joining quarter everyone, for call. our Good afternoon, Eric. Thanks, third and thanks conference
order come manufacturing to the organization that large-format cells. evolve battery lithium-metal in to cell with the As our development, challenges continues and all in meet innovate leader
we milestones. During achieved several important the third quarter,
in in of about was completed, facility First, our assembly our on Since use XX Apollo-based has and line to already months its and was produce opening, XXX XXX only able amp-hour been Korea this Korea X after greenfield to ground January. SES cells. ready pilot breaking September, cell SES large facility
in QX our SES Shanghai and produced several Second, XXX higher X,XXX about Korea Shanghai Apollo-based month. Both cells. Giga has per much have cells January since approximately was capacity, Giga and operational thousand fully XX and facility amp-hour
slowed identify intentionally quality robust. address We to plan manufacturing their order more increase focus our becomes we on lines and However, manufacturing in and down to volume when to process issues.
to XX data of all shared have our have and We partners with cells OEM amp-hour some cell shipped XX JDA partners. amp-hour
Going cells partners, of to forward, GM, ship all to our Honda. and including plan we Hyundai
share JDA and data them XXX we'll in to cells, XXXX. shipping We our also on amp-hour to begin our expect partners early
means at safe Importantly, approved independent the have have UNXX.X for XX testing amp-hour deemed cells certification, received transport which by they Giga produced an Shanghai lab. been
meeting on to Additionally, the line it certification, quality quality automotive received for our Shanghai is market. which track the means process requirements IATFXXXXX
We amp-hour in Shanghai produced to and certifications the strong. SES interest remains in expect receive cells Customer large-format cells same for these our Korea. XXX
world. have anyone battery lithium-metal in We data we X the the have shared other EV the eVTOL OEMs with built and else. cells that small OEM development than have and several to believe also we leader addition announced, formally In large-format and cell more lithium-metal around we JDAs that are
been and XXX incredibly XX developing cells much expected. we and amp-hour harder However, large has and, building than difficult candidly,
powder algorithms health pressure large foils, a to and that optimizing shorting, monitoring poor lead to our to problems, name developing complex including can encountered pressed initially, over of a cut arising lasers from have without anodes any for data using cells accurate density larger just We wide-format lithium-metal distribution few. area cells
our failures, we a valuable now we numerous Avatar. health capacity which data cell have problems, to lot of to large train using that these of result a as gained are monitoring incredibly have algorithm, Importantly, led
predict in the to increased past ability XXX our months. few from XX% approximately XX For in cells large and X% example, amp-hour to has failures
amp-hour more smaller our in predict cells is failures training. now For than to years XX% ability comparison, X of after data X
addition, partnership now several yielding changes make yield. and us in key that In in quality our are vendor process issues to manufacturing significant performance, forced cell these have and improvements
smaller X Our contains both new amp-hour X the cells cells, letter making the in and performance of smaller that match to while updated, performances material progress the X of a cells, and gap confident cell tuned will performance new show that larger plan Stay improve summarizes the in amp-hour making amp-hour developing transition manufacturing, cells exciting electrolyzed shareholder table more the anode and last engineering expected will recently our cells, coatings XX We up On we largest chemistry, of month cells. XX later cells. a samples B this there's as materials cells and data great and XX amp-hour the XXX to performance ongoing. XX we from year remain leading first the published all still still On improvements XXX between our we're bridging new amp-hour samples. entirely amp-hour are and to of amp-hour that publish detailed A performance expect our cells progress to gap. and data cell amp-hour this
certain chain lithium-metal take our to supply our we As a large have quality. elected and in-house real-world improve cells, to experiences have with fresh and of take performance operations look to a at started result
little besides and analysis our with This Our had ability us anode and comprehensive vendors. getting important component for chain. control lithium-ion internal our only now reduce but samples supply of requirements chain We focused for from is quickly quality cell for overlap OEM having on Initially, cathode, process chain not our optimize. every a scale we lot development. and step investigate and every summary purchased our Having us system Improving in B to lithium-metal critical the cell. and to to optimize and electrolyte, also R&D for that the supply identify troubleshoot, meets capability in over develop is a foil and pilot a to to cost. simply supply allows the lithium separator has only scale volumes and a
for all in-house to vendors system, performance our materials it Now with cell. and of A the lithium-metal specifications, we is new improved really especially or materials, and have we quality our cell which partner living the large breathing cells. either our them has amp-hour make XXX develop and a cell
of every If In sample late succeed at OEMs you battery or President access other New planned chain, the South meeting Korean South research not for to in don't batteries, and September, the supply will from have privilege samples I the and the batteries had detailed you of Korea. step, Korea-North Investors lithium-metal to control investment I full-blown stage. only the full South Roundtable advancing the specs in in B the South A entire America to get where event, committed Korea little in meeting North billion semiconductors for a for American York. and was of total industries. announced $X.XX participate company SES of the development
is of EV investing global Korea plays development batteries the in This are world why the key in the South and leader SES a Korea. is we chain. upstream role supply in
electric Reduction tax urban credits Act, manufacturing in the government lithium-metal chain battery proud America. supporting of to to very mobility Korea IRA, incentives and attractive our been ecosystem. future and our in battery South or offers and the by recognized of and innovation are vehicle recent We air Inflation North for for have supply commitment technology The build-out
battery can actively chain. North establish partners robust see are learning global we a to supply supply our We to from EV American with discussing how leverage the our chain
to transition very attain two, A sample are here. incredibly We this JDA sample to one, batteries; batteries our excited for set X: to the third, challenging, mid-XXXX. key we by deliver These establish are on to materials. supply and sample we all about for are from begin optimize but A good and batteries year, chains we milestones continue potential hope making X partners; Earlier X progress B
Finally, third on chain we World results AI-based hold I'll outlook. supply our large-format everyone Topics further of Battery development Nealis, now be initiatives. health our turn to expect join cells, World December our data Financial second and monitoring to over our review us. quarter battery thoughts Jim hope to Chief at Officer, include and and our able will annual will and in Battery to performance