COMMITMENTS AND CONTINGENCIES: | NOTE 10 ā COMMITMENTS AND CONTINGENCIES: ā Environmental matters: ā The Company has instituted extensive environmental conservation programs at its mining facilities in Peru and Mexico. The Companyās environmental programs include, among others, water recovery systems to conserve water and minimize the impact on nearby streams, reforestation programs to stabilize the surface of the tailings dams and the implementation of scrubbing technology in the mines to reduce dust emissions. ā Environmental capital investments in the six months ended June 30, 2020 and 2019 were as follows (in millions): ā ā ā ā ā ā ā ā ā 2020 2019 Peruvian operations ā $ (5.5) ā $ 13.9 Mexican operations ā 19.4 ā 18.4 ā ā $ 13.9 ā $ 32.3 (*) The activity, in the first six months of 2020, for the Peruvian operations include prepayment settlements. ā Peruvian operations remediation. In accordance with the requirements of this law, the Companyās closure plans were approved by MINEM. See Note 8 āAsset retirement obligationā for further discussion of this matter. ā Air Quality Standards (āAQSā): ā Soil Environmental Quality Standards (āSQSā) ā Climate change: Framework. Through this law, promoting public and private investment in climate change management is declared to be of national interest. The law proposes to create an institutional framework to address climate change in Peru, outlining new measures, particularly with respect to climate change mitigation. It includes, for example, provisions dealing with: increasing carbon capture and use of carbon sinks; afforestation and reforestation practices; land use changes; and sustainable systems of transportation, solid waste management, and energy systems. It was the first Latin American climate change framework law to incorporate responsibilities from the Paris Agreement. Regulations to this law were enacted by Supreme Decree 013-2019 published on December 31, 2019 and are applicable to all Peruvian institutions and agencies. It is expected that further Peruvian regulations would be applicable to non-governmental entities. The Company anticipates initiating a multi-year process to adopt applicable reporting recommendations of the Task-Force on Climate Related Financial Disclosures (TCFD) once new Peruvian climate change regulations applicable to non-governmental entities are implemented. The Company is committed to the environment and to managing climate-related impacts. The Companyās focus is to seek continuous improvement in the responsible use of natural resources while complying with strict applicable legal standards for prevention, mitigation, control and remediation of environmental impacts. Implementing continuous improvement in the Companyās processes improves efficiency in the use and consumption of energy, water, and other natural resources. ā Mexican operations ā The principal legislation applicable to the Companyās Mexican operations is the Federal General Law of Ecological Balance and Environmental Protection (the āGeneral Lawā), which is enforced by the Federal Bureau of Environmental Protection (āPROFEPAā). PROFEPA monitors compliance with environmental legislation and enforces Mexican environmental laws, regulations and official standards. It may also initiate administrative proceedings against companies that violate environmental laws, which in the most extreme cases may result in the temporary or permanent shutdown of non-complying facilities, the revocation of operating licenses and/or other sanctions or fines. ā In 2011, the General Law was amended, giving an individual or entity the ability to contest administrative acts, including environmental authorizations, permits or concessions granted, without the need to demonstrate the actual existence of harm to the environment as long as it can be argued that the harm may be caused. In addition, in 2011, amendments to the Civil Federal Procedures Code (āCFPCā) were enacted, which establish three categories of collective actions by means of which 30 or more people claiming injury derived from environmental, consumer protection, financial services and economic competition issues will be considered to be sufficient in order to have a legitimate interest to seek through a civil procedure restitution or economic compensation or suspension of the activities from which the alleged injury derived. The amendments to the CFPC may result in more litigation, with plaintiffs seeking remedies, including suspension of the activities alleged to cause harm. ā In 2013, the Environmental Liability Federal Law was enacted. The law establishes general guidelines for actions to be considered to likely cause