REGULATORY MATTERS | REGULATORY MATTERS STATE REGULATION Each of the Utilities' retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in Maryland by the MDPSC, in Ohio by the PUCO, in New Jersey by the NJBPU, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York by the NYPSC. The transmission operations of PE in Virginia are subject to certain regulations of the VSCC. In addition, under Ohio law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility. As competitive retail electric suppliers serving retail customers primarily in Ohio, Pennsylvania, Illinois, Michigan, New Jersey and Maryland, FES and AE Supply are subject to state laws applicable to competitive electric suppliers in those states, including affiliate codes of conduct that apply to FES, AE Supply and their public utility affiliates. In addition, if any of the FirstEnergy affiliates were to engage in the construction of significant new transmission or generation facilities, depending on the state, they may be required to obtain state regulatory authorization to site, construct and operate the new transmission or generation facility. MARYLAND PE provides SOS pursuant to a combination of settlement agreements, MDPSC orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic auctions that are overseen by the MDPSC and a third party monitor. Although settlements with respect to SOS supply for PE customers have expired, service continues in the same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS. The Maryland legislature adopted a statute in 2008 codifying the EmPOWER Maryland goals to reduce electric consumption by 10% and reduce electricity demand by 15% , in each case by 2015, and requiring each electric utility to file a plan every three years. PE's current plan, covering the three-year period 2015-2017, was approved by the MDPSC on December 23, 2014. The costs of the 2015-2017 plan are expected to be approximately $66 million for that three-year period, of which $13 million was incurred through September 2015. On July 16, 2015, the MDPSC issued an order setting new incremental energy savings goals for 2017 and beyond, beginning with the level of savings achieved under PE's current plan for 2016, and ramping up 0.2% per year thereafter to reach 2% . PE continues to recover program costs subject to a five -year amortization. Maryland law only allows for the utility to recover lost distribution revenue attributable to energy efficiency or demand reduction programs through a base rate case proceeding, and to date such recovery has not been sought or obtained by PE. On February 27, 2013, the MDPSC issued an order (the February 27 Order) requiring the Maryland electric utilities to submit analyses relating to the costs and benefits of making further system and staffing enhancements in order to attempt to reduce storm outage durations. The order further required the Staff of the MDPSC to report on possible performance-based rate structures and to propose additional rules relating to feeder performance standards, outage communication and reporting, and sharing of special needs customer information. PE's responsive filings discussed the steps needed to harden the utility's system in order to attempt to achieve various levels of storm response speed described in the February 27 Order, and projected that it would require approximately $2.7 billion in infrastructure investments over 15 years to attempt to achieve the quickest level of response for the largest storm projected in the February 27 Order. On July 1, 2014, the Staff of the MDPSC issued a set of reports that recommended the imposition of extensive additional requirements in the areas of storm response, feeder performance, estimates of restoration times, and regulatory reporting. The Staff of the MDPSC also recommended the imposition of penalties, including customer rebates, for a utility's failure or inability to comply with the escalating standards of storm restoration speed proposed by the Staff of the MDPSC. In addition, the Staff of the MDPSC proposed that the utilities be required to develop and implement system hardening plans, up to a rate impact cap on cost. The MDPSC conducted a hearing September 15-18, 2014, to consider certain of these matters, and has not yet issued a ruling on any of those matters. On March 3, 2014, pursuant to the MDPSC's regulations, PE filed its recommendations for SAIDI and SAIFI standards to apply during the period 2016-2019. The MDPSC directed the Staff of the MDPSC to file an analysis and recommendations with respect to the proposed 2016-2019 SAIDI and SAIFI standards and any related rule changes which the Staff of the MDPSC recommended. The Staff of the MDPSC made its filing on July 10, 2015, and recommended that PE be required to improve its SAIDI results by approximately 20% by 2019. The MDPSC held a hearing on the Staff's analysis and recommendations on September 1-2, 2015, and approved PE's revised proposal for an improvement of 8.6% in its SAIDI standard by 2019 and maintained its SAIFI standard at 2015 levels. On April 1, 2015, PE filed its annual report on its performance relative to various service reliability standards set forth in the MDPSC’s regulations. The MDPSC held a hearing on the reports filed by PE and the other electric utilities in Maryland on