Commitments and Contingencies | 9. Commitments and Contingencies Commitments 5G Network Deployment We initially invested a total of over $30 billion in Wireless spectrum licenses, and a portion of these licenses were included in the Sale and Transfer of Assets to EchoStar. We currently have $24 billion of investments related to Wireless spectrum licenses, which does not include $7 billion of capitalized interest related to the carrying value of such licenses. See Note 1 and Note 2 for further information. We plan to commercialize our Wireless spectrum licenses through our 5G Network Deployment. We have committed to deploy our 5G Network capable of serving increasingly larger portions of the U.S. population at different deadlines. We may need to raise additional capital in the future, which may not be available on favorable terms, to fund the efforts described below, as well as, among other things, make any potential Northstar Re-Auction Payment and SNR Re-Auction Payment for the AWS-3 licenses retained by the FCC. There can be no assurance that we will be able to complete all build-out requirements or profitably deploy our Wireless spectrum licenses, which may affect the carrying amount of these assets and our future financial condition or results of operations. Wireless Spectrum Licenses Liberty Puerto Rico Asset Sale. On November 5, 2023, we entered into an Asset Purchase Agreement, License Purchase Agreement, and other ancillary transaction agreements with Liberty Latin America (“Liberty”) and its affiliate providing for the sale of certain of our wireless assets in Puerto Rico and the US Virgin Islands (the “Liberty Puerto Rico Asset Sale”). The consideration also includes a right for us to receive preferential international roaming rates within Liberty’s footprint at a reduced rate for a 10 year period. Subsequently, in the first quarter of 2024, a portion our wireless assets included in the Liberty Puerto Rico Asset Sale were included in the Sale and Transfer of Assets to EchoStar. The Liberty Puerto Rico Asset Sale was approved by the FCC and DOJ and closed in the third quarter of 2024. Our parent, EchoStar, will receive payments totaling $251 million, of which we will receive payments totaling $125 million, including working capital adjustments, over a three year period, including an upfront payment, which we received in September 2024. We expect to receive the remaining amounts annually over the next three years. As of September 30, 2024, we received payments of $95 million, which includes payments for a portion of wireless assets held by our parent, EchoStar. As a result, $46 million is recorded in “Trade accounts payable” on our Condensed Consolidated Balance Sheets. The difference between our net carrying value of the assets sold to their fair value resulted in a $21 million gain which was recorded in “Other, net” within “Other Income (Expense)” on our Condensed Consolidated Statements of Operations and Comprehensive Income (Loss) for the three and nine months ended September 30, 2024. Our Wireless spectrum licenses are subject to certain build-out requirements, as well as certain renewal requirements that are summarized in the table below: Build-Out Deadlines Final Carrying Amount Interim Accelerated License Areas Extension License Areas Expiration Date (In thousands) Owned: DBS Licenses (1) $ 677,409 600 MHz Licenses 6,192,575 December 31, 2024 (3) June 14, 2025 (5) June 2029 3.45–3.55 GHz Licenses 7,329,093 May 4, 2026 (6) May 4, 2030 (6) May 2037 1695-1710 MHz, 1755-1780 MHz and 2155-2180 MHz (2) 972 March 2026 AWS-3 5,557,828 December 31, 2024 (4) October 2025 (7) October 2025 (7) Subtotal owned 19,757,877 Noncontrolling Investments: SNR 4,271,459 December 31, 2024 (4) October 2025 (7) October 2025 (7) Capitalized Interest (8) 6,563,550 Total Regulatory authorizations, net $ 30,592,886 Leased from EchoStar (9): 700 MHz Licenses (2) 701,803 December 31, 2024 (10) June 14, 2025 (11) June 2033 AWS-4 Licenses (2) 1,928,688 December 31, 2024 (10) June 14, 2025 (11) June 2033 H Block Licenses (2) 1,671,506 December 31, 2024 (10) June 14, 2025 (12) June 2033 MVDDS Licenses (1) 24,000 July, August, September 2034 LMDS Licenses (1) — September 2028 28 GHz Licenses 2,883 October 2, 2029 (13) October 2029 24 GHz Licenses 11,772 December 11, 2029 (13) December 2029 37 GHz, 39 GHz and 47 GHz Licenses 202,392 June 4, 2030 (13) June 2030 3550-3650 MHz Licenses 912,200 March 12, 2031 (13) March 2031 3.7-3.98 GHz Licenses 2,969 July 23, 2029 (13) July 23, 2033 (13) July 2036 Total Leased from