REGULATORY MATTERS | REGULATORY MATTERS STATE REGULATION Each of the Utilities’ retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York by the NYPSC. The transmission operations of PE in Virginia are subject to certain regulations of the VSCC. In addition, under Ohio law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility. Further, if any of the FirstEnergy affiliates were to engage in the construction of significant new transmission facilities, depending on the state, they may be required to obtain state regulatory authorization to site, construct and operate the new transmission facility. MARYLAND PE operates under MDPSC approved base rates that were effective as of March 23, 2019. PE also provides SOS pursuant to a combination of settlement agreements, MDPSC orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic auctions that are overseen by the MDPSC and a third-party monitor. Although settlements with respect to SOS supply for PE customers have expired, service continues in the same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS. The EmPOWER Maryland program requires each electric utility to file a plan to reduce electric consumption and demand 0.2% per year, up to the ultimate goal of 2% annual savings, for the duration of the 2018-2020 and 2021-2023 EmPOWER Maryland program cycles, to the extent the MDPSC determines that cost-effective programs and services are available. PE’s approved 2018-2020 EmPOWER Maryland plan continues and expands upon prior years’ programs, and adds new programs, for a projected total cost of $116 million over the three-year period. PE recovers program costs subject to a five-year amortization. Maryland law only allows for the utility to recover lost distribution revenue attributable to energy efficiency or demand reduction programs through a base rate case proceeding, and to date, such recovery has not been sought or obtained by PE. On September 1, 2020, PE filed its proposed plan for the 2021-2023 EmPOWER Maryland program cycle. The new plan largely continues PE’s existing programs and is estimated to cost approximately $148 million over the three-year period. The MDPSC had a hearing on the proposed plan in October 2020. On January 19, 2018, PE filed a joint petition along with other utility companies, work group stakeholders and the MDPSC electric vehicle work group leader to implement a statewide electric vehicle portfolio in connection with a 2016 MDPSC proceeding to consider an array of issues relating to electric distribution system design, including matters relating to electric vehicles, distributed energy resources, advanced metering infrastructure, energy storage, system planning, rate design, and impacts on low-income customers. PE proposed an electric vehicle charging infrastructure program at a projected total cost of $12 million, to be recovered over a five-year amortization. On January 14, 2019, the MDPSC approved the petition subject to certain reductions in the scope of the program. The MDPSC approved PE’s compliance filing, which implements the pilot program, with minor modifications, on July 3, 2019. On August 24, 2018, PE filed a base rate case with the MDPSC, which it supplemented on October 22, 2018, to update the partially forecasted test year with a full twelve months of actual data. The rate case requested an annual increase in base distribution rates of $19.7 million, plus creation of an EDIS to fund four enhanced service reliability programs. In responding to discovery, PE revised its request for an annual increase in base rates to $17.6 million. The proposed rate increase reflected $7.3 million in annual savings for customers resulting from the recent federal tax law changes. On March 22, 2019, the MDPSC issued a final order that approved a rate increase of $6.2 million, approved three of the four EDIS programs for four years, directed PE to file a new depreciation study within 18 months, and ordered the filing of a new base rate case in four years to correspond to the ending of the approved EDIS programs. On September 22, 2020, PE filed its depreciation study that indicated a slight increase in depreciation, and as a result, is seeking that the difference in depreciation be deferred for future recovery in PE’s next base rate case. The MDPSC has set the matter for hearing and delegated it to a public utility law judge. On November 6, 2020, an order was issued scheduling evidentiary hearings in April 2021. Maryland’s Governor issued an order on March 16, 2020, forbidding utilities from terminating residential service or charging late fees for non-payment for the duration of the COVID-19 pandemic. On April 9, 2020, the MDPSC issued an order allowing utilities to track and create a regulatory asset for future recovery of all prudently incurred incremental costs arising from the COVID-19 pandemic, including incremental uncollectible expense, incurred from the date of the Governor’s order (or earlier if the utility could show that the expenses related to suspension of service terminations). On July 8, 2020, the MDPSC issued a notice opening a public conference to collect information from utilities and other stakeholders about the impacts of the COVID-19 pandemic on the utilities and their customers. The MDPSC subsequently issued orders allowing Maryland electric and gas utilities to resume residential service terminations for non-payment on November 15, 2020, subject to various restrictions, and clarifying that utilities could resume charging late fees on October 1, 2020. NEW JERSEY JCP&L operates under NJBPU approved rates that were effective as of January 1, 2017. JCP&L provides BGS for retail customers who do not choose a third-party EGS and for customers of third-party EGSs that fail to provide the contracted service. All