environmental harm. If a possible determination regarding harm occurs, environmental clean-up and remedial actions sufficient to restore environment to a pre-existing condition should be taken. Under this law, if restoration is not possible, compensation measures should be provided. Criminal penalties and monetary fines can be imposed under this law. ā On February 2019, the Mexican Supreme Court confirmed the constitutionality of an ecological tax on extractive activities developed in the state of Zacatecas, which taxes the environmental remediation actions, emissions of certain gases to the atmosphere, emissions of pollutant substances to the soil or water, and waste storage within the state territory. The Company has determined that this new environmental regulation will have no impact on its financial position. ā Guaymas sulfuric acid spill ā On July 9, 2019, there was an incident at the CompanyĀ“s Marine Terminal in Guaymas, Sonora that caused the discharge of approximately three cubic meters of sulfuric acid into the sea in the industrial port area. ā The Guaymas bay has an estimated water volume of 340 million cubic meters, the spill upon entering in contact with the seaās alkaline conditions, led the quick dilution of the discharge and the sulfuric acid was naturally and immediately neutralized. As a result, the discharge was considered harmless, and it was found that neither the flora nor fauna of the port area were affected, according to the report from the Ministry of Navy. ā On July 10, 2019, PROFEPA made a first inspection of the area, concluding that the Company executed all the correct procedures in order to contain the discharge, and no reference was made to the existence of negative impacts on the environment resulting from the incident. ā On Friday, July 19, 2019, PROFEPA revisited the facilities to carry out a second inspection, declaring a partial temporary shutdown related only to the storage process and transportation of sulfuric acid at the terminal, arguing the absence of an authorization of environmental impact. It is important to note that these facilities have been in operation since 1979, prior to the 1988 Mexican General Law of Ecological Balance and the Protection of the Environment. Therefore, these licenses are not a requirement for companies that were operating before the aforementioned law. In addition, in 2009, PROFEPA awarded a certification of āClean Industry and Environmental Qualityā for such facility which was subsequently renewed four times (for a two-year period each time). ā The Company does not know the reasons or causes for this partial and temporary closure, but it will continue working with the environmental authorities to provide certainty that the operation is in strict compliance with environmental regulations. The Company expects the environmental authorities to suspend the partial temporary shutdown, once they resolve their concerns. Currently, the Company does not expect any impact on its operations. As of June 30, 2020, the matter is pending resolution. ā Climate change ā Grupo Mexico, the indirect parent of SCC has issued sustainability reports under the Global Reporting Initiative (GRI) for more than 10 years. Grupo Mexico also participates in different Mexican and international reporting programs such as the Greenhouse Gases (GHG) Mexico Program and the Carbon Disclosure Program (CDP). In 2013, GHG and CDP have signed a memorandum of understanding to work on aligning their reporting frameworks. Grupo Mexicoās 2018 CDP questionnaire included responses to the Task Force on Climate-Related Disclosure or TCFD concerns. In compliance with the 2012 Mexican Climate Change Law Grupo Mexicoās GHG emissions are reported and verified independently. Grupo Mexicoās Sustainability Reports disclosing inventories of GHG emissions can be found at https://www.gmexico.com/GMDocs/InformeSustentable/DS2019completoIng.pdf. On October 18, 2017, Grupo Mexico was selected to join the S&P Sustainability Indices MILA Pacific Alliance (DJSI MILA). This regional sustainability index included for 2017, 42 leading companies in sustainability from the countries that form part of the Pacific Alliance: Mexico, Chile, Colombia and Peru. ā The Company believes that all of its facilities in Peru and Mexico are in material compliance with applicable environmental, mining and other applicable laws and regulations. The Company also believes that continued compliance with environmental laws of Mexico and Peru will have no material adverse effects on the Companyās business, properties, or operating results. ā Litigation matters ā Peruvian operations ā The Tia Maria Mining Project ā There