MEMORANDUM OF AGREEMENT
                                     BETWEEN
                        GULFSTREAM AEROSPACE CORPORATION
                                       AND
                              Leonard's Metal Inc.

PREAMBLE

This Memorandum of Agreement (" MOA") is executed on September 03, 2003, between
Gulfstream Aerospace Corporation ("GULFSTREAM") and Leonard's Metal Inc. ("LMI")
for the  design,  tool  build,  manufacture,  delivery  and  product  support of
G500/550 and GIV-X kitted skins package as described in this MOA.


TABLE OF CONTENTS

        A. SCOPE OF MOA
        B. PRICING, OPTIONS, AND PAYMENT
        C. PERIOD OF PERFORMANCE
        D. DELIVERIES
        E. INSPECTION AND ACCEPTANCE
        F. PACKAGING AND SHIPPING
        G. WARRANTY
        H. TITLE AND RISK OF LOSS
        I. DESIGN CHANGES
        J. DERIVATIVES
        K. TERMINATION
        L. INTELLECTUAL PROPERTY RIGHTS, TOOLING AND DATA OWNERSHIP
        M. EXCUSABLE DELAYS
        N. PATENT INDEMNITY
        O. INDEMNITY BY LMI ENTERING GULFSTREAM PREMISES
        P. GENERAL

        A. SCOPE OF MOA

           1.   Product Description / Specification

                a.   General Description of System

                     Kitted Skins for G550 and G500 and GIV-X

                b.   Shipset Description
                     See "Pricing, Options, and Payment" section

                c.   Quantity
                     See "Pricing, Options, and Payment" section

           2.   Certification

                a.   LMI agrees to deliver  products  and parts  hereunder  that
                     will meet  applicable  FAA  requirements  as defined in the
                     current FAR, Part 21, and the JAA  requirements  as defined
                     in the JAR for LMI supplied  products.  Gulfstream shall be
                     responsible  for  maintaining  FAA  Certification  and  JAA
                     certifications as applicable, on the aircraft.

                b.   LMI  will  support  Gulfstream  in its  efforts  to  obtain
                     Foreign Type  Certificates as mutually  agreed.  Gulfstream
                     will  provide  reasonable  advance  notice  to  LMI  of the
                     Foreign certifications that it intends to pursue and of the
                     requirements  to be met. LMI agrees as long as any increase
                     in costs for obtaining foreign type  certifications  can be
                     negotiated between GAC and LMI Corp.

           3.   Integrated Logistics Support Requirements

                a.   LMI agrees to perform all work and provide all deliverables
                     as identified in the attached Gulfstream Document #GER-2011
                     entitled "Integrated  Logistics Support Requirements" dated
                     September  4,  2001  at  no  cost  to   Gulfstream.   These
                     requirements  include  Technical   Publications,   Manuals,
                     Technical   and  Product   Support,   Technical   Training,
                     Reliability,   Maintainability,   Material  Services/Ground
                     Support  Equipment  MSG3 and  Warranty  Administration  and
                     other data requirements.

           4.   Supplier Performance

                a.   Performance Level

                     This MOA is predicated upon LMI maintaining a high level of
                     performance  in all tasks  required for  commitment  to the
                     program  and  timely   satisfaction  of  all   requirements
                     including  without  limitation  performance in the areas of
                     Quality,   Reliability,   Product   Support   and  on  time
                     deliveries.  If,  during  the  life  of  this  MOA,  should
                     performance become unacceptable to Gulfstream, the pricing,
                     terms and  conditions  herein  may be  subject  to  further
                     negotiations.

                b.   Quality Assurance

                     1.   Consistent  with  industry  practice,  Gulfstream  has
                          developed  Supplier  Quality  Assurance   Requirements
                          SQAR-0003 dated 04/02 incorporated herein by reference
                          which address such things as Quality programs,  onsite
                          evaluation  inspection  and testing of  equipment  and
                          supplies and failure analysis.

                     2.   LMI to adhere to the  requirements  of SQAR-0003 dated
                          04/02 as may be amended from time to time.  Gulfstream
                          will provide LMI with revisions to SQAR- 0003.

                     3.   In addition,  as a minimum the following special terms
                          and  conditions  as cited  in  Gulfstream  Form  GA270
                          (latest revision) may apply. Form GA270 may be amended
                          from time to time as required.

                          129, 131, 259,  304, 315, 334, 456, 463,  469A,  470A,
                          480, 481, and 921

                c.   FRACAS AND FAILURE ANALYSIS REPORTS

                     1.   The    performance,    calculation,    tracking    and
                          administration  of the warranty  shall be performed by
                          LMI  at  no  cost  to   Gulfstream   consistent   with
                          Gulfstream's     reliability     document     (GER608)
                          incorporated herein by reference, which may be amended
                          from  time to time,  which  shall  include  a  Failure
                          Reporting   Analysis  and  Corrective   Action  System
                          (FRACAS)  report  submitted on a quarterly  basis when
                          requested  by  Gulfstream  during the term of the MOA.
                          This  report is due to  Gulfstream  no later  than ten
                          (10) days following the end of each quarter.

                     2.   In  addition,  LMI will provide  failure  analysis and
                          tear-down  reports on defective units to Gulfstream no
                          later  than  45  calendar  days  from  receipt  of the
                          defective unit at their Repair & Overhaul Facility.

                d.   Production Line Support

                     LMI will  maintain  a minimum  of two (2) extra  shipset of
                     hardware/assemblies  in its  production  plan  and on their
                     shelf  to  support  abnormal  production  shortages.   This
                     hardware and  assemblies  must be shipped within four hours
                     of  Gulfstream's  request  from LMI  Savannah  Distribution
                     Center.

                e.   Aircraft on Ground (AOG) Support

                     1.   LMI will provide 24 hours, 7 days a week, 365 days AOG
                          coverage,  at no cost to Gulfstream.  LMI will provide
                          Gulfstream a listing of  individual  AOG contacts with
                          E-Mail addresses,  phone and fax numbers.  The listing
                          will be  maintained  by LMI with any  revisions  being
                          provided  Gulfstream  prior  to or  at  the  time  the
                          revision is implemented.

                     2.   The standard AOG response time is as follows:

                               AOG Response                   4 Hours
                               Critical Expedite Request     24 Hours
                               Expedite                       7 Days

                     3.   LMI will maintain an adequate AOG inventory of new and
                          used  components,  inclusive  of Parts  of  Assemblies
                          (POA's), consumables and maintenance replacement units
                          as   mutually   agreed  to  offset  any  like   assets
                          Gulfstream  is required to provide  its  customers  in
                          support of warranties for said  components.  *

          *    The text noted by asterisks has been redacted in connection  with
               a  request  to  the  Securities   and  Exchange   Commission  for
               confidential  treatment  of such text.  A copy of this  Agreement
               including  the  redacted  information  has been  submitted to the
               Securities and Exchange Commission as part of such request.


               4.   Defective  components will be expeditiously  returned to LMI
                    for verification of the failure.  Upon verification that the
                    failure is covered under the warranty LMI at its cost agrees
                    to replace  the failed  unit  within  thirty (30) days after
                    receipt of the failed unit or Gulfstream may invoice LMI for
                    the actual purchase price of the unit plus a * (* %) percent
                    handling  fee.  In  the  event  that  the  component  is not
                    verified as a warranty failure,  Gulfstream shall compensate
                    LMI within  thirty (30) days, as mutually  agreed,  based on
                    the following options:

                          a.   Return same  component(s)  and compensate LMI for
                               airworthiness test and recertification  costs.

