the SPC Strands and the IRU Conduit. If the Relocation is
         because of an event of Force Majeure, pursuant to Section 26.2, or of
         any governmental or third party authority, including a Taking by right
         of eminent domain, SPC shall reimburse Owner for SPC's proportionate
         share of the costs of the Relocation of Owner's Route. To the extent
         Owner receives reimbursement from a third party which is allocable to
         a Relocation of Owner's Route, it will credit or reimburse SPC for its
         proportionate share of the reimbursement. SPC's proportionate share
         shall be based first on the ratio of the number of IRU Conduit
         relative to the total number of conduits relocated, then on the number
         of SPC Strands relative to the total fiber count in the affected
         conduit. SPC shall be responsible for all costs associated with
         Relocation of the Sale Conduit.

         8.15.    SPC shall be deemed the generator of all waste associated with
         its work related to Owner's Route and shall both remove that waste
         from the area and dispose of or otherwise manage it at its own expense
         in compliance with all applicable laws. "Waste" shall include without
         limitation, any manmade materials (including asbestos) and any soil or
         other environmental media that may be removed or excavated by SPC, and
         all hazardous and non-hazardous substances and materials associated
         with the work that are intended to be discarded, scrapped, or
         recycled. It shall be presumed that all the substances and material
         brought to the area of that work that are not incorporated into the
         work (including without limitation damaged components or tools,
         leftovers, containers, garbage, scrap, residues, or byproducts),
         except for substances and materials that SPC intends to use in their
         original form in connection with similar work, are waste to which the
         above SPC obligations apply.

9.       OWNERSHIP.

         9.1.     Legal title to the SPC Strands and the IRU Conduit shall at
         all times be vested in Owner. Neither the provision of the use of the
         SPC Strands and the IRU Conduit by Owner to SPC hereunder, nor the
         payments by SPC contemplated hereby, shall create or vest in SPC any
         easement, interest, or any other ownership or property right of any
         nature in the SPC Strands or the IRU Conduit, except as granted in
         Section 3 and Section 7 hereof. Except as provided in the URRS
         Agreement, SPC shall not grant any security interest in the SPC
         Strands, the SPC Conduit or any part or component or proceeds thereof.

         9.2.     Owner may use or permit the use of Owner's Route, the Fiber
         Optic Facilities and the telecommunications capacity thereof for any
         lawful purpose. Nothing in this Agreement shall be construed or
         interpreted to prohibit Owner from leasing or licensing the Fiber
         Optic Facilities or otherwise providing capacity to others or from
         installing

URRS Agreement                 Page 42                 Dated: September 9, 2002
Appendix E

         additional fibers or capacity, including without limitation, fiber
         optic capacity, within Owner's Route (other than the SPC Strands and
         the SPC Conduit during the term of the IRU) or to prohibit Owner from
         operating such Fiber Optic Facilities (alone or in combination with
         others) in competition with SPC.

10.      EMINENT DOMAIN.

         If there is a taking of the SPC Strands or the IRU Conduit by right of
eminent domain (a "Taking") which results in the remainder of the SPC Strands or
the IRU Conduit being unable to be restored to a condition suitable for SPC's
business needs within ninety (90) days from the date of the Taking ("Substantial
Taking"), SPC will be permitted to participate, to the extent of its interest
and at its expense, in such eminent domain proceeding, and this Agreement may be
terminated as a result of such proceedings. In such event the IRU fee and
maintenance fee shall abate from the date of Taking and any previously paid IRU
fee and/or maintenance fee attributable for any period beyond such date shall be
returned to SPC. If there shall be a Taking which does not constitute a
Substantial Taking, this Agreement shall not terminate but Owner shall, with due
diligence, restore SPC's Strands and IRU Conduit as speedily as practical to its
condition before the Taking in accordance with the provisions of Section 8.14.

11.      INDEMNIFICATION.

         11.1.    SPC will indemnify, defend, and hold harmless Owner and
         Owner's agents, officers and employees, from any and all losses,
         damages, costs, expenses (including reasonable attorneys fees),
         statutory fines or penalties, actions, or claims for personal injury
         (including death), damage to property, or other damage in any way
         arising from SPC's activities undertaken pursuant to this Agreement
         (including, without limitation, the installation, construction,
         operation or maintenance of the SPC Strands and SPC Conduit), except
         to the extent caused by the negligence or willful misconduct on the
         part of Owner or Owner's agents, officers or employees.

         11.2.    Without limiting the foregoing, SPC specifically will
         indemnify, defend, and hold harmless Owner and Owner's agents,
         officers and employees from any and all claims asserted by SPC's
         customers in any way arising out of or in connection with this
         Agreement, the SPC Strands or the SPC Conduit, except to the extent
         caused by the negligence or willful misconduct on the part of Owner
         or Owner's agents, officers or employees.

         11.3.    Owner will indemnify, defend, and hold harmless SPC and SPC's
         agents, officers and employees, from any and all losses, damages,
         costs, expenses (including reasonable attorneys fees), statutory fines
         or penalties, actions, or claims for personal injury (including
         death), damage to property, or other damage in any way arising from
         Owner's activities undertaken pursuant to this Agreement (including,
         without limitation, the installation, construction, operation or
         maintenance of the Route), except to the extent caused by the
         negligence or willful misconduct on the part of SPC or SPC's agents,
         officers or employees.

         11.4.    Except for personal injury and property damage as provided
         above, in no event shall either party be liable to the other party for
         any special, consequential or indirect

URRS Agreement                 Page 43                 Dated: September 9, 2002
Appendix E

         (including by way of illustration, lost revenues and lost profits),
         punitive or exemplary damages arising out of this Agreement or any
         obligation arising thereunder, whether in an action for or arising out
         of breach of contract, tort or otherwise.

12.      INSURANCE.

         During the term of this Agreement, each party shall obtain and maintain
and shall require any of its permitted contractors to obtain and maintain not
less than the following insurance:



- -----------------------------------------------------------------------------------------------------------------------
TYPE OF COVERAGE                                                              AMOUNT OF COVERAGE
- -----------------------------------------------------------------------------------------------------------------------
                                                        
Worker's Compensation Insurance                            Statutory Amount
- -----------------------------------------------------------------------------------------------------------------------
Employer's Liability Occupational Disease and Bodily       $1 million each accident
Injury Insurance                                           $1 million disease each employee
                                                           $1 million disease-policy limit
- -----------------------------------------------------------------------------------------------------------------------
Commercial General Liability Insurance, including          Combined single limit personal injury and
premises-operations, products/completed                    property damage on an occurrence policy form with policy
operations, independent contractors, contractual           amounts of (i) not less than $5 million per occurrence
(blanket), broad form property damage, with                (without a limitation on aggregate amount); or (ii) not
umbrella excess liability (collectively,                   less than $5 million per occurrence with an aggregate annual
"Comprehensive Coverage")                                  amount of not less than $5 million
- -----------------------------------------------------------------------------------------------------------------------
Automobile Liability Insurance for owned, hired and        $2 million combined single limit bodily injury/property
non-owned autos ("Automobile Liability Coverage")          damage
- -----------------------------------------------------------------------------------------------------------------------


         The limits set forth above are minimum limits and will not be construed
to limit either party" liability.

         This insurance shall cover the amounts and types of liability listed
above with respect to each party's obligations under this Agreement.

         Each policy evidencing the insurance described in this Section 10 must
contain a provision that the insurance policy, and the coverage it provides,
shall be primary and noncontributing with respect to any policies carried by the
party and its affiliates, and that any policies carried by the party and its
affiliates shall be excess insurance.

         The comprehensive general liability policies and umbrella excess
liability policies of the party and its subcontractors each shall contain a
provision including the other party, its parent, subsidiaries and affiliates,
and each of their respective officers, directors, employees and agents, as
additional insureds.

         Prior to commencement of any work under this Agreement, each party must
furnish to the other certificates of insurance stating that the insurer will use
best efforts to notify the other part at least thirty (30) days prior to
cancellation of, or any material change in, the coverage provided.

         Either party is entitled to self-insure coverages under this Agreement
through programs adopted by their respective risk management departments.

URRS Agreement                 Page 44                 Dated: September 9, 2002
Appendix E

13.      COMPLIANCE WITH LAWS.

         Notwithstanding anything to the contrary in this Agreement, each Party
shall ensure that any and all activities it performs pursuant to this Agreement
shall comply with all applicable laws. Without limiting the generality of the
foregoing, each Party shall comply with all applicable provisions of i)
workmen's compensation laws, ii) unemployment compensation laws, iii) the
Federal Social Security Law, iv) the Fair Labor Standards Act, and v)
Environmental, Health and Safety Laws.

14.      DISCLAIMER OF WARRANTIES

         EXCEPT AS SPECIFICALLY SET FORTH IN THIS AGREEMENT, OWNER MAKES NO
WARRANTIES REGARDING THE SERVICES OR DELIVERABLES PROVIDED UNDER THIS AGREEMENT
AND MAKES NO WARRANTIES EXPRESS, IMPLIED, OR STATUTORY, AS TO THE INSTALLATION,
DESCRIPTION, QUALITY, INCLUDING ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR
FITNESS FOR A PARTICULAR PURPOSE.

15.      OWNER SALES OR DISPOSITIONS.

         Nothing in this Agreement shall prevent or be construed to prevent
Owner from, selling or otherwise disposing of any portion of Owner's Route or
Fiber Optic Facilities or other property of Owner used for the SPC Strands or
the IRU Conduit, provided, however, that in the event of a sale or other
disposition, Owner shall condition such sale or other disposition subject to
the rights of SPC under this Agreement.

16.      LIENS.

         SPC shall keep Owner's Route and the Fiber Optic Facilities and other
property of Owner free from all mechanic's, artisan's, material-man's,
architect's, or similar services' liens which arise in any way from or as a
result of its activities and cause any such liens which may arise to be
discharged or released.

17.      DEFAULT PROVISIONS AND REMEDIES.

         17.1.    Each of the following shall be deemed an Event of Default by
         SPC under this Agreement:

                  17.1.1.   Failure of SPC to pay the any sum required to
         be paid under the terms of this Agreement or the URRS Agreement, Note,
         Security Agreement or any related agreement and such default continues
         for a period of thirty (30) days after written notice thereof to SPC;

                  17.1.2.   Failure by SPC to perform or observe any
         other terms, covenant, agreement or condition of this Agreement on the
         part of SPC to be performed and such default continues for a period of
         thirty (30) days after written notice thereof from Owner (provided
         that if such default cannot be cured within such thirty (30) day
         period, this period will be extended if SPC commences to cure such
         default within such thirty (30) day period and proceeds diligently
         thereafter to effect such cure);

URRS Agreement                 Page 45                 Dated: September 9, 2002
Appendix E

                  17.1.3.  The filing of a tax or mechanic's lien against
         Owner's Route or Fiber Optic Facilities or other property of Owner
         which is not bonded or discharged within thirty (30) days of the date
         SPC receives notice that such lien is filed.

         17.2.    Upon the occurrence of an Event of Default, Owner, without
         further notice to SPC in any instance (except where expressly provided
         for below or by applicable law) may do any one or more of the
         following:

                  17.2.1.  Perform, on behalf and at the expense of SPC, any
         obligation of SPC under this Agreement which SPC has failed to perform
         and of which Owner shall have given SPC notice, the cost of which
         performance by Owner shall be payable by SPC to Owner upon demand;

                  17.2.2.  Exercise any other legal or equitable right or
         remedy which it may have, including suspension or termination of
         maintenance services Owner provides to SPC hereunder, including any
         rights and remedies available to Owner pursuant to the URRS Agreement.

         17.3.    The following events or occurrences shall constitute a default
         by Owner under this Agreement:

                  17.3.1.  Failure by Owner to perform or observe any other
         terms, covenant, agreement or condition of this Agreement on the part
         of Owner to be performed and such default continues for a period of
         thirty (30) days after written notice thereof from SPC (provided that
         if such default cannot be cured within such thirty (30) day period,
         this period will be extended if Owner commences to cure such default
         within such thirty (30) day period and proceeds diligently thereafter
         to effect such cure.

         17.4.    Upon the occurrence of an Event of Default, SPC, without
         further notice to Owner in any instance (except where expressly
         provided for below or by applicable law) may do any one or more of the
         following:

                  17.4.1.  Perform, on behalf and at the expense of Owner, any
         obligation of Owner under this Agreement which Owner has failed to
         perform and of which SPC shall have given Owner notice, the cost of
         which performance by SPC shall be payable by Owner to SPC upon demand;

                  17.4.2.  Exercise any other legal or equitable right or remedy
         which it may have.

         17.5.    All rights and remedies of either party set forth in this
         Agreement shall be cumulative, and none shall exclude any other right
         or remedy, now or hereafter allowed by or available under any statute,
         ordinance, rule of court, or the common law, either at law or in
         equity, or both.

18.      FORCE MAJEURE.

URRS Agreement                 Page 46                 Dated: September 9, 2002
Appendix E

         Neither Owner nor SPC shall be in default under this Agreement with
respect to any delay in its performance caused by any of the following
conditions (each a "Force Majeure Event"): (1) act of God; (2) fire; (3) flood;
(4) material shortage or unavailability not resulting from the responsible
party's failure to timely place orders or take other necessary actions therefor;
(5) government codes, ordinances, laws, rules, regulations or restrictions
(collectively, "Regulations"); (6) war or civil disorder; (7) failure of a third
party to grant or recognize an Owner Occupancy Right; or (8) any other cause
beyond the reasonable control of such party; provided, however, that this
Section 20 shall not apply to the payment of money. The party claiming relief
under this Section 20 shall promptly notify the other in writing of the
existence of the Force Majeure Event relied on, the expected duration of the
Force Majeure Event, and the cessation or termination of the Force Majeure
Event. The party claiming relief under this Section 20 shall exercise
commercially reasonable efforts to minimize the time for any such delay.

19.      TAXES AND USE OF PUBLIC RIGHTS-OF-WAY, LICENSE AND PERMIT FEES.

         19.1.    Subject to Section 19.4, SPC shall be responsible for any and
         all sales, use, income, gross receipts, excise, transfer, ad valorem
         or other taxes, and any and all franchise fees or similar fees
         ("Assessments") assessed against it due to its ownership of an IRU,
         its use of the SPC Strands and the SPC Conduit, including the
         providing of services over the SPC Strands or SPC Conduit, or its
         ownership or use of facilities connected to the SPC Strands or the SPC
         Conduit.

         19.2.    Subject to Section 19.1, Owner shall be responsible for any
         and all Assessments assessed against it due to its construction,
         ownership or use of the Owner Route or Fiber Optic Facilities,
         including providing of services over the Owner Route or its ownership
         or use of facilities connected to the Owner Route.

         19.3.    Notwithstanding Sections 19.1 and 19.2 above, if Owner is
         assessed annual fees for use of public rights-or-way, SPC shall pay
         its proportionate share of such fees, its proportionate share being
         determined as provide in Section 8.14.

         19.4.    In the event that Owner is assessed for any Assessments
         related to SPC's ownership of an IRU or SPC's use of the SPC Strands
         or SPC Conduit which may not feasibly be separately assessed, Owner
         within thirty (30) days of receipt of an invoice therefor, shall
         provide information and documentation to SPC sufficient to
         demonstrate the basis for the Assessments and the amount and due date
         for payment of the Assessments. In addition, Owner shall provide SPC
         with all information reasonably requested by SPC with respect to any
         such Assessments. After such thirty (30) day period, Owner, in it
         sole discretion, may pay such Assessment and invoice SPC for
         reimbursement. SPC shall reimburse Owner for such payment within ten
         (10) days of receipt of Owner's invoice. Notwithstanding such
         payment by Owner, SPC, at its option, shall have the right at its
         sole cost to contest any such Assessments and Owner will reasonably
         cooperate with SPC in pursuing any such contest; provided that SPC
         shall have reimbursed Owner for such Assessments. In the event
         Owner, in its sole discretion, elects to not pay such tax or fee, it
         shall so notify SPC. SPC, at its option, may pay the Assessments, or
         contest the payment; provided that SPC shall indemnify and hold
         harmless Owner for the payment of such Assessments and all interest
         and penalties related thereto; and provided further, that such
         contest shall be resolved or such

URRS Agreement                 Page 47                 Dated: September 9, 2002
Appendix E

         Assessments shall be paid so as to prevent any forfeiture of
         rights or property or the imposition of any lien on the Owner's Route
         or Owner's Fiber Optic Facilities.

20.      SUCCESSION, ASSIGNABILITY.

         20.1.    This Agreement shall be binding upon and inure to the benefit
         of the parties hereto and their respective permitted successors or
         assigns.

         20.2.    Except as provided in this Section 22, a party ("Transferring
         Party") shall not assign, encumber or otherwise transfer this
         Agreement or all or any portion of its rights or obligations hereunder
         to any party without the prior written consent of the other party
         ("Other Party"), which consent will not be unreasonably withheld or
         delayed. Notwithstanding the foregoing, Transferring Party shall have
         the right, without Other Party's consent, to (i) subcontract any of
         its construction or maintenance obligations hereunder or (ii) assign
         or otherwise transfer this Agreement in whole or in party (a) to any
         parent, subsidiary or affiliate of Transferring Party, or (b) any
         corporation or other entity which Transferring Party may be merged or
         consolidated or which purchases all or substantially all of the stock
         or assets of Transferring Party; provided that the assignee or
         transferee in any such circumstance shall be subject to all of the
         provisions of this Agreement, including without limitation, this
         Section 22 and provided further that promptly following any such
         assignment or transfer, Transferring Party shall give Other Party
         written notice identifying the assignee or transferee. In the event
         of any permitted partial assignment of any rights hereunder,
         Transferring Party shall remain the sole point of contact with Other
         Party. When Other Party's consent to assign is required, Other Party
         will have the right to withhold consent if, in its judgment reasonably
         exercised, the proposed assignee cannot adequately assume the
         obligations of this Agreement. In no event will any assignment by
         Other Party be permitted without the delivery to Other Party of a
         binding agreement in writing from the proposed assignee that (i)
         states that the proposed assignee will assume all current, future and
         outstanding past obligations under this Agreement as if such assignee
         had originally executed this Agreement and (ii) evidence proof
         satisfactory to Other Party that he proposed assignee has insurance
         coverage comparable to the described in Section 12 or other assurances
         that the proposed assignee can adequately perform the obligations it
         will assume under this Agreement.

         20.3.    Notwithstanding the Provisions of Section 20, without the
         prior written consent of Owner, SPC shall have the right to lease,
         license, grant an IRU with respect to, or otherwise in any manner
         transfer or make available in any manner to, any of SPC's rights in
         the SPC Strands or the IRU Conduit and such lessee, licensee or other
         transferee shall have the ability to grant leases, licenses and grant
         an IRU with respect to, or otherwise in any manner transfer or make
         available in any manner to, any of such party's rights in the strands
         or conduit such party receives.

         20.4.    Neither party shall attempt to circumvent any of its
         obligations under this Agreement, or deprive the Other Party of any
         anticipated benefit under this Agreement, through the use of ownership
         changes, reorganizations, creation of new entities, or other
         artificial devices.

         20.5.    Neither this Agreement, nor any term or provision hereof, nor
         any inclusion by reference shall be construed as being for the benefit
         of any person or entity not a signatory

URRS Agreement                 Page 48                 Dated: September 9, 2002
Appendix E

hereto.

21.      NOTICES.

         Any demand, notice or other communication to be given to a party in
connection with this Agreement shall be given in writing and shall be given by
personal delivery, by registered or certified mail, return receipt requested,
by Tele-copy or commercial over night delivery service addressed to the
recipient as set forth as follows or to such other address, individual or
Tele-copy number as may be designated by notice given by the party to the
other:

         OWNER:
         Sierra Touch America, LLC.
         130 North Main
         Butte, Montana  59701

         Attention: Contracts Officer
         Telephone Number: 406-497-5317
         Emergency Telephone Number: same
         FAX Number: 406-497-5203

         With a copy to:
         Sierra Touch America, LLC.
         130 North Main
         Butte, Montana 59701

         Attention: General Counsel
         Telephone Number: 406-497-5427
         Emergency Telephone Number: same
         FAX Number: 406-497-5203

         SPC:
         Sierra Pacific Communications, Inc.
         5860 S. Pecos, Bldg. G, St. 100, Las Vegas, NV  89120
         Attention: Director, Facilities
         Telephone Number: 702-949-7910
         Emergency Telephone Number: same
         FAX Number: 702-949-7928

         with a copy to:
         General Counsel
         6226 West Sahara Avenue
         Las Vegas, NV 89151
         Tele: 702.367.5692
         Fax: 702.227.2069

URRS Agreement                 Page 49                 Dated: September 9, 2002
Appendix E

         Any demand, notice or other communication given by personal delivery
shall be conclusively deemed to have been given on the day of actual delivery
thereof and, if given by registered or certified mail, return receipt requested
on the date of receipt thereof and, if given by telecopy, on the day of
transmittal thereof if given during the normal business hours of the recipient
and on the next business day if not given during normal business hours.

22.      NON-WAIVER.

         No course of dealing, course of performance or failure of either party
strictly to enforce any term, right or condition of this Agreement shall be
construed as a waiver of any term, right or condition.

23.      CHOICE OF LAW

         The construction, interpretation and performance of this Agreement
shall be as governed by the law of the state of Nevada.

24.      HEADINGS.

         All headings contained in this Agreement are inserted for convenience
only and are not intended to affect the meaning or interpretation of this
Agreement or any clause.

25.      CONFIDENTIALITY AND PROPRIETARY INFORMATION.

         25.1.    In connection with this Agreement, either party may furnish
         to the other certain information that is marked or otherwise
         specifically identified as proprietary or confidential ("Confidential
         Information"). This Confidential Information may include, among other
         things, private easements, licenses, utility agreements, permits,
         other right-of-way granting documents, specifications, designs,
         plans, drawings, data, prototypes, and other technical and/or
         business information. For purposes of this Section 25, the party that
         discloses Confidential Information is referred to as the "Disclosing
         Party", and the party that receives Information is referred to as the
         "Receiving Party".

         25.2.    When Confidential Information is furnished in tangible form,
         the Disclosing Party shall mark it as proprietary or confidential.
         When Confidential Information is provided orally, the Disclosing Party
         shall, at the time of disclosure or promptly thereafter, identify the
         Confidential Information as being proprietary or confidential.

         25.3.    With respect to Confidential Information disclosed under this
         Agreement, the Receiving Party and its employees shall:

                  25.3.1.  hold the Confidential Information in confidence,
         exercising a degree of care not less than the care used by the
         Receiving Party to protect its own proprietary or confidential
         information that it does not wish to disclose.

                  25.3.2.  restrict disclosure of the Confidential Information
         solely to those of its employees who have a need to know in connection
         with the performance of this Agreement, and not disclose the
         Confidential Information to any other person or entity without the
         prior written consent of the Disclosing Party;

URRS Agreement                 Page 50                 Dated: September 9, 2002
Appendix E

                  25.3.3.  advise those employees of their obligations with
         respect to the Confidential Information; and

                  25.3.4.  use the Confidential Information only in connection
         with the performance of this Agreement, except as the Disclosing
         Party may otherwise agree in writing.

         25.4.    Confidential Information shall be deemed the property of the
         Disclosing Party. Upon written request of the Disclosing Party, the
         Receiving Party shall return all Confidential Information received in
         tangible form, except that each party's legal counsel may retain one
         copy in its files solely to provide a record of such Confidential
         Information for archival purposes. If the Receiving Party loses or
         makes an unauthorized disclosure of Confidential Information, it
         shall notify the Disclosing Party and use reasonable efforts to
         retrieve the Confidential Information.

         25.5.    The Receiving Party shall have no obligation to preserve the
         proprietary nature of Confidential Information which:

                  25.5.1.  was previously known to the Receiving Party free of
         any obligation to keep it confidential; or

                  25.5.2.  is or becomes publicly available by means other than
         unauthorized disclosure; or

                  25.5.3.  is developed by or on behalf of the Receiving Party
         independently of any Confidential Information furnished under this
         Agreement; or

                  25.5.4.  is received from a third party whose disclosure does
         not violate any confidentiality obligation.

         25.6.    The existence of this Agreement, and all information that may
         be disclosed to Receiving Party pertaining to the identities,
         locations, and requirements of the Disclosing Party's SPCs, is
         Confidential Information of Disclosing Party.

         25.7.    Under no circumstances shall either party disclose the other
         party's SPC Confidential Information to any third party (even if
         under contract to that party) or to any personnel of the party
         responsible for publicity or for end user sales or marketing.

         25.8.    If the Receiving Party is required to disclose the Disclosing
         Party's Confidential Information by an order or a lawful process of a
         court or governmental body, the Receiving Party shall promptly notify
         the Disclosing Party, and shall cooperate with the Disclosing Party in
         seeking reasonable protective arrangements before the Confidential
         Information is produced.

         25.9.    Each party agrees that a breach of this Section 25 by the
         Receiving Party or its representatives will result in irreparable harm
         for which there is no adequate remedy at law, and in the event of any
         such breach the Disclosing Party may, notwithstanding the default
         provisions in Section 17, seek a preliminary or permanent injunction
         and/or specific performance which shall be granted upon a finding of a
         breach (or substantial likelihood of a breach in the case of a
         preliminary injunction). Such remedies shall not be

URRS Agreement                 Page 51                 Dated: September 9, 2002
Appendix E

         deemed to be the exclusive remedies for a breach of this Section 25
         but shall be in addition to all other remedies available at law or in
         equity.

26.      PUBLICITY AND ADVERTISING.

         26.1.    Neither party shall publish or use any advertising, sales
         promotions, or other publicity materials that use the other party's
         logo, trademarks, or service marks without the prior written approval
         of the other party.

         26.2.    Each party shall have the right to review and approve any
         publicity material, press releases, or other public statements by
         the other that refer to such party or that describe any aspect of
         this Agreement. Each party agrees not to issue any such publicity
         materials, press releases, or public statements without the prior
         written approval of the other party.

         26.3.    Nothing in this Agreement establishes a license for either
         party to use any of the other party's brands, marks, or logos without
         prior written approval of the other party.

27.      REPRESENTATIONS AND WARRANTIES,

         Each party represents and warrants that:

         27.1.    it has full right and authority to enter into, execute,
         deliver and perform its obligations under this Agreement;

         27.2.    this Agreement constitutes a legal, valid and binding
         obligation enforceable against such party in accordance with its
         terms, subject to bankruptcy, insolvency, creditors' rights and
         general equitable principles; and

         27.3.    its execution of and performance under this Agreement shall
         not violate any applicable existing regulations, rules, statutes or
         court orders of any local, state or federal government agency, court,
         or body.

28.      ENTIRE AGREEMENT; AMENDMENT.

         This Agreement constitutes the entire and final agreement and
understanding between the parties with respect to the subject matter hereof and
supersedes all prior oral and written communications, understandings and
agreements relating to the subject matter hereof, which are of no further force
or effect. The Exhibits and/or Schedules referred to herein are integral parts
hereof and are hereby made a part of this Agreement. This Agreement may only be
modified or supplemented by an instrument in writing executed by a duly
authorized representative of each party.

29.      NO THIRD PARTY BENEFICIARIES.

         Except as set forth in Section 31, this Agreement does not provide and
is not intended to provide third parties with any remedy, claim, liability,
reimbursement, cause of action, or other privilege.

30.      NO PERSONAL LIABILITY.

         Each action or claim against any party arising under or relating to
this Agreement shall be

URRS Agreement                 Page 52                 Dated: September 9, 2002
Appendix E

made only against such party as a corporation, and any liability relating
thereto shall be enforceable only against the corporate assets of such party.
No party shall seek to pierce the corporate veil or otherwise seek to impose
any liability relating to, or arising from, this Agreement against any
shareholder, employee, officer or director of the other party. Each of such
persons is an intended beneficiary of the mutual promises set forth in this
Section 32 and shall be entitled to enforce the obligations of this Section 30.

31.      RELATIONSHIP OF THE PARTIES.

         The relationship between the parties shall not be that of partners,
agents or joint venturers for one another, and nothing contained in this
Agreement shall be deemed to constitute a partnership or agency agreement
between them for any purposes, including, but not limited to federal income tax
purposes. The parties, in performing any of their obligations hereunder, shall
be independent contractors or independent parties and shall discharge their
contractual obligations at their own risk.

32.      SUCCESSORS AND ASSIGNS.

         This Agreement and each of the parties' respective rights and
obligations under this Agreement shall be binding upon and shall inure to the
benefit of the parties and each of their respective permitted successors and
assigns.

33.      UNENFORCEABLE PROVISIONS.

         No provision of this Agreement shall be interpreted to require any
unlawful action by either party. If any section or clause of this Agreement is
held to be invalid or unenforceable, then the meaning of that section or clause
shall be construed so as to render it enforceable to the extent feasible. If no
feasible interpretation would save the section or clause, it shall be severed
from this Agreement with respect to the matter in question, and the remainder
of the Agreement shall remain in full force and effect. However, in the event
such a section or clause is an essential element of the Agreement, the parties
shall promptly negotiate a replacement that will achieve the intent of such
unenforceable section or clause to the extent permitted by law.

34.      COUNTERPARTS.

         This Agreement may be executed in one or more counterparts, all of
which taken together shall constitute one and the same instrument.

URRS Agreement                 Page 53                 Dated: September 9, 2002
Appendix E

IN WITNESS WHEREOF, the parties have caused this Agreement to be signed by
their duly authorized representatives on the date first above written.

                                           SIERRA TOUCH AMERICA, LLC.

                                           By: ______________________
                                           Name: MICHAEL J. MELDAHL
                                           Title:Manager

                                           SIERRA PACIFIC COMMUNICATIONS, INC.

                                           By: ______________________
                                           Name:  RICHARD J. COYLE, JR.
                                           Title: President

URRS Agreement                 Page 54                 Dated: September 9, 2002
Appendix E

                                   APPENDIX E

                                   EXHIBIT B

                          DESCRIPTION OF REAL PROPERTY
                             TO BE CONVEYED TO SPC

                    VERDI, NEVADA TO SACRAMENTO, CALIFORNIA

         This portion of the route consists of approximately 131 miles
(691,680') in length. The telecommunications system along the route from the
Union Pacific Railroad milepost 227, approximately 8/10 of a mile east of the
California - Nevada State Line near Verdi Nevada to Hirshdale Road UPRR MP
218.3, approximately 11 miles (58,080'). From Hirshdale Road to West Truckee,
approximately 16.5 miles (87,120'). West Truckee to Soda Spring, approximately
6.8 miles (35,904'). Soda Springs to Cisco Grove approximately 9.1 miles
(48,048'). Cisco Grove to Blue Canyon approximately 12 miles (63,360'). Blue
Canyon to Colfax UPRR MP 142, approximately 21 miles (110,880'). UPRR MP 142 to
Sacramento UPRR MP 89 approximately 53.7 mile (283,536'). Sacramento UPRR MP 89
to 1005 North B Street approximately 1 mile (5280').

                                   RENO METRO

         The fiber optic cable line will start .8 of a mile from the California
border into Nevada and ties in with a Williams handhole between UPRR and 1-80
and ends at the Wells Fargo building at 200 South Virginia Street. Phase II
begins at 200 South Virginia Street, Wells Fargo building, and ends at South
Meadows Parkway.

                                   LONG HAUL

         The fiber optic cable line will start at the intersection of South
Meadows Parkway and South Virginia Street in Reno and follow the highway
right-of-way south from Reno along U.S. highway 395 to East Lake Boulevard.
From East Lake Boulevard, the cable will continue southward along a corridor to
Goni Road and then to Arrowhead Drive in Carson City. At Arrowhead Drive it
will head eastward to US Highway 50 and continue east crossing the rest of
Nevada, passing through the cities of Fallon, Austin, Eureka, and Ely and
continuing into Delta Utah. At Delta the route would follow US Highway 6
northeastward to State Route 132 In Lynndyl, Utah. At State Route 132 the cable
would continue northeast to just west of Nephi, Utah, where it would intersect
State Route 91. On State Route 91 the fiber optic cable would continue
northward through Mona to Santaquin, Utah. The cable would then head northeast,
following side roads and a portion of State Route 115 on the west side of
Interstate 15 (1-15). Just north of Spanish Fork the fiber optic cable would
cross under 1-15 and tie in with another fiber optic cable system on 4800
South, approximately 0.2 miles east of 1-15. The route would then continue
north on I-15 to Provo, UT, run along city streets into the Provo POP located
at the corner of East 100 and North 100, then along city streets to I-15, then
north on I-15 to the vicinity of the Bangerter Highway, north to west 700
south, along city streets to 161 Regent Street, north on Regent Street to the
termination point at 100 South State Street.

                                   CALIFORNIA

- -        Verdi Nevada on UPRR MP 227 to MP 218.3 at Hirshdale Rd. spread 5.1.

- -        Hirshdale Rd. to West Truckee, spread 5.2.

- -        West Truckee to Soda Springs, spread 5.3

- -        Soda Springs to Cisco Grove, spread 5.4

URRS Agreement                 Page 55                 Dated: September 9, 2002
Appendix E

- -        Cisco Grove to Blue Canyon, spread 5.5

- -        Blue Canyon to Colfax UPRR MP 142, spread 5.6

- -        Colfax UPRR MP 142 to Sacramento UPRR 89, spread 6

- -        Sacramento UPRR 89 to 1005 North "B" Street, Sacramento Ca, spread 7

                                     NEVADA

- -        Reno Metro, Phase 1 is approximately 74,406 feet

- -        Phase 2 is approximately 51,069 feet.

- -        Spread 1, South Meadow Parkway to Lyon County line Is approximately
         321,496 feet.

- -        Spread 2, Churchill County line to the Lander County line is
         approximately 567,791 feet.

- -        Spread 3, Lender County line to the White Pine County line is
         approximately 578,458 feet.

- -        Spread 4, White Pine County to Utah border is approximately 702,319
         feet.

                                      UTAH

- -        Spread 5, Millard County at the Nevada/Utah border to Juab County line
         is approximately 616,238 feet.

- -        Spread 6, Juab County line to north of Spanish Fork approximately 0.2
         miles east of 1-15 end is approximately 355,097 feet.

- -        Spanish Fork to Provo, UT approximately 7.95 miles (42,000 feet).

- -        Provo north to Salt Lake City, UT approximately 59.14 miles (312,265
         feet).

URRS Agreement                 Page 56                 Dated: September 9, 2002
Appendix E

                                   APPENDIX E

                                   SCHEDULE B
          STANDARD ENGINEERING, CONSTRUCTION AND FIBER SPECIFICATIONS

                       DIVISION 100: GENERAL REQUIREMENTS

                       SECTION 101 - DEFINITION OF TERMS

101.01.  DESCRIPTION

This section covers the definition of terms used in various portions of the
Specifications.

101.02.  DEFINITIONS

1.       Whenever the words "he" and "him", occur in these Specifications no
         particular gender is intended by use of such words.

2.       Words beginning with capital letters are generally defined in Section
         101.02

3.       Wherever the following terms are used, the intent and meaning shall be
         interpreted as follows:

4.       Abbreviations: Wherever the following abbreviations are used in these
         Specifications or on the Drawings, they shall be construed the same as
         the respective expressions represented.

         AASHTO   American Association of State Highway and Transportation
                  Officials

         ACI:     American Concrete Institute

         AGC:     Associated General Contractors

         ANSI:    American National Standards Institute, Inc.

         APWA:    American Public Works Association

         ASTM:    American Society for Testing and Measurements

         AWPA:    American Wood Preservers Association

         AWPB:    American Wood Preservers Bureau

         AWS:     American Welding Society

         ETL:     Electrical Testing Laboratories

         FM:      Factory Mutual Research Corporation

         HDPE:    High Density Polyethylene

         ICEA:    Insulated Cable Engineer's Association

         IEEE:    Institute of Electrical and Electronic Engineers

         LIU:     Lightguide Interconnect Unit

         NBFU:    National Board of Fire Underwriters

         NEC:     National Electrical Code

         NEMA:    National Electric Manufacturer's Association

         NESC:    National Electrical Safety Code

         NFPA:    National Fire Protection Association

         OSHA:    Occupational Safety and Health Act

         OSHA:    The Occupational Safety and Health Administration

         PE:      Polyethylene

URRS Agreement                 Page 57                 Dated: September 9, 2002
Appendix E

         PVC:     Polyvinyl Chloride

         UBC:     Uniform Building Code

         SDR:     Size Dimension Ratio

         UL:      Underwriter's Laboratories

5.       As-Built Records: The final updated version of Drawings reflecting
         how the plant was actually constructed.

6.       TOUCH AMERICA Furnished Materials: Materials that are furnished
         directly by TOUCH AMERICA for the project which is listed in the
         Contract.

7.       Casing Pipe: A section of continuous pipe installed under a road,
         railroad, stream, or over or under other utilities or obstruction
         through which the cable, conduit, and other system components shall be
         placed.

8.       Codes: Regulations, ordinances, or statutory requirements of, or
         meant for adoption by, governmental units relating to building
         construction and occupancy, adopted and administered for the
         protection of the public health, safety, and welfare.

9.       Competent Person: One who is capable of identifying existing and
         predictable hazards in the surroundings, or working conditions which
         are hazardous, unsanitary, or dangerous to employees, and who has
         authorization to take prompt corrective measures to eliminate them.

10.      Conduit: A tube especially constructed for the purpose of placing and
         enclosing fiber optic cable.

11.      Depth/Depth of cover: Trench depth or depth of cover is defined as the
         cover over the cable, conduit, pipe, duct or plant placed, or the
         distance from the top of the plant to finish grade.

12.      Drawings: The approved plans, profiles, working drawings, and
         supplemental drawings, or exact reproductions thereof, which show the
         location, character, dimensions, and details of work to be done,
         except for shop drawings provided by the Builder.

13.      Final Inspection: An inspection of prior to Builder Completion Date at
         which time a Punch List may developed.

14.      Innerduct: A high density polyethylene (HDPE) or polyvinyl chloride
         (PVC) tubing placed inside a pipe or conduit through which fiber
         optic cable or other system components can be pulled for installation.

15.      Lightguide Cable: Fiber Optic Cable.

16.      Limits of Construction: The physical area within which the Builder is
         to perform work according to the Documents.

17.      On-Site Work Force (OSWF): Local TOUCH AMERICA OSP personnel, or
         authorized TOUCH AMERICA representatives, responsible for the
         operation, maintenance, and protection of operating TOUCH AMERICA
         Plant.

18.      Plant Protection: A cooperative effort involving all parties to ensure
         the integrity of service for all utilities during construction
         activities near buried or aerial plant.

19.      Plant: Cables, wires, manholes, vaults, poles, markers, signs, ducts,
         pipes, and other appurtenances owned by TOUCH AMERICA or other
         utility companies.

20.      Point of Presence (POP): A physical point of access to the TOUCH
         AMERICA Network.

URRS Agreement                 Page 58                 Dated: September 9, 2002
Appendix E

21.      Punch List: A list of items or deficiencies to be corrected or
         completed as a result of the final inspection of work.

22.      Quality: Conformance to Specifications or permit requirements.

23.      Reasonable Care: A degree of care, precaution, or diligence as may
         fairly and properly be expected or required, having regard to the
         nature of the action, or of the subject matter and the surrounding
         circumstances of the action.

24.      Regenerator or Optical Amplifier Building: A building or structure
         along a fiber optic cable route housing transmission equipment.

                         SECTION 102 - PLANT PROTECTION

102.01.  DESCRIPTION

This section covers plant protection to ensure the integrity of service for
utilities during construction activities near underground, buried or aerial
facilities.

102.02.  GENERAL

1.       Plant protection is absolutely essential to ensure the integrity of
         TOUCH AMERICA's networks and networks of other utilities. Strict
         plant protection practices shall be understood and adhered to by all
         persons working near buried, or aerial utilities.

2.       The Builder shall be solely responsible for locating and identifying
         all existing utilities or structures within the construction limits
         of work and elsewhere where construction operations may subject the
         utilities or structures to damage. This shall be done prior to the
         performance of work. All information relative to the above shall be
         recorded and incorporated into the records in a manner accepted by
         the TOUCH AMERICA Representative.

3.       The Builder shall be fully responsible for locating existing utilities
         and for compliance with the requirements of statewide or local area
         "One-Call" program or agency including, but not limited to:

         A.       Notify owners of existing utilities as required by local
                  regulations or at least 48 hours in advance of excavation
                  work, whichever is most restrictive and request them to
                  locate such facilities. Documentation which includes date,
                  time, and verification number shall be submitted to the
                  TOUCH AMERICA Representative showing notification to owners
                  of buried utilities or contact with the proper "One-Call"
                  agency.

         B.       Exercising all reasonable precautions necessary to prevent
                  damage to existing utilities.

         C.       Being fully responsible for proper notifications to utility
                  owners for repair, replacement, or restoration of damage
                  caused by the Builder's construction operations.

4.       Conduit may go over, under, or around various existing facilities
         encountered underground as long as there is a minimal separation of
         twelve (12) inches and the minimum trench depth requirements are met,
         unless greater separation is required by the permitting agency. In the
         event a twelve (12) inch separation is not possible, the TOUCH AMERICA
         Representative shall be notified. If approved by the TOUCH AMERICA
         Representative, TOUCH AMERICA Plant may be protected by utilizing
         mechanical protection as detailed elsewhere

URRS Agreement                 Page 59                 Dated: September 9, 2002
Appendix E

         in this document (i.e. split pipe, concrete encasement, etc.).
         Pothole excavations required to expose existing facilities are
         considered incidental to the work.

5.       Except where the damaged party desires to conduct his own repair and
         restoration work, the Builder shall repair and fully restore facilities
         damaged during the construction period to a condition equal to that
         which existed just prior to the time of damage. All repair and
         restoration work shall be done at the Builder's expense to the
         reasonable satisfaction of the facility owner. The Builder shall
         immediately notify the TOUCH AMERICA of any facility damage.

6.       The Builder shall make his own arrangements with the jurisdictional
         authority requiring inspection of repaired or reconditioned facilities.
         All applicable inspection fees shall be paid by the Builder.

7.       Where the facility owner desires to conduct his own repair and
         restoration work, the Builder shall render all assistance to facilitate
         this corrective work. The Builder shall assume all reasonable expenses
         incurred by the facility owner. Reasonable expenses will be that
         required to repair or restore to the condition which existed before at
         a cost that the Builder could have done itself.

102.03.  GUIDELINES FOR WORKING NEAR TOUCH AMERICA OWNED AND OPERATED PLANT

1.       Excavation: Excavation within or around TOUCH AMERICA Core Network
         cable right-of-way will not be permitted unless the cables are
         located, the locate is confirmed, and the cable is protected during
         all activity. Working TOUCH AMERICA cables will be located by TOUCH
         AMERICA personnel per the guidelines in Exhibit C.

2.       Pipe Pushing/Boring: In general, for either pipe push/bore
         perpendicular or parallel to in-service cables, the cables shall be
         uncovered near where the push/bore is started and where it is
         expected to end. If necessary, split steel pipe or equivalent
         protection shall be placed around the cables to protect them at
         push/bore points of entry and exit.

URRS Agreement                 Page 60                 Dated: September 9, 2002
Appendix E

                     SECTION 103 - CONSTRUCTION CONDITIONS

103.01.  DESCRIPTION

1.       INSPECTION, REJECTION OF WORK AND MATERIALS: TOUCH AMERICA's
         Representative shall have free access to work performed and materials
         furnished by the Builder under this Contract for the purpose of
         inspection thereof. The Builder shall provide safe and proper
         facilities for such inspection.

2.       SUPERVISION: The Builder shall keep on work Site a competent
         Superintendent and if required, any necessary assistants to supervise
         engineering and construction.

3.       CONTROL OF WORK: The Builder shall have full responsibility over the
         mode and manner of doing work, of its personnel, and compliance with
         the specifications.

