EXHIBIT 4.9 SUMMARY OF THE FORMS OF THE SURVEYING AND DESIGN SERVICES AGREEMENTS FOR RAILWAY CONSTRUCTION AND THE CONSTRUCTION SERVICES AGREEMENTS FOR THE FOURTH LINE SUMMARY OF THE FORM OF SURVEYING AND DESIGN SERVICES AGREEMENTS FOR RAILWAY CONSTRUCTION 1. Date of signing: May 15, 2006 2. Names of projects, contracting parties and prices of agreements Prices of Agreements No. Name of Projects Contracting Party/Parties (RMB10,000) - --- ---------------- ----------------------------- -------------------- 1 Xintang-Pinghu of the Fourth Railway Line The Fourth Survey & Design 3,172 Institute of China Railway 2 Guangzhou-Xintang Rural Passenger Line The Fourth Survey & Design 732 (K0+796~K2+080, K32+600~K43+900) Institute of China Railway 3 Guangzhou-Xintang Rural Passenger Line Guangzhou Institute of the 1270 (K2+080~K32+600) Fourth Survey & Design Institute of China Railway 4 Guangzhou-Xintang Rural Passenger Line China Railway Electrification 238 Electrification Works Survey Design & Research Institute 5 Xintang-Pinghu of the Fourth Railway Line China Railway Electrification 468 Electrification Works Survey Design & Research Institute 6 Guangzhou-Xintang Rural Passenger Line China National Railway Signal 460 Communication and Signals Works & Communication Corporation 7 Xintang-Pinghu Rural Fourth Railway Line China National Railway Signal 657 Communication and Signals Works & Communication Corporation 3. Outline of contracts The contracts consist of 11 parts, including the basis on which the contracts are concluded, the sketch of projects and the phases and content of surveying and design, the basis of surveying and design, the basis for documentation, rights and obligations of both parties, breach responsibilities, the delivery of designing document, surveying and design fees and their payment, settlement of dispute, the effect of agreements and others, project management. 4. Scope of service: (a) conducting feasibility studies; (b) surveying, including preliminary surveying, final surveying and supplemental surveying; and (b) design of construction works plans. 4. Payment terms: A 20% of the contracted sum to be paid within seven days of the agreement becoming effective; a further 20% of the contracted sum to be paid within seven days of the approval of the preliminary design documents; a further 50% of the contracted sum within seven days of the submission of the construction works plans and documents; the remaining 10% to be settled within seven days from completion of the construction works. SUMMARY OF THE FORM OF THE CONSTRUCTION SERVICES AGREEMENTS 1. Date of signing: Date of signing: May 15, 2006 2. Names of projects, contracting parties and prices of agreements Prices of Agreements No. Name of Projects Contracting Party/Parties (RMB10,000) - --- ---------------- ----------------------------- -------------------- 1 Xintang-Pinghu Segment ZH-4 China Railway 3rd Bureau 53426.4871 Construction Services Agreement Group Corporation Limited) 2 Xintang-Pinghu Segment ZH-6 China Railway 13th Bureau 52281.162 Construction Services Agreement Group Corporation Limited) 3 Guangzhou-Pinghu Segment TXD-7 China Railway 11th Bureau 34898.556 Construction Services Agreement Group Electric Engineering Corporation Limited; and China Railway 25th Bureau Group Electric Engineering Corporation Limited 4 Guangzhou-Pinghu Segment TXD-8 The Second Engineering 28449.3681 Construction Services Agreement Corporation Ltd of China Railway Electrification Bureau Group 5 Guangzhou-Xintang Segment ZH-3 China Railway 13th Bureau 11141.0722 Construction Services Agreement Group Corporation Limited 6 Guangzhou-Xintang Segment ZH-1 China Railway 25th Bureau 19214.2167 Construction Services Agreement Group Corporation Limited 7 Guangzhou-Xintang Segment ZH-2 China Railway 18th Bureau 11698.5079 Construction Services Agreement Group Corporation Limited 8 Xintang-Pinghu Segment ZH-5 China Railway 25th Bureau 49687.2047 Construction Services Agreement Group Corporation Limited 3. Outline of contracts The contracts consist of 48 parts, including the sketch of projects, time limit for the projects, prices of the projects, quality of projects, designing document, bodies and representatives of both parties at the scene of the projects, the job of Party A, the job of Party B, the scheme of the progress, delay of the start of projects, the extending of project period, the moving up of the start of project, examination of project quality, examination and certification of hidden projects, the change of design, the material and equipment provided by Party A, the material and equipment purchased by Party B, the change of agreement prices, down payment for the projects, examination and pricing of construction, payment of project expenses, completion and examination of project, completion final budget and transfer of fixed assets, sub-contract of project, environmental protection, protection of cultural relics, rationalization proposals, construction safety, force majeure, stop and suspense of project, breach, claim, settlement of disputes, supplemental agreements, appendix to agreements, copies of agreements, deposit for fulfilling the agreement, settlement of breaches, bonus fund, contract management, co-ordination and cooperation, the adjustment of project period, agreement files and the sequent of explanation, building of honesty, project management. 3. Scope of service: The contracting parties No. 1, 2, 4, 5, 6 and 7 shall provide such services: (1) demolition and relocation; (2) construction works, including construction of roadbeds, bridges and culverts, railway tracks, power network and buildings; (3) installation works, including installation of power network and other operational equipment; and (4) provision of construction tools and equipment. The contracting party No. 3 shall provide such services: (1) demolition and relocation; (2) construction works, including construction of communications and signaling systems, power network and buildings; and (3) installation works, including installation of communications and signaling systems and power network. 4. Payment terms: (1) Monthly pre-payment: 30% of the budget for each quarter will be paid to the Contracting Party each month; (2) Quarterly and yearly assessment and payment: the balance of any outstanding payment is settled on a quarterly and yearly basis, based on assessment reports submitted by the Contracting Party and approved by the Company; (3) Final assessment and payment: 95% of the total contracted sum is settled based on the final assessment report submitted by the Contracting Party and approved by the Company. (4) A 5% of the total of each periodic payment is retained and shall be paid in accordance with the terms set out in the Construction Services Agreement, including the satisfaction of the relevant quality standards and completion of procedures for the transfer of the relevant fixed assets.