EXHIBIT 10.27


                        TRANSMISSION SERVICE AGREEMENT
                                    FOR THE
                              VULCAN POWER PLANT




                                    BETWEEN

                         IMPERIAL IRRIGATION DISTRICT
                                      AND
                             VULCAN POWER COMPANY






    





                               TABLE OF CONTENTS

Section                             Title                                Page
- -------                             -----                                ----

  1      PARTIES........................................................... 1
  2      RECITALS.......................................................... 1
  3      AGREEMENT......................................................... 1
  4      DEFINITIONS....................................................... 1
  5      TERM.............................................................. 4
  6      TRANSMISSION SERVICE.............................................. 4
  7      TRANSMISSION LOSSES...............................................10
  8      CHARGES...........................................................11
  9      BILLING AND PAYMENT...............................................12
  10     LIABILITY.........................................................14
  11     AUDITING..........................................................16
  12     AUTHORIZED REPRESENTATIVES........................................17
  13     NO DEDICATION OF FACILITIES.......................................17
  14     NON-WAIVER........................................................18
  15     NO THIRD PARTY RIGHTS.............................................18
  16     UNCONTROLLABLE FORCES.............................................18
  17     ASSIGNMENTS.......................................................19
  18     GOVERNING LAW.....................................................21
  19     NOTICES...........................................................21
  20     SIGNATURE CLAUSE..................................................22

EXHIBIT I  - DEVELOPMENTS AND METHODOLOGIES FOR TRANSMISSION SERVICE
             CHARGES AND SCHEDULING FEE................................. EIA-1

EXHIBIT II - TRANSMISSION SERVICE FOR VUYLCAN POWER COMPANY..............EII-1


                                     -i-



    




1. PARTIES: The Parties to this Agreement are Imperial Irrigation District,
organized under the Water Code of the State of California ("IID"), and Vulcan
Power Company ("Producer"), hereinafter sometimes referred to individually as
"Party," and collectively as "Parties." 2. RECITALS: This Agreement is made
with reference to the following facts, among others:

   2.1 Producer has caused to be constructed an alternative energy resource
facility located in IID's service area.

   2.2 Producer and IID have entered into a Plant Connection Agreement.

   2.3 Producer desires to purchase, and IID desires to sell firm transmission
service of power from the Plant to Edison's Mirage Substation subject to the
terms and conditions specified herein.

   2.4 Producer and IID are parties to that certain Funding and Construction
Agreement dated June 29, 1987, providing for the funding and construction of
transmission lines within IID's service area.

3. AGREEMENT: The Parties agree as follows:

4. DEFINITIONS: The following terms, when used herein with initial
capitalization, whether in the singular or plural, shall have the meanings
specified:

   4.1 Agreement: This IID - Producer Transmission Service Agreement for
Alternative Resources between Vulcan Power Company

                                     -1-




    





and IID, and all Exhibits attached hereto, as such Agreement may subsequently
be amended for firm transmission service between each Plant and Edison's
Mirage Substation.

   4.2 Authorized Representative: The representative of a party designated in
accordance with Section 12.

   4.3 Date of Initial Service: The date when the output from each Plant is
first available for delivery to Edison, as notified to IID pursuant to Section
5.2.

   4.4 Edison: Southern California Edison Company.

   4.5 Funding and Construction Agreement: An agreement entered into by IID
and others dated June 29, 1987, providing for the funding and construction of
the Heber-Mirage Transmission Project, to which a form of this agreement is
attached as Exhibit III.

   4.6 Maximum Transmission Service Entitlement: The Maximum Transmission
Service Entitlement for each Plant, as specified in Exhibit[s] II,
Transmission Service, and in any subsequent Plant Amendments.

   4.7 Normal Transmission Capacity: The maximum transfer capability,
expressed in megawatts (MW), from the Point of Receipt to the Point of
Delivery. Such transfer capability, as determined by IID, in its sole
judgment, shall be consistent with prudent operating procedures and with
generally-accepted engineering and operating practices in the electrical
utility industry.


                                      -2-





    




   4.8 Operating Transmission Capability: The maximum transfer capability,
expressed in megawatts (MW), available to IID at any given time to transmit
power from Point of Receipt to Point of Delivery. Such transfer capability
shall be as determined by IID in its sole judgment, may vary from time-to-time
depending on system conditions, and shall be consistent with prudent operating
procedures and generally-accepted engineering and operating practices in the
electrical utility industry.

   4.9 Plant: An electrical generating alternative energy resource facility
developed by Producer for which IID shall provide transmission service, as
specified in Exhibit(s) II, Transmission Service, and in any subsequent Plant
Amendments.

   4.10 Plant Amendment: An agreement reached by the Parties, as an amendment
to this Agreement, for transmission service to be provided by IID for a Plant
added by Producer or for Producer's account subsequent to the execution of
this Agreement.

   4.11 Plant Connection Agreement: An agreement between IID and Producer
providing for the connection of a Plant to IID's electrical system, as
specified in Exhibit[s] II, Transmission Service, and in any subsequent Plant
Amendments.

   4.12 Point(s) of Delivery: The 230-kV switchrack at the Mirage Substation
site where Edison's 230-kV facilities are attached to IID's 230-kV
Coachella-Mirage Line or other points as may be mutually agreed upon by the
Authorized Representatives.


                                      -3-





    





   4.13 Point of Receipt: The point on the high voltage side of the Plant's
transformer where IID's metering equipment measures the delivery of energy to
the IID system.

   4.14 Transmission Service Entitlement: The amount of transmission service,
expressed in megawatts (MW), provided by IID for each Plant, from the
applicable Point of Receipt to the applicable Point(s) of Delivery.

5. TERM:

   5.1 Unless otherwise agreed to by the Parties, this Agreement shall be
effective on the Completion Date for the transmission lines being constructed
pursuant to the Funding and Construction Agreement, as the term Completion
Date is defined in Article I thereof, and shall remain in effect until April
15, 2015.