August 24, 2015, and has not yet issued an order on this matter. NEW JERSEY JCP&L currently provides BGS for retail customers who do not choose a third party EGS and for customers of third party EGSs that fail to provide the contracted service. The supply for BGS is comprised of two components, procured through separate, annually held descending clock auctions, the results of which are approved by the NJBPU. One BGS component reflects hourly real time energy prices and is available for larger commercial and industrial customers. The second BGS component provides a fixed price service and is intended for smaller commercial and residential customers. All New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates. On March 26, 2015, the NJBPU entered final orders which together provided an overall reduction in JCP&L's annual revenues of approximately $34 million , effective April 1, 2015. The final order in JCP&L's base rate case proceeding directed an annual base rate revenue reduction of approximately $115 million , including recovery of 2011 storm costs and the application of the NJBPU's modified CTA policy approved in the generic CTA proceeding referred to below. Additionally, the final order in the generic proceeding established to review JCP&L's major storm events of 2011 and 2012 approved the recovery of 2012 storm costs of $580 million resulting in an increase in annual revenues of approximately $81 million . JCP&L is required to file another base rate case no later than April 1, 2017. The NJBPU also directed that certain studies be completed. On July 22, 2015, the NJBPU approved the NJBPU staff's recommendation to implement such studies, which will include operational and financial components and is expected to take approximately one year to complete. In an Order issued October 22, 2014, in a generic proceeding to review its policies with respect to the use of a CTA in base rate cases (Generic CTA proceeding), the NJBPU stated that it would continue to apply its current CTA policy in base rate cases, subject to incorporating the following modifications: (i) calculating savings using a five -year look back from the beginning of the test year; (ii) allocating savings with 75% retained by the company and 25% allocated to rate payers; and (iii) excluding transmission assets of electric distribution companies in the savings calculation. On November 5, 2014, the Division of Rate Counsel appealed the NJBPU Order regarding the Generic CTA proceeding to the New Jersey Superior Court and JCP&L has filed to participate as a respondent in that proceeding. Briefing has been completed, and oral argument has not yet been scheduled. On June 19, 2015, JCP&L, along with PN, ME, FET and MAIT made filings with FERC, the NJBPU, and the PPUC requesting authorization for JCP&L, PN and ME to contribute their transmission assets to MAIT, a new transmission-only subsidiary of FET. Evidentiary hearings are scheduled to commence before the NJBPU in February 2016. A final decision from the NJBPU is expected by mid-2016. See Transfer of Transmission Assets to MAIT in FERC Matters below for further discussion of this transaction. OHIO The Ohio Companies primarily operate under their ESP 3 plan, which expires on May 31, 2016. The material terms of ESP 3 include: • Continuing the current base distribution rate freeze through May 31, 2016; • Continues collection of lost distribution revenues associated with energy efficiency and peak demand reduction programs; • Continuing to provide economic development and assistance to low-income customers for the two -year plan period at levels established in the prior ESP; • A 6% generation rate discount to certain low income customers provided by the Ohio Companies through a bilateral wholesale contract with FES (FES is one of the wholesale suppliers to the Ohio Companies); • Continuing to provide power to non-shopping customers at a market-based price set through an auction process; • Continuing Rider DCR that allows continued investment in the distribution system for the benefit of customers; • Continuing commitment not to recover from retail customers certain costs related to transmission cost allocations for the longer of the five -year period from June 1, 2011 through May 31, 2016 or when the amount of costs avoided by customers for certain types of products totals $360 million , subject to the outcome of certain FERC proceedings; • Securing generation supply for a longer period of time by conducting an auction for a three -year period rather than a one -year period, in each of October 2012 and January 2013, to mitigate any potential price spikes for the Ohio Companies' utility customers who do not switch to a competitive generation supplier; and • Extending the recovery period for costs associated with purchasing RECs mandated by SB221, Ohio's renewable energy and energy efficiency standard, through the end of the new ESP 3 period. This is expected to initially reduce the monthly renewable energy charge for all non-shopping utility customers of the Ohio Companies by spreading out the costs over the entire ESP period. Notices of appeal of the Ohio Companies' ESP 3 plan to the Supreme Court of Ohio were filed by the Northeast Ohio Public Energy Council and the ELPC. The matter has not yet been scheduled for oral