are four lawsuits filed against the Peruvian Branch of the Company related to the Tia Maria project. The lawsuits seek (i) to declare null and void the resolution that approved the Environmental Impact Assessment of the project; (ii) the cancellation of the project and the withdrawal of mining activities in the area and (iii) to declare null and void the mining concession application for the Tia Maria project. The lawsuits were filed by Messrs. Jorge Isaac del Carpio Lazo (filed May 22, 2015), Ernesto Mendoza Padilla (filed May 26, 2015), Juan Alberto Guillen Lopez (filed June 18, 2015) and Junta de Usuarios del Valle del Tambo (filed April 30, 2015). ā The del Carpio Lazio case was rejected by the court of first instance on November 14, 2016. The plaintiff filed an appeal before the Superior Court on January 3, 2017. On January 9, 2018, the lawyers of both parties presented their respective positions before the Appellate Court. On March 8, 2018, the Appellate Court issued its final decision, which upheld the first instance ruling. On April 27, 2018, the plaintiff filed an extraordinary appeal before the Supreme Court. As of June 30, 2020, the case remains pending resolution. ā The Mendoza Padilla case was initially rejected by the lower court on July 8, 2015. This ruling was confirmed by the Superior Court on June 14, 2016. On July 12, 2016, the case was appealed before the Constitutional Court. On November 20, 2018, the Constitutional Court reversed the previous decisions and remanded the case to the lower court for further action. As of June 30, 2020, the case remains pending resolution. ā The Guillen Lopez case is currently before the lower court. On July 19, 2019, the oral arguments took place. On January 7, 2020, the Judge decided to suspend the proceeding until the del Carpio Lazio case is concluded. Therefore, as of June 30, 2020, the case remains pending resolution. ā The Junta de Usuarios del Valle del Tambo case is currently before the lower court. On May 2016, the Company was included in the process, after the Ministry of Energy and Mines filed a civil complaint. On March 6, 2019, the Company was formally notified of the lawsuit and answered the complaint on March 20, 2019. On July 8, 2019, the Company requested the suspension of the proceeding until the del Carpio Lazio case is concluded. As of June 30, 2020, the case was pending resolution. ā The Company asserts that these lawsuits are without merit and is vigorously defending against them. The potential contingency amount for these cases cannot be reasonably estimated by management at this time. ā Special Regional Pasto Grande Project (āPasto Grande Projectā) ā In 2012, the Pasto Grande Project, an entity of the Regional Government of Moquegua, filed a lawsuit against SCCās Peruvian Branch alleging property rights over a certain area used by the Peruvian Branch and seeking the demolition of the tailings dam where SCCās Peruvian Branch has deposited its tailings from the Toquepala and Cuajone operations since 1995. The Peruvian Branch has had title to use the area in question since 1960 and has, since 1995, constructed and operated the tailings dams with proper governmental authorization. Upon a motion filed by the Peruvian Branch, the lower court has included MINEM as a defendant in this lawsuit. MINEM has answered the complaint and denied the validity of the claim. As of June 30, 2020, the case was pending resolution without further developments. SCCās Peruvian Branch asserts that the lawsuit is without merit and is vigorously defending against it. The amount of this contingency cannot be reasonably estimated by management at this time. ā Mexican operations ā The Accidental Spill at Buenavista Mine of 2014 ā In relation to the 2014 accidental spill of copper sulfate solution that occurred at a leaching pond in the Buenavista mine, the following legal procedures are pending against the Company: ā On August 19, 2014, PROFEPA, as part of the administrative proceeding initiated after the spill, announced the filing of a criminal complaint against Buenavista del Cobre S.A. de C.V. (āBVCā), a subsidiary of the Company, in order to determine those responsible for environmental damages. During the second quarter of 2018, the criminal complaint was dismissed. This decision was appealed and was pending resolution as of June 30, 2020. ā Through the first half of 2015, six collective action lawsuits were filed in federal courts in Mexico City and Sonora against two subsidiaries of the Company seeking economic compensation, clean up and remedial activities in order to restore the environment to its pre-existing conditions. Two of the collective