                                                                    EXHIBIT 10.8


                                 C O N T R A C T

                                       OF

            20,000 METRIC TON/YEAR SODIUM BICHROMATE PRODUCTION PLANT
          IMPORTATION OF TECHNOLOGY & EQUIPMENT FROM THE UNITED STATES
                      FOR CHONGQING DONGFENG CHEMICAL PLANT

                                     BETWEEN

              CHINA NATIONAL CHEMICAL CONSTRUCTION CHONGQING BRANCH

                                       AND

                       THE BRIGHTON INDUSTRIES CORPORATION




   2

                           THE CONTRACT OF 20000 MT/Y
                SODIUM BICHROMATE PRODUCTION PLANT IMPORTATION OF
                  TECHNOLOGY & EQUIPMENT FROM THE UNITED STATES
                      FOR CHONGQING DONGFENG CHEMICAL PLANT




CONTRACT NO.:             94HNXH/3901 US


SHIPPING MARKS:           94HNXH/3901 US
                          --------------
                             US TO HK



THE BUYER:                CHINA NATIONAL CHEMICAL CONSTRUCTION
                          CHONGQING CO.
ADDRESS:                  NO. 24 YU BEI ER CUN JIANG BEI QU
                          CHONGQING, CHINA
TELEPHONE:                (0811)752494
FAX NO.:                  (0811)750579
POSTAL CODE:              630020
BANK:                     BANK OF CHINA CHONGQING BRANCH
ACCOUNT NO.:              01809817



THE SELLER:               THE BRIGHTON INDUSTRIES CORPORATION
ADDRESS:                  15 ESSEX ROAD, CENTURY PLAZA BUILDING,
                          PARAMUS, NJ  07652 USA
TELEPHONE:                (201)368-8463
FAX NO.:                  (201)368-1623
BANK:                     BANK OF CHINA, NEW YORK BRANCH
ACCOUNT NO.:              5011-4018567-001


THE ENDUSER:              CHONGQING DONGFENG CHEMICAL FACTORY IN
                          CHINA



                                        2

   3

THE CONTRACT PRODUCT:

    Means that the Seller sells to the Buyer a complete set of productive
    technology and whole basic engineering design package of 20000 MT/Y Sodium
    Bichromate, 6000 MT/Y Chromic Anhydride (Chromic Acids) and 5000 MT/Y basic
    Chromium Sulfate. The Seller, as the contractor, will also conduct
    installations, commissioning and test run for the plant. The Seller will
    supply the Allied- Signal's existing technology information of all Chromate
    products. In addition, the Seller is responsible for supplying the key
    equipment of the production plant made in the United States.

THE CONTRACT PLANT

    Means the plant which consists of production facility, auxiliary facility
    and utility within the battery limit which is defined in the Contract
    Attachment 1.

GENERAL PRINCIPLE:

    Being entrusted by Chongqing Dong Feng Chemical Factory,
    China National Chemical Construction Chongqing Co. signed
    the contract with The Brighton Industries Corporation.

    The Seller is to apply to the U.S. Export & Import Bank a loan on behalf of
    the Buyer for the total amount of the software and the hardware of the
    contract, including shipping and insurance fee.

    The Seller performs basic engineering design for this contract plant in
    accordance with Allied-Signal's technology. The detailed responsibilities
    for both parties and the scopes of supply will be shown in the technical
    attachment.

    The Seller and the Buyer through their substantial technical exchanges and
    commercial negotiations agreed on the following clauses and the contract
    signed will be enforced accordingly.



                                        3

   4

                                 C O N T E N T S





CONTRACT CLAUSES
                                
    Clause        1       Scope of Supply
    Clause        2       Delivery, Packing and Transportation
    Clause        3       Contract Price
    Clause        4       Technical Services Provided by the
                          Seller
    Clause        5       Installation, Commissioning, Test Run &
                          Acceptance
    Clause        6       Payment and Terms of Payment
    Clause        7       Guarantee and Claims
    Clause        8       The Customs Duty and other Taxes
    Clause        9       Force Majeure
    Clause        10      Disputes Settlement
    Clause        11      Effectiveness of the Contract &
                          Miscellaneous






TECHNICAL ATTACHMENTS
                           
    Attachment            1      Battery Limit & Process Description
    Attachment            2      Basic Engineering Design
    Attachment            3      Performance Guarantee and Test
    Attachment            4      Technical Service Provided by the
                                 Seller in China
    Attachment            5      Technical Training of the Buyer's
                                 Personnel
    Attachment            6      Design and Design Contact
    Attachment            7      List of the Seller's Specialists
                                 for Technical Services in China and
                                 Treatment Conditions to be Provided
                                 by the Buyer
    Attachment            8      Procurement Service for Equipment
                                 and List of Equipment to be
                                 procured abroad



                                        4

   5

CLAUSE 1 SCOPE OF SUPPLY

1.1        The Seller's responsibility is to supply basic
           engineering design, technical guidance for installation
           commissioning, and test run.  The Seller will also
           provide technical service to the Buyer, the Buyer has
           agreed to obtain the basic engineering design package
           of the contract plant and the above mentioned guidance
           and the technical service.  The products description,
           production capacity and quality index of the plant are
           shown in technical attachment 2.2 and 2.3.