                          b.   Return like airworthy components to LMI.

                          c.   Exchange the failed core and  compensate  LMI for
                               repair and airworthiness test costs.

                          d.   Procure unit at a mutually  agreed to price based
                               upon unit flight hours.

          *    The text noted by asterisks has been redacted in connection  with
               a  request  to  the  Securities   and  Exchange   Commission  for
               confidential  treatment  of such text.  A copy of this  Agreement
               including  the  redacted  information  has been  submitted to the
               Securities and Exchange Commission as part of such request.

                f.   Parts Obsolescence

                     LMI  agrees  to  continue  all  manufacturing  capabilities
                     and/or  provide  alternate  support  for the form,  fit and
                     functional  requirements for the original configurations on
                     any/all   of   the   "out-of-production"    configurations,
                     modifications  or  enhancements,   so  long  as  the  model
                     aircraft for which it was designed remains in service.  LMI
                     further agrees to provide  Gulfstream 90 days  notification
                     for "last-time-buy"  options for any obsolete end items and
                     parts of  assemblies  at the  pricing set forth in this MOA
                     where applicable.

                g.   Local Distribution Center

                     0    LMI agrees to position  it's  Gulfstream  Distribution
                          Center   within  a  fifty   (50)  mile   radius   from
                          Gulfstream's  Savannah  facility.

                     0    LMI  agrees  to  obtain  a   facility   that  will  be
                          sufficient  in size and  functionality  to support all
                          roles  pertaining  to this MOA such as but not limited
                          to:

                          o    Warehousing  minimum  agreed upon shipsets of LMI
                               and Versaform parts.

                          o    Capacity  and  reliable   capability  to  perform
                               required  processes in order to supply Gulfstream
                               with the highest possible quality kitted products
                               defined within this MOA.

                          o    A  facility   adequately   secure  from   natural
                               elements and outside influences.

                h.   Consigned Components

                     Upon award to LMI those part  numbers  incorporated  in the
                     G500/550 and GIV-X Kitted Assemblies  currently in finished
                     goods at Gulfstream  will be consigned to LMI for inclusion
                     into the assemblies.  The following guidelines apply to the
                     management   and  control  of  these   components   in  the
                     fulfillment  of this  agreement.

                     0    That LMI will  begin  receiving  from  Gulfstream  the
                          finished  goods  inventory  for all  components of the
                          G500/550 and GIV-X Kitted Assembly by 1 October 2003.

                     0    That LMI will be in  position  to  deliver  the  first
                          kitted assembly by 1 November 2003.

                     0    That LMI will maintain at its Gulfstream  Distribution
                          Center a  finished  good  inventory  of all  consigned
                          components  and  its  usage  to  support  the  kitting
                          program.

                     0    Invoicing    procedures   for   consigned   Gulfstream
                          inventory  will  be  outlined  by LMI  and  Gulfstream
                          jointly by October  01,2003  and become an addendum to
                          this agreement at a later date.


                     0    That there is an understanding that LMI is receiving a
                          consigned inventory that meets or exceeds Gulfstream's
                          latest   engineering   requirements.    LMI   is   not
                          responsible  for the  inspection  of  these  consigned
                          components,  but is responsible  for  maintaining  the
                          components in same condition as received.

                     0    LMI will ensure  Gulfstream that the following minimum
                          insurance  requirements  are  met  in  regards  to the
                          consigned components:

                          o    No acceptance and or approval of any insurance by
                               GULFSTREAM  shall be  construed  as  relieving or
                               excusing LMI or its agents or  subcontractors  of
                               any liability or  obligation  imposed upon any of
                               them by the provisions of the contract documents.

                          o    All insurance  policies required by this section,
                               or elsewhere in the contract documents,  shall be
                               so  endorsed  as to  provide  that the  insurance
                               carrier  shall be  responsible  for giving  sixty
                               (60) days prior notice to GULFSTREAM in the event
                               of  cancellation or modification of the insurance
                               policy

                          o    LMI's carrier shall list GULFSTREAM as additional
                               insured  and  loss  payee  under  the  Commercial
                               Liability policy.


        B.  PRICING, OPTIONS AND PAYMENT **

             1.  Supplies to be furnished

                 GIV-X

                 Part number         Description           Price         Qty
                 -----------         -----------           -----         ---

                 1159B47128-82-9     Skin Assembly          $ *           1

                 1159B43131-29       Skin Assembly          $ *           1

                 1159B47226-800-63   Skin Assembly          $ *           1

                 1159B47226-800-9    Skin Assembly          $ *           1

                 1159B47227-800-3    Skin Assembly          $ *           1

                 1159B21201-800-7    Skin Assembly          $ *           1

                 1159B21201-800-8    Skin Assembly          $ *           1

                 1159B43132-7        Skin Assembly          $ *           1

                 1159B21314-800-119  Skin Assembly          $ *           1

                 1159B47318-800-3    Skin Assembly          $ *           1

                 1159B41311-800-55   Skin Assembly          $ *           1

                 1159B41311-800-56   Skin Assembly          $ *           1

                 1159B31315-800-117  Skin Assembly          $ *           1

                 115931316-800-101   Skin Assembly          $ *           1

                 1159B47319-800-5    Skin Assembly          $ *           1

                 1159B47320-800-3    Skin Assembly          $ *           1

                 1159B41317-800-121  Skin Assembly          $  *          1

                 1159B31321-803-89   Skin Assembly          $  *          1

                 1159B47510-800-5    Skin Assembly          $  *          1

                 1159B47513-800-7    Skin Assembly          $  *          1

                 1159B47501-802-3    Skin Assembly          $  *          1

                 1159B57111-800-33   Skin Assembly          $  *          1

                 1159B57111-800-27   Skin Assembly          $  *          1

                 1159B57110-800-21   Skin Assembly          $  *          1

                 1159B57110-800-23   Skin Assembly          $  *          1

                 1159B57827-800-75   Skin Assembly          $  *          1

                 1159B57222-800-7    Skin Assembly          $  *          1

                 1159B57223-800-5    Skin Assembly          $  *          1

                 1159B57225-802-7    Skin Assembly          $  *          1


                 Total shipset price GIV-X                  $  *


          *    The text noted by asterisks has been redacted in connection  with
               a  request  to  the  Securities   and  Exchange   Commission  for
               confidential  treatment  of such text.  A copy of this  Agreement
               including  the  redacted  information  has been  submitted to the
               Securities and Exchange Commission as part of such request.