New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates. On April 18, 2019, pursuant to the May 2018 New Jersey enacted legislation establishing a ZEC program to provide ratepayer funded subsidies of New Jersey nuclear energy supply, the NJBPU approved the implementation of a non-bypassable, irrevocable ZEC charge for all New Jersey electric utility customers, including JCP&L’s customers. Once collected from customers by JCP&L, these funds will be remitted to eligible nuclear energy generators. In December 2017, the NJBPU issued proposed rules to modify its current CTA policy in base rate cases to: (i) calculate savings using a five-year look back from the beginning of the test year; (ii) allocate savings with 75% retained by the company and 25% allocated to ratepayers; and (iii) exclude transmission assets of electric distribution companies in the savings calculation, which were published in the NJ Register in the first quarter of 2018. JCP&L filed comments supporting the proposed rulemaking. On January 17, 2019, the NJBPU approved the proposed CTA rules with no changes. On May 17, 2019, the Rate Counsel filed an appeal with the Appellate Division of the Superior Court of New Jersey. JCP&L is contesting this appeal but is unable to predict the outcome of this matter. Also in December 2017, the NJBPU approved its IIP rulemaking. The IIP creates a financial incentive for utilities to accelerate the level of investment needed to promote the timely rehabilitation and replacement of certain non-revenue producing components that enhance reliability, resiliency, and/or safety. On May 8, 2019, the NJBPU approved a Stipulation of Settlement submitted by JCP&L, Rate Counsel, NJBPU Staff and New Jersey Large Energy Users Coalition to implement JCP&L’s infrastructure plan, JCP&L Reliability Plus. The plan provides that JCP&L will invest up to approximately $97 million in capital investments beginning on June 1, 2019 through December 31, 2020, to enhance the reliability and resiliency of JCP&L’s distribution system and reduce the frequency and duration of power outages. JCP&L shall seek recovery of the capital investment through an accelerated cost recovery mechanism, provided for in the rules, that includes a revenue adjustment calculation and a process for two rate adjustments. The NJBPU approved adjusted rates that took effect on March 1, 2020. As further discussed below, JCP&L will recover the IIP capital investments as part of its distribution base rate case. On February 18, 2020, JCP&L submitted a filing with the NJBPU requesting a distribution base rate increase of $186.9 million on an annual basis, which represents an overall average increase in JCP&L rates of 7.8%. The filing seeks to recover certain costs associated with providing safe and reliable electric service to JCP&L customers, along with recovery of previously incurred storm costs. JCP&L proposed a rate effective date of March 19, 2020. The NJBPU issued orders suspending JCP&L’s proposed rates until November 19, 2020. JCP&L filed updates to the requested distribution base rate in both June and July 2020, resulting in JCP&L seeking a total annual distribution base rate increase of approximately $185 million. On October 16, 2020, the parties submitted a stipulation of settlement to the administrative law judge, providing for, among other things, a $94 million annual base distribution revenues increase for JCP&L based on an ROE of 9.6%, which will become effective for customers on November 1, 2021. Until the rates become effective, and starting on January 1, 2021, JCP&L will be permitted to amortize an existing regulatory liability totaling approximately $86 million to offset the base rate increase that otherwise would have occurred in this period. The parties also agreed that the actual net gain from the sale of JCP&L’s interest in the Yards Creek pumped-storage hydro generation facility in New Jersey (210 MWs), as further discussed below, shall be applied to reduce JCP&L’s existing regulatory asset for previously deferred storm costs. On October 22, 2020, the administrative law judge entered an initial decision adopting the settlement. On October 28, 2020, the NJBPU approved the settlement and ordered an upcoming management audit for JCP&L. On April 6, 2020, JCP&L signed an asset purchase agreement with Yards Creek Energy, LLC, a subsidiary of LS Power to sell its 50% interest in the Yards Creek pumped-storage hydro generation facility. Subject to terms and conditions of the agreement, the base purchase price is $155 million. Completion of the transaction is subject to several closing conditions, including approval by the NJBPU and FERC. On July 31, 2020, FERC approved the transfer of JCP&L’s interest in the hydroelectric operating license. On October 8, 2020, FERC issued an order authorizing the transfer of JCP&L’s ownership interest in the hydroelectric facilities. There can be no assurance that all closing conditions will be satisfied or that the transaction will be consummated. JCP&L currently anticipates closing of the transaction to occur in the next few months. Assets held for sale on FirstEnergy’s Consolidated Balance Sheets associated with the transaction consist of property, plant and equipment of $44 million, which is included in the regulated distribution segment. On October 28, 2020, the NJBPU approved the sale of Yards Creek. On August 27, 2020, JCP&L filed an AMI Program with the NJBPU, which proposes the deployment of approximately 1.2 million advanced meters over a three-year period beginning on January 1, 2023, at a total cost of approximately $418 million, including the pre-deployment phase. The 3-year deployment is part of the 20 year AMI Program that is expected to cost a total of approximately $732 million and proposes