Thank Trem. you,
I priorities. As on my of emphasize quarter operational safety environment want I protection the remain Berry, excellence to full first completed the with our top
employees we XXXX, and recordable of to In incident. to all Trem will all to which dedicate optimizing excellent to environment, targets. to to current environment, and not of to of report and did the we the that incidents assets meet resources we the only incident protect continue safety the value performance single XXXX, have our conventional all growth rate of to necessary our contractors, X.X, predictable our I meaningful infrastructure. and commitments had by the of exceeding regulatory total guarantee In lost translates our results respect XXXX, integrity year. place. We am recordable a will health we noted, and in in safeguard continue generating two create proud our and achieved safety time
Moving production. start I'll with to performance.
in QX. We drilling for production constitutes QX up through from activity Our paused the last during resulted we XXXX California this our to reservoirs later We October in a which XX-well in quarter, production April was X.X% Drilling XX% from XXXX. about package XX oil production, big assumed drilled of all X.X% as wells, production, anticipate fourth of total in this which in year, by quarter. thermal sandstone decline California. versus
production the we XX,XXX in year producing XX,XXX QX average and Our day a exited nearly a was day. barrels barrels
plan Our keep in year-on-year, rate with a XXXX is to with to exit year California. production year-end growth positive last in flat compared continued
BOE. OpEx reduced XX% reduction Next, by XXXX. improvements a categories. steam major per X% we expenses. in a compared to let's expense with We an OpEx in averaged $X.XX XXXX, by operating per turn BOE by is XX% improvement $XX.XX of driven all to when operating non-energy This used energy rates. And we In
around achieved $XX this we operating to BOE Importantly, for be OpEx expected Non-energy expenses without affecting total XXXX. for a per are production. sustainable of
reduce dedicating facility field cost structure can resources. projects improve that through and are generating in We even the a from more the optimizing long-term. executing We combination our of ideas LOE contracts,
to determined are become operate. cost where We operator lowest the in basins the we
to XXXX. for turn for investments CapEx at was $XX reduced QX our year let's full in our with We plan in and in capital the $XX maintain plan line Now, capital. and million, respectively. million
our completion property in restarted on decline. want to QX our development than However, higher of I XX in drilling XX% and clear California. Hill the these drilled low in Peak wells pre-drill production in is sandstone October. reservoir as example This is wells XX with in for highlight before, campaign shallow below a a Tillery predictable the mentioned with drilling the mature estimates campaign. geology costs steam flood XXXX we
XX-year As at producing a a result, the high. field is currently
XXX million is to of the in $XXX workovers emphasis program in development the will to capital and workovers XXX in putting approximately on capital drill $XXX activity performed We're compared best be of roughly XXXX efficiency. investment a this capital and year some Workover recompletions. years. Our We'll range. terms the million previous strong wells
idle diatomite Livermore CalGEM. QX. cyclic operations and were end of for development. is the $XX future study steam We abandonment In committed our mandated of and obligations the Idle continue accelerate we XXXX, abandoned review not exceeded in thermal XXX to plug reservoir million. XXX new are the to to of XX do production. further required to well XXXX, Lawrence at We've intend CalGEM to complete Well been Remember, accelerate million plan. commandments fully abandon XXX be pressure will XXX anticipate include technical by in we the wells by our required under abandoned plans Similarly, be with by California work thermal permit wells. new this We wells operations. XX told $XX production our The are above the which cost spending total on under wells, to to XXXX to high a released diatomite wells, opportunity well study thermal Management The an approximately approvals additional obtain CalGEM diatomite
enter Our new California that, is only to it reservoirs the almost year I'll anticipated Cary. with permits over XXX with And and sandstone XXXX we program development in in turn for targeting hand. where