1.2        The Seller shall be responsible for providing the technical
           documentation of the contract product. The specific content, quantity
           and delivery will be shown in technical attachment 2.5 and 2.6.

1.3        The Seller shall dispatch experts to the job-site to provide
           technical guidance and service for the Buyer's detailed engineering
           design, construction acceptance, etc. The contents and the
           requirement are shown in technical attachment 4.

1.4        The Seller shall dispatch the experts to the site to
           train Buyer's technicians and main operators of the
           contract plant in order for the Buyer to be familiar
           with the technology provided by the Seller, production
           operation, analysis and examination in the plant.  The
           contents and requirement are shown in technical
           attachment 5.

1.5        The Seller shall dispatch the experts to the site to provide
           technical guidance during the period of the test run until products
           tested qualified. The contents and requirement of the test run and
           products qualification is shown in technical attachment 3.

1.6        The U.S. key equipment purchasing service provided by the Seller for
           the Buyer's Contract Plant is shown in Contract Attachment 8.

1.7        Authorization from AlliedSignal Inc. to the Chongqing Dong Feng
           Chemical Plant to utilize the transferred technology exclusively for
           the proposed production plant.

           The transfer of the production license on chrome technology from
           AlliedSignal Inc. ("Licensor") is via and signed by the Seller to
           Chongqing Dongfeng Chemical Plant ("Licensee"). The Seller is,
           through legal procedure, to acquire the production license from the
           Licensor which is the legal owner of the technology. The Seller also
           has the right to transfer the license



                                        5

   6

           to the Licensee, and guarantees that such transference is not to be
           charged by any third party. In case that a third party contests the
           legitimacy of the transference, the Seller should assume all legal
           and economic liability.

1.7.1      SCOPE

           Sodium Bichromate, Chromic Anhydride, Chromium Sulfate technical
           know-how and related technology which includes utilizing the
           technology for production and selling products in worldwide markets.

1.7.2      LICENSE

           Exclusive transferred within the People's Republic of China and
           non-transferable worldwide.

1.7.3      DURATION

           Ten (10) years for withholding technical secrecy, indefinate for
           utilzation of the technology.

1.7.4      PRODUCTION CAPABILITY

           Total production of the license is 57,000 metric tons per year with
           an initial production license of 20,000 metric tons per year.

1.7.5      RESPONSIBILITIES OF THE LICENSEE

1.7.5.1    The Licensee is not allowed to further transfer or provide the
           technology to any third party without the written consent of the
           Licensor.

1.7.5.2    The Licensee agrees to hold all transferred
           information and technology from the Licensor in
           strict secrecy.  If any third party is able to
           obtain this transferred technical secrecy without
           the written consent from the licensee, then the
           Buyer shall have the right and obligation to take
           legal action against such third party on behalf of
           the Seller.



                                        6

   7

CLAUSE 2 DELIVERY, PACKING AND TRANSPORTATION

2.1        The Seller shall deliver the technical documentation in chongqing,
           China in accordance with the contents, quantities and times
           stipulated in the technical attachment 2.6.

2.2        After each shipment of the documentation, the Seller shall advice the
           Buyer the name, quantity, transportation way of the shipment within 2
           days and send the packing list, invoice and bill of lading, etc.
           by express mail at the same time.

2.3        Upon receipt of the delivery, the Buyer will check it against the
           items in the technical attachment. If any item missing or damaged
           during the transportation, the Buyer should advice the Seller in five
           (5) days. In return, the Seller should make up and re-ship the
           missing or damaged item to the Buyer within 30 days.

2.4        These technical documents shall be packed in new and strong cases
           which are suitable for long distance transportation to protect from
           damage. Two copies of detailed packing list for the batch shall
           content item number, name and number of total page of the document.
           Such packing list should be enclosed in each package.

2.5        Delivery, Packing and transportation of the equipment shall be in
           accordance within the specifications of the equipment orders.



                                        7

   8

CLAUSE 3 CONTRACT PRICE

           The contract price is US$11,000,000.00 CIF China main ocean port. The
           price consists of three parts: technology transfer fee, overseas
           equipment procurement fee and technical services fee.

3.1        Contract Price and Fees

3.1.1      Technology Transfer Fee is US $4,785,000.00. The goods shall be
           delivered at Chongqing Airport. The production technology transfer
           contract price consists of the following segments:

3.1.1.1    The technology transfer license fee of 20000 MT/Y Sodium Bichromate
           is US$2,200,000.00.

3.1.1.2    Fee for Seller to provide basic engineering design and technical
           documentation related to the technology is US$985,000.00.

3.1.1.3    Fee for Seller to provide basic engineering design and technical
           documentation related to the equipment and material is
           US$1,600,000.00.

3.1.2      Overseas Equipment Procurement Fee is estimated at US$6,000,500.00
           CIF China main ocean port. The final equipment price will be
           determined based upon the equipment purchase order. The Overseas
           Equipment Procurement List is attached as APPENDIX 3-1.

3.1.3      Technical service fee is US$214,500.00. The payment term of the
           technical service fee is shown in the technical attachment 7. The
           payment is to be calculated at the rate of US$858.00 man/day
           according to actual man/day serviced by the Seller's technical
           personnel on the end user site. The Technical Services Schedule is
           attached as APPENDIX 3-2.



