1 PROCESSING AGREEMENT BY AND BETWEEN TRANSAMERICAN REFINING CORPORATION AND GLENCORE LTD. Effective July 22nd, 1996 2 PROCESSING AGREEMENT PAGE 1 PROCESSING AGREEMENT THIS PROCESSING AGREEMENT ("Processing Agreement"), effective as of the date set forth herein, is by and between Glencore Ltd. ("GLENCORE") and TransAmerican Refining Corporation ("TARC"). RECITALS WHEREAS, TARC is engaged in the business of refining, storing and distributing petroleum products of various types, including, but not limited to, crude oil, cutter stock or other additives, Feedstock (as defined below) and Products (as defined below) derived or refined therefrom (collectively "Petroleum"); and WHEREAS, TARC owns and operates a refinery and storage tanks for Petroleum in or near NORCO, LA; and WHEREAS, GLENCORE intends to store Petroleum in TARC's Storage Tanks (as defined below) and WHEREAS, TARC AND GLENCORE desire to enter into this Processing Agreement whereby GLENCORE will deliver Feedstock (as defined below) to TARC'S Refinery and Storage Tanks (as defined below) for processing by TARC into Products and subsequent sale or other disposition by GLENCORE; NOW, THEREFORE, for and in consideration of the premises, and the mutual covenants and promises hereinafter set forth; the sufficiency of which is hereby acknowledged, GLENCORE and TARC hereby agree as follows: 1. Definitions. When used in this Processing Agreement, the following terms shall have the meanings herein set forth: "Delivered Product" shall be the quantity of Feedstock delivered by Glencore to TARC and processed into Products by TARC under this Processing Agreement. "Feedstock" shall mean approximately 305,000 barrels of straight run residue to be delivered by MT "Romito" to the Refinery. 3 PROCESSING AGREEMENT PAGE 2 "Processing" shall mean and include the converting of Feedstock to Products. "Products" shall mean VGO and VTB. "Refinery" shall mean and include the refinery of TARC in or near NORCO, Louisiana, including all towers, units and processes therein. "Storage Tanks" and "Storage Facility" shall mean and include each storage tank, and all related property and facilities, together with modifications, alterations or additions thereto, listed in Schedule A attached hereto. "VGO" shall mean Vacuum Gas Oil "VTB" shall mean Vacuum Tower Bottoms 2. Term. The term of this Processing Agreement shall commence upon July 22nd 1996 and shall end on the third working day after Glencore has removed all Products processed under this Agreement from the Refinery. The basis for calculation of the number of barrels of processed Feedstock shall be outturn received basis as determined by independent inspector. 3. Processing Fee. (a) GLENCORE shall pay to TARC a Processing Fee of USD 1.30 per barrel of Feedstock processed which fee shall be due and payable to TARC as agreed, but no later than three (3) working days after all Feedstock is processed into Products. (b) The parties shall agree on guaranteed quantity and quality yields for the cargo of Feedstock prior to processing. To the extent TARC fails to meet the guaranteed quality and quantity yield, GLENCORE shall be entitled to a credit against the Processing Fee due TARC equal to the economic benefit (profit) GLENCORE would have realized had the yield been met as defined below. If such credits exceed the total amount of Processing Fees due TARC, TARC shall pay GLENCORE such excess amount within one (1) business day. Failing such payment GLENCORE shall have the right to set-off such amount against any other amount owed by GLENCORE to TARC. (c) Prior to processing, the parties shall agree on a guaranteed quantity and quality conversion factor from the cargo of Feedstock to finished Product. To the extent TARC fails to meet a 99.5 percent conversion factor of Feedstock into finished Product, GLENCORE shall be entitled to a credit against the processing fee due TARC equal to the profit GLENCORE would have realized had they sold the unconverted Feedstock to a third party at the time all Feedstocks or should have been processed. If such credits exceed the processing fee due TARC, TARC shall pay Glencore such excess amount within one business day. Failing such payment GLENCORE 4 PROCESSING AGREEMENT PAGE 3 shall have the right to set-off such amount against any other amount owed by GLENCORE to TARC. (d) The quantity yields for the VGO and VTB are calculated separately for each cargo as follows unless otherwise agreed: Cutter stock yield = to be agreed case by case. VGO Yield = IBP to 1050 degrees F VTB Yield = 1050 degrees F + As determined by ASTM D-1160 Loss: 0.5 percent of the outturn received quantity maximum. (e) GLENCORE shall pay TARC a storage fee of USD 0.22 per barrel for any Products stored in the Storage Tanks in excess of 30 days from the date of completion of processing the barrels delivered. This fee can be waived or extended by mutual consent of TARC and GLENCORE. 