103.02.  SAFETY

1.       The Builder shall be responsible for initiating, maintaining and
         supervising all safety precautions and programs. The Builder shall
         take all standard precautions for the safety of, and shall provide
         reasonable protection to prevent damage, injury or loss to:

         A.       The Public

         B.       All persons on work site or who may be affected by work, and

         C.       Work and materials and equipment to be incorporated therein,
                  whether in storage on or off the site.

2.       The Builder shall comply with all applicable Laws and Regulations of
         any public body having jurisdiction for safety of persons or property
         or to protect them from damage, injury or loss; and shall erect and
         maintain all necessary safeguards for such safety and protection.

3.       OCCUPATIONAL SAFETY AND HEALTH ACT: The Builder shall be responsible
         for the safety of work it performs. In discharging that
         responsibility, it shall comply with the requirements of the
         Occupational Safety and Health Act and any other state or local act
         or other requirement of law affecting safety and health. It shall
         maintain all lights, guards, signs, temporary passages and other
         necessary protection and precautions for the safety of work. The
         Builder agrees that it and its subcontractors will give access to any
         authorized representative of Secretary of Labor or any state or local
         official for the purpose of inspecting or investigating or for the
         performance of any of the duties under the Occupational Safety and
         Health Act or under any state or local act affecting safety and
         health. The Builder shall be responsible for any Builder violation
         of any safety or health standards issued thereunder. The Builder
         also agrees to promptly remedy any condition giving rise to such
         violations, and shall defend and hold TOUCH AMERICA harmless from any
         penalty, fine or liability in connection therewith, subject to
         "Limitations of Liability" as stated in the Contract.

4.       For work or near operating tracks of any railway company, the Builder
         shall attend a railroad safety meeting for each railroad involved.
         This meeting will be coordinated with railroad

URRS Agreement                 Page 61                 Dated: September 9, 2002
Appendix E

         personnel. All personnel working within the Railroad Right-of Way
         shall attend any railroad safety training and satisfactorily complete
         any required tests. The Builder and all personnel working on railroad
         property shall adhere to all railroad rules and regulations.

103.03.  MAINTENANCE OF TRAFFIC

1.       Maintenance of traffic shall be in accordance with the permits as may
         be required by the permitting authority.

2.       The Builder shall conduct work to interfere as little as possible
         with public travel, whether vehicular or pedestrian. Whenever it is
         necessary to cross, obstruct, or close roads, driveways, or walks,
         whether public or private, the Builder shall, at his own expense,
         provide and maintain suitable and safe bridges, detours, or other
         temporary expedients for the accommodation of public and private
         travel, and shall give reasonable notice to owners of private drives
         before interfering with them. Such maintenance of traffic will not
         be required when the Builder has obtained written permission from the
         owner and tenant of private property or from the authority having
         jurisdiction over public property involved, to obstruct traffic at
         the designated point.

3.       In making open-cut street crossings, the Builder shall not block more
         than 1/2 of the street at a time. When required by the local permit
         authority, the Builder shall widen the shoulder on the opposite side
         to facilitate traffic flow. Temporary surfacing shall be provided as
         necessary on shoulders as required by the local permit authority.

4.       Materials stored upon or alongside public streets and highways shall
         be so placed, and work at all times shall be so conducted, as to
         cause the minimum obstruction and inconvenience to the traveling
         public.

5.       At times it will be necessary to divert vehicular or pedestrian
         traffic around construction areas. The Builder shall furnish and
         place all signs, barricades, cones, drums, warning lights, flag
         persons, or other devices as required in the "Manual on Uniform
         Traffic Control Devices", or as required by state and local
         governments. The Builder shall research and obtain all necessary
         approvals.

103.04.  BARRICADES AND LIGHTS

1.       Barricades and lights shall be provided in accordance with the permits.

2.       All streets, roads, highways, and other public thoroughfares which
         are closed to traffic shall be protected by effective barricades on
         which shall be placed acceptable warning signs. Barricades shall be
         located at the nearest intersecting public highway or street on each
         side of the blocked section.

3.       All open trenches and other excavations shall be provided with
         suitable barriers, signs, and lights to the extent that adequate
         protection is provided to the public. Obstructions, such as material
         piles and equipment, shall be provided with similar warning signs and
         lights.

4.       All barricades and obstructions shall be illuminated by means of
         warning lights from sunset to sunrise or in cases of low visibility.

URRS Agreement                 Page 62                 Dated: September 9, 2002
Appendix E

5.       All barricades, signs, lights, and other protective devices shall be
         installed and maintained in accordance with applicable statutory
         requirements and, where within railroad and highway rights-of-way, as
         required by the authority having jurisdiction.

103.05.  FIRE PROTECTION

1.       Only work procedures which minimize fire hazards to the extent
         practicable shall be used. Combustible debris and waste materials
         shall be collected and removed from the right-of-way or site each
         day, as specified in Article 103.11 - Cleanliness. Fuels, solvents,
         and other volatile or flammable materials shall be stored away from
         the construction and storage areas in well marked, safe containers.
         Good housekeeping is essential to fire prevention and shall be
         practiced by the Builder throughout the construction period. The
         Builder shall follow the recommendations of the AGC "Manual of
         Accident Prevention in Construction" regarding fire hazards and
         prevention, as well as the requirements of the local department of
         forestry and fire protection.

2.       The Builder's supervisory personnel and a sufficient number of
         workmen shall be instructed in proper methods for extinguishing fires
         and shall be assigned specific fire protection duties. When trained
         personnel leave the job, new personnel shall be trained in their
         duties. All workmen shall be instructed in the selection and
         operation of each type of fire extinguisher for each type of fire
         which might be encountered.

3.       The Builder shall provide adequate fire protection equipment in each
         temporary structure and in each work area he is occupying. Suitable
         fire extinguishers shall be provided in enclosed areas.

103.06.  PROTECTION OF PROPERTY AND PUBLIC LIABILITY

1.       The Builder shall be accountable for damages directly resulting from
         his negligence. The Builder shall provide standard and reasonable
         protection of all persons including members of the public, employees
         of TOUCH AMERICA, employees of other contractors or subcontractors,
         and all public and private property including structures, sewers and
         utilities, above and below ground.

2.       The Builder shall also make all reasonable efforts to protect all
         other structures, utilities and work of any kind against damage or
         interruption of service and shall preserve and protect all trees,
         shrubs, grass, or other vegetation on or adjacent to the right of way
         or work site which do not unreasonably interfere with work. Unless
         otherwise required, the Builder shall restore all property which may
         be disturbed in the execution of work to its former visible condition.

3.       The Builder shall furnish and maintain all necessary safety equipment,
         such as barriers, signs, warning lights, and guards to provide
         adequate protection of persons and property.

4.       Upon completion of work, the Builder shall be responsible for the
         complete removal from work site of all his temporary facilities, of
         whatever nature, to the satisfaction of TOUCH AMERICA's
         Representative.

5.       The Builder shall give reasonable notice to the owners of public or
         private property and utilities when such property and utilities are
         liable to injury or damage throughout the performance of work, and
         shall make all necessary arrangements with such owners relative to
         the removal and

URRS Agreement                 Page 63                 Dated: September 9, 2002
Appendix E

         replacement or protection of such property or utilities per the
         reasonable judgment of the TOUCH AMERICA Representative.

6.       During the progress of work, construction materials shall be so
         stored or stockpiled as to cause as little obstruction as possible
         and still be readily accessible for use. No material shall be stored
         within two (2) feet of trees or buildings, nor within five (5) feet
         of fire hydrants; fire hydrants shall remain ready for immediate use
         by fire departments.

7.       Claims made by property owners: The Builder agrees it will maintain
         records of communications with all interested parties relating to
         unsettled damage claims or other disputes resulting from the
         Builder's construction activities.

8.       The Builder agrees to furnish TOUCH AMERICA copies of all damage
         releases and receipts for damage payments made to property owners,
         and all records of communications as referred to above.

103.07.  PROTECTION OF PUBLIC AND PRIVATE PROPERTY

1.       The Builder shall protect, shore, brace, support, and maintain all
         underground pipes, conduits, drains, and other underground
         construction uncovered or otherwise affected by the construction
         work. All pavement, surfacing, driveways, curbs, walks, buildings,
         utility poles, guy wires, fences, and other surface structures
         affected by construction operations, together with all sod and shrubs
         in yards and parking areas, shall be restored to their original
         condition, whether within or outside the easement. All replacements
         shall be made with new materials.

2.       The Builder shall be responsible for all damage to streets, roads,
         highways, shoulders, ditches, embankments, culverts, bridges, and
         other public or private property, regardless of location or
         character, which may be negligently caused by its transporting
         equipment, materials, or men to or from work or any part or site
         thereof. The Builder shall make reasonably satisfactory and
         acceptable arrangements with the owner of, or the agency or authority
         having jurisdiction over, the damaged property concerning its repair
         or replacement, or payment of costs incurred in connection with the
         damage caused by Builder or its Subcontractors.

3.       All fire hydrants and water control valves shall be kept free from
         obstruction and available for use at all times.

4.       Street signs, mailboxes, and other items which conflict with
         construction shall be removed, stored, and reinstalled in a condition
         comparable to the condition prior to removal.

URRS Agreement                 Page 64                 Dated: September 9, 2002
Appendix E

103.08.  REPAIR OF DAMAGES

The Builder shall promptly repair damage which results from the construction or
acts of the Builder, including damage done to existing facilities. All such
repair work shall be acceptable to the TOUCH AMERICA Representative.

103.09.  FIREARM RESTRICTIONS

The Builder shall not have firearms in its possession within the limits of the
designated work areas along the route.

103.010. TEMPORARY LIGHTING

All temporary lights required by law or ordinance, or necessary for the proper
protection of the public and workmen, or for the proper execution and
inspection of the Builder's work, shall be furnished, placed, and maintained by
the Builder at its expense.

103.011. CLEANLINESS

The Builder shall give special attention to keeping the site clean and free
from trash and debris.

103.012. AS-BUILT DRAWINGS

The Builder will provide to TOUCH AMERICA engineering and as-built drawings,
per the Graphic Guidelines for TOUCH AMERICA Cable Route Engineering Drawings
Handbook within ninety (90) days after Acceptance.

103.013. CABLE DAMAGE DURING INSTALLATION

1.       If the cable becomes damaged during installation due to the Builder's
         operations, the Builder shall stop its operations and notify the
         TOUCH AMERICA Representative immediately. TOUCH AMERICA, at its sole
         discretion will within four (4) hours, decide whether to repair the
         sheath, replace the entire reel of cable, if necessary, or to install
         a splice at the damaged section. Builder shall document the event,
         the resolution and steps taken to prevent recurrence and provide to
         TOUCH AMERICA, if requested. Builder shall pay for the materials and
         labor to perform the additional splice.

2.       If TOUCH AMERICA decides to replace the entire reel of cable, the
         Builder shall begin the installation at the last designated splice
         point and replace the new cable in the same location. The damaged
         cable between these points shall be removed from the ground coiled,
         tagged, and given to TOUCH AMERICA. Builder shall pay for the
         materials and labor to replace the cable.

3.       If TOUCH AMERICA decides a splice is required at the damaged point,
         the Builder shall carefully excavate from the damaged point a
         distance along the cable as directed by TOUCH AMERICA and expose the
         cable. A splice box shall be installed at this point. A minimum of 75
         feet on both ends of the cable shall be coiled in the splice vault
         for TOUCH AMERICA's use during splicing. Builder shall pay for the
         materials and labor to perform such splices.

URRS Agreement                 Page 65                 Dated: September 9, 2002
Appendix E

4.       If damaged cable appears during installation, such as a manufacturing
         defect, the Builder shall stop the installation of the cable
         immediately and notify the TOUCH AMERICA Representative. The TOUCH
         AMERICA Representative shall facilitate the determination of the
         cause of the cable defect and the decision on replacement of the
         cable, if necessary

103.014. ENVIRONMENTAL PROTECTION

1.       All requirements of Section 114 of the Clean Air Act (42 U.S.C.
         Section 1857) and Section 308 of the Federal Water Pollution Control
         Act (33 U.S.C. Section 1251), relating to inspection, monitoring,
         entry, reports, and information as well as all other requirements
         specified in said sections, and all other regulations and guidelines
         issued thereunder, plus applicable requirements of environmental
         protection regulations and governmental agencies shall be complied
         with by the Builder.

2.       The Builder will properly dispose of all scrap, debris, etc., in
         accordance with applicable requirements of environmental protection
         regulations and governmental agencies.

103.015. ARCHAEOLOGICAL SITES

1.       Known archaeological sites along the route have been indicated on the
         TOUCH AMERICA as-built drawings on existing routes.

2.       Builder shall check the National Register of the State Historic
         Preservation Office for known archeological sites.

3.       If historical or scientific artifacts are encountered during
         construction anywhere along the route, construction at that location
         shall stop and the TOUCH AMERICA Representative shall be notified.
         The Builder shall immediately notify TOUCH AMERICA of such discovery
         and shall not harm or disturb such artifacts until evaluated by the
         appropriate controlling authority. If an extended delay is
         anticipated, the Builder may elect to move to another location.

103.016. INDEPENDENT TESTING LABORATORY

1.       Except as otherwise specified, laboratory testing required by these
         Specifications shall be done by an independent testing laboratory
         retained by the Builder and acceptable to the TOUCH AMERICA
         Representative. Laboratory services will be performed as required by
         the permitting authority. Such costs will be borne by the Builder.

2.       If tests performed by the independent laboratory indicate that Builder
         furnished workmanship or materials are not in accordance with the
         Contractor permit specifications, all re-testing required will be at
         the Builder's expense.

URRS Agreement                 Page 66                 Dated: September 9, 2002
Appendix E

                             DIVISION 200: MATERIALS

                        SECTION 201 - MATERIALS - GENERAL

201.01.  DESCRIPTION

1.       This section covers materials required for the work as specified in
         these Specifications.

2.       All materials not furnished by TOUCH AMERICA necessary to complete the
         work shall be furnished by the Builder.

3.       All materials not specifically described shall meet ASTM or other
         construction industry standards appropriate to the type of work being
         performed.

4.       All materials intended for use in the work shall be stored by the
         Builder in a manner that will prevent damage by exposure to the
         elements, or from other causes.

5.       The Builder shall move all materials furnished by either TOUCH AMERICA
         or the Builder as required in the course of construction to each site.
         All materials removed from the TOUCH AMERICA designated storage yard
         immediately become the responsibility of the Builder subject to the
         Terms and Conditions of the Contract.

6.       The Builder shall furnish and transport all the necessary tools,
         equipment and labor, unless otherwise provided, and all the materials
         necessary to perform all the work, and shall complete all work to the
         reasonable satisfaction of TOUCH AMERICA's Representative.

7.       The Builder warrants to TOUCH AMERICA that all materials furnished
         shall be new, unless otherwise approved by the TOUCH AMERICA Project
         Representative prior to use.

201.02.  CODES AND STANDARDS

Materials and devices furnished shall be in accordance with applicable
standards of ANSI, ASTM, NEMA, UL, all local codes, and requirements of the
permits. In case of conflict between the requirements of the above referenced
codes and standards and the requirements of these Specifications, the most
stringent requirements shall govern. All materials, devices, and practices
shall be in accordance with the applicable requirements of the Federal
"Occupational Safety and Health Standards."

201.03.  DOMESTIC MATERIALS

1.       The Builder shall agree that preference will be given to domestic
         construction materials in the performance of the Contract.

2.       All steel materials and products permanently incorporated in the work
         shall be manufactured in the United States. Manufactured products
         include those which are rolled, formed, shaped, drawn, extruded,
         forged, cast, or fabricated. The United States includes all
         territories subject to the

URRS Agreement                 Page 67                 Dated: September 9, 2002
Appendix E

         jurisdiction of the Untied States of America. Steel products produced
         in the United States shall not be modified in a foreign country.

201.04.  CORRECTION OF MANUFACTURING ERRORS

Except for materials provided by TOUCH AMERICA, materials shall be complete in
all respects within the limits specified herein. All manufacturing errors or
omissions required to be corrected in the field shall be performed by the
Builder at its expense, or if the errors are corrected by TOUCH AMERICA after
first having given written notice and reasonable opportunity to the Builder to
correct the defect, the cost for making the corrections will be adjusted per
the Terms and Conditions of the Contract.

201.05.  TOUCH AMERICA FURNISHED MATERIALS

1.       Unless provided otherwise herein, TOUCH AMERICA will provide The Cable
         and splice enclosures as specified in the Contract. The Builder shall
         furnish all other materials required and as specified in the Contract.

2.       The Builder will notify TOUCH AMERICA with a ship to address for The
         Cable at least ten (10) weeks prior to the desired material on site
         date or as mutually agreed upon per the Contract. The notification
         process can utilize electronic mail or other means suitable to the
         TOUCH AMERICA Representative.

3.       All material furnished by TOUCH AMERICA shall be delivered to the
         Builder at points to be mutually agreed upon by Builder and TOUCH
         AMERICA, and the Builder shall have charge of, and be responsible
         for, all the material upon and after its delivery to the Builder and
         shall return to TOUCH AMERICA all the material not required for the
         completion of the work. The Builder shall deliver Maintenance
         Restoral Reels to the designated location.

4.       TOUCH AMERICA Furnished Material will be shipped to the Builder by
         TOUCH AMERICA. Transportation costs will be as per the Contract. The
         Builder shall examine all shipments of TOUCH AMERICA Furnished
         Material for shortages, discrepancies or readily apparent damage. The
         Builder shall furnish all trucks, lifting equipment, and labor
         required to receive and inspect the TOUCH AMERICA Furnished Material.
         The risk of loss for TOUCH AMERICA Furnished Material belongs to the
         Builder from the time of receipt until Acceptance, Beneficial
         Occupancy or documented return to TOUCH AMERICA. The Builder shall
         maintain a current, accurate inventory and record of the location of
         all TOUCH AMERICA Furnished Material in its custody.

5.       The Builder shall replace all TOUCH AMERICA Furnished Materials which
         are lost or damaged while in the custody of the Builder. Replacement
         materials shall be of a type and quality equal to the original
         materials, acceptable to the TOUCH AMERICA Representative, and shall
         be obtained expeditiously to prevent delay of the work.

6.       The Builder shall re-handle and reload, if required, all TOUCH AMERICA
         furnished materials and equipment which have been rejected.

7.       Upon completion of construction, the Builder shall return all excess
         TOUCH AMERICA furnished materials to the TOUCH AMERICA storage
         facilities and unload the material as directed by

URRS Agreement                 Page 68                 Dated: September 9, 2002
Appendix E

         TOUCH AMERICA. Material shall be inventoried, boxed, crated, or
         otherwise organized as directed by TOUCH AMERICA. If there are excess
         materials which TOUCH AMERICA does not want returned, they shall be
         disposed of by the Builder.

         SECTION 202 - FIBER OPTIC CABLE, REELS AND FIBER APPARATUS

202.01.  DESCRIPTION

This section covers fiber optic cable, reels and associated fiber apparatus.
TOUCH AMERICA will provide fiber optic cable and fiber apparatus in the
quantities required per the engineered Drawings and associated Bills of
Materials.

OUTSIDE PLANT CABLES

The standard fiber optic cable sheath is a metallic armored design. The cable
will be a ribbon cable.

202.02.  REEL LENGTHS

Standard reel lengths for outside plant cable will be three (3) to eight (8)
kilometers with the majority (70%) between six (6) to eight (8) kilometers.

202.03.  DELIVERY AND HANDLING

Cable shall be handled and delivered in accordance with the requirements for
TOUCH AMERICA Furnished Material as specified in Section 201 - Materials -
General.

202.04.  EXCESS MATERIAL

1.       The Builder shall tag excess cable with a non-deteriorating tag stamped
         with the following information:



- ---------------------------------------------------------------------------------------
TAG INFORMATION             REEL NUMBER              "1A" NUMBER                LENGTH
- ---------------------------------------------------------------------------------------
                                                                      
EXAMPLE:                       272645                  1A153621                859 feet
- ---------------------------------------------------------------------------------------


2.       If the length of excess cable exceeds 3000 feet, the cable shall be
         tagged as specified above and left on the reel until further directed.

3.       If the length of the excess cable is less than or equal to 3000 feet,
         the excess cable shall be removed from the reels, and disposed of by
         the Builder.

4.       The Builder shall record the excess cable data information and supply
         it to the TOUCH AMERICA Representative or as required per the Contract.

5.       Costs associated with transporting, handling, and loading excess TOUCH
         AMERICA furnished material shall be considered incidental to other
         work performed and will not be paid as a separate item, unless
         otherwise stated in the Contract

202.05.  RETURNING REELS

URRS Agreement                 Page 69                 Dated: September 9, 2002
Appendix E

1.       Empty steel cable reels for cable provided by Lucent Technologies shall
         be transported to a designated storage yard to be returned to Lucent
         Technologies. Empty steel cable reels for cable provided by Siecor
         shall be transported to a designated storage yard to be returned to
         Siecor. Cable reels to be returned shall not contain cable, rope, or
         other material. The Builder shall be responsible for bent or damaged
         reels due to its negligence.

2.       To return empty reels to Lucent Technologies, call 1-800-232-2747,
         notify them of the following:

         -        The number of reels

         -        The size of the reels

         -        The address and phone number of the yard

3.       To return empty reels to Siecor, call 1-800-322-3116, notify them of
         the following:

         -        The number of reels

         -        The size of the reels

         -        The address and phone number of the yard

4.       The Builder shall handle and load all returnable cable reels and shall
         prepare shipping papers therefor. Costs associated with transporting,
         handling, and loading returnable cable reels shall be considered
         incidental to other work performed and will not be paid as a separate
         item.

5.       Cable reel returns shall be scheduled as soon as possible.

202.07.  RESTORATION REELS

1.       For Route Sections to be maintained by TOUCH AMERICA, restoration reels
         are to be ordered to meet the following requirements:

         A.       Restoration reels are to placed four hours apart.

         B.       Fiber count must be equal to or greater than the highest fiber
                  count in the area. Note: non-zero dispersion shifted fiber
                  can only be used to restore non-zero dispersion shifted fiber.

         C.       Restoration reels are to be a minimum length of five thousand
                  (5000) feet unless there is a physical obstruction that
                  requires a longer reel.

         D.       The cable is installed on butterfly reels so both ends are
                  accessible.

         E.       Both ends must be prepared for restoration. This includes
                  installing a UCB-1 closure and separating the ribbons so the
                  fibers can be spliced individually.

2.       For Route Sections to be maintained by Builder, restoration reels are
         to be ordered to meet Builder requirements.

         SECTION 203 - FIBER OPTIC CABLE SPLICE AND GROUNDING CLOSURES

202.08.  DESCRIPTION

URRS Agreement                 Page 70                 Dated: September 9, 2002
Appendix E

This section covers fiber apparatus required for splice enclosures.

The party performing the splicing (TOUCH AMERICA, unless otherwise agreed upon)
is responsible for providing all equipment, consumables, splice closures and
encapsulant, as required for performing the splicing.

203.02.  SPLICE CLOSURES

Unless otherwise agreed upon, splice and grounding closures will be:

1.       SIECOR:

         A.       UCA3-6-6AWG: Universal splice closure with #6 AWG ground
                  straps. This is used to ground the OSP cable where it enters
                  a building.

         B.       SCF-6C22-ORS: Advanced splice closure with open ribbon system
                  up to 288 fibers, 6" x 22" length, 6 cable entries.

         C.       SCF-6C28-ORS: Advanced splice closure with open ribbon system
                  up to 432 fibers, 6" x 28" length, 6 cable entries

         D.       SCF-8C28-ORS: Advanced splice closure with open ribbon system
                  up to 864 fibers, 8" x 28" length, 8 cable entries

2.       LUCENT:

         A.       2400-4070 Bonding and Grounding Closure: Complete grounding
                  closure assembly for use with 0.40 inch to 0.70 inch metallic
                  cables. Comcode: 107 085 987. This is used to ground the OSP
                  cable where it enters a building.

         B.       2400-7010 Bonding and Grounding Closure: Complete grounding
                  closure assembly for use with 0.70 inch to 1.0 inch metallic
                  cables. Comcode: 107 085 995. This is used to ground the OSP
                  cable where it enters a building.

         C.       2600 LG/SC6 Closure Kit (Comcode 107 706 079): Contains

                  -       one 2600LG/SC Base Closure (Comcode 107 395 493);

                  -       one 0.40 to 0.85 inch UT Grommet and Grip Kit
                          (Comcode107 111 882)

                  -       two Mass Splice Trays (107 396 095)

                  -       If the fiber count exceeds 288, additional splice
                          trays will be required. The trays hold 12 mass fusion
                          or 12 mass mechanical splices. The 2600 can hold up to
                          576 fibers. Each 2600 closure requires 1900 grams of
                          encapsulant.

         D.       UCB4 Closure Kit (Comcode 107 667 743) Contains: one UCB Base
                  Closure (includes all necessary components to splice two unit
                  tube cables from .4" to .96" (11 mm to 24.4 mm) outer
                  diameter. It contains two ribbon organizers which each
                  accommodate up to 12 mass ribbon fusion splices for a total
                  of 288 fibers and two single 24 fiber splice fusion
                  organizers for a total of 48 single fiber fusion splices.)

URRS Agreement                 Page 71                 Dated: September 9, 2002
Appendix E

         E.       51D3-LG2 Outer Closure; (Comcode 103 921 938) This closure is
                  required in all buried or underground applications with the
                  UCB Closure. Grommets and encapsulant must be ordered
                  separately.

         F.       Reentry Kit for 51D3-LG2 Closure (Comcode 104 228 424)
                  Required when accessing an encapsulated 51D3 outer closure.

203.03.  ENCAPSULANT:

         Unless agreed upon otherwise, approved encapsulants are:

         -        3M - 4442 High Gel - packaged in 750, 1500 & 3000 gram
                  kits

         -        CasChem - System 165 (low tear strength) - packaged in
                  5000 gram kits

         -        CasChem - System 126 - packaged in 5000 gram kits

                    SECTION 204 - BUILDER PROVIDED MATERIAL

204.01.  Description

1.       This section covers fiber optic cable, reels and associated fiber
         apparatus. TOUCH AMERICA will provide fiber optic cable and fiber
         apparatus in the quantities required per the engineered Drawings and
         associated Bills of Materials.

2.       All steel hardware including nails, lags, and other hardware shall be
         hot-dip galvanized in accordance with ASTM A153, unless otherwise
         specified.

204.3.   MARKER POLES

1.       PVC: PVC marker poles shall be Schedule 40, UV stabilized PVC pipe.

2.       HDPE: High density polyethylene (HDPE) marker poles shall be UV
         stabilized.

3.       Fiberglass: Fiberglass marker poles shall be 4 inches by 4 inches, with
         a weight of 1.8 pounds per foot, and a minimum tensile strength of
         65,000 psi as measured in accordance with ASTM D638.

204.4.   Cable Route Signs

1.       Marker signs are categorized by number and shall be provided as
         indicated on the Drawings. Signs shall be manufactured from aluminum
         and use a thermoset polyester powder coating applied at a thickness of
         2.0 mils. The signs shall have a smooth, hard, high gloss finish free
         from runs or sags.

2.       The aerial sign frame shall be "No. ALUM (6, 12, 18, 24) 2LMA HUMBLE"
         for 1, 2, 3, or 4 digit sign numbers respectively. Sign numbers shall
         be "No.  6F Special" 6 inch by 12 inch aluminum aerial marker plate
         with a thermoset polyester powder coating applied at a thickness of 2.0
         mils, orange background with black numbers.

3.       Specialty Markers shall be as follows:

URRS Agreement                 Page 72                 Dated: September 9, 2002
Appendix E

         A.       Flush Mounted Markers are reverse printed polycarbonate, 6
                  inches round and are driven into the soil with a 12 1/2 inch
                  flared stake.

         B.       Curb and Sidewalk Markers are cast aluminum or bronze for
                  marking cable paths on concrete sidewalks, curbs and streets.

         C.       Retrofit Curb Markers are an alternative to signs with posts
                  by adhering to the surface with an industrial adhesive.

204.5.   MARKER POLE NUMBERS

1.       PVC, Fiberglass Marker Poles: The marker pole numbers shall be 3-inch
         block style, self-adhesive black vinyl.

2.       HDPE, Concrete Marker Poles: The marker pole numbers shall be as
         indicated on the Drawings and as specified in the Supplementary
         Specifications.

204.6.   MARKER TAPE

1.       Marker tape shall be six (6) inches wide, seven (7) mils thick,
         non-detectable stretch marking ribbon, orange with bold black
         lettering, alkali resistant, non-fading in sunlight or soil. The
         following lettering shall be continuously imprinted every 30 inches:

                           CAUTION BEFORE DIGGING CALL
                 (800) XXX-XXXX MAINTAINING PARTY; BURIED BELOW

If TOUCH AMERICA maintains the cable, then imprint:
                (800) 252-1133 TOUCH AMERICA CABLE BURIED BELOW

If Builder maintains the cable, then imprint:
                   (800) XXX-XXXX BUILDER CABLE BURIED BELOW

2.       Marker tape shall conform to the following minimum physical properties.



- --------------------------------------------------------------------------------------------
             PROPERTY                  METHOD                     VALUE              UNITS
- --------------------------------------------------------------------------------------------
                                                                           
Thickness, overall                   ASTM D2103                     7.0             mils
- --------------------------------------------------------------------------------------------
3 inch Tensile, longitudinal         ASTM D882                    4,000             psi
- --------------------------------------------------------------------------------------------
3 inch Tensile, transverse           ASTM D882                    3,500             psi
- --------------------------------------------------------------------------------------------
Elongation, longitudinal             ASTM D882                      500             percent
- --------------------------------------------------------------------------------------------
Elongation, transverse               ASTM D882                      400             percent
- --------------------------------------------------------------------------------------------
PPT Tear                             ASTM D2582                      18             pounds
- --------------------------------------------------------------------------------------------
Tongue Tear                          ASTM D1938                       2             pounds
- --------------------------------------------------------------------------------------------
Sulfide Stain                        ASTM D1712                    pass             48 hours
- --------------------------------------------------------------------------------------------


URRS Agreement                 Page 73                 Dated: September 9, 2002
Appendix E

3.       Marker tape shall be "Extra Stretch" as manufactured by Reef
         Industries or "Mega Stretch" as manufactured by Thor Enterprises.

204.7.   ELECTRONIC BALL MARKERS

Electronic ball markers shall be "ScotchMark" 4-inch ball markers, EMS Model
1401, manufactured by 3M Test & Measurement Systems without exception.

204.8.   CABLE LABELS

1.       For use in manholes and buildings, the cable shall be labeled with an
         orange snap-on cable marker. The snap-on cable marker will identify
         the cable as an TOUCH AMERICA fiber optic cable, identify the cable
         route and direction (N-W-S-E), i.e. Billings to Fargo: East.

2.       Cable labels shall be manufactured of calendered vinyl in the following
         thicknesses:



- ---------------------------------------
CABLE DIAMETER             LABEL
   (INCHES)              THICKNESS
                          (MILS)
- ---------------------------------------
                      
     1/2                    10
- ---------------------------------------
      1                     20
- ---------------------------------------


3.       Cable labels shall be as manufactured by ACP International, Thor, or
         Brady USA.

204.9.   PIPE AND INNERDUCT PLUGS

1.       Pipe: Compression type duct plugs shall be used for sealing all pipes
         up to 6 inches in diameter. Vacant pipes shall be sealed with solid
         duct plugs equivalent to those manufactured by Jackmoon USA, (818)
         854-1670. Pipes with innerducts shall be sealed with duct plug or-
         ganizers equivalent to those manufactured by Jackmoon USA All duct
         plugs shall be fabricated with metal backing plates and stainless steel
          nuts, bolts, and fasteners.

2.       Multicell Duct: Plugs for multicell duct shall be provided by the duct
         manufacturer.

3.       Innerduct: Plugs for vacant innerducts shall be solid compression
         plugs. Plugs for innerducts containing cable shall be split compression
         plugs. Innerduct plugs shall be simplex duct plugs equivalent to those
         manufactured by Jackmoon USA

4.       Building Cable Vaults: Voids between the pipe and core bores in
         entrance vaults shall be sealed with "Model CSL Linx" mechanical seal
         as manufactured by Calpico. Vault seals shall use stainless steel
         bolts, nuts, washers, and pressure plates, and shall be capable of
         developing a hydrostatic seal of up to 40 feet of head.

204.10.  SEALING FOAM

Sealing foam shall be expanding, non-degradable urethane foam, with a density
of 1.75.

URRS Agreement                 Page 74                 Dated: September 9, 2002
Appendix E

204.11.  EXPANSION JOINTS

1.       Steel Pipe: Expansion joints shall be pre-manufactured, hot-dip
         galvanized, and UL listed. All expansion joints shall be provided with
         external bonding jumpers. Expansion joints shall be "Type AX" or
         "Type AX8" as manufactured by O-Z/Gedney or "Type XJ" as manufactured
         by Crouse-Hinds.

2.       Multicell Duct: Expansion joints shall be pre-manufactured units
         provided by the manufacturer of the multicell duct.

3.       Expansion joints, couplings, or devices for other types of pipe or duct
         shall be provided by the particular pipe or duct manufacturer.

204.12.  RECTANGULAR VAULTS/HANDHOLES

1.       This section covers material requirements for splice and pull vaults.
         Splice and pull vaults shall be the type and size indicated on the
         Drawings and provided in accordance with the following requirements.

2.       The vaults (handholes) to be utilized for cable splice and pull
         locations shall be a minimum of thirty (30) inches wide by forty eight
         (48) inches long by twenty four (24) inches high. Lids shall be one
         piece, nest securely and shall be bolted in place. The vault shall
         be constructed of polymer concrete material, fiber reinforced
         plastic, or a combination thereof and shall have a minimum rating of
         5,000 pounds over a 10-inch square area. Vaults/handholes placed in
         traffic areas shall have lids rated to support anticipated traffic
         loads. Material compressive strength shall be a minimum of 11,000
         psi. The lid shall have a 3M full range marker with telephone
         frequency molded into the lid with the word "LOCATOR" molded in the
         top. The other shall have "TOUCH AMERICA" molded in the top.

204.13.  PRECAST CONCRETE MANHOLES

This section covers fabrication and transportation requirements for precast
concrete manholes. The manholes shall be furnished in the shapes and sizes as
required complete with all embedments and accessories required for handling and
installation. Manholes typically shall be precast concrete 2-piece manhole, The
fabricator shall assume full structural design responsibility. Precast concrete
manholes shall be adequately reinforced to resist the stresses resulting from
the specified loading conditions. Special reinforcing shall be provided at
openings in the manhole. Precast concrete manholes and necks shall be designed
to resist all design loads. Design loads shall consist of dead loads, live
loads, and impact loads. The dead load shall consist of soil surcharge and
structure weight. Live and impact loads shall be equivalent to H-20 or HS-20
loads in accordance with the latest revision of AASHTO Standard Specifications
for Highway Bridges. The combination of loads that produces the maximum shear
and moment shall be used to design the manhole.

204.14.  CABLE INSTALLATION MATERIALS

1.       BREAK-AWAY SWIVEL CONNECTOR

URRS Agreement                 Page 75                 Dated: September 9, 2002
Appendix E

Machine roller bearing swivel shall allow cable rotation during cable pulling
operations. Swivel connector shall incorporates a fusible link or internal
shear pin to limit cable tension to a maximum of 600 pounds or to match cable
manufacturers recommendations. Swivels shall be "Part No. 15370A" as
manufactured by General Machine Products.

2.       TIE WRAPS

Tie wraps for fastening cable to racking shall be 1/4-inch by 18-inch black
nylon cable ties with 50 pounds minimum loop tensile strength.

3.       CABLE LUBRICANT

         A.       A high-efficiency cable lubricant compatible with the cable
                  and innerduct, such as "Green 80" as manufactured by Greenlee
                  Tool; "Polywater F" as manufactured by American Polywater; or
                  "Hydro-Lube F-100" as manufactured by Rancho shall be used
                  when pulling cable and innerduct through long pipe sections.
                  Lubricants used shall be compatible with the conditions at
                  the time of the pull.

         B.       Clean mineral oil or polymer shall be used as a cable
                  lubricant when the "cable-air system" installation
                  procedures are used.

204.15.  BONDING AND GROUNDING MATERIALS

1.       All connections to ground rods and other connections indicated as
         exothermic type welds shall use "Cadweld" materials as manufactured by
         Erico Products. Connections made from this process shall be in
         accordance with IEEE Standards 80 and 837. The welds shall be the
         proper size and configuration for the application.

2.       Ground rods shall be copper-clad steel rods minimum 5/8 inch diameter
         and minimum eight (8) feet long.

All grounding wire shall be insulated No. 6 solid copper wire.

3.       FILTER PROTECTOR/ARRESTOR

         A.       The party maintaining the route is responsible to purchase the
                  filter protector/arrestor compatable with their locating
                  requirements and provide the filter protector/arrestor to the
                  Builder in a timely manner to allow the connection of the
                  ground lead to the ground rod by the Builder.

         B.       The voltage suppressor/arrestor for routes maintained by TOUCH
                  AMERICA shall be without exception Norscan 2716 SGU. The
                  filter/arrestor for routes maintained by the Builder shall be
                  provided by the Builder.

204.16.  MISCELLANEOUS MATERIALS

Upon request of the Builder, for his use or reference, TOUCH AMERICA can provide
detail

URRS Agreement                 Page 76                 Dated: September 9, 2002
Appendix E

specifications for the following items, which may be required during
construction of the System.

1.       Erosion Control and Restoration Materials

         -        Seeding Mixtures, Sod and Mulch

         -        Gabions

         -        Filter Fabric

         -        Erosion Control Matting and Soil Reinforcing Grid

         -        Mulch Tackifier

         -        Posts

         -        Baffle Boards

         -        Fabric Bags and Soil-Cement Fabric Bags

         -        Packaged Materials for Concrete

2.       Rocks and Aggregates

         -        Riprap

         -        Gabions

         -        Coarse and Fine Aggregate

         -        Ballast Rock and Road Rock or Gravel

         -        Drain Rock

3.       Portand Cement Concrete

4.       Asphaltic Concrete

5.       Fencing Materials and Hardware, Including Gates

         -        Barbed Wire Fence

         -        Link Fence

                        DIVISION 300: CONDUIT PLACEMENT

                       SECTION - 301 GENERAL REQUIREMENTS

301.01.  DESCRIPTION:

         This section covers the work associated with excavation for and
         placement of conduit.

301.02.  MINIMUM DEPTH OF COVER

1.       Normal trench depth refers to the minimum nominal trench depth of cover
         indicated on the Drawings. Actual trench depth during construction can
         be expected to vary. Trench depth shall be sufficient to attain a
         minimum depth of cover of forty-two inches (42") unless otherwise
         required by the granting authority or except in the following
         instances:

         A.       The Minimum depth of cover in ditches adjacent to roads,
                  highways, railroads, and interstates is forty-eight inches
                  (48") below the clean out line or existing grade, whichever
                  is greater.

         B.       The minimum depth of cover in streams, river washes and other
                  waterways is six feet (6') below the flow line of the channel
                  bottom or existing grade, whichever is greater.

         C.       If rock is encountered, mechanical protection of the conduit
                  shall be as follows for the given minimums of cover:

                  (i.)    Eighteen inches (18") to twenty-four inches (24")
                          conduit shall be concrete encased

URRS Agreement                 Page 77                 Dated: September 9, 2002
Appendix E

                  (ii.)   Twenty-four inches (24") to thirty-six inches (36")
                          conduit shall be encased in steel pipe

         D.       The minimum allowable depth of cover beneath railroads shall
                  be four (4) feet below the toe of the slope for the tracks.
                  Minimum allowable depth of cover beneath highways and roadways
                  shall be four (4) feet beneath the crown of the pavement. In
                  all cases the most stringent between these minimum depths of
                  cover and the depths of cover specified by the railroad or
                  local permitting agency shall be adhered to.

2.       Buried Warning Tape Placement: Cable warning tape shall be placed
         twelve (12) to eighteen (18) inches directly above the conduit, but
         never at a depth of cover shallower than eighteen inches (18") below
         final grade. Care must be taken during plowing of multiple conduits
         that the warning tape does not fall in the rip line to a vertical
         separation from the conduit of less than twelve inches (12").

3.       Underground Obstructions: The Builder shall protect all existing buried
         facilities. Conduit may go over, under, or around various existing
         facilities encountered underground as long as there is a minimum
         separation of twelve (12) inches and the minimum trench depth
         requirements are met, unless greater separation is required by the
         permitting agency. If the cable running line varies, the Builder shall
         place buried cable markers at direction changes. If the minimum
         separation requirements cannot be met, mechanical protection shall be
         placed surrounding the TOUCH AMERICA plant.

4.       In the case of use or conversion of existing steel pipelines or
         existing conduit systems, the Builder shall provide a summary of the
         conduit depth to the TOUCH AMERICA Project Representative for review
         and acceptance.

301.03.  CONDUIT REQUIREMENTS - GENERAL

1.       DESCRIPTION

         A.       This section covers the installation of flexible (HDPE) and
                  rigid (PVC, and steel) conduit /duct systems for housing
                  innerduct and/or fiber optic cable.

         B.       Trench excavation and backfill shall be as specified below.

2.       MATERIAL REQUIREMENTS

         A.       Pipe shall be clearly marked with type, class, and thickness
                  as applicable. Lettering shall be legible and permanent under
                  normal conditions of handling and storage. All pipe placed
                  shall be in good condition with no splits, cracks, or other
                  physical irregularities.

         B.       PVC pipe and fittings shall be polyvinyl chloride (PVC)
                  manufactured from a PVC compound meeting the requirements of
                  Type 1, Grade 1 PVC in accordance with ASTM D1784, D1785, and
                  D2241. The PVC pipe shall be orange, gray, or white in color
                  and shall be equal to Schedule 40 in wall thickness. PVC pipe
                  exposed to sunlight shall be UV stabilized. The pipe shall
                  have a long bell on one (1) end and be plain on the other
                  end. Pipe shall be in accordance with ASTM D1785. Pipe
                  fittings shall be in accordance with ASTM D2466.

URRS Agreement                 Page 78                 Dated: September 9, 2002
Appendix E

         C.       HDPE Conduit and fittings shall be smooth wall SDR 11,
                  high-density polyethylene (HDPE), manufactured in accordance
                  with standards established by the Plastic Pipe Institute for
                  fiber optic innerducts. TOUCH AMERICA and Builder Conduit
                  shall be the color specified in Exhibit B. Fittings, such as
                  couplers and plastic caps, shall be as recommended by the
                  manufacturer of the conduit. Only external couplings shall
                  be used. All couplings shall provide an airtight seal
                  capable of withstanding 110 psi, two (2) to five (5)
                  minutes, as measured by static pressure test.

         D.       Black iron steel pipe to be trenched or bored shall be
                  resistance welded or seamless, structural grade, with an
                  average minimum wall thickness of Schedule 40 pipe, and
                  threaded and coupled or plain end. The inside walls shall
                  be free of burrs or splits. Threaded pipe shall have ends
                  prepared with NPT threads in accordance with ANSI B2.1 and
                  shall be in accordance with ASTM A252, Grade 1, Schedule 40.

         E.       Rigid galvanized steel conduit shall be in accordance with
                  Federal Specification WW-C-581d. Minimum wall thickness
                  shall conform to Schedule 40. Pipe shall be threaded and
                  coupled with NPT threads in accordance with ANSI B2.1 Pipe
                  shall be thoroughly hot-dip galvanized both inside and
                  outside including threads.

         F.       Conduits and casings shall be sized as follows:

                  (i.)     The preferred TOUCH AMERICA Conduit and First
                           Conduit is two (2) inch inner diameter (ID) HDPE
                           (SDR-11) conduit.

