207 EXHIBIT 10.14 PETROLEUM MINING PERMIT 38148 (NGATORO) Background 1. The Licensees listed below are the holders of Prospecting Licence 38706. Licence Interest % Fletcher Challenge Energy Taranaki Limited 26.50835 Southern Petroleum (Ohanga) Limited 26.50835 Petroleum Resources Limited 18.18330 Australia and New Zealand Petroleum Limited 13.35000 Minora Energy (NZ) Limited 4.45000 Minister of Energy 11.00000 2. The Licensees have applied to the Minister of Energy to surrender the Prospecting Licence 38706 as to part of the land comprised in that Licence and described in the Second Schedule to this Permit. The Licensees listed in the First Schedule to this Permit have applied to the Minister of Energy to receive in exchange a mining permit. NOW THEREFORE I, MAX BRADFORD, MINISTER OF ENERGY, acting pursuant to section 25 of the Crown Minerals Act 1991 HEREBY GRANT a Mining Permit, on the conditions in this Permit and Schedules, to the Permit Holders named in the First Schedule to this permit. PERMIT CONDITIONS 1. Definitions 1.1 In this Permit: "Permit" includes the Schedules to this Permit; "Permit Holder" means the permit holders named in the First Schedule to this permit and refers to each and all of the permit holders jointly and severally. 1.2 The headings to the Clauses of this Permit are for convenience only and have no legal effect. 2. Duration 2.1 This permit is granted for a duration of fourteen (14) years. 208 3. Mining 3.1 The Permit Holder shall have the right to prospect, explore, and mine for petroleum in the area described in the Second Schedule to this Permit, and delineated on that plan in the Schedule. 4. Compliance 4.1 The Permit Holder will comply with the conditions specified in this Permit and with every other obligation arising under the Crown Minerals Act 1991 and any Regulations made under that Act. 5. Work Programme 5.1 The Permit Holder will comply with the work programme in the Third Schedule to this Permit. 5.2 The Permit Holder is responsible for ensuring that all appropriate consents are obtained before commencing any of the works authorised under the Permit. 5.3 The Permit Holder will at all time make all reasonable efforts to conduct exploration, appraisal and mining operations as appropriate in accordance with good oilfield practice and will meet that degree of due diligence and prudence reasonably and ordinarily exercised by experienced operators engaged in a similar activity under similar circumstances. 6. Fees 6.1 The Permit Holder will pay all fees payable in relation to this Permit. 7. Royalties 7.1 The Permit Holder will pay to the Secretary of Commerce a royalty calculated in accordance with the conditions set out in the Fourth Schedule to this Permit. 8. Date of Commencement of Production 8.1 Mining operations may commence on the day following the grant of this Permit. 9. Wells and Production Facilities 9.1 The Permit Holder will produce petroleum from wells in the Ngatoro Field in the manner described in the approved Work Programme. 209 9.2 The Permit Holder will not undertake any works in relation to the injection of water or gas into any underground reservoir (except as may be authorised by an amendment to this Permit). 9.3 The Permit Holder shall not flare gas from the Ngatoro field in the normal course of operations during any twelve month period commencing on 1 July in any year unless the consent of the Secretary of Commerce to such flaring has been obtained prior to the commencement of the period within which flaring is to take place. 9.4 The Permit Holder may drill additional wells and conduct initial well testing operations in accordance with the relevant Crown Minerals (Petroleum) Regulations. Additional wells drilled into petroleum reservoirs identified in the existing wells Ngatoro-1, -2, -3, -4, -5, -6, -7, -8 may be placed into commercial production under this Permit according to the work programme in the Third Schedule. New petroleum reservoirs discovered in additional wells shall not be placed in commercial production except as authorised by an amendment to this permit. 10. Amendments to Permit 10.1 The Permit Holder may request an amendment to this Permit by forwarding to the Secretary of Commerce, for consideration by the Minister of Energy, the information referred to in the relevant Crown Minerals (Petroleum) Regulations. 10.2 An amendment to the Permit will not generally be required for minor modifications to equipment where such modifications do not affect the approved production operations. In such cases, details of any changes to facilities or equipment included in the Work Programme approved in the Third Schedule are to be provided to the Secretary within 3 months of installation thereof. 11. Abandonment 11.1 At the completion of production operations in the Permit, the Permit Holder shall abandon any wells, remove surface facilities and restore operating sites in accordance with good oil field practice. Any gas and liquid export lines well be swabbed free of gas/hydrocarbon liquid and abandoned in-situ. Prior to the abandonment of any facilities in the Permit, the Permit Holder will submit a report to the Secretary of Commerce describing the proposed abandonment and the reasons for the abandonment. Dated at Wellington this 23rd day of December, 1996 /s/ Max Bradford Minister of Energy