                 G500/550

                 Part number         Description           Price        Qty
                 -----------         -----------           -----        ---

                 1159B51510-47       Skin Assembly          $  *          1

                 1159B51513-800-95   Skin Assembly          $  *          1

                 1159B53132-31       Skin Assembly          $  *          1

                 1159B51314-800-57   Skin Assembly          $  *          1

                 1159B51318-57       Skin Assembly          $  *          1

                 1159B51311-801-49   Skin Assembly          $  *          1

                 1159B51315-800-107  Skin Assembly          $  *          1

                 1159B51993-801-35   Skin Assembly          $  *          1

                 1159B51316-800-53   Skin Assembly          $  *          1

                 1159B51320-800-57   Skin Assembly          $  *          1

                 1159B51912-800-73   Skin Assembly          $  *          1

                 1159B51321-800-91   Skin Assembly          $  *          1

                 1159B52242-800-55   Skin Assembly          $  *          1

                 1159B52242-800-53   Skin Assembly          $  *          1

                 1159B57111-800-23   Skin Assembly          $  *          1

                 1159B57111-800-31   Skin Assembly          $  *          1

                 1159B57110-800-19   Skin Assembly          $  *          1

                 1159B57110-800-17   Skin Assembly          $  *          1

                 1159B57827-800-75   Skin Assembly          $  *          1

                 1159B57222-800-7    Skin Assembly          $  *          1

                 1159B57223-800-5    Skin Assembly          $  *          1

                 1159B57225-802-7    Skin Assembly          $  *          1

                 1159B57828-802-47   Skin Assembly          $  *          1

                 1159B57226-800-53   Skin Assembly          $  *          1

                 1159B57226-800-9    Skin Assembly          $  *          1

                 1159B57227-801-43   Skin Assembly          $  *          1

                 1159B53135-49       Skin Assembly          $  *          1

                 1159B52212-800-10   Skin Assembly          $  *          1

                 1159B52212-800-9    Skin Assembly          $  *          1

                 Total shipset price G500/550               $  *

          *    The text noted by asterisks has been redacted in connection  with
               a  request  to  the  Securities   and  Exchange   Commission  for
               confidential  treatment  of such text.  A copy of this  Agreement
               including  the  redacted  information  has been  submitted to the
               Securities and Exchange Commission as part of such request.

          **   Part number  revisions  will be maintained at the purchase  order
               level.

             Quantities  per year for  Production.  Please  note  that the spare
             requirements could be as high as the production  requirements or as
             few as zero.  The  quantities  listed  below  are  estimates  only,
             actually quantities will be given via purchase order.


                                     GIV-X           G500/550
                                     -----           --------

                     2003             TBD               TBD
                     2004             6                 27
                     2005             23                27
                     2006             23                27
                     2007             23                27
                     2008             TBD               TBD

             "Gulfstream  is not  obligated  to procure  any  minimum  number of
             supplies,  products or  services to obtain the shipset  pricing set
             forth in this MOA.

         2.  Options

             Program  Review:  Purpose of this  program  review is to assess the
             progress  of  the  implementation  of the  Gulfstream  Distribution
             Center, and to evaluate the cost structure of this program.

             Schedule:  There will be a scheduled  program review every 6 months
             for the first 24 months of this contract.

             There will be two primary focuses of this review:  1) Determine the
             effectiveness  of the  distribution  center  in the  deliveries  of
             kitted assemblies to Gulfstream  seeking avenues of improvement and
             enhancement.  2) Evaluate the profitability and cost of the program
             with regards to the GV/GIV Kitting Assembly package.

             Evaluation  of  Cost  and  Profitability   review:   The  following
             milestone  objectives  will be measured  and  evaluated  during the
             program review.

             0    At the  6-month  review  a  study  will be  conducted  between
                  Gulfstream  and LMI to determine  the profit  margins for this
                  contract.  LMI's 040 report generated from its MRP system will
                  constitute the primary source document for the evaluation,  as
                  it captures cost and labor associated with this program.  Once
                  the net profit is determined the following rules will apply:

                  o   Any net profit that exceeds the *% will be shared equally
                      between Gulfstream and LMI.

                  o   If,  the net profit is less than the *% LMI will not seek
                      escalation of prices during the terms of this contract.

          *    The text noted by asterisks has been redacted in connection  with
               a  request  to  the  Securities   and  Exchange   Commission  for
               confidential  treatment  of such text.  A copy of this  Agreement
               including  the  redacted  information  has been  submitted to the
               Securities and Exchange Commission as part of such request.

        3.   All invoices, except as noted, shall be sent separately to:

                  Gulfstream Aerospace Corporation
                  Attn: Accounts Payable, M/S B-10
                  P.O.Box 2206
                  Savannah, GA     31402-2206

        4.   Payment: net 30

             LMI  will  allow a  discount  of 1% net 10 days  on  payments  of
             invoices.

        5.   Spares

               a.   Spares  pricing  Agreement:  *************************

          *    The text noted by asterisks has been redacted in connection  with
               a  request  to  the  Securities   and  Exchange   Commission  for
               confidential  treatment  of such text.  A copy of this  Agreement
               including  the  redacted  information  has been  submitted to the
               Securities and Exchange Commission as part of such request.

               b.   Sole Distribution Rights/Parts Manufacturing Authority

                    1.   LMI acknowledges that all rights to the distribution of
                         any  components  designated  for use on any  Gulfstream
                         aircraft,  belongs  solely to Gulfstream  and shall not
                         solicit the PMA from the FAA.

                    2.   LMI shall provide all  components  to Gulfstream  only,
                         for  resale  to   Gulfstream   customers   through  the
                         Gulfstream distribution network.

               c.   Spares

                    LMI and Gulfstream will be jointly responsible for providing
                    a Comprehensive Spares Requirement  Forecast,  based on past
                    spare  usage to  Gulfstream  prior to the  first  Production
                    Aircraft  delivery.  LMI will provide a revised spares list,
                    if required  based on  Gulfstream's  then  estimated  spares
                    usage,  after  the  delivery  of 5  production  shipsets  to
                    Gulfstream.

               d.   Spares Inventory

                    To the extent LMI has provided spares  inventory,  LMI shall
                    at its expense  maintain the spares  inventory to the latest
                    production  configuration  (1 shipset  only).  LMI agrees to
                    maintain spares inventory to latest production configuration
                    as  long  as LMI is  compensated  for  any  GAC  engineering
                    changes that  requires the existing  spares  inventory to be
                    pulled out of stock and  re-worked to the latest  production
                    configuration.

                    (Gulfstream will only be responsible for the 1 shipset.)

        6.   Taxes

               a.   With the exception of import and export duties (if any), LMI
                    agrees that the prices  contained herein include any and all
                    taxed levies on LMI by the United  States,  and any state or
                    political subdivision thereof, in effect on the date of this
                    MOA, including, but not limited to:

                    1.   State and Local Gross  Receipts,  Sales or Use Taxes on
                         property used or procured by LMI,  irrespective  of the
                         ownership of the property.

                    2.   Ad Valorem Property Taxes on property;  in the control,
                         custody,  or  possession  of LMI,  irrespective  of the
                         ownership of the property.

                    3.   Sales  or Use  Taxes  on the sale of any item by LMI to
                         Gulfstream under this MOA; and

                    4.   Manufacturer's and Retailer's Excise Taxes.

               b.   This  section  shall not be  applicable  to Social  Security
                    Taxes, Income and Franchise taxes.

         C. PERIOD OF PERFORMANCE

               The  period of  performance  for this MOA will be from  August 1,
               2003 through August 1, 2008. The pricing (and relevant  provision
               of this MOA)  provided for shipsets  will apply for orders placed
               by Gulfstream  prior to the end of the period of performance even
               if the delivery and  acceptance  by  Gulfstream  occurs after the
               period of performance.  Time is of the essence in the performance
               of obligations set out in this MOA.

         D. DELIVERIES

               1.   Delivery Schedules

                    The delivery  schedules in this MOA are  estimated  delivery
                    schedules.  Gulfstream  will issue  purchase  orders for the
                    supplies  acquired under this MOA.  Individual items ordered
                    will be identified on the purchase orders with  Gulfstream's
                    part  number.  The required  delivery  schedule for supplies
                    will be established on purchase orders.

               2.   Just in time (JIT) deliveries

                    The JIT delivery schedule herein permits receipts no earlier
                    than one (1) hour prior to  requested  delivery  time on the
                    Due-On-Dock date and not later than the Due-On-Dock date.

