SOW #4903RL1112SOW Number
Amendment 14
1) | Consolidate all previous amendments to this SOW and create an amended SOW that includes all changes made by such amendments; | ||
2) | Create individual Product Unique Attachments for each Product Family | ||
3) | Add Product Unique Attachment for HBA’s |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 43
SOW #4903RL1112SOW Number
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 2 of 43
SOW #4903RL1112SOW Number
[**]2.0 PRODUCT DEFINITION |
2.1 | Product Description. |
2.2 | Product Specifications & Certifications. |
• CS1-1121-015, IBM Corporate Standard “Automatic Identification (AI) for Packaging, Distribution and Manufacturing — Bar Coded Labels” | ||
• | GA21-9261-11a, “Packaging and Handling — Supplier and Interplant Requirements” | |
• | Product/Process Quality Plan, Quality Assurance Instruction 1057, QAI-1057 | |
• | ISO 2859, Sampling Procedures for Inspection by Attributes | |
• | ISO 3951, Sampling Procedures for Inspection by Variables | |
• | EIA - 599 - A, Continuous Improvement | |
• | EIA - 659 - A, Failure, Mechanism, Driven Reliability Monitoring | |
• | EIA - 670, Quality System Assessment | |
• | EIA - 671- A, Problem Analysis and Corrective Actions | |
• | EIA - JESD - 38, Standard for Failure Analysis Report Format | |
• | EIA - JESD - 46, Product Change Notice | |
• | EIA - JESD - 50, Maverick Product Elimination | |
• Supplier’s published specifications, catalogs, marketing materials, and other documentation, including references in such materials to future upgrades or performance | ||
• FAA Certification, Supplier certifies that Products and their packages do not contain explosives, hazardous materials, incendiaries and/or destructive devices as defined by the FAA | ||
• All Product claims, descriptions, specifications, and other requirements described in the Product bill of material, elsewhere in this Agreement, and via other written or electronic communications sent from or approved by Buyer. |
• | IBM Environmental Engineering Specifications 46G3772, and 53P6233 (“Environmental Specifications”) found in the Environmental Requirements section of IBM’s Information for Suppliers website: (http://www-03.ibm.com/procurement/proweb.nsf/ContentDocsByTitle/United+States~Information+for+suppliers) to be effective July 1, 2006. The foregoing does not apply to Products that will end of life as of June 30, 2006 or their associated FRUs. Any Product that does not comply with the above specifications shall be deemed end of life as of June 30, 2006. |
2.3 | COO Product Certification. |
2.4 | Engineering Changes. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 3 of 43
SOW #4903RL1112SOW Number
2.5 | Product Software and Documentation. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 4 of 43
SOW #4903RL1112SOW Number
2.6 | Tamper Evident Protection. |
3.0 | PURCHASING | |
3.1 | WA Issuance. |
3.2 | Price Modifications |
[**]3.3 Field Replaceable Unit (FRU) Availability. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 5 of 43
SOW #4903RL1112SOW Number
3.4 | Notice of Product Withdraw |
3.5 | Use of Subcontractors. |
3.5.1 | Diversity Enterprises Spending |
(i) | Supplier shall identify M/WBE Direct Opportunities: Identify procurement opportunities that may exist relating to this SOW that include, or may include, M/WBE participation in the production or distribution of the Supplier’s Products and Services. | ||
(ii) | If Buyer has a list of potential M/WBE suppliers who can perform under this SOW, Buyer will provide that list to Supplier, so long as Supplier identifies the opportunity and specifies the product or service to Buyer |
3.6 | Taxes and Duties. |
3.7 | Invoices. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 6 of 43
SOW #4903RL1112SOW Number
3.8 | Electronic Commerce. |
4.0 | MAINTENANCE LEVEL SERVICE |
4.1 | Level 1. |
4.2 | Level 2. |
4.3 | Level 3. |
4.4 | Other Technical Support Responsibilities. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
Page 7 of 43
SOW #4903RL1112SOW Number
4.5 | Technical Support Training. |
5.0 | QUALITY |
5.1 Quality Requirements. |
5.2 | Acceptance Criteria. |
5.3 | Product Modifications. |
5.4 | ISO Requirements. |
5.5 | Periodic Quality Reviews. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 8 of 43
SOW #4903RL1112SOW Number
6.0 | RESERVED. | |
7.0 | EMERGENCY ORDERS | |
7.1 | Code A-Alert Emergency Order Placement |
7.2 | Code A-Alert Emergency Order Work Authorizations |
7.3 | Code A-Alert Emergency Order Shipments |
7.4 | Code A-Alert Emergency Order Delivery and Cancellation |
8.0 | WARRANTY SUPPORT | |
[**]8.1 Epidemic Defects |
8.2 | Warranty Period. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 9 of 43
SOW #4903RL1112SOW Number
8.3 | No Trouble Found |
8.4 | Limitations |
8.5 | Warranty Redemption Logistics. |
8.6 | Additional Warranties. |
9.0 | REPAIR | |
9.1 | Required Replacement. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 10 of 43
SOW #4903RL1112SOW Number
9.2 | Scope of Repair Services. |
9.3 | CSP Requirements. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 11 of 43
SOW #4903RL1112SOW Number
10.0 | CONSIGNED MATERIALS | |
10.1 | Handling of Consigned Materials. |
10.2 | Return of Consigned Materials. |
