COMMITMENTS AND CONTINGENCIES: | NOTE 12—COMMITMENTS AND CONTINGENCIES: Environmental matters: The Company has instituted extensive environmental conservation programs at its mining facilities in Peru and Mexico. The Company's environmental programs include, among others, water recovery systems to conserve water and minimize the impact on nearby streams, reforestation programs to stabilize the surface of the tailings dams and the implementation of scrubbing technology in the mines to reduce dust emissions. Environmental capital investments in years 2017, 2016 and 2015, were as follows (in millions): 2017 2016 2015 Peruvian operations $ $ $ Mexican operations ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ Total $ $ $ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ Peruvian operations: The Company's operations are subject to applicable Peruvian environmental laws and regulations. The Peruvian government, through the Ministry of Environment ("MINAM") conducts annual audits of the Company's Peruvian mining and metallurgical operations. Through these environmental audits, matters related to environmental obligation, compliance with legal requirements, atmospheric emissions, effluent monitoring and waste management are reviewed. The Company believes that it is in material compliance with applicable Peruvian environmental laws and regulations. Peruvian law requires that companies in the mining industry provide assurances for future mine closure and remediation. In accordance with the requirements of this law, the Company's closure plans were approved by MINEM. See Note 9 "Asset retirement obligation," for further discussion of this matter. In accordance with the requirements of the law, in 2015 the Company submitted the closure plans for the Tia Maria project and for the Toquepala expansion. The process of review and approval of closure plans usually takes several months. In March 2016, MINEM approved the Mining Closure Plan for the Toquepala expansion project. The closure plan for the Tia Maria project was approved in February 2017. The Company, however, has not recorded a retirement obligation for the project as the construction permit has not been received, and work on the project is on hold. The Company believes that under these circumstances the recording of a retirement obligation is not appropriate. In December 2017, the Company submitted the mine closure plan update for the Cuajone operations, which is under review and evaluation by MINEM. In 2008, the Peruvian government enacted environmental regulations establishing stringent air quality standards ("AQS") for daily sulfur dioxide ("SO2") in the air for the Peruvian territory. These regulations, as amended in 2013, recognized distinct zones/areas, as atmospheric basins. MINAM had established three atmospheric basins that required further attention to comply with the air quality standards. The Ilo basin was one of these three areas and the Company's smelter and refinery are part of the area. In June 2017, MINAM enacted a supreme decree which defines new AQS for daily sulfur dioxide and gaseous mercury for the Peruvian territory, as well as monthly lead in particulate matter (PM10), in order to adopt standards similar to comparable countries and conform them to the technical capabilities available in Peru, while ensuring the protection of public health. This decree also considers criteria established by the World Health Organization and establishes a mean 24-hour AQS equal to 250 micrograms per cubic meter (µg/m3) of SO2 to replace the current 24-hour AQS of 20 µg/m3 of SO2, effective since 2014. The decree also establishes a mean 24-hour AQS equal to 2 µg/m3 of gaseous mercury and a mean monthly AQS equal to 1.5 µg/m3 of lead in PM10. The Company believes that these new AQS are appropriate for Peru and will allow Peruvian industry to be competitive with other countries. The Company has evaluated the potential impact of these new standards and expects that its adoption will not have a material impact on the financial position of the Company, as currently the Company maintains a lower daily average level of µg/m3 of SO2, than those required by the new AQS. In addition, in June 2017, MINAM enacted a supreme decree which establishes new quality standards for water in the Peruvian territory. The Company has reviewed this decree and considers that its adoption will not have a material impact on its financial position. In 2013, the Peruvian government enacted soil environmental quality standards ("SQS") applicable to any existing facility or project that generates or could generate the risk of soil contamination in its area of operation or influence. In March 2014, MINAM issued a supreme decree, which establishes additional provisions for the gradual implementation of SQS. Under this rule the Company had twelve months to identify contaminated sites in and around its facilities and present a report of identified contaminated sites. These documents were submitted to MINEM for approval in April 2015. After MINEM's review, the documents for the Company's operations were fully approved in July 2017. The next step is for the Company to prepare a characterization study to determine the depth, extent and physio-chemical composition of the contaminated areas and define an appropriate remediation plan with time-frame for completion. In addition, the Company must submit for approval a Soil Decontamination Plan (SDP) within 30 