                                        8

   9


Contract Attachment 8 - Hardware Equipment List & Price                                                           [APPENDIX 3-1]
Contract Number # 94 HNXH/3901 US

US Dollars Expressed In Thousand

Description                              Equipment #    Spec's            Vendor            Quantity    Unit Price

                                                                                                         
Material Feeder                          FE-125         [3-5 ton/hr]      Koppers              2            6.75           13.5

Ball Mill                                MI-130         [5-10 ton/hr]     Hardinge             1             900            900

Double Ribbon Blender                    MX-198         [20 ton/hr]       Mixing               2              60            120

Double Screw Feeder                      CV-207         [3-5 ton/hr]      Fluor Daniel         1              30             30

Continuous Treator w/Control System      TK-315         [10-20 m3/hr]     AlliedSignal         1             517            517

Evaporation Recycle Pump                 PU-330         [10-15 m3/hr]     Struthers            1              65             65

Continuous Crystallizer                  CZ-360         [2-5 ton/hr]      Struthers            1             270            270

Sulfate Centrifuge                       CG-520         [6 ton/hr]        Baker                1             355            355

Acid Solution Filter                     FL-350         [30 m2]           US Filter            2             240            480

Sodium Bichromate Centrifuge             CG-410         [6 ton/hr]        Baker                2             350            700

Packing Machine                          PG-430         [5-10 ton/hr]     Fluor Daniel         2              80            160

Sodium Bichromate Anhydrous Dryer        CG-650         [6 ton/hr]        Baker                1             348            348

Crystallizer (Anhydrous Crystallizer)    CZ-630         [2-5 ton/hr]      Swenson              1             165            165

Chromic Acid Reator w/Control System     RR-720         [1-5 ton/hr]      AlliedSignal         1             485            485

Chromic Acid Packing Machine             PG-741         [1-5 ton/hr]      Fluor Daniel         1            82.5           82.5

Cloudy Liquor Muds Filter                FL-750         [20 m2]           Dorr                 1             350            350

Oleum Supply Pump                        PU-725         [10-15 m3/h]      Liquiflo             1              12             12

Basic Chromium Sulfate Spray Dryer       DR-830         [1-5 ton/hr]      Fluor Daniel         1            80.5           80.5

Basic Chromium Sulfate Packing Machine   PG-866         [1-5 ton/hr]      Fluor Daniel         1              85             85

Mix Scales                               SG-135         N/A               K-Tron              10              35            350

Export Packing/Land & Ocean Freight/     N/A            N/A               Brighton             1             432            432

Grand Total                                                                                                              6000.5




   10

Attachment to Contract No. # 94 HNXH/3901 US                      [APPENDIX 3-2]
Technical Services Provided By The Seller
For 20,000 MT/Y Sodium Bichromate Plant



                                       Time-Range (1)     No. of People     Specialities (2)         No. of Times   Man-days

                                                                                                     
Phase 1--Contraction & Installation    [156 - 182]              1                 PE                     1            15

1 Process Engineer                     [156 - 182]              1                 ME                     1            15

2 Mechanical Engineer                  [156 - 182]              1                 IE                     1            15

3 Instrument Engineer                                           3                                        3            45

Subtotal


Phase 2--Training

1 Process Engineer                     [156 - 182]              2                 PE                     1            40


Phase 3--Commissioning

1 Process Engineer                     [156 - 182]              1                 PE                     1            30

2 Mechanical Engineer                  [156 - 182]              1                 ME                     1            30

3 Instrument Engineer                  [156 - 182]              1                 IE                     1            30

Subtotal                                                        3                                        3            90


Phase 4--Test Run/Acceptance

1 Process Engineer                     [156 - 182]              3                 PE                     1            75



Grand Total                                                     5                                        11           250



Note:     (1) Expressed in weeks.
          (2) PE = Process Engineer, ME = Mechanical Engineer, IE = Instrument
              Engineer




   11


Attachment to Contract # 94 HNXH/3901 US

Technology Transfer Documentation List




Item       Description                                                      Quantity
- ----       -----------                                                      --------
                                                                            
1)         Process description                                                  1 set

2)         Process flowsheets                                                   27

3)         Piping and instrument diagrams (P&ID's)                              14

4)         Supervisors' and operating manuals
           and Engineering Directives                                           36

5)         Research and plant research reports                                  8

6)         Baltimore plant layout drawings                                      24

7)         Baltimore plant equipment arrangement
           drawings                                                             70

8)         Cardex file of equipment which contains detailed
           equipment                                                            1 set

9)         Description of laboratory analytical
           procedures                                                           1 volume

10)        General information on process piping, valves &
           fittings                                                             *

11)        Safety data sheets for products & chemicals
           used                                                                 1 set

12)        General information for the prevention of major
           incidents                                                            1 set

13)        Recommended spare equipment or parts                                 *

14)        Physical Data                                                        4 Books




* Denotes Not Available - Will be reviewed during Technology
Transfer Phase.


   12

CLAUSE 4 TECHNICAL SERVICES PROVIDED BY THE SELLER

4.1        According to the stipulation in the contract, the Seller should
           dispatch the technical engineers with experience to the job-site to
           provide technical service. The number of people, specific tasks and
           duration on the site is shown in the technical attachment 4,5,7.

4.2        During the period of basic engineering design by the Seller in the
           United States, the Seller shall assist the Buyer for its engineers to
           apply travelling document to enter, to work and to stay in U.S. The
           specific requirement is shown in the technical attachment 6.

