Free signup for more
- Track your favorite companies
- Receive email alerts for new filings
- Personalized dashboard of news and more
- Access all data and search results
Content analysis
?Positive | ||
Negative | ||
Uncertain | ||
Constraining | ||
Legalese | ||
Litigous | ||
Readability |
8th grade Avg
|
New words:
AAG, Abdul, Academy, accreted, Accretion, accuracy, AIOI, Airlangga, airline, alcatel, alert, Alliance, Amortisation, amortised, Andi, Arief, arisen, Arta, Arwin, ASEI, Asno, bandwith, BAT, Batch, battery, Beban, BHP, Bicara, BMP, Bumiputera, Cakrawala, Capitalisation, catastrophe, Clausul, clip, complement, conference, contrary, corruption, COSO, criminal, CSO, curtailment, cycle, Daerah, Dahlan, derecognize, derecognizing, deteriorate, devastated, Dharmala, dictum, diligently, discovered, Divison, DJPT, DPLK, DSL, edition, Ekstra, enroll, Ermady, ESN, Faisal, Frameworkissued, Fujitsu, Gede, Gerai, Gerari, GMD, Guntur, HALO, heavy, herewith, hot, Huawei, Imperial, inactive, inappropriate, indicted, indictment, inInternal, Interface, Istimewa, Jarot, Jasindo, JDM, jember, Jitu, KEP, Kumala, Kustodian, labour, Labuan, laid, laptop, legacy, Licence, load, longest, machine, Magic, Makassar, MCA, Medicine, Merpati, misuse, MSOAN, mud, multiflexing, Natrindo, newspaper, NGN, Nyoman, OAN, offense, ofSEA, ofSurat, olexindo, Operationally, opnet, OSP, OSS, outperformed, pack, Padjajaran, page, Pandang, Pangandaran, parent, Parepare, passage, patent, PCcard, PDN, Pekerja, Pemberitahuan, Pemeriksa, Penyelenggaraan, perspective, PRA, Preexisting, Primakarya, prison, Pulsa, QE, rainfall, reacquired, reacquisition, recharge, recognised, rectifier, redefined, refinancing, Regula, Reinstatement, reliability, reliably, Rinaldi, RMJ, router, Sampoerna, Sentral, Serial, Sigli, SLA, SLANK, SP, spare, SSS, stable, STI, straight, Sudiro, Suwartini, Syam, Tasikmalaya, Tata, technique, tectonic, Teknologi, Temasindo, theInternal, theoretically, thousand, threshold, Titien, Topic, Treadway, Trinur, triple, Ujung, unauthorized, underfunded, unfunded, Universite, unrecognised, unregistered, unutilized, utilised, verse, voluntarily, Wahana, Wave, Wiryanata, wrote, ZTE
Removed:
accept, add, Adhi, adjudication, ADSL, Asymmetric, begun, Bina, Bisma, Boma, CATV, cheaper, coaxial, commencement, constituted, constructively, contributor, Corning, DBS, deceased, dedicate, defending, Deloitte, directed, Dodi, drafting, Electric, encoded, error, essentially, EUR, evidencing, factored, Fibre, force, forming, front, frozen, furnished, geostationary, gift, Gratika, half, haul, HFC, Hongkong, HSBC, hybrid, IBS, imputed, inclusive, indemnify, indoor, informed, inoperative, integrate, Istituto, Karya, Kindy, Kontrak, Lampung, LEN, lent, liable, Lingkungan, Lombok, longitude, malpractice, Medianusa, mid, mile, min, modification, modified, multiplexing, Nasio, Nindya, Nippon, NMS, Nordic, notional, ofHP, ofSub, outdoor, outflow, Oyj, partial, partly, payback, PBH, Peluncur, Pembangunan, Pengadaan, Percetakan, Perumahan, Peruri, PlasaTELKOM, PoA, presenting, proactive, rata, ratably, reimburse, renumeration, reportable, retroactively, revalued, reversal, SDH, selecting, serve, show, supplemented, supranational, surrendered, SVA, Syahrir, Syaripudin, TIC, Tohmatsu, toll, Touche, Transpac, Uang, uncompleted, unconditionally, untested, utility, void, Wahler, Waskita, Wijaya
Filing tables
Filing exhibits
- 20-F Annual report (foreign)
- 4.48 EX-4.48 Second Amendment to Contract on Procurement of TELKOM-2 Satellite Between Telkom and Orbital Sciences Corporation, Dated 31 March 2004.
