1 FORM 10-Q SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 [X] QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the quarterly period ended September 30, 1996 OR [ ] TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the transition period from to --------------- ----------------- Commission file number (Under the Securities Act of 1933) 33-37977 MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP -------------------------------------------------------------- (Exact name of registrant as specified in its charter) MICHIGAN 38-2726166 - ------------------------------ ----------------------------- State or other jurisdiction of (I.R.S. Employer incorporation or organization) Identification No.) 100 PROGRESS PLACE, MIDLAND, MICHIGAN 48640 - --------------------------------------------- ------------ (Address of principal executive offices) (Zip Code) Registrant's telephone number, including area code (517) 839-6000 -------------- Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes X No --- --- 2 PART I. FINANCIAL INFORMATION Item 1. Financial Statements MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP CONSOLIDATED BALANCE SHEETS AS OF (In Thousands) September 30, 1996 December 31, ASSETS (Unaudited) 1995 - ------ ---------- ---------- CURRENT ASSETS: Cash and cash equivalents $ 133,174 $ 163,953 Restricted cash and cash equivalents 14,052 13,455 Accounts receivable 64,120 64,021 Gas inventory 13,563 14,396 Unamortized property taxes 5,971 - Prepaid expenses and other 4,568 1,053 ---------- ---------- Total current assets 235,448 256,878 ---------- ---------- PROPERTY, PLANT AND EQUIPMENT: Property, plant and equipment 2,386,830 2,357,881 Pipeline 21,222 21,410 ---------- ---------- Total property, plant and equipment 2,408,052 2,379,291 Accumulated depreciation (509,787) (431,749) ---------- ---------- Net property, plant and equipment 1,898,265 1,947,542 ---------- ---------- OTHER ASSETS: Restricted non-current cash and cash equivalents 141,954 139,852 Deferred financing costs, net of accumulated amortization of $7,938 and $7,059, respectively 10,639 11,518 Materials, supplies and other 5,824 4,740 ---------- ---------- Total other assets 158,417 156,110 ---------- ---------- TOTAL ASSETS $2,292,130 $2,360,530 ========== ========== LIABILITIES AND PARTNERS' EQUITY - -------------------------------- CURRENT LIABILITIES: Accounts payable, accrued and other liabilities $ 55,430 $ 54,390 Interest payable 43,848 91,840 Current portion of long-term debt 78,574 72,190 ---------- ---------- Total current liabilities 177,852 218,420 ---------- ---------- NON-CURRENT LIABILITIES: Long-term debt 1,929,241 2,007,815 Other 411 335 ---------- ---------- Total non-current liabilities 1,929,652 2,008,150 ---------- ---------- CONTINGENCIES TOTAL LIABILITIES 2,107,504 2,226,570 ---------- ---------- PARTNERS' EQUITY 184,626 133,960 ---------- ---------- TOTAL LIABILITIES AND PARTNERS' EQUITY $2,292,130 $2,360,530 ========== ========== The accompanying condensed notes are an integral part of these statements. -1- 3 MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP CONSOLIDATED STATEMENTS OF OPERATIONS (Unaudited) (In Thousands) Three Months Ended Nine Months Ended September 30, September 30, ------------------- ------------------- 1996 1995 1996 1995 -------- -------- -------- -------- OPERATING REVENUES: Capacity $101,859 $100,364 $293,433 $300,495 Electric 56,821 48,235 164,985 144,511 Steam and other 6,594 6,207 20,851 20,060 -------- -------- -------- -------- Total operating revenues 165,274 154,806 479,269 465,066 -------- -------- -------- -------- OPERATING EXPENSES: Fuel costs (Note 5) 50,061 59,017 180,785 171,487 Depreciation 25,915 23,415 78,284 70,284 Operations 3,708 3,385 11,560 10,138 Maintenance 2,760 2,898 10,281 9,052 Property and single business taxes 6,480 6,231 19,653 19,457 Administrative, selling and general 1,849 1,892 6,049 6,397 -------- -------- -------- -------- Total operating expenses 90,773 96,838 306,612 286,815 -------- -------- -------- -------- OPERATING INCOME 74,501 57,968 172,657 178,251 -------- -------- -------- -------- OTHER INCOME (EXPENSE): Interest and other income (Note 5) 5,539 3,680 13,620 11,344 Interest expense (44,206) (45,803) (135,611) (140,256) -------- -------- -------- -------- Total other income (expense), net (38,667) (42,123) (121,991) (128,912) -------- -------- -------- -------- NET INCOME $ 35,834 $ 15,845 $ 50,666 $ 49,339 ======== ======== ======== ======== The accompanying condensed notes are an integral part of these statements. -2- 4 MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP CONSOLIDATED STATEMENT OF PARTNERS' EQUITY (Unaudited) (In Thousands) Nine Months Ended September 30, 1996 ---------------------------- General Limited Partners Partners Total -------- -------- -------- BALANCE, BEGINNING OF PERIOD $105,264 $28,696 $133,960 Net income 44,112 6,554 50,666 -------- ------- -------- BALANCE, END OF PERIOD $149,376 $35,250 $184,626 ======== ======= ======== The accompanying condensed notes are an integral part of these statements. -3- 5 MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP CONSOLIDATED STATEMENTS OF CASH FLOWS (Unaudited) (In Thousands) Nine Months Ended September 30, ------------------- 1996 1995 -------- -------- CASH FLOWS FROM OPERATING ACTIVITIES: Net income $ 50,666 $ 49,339 Adjustments to reconcile net income to net cash provided by operating activities Depreciation and amortization 79,163 71,194 (Increase) decrease in accounts receivable (99) 4,205 Decrease (increase) in gas inventory 833 (1,638) Increase in unamortized property taxes (5,971) (5,941) Increase in prepaid expenses and other (3,515) (1,275) Increase in materials, supplies and other (1,084) (1,460) Increase (decrease) in accounts payable, accrued and other liabilities 1,040 (10,023) Decrease in interest payable (47,992) (49,324) Increase (decrease) in other non-current liabilities 76 (333) -------- -------- Net cash provided by operating activities 73,117 54,744 -------- -------- CASH FLOWS FROM INVESTING ACTIVITIES: Plant modifications and purchases of plant and equipment (29,007) (19,717) -------- -------- Net cash used in investing activities (29,007) (19,717) -------- -------- CASH FLOWS FROM FINANCING ACTIVITIES: Repayment of financing obligation (72,190) (65,881) (Increase) decrease in restricted non-current cash and cash equivalents (2,102) 323 -------- -------- Net cash used in financing activities (74,292) (65,558) -------- -------- NET DECREASE IN CASH, CASH EQUIVALENTS AND RESTRICTED CASH -- CURRENT (30,182) (30,531) CASH, CASH EQUIVALENTS AND RESTRICTED CASH -- CURRENT, AT BEGINNING OF PERIOD 177,408 132,980 CASH, CASH EQUIVALENTS AND RESTRICTED CASH -- CURRENT, -------- -------- AT END OF PERIOD $147,226 $102,449 ======== ======== The accompanying condensed notes are an integral part of these statements. -4- 6 MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP CONDENSED NOTES TO UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS These consolidated financial statements and condensed notes should be read along with the audited financial statements and notes as contained in the Annual Report on Form 10-K for the year ended December 31, 1995 of Midland Cogeneration Venture Limited Partnership ("MCV") which includes the Report of Independent Public Accountants. In the opinion of management, the unaudited information herein reflects all adjustments (which include only normal recurring adjustments) necessary to assure the fair presentation of financial position, results of operations and cash flows for the periods presented. Prior period amounts have been reclassified for comparative purposes. These reclassifications had no effect on net income. The consolidated financial statements include the accounts of MCV and its wholly owned subsidiaries. All material transactions and balances among entities which comprise MCV have been eliminated in the consolidated financial statements. (1) THE PARTNERSHIP AND ASSOCIATED RISKS MCV was organized to construct, own and operate a combined-cycle, gas-fired cogeneration facility (the "Facility") located in Midland, Michigan. MCV was formed on January 27, 1987, and the Facility entered into commercial operation in 1990. In February 1992, MCV acquired the outstanding common stock of PVCO Corp., a previously inactive company. MCV and PVCO Corp. entered into a partnership agreement to form MCV Gas Acquisition General Partnership for the purpose of buying and selling natural gas on the spot market and other transactions involving natural gas activities. The Facility is designed to provide approximately 1,370 megawatts ("MW") of electricity and a maximum of 1.5 million pounds of process steam per hour. MCV has contracted to supply up to 1,240 MW of electric capacity to Consumers Power Company ("Consumers") for resale to its customers, to supply electricity and steam to The Dow Chemical Company ("Dow") under the Steam and Electric Power Agreement ("SEPA") and to supply steam to Dow Corning Corporation ("DCC") which commenced in July 1996, under the Steam Purchase Agreement ("SPA"). Results of operations are primarily dependent on successfully operating the Facility at or near contractual capacity levels and on Consumers' honoring its obligations under the Power Purchase Agreement ("PPA") with MCV. Sales pursuant to the PPA are expected to account for over 90% of MCV's revenue over the next ten years. The Facility is a qualifying cogeneration facility ("QF") certified by the Federal Energy Regulatory Commission ("FERC") under the Public Utility Regulatory Policies Act of 1978, as amended ("PURPA"). In order to maintain QF status, certain operating and efficiency standards must be maintained on a calendar-year