26 results
40-F
2023 FY
EX-99.1
NXE
NexGen Energy Ltd.
6 Mar 24
Annual report (Canada)
9:56pm
and packaging
Tailings preparation and paste tailings plant
Effluent treatment
Plant throughput will be 1,300 t/d and design production will be 30 … support infrastructure for the mill, including process plant, SX plant, effluent treatment plant, and acid plant.
Site support infrastructure
40-F
2021 FY
EX-99.1
NXE
NexGen Energy Ltd.
25 Feb 22
Annual report (Canada)
4:39pm
plant
Effluent treatment
Plant throughput will be 1,300 t/d and design production will be 30 Mlb U3O8 per annum. It is expected that a 3-month ramp … , SX plant, effluent treatment plant, and acid plant.
Site support infrastructure, including accommodation camp, Liquefied Natural Gas (LNG
40-F
2020 FY
EX-99.1
NXE
NexGen Energy Ltd.
19 Mar 21
Annual report (Canada)
5:26pm
YC precipitation and washing
YC drying, calcining and packaging
Tailings preparation and paste tailings plant
Effluent treatment
Plant throughput … explosives magazine, and ventilation fans.
Surface support infrastructure for the mill, including process plant, SX plant, effluent treatment plant
6-K/A
EX-99.1
NXE
NexGen Energy Ltd.
11 Mar 21
Current report (foreign) (amended)
2:17pm
Backfill Plant
17.2.13 Effluent Treatment
17.2.14 Feed and Effluent Monitoring Ponds
Uranium Recovery
Energy, Water, and Process Materials Requirements … precipitation and washing
YC drying, calcining and packaging
Tailings preparation and paste tailings plant
Effluent treatment
Plant throughput
F-10/A
NXE
NexGen Energy Ltd.
9 Mar 21
Registration of securities (Canada) (amended)
12:00am
Effluent treatment
Plant throughput will be 1,300 t/d and design production will be 30 Mlb U3O8 per annum. It is expected that a 3-month ramp-up period … , and ventilation fans.
Surface support infrastructure for the mill, including process plant, SX plant, effluent treatment plant, and acid plant.
Site
6-K/A
EX-99.1
178nyh6zyg wya03
8 Mar 21
Current report (foreign) (amended)
6:09am
F-10/A
ofnqx
26 Feb 21
Registration of securities (Canada) (amended)
4:42pm
F-10
vlju98
25 Feb 21
Registration of securities (Canada)
4:25pm
6-K
EX-99.2
p48xy1cnxple
25 Feb 21
Material Change Report
1:40pm
6-K
EX-99.1
61gttbrggiet aivmt
24 Feb 21
Current report (foreign)
12:00am
6-K
EX-99.1
c83rqwrl 7d8
22 Feb 21
NexGen Announces Elite Environmental and Economic Results from the Rook I Feasibility Study
10:36am
6-K
EX-99.2
ngagn
12 Nov 20
Unaudited Condensed Consolidated Interim Financial Statements
12:00am
6-K
EX-99.2
8tb iumv4sbk
13 Aug 20
Unaudited Condensed Consolidated Interim Financial Statements of
12:00am
6-K
EX-99.2
xpa mna3ldtu93
8 May 20
Unaudited Condensed Consolidated Interim Financial Statements of
11:28am
40-F
EX-99.1
hygge3j
12 Mar 20
Annual report (Canada)
12:00am
40-F
EX-99.2
6h0y 0b0e
12 Mar 20
Annual report (Canada)
12:00am
6-K
EX-99.2
xvh9a8xflycn u3sw8s7
29 Oct 19
Unaudited Condensed Consolidated Interim Financial Statements of
12:19pm
6-K
EX-99.2
6neofk3w
9 Aug 19
Unaudited Condensed Consolidated Interim Financial Statements of
4:47pm
6-K
EX-99.2
f7br08
10 May 19
Unaudited Condensed Consolidated Interim Financial Statements of
11:58am
6-K
EX-99.1
hi90 hglfm5ioic
29 Apr 19
NexGen Announces the Commencement of an Environmental Assessment for the Rook I Project
1:16pm