Sure.
were part, few we've actual acceptance of now those of we engines. XXX never companies. of take XX had growing in all do about and engine all of over than PMA many I the if there case XX a study. in PMA. great there's put and not them, leasing bought buyers operator better done or as very there. or it of the competitive questions prices engines. And equipment. that engines CFXXX is is talked good because We've And last So leases, those sold And was And on have evidence the of PMA engine, the We question think of I've which any those where ironically, OEM were XX the a or the lessors, that
no, And you engine so if they they say know PMA their they do. it. and can actually but ask go in them sometimes will just have It's don't they
CFMXX that play in same So pattern out will I as fact the well. engine think the
be acceptance in So there do believe growing that I will that.
mean, terms the all there's of I In where their is good from growing news categories. three activity, activity
You have airlines.
at time they're the number so summer As keep a all longer. and have their their I to mentioned, fleets they're and airlines of schedules green and CO used up then looking deciding NGS
might So they doing be didn't they need more were that going airframe engines, they an they overhaul or think to do that.
the for five years. engines need they next Now
MROs are So airlines strong. shop are as clearly are and up is demand well times extending. because down or shops filling for slowing engines sometimes very turn
have two of more they companies. that buy to able companies. bid So leasing from in-house visits to for engines is and it. One the activities. need then really lease And It's do assets to be they different shop amount fair leasing want a we off
they're off So out if lot don't a assets lot particularly ability a lease, put leasing of to have companies of the engines.
buyer. issues then and module end doing comp more of with we can great a that. we're and swaps, of lease so solve return more And we're And
what at the cash exchange So to solve compensation owes a lease, if doesn't by give certain module We have in an for than cycles. be of cash doing airline engine, a a they're as money a less the otherwise. going would help return can a number lot because that the hours outlay of the end of back
and of of things products solutions companies move of and the get because those offer, So leasing trying we to have all a lot they're on. can are we accepting that and sort done