EchoStar $ 5,458,213 (1) The build-out deadlines for these licenses have been met. (2) The interim build-out deadlines for these licenses are in the past. (3) For certain of these license areas, we must offer 5G broadband service to at least 85% of the population in each Partial Economic Area (which is a service area established by the FCC), and for certain other licenses we must offer 5G broadband service to at least 80% of the population in each Partial Economic Area by this date. These licenses are set forth in Appendices B and E of our September 2024 FCC extension request. (4) For certain of these license areas, we must provide reliable signal coverage and offer service for certain accelerated licenses to at least 85% of the population of each license area and for certain other accelerated licenses to at least 80% of the population of each license area by this date. These accelerated licenses are set forth in Appendices C and F of our September 2024 FCC extension request. (5) For the 600 MHz licenses set forth in Appendix G-2 of our September 2024 FCC extension request, if, by December 31, 2024, we satisfy the accelerated buildout obligations described in footnotes 3, 4 and 11 herein, the final deadline for us to offer 5G broadband service to at least 75% of the population in each Partial Economic Area (which is a service area established by the FCC) with respect to these licenses shall be extended to December 14, 2026. The final deadline shall be further extended to June 14, 2028, if: by December 31, 2024, we are offering 5G broadband service to at least 80% of the U.S. population and, as of June 14, 2025 (as defined in our September 2024 FCC extension request): (a) we have offered a low-cost 5G broadband plan and device to consumers nationwide; (b) we have deployed at least 24,000 5G sites; (c) we have upgraded our deployed 5G sites to 3GPP Release 17; and (d) we have provisioned at least 75% of new subscribers with an EchoStar-certified 5G device on our MNO network if the subscriber is within the accelerated markets as set forth in Appendices A-F of our September 2024 FCC extension request. (6) There are a variety of build-out options and associated build-out metrics associated with these licenses. If the interim build-out requirement is not met, the final build-out requirement may be accelerated by one year from May 2030 to May 2029. (7) For the AWS-3 licenses set forth in Appendix G-3 of our September 2024 FCC extension request, if, by December 31, 2024, we satisfy the accelerated buildout obligations described in footnotes 3, 4 and 11 herein, the final deadline for us to offer 5G broadband service to at least 75% of the population in each license area with respect to these licenses shall be extended to December 14, 2026. The final deadline shall be further extended to June 14, 2028, if: by December 31, 2024, we are offering 5G broadband service to at least 80% of the U.S. population and, as of June 14, 2025 (as defined in our September 2024 FCC extension request): (a) we have offered a low-cost 5G broadband plan and device to consumers nationwide; (b) we have deployed at least 24,000 5G sites; (c) we have upgraded our deployed 5G sites to 3GPP Release 17; and (d) we have provisioned at least 75% of new subscribers with an EchoStar-certified 5G device on our MNO network if the subscriber is within the accelerated markets as set forth in Appendices A-F of our September 2024 FCC extension request. (8) See Note 2 for further information. (9) See Note 1 for further information on the Sale and Transfer of Assets to EchoStar and see Note 12 for Related Party Transactions with EchoStar. (10) For certain of these license areas, we must offer 5G broadband service to at least 85% of the population in each Economic Area (which is a service area established by the FCC), and for certain other licenses we must offer 5G broadband service to at least 80% of the population in each Economic Area by this date. These licenses are set forth in Appendices A and D of our September 2024 FCC extension request. (11) For the 700 MHz and AWS-4 licenses set forth in Appendix G-1 of our September 2024 FCC extension request, if, by December 31, 2024, we satisfy the accelerated buildout obligations described in footnotes 3, 4 and 11 herein, the final deadline for us to offer 5G broadband service to at least 70% of the population in each Economic Area (which is a service area established by the FCC) with respect to these licenses shall be extended to December 14, 2026. The final deadline shall be further extended to June 