4.3        Forty five (45) days before arriving to the job-site in China, the
           Seller shall advice the Chinese party so as for the Buyer to issue
           invitation letter, to arrange accommodation, place of working and
           transportation, etc. The details is shown in the technical attachment
           7.

4.4        During the Basic Engineering Design, the Buyer will send their
           specialists to the United States, to participate in the design phase,
           equipment procurement services and contract work acceptance. The
           details of this participation are shown in Technical Attachment 6 and
           8.

4.5        The technicians from both the Seller and the Buyer should obey the
           laws and the regulations in either country where and during their
           stay.



                                        9

   13

CLAUSE 5 INSTALLATION, COMMISSIONING, TEST RUN & ACCEPTANCE

5.1        During the installation period of the contact plant, the Seller shall
           dispatch experts to the job-site to supervise the job. The Buyer will
           cooperate with the Seller to perform the erection work according to
           the Technical Attachment 4.

5.2        After the installation is completed, both the Seller and the Buyer
           will perform adjustment, commissioning, test run and acceptance of
           the trial products. The details for the test run, including testing
           item, quantity, time and acceptance standard are shown in the
           Technical Attachment 3.

5.3        When the test running of the plant and the quality of
           the products qualified to the acceptance standard
           stipulated in the technical attachment after the test
           run which is performed by both parties, the authorized
           representatives from the Seller and the Buyer will sign
           the certificate of acceptance for the contract
           products.  This certificate will be in four copies,
           each party will keep two copies.

5.4        If the technical property of the products is not fully qualified to
           the standard after test run and acceptance of the plant, the methods
           of solving the problem for both parties shall be determined according
           to the Contract Clauses 5.5.2, 5.5.3, 5.7 and 7.4.

5.5        During the commissioning period, the Buyer will provide written
           production monthly report in English to the Seller. The Seller will
           decide whether the production facility is stable and ready to perform
           the test run.

5.5.1      During the test run period, if the running can not be
           completed in two running circles due to external cause,
           such as power, gas, water failure, mechanical
           malfunction or, improper operation, both parties will
           consult and decide to suspend the running.  If and when
           both parties decide to start another running, and if
           that requires to have Seller's specialist(s) come to
           the contract plant, the incurred expenses, including
           air tickets, accommodation, transportation,
           communication and etc. will be borne by Buyer.
           However, the salary will be calculated and paid
           according to US $800 per person per working day.

5.5.2      In case that the test run cannot be completed after three tries under
           the direction of Seller's specialist(s) due to the causes described
           in 5.5.1, both parties shall decide not to try any more. Thus, the
           contract is fully fulfilled and completed.



                                         10

   14

5.5.3      In case that the test run can not be started due to nontechnical
           cause (Except for force majeure) twelve months after commissioning
           takes place, both parties shall decide not to perform the test run.
           Thus, the contract is fully fulfilled and completed.

5.5.4      Within three (3) months after both the Seller and the Buyer decide to
           finalize the contract, both parties should settle the account of the
           contract.

5.6        After the test run and the acceptance of both parties according to
           the technical attachment 3, the Seller and the Buyer will sign a
           certificate of acceptance in four (4) copies. Each party keep two (2)
           copies. The Buyer shall then pay to the Seller the remaining balance
           of the total contract price.

5.7        If the test run index is not totally qualified after the test run,
           penalty fine shall be imposed according to the Contract Clause 7.6.

5.8        The Seller undertakes to dispatch AlliedSignal's technical personnel
           to the China site to provide technical services before December 31,
           1996. After December 31, 1996, the Seller will organize its own
           technical team to provide such services which shall be satisfactory
           to the technical attachment 4.



                                         11

   15

CLAUSE 6 PAYMENT AND TERMS OF PAYMENT

6.1        All the payments either by the Buyer to the Seller or
           by the Seller to the Buyer under this Contract shall be
           made by telegraphic transfer.  Payments by the Buyer to
           the Seller shall be effected through Buyer's bank to
           Seller's bank and payments by the Seller to the Buyer
           shall be effected through Seller's bank to Buyer's
           bank.  All the documents of payment made by either the
           Buyer or the Seller shall be transferred through both
           parties' banks.

           The total Contract price specified in the Clause 3 of the Contract
           shall be paid by means of

6.1.1      The payment of fifteen percent (15%) of the total Contract price as
           indicated in Clause 3 shall be made by the Buyer to the Seller within
           thirty (30) days by cash payment through way of telegraphic transfer
           remittance after the Buyer has received the documents specified in
           Clause 6.2.1.1 and found them in order.

           The payment of eighty-five percent (85%) of the total Contract price
           shall be made in accordance with Loan Agreement signed by and between
           the Buyer's Bank and Export-Import Bank of the United States
           (hereinafter referred to as the US Bank) by way of Irrevocable Letter
           of Credit issued in favor of the Seller by the Buyer's Bank within
           three (3) months after the Effective Date of the Contract.