11.0 | RESERVED. | |
12.0 | PURCHASES THROUGH BUYER OR BUYER’S AUTHORIZED THIRD PARTIES |
13.0 | GRANTS OF RIGHTS AND LICENSES | |
13.1 | Authorization to Purchase, Integrate, and Resell |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 12 of 43
SOW #4903RL1112SOW Number
13.2 | Pictorial, Graphic and Audio/Visual Works |
14.0 | [**] | |
14.1 | Trigger Events: | |
If during the term of this Agreement: |
A) | Supplier (or its contracted manufacturer) ceases engineering, manufacturing or assembling services (except as expressly provided in Section 3.4.2 of this Agreement) contracted for hereunder; or | ||
B) | An[**]; or | ||
C) | A[**]; or | ||
D) | A[**]or | ||
E) | [**]or | ||
F) | [**] |
(each such event shall hereafter referred to as a “Trigger Event”). | |
Buyer shall notify Supplier in writing if Buyer is aware or becomes aware of the occurrence of such a Trigger Event or Supplier shall notify Buyer in writing if Supplier is aware or becomes aware of the occurrence of such a Trigger Event, and Supplier shall have[**]after the date of such written notification or from the date of the occurrence of such a Trigger Event in which to remedy such condition or conditions, or such longer period as is mutually agreed to by the parties in writing (hereafter referred to as the “Cure Period”). |
14.2 | Election of Remedies by Buyer. |
14.3 | [**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 13 of 43
SOW #4903RL1112SOW Number
14.4 | [**] |
14.5 | [**] |
14.6 | Cancellation of Purchase Order(s) (WAs). |
15.0 | SURVIVAL |
16.0 | HAZARDOUS SUBSTANCE AND ENVIRONMENTAL LAW REQUIREMENTS |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 14 of 43
SOW #4903RL1112SOW Number
16.1. | Based on evaluation of the Environmental Specifications, Supplier takes exception to the following provisions. | ||
16.1.1 | Specification 46G3772 |
16.1.2 | Specification 53P6233 |
Accepted and Agreed To: International Business Machines Corporation | Accepted and Agreed To: Brocade Communications Systems, Inc. | |||||||||||
By: /s/ Timothy B. Nolan | 5/26/2009 | By: /s/ Charles Leeming | 6/5/09 | |||||||||
Authorized Signature | Date | Authorized Signature | Date | |||||||||
Timothy B. Nolan | Charles Leeming | |||||||||||
Type or Print Name | Type or Print Name | |||||||||||
Networking Commun. Mgr. | VP, OEM Sales | |||||||||||
Title & Organization | Title & Organization | |||||||||||
Address: | Address: | 1745 Technology Drive | ||||||||||
San Jose, CA 95110 |
Accepted and Agreed To: Brocade Communications Switzerland, SarL | ||||||||
By: | /s/ U. Plechschmidt | |||||||
Authorized Signature | Date |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
Page 15 of 43
SOW #4903RL1112SOW Number
Ulrich Plechschmidt | ||||
Vice President EMEA |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
Page 16 of 43
SOW #4903RL1112SOW Number
1.0 | PRODUCT DESCRIPTION |
1.1 | Additional Description of Products |
• | “Brocade BladeCenter Fibre Channel Switch Module”, Product Requirements Document (“PRD”) Version 1.60, December, 2003, Owner, Patrick Caporale, IBM. | |
• | IBM/Intel BladeServer Base Specification for Switch Module Subsystems, Version 1.02, August 25,2003, Owner: Intel /IBM Collaboration Architecture Review Board, provided to Supplier under the terms of the Technical Information License Agreement. (“TILA”} dated August 5, 2003 between the parties. | |
2.0 | [**]DEVELOPMENT REQUIREMENTS | |
2.1 | Product Testing |
2.2 | Deliverables |
2.3 | Development modules |
Product | Quantity | Not to Exceed Expense per Unit(USD) | ||
P0.1 Level Switches | [**] | [**] | ||
(SDV Switches) | ||||
P1 Level Switches | [**] | [**] | ||
(SIT Switches) |
[**]2.4 Product Number Unique Terms. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 17 of 43
SOW #4903RL1112SOW Number
3.0 | PROPRIETARY OWNERSHIP | |
3.1 | Buyer Proprietary Ownership. |
• | Molex Connector is Buyer proprietary as long as Buyer controls the design of this connector, and the connector is not publicly available as an off the shelf item [**] | |
• | Buyer Mechanicals: |
[**]Buyer’s Midplane Connector mechanical Part and Pin Assignments | ||
• | Buyer’s Cosmetic Customization, which includes Buyer logo, Buyer name and Buyer product names. | |
• | Buyer’s two unique signals (I2C Bus Reset signal and I2C Interrupt signal) added to the I2C industry standard protocol, and the contents specified by Buyer for the I2C Register interfaces and Vital Product Data (VPD) table. | |
• | Buyer’s Standard BladeCenter and eServer Documentation and CD Contents | |
• | Common BladeCenter Labeling and Artwork | |
• | IBM Director SDK Interface Requirements |
3.2 | Seller’s Proprietary Ownership |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 18 of 43
SOW #4903RL1112SOW Number
4.0 | PART NUMBER UNIQUE TERMS | |
4.1 | Product Price List And Description See Attachment 6 to SOW #3, Consolidated Price List | |
4.2 | Product Unit Terms & Repair Pricing See Attachment 6 to SOW #3, Consolidated Price List | |
5.0 | WA FLEXIBILITY |
Increase of Product Quantity to a WA | Cancellation of Product Quantity to a WA | Rescheduling of Product Quantity to a WA | ||||
Number of Days prior to a WA | Scheduled Delivery Date | Scheduled Delivery Date | Scheduled Delivery Date | |||