4. Removal of Petroleum from Storage. TARC covenants and agrees to follow the instructions of GLENCORE for the storage and delivery of Petroleum. 5. Scheduling Deliveries to and from Storage Tanks. Reasonable efforts shall be used by GLENCORE and TARC to effect timely and efficient delivery of Petroleum to and from the Storage Tanks. 6. Processing. 6.1. The Products of Processing including the quantities and specifications thereof will be determined on a quantity and quality basis as agreed to between the parties. 6.2. At the termination of this Processing Agreement, TARC shall pay GLENCORE for any Petroleum of GLENCORE remaining in the Storage Tanks and/or the Refinery at GLENCORE'S in tank cost and should TARC fail to do so then GLENCORE is expressly granted a right of set-off against any sum due or that may be due by GLENCORE to TARC. Prior to receipt by GLENCORE from TARC of full payment for the said Petroleum, title to and possession of the Petroleum in the Storage Tanks and in the Refinery shall be and remain with GLENCORE and TARC understands and agrees that by the execution of this Processing Agreement it does not have and it will not obtain any title to such Petroleum or any legal or equitable interest therein. 7. Duties of TARC. TARC shall in a timely and efficient manner receive and store Petroleum of GLENCORE subject to the following terms and conditions: 7.1. TARC shall store the Petroleum owned by GLENCORE in the segregated Storage Tanks. 7.2. TARC shall maintain the Storage Tanks in accordance with general oil industry standards for safety and quality assurance. TARC represents and warrants to 5 PROCESSING AGREEMENT PAGE 4 GLENCORE that the Storage Tanks and related systems are clean, in good repair, not ruptured, and satisfactory for the purpose of this Processing Agreement, and the Storage Tanks will be so maintained by TARC throughout the Term. TARC shall maintain all licenses, agreements, easements or other obligations necessary and appropriate to attain and maintain the ability of the Storage Tanks to operate at full capacity. TARC shall maintain the Storage Tanks in such condition as to enable the Storage Tanks to operate at their full capacity to receive, store and deliver Petroleum. 7.3. TARC shall handle and store Petroleum of GLENCORE in accordance with general oil industry standards and in accordance with TARC's status hereunder as bailee/warehouseman. Any barge/vessel demurrage or detention incurred by or on behalf GLENCORE as a consequence of TARC being unable to receive Feedstock or deliver Product shall be reimbursed by TARC to GLENCORE. Any barge/vessel demurrage or detention directly attributable to GLENCORE will be for account of GLENCORE or will be reimbursed by GLENCORE to TARC. 7.4. Unless agreed otherwise in writing by GLENCORE, TARC shall store Petroleum of GLENCORE in the identified Storage Tanks and shall not commingle during storage or refining Petroleum of GLENCORE with Petroleum owned by any other person or entity. 7.4.1. Title to Petroleum of GLENCORE shall remain exclusively with GLENCORE and TARC shall not represent to any person or entity that it is either the owner or consignee of Petroleum of GLENCORE. TARC is not authorized to sell, pledge, exchange, remove, or otherwise dispose of Petroleum of GLENCORE without the prior approval of GLENCORE or its authorized agent. 7.5. The quantity and quality of both Feedstock and Product processed hereunder and of Products delivered from Storage Tanks to third parties pursuant to GLENCORE's instructions shall be determined by gaugings and samplings by a mutually agreed upon independent inspector immediately prior to transfer of the Feedstock and Products to or from the Storage Tanks, as set forth below. Unless otherwise specified by the independent inspector, quantities delivered; (a) into or from tankers and barges shall be measured by Storage Tanks tank gauges or if storage tanks are active by vessel/barge figures adjusted for Vessel Equalization Factors as determined by independent inspector; (b) into or from transport trucks shall be measured by calibration tables or calibrated meters; (c) into or from tank cars shall be measured by calibrated tank car tables or calibrated meters; (d) into or from pipelines shall be measured by calibrated meters or Storage Tanks tank gauges; and (e) from the processing units shall be measured by tank gauges. The parties shall be bound by the results of such inspection in the absence of manifest error. 7.5.1. The mutually agreed upon independent inspector, whose fees will be paid by GLENCORE will sample and analyze Feedstock for quality (including but not limited to, when appropriate, flashpoint, pourpoint, water, sediment, viscosity, gravity, and sulfur) prior to discharge of the Feedstock from the transport vehicle, pipeline, or vessel into the Storage 6 PROCESSING AGREEMENT PAGE 5 Tanks. The parties shall be bound by the results of such inspection except in the case of manifest error. 