6.2        The total Contract price stipulated in Clause 3 shall be paid by the
           Buyer to the Seller according to the following schedule, terms and
           proportions:

6.2.1      Technology Transfer Fee specified in Contract Clause
           3.1.1.

6.2.1.1    Within thirty (30) days after the Effective Date of Contract, fifteen
           percent (15%) of the total Contract price, which is US$1,650,000,00

           (say: one million six hundred fifty thousand US dollars only)

           Shall be paid by the Buyer to the Seller, as downpayment for the
           technology transfer fee, within thirty (30) days after the Buyer has
           received the following documents submitted by the Seller and found
           them in order:

           (a)    Export License issued by the relevant authorities of the
                  Seller's country, authorizing the Seller to export the



                                       12

   16

                  Equipment, Materials, License and Know-how, Technical
                  Documentation or a certificate issued by the Licensor stating
                  that such export license is not required;

           (b)    One (1) original and one (1) copy of an irrevocable Letter of
                  Guarantee issued by the Seller's Bank (Specimen as per
                  Appendix 6-1);

           (c)    Four (4) copies of proforma invoice issued by the Seller
                  covering the total Contract price;

           (d)    Four (4) copies of commercial invoice;

           (e) Two (2) copies of sight draft.

6.2.1.2    Nine (9) weeks after the first payment, ten percent (10%) of the
           total Contract price, which is US$1,100,000.00

           (say: one million one hundred thousand US dollars
           only)

           shall be paid by the Buyer to the Seller within thirty (30) days
           after the Buyer has received the following documents and found them
           in order:

           (a)    Two (2) copies of the certificate of technology data
                  confirmation signed by the ultimate user;

           (b)    Four (4) copies of commercial invoice;

           (c)    Two (2) copies of sight draft.

6.2.1.3    Five (5) months after the first payment, four percent (4%) of the
           total Contract price, which is US$440,000.00

           (say: four hundred forty thousand US dollars only)

           shall be paid by the Buyer to the Seller upon delivery by the Seller
           of the equipment specification list in accordance within the
           Technical Attachment of the Contract and within thirty (30) days
           after the Buyer has received the following documents and found them
           in order:

           (a)    Two (2) copies of the receipt of the Equipment Specification
                  List signed and accepted by the ultimate user;

           (b)    Four (4) copies of commercial invoice;



                                       13

   17

           (c)    Two (2) copies of sight draft.

6.2.1.4    Seven months after the first payment, four percent (4%) of the total
           Contract price, which is US$440,000,00

           (say: four hundred forty thousand US dollars only)

           shall be paid by the Buyer to the Seller upon delivery by the Seller
           to the Buyer of the instrument list in accordance within the
           Technical Attachment of the Contract and within thirty (30) days
           after the Buyer has received the following documents and found them
           in order:

           (a)    One (1) copy of the Authorization Letter issued by
                  AlliedSignal, Inc. to Chongqing Dongfeng Chemical Factory of
                  utilizing the transferred chrome technology to produce
                  products as specified within the contract.

           (b)    Two (2) copies of the receipt of the Instrument Specification
                  List signed and accepted by the ultimate user;

           (c)    Four (4) copies of commercial invoice;

           (d)    Two (2) copies of sight draft,

6.2.1.5    Eleven (11) months after the first payment, eight point thirty-three
           percent (8.33%) of the total Contract price, which is US$916,300,00

           (say:  nine hundred sixteen thousand and three
           hundred US dollars only)

           shall be paid by the Buyer to the Seller upon delivery by the Seller
           to the Buyer of the whole basic engineering design package in
           accordance within the Technical Attachment of the Contract and within
           thirty (30) days after the Buyer has received the following documents
           and found them in order:

           (a)    Two (2) copies of the Acceptance Certificate of the Basic
                  Engineering Design Package signed by the ultimate user;

           (b)    Full set of the Airway Bill delivering of the
                  package;

           (c)    Four (4) copies of commercial invoice;

           (d)    Two (2) copies of sight draft.



                                       14

   18

6.2.2      Overseas Equipment Procurement Fee specified in
           Contract Clause 3.1.2

6.2.2.1    Within six (6) months after the first payment, fifteen percent (15%)
           of the total Contract price, which is US$1,650,000,00

           (say: one million six hundred fifty thousand US
           dollars only)

           shall be paid by the Buyer to the Seller, as downpayment for the
           American made equipment procurement, within thirty (30) days after
           the Buyer has received the following documents and found them in
           order:

           (a)    One (1) copy of the List of Purchase Orders signed and
                  confirmed by the ultimate user.

           (b)    Four (4) copies of commercial invoice;

           (c)    Two (2) copies of sight draft,

6.2.2.2    Within twelve (12) months after the first payment, twenty percent
           (20%) of the total Contract price, which is US$2,200,000.00

           (say: two million two hundred thousand US dollars
           only)

           shall be paid by the Buyer to the Seller, as the second payment for
           the American made equipment procurement, within thirty (30) days
           after the Buyer has received the following documents and found them
           in order:

           (a)    Four (4) copies of commercial invoice;

           (b) Two (2) copies of sight-draft.

6.2.2.3    Within eighteen (18) months after the first payment, nineteen point
           fifty five percent (19.55%) of the total Contract price, which is
           US$2,150,500.00

           (say:  two million one hundred fifty thousand and
           five hundred US dollars only)

           shall be paid by the Buyer to the Seller within thirty (30) days
           after the Buyer has received the following documents and found them
           in order:



                                       15

   19

           (a)    Full set clean on board ocean Bill of Lading made out to order
                  marked "Freight Prepaid";

           (b)    One (1) original and two (2) copies of ocean transportation
                  insurance policy covering the amount of 110% of the invoice
                  value of the equipment and material shipped;

           (c)    Packing list in four (4) copies;

           (d)    Four (4) copies of commercial invoice;

           (e)    Two (2) copies of sight draft.