14, 2028, if: by December 31, 2024, we are offering 5G broadband service to at least 80% of the U.S. population and, as of June 14, 2025 (as defined in our September 2024 FCC extension request): (a) we have offered a low-cost 5G broadband plan and device to consumers nationwide; (b) we have deployed at least 24,000 5G sites; (c) we have upgraded our deployed 5G sites to 3GPP Release 17; and (d) we have provisioned at least 75% of new subscribers with an EchoStar-certified 5G device on our MNO network if the subscriber is within the accelerated markets as set forth in Appendices A-F of our September 2024 FCC extension request. (12) For the H-Block licenses set forth in Appendix G-1 of our September 2024 FCC extension request, if, by December 31, 2024, we satisfy the accelerated buildout obligations described in footnotes 3, 4 and 11 herein, the final deadline for us to offer 5G broadband service to at least 75% of the population in each Economic Area (which is a service area established by the FCC) with respect to these licenses shall be extended to December 14, 2026. The final deadline shall be further extended to June 14, 2028, if: by December 31, 2024, we are offering 5G broadband service to at least 80% of the U.S. population and, as of June 14, 2025 (as defined in our September 2024 FCC extension request): (a) we have offered a low-cost 5G broadband plan and device to consumers nationwide; (b) we have deployed at least 24,000 5G sites; (c) we have upgraded our deployed 5G sites to 3GPP Release 17; and (d) we have provisioned at least 75% of new subscribers with an EchoStar-certified 5G device on our MNO network if the subscriber is within the accelerated markets as set forth in Appendices A-F of our September 2024 FCC extension request. (13) There are a variety of build-out options and associated build-out metrics associated with these licenses. Commercialization of Our Wireless Spectrum Licenses and Related Assets. On September 29, 2023, the FCC confirmed we have met all of our June 14, 2023 band-specific 5G deployment commitments, and two of our three nationwide 5G commitments. The single remaining 5G commitment, that at least 70% of the U.S. population has access to average download speeds equal to 35 Mbps, was achieved in March 2024 using the drive test methodology previously agreed upon by us and the FCC and overseen by an independent monitor. We currently have the largest commercial deployment of 5G VoNR in the world covering over 200 million Americans and 5G broadband service covering over 250 million Americans. We currently expect capital expenditures, excluding capitalized interest, for our 5G Network Deployment to be approximately $10 billion, including amounts incurred in 2021, 2022, 2023 and the first nine months of 2024. See Note 2 for further information. In September 2024, the FCC conditionally granted our requests to extend the 5G deployment deadlines for certain of our licenses based on several commitments, described above. We may need to make significant additional investments or partner with others to, among other things, continue our 5G Network Deployment and further commercialize, build-out and integrate these licenses and related assets and any additional acquired licenses and related assets, as well as to comply with regulations applicable to such licenses. Depending on the nature and scope of such activities, any such investments or partnerships could vary significantly. In addition, as we continue our 5G Network Deployment, we have and may continue to incur significant additional expenses related to, among other things, research and development, wireless testing and ongoing upgrades to the wireless network infrastructure, software and third-party integration. As a result of these investments, among other factors, we may need to raise additional capital, which may not be available on favorable terms. We may also determine that additional wireless spectrum licenses may be required for our 5G Network Deployment and to compete effectively with other wireless service providers. AWS-3 Auction Northstar Wireless is a wholly-owned subsidiary of Northstar Spectrum, which is an entity wholly-owned by us and, prior to October 12, 2023, by us and Northstar Manager. SNR Wireless is a wholly-owned subsidiary of SNR HoldCo, which is an entity owned by us and our parent’s direct wholly-owned subsidiary EchoStar SNR HoldCo L.L.C. and, prior to February 16, 2024, by us and SNR Management. See Note 2 for further information. Northstar Wireless and SNR Wireless each filed applications