basis. In the case of a topping-cycle generating plant such as the Facility, the applicable operating standard requires that the portion of total energy output that is put to some useful purpose other than facilitating the production of power (the "Thermal Percentage") be at least 5%. In addition, the Facility must achieve a PURPA efficiency standard (the sum of the useful power output plus one-half of the useful thermal energy output, divided by the energy input (the "Efficiency Percentage")) of at least 45%. If the Facility maintains a Thermal Percentage of 15% or higher, the required Efficiency Percentage is reduced to 42.5%. Since 1990, the Facility has achieved the applicable Thermal and Efficiency Percentages. For the nine months ended September 30, 1996, the Facility has achieved a Thermal Percentage of 14.5% and a PURPA Efficiency Percentage of 45.4%. The loss of QF status could, among other things, cause the Facility to lose its rights under PURPA to sell power to Consumers at Consumers' "avoided cost" and subject the Facility to additional federal and state regulatory requirements. MCV believes that, given projected levels of steam and electricity sales, coupled with continued diligent operating practices, the Facility will meet the required Thermal and the corresponding Efficiency Percentages in 1996. -5- 7 MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP CONDENSED NOTES TO UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS (Continued) The Facility is wholly dependent upon natural gas for its fuel supply and a substantial portion of the Facility's operating expenses will consist of the costs of obtaining natural gas. MCV recognizes that its existing gas contracts are not sufficient to satisfy the anticipated gas needs over the term of the PPA and, as such, no assurance can be given as to the availability or price of natural gas after the expiration of the existing gas contracts. In addition, to the extent that the costs associated with production of electricity rise faster than the energy charge payments, MCV's financial performance will be negatively affected. The amount of such impact will depend upon the amount of the average energy charge payable under the PPA, which is based upon costs incurred at Consumers' coal-fired plants and upon the amount of energy scheduled by Consumers for delivery under the PPA. However, given the unpredictability of these factors, the overall economic impact upon MCV of changes in future fuel costs under new or existing contracts cannot accurately be predicted. (2) RESTRICTED CASH AND CASH EQUIVALENTS Current and non-current restricted cash and cash equivalents consist of the following as of (in thousands): September 30, December 31, 1996 1995 -------- -------- Current: ------- Funds restricted for plant modifications $ 14,052 $ 13,455 ======== ======== Non-current: ----------- Funds restricted for rental payments pursuant to the Overall Lease Transaction $141,572 $139,546 Funds restricted for management non-qualified plans 382 306 -------- -------- $141,954 $139,852 ======== ======== (3) ACCOUNTS PAYABLE AND ACCRUED LIABILITIES Accounts payable and accrued liabilities consist of the following as of (in thousands): September 30, December 31, 1996 1995 ------------- ------------ Accounts payable Related parties $14,856 $11,652 Trade creditors 24,710 26,956 Property and single business taxes 13,982 13,675 Other 1,882 2,107 ------- ------- Total $55,430 $54,390 ======= ======= -6- 8 MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP CONDENSED NOTES TO UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS (Continued) (4) LONG-TERM DEBT Long-term debt consists of the following as of (in thousands): September 30, December 31, 1996 1995 ------------- ------------ Financing obligation, maturing through 2015, effective interest rate of approximately 8.7%, payable in semi-annual installments of principal and interest, secured by property, plant and equipment $2,007,815 $2,080,005 Less current portion (78,574) (72,190) ---------- ---------- Total long-term debt $1,929,241 $2,007,815 ========== ========== Financing Obligation In 1990, MCV obtained permanent financing for the Facility by entering into sale and leaseback agreements ("Overall Lease Transaction") with a lessor group ("Owner Participants"), related to substantially all of MCV's fixed assets. Proceeds of the financing were used to retire borrowings outstanding under existing loan commitments, make a capital distribution to the Partners and retire a portion of the notes issued by MCV to MEC Development Corporation ("MDC") in connection with the transfer of certain assets by MDC to MCV. In accordance with SFAS No. 98, "Accounting For Leases," the sale and leaseback transaction has been accounted for as a financing arrangement. Interest and fees incurred related to long-term debt arrangements during the nine months ended September 30, 1996 and 1995 were $134.7 million and $139.3 million, respectively. Interest and fees paid for the nine months ended September 30, 1996 and 1995 were $182.8 million and $188.7 million, respectively. (5) CONTINGENCIES PPA - 25 MW Regulatory Disallowance, Fixed Energy Payments for Deliveries Above the Caps On February 23, 1995, the Michigan Public Service Commission ("MPSC") in Case No. U-10155-R (the 1993 power supply cost recovery reconciliation proceeding conducted by the MPSC to reconcile actual costs incurred by Consumers in 1993 in providing power supply to its customers with actual revenues it collected that same year), ruled that Consumers could not recover the full 915 MW of MCV capacity and fixed energy charges provided under the terms of the 1993 revised settlement proposal approved by the MPSC in Case Nos. U-10127 and U-8871 et al. Instead, the MPSC "allocated" approximately 25 MW of MCV capacity to "non-jurisdictional" customers (i.e. customers not subject to PSCR rates), resulting in a disallowance to Consumers of approximately $7.4 million of which approximately $.7 million relates to fixed energy charges. In addition, the MPSC ruled in this case that Consumers could not recover approximately $.6 million of fixed energy charges payable to MCV for energy delivered above the off-peak cap of 732 MW. (Consumers has paid into escrow approximately $.4 million of this sum and the balance was paid to MCV.) Under the "regulatory out" provision of the PPA Consumers may, under certain conditions, be relieved of paying energy charges to MCV to the extent the MPSC does not allow Consumers to recover such charges from its customers. Consumers is not permitted for the first 17 1/2 years of the PPA to reduce capacity payments to MCV below an average rate of 3.77 cents per kWh for available contract capacity as a result of the regulatory disallowance described above. On October 19, 1995, Consumers notified MCV that pursuant to the "regulatory -7- 9 MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP CONDENSED NOTES TO UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS (Continued) out" provision of the PPA, it would be increasing the amount being escrowed each month to reflect its calculation of fixed energy charge payments related to the 25 MW disallowed by the MPSC described above. In addition, Consumers requested a refund from MCV of $1.9 million plus interest, for the calendar years 1993 and 1994 and the first eight months of 1995. On November 21, 1995, MCV responded to Consumers indicating that MCV would, pursuant to the PPA, refund the appropriate funds, if any, and determine the appropriate escrowing of funds, if any, at such time as a final and non-appealable order disallowing these recoveries is entered. As of September 30, 1996, MCV has not recognized as operating revenues approximately $2.7 million for amounts placed in escrow and the potential refund relating to the 25 MW disallowance. Currently, Consumers is escrowing approximately $62,000 per month in fixed energy charge payments from MCV due to this issue. Consumers and MCV appealed the MPSC February 23, 1995 Order to the Michigan Court of Appeals and on November 1, 1996 the Michigan Court of Appeals affirmed the MPSC's decision which "allocated" approximately 25 MW of MCV capacity to "non-jurisdictional" customers and ruled Consumers could not recover fixed energy charges for energy delivered above the off peak cap of 732 MW. MCV management is currently assessing the prospects of further appeal or review and, at this time, cannot predict if such an appeal will be filed (by MCV, Consumers or any other party) or the outcome of such a proceeding. In addition, as part of its order in Consumers' 1994 PSCR Plan proceedings, the MPSC, ruled that for 1994 Consumers would not be permitted to recover fixed energy costs during off-peak hours for energy delivered above the availability "caps" contained in the Settlement Order and below 915 MW. MCV believes the MPSC order on this issue is erroneous and has filed an appeal of the MPSC decision. Other PSCR Plan and Reconciliation Cases for the years 1994 - 1997 are pending before the MPSC at this time. MCV Management cannot predict the outcome of these proceedings. Consumers has escrowed approximately $2.1 million for the first nine months of 1996 and approximately $1.0 million for the years 1995 and 1994, of fixed energy charges payable to MCV based on this MPSC ruling and continues escrowing approximately $.2 million per month for this portion of fixed energy charges. MCV has not recognized these amounts as operating revenues. Fuel Matters MCV has entered into long-term gas transportation arrangements with four U.S. interstate transporters: ANR Pipeline Company, Panhandle Eastern Pipe Line Company, Trunkline Gas Company and Great Lakes Gas Transmission Company ("Great Lakes"). The