action lawsuits have been dismissed by the court. As of June 30, 2020, four lawsuits were in process: three were filed by Acciones Colectivas de Sinaloa, A.C. and one, by Defensa Colectiva, A.C., requesting precautionary measures about construction of facilities for monitoring public health services and prohibiting the closure of the Rio Sonora Trust. ā Similarly, in 2015, eight civil action lawsuits were filed against BVC in the state courts of Sonora seeking damages for alleged injuries and for moral damages as a consequence of the spill. The plaintiffs in the state court lawsuits are: Jose Vicente Arriola Nunez et al; Santana Ruiz Molina et al; Andres Nogales Romero et al; Teodoro Javier Robles et al; Gildardo Vasquez Carvajal et al; Rafael Noriega Souffle et al; Grupo Banamichi Unido de Sonora El Dorado, S.C. de R.L. de C.V; and Marcelino Mercado Cruz. In 2016, three additional civil action lawsuits, claiming similar damages, were filed by Juan Melquicedec Lebaron; Blanca Lidia Valenzuela Rivera et al and Ramona Franco Quijada et al. In 2017, BVC was served with thirty-three additional civil action lawsuits, claiming similar damages. The lawsuits were filed by Francisco Javier Molina Peralta et al; Anacleto Cohen Machini et al; Francisco Rafael Alvarez Ruiz et al; Jose Alberto Martinez Bracamonte et al; Gloria del Carmen Ramirez Duarte et al; Flor Margarita Sabori et al; Blanca Esthela Ruiz Toledo et al; Julio Alfonso Corral DomĆnguez et al; Maria Eduwiges Bracamonte Villa et al; Francisca Marquez Dominguez et al; Jose Juan Romo Bravo et al; Jose Alfredo Garcia Leyva et al; Gloria Irma Dominguez Perez et al; Maria del Refugio Romero et al; Miguel Rivas Medina et al; Yolanda Valenzuela Garrobo et al; Maria Elena Garcia Leyva et al; Manuel Alfonso Ortiz Valenzuela et al; Francisco Alberto Arvayo Romero et al; Maria del Carmen Villanueva Lopez et al; Manuel Martin Garcia Salazar; Miguel Garcia Arguelles et al; Dora Elena Rodriguez Ochoa et al; Honora Eduwiges Ortiz Rodriguez et al; Francisco Jose Martinez Lopez et al; Maria Eduwiges Lopez Bustamante; Rodolfo Barron Villa et al, Jose Carlos Martinez Fernandez et al, Maria de los Angeles Fabela et al; Rafaela Edith Haro et al; Luz Mercedes Cruz et al; Juan Pedro MontaƱo et al; and Juana Irma Alday Villa. During the first quarter of 2018, BVC was served with another civil action lawsuit, claiming similar damages. The lawsuit was filed by Alma Angelina Del Cid Rivera et al. In the last quarter of 2018, BVC was served with other three civil action lawsuits, claiming similar damages. These lawsuits were filed by Los Corrales de la Estancia, S.C. de R.L.; Jose Antonio Navarro; Jesus Maria PeƱa Molina, et al; these actions were dismissed by the court, because they have expired. As of June 30, 2020, forty-five cases were pending resolution. ā In 2015, four constitutional lawsuits (juicios de amparo) were filed before Federal Courts against various authorities and against a subsidiary of the Company, arguing; (i) the alleged lack of a waste management program approved by SEMARNAT; (ii) the alleged lack of a remediation plan approved by SEMARNAT with regard to the August 2014 spill; (iii) the alleged lack of community approval regarding the environmental impact authorizations granted by SEMARNAT to one subsidiary of the Company; and (iv) the alleged inactivity of the authorities with regard of the spill in August 2014. The plaintiffs of these lawsuits are: Francisca Garcia Enriquez, et al filed two lawsuits, Francisco Ramon Miranda, et al and Jesus David Lopez Peralta et al. In the third quarter of 2016, four additional constitutional lawsuits, claiming similar damages were filed by Mario Alberto Salcido et al; Maria Elena Heredia Bustamante et al; Martin Eligio Ortiz Gamez et al; and Maria de los Angeles Enriquez Bacame et al. In the third quarter of 2017, BVC was served with another constitutional lawsuit filed by Francisca GarcĆa Enriquez et al. In 2018, BVC was served with two additional constitutional lawsuits that were filed against SEMARNAT by Norberto Bustamante et al. Regarding the constitutional lawsuit filed by Maria Elena Heredia Bustamante et al; in which it was claimed the lack of community approval regarding the authorization granted by SEMARNAT to build the new BVC tailings dam, on September 5, 2018, the Supreme Court of Justice issued a resolution establishing that such authorization was granted to BVC in compliance with the applicable legislation. However, SEMARNAT must carry out a public meeting to inform the community of the technical aspects required to build the dam, potential impacts and prevention measures, with no material effects to