months after being notified by the authority. This SDP must include remediation actions, a schedule and compliance deadlines. Also under this rule, if deemed necessary and given reasonable justification, the Company may request a one year extension for the decontamination plan. Soil confirmation tests must be carried out after completion of decontamination actions (within the approved schedule) and results must be presented to authorities within 30 days after receiving such results. Non-compliance with this obligation or with decontamination goals will carry penalties, although no specific sanctions have been established yet. During compliance with this schedule, companies cannot be penalized for non-compliance with the SQS. While the Company believes that there is a reasonable possibility that a potential loss contingency may exist, it cannot currently estimate the amount of the contingency. The Company believes that a reasonable determination of the loss will be possible once the characterization study and the SDP are substantially completed, which is expected for the first quarter of 2020. At that time the Company will be in a position to estimate the remediation cost. Further, the Company does not believe that it can estimate a reasonable range of possible costs until the noted studies have substantially progressed and therefore is not be able to disclose a range of costs that is meaningful. Mexican operations : The Company's operations are subject to applicable Mexican federal, state and municipal environmental laws, to Mexican official standards, and to regulations for the protection of the environment, including regulations relating to water supply, water quality, air quality, noise levels and hazardous and solid waste. The principal legislation applicable to the Company's Mexican operations is the Federal General Law of Ecological Balance and Environmental Protection (the "General Law"), which is enforced by the Federal Bureau of Environmental Protection ("PROFEPA"). PROFEPA monitors compliance with environmental legislation and enforces Mexican environmental laws, regulations and official standards. It may also initiate administrative proceedings against companies that violate environmental laws, which in the most extreme cases may result in the temporary or permanent shutdown of non-complying facilities, the revocation of operating licenses and/or other sanctions or fines. In 2011, the General Law was amended, giving an individual or entity the ability to contest administrative acts, including environmental authorizations, permits or concessions granted, without the need to demonstrate the actual existence of harm to the environment as long as it can be argued that the harm may be caused. In addition, in 2011, amendments to the Civil Federal Procedures Code ("CFPC") were enacted. These amendments establish three categories of collective actions by means of which 30 or more people claiming injury derived from environmental, consumer protection, financial services and economic competition issues will be considered to be sufficient in order to have a legitimate interest to seek through a civil procedure restitution or economic compensation or suspension of the activities from which the alleged injury derived. The amendments to the CFPC may result in more litigation, with plaintiffs seeking remedies, including suspension of the activities alleged to cause harm. In 2013, the Environmental Liability Federal Law was enacted. The law establishes general guidelines for actions to be considered to likely cause environmental harm. If a possible determination regarding harm occurs, environmental clean-up and remedial actions sufficient to restore environment to a pre-existing condition should be taken. Under this law, if restoration is not possible, compensation measures should be provided. Criminal penalties and monetary fines can be imposed under this law. 2014 accidental spill at Buenavista mine: In 2014, an accidental spill of approximately 40,000 cubic meters of copper sulfate solution occurred at a Buenavista mine leaching pond. This solution reached the Bacanuchi River and the Sonora River. The Company took immediate actions to contain the spill, and to comply with all necessary legal requirements. The Company hired contractors including environmental specialists and assigned more than 1,200 of its own personnel to clean the river. In addition, the Company developed a service program to assist the residents of the Sonora River region. • Administrative proceedings: The National Water Commission, the Federal Commission for the Protection of Sanitary Risk and PROFEPA initiated administrative proceedings regarding the spill to determine possible environmental and health damages. On September 15, 2014, the Company executed an administrative agreement with PROFEPA, providing for the submission of a remediation action plan to the Mexican Ministry of Environment and Natural Resources (Secretaria de Medio Ambiente y Recursos Naturales "SEMARNAT"). The general remediation program submitted to SEMARNAT was approved on January 6, 2015. The Company also created a trust with a Mexican development bank, acting as a Trustee to support environmental remedial actions in connection with the spill, to comply with the remedial action plan and to compensate those persons adversely affected by the spill. The Company committed up to two billion Mexican pesos (approximately $150 million). A