Scheduled Delivery Date | (% of WA Quantity) | (% of WA Quantity) | (% of WA Quantity) | |||
Less than[**]days | As mutually agreed upon | [**] | [**] | |||
From[**]days to[**]days | [**] | [**] | [**] | |||
From[**]days to[**]days | [**] | [**] | [**] | |||
More than[**]days | [**] | [**] |
6.0 | SUPPLIER PRODUCT WITHDRAW |
7.0 | SUPPLY OF PRODUCTS |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 19 of 43
SOW #4903RL1112SOW Number
8.0 | COMMUNICATIONS |
8.1 | Business Coordinators. |
SUPPLIER | BUYER | |||||
Name | [**] | Name | [**] | |||
Title | [**] | Title | [**] | |||
Address | [**] | Address | [**] | |||
Phone | [**] | Phone | [**] | |||
Fax | Fax | [**] | ||||
[**] | ||||||
8.2 Technical Coordinators. | ||||||
SUPPLIER | BUYER | |||||
Name | [**] | Name | [**] | |||
Title | [**] | Title | [**] | |||
Address | [**] | Address | [**] | |||
Phone | [**] | Phone | [**] | |||
Fax | Fax | [**] | ||||
[**] | ||||||
All legal notices will be sent to the following addresses and will be deemed received (a) two (2) days after mailing if sent by certified mail, return receipt requested or (b) on the date confirmation is received if sent by facsimile transmittal, to the party set forth below. | ||||||
SUPPLIER | BUYER | |||||
Name | [**] | Name | [**] | |||
Title | Title | [**] | ||||
Address | [**] | Address | [**] | |||
Phone | Phone | [**] | ||||
Fax | Fax (Fax notice shall be valid only when verbal confirmation of receipt is obtained.) | [**] | ||||
[**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 20 of 43
SOW #4903RL1112SOW Number
Actual | Explanation | Root Cause Analysis Action Taken to | ||||||||||
Buyer P/N | Description | Barcode | Symptoms | Finding | Code | Fix | ||||||
Total Units Repaired in Current Montho | ||
Total Warranty Claims Received | ||
Actual Warranty Accepted | ||
Warranty % | ||
High Flyers (more than ___%) | High Flyers Require a Corrective Action Plan and Date of Implementation. |
EXPLANATION | ||
CODE | DESCRIPTION | |
Code 03 | Warranty Expired | |
Code 04 | Missort | |
Code 07 | Cannibalized or Missing Parts | |
Code 08 | Warranty Product Received | |
Code 09 | Physical Damage | |
Code 10 | No Defect Found | |
Code 11 | Other |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 | |||
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 21 of 43
SOW #4903RL1112SOW Number
1.0 | PRODUCT DESCRIPTION |
1.1 | Additional Description of Products |
• | “[**] [**] ”, Product Requirements Document (“PRD”) Version 1.0, May, 2005, Owner, Patrick Caporale, IBM. | |
• | IBM/Intel BladeServer Base Specification for Switch Module Subsystems, Version 1.02, August 25,2003, Owner: Intel /IBM Collaboration Architecture Review Board, provided to Supplier under the terms of the Technical Information License Agreement. (“TILA”} dated August 5, 2003 between the parties. |
2.1 | Product Testing |
Product | Quantity | Not to Exceed Expense per Unit(USD) | ||
P0.1 Level Switches (SDV Switches) | [**]*Note: 30-IBM/ 1-Intel | [**] | ||
P1 Level Switches (SIT Switches) | [**]*Note: 92-IBM/ 24-Intel | [**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 22 of 43
SOW #4903RL1112SOW Number
2.4 | Product Number Unique Terms |
3.1 | Buyer Proprietary Ownership. |
• | Molex Connector is Buyer proprietary as long as Buyer controls the design of this connector, and the connector is not publicly available as an off the shelf item[**] | |
• | Buyer Mechanicals: |
[**]OEM Generic Switch Module Cover
[**]OEM Generic Switch Module Blade Opening
[**]OEM Generic Switch Module Cover
[**]OEM Generic Switch Module Enclosure Assembly Drawing
[**]OEM Generic Switch Module Shield
• | [**]Buyer’s Cosmetic Customization, which includes Buyer logo, Buyer name and Buyer product names. |
• | Buyer’s two unique signals (I2C Bus Reset signal and I2C Interrupt signal) added to the I2C industry standard protocol, and the contents specified by Buyer for the I2C Register interfaces and Vital Product Data (VPD) table. | |
• | Buyer’s Standard BladeCenter and eServer Documentation and CD Contents | |
• | Common BladeCenter Labeling and Artwork | |
• | IBM Director SDK Interface Requirements |
4.1 | Seller’s Proprietary Ownership |
4.1 | Product Price List And Description |
4.2 | Product Unit Terms & Repair Pricing |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 23 of 43
SOW #4903RL1112SOW Number
5.0 | WA FLEXIBILITY |
Increase of Product Quantity to a WA | Cancellation of Product Quantity to a WA | Rescheduling of Product Quantity to a WA | ||||
Number of Days prior to a WA | Scheduled Delivery Date | Scheduled Delivery Date | Scheduled Delivery Date | |||
Scheduled Delivery Date | (% of WA Quantity) | (% of WA Quantity) | (% of WA Quantity) | |||
Less than[**]days | As mutually agreed upon | [**] | [**] | |||
From[**]days to[**]days | [**] | [**] | [**] | |||
From[**]days to[**]days | [**] | [**] | [**] | |||
More than[**]days | [**] | [**] |
6.0 | SUPPLIER PRODUCT WITHDRAW |
7.0 | SUPPLY OF PRODUCTS |
8.0 | COMMUNICATIONS |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 24 of 43
SOW #4903RL1112SOW Number
8.1 | Business Coordinators. |
SUPPLIER | BUYER | |||||
Name | [**] | Name | [**] | |||
Title | [**] | Title | [**] | |||
Address | [**] | Address | [**] | |||
