20 results
40-F
2023 FY
EX-99.1
ASM
Avino Silver & Gold Mines Ltd.
29 Mar 24
Annual report (Canada)
6:05am
the Avino underground mine operation before discharging it to El Caracol Dam. The effluent is sampled daily when the WTP is operational.
1.8.1 Oxide
40-F
2022 FY
EX-99.1
ASM
Avino Silver & Gold Mines Ltd.
3 Apr 23
Annual report (Canada)
8:00am
treatment plant (WTP) for treating excess water from the Avino underground mine operation before discharging it to El Caracol Dam. The effluent is sampled
F-3/A
EX-4.6
ASM
Avino Silver & Gold Mines Ltd.
27 Jan 21
Shelf registration (foreign) (amended)
5:22pm
underground mine operation before discharging to El Caracol Dam. The effluent is being monitored on a daily basis when the treatment plant is operational … and to precipitate the heavy metals was constructed and built. The water treatment facility is a typical Mexican design, and the effluent water quality
6-K
EX-99.2
ASM
Avino Silver & Gold Mines Ltd.
27 Feb 19
Consolidated Financial Statements
9:37pm
technology.
In October 2018, the Company received a Permit Amendment of the Effluent Permit. This amendment now encompasses a broader scope for water
6-K
EX-10.1
ocvait1fj5x
26 Dec 18
Current report (foreign)
2:45pm
6-K
EX-99.1
tofn0poe09 1cogd
17 Dec 18
Avino Announces Drilling into the 27 Vein Extension Target at the Bralorne Gold Mine
3:53pm
6-K
EX-99.2
xjm51p
8 Nov 18
Condensed Consolidated Interim Financial Statements
12:00am
6-K
EX-99.1
wz46wr1
8 Nov 18
Current report (foreign)
12:00am
20-F/A
xupz4r66z8 1cmi4y
13 Jan 15
Annual report (foreign) (amended)
12:00am
20-F/A
30mo0267m1uhas4 4fm
19 Nov 13
Annual report (foreign) (amended)
12:00am
6-K
EX-99.1
x45zjvembjp7n0ayq8nz
26 Jul 13
Technical Report on the Avino Property, Durango, Mexico
12:00am
6-K
EX-99.1
zh3h cviw2fa8
30 Jul 12
Technical Report on the Avino Property
12:00am
6-K
EX-99.1
ihxitnuv nln
26 Apr 12
Retreatment Process Option Update
12:00am
6-K
EX-99.1
06htf8b7f
4 May 06
Current report (foreign)
12:00am
- Prev
- 1
- Next