technical committee for the trust was created with representatives from the federal government, the Company and specialists assisted by a team of environmental experts to ensure the proper use of the funds. Along with the administrative agreement executed with PROFEPA, the trust served as an alternative mechanism for dispute resolution to mitigate public and private litigation risks. On December 1, 2016, SEMARNAT issued its final resolution which held that all remediation actions contained in the remediation plan, had been fulfilled and that all requirements had been complied with, except for biological monitoring activities at the Sonora River that will continue until the first semester of 2019 pursuant to the plan. On January 26, 2017, PROFEPA issued its final resolution under which it declared all mitigation actions completed and its investigation closed. In light of the above, the Company has obtained all necessary formal rulings from SEMARNAT and PROFEPA. On February 7, 2017, the Company closed the trust. As a result, $10.2 million of excess provision was credited to income in the first quarter of 2017. The total expense recorded for this accident in 2014 and 2015 was $136.4 million. Therefore, the remediation concerns raised by SEMARNAT and PROFEPA have been addressed. • Other procedures: On August 19, 2014, PROFEPA, as part of the administrative proceeding initiated after the spill, announced the filing of a criminal complaint against Buenavista del Cobre S.A. de C.V. ("BVC"), a subsidiary of the Company, in order to determine those responsible for the environmental damages. The Company is vigorously defending itself against this complaint. As of December 31, 2017, the case remains pending resolution. Through the first half of 2015, six collective action lawsuits were filed in federal courts in Mexico City and Sonora against two subsidiaries of the Company seeking economic compensation, clean up and remedial activities in order to restore the environment to its pre-existing conditions. Two of the collective action lawsuits have been dismissed by the court. The plaintiffs in the four remaining lawsuits are: Acciones Colectivas de Sinaloa, A.C. which established two collective actions, Defensa Colectiva A.C.; and Ana Luisa Salazar Medina et al. which has been granted a collective action certification. The remaining plaintiffs have requested cautionary measures on the construction of facilities for the monitoring of public health services and the prohibition of the closure of the RÃo Sonora Trust. As of December 31, 2017, these cases remain pending resolution. Similarly, during 2015, eight civil action lawsuits were filed against BVC in the state courts of Sonora seeking damages for alleged injuries and for moral damages as a consequence of the spill. The plaintiffs in the state court lawsuits are: Jose Vicente Arriola Nunez et al; Santana Ruiz Molina et al; Andres Nogales Romero et al; Teodoro Javier Robles et al; Gildardo Vasquez Carvajal et al; Rafael Noriega Souffle et al; Grupo Banamichi Unido de Sonora El Dorado, S.C. de R.L. de C.V; and Marcelino Mercado Cruz. In 2016, three additional civil action lawsuits, claiming similar damages, were filed by Juan Melquicedec Lebaron; Blanca Lidia Valenzuela Rivera et al and Ramona Franco Quijada et al. In 2017, BVC was served with thirty-three additional civil action lawsuits, claiming similar damages. The lawsuits were filed by Francisco Javier Molina Peralta et al; Anacleto Cohen Machini et al; Francisco Rafael Alvarez Ruiz et al; Jose Alberto Martinez Bracamonte et al; Gloria del Carmen Ramirez Duarte et al; Flor Margarita Sabori et al; Blanca Esthela Ruiz Toledo et al; Julio Alfonso Corral DomÃnguez et al; Maria Eduwiges Bracamonte Villa et al; Francisca Marquez Dominguez et al; Jose Juan Romo Bravo et al; Jose Alfredo Garcia Leyva et al; Gloria Irma Dominguez Perez et al; Maria del Refugio Romero et al; Miguel Rivas Medina et al; Yolanda Valenzuela Garrobo et al; Maria Elena Garcia Leyva et al; Manuel Alfonso Ortiz Valenzuela et al; Francisco Alberto Arvayo Romero et al; Maria del Carmen Villanueva Lopez et al; Manuel Martin Garcia Salazar; Miguel Garcia Arguelles et al; Dora Elena Rodriguez Ochoa et al; Honora Eduwiges Ortiz Rodriguez et al; Francisco Jose Martinez Lopez et al; Maria Eduwiges Lopez Bustamante; Rodolfo Barron Villa et al, Jose Carlos Martinez Fernandez et al, Maria de los Angeles Fabela et al; Rafaela Edith Haro et al; Luz Mercedes Cruz et al; Juan Pedro Montaño et al; and Juana Irma Alday Villa. As of December 31, 2017, these cases remain pending resolution. During 2015, four constitutional lawsuits (juicios de amparo) were filed before Federal Courts against various authorities and against a subsidiary of the Company, arguing; (i) the alleged lack of a waste management program approved by SEMARNAT; (ii) the alleged lack of a remediation plan approved by SEMARNAT with regard to the August 2014 spill; (iii) the alleged lack of community approval regarding the environmental impact authorizations granted by SEMARNAT to one subsidiary of the Company; and (iv) the alleged inactivity of the authorities with regard of the spill in August 2014. The plaintiffs of these lawsuits are: Francisca Garcia Enriquez, et al which established two lawsuits, Francisco Ramon Miranda, et al and Jesus David Lopez Peralta et al. During the third quarter of 2016, four additional constitutional lawsuits, claiming similar