with the FCC to participate in Auction 97 (the “AWS-3 Auction”) for the purpose of acquiring certain AWS-3 Licenses. Each of Northstar Wireless and SNR Wireless applied to receive bidding credits of 25% as designated entities under applicable FCC rules. FCC Order and October 2015 Arrangements. On August 18, 2015, the FCC released a Memorandum Opinion and Order , FCC 15-104 (the “Order”) in which the FCC determined, among other things, that DISH Network has a controlling interest in, and is an affiliate of, Northstar Wireless and SNR Wireless, and therefore DISH Network’s revenues should be attributed to them, which in turn makes Northstar Wireless and SNR Wireless ineligible to receive the 25% bidding credits (approximately $1.961 billion for Northstar Wireless and $1.370 billion for SNR Wireless). On November 23, 2020, the FCC released a Memorandum Opinion and Order on Remand, FCC 20-160, that found that Northstar Wireless and SNR Wireless are not eligible for bidding credits based on the FCC’s determination that they remain under DISH Network’s de facto control. Northstar Wireless and SNR Wireless appealed the FCC’s order to the D.C. Circuit Court of Appeals. On June 21, 2022, the United States Court of Appeals for the District of Columbia issued an Opinion rejecting this challenge. On January 17, 2023, Northstar Wireless filed a petition for a writ of certiorari asking the United States Supreme Court to hear a further appeal, but that petition was denied on June 30, 2023. Letters Exchanged between Northstar Wireless and the FCC Wireless Bureau. As outlined in letters exchanged between Northstar Wireless and the Wireless Telecommunications Bureau of the FCC (the “FCC Wireless Bureau”), Northstar Wireless paid the gross winning bid amounts for 261 AWS-3 Licenses and notified the FCC that it would not be paying the gross winning bid amounts for 84 AWS-3 Licenses. As a result of the nonpayment of those gross winning bid amounts, the FCC retained those licenses. If the winning bids from re-auction or other award of the AWS-3 licenses retained by the FCC are greater than or equal to the winning bids of Northstar Wireless, no additional amounts will be owed to the FCC by Northstar Wireless. However, if those winning bids are less than the winning bids of Northstar Wireless, then we will be responsible for the difference less any overpayment of the Northstar interim payment, detailed below, (which will be recalculated as 15% of the winning bids from re-auction or other award) (the “Northstar Re-Auction Payment”). For example, if the winning bids in a re-auction are $1, the Northstar Re-Auction Payment would be approximately $1.892 billion, which is calculated as the difference between $2.226 billion (the Northstar winning bid amounts) and $1 (the winning bids from re-auction) less the resulting $334 million overpayment of the Northstar interim payment. We cannot predict with any degree of certainty the timing or outcome of any re-auction or the amount of any Northstar Re-Auction Payment. Letters Exchanged between SNR Wireless and the FCC Wireless Bureau. As outlined in letters exchanged between SNR Wireless and the FCC Wireless Bureau, SNR Wireless paid the gross winning bid amounts for 244 AWS-3 Licenses and notified the FCC that it would not be paying the gross winning bid amounts for 113 AWS-3 Licenses. As a result of the nonpayment of those gross winning bid amounts, the FCC retained those licenses. If the winning bids from re-auction or other award of the AWS-3 licenses retained by the FCC are greater than or equal to the winning bids of SNR Wireless, no additional amounts will be owed to the FCC by SNR Wireless. However, if those winning bids are less than the winning bids of SNR Wireless, then we and our parent, EchoStar, will be responsible for the difference less any overpayment of the SNR interim payment, detailed below, (which will be recalculated as 15% of the winning bids from re-auction or other award) (the “SNR Re-Auction Payment”). For example, if the winning bids in a re-auction are $1, the SNR Re-Auction Payment would be approximately $1.029 billion, which is calculated as the difference between $1.211 billion (the SNR winning bid amounts) and $1 (the winning bids from re-auction) less the resulting $182 million overpayment of the SNR interim payment. We cannot predict with any degree of certainty the timing or outcome of any re-auction or the amount of any SNR Re-Auction Payment. D.C. Circuit Court Opinion . On August 29, 2017, the United States Court of Appeals for the District