BVCās operations. SEMARNAT has carried out the consultation ordered by the Supreme Court. As a result, has informed the corresponding Judge about its compliance with the resolution, in which BVC was imposed additional measures of environmental impact prevention, such as: (i) the building of at least three monitoring wells downstream from the curtain of the contingency dam in a period of six months; (ii) monitoring of the groundwater level and water quality every six months; (iii) carrying out rain collection work in order to restore water to the Sonora River basin, for which six months are granted to present the execution program; (iv) determine the location of wildlife conservation and protection areas and define the need to establish biological corridors; (v) obtain photographic or videographic evidence every six months; (vi) submitting to SEMARNAT two years before the closure and abandonment of the site, or earlier if necessary, the closure program that includes the cleaning and restoration of the soil including Mexican regulation NOM-141; (vii) include the measures in the Environmental Monitoring Program according to the environmental components impacted; and (viii) hiring an external environmental consultant to validate compliance with the current and new conditions that are imposed. The foregoing does not impact BVCās operations. Likewise, it is noted that the lawsuits filed by Maria de los Angeles Enriquez Bacame and Norberto Bustamante have been dismissed and closed without prejudice to the Company. As of June 30, 2020, the remaining cases were still pending resolution. ā It is currently not possible to determine the extent of the damages sought in these state and federal lawsuits but the Company believes that these lawsuits are without merit. Accordingly, the Company is vigorously defending against them. Nevertheless, the Company believes that none of the legal proceedings resulting from the spill, individually or in the aggregate, would have a material effect on its financial position or results of operations. ā Corporate operations ā Carla Lacey, on behalf of herself and all other similarly situated stockholders of Southern Copper Corporation, and derivatively on behalf of Southern Copper Corporation ā In April 2019, a derivative lawsuit was filed against the Company, certain current and former Directors, and Grupo Mexico in the Delaware Court of Chancery relating to certain construction contracts, contracts for the purchase and sale of minerals, and transportation contracts entered into between the Companyās subsidiaries and subsidiaries of Grupo Mexico. ā In October 2019, the plaintiff amended the complaint to include claims related to certain administrative services contracts between the Companyās subsidiaries and Grupo Mexico. The amended complaint alleges, among other things, that the construction contracts, the mineral contracts, the transportation contracts, and the administrative services contracts were unfair as a result of breaches of fiduciary duties and the Companyās charter. The amended complaint seeks, among other things, unspecified monetary damages. In January 2020, the Company, the current and former Directors, and Grupo Mexico responded to the complaint by filing motions to dismiss. The Plaintiff filed a brief in response to the motions on March 13, 2020. Because the Company has not reached a conclusion as to whether an unfavorable outcome is either probable or remote, the Company expresses no opinion as to the likelihood of an unfavorable outcome or the amount or range of any possible loss to the Company. ā Labor matters ā Peruvian operations: included annual salary increases of 5% for each year starting September 2018, and a signing bonus of S/45,000 (approximately $13,600) which was recorded as a labor expense in the first quarter of 2019. ā In November 2019, the Company signed two collective bargaining agreements with the remaining union, one of which was for one year and the other, for three-years. The agreements also included annual salary increases of 5% for each year starting September 2018, and a signing bonus of S/15,000 (approximately $4,500) for the one-year agreement and S/45,000 for the three-year agreement (approximately $13,600), which were recorded as labor expenses in the fourth quarter of 2019. ā Mexican operations : ā The workers of the San Martin mine began a strike in July 2007. On February 28, 2018, the striking workers of the San MartĆn mine of IMMSA held an election to vote on the union that would hold the collective bargaining agreement at the San MartĆn mine. The Federacion Nacional de Sindicatos Independientes (the National Federation of Independent