damages were filed by Mario Alberto Salcido et al; Maria Elena Heredia Bustamante et al; Martin Eligio Ortiz Gamez et al; and Maria de los Angeles Enriquez Bacame et al. During the third quarter of 2017, BVC was served with another constitutional lawsuit filed by Francisca GarcÃa Enriquez et al. As of December 31, 2017, these cases remain pending resolution. It is not currently possible to determine the extent of the damages sought in these state and federal lawsuits but the Company considers that these lawsuits are without merit. Accordingly, the Company is vigorously defending against them. Nevertheless, the Company considers that none of the legal proceedings resulting from the spill, individually or in the aggregate, would have a material effect on its financial position or results of operations. The Company believes that all of its facilities in Peru and Mexico are in material compliance with applicable environmental, mining and other laws and regulations. The Company also believes that continued compliance with environmental laws of Mexico and Peru will not have a material adverse effect on the Company's business, properties, result of operations, financial condition or prospects and will not result in material capital investments. Litigation matters : The "Virgen Maria" Mining Concessions of the Tia Maria Mining Project The Tia Maria project includes various mining concessions, totaling 32,989.64 hectares. One of the concessions is the "Virgen Maria" mining concession totaling 943.72 hectares or 2.9% of the total mining concessions. Related to the "Virgen Maria" mining concessions, in August 2009, a lawsuit was filed against SCC's Branch by the former stockholders of Exploraciones de Concesiones Metalicas S.A.C. ("Excomet"). The plaintiffs allege that the acquisition of Excomet's shares by the Branch is null and void because the $2 million purchase price paid by the Branch for the shares of Excomet was not fairly negotiated by the plaintiffs and the Branch. In 2005, the Branch acquired the shares of Excomet after lengthy negotiations with the plaintiffs, and after the plaintiffs, which were all the stockholders of Excomet, approved the transaction in a general stockholders' meeting. Excomet was at the time owner of the "Virgen Maria" mining concession. In October 2011, the civil court dismissed the case on the grounds that the claim had been barred by the statute of limitations. On appeal by the plaintiffs, the Superior Court reversed the lower court's decision and remanded it to the lower court for further proceedings. In August 2015, the lower court dismissed the case on the grounds that the plaintiffs had not proven the alleged unfairness of the negotiations. The plaintiffs appealed this resolution before the Superior Court. In September 2016, the Superior Court confirmed the lower court's resolution and the plaintiffs filed an extraordinary appeal in order to have the case reviewed by the Supreme Court. In June 2017, the Supreme Court dismissed the extraordinary appeal filed by the plaintiffs. Therefore, the lawsuit ended favorably for the Company. The Tia Maria Mining Project There are four lawsuits filed against the Peruvian Branch of the Company related to the Tia Maria project. The lawsuits seek (i) to declare null and void the resolution which approved the Environmental Impact Assessment of the project; (ii) the cancellation of the project and the withdrawal of mining activities in the area and (iii) to declare null and void the mining concession application of the Tia Maria project. The lawsuits were filed by Messrs. Jorge Isaac del Carpio Lazo (filed May 22, 2015), Ernesto Mendoza Padilla (filed May 26, 2015), Juan Alberto Guillen Lopez (filed June 18, 2015) and Nicolas Belfiore Nicolini (filed November 13, 2015). The del Carpio Lazio case was rejected by the court of first instance on November 14, 2016. The plaintiff filed an appeal before the Superior Court on January 3, 2017. On January 9, 2018, the lawyers of both parties presented their respective positions before the Appellate Court. As of February 20, 2018, the case remains pending resolution. The Mendoza Padilla case was rejected by the lower court on July 8, 2015. This ruling was confirmed by the Superior Court on June 14, 2016. On July 12, 2016, the case was appealed before the Constitutional Court. As of December 31, 2017, the case remains pending resolution without further developments. The Guillen Lopez case is currently before the lower court. As of December 31, 2017, the case remains pending resolution without further developments. In the Belfiore Nicolini case, the court ruled partially in favor of the plaintiff. However, the Company filed an appeal to challenge said decision. As of February 20, 2018, the file was sent to the Appelllate Court for reviewing. The Company asserts that these lawsuits are without merit and is vigorously defending against them. The potential contingency amount for these cases cannot be reasonably estimated by management at this time. Special Regional Pasto Grande Project ("Pasto Grande Project") In 2012, the Pasto Grande Project, an entity of the Regional Government of Moquegua, filed a lawsuit against SCC's Peruvian Branch alleging property rights over a certain area used by the Peruvian Branch and seeking the demolition of the tailings dam where SCC's Peruvian Branch has deposited its tailings from the Toquepala and Cuajone operations since 1995. The Peruvian