Phone | [**] | Phone | [**] | |||
Fax | [**] | Fax | [**] | |||
[**] | [**] | |||||
8.2 Technical Coordinators. | ||||||
SUPPLIER | BUYER | |||||
Name | [**] | Name | [**] | |||
Title | [**] | Title | ||||
Address | [**] | Address | [**] | |||
Phone | [**] | Phone | [**] | |||
Fax | Fax | [**] | ||||
[**] | [**] | |||||
All legal notices will be sent to the following addresses and will be deemed received (a) two (2) days after mailing if sent by certified mail, return receipt requested or (b) on the date confirmation is received if sent by facsimile transmittal, to the party set forth below. | ||||||
SUPPLIER | BUYER | |||||
Name | [**] | Name | [**] | |||
Title | [**] | Title | [**] | |||
Address | [**] | Address | [**] | |||
Phone | [**] | Phone | [**] | |||
Fax | [**] | Fax (Fax notice shall be valid only when verbal confirmation of receipt is obtained.) | [**] | |||
[**] | [**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 25 of 43
SOW #4903RL1112SOW Number
[**]PRODUCT UNIQUE ATTACHMENT #3, EFFECTIVE BEGINNING FEBRUARY 17, 2009
1.0 | PRODUCT DESCRIPTION |
1.1 | Additional Description of Products. |
2.1 | Product Testing |
§ | Brocade FCHBA v1.1.0 Test Plan, dated November 6, 2008 |
§ | Hedingham_testplan_v1.0.doc dated October 8, 2008 |
§ | Brocade HBA Adapter XCSA Test.doc, dated January 14, 2009 |
2.2 | Deliverables |
2.3 | Development |
2.4 | Product Number Unique Terms. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
Page 26 of 43
SOW #4903RL1112SOW Number
3.0 | PROPRIETARY OWNERSHIP |
3.2 | Seller’s Proprietary Ownership |
4.0 | PART NUMBER UNIQUE TERMS |
4.1 | Product Price List And Description |
4.2 | Product Unit Terms And Repair Pricing |
5.0 | WA FLEXIBILITY |
Increase of Product Quantity to a WA | Cancellation of Product Quantity to a WA | Rescheduling of Product Quantity to a WA | ||||
Number of Days prior to a WA | Scheduled Delivery Date | Scheduled Delivery Date | Scheduled Delivery Date | |||
Scheduled Delivery Date | (% of WA Quantity) | (% of WA Quantity) | (% of WA Quantity) | |||
Less than[**]days | As mutually agreed upon | [**] | [**] | |||
From[**]days to[**]days | [**] | [**] | [**] | |||
From[**]days to[**]days | [**] | [**] | [**] | |||
More than[**]days | [**] | [**] |
6.0 | SUPPLIER PRODUCT WITHDRAW |
7.0 | SUPPLY OF PRODUCTS |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 27 of 43
SOW #4903RL1112SOW Number
8.0 | COMMUNICATIONS |
8.1 | Business Coordinators. |
SUPPLIER | Brocade Communications Systems Inc. | BUYER | ||||
Name | [**] | Name | [**] | |||
Title | [**] | Title | [**] | |||
Address | [**] | Address | [**] | |||
Phone | [**] | Phone | [**] | |||
[**] | [**] | |||||
8.2 Technical Coordinators. | ||||||
SUPPLIER | Brocade Communications Systems Inc. | BUYER | ||||
Name | [**] | Name | [**] | |||
Title | [**] | Title | ||||
Address | [**] | Address | [**] | |||
Phone | [**] | Phone | [**] | |||
[**] | [**] | |||||
All legal notices will be sent to the following addresses and will be deemed received (a) two (2) days after mailing if sent by certified mail, return receipt requested or (b) on the date confirmation is received if sent by facsimile transmittal, to the party set forth below. | ||||||
SUPPLIER | Brocade Communications Systems Inc. | BUYER | ||||
Name | [**] | Name | [**] | |||
Title | [**] | Title | ||||
Address | [**] | Address | [**] | |||
Phone | [**] | Phone | ||||
Fax | [**] | Fax (Fax notice shall be valid only when verbal confirmation of receipt is obtained.) | ||||
[**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 28 of 43
SOW #4903RL1112SOW Number
SUPPLIER QUALITY ATTACHMENT
1.0 | INCORPORATION OF SQA DOCUMENTS |
2.0 | QUALITY REQUIREMENTS |
3.0 | ISO REQUIREMENTS |
4.0 | AUDITS |
On a periodic basis, upon reasonable prior written notice, the Buyer or Buyer’s quality representative shall conduct audits/visits at the Supplier’s and Supplier’s contract manufacturer’s manufacturing locations. The Supplier shall, at Buyer’s request, permit access to the auditors to manufacturing operations and/or inspection of Products for Buyer, including access to the contract manufacturer’s facilities. Any such audit is subject to the contract manufacturers security requirements and shall not allow access to contract manufacturer’s proprietary or confidential information. Periodic audits shall include process control, quality inspection test data, internal audit reports, and other information solely related to Products to verify compliance to the terms of this SQA. Under normal circumstances, Supplier shall be given at least a two weeks advance written notice by Buyer’s representatives of their intent to visit. Buyer’s inspection of Product at the Supplier or contract manufacturer shall not relieve the Supplier’s responsibility to furnish Product compliant with the applicable written specifications as set forth in the SOW. Any Confidential Information exchanged in connection with the audit shall be handled in accordance with Section 14.6 of the Goods Agreement (ROC-P-68, dated April 15, 1999).[**]5.0DOCUMENT CONTROL |
6.0 | RECORDS |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 29 of 43
SOW #4903RL1112SOW Number
7.0 | CONTINUOUS IMPROVEMENT PROCESS |
8.0 | QUALITY PROBLEM NOTIFICATION TO BUYER |
9.0 | PRODUCT RE-QUALIFICATION COSTS |