   5.2 The Transmission Service Entitlement to be provided by IID for each
Plant shall be contingent on a Plant Connection Agreement being in effect.
Transmission service for each Plant shall commence on the Date of Initial
Service of such Plant. Producer's Authorized Representative shall give IID's
Authorized Representative written notice of the Date of Initial Service at
least thirty (30) days before the Date of Initial Service.

6. TRANSMISSION SERVICE:

   6.1 Subject to the terms of this Agreement, IID shall provide to Producer
and Producer shall purchase from IID transmission service over IID's
transmission system for each Plant. IID shall make arrangements with Edison to
provide, at


                                      -4-




    





Producer's or Edison's expense, for the transfer of the electrical power to be
delivered to Edison hereunder from IID's transmission system to Edison's
transmission system at the Point(s) of Delivery.

   6.2 The Transmission Service Entitlement for each Plant shall be the
Maximum Transmission Service Entitlement for such Plant specified in
Exhibit[s] II, Transmission Service, or any subsequent Plant Amendments, or
such lesser amount as may be established as follows. Beginning on the Date of
Initial Service for each Plant, Producer shall be entitled to specify a
Transmission Service Entitlement by advance written notice given to IID's
Authorized Representative at least thirty (30) days prior to the Date of
Initial Service. The Transmission Service Entitlement to be provided by IID
subsequent to the Date of Initial Service may be adjusted at six (6) month
intervals thereafter until two (2) years after the Date of Initial Service for
such Plant (the "Trial Period"). Such adjustments shall be made by having
Producer's Authorized Representative give IID's Authorized Representative a
ninety (90) day advance written notice as to the adjustment required.
Beginning two (2) years after the Date of Initial Service for such Plant,
Producer shall be entitled to specify a Transmission Service Entitlement for
each successive two-year period during the remaining term of this Agreement by
written notice from Producer's Authorized Representative to IID's Authorized
Representative given at least ninety (90) days prior to the beginning of each
two-year period.


                                      -5-





    





   6.3 The Transmission Service Entitlement selected by Producer for each
Plant in accordance with Section 6.2 may be any amount which is less than or
equal to the Maximum Transmission Service Entitlement for such Plant specified
in Exhibit[s] II, Transmission Service and in any subsequent Plant Amendments,
provided, however, that the following shall apply to each Plant after the
Trial Period for such Plant has elapsed.

       6.3.1 If (i) the sum of the Transmission Service Entitlements for all
Plants which are no longer in their Trial Periods is less than the sum of the
Maximum Transmission Service Entitlements for such Plants, as shown in
Exhibit[s] II, Transmission Service and in any subsequent Plant Amendments,
(the "Aggregate Maximum Transmission Service Entitlement"), and (ii) provided
that IID requires additional capacity for transmitting electric power to
Edison's transmission system for another person (or, following the Credit
Installment Period as defined in the Funding and Construction Agreement, for
itself) and (iii) IID's use of such required capacity would be in conflict
with Producer's right as provided herein to increase the sum of the
Transmission Service Entitlements for such Plants to the Aggregate Maximum
Transmission Service Entitlement, then IID shall so notify Producer in
writing, specifying in such notice the portion, expressed in megawatts (MW),
of the excess of the Maximum Transmission Service Entitlement over the
Transmission Service Entitlement for each such Plant which it desires to use
as stated above. Producer shall have ninety (90) days after receipt of IID's
notice to notify IID in writing that it desires


                                      -6-




    




to increase the Transmission Service Entitlements of such Plants. To the
extent that Producer does not elect to increase the Transmission Service
Entitlement of each such Plant up to the Maximum Transmission Service
Entitlement for such Plant, IID shall be entitled to use such unclaimed
capacity to satisfy the transmission requirements specified in its notice to
Producer, and to the extent that IID does so, Producer shall thereafter be
foreclosed from increasing the Transmission Service Entitlement for such Plant
in a manner which would conflict with such usage by IID.

       6.3.2 IID shall treat Producer and each other person who has entered
into a transmission service agreement similar in substance to this Agreement
in a fair and nondiscriminatory manner in requesting additional transmission
capacity as provided in this Section 6.3. Without limiting the generality of
the foregoing, IID shall request additional transmission capacity from
Producer and such other persons on a pro rata basis, in proportion to the
Aggregate Maximum Transmission Service Entitlement for each person less the
sum of the Transmission Service Entitlements for each of such persons'
generating plants which is no longer in a Trial Period.

   6.4 In the event that the Original Capacity Nomination designated by
Producer (or the Participant associated with Producer) is adjusted pursuant to
Section 3.07 of the Funding and Construction Agreement, the Parties agree to
amend this Agreement in such a way that the sum of the Maximum Transmission
Service Entitlements for all Plants hereunder is equal to such Original


                                      -7-





    




Capacity Nomination as so adjusted. As used in this Section 6.4, the terms
Original Capacity Nomination and Participant shall have the meanings assigned
to them in Article I of the Funding and Construction Agreement.

   6.5 IID, reserves the right to interrupt or curtail the transmission
service provided hereunder as follows:

       6.5.1 If the Operating Transmission Capability is reduced to less than
Normal Transmission Capacity from a Point of Receipt to a Point of Delivery,
and when continuity of service within IID's service area is not being
jeopardized, IID may curtail the transmission service currently being provided
from such Point of Receipt to such Point of Delivery, to an amount "A"
determined by the following formula:

         A = Operating Transmission Capability  x  Transmission Service
               Normal Transmission Capacity           Entitlement

                  The transmission service for each Plant affected shall be
curtailed by multiplying the Transmission Service Entitlement in accordance
with Exhibit[s] II, Transmission Service, and in any subsequent Plant
Amendments by the same percentage (expressed as a decimal) as used in the
determination of "A." However, any such curtailment shall occur only after IID
has made all reasonable efforts to eliminate the cause of the reduction in
Operating Transmission Capability, and IID shall then employ reasonable
efforts to eliminate expeditiously the cause of said reduction.