of Columbia Circuit (the “D.C. Circuit”) in SNR Wireless LicenseCo, LLC, et al. v. Federal Communications Commission , 868 F.3d 1021 (D.C. Cir. 2017) (the “Appellate Decision”) affirmed the Order in part, and remanded the matter to the FCC to give Northstar Wireless and SNR Wireless an opportunity to seek to negotiate a cure of the issues identified by the FCC in the Order (a “Cure”). On January 26, 2018, SNR Wireless and Northstar Wireless filed a petition for a writ of certiorari, asking the United States Supreme Court to hear an appeal from the Appellate Decision, which the United States Supreme Court denied on June 25, 2018. Order on Remand. On January 24, 2018, the FCC released an Order on Remand, DA 18-70 (the “Order on Remand”) purporting to establish a procedure to afford Northstar Wireless and SNR Wireless the opportunity to implement a Cure pursuant to the Appellate Decision. On June 8, 2018, Northstar Wireless and SNR Wireless each filed amended agreements to demonstrate that, in light of such changes, each of Northstar Wireless and SNR Wireless qualified for the very small business bidding credit that it sought in the AWS-3 Auction. Northstar Wireless and SNR Wireless filed a Joint Application for Review of the Order on Remand requesting, among other things, an iterative negotiation process with the FCC regarding a Cure, which was denied on July 12, 2018. The pleading cycle established in the Order on Remand concluded in October 2018. On November 23, 2020, the FCC issued a Memorandum Opinion and Order that concluded, among other things, that DISH Network retained de facto control over Northstar Wireless and SNR Wireless and denied the very small business bidding credit sought by Northstar Wireless and SNR Wireless, even though the parties had eliminated or significantly modified every provision previously deemed to have been disqualifying by the FCC. Northstar Wireless and SNR Wireless timely filed an appeal of the FCC’s 2020 decision. On June 21, 2022, the United States Court of Appeals for the District of Columbia issued an Opinion rejecting this challenge. On January 17, 2023, Northstar Wireless filed a petition for a writ of certiorari asking the United States Supreme Court to hear a further appeal, but that petition was denied on June 30, 2023. For further information, refer to the Consolidated Financial Statements and notes thereto included in our Annual Report on Form 10-K for the year ended December 31, 2023. Contingencies Litigation We are involved in a number of legal proceedings (including those described below) concerning matters arising in connection with the conduct of our business activities. Many of these proceedings are at preliminary stages, and many of these proceedings seek an indeterminate amount of damages. We regularly evaluate the status of the legal proceedings in which we are involved to assess whether a loss is probable or there is a reasonable possibility that a loss or an additional loss may have been incurred and to determine if accruals are appropriate. If accruals are not appropriate, we further evaluate each legal proceeding to assess whether an estimate of the possible loss or range of possible loss can be made. For certain cases described on the following pages, management is unable to provide a meaningful estimate of the possible loss or range of possible loss because, among other reasons: (i) the proceedings are in various stages; (ii) damages have not been sought; (iii) damages are unsupported and/or exaggerated; (iv) there is uncertainty as to the outcome of pending appeals or motions; (v) there are significant factual issues to be resolved; and/or (vi) there are novel legal issues or unsettled legal theories to be presented or a large number of parties. For these cases, however, management does not believe, based on currently available information, that the outcomes of these proceedings will have a material adverse effect on our financial condition, though the outcomes could be material to our operating results for any particular period, depending, in part, upon the operating results for such period. ClearPlay, Inc. On March 13, 2014, ClearPlay, Inc. (“ClearPlay”) filed a complaint against us, our wholly-owned subsidiary DISH Network L.L.C., EchoStar, and its then wholly-owned subsidiary EchoStar Technologies L.L.C., in the United States District Court for the District of Utah. The complaint alleges willful infringement of United States Patent Nos. 6,898,799 (the “799 patent”), entitled “Multimedia Content Navigation and Playback”; 7,526,784 (the “784 patent”), entitled “Delivery of Navigation Data for Playback of Audio and Video Content”; 7,543,318 (the “318 patent”), entitled “Delivery of Navigation Data for Playback of Audio and Video Content”; 7,577,970 (the “970 patent”), entitled “Multimedia Content Navigation and Playback”; and 8,117,282 (the “282 patent”), entitled “Media Player Configured to Receive Playback Filters From Alternative Storage Mediums.” ClearPlay alleges that the AutoHop™ feature of our Hopper® set-top box infringes the asserted patents. On February 11, 2015, the case was stayed pending various third-party challenges before the United States Patent and Trademark Office regarding the validity of certain of the patents asserted in the action. In those third-party challenges, the United States Patent and Trademark Office found that all claims of the 282 patent are unpatentable, and that certain claims of the 784 patent and 318 patent are unpatentable. ClearPlay appealed as to the 784 patent and the 318 patent, and on August 23, 2016, the United States Court of Appeals for the Federal Circuit affirmed the findings of the United States Patent and Trademark Office. On October 31, 2016, the stay was lifted, and in May 2017, ClearPlay agreed to dismiss us and EchoStar as defendants, leaving DISH Network L.L.C. and DISH Technologies L.L.C. as the sole defendants. On October 16, October 21, November 2, 2020 and November 9, 2020, DISH Network L.L.C. filed petitions with the United States Patent and Trademark Office requesting ex parte reexamination of the validity of the asserted claims of, respectively, the 784 patent, the 799 patent, the 318 patent and the 970 patent; and on November 2, November 20, December 14 and December 15, 2020, the United States Patent and Trademark Office granted each request for reexamination. On May 7, 2021, May 25, 2021, June 25, 2021 and July 7, 2021, the United States Patent and Trademark Office issued Ex Parte Reexamination Certificates confirming the patentability of the challenged claims of, respectively, the 799 patent, the 784 patent, the 318 patent and the 970 patent. In October and November 2021, DISH Network L.L.C. filed petitions with the United States Patent and Trademark Office requesting ex parte reexamination of the validity of certain asserted claims of the 784 patent, the 799 patent and the 970 patent. In November and December 2021, the United States Patent and Trademark Office granted review of the challenged claims of the 799 patent and the 970 patent, but denied review of the challenged claims of the 784 patent. On January 24, 2022, an examiner of the United States Patent and Trademark Office affirmed the challenged claims of the 799 patent, and on January 19, 2023, an examiner of the United States Patent and Trademark Office affirmed the challenged claims of the 970 patent. In an order dated January 31, 2023, the Court granted in part and denied in part DISH Network L.L.C.’s and DISH Technologies L.L.C.’s motion for summary judgment. Thereafter, ClearPlay narrowed its case to three asserted claims: one under the 799 patent and two under the 970 patent. Following a two-week trial, on March 10, 2023, the jury returned a verdict that DISH Network L.L.C. and DISH Technologies L.L.C. infringed each of the asserted patent claims (though not willfully), and awarded damages of $469 million. That verdict became moot on March 21, 2023, when the trial court indicated that it would grant DISH Network L.L.C.’s and DISH Technologies L.L.C.’s motion for judgment as a matter of law, thus effectively vacating the jury award. On June 2, 2023, the Court entered its formal order granting judgment as a matter of law. On December 12, 2023, the Court denied ClearPlay’s motion to alter or amend the judgment. ClearPlay has filed a notice of appeal to the United States Court of Appeals for the Federal Circuit, and briefing should be completed by November 27, 2024. We intend to vigorously defend this case. In the event that a court ultimately determines that we infringe the asserted patents, we may be subject to substantial damages, which may include treble damages, and/or an injunction that could require us to materially modify certain features that we currently offer to consumers. We cannot predict with any degree of certainty the outcome of the suit or determine the extent of any potential liability or damages. Data Breach Class Actions On May 9, 2023, Susan Owen-Brooks, an alleged customer, filed a putative class action complaint against us in the United States District Court for the District