Branch has had title to use the area in question since 1960 and has constructed and operated the tailing dams with proper governmental authorization, since 1995. Upon a motion filed by the Peruvian Branch, the lower court has included MINEM as a defendant in this lawsuit. MINEM has answered the complaint and denied the validity of the claim. As of December 31, 2017, the case remains pending resolution without further developments. SCC's Peruvian Branch asserts that the lawsuit is without merit and is vigorously defending against it. The amount of this contingency cannot be reasonably estimated by management at this time. Carla Lacey and Barbara Siegfried, on behalf of themselves and all other similarly situated stockholders of Southern Copper Corporation, and derivatively on behalf of Southern Copper Corporation A purported class action derivative lawsuit filed in the Delaware Court of Chancery was served on the Company and its Directors in February 2016 relating to the 2012 capitalization of 99.999% of MGE by Controladora de Infraestructura Energetica Mexico, S.A. de C.V., an indirect subsidiary of Grupo Mexico (the "CIEM Capitalization"), the Company's entry into a power purchase agreement with MGE in 2012 (the "MGE Power Purchase Agreement"), and the 2012 restructuring of a loan from the Company's Mexican Operations to MGE for the construction of two power plants to supply power to the Company's Mexican operations (the "MGE Loan Restructuring"). The action purports to be brought on behalf of the Company and its common stockholders. The complaint alleges, among other things, that the CIEM Capitalization, the MGE Power Purchase Agreement and the MGE Loan Restructuring were the result of breaches of fiduciary duties and the Company's charter. The Company has filed a response denying these allegations and is currently in the discovery process. Labor matters : Peruvian operations: 69% of the Company's 4,628 Peruvian employees were unionized at December, 2017. Currently, there are six separate unions, one large union and five smaller unions. In the first quarter of 2016, the Company signed three-year agreements with five unions. These agreements include, among other things, annual salary increases of 5% for each of the three years. In April 2017, the Unified Labor Union of SPCC workers and one of Toquepala's unions began a strike, demanding a review of certain health and profit sharing benefits. The strike ended after 12 days. These two unions began illegal strikes in July and November 2017, that lasted five days and 21 days, respectively. The Company estimates that the loss of copper production resulting from the 2017 strikes was not significant and its sales contracts were not affected. Mexican operations : In recent years, the Mexican operations have experienced a positive improvement of their labor environment, as its workers opted to change their affiliation from the Sindicato Nacional de Trabajadores Mineros, Metalurgicos y Similares de la Republica Mexicana (the "National Mining Union") to other less politicized unions. However, the workers of the San Martin and Taxco mines, are still under the National Mining Union and have been on strike since July 2007. On December 10, 2009, a federal court confirmed the legality of the San Martin strike. In order to recover the control of the San Martin mine and resume operations, the Company filed a court petition on January 27, 2011 requesting that the court, among other things, define the termination payment for each unionized worker. The court denied the petition alleging that, according to federal labor law, the union was the only legitimate party to file such petition. On appeal by the Company, on May 13, 2011, the Mexican federal tribunal accepted the petition. In July 2011, the National Mining Union appealed the favorable court decision before the Supreme Court. On November 7, 2012, the Supreme Court affirmed the decision of the federal tribunal. The Company filed a new proceeding before the labor court on the basis of the Supreme Court decision, which recognized the right of the labor court to define responsibility for the strike and the termination payment for each unionized worker. A favorable decision of the labor court in this new proceeding would have the effect of terminating the protracted strike at San Martin. As of December 31, 2017, the case remains pending resolution without further developments. In the case of the Taxco mine, following the workers refusal to allow exploration of new reserves, the Company commenced litigation seeking to terminate the labor relationship with workers at the mine (including termination of the related collective bargaining agreement). On September 1, 2010, the federal labor court issued a ruling approving the termination of the collective bargaining agreement and all the individual labor contracts of the workers affiliated with the Mexican mining union at the Taxco mine. The mining union appealed the labor court ruling before a federal court. In September 2011, the federal court accepted the union's appeal and remanded the case to the federal labor court for reconsideration. After several legal proceedings on January 25, 2013, the Company filed a new proceeding before the labor court. On June 16, 2014, the labor court denied the petition of the Company. The resolution issued by the labor court was challenged by the Company before a federal court. In August 2015, the Supreme Court