       6.5.2 If continuity of service within IID's control area is being
jeopardized, as determined by IID in its sole


                                      -8-





    





judgment, IID may interrupt or curtail the transmission service provided
hereunder to the extent necessary to avoid or eliminate such jeopardy;
provided that (i) such interruptions or cur tailments may be made so that IID
may fully utilize all generating resources owned by it or available to it
under contract in order to avoid damage to IID's electrical system caused by
overloading, (ii) such interruption or curtailment shall occur only after IID
has made all reasonable efforts to avoid or eliminate such jeopardy and (iii)
to the extent feasible any curtailment of transmission service provided
hereunder from a Point of Receipt to a Point of Delivery shall be made in
accordance with the formula set forth in Section 6.5.1.

   6.6 If IID's efforts do not avoid or eliminate such jeopardy, the Parties
shall endeavor to develop some other arrangement to avoid or eliminate such
jeopardy and minimize the effects of IID's interruption or curtailment on both
parties.

   6.7 In the event of any curtailments or interruptions made pursuant to
Section 6.5.1 or Section 6.5.2, Producer shall, immediately after being orally
notified by IID, reduce the electrical output of the Plants by the amounts
requested by IID.

   6.8 The transmission service to be provided by IID and purchased by
Producer for each Plant shall not exceed the Transmission Service Entitlement
for that Plant.

   6.9 Subject to Section 6.5, IID shall, during the periods that IID has
agreed to provide the transmission service at the specified Transmission
Service Entitlements, accept hourly


                                      -9-





    





scheduled energy deliveries at each Point of Receipt and simultaneously
deliver the same amount of energy (less transmission losses as provided
herein) at the Point(s) of Delivery mutually agreed upon by the Parties'
dispatchers and/or schedulers.

   6.10 Hourly scheduled energy deliveries at each Point of Receipt shall
conform with the practices and procedures developed by the Parties'
dispatchers and schedulers and agreed to by the Authorized Representatives.

7. TRANSMISSION LOSSES:

   7.1 IID shall determine, by transmission power flow analysis, the
electrical losses (expressed as a percent amount of hourly scheduled energy
deliveries) associated with the electrical output from each Plant. Such
analysis shall be performed by IID at its sole expense. The initial percent
amount, for each Plant, representing the electrical losses as determined
herein shall be as specified in Exhibit[s] II, Transmission Service and in any
subsequent Plant Amendments.

   7.2 Unless otherwise agreed to by Producer's and IID's schedulers and
dispatchers, IID shall reduce the amount of all hourly scheduled energy
deliveries for Producer or Producer's account by the percent amount of such
hourly deliveries for each Plant in accordance with Exhibit[s] II,
Transmission Service and in any subsequent Plant Amendments.


                                     -10-





    




   7.3 If either Party believes that there has been a significant change in
IID's electrical system and the electrical losses associated with any Plant
should be redetermined, either Party's Authorized Representative may submit a
written request to the other Party's Authorized Representative that the
electrical losses be redetermined. Following such request, a transmission flow
analysis shall be performed by IID as approved by the Authorized
Representatives and paid for by the requesting Party. Whenever the percent
amount for electrical losses is redetermined, such percent amount shall become
effective as of the first day of the month following the date of such
redetermination; provided, that such a redetermination may be no sooner than
twelve (12) months after the most recent redetermination. Any redetermination
of electrical losses made pursuant to this Section 7 shall be based on
conditions in existence at the time of such redetermination.

   7.4 Along with the monthly billing pursuant to Section 9.1, for the
transmission service for each Plant, IID shall submit a monthly summary of
hourly scheduled energy deliveries and of electrical losses for each Plant.

8. CHARGES:

   8.1 For transmission service provided by IID, Producer shall pay IID at a
rate to be determined by IID pursuant to the methodologies specified in
Exhibit I.A. The initial rate is specified in Exhibit[s] II, Transmission
Service, and revisions thereto will be specified in any subsequent Plant
Amendments.


                                     -11-





    





Any specific facility charge to Producer for connecting the Plant(s) to the
IID transmission system shall be included only in the Plant Connection
Agreement(s) between IID and Producer.

   8.2 The transmission rate shall be reviewed annually and may be
revised. Any revision of the rates shall be based on the methodologies in
Exhibit I.A and on the conditions in existence at the time of the revision.
Producer shall have the right to review any exhibits or work papers prepared
by IID to revise the rates.

   8.3 An initial monthly scheduling fee, as specified in Exhibit[s] II,
Transmission Service and revisions thereto specified in any subsequent Plant
Amendments, shall be paid by Producer to IID for those months in which there
were scheduled energy deliveries from the Plant(s). The initial scheduling fee
has been determined by IID pursuant to the methodology specified in Exhibit
I.B. The scheduling fee shall be reviewed annually and may be revised. Any
revision of the scheduling fee shall be based on the methodology in Exhibit
I.B and on the conditions in existence at the time of the revision. Producer
shall have the right to review any exhibits or work papers prepared by IID to
revise the scheduling fee.

9. BILLING AND PAYMENT:

   9.1 IID shall render bills to Producer, beginning in the month of the Date
of Initial Service, on or before the fifteenth (15th) day of each month for
the transmission service to be.


                                                      -12-





    





provided during the month. Producer shall pay such bills within twenty (20)
days after receipt thereof


                      All payments by Producer shall be sent to:

                             Imperial Irrigation District
                             c/o Manager, Finance and Accounting
                             P.O. Box 937
                             Imperial, California  92251

                      All billings by IID shall be sent to:

                             Vulcan Power Company
                             P.O. Box 630
                             Calipatria, California  92233

   9.2 Either Party's Authorized Representative may at any time, by advance
written notice to the other Party's Authorized Representative, change the
address to which payments or billings shall be sent.