7.5.2. All such quantity determinations shall be adjusted to net barrels at 60 degrees Fahrenheit in accordance with ASTM IP Petroleum Measurement Tables (ASTM designation D1250) as then currently in effect. 7.6. TARC shall provide the maintenance, labor, material and equipment necessary to receive Petroleum for delivery to and release from the Storage Tanks, and to operate the Storage Tanks at a capacity and level that will serve the needs of GLENCORE hereunder and enable TARC to fulfill its duties and obligations hereunder. 7.7. TARC shall comply with all reasonable requests by GLENCORE with regard to monitoring quality and quantity, including daily tank measurements, sealing off lines and tanks, daily inventory reconciliation, etc. and shall provide GLENCORE or its agents access to the Refinery and the Storage Tanks at any time. 8. Representation and Warranties of TARC to GLENCORE. TARC represents and warrants to GLENCORE each of the following: 8.1. TARC owns each of the Storage Tanks and has full title and authority to operate the Storage Tanks as contemplated herein. Each of the Storage Tanks set forth in Schedule A is in good working condition and order; is properly licensed and maintained; and has the capacity to receive, store, through-put and distribute Petroleum in the volumes set forth in Schedule A. 8.2. TARC shall cause no liens or claims of lien to be filed or asserted with respect to the Petroleum stored in the Storage Tanks where Petroleum of GLENCORE will be stored, and TARC shall not permit any such liens, except (i) liens either affirmatively granted by or in favor of GLENCORE and (ii) liens arising in TARC's favor by operation of law in the event of GLENCORE's default hereunder. TARC expressly disclaims all claims of ownership over the Petroleum stored. TARC confirms the terms of this Agreement do not and will not conflict with the terms of any other agreement to which TARC is a party with the possible exception of a similar agreement with J.Aron and Company provided however that GLENCORE shall be provided with a copy of such agreement at least 3 business days prior to such agreement coming into effect and GLENCORE shall have the right to contact J.Aron and Company to confirm no conflict. 9. Duties of GLENCORE. GLENCORE shall cause Feedstock to be delivered to TARC for storage at the Storage Tanks and Processing at the Refinery subject to the following terms and conditions: 9.1. GLENCORE shall, at its own expense, procure and maintain with a responsible insurance company or companies, "all risks" insurance on all Petroleum of GLENCORE against physical loss or damage to such Petroleum. 7 PROCESSING AGREEMENT PAGE 6 9.2. GLENCORE understands that the addition of cutterstock or the injection of additives for third party sales into its Products is its own exclusive responsibility. The cutterstock/additives will be purchased by GLENCORE. 9.3. GLENCORE shall cause Feedstock to be delivered to TARC for storage in the Storage Tanks and processing at the Refinery with all reasonable dispatch subject to the terms and conditions contained herein. 10. Events of Default. Each of the following shall constitute an event of default under this Processing Agreement: 10.1. Any representation or warranty contained herein shall prove at any time to be false or misleading in any material respect. 10.2. Either party fails timely to perform any of its obligations under this Processing Agreement, or fails otherwise to comply in any material respect with this Processing Agreement. 10.3. There shall occur any material adverse change in TARC's business, properties or condition, financial or otherwise as determined in GLENCORE's discretion. Upon the occurrence of any event of default under this Processing Agreement, the non-defaulting party shall give written notice to the defaulting party of the default; and the defaulting party shall have ten (10) days to cure the default. 10.4. In the event of any occurrence of any event of default under this Processing Agreement, without limiting any other remedy available to TARC or without limiting any other remedy available to TARC or GLENCORE at law or equity the non-defaulting party may, at its sole discretion, terminate this Processing Agreement and take any or all such other or further action as it deems reasonably necessary. 11. Rights Survive Termination. Upon expiration of this Processing Agreement, by default or termination, either party may exercise any of its rights which have theretofore accrued hereunder without prejudice to any other rights it may have at law or in equity. Upon termination of this Agreement for any reason GLENCORE shall have the right to require the removal of all Petroleum then located at the Refinery. The costs of removal of the Petroleum shall be borne by the party whose breach or default caused the termination of this Processing Agreement. 