argument. The Ohio Companies filed an application with the PUCO on August 4, 2014 seeking approval of their ESP IV entitled Powering Ohio's Progress. The Ohio Companies filed a partial Stipulation and Recommendation on December 22, 2014, a Supplemental Stipulation and Recommendation on May 28, 2015, and a Second Supplemental Stipulation and Recommendation on June 4, 2015. The evidentiary hearing on the ESP IV commenced on August 31, 2015. The material terms of the proposed plan as filed include: • Continuing a base distribution rate freeze through May 31, 2019; • Continuing collection of lost distribution revenues associated with energy efficiency and peak demand reduction programs; • Providing economic development and assistance to low-income customers for the three-year plan period; • An Economic Stability Program providing for a retail rate stability rider to flow through charges or credits representing the net result of the costs paid to FES through a proposed 15-year purchase power agreement for the output of Sammis, Davis-Besse and FES’ share of OVEC against the revenues received from selling the output into the PJM markets over the same period; • Continuing to provide power to non-shopping customers at a market-based price set through an auction process; • Continuing Rider DCR with increased revenue caps of approximately $30 million per year that allows continued investment supporting the distribution system for the benefit of customers; • A commitment not to recover from retail customers certain costs related to transmission cost allocations for the longer of the five -year period from June 1, 2011 through May 31, 2016 or when the amount of such costs avoided by customers for certain types of products totals $360 million , including appropriately such costs from MISO along with such costs from PJM, subject to the outcome of certain FERC proceedings; and • General updates to electric service regulations and tariffs to reflect regulatory orders, administrative rule changes, and current practices. On September 18, 2015, PUCO Staff filed testimony addressing various issues within the Ohio Companies’ filing, including a recommendation that the PUCO deny the request for approval of a retail rate stability rider as proposed by the Ohio Companies, but PUCO Staff also stated that the retail rate stability rider may be in the public interest if its recommended changes are adopted. Briefs are due November 30, 2015, and reply briefs are due December 22, 2015. A final decision of the PUCO is expected early in 2016. Under Ohio's energy efficiency standards (SB221 and SB310), and based on the Ohio Companies' amended energy efficiency plans, the Ohio Companies are required to implement energy efficiency programs that achieve a total annual energy savings equivalent of 2,266 GWHs in 2015 and 2,288 GWHs in 2016, and then begin to increase by 1% each year in 2017, subject to the outcome of a legislative study committee. The Ohio Companies are also required to retain the 2014 peak demand reduction level for 2015 and 2016 and then increase the benchmark by an additional 0.75% thereafter through 2020, subject to the outcome of a legislative study committee. On September 30, 2015, the Energy Mandates Study Committee issued its report related to energy efficiency and renewable energy mandates, recommending that the current level of mandates remain in place indefinitely. The report also recommended: (i) an expedited process for review of utility proposed energy efficiency plans; (ii) ensuring maximum credit for all of Ohio's Energy Initiatives; (iii) a switch from energy mandates to energy incentives; and (iv) a declaration be made that the General Assembly may determine energy policy of the state. On March 20, 2013, the PUCO approved the three-year energy efficiency portfolio plans for 2013-2015, originally estimated to cost the Ohio Companies approximately $250 million over the three-year period, which is expected to be recovered in rates. Actual costs may be lower for a number of reasons including the approval of the amended portfolio plan under SB310. On July 17, 2013, the PUCO modified the plan to authorize the Ohio Companies to receive 20% of any revenues obtained from offering energy efficiency and DR reserves into the PJM auction. The PUCO also confirmed that the Ohio Companies can recover PJM costs and applicable penalties associated with PJM auctions, including the costs of purchasing replacement capacity from PJM incremental auctions, to the extent that such costs or penalties are prudently incurred. ELPC and OCC filed applications for rehearing, which were granted for the sole purpose of further consideration of the issue. On September 24, 2014, the Ohio Companies filed an amendment to their portfolio plan as contemplated by SB310, seeking to suspend certain programs for the 2015-2016 period in order to better align the plan with the new benchmarks under SB310. On November 20, 2014, the PUCO approved the Ohio Companies' amended portfolio plan. Several applications for rehearing were filed, and the PUCO granted those applications for further consideration of the matters specified in those applications. On September 16, 2013, the Ohio Companies filed with the Supreme Court of Ohio a notice of appeal of the PUCO's July 17, 2013 Entry on