   9.3 Bills which are not paid in full by said due date shall thereafter bear
an additional charge of one and one-half percent (1-1/2%) per month, or the
maximum legal rate of interest, whichever is less, compounded monthly on the
unpaid amount prorated by days from the due date until payment is received by
IID.

   9.4 In the event any portion of any bill is disputed, the disputed amount
shall be paid when due under protest. If the protested portion of the payment
is found to be incorrect by the Authorized Representatives, the disputed
amount shall be paid by IID to Producer, including interest at the rate of
1-1/2% per month, or the maximum legal rate, whichever is less, compounded
monthly from the date of payment by Producer to the date the refund check or
adjusted bill is received by Producer.


                                     -13-





    




   9.5 For a fractional part of a calendar month at the beginning or end of
the period for which the transmission service is provided hereunder, the
charge pursuant to Section 8.1 shall be proportionately adjusted by the ratio
of days that service is furnished by IID to Producer during such month to the
total number of days in such month.

   9.6 The charge for the transmission service pursuant to Section 8.1 shall
be proportionately reduced to the extent the duration of the interruptions or
curtailments of the transmission service which may occur pursuant to Section
6.5.1 or Section 6.5.2 exceed a cumulative total of twenty-four (24) hours
during any calendar month based on 730 hours per month representing the full
transmission service charge. The amount of such prorata reduction in any month
shall reflect the duration and amount of such interruptions or curtailments
which exceed said cumulative 24 hours. Such prorata reduction shall be
reflected as a credit to Producer as soon as possible in a subsequent monthly
bill.

   9.7 The charge for the transmission service shall not be reduced if
IID can deliver, but Edison's transmission system cannot receive, the hourly
scheduled energy deliveries independent of the duration of time this condition
exists.

10. LIABILITY:

   10.1 Except for any loss, damage, claim, costs, charge or expense resulting
from Willful Action, neither Party (the "released Party"), its directors or
other governing body, officers or employees shall be liable to the other Party
for any loss, damage, claim, cost, charge, or expense of any kind or


                                     -14-





    




nature incurred by the other Party (including direct, indirect or
consequential loss, damage, claim, cost, charge or expense; and whether or not
resulting from the negligence of a Party, its directors or other governing
body, officers, employees or any person or entity whose negligence would be
imputed to a Party) from engineering, repair, supervision, inspection,
testing, protection, operation, maintenance, replacement, reconstruction, use
or ownership of the released Party's electrical system, Plant(s) or associated
facilities in connection with the implementation of this Agreement. Except for
any loss, damage, claim, cost, charge or expense resulting from Willful
Action, each Party releases the other Party, its directors or other governing
body, officers and employees from any such liability.

   10.2 For the purpose of this Section 10, Willful Action shall be defined as
action taken or not taken by a Party at the direction of its directors or
other governing body, officers or employees having management or
administrative responsibility affecting its performance under this Agreement,
as follows:

        10.2.1 Action which is knowingly or intentionally taken or not taken
with conscious indifference to the consequences thereof or with intent that
injury or damage would result or would probably result therefrom.

        10.2.2 Action which has been determined by final arbitration award or
final judgment or judicial decree to be a material default under this
Agreement and which occurs or continues beyond the time specified in such
arbitration award or judgment or judicial decree for curing such default or,
if no


                                     -15-





    




time to cure is specified therein, occurs or continues thereafter beyond
a reasonable time to cure such default.

        10.2.3 Action which is knowingly or intentionally taken or not taken
with the knowledge that such action taken or not taken is a material default
under this Agreement.

   10.3 Willful Action does not include any act or failure to act which is
merely involuntary, accidental or negligent.

   10.4 The phrase "employees having management or administrative
responsibility," as used in Section 10.2, means the employees of a Party who
are responsible for one or more of the executive functions of planning,
organizing, coordinating, directing, controlling and supervising such Party's
performance under this Agreement with responsibility for results.

   10.5 Subject to the foregoing provisions of this Section 10, each Party
agrees to defend, indemnify and save harmless the other Party, its officers,
agents, or employees against all losses, claims, demands, costs or expenses
for loss of or damage to property, or injury or death of persons, which
directly or indirectly arise out of the indemnifying Party's performance pur
suant to this Agreement; provided, however, that a Party shall be solely
responsible for any such losses, claims, demands, costs or expenses which
result from its sole negligence or Willful Action.

11.  AUDITING

   11.1 IID shall make its books, records, and other supporting information,
as requested, available to Producer or to Producer's designated contracted
representatives with a CPA firm, for the purpose of auditing any charges or
accounts to be kept by


                                     -16-





    





IID hereunder. All such audits shall be undertaken at reasonable times and in
conformance with generally-accepted auditing Stan dards.

    11.2 If as a result of such audits Producer believes its charges or
accounts should be adjusted, the findings shall be presented to the Authorized
Representatives. If the Authorized Representatives agree that any audit
finding should result in a revision of charges or accounts, such revisions
shall be retroactive to the first billing for such charges and accounts and
shall be made as soon as practical after determination.

    11.3 The amount of any unresolved dispute shall accrue interest at the
rate of one and one-half percent (1-1/2%) per month, or the maximum legal
rate, whichever is less, compounded monthly for any amount of money ultimately
refunded to Producer.

12. AUTHORIZED REPRESENTATIVES: Within thirty (30) calendar days after the
Completion Date, as defined in Article I of the Funding and Construction
Agreement, each Party shall designate by written notice to the other Party a
representative who is authorized to act on its behalf in the implementation of
this Agreement. Either Party may at any time change the designation of its
Authorized Representative by written notice to the other Party.