12. Authority. Each party hereby represents and warrants that its execution and delivery of this Processing Agreement and the performance of its obligations hereunder will not violate its certificate of incorporation or bylaws and will not conflict with or cause a breach under any agreement to which it is party or by which its assets may be bound; and that it has the power and authority to enter into this Processing Agreement and to carry out its obligations thereunder. 8 PROCESSING AGREEMENT PAGE 7 13. INDEMNIFICATION. EACH PARTY HEREBY COVENANTS AND AGREES TO SAVE, DEFEND, INDEMNIFY AND HOLD THE OTHER PARTY HARMLESS FROM AND AGAINST ANY AND ALL CLAIMS, SUITS, EXPENSES, COSTS, JUDGMENTS AND DAMAGES (EXCLUDING ANY INDIRECT, CONSEQUENTIAL, OR SPECIAL DAMAGES) ARISING FROM ANY FAILURE BY THE INDEMNIFYING PARTY OR ANY EMPLOYEE OR AGENT THEREOF TO COMPLY WITH ANY OBLIGATION OF SUCH INDEMNIFYING PARTY UNDER THIS PROCESSING AGREEMENT, OR ARISING FROM ANY NEGLIGENCE OR WRONGFUL ACT OF THE INDEMNIFYING PARTY, ITS EMPLOYEES, OR AGENTS IN CONNECTION WITH THE MATTERS CONTEMPLATED BY THIS PROCESSING AGREEMENT, OR ARISING FROM THE FAILURE OF ANY REPRESENTATION OR WARRANTY HEREIN TO BE TRUE WHEN MADE OR WHEN EFFECTIVE HEREUNDER. WITHOUT LIMITING THE GENERALITY OF THE FOREGOING, TARC SHALL SAVE, DEFEND AND INDEMNIFY GLENCORE FROM AND AGAINST ANY AND ALL CLAIMS, FINES, ASSESSMENTS AND PENALTIES (INCLUDING BUT NOT LIMITED TO CLAIMS FOR CLEAN-UP AND REHABILITATION OF THE ENVIRONMENT) RESULTING FROM ANY POLLUTION OR OTHER DAMAGE CAUSED BY ITS WRONGFUL OR NEGLIGENT, ACT OR OMISSION, CAUSING DISCHARGE OR RELEASE OF PETROLEUM PRODUCTS FROM EITHER THE REFINERY OR THE STORAGE TANKS. 14. Compliance with Laws. TARC shall comply with, and use its best efforts to ensure that third parties comply with, all applicable laws, regulations, ordinances, mandates, and other requirements of any national, state, regional or local government having jurisdiction over the transportation, refining transfer or terminalling of Petroleum including, without limitation, those regarding air, land and water pollution. 15. Relationship of Parties. Nothing in this Processing Agreement shall be construed or interpreted as creating a joint venture, partnership, agency or employment relationship between TARC and GLENCORE. 16. Successors and Assigns. This Processing Agreement shall be binding upon and shall inure to the benefit of the successors and permitted assigns of the parties hereto; provided, however, that this Processing Agreement is personal to GLENCORE and TARC, and neither GLENCORE nor TARC shall assign this Processing Agreement or any interest herein (either voluntarily or by operation of law) without the other party's prior written consent. 17. Force Majeure. Neither TARC nor GLENCORE shall be responsible for any failure to fulfill their respective obligations under this Processing Agreement (other than the payment of money) if fulfillment has been delayed, hindered, interfered with, curtailed, or prevented, by any circumstance whatsoever which is not within the reasonable control of TARC or of GLENCORE as the case may be, until the conditions preventing such party's performance of this Processing Agreement are removed. 9 PROCESSING AGREEMENT PAGE 8 17.1. By way of example, neither party will be responsible for damages caused by delay or failure to perform its obligations in whole or in part hereunder (other than its obligation to make accountings and payment hereunder) if such delay or failure is attributable to a storm, flood, hurricane or other act of God, 17.2. The party whose performance is affected by an event of force majeure will make all reasonable efforts to remove the event of force majeure or mitigate its effect. If an event of force majeure continues for a period of more than one month, the party whose ability to perform is not affected by such event shall have the right to terminate this Processing Agreement on ten day's prior written notice. 18. Controlling Law. The interpretation, construction, and performance of this Processing Agreement, and the rights and remedies of the parties hereunder shall be governed by the laws of the State of New York without reference to choice of law principles. Each party agrees that the New York State Supreme Court located in New York county or the United States District Court for the Southern District of New York shall have exclusive jurisdiction to hear and determine any suit, action or proceeding arising out of or in connection with this Processing Agreement and irrevocably submits to the jurisdiction of such court. 