EXHIBIT 99.323


CHANGED TO THE PX TARIFF AND PROTOCOLS NECESSARY TO ACCOMMODATE PX PARTICIPANTS'
REVISED ANCILLARY SERVICES BIDS


REQUIRED CHANGES

1.       REQUIRED CHANGES TO THE TARIFF AND PROTOCOLS TO PROVIDE FOR REVISED
         ANCILLARY SERVICES THROUGH THE PX

TARIFF

The present Tariff is not specific on whether or not revised ancillary services
bids are allowed. In paragraph 3.3.9 of the PX Tariff, it is stated that "The PX
shall, where possible, forward to the ISO any Ancillary Services bids submitted
to it by PX Participants in connection with any auction for Ancillary Services
conducted by the ISO." This statement will accommodate revised Ancillary
Services bids.

Therefore, there is no need to change the Tariff for accepting revised Ancillary
Services bids.

PBEP

Section 6.2.2, Format and Contents of Ancillary Services Bids, needs to be
changed to require a Bid Type flag, indicating whether an Ancillary Services bid
is "preliminary" or "revised". Note that the present TA system software and user
interface does not provide for accepting this flag yet. As a result of the
change here, the required data items for Ancillary Service bids under Section
6.2.2 need to be renumbered.

PSCP

The description of the Day-Ahead scheduling process timeline needs to be
changed. Specifically:

o        A new section, renumbered as 2.1.13, needs to be added to require PX
         Participants who submit revised Ancillary Services bids to do so by
         11:40 am.

o        The original section 2.1.13 needs to be revised to state that the PX
         will forward PX Participants' revised Ancillary Services bids, if any,
         and any remaining unrevised Ancillary Services bids to the ISO.

o        As a result of these changes, the original sections 2.1.13, 2.1.14 and
         2.1.15 will be renumbered.




The proposed tariff and protocol revisions are in the following pages.

2.       POTENTIAL OF GAMING BY REVISING ANCILLARY SERVICE BIDS

No significant issue has been identified in this regard. Therefore, no changes
are proposed to address such potential. We will rely on the general provision of
the PX Tariff which would allow changes to the PX Tariff and Protocols on
revised Ancillary Services bids should unforeseen gaming surface in the future
because of the allowance of revised Ancillary Services bids.

3.       PROCESS CHANGES

In the PX Day-Ahead scheduling process, the PX Participants who are to submit
revised Ancillary Services bids through PX need to submit the bids by 11:40 am.

The PX need to study if other information from the ISO (e.g., the Suggested
Adjusted Schedule and the preliminary schedule of Ancillary Services) would need
to be published to aid PX Participants' decision on revising Ancillary Service
bids. At present, there is no software capability to enable automatic publishing
such information through the TA System.





PROPOSED REVISIONS

TARIFF


[No change is necessary)


PBEP

6.2.2    FORMAT AND CONTENT OF ANCILLARY SERVICES BIDS

         An Ancillary Services bid shall include the following information as
         appropriate for the type of Ancillary Service, for each Settlement
         Period of the Trading Day:

                  a)       Bid Type: preliminary (e.g, PRE_ANC) or Revised
                           (e.g., REV_ANC)

                  b)       PX Participant name and ID code;

                  c)       Ancillary Service type:

                           i)       Regulation;

                           ii)      Spinning Reserve;

                           iii)     Non-Spinning Reserve; or

                           iv)      Replacement Reserve;

                  d)       Resource ID;

                  e)       Settlement Period for which the bid applies;

                  f)       Trading Day for which the bid applies;

                  g)       the $/MWh values for the Energy supplied (which shall
                           be the same for each of the four Ancillary Service
                           types);

                  h)       the lower and upper operating limits for each
                           resource;

                  i)       ramp rate;

                  j)       capacity reservation prices (in $/MW), which may be
                           different for each type of Ancillary Service;

                  k)       Regulation range both up and down;

                  l)       Spinning Reserve, Non-Spinning Reserve or Replacement
                           Reserve quantity in MW;





                  m)       the time period required to reach synchronization
                           (this must be the same value for all 24 Settlement
                           Periods for a particular resource).

