10 results
40-F
2023 FY
EX-99.1
NXE
NexGen Energy Ltd.
6 Mar 24
Annual report (Canada)
9:56pm
and process water usage through recycling, finalize the site water management philosophy and optimize the required infrastructure, consider heat recovery
40-F
2021 FY
EX-99.1
NXE
NexGen Energy Ltd.
25 Feb 22
Annual report (Canada)
4:39pm
mining equipment, reductions in mining and process water usage through recycling, finalize the site water management
philosophy and optimize
40-F
2020 FY
EX-99.1
NXE
NexGen Energy Ltd.
19 Mar 21
Annual report (Canada)
5:26pm
in mining and process water usage through recycling, finalize the site water management philosophy and optimize the required infrastructure, consider
6-K/A
EX-99.1
NXE
NexGen Energy Ltd.
11 Mar 21
Current report (foreign) (amended)
2:17pm
and improved safety by considering remote or autonomous mining equipment, reductions in mining and process water usage through recycling, finalize the site … operating costs and improved safety by considering remote or autonomous mining equipment, reductions in mining and process water usage through recycling
F-10/A
NXE
NexGen Energy Ltd.
9 Mar 21
Registration of securities (Canada) (amended)
12:00am
or autonomous mining equipment, reductions in mining and process water usage through recycling, finalize the site water management philosophy and optimize
6-K/A
EX-99.1
elio78allhdl98
8 Mar 21
Current report (foreign) (amended)
6:09am
F-10/A
81m3y1c
26 Feb 21
Registration of securities (Canada) (amended)
4:42pm
F-10
4ppjkgo2
25 Feb 21
Registration of securities (Canada)
4:25pm
6-K
EX-99.2
zqc5edzdg0s
25 Feb 21
Material Change Report
1:40pm
6-K
EX-99.1
slsn us10xw3q0p2
24 Feb 21
Current report (foreign)
12:00am
- Prev
- 1
- Next