transportation rates from these transporters are subject to FERC regulation. In 1990, Great Lakes expanded its interstate pipeline system to accommodate gas purchases from MCV and other customers. Historically, such capital costs were "rolled-in" to the rate base, thus combining the capital cost of common use facility additions with the cost of existing common use facilities for the purpose of determining the transportation rates to be charged to all system shippers. In 1991, FERC issued an order that rejected rolled-in pricing for the MCV-related expansion costs and, instead, imposed incremental pricing which, for MCV, took effect April 1, 1993. The incremental methodology allocates the capital cost of facility additions solely to the new shippers who will gain access to the expanded facilities. FERC's decision was appealed by MCV and others to the United States Court of Appeals for the District of Columbia Circuit, which held that FERC had failed to adequately explain the adoption of incremental rates and remanded the orders to FERC for reconsideration. On July 26, 1995, FERC issued its Order on Remand reversing its prior order and directed Great Lakes to: (i) implement rolled-in rates prospectively beginning October 1, 1995, for the expansion facilities including those applicable to MCV; and (ii) refund to MCV, subject to FERC approval, the principal amount, excluding interest, paid in excess of rolled-in rates. MCV had, from April 1, 1993 to October 1, 1995, reflected in current operating results Great Lakes gas transportation costs associated with incremental pricing. On April 25, 1996, FERC affirmed its Order on Remand as it pertains to the MCV issues described above ("Order on Rehearing"). On June 3, 1996, FERC granted rehearing for further consideration. Rehearing was requested by, among others, MCV for clarification of the timing of refunds, surcharges and -8- 10 MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP CONDENSED NOTES TO UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS (Continued) interest thereon subsequent to October 1, 1995. On July 31, 1996, FERC clarified its April 25, 1996 order stating that interest on refunds was to commence October 1, 1995 and otherwise denied the relief requested in the petitions for rehearing. In August 1996, MCV recognized in its current operating results approximately $19.0 million (which represented $17.6 million in transportation costs included as a reduction in fuel costs and $1.4 million of accrued interest subsequent to October 1, 1995) of the Great Lakes refund. Approximately $6.4 million is attributable to the period January 1, 1995 to September 30, 1995 and approximately $12.6 million is attributable to the period prior to January 1, 1995. As of September 30, 1996, 98% of the refund has been paid to MCV. The FERC Order on Rehearing and its July 31, 1996 order are subject to further administrative and judicial processes and, MCV and others have filed appeals to the United States Court of Appeals for the District of Columbia ("Court of Appeals") challenging certain aspects of the Order on Remand. Management cannot predict the outcome of these proceedings but believes that the likelihood of a reversal by the Court of Appeals of that portion of the FERC Order on Rehearing requiring rolled-in rate treatment is remote. GTG Equipment Problems In 1991 and 1992, several gas turbine generators ("GTGs") experienced cracking in the hot gas casing which, in two cases, caused extensive damage to the turbine blades. As a result of the cracking problems, modifications were made on all GTGs and MCV and ABB Power Generation, Inc. ("ABB Power") implemented a program of hot gas casing inspections for all GTGs. During 1994, ABB Power completed an analysis of cracking problems present in two of the modified GTG hot gas casings and determined that additional modifications should be made to the hot gas casings. New hot gas casings which include these modifications have been installed on ten of the units and are expected to be installed on the remaining two units by the end of the first quarter of 1997. In January 1996, two additional GTGs experienced severe cracking in the hot gas casing (one of which included the newest hot gas casing modifications), causing extensive damage to the turbine blades and vanes. MCV immediately inspected all of the remaining GTG hot gas casings for evidence of cracking and identified an additional five GTGs which required casing replacements. During the first quarter of 1996, MCV and ABB Power increased the frequency of inspections on these units which resulted in additional scheduled and unscheduled maintenance outages. Extensive analysis and review by MCV and ABB Power has concluded that crack initiation tended to start in high stress areas of the hot gas casing and that pulsations were the key factor in crack propagation in these units. MCV and ABB Power have modified the burner geometry of the affected turbines which has significantly reduced pulsations in the hot gas casings. MCV has also installed additional measuring devices to detect any pulsations which are suspected of accelerating crack propagation. In addition, MCV and ABB Power continue to study whether any modifications are needed in the high stress areas of the hot gas casings. In May 1996, MCV successfully completed its second round of 800 hour GTG inspections which indicated no additional cracking. Therefore, MCV has increased its GTG inspections to 2000 hours on certain units. MCV believes that the burner modifications have resolved the pulsation problems and there should be no significant future impacts on plant availability or efficiency, although no assurance can be given that additional equipment problems will not occur. The cost of casing replacements and modifications is covered by ABB Power (with the exception of insurable events) pursuant to the amended Service Agreement, under which ABB Power is providing hot gas path parts for MCV's twelve gas turbines for the next three series of major GTG inspections which are expected to be completed by the year 2002. MCV's insurance carriers continue to monitor and review all the GTG inspection findings. At this time, MCV currently maintains property insurance policies that include the hot gas casing equipment and are in effect through the first quarter of 1997. Failure to maintain insurance is an Event of Default under the Overall Lease Transaction. -9- 11 MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP CONDENSED NOTES TO UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS (Continued) (6) PARTNERS' EQUITY AND RELATED PARTY TRANSACTIONS The following table summarizes the nature and amount of each of MCV's Partner's equity interest, interest in profits and losses of MCV at September 30, 1996, and the nature and amount of related party transactions or agreements that existed with the Partners or affiliates as of September 30, 1996 and 1995, and for each of the nine month periods ended September 30 (in thousands). Equity Partner, Type of Partner Equity Related Party Transactions and Nature of Related Party Interest Interest and Agreements 1996 1995 - ---------------------------------- -------- -------- ---------------------------------------------- -------- -------- CMS Midland, Inc. $90,467 49.0% Power purchase agreement $443,498 $430,423 General Partner; wholly-owned Power purchase agreement administrative fees 18 18 subsidiary of Consumers Power Purchases under gas transportation agreements 7,111 6,955 Company Purchases under spot gas agreements 1,948 677 Purchases under gas supply agreements 7,349 6,521 Gas storage agreement 1,922 1,922 Land lease/easement agreements 450 450 General construction/service/engineering agreement 166 96 Facilities agreement - transmission line and metering facility maintenance 19 13 Accounts receivable 49,987 45,830 Accounts payable 6,693 4,972 Gas exchanges 3,305 6,350 Prepaid land lease -- 150 The Dow Chemical Company 26,834 7.5 Steam and electric power agreement 35,771 34,643 Limited Partner Purchases under demineralized water supply agreement 4,591 4,036 Rent under office building lease agreement 304 292 Accounts receivable 2,273 2,284 Accounts payable 1,336 993 Standby and backup fees 967 729 Source Midland Limited Partnership 28,052 18.1 Purchases under gas transportation agreements 11,562 10,308 General Partner; affiliate of Purchases under spot gas agreements 3,313 1,242 PanEnergy Corp Accounts payable 1,387 1,432 Gas exchanges 2,082 204 Coastal Midland, Inc. 16,831 10.9 Purchases under gas transportation agreements*** (6,739) 16,535 General Partner; wholly-owned Purchases under spot gas agreement 12,161 8,587 subsidiary of The Coastal Purchases under gas supply agreement 2,872 2,571 Corporation Gas agency agreement 953 656 Deferred reservation charges under gas purchase agreement 2,955 1,757 Accounts receivable 455 607 Accounts payable 4,276 4,131 Gas exchanges 4,056 1,866 MEI Limited Partnership 14,026 9.1 Gas turbine maintenance and spare parts agreement 22,297 18,425 General Partner; affiliate of Accounts payable 81 296 ASEA Brown Boveri, Inc. Partner cash withdrawal (including accrued interest)** 4,229 -- Accounts receivable 210 -- Micogen Limited Partnership 7,013 4.5 Maintenance/Engineering agreement -- 243 Limited Partner; affiliate of Computer maintenance software agreement 14 15 Fluor Corporation Partner cash withdrawal (including accrued interest)** 1,899 -- C-E Midland Energy, Inc. 1,402 .9 Service Agreement 5,167 2,167 Limited Partner; wholly-owned Accounts Payable 1,077 329 subsidiary of Combustion Engineering, Inc. which is a wholly-owned subsidiary of ASEA Brown Boveri, Inc. Alanna Corporation 1* .00001 Note receivable 1 1 Limited Partner; wholly-owned Subsidiary of Alanna Holdings