Unions) won the vote by a majority. Nevertheless, the vote was challenged by the National Mining Union. On June 26, 2018, the Federal Mediation and Arbitration Board issued a ruling recognizing the election results. Due to the agreement between workers and the Company to end the protracted strike, on August 22, 2018, the Federal Mediation and Arbitration Board authorized the restart of operations of the San MartĆn mine. Such authorization was challenged by the National Mining Union. On April 4, 2019, the Federal Mediation and Arbitration Board recognized, once again, the election results from February 28, 2018, by which the National Federation of Independent Unions won by a majority. In the last quarter of 2019, a Federal Court issued a resolution that established that the Labor Court should analyze the list of workers with the right to vote in the union election. The Company and the National Federation of Independent Unions challenged such determination before the Supreme Court of Justice and the case was still pending resolution as of June 30, 2020. The Company is working on a rehabilitation plan to restore operations at the San Martin mine with a budget of $97.7 million. As of June 30, 2020, the plan is in progress with a total expense of $81.1 million. ā In the case of the Taxco mine, its workers have been on strike since July 2007. After several legal procedures, in August 2015, the Supreme Court decided to assert jurisdiction over the case and to rule on it directly. As of June 30, 2020, the case was pending resolution without further developments. ā It is expected that operations at the Taxco mine will remain suspended until the labor issues are resolved. In view of the lengthy strike, the Company has reviewed the carrying value of the Taxco mine to ascertain whether impairment exists. The Company concluded that there is a non-material impairment of the assets located at this mine. ā Other legal matters ā The Company is involved in various other legal proceedings incidental to its operations, but the Company does not believe that decisions adverse to it in any such proceedings, individually or in the aggregate, would have a material effect on its financial position or results of operations. ā Other commitments: ā Peruvian Operations ā ā Tia Maria: ā On August 1, 2014, the Company received final approval for Tia MariaĀ“s Environmental Impact Assessment (āEIAā). On July 8, 2019, the Company received the construction permit for this 120,000 ton annual SX-EW copper greenfield project with a total capital budget of $1,400 million. This permit was obtained after completing an exhaustive review process, complying with all established regulatory requirements and addressing all observations raised. ā On July 15, 2019, anti-mining groups staged a violent demonstration affecting economic as well as other activities in the Islay province. These actions were followed by the filing of three complaints, sponsored by groups opposing the Tia Maria project, with the Mining Council, which is the Peruvian administrative authority responsible for ruling on these complaints. The Mining Council temporarily suspended the construction permit on August 8, 2019. On October 7, 2019, as part of the process, the Mining Council conducted a hearing to hear the complaints and the CompanyĀ“s position. On October 30, 2019, the Mining Council of the Peruvian Ministry of Energy and Mines ratified the construction permit for the Tia Maria project. ā The CompanyĀ“s commitment is to guarantee the population of Islay that the Tia Maria project will not adversely affect other local economic activities. The project will use only desalinated seawater for its operations and, to transport its supplies and copper production, the Company will build an 32 kilometer industrial railway and an access road at a safe distance from the Tambo Valley. ā The CompanyĀ“s social programs for education, healthcare and productive development will continue to improve the quality of life and the agricultural and livestock activities in the Tambo Valley, as well as develop fishing and tourism in Islay. In June 2019, the Company launched a no-cost technical training program āForging the Futureā, which focuses on making the hiring of local labor a priority and which will benefit 1,137 people in this province during the construction and operation phase. After training, the participants will be eligible to apply for one of the estimated 9,000 jobs (3,600 direct and 5,400 indirect) required during the Tia Maria construction phase. ā When operating, the Company expects Tia Maria will generate a significant contribution through mining royalties and taxes from