Andy. you, Thank
study Capture was Let’s review ethanol Capture. XXXX, the our University the in carbon have sources X new one of as a Center plants return California plant that on the Carbon Stanford largest plant a cement facility subsidiary, COX California. California from COX for highest compared Carbon October Aemetis by In in to building the refineries, identified potential Aemetis issued and that XX comprise investment and capture natural gas oil in sequestration emission sources the plants power in
already dioxide ethanol tons COX for credits already of plant we COX compresses liquification about plant per Messer XXX,XXX carbon Our from transportable captures metric tax in reuse. COX generate XXQ IRS already into year liquid which the and the
confirmation were study. We in underground now of cited formations review are Stanford completing COX the that a X-month the sequestration
as We deep about as sequestration. foot basement a above is that have ideal period with Riverbank known jet related Stanford by strata two that salient our process cited as COX the well managing the expanded underground Class plant permanently Riverbank known Compliance carbon form Hopkins of and opportunities rock. other a team an are sequestered the and subsidiary formation process. COX and a reacts X,XXX time, X,XXX salient dioxide layers and Carbon not by the atmosphere. the a EPA was Manager and development well mineral the diesel regulatory sites Between a Aemetis to Capture long Regulatory is X Over a to permitting cap adding Keyes manage located foot the to to lead plant deep determined strata the and as plant as permitting Mehagan injection We rock does as a for of that return site
from the In XX for global projects, plan two plan emissions to worked XXX,XXX waste to years inject for recently sequestration year project, ethanol wells of Chevron’s and and and industrial two Capture up diesel Aemetis managed addition at we experience we in sites to biogas, Phase biofuels California. California Mehagan COX commercial permitting jet remediation. our tons X Carbon per which drill plants into of In our plant to metric near Chevron
the injection X year per We After per expecting for build wells million X.X of an a XXX,XXX have ground per initial gas year that compression operational. capacity of tons million then construct additional are metric to year tons above metric is capacity. facility minimum the per of compression point initial COX injection COX tons well the
sources We in California, credits, including discussions are credits would LCFS and XXQ air companies. active emission IRS capture with major generate COX in that and oil multiple refineries direct
million initial for Carbon to a construction of two Regarding will project. phase EPA metric data wells of year other COX empirical up afterwards the of the The to the wells Aemetis tons X EPA X provide Class supply per permits. characterization Aemetis of injection for drilled includes X and to drilling receiving The Phase permit. Capture be then
we in with QX the next the process expectation are in the first drill can characterisations and We two year. that of well currently engineering characterization permitting with the wells
Let’s our renewable zero jet using in negative fuel diesel intensity Riverbank, carbon California. project discuss carbon hydrogen
separate air Further this construct under of to milestones amendments authority of a ATC known year, issuance pleased the are otherwise permits We Earlier refinery final years the to related bio we as continues work. carbon achieve are near the Riverbank after major XX planned announced the or in to Riverbank, to California several permits of development Modesto, Aemetis zero part the as engineering. permits. refinery,
are the diesel engineering XX jet USDA the financing. of closing year phase currently support We in the to of debt plant
signed XXXX of with technology a for Axens process technology QX, France catalyst diesel the plant. agreement the we and for jet During
moving the EPC as Project construction. Koch of scope expected work with the the managed agreements and for was contractor. the which a manager We engineering are the engineering Solutions Koch of contracting recently project phase the We development accelerated that project, to completed also with by diesel signed jet toward EPC now of engineering project an and agreement phase
onerous on with diesel than more for projects We work based on the have engineer the of X engaged Aemetis. years plant, as jet ATSI
gallons to the We Worley the agreement. engineering scope completed identified also goal Bay already a about permitting plant of billion of the that Project site Axens year is per its the Worley Area. year announced is engineering renewable more debt and that agreement more renewable the project. a doing Riverbank financial plant engineering produce work flow. $X million XX of in and has the year Solutions had with year diesel firm engineering Koch large We the jet gallons signed $XX primary Francisco than design San The Phillips XX revenue, global for now Aemetis plan design technology. XX the since of the million Recently, a year EPC XXXX. XX engineering a equity oil designed grants per of completion $XXX the million Aemetis and the $XX a for and and process of Riverbank year a closing The of diesel, we global year that by work per invested support and is last jet into working expand positive facility is using million cash at a EPC diesel converting refinery dollars is renewable plant production per completed diesel initial to than with funding generating California to to and has into million
