EXHIBIT 99.181 SETZER, CHERYL - -------------------------------------------------------------------------------- FROM: dariush shirmohammadi SENT: Tuesday, November 04, 1997 2:18 AM TO: Jim Cribari; Jim Napier; Jim Robertson; Herb Zimmerman; Terry McManus CC: Andy Goletz; Steve Ingram; herb_zimmerman@oaot.com; jim_napier@oaot.com%smtp SUBJECT: Re: Note from Ziad on Variances We managed to address/close most of these variances tonight. And should be done with all the critical ones by tomorrow noon. I think that the ISO/BBS folks are going to take it easy on us on the Settlements subsystem. I negotiated a solution with them that should let us off the hook, if we get the right resources from ABB to perform some major bugs. However, what surprised me tonight was the large number of SI to Settlements data transfer errors. Energy schedules would not show up or turn into A/S schedules, etc. I thought we had tested this path carefully all of last week (Herb/Jim N. please confirm) . Tonight, I was verifying the hand-shake between SI and BBS as a means of ensuring (even showing off to ISO folks) the correct transfer of data between SI and Settlements. Unfortunately this step turned mainly into an embarrassing exercise. Thanks to Mel we climbed out of several jams but the data transfer is still flawed. As it stands, ISO will take over the machines around noon tomorrow. Dariush _______________________________ Reply Separator ________________________________ Subject: Note from Ziad on Variances Author: Terry McManus at PSCMerit6 Date: 11/2/97 11:55 PM In addition to all outstanding Integration and ISST class 1 variances, the following Integration and ISST class 2 variances must be completed prior to the start of ODR scenario 3. ODR scenario begins at 6pm on Tuesday, 11/4. In order to test these variances, they should be completed by noon on Tuesday, 11/4. Those with "C" in the far left column have been prioritized as the most critical class 2 variances. Integration class 2 variances: 144 A resource was assigned to two SCs (ready for retest by ISO) 206 Midnight procedures not set up in DBMS_JOB (ready for retest by ISO) 221 DBMS_JOB submission script (ready for retest by ISO) C 226 SI to BBS transfer (ready for retest by ISO) C 236 Unable to purge HA schedules 243 SC specific event file for event notification to WEB (ready for retest by ISO) 247 Ancillary services gen spin reserve bid template - validation 264 Oracle database privileges present security risk for SI (targeted completion of 11/3/97) C 285 ISO MKT INFO - UDC load forecast - needs pull down for UDC IDs ISST class 2 variances: 3 DA preferred schedules error in SCWS 10 Bid flag changes as DA becomes HA 13 SCWS data needs to be cleared when resource associations are changed 15 BEEP core dump on SI (ready for retest by ISO) 1 C 97&31 COI downrating transfer error / DPF is note using branch group limits from OS C 20 DPF convergence in the two--day forecast C 21 Congestion management prices 25 Unit quality codes in BEEP do not appear to be correct 26 BEEP 5 minute ex-post pricing doesn't appear to be correct C 27 CONG has a problem with calculating congestion zone prices 30 SI generation quantity validation error on resources 32 OS data entry problems C 33 Network application controller (NAC) error 37 BEEP failure during real time processing (this variance has not reoccured since approx. 14:30 on 11/1; will re-evaluate status on 11/3) 2