Free signup for more
- Track your favorite companies
- Receive email alerts for new filings
- Personalized dashboard of news and more
- Access all data and search results
Content analysis
?Positive | ||
Negative | ||
Uncertain | ||
Constraining | ||
Legalese | ||
Litigous | ||
Readability |
H.S. sophomore Bad
|
New words:
abeyance, absence, analyzed, arguing, arrangement, asserted, Baa, blame, coastal, commissioner, default, disposition, entirety, equal, FASB, favorable, fine, flat, infusion, insignificant, intervening, lose, modification, originally, outage, rebuttal, reclassified, remedyto, resume, retrospectively, secondary, SED, slightly, stay, stayed, sum, Supreme, text, thirty, twelve, unresolved
Removed:
abnormal, absorb, absorbed, accelerate, accelerated, acceptance, accrue, accurate, achieved, acquisition, add, adequately, adverse, agricultural, aim, allocated, alternatively, America, amounted, appended, approve, assigned, assigning, assumed, authorize, awarded, begin, begun, book, buy, Canada, cancellable, cancelled, capture, cask, cease, challenge, challenging, chance, choose, clean, colder, collateralized, collecting, collectively, combination, commit, compare, compensate, computing, conclude, conducted, consolidation, constructed, contaminated, contingent, continuation, Contra, contracted, contractually, controlling, conversion, Costa, credited, criteria, culture, deduction, deemed, deferral, deficient, delegated, demonstration, description, designated, designation, detect, diminished, directed, discern, discount, dispose, diversify, draft, dry, dynamic, efficient, EIR, electromechanical, emergency, emphasized, enabling, enacted, encourage, enrichment, enterprise, EPA, escalated, establish, evenly, evidence, exercise, existed, experience, expiration, extend, extrapolate, extreme, fabrication, failed, feasible, feet, finance, fix, Floating, flooding, fluctuating, force, formal, formed, found, fourth, fulfill, functional, funding, gain, Gateway, goal, greenhouse, grid, guarantee, handle, hedging, hired, hold, imposing, inadequate, incentive, indexed, individual, initial, Initiative, install, installed, installing, instrumentation, insufficient, integrated, intent, international, intrastate, irrigate, July, lack, land, leak, learned, legislative, length, lesser, letter, liable, line, LLC, location, longer, low, managed, mandatory, manufacture, MAOP, mature, meant, meter, methane, MGP, minimum, Mirant, missed, monitored, monitoring, monthly, Mountain, National, NEGT, Network, newly, noted, Obama, obligated, oil, opened, Operator, opposed, overhead, owed, participate, patrol, peak, PERF, permitting, pipe, pool, portfolio, predetermined, presenting, President, preventable, prevented, priced, production, prohibit, promote, protest, prudently, published, pumped, PX, qualifying, qualitative, quantify, quantitative, quantity, radioactive, Ramon, Ratepayer, reacquired, reactor, reading, recently, recommended, rectify, reducing, referred, reforestation, reform, refundable, release, remain, remarketed, remote, removal, reorganization, repay, replace, replaced, represent, repurchased, requiring, research, reservation, resident, responsibility, retained, Rocky, rolling, RPS, ruling, rupture, seasonally, seismological, seller, Senate, sensitivity, servicing, ship, side, smaller, SmartMeter, SmartMeterTM, southwestern, space, specific, spending, spot, square, statewide, stating, store, Street, subordinated, subsidiary, substance, sued, systemic, task, technical, temperature, tender, terminated, traditional, treated, trial, typically, unamortized, unexcused, United, uranium, vary, varying, volumetric, Wall, warmer, whichever, winter, withdrawn, withholding, worth
Filing tables
Filing exhibits
- 10-Q Quarterly report
- 10.01 Amended and Restated Credit Agreement- Pg&e Corporation
- 10.02 Amended and Restated Credit Agreement - Pacific Gas and Electric Company
- 10.03 Form of Restricted Stock Unit Agreement for 2013 Grants
- 10.04 Form of Performance Share Agreement for 2013 Grants
- 10.05 Restricted Stock Unit Agreement Between Anthony F. Earley, JR. and Pg&e Corporation for 2013 Grant
- 10.06 Performance Share Agreement Between Anthony F. Earley, JR. and Pg&e Corporation for 2013 Grant
- 12.01 Pacific Gas and Electric Company Computation of Ratios of Earnings to Fixed Charges
- 12.02 Pacific Gas and Electric Company Computation of Ratios of Earnings to Combined Fixed Charges and Preferred Stock Dividends
- 12.03 Pg&e Corporation Computation of Ratios of Earnings to Fixed Charges
- 31.01 Certifications of the CEO and CFO of Pg&e Corporation
- 31.02 Certifications of the CEO and CFO of Pacific Gas and Electric Company
- 32.01 Certifications of the CEO and CFO of Pg&e Corporation
- 32.02 Certifications of the CEO and CFO of Pacific Gas and Electric Company
Related press release
PCG similar filings
Filing view
External links
EXHIBIT 12.3
PG&E CORPORATION
COMPUTATION OF RATIOS OF EARNINGS TO FIXED CHARGES
Three Months | ||||||||||||||||||||||||
Ended | ||||||||||||||||||||||||
March 31, | Year Ended December 31, | |||||||||||||||||||||||
2013 | 2012 | 2011 | 2010 | 2009 | 2008 | |||||||||||||||||||
Earnings: | ||||||||||||||||||||||||
Incoming from continuing operations | $ | 242 | $ | 830 | $ | 858 | $ | 1,113 | $ | 1,234 | $ | 1,198 | ||||||||||||
Income taxes provision | 114 | 237 | 440 | 547 | 460 | 425 | ||||||||||||||||||
Fixed charges | 237 | 931 | 919 | 850 | 877 | 907 | ||||||||||||||||||
Pre-tax earnings required to cover the preferred stock dividend of consolidated subsidiaries | (4 | ) | (15 | ) | (17 | ) | (16 | ) | (16 | ) | (16 | ) | ||||||||||||
Total earnings | $ | 589 | $ | 1,983 | $ | 2,200 | $ | 2,494 | $ | 2,555 | $ | 2,514 | ||||||||||||
Fixed charges: | ||||||||||||||||||||||||
Interest on short-term borrowings and long-term debt, net | $ | 218 | $ | 859 | $ | 846 | $ | 766 | $ | 798 | $ | 825 | ||||||||||||
Interest on capital leases | 2 | 9 | 16 | 18 | 19 | 22 | ||||||||||||||||||
AFUDC debt | 13 | 48 | 40 | 50 | 44 | 44 | ||||||||||||||||||
Pre-tax earnings required to cover the preferred stock dividend of consolidated subsidiaries | 4 | 15 | 17 | 16 | 16 | 16 | ||||||||||||||||||
Total fixed charges | $ | 237 | $ | 931 | $ | 919 | $ | 850 | $ | 877 | $ | 907 | ||||||||||||
Ratios of earnings to fixed charges | 2.49 | 2.13 | 2.39 | 2.93 | 2.91 | 2.77 | ||||||||||||||||||
Note:
For the purpose of computing PG&E Corporation's ratios of earnings to fixed charges, “earnings” represent income from continuing operations adjusted for income taxes, fixed charges (excluding capitalized interest), and pre-tax earnings required to cover the preferred stock dividend of consolidated subsidiaries. “Fixed charges” include interest on long-term debt and short-term borrowings (including a representative portion of rental expense), amortization of bond premium, discount and expense, interest on capital leases, AFUDC debt, and earnings required to cover preferred stock dividends of consolidated subsidiaries. Fixed charges exclude interest on tax liabilities.