                  (ii.)    Casing pipes shall be sized appropriate to the
                           number of conduits placed.

3.       CONDUIT HANDLING

         A.       Reels shall be placed on a level area and securely blocked to
                  prevent accidental movement. Reels left overnight shall be
                  protected with safety flashers on all sides as required or
                  other suitable means as approved by the local authorities
                  having jurisdiction.

         B.       Empty reels shall be returned to the Builder's yard or
                  disposed of at the end of each day after Conduit placement.

         C.       Protective coating on steel pipe that has been scratched,
                  scraped, gouged, or damaged in any manner shall be repaired
                  in accordance with the pipe coating manufacturer's
                  specifications prior to placement of the pipe.

         D.       Defective conduit, pipe or duct shall not be installed and
                  shall be tagged as defective and removed from the site in a
                  timely manner.

4.       CONDUIT JOINING/SPLICING

         A.       Conduit jointing shall be completed before or as the pipe is
                  installed. All joints shall be made secure. Splices shall
                  be capable of withstanding 110 psi air pressure, two (2) to
                  two (5) minutes as measured by static pressure test.

URRS Agreement                 Page 79                 Dated: September 9, 2002
Appendix E

                  Pipe joints shall be as specified below.

         B.       Rigid Galvanized Steel Pipe: The pipe ends shall be threaded
                  with fittings that are hot-dip galvanized both inside and
                  outside including threads.

         C.       Black Steel Pipe: The pipe ends shall be threaded or plain
                  end. Plain end pipe shall have ends prepared for welding.
                  Welding shall be performed full-circle and in accordance
                  with ANSI/AWS D1.1-92.

         D.       PVC Pipe: PVC joints shall be joined with PVC solvent cement
                  as recommended by the pipe manufacturer. The joint shall be
                  allowed to cure before handling. Care shall be taken to
                  prevent twisting or pulling the joint. Joints to be bent,
                  pushed, or pulled shall be allowed to set up for a minimum
                  of 24 hours after joining.

         E.       HDPE Splicing: HDPE conduit shall be spliced together with
                  manufactured mechanical external couplings compatible with
                  the type of innerduct being placed and with the method of
                  cable placement to be used. HDPE duct ends shall be cut
                  square to provide flush butting surfaces when spliced. The
                  inside edge shall be free of burrs that could impede the
                  cable pulling operations.

5.       CONDUIT BENDS

         Where directional changes are required, the conduit shall be bent in
smooth, uniform bends. Bends shall be made to the minimum radius as required to
place the cable and to meet the cable manufacturer's recommendation and shall
not result in a reduced cross-sectional area.

         A.       The Builder shall provide equipment to bend pipe when the
                  radius of bends is less than the radius of allowable
                  material design stress. Bends shall be made with approved
                  pipe bending tools and pipe manufacturer's approved methods
                  of procedure. Bends shall be made to the minimum radius as
                  required to place the cable and to meet the cable
                  manufacturer's recommendation and shall not result in a
                  reduced cross-sectional area.

         B.       PVC Conduit: Cold bending of PVC pipe will not be allowed.
                  Heat bending of PVC Conduit is allowed when the minimum
                  radius is less than the radius of allowable material design
                  stress. Heat bending shall be accomplished with a heating
                  box or blanket recommended by the manufacturer. When heat
                  bending of PVC conduit is not recommended by the
                  manufacturer, prefabricated conduit/pipe bends shall be used.

         C.       HDPE Conduit: HDPE conduit bends shall be gradual and not
                  cause any kinks in the conduit.

         D.       Field pipe bends shall have a minimum 10-foot radius for steel
                  and PVC pipe unless otherwise accepted by the TOUCH AMERICA
                  Representative. Where a radius less than the allowable
                  field bend is required, factory sweeps and bends with a
                  minimum radius of three (3) feet shall be used.

         E.       For Steel Pipe: Applying heat to steel pipe to facilitate
                  making pipe bends will not be allowed. Bending pipe around
                  portions of construction equipment and vehicles will not be
                  allowed.

URRS Agreement                 Page 80                 Dated: September 9, 2002
Appendix E

                  Only approved mechanical pipe benders with properly sized
                  bending shoes will be allowed. Pipe bending will not be
                  allowed after jointing.

         F.       For PVC Pipe: Cold bending of PVC pipe will not be allowed.
                  Heat bending of PVC pipe is allowed when the minimum radius
                  is less than the radius of allowable material design stress.
                  Heat bending shall be accomplished with a heating box or
                  blanket recommended by the manufacturer. When heat bending
                  of PVC pipe is not recommended by the manufacturer,
                  prefabricated pipe bends shall be used.

6.       CONDUIT SEALING

         A.       When connections are not being made to additional pipe or
                  innerducts, the Builder shall seal ends of conduits to keep
                  dirt and debris from entering conduits, casing pipes or
                  innerducts. Manufactured compression plugs or other approved
                  duct seals shall be used in sealing conduit and casing pipe
                  ends. Plugs shall accommodate innerducts or cable if they
                  are placed concurrently. Innerducts and/or voids between
                  cable and surrounding ducts shall also be sealed if placed
                  concurrently.

         B.       Casing pipe ends larger than six (6) inches shall be sealed.

         All conduits or pipes terminating in buildings, vaults, or manholes
shall be sealed around the outside of the pipe .

301.04.  DRAIN TILE RESTORATION

The Builder shall use best efforts to avoid damage to known drain tile by not
ripping or plowing in the immediate area of drain tiles. The Builder shall
restore all drain tile damaged during construction, to a condition as good or
better than prior to damage.

301.05.  CONCRETE ENCASEMENT

1.       DESCRIPTION: This section covers the preparation, forming, placing,
         curing, and all other work incidental to the placement of concrete
         encasement of conduit.

2.       MATERIAL REQUIREMENTS: The concrete shall be a Portland Cement
         Concrete, minimum of five (5) sacks of cement per cubic yard, minimum
         28 day compressive strength of 3000 psi.

3.       FORMING: The Builder shall form the side walls of all concrete
         encasement sections with removable wood or steel forming for sections
         to be placed in noncohesive material. The forming may be omitted in
         sections where stiff clay, rock, or firm silty clays permit the shaping
         of vertical sides for the excavation to the top surface of the concrete
         encasement.

4.       Placing: CONCRETE ENCASEMENT SHALL BE PLACED AS FOLLOWS:

         A.       THE SIDES OF TRENCHES ABOVE THE TOP OF THE CONCRETE SHALL BE
                  SLOPED, SHEETED, OR OTHERWISE STABILIZED TO PREVENT DIRT,
                  BALLAST, OR OTHER FOREIGN MATERIAL FROM FALLING INTO AND
                  CONTAMINATING THE CONCRETE DURING PLACEMENT.

URRS Agreement                   Page 81                Dated: September 9, 2002
Appendix E

         B.       The concrete shall be placed as near the final placement
                  point as practicable. The concrete shall be placed after the
                  pipe or individual ducts are rigidly supported within the
                  trench to avoid flotation or sag. Care shall be taken in
                  placing the concrete to prevent the pipe or ducts from being
                  damaged or displaced, either in grade or alignment.

         C.       Concrete shall not be deposited in water or exposed to the
                  action of water before setting.

         D.       The fresh concrete shall be leveled and consolidated by
                  rodding or spading only. Mechanical vibrators shall not be
                  used unless accepted by the TOUCH AMERICA Representative.
                  The top surface of the concrete shall be screeded only; no
                  floating or troweling of the surface is required unless the
                  concrete encasement will have exposed surfaces. Particular
                  care shall be taken to keep concrete or other substances
                  from the inside of the pipe or ducts during construction.

5.       After the initial set of the concrete, backfill material shall be
         placed and compacted in a manner that will not crack or damage the
         concrete. Forming, when required, shall be removed as soon as the
         concrete can support itself for backfilling the trench to grade.

6.       In locations where railroad ballast rock is the only permitted
         backfill, concrete encasement shall be covered with a plastic
         sheathing.

7.       In cases where the pipe or ducts pass above or below an underground
         obstruction such as a utility line, a minimum clearance of six (6)
         inches shall be maintained between the concrete and the utility. A
         minimum of 12 inches of clearance shall be maintained between the
         concrete encasement and a paralleling utility. No utility shall be
         contained within the concrete encasement.

301.06.  RIGHT-OF-WAY RESTORATION

1.       Areas disturbed by construction activity will be repaired to a
         condition equal to or better than prior to construction activities per
         Section XXX.

2.       Damage to banks, ditches, driveways and roads caused by the equipment
         shall be immediately repaired to the satisfaction of the Builder and
         public authorities having jurisdiction over highway and road ROW.

301.07.  DEPTH VERIFICATION

1.       TOUCH AMERICA and the Builder are constructing the System which will
         benefit both parties. The Builder is responsible to ensure his
         contractors and their subcontractors adhere to the specifications.
         TOUCH AMERICA has the right, but not the responsibility, verify
         placement.

2.       At any time requested by the TOUCH AMERICA Representative, the Builder
         shall demonstrate that the warning tape and conduit, pipe, duct or
         handholes, etc. is being placed to the specified depth by excavating
         and observing. Shoring and dewatering shall be included in the work of
         excavating observation pits if required to accurately verify the
         conduit, pipe or duct and marker tape depths. If the excavation reveals
         the construction to have met the specifications, then TOUCH AMERICA
         shall pay the actual costs of the excavation. If the excavation reveals
         the

URRS Agreement                   Page 82                Dated: September 9, 2002
Appendix E

         construction does not meet the specifications, the Builder shall
         excavate in each direction until the facility is found in compliance at
         Builder's cost.

3.       If the marker tape, conduit, pipe or duct measures less than the
         specified minimum depth, sufficient additional excavations shall be
         made in each direction away from the original excavation to determine
         the length of conduit, pipe, duct and/or marker tape that requires
         lowering.

                    SECTION 302 - CONDUIT PLACEMENT - TRENCH

302.01.  DESCRIPTION

1.       This section covers the work associated with trench excavation. Work
         consists of the trench excavation necessary to install underground
         pipe, duct, or cable. Trenching shall also include those excavations
         necessary to set manholes, splice and pull vaults, bore pits, and other
         miscellaneous excavations required throughout the performance of the
         work.

2.       Trench depth is defined as the cover over the cable, conduit, pipe,
         duct or plant placed, or the distance from the top of the plant to
         finish grade.

302.02.  EXCAVATION FOR CONDUIT PLACEMENT

1.       Trench width and depth of cover shall be as specified herein. Trench
         excavation shall be accomplished by hand digging, mechanical trencher,
         or backhoe at the discretion of the Builder depending on locations of
         nearby existing utilities or obstructions.

2.       Any grade transition shall be gradual.

3.       During trench excavations, materials suitable for backfilling shall be
         stockpiled in an orderly manner a sufficient distance from the banks of
         the trench to avoid overloading and to prevent slides or cave-ins. All
         material not suitable for backfill shall be removed and disposed of.

4.       Wherever possible, the trench shall be excavated to permit the pipe,
         duct, or cable to rest on undisturbed earth or rock. Where it is
         necessary to trench through fill areas, the earth shall be well
         compacted before the pipe, duct, or cable is installed. Care shall be
         taken not to excavate below the depths indicated. Unauthorized over-
         excavation shall be backfilled with suitable bedding material and
         thoroughly compacted. Care shall be taken not to exceed the limits
         imposed by permits, right-of-way limits, or easement descriptions.

5.       No trench or excavation shall be allowed to remain unattended at any
         time or left open overnight in public or private right-of-way unless
         said excavation is fenced or barricaded A trench shall not remain open
         overnight on railroad right-of-way unless approved in writing by the
         railroad representative. The written approval shall be site and date
         specific.

302.03.  SHEETING AND SHORING

         The Builder shall comply with all current and applicable Occupational
Safety and Health

URRS Agreement                   Page 83                Dated: September 9, 2002
Appendix E

Administration (OSHA), federal, state, and local rules and regulations
governing the safety of men and material during excavation, installation, and
backfilling operations.

302.04.  TRENCH WIDTH

         All trenches shall be wide enough to provide ample room for proper
installation of the plant. Where it is necessary to reduce the earth load on
trench banks to prevent sliding or caving, trench banks may be back back cut
back on slopes which shall not extend lower than twelve (12) inches above the
top of the pipe, duct, or cable.

302.05.  SUBGRADE PREPARATION AND STABILIZATION

1.       Subgrade soil shall be firm and compact. Should the subgrade or the
         bottom of trench in any area become mucky or should it work into mud
         under feet of the workers, the Builder shall remove the soft soil to
         firm ground and replace it with compacted layers of dry soil, crushed
         rock or gravel. The subgrade shall be brought to the proper level by
         means of a thin layer of sand tamped or rolled into the reinforced
         subsoil. Pipe, duct, or cable shall not be laid under unsuitable
         weather or trench conditions.

2.       The finished elevation of stabilized subgrades for manholes shall not
         be above the subgrade elevations indicated on the Drawings. Subgrades
         for manholes and vaults shall be firm and free from all loose
         materials, shall be free from mud and muck, and shall be sufficiently
         stable to remain firm and intact under the feet of the workers. In
         addition, the subgrade shall be compacted to a minimum of ninety (90)
         percent of maximum dry density in accordance with ASTM D698 at plus or
         minus five (5) percent of optimum moisture content as determined by
         ASTM D698. Subgrades which are otherwise solid which become mucky on
         top due to construction operations shall be reinforced with one (1) or
         more layers of crushed rock or gravel.

302.06.  GROUNDWATER, DEWATERING

1.       When groundwater is encountered in the trench excavation, the Builder
         shall dewater as required to provide for stability and firmness of the
         cable trench or foundation.

2.       Dewatering of trenches shall be performed as needed for placement
         inspections, measurement, and backfilling operations before and during
         installation of the work. The lowered water level shall be maintained
         until such time as backfill has been properly placed and compacted to
         an elevation equal to the surrounding groundwater level.

3.       Dewatering methods shall adequately prevent trench and foundation
         instability.

302.07.  DRAINAGE

1.       The Builder shall control the grading in the vicinity of trenches so
         that the ground surface is properly sloped to prevent water from
         running into the excavated areas.

URRS Agreement                   Page 84                Dated: September 9, 2002
Appendix E

2.       Water which has accumulated in the excavation from rainfall, surface
         runoff, or from other causes, shall be removed by the Builder and the
         subsurface shall be restored to suitable condition for conduit or cable
         installation.

3.       Damage to adjacent works or property caused by surface runoff or
         dewatering, and as a result of construction operations, shall be the
         Builder's responsibility and shall be corrected and restored as soon as
         conditions permit by the Builder.

4.       The Builder shall prevent silt discharge from the site and shall
         maintain compliance with construction stormwater discharge
         requirements.

302.08.  CONDUIT PLACEMENT (TRENCH)

1.       Conduit shall be placed in the center of the bottom of the trench with
         the entire length of conduit, pipe or duct bearing on the trench
         bottom. The trench bottom shall be re-graded if the conduit does not
         have full bearing.

2.       After final placement, non-rigid conduit shall rest on the bottom of
         the trench in a straight line under slight tension and rigid conduit
         shall rest on the bottom of the trench in a straight line. A check
         shall be made that proper depth is obtained and the conduit is in a
         straight line and under tension during backfilling.

3.       Warning marker tape shall be installed per Paragraph 301.02.2.

                  Electronic ball markers shall be placed above each end of the
         pipe casing pipe at major river and road crossings four (4) lanes or
         wider at a minimum depth of eighteen (18) inches to a maximum forty-two
         (42) inch depth below finish ground level.

302.09.  BACKFILL AND COMPACTION

1.       Backfilling and compaction shall begin as soon as the corresponding
         trenching work is complete. All excavations shall be backfilled at
         the end of each working day. Backfill shall be compacted and shaped to
         the original contour and drainage.

2.       On finished areas including road surfaces, road shoulders, parking
         areas, lawns, and public right-of-way, backfill and compaction shall be
         in accordance with the authority having jurisdiction thereover.

3.       Material for backfill shall be composed of earth only and shall not
         contain logs, stumps, frozen debris, wood, grass, roots, broken
         concrete, stones, trash, organic material, or other debris.

4.       All backfill material shall consist of loose earth having a moisture
         content such that the required density of the compacted soil will be
         obtained with the compaction method used. Moisture content shall be
         distributed uniformly and water for correction of moisture content
         shall be be added sufficiently in advance so that proper moisture
         distribution and compaction will be obtained. Granular material shall
         be wet, not just damp, when compacted.

URRS Agreement                   Page 85                Dated: September 9, 2002
Appendix E

5.       Backfill material shall be similar to the material upon and adjacent to
         those which it is placed. The placement of alternate layers of cohesive
         and noncohesive backfill material shall be thoroughly mixed prior to
         compaction, except as required for surfacing material.

6.       No backfill material shall be deposited in standing water.

7.       Backfill material shall be placed and compacted in uniform layers not
         exceeding 8 inches in uncompacted thickness. Moisture content shall be
         adjusted as required to obtain the specified density with the
         compaction equipment used. Compaction equipment shall be appropriate to
         the material being compacted. (i.e. Vibratory equipment for granular
         materials)

8.       All trenches that have not been acceptably filled and compacted, or
         which settle after backfilling, shall be reopened to the depth of
         satisfactory compaction and refilled and recompacted as specified in
         these Specifications.

9.       Warning marker tape shall be installed per Paragraph 301.02.2.

10.      Extreme caution shall be used while compacting over installed Plant,
         drain tile and other utilities to avoid damage or collapse.

11.      When a trench is located under asphalt surfaces, cold-mix patch shall
         be placed as a temporary surface restoration as soon as possible after
         the completion of compaction. Permanent hot mix repairs shall be made
         as soon as possible per Section 803.03.

                    SECTION 303 - CONDUIT PLACEMENT - PLOW

303.01.  DESCRIPTION

1.       This section covers the installation of HDPE, and PVC duct systems for
         housing innerduct and cable by the use of a utility plow or railroad
         plow.

2.       The simultaneous placement of split HDPE duct and cable will be
         prohibited.

303.02.  RIPPING

The Builder may make pre-rip passes prior to plow operations by making ripping
passes be made to condition the route to a depth which exceeds the pipe or duct
burial depth. The final ripping pass shall be in the same direction as pipe or
duct plowing.

303.03.  CONDUIT PLACEMENT

1.       Before a plowing operation is started, the route surface shall be
         prepared to eliminate abrupt changes such that the pipe or duct
         alignment and grade shall be smooth and uniform. However, every effort
         shall be made to minimize the damage to the environment by grading only
         where abrupt changes in grade would adversely affect the placement.

URRS Agreement                   Page 86                Dated: September 9, 2002
Appendix E

2.       Where large rocks, large amounts of fill, and other debris have been
         placed over the cable route, the Builder shall blade the areas to
         natural grade before plowing. After the pipe or duct has been
         installed, the material shall be placed back to its original position.

3.       Pipe or duct shall be placed directly in the ground with plowing
         equipment and delivery chutes designed to accommodate the pipe or duct
         material being installed without damaging or overstressing the conduit.
         Conduit shall be installed at the minimum depth of cover per 301.02.
         Warning marker tape shall be installed per paragraph 3.01.02.2.

4.       The plow shank shall not be raised, lowered, or have its attitude
         changed unless the prime mover is moving forward and any changes in
         attitude shall be gradual. The plow shall not be set at extreme forward
         rake angles. All changes in depth shall be gradual with the vertical
         curve having a minimum 4-foot radius. The prime mover shall never be
         backed up with the plow in the ground.

5.       Pipe or duct jointing shall be completed as the pipe or duct is
         installed per Paragraph 301.03.4

6.       Connections shall be made to pushed or bored pipes and bridge
         attachment pipes.

7.       Pipe or duct placement in a free-water environment shall be
         accomplished to prevent the pipe or duct from floating. Dewatering,
         anchoring, or weighing of the pipe or duct shall be accomplished
         without causing damage to the pipe or duct. If requested by the TOUCH
         AMERICA Representative, the Builder shall submit and demonstrate his
         plan for placing pipe or duct in a free-water environment prior to
         construction.

                              SECTION 304 - BORE

304.01.  This section covers the pushing, boring, or simultaneously boring and
pushing of casing pipes under roads, railroads, drives, sidewalks, trees, and
other items.

304.02.  This section refers to conventional horizontal boring and does not
pertain to directional guided bores.

304.03.  CONDUIT PLACEMENT

1.       Minimum depth of cover shall be per paragraph 301.02 or as required by
         the permitting agency.

2.       Multiple pipes or conduits placed in a single bore hole shall be cased
         or the voids around the pipes pressure grouted.

3.       Conduit shall be placed through an augured hole or shall be advanced by
         jacking as the soil is removed by the auger or by jacking directly
         through soil. Boring without the concurrent installation of the casing
         pipe will not be permitted. The installation shall be performed in a
         manner that will not unreasonably disrupt traffic nor damage the
         subgrade, and will provide accurate alignment and grade of the pipe.
         Removal of material from an augured hole by washing will not be
         permitted. Small amounts of water may be used as a lubricant in the
         boring or jacking operation.

URRS Agreement                   Page 87                Dated: September 9, 2002
Appendix E

4.       Prior to boring, all existing underground facilities shall be located
         and marked or exposed as necessary for safety and for protection of the
         existing facility.

5.       Voids outside casings which exceed 1-1/2 inches shall be pressure
         grouted. If a pipe casing cannot be completed but has to be abandoned,
         the pipe shall be either removed and the void filled or the pipe
         completely filled as indicated by the Engineer unless required
         otherwise by the permit.

6.       Electronic ball markers shall be placed above each end of the casing
         pipe at pipe at major river and road crossings four (4) lanes or wider
         at a minimum depth of 18 inches to a maximum 42-inch depth below
         ground.

304.04.  RIVER AND STREAM CROSSINGS

1.       This section covers the installation of casing pipe across water
         courses.

2.       Stream bank protection, shall be as specified Right-of-Way Restoration.

3.       Horizontally directional bored pipe placement required for some river
         and stream crossings shall be as specified in Conduit Placement -
         Directional Bore.

4.       Pipe Placement

         A.       The casing pipe shall be installed at a minimum of six (6)
                  feet of depth across the flow line of the channel bottom or
                  to the minimum depths indicated on the Drawings.

         B.       The method of placement shall be by open trench, boring,
                  plowing, or pushing, or a combination of these methods at
                  the Builder's option, provided the methods do not conflict
                  with permit requirements.

         C.       The Builder shall be responsible for dewatering, diverting
                  water, and controlling downstream water turbidity as
                  required for the site conditions and per permit requirements.

         D.       The installation of the casing pipe shall include shaping of
                  the banks and stream bed back to original contours and
                  compacting as necessary to accomplish the crossing and
                  restoration of the areas. Placement of erosion control
                  devices is also included.

         E.       Pipe jointing shall be completed before or as the pipe is
                  installed, per Paragraph 301.03.4.

         F.       Pipe placement in trenched sections shall be as specified
                  above..

         G.       Pipe placed in a trench across a flowing stream or below
                  normal water level shall be secured and stabilized to ensure
                  required depth as indicated on the Drawings.

         H.       During bore pit backfill operations, warning marker tape
                  shall be installed per 302.02.2..

         I.       Electronic ball markers shall be placed above each end of the
                  casing pipe at major river and road crossings four (4) lanes
                  or wider at a minimum depth of 18 inches to a maximum 42-inch
                  depth below ground.

URRS Agreement                   Page 88                Dated: September 9, 2002
Appendix E

         J.       Casing pipe across some shallow flowing streams and most dry
                  watercourses may be installed by plowing. Such stream or
                  watercourse shall require sloped banks that tracked
                  construction equipment may readily negotiate either
                  unassisted or with a powered winch. Plowed casing pipe shall
                  be accomplished by pulling pre-assembled pipe lengths
                  attached to the plow shank at full placing depth by using
                  either a sled or a tracked tractor mounted plow shank. Such
                  crossing shall be made without exceeding the minimum
                  allowable bending radius that will exceed the maximum
                  allowable material design stress.

         K.       Smaller streams may be pushed or bored with guided boring
                  equipment as an option to open-cut trenching of the stream
                  or portions of the stream. Guided boring systems using fluid
                  other than water shall be as specified in the Section 305 -
                  Pipe Placement - Directional Bore. The location including
                  depth of the pipe placed by using this equipment shall be
                  verifiable using sensors, locating equipment, and test pits
                  at stream banks and points along the pipe. All requirements
                  of a minimum radius, stress limitations, and detrimental
                  effects shall be observed.

                        SECTION 305 - DIRECTIONAL BORE

305.01.  DESCRIPTION

         This section covers the installation of a river or other crossing
utilizing casing pipe placed by horizontal directional boring methods, as
required. The crossing to be cased shall be installed by horizontal directional
boring which requires a directionally drilled hole going from one side of the
crossing to an exit on the other side, without disturbing the stream banks or
flowline. The directional boring shall be guided by guidance equipment that
gives continuous, accurate monitoring of the drill bit position.

305.02.  CONDUIT PLACEMENT

1.       The casing pipe shall be installed to the line and minimum depths
         indicated. The method of placement shall be by horizontal directional
         boring.

2.       Minimum depth of cover shall be per Paragraph 3.02.2

3.       The Builder shall determine the types of subsurface materials which
         will be found and shall determine their effect on the bore
         installation. If available, soil boring logs and geophysical
         investigations obtained by TOUCH AMERICA are indicated on the Drawings.
         Interpretation of this information and the subsurface conditions
         between the locations of the soil borings shall be the responsibility
         of the Builder. Additional subsurface investigations required at bore
         locations shall be the responsibility of the Builder.

4.       The Builder shall be responsible for dewatering, diverting water, and
         controlling downstream water turbidity as required for the site
         conditions. The construction work shall be in accordance with all
         applicable safety and environmental regulations.

URRS Agreement                   Page 89                Dated: September 9, 2002
Appendix E

5.       At request of a permitting agency, the Builder shall include a plan for
         containing and handling drilling fluid which may upwell to the surface.
         An emergency procedure shall be included for containing fluids which
         may be discharged into a body of water, and shall include a complete
         list of the appropriate governmental agencies which shall be
         immediately notified of the discharge. Alternatives shall be proposed
         which could be implemented to maintain or reestablish return of fluid
         to the entry pit. Builder is responsible for all clean-ups required by
         environmental or regulatory agencies.

6.       All water use permits shall be obtained by the Builder prior to
         beginning work. Water sources shall be in accordance with the governing
         water control agency.

7.       An emergency contact list to be used in the event of a drilling fluid
         spill spill will be included with the list of permits. The Builder
         shall notify the TOUCH AMERICA Representative immediately of drilling
         fluid spills.

8.       Casing pipe entry and exit points shall be allowed no more than five
         (5) feet of deviation from the staked cable centerline. Entry and exit
         points normally will not be allowed closer to the banks of a waterway
         being crossed.

9.       The exit hole for any bore exit to the surface other than for the final
         casing location shall be plugged and stabilized before proceeding with
         the bore.

10.      Bentonite or other drilling fluids discharged at an exit location shall
         be contained and removed, and the exit site shall be restored to its
         original condition.

11.      Protective coating on steel pipe that has been scratched, scraped,
         gouged, or damaged in any manner shall be repaired in accordance with
         the pipe coating manufacturer's specifications prior to placement of
         the pipe in the bored hole.

12.      When boring requires the use of drilling mud, such as bentonite, no
         discharge of excess material or site runoff will be allowed into
         waterways. Mud tank capacities shall be sized to hold excess material
         completely by containing mud quantities without spillage. If required
         by the permitting agency, the casing pipe entry point shall be
         appropriately enclosed and equipped with a sump pump to reclaim or
         discharge excess mud to a reuse or disposal tank. Earth spoiled by
         drilling mud shall be removed and disposed of by the Builder and the
         site refilled with clean material. The site shall be restored to a
         condition equal to or better than its original condition.

13.      All personnel, equipment, and materials required to contain drilling
         fluid which upwells to the surface or is discharged into a body of
         water shall be onsite during all drilling operations.

14.      Drilling fluids shall be disposed of in an acceptable manner.

15.      After testing and cleaning have been completed, both ends of the steel
         pipe shall be terminated and sealed. Innerduct, as indicated on the
         Drawings, shall be installed and extend a minimum of fifteen (15) feet
         past the ends of the bore pipe. Both ends of the bore pipe shall then
         be sealed with manufactured duct plug organizers. Bore pipes larger
         than six (6) inches shall be sealed as indicated on the Drawings. Pipe
         ends shall be clearly marked with a surface marker or the pipe ends
         shall be fenced.

URRS Agreement                   Page 90                Dated: September 9, 2002
Appendix E

16.      Electronic ball markers shall be placed above each end of the casing
         pipe at pipe at major river and road crossings four (4) lanes or wider
         at a minimum depth of 18 inches to a maximum 42-inch depth below
         ground.

                        SECTION 306 - BRIDGE ATTACHMENT

306.01.  DESCRIPTION

This section covers the attachment of pipe to concrete box culverts, and to
road, railroad, and other types of bridges which may be constructed of steel,
concrete, or arch stone. Work includes coring of abutments, diaphragms, or
retaining walls as required.

306.02.  CONDUIT PLACEMENT: BRIDGE ATTACHMENT

1.       Pipe shall be attached to bridge. Work on any bridge shall not disrupt
         road or railroad traffic on or below the bridge unless approved in the
         permit obtained for the particular bridge. The bridge owner will be
         allowed to inspect the work at any time during construction. The
         Builder shall supply all equipment and materials to drill, punch,
         drive, weld, or otherwise fix the attachments and hangers.

2.       If required, bridge abutments shall be cored to allow passage of the
         conduit onto the bridge. After placement of the conduit, the remaining
         space between the outside of the pipe and the cored hole shall be
         filled with non-shrink grout or other approved material.

3.       The nuts on bolts or hanger rods shall be secured prevent the nuts
         from vibrating loose.

4.       Pipe shall extend outside the bridge abutments into the ground with
         bends.

5.       All conduits placed on bridges shall have expansion joints placed at
         each structural (bridge) expansion joint or at least every 300 feet,
         whichever is the shorter distance. For bridges under 100 feet, at least
         one conduit expansion joint will be placed, even if there is no bridge
         expansion joint.

6.       If required, electronic ball markers shall be placed above each end of
         the pipe at pipe at major river and road crossings four (4) lanes or
         wider at a minimum depth of 18 inches to a maximum 42-inch depth below
         ground.

                        SECTION 307 - INNERDUCT PLACEMENT

307.01.  Description: This section covers the installation of one (1) or more
new innerducts or conduits in an existing or newly placed conduit or casing.

307.02.  If the Conduit does not have a pull line already installed, it shall be
installed by the Builder .

307.03.  All of the innerducts being placed in a conduit or casing shall be
pulled in simultaneously. Innerducts shall be of one (1) continuous length
between pull points. Before placement, the leading end

URRS Agreement                   Page 91                Dated: September 9, 2002
Appendix E

of each innerduct shall be sealed. In the event splicing of innerduct is
allowed, and multiple innerducts are spliced, the splices shall be staggered.
Innerducts may be lubricated in quantities as recommended by the lubricant
manufacturer.

307.04.  The pulling force on the innerduct shall not exceed the tensile yield
strength of the innerduct or the rated pull strength established by the
manufacturer.

307.05.  On completion of the innerduct placing, the innerduct shall rest freely
in the conduit and splice vaults or manholes without tension. Racking of the
innerduct in manholes shall be completed after the cable is placed and as a part
of cable placing.

307.06.  The ends of innerducts shall be sealed to keep dirt and debris from
entering the innerduct. Manufactured compression plugs or other approved duct
seals shall be used in sealing innerduct ends. Plugs shall accommodate the cable
if cable is placed concurrently.

                         DIVISION 400: CABLE PLACEMENT

401.01.  DESCRIPTION

This section covers the installation of cable in pipe or duct through manholes
or pull vaults.

401.02.  GENERAL

1.       The Builder shall not damage equipment items including cables,
         apparatus cases, and load coil cases when working in manholes. Per
         joint use agreement(s), a representative of an other utility (or other
         utilities) may need to be present before entering their manholes.

2.       When working in manholes, the Builder shall follow all applicable OSHA
         confined space requirements as well as any environmental agency
         requirements for water removal.

3.       Smoking and open flames are not allowed in manholes. There will be no
         fusion splicing done in manholes.

401.03.  MATERIAL REQUIREMENTS

1.       Cable and fiber apparatus (splice closures) shall be furnished by TOUCH
         AMERICA. The Builder shall provide TOUCH AMERICA, a minimum of 12
         weeks, or as otherwise agreed upon prior to the date that the cable is
         required on the job, the cable required for the project.

2.       Break-away swivel connectors, pull line for fiber optic cable pulling,
         cable labels, tie wraps, lubricant, all other materials and equipment
         required to place the fiber optic cable shall be furnished by the
         Builder.

3.       All other equipment items and tools such as manhole bridging, pulling
         grips, and bending shoes shall be provided by the Builder.

401.04.  CABLE PLACING PLAN

URRS Agreement                   Page 92                Dated: September 9, 2002
Appendix E

At least two (2) weeks prior to beginning cable placing operations, the Builder
shall schedule a meeting with the TOUCH AMERICA Project Representative to
discuss the cable placing plan. This proposed plan shall outline plan of action
for each reel to be placed, and the sequence of cable placement. Cable shall be
placed continuously in Route Sections between A&T Sites. This meeting will
allow TOUCH AMERICA to schedule splicing crews.

The Builder shall follow the approved cable placing plan. Deviations from the
cable placing plan will not be allowed without the acceptance of the TOUCH
AMERICA. Deviations from the scheduled placing plan, may extend the completion
date, by delaying the splice activity.

Cable shall be installed in the lowest available duct.

Placing cable will only be allowed during daylight hours which will be 1/2 hour
before sunrise to 1/2 hour after sunset unless otherwise required by the
permitting agency

401.05.  CABLE HANDLING

1.       Cable reels shall be delivered to the designated address supplied by
         the Builder.

2.       Cable reels shall be placed upright on a level area and securely
         blocked to prevent accidental movement. Partially placed cable reels to
         be left on the right-of-way overnight or for an extended period of time
         shall be covered with a heavy steel box accepted by the TOUCH AMERICA
         Project Representative. Full unused reels shall not be left overnight
         on the right-of-way.

3.       TOUCH AMERICA assumes that cable provided by the fiber optic cable
         manufacturer to be as specified and as per the test results supplied by
         the Cable Manufacturer. The Builder shall visually inspect each reel
         for damage upon receipt of the cable. Damages are to be recorded on
         the transportation company's bill of lading and reported to TOUCH
         AMERICA in writing as soon as received. The Builder, may at his own
         expense test fiber on a end-to-end basis while such fiber cable is
         still on the reel. Any defective fibers discovered in the on-reel test
         will be brought to the attention of the Engineer in writing for further
         action. The Builder will not be responsible for fiber cable found to be
         defective due to manufacturing or transportation, provided such defects
         are discovered prior to cable placement and TOUCH AMERICA is notified.
         Failure to make the on-reel test and to notify TOUCH AMERICA of such
         defects prior to placing the cable will be at the Builder's own risk.
         TOUCH AMERICA will deem such cable to have been free of defects prior
         to placement, and the Builder will be required to replace or repair
         such defective cable at TOUCH AMERICA's option and at the Builder's
         expense. Such replacement will include the cost of materials, labor and
         incidentals.

4.       If damage is observed to the interior of the cable reel during
         placement of the cable, placement should stop and TOUCH AMERICA shall
         be immediately notified.

5.       The Builder shall visually inspect the cable prior to and during
         placement and immediately notify the TOUCH AMERICA Representative of
         any damage. Reels with damage observed after the Transportation company
         has left the site which were not noted and recorded at the time of
         unloading, will be placed at the Builder's own risk. Builder will be
         required to replace or repair

URRS Agreement                   Page 93                Dated: September 9, 2002
Appendix E

         such defective cable at TOUCH AMERICA's option and at the Builder's
         expense. Such replacement will include the cost of materials, labor and
         incidentals.

6.       The cable shall not be subjected to rough treatment or sharp bending
         that could cause crushing or kinking.

7.       The minimum fiber cable bend radius for mechanical equipment and manual
         handling in duct and in underground installations under load shall be
         20 times the fiber cable diameter or 12 inches, whichever is the
         greater or as specified by the manufacturer. The minimum fiber cable
         bend radius for mechanical equipment and manual handling in duct and
         in underground installations under no load shall be 10 times the fiber
         cable diameter or as specified by the manufacturer.

8.       The maximum pulling force on the cable shall be 600 pounds or as
         specified by the manufacturer of the cable.

401.06.  PLACEMENT LENGTH OF FIBER OPTIC CABLE

Prior to beginning operations, the Builder shall examine each manhole in each
underground section or each buried pipe or duct section. The Builder shall
decide, if cable will be placed from splice location to splice location or if
assists such as an mid-span winch will be required at intermediate locations.

401.07.  MANHOLE, SPLICE AND PULL VAULT/HAND HOLE PREPARATION

1.       Splice and pull vaults or hand holes utilized for cable placement shall
         be prepared and rigged for cable placement using pulling methods as
         follows:

2.       All rigging in the manholes shall ensure that the cable will never be
         bent to less than a 12-inch bend radius or 20 times the fiber cable
         diameter or whichever is the greater.

3.       Manholes With Innerduct: In intermediate manholes without continuous
         innerduct, previously placed innerduct installed with pull line shall
         be overlapped at the midpoint of the manhole with the ends of the
         innerduct securely joined together to provide a continuous duct
         arrangement. If the opposing ducts do not line up, approved bending
         shoes or pulley wheels and bracing shall be used maintaining the
         minimum allowable bending radius. Lubrication points shall be
         provided as required. When cable placement is to be performed via
         pneumatic/tracktive force methods, intermediate manholes shall be
         bridged and sealed to equipment manufacturers recommendations. using
         airtight couplers.

4.       Manholes Without Innerduct: All intermediate manholes shall be bridged
         to provide a smooth cable path and transfer of lubricant. For manholes
         with a large offset or a change in direction, sheaves or quadrant
         blocks shall be used as required and shall be securely tied in position
         to guide the cable into the duct to prevent cable sheath abrasion at
         the duct entrance.

5.       Feed Manholes: The feed manhole shall have a smooth cable feeder
         extended out of the manhole. The cable feed apparatus shall be securely
         fastened to ensure that specified minimum bends are not exceeded. The
         feed manhole shall be rigged to ensure that the cable passes directly
         and freely into

URRS Agreement                   Page 94                Dated: September 9, 2002
Appendix E

         the manhole, over a sheave or quadrant block, and directly into the
         duct or innerduct entrance without rubbing against parts of the manhole
         rigging.

6.       Pull Manhole: The pull manhole for both the placement of the pull line
         and cable shall be rigged to ensure that the pull line passes directly
         and freely from the duct or innerduct entrance into the manhole, around
         a snatch block, up the manhole chimney, over a manhole sheave or
         quadrant block, and directly to the capstan winch without rubbing
         against parts of the manhole rigging.

7.       Cable Air System Placement: Cable entry, intermediate and exit manholes
         shall be prepared per the equipment manufacturers recommendations. All
         rigging in the manholes shall ensure that the cable will never be bent
         to less than a twelve (12) inch bend radius or twenty (20) times the
         fiber cable diameter or whichever is the greater.

401.08.  CABLE PLACEMENT

1.       When possible, the entire length of cable shall be placed in one
         uninterrupted operation without intermediate assistance.

2.       Radios and cellular telephones shall not be used in telecommunications
         rooms or central offices.

3.       In the event cable is placed utilizing air methods, the Builder shall
         provide personnel at all manholes where conduit/duct is not sealed
         through.

4.       The Builder shall calibrate all cable placing equipment before cable
         placement begins, as required during placement operations.

5.       Lubrication shall be provided as recommended by the equipment
         manufacturer to minimize tension on the cable.

6.       For cable placed utilizing pulling methods, the cable shall be
         installed using a winch equipped with a running line dynamometer to
         measure the pulling tension. If tensions at the running line
         dynamometer approach or exceed the allowable tensile limit, the pull
         shall be stopped and the winch moved closer to the pulling end of the
         cable. When a mid-point assist cable winch is used in a pull length,
         the cable winch shall also have a running line dynamometer. Cable
         pulling winches shall meet the following requirements:

         A.       Pulling force is maximum of 1,000 pounds

         B.       Minimum capstan radius of 12 inches or to meet cable
                  manufacturer's specifications.

7.       The maximum pulling force on the cable shall be 600 pounds or per cable
         manufacturer's recommendations. An approved cable grip with pulling eye
         shall be attached to the cable end. The pulling eye on the cable grip
         shall be connected to the pulling line using a break-away swivel
         connector. The break-away swivel connector shall be calibrated to 600
         pounds tension or as per the cable manufacturer's recommendations. The
         cable shall be pulled off the top of the cable reel by hand during
         cable placement to maintain cable slack and to prevent reverse bends.
         The cable reel shall be tended for the entire pull. The running line
         dynamometer shall monitor the pull line tension just ahead of the
         capstan.

URRS Agreement                   Page 95                Dated: September 9, 2002
Appendix E

8.       Cable can be placed using pneumatic methods provided the equipment is
         appropriate to the allowable tensile forces, the diameter of the cable
         and the conduit utilized. Care is to be exercised during the blowing
         operation, to feed the cable in the equipment loosely and with no
         tensile force.

9.       The cable shall be placed with sufficient control of speed to prevent
         cable damage.

10.      In the event that that a cable pull becomes too difficult in a buried
         sections, excavation of the conduit may be required. The pipe or duct
         shall be exposed, cut and the cable pulled through. After the cable is
         placed, the pipe or duct shall be repaired and the backfill replaced.

11.      In the event that that cable placement utilizing air driven placement
         stops, buried sections may require excavation of the conduit. The
         pipe or duct shall be exposed, cut and repaired or the site used as
         an intermediate assist point. After the cable is placed, the pipe or
         duct shall be repaired and the backfill replaced.

12.      When cable placement is completed, unless agreed to otherwise, there
         shall be cable coiled in manholes, handholes or vaults as follows:

         (i.)     A minimum of fifty (50) feet of cable shall be coiled at all
                  intermediate handholes.

         (ii.)    A minimum of seventy-five (75) feet of cable shall be coiled
                  at each end of the cable for splicing purposes.

                  These measurements are minimums referenced to the point at
                  which the cable would exit the manhole lid for the purpose of
                  splicing. These measurements may be modified during
                  engineering to reflect the actual distance from the splice
                  handhole or manhole to an adjacent splicing van.

13.      Empty cable reels shall be removed from the work site promptly.
         Returnable reels are to be handled per 202.06 - Returning Reels.

14.      Excess fiber optic cable shall be handled per 202.05 - Excess
         Material.

401.09.  CABLE CUTTING

         The Builder shall not cut the cable unless approved by the TOUCH
AMERICA Representative.

401.10.  CABLE RACKING - MANHOLES

1.       After cable placement, all pulling hardware and lubricant shall be
         removed

2.       Cable racking in manholes shall proceed as follows:

         A.       Racking shall be started at the center manhole and proceed in
                  each direction simultaneously towards the cable ends.

URRS Agreement                   Page 96                Dated: September 9, 2002
Appendix E

         B.       The necessary cable slack shall be pulled by hand. Use
                  caution when pulling cable to prevent damage.

         C.       The cable shall be covered with split innerduct, if bare, and
                  laid on the racking shelves along the side walls at the same
                  height as it enters and exits the manhole or as indicated by
                  the Engineer. All bends shall be gently formed to the
                  greater of a minimum 24-inch diameter or 20 times the cable
                  diameter.

         D.       Innerduct with cable shall be secured to the manhole hardware
                  using lightweight plastic tie wraps.