- 4.49 EX-4.49 Third Amendment to Contract on Procurement of TELKOM-2 Satellite Between Telkom and Orbital Sciences Corporation, Dated 29 October 2004.
- 4.50 EX-4.50 Fourth Amendment to Contract on Procurement of TELKOM-2 Satellite Between Telkom and Orbital Sciences Corporation, Dated 21 February 2005.
- 4.51 EX-4.51 Fifth Amendment to Contract on Procurement of TELKOM-2 Satellite Between Telkom and Orbital Sciences Corporation, Dated 30 August 2005.
- 4.52 EX-4.52 First Amendment to Supply Contract for the Procurement and Installation of Ring Jasuka Backbone Between Telkom and Nec-siemens Consortium, Dated 6 February 2006.
- 4.53 EX-4.53 Second Amendment of the Supply Contract for the Procurement and Installation of Ring Jasuka Backbone Between Telkom and Nec-siemens Consortium, Dated 16 March 2006.
- 4.54 EX-4.54 Third Amendment of the Supply Contract for the Procurement and Installation of Ring Jasuka Backbone Between Telkom and Nec-siemens Consortium, Dated 7 February 2007.
- 4.55 EX-4.55 Amended and Restated KSO7 Agreement, Between Telkom and PT Bukaka Singtel International, Dated 19 October 2006.
- 4.56 EX-4.56 First Amendment of Supply Contract for Tanjung Pandan - Pontianak Capacity Expansion Between Telkom and Nec Corporation, Dated 12 January 2006.
- 4.57 EX-4.57 Supply Agreement for Surabaya - Ujung Pandang - Banjarmasin (Sub) Capacity Expansion Between Telkom and Nec Corporation, Dated 16 August 2006.
- 4.58 EX-4.58 First Amendment to Supply Contract for Surabaya - Ujung Pandang - Banjarmasin (Sub) Capacity Expansion Between Telkom and Nec Corporation, Dated 29 December 2006.
- 4.59 EX-4.59 Second Amendment to Supply Contract for Surabaya - Ujung Pandang - Banjarmasin (Sub) Capacity Expansion Between Telkom and Nec Corporation, Dated 26 January 2007.
- 4.60 EX-4.60 Third Amendment to Supply Contract for Surabaya - Ujung Pandang - Benjarmasin (Sub) Capacity Expansion Between Telkom and Nec Corporation, Dated 21 February 2007.
- 4.61 EX-4.61 Fourth Amendment to Supply Contract for Surabaya - Ujung Pandang - Banjarmasin (Sub) Capacity Expansion Between Telkom and Nec Corporation, Dated 12 March 2007.
- 4.62 EX-4.62 Procurement and Installation Agreement for Ring JDCS Project (Jember Denpasar Cable System) Between Telkom and Zte Consortium, Dated 29 December 2006.
- 4.63 EX-4.63 First Amendment for Procurement and Establishment of Regional Metro Junction and Optical Access Network for Regional Division-iii Between Telkom and PT Industri Telekomunikasi Indonesia (Inti
- 4.64 EX-4.64 Second Amendment of Procurement and Establishment of Regional Metro Junction and Optical Access Network for Regional Division-iii Between Telkom and PT Industri Telekomunikasi Indonesia (Inti
- 4.65 EX-4.65 Third Amendment of Procurement and Establishment of Regional Metro Junction and Optical Access Network for Regional Division-iii Between Telkom and PT Industri Telekomunikasi Indonesia (Inti)
- 4.66 EX-4.66 Partnership Agreement for Fwa Cdma Expansion Project NSS, BSS and PDN System In Divre I and Divre IV Between Telkom and Huawei Consortium, Dated 6 January 2006.