Rehearing related to energy efficiency, alternative energy, and long-term forecast rules stating that the rules issued by the PUCO are inconsistent with, and are not supported by, statutory authority. On October 23, 2013, the PUCO filed a motion to dismiss the appeal, which is still pending. The matter has not been scheduled for oral argument. Ohio law requires electric utilities and electric service companies in Ohio to serve part of their load from renewable energy resources measured by an annually increasing percentage amount through 2026, subject to the outcome of a legislative study committee, except 2015 and 2016 that remain at the 2014 level. The Ohio Companies conducted RFPs in 2009, 2010 and 2011 to secure RECs to help meet these renewable energy requirements. In September 2011, the PUCO opened a docket to review the Ohio Companies' alternative energy recovery rider through which the Ohio Companies recover the costs of acquiring these RECs. The PUCO issued an Opinion and Order on August 7, 2013 approving the Ohio Companies' acquisition process and their purchases of RECs to meet statutory mandates in all instances except for part of the purchases arising from one auction and directing the Ohio Companies to credit non-shopping customers in the amount of $43.4 million , plus interest, on the basis that the Ohio Companies did not prove such purchases were prudent. On December 24, 2013, following the denial of their application for rehearing, the Ohio Companies filed a notice of appeal and a motion for stay of the PUCO's order with the Supreme Court of Ohio, which was granted. On February 18, 2014, the OCC and the ELPC also filed appeals of the PUCO's order. The Ohio Companies timely filed their merit brief with the Supreme Court of Ohio and the briefing process has concluded. The matter is not yet scheduled for oral argument. On April 9, 2014, the PUCO initiated a generic investigation of marketing practices in the competitive retail electric service market, with a focus on the marketing of fixed-price or guaranteed percent-off SSO rate contracts where there is a provision that permits the pass-through of new or additional charges. The matter remains pending. PENNSYLVANIA The Pennsylvania Companies currently operate under DSPs that expire on May 31, 2017, and provide for the competitive procurement of generation supply for customers that do not choose an alternative EGS or for customers of alternative EGSs that fail to provide the contracted service. The default service supply is currently provided by wholesale suppliers through a mix of long-term and short-term contracts procured through spot market purchases, quarterly descending clock auctions for 3, 12- and 24-month energy contracts, and one RFP seeking 2-year contracts to serve SRECs for ME, PN, and Penn. Pursuant to Pennsylvania's EE&C legislation (Act 129 of 2008) and PPUC orders, Pennsylvania EDC's implement energy efficiency and peak demand reduction programs. The Pennsylvania Companies' Phase II EE&C Plans are effective through May 31, 2016. Total costs of these plans are expected to be approximately $234 million and recoverable through the Pennsylvania Companies' reconcilable EE&C riders. On June 19, 2015, the PPUC issued a Phase III Final Implementation Order setting: demand reduction targets, relative to each Pennsylvania Companies' 2007-2008 peak demand (in MW), at 1.8% for ME, 1.7% for Penn, 1.8% for WP, and 0% for PN; and energy consumption reduction targets, as a percentage of each Pennsylvania Companies’ historic 2010 forecasts (in MWH), at 4.0% for ME, 3.9% for PN, 3.3% for Penn, and 2.6% for WP. The Pennsylvania Companies expect to file their Phase III EE&C plans for the June 2016 through May 2021 period by November 30, 2015. EDCs are permitted to recover costs for implementing Phase III EE&C plans. Pursuant to Act 11 of 2012, Pennsylvania EDCs may establish a DSIC to recover costs of infrastructure improvements and costs related to highway relocation projects with PPUC approval. Pennsylvania EDCs must file LTIIPs outlining infrastructure improvement plans for PPUC review and approval prior to approval of a DSIC. On October 19, 2015, each of the Pennsylvania Companies filed LTIIPs with the PPUC for infrastructure improvement over the five -year period of 2016 to 2020 for the following costs: WP $88.34 million ; PN $56.74 million ; Penn $56.35 million ; and ME $43.44 million . These amounts include all qualifying distribution capital additions identified in the revised implementation plan for the recent focused management and operations audit of the Pennsylvania Companies. Following PPUC approval of the LTIIPs, the Pennsylvania Companies will submit DSIC tariffs for approval for quarterly recovery of approved costs. Each of the Pennsylvania Companies currently offer distribution rates under their respective Joint Petitions for Settlement approved on April 9, 2015 by the PPUC, which, among other things, provide for a total increase in annual revenues for all Pennsylvania Companies of $292.8 million , ( $89.3 million for ME, $90.8 million for PN, $15.9 million for Penn and $96.8 million for WP) , including the recovery of $87.7 million of additional annual operating expenses, including costs associated with service reliability enhancements to the distribution