10. | PART HISTORY |
11. | PART QUALITY |
12. | CORRECTIVE ACTION PROCESS |
13. | EXCEPTION APPROVAL PROCESS |
14. | REVIEW AND DISPOSITION OF NONCONFORMING PRODUCTS |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 30 of 43
SOW #4903RL1112SOW Number
15. | PRODUCT IDENTIFICATION AND LOT TRACEABILITY |
16. | QUALITY REPORTING |
17. | SUPPLIER QUALITY & RELIABILITY (“SQR”) REVIEW MEETINGS |
18. | APPLICABLE PRODUCT SPECIFICATIONS & TESTS |
a. | ISO 2859-1 (Sampling Procedures for Inspection by Attributes) | ||
b. | ISO 3951 (Sampling Procedures for Inspection by Variables) |
Physical addresses and line id’s
Review Group A, B, C test results
Defect and root cause analysis
Pareto distribution of fails
Corrective action and data verification
Point of origin and incidence contributions associated with internal, assembly and final test operations.
EFR/IFR estimates
Defect and root cause analysis
Pareto distribution of fails and associated POH distribution for Buyer and total customer database
Failure mechanism driven corrective actions
Defect monitoring, elimination and analysis results
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 31 of 43
SOW #4903RL1112SOW Number
SPC parameter and control limits — data review
Maverick Product Elimination occurrences (if applicable) and related data
Yield cut limit compliance
Last internal audit findings and corrective action of one manufacturing location & future audit plans
Product, process, materials or specifications affecting form, fit or function
Traceability history for date code inception
AOQ and Failure Rate Improvement targets for next 3 years
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
Page 32 of 43
SOW #4903RL1112SOW Number
Certificate of Originality
• | The following Certificate of Originality applies to all Developed Works described in this Statement of Work. | ||
• | Was any portion of the software material written by anyone other than you or your employees within the scope of their employment? YES ___ NO ___ If YES, identify the author and the circumstances: |
1) | Indicate if the whole software material or only a portion thereof was written by such party, and identify such portion: |
a) | Specify for each involved party the name, address, and citizenship: | ||
b) | If the party is a company, how did it acquire title to the software material (e.g., software material was written by company’s employees within the scope of their employment)? | ||
c) | If the party is an individual, did he/she create the software material while employed by or under contractual relationship with another party? YES ___ NO ___ If YES, provide name and address of the other party and explain the nature of the contractual relationship: |
2) | How did you acquire title to the software material written by the other party? |
• | Are any copyright, confidentiality, or proprietary notice(s) present on the software material(s)? YES ___ NO ___ If YES, please describe such notice(s). | ||
• | Was any portion of the software material (e.g., Code, associated documentation or Externals) derived from preexisting works (either yours or a third party’s), including any code from freeware, shareware, electronic bulletin boards, or the Internet? YES ___ NO ___ If YES, please identify the material, author, owner and copyright notice, if any, for each of the preexisting materials. | ||
• | Does any of the software materials (e.g., Code, associated documentation or Externals) include recognizable voices, pictures or other likenesses? YES ___ NO ___ If YES, how did you acquire rights to use such recognizable voices, pictures or other likenesses? | ||
• | Provide an explanation of any other circumstance which might affect Buyer’s ability to reproduce, distribute and market this software material, including whether your software material was prepared from any preexisting materials which have any: a) confidentiality or trade secret restrictions to others; b) known or possible royalty obligations to others; and c) used other preexisting materials developed for another party or customer (including government) where you may not have retained full rights to such other preexisting materials. | ||
Although the answers above are correct to the best of our knowledge, they are provided for informational purposes only. Any warranties on the software and associated hardware products shall be as provided in the Goods Agreement between Supplier and Buyer. Accordingly, provision by Supplier of the information in this document shall create no additional warranties of any kind beyond those in the Goods Agreement, and Supplier shall have no liability, unless otherwise expressly provided in the Goods Agreement, related to the provision of this information. |
Authorized Signature: | ||||
Name: | ||||
Title: | ||||
Date: | ||||
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
Page 33 of 43
SOW #4903RL1112SOW Number
1745 Technology Drive
San Jose CA 95110
408-487-8000
AFFIDAVIT OF MANUFACTURER
Address
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
Page 34 of 43
SOW #4903RL1112SOW Number
FULFILLMENT
1.0 | Product Hubbing/Consignment |