- 4.67 EX-4.67 Agreement for Procurement and Installation on the Cdma 2000-IX Equipment In Division Regional V East Java Between Telkom and Samsung Consortium Dated 8 June 2006.
- 4.68 EX-4.68 First Amendment to Agreement for Procurement and Installation on Cdma 2000-IX Equipment In Divre V East Java Between Telkom and Samsung Consortuim, Dated 1 August 2006.
- 4.69 EX-4.69 Second Amendment to Agreement for Procurement and Installation on Cdma 2000-IX Equipment In Divre V East Java Between Telkom and Samsung Consortium, Dated 18 December 2006.
- 4.70 EX-4.70 Procurement and Installation Agreement of Msoan Package III Divre-i Sumatera Between Telkom and PT Industri Telekomunikasi Indonesia (Inti), Dated 29 June 2006.
- 4.71 EX-4.71 First Amendment to the Procurement and Installation Agreement of Msoan Package III Divre-i Sumatera Between Telkom and PT Industri Telekomunikasi Indonesia (Inti), Dated 29 December 2006.
- 4.72 EX-4.72 Procurement and Installation Agreement of Osp for Regional Metro Junction (RMJ) Banda Aceh - Sigli Divre I Sumatera Between Telkom and PT Telekomindo Primakarya, Dated 3 July 2006.
- 4.73 EX-4.73 Procurement and Installation Agreement of Digital Micro Wave Radio ("GMD Radio") for Regional Metro Junction (RMJ) Package II Java and Kalimantan, Between Telkom and PT Fujitsu Indonesia
- 4.74 EX-4.74 Procurement and Installation Agreement of Msoan Divre II Year 2005 Phase II Location Divre II Between Telkom and Zte - Temasindo Consortium 6 October 2005.
- 4.75 EX-4.75 First Amendment to Procurement and Installation Agreement of Msoan Divre II Year 2005 Phase II Location Divre II Between Telkom and Zte - Temasindo Consortium Dated 30 December 2005.
- 4.76 EX-4.76 Second Amendment to Procurement and Installation Agreement of Msoan Divre II Year 2005 Phase II Location Divre II Between Telkom and Zte - Temasindo Consortium Dated 15 September 2006.
- 4.77 EX-4.77 Procurement and Installation Agreement on Ip Core Backbone Expansion PACKAGE-1 Between Telkom and PT Siemens Indonesia, Dated 26 September 2006.
- 4.78 EX-4.78 Procurement and Installation Agreement on Expansion of Interface VS.2, E1 Circuit, E1 Pra, CCS#7P, Clip and Enhancement of PSTN Central Ewsd Between Telkom and PT Siemens Indonesia
- 4.79 EX-4.79 Procurement and Installation Agreement for Fwa Cdma Expansion Project NSS, BSS and PDN System In Divre V Between Telkom and Samsung Consortium Dated 13 October 2006.
- 4.80 EX-4.80 Agreement for Procurement and Installation for Fwa Cdma Expansion Project NSS, BSS and PDN Systems In Divre VI Between Telkom and Zte Consortium, Dated 28 November 2006.
- 4.81 EX-4.81 Procurement and Installation Agreement on Expansion of Interface VS.2, E1 Circuit, E1 Pra, CCS#7P, Clip and Enhancement of PSTN Central 5ESS Between Telkom and PT Lintas Teknologi Indonesia
- 4.82 EX-4.82 Procurement and Installation Agreement on Expansion of Interface VS.2, E1 Circuit, E1 Pra, CCS#7P, Clip and Enhancement of PSTN Central Neax Between Telkom and PT Nec Indonesia
- 4.83 EX-4.83 Agreement for Procurement and Installation for Optical Access Network (Oan) Project Package-iii Between Telkom and Huawei Consortium, Dated 30 November 2006.