               3.   Delivery requirements change to the actual Delivery Schedule

                    Gulfstream  will  provide a minimum of 30 days notice to LMI
                    in the event of  production  schedule  decelerations  and/or
                    production  schedule   accelerations.   Gulfstream  will  be
                    allowed to increase or decrease the delivery rate by up to 1
                    shipset  per  month  (total of 12  shipsets  per year) at no
                    additional cost.  Gulfstream and LMI will work together on a
                    best  effort  basis to  provide  as much  advance  notice as
                    possible for schedule changes.

               3.   Late Delivery Penalties

                    In the advent  that the  supplier  is late to deliver on the
                    scheduled  due on  dock  date a  penalty  will  be  assessed
                    according to the amount of time finished  product is late to
                    the  established  delivery date provided  adequate lead time
                    for procurement of raw material and delivery is not affected
                    by Gulfstream  design changes (i.e. tools) and a minimum six
                    month forecast is provided on all kits. The penalty scale is
                    as follows:

                    * % of Unit Price         1 (24 hours) to 3 Calendar days

                    * % of Unit Price         4 to 7 Calendar days

                    * % of Unit Price         8 to 14 Calendar days

                    * % of Unit Price         15 to 21 Calendar days

                    * % of Unit Price         22 to 28 Calendar days

                    * % of Unit Price         29 to 36 Calendar days

                    * % of Unit Price        37 and beyond Calendar days

                    Penalty  cost can not exceed  cost of  finished  product and
                    will  only be  assessed  if  purchase  order is placed on or
                    before the agreed upon lead-time of 12 weeks.

                    Penalty is  assessed  to each  individual  finished  product
                    starting on the day that individual finished product is due.
                    This penalty is assessed  even if prior parts are still past
                    due.

          *    The text noted by asterisks has been redacted in connection  with
               a  request  to  the  Securities   and  Exchange   Commission  for
               confidential  treatment  of such text.  A copy of this  Agreement
               including  the  redacted  information  has been  submitted to the
               Securities and Exchange Commission as part of such request.

         E. INSPECTION, ACCEPTANCE AND REMEDIES FOR NON-CONFORMING Kitted skins
            package

               1.   Inspection and Acceptance of Supplies

                    a.   Gulfstream   has  the  right  to  perform  an  incoming
                         inspection on each kitted skins upon delivery  prior to
                         acceptance.  Acceptance of material  ordered under this
                         MOA will occur at the designated Gulfstream facility as
                         soon as possible following delivery of material and all
                         required  material   documentation  (i.e.  8130  forms,
                         etc.),  but no more than sixty (60) days after delivery
                         to Gulfstream's facility.

                    b.   Notwithstanding  any prior inspection or test, payment,
                         or receiving  documents,  the leading edges are subject
                         to  final   inspection,   test,   and   acceptance   at
                         destination stated herein or at the Gulfstream Facility
                         which orders part(s).

               2.   Remedies for Non-Conforming Supplies

                    a.   Gulfstream may, if the supplies are non-conforming,  do
                         any or all of the following:

                         1.  Reject or return such supplies upon failure to pass
                             inspection or meet  warranty,  respectively.  As to
                             returned  supplies (and as to rejected supplies but
                             only if Gulfstream so directs),  LMI shall promptly
                             at  its  expense,  and  at  Gulfstream's  election,
                             repair or replace such supplies.  Upon rejection or
                             failure to promptly  repair or replace,  Gulfstream
                             may  cancel  and/or  effect  cover by  purchase  or
                             otherwise.  If  notice  of  rejection  or return is
                             given,  incidental expenses and the risk of loss or
                             damage  shall be borne by LMI until  acceptance  by
                             Gulfstream at destination.

                         2.  Accept or retain  non-conforming  supplies  and, at
                             its election,  equitably reduce the price or repair
                             such  supplies  at LMI  expense  and recoup as in 3
                             below. Not to exceed original part price.

                         3.  Require  repayment  or effect a setoff  against any
                             amounts owed to LMI of any expenses  incidental  to
                             rejection or return and of any amount paid for such
                             supplies pending a conforming redelivery.

               2.   Acceptance of supplies previously  rejected or returned,  or
                    of used supplies,  or of former  government  property may be
                    revoked if delivery is conforming but is not  accompanied by
                    written notice that the supplies were  previously  rejected,
                    returned, used or government property.

               3.   Quality Assurance Inspections of Systems

                    a.   LMI and LMI  subcontractors,  at  their  expense,  will
                         maintain  reasonable  quality  control  and  inspection
                         systems  consistent with SQAR 0003 and will provide the
                         Supplier's Quality  Organization a failure analysis and
                         corrective action program for all design, tooling, test
                         equipment,  manufacturing and test operations  supplied
                         to Gulfstream.  Each type of  non-conformance  shall be
                         documented,    investigated,    and   the   appropriate
                         corrective   action   implemented   by  LMI   and   its
                         subcontractors.  The  supplier  will have a method  for
                         positive  identification,  recall,  and  replacement of
                         priority parts in the event of a nonconformance.

                    b.   At  all  reasonable  times,  including  the  period  of
                         manufacture,  Gulfstream  may  inspect and test the end
                         products and inspect the involved plants of LMI and LMI
                         subcontractors.  LMI and its subcontractors LMI will at
                         their  expense   provide   Gulfstream  with  reasonable
                         assistance to effectively and  efficiently  conduct the
                         inspections  and  LMI and LMI  will  at  their  expense
                         promptly  comply with written  directions by Gulfstream
                         reasonably  necessary to correct  deficiencies  in such
                         systems.

         F. PACKAGING AND SHIPPING

               1.   Packing tickets

                    LMI will submit a packing ticket with each shipment. Packing
                    tickets shall include the following:

                    a.   All  packing  tickets  shall  include   purchase  order
                         number(s),  MRA/MRP  release  numbers,  item number(s),
                         quantity,   serial  number(s)  (as   applicable),   and
                         nomenclature  exactly  as it  appears  on the  purchase
                         order.

                    b.   All  parts  shall  be  identified  per the  Engineering
                         Drawing  and  Purchase   Order   Quality   requirements
                         utilizing GAMPS 1105 and GAMPS 1106 as required.

                    c.   All  components,  which  are  serialized  must have the
                         serial numbers stated on the packing ticket.

                    d.   The serial number on the packing  ticket and the serial
                         number on the component  must be  identical.  Copies of
                         functional test results must be included.

                    e.   If for any  reason,  a kitted  skin part ends up on the
                         problem  file,  LMI  has  one (1)  week,  from  date of
                         notification to comply with the request from Gulfstream
                         to clear the problem file. If after a week, the request
                         has not been complied with, Gulfstream will return said
                         part  back  to LMI at  LMI's  expense  to LMI  Savannah
                         Distribution Center.

               2.   Shipping, Marking and Packing Instructions

                    Unless  otherwise stated herein,  all Shipping,  Marking and
                    Packing  instructions  will be in accordance with Gulfstream
                    Document Number GA 75, 6/01 as amended from time to time. In
                    addition,  LMI agrees to furnish  reusable  container and/or
                    rack to transport  kitted skins to location of point of use.
                    After use is complete the  container  and/or rack along with
                    clecos will be returned to LMI.

               3.   Certification of country of manufacture

                    U.S.   Customs   has   increased    requirements   for   the
                    identification  of foreign  made items  entering  the United
                    States  of   America.   Therefore,   proof  of   Country  of
                    Manufacture is required for all end items.