Corporation * Alanna's capital stock is pledged to secure MCV's obligation under the lease and other overall lease transaction documents. ** In exchange for a letter of credit pursuant to the Participation Agreement. *** 1996 includes the Great Lakes gas transportation refund of $17.6 million. -10- 12 Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations (MD&A) MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP This MD&A should be read along with the MD&A in the Annual Report on Form 10-K for the year ended December 31, 1995 of the Midland Cogeneration Venture Limited Partnership ("MCV"). Results of Operations Operating Revenue Statistics The following represents significant operating revenue statistics for the following periods (dollars in thousands except average rates): Three Months Ended Nine Months Ended September 30, September 30, ------------------------- ------------------------- 1996 1995 1996 1995 ---------- ---------- ---------- ---------- Operating Revenues $ 165,274 $ 154,806 $ 479,269 $ 465,066 Capacity Revenue $ 101,859 $ 100,364 $ 293,433 $ 300,495 PPA Contract Capacity (MW) 1,240 1,240 1,240 1,240 PPA Availability 98.6% 97.2% 95.4% 98.1% Electric Revenue $ 56,821 $ 48,235 $ 164,985 $ 144,511 Average PPA Variable Energy Rate ($/MWh) $ 16.97 $ 17.07 $ 16.99 $ 17.26 Average PPA Fixed Energy Rate ($/MWh) $ 4.09 $ 4.00 $ 4.06 $ 3.85 PPA Delivery as a Percentage of Contract Capacity 90.9% 75.1% 88.8% 75.9% PPA and SEPA Electric Deliveries (MWh) 2,632,799 2,193,097 7,649,924 6,565,069 Steam and Other Revenue $ 6,594 $ 6,207 $ 20,851 $ 20,060 Steam Deliveries (Mlbs) 1,104,731 934,890 3,708,281 3,369,810 Comparison of the Three Months Ended September 30, 1996 and 1995 Overview For the third quarter of 1996, MCV recorded net income of $35.8 million as compared with net income of $15.8 million for the third quarter of 1995. The increase in net income for the third quarter of 1996 as compared to 1995 is primarily the result of the Great Lakes gas transportation refund and higher capacity revenue under the PPA, partially offset by higher depreciation expense and higher natural gas prices. Operating Revenues For the third quarter of 1996, MCV's operating revenues increased $10.5 million from the third quarter of 1995 due primarily to higher electric revenue generated under the PPA. The increase in 1996 third quarter electric revenue of -11- 13 $8.6 million is primarily the result of Consumers' decision to increase MCV's electric dispatch in 1996 consistent with the terms of the Proposed Settlement. (See Part II, Item 1, "Legal Proceedings - MPSC Proceedings Relating to Capacity and Energy Charges" for definition of Proposed Settlement.) The capacity revenue increase of $1.5 million is the result of higher capacity payments under the PPA due to fewer scheduled and unscheduled maintenance outages of the GTG's during the third quarter of 1996. Operating Expenses For the third quarter of 1996, MCV's operating expenses were $90.8 million, which includes $50.1 million of fuel costs. The fuel costs for the quarter includes the recognition of the Great Lakes gas transportation refund of approximately $17.6 million (excluding interest). Excluding the Great Lakes refund, fuel costs were $67.7 million in which MCV used approximately 24.6 billion cubic feet ("bcf") of natural gas at an average rate of $2.35 per million British thermal units ("MMBtu"). For the third quarter of 1995, operating expenses were $96.8 million, which includes $59.0 million of fuel costs. During this period, MCV used approximately 20.9 bcf of natural gas at an average fuel rate of $2.28 per MMBtu. The increase in fuel costs of $8.7 million (excluding the Great Lakes refund) for the third quarter of 1996 compared to 1995 is due primarily to the increase in fuel usage resulting from the higher Consumers dispatch level and higher natural gas prices in the short term market. This increase was slightly offset by lower Great Lakes demand charges as a result of implementing rolled-in rates beginning October 1, 1995. For the third quarter of 1996, operating expenses other than fuel costs increased $2.9 million over the third quarter of 1995 due primarily to higher depreciation expense resulting from the amortization of increased payments for hot gas path parts. Other expenses incurred in these periods were considered normal expenditures to achieve the recorded operating revenues. Other Income (Expense) The increase in interest and other income for the third quarter of 1996 compared to the third quarter of 1995 is due primarily to interest received of approximately $1.4 million on the Great Lakes gas transportation refund. The decrease in interest expense in the third quarter of 1996 from the third quarter of 1995 is due to a lower principal balance on MCV's financing obligation. Comparison of the Nine Months Ended September 30, 1996 and 1995 Overview For the first nine months of 1996, MCV recorded net income of $50.7 million as compared with net income of $49.3 million for the first nine months of 1995. The increase in net income for the first nine months of 1996 as compared to 1995 is primarily the result of the Great Lakes gas transportation refund, partially offset by lower capacity payments under the PPA due to first quarter 1996 equipment problems, higher natural gas prices and higher depreciation expense. Operating Revenues For the first nine months of 1996, MCV's operating revenues increased $14.2 million from the first nine months of 1995 due primarily to higher electric revenue generated under the PPA, which was partially offset by lower capacity revenue under the PPA. The increase in electric revenue during the first nine months of 1996 of $20.5 million is primarily the result of Consumers' decision to increase MCV's electric dispatch in 1996 consistent with the terms of the Proposed Settlement. The capacity revenue reduction of $7.1 million is the result of lower capacity payments under the PPA due to additional scheduled and unscheduled maintenance outages on the hot gas casing equipment during the first quarter of 1996. -12- 14 Operating Expenses For the first nine months of 1996, MCV's operating expenses were $306.6 million, which includes $180.8 million of fuel costs. The year to date fuel costs includes the recognition of the Great Lakes gas transportation refund of approximately $17.6 million (excluding interest). Excluding the Great Lakes refund, fuel costs were $198.4 million in which MCV used approximately 72.3 bcf of natural gas at an average rate of $2.35 per MMBtu. For the first nine months of 1995, operating expenses were $286.8 million, which includes $171.5 million of fuel costs. During this period, MCV used approximately 63.0 bcf of natural gas at an average fuel rate of $2.21 per MMBtu. The increase in fuel costs of $26.9 million (excluding the Great Lakes refund) for the first nine months of 1996 compared to 1995 is due primarily to an increase in fuel usage resulting from the higher Consumers dispatch level and to an increase in purchases of more expensive long-term gas over short-term purchases since there has been a substantial rise in short-term market prices over the first nine months of 1995. This increase was slightly offset by lower Great Lakes demand charges as a result of implementing rolled-in rates beginning October 1, 1995. For the first nine months of 1996, operating expenses other than fuel costs increased $10.5 million over the first nine months of 1995 due primarily to higher depreciation expense resulting from the amortization of increased payments for hot gas path parts and an allowance for the insurance claims on the two hot gas casings which experienced severe cracking (and consequent damage to the turbine blades and vanes). Other expenses incurred in these periods were considered normal expenditures to achieve the recorded operating revenues. Other Income (Expense) The increase in interest and other income for the first nine months of 1996 compared to the first nine months of 1995 is due primarily to interest received of approximately $1.4 million on the Great Lakes gas transportation refund. The decrease in interest expense in the first nine months of 1996 from the first nine months of 1995 is due to a lower principal balance on MCV's financing obligation. Liquidity and Financial Resources During the first nine months of 1996 and 1995, net cash generated by MCV's operations was $73.1 million and $54.7 million, respectively. The primary use of cash was for the payment of interest and principal on the financing obligation, fuel costs, maintenance costs and other operating expenses. MCV's cash and cash equivalents have a normal cycle of collecting six months of revenues less operating expenses prior to making the semiannual interest and principal payments of the financing obligation due in January and July for the next nineteen years. During the first nine months of 1996, and 1995, MCV paid the basic rent requirements of $254.7 million and $254.4 million, respectively, as required under the Overall Lease Transaction. MCV also has arranged for a $50 million working capital line ("Working Capital Facility") from Bank of Montreal to provide temporary financing, as necessary, for operations. The Working Capital Facility has been secured by MCV's natural gas inventory and earned receivables. At any given time, borrowings and letters of credit are limited by the amount of the borrowing base, defined as 90% of earned receivables. The borrowing base varies over the month as receivables are earned, billed and collected. At September 30, 1996, the borrowing base was $47.1 million. The Working Capital Facility term currently extends to August 31, 1997. MCV did not utilize the Working Capital Facility during the first nine months