21 results
6-K
EX-99.1
PLM
Polymet Mining Corp
30 Dec 22
Form 43-101F1 Technical Report
5:25pm
(Wet)
(st)
Shovel Cycle Time / Pass
(min)
Waiting for Truck
(min)
Truck Spot Time
(min)
Shovel Dump Time
(min)
N.A.
Passes / Truck
(passes)
Tons Per … to handle all of the on-going road construction and maintenance, dump maintenance and clean up around the loading areas. Four multi-engine locomotives (2100
6-K
EX-99.1
PLM
Polymet Mining Corp
31 Oct 12
Report of Foreign Private Issuer
12:00am
Dams
ICOLD
Inverse Distance Cubed
ID3
Land and Resource Management Plan
LRMP
Lerchs-Grossman
LG
Life-of-mine
LOM
Load-haul-dump
LHD
Locked cycle tests … altered to include East Pit backfill, the elimination of some dumps, and redesign of the remaining permanent dump.
In the DFS Update, overburden material
6-K
EX-99.1
PLM
Polymet Mining Corp
5 Apr 13
Current report (foreign)
12:00am
ID3
Land and Resource Management Plan
LRMP
Lerchs-Grossman
LG
Life-of-mine
LOM
Load-haul-dump
LHD
Locked cycle tests
LCTs
Loss on Ignition
LOI
Metal … , but have subsequently been altered to include East Pit backfill, the elimination of some dumps, and redesign of the remaining permanent dump.
In the DFS
6-K
EX-99.1
PLM
Polymet Mining Corp
13 Nov 06
Technical Report on the Results of a Definitive Feasibility Study of the NorthMet Project
12:00am
). ROM ore is delivered by rail from the open pit and dumped sequentially from 100 short ton side tipping rail cars into a 110 short ton dump pocket … , rear dump haul trucks. Support equipment will include bulldozers, graders, water trucks, service vehicles, a rough terrain crane, pit pumps, lighting
40-F
EX-99.1
pxygmg1
29 Mar 19
Annual report (Canada)
12:00am
40-F
EX-99.1
crdlmcvd04
30 Mar 20
Annual report (Canada)
5:02pm
40-F
EX-99.1
dzzwe eihx1mideb7ow7
17 Mar 22
Annual report (Canada)
4:42pm
40-F
EX-99.1
dpl835qv brmp
18 Mar 21
Annual report (Canada)
4:08pm
20-F/A
z0l4kj
28 Aug 08
Annual report (foreign) (amended)
12:00am
20-F/A
i8zyw1p vr7
17 Apr 09
Annual report (foreign) (amended)
12:00am
6-K
EX-99.1
3rth0wgiy1s dp053v
28 Nov 22
Mesaba Project Form 43-101F1 Technical Report – Mineral Resource Statement
7:02am
20-F/A
3bp79jxcxx9hp7wj5xpn
31 May 11
Annual report (foreign) (amended)
12:00am