               4.   FOB

                    Point of origin is *.

          *    The text noted by asterisks has been redacted in connection  with
               a  request  to  the  Securities   and  Exchange   Commission  for
               confidential  treatment  of such text.  A copy of this  Agreement
               including  the  redacted  information  has been  submitted to the
               Securities and Exchange Commission as part of such request.

         G. WARRANTY

               1.   General

                    Subject to the  limitations  and conditions  hereinafter set
                    forth, LMI warrants that the leading edge and its components
                    supplied hereunder shall:

                    a.   at the Date of Delivery, be free from:

                         i.  defects in material or workmanship

                         ii. defects  arising from the  selection of material or
                             process of  manufacture  other than as specified by
                             Gulfstream  or contained in  Gulfstream's  provided
                             design under the Product Description; or Gulfstream
                             approved design.

                         iii.defects inherent in the design thereof,  in view of
                             the state of the art at the time of design thereof,
                             except for those  portions which have been retained
                             from the prior GIV  design or which are based  upon
                             Gulfstream   directed  or   furnished   engineering
                             criteria  but,  only to the extent such criteria is
                             defective or incorrect.

                    b.   at the Date of Delivery, and throughout the duration of
                         the  warranty,  be free from  defects  arising from the
                         failure to conform  to the Type  Design  specifications
                         and  drawings,   as  certified  by  the  FAA  or  other
                         airworthiness authorities, developed by LMI pursuant to
                         the Product Description or the Engineering Statement of
                         Work.

               2.   Duration

                    The extent of LMI liability under this Section as to defects
                    in the  kitted  skin is  limited  to the  repair of all such
                    defects in the kitted  skin  which are  discovered  within a
                    period  of  seventy  eight  (78)  months  from  the  date of
                    shipment,  or  seventy  two  (72)  months  from  the date of
                    delivery to the GIV-SP and GIV-X  aircraft  to the  operator
                    and while LMI  retains the  tooling  and data  necessary  to
                    effect such  repairs.  Warranty  duration  calculations  are
                    based upon the  exclusion  of any  repair  time spent at LMI
                    facilities.

               3.   Remedies

                    a.   LMI  obligation  for a breach  of a  warranty  provided
                         under this Section during the periods described in this
                         Section.  shall  be  to  promptly  repair,  replace  or
                         correct (to include all costs  associated  with removal
                         and  reinstallation) at LMI sole election and cost, the
                         defective  part or condition with  reasonable  care and
                         dispatch. LMI will reimburse Gulfstream for the cost of
                         labor  associated with the removal of defective  units,
                         installation  of  the  replacement  unit  and  required
                         operational  checks  provided  the work is performed by
                         Gulfstream,  an Authorized  Warranty Repair Facility or
                         by a facility as directed by Gulfstream.  Reimbursement
                         will be  based  on  standard  hours  applicable  to the
                         removal and replacement of each unit.

               4.   Removal and Reinstallation of LMI Components

                    a.   Gulfstream  reserves the right to debit LMI account for
                         all direct and related tasks at any Gulfstream facility
                         or any  Gulfstream  authorized  facility  to effect the
                         removal and  reinstallation  of LMI components or parts
                         of assemblies  inclusive of consumables and maintenance
                         replacement units.  Gulfstream will debit LMI's account
                         only after  Gulfstream  has given LMI adequate  time to
                         investigate and respond to the rejection that has taken
                         place.

                    b.   Gulfstream will forward a periodic  listing of items to
                         be debited to LMI and will include the following data:

                         1.  The date component was identified and removed.

                         2.  Part number description and serial number

                         3.  Reason for removal

                         4.  Aircraft serial number

                         5.  Then  actual  labor  hours  if  known  or  standard
                             published  labor hours and any related  labor hours
                             incurred

                         6.  Labor rate at then published rates

                         7.  Debit amount

                    c.   LMI will have 30 days from the date of  notification to
                         take  exception  to any item(s)  submitted.  Gulfstream
                         will only debit said account  after LMI and  Gulfstream
                         have  worked  in  good  faith  to  determine   who  the
                         responsible party is.

               5.   Guaranteed Mean Time Between Failure (MTBF)

                    a.   The MTBF  requirements for the component(s)  herein are
                         as follows:

                             Description      Guaranteed MTBF       Design Goal
                             -----------      ---------------       -----------


                    b.   LMI shall guarantee that the component(s)  will achieve
                         the guaranteed  MTBF noted above,  with the calculation
                         as  follows:   MTBF  equals  Flight  Hours  divided  by
                         confirmed  failures.  Where  the  flight  hours are the
                         total number of (INSERT  AIRCRAFT  MODEL)  flight hours
                         accumulated  by the aircraft on which the  component(s)
                         are installed.  If at the end of the agreed to warranty
                         period, the guaranteed MTBF has not been achieved,  LMI
                         agrees to extend the warranty period until such time as
                         the guaranteed MTBF is achieved.

                    c.   The    performance,     calculation,    tracking    and
                         administration  of this  warranty and  associated  MTBF
                         guarantees  will  be  carried  out in  accordance  with
                         Gulfstream's  Reliability Document (GER 608 Rev A). The
                         labor  and  material   required  to   incorporate   the
                         corrective  actions as defined in said document will be
                         provided at no cost to Gulfstream or its customers.

               6.   Bad Actor Program

                    LMI  will  provide,   at  no  cost  to  Gulfstream,   a  new
                    replacement  component  if it is verified  that the rejected
                    part is the responsibility of LMI.

               7.   Disclaimer

                    THE  WARRANTIES  SET FORTH IN THIS MOA ARE  EXCLUSIVE AND NO
                    OTHER  WARRANTIES OF ANY KIND,  WHETHER  EXPRESS OR IMPLIED,
                    INCLUDING ALL WARRANTIES OF MERCHANTABILITY  AND FITNESS FOR
                    A PARTICULAR  PURPOSE,  AND ALL WARRANTIES  ARISING FROM THE
                    COURSE  OF  DEALING  OR USAGE OF  TRADE,  SHALL  APPLY.  THE
                    REMEDIES  SET  FORTH IN THIS MOA ARE THE SOLE AND  EXCLUSIVE
                    REMEDIES OF GULFSTREAM FOR ANY CLAIMS,  EXPENSES,  OR DAMAGE
                    ARISING OUT OF OR RELATED TO PRODUCTS  DELIVERED  UNDER THIS
                    MOA.  IN NO EVENT SHALL LMI BE LIABLE IN TORT OR IN CONTRACT
                    FOR ANY  INCIDENTAL,  SPECIAL,  INDIRECT,  OR  CONSEQUENTIAL
                    DAMAGES.  THIS SECTION SHALL NOT BE INTERPRETED TO AFFECT IN
                    ANY WAY [INSERT  SUPPLIER NAME)  OBLIGATIONS WITH RESPECT TO
                    THIRD PARTY CLAIMS FOR PROPERTY  DAMAGE,  PERSONAL INJURY OR
                    WRONGFUL DEATH.

          H.   TITLE AND RISK OF LOSS

               1.   Title and Shipping Point

                    * All risks of loss or damage to property to be delivered by
                    LMI hereunder shall be upon LMI until title of such property
                    passes to Gulfstream.

          *    The text noted by asterisks has been redacted in connection  with
               a  request  to  the  Securities   and  Exchange   Commission  for
               confidential  treatment  of such text.  A copy of this  Agreement
               including  the  redacted  information  has been  submitted to the
               Securities and Exchange Commission as part of such request.