system, amortization of deferred storm costs and the remaining net book value of legacy meters, assistance for providing service to low-income customers, and the creation of a storm reserve for each utility. Additionally, the settlements include commitments to meet certain wait times for call centers and service reliability standards. The new rates were effective May 3, 2015. On July 16, 2013, the PPUC's Bureau of Audits initiated a focused management and operations audit of the Pennsylvania Companies as required every eight years by statute. The PPUC issued a report on its findings and recommendations on February 12, 2015, at which time the Pennsylvania Companies' associated implementation plan was also made public. In an order issued on March 30, 2015, the Pennsylvania Companies were directed to develop and file by May 29, 2015 revised implementation plans regarding certain of the operational topics addressed in the report, including addressing certain reliability matters. On May 19, 2015, the PPUC granted a forty-five day extension for the filing of revised implementation plans with respect to certain of the matters raised in its March 30, 2015 Order. On May 29, 2015 and July 13, 2015, the Pennsylvania Companies filed their revised implementation plan. On August 20, 2015, the PPUC issued a Tentative Order accepting the Pennsylvania Companies’ revised plan as being in the public interest and seeking public comment. The OCA submitted comments on September 21, 2015, generally supportive of the Pennsylvania Companies’ revised plan as being complementary with the commitments made in the recent base rate case proceedings. The Pennsylvania Companies filed a limited reply on October 13, 2015, and a Final Order is pending. The cost of compliance for the Pennsylvania Companies is currently expected to range from approximately $200 million to $230 million . On June 19, 2015, ME and PN, along with JCP&L, FET and MAIT made filings with FERC, the NJBPU, and the PPUC requesting authorization for JCP&L, PN and ME to contribute their transmission assets to MAIT, a new transmission-only subsidiary of FET. Evidentiary hearings are scheduled to commence before the PPUC on February 29, 2016. A final decision from the PPUC is expected by mid-2016. See Transfer of Transmission Assets to MAIT in FERC Matters below for further discussion of this transaction. WEST VIRGINIA MP and PE currently operate under a Joint Stipulation and Agreement of Settlement approved by the WVPSC on February 3, 2015, that provides for: a $15 million increase in base rate revenues effective February 25, 2015; the implementation of a Vegetation Management Surcharge to recover all costs related to both new and existing vegetation maintenance programs; authority to establish a regulatory asset for MATS investments placed into service in 2016 and 2017; authority to defer, amortize and recover over a 5 -year period approximately $46 million of storm restoration costs; and elimination of the TTS for costs associated with MP's acquisition of the Harrison plant in October 2013 and movement of those costs into base rates. MP and PE's current ENEC rates went into effect on February 25, 2015, in accordance with a settlement approved by the WVPSC on January 29, 2015. On August 14, 2015, MP and PE filed their annual ENEC case with the WVPSC proposing an approximate $165.1 million annual increase in rates effective January 1, 2016 or before, which is a 12.5% overall increase over existing rates and remains subject to WVPSC approval. The proposed increase is comprised of a $97 million under-recovered balance as of June 30, 2015, a projected $23.7 million under-recovery for the 2016 calendar year, and an actual under-recovered balance from MP and PE's TTS for Harrison Power Station of $44.4 million . On September 10, 2015, MP and PE filed an amendment addressing the results of the recent PJM Transitional Auctions for Capacity Performance, which resulted in a net decrease of $20.6 million from the initial requested increase to $144.5 million . A hearing has been set for November 19-20, 2015 with an order expected to be issued before the end of 2015 for rates effective by January 1, 2016. On August 31, 2015, MP and PE filed with the WVPSC their biennial petition for reconciliation of the Vegetation Management Program Surcharge and regular review of the program proposing an approximate $37.7 million annual increase in rates, which is a 2.8% overall increase over existing rates and remains subject to WVPSC approval. The proposed increase is comprised of a $2.1 million under-recovered balance as of June 30, 2015, a projected $23.9 million in under-recovery for the 2016/2017 rate effective period, and recovery of previously authorized deferred vegetation management costs from April 14, 2014 through February 24, 2015 in the amount of $49.9 million . Hearings are scheduled for November 19-20, 2015 and a final order is expected to be issued before the end of 2015 for rates effective by January 1, 2016. RELIABILITY MATTERS Federally-enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements on the Utilities, FES, AE Supply, FG, FENOC, NG, ATSI and TrAIL. NERC is the ERO designated by FERC to establish and enforce these reliability standards, although NERC has delegated day-to-day implementation