1.1 | Hub ArrangementThe parties hereby agree that “Hub Product” is defined as any Supplier Product for which a portion of sales of such Product are subject to a hubbing arrangement. The following terms and conditions will apply to any Hub Product(s) for which an agreement has been executed between and among Supplier, Buyer, and/or third party (“Hub Provider”) to allow such Hub Product to be shipped to and held in a third party’s warehouse (or warehouses) (“Hub(s)”). The parties agree that, as of the Effective Date of Amendment Number 1 (effective date May 12, 2004) to the Agreement, the Brocade SAN Switch Module for IBM BladeCenter will be a Hub Product. | ||
Hubs will be established for IBM’s third party fulfillment partners[**]in[**]and[**] in[**]. The parties reserve the right to discuss the addition of a Hub in other location(s), subject to the mutual written agreement of the parties. | |||
The parties will mutually agree to any[**]associated with the hubbing arrangement, such as[**]to hub destinations and[**]prior to any performance, which Supplier may include in the Product price and update in SOW3 PUA Section 4.1 Product Price List and Description, and for other products will be added to the applicable price list. The parties agree to periodically review a breakdown of such[**]to determine if changes in the logistics will change this cost. | |||
1.2 | Hub StockingOn a[**]basis Buyer, or Hub Provider, will provide a[**]rolling forecast to Supplier showing the demand for the Hub Products to be sent to the Hub(s), such quantities shall be identified by the specific geographic locations of the Hubs (“Hub Forecast”). Supplier agrees to ship quantities of such Product to the Hubs sufficient to meet at least[**]of demand, and at most[**]of demand, both of which are based on the forward-looking[**]period forecast (“Minimum Stock Level”). Should Buyer pull more than the Hub Forecast amount, Supplier will have[**]to restock the Hub to the Minimum Stock Level. The Minimum Stock Level will include the balance of the material physically in the hub location available for immediate sale (“On-Hand Balance”) plus the material en route to the hub location scheduled for arrival within the transit lead time for that hub (“In-Transit Balance”). Supplier may reduce Hub inventory to[**]only when there is no demand reflected in each week of the Hub Forecast for the forward-looking[**]period. | ||
1.3 | Ship PerformanceSupplier’s goal will be to satisfy a[**]product availability rate at each Hub location. Product Availability is defined as Hub Products being available for pull by Hub Provider at a time a valid pull notification is received. At the beginning of each[**], Buyer and Supplier may discuss the above Product Availability rate goal. Should the parties agree that the Product Availability rate goal was not achieved, Supplier will immediately acknowledge the deficiency. Within[**]of such acknowledgement, Supplier will begin the Corrective/Preventive Action Process to determine the root cause, and will develop an appropriate corrective action. Hub Product pull requests in excess of Hub Forecast will not be used in the calculation of the product availability rate, nor in the determination of root cause. In addition, should Supplier experience an allocation situation, the allocation provisions of SOW3 PUA Section 7.0 “Supply of Products” shall apply. | ||
1.4 | ShippingSupplier will be responsible for[**]of the Hub Product from Supplier’s[**]. Pursuant to Section 1.0 of this Attachment 5 these costs may be included in the Product price. All shipments from the Hub will be[**]the Hub, and Buyer is responsible for all[**]thereafter. Buyer will act as the importer of record for all Hub Product shipped from the Hub and will be responsible for |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 35 of 43
SOW #4903RL1112SOW Number
associated customs, duty, and Value Add Tax (VAT) administration. Title to and risk of loss of the Hub Product will pass to Buyer upon physical removal of such Hub Product from Brocade’s designated area within the applicable Hub. | |||
1.5 | Product Discontinuance for Products Held in HubDiscontinuance of any Hub Product shall be in accordance with the terms set forth in the SOW. The parties agree to work together to minimize the liability of each party upon end-of-life notice of a Hub Product. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
Page 36 of 43
SOW #4903RL1112SOW Number
PRODUCT PART NUMBERS AND PRICING
Freight - | ||||||||||||||||
DDU for | ||||||||||||||||
hub locs | ||||||||||||||||
Buyer | Fulfillment | Ship | FCA for | |||||||||||||
Part | Supplier Part | locations | group | non-hub | **Software | |||||||||||
Number | Number * | (if required) * | Product Description | Unit Price of Product | adder | loc | Maintenance | Total Price | ||||||||
2GBit/sec Products | ||||||||||||||||