         E.       Intermediate manholes with cable in coils shall be gently
                  formed to a minimum 24-inch diameter and secured to the
                  manhole hardware in a safe location using plastic tie wraps.
                  Cable coils shall not be covered with split innerduct.

401.11.  CABLE STORAGE - HANDHOLES

1.       Excess cable in the splice handholes shall be coiled by hand while
         maintaining a minimum 24-inch diameter coil. The cable shall be
         coiled from the cable end toward the conduit face of the handhole.
         Bundle the turns of the coil together with loosely applied plastic
         tie wraps or electrical tape at several locations on the
         circumference of the coil.

2.       The ends of the innerduct occupied by the cable shall be sealed at
         building entrances with split rubber plugs and compression bands.
         The ends of the innerduct occupied by the cable shall be sealed with
         an industry standard duct seal at handholes, manholes or vaults to
         prevent animal intrusion (for example, gophers).. Spare innerducts
         shall be sealed with standard fitting plugs.

3.       Cable labels shall be placed on the cable.

4.       Construction debris shall be removed from manholes upon completion of
         cable installation. All manhole hardware shall be installed and
         secured. The manhole lid shall be replaced and bolted in place, if
         applicable.

                      DIVISION 500: BONDING AND GROUNDING

1.       This section covers bonding and grounding work to be performed to
         increase the electrical protection against stray voltages (lightning
         and induced 60 hertz voltage) to minimize personal injury, equipment
         damage, and service interruptions.

2.       Periodic paths to ground for the currents producing these voltages in
         the cable sheaths metallic members shall be provided in such a manner
         that do not jeopardize the effectiveness of the cable locating
         equipment which uses the sheath's metallic members as the "tone"
         conductor.

3.       Filter-protectors are to be placed at each and every splice for Routes
         maintained by TOUCH AMERICA, at every other splice for Routes
         maintained by Builder. Additional units may be required at the
         following locations:

         A.    Metallic pipe or lead cable sheath road bores

         B.    Bridge Crossings

         C.    Proximity to other well-grounded structures

         D.    Plant transitions (i.e. underground to buried)

URRS Agreement                   Page 97                Dated: September 9, 2002
Appendix E

4.       All sheath metallic members will be bonded together at all splices and
         facility entrances. Sheath metallic members include the crossply, LXE
         and B-oversheath, but not wire armor. Wire armor is not to be bonded
         to metallic sheath members, but must be independently grounded.

5.       All connections wire to ground rods are to be exothermic (CAD Welds or
         equivalent). Area to be exothermic welded shall be cleaned with steel
         wool or sandpaper prior to setting and igniting charge.

6.       During handhole placement at splice locations, a ground rod shall be
         installed. The ground rod may be installed adjacent to and outside of
         the handhole or inside the handhole, adjacent to a corner of the
         handhole. The top of the ground rod shall no extend above the conduct
         Insulated number six (6) AWG solid copper ground wire shall be placed
         through the side of the handhole and exothermic welded to the ground
         rod. A hand coil of ten (10) feet of wire shall be coiled inside the
         handhole for use by the splicers.

7.       If required the additional general bonding and grounding may be
         required:

         -        Racking hardware in precast concrete manholes shall be bonded
                  to the manhole reinforcing steel.

         -        Steel pipe conduit entering a manhole shall be bonded to the
                  racking hardware.by attaching a No. 6 AWG insulated solid
                  copper conductor to the steel pipe with a grounding pipe
                  clamp. The other end of the conductor shall be bolted to the
                  hardware with a 2-hole connector attached to the other end
                  of the conductor by an exothermic type weld. The connector
                  shall be bolted to the hardware using a stainless steel bolt.

         -        Steel pipe casing locations, the Supplier shall furnish and
                  install a ground rod and a No. 6 AWG insulated solid copper
                  conductor.

                         DIVISION 600 - MARKER PLACEMENT

601.01.  DESCRIPTION

This section covers the installation of cable route markers with warning and
information signs identifying the cable route.

601.02.  INSTALLATION

1.       Cable markers shall be installed along the route as follows:

         -        All sign posts shall include the phone number of the local
                  One-Call Agency and if required, the maintaining company's
                  "800-" phone number.

         -        Markers should be placed at line-of-sight intervals so the
                  direction of the route is clearly indicated by placing at
                  points where the route changes direction, at each splice, at
                  handholes and manholes , at both sides of street, highway or
                  railroad crossings, and at other points where they will be
                  helpful in identifying the plant.

         -        An adjacent marker should be visible each way from an
                  adjoining marker but at no time shall any markers be spaced
                  more than five hundred feet (500) apart in metro areas or
                  one thousand feet (1000) in non-metro areas, land use
                  permitting. Placing of markers in cultivated areas or at
                  locations likely to be objectionable to property owners
                  should be avoided.

URRS Agreement                   Page 98                Dated: September 9, 2002
Appendix E

         -        Markers shall be positioned so that they can be seen from the
                  location of the cable and generally set facing perpendicular
                  to the cable running line.

         -        Splices and pull boxes shall be marked on the cable marker
                  post.

2.       Marker posts shall be plumb, with signs level and correctly positioned.
         Markers shall be set concurrently with other work such as trenching,
         plowing, boring or attaching to bridges

3.       Markers will be set prior to installation of the cable.

4.       Holes for posts shall not be excavated with a backhoe. Power augers or
         manual post hole diggers shall be used. Posts set directly in the
         ground shall be backfilled in maximum lifts of six (6) inches loose
         measurement with suitable material. Each lift shall be thoroughly
         compacted by the use of mechanical tampers to the density of the
         surrounding soil so that posts are firmly set.

5.       Driven posts shall be held in alignment while being driven. The post
         top shall be protected during driving by means of a cap or other
         approved device to prevent damage. All damaged posts shall be removed
         and replaced.

6.       Warning signs not requiring stamping shall be installed at the time the
         post is set.

       DIVISION 700 - PULL/SPLICE VAULT AND PULL/SPLICE MANHOLE PLACEMENT

701.01.  DESCRIPTION

This section covers the installation of vaults and manholes for housing conduit,
innerduct, or cable.

701.02.  PULL AND SPLICE VAULT PLACEMENT

1.       Pull and splice vaults shall be set per the attached detail. The
         maximum spacing between handholes shall be 4,000 plus or minus 200
         feet.

2.       The excavation shall be a minimum of two (2) feet larger than the
         vault in circumference. A layer of coarse, free draining aggregate a
         minimum of 12 inches thick shall be used to obtain a level subgrade
         and to provide full base support prior to vault placement. Each vault
         shall be installed during cable placement operation. Pull/splice
         vaults shall be buried and placed with the minimum cover of 18 inches.

3.       Splice vaults for a basic straight through cable placement shall have
         the conduit openings made in diagonally opposite corners to
         facilitate cable coiling and splice case housing placement. Pull or
         splice vault openings shall be enlarged, if necessary, by drilling to
         accept the diameter of conduit being installed. A core type bit
         shall be used to make the opening. The finished diameter of the
         enlarged opening shall not exceed the outside diameter of the conduit
         by more than 1/2 inch. The conduit shall terminate three (3) to six
         (6) inches inside of the vault. The space between the conduit and
         the opening shall be filled with nonshrink epoxy grout or silicone
         sealant. Do not damage conduit to splice vault connection during the
         placement of backfill material.

URRS Agreement                   Page 99                Dated: September 9, 2002
Appendix E

4.       The spare TOUCH AMERICA Conduits are to express through the handhole.
         The Builder Conduits are to route outside of the TOUCH AMERICA
         handhole. In the event the Builder is to access The Cable, a Builder
         handhole is to be set adjacent to the TOUCH AMERICA handhole, and a
         conduit placed between the handholes.

5.       In the event the vault is to be buried, after the vault has been set,
         the Builder shall install two (2) or more extension units, if
         required, which will bring the top of the extension units to a point
         near the surrounding ground surface. After the cable has been coiled
         and placed inside the vault, the cover shall be securely bolted in
         place on the upper extension unit and the excavation backfilled. A
         stake shall be placed at the surface to mark the vault location. Upon
         completion of cable placing, splicing and testing, and with the
         approval of the TOUCH AMERICA Splicing Representative, the extension
         units will be removed, the cover securely bolted in place and the
         excavation backfilled.

6.       The Builder shall furnish and install conduit duct seals, innerduct
         cable seals, and spare innerduct plugs.

URRS Agreement                   Page 100               Dated: September 9, 2002
Appendix E

                          TYPICAL HANDHOLE PLACEMENT:
                              PLAIN VIEW (N.T.S.)

                                   [GRAPHIC]

URRS Agreement                   Page 101               Dated: September 9, 2002
Appendix E

                          TYPICAL HANDHOLE PLACEMENT:
                            ELEVATION VIEW (N.T.S.)

                                   [GRAPHIC]

URRS Agreement                   Page 102               Dated: September 9, 2002
Appendix E

7.       The Builder shall furnish and install the cable labels. Cable labels
         shall be attached to each cable in the vault.

701.03.  PULL AND SPLICE MANHOLE PLACEMENT

1.       Manhole excavation and placement shall be at the designated locations.
         Manhole excavation shall be large enough to accommodate compaction
         equipment for backfill operations. Manholes shall be installed to
         provide the proper manhole lid elevation and shall be set level and
         plumb. A 12-inch pad of coarse aggregate shall be placed to obtain a
         level subgrade prior to manhole placement.

2.       The precast base section shall be carefully placed on the prepared
         bedding so as to be fully and uniformly supported in true alignment.
         All joints between precast elements shall be sealed with sealant
         material. The sealant material shall be placed in accordance with the
         manufacturer's specifications.

3.       Castings placed on concrete or masonry surface shall be set in full
         bituminous mastic beds.

4.       Grade adjustment of the manhole frame and lid of three (3) inches and
         over shall be accomplished with precast concrete grade rings.
         Adjustments less than three (3) inches shall be made with concrete
         dresser blocks, sealed with nonshrink grout.

5.       Manholes with frame, TOUCH AMERICA locking lid, riser casting, and
         grade rings shall be placed to provide a final finish grade elevation
         as follows:

         A.       Street Concrete or Asphalt Pavement: The frame and lid shall
                  be placed flush with the existing or proposed finish
                  pavement grade to prevent a rough or uneven driving surface.
                  Unless specified differently by local authorities, final
                  pavement placement shall be flush with the top of the
                  manhole frame.

         B.       Off-Street Concrete or Asphalt Pavement: The frame and lid
                  shall be placed two (2) inches higher than the existing or
                  proposed finish grade to prevent surface run-off water from
                  entering the manhole. Final pavement placement shall be
                  flush with the top of the manhole frame by tapering the
                  pavement to the finish grade for ten (10) feet in all
                  directions from the manhole frame. Manhole frame shall be
                  set level.

         C.       Residential Lawns: The frame and lid shall be placed two (2)
                  inches higher than the existing finish grade to prevent
                  surface run-off water from entering the manhole. Final
                  sodding or topsoil for seeding shall be placed to the top of
                  the manhole frame and graded to taper the lawn areas to the
                  existing contour and provide drainage for ten (10) feet in
                  all directions from the manhole frame. Manhole frames shall
                  normally be set level, but may be set out of level to match
                  the existing grade only with the acceptance of the TOUCH
                  AMERICA Representative.

         D.       Undeveloped or Rural Areas: The frame and lid shall be placed
                  two (2) inches higher than the existing finish grade to
                  prevent surface run-off water from entering the manhole,
                  upon approval of landowners. Final soil grading shall be to
                  the top of the manhole frame and tapered to existing contour
                  and provide drainage for five (5) feet in all directions
                  from the manhole frame. Manhole frames shall be set level.

URRS Agreement                   Page 103               Dated: September 9, 2002
Appendix E

6.       Extra care shall be taken to avoid plugging the unused duct terminators
         when placing encasement concrete for protecting the conduit.

7.       Manhole hardware shall be installed by the Builder in accordance with
         the manhole fabricator's drawings. All hardware shall be installed
         prior to cable pulling.

8.       The Builder shall install bonding ribbon and connectors in the manhole
         to bond the racking hardware to the manhole reinforcing steel in each
         manhole section as indicated on the Drawings. All bonding shall be in
         place prior to cable placement.

9.       Backfilling shall start immediately after placing the manhole and
         conduits entering the structure. In paved areas, the backfill shall
         consist of the material and compaction specified for use in street
         excavation up to the base required for pavement, per the permitting
         agencies requirements. In unpaved areas, select backfill material
         shall be placed up to the roof of the structure followed by the
         material removed during the pit excavation. The graded surface shall
         be prepared for seeding or sodding.

10.      The Builder shall furnish and install conduit/pipe, duct seals,
         innerduct cable seals, and spare innerduct plugs.

11.      The Builder shall furnish and install the cable labels. Cable labels
         shall be attached to each cable in the manhole.

                  DIVISION 800 - RESTORATION & EROSION CONTROL

                         SECTION 801 - EROSION CONTROL

         Description

         This section covers the furnishing and placing of materials for erosion
protection along trench lines, streams, steep ground areas, and road ditches, as
well as measures for water course channel grade stabilization.

801.01.  GENERAL

1.       Trench plugs shall be constructed with fabric bags, filled 2/3 full
         with clean soil.

2.       Terraces shall be constructed with native soil. If available, terrace
         material shall be cohesive soil.

3.       Baffles shall be constructed with new boards and posts.

4.       Soil-cement bags shall consist of fabric bags filled 2/3 full with
         soil-cement.

5.       Gabions shall be as specified by the permitting authority.

URRS Agreement                   Page 104               Dated: September 9, 2002
Appendix E

6.       Hay bale checks shall consist of straw or hay bales, filter fabric, and
         anchoring stakes.

801.02.  CONSTRUCTION METHODS

1.       Trench plugs shall be installed at locations as required. The
         soil-filled bags shall be placed in the trench in a manner which will
         produce a compact mass with a minimum percentage of voids. A minimum
         of two (2) rows of bags shall be arranged so that the long dimension
         of bags is parallel to the cable in one (1) layer and perpendicular
         to it in the next layer.

2.       Terraces shall be constructed at locations as required. Terraces shall
         be placed so that the terrace flow line is unobstructed and has a
         grade of between two (2) and five (5) percent. Terraces shall extend
         the full width of the area disturbed by construction and shall
         discharge to the down slope side of the right-of-way into an
         undisturbed area. Terraces shall be compacted. Terrace construction
         shall begin immediately following backfill operations.

3.       Baffles shall be installed at locations as required. Baffles shall be
         placed so that the flow line is unobstructed and has a grade of
         between 2 and 5 percent. Baffles shall extend the full width of the
         area disturbed by construction and shall discharge to the down slope
         side of the right-of-way into an undisturbed area. The posts shall
         be set or driven into the soil to the depth indicated on the
         Drawings. Care shall be taken not to damage the posts or boards
         during installation. All damaged posts and boards shall be replaced
         by the Builder. The boards shall be securely attached to the posts
         with galvanized nails or bolts. A trench plug shall be constructed
         directly beneath each baffle. Backfill around the baffle and trench
         plug shall be compacted to a minimum of 85 percent of maximum dry
         density as determined by ASTM D698 or local right-of-way or permit
         requirements, whichever is more stringent.

4.       Soil-cement filled fabric bags shall be installed as required. The
         bags shall be placed in a manner which will produce a compact mass
         with a minimum percentage of voids.

5.       The soil-cement shall be made by mixing ten (10) percent by weight of
         cement with soil. Water shall be added to create a moist mixture. All
         mixing shall be done in a concrete mixer acceptable to the TOUCH
         AMERICA Representative. The mixing time shall be that which is
         required to produce a uniform mixture of the soil, cement, and water.
         Mixing will not be permitted when the soil is frozen, or when the air
         temperature is below 40 degrees F, unless the temperature is at least
         35 degrees F and rising.

6.       The soil-cement mixture shall be transported from the mixer to the
         placement location in clean equipment. The total elapsed time between
         the addition of water to the mixture and placement of the soil-cement
         filled bags shall not exceed two (2) hours. The mixture shall not be
         left undisturbed for longer than 30 minutes during this period. Water
         shall be sprayed on the soil-cement as required after mixing to keep
         it moist.

7.       The fabric bags shall be filled 2/3 full of soil-cement, loosely packed
         to leave room for folding or tying at the top. Immediately after
         filling, the bags shall be placed as required and compacted to
         conform with the earth subgrade and with adjacent bags in place. All
         dirt and debris shall be removed from the top of the bags before the
         next course is laid thereon. The subgrade and each course of bags
         shall be pre-moistened by spraying with water prior to placement of
         later courses.

URRS Agreement                   Page 105               Dated: September 9, 2002
Appendix E

         To ensure a proper bond between successive courses, the bags shall be
         placed as specified in a continuous manner. Voluntary delays will not
         be permitted during placement operations.

8.       Riprap shall be placed as required.

9.       Gabions shall be placed as required . Stone shall be placed in close
         contact in the unit so that maximum fill is obtained. The units may
         be filled by machine with sufficient hand work to accomplish the
         requirements of these Specifications. The exposed face or faces shall
         be hand-placed using selected stones to prevent bulging of the gabion
         cell and to improve appearance. Each cell shall be filled in three
         (3) lifts. Connecting tie wires shall be placed in accordance with
         the manufacturer's recommendations between each lift in each cell.
         Care shall be taken to protect the vertical panels and diaphragms
         from being bent during filling operations.

10.      The last lift of stone in each cell shall be level with the top of the
         gabion to properly close the lid and provide an even surface for the
         next course.

11.      All gabion units shall be tied together along all contacting edges in
         order to form a continuous connecting structure. Empty gabions
         stacked on filled gabions shall be laced to the filled gabion at the
         front, side, and back.

12.      Hay bale checks shall be as required. The installation shall be
         perpendicular to the flow of the water. The filter fabric shall be
         placed on the bottom and along the downstream vertical side of the
         excavation made for placing the bales and extend downstream a minimum
         of 2 feet as indicated on the Drawings. The fabric shall be pinned to
         the bottom of the trench and at the downstream edge of the fabric.
         Bales shall be placed with the tied surfaces parallel to the sides of
         the trench. The top surface of the bale shall project above the
         adjacent ground not less than two (2) inches nor more than four (4)
         inches. The backfill around the bale shall be firmly compacted and
         the bale staked in position with two each 2-inch by 2-inch by 36-inch
         wood stakes driven vertically through the bale. as required, Builder
         shall reshape the surrounding disturbed areas and reseed by hand
         methods.

                   SECTION 802 - RESTORATION AND REVEGETATION

802.01.  DESCRIPTION

This section covers the clean-up, repair, protection, and revegetation of the
right-of-way after installation of pipe, duct, or cable.

802.02.  RESTORATION

1.       Areas disturbed by construction shall be restored within two (2) weeks
         of construction completion. This includes, but is not limited to:

         A.       Removal of excess excavation spoils from the construction
                  area.

         B.       Removal of trash and construction debris.

         C.       Filling, repairing, and stabilizing ground surfaces disturbed
                  by construction.

         D.       Regrading, hand raking, or manipulating the finished ground
                  surface to the level of smoothness necessary for seeding or
                  sodding.

URRS Agreement                   Page 106               Dated: September 9, 2002
Appendix E

         E.       Treating, repairing, or replacing, trees and shrubs specified
                  for preservation but damaged by construction activity.

2.       Natural grades shall be reestablished to the extent practical. Care
         shall be taken so as not to disturb natural surface drainage patterns.

802.03.  PREPARATION OF SOIL

1.       The area to be planted shall be thoroughly tilled to a depth of at
         least three (3) inches by discing, harrowing, or other acceptable
         methods until the soil is well pulverized. After completion of the
         tilling operation, the surface shall be cleared of all stones,
         stumps, or other objects larger than 1-1/2 inches in thickness or
         diameter, and of roots, wire, grade stakes, and other objects that
         might be a hindrance to maintenance operations. Undisturbed areas
         with a satisfactory cover of native grasses shall be left untilled
         and unplanted.

2.       The spreading of topsoil, when required, shall be completed over the
         entire area before the beginning of soil preparation.

3.       Soil preparation shall be performed only during periods when
         satisfactory results are likely to be obtained. When results are not
         satisfactory because of drought, excessive moisture, or other causes,
         the work shall be stopped until such conditions have been corrected.

802.04.  FERTILIZING

1.       Fertilizer shall be applied at rates specified by the local permit
         authority. The fertilizer shall be applied uniformly with a
         fertilizer spreader before the beginning of the seeding operation.
         The first application of fertilizer shall become a part of the bed
         preparation.

2.       If seed is to be applied by hydraulic application, the fertilizer may
         be mixed with the seed and mulch and applied as a slurry as specified.

802.05.  SEEDING AND SODDING

1.       The Builder shall seed all disturbed areas, if required, except
         croplands and areas to receive sod.

2.       Seed shall be applied uniformly over the disturbed area with the seed
         mix and application rates as specified by the local permit authority.

3.       In general, turfed areas within commercial and residential areas shall
         be sodded. Areas where sodding is required will determined by the
         granting authority.

4.       The soil to be sodded shall be loosened to a depth of not less than two
         (2) inches by discing, harrowing, raking, or other approved means.
         The resulting sodbed shall be free of debris, waste materials, and
         vegetation. The sodbed shall be graded to allow for the thickness of
         sod and to match abutting vegetation. Sod shall be placed only during
         seasons when satisfactory results can be expected. All soil surfaces
         shall be moist when the sod is placed. Sod shall be placed when the
         ground is in a workable condition and temperatures are less than 90
         degrees F. Sod shall not be placed when the sod or ground surface is
         frozen.

URRS Agreement                   Page 107               Dated: September 9, 2002
Appendix E

5.       The sod shall be placed on the prepared surface with the edges in close
         contact and alternate courses staggered. In ditches, the sod shall be
         placed with the longer dimension perpendicular to the flow of water
         in the ditch. On slopes, starting at the bottom of the slope, the sod
         shall be placed with the longer dimension parallel to the contours of
         the ground. The exposed edges of sod shall be buried flush with the
         adjacent soil. Sod edges shall be filled to present a smooth surface.
         The sod shall be rolled, tamped, and thoroughly watered to ensure
         good root contact and tie to the prepared subgrade.

6.       The sod shall be staked on all slopes of two to one (2:1) or steeper.
         Sod shall be staked with not less than four (4) stakes per square
         yard with at least one (1) stake for each piece of sod. Stakes shall
         be a minimum of six (6) inches long. Stakes shall be installed so
         that they hold the sod firmly in place yet present no danger to
         pedestrians or mowing crews. The type of stake and the method of
         installation shall meet the approval of the TOUCH AMERICA
         Representative.

7.       The Builder shall keep all sodded areas, including the subgrade,
         thoroughly moist until the newly laid sod is firmly established as
         indicated by at least 1 inch of new growth developed after the sod is
         laid.

802.06.  MULCHING

1.       Mulch shall be applied to all areas that have been seeded, if required.
         Seeded areas shall be mulched within 24 hours of seeding.

2.       Straw mulch shall be applied with a mulch blowing machine or other
         approved method, and shall be evenly applied to obtain a uniform
         cover. Straw mulch shall be applied at a rate of 2.25 tons per acre.

3.       Hydromulching shall be performed with hydroseeding operations.
         Cellulose fiber mulch shall be spray applied uniformly to the seedbed
         at a rate of 1,500 pounds per acre.

802.07.  VEGETATION LIMITS

All earth surface disturbed by the Builder's construction activities except
croplands shall be revegetated by seeding or sodding, as required. Seeding and
sodding operations shall take place only during seasons when satisfactory
results can be expected. The Builder may be required to return after completion
of construction to meet above specified seeding limits.

802.08.  MATTING AND NETTING PLACEMENT

1.       Erosion control matting shall consist of excelsior blankets, mulch
         blankets, jute blankets, synthetic blankets, as required.

2.       Matting and netting shall be placed on steep or highly erosion
         susceptible soil areas for erosion control at locations indicated on
         the Drawings and as determined by the TOUCH AMERICA Representative or
         Engineer. Matting shall be placed on the graded and prepared surface
         after the seeding operation. The ground surface shall be free of
         rocks, soil clumps, sticks, or other imperfections which would
         prevent the matting from laying flat with the ground. The material
         shall

URRS Agreement                   Page 108               Dated: September 9, 2002
Appendix E

         be pinned or anchored to the ground as recommended by the
         manufacturer. In areas of watercourses, pin spacing shall not exceed
         two (2) feet between rows and two (2) feet on centers in a row.

802.09.  CONTACT WITH LANDOWNERS

All restoration and revegetation work shall be performed to the satisfaction of
the landowner. The Builder shall work with the landowner during construction to
ensure that landowner concerns are being addressed. Restoration and revegetation
work which is not satisfactory to the landowner shall be corrected within ten
(10) days from the notice of deficiency. In the event that the Builder has
obtained right-of-way access from any "off right-of-way" landowners, the Builder
shall obtain written releases from said landowners.

802.10.  PLOW LINE RESTORATION

Restoration for plowing operations not involving railroad right-of-way shall be
as follows:

         A.       The plow furrow shall be compacted by a minimum 15-ton
                  tracked tractor that shall be driven with 1 track parallel
                  and on 1 side of the furrow, then on the other side, and
                  then over the plow furrow. A minimum 5-ton vibratory roller,
                  4 to 6 feet in width, or other heavy construction equipment
                  accepted by the TOUCH AMERICA Representative may be used
                  instead of the tracked tractor.

         B.       The track-mounted plow furrow shall be graded to original
                  contour with track-mounted equipment.

802.11.  RAILROAD ROW

         A.       The Builder shall repair or restore railroad right-of-way
                  disturbed by his operations to a condition equal to or
                  better than its pre-existing condition and to the
                  satisfaction of the railroad company representative. work
                  shall include, but not be limited to, retrieving and
                  compacting displaced material on steep slopes or high
                  embankments, grading and compacting backfill in the plow
                  furrow to prevent settlement, and grading and shaping of the
                  railroad ballast disturbed during work operations.

         B.       The work of providing and placing railroad ballast shall be
                  as specified in the applicable railroad agreement.

             SECTION 803 - PAVEMENT, GRAVEL SURFACES, AND SIDEWALKS

803.01.  DESCRIPTION

1.       This section covers the removal and replacement of pavement, gravel
         surfaces, and sidewalks along the route at locations as required.

2.       Temporary patching material shall be in accordance with the
         appropriate city, county, or state specifications for asphaltic mixed
         materials for roadway patching.

URRS Agreement                   Page 109               Dated: September 9, 2002
Appendix E

803.02.  REMOVAL

1.       Pavement removal shall be in accordance with the local permit
         authority.

2.       Cuts in concrete or asphalt pavement shall be no larger than necessary
         to provide adequate working space. Cutting shall be started with a
         concrete saw in a manner which will provide a clean vertical groove
         at least four (4) inches deep along each side of the trench.

803.03.  REPLACEMENT

1.       Asphalt and concrete paving shall be in accordance with the applicable
         state highway department or local permit authority standards and as
         specified in these Specifications.

2.       Pavement replacement shall match existing pavement in type, appearance,
         wearing surface, and durability to the maximum extent practical.
         Pavement thickness shall be as required by applicable permits; or
         shall match existing thickness, whichever is greater.

3.       Base and subbase material shall be compacted, graded, and prepared as
         required by applicable permits, or shall match existing thickness,
         whichever is greater.

4.       Cut edges of asphalt pavement shall be thoroughly cleaned and a tack
         coat shall be uniformly applied to cut edges before pavement repair.

5.       Gravel surface replacement shall be in accordance with all applicable
         permits. The replacement surface material shall match existing
         surface material in type, thickness, and appearances to the maximum
         extent practical.

6.       Sidewalk and curb and gutter replacement shall be in accordance with
         all applicable permits. Sidewalks and curb and gutter shall be placed
         to the lines and grades indicated on the Drawings or shall match
         adjacent existing sections. Reinforcement for sidewalks and curb and
         gutter shall be in accordance with all applicable permits. As a
         minimum, one (1) layer of 6X6X6 welded wire fabric shall be used for
         sidewalk reinforcement and two (2) longitudinal No. 4 reinforcing
         bars shall be used for curb and gutter reinforcement.

                         DIVISION 900 - SITE PREPARATION

The Builder shall perform the following for site preparation:

1.       Ground surfaces within the site easement limits shall be cleared of
         all trees, brush, and debris. Surface irregularities such as mounds
         or low spots shall be graded to provide uniformly sloping surfaces
         which drain from the site.

2.       All combustible and other waste materials, including trash and junk,
         shall be removed from the construction areas and disposed of.

3.       The Builder shall at the installation of the electrical service
         connection in accordance with the local electric utility, governing
         inspection agencies, and as specified herein. The Builder shall
         ensure that

URRS Agreement                   Page 110               Dated: September 9, 2002
Appendix E

         a licensed electrician performs all electrical work on the site and
         that all local electrical permits and inspections are obtained.
         Detailed requirements will be available upon request.

4.       Power requirements for OA and regen sites is 200 Amp, three (3) phase,
         where available.

                     SECTION 1000 - OUTSIDE PLANT DIVERSITY

1000.1.  DESCRIPTION

The following guidelines address physical diversity from the cable
vault/headwall of the Primary or Intermediate City terminal A office to the
cable vault/headwall of the terminal Z office as defined in Exhibit B. The new
Route must be reviewed at with respect to:

(i)      In-place parallel cable or Routes built on existing TOUCH AMERICA ROW
         (For example, the new Denver to Salt Lake Route does not need to be
         diverse from the existing Denver to Salt Lake Route.);

(ii)     In-place cable on Routes which are "non-parallel" Routes; (For example
         in Denver, the new Denver to Salt Lake Route must be diverse from both
         the new and existing Chicago to Denver Routes.); and

(iii)    Route intersections

1000.2.  DIVERSITY GUIDELINES: NEW BUILD AND EXISTING PARALLEL ROUTES

1.       New Routes constructed between Primary and/or Intermediate Cities as
         listed in Exhibit B do not have to be diverse from the existing
         parallel Routes connecting the same two Primary and/or Intermediate
         Cities.

2.       At regenerator, optical amplifier and terminal locations, a minimum
         horizontal separation of twenty (20) feet is required between
         entrance points. It is preferred that the separate building entrances
         be on different (preferably opposite) walls for each Route installed.
         The twenty (20) foot separation must be maintained for one-half mile
         from the building. Beyond one-half mile, a minimum separation of one
         hundred (100) feet must be maintained.

1000.3.  DIVERSITY GUIDELINES: NEW BUILD AND EXISTING NON-PARALLEL ROUTES

New Routes constructed between Primary and/or Intermediate Cities as listed in
Exhibit B must be diverse from existing Routes and new non-parallel Routes built
under this contract. Cables connecting such city pairs must meet the following
guidelines:

1.       At regenerator, optical amplifier and terminal locations, a minimum
         horizontal separation of twenty (20) feet is required between
         entrance points. It is preferred that the separate building entrances
         be on different (preferably opposite) walls for each cable installed.
         The twenty (20) foot separation must be maintained for one-half mile
         from the building. Beyond one-half mile, a minimum separation of one
         hundred (100) feet must be maintained.

2.       Two Route should not share the same right-of-way. Routes must be at
         least one hundred (100) feet apart horizontally, unless the
         regenerator/terminal guidelines above apply.

URRS Agreement                   Page 111               Dated: September 9, 2002
Appendix E

3.       Two Route cannot share the same conduit system.

4.       River crossings for two Routes must maintain a separation of one
         hundred (100) feet.

5.       No two Route can be placed on the same bridge crossing.

1000.4.  DIVERSITY GUIDELINES: CABLE INTERSECTIONS

In the event, cables from different routes intersect; both cables shall be
protected with pipe, either split or solid. The material used for the pipe
shall meet the requirements of Division 200. The length of the protection
should be ten (10) feet on either side of the intersection point on both
cables. There shall be a minimum of two (2) feet of vertical separation between
the cables.

1000.5.  DIVERSITY GUIDELINES: OPTICAL GROUND WIRE (OPGW)

Two routes can share the same power ROW, but they cannot be on the same
structure. The structures must be far enough apart so they cannot damage the
adjacent OPGW, if the structure fails. Buried and OPGW cables sharing the same
ROW are considered diverse from on another.

1000.6.  DIVERSITY GUIDELINES: WAIVERS

In circumstances where the new construction cannot meet the guidelines above,
the Builder shall notify the TOUCH AMERICA Representative and provide the
following information:

1.       Describe the diversity violation

2.       Describe diverse solutions, if available

TOUCH AMERICA will review the information and respond within seven (7) days
either by providing a waiver, or requesting an alternate route be developed.

URRS Agreement                   Page 112               Dated: September 9, 2002
Appendix E

                                   APPENDIX E

                                   SCHEDULE C

             FIBER CABLE SPLICING, TESTING AND ACCEPTANCE PROCEDURES

(Note: Service Provider = SP shall be Touch America, Inc. and Service
Recipient = SR shall be Sierra Pacific Communications, LLC.)

1.0      The cable sheath will be an armored sheath, ribbon cable manufactured
         with the fibers shown by:

         -        Lucent Technologies (LXE-ME) comprised of standard single
                  mode and non-zero dispersion shifted (TrueWave-Reduced Slope)
                  fibers.

         -        Siecor (Armored) comprised of standard single mode and
                  non-zero dispersion shifted fibers (Enhanced Leaf).

2.0      The fiber optic cable shall be installed per the specifications in
         Schedule B.

3.0      All splices shall be contained in a hand-hole or manhole when in the
         underground or buried environment. Splices will be in enclosures or
         splice cabinets when inside an office.

4.0      Each cable shall be distinguishable from other telecommunications
         cables (this will consist of a unique tag at each manhole, hand-hole,
         and street marker).

5.0      Splice closures which facilitate taut sheath entry and which are
         designed to seal, bond, anchor and protect various types of cable and
         splices shall be used. Metal aerial closures shall be encapsulated in
         outer closures if the plant is in a corrosive atmosphere or saltwater
         environment.

6.0      The entire fiber optic cable system shall be properly protected from
         foreign voltage and grounded with an industry-accepted system. Foreign
         voltage on the cable system shall not exceed 50 VAC.

7.0      All splices will be made with a fusion-splicing machine on new fiber
         route installations. Temporary maintenance splices shall be low
         reflectance mechanical splices such as Fiberlock as manufactured by 3M.

8.0      The Service Provider ("SP") will perform directional span testing once
         end-to-end continuity, from fiber distribution panel (FDP) to fiber
         distribution panel (FDP), is established. End-to-end loss measurements
         at the required wavelength will be measured and recorded using an
         industry accepted laser source and power meter at the required
         wavelength(s). (Note: An OTDR is not considered an acceptable measuring
         device for end-to-end loss measurements.) Standard single mode
         conventional fiber and non-zero dispersion shifted fibers will be
         tested at 1550 nm only. The end-to-end loss measurements, as well as,
         bi-directional OTDR readings shall be made between SR's Outside Plant
         Fiber Distribution Panels (FDP), commonly referred to as "High-Speed
         LGXs" (HSLGX). These measurements must be made after the splice
         manholes or hand-holes are closed to check for macro-bending problems.

URRS Agreement                   Page 113               Dated: September 9, 2002
Appendix E

9.0      Route Splicing Criteria

         Although no single maximum splice loss limit is placed on individual
         splices, the System shall be designed utilizing the following design
         criteria: (i)0.05 dB engineering loss for each single fusion splice
         (ii) 0.08 dB engineering loss for mass fusion splices. (iii) 0.25 dB
         engineered loss per transition splice (Standard Single Mode fiber
         spliced to Non-zero Dispersion Shifted fiber) (iv) 1.0 dB engineered
         loss per "through" office (fibers connected through an office with
         jumpers, includes connector loss). The end-to-end loss value as
         measured with an industry-accepted laser source and power meter
         includes the fiber loss, splice loss, and connections in "through"
         offices. The end-to-end loss must meet the design loss value of 0.25
         dB/km at 1550nm (plus engineered splice loss and "through" office loss)
         for conventional single mode fiber and 0.25 dB/km at 1550 nm (plus
         engineered splice loss, transition splice loss and "through" office
         loss) for non-zero dispersion shifted fiber.

         Example 1:

         -        Route is 50 km conventional single mode fiber

         -        Ten mass fusion splices

         -        One "through" office

         The engineered loss will be calculated as follows:

         Step 1. Conventional Single Mode Fiber @ 1550 nm = 50 km x 0.25 =
                 12.5 dB

         Step 2. Mass fusion splice loss for 10 splices x 0.08 dB = 0.8 dB

         Step 3. "Through" office loss =1 @ 1.0 dB each

         Step 4. Engineered Loss from FDP to FDP is:
                    @ 1550 nm = 12.5 dB+0.8 dB +1.0 dB = 14.3 dB

         Example 2:

         -        Route is 50 km non zero dispersion shifted fiber

         -        Ten mass fusion splices

         -        Two transition splices

         -        One "through" office

         The engineered loss will be calculated as follows:

         Step 1. Non-zero Dispersion Shifted Fiber @ 1550 nm = 50 km x 0.25 =
                 12.5 dB

         Step 2. Engineered mass fusion splice loss for 10 splices x 0.08 dB =
                 0.8 dB

         Step 3. Transition splice loss = 2 @ 0.25 dB = 0.5 dB

         Step 4. "Through" offices = 1 @ 1.0 dB each

         Step 5. Engineered Loss from FDP to FDP is:
                    @ 1550 nm = 12.5 dB+0.8 dB + 0.5 dB +1.0 dB = 14.3 dB

10.0     SP will record end to end loss on testing documentation or in an
         electronic format acceptable to the SR and supply a copy to the SR.

11.0     If the SR's fibers terminate in the SP's office, the fibers shall be
         terminated in a FDP equipped with "positive contact" type connectors.

URRS Agreement                   Page 114               Dated: September 9, 2002
Appendix E

12.0     The SP will record bi-directional OTDR test data, including traces, on
         diskette or CD and supply a copy to the SR.

13.0     SR fiber assignments will be as provided in an electronic format
         acceptable to the SR.

URRS Agreement                   Page 115               Dated: September 9, 2002
Appendix E

                                   APPENDIX E

                                   SCHEDULE D

                    MAINTENANCE SPECIFICATIONS AND PROCEDURES

TABLE OF CONTENTS:


                                                                                                    
1.   DEFINITIONS:....................................................................................  117
2.   MAINTENANCE ACTIVITIES..........................................................................  118
     2.1.   Preventative Maintenance.................................................................  118
            2.1.1.    Cable and Conduit Damage Prevention............................................  119
            2.1.2.    Route Patrol...................................................................  119
            2.1.3.    Signs..........................................................................  119
            2.1.4.    Right Of Way Maintenance.......................................................  119
            2.1.5.    Voltage Suppressor/Arrestor....................................................  120
     2.2.   Planned Cable Activity...................................................................  120
            2.2.1.    Intrusive PCAs.................................................................  120
            2.2.2.    Non-Intrusive PCAs.............................................................  120
            2.2.3.    Responsibilities of SP and SR..................................................  120
     2.3.   Cable and Conduit Restoration............................................................  121
            2.3.1.    Types of Restorations..........................................................  121
                      2.3.1.1.    Total Restoration..................................................  121
                      2.3.1.2.    Partial Restoration................................................  123
                      2.3.1.3.    Conduit Damage and Restoration.....................................  123
     2.4.   Hazardous Conditions/Service Precautions.................................................  124
     2.5.   Disaster Recovery........................................................................  124
3.   OPERATIONS/NETWORK CONTROL CENTER(S)............................................................  124
     3.1.1. Operations/Network Control Centers.......................................................  124
4.   ESCALATION LIST.................................................................................  125
5.   FACILITIES......................................................................................  125
6.   COVERAGE PERIOD.................................................................................  125
7.   SUBCONTRACTING..................................................................................  125
8.   FEES AND COSTS..................................................................................  126
ATTACHMENT 1.........................................................................................  127


URRS Agreement                   Page 116               Dated: September 9, 2002
Appendix E

1.       DEFINITIONS:

Terms used in this exhibit are defined in the Agreement and as follows:

Agreement: The Conduit and Dark Fiber IRU and Sale Agreement between Touch
America and Customer.

Cable Relocation: The physical relocation of the System which may be required
by public (e.g., city or state government) or private entities.

Facilities: All physical building spaces, including but not limited to
regenerator huts, terminal offices, terminal huts, and manholes, where the
System is present along the Route.

Fiber, Dark (Dark Fiber): A fiber within The Cable that has no electronics at
the Terminating ends, or has electronics at the Terminating Ends but carries no
service. The opposite of this is Lit Fiber.

Fiber, Lit (Lit Fiber): A fiber within The Cable that has electronics at the
Terminating ends and carries service. The opposite of this is Dark Fiber.

Maintenance Activity: All work activities as defined in Section 2 of this
Schedule D.

Method of Procedure (MOP): The plan developed by the SP, which details the
activities, required to be followed during work activities near or on the
System.

One-Call Agency: Each state has a state run agency established by the state for
anyone (including but not limited to contractors) to call a pre-designated
phone number to report potential intrusions to the System. Every state has its
own One-Call Agency.

Operations Center (OC): The facility or facilities, along with the personnel
and other assets required to monitor, communicate, coordinate, restore, repair,
and perform all Maintenance Activity.

Planned Cable Activity (PCA): Any planned cable activity, including activities
that do not impair the Cable as well as activities that do impair the Cable,
that could potentially affect SR's service of the System.

Planned System Work Period (PSWP): A pre-arranged period of time reserved for
performing certain work on the System that may potentially impact traffic.
Generally, this will be restricted to weekends, avoiding the first and last
weekend of each month and high-traffic weekends. The PSWP shall be agreed upon
per this Exhibit C of this Agreement.

Restoration, Partial. (Partial Restoration): A condition whereby one or more
fibers, but not all fibers in a cable, cannot carry service along one or more
Route Segment(s) or Route Section(s) on a Link(s). An example of this condition
could be a lightning strike or ice damage that impacts a cable but does not
affect all the fibers in the cable.

URRS Agreement                   Page 117               Dated: September 9, 2002
Appendix E

Restoration, Total (Total Restoration): A condition whereby all fibers in a
cable cannot carry service along one or more Route Segment(s) or Route
Section(s) on a Link(s). An example of this condition is a backhoe severing the
cable.

Service Acceptance Date: The date that the SR accepts the System and requires
service on the System.

Service Provider ("SP"): The party responsible for providing maintenance for
the System.

Service Recipient ("SR"): The party receiving maintenance for the System.

2.       MAINTENANCE ACTIVITIES

The following subsections describe the types of Maintenance Activities that
must be performed. All Maintenance Activity types described below shall be
performed by or under the direction of the SP.

For all Maintenance Activities, SR may contact SP at any time to discuss fiber
status or to notify SP of changes in fiber status, (example, Lit Fibers vs.
Dark Fibers), fiber problems, or any other fiber issues or anomalies for SR's
fibers which require action by the SP. However, no other party, including but
not limited to a lessee of the SR's fibers (i.e. SR subleases its fibers to a
third party), shall call the SP for anything related to SR's fibers without the
written agreement of both the SR's and SP's escalation lists (Attachment 2)
Tier 3 representative. It is the intention of this Agreement that any lessee of
fibers in The Cable coordinate all problems and issues solely with the
originating party of the Disposition.

Parties have the right to review each other's maintenance standards, which
include preventative maintenance procedures, Planned Cable Activity procedures,
and cable restoration procedures.

SP shall notify SR at least ten (10) business days prior to the date in
connection with any Planned System Work Period (PSWP) of any Maintenance
Activity and as soon as possible after becoming aware of the need for
unscheduled maintenance. SR shall have the right to be present during the
performance of any Maintenance Activity or unscheduled maintenance so long as
this requirement does not interfere with SP's ability to perform its
obligations under this Agreement. In the event that Maintenance Activity is
canceled or delayed for whatever reason as previously notified, SP shall notify
SR at SP's earliest opportunity, and will comply with the provisions of the
first sentence of this paragraph to reschedule any delayed activity.