and enforcement of these reliability standards to eight regional entities, including RFC. All of FirstEnergy's facilities are located within the RFC region. FirstEnergy actively participates in the NERC and RFC stakeholder processes, and otherwise monitors and manages its companies in response to the ongoing development, implementation and enforcement of the reliability standards implemented and enforced by RFC. FirstEnergy believes that it is in compliance with all currently-effective and enforceable reliability standards. Nevertheless, in the course of operating its extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the reliability standards. If and when such occurrences are found, FirstEnergy develops information about the occurrence and develops a remedial response to the specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy's part to comply with the reliability standards for its bulk electric system could result in the imposition of financial penalties, and obligations to upgrade or build transmission facilities, that could have a material adverse effect on its financial condition, results of operations and cash flows. FERC MATTERS PJM Transmission Rates PJM and its stakeholders have been debating the proper method to allocate costs for new transmission facilities. While FirstEnergy and other parties advocate for a traditional "beneficiary pays" (or usage based) approach, others advocate for “socializing” the costs on a load-ratio share basis, where each customer in the zone would pay based on its total usage of energy within PJM. This question has been the subject of extensive litigation before FERC and the appellate courts, including before the Seventh Circuit. On June 25, 2014, a divided three-judge panel of the Seventh Circuit ruled that FERC had not quantified the benefits that western PJM utilities would derive from certain new 500 kV or higher lines and thus had not adequately supported its decision to socialize the costs of these lines. The majority found that eastern PJM utilities are the primary beneficiaries of the lines, while western PJM utilities are only incidental beneficiaries, and that, while incidental beneficiaries should pay some share of the costs of the lines, that share should be proportionate to the benefit they derive from the lines, and not on load-ratio share in PJM as a whole. The court remanded the case to FERC, which issued an order setting the issue of cost allocation for hearing and settlement proceedings. Settlement discussions under a FERC-appointed settlement judge are ongoing. The PJM transmission owners, including FirstEnergy, submitted filings to FERC setting forth the cost allocation method under Order No. 1000 for projects that cross the borders between the PJM Region and: (i) the NYISO region; (ii) the MISO region; and (iii) the FERC-jurisdictional members of the SERTP region. These filings propose to allocate the costs of these interregional transmission projects based on the costs of projects that otherwise would have been constructed separately in each region, or, in the case of MISO, based on the cost allocation provisions for interregional transmission projects provided in the Joint Operating Agreement between PJM and MISO comply with the requirements of Order No. 1000. As of May 14, 2015, FERC has accepted the PJM/NYISO, PJM/MISO and PJM/SERTP filings, subject to further compliance requirements. FERC’s acceptance of the PJM/SERTP filing is also subject to refund and the SERTP region participants’ related Order No. 1000 interregional compliance proceedings. In a series of orders in certain Order No. 1000 dockets, FERC asserted that the PJM transmission owners do not hold an incumbent “right of first refusal” to construct, own and operate transmission projects within their respective footprints that are approved as part of PJM’s RTEP process. FirstEnergy and other PJM transmission owners have appealed these rulings, and the question of whether FirstEnergy and the PJM transmission owners have a "right of first refusal" is now pending before the U.S. Court of Appeals for the D.C. Circuit in an appeal of FERC's order approving PJM's Order No.1000 compliance filing. The outcome of these proceedings and their impact, if any, on FirstEnergy cannot be predicted at this time. RTO Realignment On June 1, 2011, ATSI and the ATSI zone transferred from MISO to PJM. While many of the matters involved with the move have been resolved, FERC denied recovery under ATSI's transmission rate for certain charges that collectively can be described as "exit fees" and certain other transmission cost allocation charges totaling approximately $78.8 million until such time as ATSI submits a cost/benefit analysis demonstrating net benefits to customers from the move. Subsequently, FERC rejected a proposed settlement agreement to resolve the exit fee and transmission cost allocation issues, stating that its action is without prejudice to ATSI submitting a cost/benefit analysis demonstrating that the benefits of the RTO realignment decisions outweigh the exit fee and transmission cost allocation charges. FirstEnergy's request for rehearing of FERC's order rejecting the settlement agreement remains pending. Separately, the question of ATSI's responsibility for certain costs for the “Michigan Thumb” |