day one and will directly employ 600 workers, and indirectly another 4,200. ā Tia MariaĀ“s project budget is approximately $1.4 billion, of which $340.9 million has been invested through June 30, 2020. This project will use state-of-the-art SX-EW technology with the highest international environmental standards. SX-EW facilities are the most environmentally friendly in the industry as they do not require a smelting process and therefore, do not release any emissions into the atmosphere. ā Michiquillay: ā In June 2018, the Company signed a contract for the acquisition of the Michiquillay copper project in Cajamarca, Peru, at a purchase price of $400 million. Michiquillay is a world class mining project with estimated mineralized material of 1,150 million tons and a copper grade of 0.63%. It is expected to produce 225,000 tons of copper per year (along with by-products of molybdenum, gold and silver) for an initial mine life of more than 25 years. ā The Company paid $12.5 million at the signing of the contract. The balance of $387.5 million will be paid if the Company decides to develop the project, which is not a present obligation. ā Corporate Social Responsibility: ā The Company has a corporate social responsibility policy to maintain and promote the continuity of its mining operations and obtain the best results. The main objective of this policy is to integrate the CompanyĀ“s operations with local communities in the areas of influence of its operations by creating permanent positive relationships to develop optimum social conditions and promote sustainable development in the area. Accordingly, the Company has made the following commitments: ā Tacna Region: ā As the Toquepala expansion project has been completed, the Company considers that these commitments constitute present obligations of the Company and consequently has recorded a liability of $56.9 million in its condensed consolidated financial statements as of June 30, 2020. ā In addition, the Company has committed S/69.7 million (approximately $19.7 million) for the construction of one infrastructure project in the Tacna region under the āsocial investment for taxesā (obras por impuestos) program, which allows the Company to use these amounts as an advance payment of taxes. ā Moquegua Region: e ā In addition, the Company has committed S/87.8 million (approximately $24.8 million) for the construction of two infrastructure projects in the Moquegua region under the āsocial investment for taxesā (obras por impuestos) program, which allows the Company to use these amounts as an advance payment of taxes. ā Power purchase agreements: ā ā Electroperu S.A.: In June 2014, the Company entered into a power purchase agreement for 120 megawatts (āMWā) with the state power company Electroperu S.A., under which Electroperu S.A. began supplying energy for the Peruvian operations for twenty years starting on April 17, 2017. ā ā Kallpa Generacion S.A. (āKallpaā): In July 2014, the Company entered into a power purchase agreement for 120MW with Kallpa, an independent Israeli owned power company, under which Kallpa will supply energy for the Peruvian operations for ten years starting on April 17, 2017 and ending on April 30, 2027. In May 2016, the Company signed an additional power purchase agreement for a maximum of 80MW with Kallpa, under which Kallpa began supplying energy for the Peruvian operations related to the Toquepala Expansion and other minor projects for ten years starting on May 1, 2017 and ending after ten years of commercial operation of the Toquepala Expansion or on April 30, 2029; whichever occurs first. ā Mexican operations ā Power purchase agreements: ā ā MGE: In 2012, the Company signed a power purchase agreement with MGE, an indirect subsidiary of Grupo Mexico, to supply power to some of the Companyās Mexican operations through 2032. For further information, please see Note 6 āRelated party transactionsā. ā ā Eolica el Retiro, S.A.P.I. de C.V.: In 2013, the Company signed a power purchase agreement with Eolica el Retiro, S.A.P.I. de C.V. a windfarm energy producer that is an indirect subsidiary of Grupo Mexico, to supply power to some of the CompanyĀ“s Mexican operations. For further information, please see Note 6 āRelated party transactionsā. ā ā Parque Eolico de Fenicias, S. de R.L. de C.V.: On February 20, 2020, the Company signed a power purchase agreement with Parque Eolico de Fenicias, S. de R.L. de C.V., and indirect subsidiary of Grupo Mexico, to supply 611,400 MWh of power per year to some of the CompanyĀ“s Mexican operations for 20 years . This agreement will start in January 2021. ā Corporate operations ā Commitment for capital pro |