2.1.     Preventative Maintenance

Preventative maintenance will be performed according to the SP's standards. Each
SP's maintenance standards must include the following:

URRS Agreement                   Page 118               Dated: September 9, 2002
Appendix E

2.1.1.   Cable and Conduit Damage Prevention

2.1.1.A. Consistent with Transportation Equity Act 21 (TEA21) Best practices,
         the SP will:

         -        Subscribe to each and all One-Call Agencies that govern Route
                  Segment(s), Route Section(s) or Link(s) they maintain.

         -        Abide by all state One-Call Agency laws

         -        Respond to all locate requests.

         -        Analyze, assign, and dispatch locate request to SP's
                  qualified technicians

2.1.1.B. The SP will positively respond to excavation activity notifications
         as follows:


- -----------------------------------------------------------------------------------------------
                                                     
Locate and Mark Cable                                   Within fifty (50) feet of System
- -----------------------------------------------------------------------------------------------
Locate, Mark, and Standby to protect Cable              Within ten (10) feet of System
- -----------------------------------------------------------------------------------------------
Positive confirmation of the location of the            Within eighteen (18) inches either side
SP's cable will be done through various means           of System
e.g. of System Potholing) to ensure that SP's cable
is not damaged
- -----------------------------------------------------------------------------------------------


2.1.1.C. Positively respond to boring operations as follows:


- ----------------------------------------------------------------------------------------
                                                     
Standby and monitor the boring operation to ensure      Within one hundred (100) feet of
the cable is not damaged. (Potholing, etc. as           System
required)
- ----------------------------------------------------------------------------------------


2.1.2.   Route Patrol

Patrol the route by a qualified technician in accordance with the current SP's
procedures for maintenance a minimum of four (4) times a year. This "patrol"
will consist of riding the route to identify potential maintenance issues (e.g.
erosion, encroachments, damaged or missing signs, etc.).

2.1.3.   Signs

The SP will routinely replace signs that are damaged.

2.1.4.   Right Of Way Maintenance

Brush, trees and/or other vegetation should be trimmed to the edge of the ROW
as required to support ROW accessibility and worker safety. Under no
circumstances should prevailing growth exceed 30 inches in height or lower if
it obstructs signage visibility. Ongoing trimming of the ROW communicates a
message to others that the underground plant exists in the right of way and
that the SP cares about it. As such, ROW-clearing and trimming serves as a
crucial part of the overall right-of-way maintenance effort to enhance plant
protection.

At a minimum ROW maintenance must comply with local, state, and federal
requirements.

URRS Agreement                   Page 119               Dated: September 9, 2002
Appendix E

2.1.5.   Voltage Suppressor / Arrestor

Wherever the cable sheath voltage exceeds 50v AC, voltage suppressers or
arrestors shall be installed at the splice points and regenerator locations.

2.2.     Planned Cable Activity

A Planned Cable Activity (PCA) is any activity, which can be planned in advance
(i.e., not an emergency) that will cause maintenance personnel to physically
move the cable, or will affect the sheath and/or the fiber. There are two types
of PCAs: intrusive and non-intrusive.

2.2.1.   Intrusive PCAs

An intrusive PCA is an activity where the SP will expose the buffer tube and/or
the fibers.
Examples:

         -        installation of insulating joints / isolation closures,

         -        reroutes / cutovers / hot cuts,

         -        repairing damaged fibers at splice locations,

         -        repairing sheath faults.

Intrusive PCAs must be performed from 6pm to 6am local time Monday through
Friday or any time during the weekends, excluding holidays. If exceptions are
required to these times, including holidays, utilize the escalation list.

2.2.2.   Non-Intrusive PCAs

Examples of non-intrusive PCAs are as follows:

         -        cable lowering, cable rearrangements

         -        conduit or manhole rearrangements

Non-intrusive PCAs can be performed anytime.

2.2.3.   Responsibilities of SP and SR

For ALL PCAs, the SP must notify the SR at least fourteen (14) calendar days
prior to the activity.

For PCA activity that will result in signal discontinuity, the following
process will be performed:

         -        AT LEAST FOURTEEN (14) CALENDAR DAYS IN ADVANCE: SP shall
                  provide a copy of its Method of Procedure (MOP) in writing
                  to SR and will notify SR of this PCA per escalation list.

         -        AT LEAST TEN (10) CALENDAR DAYS IN ADVANCE: After receipt of
                  SP's MOP, SR then will provide a copy of its MOP to the SP
                  that incorporates the switching, verification,
                  identification, and testing of SR's fibers.

         -        AT THE TIME OF THE PCA: The SP and SR shall maintain
                  communication via phone for the entire execution of the
                  event. SR shall coordinate the execution of SR's MOP with
                  SP. SP shall comply with the splicing specifications as set
                  forth in the Fiber Cable Splicing, Testing, and Acceptance
                  Procedures (Schedule C).

URRS Agreement                   Page 120               Dated: September 9, 2002
Appendix E

         -        SP shall provide written approval to SR for any modifications
                  to these specifications as may be necessary or appropriate
                  in any particular instance for SR's approval, which approval
                  shall not be unreasonably withheld.

         -        For all Intrusive PCAs, SP shall ensure all fibers meet
                  overall span loss per fiber specifications outlined in the
                  Fiber Cable Splicing, Testing, and Acceptance Procedures
                  (Schedule C).

         -        If for any reason any PCA is canceled or delayed, then SP
                  shall notify SR as soon as SP is aware of the change, and SP
                  will reschedule the activity.

2.3.     Cable and Conduit Restoration

A cable restoration occurs whenever service has affected one or more fibers and
restoration of the fiber(s) is needed. The fiber(s) may or may not have service
on them.

The SP will respond to all SR's notifications indicating any failure, any
interruption, or any impairment to the SR's Cable System.

2.3.1.   Types of Restorations

2.3.1.1. Total Restoration

A Total Restoration (total cable cut) occurs when ALL fibers in the cable sheath
are affected.

The SP shall notify SR of the cable cut, per the escalation list, including the
time of the cable cut, and the Route Section as soon as possible, but no later
than 15 minutes from the time the cut occurs. Once this information is provided
to the SR, the SP shall establish a communications bridge with the SR and stay
in constant communication throughout the cable cut.

In the event the SP's fibers are Dark Fibers (no service on the fibers), the SR
shall notify the SP.

The SP shall notify the SR of the physical location of the cable cut as soon as
possible but no later than 90 minutes from the time the cable cut occurs.

Restoration Priorities

         1.       SP's out of service Lit Fibers will be restored first then
                  rotating to the SR restoration sequence.

         2.       SR's will be restored in a general SR sequence (priority),
                  which will rotate after each incident.

         3.       Within the general SR sequence, out of service Lit Fibers
                  will always be restored first.

         4.       In the event a SR has re-established its traffic through
                  other means, its fibers will be skipped in the SR sequence
                  rotation for the splicing of Lit Fibers.

         5.       Each SR's Dark (spare) Fiber will be addressed in the SR
                  sequence priority during the repair of the remainder of the
                  fibers in the cable.

URRS Agreement                     Page 121             Dated: September 9, 2002
Appendix E

         Example:

         Four SR's have traffic on a Route Section. They are initially listed
         in the SR sequence as A, B, C, and D. After SP's Lit Fibers are
         restored, SR "A" is first priority and "D" is last.

         The first time the cable in that Route Section is damaged, SP will
         contact SR "A" first, followed by each SR in sequence. Each SR will
         declare which of its Lit Fibers are not in service as result of the
         damage.

         SR "A" out of service Lit Fibers will be restored first followed by
         each SR's out of service Lit Fibers, in the SR sequence order.

         After all out of service Lit Fibers are restored, this same sequence
         will be followed in the repair of the Dark (spare) Fibers. All fibers
         will be restored before securing the site.

         The SP will notify the SR when each fiber has been repaired, and then
         the SR will verify that continuity exists from end-to-end on the
         affected Cable(s) and/or fiber(s).

         Verification of continuity of Dark Fibers shall be the responsibility
         of the SP or SR depending on whoever has the capability to verify
         service.

         In the event of a second cable cut in this particular Route Section of
         fiber optic cable, the SR sequence will rotate such that SR "B" will be
         first priority, "C" second, "D" third, and "A" fourth.

         For every total cable cut, SP shall respond immediately after
         receiving notification with a goal of restoring SR's service-carrying
         Lit Fiber in six (6) hours from the time of the cable cut. The only
         exception to this response time is when an uncontrolled incident,
         such as a flood, a chemical spill, a fire, a bridge collapse, a riot,
         or other circumstance prevents access to the damage area.

                  To accomplish this cable restoration, it is acknowledged that
                  the repairs so effected may be temporary in nature. In such
                  event, within twenty-four (24) hours after completion of all
                  temporary Restoration activity, SP shall commence its
                  planning for permanent repair, and thereafter promptly shall
                  notify SR of such plans. If the SP informs the SR that the
                  temporary fiber repair cannot be made permanent immediately,
                  then the permanent repair shall be mutually agreed upon by
                  both parties.

         The parties agree to mutually support each other during restoration
         activities. Examples of support may include providing fault locating,
         splicing, or running cable. All support is at the discretion of the
         SP - meaning that the SP shall have its restoration crew working on
         the restoration and may accept and direct the support from the SR if
         the SR offers such support.

         In the event the restoration cable is exposed above ground, the SP
         must provide on-site personnel for cable protection.

         Refer to Section 2.2 to accomplish permanent repairs.

URRS Agreement                     Page 122             Dated: September 9, 2002
Appendix E

2.3.1.2. Partial Restoration

A Partial Restoration (partial cable cut) occurs when less than ALL fibers in
the cable sheath are affected.

For partial cable cuts, if and where possible, SP will loan to SR spare fibers
to implement temporary repair.

The SP shall notify SR of the partial cable cut, per the escalation list,
including the time of the cable cut, and the Route Section as soon as possible,
but no later than 15 minutes from the time the cut occurs. Once this information
is provided to the SR, the SP shall establish a communications bridge with the
SR to stay in constant communication throughout the partial cable cut.

The SP shall notify the SR of the physical location of the cable cut as soon as
possible but no later than 90 minutes from the time the cable cut occurs.

In the event the SP's fibers are not affected, the SR shall notify the SP of
such event. If the SR cannot restore service via its own Dark Fiber, SR shall
have the right to utilize SP's unaffected Dark Fiber. The SR will offer the SP
the same unaffected Dark Fiber in the event the SP cannot restore its service.

Restoration prioritization will be the same as that outlined in Section 2.3.1.1
Total Cable Cut.

The SP will notify the SR when each fiber has been repaired, and then the SR
will verify that continuity exists from end-to-end on the affected Cable(s)
and/or fiber(s).

2.3.1.3. Conduit Damage and Restoration

The SP will respond to all notifications indicating any damage to the Conduits
in the System. The SR will effect repairs to the conduit immediately in occupied
conduit or as soon as commercially reasonable and practical in the case of
damaged empty conduit. The trench will be back filled using approved materials
appropriate to the field conditions. Restoration standards will be at least as
found prior to the excavation or better.

Verification of continuity of Dark Fibers shall be the responsibility of the SP
or SR depending on whoever has the capability to verify service.

For every partial cable cut, SP shall respond immediately after receiving
notification with a goal of restoring SR's service-carrying Lit Fiber in six (6)
hours from the time of the partial cable cut. The only exception to this
response time is when an uncontrolled incident, such as a flood, a chemical
spill, a fire, a bridge collapse, a riot, or other circumstance prevents access
to the damage area.

To accomplish this partial restoration, it is acknowledged that the repairs so
affected may be

URRS Agreement                     Page 123             Dated: September 9, 2002
Appendix E

temporary in nature. In such event, within twenty-four (24) hours after
completion of all temporary restoration activity, SP shall commence its planning
for permanent repair, and thereafter promptly shall notify SR of such plans. If
the SP informs the SR that the temporary fiber repair cannot be made permanent
immediately, then the permanent repair shall be mutually agreed upon by both
parties.

For all temporary repairs, the SP will maintain an on-site personnel for all
exposed cables.

Refer to Section 2.2 to accomplish permanent repairs.

2.4.     Hazardous Conditions / Service Precautions

A hazardous condition or service precaution is when an event, such as flooding,
fire, street collapse, cable wash-out or a man-made event such as a train
derailment occurs, and there is an increased probability that the System may be
damaged, and maintenance activity is needed to prevent any potential damage.

For these events SP shall notify SR, per escalation list, as soon as the SP
knows of such event. The SP shall establish a communications bridge for these
events and stay in constant communication.

2.5.     Disaster Recovery

Disaster recovery is any event that affects service on the System and involves
significantly more maintenance activity than just a cable restoration. Examples
of disaster recovery are as follows:

         -        train derailment occurs, which by itself would be a hazardous
                  condition, but for this example it destroys a regeneration
                  site, or

         -        the cable at a bridge is washed out and restoration involves
                  deploying several miles of cable to restore service.

For these events SP shall notify SR, per escalation list, as soon as the SP
knows of such event. The SP shall establish a communications bridge for these
events and stay in constant communication.

The parties agree to mutually support each other during disaster recovery
activities. Examples of support may include providing fault locating, splicing,
or running cable. All support is at the discretion of the SP -- meaning that the
SP shall have its crew performing disaster recovery and may accept and direct
the support from the SR if the SR offers such support.

3.       OPERATIONS / NETWORK CONTROL CENTER(S)

3.1.1.   Operations / Network Control Centers

The terms Operations Center and Network Control Center are synonymous, and will
be called Operations Centers for the remainder of this Schedule.

SP shall operate and maintain an Operations Center (OC) staffed twenty-four (24)
hours a day, seven (7) days a week including all holidays. The OC shall be
staffed by trained and qualified

URRS Agreement                     Page 124             Dated: September 9, 2002
Appendix E

personnel. SP's maintenance personnel shall be available for dispatch
twenty-four (24) hours a day, seven (7) days a week.

4.       ESCALATION LIST

An escalation list (Attachment 1) will be shared between the parties. This list
shall provide for coordination between SP and SR for day-to-day issues,
coordination of all Maintenance Activity communication and coordination, as well
as escalation personnel in the event agreement cannot be reached at the lowest
level of the escalation list.

This escalation list may be modified by either party at any time if the party
making the change notifies the other party in writing twenty-four (24) hours in
advance of the change.

The escalation's Tier 1 contact shall be the day-to-day working level, which
shall address daily maintenance operations activities.

5.       FACILITIES

Except to the extent otherwise expressly provided in the Agreement, SR will be
solely responsible for providing and paying for any and all maintenance of all
electronic, optical, and any other equipment, materials and facilities used by
SR in connection with the operation of the Dark Fibers, none of which is
included in the maintenance services to be provided hereunder.

Each party agrees that the Facilities shall be placed and maintained in
accordance with the requirements and specifications of current editions of the
National Electrical Code and the National Electrical Safety Code, the applicable
rules and regulations of the Occupational Safety and Health Act (including those
of 29 C.F.R. Section 1910.268(a) et seq.) and the requirements of any other
authority having jurisdiction. Each party shall promptly furnish to each other,
but in no case later than twenty-four (24) hours, copies of all notices,
reports, correspondence, submissions, made by either party to federal, state, or
municipal environmental, safety, or health authorities. Each party agrees that
Facilities shall not physically, electronically or inductively interfere with
those of facilities in place.

6.       COVERAGE PERIOD

Maintenance will be performed for agreed upon Route Segment(s) or Route
Section(s) on a Link(s) commencing upon the Service Acceptance Date, and
conclude upon expiration or termination of the Agreement.

7.       SUBCONTRACTING

Upon mutual agreement between Touch America and the Customer, the SP may
subcontract any Maintenance Activities herein, provided the SP shall require the
subcontractor(s) to perform in accordance with the Agreement. The use of any
such subcontractor shall not relieve SP of any of its obligations herein.

URRS Agreement                     Page 125             Dated: September 9, 2002
Appendix E

8.       FEES AND COSTS

During any time after the Acceptance Date for any Route Segment(s) or Route
Section(s) on a Link(s), but subject to the Term section of the Agreement, the
SP shall provide for all Maintenance Activity for all Cable Systems that are the
responsibility of the SP. Customer shall pay Touch America an annual fee as
defined in Article 4.2 of the Dark Fiber IRU Agreement.

URRS Agreement                     Page 126             Dated: September 9, 2002
Appendix E

                                 ATTACHMENT 1
                                   SCHEDULE D
                                ESCALATION LISTS

                              [TOUCHAMERICA LOGO]

                         .14.1.1.1     Escalation List

                   1. Touch America 24 by 7 NOC 877-638-6621

                        2. Transport Manager - Tom Good

                        3. NOC Director - Jonathan Strong

                   4. Director, Field Operations - Jerry Piazzola

                   5. Vice President, Networks - Kevin Dennehy

URRS Agreement                     Page 127             Dated: September 9, 2002
Appendix E

                                  APPENDIX F

                             INTENTIONALLY OMITTED

URRS Agreement                     Page 128             Dated: September 9, 2002
Appendix F

                                   APPENDIX G

                          FORM OF COLLOCATION AGREEMENT

         THIS COLLOCATION AGREEMENT is made and entered into as of December 18,
2001 between Touch America, Inc. ("TA") and XXX, LLC ("Customer"). TA and
Customer are hereinafter individually referred to as a "Party" and collectively
as the "Parties".

                                   RECITALS

         WHEREAS, TA is constructing or has constructed a fiber optic cable
system along a route from A, to B. (the "TA System").

         WHEREAS, TA has certain facilities in which it provides collocation
space to third parties, and

         WHEREAS, the Parties have entered into a Dark Fiber IRU Agreement
whereby Customer has acquired from TA and TA granted to Customer an Indefeasible
Right of Use ("IRU") in twelve (12) IRU fibers within the TA System, and

         WHEREAS, Customer desires to collocate certain Customer equipment
within such TA facilities at the rates and in accordance with the specifications
set forth herein; and

         WHEREAS, TA desires to provide to Customer collocation space within
certain TA facilities at the rates and in accordance with the specifications set
forth herein;

         NOW, THEREFORE, for valuable consideration, TA and Customer agree as
follows:

1.       Collocation.

         a.       Collocation Space. During the term of this Agreement Customer
         shall have a non-exclusive license to locate, install, maintain and
         operate Customer equipment ("Customer Equipment") in the TA
         collocation facilities ("Facilities") at the sites ("Selected Sites")
         set out on service orders ("Service Order") executed from time to time
         by the Parties. The term ("Site Term"), and the amount of floor space
         and number and description of racks and cabinets, as applicable,
         ("Customer Space") at each Selected Site are set out on the Service
         Order for each Selected Site. No use of the Selected Sites, Facilities
         or Customer Space shall create or vest in Customer any easements or
         other ownership rights in TA's real or personal property. TA shall
         construct, install and operate the Selected Sites, Facilities and
         Customer Space, as provided in this Agreement.

         b.       Rent. The monthly rent ("Rent") for the Customer Space at each
         Selected Site shall be $750 per 19 inch rack space. Customer shall pay
         the Rent on or before the first day of each calendar month during the
         Site Term. Payments shall be prorated, as necessary, for the first and
         last months of the Site Term. The Rent

URRS Agreement                     Page 129             Dated: September 9, 2002
Appendix G

         shall begin on the Commencement Date for the Site Term. The Rent shall
         be adjusted once annually on the anniversary date of the commencement
         of this Agreement and in an amount not to exceed the cumulative
         changes in the U.S. Producer Price Index (Bureau of Labor Statistics
         "Finished Goods" Series - ID WPUSOP3000) since the Commencement Date.

         c.       Except as otherwise specifically provided, Customer shall pay
         all applicable fees and charges provided for in this Agreement, within
         thirty (30) days after receipt of invoice.

         d.       All payments not made when due shall bear a late payment
         charge of one and one-half (1 1/2%) percent per month of the unpaid
         balance or the highest lawful rate, whichever is less.

         e.       Basic Services. TA shall provide HVAC, AC power, lighting and
         escorted entry to the Site, Facilities and, if applicable, the
         Customer Space ("Basic Services") for each Selected Site.

         f.       Additional Services. Customer may request in writing
         installation services, additional AC power or DC power, additional
         back-up power, technical assistance, additional space, racks or
         cabinets, assistance in establishing an Interconnect Facility
         (collectively referred to as the "Additional Services") at any
         Selected Site. Within forty-five (45) business days after receiving
         such written request, TA shall notify Customer in writing whether the
         Additional Services are available, and, if they are, specify TA's
         standard rates for the Additional Services and the costs of any
         upgrades or expansions needed in order to accommodate Customer's
         request. Customer shall provide written notice to TA confirming its
         acceptance of such Additional Services at the quoted rates and costs
         within fifteen (15) days after receipt of TA's notice with respect to
         the availability of the Additional Services.

         g.       Payment for Additional Services. If Customer chooses to
         receive the Additional Services, Customer shall pay TA the amounts
         due within thirty (30) days of receipt of an invoice from TA. Once
         each calendar year, upon at least thirty (30) days' prior notice to
         Customer, TA may adjust its standard rates for the Additional Services
         to reflect its then-current standard charges. If the adjustment by TA
         exceeds five percent (5%) in any given calendar year, Customer shall
         have the right to reduce or discontinue the Additional Services at the
         Selected Site without liability or penalty.

         h.       Installation of Customer Equipment. Customer shall, at its
         expense, cause the Customer Equipment to be delivered, installed,
         operated and maintained in a safe condition, meeting or exceeding
         telecommunications industry standards and the provisions set forth in
         this Agreement.

         i.       Interface. Customer may connect Customer Equipment with the
         equipment of TA customers who are collocated, have service termination
         at or have interconnection facilities at a Selected Site. Customer will
         pay TA's then current charges for any cross-connections. The TA Fiber
         Patch Panel ("FPP") or fiber termination point is the TA demarcation
         for such connection. Interface

URRS Agreement                     Page 130             Dated: September 9, 2002
Appendix G

         points for the Customer's Equipment shall be at the fiber patch panel
         located in the TA area of each Selected Site. Such panels shall be the
         demarcation to establish each Party's operational and maintenance
         responsibilities. All cables for interface shall be provided by
         Customer at its cost and expense and shall conform to all applicable
         TA standards. TA shall install all such interface cables at the
         expense of Customer. After successful and complete installation by TA,
         TA will not monitor or take responsibility for such cabling, which
         shall be the sole responsibility of Customer.

         j.       Alarms. TA shall continuously monitor security, environmental
         and power alarms for the Selected Sites at one or more manned
         monitoring centers. At Customer's request, TA shall establish
         procedures to allow Customer at Customer's expense to share or receive
         alarm information.

2.       Interconnection Off-Site.

         a.       Interconnect. Customer shall have the right to connect its
         fiber to the Facility at any Selected Site. The fiber and related
         conduit, and the connection or entrance facilities shall extend from
         the property parcel adjacent to the Selected Site to the Facility, and
         are referred to herein as the "Interconnect Facility." TA will, at its
         option, either provide to Customer, at the rates and charges set out
         in the Service Order, the Interconnect Facility to allow Customer to
         connect its fiber to the Facility , or provide to Customer, at
         Customer's expense and subject to any requirements or restrictions
         applicable to TA, access, including existing building entrance
         facilities from any third party, necessary to allow Customer to
         install Interconnect Facilities; provided, however, that in the case
         of Selected Sites or Facilities not owned by TA, TA's duty to provide
         such access shall be limited to providing all reasonable assistance to
         Customer in obtaining such access from said third parties.

         b.       Construction and Installation. If Customer installs an
         Interconnect Facility, Customer shall provide at its expense all
         necessary equipment and TA-approved materials including, but not
         limited to, cables and conduit, building and similar permits, and any
         FTP's and labor to construct and install such Interconnect Facility;
         provided however that TA shall provide reasonable assistance to
         Customer in obtaining any such permits. Customer shall provide the FPP
         for Interconnect Facilities. TA will, at its option, either install
         the Customer-provided FPP or allow Customer to install FPP at the
         Selected Site.

         b.       Demarcation. The demarcation point for Interconnect
         Facilities shall be at the FPP in each Selected Site.

         c.       Ownership. During the Site Term, TA shall retain ownership of
         any portion of each Interconnect Facility that is installed on
         Selected Sites; provided, however, that title to any part of the
         Interconnect Facility within Selected Sites shall be
         transferred to TA upon expiration or termination of the Site Term or
         this Agreement.

         e.       Limitation on Interconnection with TA Customers. Except as
         provided in Section 1.h., Customer shall not use any Interconnect
         Facility to allow TA

URRS Agreement                     Page 131             Dated: September 9, 2002
Appendix G

         customers, other carriers or any other parties to interconnect directly
         with Customer or each other at a Selected Site.

         e.       Maintenance and Changes. TA shall provide all maintenance and
         repair of any Interconnect Facility installed by Customer, or fiber
         installed by Customer in any Interconnect Facility provided by TA, on
         Customer's side of the point of demarcation. Customer shall not make
         any improvement, modification, or addition to, or relocate or remove
         any Interconnect Facility provided by TA. Any improvement,
         modification, addition to, relocation, or removal of any Interconnect
         Facility installed by Customer shall be subject to TA's prior review
         and written approval, which will not be unreasonably withheld or
         delayed. If Customer requests and TA undertakes or approves any
         improvement, modification, addition to, relocation, or removal of any
         Interconnect Facility installed by Customer, Customer shall pay the
         cost thereof.

3.       Selected Site Delivery and Termination.

         a.       Delivery of Selected Site. TA shall provide Customer with a
         tentative schedule of availability of each Selected Site and any
         changes to the tentative schedule. TA shall notify Customer in writing
         when a Selected Site is available for delivery and installation of
         Customer Equipment ("Commencement Date") and will provide reasonable
         access to Customer for installation of the Customer Equipment.

         b.       Selected Site Termination and Termination Charges. Customer
         may terminate a Selected Site at any time before the Commencement Date
         without any liability by giving written notice thereof to TA. Customer
         may terminate a Selected Site following the Commencement Date but
         before Customer installs any Customer Equipment or Interconnect
         Facility or equipment or material related to any Interconnect Facility
         upon not less than ten (10) days advance written notice to TA and
         payment of liquidated damages of three (3) months Rent and any
         non-recurring charges for such Selected Site. Customer may terminate a
         Selected Site after Customer installs any Customer Equipment or
         Interconnect Facility or equipment or material related to any
         Interconnect Facility upon not less than twenty (20) days advance
         written notice to TA and payment of liquidated damages in the amount
         of the Rent for the remainder of the Site Term and any other recurring
         and non-recurring charges for the remainder of the Site Term unless
         TA, upon use of reasonable efforts, finds another party to occupy said
         space including reclaiming said space for its own purposes.
         Termination of a Selected Site will not affect any other Selected Site.

4.       Notice to Collocate or Interconnect.

         a.       Collocate. Not less than ten (10) days prior to Customer's
         planned installation of its Customer Equipment at a Selected Site,
         Customer shall provide a notice to TA (the "Collocation Notice"). The
         Collocation Notice shall include notice of Customer's desire to
         collocate in the particular Selected Site, a copy of Customer's design
         drawings meeting CAD requirements and an installation schedule. The
         Collocation Notice shall also include: (a) Customer's requested
         installation date(s); (b) any excess cable storage requirements; (c)
         identification

URRS Agreement                     Page 132             Dated: September 9, 2002
Appendix G

         of all Customer Equipment to be installed; (d) a diagram of the
         desired location of the Customer Equipment; (e) the space, power,
         environmental and other requirements for the Customer Equipment; and
         (f) the estimated date to commence and complete the installation.
         Customer shall provide to TA all other information reasonably required
         by TA. Within ten (10) days of receiving the Collocation Notice, TA
         shall respond to Customer's Collocation Notice with its acceptance or
         objections to Customer's proposal.

         b.       Interconnect. Not less than forty-five (45) days prior to
         Customer's planned installation of its Interconnect Facilities at any
         Selected Site Customer shall provide a notice to TA (the "Interconnect
         Notice"). The Interconnect Notice shall include notice of Customer's
         desire to install the Interconnect Facilities at the particular
         Selected Site, a copy of Customer's construction design drawings
         meeting CAD requirements and an installation schedule. The
         Interconnect Notice shall also include: (a) Customer's requested
         installation date(s); (b) any excess cable storage requirements; (c)
         identification of all Interconnect Facilities to be installed; (d) a
         diagram of the desired location of the Interconnect Facilities; (e)
         the space, power, environmental and other requirements for the
         Interconnect Facilities; and (f) the estimated date to commence and
         complete the installation. Customer shall provide to TA all other
         information reasonably required by TA. Within thirty (30) days of
         receiving the Interconnect Notice, TA shall respond to Customer's
         Interconnect Notice with its acceptance or objections to Customer's
         proposal.

5.       Access to Selected Site.

         a.       Access. Unless otherwise provided in this Agreement access to
         Customer's Space shall consist of the following: TA shall provide
         Customer with secure, separate, unescorted twenty-four (24) hour access
         to Customer's assigned Customer Space ("Unescorted Access"). Upon
         providing a sixty (60) day written notice to Customer, TA at its sole
         discretion may terminate Unescorted Access. Upon termination of
         Unescorted Access, TA shall provide Customer with escorted twenty-four
         (24) hour access to Customer's assigned Customer Space (Escorted
         Access). Under the Escorted Access plan, for routine maintenance
         issues, Customer must notify TA's Change Management group at
         866-491-5540 between 8 am and 9 pm., or at changeman@tamerica.com. For
         emergency maintenance issues, Customer must notify TA's Change
         Management group at 866-491-5540 between 8 am and 8 pm, or TA's 24/7
         Network Operations Center at 877-638-6621. Customer agrees to pay TA's
         charges for emergency escort services, which charges shall be based on
         a rate of Ninety Dollars per hour ($90.00/hr). If Customer requires
         access to TA's common space, it shall provide TA with reasonable
         advance notice and TA shall provide escorted access. Customer shall pay
         TA's charges for such escorted access. In no case shall Customer enter
         TA's common space without a TA escort, unless authorized by TA in
         writing in advance.

         b.       Security. Customer shall abide by TA's reasonable security
         requirements. When deemed appropriate by TA, Customer employees or
         representatives shall be issued passes or visitor identification cards
         which must be presented upon request before entry to Selected Sites and
         surrendered upon demand or upon

URRS Agreement                     Page 133             Dated: September 9, 2002
Appendix G

         termination of this Agreement. Such passes or other identification
         shall be issued only to persons meeting any reasonable security
         criteria applicable at the relevant Selected Site for such purpose.
         Any individual entering a Selected Site will be required to notify (by
         telephone) the TA Network Operations Center. TA shall provide Customer
         with a toll free number to reach the Network Operations Center. Upon
         leaving the Selected Site, the individual shall notify the Network
         Operations Center to confirm exiting the space and lock the entrance
         gate.

         c.       Right to Terminate Individual's Access. Notwithstanding any
         other provision of this Agreement, TA shall, without threat of
         liability, have the right to immediately terminate the right of access
         of any Customer personnel, agent or representative should it determine
         in the reasonable exercise of the discretion that such access is or
         poses an immediate and serious threat to persons or property located
         at the Selected Site or the integrity of the TA network. TA shall
         promptly notify Customer of any such termination, and Customer shall
         have a reasonable opportunity to demonstrate that the individual
         access rights should be reinstated. Any termination of an individual's
         access shall remain in effect pending such demonstration and TA's
         determination as to the advisability of such reinstatement. This
         determination shall not be unreasonably withheld or delayed. Any
         determination by TA shall be final.

6.       Use of Customer Equipment and Interconnect Facilities.

         a.       Power Use. Customer shall not install any Customer Equipment
         or other equipment that overloads any electrical circuits or
         associated hardware that uses greater than 20 AMPs of power.

         b.       Standards. Customer shall ensure that the Customer Equipment
         and any Interconnect Facilities are installed, operated, and
         maintained to meet or exceed any reasonable requirements of TA, any
         reasonable requirements of TA's building management or insurance
         underwriters, and any applicable local, state and federal codes and
         public health and safety laws and regulations (including fire
         regulations and the National Electric Code).

         c.       Intervention. If any part of Customer's fiber, Interconnect
         Facilities or Customer Equipment is not placed and maintained in
         accordance with the terms and conditions of this Agreement and Customer
         fails to correct the violation within fifteen (15) business days from
         receipt of written notice thereof from TA, then TA may, at its option,
         without further notice to Customer, correct the deficiency at
         Customer's expense without liability for damages, except to the extent
         caused by TA's gross negligence or willful misconduct, to any fiber,
         Interconnect Facilities or Customer Equipment or for any interruption
         of Customer's services. As soon as practicable thereafter, TA shall
         advise Customer in writing of the work performed or the action taken.
         Customer shall reimburse TA for all expenses reasonably incurred by TA
         associated with any work or action performed by TA pursuant hereto.
         Customer shall remit payment to TA within thirty (30) days from its
         receipt of TA's invoice therefor.

         d.       Threat to Persons or Property. If TA determines that
         Customer's actions or failure to fulfill an obligation of this
         Agreement, or its Interconnect Facilities

URRS Agreement                     Page 134             Dated: September 9, 2002
Appendix G

         or Customer Equipment poses an immediate threat (i) to the safety of
         TA's employees or the public, (ii) to the use by other parties of
         their fiber or equipment, (iii) to the physical integrity of any
         Selected Site, Facility or other TA's facilities, or the facilities of
         the other parties, or (iv) materially interferes with the performance
         of TA's service obligations for the Selected Site, TA shall give
         notice to Customer, and in the event that Customer does not take
         immediate action to cure such threat, TA may perform such work and/or
         take such action that it deems necessary without notice to Customer
         and without subjecting itself to any liability for damage to Customer
         fiber, Interconnect Facilities or the Customer Equipment or for any
         interruption of Customer's services, except to the extent caused by
         TA's gross negligence or willful misconduct. As soon as practicable
         thereafter, TA shall advise Customer in writing of the work performed
         or the action taken. Customer shall reimburse TA for all expenses
         reasonably incurred by TA associated with any work or action performed
         by TA pursuant hereto. Customer shall remit payment to TA within
         thirty (30) days from its receipt of TA's invoice therefor.

7.       Liens and Encumbrances. Customer shall not create and, if created by
Customer, shall not permit any lien or encumbrance, including, without
limitation, tax liens, mechanics' liens, or other liens or encumbrances, on the
TA network, any Facilities, the Selected Sites, any equipment or property of TA
or any third party in the Facilities or Selected Sites or any Interconnect
Facility.

8.       Taxes and Franchises, Licenses and Permit Fees. Customer shall be
responsible for payment of all sales, use, gross receipts, excise, access,
bypass, franchise or other local, state and Federal taxes, fees, charges or
surcharges however designated, imposed on or based upon the provision, sale or
use of the Cabinet or Interconnect Facility or any equipment or materials
related to the Cabinet or Interconnect Facility (the "Taxes"), except Taxes on
the income or property of TA.

9.       Relocation of Customer Equipment and Interconnect Facilities. Customer
shall, at TA's sole expense, relocate its fiber, Interconnect Facilities and
Customer Equipment within a Selected Site upon TA's written request and in the
reasonable (under the circumstances) time frame requested by TA; provided, that
such relocated Facilities are substantially the same as the previously used
Facilities and such relocation can be performed without unreasonable
interruption of services by Customer.

10.       Inspections. TA reserves the right to have an inspector present during
any delivery or installation of Customer Equipment or Interconnect Facility, and
to make periodic inspections of any part of a Selected Site, Facility,
Interconnect Facility, Cabinet or Customer Equipment. Customer shall have the
right to have one or more of its employees or representatives present during the
time of any such inspection involving Customer Equipment or Interconnect
Facilities. TA shall give Customer reasonable advance notice of such
inspections, except in those instances where TA determines that safety
considerations justify the need for such an inspection without the delay of
providing notice. The making of periodic inspections or the failure to do so
shall not operate to impose upon TA any liability of any kind whatsoever nor
relieve Customer of any responsibility, obligation, or liability in accordance
with this Agreement.

11.       No Restrictions on TA. Except as otherwise specifically limited in
this

URRS Agreement                     Page 135             Dated: September 9, 2002
Appendix G

Agreement, TA shall have the right to maintain and operate its facilities in a
manner meeting or exceeding standard telecommunications industry practice as
will best enable it to fulfill its own service requirements.

12.      Term and Termination.

         a.       Term. The Term of this Agreement ("Term") shall commence on
         execution by the Parties and shall continue in effect until the
         earlier of (a) the expiration of all Site Terms or (b) the expiration
         or termination of this Agreement in accordance with its terms.
         Termination of this Agreement shall result in the immediate
         termination of all Site Terms.

         b.       Termination by TA. TA may terminate this Agreement in the
         following circumstances:

                  (i)    at any time following Customer's termination of all
         Site Terms in accordance with Section 3.b;

                  (ii)   immediately upon the Customer becoming insolvent or
         bankrupt or unable to pay its debts as they fall due or any bankruptcy,
         reorganization, debt arrangement or other proceeding under any
         bankruptcy or insolvency law or any dissolution or liquidation
         proceedings being instituted by or against the Customer and, if
         instituted against the Customer and defended by the Customer, remaining
         undismissed for thirty (30) days; or

                  (iii)  immediately upon the appointment of a receiver or
         receiver and manager or officer with similar powers over any part of
         the Customer's property.

                  (v)    upon thirty (30) days prior written notice, (or
         immediately in the event of imminent danger to persons or property) if
         TA, in its reasonable opinion, determines that continued operation of
         the Customer Equipment at the Selected Site represents a danger to the
         public or to TA personnel or the personnel of TA customers, or will
         interfere with TA's network, equipment or facilities or the equipment
         or facilities of TA's customers or will otherwise adversely affect the
         provision of service by TA and Customer has not cured the condition
         giving rise to the notice; provided that TA need for space in a
         Selected Site shall not constitute interference with or be deemed to
         adversely affect the provision of service by TA. TA may, at its option
         and in lieu of termination, suspend any and all services and/or
         facilities, including the furnishing of electrical power, to be
         provided hereunder until such time as the perceived danger or
         interference has been eliminated. Written notice of suspension shall be
         given to Customer as far prior to suspension as practical, and
         otherwise as soon as reasonably practical thereafter.

         c.       Termination by Customer. Customer may terminate this Agreement
         in the following circumstances:

                  (i)    at any time following Customer's termination of all
         Site Terms in accordance with Section 3.b;

URRS Agreement                     Page 136             Dated: September 9, 2002
Appendix G

                  (iii)  immediately upon TA becoming insolvent or bankrupt or
         unable to pay its debts as they fall due or any bankruptcy,
         reorganization, debt arrangement or other proceeding under any
         bankruptcy or insolvency law or any dissolution or liquidation
         proceedings being instituted by or against the Customer and, if
         instituted against TA and defended by TA, remaining undismissed for
         thirty (30) days;

                  (iv)   immediately upon the appointment of a receiver or
         receiver and manager or officer with similar powers over any part of
         the Customer's property.

         d.       Termination Charges. In the event of termination of this
         Agreement by TA for any of the reasons enumerated in paragraph b (ii)
         and (iii) above, Customer shall pay, as liquidated damages and not as
         a penalty, termination charges equal to the net present value of the
         remaining Rent payments.

13.      Default.

         a.       Default. Either Party may terminate this Agreement upon the
         other Party's default and continuance after fifteen (15) days written
         notice thereof in the observation or performance of any material term,
         covenant or condition of this Agreement; provided, however, that where
         such default cannot reasonably be cured within such fifteen (15) day
         period, if the defaulting Party shall proceed promptly to cure the
         same and prosecute such curing with due diligence, the time for curing
         such default shall be extended for a period no longer than forty-five
         (45) days from the date of the receipt of the default notice.

         b.       Remedies. In the event that TA terminates of this Agreement
         pursuant to this Section 13, Customer shall pay to TA, as liquidated
         damages and not as a penalty, an amount equal to the net present value
         of the remaining Rent payments. In the event that Customer terminates
         this Agreement pursuant to this Section 13 Customer, as its sole
         remedy, may terminate this Agreement and seek such actual damages as
         are available under law or equity; provided, however that the amount
         of such damages shall be limited to the amount of Rent paid by
         Customer during the twelve (12) months prior to such termination.

414      Removal of Customer Equipment. Customer shall,(and TA shall provide
access as necessary) within thirty (30) days after the termination or expiration
of a Site Term, remove all Customer Equipment and Customer Interconnect
Facilities from the Selected Site. Customer shall, (and TA shall provide access
as necessary) within sixty (60) days after termination or expiration of this
Agreement, remove all Customer Equipment and Customer Interconnect Facilities
from all Selected Sites. Removal shall be at Customer's sole cost under TA's
supervision. If Customer fails to remove the same within said periods it shall
deemed abandoned, and TA shall notify Customer in writing that TA will either:

                  (i)    remove Customer's Equipment and Customer Interconnect
         Facilities and issue an invoice to Customer for the cost of removal
         and storage; or

                  (ii)   thirty (30) days from the date of the notice take
         ownership of such

URRS Agreement                     Page 137             Dated: September 9, 2002
Appendix G

         abandoned Customer Equipment and Customer Interconnect Facilities.

         If TA provides the notice with respect to clause (i), Customer shall
pay the invoice within thirty (30) days of receipt thereof. If TA provides the
notice with respect to clause (ii), Customer shall remove the Customer Equipment
and Customer Interconnect Facilities within such thirty (30) day period or
thereafter upon TA's request execute a bill of sale or other document evidencing
TA's title to such Customer Equipment and Customer Interconnect Facilities.

15       Insurance.

         a.       Type. During the term of this Agreement, the Parties shall
         each obtain and maintain, the following insurance:

                  (i)    Commercial General Liability Insurance with a combined
         single limit of $5,000,000 for bodily injury and property damage.

                  (ii)   Worker's Compensation Insurance in amounts required by
         applicable law and Employers Liability Insurance with limits of
         $1,000,000 each accident.

                  (iii)  Automobile Liability Insurance with a combined single
                         limit of $1,000,000 for bodily injury and property
                         damage, to include coverage for all owned, non-owned
                         and hired vehicles.

                  (iv)   Excess or Umbrella Liability Insurance with a
                         combined single limit in excess of the amounts
                         required in (I,II,III) above of $5,000,000 for bodily
                         injury and property damage each occurrence and annual
                         aggregate.

         b.  The Customer shall also obtain and maintain All-Risk Property
         insurance with standard extended coverage, replacement value, without
         co insurance factor, for the full replacement value of Customer's
         Equipment, any Improvements and Betterments to the building(s), and
         until all Equipment has been removed from the Touch America Building.

         b.       Limits. The limits set forth above are minimum limits and
         shall not be construed to limit the liability of either Party.

         c.       TA Insurers. TA insurance policies required above shall be
         obtained and maintained with companies rated A or better by Best's Key
         Rating Guide. All such insurance or shall, to the extent of TA's
         indemnity obligation contained in this Agreement, be primary to any
         other available coverage. TA shall provide Customer with an insurance
         certificate confirming compliance with the insurance requirements in
         this Section 14. The insurance certificate shall indicate that Touch
         America shall endeavor to notify Customer not less than thirty (30)
         days prior to any cancellation or material change in coverage.

         d.       Customer Insurers. Customer's insurance policies required
         above shall be obtained and maintained with companies rated A or
         better by Best's Key Rating Guide. All such insurance shall, to the
         extent of Customer's indemnity obligation contained in this Agreement,
         be primary to any other available coverage.