               2.   Risk of Loss

                    Notwithstanding  the foregoing,  LMI shall bear risk of loss
                    or damage to property  subsequently  rejected by  Gulfstream
                    and  placed  on  transport  for  return  to LMI  until  such
                    property is redelivered to Gulfstream,  except for the loss,
                    destruction   of,  or  damage  to  such  rejected   property
                    resulting  from  the  negligence  of  officers,   agents  or
                    employees  of  Gulfstream  acting  within the scope of their
                    employment.

                    a.   If property is furnished by Gulfstream for  performance
                         of  this  MOA all  risks  of  loss  or  damage  to such
                         property  shall be upon LMI until the said property has
                         been  redelivered  to  Gulfstream.  LMI shall  properly
                         segregate, identify and protect all such property.

                    b.   Processing  of claims  relating to loss of or damage to
                         property   to   be   furnished   hereunder   shall   be
                         accomplished by the party  responsible for risk of loss
                         or  damage  to such  property  at the  time  the  claim
                         arises.

          I.   DESIGN CHANGES

               1.   Design Changes

                    a.   Gulfstream  may at any time make  changes in  drawings,
                         designs, specifications, materials, packaging, time and
                         place of delivery,  method of  transportation  or other
                         terms  of this  MOA,  which  changes  Gulfstream  shall
                         document  in  writing  and which LMI shall  immediately
                         implement.   If  such  changes  cause  an  increase  or
                         decrease in the cost of  performance  of this MOA or in
                         time required for performance,  an equitable adjustment
                         shall be made, as  applicable,  to the price and/or the
                         delivery schedule of the affected  performance and this
                         MOA shall be amended in writing accordingly.  Any claim
                         by the  LMI  for an  equitable  adjustment  under  this
                         clause  must be asserted  within  thirty (30) days from
                         the date of  written  order  effecting  the  changes or
                         Gulfstream  shall not be  obligated  to consider  LMI's
                         claim for an  equitable  adjustment.  In no event shall
                         Gulfstream  be liable for any claim for an  increase in
                         price after  payment for the  supplies.  If property is
                         made obsolete as a result of a change, Gulfstream shall
                         have the right to prescribe  the manner of  disposition
                         of such property.  Changes directed by Gulfstream which
                         are issued in order to improve  fit and/or  ease use by
                         Gulfstream production operations will be accepted at no
                         cost to Gulfstream  and promptly acted upon as mutually
                         agreed.  There  will be no  increase  in  price  if the
                         changes   incorporated  do  not  impact  the  costs  of
                         manufacturing the final component as agreed upon during
                         the onset of this program.

               2.   Class 1 & 2 Design Changes - Supplier Requested Changes

                    a.   Class 1  changes  are  those  that  affect  fit,  form,
                         function,    interchangeability,    safety,   strength,
                         performance,  flight characteristics,  weight, balance,
                         product qualifications, service life or installation of
                         the next  assembly.  These  changes are  required to be
                         submitted  to and  approved by  Gulfstream  Engineering
                         prior to incorporation.

                    b.   Class 2 changes  (those that do not affect  fit,  form,
                         function,    interchangeability,    safety,   strength,
                         performance,  flight characteristics,  weight, balance,
                         product qualification,  service life or installation of
                         the  next   assembly)   must  also  be  submitted   for
                         Gulfstream  Engineering's  review and concurrence  with
                         respect  to  classification   prior  to  incorporation.
                         Gulfstream  will respond with said  concurrence  or any
                         exceptions  taken  within  2  weeks  after  receipt  of
                         supplier notification.

                    c.   All  Class  1 and  Class  2  Design  changes  shall  be
                         submitted  in writing via a "Seller  Engineering  Memo"
                         (SEM)  to   Gulfstream   Engineering   with  copies  to
                         Gulfstream Purchasing and Quality Assurance.

               3.   Supplier Escapes

                    LMI will immediately notify Gulfstream,  in writing,  of any
                    material/component   escapes.   Escapes  are  any  material/
                    component    issue   that   may   result   in   performance,
                    airworthiness,  FAR  non-compliance,  or  non-conformance as
                    defined below:

                    a.   Material  or  component  issues  that might  affect the
                         item's ability to perform to original specifications.

                    b.   Airworthiness  of the  component  or end use product in
                         question.

                    c.   FAR non-compliance has been identified with components.

                    d.   Non-conformance to original specification (component or
                         material does not conform to Engineering specification,
                         drawing or document).

               Written notification must include:

               1.   Nature of the Issue

                    "What, why, how and when" information.  Reference SQAR-0003,
                    Paragraph 19.


               2.   Inspections/Action

                    State  if it is  satisfactory  to  simply  inspect  for this
                    condition and what inspection  methods are required.  If the
                    item needs to be replaced,  state NDT standards,  tools, and
                    inspection resources available. Identify specific series (by
                    serial  number,  by  date of  manufacture,  by  location  of
                    manufacture, etc.) if possible.

               3.   Compliance Time

                    State the  urgency of the issue and  recommended  compliance
                    time.

               4.   Spares

                    State if  replacement  or return to  supplier  for repair is
                    required,  whether or not  adequate  spares  exist to either
                    replace  outright,  or to develop a rotable  pool to keep in
                    service aircraft flying.

               5.   Remedy

                    If  appropriate,  recommend  actions to preclude  this event
                    from happening again, both short term and long term.

               6.   Suppliers identification of the issue

                    State   if   Airworthiness   issue,   Quality   issue,   FAR
                    non-compliance (or all of the above).

               7.   Service Bulletin

                    The above  information  is the basis of a Service  Bulletin.
                    The LMI should provide a draft Service Bulletin at this time
                    if possible.

               However,  in those cases where LMI has the Material  Review Board
               (MRB)  authority  and the escape  disposition  meets type design,
               then a separate submission, other than MRB with the component, is
               not necessary.

          J.   DERIVATIVES

               1.   Derivative Aircraft

                    At any time  during  the term of this  MOA,  Gulfstream  may
                    elect to build a  derivative  of the  aircraft  on which the
                    products  purchased  under this MOA are used.  A  derivative
                    aircraft is defined as an already  type  certified  aircraft
                    that will  undergo  sufficient  modification  as to  require
                    re-certification and issuance of a new type certificate.

               2.   Alternate Sources

                    If the products  purchased  under this MOA will not meet the
                    market  requirements  or  technical  specifications  of  the
                    derivative   aircraft,   Gulfstream  may  elect  to  develop
                    alternate  sources  for  like  products  to be  used  on the
                    derivative  aircraft in lieu of the products purchased under
                    this  MOA.  If  an  alternate  source  supplied  product  is
                    selected for use on the derivative aircraft,  Gulfstream may
                    terminate this MOA in accordance  with the terms  delineated
                    herein.

          K.   TERMINATION

               1.   For default

                    a.   Gulfstream  may terminate this MOA or any part thereof,
                         by  giving  notice of  default  to LMI under any of the
                         following circumstances.

                         1.  If LMI  refuses  or  fails  to make  deliveries  or
                             perform the services  within the time  specified in
                             this MOA.

                         2.  If LMI  fails  to  comply  with  any  of the  other
                             provisions  of  this  MOA,  or  so  fails  to  make
                             progress as to endanger  performance of this MOA in
                             accordance  with its  terms,  and does not cure any
                             such  failure  within a period of ten (10) days (or
                             such longer period as  Gulfstream  may authorize in
                             writing)  after  receipt of notice from  Gulfstream
                             specifying such failure.