6.2.3      Technical Service Fee specified in Contract Clause
           3.1.3

6.2.3.1    When the Buyer and the Seller both agree that the contract plant is
           ready for technical services, such as site inspection, training,
           commissioning and test run, then zero point ninety five percent
           (0.95%) of the contract price as of the Technical Service Fee, which
           is US $104,500.00

           (say:  One hundred four thousand and five hundred
           US dollars only)

           shall be paid by the Buyer to the Seller within ten (10) days after
           the Buyer has received the following documents submitted by the
           Seller and found them in order :

           (a)    One (1) copy of the notification from the Seller to the Buyer
                  advising the number of technical specialists and the arrival
                  time to the job site to perform the contracted technical
                  services;

           (b)    Four (4) copies of commercial invoice;

           (c)    Two (2) copies of sight draft.

6.2.3.2    The remaining of the Technical Service Fee or one percent (1%) of the
           contract price, which is US $110,000.00

           (say: One hundred ten thousand US dollars only)

           shall be paid by the Buyer to the Seller within ten (10) days after
           the Buyer has received the following documents submitted by the
           Seller and found them in order:



                                       16

   20

           (a)    Two (2) copies of the time sheets signed by the
                  representatives of both parties confirming the actual workdays
                  performed by the Seller for the contracted technical services
                  and the final compensation calculation for the technical
                  services;

           (b)    Four (4) copies of commercial invoice;

           (c)    Two (2) copies of sight draft.

6.2.3.3    In the event that the actual workdays of the
           technical services performed by the Seller differ
           from the contracted 250 workdays, then the amount
           of the last payment of the Technical Services Fee
           shall be adjusted at the rate for the workday
           specified in Contract Clause 3.1.3 and Clause 7
           against the actual workdays performed by the
           Seller.

6.3        Contract Remaining Balance Settlement

6.3.1      Upon satisfying Contract Clause 7 of the Performance Guarantee, after
           the last shipment of the equipment procured in the United States of
           America as per Contract Clause 3.1.2, and after qualified products
           produced from the test run of the plant, the last payment of the
           total Contract price, which is US $238,700.00

           (say: two hundred thirty-nine thousand and two hundred US dollars
           only)

           shall be paid by the Buyer to the Seller after the Buyer has received
           the following documents and found them in order :

           (a)    Two (2) copies of the Certificate of the result of the Test
                  Run and final Contract Settlement Calculation signed by the
                  ultimate user;

           (b)    one (1) original and one (1) copy of an irrevocable Letter of
                  Guarantee issued by the Seller's Bank for Performance
                  Guarantee for the commissioning and test run of the contract
                  plant in favor of the Buyer (Specimen as per
                  Appendix 6-1);

           (c)    Four (4) copies of commercial invoice;

           (d)    Two (2) copies of sight draft.



                                       17

   21

6.3.2      In the event that the Seller shall pay any amount for penalty as of
           the failure of the performance test specified in Contract Clause 7,
           then the Seller shall make the penalty payment to the Buyer within
           thirty (30) days after the two parties reach agreement on the testing
           result and receiving the formal written notice from the Buyer.

6.4        All the banking charges and fees for the execution of this contract
           incurred in P.R. China shall be borne by the Buyer, while those
           incurred outside of P.R. China shall be borne by the Seller.

6.5        Agreement on postponing payment 

           If the Buyer fails to pay the Seller on the payment schedule
           stipulated in the Contract Clause 6, the failure of the payment shall
           be treated as follows:

6.5.1      If the Buyer fails to pay the Seller exceeding the payment schedule
           specified within Contract Clause 6 for more than four (4) weeks, then
           the Seller shall have right to delay the execution of the contract.
           In addition, the Buyer shall compensate the Seller all associated
           financial losses.

6.5.2      If the Seller re-starts the contract according to the specific
           request from the Buyer after the contract has been postponed due to
           the f act that the Buyer fails to pay the Seller according to the
           payment schedule, then the Buyer shall pay the Seller the Contract
           re-starting fee. The actual amount of the Contract re-starting fee
           shall be determined and agreed by both parties.



                                       18

   22

APPENDIX 6-1  Letter of Guarantee Specimen

Date :

To :       The Buyer
           Address

Letter of Guarantee for Contract No. _________________________

This Guarantee is hereby issued to serve as the Performance Guarantee of The
Brighton Industries Corporation (hereinafter called "the Seller") for contract
No. _________________ dated __________________, 1994, between you and the Seller
for supply of technology transfer and related services, overseas equipment
procurement, technical services for Sodium Bichromate Chemical Plant
(hereinafter called "the project").

(The Seller's Bank) in the State of _______________________, the United States
(hereinafter called "the Bank") hereby irrevocably guarantees and binds itself,
its successors and assigns to pay you up to the total amount US$ _____________
(say United States Dollars _______________________________) representing the
exact amount of the fund which you will deposit into the Bank in care of the
Seller's bank account and accordingly agrees as follows:

(1) On the Seller's failure of the faithful performance of the contract and
determined by you, the Bank shall, on your demand in a written notification
stating the failure of performance by the Seller, pay you such amount or amounts
as required by you not exceeding the aggregate total as stated above. All
demands notifications and statements must bear the confirmation of a bank in
P.R, China that the signatories thereon are authorized to sign.