URRS Agreement                     Page 138             Dated: September 9, 2002
Appendix G

         Customer shall provide TA with an insurance certificate confirming
         compliance with the insurance requirements in this Section 15. The
         insurance certificate shall indicate that TA shall be notified not
         less than thirty (30) days prior to any cancellation or material
         change in coverage.

         e.       Denied Coverage. In the event coverage is denied or
         reimbursement of a properly presented claim is disputed by the carrier
         for insurance provided above, the Party carrying such coverage shall
         make commercially reasonable efforts to pursue such claim with its
         carrier.

         f.       Subrogation. Except for Worker's Compensation coverage, each
         party shall obtain from the insurance companies providing the coverage
         required by this Agreement a waiver of all rights of subrogation or
         recovery against the other party and its parent corporation,
         shareholders, affiliates, subsidiaries, assignees, officers,
         directors, and employees or any other party entitled to indemnity
         under this Agreement.

16       Indemnification and Limitation of Liability.

         a.       Customer. Customer hereby releases and agrees to indemnify,
         defend, protect and hold harmless TA, its employees, officers,
         directors, agents, contractors, shareholders and Affiliates
         ("Indemnified Persons"), from and against any third party claims,
         suits, proceedings and actions ("Claims") for:

                  (i)    Any injury, death, loss or damage to any person,
         tangible property or facilities of any person or entity (including
         reasonable attorney fees and costs at trial and appeal) to the extent
         arising out of or resulting from the acts or omissions, negligent or
         otherwise, of Customer, its officers, employees, servants, agents or
         contractors in connection with its performance under this Agreement;
         and

                  (ii)   Any liabilities or damages (including reasonable
         attorney fees and costs at trial and appeal) arising out of any
         violation by Customer of regulations, rules, statutes or court orders
         of any local, state or federal governmental agency, court or body in
         connection with its performance under this Agreement.

         b.       TA. TA hereby releases and agrees to indemnify, defend,
         protect and hold harmless Customer, and its Indemnified Persons from
         and against any third party Claims for:

                  (i)    Any injury, death, loss or damage to any person,
         tangible property or facilities of any person or entity (including
         reasonable attorney fees and costs at trial and appeal), to the extent
         arising out of or resulting from the acts or omissions, negligent or
         otherwise, of TA, its officers, employees, servants, agents or
         contractors in connection with its performance under this Agreement;
         and

                  (ii)   Any liabilities or damages (including reasonable
         attorney fees and costs at trial and appeal) arising out of any
         violation by TA of regulations, rules, statutes or court orders of any
         local, state or federal governmental agency, court or body in
         connection with its performance under this Agreement.

URRS Agreement                     Page 139             Dated: September 9, 2002
Appendix G

         c.       Survival. TA and Customer hereby expressly recognize and agree
         that each Party's obligation to indemnify, defend, protect and save
         harmless Indemnified Persons is a material obligation to the
         continuing performance of the Parties' other obligations, if any,
         hereunder. The obligations of this Section 16 shall survive the
         expiration or earlier termination of this Agreement. TA and Customer
         each affirmatively state and warrant to the other that its indemnity
         obligation will be supported by liability insurance to be furnished by
         it, as set forth in Section 14 above; provided that recovery under or
         in respect of this indemnity shall not be limited to the proceeds of
         any such insurance.

         d.       Limitation. Notwithstanding any other provision of this
         Agreement, TA AND CUSTOMER HEREBY EXPRESSLY AGREE THAT IN NO EVENT
         SHALL EITHER OF THEM BE LIABLE TO THE OTHER FOR ANY LOST OR
         PROSPECTIVE PROFITS OR ANY OTHER SPECIAL PUNITIVE, EXEMPLARY,
         CONSEQUENTIAL, INCIDENTAL OR INDIRECT LOSSES OR DAMAGES (IN TORT,
         CONTRACT OR OTHERWISE) UNDER OR IN RESPECT OF THIS AGREEMENT OR FOR
         ANY FAILURE OF PERFORMANCE RELATED HERETO HOWSOEVER CAUSED, WHETHER OR
         NOT ARISING FROM SOLE, JOINT OR CONCURRENT NEGLIGENCE.

17.      Subordination. Customer's rights under this Agreement shall be totally
subordinate to any bona fide mortgages, loans, deeds of trust, or any other
encumbrance upon the Selected Site, Facility or other real or personal property
of TA which may be incurred by TA; provided, however, that TA shall use
reasonable efforts to assure Customer's rights under this Agreement are not
disturbed. Customer shall sign any such reasonable documents as are necessary to
satisfy any lender, private or institutional, to reflect said subordination.

18       Assignment.

         a.       By Customer. Customer may not assign or otherwise transfer
         this Agreement or any rights or obligations hereunder to any other
         party without the prior written consent of TA, which consent shall not
         be unreasonably withheld; provided, however, any such assignee or
         transferee shall agree in writing to be bound and abide by this
         Agreement. Customer shall have the right, without TA's consent, to
         assign or otherwise transfer this Agreement, or to any entities
         controlling, controlled by or under common control with Customer,
         ("Affiliates") or to any corporation that purchases all of the stock
         or all or substantially all of the assets of Customer, or as
         collateral to any lender; provided, however, that: (a) any such
         assignment or transfer shall be subject to TA's rights under this
         Agreement and any assignee or transferee shall continue to perform
         Customer's obligations to TA under the terms and conditions of this
         Agreement; and (b) such assignee or transferee shall agree in writing
         to be bound and abide by this Agreement. In the event of any permitted
         partial assignment of any rights hereunder Customer shall remain the
         sole point of contact with TA.

         b.       By TA. TA may not assign or otherwise transfer this Agreement
         or any rights or obligations hereunder to any other party without the
         prior written consent of Customer, which consent shall not be
         unreasonably withheld;

URRS Agreement                     Page 140             Dated: September 9, 2002
Appendix G

         provided, however, any such assignee or transferee shall agree in
         writing to be bound and abide by this Agreement. TA shall have the
         right, without Customer's consent, to assign or otherwise transfer
         this Agreement to any Affiliate of Customer, or to any corporation
         that purchases all of the stock or all or substantially all of the
         assets of Customer, or as collateral to any lender; provided, however,
         that: (a) any such assignment or transfer shall be subject to
         Customer's rights under this Agreement and any assignee or transferee
         shall continue to perform TA's obligations to Customer under the terms
         and conditions of this Agreement; and (b) such assignee or transferee
         shall agree in writing to be bound and abide by this Agreement. In the
         event of any permitted partial assignment of any rights hereunder TA
         shall remain the sole point of contact with Customer.

19       Confidentiality.

         a.       Separate Agreement. If the Parties have entered into (or later
         enter into) a confidentiality agreement, the terms of such an
         agreement shall control and Section 19 (b) below shall not apply;
         provided, however, that if any such confidentiality agreement expires
         or is no longer effective at any time when this Agreement is
         effective, Section 19 (b) below shall be in effect for such periods.

         b.       Agreement. In the absence of a separate confidentiality
         agreement between the Parties, if either Party provides confidential
         information to the other in writing and identified as such or if in
         the course of performing under this Agreement a Party learns
         confidential information regarding the facilities or plans of the
         other, the receiving Party shall protect the confidential information
         from disclosure to third parties with the same degree of care accorded
         its own confidential and proprietary information; provided, however,
         that the Parties shall each be entitled to provide such confidential
         information to their respective directors, officers, members,
         managers, employees, agents, and contractors ("Representatives"),
         Affiliates, or the Representatives of such Affiliates, in each case
         whose access is reasonably necessary; provided, however, that neither
         the Party nor its Affiliates nor their respective Representative shall
         use such confidential information for any marketing, competitive or
         sales purpose. Each such recipient of confidential information shall
         be informed by the Party disclosing confidential information of its
         confidential nature, and shall be directed to treat such information
         confidentially and shall agree to abide by these provisions. In any
         event, each Party shall be responsible for any breach of this
         provision by any person to whom that Party discloses confidential
         information. Neither TA nor Customer shall be required to hold
         confidential any information that: (a) becomes publicly available
         other than through the recipient; (b) is independently developed by
         the disclosing Party; or (c) becomes available to the disclosing Party
         without restriction from a third party. These obligations shall
         survive expiration or termination of this Agreement for a period of
         two (2) years.

         c.       Limitation. Notwithstanding clauses (a) and (b) above,
         confidential information shall not include information disclosed by
         the receiving Party as required by applicable law or regulation;
         provided, however, that the disclosing Party uses reasonable efforts
         to provide the other Party with written notice of such potential
         disclosure, prevent such disclosure, and provide the other Party with
         a reasonable opportunity to secure the confidential protections
         thereof.

URRS Agreement                     Page 141             Dated: September 9, 2002
Appendix G

         Notwithstanding the foregoing, this Agreement may be provided to any
         governmental agency or court of competent jurisdiction to the extent
         required by applicable law.

         d.       Trademarks. Neither Party shall use the name, tradename,
         servicemark or trademark of the other, nor issue any press releases
         regarding this Agreement or the terms and conditions of this Agreement
         or use the other Party's name in any promotional or advertising
         material without the prior written consent of such Party.

20       REPRESENTATIONS AND WARRANTIES. Each Party represents and warrants that
it has full power and authority to execute, deliver and perform its obligations
under this Agreement, that it has duly executed and delivered this Agreement and
that this Agreement constitutes the legal valid and binding obligation of such
Party enforceable against it in accordance with its terms, subject to
bankruptcy, insolvency, reorganization and other laws affecting creditors'
rights generally. EXCEPT AS OTHERWISE SPECIFICALLY SET FORTH IN THIS AGREEMENT,
TA MAKES NO WARRANTY TO CUSTOMER OR ANY OTHER PERSON OR ENTITY, WHETHER EXPRESS,
IMPLIED OR STATUTORY, AS TO THE INSTALLATION, DESCRIPTION, QUALITY,
MERCHANTABILITY, COMPLETENESS OR FITNESS FOR ANY PURPOSE OF ANY SELECTED SITE
CABINET OR INTO INTERCONNECT FACILITY OR ANY OTHER EQUIPMENT FACILITY OR SERVICE
PROVIDED HEREUNDER OR DESCRIBED HEREIN, OR AS TO ANY OTHER MATTER, ALL OF WHICH
WARRANTIES ARE HEREBY EXCLUDED AND DISCLAIMED.

21       Independent Parties. The Parties are independent contractors and
nothing herein, including the presence of a TA or Customer employee or
representative (as an inspector or otherwise) while an employee or
representative of the other Party at any Facilities or any Selected Site or
performing work pursuant to this Agreement, shall make a Party an agent, partner
or joint venturer of the other Party; make a Party liable for the actions of the
other Party or relieve a Party of the responsibility to perform its obligations
hereunder in a safe and workmanlike manner.

22       Governing Law. This Agreement shall be governed by and construed in
accordance with the domestic laws of the State of New York without reference to
its choice of law principles.

23       Notice. Any notices required or permitted to be given under this
Agreement will be deemed sufficiently given if in writing, and if delivered by
hand, by courier, by confirmed facsimile or sent by registered or certified
mail, postage and fees prepaid, addressed to the party to be notified at its
address shown below, or at such other address as may be furnished in writing to
the notifying party.

TOUCH AMERICA, INC.                                  CUSTOMER
130 North Main Street                                XXX, LLC
Butte, MT  59701                                     XXXX
Attention: Liza Dennehy                              XXXX
                                                     Attention:
Copies to:

URRS Agreement                     Page 142             Dated: September 9, 2002
Appendix G

TOUCH AMERICA, INC.
Legal Department
130 North Main Street
Butte, MT  59701
Attention: Susan Callaghan

24.      Miscellaneous.

         a.       Amendment. This Agreement may not be amended or modified
         except in writing signed by both Parties.

         b.       Severability. In the event that any one or more of the
         clauses, covenants or provisions contained in this Agreement should be
         held unenforceable under any federal, state or local government law,
         statute, code, or regulatory rule, such invalidity or unenforceability
         shall not affect the remainder of this Agreement, which remains in
         full force and effect.

         c.       Waiver. Any failure of a Party to insist upon the strict
         observance or performance by the other Party of the provisions of this
         Agreement shall not be deemed a waiver by such Party of any such
         provision, a modification of such provision or a release by such Party
         of its right to claim a breach by reason of such failure.

         d.       Entire Agreement. This Agreement and any referenced
         attachments constitute the complete agreement between the Parties
         related to the subject matter hereof, and supersedes any prior or
         contemporaneous agreements, whether written or oral.

         e.       Counterparts. This Agreement may be executed simultaneously in
         any number of counterparts, each of which when so executed and
         delivered shall be taken to be an original, but such counterparts
         shall together constitute but one and the same document.

         f.       Facsimile Delivery. This Agreement may be delivered by
         facsimile transmission of an executed counterpart signature page
         hereof, and after attachment of such transmitted signature page to a
         copy of this Agreement, such copy shall have the same effect and
         evidentiary value as copies delivered with original signatures. Any
         Party delivering this Agreement by facsimile transmission shall
         deliver to the other Party, as soon as practicable after such
         delivery, an original executed counterpart signature page of this
         Agreement.

         IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as
of

URRS Agreement                     Page 143             Dated: September 9, 2002
Appendix G

the date first written above.

Touch America, Inc. ("TA")                           XXX, LLC ("Customer")

_______________________________________________________________________________
Name:                                          Name

_______________________________________________________________________________
Title:                                         Title:

URRS Agreement                     Page 144             Dated: September 9, 2002
Appendix G

                                  APPENDIX H

                             INTENTIONALLY OMITTED

URRS Agreement                     page 145             Dated: September 9, 2002
Appendix H

                                  APPENDIX I

                                QUITCLAIM DEED

                                METRO CONDUIT

         SIERRA TOUCH AMERICA, LLC., a Nevada limited liability company (the
"Grantor"), for good and valuable consideration paid to it by SIERRA PACIFIC
COMMUNICATIONS, a Nevada corporation (the "Grantee"), pursuant to a Unit
Redemption, Release, and Sale Agreement dated as of September 9, 2002 between
Grantor and Grantee (the "Agreement"), and for other good and valuable
consideration, receipt and sufficiency of which are hereby mutually
acknowledged, does hereby remise, release and quitclaim unto Grantee forever,
all the right, title, interest and claim which Grantor has in and to the
following:

         The land, improvements and appurtenances upon, over, across, above, and
along which is placed, and occupied thereby, the personal property and assets
described or identified as the "Metro Conduit" in Section V of the Agreement or
on schedules relating thereto, in the Counties of Washoe, Storey, Churchill,
Carson and Douglas, in the State of Nevada.

         This instrument shall be binding upon, inure to the benefit of, and be
enforceable by, Grantee and its successors and assigns.

         IN WITNESS WHEREOF, the undersigned Grantor has executed this Quitclaim
Deed as of the 9th day of September, 2002.

                                            GRANTOR:

                                            SIERRA TOUCH AMERICA LLC,
                                            a Nevada limited liability company

                                            By _________________________________
                                               MICHAEL J. MELDAHL,
                                               Manager
STATE OF MONTANA    )
COUNTY OF SILVER BOW    )

         The foregoing instrument was acknowledged before me this ___ day of
_______, 2002, by _________________________, known to be the individual
described in and who executed this instrument.

                                                ________________________________

         NOTARY PUBLIC

My Commission Expires: _________________________

URRS Agreement                     Page 146             Dated: September 9, 2002
Appendix I

                                  APPENDIX J

                                 METRO CONDUIT
                          ASSIGNMENT AND BILL OF SALE

         SIERRA TOUCH AMERICA, LLC., a Nevada limited liability company (the
"Seller"), for good and valuable consideration paid to it by SIERRA PACIFIC
COMMUNICATIONS, a Nevada corporation (the "Purchaser"), pursuant to a Unit
Redemption, Release, and Sale Agreement dated as of September 9, 2002 between
Seller and Purchaser (the "Agreement"), and for other good and valuable
consideration, receipt and sufficiency of which are hereby mutually
acknowledged, does hereby sell, assign, transfer, convey, and deliver to
Purchaser, its successors and assigns, the following:

         The personal property and assets described or identified as the "Metro
Conduit" in Section V of the Agreement or on schedules relating thereto, free
and clear of any and all material claims, liens, and encumbrances except as
specifically identified or assumed by Purchaser as set forth in Schedule II of
the Agreement.

         Seller hereby covenants and agrees that it will warrant and defend the
sale of these assets against each and every person or persons whomsoever
claiming against any or all of the same. This instrument shall be binding upon,
inure to the benefit of, and be enforceable by, Seller and Purchaser and their
respective successors and permitted assigns.

         IN WITNESS WHEREOF, the undersigned have executed this Assignment and
Bill of Sale as of this 9th day of September 2002.

                                          SELLER:

                                          SIERRA TOUCH AMERICA LLC,
                                          a Nevada limited liability company

                                          By ___________________________________
                                             MICHAEL J. MELDAHL, Manager

                                          PURCHASER:

                                          SIERRA PACIFIC COMMUNICATIONS,
                                          a Nevada corporation

                                          By ___________________________________
                                             RICHARD J. COYLE, JR., President

URRS Agreement                     Page 147             Dated: September 9, 2002
Appendix J

                                  APPENDIX K

                              METRO IRU AGREEMENT

         This METRO IRU AGREEMENT (the "Agreement") is made as of September 9,
2002, between SIERRA TOUCH AMERICA LLC, a Nevada limited liability company,
with offices at 130 North Main, Butte, Montana 59701 ("SPC"), and SIERRA
PACIFIC COMMUNICATIONS, a Nevada corporation, with offices at 5860 S. Pecos,
Bldg. G, Ste. 100, Las Vegas, NV 89120 ("SPC") (each individually a "Party",
and collectively the "Parties").

         WHEREAS, SPC has commenced construction of a fiber optic communication
system consisting of dark fiber strands and other fiber optic facilities within
the Reno and Las Vegas metropolitan areas (collectively, the "Metro Network")
described in Attachment 1 hereto, and

         WHEREAS, upon the terms and conditions set forth below and set forth in
the Unit Redemption, Release, and Sale Agreement between Touch America, Inc.,
STA, and SPC of even date herewith (the "URRS Agreement"), and the April 25,
2000 Operating Agreement of Sierra Touch America LLC between SPC and Touch
America, Inc., STA desires to acquire from SPC and SPC desires to convey to STA
an indefeasible right of use in twelve strands of dark fiber from the Reno
metropolitan network and four (4) strands of dark fiber from the Las Vegas
metropolitan network.

         NOW, THEREFORE, in consideration of the mutual promises set forth
below, the Parties hereby agree as follows:

1.       DEFINITIONS

As used in this Agreement:

1.1      "Authorized Use" means a business purpose of STA's optical fiber
telecommunications network for telecommunication traffic of STA or STA's
Customers.

1.2      "Strands" individual fiber optic strands within the Network.

1.3      "Dark Fiber" means one or more Strands subject to this Agreement
through which an associated light, signal or light communication transmission
must be provided to furnish service. 1.4 "Indefeasible Right Of Use" or "IRU"
means an irrevocable and exclusive right to use SPC's Dark Fiber as described
in this Agreement.

1.5      "Environmental, Health, or Safety Complaint" means any complaint,
summons, citation, notice, directive, order, claim, litigation, investigation,
proceeding, judgment, letter or communication from any federal, state, or
municipal authority or any other private party involving a Hazardous Discharge
from, in or at or along SPC's Network or SPC's facilities installed in the
Network or any violation related to SPC's Route or its facilities installed in
the Route of any order, permit, or Environmental, Health and Safety Law.

1.6      "Environmental, Health and Safety Laws" means any federal, state, or
local statute, regulation, rule, ordinance or applicable governmental order,
decree, or settlement agreement, or principle or requirement of common law,
regulating or protecting the environment or human health or safety, including
without limitation the Comprehensive Environmental

URRS Agreement                     Page 148             Dated: September 9, 2002
Appendix K

Response, Compensation, and Liability Act (42 U.S.C. Section 9601 et seq.), as
amended, the Resource Conservation and Recovery Act (42 U.S.C. Section 6901 et
seq.), as amended, and the Occupational Safety and Health Act (29 U.S.C.
Section 651 et seq.), as amended, and regulations promulgated thereunder.

1.7      "Hazardous Discharge" means any release, spill, leak, pumping,
emission, discharge, injection, leaching, pouring, disposing or dumping of a
Hazardous Substance.

1.8      "Hazardous Substance" means any pollutant or contaminant or any
hazardous or toxic chemical, waste, material, or substance, including without
limitation any defined as such under Environmental, Health and Safety Laws, and
including without limitation asbestos, petroleum products and wastes,
polychlorinated biphenyl's, and radon gas.

1.9      "Metro Network" or "Network" means SPC's fiber optic facilities within
the Reno and Las Vegas metropolitan areas.

1.10     "STA Strands" means twelve (12) strands of dark fiber from the Reno
metropolitan network and four (4) strands of dark fiber from the Las Vegas
metropolitan network, as designated by SPC.

1.11     "Useful Life" means the period from the Acceptance Date of STA's
Strands until the date they are no longer capable of producing commercial
revenues.

2.       GRANT OF IRU

2.1      Upon the terms, covenants and conditions contained in this Agreement
and subject to the terms and conditions contained in URRS Agreement, SPC grants
to STA and STA accepts from SPC an Indefeasible Right of Use of the STA Strands
solely for Authorized Use (the "IRU") during the Term of the IRU as provided in
this Agreement. STA shall have no further right, title or other interest in
SPC's Network, its fiber optic facilities or SPC's Strands. SPC shall have the
right to grant and renew rights to any entity to use SPC's Network, its fiber
optic facilities or any other property of SPC (exclusive of the STA Strands
during the term of the IRU).

2.2      It is understood and agreed as between the Parties that the grant of
the IRU shall be treated for federal and all applicable state and local tax
purposes as the sale and purchase of the STA Strands, and that on or after the
exercise of its IRU, STA shall be treated as the owner of the STA Strands for
such purposes. The Parties agree to file their respective income tax returns,
property tax returns and other returns and reports for their respective
Assessments on such basis and, except as otherwise required by law, not to take
any positions inconsistent therewith.

3.       TESTING AND ACCEPTANCE

3.1      SPC shall test all STA's Strands in accordance with the procedures
specified in Schedule C ("Fiber Cable Splicing, Testing, and Acceptance
Standards and Procedures") to verify that STA's Strands are installed and
operational in accordance with the specifications described in Schedule C. SPC
shall provide STA reasonable advance notice of the date and time of each Fiber
Acceptance Testing such that STA shall have the opportunity to have a person or
persons present to observe SPC's Fiber Acceptance Testing. When SPC has
determined that the results of the Fiber Acceptance

URRS Agreement                     Page 149             Dated: September 9, 2002
Appendix K

Testing with respect to a particular segment show that the STA's Strands so
tested are installed and operating in conformity with the applicable
specifications as set forth in Schedule C, SPC shall promptly provide STA with
a copy of such test result.

3.2      If and when SPC gives written notice to STA that the test results of
the Fiber Acceptance Testing are within parameters of the specifications in
Schedule C with respect to an entire segment, STA shall provide SPC with
written notice accepting (or rejecting by specifying the defect or failure in
the Fiber Acceptance Testing that is the basis for such rejection) STA's
Strands. If STA fails to notify SPC of its acceptance or rejection of the final
test results with respect to STA's Strands comprising a segment within twenty
(20) days after STA's receipt of notice of such test results, STA shall be
deemed to have accepted such segment. If, during the course of such testing,
any material deviation from the specifications set forth in Schedule C is
discovered, the construction or installation of the affected portion of the
segment shall be repaired to such specification by SPC at SPC's sole cost and
expense. The date of such notice of acceptance (or deemed acceptance) of STA's
Strands for all segments along the Route shall be the "Acceptance Date" for the
Route.

4.       CONSIDERATION

4.1      Consideration for the STA Strands shall be as set forth in the URRS
Agreement, the STA Operating Agreement, and related documents.

4.2      Beginning on August 1, 2003, STA shall pay to SPC an annual
maintenance fee of Two Hundred Forty dollars ($240.00) per Network mile each
year during the term of this Agreement for maintenance of the STA Strands.
Thereafter, STA shall pay the annual maintenance fee on or before the
anniversary date of this Agreement each year. This amount shall be adjusted
annually to reflect changes in the U.S. Producer Price Index (Bureau of Labor
Standards "All Finished Goods" Series ID WPUSOP3000), but in no event shall
such amount be less than $20 per actual route mile per month.

4.3      Except as otherwise specifically provided, STA shall pay all
applicable fees and charges provided for in this Agreement, within thirty (30)
days after receipt of invoice.

4.4      All payments not made within thirty (30) days of the due date shall
bear a late payment charge of one (1%) percent per month of the unpaid balance
or the highest lawful rate, whichever is less.

5.       TERM.

5.1      The Term of this Agreement shall begin on the date first above written
and shall end upon the expiration of the Useful Life of the STA Strands.

6.       TERMINATION

6.1      Upon the expiration of the Term of this Agreement, STA's IRU in the
STA Strands shall immediately terminate and all rights of STA to use the STA
Strands, or any part thereof, shall cease and SPC shall owe STA no additional
duties or consideration.

7.       AUTHORIZATIONS

URRS Agreement                     Page 150             Dated: September 9, 2002
Appendix K

7.1      SPC has obtained certain easements, leases, licenses, fee interests,
rights of- way, permits, authorizations and other rights necessary to allow SPC
to install and operate the Network. If a governmental entity requires STA or
its permitted assigns to obtain a separate license or permit for the STA
Strands, then SPC shall be responsible to obtain such license or permit at its
sole cost and expense. SPC agrees to use commercially reasonable efforts in
cooperating with STA with respect to STA's efforts to secure such licenses or
permits.

8.       MAINTENANCE AND OPERATION

8.1      SPC shall maintain the STA Strands in accordance with the requirements
and procedures set forth in Schedule D ("Maintenance and Operations
Specifications and Procedures"). STA shall cooperate with and assist, as may be
reasonably required, SPC in performing said maintenance.

8.2      In the event of service outages, SPC agrees to use commercially
diligent efforts to respond promptly and restore STA's Strands within the
parameters of the specifications in Schedule C; provided however, that STA
shall solely be responsible, at its own expense, for restoring an outage caused
by a failure of light, signal or light communication transmission. STA shall
also be solely responsible, at its own expense, for the routine surveillance of
the STA Strands, and the operation, maintenance and repair of all terminal
equipment and facilities required in connection with the use of the STA Strands.

8.3      SPC shall provide STA access to STA's Strands by cable stub taken by
SPC from the Network Facilities and delivered to STA at a splice point or, as
mutually agreed to by the parties, in selected SPC OA Sites at the fiber
distribution panel. If a splice point is not located at an SPC
manhole/handhole/overhead splice enclosure, SPC shall, if mutually agreed,
obtain all necessary permissions (if possible) and construct, at STA's expense,
a manhole/handhole/overhead splice enclosure for STA. STA shall, if necessary,
obtain the permissions outlined in the preceding sentence. All other splice
points shall be located at an SPC manhole/handhole/overhead splice enclosure.
STA is permitted to request access to splice points in the future, provided STA
reimburses SPC for any costs it incurs in providing access to such splice
points.

         8.3.1    SPC shall accomplish sheath opening and stub out of STA's
         Strands at the splice points in STA's and SPC's manholes/handholes/
         overhead splice enclosures. STA may splice its own fiber optic cable
         to STA's Strands only in STA's manholes/handholes/overhead splice
         enclosures. SPC shall splice STA's fiber optic cable to STA's Strands
         in SPC's manhole/handhole/overhead splice enclosures.

         8.3.2    The parties shall enter into a Collocation Agreement pursuant
         to which SPC shall provide collocation space to STA at SPC's Sites
         along the Route, such space and related services to be specifically
         defined in the Collocation Agreement. Should STA subsequently request
         additional space in SPC facilities along the Route not identified in
         the Collocation Agreement, SPC agrees to provide such space if it is
         available at the time STA requests such additional space. All billings
         for collocation space shall be made under the Collocation Agreement,
         and not this Agreement.

8.4      Within thirty (30) days after the Acceptance Date, SPC shall provide
to STA as-built drawings for the Route. The drawings shall contain ROW detail,
splice locations, manhole/handhole/overhead splice enclosure locations and STA
fiber count detail.

URRS Agreement                     Page 151             Dated: September 9, 2002
Appendix K

8.5      In exercising its rights under this Agreement, both parties shall at
their own expense comply with all applicable Environmental, Health and Safety
Laws; the requirements and specifications of the National Electrical Code and
the National Electrical Safety Code (all of the foregoing collectively referred
to as "EHS Requirements"); other applicable governmental laws, regulations,
ordinances, rules, codes, orders, guidance, permits, and approvals; and
applicable easement or license conditions. Any notice, report, correspondence,
or submissions made by STA to federal, state, or municipal environmental,
safety, or health authorities related to the SPC's Route or Network shall be
provided by STA to SPC promptly, and in no case later than twenty-four (24)
hours. STA also shall promptly provide to SPC a copy of any Environmental,
Health or Safety Complaint received by STA, and in no case late than three (3)
business days after STA's receipt of same. STA shall ensure that its employees
are trained in the proper procedures for entering and operating in the SPC's
Route and in its Network, optical amplifier sites and regenerator sites.

8.6      STA agrees to reimburse SPC the reasonable cost of SPC (i)
constructing manholes/handholes/overhead splice enclosures for STA; (ii)
accomplishing all sheath openings and stub out of STA's Strands; and (iii)
splicing STA's fiber optic cable to STA's Strands. Such charges shall be at
SPC's fully loaded labor rates then in effect and SPC's cost of material plus
fifteen (15%) per cent.

8.7      Should STA's splices or other work not be placed and maintained in
accordance with the provisions of this Agreement, SPC may at its option correct
said condition. SPC shall notify STA in writing prior to performing such work
whenever practicable. However, when such conditions pose an immediate safety
threat, interfere with the performance of SPC's service obligations, or pose an
immediate threat to the physical integrity of SPC's facilities, SPC, may
perform such work and take such action that it deems necessary without first
giving notice to STA. As soon as practicable thereafter, SPC shall advise STA
of the work performed and the action taken and shall endeavor to arrange for
re-accommodation of STA's Strands so affected. STA shall promptly reimburse SPC
for all reasonable costs incurred by SPC for all such work, action, and
re-accommodation performed by SPC.

8.8      In the event a Hazardous Discharge or other conditions are discovered
or created at or near work being performed by STA in on or around SPC's Route
that may require (i) investigation or remediation or (ii) unforeseen measures
to protect the environment, health or safety (collectively "Adverse EH&S
Conditions"), the party discovering the condition shall immediately notify the
other party. The party in the best position to do so (or, if the parties are
equally situated, STA) shall then immediately take reasonable measures to
temporarily contain or otherwise avoid exacerbation of or exposure to the
Adverse EH&S Conditions. Unless SPC affirmatively notifies STA otherwise, STA
shall also take such other actions as applicable EH&S Requirements prescribe.

8.9      STA shall be responsible for obtaining and maintaining, at its sole
expense, from the appropriate public or quasi-public authority, any franchises,
licenses, permits or other similar authorizations required to enter upon the
property where SPC's Route is located and to operate and maintain the STA
Strands and the STA Conduit in the SPC's Route.

8.10     STA, at its sole cost and expense, shall (i) use STA's Strands and
(ii) conduct all work in or around SPC's Route in a safe condition and in a
manner reasonably acceptable to SPC, so as not to physically, electronically or
inductively conflict or interfere or otherwise adversely affect SPC's Route or
the facilities placed therein by SPC, joint users, or other authorized STA's.
SPC

URRS Agreement                     Page 152             Dated: September 9, 2002
Appendix K

agrees to operate its facilities in the SPC's Route in a similar manner.

8.11     STA must obtain prior written authorization from SPC approving any
future work and the party performing such work before STA shall perform any
work in or around SPC's Route.

8.12     In the event STA receives information that SPC's Network or the fiber
optic facilities are damaged, it shall notify STA of said damage by phone at:
____________.

This is a 24 hour, 7 day per week notification number. In the event SPC
receives information that STA's Strands are damaged, SPC will notify STA of
said damage by phone at SPC's emergency telephone number. The call shall be
directed to the Supervisor on Duty, and the caller shall provide the following
information.

          1.     Name of Company making report.

          2.     Location reporting problem

          3.     Name of contact person reporting problem.

          4.     Telephone number to call back with progress report.

          5.     Description of the problem in as much detail as possible.

          6.     Time and date the problem occurred or began.

          7.     State whether or not the problem presents a jeopardy situation
                 to SPC's Network, the fiber optic facilities or STA's Strands.

8.13     SPC shall designate and notify STA of the particular Strands of Dark
Fiber that will constitute the STA Strands with thirty (30) days of the signing
of this Agreement.

8.14     If SPC moves, replaces or changes the location, alignment or grade of
SPC's Network ("Relocation"), SPC shall provide STA sixty (60) calendar days'
prior notice of any such relocation, if possible, and shall proceed
concurrently to relocate the STA Strands. If the Relocation is because of an
event of Force Majeure, pursuant to Section 26.2, or of any governmental or
third party authority, including a Taking by right of eminent domain, STA shall
reimburse SPC for SPC's proportionate share of the costs of the Relocation of
SPC's Route. To the extent SPC receives reimbursement from such governmental
or third party, which is allocable to a Relocation of SPC's Network, SPC will
credit or reimburse STA for its proportionate share of the reimbursement. STA's
proportionate share shall be based on the number of SPC Strands relative to the
total fiber count in the affected conduit.

9.       OWNERSHIP

Legal title to the STA Strands shall at all times be vested in SPC. Neither the
provision of the use of the STA Strands by SPC to STA hereunder, nor any
payments by STA in connection therewith, shall create or vest in STA any
easement, interest, or any other ownership or property right of any nature in
the STA Strands, except as granted in specifically herein. 9.2 SPC may use or
permit the use of SPC's Network, the fiber optic facilities therein and the
telecommunications capacity thereof for any lawful purpose. Nothing in this
Agreement shall be construed or interpreted to prohibit SPC from leasing or
licensing the Network or otherwise providing capacity to others or from
installing additional fibers or capacity, including without limitation, fiber
optic capacity, within SPC's Network (other than the STA Strands during the
term of the IRU) or to prohibit SPC from operating such Network (alone or in
combination with others) in competition with STA.

URRS Agreement                     Page 153             Dated: September 9, 2002
Appendix K

10.      EMINENT DOMAIN

If there is a taking of the STA Strands by right of eminent domain (a "Taking")
which results in the remainder of the STA Strands being unable to be restored
to a condition suitable for STA's business needs within ninety (90) days from
the date of the Taking ("Substantial Taking"), STA will be permitted to
participate, to the extent of its interest and at its expense, in such eminent
domain proceeding, and this Agreement may be terminated as a result of such
proceedings. In such event the IRU fee and maintenance fee shall abate from the
date of Taking and any previously paid IRU fee and/or maintenance fee
attributable for any period beyond such date shall be returned to STA. If there
shall be a Taking which does not constitute a Substantial Taking, this
Agreement shall not terminate but SPC shall, with due diligence, restore STA's
Strands as speedily as practical to its condition before the Taking in
accordance with the provisions herein.

11.      INDEMNIFICATION

11.1     STA will indemnify, defend, and hold harmless SPC and SPC's agents,
officers and employees, from any and all losses, damages, costs, expenses
(including reasonable attorneys fees), statutory fines or penalties, actions,
or claims for personal injury (including death), damage to property, or other
damage in any way arising from STA's activities undertaken pursuant to this
Agreement (including, without limitation, the installation, construction,
operation or maintenance of the STA Strands), except to the extent caused by
the negligence or willful misconduct on the part of SPC or SPC's agents,
officers or employees.

11.2     Without limiting the foregoing, STA specifically will indemnify,
defend, and hold harmless SPC and SPC's agents, officers and employees from any
and all claims asserted by STA's customers in any way arising out of or in
connection with this Agreement or the STA Strands, except to the extent caused
by the negligence or willful misconduct on the part of SPC or SPC's agents,
officers or employees.

11.3     SPC will indemnify, defend, and hold harmless STA and STA's agents,
officers and employees, from any and all losses, damages, costs, expenses
(including reasonable attorneys fees), statutory fines or penalties, actions,
or claims for personal injury (including death), damage to property, or other
damage in any way arising from SPC's activities undertaken pursuant to this
Agreement (including, without limitation, the installation, construction,
operation or maintenance of the Route), except to the extent caused by the
negligence or willful misconduct on the part of STA or STA's agents, officers
or employees.

11.4     EXCEPT FOR PERSONAL INJURY AND PROPERTY DAMAGE AS PROVIDED ABOVE, IN
NO EVENT SHALL EITHER PARTY BE LIABLE TO THE OTHER PARTY FOR ANY SPECIAL,
CONSEQUENTIAL OR INDIRECT (INCLUDING BY WAY OF ILLUSTRATION, LOST REVENUES AND
LOST PROFITS), PUNITIVE OR EXEMPLARY DAMAGES ARISING OUT OF THIS AGREEMENT OR
ANY OBLIGATION ARISING THEREUNDER, WHETHER IN AN ACTION FOR OR ARISING OUT OF
BREACH OF CONTRACT, TORT OR OTHERWISE.

12.      INSURANCE

During the term of this Agreement, each party shall obtain and maintain and
shall require any of its permitted contractors to obtain and maintain not less
than the following insurance:

URRS Agreement                     Page 154             Dated: September 9, 2002
Appendix K



- --------------------------------------------------------------------------------------------------
TYPE OF COVERAGE                                                AMOUNT OF COVERAGE
- --------------------------------------------------------------------------------------------------
                                                
Worker's Compensation Insurance                    Statutory Amount
- --------------------------------------------------------------------------------------------------
Employer's Liability Occupational Disease          $1 million each accident
and Bodily Injury Insurance                        $1 million disease each employee
                                                   $1 million disease-policy limit
- --------------------------------------------------------------------------------------------------
Commercial General Liability Insurance,            Combined single limit personal injury and
including premises-operations,                     property damage on an occurrence policy form
products/completed operations, independent         with policy amounts of (i) not less than $5
contractors, contractual (blanket), broad form     million per occurrence (without a limitation on
property damage, with umbrella excess liability    aggregate amount); or (ii) not less than $5
(collectively, "Comprehensive Coverage")           million per occurrence with an aggregate
                                                   annual amount of not less than $5 million
- --------------------------------------------------------------------------------------------------
Automobile Liability Insurance for owned,          $2 million
hired and non-owned autos ("Automobile             combined single limit bodily injury/property
Liability Coverage")                               damage
- --------------------------------------------------------------------------------------------------


         The limits set forth above are minimum limits and will not be
construed to limit either party's liability.

This insurance shall cover the amounts and types of liability listed above with
respect to each party's obligations under this Agreement.

Each policy evidencing the insurance described in this Section 10 must contain
a provision that the insurance policy, and the coverage it provides, shall be
primary and noncontributing with respect to any policies carried by the party
and its affiliates, and that any policies carried by the party and its
affiliates shall be excess insurance.

The comprehensive general liability policies and umbrella excess liability
policies of the party and its subcontractors each shall contain a provision
including the other party, its parent, subsidiaries and affiliates, and each of
their respective officers, directors, employees and agents, as additional
insureds.

Prior to commencement of any work under this Agreement, each party must furnish
to the other certificates of insurance stating that the insurer will use best
efforts to notify the other part at least thirty (30) days prior to
cancellation of, or any material change in, the coverage provided.

Either party is entitled to self-insure coverages under this Agreement through
programs adopted by their respective risk management departments.

13.      COMPLIANCE WITH LAWS

Notwithstanding anything to the contrary in this Agreement, each Party shall
ensure that any and all activities it performs pursuant to this Agreement shall
comply with all applicable laws. Without limiting the generality of the
foregoing, each Party shall comply with all applicable provisions of i)
workmen's compensation laws, ii) unemployment compensation laws, iii) the
Federal Social Security Law, iv) the Fair Labor Standards Act, and v)
Environmental, Health and Safety Laws.

14.      DISCLAIMER OF WARRANTIES

URRS Agreement                     Page 155             Dated: September 9, 2002
Appendix K

         EXCEPT AS SPECIFICALLY SET FORTH IN THIS AGREEMENT, SPC MAKES NO
WARRANTIES REGARDING THE SERVICES OR DELIVERABLES PROVIDED UNDER THIS AGREEMENT
AND MAKES NO WARRANTIES EXPRESS, IMPLIED, OR SPCTUTORY, AS TO THE INSTALLATION,
DESCRIPTION, QUALITY, INCLUDING ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR
FITNESS FOR A PARTICULAR PURPOSE.

15.      SPC SALES OR DISPOSITIONS

Nothing in this Agreement shall prevent or be construed to prevent SPC from,
selling or otherwise disposing of any portion of SPC's Network or fiber optic
facilities or other property of SPC used for the STA Strands, provided,
however, that in the event of a sale or other disposition, SPC shall condition
such sale or other disposition subject to the rights of STA under this
Agreement.

16.      LIENS

STA shall not cause or permit SPC's Network and the fiber optic facilities and
other property of SPC to become subject to any mechanic's, artisan's,
material-man's, architect's, or similar services' liens, which arise in any way
from or as a result of STA's activities, and shall cause any such liens which
may arise to be discharged or released.

17.      DEFAULT PROVISIONS AND REMEDIES

17.1     Each of the following shall be deemed an Event of Default by STA under
this Agreement:

         17.1.1   Failure by STA to perform or observe any other material
terms, covenant, agreement or condition of this Agreement on the part of STA to
be performed and such default continues for a period of thirty (30) days after
written notice thereof from SPC (provided that if such default cannot be cured
within such thirty (30) day period, this period will be extended if STA
commences to cure such default within such thirty (30) day period and proceeds
diligently thereafter to effect such cure);

         17.1.2   The filing of a tax or mechanic's lien caused by STA against
SPC's Network or fiber optic facilities or other property of SPC which is not
bonded or discharged within thirty (30) days of the date SPC receives notice
that such lien is filed.

17.2     Upon the occurrence of an Event of Default, SPC, without further
notice to STA in any instance (except where expressly provided for below or by
applicable law) may do any one or more of the following:

         17.2.1   Perform, on behalf and at the expense of STA, any obligation
of STA under this Agreement which STA has failed to perform and of which SPC
shall have given STA notice, the cost of which performance by SPC shall be
payable by STA to SPC upon demand;

         17.2.2   Exercise any other legal or equitable right or remedy which
it may have, including suspension or termination of maintenance services SPC
provides to STA hereunder.

17.3     The following events or occurrences shall constitute a default by SPC
under this Agreement:

URRS Agreement                     Page 156             Dated: September 9, 2002
Appendix K

         17.3.1   Failure by SPC to perform or observe any other terms,
covenant, agreement or condition of this Agreement on the part of SPC to be
performed and such default continues for a period of thirty (30) days after
written notice thereof from STA (provided that if such default cannot be cured
within such thirty (30) day period, this period will be extended if SPC
commences to cure such default within such thirty (30) day period and proceeds
diligently thereafter to effect such cure).

17.4     Upon the occurrence of an Event of Default, STA, without further
notice to SPC in any instance (except where expressly provided for below or by
applicable law) may do any one or more of the following:

         17.4.1   Perform, on behalf and at the expense of SPC, any obligation
of SPC under this Agreement which SPC has failed to perform and of which STA
shall have given SPC notice, the cost of which performance by STA shall be
payable by SPC to STA upon demand;

         17.4.2   Exercise any other legal or equitable right or remedy which
it may have.

17.5     All rights and remedies of either party set forth in this Agreement
shall be cumulative, and none shall exclude any other right or remedy, now or
hereafter allowed by or available under any statute, ordinance, rule of court,
or the common law, either at law or in equity, or both.