of 1996, except for letters of credit associated with normal business practices. MCV believes that amounts available to it under the Working Capital Facility will be sufficient to meet working capital shortfalls, primarily during months when rent payments are due. In addition, affiliates of certain MCV Partners have agreed (under certain conditions and for a limited time) to make loans to MCV in an aggregate amount not to exceed $10 million to cover working capital expenses, as appropriate. To date, MCV has not made any borrowings under these agreements with MCV Partners. -13- 15 Since January 1992, MCV has experienced a reduction in the energy charges it is paid for electricity under the PPA due both to declining coal costs at Consumers' generating plants and Consumers' ability, under the "regulatory out" provisions of the PPA, to withhold fixed energy charges for available but undelivered energy. These circumstances have resulted in rent coverage ratios (as defined in the Overall Lease Transaction) of less than 1.11 to 1.00. If there are continued reductions in energy charges relative to MCV's cost of fuel used in production, there could be a material adverse impact on MCV's ability to make future rental payments out of cash flow from operations. For the foreseeable future, MCV expects to fund current operating expenses, payments under the amended Service Agreement and rental payments primarily through cash flow from operations. If necessary, MCV could fund any operating cash flow shortfalls from cash reserves to the extent available for such purposes. As of September 30, 1996, there was $221.1 million (which includes $35.3 million reserved for capital improvements and spare parts purchases), including accrued interest, in available reserves for such purposes. Outlook "Safe Harbor" Statement Under the Private Securities Litigation Reform Act of 1995. The following discussion of the outlook for MCV contains certain "forward-looking statements" as defined by the Private Securities Litigation Reform Act of 1995 (the "Act"), including (without limitation) discussion as to expectations, beliefs, plans, objectives and future financial performance, or assumptions underlying or concerning matters discussed reflecting MCV's current expectations of the manner in which the various factors discussed therein may affect its business in the future. Any matters that are not historical facts are forward-looking and, accordingly, involve estimates, assumptions, and uncertainties which could cause actual results or outcomes to differ materially from those expressed in the forward-looking statements. Accordingly, this "Safe Harbor" Statement contains additional information about such factors relating to the forward-looking statements. There is no assurance that MCV's expectations will be realized or that unexpected events will not have an adverse impact on MCV's business. Some important factors that could cause actual results or outcomes to differ materially from those discussed in the forward-looking statements include prevailing governmental policies and regulatory actions (including those of the Federal Energy Regulatory Commission and the Michigan Public Service Commission) with respect to cost recovery under the PPA, operation and construction of plant facilities including natural gas pipeline and storage facilities, and present or prospective wholesale and retail competition, among others. The business and profitability of the Company is also influenced by economic factors, weather conditions, pricing and transportation of commodities, inflation, among other important factors. All such factors are difficult to predict, contain uncertainties which may materially affect actual results, and are beyond the control of MCV. Results of operations are largely dependent on successfully operating the Facility at or near contractual capacity levels, the availability of natural gas, the level of energy rates paid to MCV relative to the cost of fuel used for generation, Consumers' performance of its obligations under the PPA, and maintenance of the Facility's QF status. Operating Outlook. Approximately 70% of PPA revenues are capacity payments which are based on the Facility's availability. PPA availability was 98.1% in 1995 and 97.2% in 1994. In future years, PPA availability is expected to decline from the historically high levels as Contract Capacity is sustained at the PPA contractual level of 1240 MW. Availability will depend on the level of scheduled and unscheduled maintenance outages, and on the sustained level of output from each of the GTGs and the steam turbine. MCV expects long-term PPA availability to exceed 90%. In 1991 and 1992, several GTGs experienced cracking in the hot gas casing which, in two cases, caused extensive damage to the turbine blades. As a result of the cracking problems, modifications were made on all GTGs and MCV and ABB Power implemented a program of hot gas casing inspections for all GTGs. During 1994, ABB Power completed an analysis of cracking problems present in two of the modified GTG hot gas casings and determined that additional modifications should be made to the hot gas casings. New hot gas casings which include these modifications were installed on ten of the units and are expected to be installed on the remaining two units by the end of the first quarter of 1997. -14- 16 In January 1996, two additional GTGs experienced severe cracking in the hot gas casing (one of which included the newest hot gas casing modifications), causing extensive damage to the turbine blades and vanes. MCV immediately inspected all of the remaining GTG hot gas casings for evidence of cracking and identified an additional five GTGs which required casing replacements. During the first quarter of 1996, MCV and ABB Power increased the frequency of inspections on these units which resulted in additional scheduled and unscheduled maintenance outages. Extensive analysis and review by MCV and ABB Power has concluded that crack initiation tended to start in high stress areas of the hot gas casing and that pulsations were the key factor in crack propagation in these units. MCV and ABB Power have modified the burner geometry of the affected turbines which has significantly reduced pulsations in the hot gas casings. MCV has also installed additional measuring devices to detect any pulsations which are suspected of accelerating crack propagation. In addition, MCV and ABB Power continue to study whether any modifications are needed in the high stress areas of the hot gas casings. In May 1996, MCV successfully completed its second round of 800 hour GTG inspections which indicated no additional cracking. Therefore, MCV has increased its GTG inspections to 2000 hours on certain units. MCV believes that the burner modifications have resolved the pulsation problems and there should be no significant future impacts on plant availability or efficiency, although no assurance can be given that additional equipment problems will not occur. The cost of casing replacements and modifications is covered by ABB Power (with the exception of insurable events) pursuant to the amended Service Agreement, under which ABB Power is providing hot gas path parts for MCV's twelve gas turbines for the next three series of major GTG inspections which are expected to be completed by the year 2002. MCV's insurance carriers continue to monitor and review all the GTG inspection findings. At this time, MCV currently maintains property insurance policies that include the hot gas casing equipment and are in effect through the first quarter of 1997. Failure to maintain insurance is an Event of Default under the Overall Lease Transaction. Natural Gas. The Facility is wholly dependent upon natural gas for its fuel supply and a substantial portion of the Facility's operating expenses will consist of the costs of obtaining natural gas. Over the last several years additional gas contracts have been entered into or amended, extending the period over which fuel supplies are secured. While MCV will continue to pursue the acquisition of fuel supply beyond the year 2001, MCV recognizes that its existing gas contracts are not sufficient to satisfy the anticipated gas needs over the term of the PPA and, as such, no assurance can be given as to the availability or price of natural gas after the expiration of the existing gas contracts. Energy Rates and Cost of Production. Under the PPA, energy charges are based on the costs associated with fuel inventory, operations and maintenance, and administrative and general expenses associated with certain of Consumers' coal plants. However, MCV's costs of producing electricity are tied, in large part, to the cost of natural gas. To the extent that the costs associated with production of electricity with natural gas rise faster than the energy charge payments, which are based largely on Consumers' coal plant operation and maintenance costs, MCV's financial performance would be negatively affected. For the period April 1990 through September 1996, the energy charge (fixed and variable) paid to MCV has declined by .20 cents per kWh, while the average variable cost of production, as indicated by the average cost of delivered fuel for the period 1990 - 1995, has risen by $0.05 per MMBtu. The divergence between variable revenues and costs will become greater if the energy charge (based largely on the cost of coal) declines or escalates more slowly than the contract prices under which MCV purchases fuel (generally escalated at either the total PPA energy charge or 4% per year). The difference could be further exacerbated in approximately four years as MCV's gas contracts begin to expire if the cost of replacement fuel is materially higher than the prices in the expiring