we X Slide drilling our breakdown buckets. the quarter split drilling end is four Bossier of A it into inventory you, thank and XXXX got Okay, is between Haynesville Roland. inventory. divided
up feet and medium feet. laterals our short Our feet, between X,XXX X,XXX X,XXX run laterals that to
category laterals. long Our to feet, our created XX,XXX recently feet laterals and feet extra-long our for XX,XXX from of X,XXX run laterals exceed that wells our
stands currently inventory interest on operated X,XXX net equates to X,XXX total gross which locations, average XX% at inventory. Our locations, the working a operated
average locations interest working inventory. we non-operated XX% Our on locations, in which represents have non-operated our XXX inventory a X,XXX net gross
bucket, we gross long to laterals, extend recap, range. operated Haynesville our operated Based have the XXX inventory, on operated locations. inventory our split acreage inventory we leverage laterals, the and have wells, targeting gross lateral XX% the locations And short to XXX where drilling foot the And and Bossier. XXX net modifier extra-long is laterals, in XX,XXX The XXX recent XX% XXX we our to continue of foot laterals. in to future medium recap laterals lateral the gross extra-long operated specifically our extra-long position XXX our to XX,XXX and possible our currently success and
our end of By This at slightly extending at X,XXX our up we stands the from is laterals, the feet. XXXX. our X,XXX in average lateral inventory length feet now had
with activity levels. a us In plan methane footprint addition Based level our gas locations. laterals intensity our help reduce to surface the longer runway XX-year inventory our greenhouse of to provides drilling the this and economic XXXX us uplift, reduce and future on
Slide as average On a drilled length, XX by we've year. outlines the chart, lateral this
the quarter that an in short wells of foot to benchmark to the lateral laterals long the than of the had we of feet. ranged long foot The wells lateral long. Five the during XX were the first the on two X,XXX foot long length beyond end. wells quarter than of XX coming lateral laterals greater were up we to XX,XXX XX turned turned average feet During a our individual with XX,XXX sales are X,XXX laterals. X,XXX on from feet XXX XX,XXX end sales We longer wells feet.
wells increase feet. foot XX stands Our sales last was to recently another our record which XX of successful quarter Texas wells length on #XH group feet be in This with current XX,XXX to XX the well a Included and the average of wells XX end. completed XX,XXX on XX,XXX formation XX,XXX feet. foot we Western on is well, well, plan in the third our and laterals year East approximately completed year-end year. will will Based that these beyond by extra-long the lateral If will to Campbell be we the to still laterals. [ph] schedule, XX,XXX acreage of is turn future long-lateral. XXXX well sales turned during acreage, our lateral long the fourth at Haynesville Bossier was our
Slide XX outlines activity. our new, a well new
million last call. well our sales had We of XX IP to this wells on the of million and really feet with XX an XX,XXX a again a have with was the turned group day good rate feet. We up with from XX feet new XX,XXX to wells laterals individual XX since ranging test tested ranged X,XXX average of time to individual rates day. The cubic a from average performance and feet lateral million length up day, the
in to a this The enhances Panola day, dry well in low we in in acreage our have gas wells lower wells natural rate IP ownership wells well. XX quarters, for XX% as activity completed which in those XX% this our turn our for that on six Included million versus on which the comparable our the the working interest quarters the to wells. at even a with were represents liquids, interest is to working six IP XX gas XX prior average produced Haynesville County, XX latest barrels barrels the acreage economics rich gas liquids
lateral Also well at plan We with quarter on Haynesville an flowing foot well included produce Campbell XX rate are our sales well our million XX,XXX rate. which well was was cubic to IP we today rate day with tested the same this in the the this to March. feet The currently a the in and and well a of long this at third turned #X Western completed was successful acreage. Bossier
the a have well and In fourth completing is that addition, we completion. well are acreage on currently our waiting fifth on
couple to of expect next both the these next turn of two to We wells months. sales within
two wells. we're Western on acreage Additionally, seventh its rigs our and drilling Haynesville our running sixth currently
to foot, were which sales Texas, the all XXXX for legacy lateral a greater the during D&C cost wells. increase fourth North the XX% covers which D&C Slide on XX quarter, benchmark the $X,XXX quarter our East long first XX over is XX per we our cost. through XX% the lateral than these benchmark our acreage quarter feet wells quarter averaged increase position. compared full wells, an our D&C first of In long X,XXX our wells cost turn to year our Louisiana core summarizes and
a this most and compared as a Our versus shorter quarter first drilled last, majority the of quarter sales quarter $XXX The at to we to drilling costs which early of is turned the with is the wells fourth drilling increase the quarter. a came cost foot, length in of quarter. lateral XX% attributable increase average third inflation the fourth along in to were
fourth Our completion used half at frac the of fraced completion to in natural is The only the increase Titan with fourth X% primary first first costs our fleet completions to fact natural which opposed Titan wells quarter came fleet. than that to gas the contributor quarter as in XX% was quarter. of our well quarter were more a our our the gas foot, first were $XXX costs a quarter higher compared during
As mentioned With to we've the gas of Titan being significant calls, to fuel that compared savings the previous capture on able diesel use fleet. conventional natural been the the fleet rigs. couple on activity fleet we our eight within To the next we are where the stand second are said, sum of levels, delivery up currently expecting we months. of Titan running through
of be rigs. to down these couple in of us weeks released to One seven a bring will
length Well, of This methane a improvement Slide gas We we our rate related turn emissions highlight improvement greenhouse XXXX, in into XX% On intensity by versus lateral reported lateral X% X.XXX%, a versus sales those we we is per of our BOE a of emission reported achieved of improvements to of sales increasing despite XXXX, improvement our kilograms production. equivalent XXXX. completed continued intensity a which gas X.XX turn and wells. to emissions. feet adjusting for XX% COX for is methane XX, greenhouse
sales turn Our XX% by greenhouse gas sales to methane our lateral emissions to foot improved improve lateral XX%. turned emissions per per while foot
gas aircraft and technology at imaging XXX% ability almost our us gas optical responsibly earned of sourced. is sites, the deployed We production our leak certify monitoring which to
natural Our COX five diesel natural eliminated gallons metric approximately gas-powered gas million frac equivalent. tons by of offsetting XX,XXX fleet approximately of utilizing
operating frac began in a natural reminder, first our gas-powered As fleet April.
contribution see So second our reflects of arriving numbers. to that date just reductions fleet by our in of the the quarter, XXXX our in we end nine gas-powered natural months field should continued second With emissions. the
eliminated utilizing approximately approximately on our X,XXX of rigs by offset natural newly of constructed drilling tons gas, approximately metric fuel equivalent. gallons dual equivalent. mitigating which facilities Our X.X installed COX metric million tons of diesel We X,XXX COX of instrument approximately production XX%
going call over now back I'm to to Jay. turn the
sum outlook. XXXX the up can You