                         3.  If  LMI   becomes   insolvent   or  is  subject  to
                             proceedings  under any law relating to  bankruptcy,
                             insolvency or the relief of debtors.

                    b.   In  the  event  of  such  termination,  Gulfstream  may
                         purchase or manufacture  similar product and/or require
                         LMI to transfer  title and deliver to Gulfstream any or
                         all  property  produced  or  procured by LMI under this
                         MOA,  and LMI  shall be liable  to  Gulfstream  for any
                         excess cost to Gulfstream; provided, however, LMI shall
                         not be liable to  Gulfstream  for such excess cost when
                         the default of LMI is due to causes  beyond the control
                         and without the fault or  negligence  of LMI;  provided
                         further,  and LMI has exercised due diligence to remove
                         delay,  LMI shall not be excused from liability  unless
                         LMI has notified Gulfstream in writing of the existence
                         of such cause  within ten (10) days from the  beginning
                         thereof.

                    c.   Gulfstream's  liability  in  the  event  of  a  default
                         termination  shall be limited  to the  agreed  price of
                         items  delivered  and  accepted,  subject  to  downward
                         equitable    adjustment   if   such    product(s)   are
                         nonconforming,  and  to  the  reasonable  value  of any
                         property,  inclusive of tooling,  design data, survival
                         of   warranties   and   obligations   thereunder   that
                         Gulfstream  may require to be delivered  pursuant to b.
                         above.

               2.   For Convenience

                    Gulfstream may terminate  this MOA, or any part thereof,  by
                    giving  written  notice thereof to LMI. In the event of such
                    termination,  Gulfstream  shall pay to LMI costs incurred by
                    LMI,  for  supplies  that have been  ordered by  Gulfstream,
                    determined in  accordance  with sound  accounting  practices
                    plus a  reasonable  allowance  for  profit  earned  thereon;
                    provided  that LMI shall not be entitled to any profits with
                    respect  to work  and/or  services  not  performed  prior to
                    effective  date of such  termination,  nor  shall  the total
                    termination  sum payable to the LMI exceed the total  agreed
                    to price for supplies  that have been ordered by  Gulfstream
                    as reduced by the amount of payments  otherwise made, and as
                    further   reduced  by  the  agreed  to  price  of  work  not
                    terminated;  further provided,  however,  that if it appears
                    that LMI would have  sustained  a loss of the entire MOA had
                    it been completed,  no profit shall be payable hereunder and
                    an appropriate  adjustment shall be made reducing the amount
                    otherwise payable hereunder to reflect the indicated rate of
                    loss.

          L.   INTELLECTUAL PROPERTY RIGHTS, TOOLING AND DATA OWNERSHIP

               1.   Ownership of Design Drawings/Data

                    a.   Title  and  rights  to  all  design  and  design   data
                         (drawings)  created  by LMI under this MOA are owned by
                         Gulfstream upon full payment for supplies.

                    b.   In the supplies have been either originated or designed
                         by  Gulfstream  in accordance  with  specifications  or
                         other  data  furnished  by  Gulfstream,  all  rights to
                         supplies  or other  data and the  reproduction,  use or
                         sale thereof are owned solely by Gulfstream.

               2.   Ownership of Tooling, Design and Data

                    a.   All tooling  whether  designed by LMI, by Gulfstream or
                         by a third party,  shall become,  upon  acquisition  or
                         manufacture,  the  property  of  Gulfstream.  LMI shall
                         deliver  such  tooling to  Gulfstream  or  Gulfstream's
                         designees after  performance is completed  hereunder or
                         upon termination, unless such tooling is needed to fill
                         further orders from  Gulfstream and retention by LMI of
                         such  tooling  has  been  consented  to in  writing  by
                         Gulfstream.

                    b.   The term "tooling"  shall  include,  but not be limited
                         to, all tools, dies, jigs, fixtures,  molds,  patterns,
                         special taps,  special gauges,  special test equipment,
                         other special  equipment and  manufacturing  aids,  and
                         replacement  thereof,  acquired or  manufactured by LMI
                         for the  performance  of this MOA,  which are of such a
                         specialized    nature    that    without    substantial
                         modification or alteration, their use is limited to the
                         production  of  supplies  or  parts   hereof,   or  the
                         performance  of such  services as are to be supplied to
                         Gulfstream  hereunder.  LMI  agrees to comply  with the
                         provisions  of  the   Gulfstream   Tooling  Manual  for
                         Subcontractors.

               3.   Disposition of Tools

                    a.   LMI is wholly  responsible  for all Gulfstream  tooling
                         located  in its  facility/facilities.  When  tooling is
                         deemed  no  longer  necessary,  LMI  will  receive,  in
                         writing,  from  Gulfstream  guidance on disposition for
                         said tools.

                    b.   Upon  completion  of  payments,  all  tooling  shall be
                         properly marked to indicate its ownership by Gulfstream
                         in  accordance  with the  mutually  agreed  to  tooling
                         philosophy by Gulfstream and LMI.  Gulfstream may file,
                         with the cooperation of LMI, a UCC Financing  statement
                         confirming Gulfstream's ownership interest.

          M.   EXCUSABLE DELAYS

               1.   Neither party hereto shall be responsible for, nor deemed to
                    be in default,  on account of delays in  performance  of the
                    MOA due to causes  beyond its control and not  occasioned by
                    its fault or negligence.  Such causes  include,  but are not
                    limited  to:  acts  of God,  force  majeure,  action  by the
                    Governments,  delays in  transportation,  labor  disputes or
                    strikes;  provided,  however,  that  the  existence  of such
                    causes  shall  not  excuse  the  delaying   party  from  the
                    resulting delay unless such party shall have given the other
                    party  written  notice on any excusable  delays  referred to
                    above,  within  5 days (or  such  additional  time as may be
                    approved by the other party)  after the  delaying  party has
                    actual  knowledge  that such  occurrences  will  result in a
                    delay in delivery and the delaying party.

               3.   In the event the delivery of any product from LMI is delayed
                    for any cause deemed excusable hereunder, so that the extent
                    of such delay in delivery of any product will exceed 1 month
                    from  the  date of  scheduled  delivery,  the  MOA,  for the
                    undelivered   delayed   products,   may  be   terminated  by
                    Gulfstream upon written notice to LMI. Any termination under
                    this paragraph shall be treated as a termination for default
                    as described elsewhere in these terms and conditions.

               3.   In the event of a significant force majeure event, terrorist
                    act or  other  act or  declaration  of war  that  materially
                    impacts  Gulfstream's  aircraft backlog or sales activities,
                    Gulfstream  may in addition to the other rights set forth in
                    this MOA reschedule or cancel deliveries effected by such an
                    event, as required (in Gulfstream's sole determination).  In
                    the event  Gulfstream  determines  a  requirement  to either
                    reschedule or cancel deliveries,  Gulfstream will notify the
                    supplier   in  writing  of  the   deliveries   impacted   by
                    Gulfstream's   determination.   The  MOA  will  be  modified
                    accordingly and all other deliveries, rights and obligations
                    under the MOA will  remain  unchanged  and there shall be no
                    penalty,   additional   costs  or   liability   assessed  to
                    Gulfstream as a result of its  cancellation  or rescheduling
                    of deliveries under this section.

          N.   PATENT INDEMNITY

               1.   Unless the leading edge are made to the  detailed  design of
                    Gulfstream,  LMI shall at its expense  defend and  indemnify
                    Gulfstream against any claim of patent infringement provided
                    timely notice of such claim be given LMI.

