11 results
6-K
EX-99.1
tLAC
Lithium Americas Corp.
13 May 24
Current report (foreign)
7:30am
, and minimizing Scope 3 emissions by utilizing lower carbon intensity transportation methods.
The TLT design has been advanced to approximately 20% design
424B5
tLAC
Lithium Americas Corp.
18 Apr 24
Prospectus supplement for primary offering
9:48pm
Intensity
Scope 1 and 2 carbon intensity for the Thacker Pass Project based on the Thacker Pass TR process is estimated to be approximately 40% less than … emissions intensity for the Thacker Pass Project.
Water Recycling and Reuse
In furtherance of the Company's commitment to low water consumption
424B5
tLAC
Lithium Americas Corp.
17 Apr 24
Prospectus supplement for primary offering
5:20pm
Intensity
Scope 1 and 2 carbon intensity for the Thacker Pass Project based on the Thacker Pass TR process is estimated to be approximately 40% less … emissions intensity for the Thacker Pass Project.
Water Recycling and Reuse
In furtherance of the Company's commitment to low water consumption
6-K
EX-99.3
tLAC
Lithium Americas Corp.
17 Apr 24
Notice of Annual General and Special Meeting of Shareholders
5:04pm
) greenhouse gas (GHG) carbon emissions intensity for Thacker Pass, including benchmarking against comparable peer projects for which carbon intensity … is publicly disclosed.
For Thacker Pass, expected operational Scope 1 and Scope 2 carbon intensity per tonne of lithium carbonate (tCO2e/tLi2CO3e
20-F
2023 FY
tLAC
Lithium Americas Corp.
18 Mar 24
Annual report (foreign)
7:15am
is as high as 1.81 wt.% in the clay regions located in the boundaries of detrital grains.
Attrition scrubbing (a form of high intensity slurry
20-F
EX-15.12
q5sf l8o1x
18 Mar 24
Annual report (foreign)
7:15am
6-K
EX-99.1
2v6weosk1uw9v1 zwqb1
14 Mar 24
Lithium Americas Receives Conditional Commitment for $2.26 Billion ATVM Loan from the U.S. DOE for Construction of Thacker Pass
6:06am
6-K
EX-99.2
y9k06 j2lvj7t4
14 Mar 24
Lithium Americas Receives Conditional Commitment for $2.26 Billion ATVM Loan from the U.S. DOE for Construction of Thacker Pass
6:06am
F-3/A
llhp5y6 iam
7 Nov 23
Shelf registration (foreign) (amended)
8:32pm
F-3
5cfwb 7jsnldmlp7qc
5 Oct 23
Shelf registration (foreign)
7:34pm
20FR12B
EX-15.1
8k2td57pic
21 Aug 23
Initial registration of securities (foreign private issuers)
5:32pm
- Prev
- 1
- Next