18       FORCE MAJEURE

Neither SPC nor STA shall be in default under this Agreement with respect to
any delay in its performance caused by any of the following conditions (each a
"Force Majeure Event"): (1) act of God; (2) fire; (3) flood; (4) material
shortage or unavailability not resulting from the responsible party's failure
to timely place orders or take other necessary actions therefor; (5) government
codes, ordinances, laws, rules, regulations or restrictions (collectively,
"Regulations"); (6) war or civil disorder; (7) failure of a third party to
grant or recognize an SPC Occupancy Right; or (8) any other cause beyond the
reasonable control of such party; provided, however, that this Section 20 shall
not apply to the payment of money. The party claiming relief under this Section
20 shall promptly notify the other in writing of the existence of the Force
Majeure Event relied on, the expected duration of the Force Majeure Event, and
the cessation or termination of the Force Majeure Event. The party claiming
relief under this Section 20 shall exercise commercially reasonable efforts to
minimize the time for any such delay.

19       TAXES AND USE OF PUBLIC RIGHTS-OF-WAY, LICENSE AND PERMIT FEES

19.1     Subject to Section 19.4, STA shall be responsible for any and all
sales, use, income, gross receipts, excise, transfer, ad valorem or other
taxes, and any and all franchise fees or similar fees ("Assessments") assessed
against it due to its ownership of an IRU, and its use of the STA Strands,
including the providing of services over the STA Strands, or its ownership or
use of facilities connected to the STA Strands.

19.2     Subject to Section 19.1, SPC shall be responsible for any and all
Assessments assessed against it due to its construction, ownership or use of
the SPC Network or fiber optic facilities, including providing of services over
the SPC Network or its ownership or use of facilities connected to the SPC
Network.

19.3     Notwithstanding Sections 19.1 and 19.2 above, if STA is assessed
annual fees for use of public rights-or-way, STA shall pay its proportionate
share of such fees, its proportionate share

URRS Agreement                     Page 157             Dated: September 9, 2002
Appendix K

being determined as provide in Section 8.14.

19.4     In the event that STA is assessed for any Assessments related to STA's
ownership of an IRU or use of the STA Strands which may not feasibly be
separately assessed, SPC within thirty (30) days of receipt of an invoice
therefor, shall provide information and documentation to STA sufficient to
demonstrate the basis for the Assessments and the amount and due date for
payment of the Assessments. In addition, STA shall provide SPC with all
information reasonably requested by SPC with respect to any such Assessments.
After such thirty (30) day period, SPC, in it sole discretion, may pay such
Assessment and invoice STA for reimbursement. STA shall reimburse SPC for such
payment within ten (10) days of receipt of SPC's invoice. Notwithstanding such
payment by SPC, STA, at its option, shall have the right at its sole cost to
contest any such Assessments and SPC will reasonably cooperate with STA in
pursuing any such contest; provided that STA shall have reimbursed SPC for such
Assessments. In the event STA, in its sole discretion, elects to not pay such
tax or fee, it shall so notify SPC. SPC, at its option, may pay the
Assessments, or contest the payment; provided that STA shall indemnify and hold
harmless SPC for the payment of such Assessments and all interest and penalties
related thereto; and provided further, that such contest shall be resolved or
such Assessments shall be paid so as to prevent any forfeiture of rights or
property or the imposition of any lien on the SPC's Network or SPC's fiber
optic facilities.

20.      SUCCESSION, ASSIGNABILITY

20.1     This Agreement shall be binding upon and inure to the benefit of the
parties hereto and their respective permitted successors or assigns.

20.2     Except as provided in this Section 20, a party ("Transferring Party")
shall not assign, encumber or otherwise transfer this Agreement or all or any
portion of its rights or obligations hereunder to any party without the prior
written consent of the other party ("Other Party"), which consent will not be
unreasonably withheld or delayed. Notwithstanding the foregoing, Transferring
Party shall have the right, without Other Party's consent, to (i) subcontract
any of its construction or maintenance obligations hereunder or (ii) assign or
otherwise transfer this Agreement in whole or in party (a) to any parent,
subsidiary or affiliate of Transferring Party, or (b) any corporation or other
entity which Transferring Party may be merged or consolidated or which
purchases all or substantially all of the stock or assets of Transferring
Party; provided that the assignee or transferee in any such circumstance shall
be subject to all of the provisions of this Agreement, including without
limitation, this Section 20 and provided further that promptly following any
such assignment or transfer, Transferring Party shall give Other Party written
notice identifying the assignee or transferee. In the event of any permitted
partial assignment of any rights hereunder, Transferring Party shall remain the
sole point of contact with Other Party. When Other Party's consent to assign is
required, Other Party will have the right to withhold consent if, in its
judgment reasonably exercised, the proposed assignee cannot adequately assume
the obligations of this Agreement. In no event will any assignment by Other
Party be permitted without the delivery to Other Party of a binding agreement
in writing from the proposed assignee that (i) states that the proposed
assignee will assume all current, future and outstanding past obligations under
this Agreement as if such assignee had originally executed this Agreement and
(ii) evidence proof satisfactory to Other Party that the proposed assignee has
insurance coverage comparable to the described in Section 10 or other
assurances that the proposed assignee can adequately perform the obligations it
will assume under this Agreement.

20.3     Notwithstanding the Provisions of this Section 20, without the prior
written consent of SPC, STA shall have the right to lease, license, grant an
IRU with respect to, or otherwise in any

URRS Agreement                     Page 158             Dated: September 9, 2002
Appendix K

manner transfer or make available in any manner to, any of STA's rights in the
STA Strands and such lessee, licensee or other transferee shall have the
ability to grant leases, licenses and grant an IRU with respect to, or
otherwise in any manner transfer or make available in any manner to, any of
such party's rights in the strands or conduit such party receives.

20.4     Neither party shall attempt to circumvent any of its obligations under
this Agreement, or deprive the Other Party of any anticipated benefit under
this Agreement, through the use of ownership changes, reorganizations, creation
of new entities, or other artificial devices.

20.5     Neither this Agreement, nor any term or provision hereof, nor any
inclusion by reference shall be construed as being for the benefit of any
person or entity not a signatory hereto.

21.      NOTICES

Any demand, notice or other communication to be given to a party in connection
with this Agreement shall be given in writing and shall be given by personal
delivery, by registered or certified mail, return receipt requested, by
Tele-copy or commercial over night delivery service addressed to the recipient
as set forth as follows or to such other address, individual or Tele-copy
number as may be designated by notice given by the party to the other:

STA:
Sierra Touch America, LLC.
130 North Main
Butte, Montana  59701

Attention: Contracts Officer
Telephone Number: 406-497-5317
Emergency Telephone Number: same
FAX Number: 406-497-5203

With a copy to:

Sierra Touch America, LLC.
130 No. Main
Butte, Montana 59701

Attention: General Counsel
Telephone Number: 406-497-5427
Emergency Telephone Number: same
FAX Number: 406-497-5203

SPC:
Sierra Pacific Communications
5860 S. Pecos Road,
Bldg. G, Ste. 100,
Las Vegas, NV  89120

Attention: Director, Facilities
Telephone Number: 702-949-7932
Emergency Telephone Number: Same

URRS Agreement                     Page 159             Dated: September 9, 2002
Appendix K

FAX Number: 702-949-7928

with a copy to:

Sierra Pacific Resources
6100 Neil Road
Reno, NV  89520

Attention: General Counsel
Telephone Number: 775-834-5698
Emergency Telephone Number: 775-834-5691
FAX Number: 775-834-4811

Any demand, notice or other communication given by personal delivery shall be
conclusively deemed to have been given on the day of actual delivery thereof
and, if given by registered or certified mail, return receipt requested on the
date of receipt thereof and, if given by telecopy, on the day of transmittal
thereof if given during the normal business hours of the recipient and on the
next business day if not given during normal business hours.

22.      NON-WAIVER

No course of dealing, course of performance or failure of either party strictly
to enforce any term, right or condition of this Agreement shall be construed as
a waiver of any term, right or condition.

23.      CHOICE OF LAW

The construction, interpretation and performance of this Agreement shall be as
governed by the law of the state ofNevada.

24.      HEADINGS

All headings contained in this Agreement are inserted for convenience only and
are not intended to affect the meaning or interpretation of this Agreement or
any clause.

26.      PUBLICITY AND ADVERTISING

26.1     Neither party shall publish or use any advertising, sales promotions,
or other publicity materials that use the other party's logo, trademarks, or
service marks without the prior written approval of the other party.

26.2     Each party shall have the right to review and approve any publicity
material, press releases, or other public statements by the other that refer to
such party or that describe any aspect of this Agreement. Each party agrees not
to issue any such publicity materials, press releases, or public statements
without the prior written approval of the other party.

26.3     Nothing in this Agreement establishes a license for either party to
use any of the other party's brands, marks, or logos without prior written
approval of the other party.

URRS Agreement                     Page 160             Dated: September 9, 2002
Appendix K

27.      REPRESENTATIONS AND WARRANTIES

Each party represents and warrants that:

(i) it has full right and authority to enter into, execute, deliver and perform
its obligations under this Agreement;

(ii) this Agreement constitutes a legal, valid and binding obligation
enforceable against such party in accordance with its terms, subject to
bankruptcy, insolvency, creditors' rights and general equitable principles; and

(iii) its execution of and performance under this Agreement shall not violate
any applicable existing regulations, rules, statutes or court orders of any
local, state or federal government agency, court, or body.

28.      ENTIRE AGREEMENT; AMENDMENT

This Agreement constitutes the entire and final agreement and understanding
between the parties with respect to the subject matter hereof and supersedes
all prior oral and written communications, understandings and agreements
relating to the subject matter hereof, which are of no further force or effect.
The Exhibits and/or Schedules referred to herein are integral parts hereof and
are hereby made a part of this Agreement. This Agreement may only be modified
or supplemented by an instrument in writing executed by a duly authorized
representative of each party.

29.      NO THIRD PARTY BENEFICIARIES

Except as set forth in Section 31, this Agreement does not provide and is not
intended to provide third parties with any remedy, claim, liability,
reimbursement, cause of action, or other privilege.

30.      NO PERSONAL LIABILITY

Each action or claim against any party arising under or relating to this
Agreement shall be made only against such party as a corporation, and any
liability relating thereto shall be enforceable only against the corporate
assets of such party. No party shall seek to pierce the corporate veil or
otherwise seek to impose any liability relating to, or arising from, this
Agreement against any shareholder, employee, officer or director of the other
party. Each of such persons is an intended beneficiary of the mutual promises
set forth in this Section 30 and shall be entitled to enforce the obligations
of this Section 30.

31.      RELATIONSHIP OF THE PARTIES

The relationship between the parties shall not be that of partners, agents or
joint venturers for one another, and nothing contained in this Agreement shall
be deemed to constitute a partnership or agency agreement between them for any
purposes, including, but not limited to federal income tax purposes. The
parties, in performing any of their obligations hereunder, shall be independent
contractors or independent parties and shall discharge their contractual
obligations at their own risk.

URRS Agreement                     Page 161             Dated: September 9, 2002
Appendix K

32.      SUCCESSORS AND ASSIGNS.

This Agreement and each of the parties' respective rights and obligations under
this Agreement shall be binding upon and shall inure to the benefit of the
parties and each of their respective permitted successors and assigns.

33.      UNENFORCEABLE PROVISIONS

No provision of this Agreement shall be interpreted to require any unlawful
action by either party. If any section or clause of this Agreement is held to
be invalid or unenforceable, then the meaning of that section or clause shall
be construed so as to render it enforceable to the extent feasible. If no
feasible interpretation would save the section or clause, it shall be severed
from this Agreement with respect to the matter in question, and the remainder
of the Agreement shall remain in full force and effect. However, in the event
such a section or clause is an essential element of the Agreement, the parties
shall promptly negotiate a replacement that will achieve the intent of such
unenforceable section or clause to the extent permitted by law.

34.      COUNTERPARTS

This Agreement may be executed in one or more counterparts, all of which taken
together shall constitute one and the same instrument.

URRS Agreement                     Page 162             Dated: September 9, 2002
Appendix K

IN WITNESS WHEREOF, the parties have caused this Agreement to be signed by their
duly authorized representatives on the date first above written.

                                              Sierra Touch America, LLC.

                                              By:  ____________________________
                                              Name:  Michael J. Meldahl
                                              Title: Manager

                                              Sierra Pacific Communications

                                              By:  ____________________________
                                              Name:  Richard J. Coyle, Jr.
                                              Title: President

URRS Agreement                     Page 163             Dated: September 9, 2002
Appendix K

                                  APPENDIX K

                                 ATTACHMENT 1

                         DESCRIPTION OF METRO NETWORK

[LAS VEGAS METRO]

                                   [GRAPHIC]

URRS Agreement                     Page 164             Dated: September 9, 2002
Appendix K

[RENO METRO]

                                   [GRAPHIC]

URRS Agreement                     Page 165             Dated: September 9, 2002
Appendix K

                                  APPENDIX K

                                  SCHEDULE C

         FIBER CABLE SPLICING, TESTING, AND ACCEPTANCE STANDARDS AND PROCEDURES

1.       SPC will perform all tests, provide documentation, and meet the
         standards identified in this Schedule C. Analysis of final
         bi-directional Optical Time Domain Reflectometer ("OTDR") data will be
         the tool used to support final acceptance of the fibers.

2.       ACCEPTANCE STANDARDS

         2.1      PIGTAIL TRACES

                  When pigtails are attached to the end of the cable, the
                  pigtail test will be performed for that site. A 1-km launch
                  reel that matches the backbone cable will be attached between
                  the OTDR and the pigtail. The loss of the pigtail splice and
                  connector will be measured and recorded at 1550 nm. SPC will
                  provide STA with a copy of the OTDR traces of all pigtail
                  splices stored on diskette.

                  The loss value of the pigtail connector and its associated
                  splice with matching mode field diameters will not exceed .5dB
                  at 1550 nm. The loss value of the pigtail connector and its
                  associated splice with mismatched mode field diameters should
                  not exceed .8 dB.

         2.2      BI-DIRECTIONAL TRACES

                  Bi-directional OTDR traces will be taken without a launch
                  reel. OTDR traces should be taken in both directions at 1550
                  nm. Loss measurements for each splice point should be measured
                  and recorded in both directions. These loss values should then
                  be averaged. The traces for all fibers should be recorded on
                  diskette and provided to the STA.

                  NOTE: THESE MEASUREMENTS WILL BE MADE AFTER THE SPLICE
                        HANDHOLE OR MANHOLE IS CLOSED IN ORDER TO CHECK FOR
                        MACRO-BENDING PROBLEMS.

                  2.2.1    FIELD SPLICES

                           The objective for each splice is an averaged loss
                           value of 0.1 dB or less when measured
                           bi-directionally with an OTDR at 1550 nm. If after 3
                           attempts, SPC is not able to produce a loss value of
                           0.1 dB or less bi-directionally at

URRS Agreement                     Page 166             Dated: September 9, 2002
Appendix K

                           1550 nm, then 0.3 dB or less bi-directionally at 1550
                           nm will be acceptable. Fibers not meeting the 0.1 dB
                           or less specification will be identified as Out Of
                           Specification (OOS). Documentation of the three
                           attempts (reburns) to bring the OOS fiber within
                           specification will be provided.

                  2.3      LIGHT SOURCE AND POWER METER TEST

                           A bi-directional End to End test will be performed on
                           each fiber in a span at 1550 nm with a Light Source
                           and Power Meter. The purpose of this test is to
                           determine actual span loss and to prove there is a
                           one-to-one correspondence of all fibers. It is the
                           SPC's responsibility to insure proper continuity of
                           all fibers at the fiber level, not just the pigtail
                           level. Any "frogs" or fibers that cross in the route
                           will be remedied by SPC. The following span loss
                           calculation will be used:

                              (A * L) + (0.1 * N) + C = Acceptable Span Loss

                           A = Attenuation per KM at 1550 nm

                           L = Optical length of cable measured in kilometers
                              (from OTDR Trace)

                           N = Number of splices in a span

                           C = Connector loss. The connector loss will not
                               exceed .5dB. The section test will have (2)
                               pigtail connectors/splices under test, so 1.0dB
                               will be allowed for this loss.

         NOTE:    STA MAY PROVIDE AN EXCEL SPREADSHEET FORMATED ON DISK FOR
                  ENTRY OF TEST DATA. SPC WILL COMPLETE THE SPREADSHEET AND
                  FORWARD TO STA.

3.       NAMING OF TRACES

         OTDR traces taken for bi-directional testing and the OTDR traces of the
         pigtail splice must be recorded on floppy diskette and provided to STA.
         To name the traces, each party will provide alpha abbreviations for the
         sites. The 8-character file name plus 3-character file extension name
         should follow this example:

         First four letters = source point

         Letters 5, 6, 7 = Destination point

         8th letter = wavelength

         Extension = fiber number

         Examples:

                  Springfield to Lebanon at 1550 nm, fiber 96 = sgfdlbn5.096

URRS Agreement                     Page 167             Dated: September 9, 2002
Appendix K

                  Springfield to Monett pigtail trace on fiber 1 = sgfdmntp.001

         NOTE:    ALL HEADER INFORMATION ON OTDR TRACE WILL BE COMPLETED.

4.       OTDR SETUP

         The OTDR that is acceptable for testing is the Hewlett Packard HPE6000B
         or equivalent. This system must have a floppy disk drive for storing
         the trace files. Again, it should be noted that it is vital that during
         all tests (OTDR, power meter, etc.), that all connectors are clean.
         This can dramatically affect test results. The following settings
         should be used.

         NOTE:    BEFORE THE START OF ANY TESTING, ALL CONNECTORS WILL BE
                  CLEANED PURSUANT TO MANUFACTURER'S SPECIFICATIONS

5.       TEST PACKAGES

         SPC shall provide a package containing the following test data for each
         fiber. All data provided should be saved on diskette.

         A.    OTDR span traces taken at 1550 nm.

         B.    Pigtail traces taken for each fiber.

         C.    An Excel spreadsheet containing the power meter and light
               source data for both directions at 1550 nm.

         D.    A document identifying splice points with OOS test results.

6.       TESTING AND ACCEPTANCE OF THE LEASED FIBERS

         SPC shall test the Leased Fibers in accordance with the procedures
         specified in this schedule C to verify that the Leased Fibers are
         installed and operating in accordance with the specifications. SPC
         shall provide such test data to STA in accordance with Section 3.1 of
         the Metro IRU Agreement.

URRS Agreement                     Page 168             Dated: September 9, 2002
Appendix K

                                 APPENDIX K
                                 Schedule D

           MAINTENANCE AND OPERATIONS SPECIFICATIONS AND PROCEDURES

"ROUTINE MAINTENANCE" is all preventive maintenance activities including
upgrades and repairs, including but not limited to those activities outlined in
this Metro IRU Agreement.

"NON-ROUTINE MAINTENANCE" is all efforts and services provided in response to an
emergency circumstance which requires restoration.

1.       GENERAL

    a.   SPC shall maintain a Network Operations Center (NOC) with twenty-four
         (24) hour access , (7) seven days a week, staffed by trained and
         qualified personnel. SPC shall maintain a toll-free number to contact
         personnel at NOC. SPC's NOC personnel shall dispatch maintenance and
         repair personnel along the system to handle and repair problems
         detected through the NOC's remote surveillance equipment, by the STA,
         or otherwise.

    b.   SPC's maintenance employees shall be available for dispatch twenty-four
         (24) hours a day, seven (7) days a week. SPC shall use best
         commercially reasonable efforts to have its first maintenance employee
         at the site requiring an emergency maintenance activity within four (4)
         hours from the time alarm identified by SPC's NOC or notification by
         STA, whichever occurs first. Emergency maintenance is defined as any
         service affecting situations requiring an immediate response.

    c.   STA shall utilize an Operations Escalation List, to report and seek
         immediate initial redress of exceptions noted in the performance of SPC
         in meeting maintenance service objectives.

    d.   In performing its services hereunder, SPC shall take workmanlike care
         to prevent impairment to the signal continuity and performance of the
         system. The precautions to be taken by SPC shall include notification
         to STA. In addition, SPC shall reasonably cooperate with STA in sharing
         information and analyzing the disturbances regarding the cable and/or
         Fiber Facility.

    e.   SPC shall use its best effort to notify STA seven (7) days prior to the
         date of any planned non-emergency maintenance activity. In the event
         that a SPC planned activity is canceled or delayed for whatever reason
         as previously notified, SPC shall notify STA at SPC's earliest
         opportunity and will comply with the provisions of the previous
         sentence to reschedule any delayed activity.

    f.   Non-emergency work that is reasonably expected to produce any signal
         discontinuity must be coordinated between parties. Generally, this work
         should be scheduled, pursuant to the Scheduled Maintenance Procedures,
         on a Saturday or Sunday after midnight and before 6:00 a.m. local time.
         Major system work such as fiber rolls and hot cuts will be scheduled
         for SMP.

    g.   SPC shall have qualified representatives on site at any time another
         company is

URRS Agreement                     Page 169             Dated: September 9, 2002
Appendix K

         crossing the System or digging within four (4) feet of buried
         facilities. SPC shall maintain all signposts along the Route with
         the number of the "call before you dig" organization.

    h.   SPC shall maintain the system in a manner that permits normal operation
         of the equipment associated with the system. Such maintenance includes,
         but is not limited to, landscaping, weed control, fence repair, smoke
         detectors, air conditioning, power and trash removal.

2.       FACILITIES

    a.   SPC shall maintain the System in a manner that permits normal operation
         of the Leased Fibers and STA Equipment used in connection therewith.

    b.   SPC shall perform appropriate Routine Maintenance on the Cable and
         Equipment in accordance with SPC's then current preventive maintenance
         procedures that shall not substantially deviate from industry practice
         and shall be responsible for correcting dysfunction. SPC shall notify
         STA in advance of Routine Maintenance procedure. Typical routine
         procedures and the frequency of the procedure include but are not
         limited to:
                      Semi-Annually
                      Optical equipment levels verified and reported
                      Power levels verified and reported

                      All records remain on master files and at each site for
                      reference.

    c.   SPC's NOC shall monitor the housekeeping alarms throughout the system.
         STA may monitor SPC's housekeeping alarms. Upon receipt of an alarm,
         SPC shall take appropriate action and notify STA of a major service
         jeopardy situation.

    d.   At a minimum, SPC's NOC shall monitor the alarms and in a similar
         fashion as it does for the rest of its network, including, but not
         limited to, degradation and dysfunction of transmission systems,
         intrusion. Upon receipt of an alarm, SPC shall take appropriate action.

3.       FIBERS

    a.   Subject to the provisions of paragraph 3.b., hereof, SPC shall maintain
         the Cable in good and operable condition and shall repair the cable in
         workmanlike manner pursuant to Section 5 hereof.

    b.   SPC shall patrol the route of cable on a reasonable, routine basis and
         shall perform all required locates. SPC shall have qualified
         representatives on site at any time another company is crossing the
         cable or digging within four (4) feet of the cable or, if aerial, use
         attached escalation list to notify utility provider. SPC shall perform
         appropriate routine maintenance on the Cable in accordance with SPC's
         then current preventative maintenance. SPC's maintenance procedures
         shall not substantially deviate from industry practice.

4.       RESTORATION

URRS Agreement                     Page 170             Dated: September 9, 2002
Appendix K

    a.   When restoring a cut cable, the parties agree to work together to
         restore all traffic as quickly as possible. SPC, immediately upon
         arriving on the site of the cut, shall determine the best course of
         action to be taken to restore the cable and shall begin restoration
         efforts. Upon SPC's NOC learning of an emergency restoration event, SPC
         will notify STA at (1) hour intervals until the emergency event or
         restoration is resolved.

    b.   It will be the responsibility of SPC and STA to report to one another
         respectively of any known environmental hazards which would restrict or
         jeopardize any maintenance work activities in shelters or right of ways
         areas of operations.

    c.   When restoring a cut Cable, the parties agree to work together to
         restore all traffic as quickly as possible. SPC, immediately upon
         arriving on the site of the cut, shall determine the course of action
         to be taken to restore the Cable and shall begin restoration efforts.
         SPC shall initially splice a buffer tube 12 fibers of its choice
         containing SPC's fibers. Once continuity is established allowing
         transmission systems to come back on line, SPC shall begin splicing
         STA's lit fibers. This process will continue until all fibers in all
         lit STA buffer fibers are spliced and all STA traffic restored. SPC
         repair and restoration efforts shall be conducted in a manner whereby
         STA's lit Leased Fibers receive preferential repair and restoration
         service.

    d.   SPC will maintain an updated list of local area qualified maintenance
         support contractors equipped with the necessary equipment and
         personnel.

    e.   Upon notification of interruption of fiber service, disrepair,
         impairment or other need for repair or restoration of the Cable and the
         location of the damaged Cable, SPC shall pursue commercially reasonable
         efforts to mobilize SPC crews to achieve necessary repair or
         restoration, including, but without limitation, to have Maintenance
         personnel at the affected site within four (4) hours after receipt of
         such notice with the required restoration material and equipment. In
         the event SPC fails to respond in such timeframe, STA may dispatch
         personnel and restore the Cable at SPC's expense.

    f.   In the event that STA's use of the Cable is interrupted due to the
         occurrence of a Force Majeure event repairs and restoration will be
         made as expeditiously as possible.

    g.   The requirement for detection of the fault location is "as exact as
         possible" utilizing test records, cable documentation, GPS coordinates
         and OTDR test results of the affected cable segment. Subject to the
         priorities described above in the event that STA's use of the Cable is
         interrupted due to an occurrence of a Force Majeure Event, repairs and
         restoration shall be made as expeditiously as possible. STA recognizes
         that the four (4) hour response time represents optimal conditions, and
         may be impossible to achieve when emergency restoration of SPC's System
         Integrity is required or when responding to certain remote locations.
         Actual response times will be influenced by such factors as terrain,
         weather conditions present at the time the request is made, and the
         actual mileage from SPC's dispatch station to the fault site.

    h.   For purposes of this section, "commercially reasonable efforts" means
         activities and performances consistent with prudent utility practice,
         existing contract provisions

URRS Agreement                     Page 171             Dated: September 9, 2002
Appendix K

         for SPC hourly employees, preserving SPC System Integrity, and
         response times that do not jeopardize the health and safety of the
         employees and agents of SPC and STA.

    i.   SPC maintenance employees shall be responsible for correcting or
         repairing Cable discontinuity or damage, including, but not limited to,
         the emergency repair of the Cable or STA fibers within. SPC shall use
         reasonable efforts to repair Cable traffic affecting discontinuity
         within eight (8) hours after learning of the discontinuity or the
         service affecting situation.

    j.   SPC shall maintain sufficient capability to teleconference with STA
         during an emergency repair in order to provide continuous
         communication. Within twenty-four (24) hours after completion of an
         emergency repair, SPC shall commence its planning for permanent repair,
         shall notify STA of such plans, and shall implement such permanent
         repair within an appropriate time thereafter. Restoration of open
         fibers on fiber strands not immediately required for service, the
         repair shall be scheduled for the next available SMP (as described in
         section 4 above).

    k.   SPC shall comply with the Fiber Cable Splicing Specifications as
         provided in Schedule C. SPC shall provide to STA any modifications to
         these specifications for STA's approval, which shall not be
         unreasonably withheld. STA shall have the right but not the obligation
         at its sole expense to either conduct its own fiber acceptance testing
         to verify that they are operating in accordance with the test
         specifications or observe SPC or its contractor during testing.

URRS Agreement                     Page 172             Dated: September 9, 2002
Appendix K

                                  APPENDIX L

                         COMPLETION NOTICE TO THE URRS

To:    Sierra Pacific Communications (SPC)

Date:  __________________

       Notice is hereby given that Sierra Touch America LLC (STA) has
completed construction and testing of the following facilities pursuant to the
Unit Redemption. Release and Sale Agreement dated September 9, 2002 among SPC,
STA, and Touch America, Inc., a Montana corporation:

       [ ]        First Conduit

       [ ]        IRU Conduits

       [ ]        IRU Fiber

       -----------------------------------------

                                 (STA) Sierra Touch America, LLC
                                 a Nevada limited liability company

                                 By: ______________________________
                                       MICHAEL J. MELDAHL, MANAGER

URRS Agreement                     Page 173             Dated: September 9, 2002
Appendix L

                                  APPENDIX M

                            FORM OF QWEST AGREEMENT

                       AMENDED AND RESTATED AGREEMENT FOR
                       CONSTRUCTION AND SALE OF A CONDUIT

         THIS AMENDED AND RESTATED CONDUIT SALE AGREEMENT ("Agreement") dated
this 4 day of September, 2002, is made by and between Sierra Pacific
Communications ("SPC"), a Nevada corporation with offices located at 5860 South
Pecos Road, Building G, Suite 100, Las Vegas, Nevada 89120, and Qwest
Communications Corporation ("Qwest"), a Delaware corporation, with offices
located at 1801 California Street, Denver, Colorado 80202. SPC and Qwest may be
referred to individually as a "Party," and collectively may be referred to as
the "Parties".

                                    RECITALS

         WHEREAS, Qwest and SPC previously entered into an agreement regarding
the subject matter of this Agreement on or about June 29, 2001; and further
agree that each Party hereby waives any default of the other Party under such
June 29, 2001 agreement.

         WHEREAS, the Parties have agreed to certain changes in the structure of
the sale and other terms described in the June 29, 2001 agreement, and agree
that agreement shall be replaced in its entirety with this Agreement;

         WHEREAS, SPC is constructing and installing or otherwise procuring a
multiple conduit fiber optic system (the "System") of approximately eight
hundred twelve (812) miles in length from Sacramento, California to Salt Lake
City, Utah, all along public and private right of way more particularly
described in Exhibit A (the "Right-of-Way"); and

         WHEREAS, Qwest desires to purchase from SPC the following conduits
within the Right of Way along the Route:

         (iv) one (1) one-and-one-quarter inch (1.25") conduit of
              approximately one hundred forty-six (146) miles in length
              between Sacramento, California and Reno, Nevada ("Leg One");

         (v)  one (1) two inch (2") conduit of approximately three hundred
              fifty (350) miles in length between Reno, Nevada and Ely,
              Nevada ("Leg Two");

         (vi) one (1) two inch (2"") conduit of approximately three hundred
              sixteen (316) miles in length between Ely, Nevada and Salt
              Lake City, Utah ("Leg Three").

together with the associated vaults, handholes and manholes, and other related
facilities within the Route, as set forth in Section 1 herein and on Exhibit B
(collectively, the "Conduit System"), and as constructed pursuant to the
specifications attached hereto as Exhibit G (the "Specifications").

NOW THEREFORE, for and in consideration of the Recitals and the mutual covenants
and agreements herein contained and for other good and valuable consideration,
the receipt and sufficiency of which are hereby acknowledged, the parties hereby
agree as follows:

URRS Agreement                     Page 174             Dated: September 9, 2002
Appendix M

1.       Sale of the Conduit

         1.01     Purchase and Sale. Subject to the terms and conditions of this
Agreement, SPC agrees to convey to Qwest, and Qwest agrees to purchase from SPC,
the Conduit System. SPC shall use commercial best efforts to effect the
completion of the Conduit System according to the schedule set forth on Exhibit
E (the "Scheduled Completion Dates"). SPC shall provide Qwest as-built drawings
within sixty (60) days following the Acceptance Date as defined in Section 3.02.

         1.02     Access and Maintenance. The Parties acknowledge that SPC will
install, or cause to be installed, handholes or manholes at standard intervals
along the Route in accordance with the Specifications. To the extent SPC has
such rights and as further set forth in Section 2.06, SPC shall convey to Qwest
any and all access rights to the Conduit System, and Qwest shall maintain any
fiber optic cable contained therein; provided, however, such access is
conditioned upon Qwest complying with any access protocols. In addition, Qwest
shall also have such access to all vaults, handholes, manholes and other
facilities where such access is commonly shared by SPC and other
telecommunications facility users and collocators within the Right of Way along
the Route, subject to STA access protocols as stated in Maintenance Agreement.

         1.03     Maintenance. Concurrent with the Final Payment, Qwest and SPC
shall execute a maintenance agreement, in the form of Exhibit F hereto, for the
maintenance, repair, and relocation of the Conduit System (excluding fiber optic
cable) in accordance with the Specifications (the "Maintenance Agreement").
Qwest's obligation to purchase said maintenance from SPC shall be limited to one
(1) two (2) year term with monthly payments equal to $24,000 per month,
commencing on the effective date of this Agreement. The first payment shall be
prorated to reflect a partial month, if applicable. Qwest shall have the option
to renew the Maintenance Agreement at the same monthly rate and in one-year
increments for a total of two (2) renewal years. At such time as Qwest places
fiber in the Conduit system, the Parties agree to modify the specifications and
procedures of the Maintenance Agreement as appropriate to address the presence
of such fiber.

         1.04     Additional Associated Property. Provided that Qwest gives SPC
written notice of additional requirements prior to the completion of
construction of the standard handholes or manholes, SPC will install or cause to
be installed, if any such installation does not materially interfere with the
existing facilities of SPC and is otherwise reasonably practicable as determined
by SPC in its reasonable discretion, additional handholes or manholes at such
other locations as requested by Qwest at Qwest's expense. Prior to installing
such handholes or manholes, SPC shall notify Qwest of whether such handholes or
manholes are subject to rights of way requirements of private entities, or
subject to approval by permitting agencies and governmental authorities. Based
on such information, Qwest may elect not to install the additional handholes or
manholes. If Qwest elects to install additional handholes or manholes, Qwest
shall pay SPC all direct costs and out-of-pocket expenses associated with such
additional work plus a management fee equal to fifteen percent (15%) of such
costs.

2.       Payment.

URRS Agreement                     Page 175             Dated: September 9, 2002
Appendix M

         2.01     Total Purchase Price. Qwest shall pay SPC twenty million and
no/100 dollars (US$20,000,000.00) for the Conduit System (the "Total Purchase
Price") as set forth in this Section 2.

         2.02     First Payment. Qwest has already paid to SPC, and SPC
acknowledges the receipt thereof, the sum of four million nine hundred
eighty-eight thousand seven hundred eighty four and no/100 dollars
(US$4,988,784.00) (the "First Payment").

         2.03     Second Payment. Qwest shall pay SPC by wire transfer of
immediately available funds the sum of five million eleven thousand two hundred
sixteen and no/100 dollars (US$5,011,216.00) immediately upon the execution of
this Agreement by both Parties (the "Second Payment").

         2.04     Final Payment. Final payment due for the conduit system shall
be ten million and no/100 dollars (US $10,000,000.00) payable as set forth below
(the "Final Payment"). Qwest shall pay SPC by wire transfer of immediately
available funds the sum of nine million four hundred thousand and no/100 dollars
(US$9,400,000.00) payable on the Acceptance Date (as defined in Section 3.03
below). Upon receipt of said $9,400,00.00, SPC shall promptly transfer title to
the Conduit System to Qwest via a bill of sale in the form attached as Exhibit C
upon receipt of the Final Payment. Qwest shall hold back ("Hold Back") an amount
of six hundred thousand and no/100 dollars until SPC delivers the as-built
drawings as set forth in section 1.01 and shall pay by wire transfer of
immediately available funds such Hold Back amount upon receipt of the as built
drawings

         2.05     Security. SPC hereby grants Qwest a security interest in (i)
the Conduit System, (ii) all equipment, goods and materials purchased or
otherwise obtained for use in the Conduit System, and (iii) SPC's transferable
occupancy rights in the Right-of-Way in so far as such rights extend to the
Conduit System, to secure payments made by Qwest to SPC, and SPC's performance,
under this Agreement.

SPC hereby warrants and covenants that the security interests granted to Qwest
in this Section 2.05 are (i) a first-priority security interest in Legs One and
Two of the Conduit System, (ii) a security interest in Leg Three of Conduit
System and (iii) SPC's transferable occupancy rights in the Right-of-Way in so
far as such rights extend to the Conduit System. Qwest agrees and acknowledges
that the enforcement of the security interest granted to Qwest in this Section
2.05 is subject to the terms and conditions of Section 4.01(a) of this
Agreement.

SPC shall take all reasonable action requested by Qwest to assist Qwest in the
perfection of the security interest granted to Qwest herein. Immediately upon
the first to occur of (i) SPC's transfer of title to the Conduit System via bill
of sale as provided hereunder, or (ii) Qwest's default under Section 4.01(b) of
this Agreement, the security interest granted herein shall immediately
extinguish and terminate and be of no further force or effect.

         2.06     Right of Way. Promptly following full payment of the Final
Payment to SPC, SPC shall partially assign to Qwest the assignable occupancy
rights in the Right-of-Way occupied by the Conduit System to the extent such
rights are legally transferable; provided, however, Qwest shall cooperate with
SPC in obtaining any required consents to such transfers from private entities
or governmental authorities, and shall be responsible for its share of any
annual recurring fees charged in connection with such occupancy rights. SPC

URRS Agreement                     Page 176             Dated: September 9, 2002
Appendix M

will convey such rights by way of occupancy agreements. If SPC's occupancy
rights cannot be assigned directly to Qwest, then SPC shall grant, to the extent
permissible under applicable law and underlying rights of way agreements, access
rights to Qwest through license, indefeasible right of use or otherwise so that
it may access the Conduit System to operate, maintain, and repair the Conduit
System and install, maintain, and repair fiber optic cable in the Conduit
System. If SPC cannot grant the full rights to access, operate, maintain and
repair the Conduit System, then SPC shall agree to perform, or cause to be
performed, such services, not allowed or permitted to be performed by Qwest, on
Qwest's behalf at customary and reasonable costs and timeframes.

         2.07     AMP Sites. For that portion of the Conduit System located in
Nevada and Utah, SPC shall provide Qwest with (i) a 20 year IRU for a minimum of
one-half (1/2) acre (Qwest Space) at each of the applicable AMP sites described
on Exhibit H, and shall deliver said IRUs to Qwest upon receipt of Final Payment
(ii) all easements, permits and associated rights of way necessary for Qwest to
utilize said Qwest Space as is customary, and shall deliver said easements,
permits and associated rights of way necessary for Qwest to utilize said Qwest
Space as is customary to Qwest upon receipt of Final Payment (iii) 48V DC power
at $10 and amp per month at each Qwest Space, at a minimum of 200 amps per site,
with an option for Qwest to increase the amperage within the Regen sites at the
same cost per each additional amp. Qwest shall indemnify SPC for any damage to
persons or property in connection with its access to, and use and occupancy of,
such space on the site, in conformity with Qwest's indemnification obligations
set forth in Section 6.06. Qwest agrees to pay its pro rata share of the total
of the acquisition price and acquisition costs specific to each such
regeneration or AMP site, including but not necessarily limited to costs
associated with government permits, licenses, and other authorizations,
environmental reviews, physical inspections, and due diligence investigations
for each site. Such pro rata share shall be equivalent to Qwest's proportionate
share of such costs based on the total square acreage of the land to be used by
Qwest as compared to the total square acreage of the land actually permitted or
licensed to SPC. SPC shall acquire the use of said property on behalf of SPC and
Qwest and convey to Qwest its portion through assignment, license, indefeasible
right of use or similar instrument upon receipt of the Final Payment.

         2.08     Interest Rate. If Qwest fails to make any payment under this
Agreement when due, then such payment shall accrue interest both before and
after judgment at the lower of (i) the highest rate permitted by law, or (ii)
one (1%) per month.

3.       Conduit System Completion

         3.01     Completion of the Conduit System. When SPC has determined that
the Conduit System has been constructed and installed substantially in
conformity with the Specifications, SPC shall provide Qwest a written notice of
the same of the Conduit System (a "Completion Notice"). SPC's delivery of the
Completion Notice shall constitute SPC's representation and warranty to Qwest
(i) that the Conduit System has been constructed and installed substantially in
conformity with the Specifications, (ii) that all costs and expenses of
construction have been paid, and (iii) that the Conduit System has been tested
and is in good working order.

         3.02     Acceptance of the Conduit System. Within fifteen (15) days of
receipt of a Completion Notice, Qwest shall either accept or reject the
Completion Notice (specifying in reasonable detail the defect in the applicable
specifications) by delivery of written notice to

URRS Agreement                     Page 177             Dated: September 9, 2002
Appendix M

SPC. In the event Qwest rejects the Completion Notice, SPC shall promptly
commence to remedy, or cause to remedy, any nonconforming item. Thereafter, SPC
shall again provide Qwest a Completion Notice and the foregoing procedure shall
again apply. Any failure of Qwest to timely reject a Completion Notice shall be
deemed to constitute final acceptance for purposes of this Agreement and in such
event Qwest shall be deemed to have accepted the Conduit System, as applicable,
on the fifteenth day after delivery of the Completion Notice.

         3.03     Acceptance Date. The acceptance date (the "Acceptance Date")
shall be defined as the later of (i) February 1, 2003 or (ii) thirty (30) days
following acceptance of the Completion Notice with respect to the Conduit System
as set forth in Section 3.02.

         3.04     Fiber Installation. Qwest shall perform all work with respect
to the pulling, splicing and testing of the fiber optic cable within the Conduit
System

4.       Default and Termination Provisions.

         4.01     Default. Except as set forth below, neither Party shall be in
default under this Agreement herein unless and until the Party shall have
received written notice of such default from the other Party, and shall have
failed to cure the same within thirty (30) days after receipt of such notice.
Any event of default may be waived under the terms of this Agreement at the
other Party's option. Events of default and the remedies of the parties shall
include, but not be limited to, the following:

         (a)  Failure to Complete the Conduit System or Other Failure of SPC. If
         Qwest has not received a Completion Notice by June 30, 2003, or upon
         SPC's breach of any other term or condition of this Agreement and its
         failure to cure such breach, Qwest's sole remedy shall be the right to
         immediately terminate this Agreement and enforce the security interest
         granted to Qwest in Section 2.05 of this Agreement and/or cause SPC to
         transfer clear title and ownership of the Conduit System to Qwest as
         follows:

                  (i)  Qwest may enforce its security interest against, and/or
                  cause SPC to transfer to Qwest clear title and ownership to
                  Legs One and Two of the Conduit System.; and

                  (ii) Upon Qwest's payment of Ten Million Dollars
                  ($10,000,000.00) to SPC, Qwest may enforce its security
                  against, and/or cause SPC to transfer clear title and
                  ownership to Leg Three of the Conduit System.

         (b)  Failure to Make Payment. Upon the failure by Qwest to timely cure
         any undisputed payment default after notice thereof from SPC, Qwest
         shall immediately forfeit any right, title or interest in any portion
         of the Conduit System, its security interest in the Conduit System
         shall immediately extinguish and terminate and be of no further force
         or effect, and SPC shall retain all amounts paid by Qwest through the
         date of default. The foregoing shall not mitigate or reduce any claim
         SPC may have for any amounts due and owing it by Qwest pursuant to the
         terms and conditions of this Agreement.

URRS Agreement                     Page 178             Dated: September 9, 2002
Appendix M

5.       Legal Requirements.

         5.01     Authorizations; Compliance. To the best of SPC's knowledge,
SPC is permitted to install and locate the Conduit System and Qwest is permitted
to own, operate, maintain, remove, repair and reinstall the Conduit System as
provided under this Agreement. SPC shall assign to Qwest any and all underlying
rights, permits, licenses and governmental approvals to the extent permitted.
Qwest shall be responsible for obtaining any and all underlying rights, permits,
licenses and governmental approvals that are required for Qwest use, operation
and ownership of the Conduit System subsequent to the Acceptance Date. In
implementing the terms of this Agreement, SPC and Qwest agree to comply with all
applicable local, municipal, state or federal laws, rules, regulations and
orders.

         5.02     Permittee Agreement. Qwest acknowledges and agrees that all
rights of Qwest with respect to that segment of the Route that is upon and
within rights-of-way owned or controlled by the Nevada Department of
Transportation ("NDOT") are dependent upon and subject to SPC's rights under
that certain June 29, 2001 Permittee Agreement between NDOT and SPC. Qwest
agrees that it will not do any act or thing that will cause or result in a
default by SPC under the Permittee Agreement. This Agreement shall be subject to
all terms, conditions, and provisions of the Permittee Agreement, and Qwest
hereby binds itself to and agrees, with respect to the Conduit System located
within NDOT rights of way, to all terms and provisions of the Permittee
Agreement applicable thereto, which are hereby incorporated by reference.
Additionally, attached as Exhibit D is form release language, which is required
by NDOT to be incorporated into this Agreement.