               2.   Gulfstream  agrees to pay LMI all costs and  expenses in its
                    defense and to pay LMI the amount of any  judgement  against
                    LMI in any suit  proceeding  against LMI, based upon a claim
                    of infringement  resulting solely from Gulfstream connecting
                    any  equipment  purchased  herein with any article or device
                    not manufactured or supplied by LMI, or from the sale or use
                    of any such combination by Gulfstream.

          O.   INDEMNITY BY LMI ENTERING GULFSTREAM PREMISES

               LMI assumes the risk of all damage,  loss, costs and expense, and
               agrees to indemnify and hold harmless  Gulfstream,  its officers,
               agents and  employees  from and  against  any and all  liability,
               damage, loss, cost and expense,  including attorney's fees, which
               may accrue to or be sustained by Gulfstream, its officers, agents
               or  employees  on account of any  claim,  suit or action  made or
               brought against  Gulfstream,  its officers,  agents or employees,
               (including  claims,  suits or actions brought against  Gulfstream
               because  of  Gulfstream's  own  negligence)  for the  death of or
               injury  to  employees,   agents  or   subcontractors  of  LMI  or
               destruction of property of LMI,  sustained in connection with LMI
               performance  of  any  activity  under  this  MOA  performed  at a
               Gulfstream   facility,   arising   from  any   cause   whatsoever
               (including, without limitation, falls from scaffolding,  ladders,
               catwalks,  beams or other high places;  mishaps involving cranes,
               booms, elevators,  trucks or other equipment;  injuries resulting
               from electrical shock; and failure of or defect in any equipment,
               instrument  or device  supplied by Gulfstream or its employees to
               LMI, its employees,  agents or  representatives at the request of
               LMI, its employees,  agents or  representatives),  except for the
               willful  misconduct of Gulfstream or its employees  acting within
               the scope of their employment.

          P.   GENERAL

               1.   Disputes

                    Any  controversy or claim between the parties arising out of
                    or  relating  to this  MOA,  or  breach  thereof,  shall  be
                    governed  by the laws of the State of  Georgia  and shall be
                    settled  by  arbitration  in  Savannah,  Georgia  under  the
                    Commercial  Arbitration  Rules of the  American  Arbitration
                    Association  ("AAA") and  administered  by the AAA.  Pending
                    settlement  by  agreement  or a final  judgement,  LMI shall
                    proceed  diligently with the performance hereof according to
                    Gulfstream's decision and instructions.

               2.   Substance Abuse Policy

                    LMI, its  subcontractors,  agent and employees  acknowledges
                    and understands that:

                    a.   The  possession,   sale,   transfer,   purchase  and/or
                         presence in one's system of a  controlled  substance(s)
                         or  alcohol  by any person on  Gulfstream  property  is
                         prohibited;

                    b.   Entry onto Gulfstream  property  constitutes consent to
                         an  inspection  of any  individual  and their  personal
                         effects  when  entering,   on,  or  leaving  Gulfstream
                         property;

                    c.   Any  individual  found in violation of (1) above or who
                         refuses  to permit an  inspection  may be  removed  and
                         barred from  Gulfstream  property at the  discretion of
                         Gulfstream.

                    d.   LMI   agrees   to   abide   by   and  to   advise   its
                         subcontractors,   agents  and  its   employees  of  the
                         provisions herein.

                    e.   Gulfstream  Aerospace   Corporation's  Substance  Abuse
                         Policy  (GA  3059)  is  enclosed  and  incorporated  by
                         reference  and will  apply  while LMI and/or any of its
                         subcontractors are on Gulfstream's premises.

               3.   TSO

                    The GIV-SP and GIV-X leading edge will be covered by TSO, if
                    applicable.

               4.   Press Releases

                    LMI shall not issue any press release,  press  conference or
                    similar  announcements  to the  industry  or the  media  (to
                    include  securities  analysts)  without  the  prior  written
                    consent of Gulfstream.

               5.   Marketing/Advertising Assistance

                    LMI  agrees,  at its  expense,  and  upon the  direction  of
                    Gulfstream to provide  reasonable  and normal  assistance in
                    support of the following:

                    a.   Green Aircraft Sales

                    b.   Customer/Options/Retrofits

                    c.   Air Shows/Trade Shows

                    d.   Gulfstream's Customer Workshops

                    e.   Other Gulfstream sponsored activities

               6.   Assignment

                    Except  as to the sale of the  business  to  which  this MOA
                    relates, the rights of the parties under this MOA may not be
                    assigned or transferred, in whole or in part, to any person,
                    firm,  corporation,  or  subcontractors  without the express
                    prior consent of the other party.

               7.   Entire Agreement

                    This MOA  constitutes the entire  understanding  between the
                    parties  and   supersedes   all   previous   understandings,
                    agreements,  communications  and  representations,   whether
                    written  or  oral,  concerning  the  subject  matter  of the
                    agreement.

               8.   MOA Acceptance

                    Agreement  by LMI to furnish  materials  or services  hereby
                    ordered or partial performance  hereunder or shipment of any
                    leading edge ordered  hereby  constitutes  acceptance of the
                    terms and  conditions of this MOA. The terms and  conditions
                    set forth shall be the only applicable  terms and conditions
                    for this  purchase,  unless  changes  or  substitutions  are
                    agreed  to,  in   writing,   by  an   authorized   agent  or
                    representative for Gulfstream and LMI.

               9.   Offset Credits

                    Any order  placed by LMI with a  sub-contractor  outside the
                    United States may be used to satisfy Gulfstream's (including
                    its parent company,  General Dynamics  Corporation,  and all
                    other affiliated entities) contractual obligations,  current
                    and future to procure  goods and/or  services  from firms in
                    said  country to offset,  in part,  their sales of goods and
                    services   into  that  country  and  their  impact  on  that
                    country's  balance-of-trade accounts. If Gulfstream requests
                    these offset credits, Gulfstream shall reimburse for any LMI
                    cost  associated in  implementing  / obtaining  these offset
                    credits.

               10.  Most Favored Customers

                    LMI shall warrant that prices,  terms and  warranties  under
                    this MOA are at least as favorable as those being offered to
                    any other  purchaser of similar  products  under the same or
                    similar circumstances.

               11.  Order of Precedence

                    In the  event of  conflict  in  terms,  conditions  or other
                    Gulfstream documents, the following order of precedence will
                    apply:

                    A.   Memorandum of Agreement

                    B.   Purchase Order Issues per MOA

                    C.   Statement of Work

                    D.   Design Specification

                    E.   GV-GER-608, Rev. A, July 15, 1993

                    F.   SQAR-0003 dated 04/02 Quality

                    G.   GA 270 3/01 Additional Conditions

                    H.   GA75 7/97 SHIPPING, MARKING AND PACKING INSTRUCTIONS


GULFSTREAM AEROSPACE CORPORATION          LMI

/s/ Jim McQueeny                          /s/ Robert Grah
- ------------------------------------      --------------------------------------
Jim McQueeny                              Robert Grah
Director of Initial Phase Purchasing      Vice President, LMI

/s/ Brian McCarthy                        /s/ Ed Campbell
- ------------------------------------      --------------------------------------
Brian McCarthy                            Ed Campbell
Purchasing Manager                        Director of Marketing


/s/ Todd Smiley                           /s/ Ron Llopis
- ------------------------------------      --------------------------------------
Todd Smiley                               Ron Llopis
Senior Buyer                              Manager Customer Relationship