19. Notices. Except as otherwise provided herein, all notices required or permitted to be given hereunder shall be in writing and shall be deemed delivered when personally delivered, or received from an overnight delivery courier service, or when delivered by telex or telecopier addressed as follows (or such other address as the party may, by written notice to the other party, designate as the address for purposes of notice hereinafter): If to GLENCORE: Glencore Ltd. 3 Stamford Plaza 301 Tresser Boulevard Stamford, CT 06901 Telephone: (203) 328-4920 Fax No.: (203) 328-3177 Attn: David Porter If to TARC: TransAmerican Refining Corporation 1300 East North Belt, Suite 320 Houston, Texas 77032 Telephone: (713) 986-8811 Fax No.: (713) 986-8820 Attn: Bill Hoffman 20. Severability. If any provisions of this Processing Agreement shall be held invalid under applicable law, such invalidity shall not affect any other provision of this Processing Agreement which can be given effect without the invalid provision and, to this extent the provisions are severable. 10 PROCESSING AGREEMENT PAGE 9 21. Non-Waiver. Neither GLENCORE nor TARC shall be deemed to have waived or modified any of its rights hereunder, by course of conduct or otherwise, or under any other writing unless such waiver or modification be in writing as signed by its authorized officer and then such waiver or modification shall be effective only for the period and under the terms and conditions as are specifically set forth therein. No delay or omission on the part of TARC or GLENCORE in exercising any right shall operate as a waiver or modification of such right or any other right. No waiver of any default on one occasion shall operate as a waiver of any other default or of the same default on a future or different occasion. All TARC's and GLENCORE's rights and remedies, whether evidenced hereby or by any other writing, shall be cumulative and may be exercised from time to time singularly, concurrently, or successively. 22. Notwithstanding anything to the contrary in this or any other agreement between TARC and GLENCORE, GLENCORE shall have the right to set-off against any funds it holds for the account of TARC or that it may owe TARC under this Agreement against any right or claim of GLENCORE as a result of TARC's non compliance or breach of this Processing Agreement. 23. Entire Agreement. This Processing Agreement sets forth the entire agreement between TARC and GLENCORE regarding the subject matter covered herein, and supersedes any and all prior oral or written communications between the parties regarding the subject matter covered herein, and may not be modified and amended except in a writing signed by the party against whom the modification or amendment is being enforced. 24. Audit. GLENCORE shall have the right to audit the books and records of TARC relating to the performance, storage and Processing services. Any errors discovered shall be immediately corrected by appropriate payment to the injured party. 25. Grant of Precautionary Security Interest. Solely as a precaution, in the event that a court of applicable jurisdiction should hold for any reason that Glencore is not the owner of the Petroleum processed and/or stored at the Refinery, the Storage Tanks or the Storage Facility (collectively, "TARC's Facility"), TARC hereby grants and continues to grant Glencore a security interest in and to all Petroleum owned by GLENCORE at TARC's Facility and all products and proceeds therefrom. At Glencore's request, there shall be filed, and TARC hereby agrees to execute and deliver, Uniform Commercial Code financing statements (and all such other documents as Glencore requests in its sole discretion) in such form and in such jurisdictions as Glencore deems appropriate to evidence the granting of the security interest by TARC in GLENCORE's Petroleum including but not limited to the Feedstock and Products. TARC represents and warrants to Glencore that neither TARC nor any affiliate of TARC has granted or suffered or permitted to exist (or will grant, suffer or permit) any liens or encumbrances which could conflict with Glencore's ownership of the Petroleum processed and/or stored at TARC's Facility or with the security interest in such Petroleum granted to Glencore hereby. 11 PROCESSING AGREEMENT PAGE 10 IN WITNESS THEREOF, the parties hereto have caused this Processing Agreement to be duly executed as of the day and year first above written. TRANSAMERICAN REFINING CORPORATION By: /s/ JOHN R. STANLEY Name: JOHN R. STANLEY Title: CHIEF EXECUTIVE OFFICER ATTEST: By: /s/ DOUGLAS WIDLASKI GLENCORE LTD. By: /s/ DAVID PORTER Name: DAVID PORTER Title: AUTHORIZED SIGNATORY ATTEST: By: 12 PROCESSING AGREEMENT PAGE 11 ATTACHMENT A Tank No. Nominal Capacity -------- ---------------- 425-1 425,000 bbls. 425-3 425,000 bbls. 425-4 425,000 bbls. 625-1 625,000 bbls. 150-7 150,000 bbls. 150-8 150,000 bbls. 55-8 55,000 bbls. 150-13 150,000 bbls. 150-15 150,000 bbls.