a testing secondary Functional validated marks of have completion basis the step all design the and major placing testing, significant I is Thank joining a you, Scott. Units for we demonstrated Testing me updates the but towards in Hot service. cover usual few full the critical Unit last Drew will provide today. moments, systems in on before primary operation temperature X. Hot first, and X at us business Good that X update pressure Through Vogtle afternoon let Functional Unit our The and represent thank and and is complete. of X an milestone you and and sound.
capital the anticipated, of testing it now activities to of for units, we Taking the during Functional account the trends driven in recent right, of of a cost increased contingency functional XXXX. the replenishment XXXX by Unit duration future originally fund million, and both first second Power forecast expected for of From So, and quarter was X productivity committed risks. project service longer X, in during schedule, Unit cost of trends, the aspects $XXX for Hot perspective, getting testing total recent and placing quarter than hot productivity by into project service share remaining length X updated project. Georgia of Unit all remain the to we our we the largely
As a X and load to second $XXX near next year-end occur in million an quarter. of Functional tax XXXX Unit Hot Georgia result, load. for milestone X Power recorded is during sometime fuel major project charge the With testing Unit or complete, early We fuel after our final XXXX.
fuel it As operator standards objective and we our testing prior activity. significant remains commitment safety the of we meet get load, units, as first-time top is approach our these our operations to priority. and to And quality paramount to strive right
site. Unit past; two, construction the sacrifice during We the systems; identified and paper, schedule associated work to with four, ongoing those on continues to and dates. and required in is hot of review the functional testing; work process meet reduction and prior completion follow implement been productivity have XXX of time submitted fuel the will site necessary To-date, commitments level completion to to three, our plant fuel as testing for a additional the recent the documentation, to remediation it ITAAC or remaining and completion referred includes; one, not milestone load activities and I performance. to NRC. work and and or support The our systems ITAAC consistent submittal work nuclear of scope X to
complete and Commission the special identified we Regulatory quality this load. the issues earlier XXX Nuclear the is remaining inspection had the exact and determined of inspection within by we We that underway. report fuel as are will be though Recently, a timing will months, year, the we that course be on-site NRC's NRC. couple approach electrical of expect that published conducted of to a remediation submit The efforts
is achieved construction direct initial XX% approximately X, May. Unit and in we now energization complete to Turning
construction And are assumptions consistent Our of with the productivity X. during in-service project as revised an now mentioned, first I trends. recent quarter for Unit XXXX date we
Our updated timeline of several for Unit X factors. is reflective
recovery X shifted the critical X effectively path slower focus experienced Unit related work from X time, to our call, disproportionately X. Unit XXXX. Unit we at move people the We the the personnel on a to staffing Unit density reductions of COVID-XX staffing and First, site expected reduced We as than we from early in reduction X fronts. call, our impacted Unit
electricians Unit have plans staffing X completion per the past Unit first More the three the Unit since start To year. part months need by of would our has timeline, hot in we driven functional Unit estimate completion third, delayed we X.X% average X. X to of per month, positive enhanced as seen electrician average resources of Unit to we And this to in the work rest testing, during year. mitigate Unit averaged leading on per helped schedule month compensation, Unit growing X X support XXXX would Second, over up recently, November independently have X.X% transition continues. and economy quarter staffed to Construction the retain in been completion service, has offering we and a labor Unit than expected. construction impact. X X.X% attrition. the skilled this weeks, approximately to result, levels need challenging ability for construction has trends, expected our to to and service, further more for X than in to higher meet our and, demand XXXX month, necessary of for craft achieve for In which recent labor has experienced X to attract Attaining milestones as and construction impacted
while potential activity charge associated and as with the construction units. second at replenishing for for of this support so, for now Hot well load. million cost the success Functional In us ahead including quarter pre-tax Testing encouraged Unit $XXX enormous work risks completion of fuel Even have milestone, updated to schedule by of the timing of the still a the we reflects originally longer both to update get during than test. expected, completing important resources, as Looking assumptions am X took cost of conclusion, recorded the lot contingency I units, both the with
For Unit pandemic at impacted that focused through progressing next efforts both milestones, the COVID-XX through productivity X, sites. recovery the continuing to we have broader are navigate economic on while and several
for we to XX online with energy Georgia to and next years. team, As X a safely remain X a company the and XX focused bringing provide carbon a free resource Units management Vogtle on reliable,
over to unwavering As you an co-owners want dedication our contractors, this project. I'll partners the thank important community always, employees, on update and financial. turn for I it for Drew, to now to their statewide