(2) On your written notification, the Bank shall pay the amount or amounts to
the Seller as specifically instructed by you not exceeding the aggregate total
as stated above. All written notifications and payment instructions must bear
the confirmation of a bank in P.R. China that the signatories thereon are
authorized to sign.

(3) This guarantee shall only be valid in full force and effect from the date
that the Bank shall receive the exact amount of fund deposited from you to the
Bank in care of the Seller and remain valid in full force until _____________,
199x after which date the Bank's liability hereunder shall absolutely cease and
this Guarantee will be of no further effect. All claims or demands hereunder
must be received by the Bank at its registered office in the State of
___________, the United States of America on or before the said date of expiry
of this Guarantee.



                                       19

   23

This Guarantee is personal to you and is not assignable or transferable.

It is a condition of this Guarantee that this Guarantee shall be returned to the
Bank for cancellation upon payment or upon expiry, as the case may be.

This Guarantee shall be governed by and construed in accordance with the laws in
the State of ___________________, the United states of America.



Your faithfully,

For and on behalf of
The Seller's Bank

Authorized signature(s)



                                       20

   24

CLAUSE 7  GUARANTEE AND CLAIMS

7.1        The Seller guarantees that the technical documentation of basic
           engineering design provided by the Seller according to the contract
           is to be verified and confirmed by the Buyer, The Seller further
           guarantees that the technical documents will be delivered on schedule
           according to the technical attachment 2.6.

7.2        After the validity of the contract, upon Buyer's request, the Seller
           will continue to provide technical guidance to the contract plant if
           and when condition allows in order to improve technical level and
           quality of the contract products.

7.3        If the technical documents delivered by the Seller are not in
           accordance with the stipulation in the technical attachment 2.5, the
           Seller must mail related technical documents to the Buyer free of
           charge within thirty (30) days after receipt of Buyer's written
           notice.

7.4        During the commissioning, test run and acceptance
           period, if the production and product quality is not
           stable due to improper process and selection of
           equipment provided by the Seller, then the Seller will
           continue to provide technical services free of charge
           until the production and the product quality is stable
           and qualified.

7.5        If the Seller does not deliver the technical documents
           on the schedule according to the technical attachment
           2.6, and when the delay exceeds four (4) weeks, a
           maximum penalty of (0.1%) of the contract software
           price for each week may be charged starting the fifth
           week.  However, the penalty will not release Seller's
           liability of continuing to deliver the technical
           documents.

           If the delay exceeds seventy (70) days, the Buyer has the right to
           cancel the contract, and the Seller must reimburse the Buyer the
           whole amount paid by the Buyer.

7.6        If the technical property guarantee stipulated in the
           technical attachment 3 (production capability, product
           quality, chrome ore recoverability, chrome yield,
           chromium residue discharge rate, and chrome loss)
           cannot be qualified within six (6) months after the
           beginning of the test run, the Seller shall pay penalty
           fines to the Buyer according to the following
           percentage table.  But the total penalty fine will not
           exceed five percent (5%) of the total contracted
           technology transfer and related services price.



                                       21

   25

    TEST ITEMS                                 PENALTY PERCENTAGE
                                        (% of total software price)

1  Total Production output
   (90% of the designed capacity)                     1.5%

2  Sodium Bichromate production                       1.5%
   (90% of the designed capacity)

3  Sodium Bichromate quality
   (100% as qualification)                            2.0%

4  Chromic Acids quality
   (100% as qualification)                            2.0%

5  Chromium Basic Sulfate quality                     1.0%
   (100% as qualification)

6  Chromium total recoverability                      1.0%
   (86.52% as qualification)

7  Chromic Residue discharge                          0.5%
   (1.53 T/1.0 T Sodium Bichromate)                   0.5%

8  Chromium in process waste water of workshop 0.5% (0 as qualification)

   If the above item does not meet the qualification figure, penalty fine will
   be calculated according to the following:

7.6.1      Total production output, Sodium Bichromate production, product
           quality, chrome yield, once one percent (1%) below the qualification
           figure, the penalty will be ten percent (10%) of the penalty
           percentage listed in the above table, respectively.

7.6.2      Chromium Residue discharge, once one percent (1%) higher than the
           qualification figure, the penalty will be ten percent (10%) of the
           penalty percentage listed in the above table.

7.6.3      Chromium in process waste water of workshop, if it can not reach zero
           in the waste water discharge, the penalty will be the total penalty
           percentage listed in the above table.

7.6.4      If the test run items above exceed the lowest penalty level [item 1,
           2, 3, 4, 5, 6 lower than ten percent (10%) of the designed; item 7
           higher than ten percent (10%); item 8 higher than 1000g/sec.], the
           Buyer has the right to refuse to accept.

7.7        Upon validity of the contract, the Seller and the Buyer
           must strictly comply with the contract.  If one party



                                         22

   26

           cancels the contract without permission of the other except the
           equipment procurement contract, the one who cancels the contract must
           pay the other party economic compensation.