                  PSCP


         2.1.12 BY 11:00 AM, ONE DAY AHEAD

                  By 11:00 am on the day ahead of the Trading Day and for each
                  Settlement Period of that Trading Day the ISO will, acting in
                  accordance with the SP:

                  a)       complete the Inter-Zonal Congestion Management
                           process (if Inter-Zonal Congestion does not exist in
                           any Settlement Period the timeline will continue with
                           the step at PSCP 2.1.14);

                  b)       provide, via WEnet, a Suggested Adjusted Day-Ahead
                           Schedule for Energy to the PX (if it submitted a
                           Preferred Day-Ahead Schedule and the ISO proposes to
                           modify the PX's Preferred Day-Ahead Schedule);

                  c)       publish on WEnet the estimated Day-Ahead Usage Charge
                           rates (in $/MW of scheduled flow) for Energy
                           transfers between Zones; and

                  d)       provide, via WEnet, together with the Suggested
                           Adjusted Day-Ahead Schedule, a preliminary schedule
                           for Ancillary Services to the PX (to the extent that
                           the PX submitted Ancillary Services bids).

         2.1.13 BY 11:40 AM, ONE DAY AHEAD

                  By 11:40 am on the day ahead of the Trading Day and for each
                  Settlement Period of that Trading Day, any PX Participant that
                  uses the PX as its Scheduling Coordinator must submit to PX,
                  through the TA System, any revised Ancillary Services Bids, in
                  accordance with the PBEP 6.2.2.

         2.1.14 BY 12:00 NOON, ONE DAY AHEAD

         By 12:00 noon on the day ahead of the Trading Day and for each
         Settlement Period of that Trading Day, (except where Inter-Zonal
         Congestion does not exist, in which case the timeline will continue
         with the step at PSCP 2.1.15):




                  a)       the PX will submit to the ISO, through the WEnet,

                           i)       its unchanged Preferred Schedule as its
                                    Revised Day-Ahead Schedule (as described in
                                    PSCP 6.3), in response to the ISO's
                                    Suggested Adjusted Day-Ahead Schedule;

                           ii)      The revised Ancillary Services bids referred
                                    to in PSCP 2.1.13 (if any) and the remaining
                                    unrevised Ancillary Services bids; and

                  b)       the ISO will:

                           i)       validate (in accordance with the SBP) the
                                    Revised Day-Ahead Schedule and the revised
                                    Ancilary Services bids referred to in (a)
                                    above;

                           ii)      start the second and final iteration of the
                                    Inter-Zonal Congestion Management process in
                                    accordance with the SP; and

                           iii)     start the evaluation of the revised
                                    Ancillary Services bids in accordance with
                                    the SP.

         2.1.15 BY 1:00 PM, ONE DAY AHEAD

         By 1:00 pm on the day ahead of the Trading Day (or by 11:00 am if there
         is no Inter-Zonal Congestion) and for each Settlement Period of that
         Trading Day, the ISO will, in accordance with the SP:

                  a)       complete the second iteration, if necessary, of the
                           Inter-Zonal Congestion Management process;

                  b)       provide, via WEnet, a Final Day-Ahead Schedule to the
                           PX which, depending on the existence of Inter-Zonal
                           Congestion, could be:

                           i)       the Preferred Day-Ahead Schedule (when no
                                    Congestion was found at 11:00 am);

                           ii)      the Revised Day-Ahead Schedule (when no
                                    Congestion was found at 1:00 pm); or

                           iii)     a modified Revised Day-Ahead Schedule if the
                                    Revised Day-Ahead Schedule for Energy was
                                    modified for Inter-Zonal Congestion;


                  c)       publish on WEnet the Day-Ahead Usage Charge rates, if
                           any, (in $/MW of scheduled flow) for Energy transfers
                           between Zones; and




                  d)       provide, via WEnet, as part of the Final Day-Ahead
                           Schedule, a schedule of Ancillary Services (if any)
                           which PX Participants have been selected to supply in
                           the ISO's Ancillary Services auction.

         2.1.16 BY 1:15 PM, ONE DAY AHEAD

         By 1:15 pm on the day ahead of the Trading Day (or by 11:15 am if there
         is no Inter-Zonal Congestion), the PX will notify each PX Participant,
         through the TA System, and for each Settlement Period of the Trading
         Day, of the details from the Final Day-Ahead Schedule which relate to
         the PX Participant in question, including Schedule changes for
         Inter-Zonal Congestion Management and bids accepted in the ISO's
         Ancillary Services auction.