13. NO DEDICATION OF FACILITIES: Any undertaking by one Party to the other
Party under any provision of this Agreement shall not constitute the
dedication of the system or any portion thereof of the Party to the public or
to the other Party, and it is understood and agreed that any such undertaking
under any


                                     -17-





    




provision of this Agreement by a Party shall cease upon the termination of its
obligations hereunder.

14. NON-WAIVER: None of the provisions of this Agreement shall be considered
waived by either Party except when such waiver is given in writing. The
failure of either Party to insist in any one or more instances upon strict
performance of any of the provisions of this Agreement or to take advantage of
any of its rights hereunder shall not be construed as a waiver of any such
provisions or the relinquishment of any such rights for the future, but the
same shall continue and remain in full force and effect.

15. NO THIRD PARTY RIGHTS: The Parties do not intend to create rights in or to
grant remedies to any Third Party or others as a beneficiary of this Agreement
or of any duty, covenant, obligation or undertaking established hereunder.

16. UNCONTROLLABLE FORCES: Neither Party shall be considered to be in default
in the performance of any of its obligations under this Agreement when a
failure of performance shall be due to an uncontrollable force. The term
"uncontrollable force" shall mean any cause beyond the control of the Party
affected including, but not restricted to, failure of or threat of failure of
facilities which have been maintained in accordance with generally-accepted
engineering and operating practices in the electrical utility industry, flood,
drought, earthquake, tornado, storm, fire, pestilence, lightning and other
natural catastrophes, epidemic, war, riot, civil disturbance or disobedience,
strike, labor dispute, labor or material shortage, sabotage, government


                                     -18-





    





priorities and restraint by court order or public authority (whether valid or
invalid) and actions or nonaction by or inability to obtain or keep the
necessary authorizations or approvals from any governmental agency or
authority, the failure or inability of Edison to receive the electric power to
be transmitted hereunder at the Point(s) of Delivery, which by exercise of due
diligence such Party could not reasonably have been expected to avoid and
which by exercise of due diligence it has been unable to overcome. Nothing
contained herein shall be construed as to require a Party to settle any strike
or labor dispute in which it may be involved. Either Party rendered unable to
fulfill any of its obligations under this Agreement by reason of an
uncontrollable force shall give prompt written notice of such fact to the
other Party and shall exercise due diligence to remove such inability with all
reasonable dispatch.

17. ASSIGNMENTS:

    17.1 Any assignment by Producer of its interest in this Agreement which is
made without the written consent of IID (which shall not be unreasonably
withheld) shall not relieve Producer from its primary liability for any of its
duties and obligations hereunder, and in the event of any such assignment
Producer shall continue to remain primarily liable for payment of any and all
money due IID hereunder and for the performance and observance of all other
covenants, duties and obligations to be performed and observed hereunder by it
to the same extent as though no assignment has been made.


                                     -19-





    



    17.2 Notwithstanding any provision of Section 17.1 to the contrary, prior
to the end of the Credit Installment Period, as defined in Article I of the
Funding and Construction Agreement, Producer's right to transmission service
under this Agreement with respect to one or more of the Plants may be assigned
only (i) to a purchaser or co-owner of such Plants or to a person who will
operate such Plants pursuant to a contract or other arrangement with such
purchaser and in either case only with the prior written consent of IID (which
shall not be unreasonably withheld) or (ii) for security purposes, to a bank
or other entity which provides financing for such Plants or any electrical
transmission facilities associated therewith. Producer and IID agree that
nothing in this Section 17.2 may be amended, modified or waived without the
prior written consent of each and every party to the Funding and Construction
Agreement (except for any parties in default thereunder).

    17.3 Whenever an assignment of Producer's interest in this Agreement is
made with the written consent of IID, Producer's assignee shall expressly
assume in writing the duties and obligations hereunder of Producer and, within
thirty (30) days after any such assignment and assumption of duties and obli
gations, Producer shall furnish or cause to be furnished to IID a true and
correct copy of such assignment and assumption of duties and obligations.

    17.4 Subject to the foregoing restrictions on assignments, all of the
terms of this Agreement shall be binding upon and


                                     -20-





    




inure to the benefit of both of the Parties and their respective successors,
permitted assigns and legal representatives.

18. GOVERNING LAW: This Agreement shall be interpreted, governed by and
construed under the laws of the State of California or the laws of the United
States, as applicable.

19. NOTICES: Any notice, demand or request provided for in this Agreement, or
served, given or made in connection with it, shall be in writing and shall be
deemed properly served, given or made if delivered in person or sent by United
States mail, postage prepaid, to the persons specified below unless otherwise
provided for in this Agreement:

                                    Imperial Irrigation District
                                    c/o General Manager
                                    P.O. Box 937
                                    Imperial, California  92251


                                    Vulcan Power Company
                                    P.O. Box 630
                                    Calipatria, California  92233

    Either Party may at any time, by notice to the other Party, change the
designation or address of the person so specified as the one to receive
notices pursuant to this Agreement.

                                     -21-





    




20. SIGNATURE CLAUSE: The signatories hereto represent that they have been
appropriately authorized to enter into this IID- Vulcan Power Plant
Transmission Service Agreement for Alternative Resources (Standard Form) on
behalf of the Party for whom they signed. This Agreement is hereby executed as
of the 1st day of December, 1988.


[SEAL]                            IMPERIAL IRRIGATION DISTRICT

                                       By: /s/ Tony Gallego
                                          -----------------------------------
                                           President, Board of Directors


                                  VULCAN POWER COMPANY

                                       By: /s/ Jon R. Peele
                                          -----------------------------------
                                           Vice President

                                     -22-




    



                                  EXHIBIT I.A

                      DEVELOPMENT AND METHODOLOGY FOR THE
                          TRANSMISSION SERVICE CHARGE


IID's transmission service charge shall be recalculated during the month of
April of each year, using the methodology summarized in this Exhibit. The
recalculated transmission service charge shall be effective on June 1 of the
year of recalculation.