contracts. Energy Payments Under the PPA. On June 7, 1993, Consumers notified MCV that, based on its interpretation of the 1993 Settlement Order (see Part II, Item 1, "Legal Proceedings - MPSC Proceedings Relating to Capacity and Energy Charges" for definition of Settlement Order), it would be applying the "regulatory out" provision of the PPA and withholding fixed energy payments on energy delivered during off-peak periods above the "availability caps" but below 915 MW. Consumers has escrowed approximately $2.1 million for the first nine months of 1996 and approximately $1.0 million for the years 1995 and 1994, of fixed energy payments for energy delivered above the -15- 17 availability caps but below 915 MW. MCV has not recognized these amounts placed in escrow as operating revenues. MCV and Consumers have appealed the MPSC orders denying recovery of the fixed energy charges for energy delivered to Consumers. MCV management cannot predict the outcome of these appeals. (See Part II, Item 1, " Legal Proceedings - MPSC Proceedings Relating to Capacity and Energy Charges.") On February 23, 1995, the MPSC applied the Settlement Order to Consumers' 1993 Reconciliation Case and ruled that Consumers could not recover the full 915 MW of MCV capacity and fixed energy charges provided under the terms of the 1993 Revised Settlement Proposal approved by the MPSC in the Settlement Order. Instead, the MPSC "allocated" approximately 25 MW of MCV capacity to "non-jurisdictional" customers (i.e. customers not subject to PSCR rates), resulting in a disallowance to Consumers of approximately $7.4 million of which approximately $.7 million relates to fixed energy charges. In addition, the MPSC ruled in this case that Consumers could not recover approximately $.6 million of fixed energy charges payable to MCV for energy delivered above the off-peak cap of 732 MW. (Consumers has paid into escrow approximately $.4 million of this sum and the balance was paid to MCV). It is likely that the MPSC will apply these types of disallowances in future PSCR cases unless the Michigan Court of Appeals or other court reverses the Order of the MPSC. On October 19, 1995, Consumers notified MCV that pursuant to the "regulatory out" provision of the PPA, it would be increasing the amount being escrowed each month, to reflect its calculation of fixed energy charge payments related to 25 MW disallowed by the MPSC and Michigan Court of Appeals in Consumers' 1993 Reconciliation Case. In addition, Consumers requested a refund from MCV of $1.9 million plus interest, for the calendar years 1993 and 1994 and the first eight months of 1995. On November 21, 1995, MCV responded to Consumers indicating that MCV would, pursuant to the PPA, refund the appropriate funds, if any, and determine the appropriate escrowing of funds, if any, at such time as a final and non-appealable order disallowing these recoveries is entered. As of September 30, 1996, MCV has not recognized as operating revenues approximately $2.7 million for amounts placed in escrow and the potential refund relating to the 25 MW disallowance. Currently, Consumers is escrowing approximately $62,000 per month in fixed energy charge payments from MCV due to this issue. Consumers and MCV appealed the MPSC February 23, 1995 Order to the Michigan Court of Appeals and on November 1, 1996 the Michigan Court of Appeals affirmed the MPSC's decision which "allocated" approximately 25 MW of MCV capacity to "non-jurisdictional" customers and ruled Consumers could not recover fixed energy charges for energy delivered above the off peak cap of 732 MW. MCV management is currently assessing the prospects of further appeal or review and, at this time, cannot predict if such an appeal will be filed (by MCV, Consumers or any other party) or the outcome of such a proceeding. On September 8, 1995, Consumers and the MPSC staff filed a motion to create a consolidated proceeding for the purpose of reviewing a proposed settlement agreement entered into between the MPSC staff and Consumers related to three cases: Case No. U-10685, Consumers' electric general rate case; Case No. U-10787, Consumers' request for approval of a special competitive services tariff (Rate SCS); and Case No. U-10754, Consumers' application for approval of revised depreciation rates for electric and common utility plant. MCV is a party to the consolidated proceeding. The settlement agreement proposes approving the jurisdictional cost recovery of an additional 325 MW of capacity purchased from MCV. Cost recovery approval for the 325 MW of MCV contract capacity would be in addition to the 915 MW already approved by the MPSC. Recovery would begin January 1, 1996. The initial average capacity charge recovered would be 2.86 cents per kWh escalating to 3.62 cents per kWh in 2004 and thereafter. On September 22, 1995, MCV filed a position statement not objecting to the proposed settlement agreement, but reserving all of its rights and privileges under the PPA. If the settlement is approved as filed it will likely result in an increase in dispatch under the PPA. Consumers has, in fact, increased MCV's dispatch in 1996 on the expectation that the proposed settlement agreement will be approved. This should have a positive impact on MCV's cash flow and earnings, assuming current gas prices and energy rates continue in effect. Management cannot predict the outcome of this proceeding. Maintaining QF Status. In the case of a topping-cycle generating plant such as the Facility, the applicable operating standard requires that the portion of total energy output that is put to some useful purpose other than facilitating the production of power (the "Thermal Percentage") be at least 5%. In addition, the plant must achieve and maintain an average PURPA efficiency standard (the sum of the useful power output plus one-half of the useful thermal energy -16- 18 output, divided by the energy input (the "Efficiency Percentage")) of at least 45%. However, if the plant maintains a Thermal Percentage of 15% or higher, the required Efficiency Percentage is reduced to 42.5%. The tests are applied on a calendar year basis. The Facility has achieved the applicable Efficiency Percentage of 42.5% in each year since commercial operation, while in 1995 the Facility achieved an Efficiency Percentage in excess of 45%. The Facility's achievement of a Thermal Percentage of 15% (thereby requiring compliance with the reduced Efficiency Percentage of 42.5%) is dependent upon both the amount of Dow and DCC steam purchases and the level of electricity generated by the Facility. Dow has agreed to take as much steam as is necessary for the Facility to retain its QF status under the FERC regulations in effect on November 1, 1986 (which regulations have not been revised in relevant part in any material respect), subject to an annual average purchase obligation of no less than approximately 440,000 lbs/hr. of steam (less amounts supplied by the Standby Facilities and less 50% of the amount sold by MCV to other steam customers). The SEPA can be terminated by Dow under certain circumstances. Such termination would likely lead to a loss of QF status for the Facility. The amounts of steam that Dow is obligated to take under the SEPA are expected to be sufficient to allow the Facility to maintain a Thermal Percentage of 5% (which would require the Facility to achieve the 45% PURPA Efficiency Percentage) but will not be sufficient to allow the Facility to maintain a Thermal Percentage of 15% (which would allow a reduction of the required PURPA efficiency standard to 42.5%). As a result of Consumers decision to increase MCV's electric dispatch in 1996 consistent with the terms of the Proposed Settlement, energy deliveries under the PPA could exceed 90% of contract capacity for the year 1996. In that event, Dow and DCC steam purchases must average approximately 600,000 lbs/hour in 1996 and beyond for the Facility to achieve a 15% Thermal Percentage. Higher levels of electric energy deliveries will require higher levels of steam purchases in order to achieve a 15% Thermal Percentage. Under an agreement signed November 1, 1994, Dow began purchasing steam for its corporate center in October 1995, which has added an annual average of approximately 22,000 lbs/hr in steam sales. Under an agreement signed November 15, 1995, DCC began purchasing steam for its Midland site in July 1996, a use MCV believes will add an annual average of approximately 115,000 lbs/hr in steam sales. From 1991 through 1995 Dow steam purchases have averaged 504,236 lbs/hr. Dow and DCC steam purchases during the first nine months of 1996 averaged 563,911 lbs/hr reflecting, in part, the steam sales to DCC which began in mid July 1996. Actual steam usage has varied and will vary with product mix, seasonal delivery fluctuations and other factors which may change over time. Thus, MCV believes annual steam sales will be sufficient to allow the Facility to exceed the 15% Thermal Percentage even if electricity deliveries under the PPA exceed 90% of Contract Capacity. MCV believes that, given projected levels of steam and electricity sales, as a result of recent equipment modifications, and through diligent management of the issue, the Facility will be able to maintain QF Certification and should be capable of achieving a 45% PURPA Efficiency Percentage on a long-term basis. However, no assurance can be given that factors outside MCV's control such as Dow and DCC steam requirements, Consumers' dispatch of the Facility pursuant to the Settlement Order or the Proposed Settlement, extended outage of the Unit 1 steam turbine, major malfunctions of other equipment, or degradation of plant heat rate will not cause the Facility to fail to satisfy the annual PURPA qualification