decided to assert jurisdiction over the case and to rule on it directly. As of December 31, 2017, the case remains pending resolution without further developments. It is expected that operations at these mines will remain suspended until these labor issues are resolved. In view of these lengthy strikes, the Company has reviewed the carrying value of the San Martin and Taxco mines to ascertain whether impairment exists. The Company concluded that there is a non-material impairment of the assets located at these mines. Other legal matters : The Company is involved in various other legal proceedings incidental to its operations, but does not believe that decisions adverse to it in any such proceedings, individually or in the aggregate, would have a material effect on its financial position or results of operations. Other commitments : Peruvian Operations Tia Maria: On August 1, 2014, the Company received the final approval of Tia Maria´s Environmental Impact Assessment ("EIA"). However, the issuance of the project´s construction permit has been delayed due to pressures from anti-mining groups. The Company continues working with community groups in order to resolve open issues concerning the project. The Company is also working jointly with the Peruvian Government to obtain the construction license for this 120,000 tons of SX-EW copper per year greenfield project. The Company expects the license to be issued in the first half of 2018. Tia Maria´s project budget is approximately $1.4 billion, of which $353.9 million has been invested through December 31, 2017. When completed, it is expected to produce 120,000 tons of copper cathodes per year. This project will use state-of-the-art SX-EW technology with the highest international environmental standards. SX-EW facilities are the most environmentally friendly in the industry as they do not require a smelting process and consequently, no emissions are released into the atmosphere. The project will only use seawater, transporting this more than 25 kilometers to 1,000 meters above sea level, and includes a desalinization plant which will be constructed at a cost of $95 million. Consequently, the Tambo river water resources and the water resources from the wells in the area will be used solely for farming and human consumption. The Company expects the project to generate 3,500 jobs during the construction phase. When in operation, Tia Maria will directly employ 600 workers and indirectly provide jobs to another 2,000. Through its expected twenty-year life, the project related services will create significant business opportunities in the Arequipa region. In view of the delay in this project, the Company continues to review the carrying value of this asset to ascertain whether impairment exists. Should the Tia Maria project not move forward, the Company is confident that most of the project equipment will continue to be used productively, through reassignment to other mine locations operated by the Company. The Company believes that an impairment loss, if any, will not be material. Toquepala Concentrator Expansion: In April 2015, the construction permit for the Toquepala expansion project was approved by the MINEM. The project budget is $1.2 billion, of which $892.9 million has been expended through December 31, 2017. When completed, this expansion project is expected to increase annual production capacity by 100,000 tons of copper and 3,100 tons of molybdenum. The project has reached 87% progress and is expected to be completed by the third quarter of 2018. Corporate Social Responsibility: The Company has a corporate social responsibility policy to maintain and promote continuity of its mining operations and obtain the best results. The main objective of this policy is to integrate its operations with the local communities in the areas of influence of its operations by creating a permanent positive relationship with them, in order to develop the optimum social conditions and to promote sustainable development in the area. Accordingly, the Company has made the following commitments: Tacna Region : In connection with the Toquepala concentrator expansion, the Company has committed to fund various social and infrastructure improvement projects in Toquepala's neighboring communities. The total amount committed for these purposes is S/ 445.0 million (approximately $132 million). Moquegua Region : In the Moquegua region, the Company is part of a "development roundtable" in which the local municipal authorities, the community representatives and the Company discuss the social needs and the way the Company could contribute to sustainable development in the region. As part of this, the roundtable is discussing the creation of a Moquegua Region Development Fund for which the Company has offered a contribution of S/ 700 million (approximately $209 million). While final funding is not yet settled, the Company has committed to contribute S/ 108.5 million (approximately $32 million) in advance, which is being utilized in an educational project and S/ 48.4 million (approximately $14 million) for a residual water treatment plant in Ilo, a sea-wall embankment and a fresh water facility at El Algarrobal. In addition, the Company has committed S/ 143.0 million (approximately $43 million) for the construction of five infrastructure projects in the Moquegua region under the "social investment for taxes" (obras por impuestos) program which allows the Compan |