21 results
6-K
EX-99.1
PLM
Polymet Mining Corp
30 Dec 22
Form 43-101F1 Technical Report
5:25pm
(Wet)
(st)
Shovel Cycle Time / Pass
(min)
Waiting for Truck
(min)
Truck Spot Time
(min)
Shovel Dump Time
(min)
N.A.
Passes / Truck
(passes)
Tons Per … to handle all of the on-going road construction and maintenance, dump maintenance and clean up around the loading areas. Four multi-engine locomotives (2100
6-K
EX-99.1
PLM
Polymet Mining Corp
28 Nov 22
Mesaba Project Form 43-101F1 Technical Report – Mineral Resource Statement
7:02am
installation and third-party taconite mine-waste dump construction. Previous owners/operators of the mineral interests completed a shaft and underground
40-F
2021 FY
EX-99.1
PLM
Polymet Mining Corp
17 Mar 22
Annual report (Canada)
4:42pm
is the transfer point where the run-of-mine ore is placed into the side dump rail cars for hauling to the Coarse Crusher.
In addition
40-F
2020 FY
EX-99.1
PLM
Polymet Mining Corp
18 Mar 21
Annual report (Canada)
4:08pm
is the transfer point where the run-of-mine ore is placed into the side dump rail cars for hauling to the Coarse Crusher.
In addition to the railroads
40-F
2019 FY
EX-99.1
PLM
Polymet Mining Corp
30 Mar 20
Annual report (Canada)
5:02pm
is placed into the side dump rail cars for hauling to the Coarse Crusher.
In addition to the railroads and the loading pocket, infrastructure
40-F
EX-99.1
doo0vrdoegcs
29 Mar 19
Annual report (Canada)
12:00am
6-K
EX-99.1
0le2ie
5 Apr 13
Current report (foreign)
12:00am
6-K
EX-99.1
bbqmfho wla9sk99
31 Oct 12
Report of Foreign Private Issuer
12:00am
20-F/A
xeihq
31 May 11
Annual report (foreign) (amended)
12:00am
20-F/A
hruh6tg
17 Apr 09
Annual report (foreign) (amended)
12:00am
20-F/A
k3dmq6l
28 Aug 08
Annual report (foreign) (amended)
12:00am
6-K
EX-99.1
x48vb3m3phyz7dc
13 Nov 06
Technical Report on the Results of a Definitive Feasibility Study of the NorthMet Project
12:00am