requirements and thus lose its QF certification. In 1995, MCV achieved an Efficiency Percentage of 45.2% and an Operating Percentage of 15.7%. The loss of QF status could, among other things, cause the Facility to lose its right under PURPA to sell power to Consumers at Consumers' "avoided cost" and subject the Facility to additional federal and state regulatory requirements, including the Federal Power Act (under which FERC has authority to establish rates for electricity, which may be different than existing contractual rates). If the Facility were to lose its QF status, the Partners of MCV, the Owner Participants, the bank acting as the Owner Trustee and their respective parent companies could become subject to regulation under the Public Utility Holding Company Act of 1935 (under which, among other things, the Securities and Exchange Commission has authority to order divestiture of assets under certain circumstances). The loss of QF status would not, however, entitle Consumers to terminate the PPA. Under the PPA, Consumers is obligated to continue purchasing power from MCV at FERC-approved rates (provided that the FERC-approved rates do not exceed the existing contractual rates) and MCV, not Consumers, is entitled to terminate the PPA (which MCV has covenanted not to do under the Participation Agreements). There can be no assurance that FERC-approved rates would be the same as the rates currently in effect under the PPA. If the FERC- -17- 19 approved rates are materially less than the rates under the PPA, MCV may not have sufficient revenue to make rent payments under the Overall Lease Transaction. The loss of QF status would constitute an Event of Default under the Lease (and a corresponding Event of Default under the Indenture) unless, among other requirements, FERC approves (or accepts for filing) rates under the PPA or other contracts of MCV for the sale of electricity sufficient to meet certain target coverage ratios (as defined in the Overall Lease Transaction). See Part I, Item 1, "Financial Statements -- Notes 1 and 5 to the Condensed Notes to Unaudited Consolidated Financial Statements" for a further discussion of associated risks and contingencies. -18- 20 PART II. OTHER INFORMATION Item 1. Legal Proceedings MPSC Proceedings Relating to Capacity and Energy Charges Background. Michigan law requires Consumers to file on an annual basis a "Power Supply Cost Recovery Plan" (the "PSCR Plan") describing, among other things, the anticipated sources of electric power to be purchased during the upcoming year. The PSCR Plan must be filed at least three months before the beginning of the 12-month period covered by the plan. If the MPSC fails to allow the costs of purchased power in the PSCR Plan by the beginning of the year covered thereby, Consumers may adjust its rates to recover such costs until the MPSC acts. Actual costs are reconciled with the costs billed to customers in a subsequent filing (made by March 31 each year) following the year in which the PSCR Plan was in effect, known as the "Power Supply Cost Reconciliation Proceeding" ("Reconciliation Case"). By law, the MPSC must disallow in the Reconciliation Case any capacity charges associated with power purchases for periods in excess of six months unless the MPSC has previously approved the capacity charge. Under a Michigan statute known as Act 81, once a capacity charge in a contract for a purchase from a QF has been approved by the MPSC, the MPSC may not disallow recovery by the utility of that capacity charge from its customers for a 17-1/2 year period commencing with commercial operation of the QF. The PPA. The PPA contains a "regulatory out" provision which permits Consumers, under certain conditions, to reduce the capacity and energy charges payable to MCV and/or to receive refunds of capacity and energy charges paid to MCV under the PPA if the MPSC does not permit Consumers to recover from its customers the capacity and energy charges specified in the PPA. For the first 17-1/2 years after the Facility's Commercial Operation Date, however, the PPA further provides that Consumers may not reduce the average capacity charge below 3.77 cents per kWh notwithstanding the MPSC's failure to approve either the amount of capacity Consumers has agreed to purchase from MCV under the PPA or the capacity charge specified in the PPA for such purchase. Energy charges payable by Consumers under the PPA are separate and distinct from the capacity charge in that no 17-1/2 year protection against the exercise of the "regulatory out" provision for energy charges is provided for in the PPA. Although prior approval of energy charges is not required or provided for under Michigan law, the MPSC has asserted the authority to disallow Consumers' recovery of a portion of such energy charges paid to MCV. Any disallowance by the MPSC of Consumers' ability to pass energy charges through to its customers could, pursuant to the "regulatory out" provision of the PPA, result in a reduction or refund of the fixed and variable portions of the energy charge under the PPA. MPSC Proceedings. In September 1987, in order to comply with the prior approval requirement for contracts exceeding six months and to obtain the benefit of the 17-1/2 year rate protection provided by Michigan law, MCV requested MPSC approval of the 4.15 cents per kWh capacity rate provided for in the PPA. The MPSC hearing held on the request was consolidated with numerous dockets involving other qualifying facility projects, and resulted in a number of MPSC orders. Numerous appeals from the MPSC orders were taken to the Michigan Court of Appeals and the Michigan Supreme Court by parties to the MPSC proceedings, including Consumers and MCV. During the pendency of this matter before the Court of Appeals, Consumers, MPSC staff and other parties negotiated a Revised Settlement Proposal which was submitted to the MPSC for approval. On March 31, 1993, the MPSC issued an order, effective January 1, 1993 (the "Settlement Order"), which approved with modifications the Revised Settlement Proposal filed by Consumers, the MPSC staff and ten small power and cogeneration developers. Although MCV was not a party to the Revised Settlement Proposal, the MPSC staff required that MCV file a letter of non-objection to the Revised Settlement Proposal. The Settlement Order addressed the amount Consumers could recover from its electric customers for the costs of capacity and energy purchased by it from MCV. Generally, the Settlement Order approved cost recovery of 915 MW of MCV capacity subject to certain "availability caps" associated with on-peak and off-peak periods of time each day and recovery of energy payments based on coal proxy prices (the formula in the PPA). However, instead of capacity and fixed -19- 21 energy payments being based on "availability" as provided in the PPA, the Settlement Order provided for recovery of such payments on an energy "delivered" basis. The MPSC did not order that the PPA be modified to conform with the cost recovery approved in the Settlement Order. However, the MPSC found that since the capacity charges approved for recovery under the PPA would not be reflected in the PPA, approval for the purposes of Act 81 could not be extended to those capacity charges. The MPSC did indicate in its order, however, that its Settlement Order would be implemented for rate-making purposes in the PSCR Plan and Reconciliation Case for 1993 and was intended to be applied in subsequent years if the MPSC deemed it to be appropriate. Petitions for Rehearing of the Settlement Order filed with the MPSC by opponents to the Revised Settlement Proposal, including the Michigan Attorney General, were denied by the MPSC in May 1993. In accordance with the provisions of the Settlement Order, in August 1993 Consumers and MCV withdrew their remaining appeals relating to MCV cost recovery issues (from 1990, 1991 and 1992 PSCR Reconciliation Cases) pending before the Michigan Court of Appeals and the Michigan Supreme Court. An appeal of the Settlement Order has been filed with the Michigan Court of Appeals by a group representing some of Consumers' industrial customers and by the Michigan Attorney General ("Appellants"). On March 19, 1996, the Court of Appeals issued a decision which affirmed the Settlement Order. The Appellants did not seek further judicial review of the Court of Appeals' decision and thus the March 19, 1996 decision has become final. Because the Settlement Order did not approve the capacity charges authorized for recovery in the PPA, and thereby denied the protection provided under Michigan law from reconsideration for a 17-1/2 year period, Consumers' cost recovery relating to purchases from the MCV is subject to annual PSCR reviews. In connection with a dispute between MCV and Consumers regarding the payment of certain fixed energy charges which stemmed from the Revised Settlement Proposal, on December 10, 1993, Consumers made a written irrevocable offer of relief ("Offer of Relief") to MCV. The Offer of Relief was for the purpose of facilitating the sale of Senior Secured Lease Obligation Bonds, issued in connection with the financing of the Overall Lease Transaction and held by Consumers. Pursuant to the Offer of Relief, which was rendered final and irrevocable on December 28, 1993, Consumers committed to pay MCV the fixed energy charges on all energy delivered by MCV from the block of contract capacity above 915 MW. Consumers did not commit to pay MCV for fixed energy charges on energy delivered above the "caps" established in the Settlement Order up to 915 MW. The Offer of Relief represented a "floor" for the arbitration of said dispute below which payments to MCV of fixed energy charges in dispute could not fall. Consumers