EI.A-1 Plant Investment
- -----------------------
    TAI= WP + PA - TR + GP + M&S

where

             TAI=  Total adjusted investment at the time of calculation.
             WP =  Estimate of weighted Transmission Plant Cost ($40,980,291)
                   as December 31, 1983 calculated using the following formula:
                   WP =   (0.7 x OC) + (0.3 x RCN); where
                   OC =    Cumulative original cost of Transmission Plant as
                           shown in IID's accounting records, obtained by
                           summing the actual cost of all yearly additions to
                           Transmission Plant from 1938 to the end of 1983
                           (i.e., $20,700,415).
                   RCN=     Estimate of the cumulative reproduction cost to
                           build the Transmission Plant items identified in
                           OC in 1983 dollars.  Calculated by summing the
                           escalated cost of each yearly addition to
                           Transmission Plant starting in 1938 up to the end
                           of calendar year 1983 using the Handy-Whitman
                           Index for Total Transmission Plant for the Pacific
                           Region, (i.e., $88,300,000).
             PA =  Cumulative sum of additions to Transmission Plant from
                   January 1, 1984 to the end of the year preceding the year
                   of calculation. Thus, if the calculation takes place in
                   1996, PA is sum of Transmission Plant additions at actual
                   cost from January 1, 1984 to December 31, 1995.
                   PA = Sum of [TPA(i) + OA(i)]
                   where TPA(i)= Annual additions to Transmission Plant
                                 for each year associated with the
                                 Transmission Project, as defined in Section
                                 7.05 of the Funding and Construction
                                 Agreement. TPA(i) is calculated for each year
                                 from Completion Date of Transmission Project
                                 to end of year preceding year of calculation.
                         OA(i)=  Other annual additions to Transmission Plant
                                 by IID each year. OA(i) is calculated for
                                 each year from January 1, 1984 to end of year
                                 preceding year of calculation.


                                    -EIA-1-




    




         TR =     Sum of (i) and (ii) where:
         (i)=     For facilities placed in service prior to 1984, the
                  cumulative sum of the annual Weighted Retirement Costs (WRC)
                  for retirements from Transmission Plant from January 1, 1984
                  to the end of the year preceding the year of calculation.
                  Thus, if the calculation takes place in 1996, TR is
                  comprised of the sum of annual Transmission Plant
                  retirements from January 1, 1984 to December 31, 1995 with
                  each year's original cost adjusted to account for the
                  weighted cost of retirement.
                  where WRC = Weighted Retirement Cost for transmission
                                       retired in a given year.
                             OCI =     Original cost of transmission facilities
                                       retired in a given year.
                  WRC = 70%*OCI + 30%*OCI*RCN/OC
         (ii) =       Cumulative sum of original cost of annual
                      transmission retirements for facilities placed in
                      service after January 1, 1984.
         GP =     General plant investment as shown in IID's accounting
                  records, as of the year preceding the year of calculation,
                  allocated to transmission use by the ratio of total
                  allocated transmission O&M cost to the sum of production O&M
                  cost excluding fuel, distribution O&M cost, transmission O&M
                  cost, dispatching cost, and customer accounting and services
                  costs.
         M&S=     Materials and supplies inventory held by IID as of the year
                  preceding the year of calculation, allocated to transmission
                  use by the ratio of Transmission Plant Original Cost to
                  Total Electric Plant original cost as reflected in IID's
                  accounting records for the year preceding the year of
                  calculation.

EI.A-2  Annual Cost
- -------------------

         TAC= (1.25 x CRF x TAI) + OM + A&G

         where

         TAC=     Total Annual Cost.
         CRF=     Annual capital recovery factor calculated for a 33-year
                  amortization using the average interest rate for the year
                  preceding the year of calculation from the "Merrill Lynch
                  500 Municipal Bond Index Electric- Retail."
         OM =     Total allocated transmission O&M cost during the year
                  preceding the year of calculation, equal to the sum of
                  (i) dispatching costs and (ii) transmission O&M cost
                  allocated to transmission use by the ratio of
                  Transmission Plant original cost (OC) to Total
                  Transmission Plant original cost (including the cost of
                  subtransmission plant) as shown in IID's accounting
                  records.
         A&G=     Administrative and general cost during the year
                  preceding the year of calculation, allocated to


                                    -EIA-2-





    




                  transmission use by the ratio of total allocated
                  transmission cost (OM) to the sum of production O&M cost
                  excluding fuel, distribution O&M cost, transmission O&M
                  cost, dispatching cost, and customer accounting and services
                  cost. Administrative and general cost is comprised of Power
                  Department plus Joint Department A&G less Customer Account
                  Expense.

EI.A-3         Monthly Transmission Service Charge
- --------------------------------------------------

         TSC=   TAC
             --------
             12 x APL

         where

         TSC=      Monthly transmission service charge, in $/kW.
         APL=      Annual peak load during the year preceding the year of
                   calculation, expressed in kW, which is equal to the sum of
                   IID's service peak load plus all transmission wheeling
                   commitments (including all Transmission Service
                   Entitlements).

                                   Examples

(1)  Recalculation of 1985 Transmission Service Charge Plant Investment
- -----------------------------------------------------------------------
         OC =      20,700,415
         RCN=      88,300,000
         WP =      (0.7 x OC) + (0.3 x RCN) = 40,980,291
         PA =      0 + 4,111,000 = 4,111,000
         GP =
         1,526,849 x                       764,058
                    -----------------------------------------------------
                    3,085,080 + 4,080,868 + 694,545 + 189,450 + 1,621,252
            =      1,526,849 x 0.079 = 120,625
         M&S=      6,151,304 x 20,700,415
                              162,700,978
            =      6,151,304 x 0.1272 = 782,629