7.8        Within ten (10) years after the contract comes into
           force, both parties have the liability to keep secrecy
           to the productive technology of scope of the contract
           product.  Neither party is allowed to transfer or to
           provide the technology to any third party.  If any
           party breaks the contract, the other party has the
           right to impose penalty of twenty percent (20%) of the
           technology transfer price of the contract.

7.9        The guarantee and the claim for the overseas equipment will be in
           accordance with relevant clauses in each equipment purchasing
           contract.



                                       23

   27
\
CLAUSE 8  THE CUSTOMS DUTY AND OTHER TAXES

8.1        A treaty between the US and the Chinese government was signed on the
           30th of April, 1984 regarding avoiding double taxation between the
           two countries. Both parties shall obey the regulation and provision
           of the treaty.

8.2        The duty and the taxation related to the contract collected by the
           People's Republic of China from the Buyer according to the country's
           current tax law will be borne by the Buyer.

8.3        The duty and the taxation related to the contract collected by the
           People's Republic of China from the seller according to the country's
           current tax law will be borne by the Seller.  The Seller agrees to
           pay the Buyer within ten (10) days the taxation referred in Contract
           Clause 8.1 when the Buyer produces a notification of taxation payment
           from the Taxation Authority of the Chinese Government.  The Buyer
           agrees to provide to the Seller the original copy of the certificate
           or receipt of the taxation payment from the Taxation Authority of the
           Chinese Government when the Buyer receives it.

8.4        The duty and the taxation related to the contract collected outside
           Chinese boundary will be borne by the Seller.



                                         24

   28

CLAUSE 9  FORCE MAJEURE

9.1        Both Parties shall extend the execution period of the contract in
           case of war, water or fire disaster, earthquake and/or such natural
           disasters of force majeure that affected to either party.

9.2        The party affected by the force majeure shall inform, by fax or
           telex, the other party, and send within fourteen (14) days, by
           certifies air mail, the other party an authorized testimonial for the
           other party to confirm.

9.3        In case that the influence of the force majeure lasts more than one
           hundred twenty (120) days, both parties shall consult to each other
           in order to decide how to continue executing the contract.



                                         25

   29

CLAUSE 10  DISPUTES SETTLEMENT

10.1       During the performance of the contract, both parties will attempt to
           settle any and all dispute first through friendly consultation. If
           there is no agreement reachable after such consultation, the dispute
           shall be submitted to arbitration.

10.2       The arbitration will be conducted in Beijing, the People's Republic
           of China by the arbitration institute of the China Foreign Trade
           Promotion Committee in accordance with the arbitration procedures and
           rules of the institute.

10.3       The award of the arbitration will be final and binding, and parties
           will abide by such award.

10.4       When arbitration takes place in Beijing, the Chinese law is the
           applicable law.

10.5       The arbitration fee shall be borne by the failure party except
           otherwise decided by the arbitrator.

10.6       In the course of arbitration, the contract will be continuously
           executed by both parties except for matters which are under
           arbitration.



                                         26

   30

CLAUSE 11  EFFECTIVENESS OF THE CONTRACT & MISCELLANEOUS

11.1       This contract is signed by the representatives authorized by both 
           parties on the 15th day of April, 1994. The Buyer will then apply to
           the Chinese government authorities for approval. Upon such
           governmental approval, then the buyer's Bank and the Export-Import
           Bank of USA will negotiate and sign a loan agreement according to the
           contract. The date for such loan agreement execution is the date when
           the contract becomes valid. The Buyer shall duly inform the Seller of
           the contract approval by fax and then air mail.

11.2       If the contract does not become valid three months after the signing,
           both parties shall have right to cancel the contract. The
           cancellation shall be confirmed by air mail.

11.3       The term of the validity of the contract is five (5) years beginning
           the date that the contract comes into effect. When the term of
           validity expires, the contract will loss its effect.

11.4       When the contract expires, outstanding creditor's rights and debts of
           both parties will not be influenced by the expiration of the
           contract. The debtor shall continue to fulfil its obligation of
           paying the outstanding debts to the creditor.

11.5       The contract shall be in English and Chinese. Each party keeps two
           (2) sets of originals. If there is any discrepancy(ies) between the
           English and Chinese versions of the contract, then the English
           version of the contract shall prevail.

11.6       This contract consists of Clauses 1 through 11, and technical
           attachment 1 through 8. The Contract Clauses and the technical
           attachments to it are inalienable, all of them are equally legal and
           valid.

11.7       In case that any item of the contract is to be revised, expanded or
           deleted in the future, it shall be in form of written document which
           shall be signed by the representatives of both parties and then shall
           become inalienable and equally valid as the contract.

11.8       In the process of execution of the contract, the communication
           between both parties may be in either English or Chinese. Any formal
           notice shall be in writing, and mailed by certified air mail in two
           (2) sets.



                                       27

   31

Signed for and on behalf of the Buyer

CHINA NATIONAL CHEMICAL CONSTRUCTION CHONGQING CO.


/s/ (in Chinese characters)                                  1994/4/15
- -------------------------------------              -----------------------------
Authorized Signature                                           Date



Signed for and on behalf of the Seller

THE BRIGHTON INDUSTRIES CORPORATION



/s/ Kit Kung                                             April 15, 1994
- -------------------------------------              -----------------------------
Authorized Signature                                          Date