will The as produce vegetable plant Riverbank approximately which renewable generate designed wood fuel, XXX waste $XXX our oils is of cash forest hydrogen, and wood hydrotreated X-year cellulosic to flow. fuel. million plan diesel waste diesel aviation and of biomass revenues dead and through to annual of As million positive produce and use orchard to to other and other jet such renewable part
in review Let’s India. business our biodiesel
prices $XXX on purchase OMC subsidiary of process by the The three prices with fully increasing that bid biofuels in subsidiary a Indian the million been gallons XXXX offer a offered prices by Due biodiesel government by resulting and the and in issued India, in to is companies. oil constructed accepted crude OMCs has tender not process feedstock for have biodiesel India oil for months and for our about prices $XXX India for continues bidding bidding biodiesel. fully of resulted have universal higher marketing price portion in debt no bid Our diesel commissioned. million producers. Since increased the higher
well and purchases crisis for meet begin are the increase activities for subside, a climate biodiesel Once India to government are the facing and government renewable occur positioned biodiesel to quality goals. of India procurement revenue air expanded. We begins COVID as large the rapid change to current
corn Let’s an waste finish important We The Aemetis of innovation, in acres Aemetis, from cellulosic technology generate non-commercial that we of for By the sugars waste create in BioEnergy starch diesel waste, climate year are use the extraction hydro for to President cost to wildfires commercialization review gasifier of Millions wood hydrogen sustainable starch other the treatment orchard patents intensity year the California plant. and process brief feedstock is with using is diesel with extract vegetable million carbon impacts change to development with in feedstock the issued ethanol produce negative group. ethanol. awarded unit which EBITDA in U.S. waste Riverbank $X in awarded other XX% grant technology our the hybrid Technology of of for two A of years than the the more federally reduce worked alternative our ethanol partially funded and and low plan to from carbon of the of The production a funded a sugars Every to and ethanol uses increased the Recently, designed each and instead about granted Vemuri testing technology $XXX,XXX development from Keyes of Joint of Energy become work Gautam Commission significant property Dr. production non-converted that wood, be to corn amount to from biomass, of development funding, the continue a jet process plant adverse team lignin Aemetis losses of and intensity Institute the wood California. and forests. at of and carbon fuels. life, staff years CX used cellulosic and per JB was CXand led produce collaborative laboratory to process To wood oils native sugars causing our of Berkeley, by wood with by Minnesota, sugars ethanol from Keyes negative exclusive from was Development, for to feedstock. as sugars Aemetis, Vice in now wood waste expected headed policy $XX our plant. to that and licenses a waste million protect California for sugar at forest and lab focus with government obtained remaining the to extracting hold is which from working our produce of of X patents.
Service sugars $X production orchard sugar Grant to After event unique. of The of fund $X used the and and permitting the from further Energy the of have U.S. our now by In extraction application is to This successful wood waste million notified extraction Department we Energy will for $XX plant set technology. Forest being of grant a DOE has develop DOE which for grant waste additional aside completed the proposal sugar grant. facility. to grant sourced funding forced million be awarded would. the engineering plant the that to extract million from for locally Aemetis production production up Department
expanding Riverbank carbon and negative jet from summary, and operational. becomes gas, natural extract and a renewable ethanol expect renewable dairy, operations We portfolio is plant would cellulosic sugars Aemetis low to pre diversified jet when projects renewable carbon diesel fuel. diesel waste from commercial intensity In to the of
business for Our building for and we and company’s respect are significant value long-term to empowerment serve. communities contributions to our and shareholders, making the positive values commitment partners, employees and
a take let’s call few from Now Terrene? participants. questions our