         5.03     Taxes. Qwest shall pay all taxes, fees and other impositions,
including without limitation personal property taxes, value added and gross
receipts taxes, which are assessed on the Conduit System after the relevant
Acceptance Date. SPC shall be responsible for all taxes imposed on the Conduit
System prior to the relevant Acceptance Date.

         5.04     Confidentiality. This Agreement and all materials, maps, and
other documents which are disclosed by one party to the other in fulfilling the
provisions and intent of this Agreement, are and shall be confidential
("Confidential Information"). Neither party shall divulge or otherwise disclose
Confidential Information to any third party without the prior written consent of
the other party except as required for the implementation of this Agreement, and
to auditors, attorneys, financial advisors, lenders and prospective lenders,
provided that in each case the recipient agrees in writing to be bound by the
confidentiality provisions set forth in this Section 4.04. A party may also
disclose Confidential Information without the prior written consent of the other
party if required by a court order or as otherwise required by law or in any
legal or arbitration proceeding relating to this Agreement; provided, however,
that in such case, the disclosing party shall give the other party five (5)
days' written notice of such disclosure to allow such party to seek a protective
order or otherwise prevent or protect such disclosure.

6.       General

         6.01     Notices. All notices and other communications required or
permitted under this Agreement shall be in writing and shall be given by United
States first class mail, postage prepaid, registered or certified, return
receipt requested], or by hand delivery (including by means of a professional
messenger service) addressed as follows:

URRS Agreement                     Page 179             Dated: September 9, 2002
Appendix M

                      To SPC:       Sierra Pacific Communications
                                    P.O. Box 300088
                                    Reno, NV 89520
                                    Attention:  Manager, Facilities

              With a copy to:       Sierra Pacific Communications
                                    Associate General Counsel
                                    Nevada Power Company M/S 3A
                                    P.O. Box 230
                                    Las Vegas, NV  89151

                    To Qwest:       Qwest Communications Corporation
                                    13952 Denver West Parkway
                                    Building 53, Suite 200
                                    Denver, CO 80401.
                                    Attention: Vice President of Outside
                                    Plant Construction

              With a copy to:       Qwest Law Department
                                    1801 California Street, Suite 3800
                                    Denver, Colorado 80202
                                    Attention:  Procurement Attorney

         Any such notice or other communication shall be deemed to be effective
when actually received or refused. Either party may by similar notice given
change the address to which future notices or other communications shall be
sent.

         6.02     Modification. This Agreement may not be rescinded, amended or
otherwise modified except by a writing executed by an authorized representative
of both SPC and Qwest.

         6.03     Assignment. Neither party shall assign or otherwise
transfer, by operation of law or otherwise, any of its rights or obligations
under this Agreement without the express written consent of the other party,
which consent shall not be unreasonably withheld or delayed. Notwithstanding
the foregoing, either party may assign or otherwise transfer without the
express written consent of the other in connection with: (i) any disposition of
all or substantially all of the assets of either party; (ii) any merger,
consolidation or reorganization of either party; (iii) any assignment, in whole
or in part, to any subsidiary, parent company or other affiliate of either
party; (iv) any collateral assignment, security interest or pledge of this
Agreement to a lender. In any event the assignor shall remain obligated to the
other party under the terms of this Agreement unless the other party releases
and discharges the assignor in writing.

         6.04     Warranties. SPC represents and warrants that Qwest shall
receive title to the personal property that comprises the Conduit System free
and clear of all encumbrances, including any mechanics or material liens,
except as may be specifically provided in Section 6.14(c). SPC warrants that
all construction of the Conduit System shall have been performed in a manner
consistent with telecommunication industry standards and the Specifications.
All warranties made under this Section 6.04 shall be true and correct as of the
Acceptance Date and shall survive expiration or termination of this Agreement
for a

URRS Agreement                     Page 180             Dated: September 9, 2002
Appendix M

period of one (1) year from the Acceptance Date. EXCEPT AS SET FORTH IN THIS
SECTION 6.04, SPC MAKES NO WARRANTY, EXPRESS OR IMPLIED, WITH RESPECT TO THE
CONDUIT SYSTEM, INCLUDING ANY WARRANTY OF MERCHANTABILITY AND FITNESS FOR
PARTICULAR PURPOSE, AND ALL SUCH WARRANTIES ARE EXPRESSLY DISCLAIMED. THE
WARRANTIES SET FORTH IN THIS AGREEMENT CONSTITUTE THE ONLY WARRANTIES MADE BY
SPC TO QWEST WITH RESPECT TO THIS AGREEMENT AND ARE MADE IN LIEU OF ALL OTHER
WARRANTIES, WRITTEN OR ORAL, STATUTORY, EXPRESS OR IMPLIED. If Qwest discovers
any defect in the Conduit System within one (1) year of the Acceptance Date,
Qwest shall notify SPC in writing of the same and SPC shall, within thirty (30)
days of receiving such notice, correct or cause to be corrected any defect at
SPC's cost and expense. If the defect is of a nature that will cause immediate
damage or harm to the Conduit System, Qwest shall notify SPC of the same and SPC
shall use reasonable commercial efforts to have any defect repaired within
forty-eight (48) hours of receiving such notice or, if SPC cannot have the
defect repaired within forty-eight (48) hours of receiving notice, Qwest may
repair the defect at SPC's cost. Additionally, SPC agrees to pass on and assign
to Qwest any warranty it may have received from the manufacturer or supplier, to
the extent that such warranty is assignable.

         6.05     Insurance. Each Party shall procure and maintain in force, at
its own expense, insurance coverage in amounts that a reasonably prudent
business person would maintain considering the obligations of the parties
hereunder but in no event less than coverage of the following types and limits:
(a) workers' compensation as required by applicable law; (b) employer's
liability with minimum limits of $1,000,000; (c) general liability with minimum
limits of $2,000,000; and (d) automobile liability with minimum limits of
$2,000,000. Such required insurance shall be obtained through insurers
reasonably acceptable to the other party and licensed to conduct business in the
jurisdiction. Each party shall obtain from the insurance companies providing the
coverage required by this Agreement, the permission of such insurers to allow
such party to waive all rights of subrogation and each party does hereby waive
all such subrogation rights. Both parties expressly acknowledge that a party
shall be deemed to be in compliance with the provisions of this Section 6.05 if
it maintains a state-approved self-insurance program providing for a retention
of up to $1,000,000, and covers any excess coverage requirements under
subsections (a) - (d) above with insurance

         6.06     Indemnity. Each Party hereby agrees to indemnify, defend,
protect and hold harmless the other party, its employees, agents, officers and
directors (the "Indemnified Persons"), from and against, and assumes liability
for, all suits, actions, damages or claims of any character brought against the
Indemnified Persons because of any damage received or sustained by any persons
or tangible property which in whole or in part arise on account of (i) the
negligent acts or omissions or willful misconduct of the indemnifying Party in
the performance of or related to the indemnifying Party's duties or obligations
under this Agreement, or (ii) a breach of this Agreement. Notwithstanding the
termination of this Agreement for any reason, the provisions in this paragraph
shall survive such termination.

         6.07     Complete Agreement. This Agreement represents the entire
understanding between SPC and Qwest with respect to the installation and sale of
the Conduit System covered hereunder and incorporate all prior and
contemporaneous understandings, whether written or oral, between the parties.
This Agreement supersedes all other prior oral or written agreements concerning
the installation and sale of the Conduit System

URRS Agreement                     Page 181             Dated: September 9, 2002
Appendix M

covered hereunder. This Agreement may not be rescinded, amended, or otherwise
modified except in writing executed by the authorized representatives of both
parties.

         6.08     No Personal Liability. Each action or claim against any party
arising under or relating to this Agreement shall be made only against such
party as a corporation, and any liability relating thereto shall be enforceable
only against the corporate assets of such party. No party shall seek to pierce
the corporate veil or otherwise seek to impose any liability relating to, or
arising from, this Agreement against any shareholder, employee, officer,
director or agent of the other party. Each of such persons is an intended
beneficiary of the mutual promises set forth in this Section and shall be
entitled to enforce the obligations or provisions of this Section.

         6.09      Attorneys' Fees. Subject to Sections 3.02 and 6.19 , in the
event any suit or action is brought by a party under this Agreement to enforce
any of its terms, or in an appeal therefrom, the prevailing party will be
entitled to have the other party pay its reasonable attorneys' fees, as fixed by
the trial court and/or appellate court, whichever the case may be.

         6.10     Damages; Limitation of Liability. Notwithstanding any
provision of this Agreement to the contrary, neither party shall be liable to
the other party for any loss of profits or indirect, incidental, consequential,
punitive or exemplary damages of any type whatsoever arising under or related to
this agreement. The parties expressly agree that damages of the types referenced
in the immediately preceding sentence do not include damages for termination of
contract provided under Section 4 of this Agreement. The parties further agree
that no claim for losses or damages whatsoever in connection with this Agreement
shall be made more than two (2) years after the date that the event giving rise
to such claim is known or reasonably should have been known to the party making
such claim.

         6.11     Counterparts. This Agreement may be executed in one or more
counterparts, all of which taken together shall constitute one and the same
instrument.

         6.12     Severability. In the event that any provision of this
Agreement is held unenforceable or invalid, the remainder of the Agreement shall
remain in full force and effect, and that the unenforceable or invalid provision
be replaced with a reasonable provision that most closely reflects the intention
of the parties.

         6.13     Governing Law. This Agreement shall be governed by the laws
of the State of Nevada, without reference to conflicts of law principles.

         6.14     SPC's Representations and Warranties. SPC represents and
warrants that:

                  (a)  SPC is a corporation duly organized, validly existing and
         in good standing under the Laws of its state of incorporation. SPC has
         full power and lawful authority to enter into this Agreement and
         consummate the transactions contemplated by this Agreement.

                  (b)  As of the Acceptance Date, SPC has good and marketable
         title to the personal property which comprises the Conduit System, free
         and clear of all liens, claims and encumbrances.

URRS Agreement                     Page 182             Dated: September 9, 2002
Appendix M

                  (c)  To the best of SPC's knowledge and except as otherwise
         set forth in Exhibit G, neither SPC nor the Conduit System is subject
         to any pending or threatened litigation, proceeding or administrative
         investigation.

                  (d)  To the best of SPC's knowledge and as of the Acceptance
         Date, the Conduit System complies with all applicable laws.

                  (e)  As of the Acceptance Date, there are no parties in
         possession of any of the Conduit System, and there are no other rights
         of possession to or use of the Conduit System which have been granted
         to any third party or parties, except where access is commonly shared
         by SPC and other telecommunications facility users and collocators
         within the Right of Way along the Route.

                  (f)  As of the Acceptance Date SPC has not granted to any
         party any option, contract or other agreement with respect to the
         purchase or sale of the Conduit System.

                  (g)  To the best of SPC's knowledge, there are no pending or
         threatened condemnations or similar proceedings affecting any of the
         Conduit System and, to the best of SPC's knowledge, no such proceeding
         is contemplated by any governmental authority. SPC has no knowledge i)
         that the Conduit System is situated within any special assessment
         district, or ii) of any proposal under which the Conduit System is to
         be placed in any such special assessment district.

                  (h)  To the best of SPC's knowledge and provided Qwest
         performs its transactional and continuing obligations under this
         Agreement, the entering into and consummation of the transactions
         contemplated hereby will not conflict with or, with or without notice
         or the passage of time or both, constitute a default under, any
         contract, lease or other agreement, including, without limitation, the
         contracts to which SPC is a party or by which SPC may be bound or any
         laws affecting SPC or the Conduit System. This Agreement and all
         documents referenced herein to be executed by SPC are and shall be
         valid and legally binding obligations of SPC.

                  (i)  To the best of SPC's knowledge, (i) all representations
         and warranties made by SPC in this Agreement, and all information
         contained in any statement, document or certificate furnished to Qwest
         in connection with this transaction, are free from any untrue statement
         of material fact and do not omit to state any material facts necessary
         to make the statements contained herein or therein not misleading; and
         (ii) the copies of any documents furnished to Qwest in connection with
         this transaction are true and complete copies of the documents they
         purport to be. Each of the representations and warranties of SPC
         contained in this Agreement are acknowledged by SPC to be material and
         to be relied upon by Qwest in proceeding with this transaction, shall
         be deemed to have been remade by SPC as of the Acceptance Date and
         shall survive the Acceptance Date.

         6.16     Qwest's Representations and Warranties. Qwest represents and
warrants that:

                  (a)  Qwest is a corporation duly organized, validly existing
         and in good standing under the Laws of its state of incorporation, and
         has or will have the corporate power and authority to enter into this
         Agreement and to consummate the

URRS Agreement                     Page 183             Dated: September 9, 2002
Appendix M

         transactions contemplated by this Agreement. Prior to the date of
         execution of this Agreement, this Agreement will have been duly
         authorized by all necessary corporate action on the part of the Qwest.
         This Agreement constitutes the legal, valid and binding obligation of
         Qwest, enforceable against Qwest in accordance with its terms.

                  (b)  No third party approval or consent is required to enter
         into this Agreement or the documents referenced herein or to consummate
         the transactions contemplated hereby. To the best of Qwest's knowledge,
         the entering into and consummation of the transactions contemplated
         hereby will not conflict with or, with or without notice or the passage
         of time or both, constitute a default under, any contract, lease or
         other agreement, including, without limitation, the contracts to which
         Qwest is a party or by which Qwest may be bound or any laws affecting
         Qwest.This Agreement and all documents referenced herein to be executed
         by Qwest are and shall be valid and legally binding obligations of
         Qwest.

                  (c)  All representations and warranties made by Qwest in this
         Agreement, and all information contained in any statement, document or
         certificate furnished to SPC in connection with this transaction, are
         free from any untrue statement of material fact and do not omit to
         state any material facts necessary to make the statements contained
         herein or therein not misleading. The copies of any documents
         furnished to SPC in connection with this transaction are true and
         complete copies of the documents they purport to be. Each of the
         representations and warranties of Qwest contained in this Agreement are
         acknowledged by Qwest to be material and to be relied upon by SPC in
         proceeding with this transaction, shall be deemed to have been remade
         by Qwest as of the Acceptance Date and shall survive the Acceptance
         Date.

         6.17     Conditions to Qwest's Obligations. Qwest's obligations under
this Agreement are subject to the satisfaction, on the Acceptance Date, of each
of the following conditions, any of which may be waived in writing by Qwest:

                  (a) SPC will have fully complied with and performed all of
         its obligations under this Agreement.

                  (b) All representations of SPC in this Agreement will be true
         and complete as of the date when given and on the Acceptance Date.

                  (c) All consents, approvals and waivers required to consummate
         the transactions contemplated by this Agreement will have been obtained
         in writing by SPC.

         6.18     Conditions to SPC's Obligations. SPC's obligations under this
Agreement are subject to the satisfaction, on the Acceptance Date, of each of
the following conditions, any of which may be waived in writing by SPC:

                  (a) Qwest will have fully complied with and performed all of
         its obligations under this Agreement.

                  (b) All representations of Qwest in this Agreement will be
         true and complete as of the date when given and on the Acceptance Date.

                  (c) All consents, approvals and waivers required to
         consummate the

URRS Agreement                     Page 184             Dated: September 9, 2002
Appendix M

         transactions contemplated by this Agreement will have been obtained in
         writing by Qwest.

         6.19     Risk of Loss. If, prior to the Scheduled Completion Date, the
Conduit System or any portion thereof is destroyed by any casualty or is the
subject of a taking, SPC may repair or replace the affected potion of the
Conduit System and, in such event, all the terms and conditions of this
Agreement shall remain in full force and effect. If SPC chooses not to repair
the Conduit System, then Qwest will have the option, to be exercised within
twenty (20) days following the date on which SPC notifies Qwest in writing that
it will not repair or replace the affected portion of the Conduit System, to (a)
terminate this Agreement and receive from SPC, within ten (10) days of providing
SPC with notice of such termination, any portion of the Purchase Price which
Qwest paid to SPC as of the date of the destruction or taking, or (b) deduct
from the Purchase Price the value of that portion of the Conduit System which
was so destroyed or taken as is mutually agreed to by Qwest and SPC or, in the
event of disagreement, the amount determined by an arbitrator or appraiser
mutually agreeable to Qwest and SPC, and to otherwise consummate this
transaction.

         6.20     Dispute Resolution. Except for an action seeking a temporary
restraining order or injunction, or suit to compel compliance with this dispute
resolution process, the Parties agree to exclusively use the dispute resolution
procedures set forth in this Section 6.20 with respect to any controversy or
claim arising out of or relating to this Agreement. For a period of forty-five
(45) days after notice from either Party, the Parties shall attempt in good
faith to resolve the dispute by direct negotiation of representatives of the
Parties. If the Parties do not resolve the dispute within such period, such
dispute shall be resolved by arbitration in a location agreed to by the parties
and in accordance with the Commercial Arbitration Rules of the American
Arbitration Association. The Federal Arbitration Act, 9 U.S.C. Sections 1-15,
not state law, shall govern the arbitrability of all claims, the arbitration
shall be held in the jurisdiction of the Party against whom the arbitration is
filed Judgment on any award rendered by the arbitrator under this Section may
be entered in any court having jurisdiction thereof. No award rendered under
this Section, shall include indirect, consequential, special or punitive
damages. If any party files a judicial or administrative action asserting
claims subject to arbitration as prescribed herein, and another party
successfully stays such action or compels arbitration of said claims, the party
filing said action shall pay the other party's costs and expenses incurred in
seeking such stay or compelling arbitration, including reasonable attorneys'
fees.

         6.21     Force Majeure. Neither party shall be liable to the other
party, and each party's performance under this Agreement shall be excused, if
and to the extent that any failure or delay in such party's performance of one
or more of its obligations hereunder is caused by any of the following
conditions, and such party's performance of such obligation or obligations shall
be excused and extended for and during the period of any such delay: act of God;
fire; flood; fiber, cable, conduit, or other material failures, shortages or
unavailability or other delay in delivery not resulting from the responsible
party's failure to timely place orders therefor; lack of or delay in
transportation; the effect of applicable laws, or the imposition of any
governmental codes, ordinances, laws, rules, regulations or restrictions, or
delay in governmental authorizations; war or civil disorder; strikes or other
labor disputes; failure of a third party to grant or recognize an underlying
right (provided that SPC has made timely and reasonable commercial efforts to
obtain the same); or any other cause beyond the reasonable control of such
party. The party claiming relief under this Section shall notify the other in
writing of the existence of the event relied on and the

URRS Agreement                     Page 185             Dated: September 9, 2002
Appendix M

cessation or termination of said event, and the party claiming relief shall
exercise reasonable commercial efforts to minimize the time of any such delay.

         IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed on the day and year first written above.

QWEST COMMUNICATIONS
CORPORATION

By: _______________________________        By: _____________________________

Name: _____________________________        Name:  RICHARD J. COYLE, JR.

Title: ____________________________        Title: President

URRS Agreement                     Page 186             Dated: September 9, 2002
Appendix M

                                   EXHIBIT A

                            MAP OF THE RIGHT-OF-WAY

                                   [GRAPHIC]

URRS Agreement                     Page 187             Dated: September 9, 2002
Appendix M

                                    EXHIBIT B

                               THE CONDUIT SYSTEM

                     VERDI, NEVADA TO SACRAMENTO, CALIFORNIA

         This portion of the route consists of approximately 131 miles
(691,680') in length. The telecommunications system along the route from the
Union Pacific Railroad milepost 227, approximately 8/10 of a mile east of the
California - Nevada State Line near Verdi Nevada to Hirshdale Road UPRR MP
218.3, approximately 11 miles (58,080'). From Hirshdale Road to West Truckee,
approximately 16.5 miles (87,120'). West Truckee to Soda Spring, approximately
6.8 miles (35,904'). Soda Springs to Cisco Grove approximately 9.1 miles
(48,048'). Cisco Grove to Blue Canyon approximately 12 miles (63,360'). Blue
Canyon to Colfax UPRR MP 142, approximately 21 miles (110,880'). UPRR MP 142 to
Sacramento UPRR MP 89 approximately 53.7 mile (283,536'). Sacramento UPRR MP 89
to 1005 North B Street approximately 1 mile (5280').

                                   RENO METRO

         The fiber optic cable line will start .8 of a mile from the California
border into Nevada and ties in with a Williams handhole between UPRR and 1-80
and ends at the Wells Fargo building at 200 South Virginia Street. Phase II
begins at 200 South Virginia Street, Wells Fargo building, and ends at South
Meadows Parkway.

                                   LONG HAUL

         The fiber optic cable line will start at the intersection of South
Meadows Parkway and South Virginia Street in Reno and follow the highway
right-of-way south from Reno along U.S. highway 395 to East Lake Boulevard.
From East Lake Boulevard, the cable will continue southward along a corridor to
Goni Road and then to Arrowhead Drive in Carson City. At Arrowhead Drive it
will head eastward to US Highway 50 and continue east crossing the rest of
Nevada, passing through the cities of Fallon, Austin, Eureka, and Ely and
continuing into Delta Utah. At Delta the route would follow US Highway 6
northeastward to State Route 132 In Lynndyl, Utah. At State Route 132 the cable
would continue northeast to just west of Nephi, Utah, where it would intersect
State Route 91. On State Route 91 the fiber optic cable would continue
northward through Mona to Santaquin, Utah. The cable would then head northeast,
following side roads and a portion of State Route 115 on the west side of
Interstate 15 (1-15). Just north of Spanish Fork the fiber optic cable would
cross under 1-15 and tie in with another fiber optic cable system on 4800
South, approximately 0.2 miles east of 1-15. The route would then continue
north on I-15 to Provo, UT, run along city streets into the Provo POP located
at the corner of East 100 and North 100, then along city streets to I-15, then
north on I-15 to the vicinity of the Bangerter Highway, north to west 700
south, along city streets to 161 Regent Street, north on Regent Street to the
termination point at 100 South State Street.

                                   CALIFORNIA

- -   Verdi Nevada on UPRR MP 227 to MP 218.3 at Hirshdale Rd. spread 5.1.

- -   Hirshdale Rd. to West Truckee, spread 5.2.

- -   West Truckee to Soda Springs, spread 5.3

- -   Soda Springs to Cisco Grove, spread 5.4

- -   Cisco Grove to Blue Canyon, spread 5.5

- -   Blue Canyon to Colfax UPRR MP 142, spread 5.6

- -   Colfax UPRR MP 142 to Sacramento UPRR 89, spread 6

- -   Sacramento UPRR 89 to 1005 North "B" Street, Sacramento Ca, spread 7

URRS Agreement                     Page 188             Dated: September 9, 2002
Appendix M

                                   NEVADA

- -   Reno Metro, Phase 1 is approximately 74,406 feet

- -   Phase 2 is approximately 51,069 feet.

- -   Spread 1, South Meadow Parkway to Lyon County line Is approximately 321,496
    feet.

- -   Spread 2, Churchill County line to the Lander County line is approximately
    567,791 feet.

- -   Spread 3, Lender County line to the White Pine County line is approximately
    578,458 feet.

- -   Spread 4, White Pine County to Utah border is approximately 702,319 feet.

                                   UTAH

- -   Spread 5, Millard County at the Nevada/Utah border to Juab County line is
    approximately 616,238 feet.

- -   Spread 6, Juab County line to north of Spanish Fork approximately 0.2 miles
    east of 1-15 end is approximately 355,097 feet.

- -   Spanish Fork to Provo, UT approximately 7.95 miles (42,000 feet).

- -   Provo north to Salt Lake City, UT approximately 59.14 miles (312,265 feet).

URRS Agreement                     Page 189             Dated: September 9, 2002
Appendix M

                                   EXHIBIT C

                                  BILL OF SALE

KNOW ALL MEN BY THESE PRESENTS that, for good and valuable consideration, the
receipt and sufficiency of which are hereby acknowledged, Sierra Pacific
Communications, a Nevada corporation ("SPC"), does hereby sell, transfer, and
convey to Qwest Communications Corporation, a Delaware corporation ("Qwest"),
all right, title and interest in the following personal property:

         (i)      one (1) one-and-one-quarter inch (1.25") conduit of
                  approximately one hundred forty-six (146) miles in length
                  between Sacramento, California and Reno, Nevada;

         (ii)     one (1) two inch (2") conduit of approximately three hundred
                  fifty (350) miles in length between Reno, Nevada and Ely,
                  Nevada;

         (iii)    one (1) two inch (2"") conduit of approximately three hundred
                  sixteen (316) miles in length between Ely, Nevada and Salt
                  Lake City, Utah;

together with the associated vaults, handholes and manholes, and other related
facilities within the Route as set forth in Exhibit B (the "Conduit System"),
installed on approximately 812 miles between Sacramento, CA and Salt Lake City,
Utah and as more particularly described in the Amended and Restated Agreement
for Construction and Sale of a Conduit between the SPC and Qwest dated
September 4, 2002. SPC hereby warrants to Qwest that good and clear title to
the personal property that comprises the Conduit System is hereby vested in
Qwest free and clear of all liens, claims, encumbrances and rights of others.

         IN WITNESS WHEREOF, SPC has caused this Bill of Sale to be executed
and delivered in its name this ____ day of _______, 2003.

                                       SIERRA PACIFIC COMMUNICATIONS
                                         ("SPC")

                                            Insert Company Name

                                       By:  _________________________________

                                       Name: ________________________________

                                       Title: _______________________________

URRS Agreement                     Page 190             Dated: September 9, 2002
Appendix M

                                            Date:
                                                _______________________________

                                   EXHIBIT D

                           NDOT FORM RELEASE LANGUAGE

         IRU Grantee acknowledges and agrees that neither NDOT, nor its
representatives, agents, servants, and/or employees is responsible for the
continuing Operation and Maintenance of the System and the IRU Grantee's IRU
Fibers. Neither NDOT, its representatives, agents, servants, and/or employees
shall be responsible or liable for any damage to, or interruption of the
Operational status of IRU Grantee's network and/or the IRU Fibers, provided,
however, that in the event that Maintenance on the IRU Fibers is required due
to the supervening negligence or willful misconduct of NDOT, its
representatives, agents, servants of employees, the reasonable costs and
expenses of such Maintenance work shall be borne by NDOT, subject to any
limitations set forth in the Permittee Agreement between NDOT and SPC. IRU
Grantee understands and agrees that the Installation of the IRU Fibers and the
System is within a public highway environment and therefore subject to the
inherent dangers of such environment including, without limitation damage to
the IRU Fibers resulting from traffic accident or construction along the ROW.
IRU Grantee agrees to release, remise and forever discharge NDOT, its
representatives, agents, servants, and employees from any liability associated
with or relating to damage to, or interruption of the Operational status of,
the System and/or the IRU Fibers, whether or not the proximate cause of such
damage or interruption was the negligence of NDOT, representatives, agents,
servants, and/or employees, including, without limitation, liability for
incidental or consequential damages and/or loss of business or business
revenue; provided, however, that in the event that Maintenance on the IRU
Fibers is required due to the supervening negligence or willful misconduct of
NDOT, its representatives, agents, servants or employees, the reasonable costs
and expenses of such Maintenance work shall be borne by NDOT, subject to the
limitations set forth in the Permittee Agreement between NDOT and SPC.

URRS Agreement                     Page 191             Dated: September 9, 2002
Appendix M

                                   EXHIBIT E

                                COMPLETION DATES



ROUTE STATUS CONDUIT INSTALLATION:        STATUS                EST. COMPLETION
                                                          
Sacramento to Reno                        Complete

South Meadows - Lyon/Churchill            79.7% complete            10-30-02

Churchill County NV                       98.5% complete            10-30-02

Lander & Eureka Counties, NV              94% complete              10-30-02

White Pine county, NV                     87% complete              10-30-02

Millard County, UT                        99.1% Complete            10-30-02

Juab & Utah Counties, UT                  98% complete              10-30-02

Spanish Fork - Bangerter UT               0.0% complete             11-31-02

I15 - Provo POP, UT                       0.0% complete             12-31-02

Provo, UT - SLC                           0.0% complete             01-31-03


URRS Agreement                     Page 192             Dated: September 9, 2002
Appendix M

                                   EXHIBIT F

                   MAINTENANCE SPECIFICATIONS AND PROCEDURES

1.       DEFINITIONS:

Terms used in this exhibit are defined in the Agreement and as follows:

Agreement: The Agreement between Qwest Communications ("CUSTOMER") and Sierra
Pacific Communications, the Service Provider ("SP")

Cable Relocation: The physical relocation of the System, which may be required
by public (e.g., city or state government) or private entities.

Facilities: All physical building spaces, including but not limited to
regenerator huts, terminal offices, terminal huts, and manholes, where the
System is present along the Route.

Maintenance Activity: All work activities as defined in Section 2 of this
Schedule.

Method of Procedure (MOP): The plan developed by the SP, which details the
activities, required to be followed during work activities near or on the
System.

One-Call Agency: Each state has a state run agency established by the state for
anyone (including but not limited to contractors) to call a pre-designated
phone number to report potential intrusions to the System. Every state has its
own One-Call Agency.

Operations Center (OC): The facility or facilities, along with the personnel
and other assets required to monitor, communicate, coordinate, restore, repair,
and perform all Maintenance Activity.

Planned Cable Activity (PCA) : Any planned conduit activity, including
activities that do not impair the conduit as well as activities that do impair
the conduit, that could potentially affect SP's service of the System.

Planned System Work Period (PSWP): A pre-arranged period of time reserved for
performing certain work on the System that may potentially impact traffic.
Generally, this will be restricted to weekends, avoiding the first and last
weekend of each month and high-traffic weekends. The PSWP shall be agreed upon
per this Exhibit C of this Agreement.

Restoration, Total (Total Restoration): A condition whereby the conduit cannot
carry service along one or more Route Segment(s) or Route Section(s) on a
Link(s). An example of this condition is a backhoe severing the conduit.

Service Acceptance Date: The date that the Customer accepts the System and
requires service on the System.

2.       MAINTENANCE ACTIVITIES

The following subsections describe the types of Maintenance Activities that
must be performed. All Maintenance Activity types described below shall be
performed by or under the direction of the SP.

For all Maintenance Activities, CUSTOMER may contact SP at any time to discuss
fiber status or

URRS Agreement                     Page 193             Dated: September 9, 2002
Appendix M

to notify SP of changes in status or any other issues which require action by
the SP. However, no other party, including but not limited to a lessee of the
CUSTOMER's conduit (i.e. CUSTOMER subleases its conduit to a third party),
shall call the SP for anything related to CUSTOMER's conduit without the
written agreement of both the CUSTOMER's and SP's escalation lists (Attachment
2) Tier 3 representative. It is the intention of this Agreement that any lessee
of fibers in the conduit coordinate all problems and issues solely with the
originating party of the Disposition.

Parties have the right to review each other's maintenance standards, which
include preventative maintenance procedures, Planned Cable Activity procedures,
and cable restoration procedures.

SP shall notify CUSTOMER at least ten (10) business days prior to the date in
connection with any Planned System Work Period (PSWP) of any Maintenance
Activity and as soon as possible after becoming aware of the need for
unscheduled maintenance. CUSTOMER shall have the right to be present during the
performance of any Maintenance Activity or unscheduled maintenance so long as
this requirement does not interfere with SP's ability to perform its
obligations under this Agreement. In the event that Maintenance Activity is
canceled or delayed for whatever reason as previously notified, SP shall notify
CUSTOMER at SP's earliest opportunity, and will comply with the provisions of
the first sentence of this paragraph to reschedule any delayed activity.

2.2.     Preventative Maintenance
Preventative maintenance will be performed according to the SP's standards.
Each SP's maintenance standards must include the following:

         2.1.     Consistent with Transportation Equity Act 21 (TEA21) Best
                  practices, the SP will:

                  -    Subscribe to each and all One-Call Agencies that
                       govern Route Segment(s), Route Section(s) or Link(s)
                       they maintain.

                  -    Abide by all state One-Call Agency laws

                  -    Respond to all locate requests.

                  -    Analyze, assign, and dispatch locate request to SP's
                       qualified technicians

         2.2.     The SP will positively respond to excavation activity
                  notifications as follows:


                                                     
- ---------------------------------------------------------------------------------------
Locate and Mark Cable                                   Within fifty (50) feet of System
- ---------------------------------------------------------------------------------------
Locate, Mark, and Standby to protect conduit            Within ten (10) feet of System
- ---------------------------------------------------------------------------------------
Positive confirmation of the location of the            Within eighteen (18) inches
Customer's Conduit will be done through                 either side of System
various means of (e.g. Potholing) to ensure
that Customers' cable is not damaged
- ---------------------------------------------------------------------------------------


         2.3.     Positively respond to boring operations as follows:


                                                     
- ----------------------------------------------------------------------------------------
Standby and monitor the boring operation                Within one hundred (100) feet of
to ensure the cable is not damaged.                     System
(Potholing, etc. as required)
- ----------------------------------------------------------------------------------------


         2.4.     Route Patrol

Patrol the route by a qualified technician in accordance with the current SP's
procedures for maintenance a minimum of four (4) times a year. This "patrol"
will consist of riding the route to identify potential maintenance issues (e.g.
erosion, encroachments, damaged or missing signs,

URRS Agreement                     Page 194             Dated: September 9, 2002
Appendix M

etc.).

         2.5.     Signs

The SP will routinely replace signs that are damaged.

         2.6.     Right Of Way Maintenance

Brush, trees and/or other vegetation should be trimmed to the edge of the ROW
as required to support ROW accessibility and worker safety. Under no
circumstances should prevailing growth exceed 30 inches in height or lower if
it obstructs signage visibility. Ongoing trimming of the ROW communicates a
message to others that the underground plant exists in the right of way and
that the SP cares about it. As such, ROW-clearing and trimming serves as a
crucial part of the overall right-of-way maintenance effort to enhance plant
protection.

At a minimum ROW maintenance must comply with local, state, and federal
requirements.

         2.7.     Voltage Suppressor / Arrestor

Wherever the cable sheath voltage exceeds 50v AC, voltage suppressers or
arrestors shall be installed by Customer at the splice points and regenerator
locations.

         2.8.     Planned Cable Activity

A Planned Cable Activity (PCA) is any activity, which can be planned in advance
(i.e., not an emergency) that will cause maintenance personnel to physically
move the conduit. There are two types of PCAs: intrusive and non-intrusive.

         2.9.     Intrusive PCAs

An intrusive PCA is an activity where the SP will expose the buffer tube.
Examples:

                  -    installation of insulating joints / isolation closures,

                  -    reroutes / cutovers / hot cuts

Intrusive PCAs must be performed from 6pm to 6am local time Monday through
Friday or any time during the weekends, excluding holidays. If exceptions are
required to these times, including holidays, utilize the escalation list.

         2.10.    Non-Intrusive PCAs

Examples of non-intrusive PCAs are as follows:

                  -    conduit lowering or rearrangements

                  -    conduit or manhole rearrangements

Non-intrusive PCAs can be performed anytime.

         2.2.4.   Responsibilities of SP and CUSTOMER

For ALL PCAs, the SP must notify the CUSTOMER at least fourteen (14) calendar
days prior to the activity.

For PCA activity that will result in signal discontinuity, the following
process will be performed:

URRS Agreement                     Page 195             Dated: September 9, 2002
Appendix M

         -        AT LEAST FOURTEEN (14) CALENDAR DAYS IN ADVANCE: SP shall
                  provide a copy of its Method of Procedure (MOP) in writing
                  to CUSTOMER and will notify CUSTOMER of this PCA per
                  escalation list.

         -        AT LEAST TEN (10) CALENDAR DAYS IN ADVANCE: After receipt of
                  SP's MOP, CUSTOMER then will provide a copy of its MOP to
                  the SP that incorporates the switching, verification,
                  identification, and testing of CUSTOMER's fibers.

         -        AT THE TIME OF THE PCA: The SP and CUSTOMER shall maintain
                  communication via phone for the entire execution of the event.
                  CUSTOMER shall coordinate the execution of CUSTOMER's MOP
                  with SP.

         -        If for any reason any PCA is canceled or delayed, then SP
                  shall notify CUSTOMER as soon as SP is aware of the change,
                  and SP will reschedule the activity.

         2.11.    Cable and Conduit Restoration

The SP will respond to all CUSTOMER's notifications indicating any failure, any
interruption, or any impairment to the CUSTOMER's conduit System.

         2.12.    Restoration

The SP shall notify CUSTOMER of the cable cut, per the escalation list,
including the time of the conduit cut, and the Route Section as soon as
possible, but no later than 15 minutes from the time the cut occurs. Once this
information is provided to the CUSTOMER, the SP shall establish a
communications bridge with the CUSTOMER and stay in constant communication
throughout the cable cut.

The SP shall notify the CUSTOMER of the physical location of the conduit cut as
soon as possible but no later than 90 minutes from the time the cable cut
occurs.

For every total cable cut, SP shall respond immediately after receiving
notification with a goal of restoring CUSTOMER's conduit in six (6) hours from
the time of the cable cut. The only exception to this response time is when an
uncontrolled incident, such as a flood, a chemical spill, a fire, a bridge
collapse, a riot, or other circumstance prevents access to the damage area.

To accomplish this conduit restoration, it is acknowledged that the repairs so
affected may be temporary in nature. In such event, within twenty-four (24)
hours after completion of all temporary Restoration activity, SP shall commence
its planning for permanent repair, and thereafter promptly shall notify
CUSTOMER of such plans. If the SP informs the CUSTOMER that the temporary
conduit repair cannot be made permanent immediately, then the permanent repair
shall be mutually agreed upon by both parties.

The parties agree to mutually support each other during restoration activities.

In the event the restoration cable is exposed above ground, the SP must provide
on-site personnel for conduit protection.

         2.13.    Conduit Damage and Restoration

The SP will respond to all notifications indicating any damage to the Conduits
in the System. The CUSTOMER will affect repairs to the conduit immediately in
occupied conduit or as soon as commercially reasonable and practical in the
case of damaged empty conduit. The trench will be back filled using approved
materials appropriate to the field conditions. Restoration standards will be at
least as found prior to the excavation or better.

URRS Agreement                     Page 196             Dated: September 9, 2002
Appendix M

Verification of continuity of Dark Fibers shall be the responsibility of the
CUSTOMER.

         2.14.    Hazardous Conditions / Service Precautions

A hazardous condition or service precaution is when an event, such as flooding,
fire, street collapse, cable wash-out or a man-made event such as a train
derailment occurs, and there is an increased probability that the System may be
damaged, and maintenance activity is needed to prevent any potential damage.

For these events SP shall notify CUSTOMER, per escalation list, as soon as the
SP knows of such event. The SP shall establish a communications bridge for
these events and stay in constant communication.

         2.15.    Disaster Recovery

Disaster recovery is any event that affects service on the System and involves
significantly more maintenance activity than just a cable restoration.
Examples of disaster recovery are as follows:

         -        train derailment occurs, which by itself would be a hazardous
                  condition, but for this example it destroys a regeneration
                  site, or

         -        the cable at a bridge is washed out and restoration involves
                  deploying several miles of cable to restore service.

For these events SP shall notify CUSTOMER, per escalation list, as soon as the
SP knows of such event. The SP shall establish a communications bridge for
these events and stay in constant communication.

The parties agree to mutually support each other during disaster recovery
activities. Examples of support may include providing fault locating, splicing,
or running cable. All support is at the discretion of the SP -- meaning that
the SP shall have its crew performing disaster recovery and may accept and
direct the support from the CUSTOMER if the CUSTOMER offers such support.

3.       OPERATIONS / NETWORK CONTROL CENTER(S)

         3.1.     Operations / Network Control Centers

The terms Operations Center and Network Control Center are synonymous, and will
be called Operations Centers for the remainder of this Schedule.

SP shall operate and maintain an Operations Center (OC) staffed twenty-four
(24) hours a day, seven (7) days a week including all holidays. The OC shall be
staffed by trained and qualified personnel. SP's maintenance personnel shall be
available for dispatch twenty-four (24) hours a day, seven (7) days a week.

4.       ESCALATION LIST

An escalation list (Attachment 1) will be shared between the parties. This
list shall provide for coordination between SP and CUSTOMER for day-to-day
issues, coordination of all Maintenance Activity communication and
coordination, as well as escalation personnel in the event agreement cannot be
reached at the lowest level of the escalation list.

URRS Agreement                     Page 197             Dated: September 9, 2002
Appendix M

This escalation list may be modified by either party at any time if the party
making the change notifies the other party in writing twenty-four (24) hours in
advance of the change.

The escalation's Tier 1 contact shall be the day-to-day working level, which
shall address daily maintenance operations activities.

5.       FACILITIES

Except to the extent otherwise expressly provided in the Agreement, CUSTOMER
will be solely responsible for providing and paying for any and all maintenance
of all electronic, optical, and any other equipment, materials and facilities
used by CUSTOMER in connection with the operation of the Dark Fibers, none of
which is included in the maintenance services to be provided hereunder.

Each party agrees that the Facilities shall be placed and maintained in
accordance with the requirements and specifications of current editions of the
National Electrical Code and the National Electrical Safety Code, the
applicable rules and regulations of the Occupational Safety and Health Act
(including those of 29 C.F.R. Section 1910.268(a) et seq.) and the requirements
of any other authority having jurisdiction. Each party shall promptly furnish
to each other, but in no case later than twenty-four (24) hours, copies of all
notices, reports, correspondence, submissions, made by either party to federal,
state, or municipal environmental, safety, or health authorities. Each party
agrees that Facilities shall not physically, electronically or inductively
interfere with those of facilities in place.

6.       COVERAGE PERIOD

Maintenance will be performed for agreed upon Route Segment(s) or Route
Section(s) on a Link(s) commencing upon the Service Acceptance Date, and
conclude upon expiration or termination of the Agreement.

7.       SUBCONTRACTING

The SP may subcontract any Maintenance Activities herein, provided the SP shall
require the subcontractor(s) to perform in accordance with the Agreement. The
use of any such subcontractor shall not relieve SP of any of its obligations
herein.

8.       ESCALATION LISTS

1.       Touch America 24 by 7 NOC 877-638-6621

2.       Transport Manager - Tom Good

3.       NOC Director - Jonathan Strong

4.       Director, Field Operations - Jerry Piazzola

5.       Vice President, Networks - Kevin Dennehy

URRS Agreement                     Page 198             Dated: September 9, 2002
Appendix M

                                   EXHIBIT G

                                15.  LITIGATION

1.       Bayport Pipeline, Inc. v. STA and Mastec North America, Inc.; Case
         No. CV-02-0187-HDM (VPC); United States District Court for the
         District of Nevada; alleged breach of contract action.

                                      16.

2.       TI Energy Services, Inc. v. STA; Cause No. 2001-59361; Harris County,
         Texas; 164th Judicial District; alleged breach of contract action.

3.       Cleveland Inspection Services, Inc. v. Sierra Pacific Communications
         and Touch America, Inc.; Cause No. 0020905259; Salt Lake City, UT;
         lien foreclosure action.

4.       Sorensen Construction, Inc. v. STA; Cause No. 020901281; Salt Lake
         City, UT; lien foreclosure action.

5.       Adesta Bankruptcy - includes Adesta facilities in Bangerter Hwy and
         I15 in Utah

URRS Agreement                     Page 199             Dated: September 9, 2002
Appendix M

                                   EXHIBIT H

                   REGENERATION/AMP SITES IN NEVADA AND UTAH

         Moundhouse, NV
         Lahontan, NV
         Salt Wells, NV
         Edwards Creek, NV
         Cape Horn, NV
         Eureka, NV
         Moorman, NV
         Ely, NV
         Dry Gulch, NV
         Dog Valley, UT
         Hinkley, UT

17.

URRS Agreement                     Page 200             Dated: September 9, 2002
Appendix M