[**] | [**] | [**] | Option, FC Switch Module, includes Fabric OS, Fabric Watch, Advance Zoning, Web Tools and ship group | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Option, FCSwitch Module, includes Fabric OS, Fabric Watch, Advance Zoning, Web Tools, and Ship Group | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | CRU, Value line FC Switch Module | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Asm, FC Switch Module, includes Fabric OS, Fabric Watch, Advance Zoning, and Web Tools | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Option, Value Line Module | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Option, Value Line Module | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Asm, Value Line Module | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Performance Bundle (Performance Monitor and Trunking) | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | ISL Trunking | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Advance Performance Monitor | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Extended Fabrics | [**] | [**] | [**] | [**] | [**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 37 of 43
SOW #4903RL1112SOW Number
Freight - | ||||||||||||||||
DDU for | ||||||||||||||||
hub locs | ||||||||||||||||
Buyer | Fulfillment | Ship | FCA for | |||||||||||||
Part | Supplier Part | locations | group | non-hub | **Software | |||||||||||
Number | Number * | (if required) * | Product Description | Unit Price of Product | adder | loc | Maintenance | Total Price | ||||||||
2GBit/sec Products | ||||||||||||||||
[**] | [**] | [**] | Fabric Manager v4.x | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Remote Switch Activation | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Advanced Security Activation | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Full SAN Scaling | [**] | [**] | [**] | [**] | [**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 38 of 43
SOW #4903RL1112SOW Number
Freight - | ||||||||||||||||
DDU for | ||||||||||||||||
hub locs | ||||||||||||||||
Intel | Fulfillment hub | Ship | FCA for | |||||||||||||
Part | Supplier Part | locations (if | group | non-hub | **Software | |||||||||||
Number | Number * | required) * | Product Description | Unit Price of Product | adder | loc | Maintenance | Total Price | ||||||||
2GBit/sec Products (Intel) | ||||||||||||||||
[**] | [**] | [**] | Option, FC Switch Module, includes Fabric OS, Fabric Watch, Advance Zoning, Web Tools and ship group | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | CRU, Value line FC Switch Module | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Option, Value Line Module | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Performance Bundle (Performance Monitor and Trunking) | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | ISL Trunking | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Advance Performance Monitor | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Extended Fabrics | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Fabric Manager v4.x | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Remote Switch Activation | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Advanced Security Activation | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Full SAN Scaling | [**] | [**] | [**] | [**] | [**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 39 of 43
SOW #4903RL1112SOW Number
Freight - | ||||||||||||||||
DDU for | ||||||||||||||||
hub locs | ||||||||||||||||
Buyer | Fulfillment hub | FCA for | ||||||||||||||
Part | Supplier Part | locations | Product | Ship | non-hub | **Software | ||||||||||
Number | Number * | (if required) * | Description | Unit Price of Product | group adder | loc | Maintenance | Total Price | ||||||||
4GBit/sec Products | ||||||||||||||||
[**] | [**] | [**] | Option, FC Switch Module (20 port), includes Fabric OS, Advance Zoning, Web Tools and ship group | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Option, FC Switch Module (20 port), includes Fabric OS, Advance Zoning, Web Tools and ship group | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Option, FC Switch Module (20 port), includes Fabric OS, Advance Zoning, Web Tools and ship group | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | CRU, FC Switch Module (20 port) | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Option, FC Switch Module (10 port), includes Fabric OS, Advance Zoning, Web Tools and ship group | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Option, FC Switch Module (10 port), includes Fabric OS, Advance Zoning, Web Tools and ship group | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Option, FC Switch Module (10 port), includes Fabric OS, Advance Zoning, Web Tools and ship group | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | CRU, FC Switch Module (10 port), includes Fabric OS, Advance Zoning, Web Tools and ship group | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | 10 Port POD (SW4020) | [**] | [**] | [**] | [**] | [**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 40 of 43
SOW #4903RL1112SOW Number
Freight - | ||||||||||||||||
DDU for | ||||||||||||||||
hub locs | ||||||||||||||||
Buyer | Fulfillment hub | FCA for | ||||||||||||||
Part | Supplier Part | locations | Product | Ship | non-hub | **Software | ||||||||||
Number | Number * | (if required) * | Description | Unit Price of Product | group adder | loc | Maintenance | Total Price | ||||||||
4GBit/sec Products | ||||||||||||||||
[**] | [**] | [**] | Fabric Watch | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Performance Bundle (Performance Monitor and Trunking) | [**] | ||||||||||||
[**] | [**] | [**] | ISL Trunking | [**] | ||||||||||||