would schedule deliveries of this energy in accordance with the provisions of the PPA. This unilateral commitment, which became effective as of January 1, 1993, to pay fixed energy charges on delivered energy from the block of Contract Capacity above 915 MW will expire on September 15, 2007. This commitment will continue to apply even if the Settlement Order is later amended. On June 23, 1993, Consumers exercised its rights under the PPA to obtain a determination through arbitration proceedings of whether Consumers could exercise the "regulatory out" provision of the PPA in view of Consumers' acceptance of the Settlement Order. In a Final Order issued on February 16, 1995, the arbitrator ruled that Consumers may withhold the fixed energy charges for available but undelivered energy, as well as for energy delivered between the "caps" contained in the Settlement Order and 915 MW, subject to completion of appellate review in all regulatory and judicial proceedings with respect to the Settlement Order and then pending PSCR cases. On February 23, 1995, the MPSC applied the Settlement Order to Consumers' 1993 Reconciliation Case and ruled that Consumers could not recover the full 915 MW of MCV capacity and fixed energy charges provided under the terms of the 1993 Revised Settlement Proposal approved by the MPSC in the Settlement Order. Instead, the MPSC "allocated" approximately 25 MW of MCV capacity to "non-jurisdictional" customers (i.e., customers not subject to PSCR rates), resulting in a disallowance to Consumers of approximately $7.4 million of which approximately $.7 million relates to fixed energy charges. In addition, the MPSC ruled in this case that Consumers could not recover approximately $.6 million of fixed energy charges payable to MCV for energy delivered above the off-peak cap of 732 MW. (Consumers has paid into escrow approximately $.4 million of this sum and the balance was paid to MCV.) On October 19, 1995, Consumers notified MCV that, pursuant to the "regulatory out" provision of the PPA, it would be increasing the amount being escrowed each month to reflect its calculation of fixed energy charge -20- 22 payments related to the 25 MW disallowed by the MPSC and Michigan Court of Appeals described above. In addition, Consumers requested a refund from MCV of $1.9 million plus interest, for the calendar years 1993 and 1994 and the first eight months of 1995. On November 21, 1995, MCV responded to Consumers indicating that MCV would, pursuant to the PPA, refund the appropriate funds, if any, and determine the appropriate escrowing of funds, if any, at such time as a final and non-appealable order disallowing these recoveries is entered. Currently, Consumers is escrowing approximately $62,000 per month in fixed energy charge payments from MCV due to this issue. Consumers and MCV appealed the MPSC February 23, 1995 Order to the Michigan Court of Appeals and on November 1, 1996 the Michigan Court of Appeals affirmed the MPSC's decision which "allocated" approximately 25 MW of MCV capacity to "non-jurisdictional" customers and ruled Consumers could not recover fixed energy charges for energy delivered above the off peak cap of 732 MW. MCV management is currently assessing the prospects of further appeal or review and, at this time, cannot predict if such an appeal will be filed (by MCV, Consumers or any other party) or the outcome of such a proceeding. As part of its order in Consumers' 1994 PSCR Plan proceedings, the MPSC, on August 18, 1994, ruled that for 1994 Consumers would not be permitted to recover fixed energy costs during off-peak hours for energy delivered above the availability "caps" contained in the Settlement Order and below 915 MW. MCV believes the MPSC order on this issue is erroneous and has filed an appeal of the MPSC decision. Other PSCR Plan and Reconciliation Cases for the years 1994 - 1997 are pending before the MPSC at this time. MCV Management cannot predict the outcome of these proceedings. Consumers has escrowed approximately $2.1 million for the first nine months of 1996 and approximately $1.0 million for the years 1995 and 1994, of fixed energy charges payable to MCV based on this MPSC ruling and continues escrowing approximately $.2 million per month for this portion of fixed energy charges. 1995 Settlement Proceedings. On September 8, 1995, Consumers and the MPSC staff filed a motion to create a consolidated proceeding for the purpose of reviewing a settlement agreement ("Proposed Settlement") entered into between the MPSC staff and Consumers related to three cases: Case No. U-10685, Consumers' electric general rate case; Case No. U-10787, Consumers' request for approval of a special competitive services tariff (Rate SCS); and Case No. U-10754, Consumers' application for approval of revised depreciation rates for electric and common utility plant. MCV is a party to the consolidated proceeding. The settlement agreement proposes approving the jurisdictional cost recovery of an additional 325 MW of capacity purchased from MCV. Cost recovery approval for the 325 MW of MCV contract capacity would be in addition to the 915 MW already approved by the MPSC. Recovery would begin January 1, 1996. The initial average capacity charge recovered would be 2.86 cents per kWh escalating to 3.62 cents per kWh in 2004 and thereafter. On September 22, 1995, MCV filed a position statement not objecting to the Proposed Settlement, but reserving all of its rights and privileges under the PPA. If the settlement is approved as filed it will likely result in an increase in MCV's dispatch under the PPA. Consumers has, in fact, increased MCV's dispatch in 1996 consistent with the terms of the Proposed Settlement. Based on current gas prices and energy rates, this should have a positive impact on MCV's cash flow and earnings, assuming current gas prices and energy rates continue in effect. Management cannot predict the outcome of this proceeding. Great Lakes Pricing of Gas Transportation Costs MCV has entered into long-term gas transportation arrangements with four U.S. interstate transporters: ANR Pipeline Company, Panhandle Eastern Pipe Line Company, Trunkline Gas Company and Great Lakes Gas Transmission Company ("Great Lakes"). The transportation rates from these transporters are subject to FERC regulation. In 1990, Great Lakes expanded its interstate pipeline system to accommodate gas purchases from MCV and other customers. Historically, such capital costs were "rolled-in" to the rate base, thus combining the capital cost of common use facility additions with the cost of existing common use facilities for the purpose of determining the transportation rates to be charged to all system shippers. In 1991, FERC issued an order that rejected rolled-in pricing for the MCV-related expansion costs and, instead, imposed incremental pricing which, for MCV, took effect April 1, 1993. The incremental methodology allocates the capital cost of facility additions solely to the new shippers who will gain access to the expanded facilities. FERC's decision was appealed by MCV and others to the -21- 23 United States Court of Appeals for the District of Columbia Circuit, which held that FERC had failed to adequately explain the adoption of incremental rates and remanded the orders to FERC for reconsideration. On July 26, 1995, FERC issued its Order on Remand reversing its prior order and directed Great Lakes to: (i) implement rolled-in rates prospectively beginning October 1, 1995, for the expansion facilities including those applicable to MCV; and (ii) refund to MCV, subject to FERC approval, the principal amount, excluding interest, paid in excess of rolled-in rates. MCV had, from April 1, 1993 to October 1, 1995, reflected in current operating results Great Lakes gas transportation costs associated with incremental pricing. On April 25, 1996, FERC affirmed its Order on Remand as it pertains to the MCV issues described above ("Order on Rehearing"). On June 3, 1996, FERC granted rehearing for further consideration. Rehearing was requested by, among others, MCV for clarification of the timing of refunds, surcharges and interest thereon subsequent to October 1, 1995. On July 31, 1996, FERC clarified its April 25, 1996 order stating that interest on refunds was to commence October 1, 1995 and otherwise denied the relief requested in the petitions for rehearing. As of September 30, 1996, 98% of the refund has been paid to MCV. The FERC Order on Rehearing and its July 31, 1996 order are subject to further administrative and judicial processes and, MCV and others have filed appeals to the United States Court of Appeals for the District of Columbia ("Court of Appeals") challenging certain aspects of the Order on Remand. Management cannot predict the outcome of these proceedings but believes that the likelihood of a reversal by the Court of Appeals of that portion of the FERC Order on Rehearing requiring rolled-in rate treatment is remote. -22- 24 Item 6. Exhibits and Reports on Form 8-K a.) List of Exhibits 27 Financial Data Schedule (3rd Quarter 1996) b.) Reports on Form 8-K There were no reports on Form 8-K filed during the quarter for which this report is filed. -23- 25 SIGNATURES Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized. MIDLAND COGENERATION VENTURE LIMITED PARTNERSHIP ---------------------------- (Registrant) Dated: November 8, 1996 /s/ James M. Kevra --------------------------------------- James M. Kevra President and Chief Executive Officer Dated: November 8, 1996 /s/ James M. Rajewski ------------------------------------- James M. Rajewski Vice President and Controller (Principal Accounting Officer) -24- 26 EXHIBIT INDEX Exhibit Sequential Number Page No. ------- ---------- 27 Financial Data Schedule (3rd Quarter 1996) 26 -25-