of Colorado. She purports to represent a nationwide class of all individuals in the United States who allegedly had private information stolen as a result of the February 23, 2023 Cyber-security Incident (and a North Carolina statewide subclass of the same individuals). Since that filing, ten additional putative class action complaints have been filed in the United States District Court for the District of Colorado, purporting to represent the same nationwide class of people, and Owen-Brooks has filed an amended complaint. On August 2, 2023, the Court issued an order consolidating the first ten cases (the eleventh was dismissed) and, on November 16, 2023 and January 16, 2024, the plaintiffs filed consolidated amended class action complaints. On September 27, 2024, the Court granted DISH Network’s motion to dismiss the First Amended Consolidated Class Action Complaint as to eight of the eleven named plaintiffs and as to certain causes of action. On October 29, 2024, the Plaintiffs filed the operative Second Amended Consolidated Class Action Complaint, which deletes the allegations as to the dismissed plaintiffs and causes of action, leaving three named plaintiffs and causes of action for negligence, negligence per se, breach of implied contract, and declaratory judgment. We intend to vigorously defend this case. We cannot predict with any degree of certainty the outcome of the suit or determine the extent of any potential liability or damages. Digital Broadcasting Solutions, LLC On August 29, 2022, Digital Broadcasting Solutions, LLC filed a complaint against our wholly-owned subsidiaries DISH Network L.L.C. and DISH Technologies L.L.C. in the United States District Court for the Eastern District of Texas. The complaint alleges infringement of U.S. Patent No. 8,929,710 (the “710 patent”) and U.S. Patent No. 9,538,122 (the “122 patent”), each entitled “System and method for time shifting at least a portion of a video program.” Generally, the plaintiff contends that the AutoHop feature of our Hopper® set-top boxes infringes the asserted patents. On June 21, 2023, the Court granted the motion of DISH Network L.L.C. and DISH Technologies L.L.C. to have the case transferred to the United States District Court for the District of Colorado . In May 2023, DISH Network L.L.C. and DISH Technologies L.L.C. filed petitions with the United States Patent and Trademark Office challenging the validity of all claims of the 710 patent and the 122 patent and, on December 11, 2023, the United States Patent and Trademark Office entered decisions instituting each petition. On May 9, 2024, a magistrate judge issued an order granting the defendants’ motion to stay the case pending the petitions before the United States Patent and Trademark Office and any related appeals. We intend to vigorously defend this case. In the event that a court ultimately determines that we infringe the asserted patents, we may be subject to substantial damages, which may include treble damages, and/or an injunction that could require us to materially modify certain features that we currently offer to consumers. We cannot predict with any degree of certainty the outcome of the suit or determine the extent of any potential liability or damages. Entropic Communications, LLC (first action) On March 9, 2022, Entropic Communications, LLC (“Entropic”) filed a complaint against us and our wholly-owned subsidiaries DISH Network L.L.C. and Dish Network Service L.L.C. in the United States District Court for the Eastern District of Texas. The complaint alleges infringement of U.S. Patent No. 7,130,576 (the “576 patent”), entitled “Signal Selector and Combiner for Broadband Content Distribution”; U.S. Patent No. 7,542,715 (the “715 Patent”), entitled “Signal Selector and Combiner for Broadband Content Distribution”; and U.S. Patent No. 8,792,008 (the “008 Patent”), entitled “Method and Apparatus for Spectrum Monitoring.” On March 30, 2022, Entropic filed an amended complaint alleging infringement of the same patents. Generally, the plaintiff accuses satellite antennas, low-noise block converters, signal selector and combiners, and set-top boxes and the manner in which they process signals for satellite television customers of infringing the asserted patents. The plaintiff is an entity that seeks to license a patent portfolio without itself practicing any of the claims recited therein. On October 24, 2022, this case was ordered to be transferred to the United States District Court for the Central District of California. A companion case against DirecTV w |