         TAI=      40,980,291 + 4,111,000 + 120,625 + 782,629
            =      45,994,545

Annual Cost
- -----------
         CRF=      (33 years, 10.41%) = 10.8221%
         OM =      189,540 + 694,545 x  20,700,415
                                        25,025,093
            =      189,540 + 694,545 x  0.8272 = 764,058
         A&G=
         4,086,530  x                         764,058
                     ----------------------------------------------------
                     3,085,080 + 4,080,868 + 694,545 +189,450 + 1,621,252
            =      4,086,530 x 0.079 = 322,847
         TAC=      (1.25 x 0.108221 x 45,994,545) + 764,058 + 322,847
            =      7,308,875

                                    -EIA-3-





    




                             Examples (Continued)

Monthly Transmission Service Charge

               APL=  369,000 + 63,000 = 432,000

               TSC=  7,308,875    = 1.41 $/kW
                     -------------
                     12 x 432,000

(2) Sample Calculation, 1996

Assumptions

         -    Weighted cost of Transmission Plant to 12-31-83; $40,980,291.
         -    Transmission Additions to 12-31-95; $67,000,000.
         -    Transmission Credit to rate base through 12-31-94; $30,000,000.
         -    Transmission credits used during 1995 were $6,000,000; IID's
              Reserved Capacity is 40 MW, and the Deemed Capacity is 600 MW.
         -    No accumulated retirements.
         -    General plant investment as of 12-31-95, from IID records, is
              $2,000,000.
         -    All allocation factors are assumed the same as in the previous
              example but, in general, would not be identically the same each
              year.
         -    Materials and supplies inventory as of 12-31-95; from IID
              records, is $8,000,000.
         -    The 12-month average Merrill-Lynch Index interest rate is 8%
              in 1995.
         -    Dispatching costs in 1995 were $1,000,000.
         -    IID's transmission O&M costs in 1995 were $1,000,000.
         -    IID's administrative and general costs in 1995 were $5,000,000.
         -    IID's service peak load in 1995 was 543 MW.
         -    IID's total transmission commitments in 1995 were 320 MW.




Adjusted Investment                                                      1996
- -------------------                                                   -----------
                                                                
WP            =      Weighted Plant to 12-31-83. . . . . . . .        $40,980,291
OA[1984-1995] =      Transmission Plant Additions Through
                     12-31-95 (excludes Transmission Project).         67,000,000
TPA[1984-1994]=      Transmission Credit to Rate Base Through
                     12-31-94. . . . . . . . . . . . . . . . .         30,000,000
TPA[1995]     =      Transmission Credit to Rate Base during 1995;
                     6,000,000 x 600 - 40
                      600. . . . . . . . . . . . .                      5,600,000
GP            =      General Plant Allocated; 2,000,000 x 0.079           158,000
M&S           =      M&S Allocated; 8,000,000 x 0.1272 . . . .          1,017,600
                                                                      -----------
                                                           TAI =     $144,755,891




                                    -EIA-4-





    




Annual Cost

                CRF  =   (33 years, 8%) = 8.6852
                OM   =   1,000,000 + 1,000,000 x 0.8272 = 1,827,200
                A&G  =   5,000,000 x 0.079 = 395,000
                TAC  =   1.25 x 0.086852 x $144,755,891 + 1,827,200 + 395,000
                     =   $17,937,623

Monthly Transmission Service Charge

                APL = 543,000 + 320,000 = 863,000
                TSC = $17,937,623  = $1.73/kW
                      12 x 863,000

R1


                                    -EIA-5-





    






                                  EXHIBIT I.B
                 METHODOLOGY AND CALCULATION OF SCHEDULING FEE

                             ANNUAL DETERMINATION
                                      OF
                              IID SCHEDULING FEES


         IID, in April each year, will calculate monthly fees for scheduling
services related to Alternative Energy Resources and transactions with other
utilities as follows:

         A.       An appropriate number of scheduling units will be assigned
                  to every IID resource, Alternative Energy Resource, and
                  transaction with other utilities in operation during the
                  preceding year. The number of scheduling units assigned to
                  each resource and/or transaction will depend upon the total
                  daily number of functions and therefore, estimated time
                  required to schedule the resource and/or transaction. This
                  estimate will be directly related to the complexity of the
                  sche duling service being provided. Table 1 shows how the
                  total scheduling units were determined for the IID system.

         B.       The expenses related to dispatching and scheduling services
                  will be equal to the sum of the following:

                  1.  IID FPC Account 556 for the year preceding the year of
                      calculation

                  2.  A portion of the annual expenses related to the SCADA
                      and AGC for the year preceding the year of calculation,
                      determined by multiplying one half of the levelized debt
                      service payments for the systems by the percentage that
                      FPC Account 556 is of the total of FPC Accounts 556, 561
                      and 581. Table 2 shows calculations involved with this
                      step.

         C.       The annual scheduling fee per scheduling unit will be
                  determined by dividing the expenses related to scheduling
                  found in Step B by the total scheduling units from Step A.
                  The per unit fee will then be multiplied by the number of
                  scheduling units assigned to each resource and/or
                  transaction to develop an appropriate annual scheduling fee
                  for that resource and/or transaction. The monthly scheduling
                  fee will then be calculated by dividing the annual fee by
                  12. Table 3 shows the calculation.

The revised scheduling fee will be effective on June 1 of the year in which
they are calculated.

