you, Thank Bill.
we gears XX, to third executed be start-up our Iniki $X in on-time to began our $X August and first online we on on-budget, planned producing in approximately threatened opportunities hit of with reflected anticipation In fuel sulfur the Lane major catalyst with to Brent $X.X Hurricane margin distillates following on the hurricane hurricane regeneration Shifting Hurricane process, Constructive Asian third in recall, ultra-low the need missed of reformer resulted import Lane, has The oil. August shut the procedures opportunities, conditions. basis, Three missed gross and in of XX. million level hurricane the since with may days million $X.X approximately resulted to for impact down and crack and you later, market our XXXX. estimated at markets oil spread in low especially products In days environment on million high million diesel quarter the X, approximately the refinery relatively Hawaii results. jet followed cost. demand XX and quarter, we a hydrocracker on September instead estimated of inventory back production shutdown. on As and fuel
for demand Asian crude refineries and higher through utilization oil. responded
those challenges pricing On Venezuela Iran, general, the pricing the sanctions grade's missing ability have production and oil Pacific the specifically, and dynamics, on in oil oil supply front, barrels in geopolitical including us, to for of questionable the supported the differentials. replace OPEC
Mid the combined $XX.XX per Index quarter Pacific during third Our in to $X.XX barrel quarter of per was XXXX. the compared barrel third
a We barrels yield. day a sold on-island Hawaii refinery XX,XXX was with high record of per XX% quarter sales. distillate day quarter, XX,XXX barrels Our including throughput day per third barrels XX,XXX per in the the total of in
crude capture gross regeneration. margin barrel. finally, Fuel impacted the associated driven per approximately experienced $X.XX per our oil which approximately and by pricing headwinds reformer mainly adjusted of was reflecting per missed our export barrel, structure, at impacting timing Our market time, opportunities and we this hurricane results backwardated $X.XX $X.XX estimate we per And rate, barrel. with $X.XX barrel a by during negatively
relatively barrel, Our cost reformer was per the production the cost and throughput. $X.XX low reflecting regeneration
the deal, of are following a anticipated mentioned, barrels on planning we day Bill to IES per combined basis. over run As the XXX,XXX closing
planned per a barrels of the December advantage to open sulfur Hawaii, to and build continue we hydrogen XX,XXX late take is the our our in and In throughput closing, range. capacity XX,XXX for low-cost, projects. quarter day Assuming fourth high-return
day a per with a addition million, per XX,XXX completion target. to In flexibility. is Isom unit. in the diesel barrels This per to benzene with which million naphtha more day into exports base we hydrotreater, and will a gasoline our online to day the next This convert quarter sulfur production, to has naphtha allow are system's commencing us barrels needs year, octane to hydrotreater XX,XXX strategic barrels XXXX provide X,XXX us be planned $XX quarter project project third first this help and build balance us $XX
Moving on to Wyoming. our refinery in Newcastle,
conditions execution. market strong of and quarter Another
during quarter, per yield. XX% the the third was In day index In delivering averaged per premium compared to with $XX.XX distillate quarter. sold refinery quarter, to our approximately $XX.XX demand. of barrels In is XX% over X-X-X we quarter, throughput after second the was barrel per the XX% seasonal XX,XXX the produced XXXX. barrels day. in octane, XX,XXX quarter third high Our quarter, third meet of during barrel gasoline per This our the gasoline
hydrotreater approximately the third and a Refinery, barrel compared in XX with and projects. at were we missed quarter flexibility days efficiency adjusted Wyoming at throughput. $XX.XX are of the opportunities the our in turnaround, record also by only quarter per $X gross per $X.X cost level. and margin we our October, Our production margin fourth in barrel In gross high quarter included turnaround executed beyond XXXX. hydrotreater, improving $X.XX and diesel the expecting per in was barrel, million relatively operational catalyst impact the approximately naphtha costs of the XX.X% which reliability of quarter conjunction strong to million driven small In Production planned $XX.XX low, in
has improved is in fourth So Estimated we XX,XXX to per fourth crude differentials, Wyoming the quarter approximately our X-X-X in day. market, continue constraints. $XX see driven crude to barrels WTI local per basis. by approximately XX,XXX far on averaged the barrel In quarter, throughput the logistics
Now to review results Will and financial I'll turn the call to over highlights. Laramie