[**] | [**] | [**] | Advance Performance Monitor | [**] | ||||||||||||
[**] | [**] | [**] | Extended Fabrics | [**] | ||||||||||||
[**] | [**] | [**] | Fabric Manager v5.x | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Advanced Security Activation | [**] | ||||||||||||
[**] | [**] | [**] | Multi-pack of FC Switch Module (20 port), includes Fabric OS, Advance Zoning, Web Tools; NO ship group; MUST be ordered in quantity of 10 | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Multi-pack of FC Switch Module (20 port), includes Fabric OS, Advance Zoning, Web Tools; NO ship group; MUST be ordered in quantity of 10 | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Multi-pack of FC Switch Module (10 port), includes Fabric OS, Advance Zoning, Web Tools, NO ship group; MUST be ordered in quantity of 10 | [**] | [**] | [**] | [**] | [**] | ||||||||
[**] | [**] | [**] | Multi-pack of FC Switch Module (10 port), includes Fabric OS, Advance Zoning, Web Tools, NO ship group; MUST be ordered in quantity of 10 | [**] | [**] | [**] | [**] | [**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 41 of 43
SOW #4903RL1112SOW Number
Freight - | ||||||||||||||
DDU for hub | Total Price | |||||||||||||
Fulfillment | locs | (Software Maintenance is not | ||||||||||||
Buyer Part | Supplier Part | locations | Ship group | FCA for non- | applicable for these | |||||||||
Number | Number * | (if required) * | Product Description | Unit Price of Product | adder | hub loc | products) | |||||||
Brocade 8Gb FC Single & Dual port HBA for System x | ||||||||||||||
[**] | [**] | [**] | Single port, PCI Express 2.0 adapter, 3U bracket, 1 x 8G SWL SFP installed; no documentationMUSTbe ordered in quantity of 20 units | [**] | [**] | [**] | [**] | |||||||
[**] | [**] | [**] | Dual port, PCI Express 2.0 adapter, 3U bracket, 2 x 8G SWL SFP installed; no documentationMUSTbe ordered in quantity of 20 units | [**] | [**] | [**] | [**] | |||||||
[**] | [**] | [**] | FRU Single port, PCI Express 2.0 adapter, 3U bracket, 1 x 8G SWL SFP installed; 1 x 2U bracket in clamshellMUSTbe ordered in quantity of 5 units | [**] | [**] | [**] | [**] | |||||||
[**] | [**] | [**] | FRU Dual port, PCI Express 2.0 adapter, 3U bracket, 2 x 8G SWL SFP installed; 1 x 2U bracket in clamshellMUSTbe ordered in quantity of 5 units | [**] | [**] | [**] | [**] | |||||||
[**] | [**] | [**] | Single port 2U bracketMUSTbe ordered in quantity of 140 units | [**] | [**] | [**] | [**] | |||||||
[**] | [**] | [**] | Dual port 2U bracketMUSTbe ordered in quantity of 140 units | [**] | [**] | [**] | [**] | |||||||
[**] | [**] | [**] | FRU, 8G SWL SFP (single pack) Brocade 8Gb Shortwave length SFP module, 1-pack | [**] | [**] | [**] | [**] |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 42 of 43
SOW #4903RL1112SOW Number
Repair Price | ||||||||
Buyer P/N | Supplier P/N | Description | TAT | (USD)* | ||||
2GBit/sec Products | ||||||||
[**] | [**] | Option, FC Switch Module | [**] | [**] | ||||
[**] | [**] | CRU, Value Line Switch Module | [**] | [**] | ||||
[**] | [**] | Asm, FC Switch Module | [**] | [**] | ||||
[**] | [**] | Option, Value Line Module | [**] | [**] | ||||
[**] | [**] | Asm, Value Line Module | [**] | [**] |
* | Repair Price applies only to Products sent to Supplier for Repair, which are not covered by the warranties in the Agreement. |
Repair Price | ||||||||
Intel P/N | Supplier P/N | Description | TAT | (USD)* | ||||
2GBit/sec Products | ||||||||
[**] | [**] | Option, FC Switch Module | [**] | [**] | ||||
[**] | [**] | CRU, Value Line Switch Module | [**] | [**] | ||||
[**] | [**] | Option, Value Line Module | [**] | [**] |
* | Repair Price applies only to Products sent to Supplier for Repair, which are not covered by the warranties in the Agreement. |
Repair Price | ||||||||
Buyer P/N | Supplier P/N | Description | TAT | (USD)* | ||||
4GBit/sec Products | ||||||||
[**] | [**] | Option, FC Switch Module (20 port), includes Fabric OS, Advance Zoning, Web Tools and ship group | [**] | [**] | ||||
[**] | [**] | CRU, FC Switch Module (20 port) | [**] | [**] | ||||
[**] | [**] | Option, FC Switch Module (10 port), includes Fabric OS, Advance Zoning, Web Tools and ship group | [**] | [**] | ||||
[**] | [**] | CRU, FC Switch Module (10 port), includes Fabric OS, Advance Zoning, Web Tools and ship group | [**] | [**] |
* | Repair Price applies only to Products sent to Supplier for Repair, which are not covered by the warranties in the Agreement. |
Repair Price | ||||||||
Buyer P/N | Supplier P/N | Description | TAT | (USD)* | ||||
Brocade 8Gb FC Single & Dual port HBA for System x | ||||||||
[**] | [**] | FRU Single port, PCI Express 2.0 adapter, 3U bracket, 1 x 8G SWL SFP installed; 1 x 2U bracket in clamshell | [**] | [**] | ||||
[**] | [**] | FRU Dual port, PCI Express 2.0 adapter, 3U bracket, 2 x 8G SWL SFP installed; 1 x 2U bracket in clamshell | [**] | [**] | ||||
[**] | [**] | FRU, 8G SWL SFP (single pack) Brocade 8Gb Shortwave length SFP module, 1-pack | [**] | [**] |
* | Products listed in Section 4.1 are replacement only as covered by the warranties in the agreement. |
Form Title: Agreement Title | Form Release: 8/98 | |||
Form Owner: Global Procurement | Revision: 05/02 |
[**] | Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 43 of 43