- 4.84 EX-4.84 Agreement for Procurement and Installation for Fwa Cdma Expansion Project NSS, BSS and PDN Systems In Divre III Between Telkom and Huawei Consortium, Dated 8 December 2006.
- 4.85 EX-4.85 Agreement for Procurement and Installation for Fwa Cdma Expansion Project NSS, BSS and PDN Systems In Divre II Between Telkom and Huawei Consortium, Dated 8 December 2006.
- 4.86 EX-4.86 Agreement for Procurement and Installtion for Optical Access Network (Oan) Project Package-iv Between Telkom and Alcatel-inti Consortium Dated 18 December 2006.
- 4.87 EX-4.87 First Amendment to Procurement and Installation Agreement of Msoan Divre I Sumatera Package I Between Telkom and PT Dharmala Kumala Utama, Dated 28 December 2006.
- 4.88 EX-4.88 Procurement and Installation Agreement of Msoan Aceh Area Divre I Sumatera Between Telkom and PT Nec Indonesia, Dated 16 August 2006.
- 4.89 EX-4.89 First Amendment to Procurement and Installation Agreement of Msoan Aceh Area Divre I Sumatera Between Telkom and PT Nec Indonesia, Dated 29 December 2006.
- 4.90 EX-4.90 Agreement for Procurement and Installation for Secondary Cable Network Package I Between Telkom and Olex Cables Indonesia (Olexindo), Dated 29 December 2006.
- 4.91 EX-4.91 Agreement for Procurement and Installation for Optical Access Network (Oan) Project Package-i (Divre I and Divre Iii) Between Telkom and Opnet - Olexindo Consortium, Dated 29 December 2006.
- 4.92 EX-4.92 Agreement for Procurement and Installation for Optical Access Network (Oan) Project Package-ii (Divre-ii) Between Telkom and Opnet - Olexindo Consortium, Dated 29 December 2006.
- 4.93 EX-4.93 Contract on the CDMA2000-1X Initial Purchase Order Between Telkom and Samsung Electronics Co., LTD., Dated 9 October 2002.
- 12.1 EX-12.1 Certification Pursuant to Section 302, the Sarbanes-oxley Act of 2002
- 12.2 EX-12.2 Certification Pursuant to Section 302, the Sarbanes-oxley Act of 2002
- 13.1 EX-13.1 Certification Pursuant to 18 U.s.c. Section 1350, As Adopted Pursuant to Section 906 of the Sarbanes-oxley Act of 2002
- 13.2 EX-13.2 Certification Pursuant to 18 U.s.c. Section 1350, As Adopted Pursuant to Section 906 of the Sarbanes-oxley Act of 2002
TLK similar filings
Filing view
External links
Exhibit 12.2
CERTIFICATION
PURSUANT TO SECTION 302
THE SARBANES-OXLEY ACT OF 2002
I, Sudiro Asno, certify that:
1. I have reviewed this annual report on Form 20-F of PERUSAHAAN PERSEROAN (PERSERO) P.T. TELEKOMUNIKASI INDONESIA Tbk.; | |
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report; | |
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the company as of, and for, the periods presented in this report; | |
4. The company’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and15d-15(f)) for the company and have: |
(a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the company, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared; | |
(b) Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles; | |
(c) Evaluated the effectiveness of the company’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and | |
(d) Disclosed in this report any change in the company’s internal control over financial reporting that occurred during the period covered by the annual report that has materially affected, or is reasonably likely to materially affect, the company’s internal control over financial reporting; and |
5. The company’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the company’s auditors and the audit committee of the company’s board of directors (or persons performing the equivalent functions): |
(a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the company’s ability to record, process, summarize and report financial information; and | |
(b) Any fraud, whether or not material, that involves management or other employees who have a significant role in the company’s internal control over financial reporting. |
Date: June 28, 2007
/s/ Sudiro Asno | |
Name: Sudiro Asno |
Title: | Director of Finance and Chief Financial Officer |