16 results
6-K
ABBNY
Abb LTD
18 Apr 24
Current report (foreign)
9:32am
regulations.
ABB Electrification’s
facility in Vaasa
has achieved a 1,400t
CO
e reduction in Scope
1 & 2 emissions since
2019. This
progress …
CHANGE
12M ROLLING
CO
e own operations emissions,
Ktons scope 1 and 2
-28%
Lost Time Injury Frequency Rate (LTIFR),
frequency / 200,000
6-K
ABBNY
Abb LTD
23 Feb 24
Current report (foreign)
8:32am
percent reduction of scope 1 and 2 GHG emissions since 2019
74 megatons CO2e emissions avoided throughout lifetime of products sold in
ABB today … Standard of the Science-Based Targets initiative (SBTi) for
validation. These targets include ABB’s scope 1 and 2 emissions, which it aims to reduce
6-K
ABBNY
Abb LTD
1 Dec 23
Current report (foreign)
10:57am
targets to SBTi with
validation expected in 2024. These include
1.5°C-aligned Scope 1 and 2 targets aiming
at a CO2e
emissions reduction of 80
6-K
ABBNY
Abb LTD
18 Oct 23
Current report (foreign)
10:06am
steady progress
towards our target.
Sustainability
Q3 2023
Q3 2022
CHANGE
12M ROLLING
CO
e own operations
emissions,
Ktons scope 1 and 2
6-K
ABBNY
Abb LTD
20 Jul 23
Current report (foreign)
8:13am
vehicles
that can be
driven fossil-free.
Q2 2023
Q2 2022
CHANGE
12M ROLLING
CO
e own operations emissions,
Ktons scope 1 and 2
-28%
Lost
6-K
baeqxekfsd89k22
25 Apr 23
Current report (foreign)
9:17am
6-K
z0war181n 13g
20 Oct 22
Current report (foreign)
1:43pm
6-K
wqi5y4wr
21 Jul 22
Current report (foreign)
9:51am
6-K
9wwu5rrx k2
21 Apr 22
Current report (foreign)
10:54am
6-K
q2n8tepbgwkdobzdee
3 Feb 22
Current report (foreign)
9:30am
6-K
qkhp smea7
21 Oct 21
Current report (foreign)
6:12am
6-K
dkyi zqrpoh
22 Jul 21
Current report (foreign)
3:34pm
6-K
bf8nii b09
27 Apr 21
Current report (foreign)
3:05pm
- Prev
- 1
- Next