R1

                                    -EIB-1-





    






                                                              TABLE 1

                                                    IMPERIAL IRRIGATION DISTRICT
                                                     SCHEDULING FEE METHODOLOGY
                                              DETERMINATION OF TOTAL SCHEDULING UNITS

                                                  Hours    Payback/      Pre-       On AGC     Off       Loss
                             Energy   Capacity   Variable   Banking   Scheduling    System    System  Accounting
                              (X=2)     (X=2)     (X=1)      (X=1)      (X=1)        (X=1)    (X=1)      (X=1)       Total
                             ------   --------   --------  --------   ----------    ------    ------- ----------     -----
                                                                                           
IID's Generating Units:

Pilot Knob                      X         X         X                                  X                                6
Drop No. 1                      X         X         X                                  X                                6
Drop No. 2                      X         X         X                                  X                                6
Drop No. 3                      X         X         X                                  X                                6
Drop No. 4                      X         X         X                                  X                                6
Drop No. 5                      X         X         X                                  X                                6
_____ Highline                  X         X         X                                  X                                6
Turnip and Double Weir          X         X         X                                  X                                6
El Centro Unit No. 1            X         X         X                                  X                                6
El Centro Unit No. 2            X         X         X                                  X                                6
El Centro Unit No. 3            X         X         X                                  X                                6
El Centro Unit No. 4            X         X         X                                  X                                6
Coachella Units No. 1 and 2     X         X         X                                  X                                6
Coachella Units No. 3 and 4     X         X         X                                  X                                6
Rockwood                        X         X         X                                  X                                6
                                X         X         X                                  X                                6
                                                                                                                       --
                                                                                                          Subtotal     96

Alternative Energy Resources:

Earth Energy                    X         X        X          X            X                     X        X            10
Magma (East Mesa)               X         X        X          X            X                     X                      9
Heber HGC                       X         X        X          X            X                     X        X            10
Vulcan Power                    X         X        X          X            X                     X        X            10
Ormesa I                        X         X        X          X            X                     X        X            10
Ormesa II                       X         X        X          X            X                     X        X            10
_____ Binary                    X         X        X          X            X                     X        X            10
                                                                                                                       --
                                                                                                          Subtotal     69

Transactions with Other Utilities:

DOE                             X         X        X                       X                     X                      7
EPE                             X         X        X                       X                     X                      7
SCE                             X         X        X                       X                     X                      7
SDG&E                           X         X        X          X            X                     X        X            10
APS (Yucca)                     X         X        X                       X                     X                      7
SCE GT's (Axis)                 X         X        X          X            X                     X                      9
APS (Axis)                      X         X        X          X            X                     X                      9
YCWUA                           X         X        X          X            X                     X                      9
                                                                                                                      ---
                                                                                                          Subtotal     65

                                                                                            Total Scheduling Units    230
                                                                                                                      ---


                                    -EIB-2-





    






                                    TABLE 2

                         IMPERIAL IRRIGATION DISTRICT
                          SCHEDULING FEE METHODOLOGY
                        EXPENSES RELATED TO SCHEDULING

IID 1986 Actual

     FPC Account 556 (3)                 $371,297                 (52.15%)
     FPC Account 561                     $230,170                 (32.33%)
     FPC Account 581        $110,461                 (15.52%)
                            --------                 --------

                            $711,928                 (100.0%)



SCADA and AGC Systems

         Investment  (2)                                      = $4,536,285
         Annual Expense
                  $4,536,285 x 0.1170923 (1) = $ 531,164

Expenses Related to Scheduling

         FPC Account 556                                      = $371,297
         52.15% of SCADA and AGC Systems
                  Annualized Expense ($531,164 x 0.5215) = $277,002

         Total Expense Related to Scheduling             = $648,299






(1)     Capital Recovery Factor determined from levelized debt service
        payments of $7,611,000 for $65,000,000 - May, 1983 COP issue.

(2)     Fifty percent of total investment for SCADA and AGC $9,072,571
        is assumed related to transmission service.

(3)     Related to load dispatching for system control.


                                    -EIB-3-





    





                                    TABLE 3
                         IMPERIAL IRRIGATION DISTRICT
                          SCHEDULING FEE METHODOLOGY
                         CALCULATION OF SCHEDULING FEE

Annual Charge per Scheduling Unit
         Total Expenses Related to Scheduling (from Table 2)   = $648,299
         Total Scheduling Units (from Table 1)                        230
                                                                  -------
         Annual Charge per Scheduling Unit ($613,446/220)      = $  2,818
Alternative Energy Resource Scheduling Fee
         Magma (East Mesa) Plant:

                  Annual Charge (9 Scheduling Units x $2,818)  = $25,362/year
                  Monthly Charge ($25,362/12)                    $ 2,113/month

         All Other Plants:

                  Annual Charge (10 Scheduling Units x $2,818) = $28,180/year
                  (1) Monthly Charge ($28,180/12)                $ 2,348/month








(1) Also applies to new plants to be on-line in 1988 & 89


                                    -EIB-4-




    




                                  EXHIBIT II

                             TRANSMISSION SERVICE
                          FOR THE VULCAN POWER PLANT



EII-1.        DESCRIPTION:

EII-2.        APPLICABILITY:  Applicable to the transmission service to be
              provided by IID to Producer for transmitting the electrical
              output from the Vulcan Power Plant Point of Receipt to the
              Point(s) of Delivery.

EII-3.        PLANT CONNECTION AGREEMENT:  The Vulcan Power Plant Connection
              Agreement to be executed between IID and Producer.

EII-4.        MAXIMUM TRANSMISSION SERVICE ENTITLEMENT:  38 MW.

              TRANSMISSION SERVICE ENTITLEMENT:  38 MW, as specified in
              accordance with Sections 6.2 and 6.3.

EII-5.        POINT OF RECEIPT:  See Section 4.13.

EII-6.        POINT(S) OF DELIVERY:  The 230-kV switchrack at Edison's
              Mirage Substation.

EII-7.        TERM:  The term of the Transmission Service Entitlement for
              the Vulcan Power Plant shall be effective from the Date of
              Initial Service and shall terminate on April 15, 2015.

EII-8.        TRANSMISSION SERVICE CHARGE:  $1.41 per kilowatt-month, or as
              revised in accordance with Section 8.2, times Transmission
              Service Entitlement.

EII-9.        SCHEDULING FEE:  $2,348 per month or as revised in accordance
              with Section 8.3.

EII-10.       TRANSMISSION LOSSES:  2.60% or as revised in accordance with
              Section 7.


                                    -EII-1-