a cost recovery mechanism through a separate AMI tariff rider. On June 10, 2020, the NJBPU issued an order establishing a framework for the filing of utility-run energy efficiency and peak demand reduction programs in accordance with the New Jersey Clean Energy Act. Under the established framework, JCP&L will recover its program investments over a ten year amortization period and its operations and maintenance expenses on an annual basis, be eligible to receive lost revenues on energy savings that resulted from its programs and be eligible for incentives or subject to penalties based on its annual program performance, beginning in the fifth year of its program offerings. On September 25, 2020, JCP&L filed its energy efficiency and peak demand reduction program. JCP&L’s program consists of 11 energy efficiency and peak demand reduction programs and subprograms to be run from July 1, 2021 through June 30, 2024. The program also seeks approval of cost recovery totaling approximately $230 million as well as lost revenues associated with the energy savings resulting from the programs. On July 2, 2020, the NJBPU issued an order allowing New Jersey utilities to track and create a regulatory asset for future recovery of all prudently incurred incremental costs arising from the COVID-19 pandemic beginning March 9, 2020 through September 30, 2021, or until the Governor issues an order stating that the COVID-19 pandemic is no longer in effect. New Jersey utilities can request recovery of such regulatory asset in a stand-alone COVID-19 regulatory asset filing or future base rate case. On August 21, 2020, the Governor of New Jersey issued a press release announcing that the New Jersey utilities agreed to extend their voluntary moratorium preventing shutoffs to both residential and commercial customers during the COVID-19 pandemic until October 15, 2020. On October 15, 2020, the Governor issued an Executive Order prohibiting utilities from terminating service to any residential gas, electric, public and private water customer, through March 15, 2021, requiring the reconnection of certain customers, and disallowing the charging of late payment charges or reconnection fees during the public health emergency. On October 28, 2020, the NJBPU issued an order expanding the scope of the proceeding to examine all pandemic issues, including recovery of the COVID-19 regulatory assets, by way of a generic proceeding. Comments are due by November 30, 2020. The recent credit rating actions taken on October 28, 2020, by S&P and Fitch triggered a requirement from various NJBPU orders that JCP&L file a mitigation plan, which was filed on November 5, 2020, to demonstrate that JCP&L has sufficient liquidity to meet its BGS obligations. On November 18, 2020, the NJBPU scheduled a public hearing on the mitigation plan for December 11, 2020. OHIO The Ohio Companies operate under base distribution rates approved by the PUCO effective in 2009. The Ohio Companies’ residential and commercial base distribution revenues are decoupled, through a mechanism that took effect on February 1, 2020, to the base distribution revenue and lost distribution revenue associated with energy efficiency and peak demand reduction programs recovered as of the twelve-month period ending on December 31, 2018. The Ohio Companies currently operate under ESP IV effective June 1, 2016, and continuing through May 31, 2024, that continues the supply of power to non-shopping customers at a market-based price set through an auction process. ESP IV also continues the DCR rider, which supports continued investment related to the distribution system for the benefit of customers, with increased revenue caps of $20 million per year from June 1, 2019 through May 31, 2022; and $15 million per year from June 1, 2022 through May 31, 2024. In addition, ESP IV includes: (1) continuation of a base distribution rate freeze through May 31, 2024; (2) the collection of lost distribution revenues associated with energy efficiency and peak demand reduction programs; (3) a goal across FirstEnergy to reduce CO 2 emissions by 90% below 2005 levels by 2045; and (4) contributions, totaling $51 million to: (a) fund energy conservation programs, economic development and job retention in the Ohio Companies’ service territories; (b) establish a fuel-fund in each of the Ohio Companies’ service territories to assist low-income customers; and (c) establish a Customer Advisory Council to ensure preservation and growth of the competitive market in Ohio. ESP IV further provided for the Ohio Companies to collect through the DMR $132.5 million annually for three years beginning in 2017, grossed up for federal income taxes, resulting in an approved amount of approximately $168 million annually in 2018 and 2019. On appeal, the SCOH, on June 19, 2019, reversed the PUCO’s determination that the DMR is lawful, and remanded the matter to the PUCO with instructions to remove the DMR from ESP IV. On August 20, 2019, the SCOH denied the Ohio Companies’ motion for reconsideration. The PUCO entered an order directing the Ohio Companies to cease further collection through the DMR, credit back to customers a refund of the DMR funds collected since July 2, 2019, and remove the DMR from ESP IV. On July 15, 2019, OCC filed a Notice of Appeal with the SCOH, challenging the PUCO’s exclusion of the DMR revenues from the determination of the existence of significantly excessive earnings under ESP IV for calendar year 2017 and claiming a $42 million refund is due to OE customers. The Ohio Companies are contesting this appeal but are unable to predict the outcome of this matter. The SCOH heard the argument on this matter on May 12, 2020. On July 23, 2019, Ohio enacted legislation establishing support for nuclear energy supply in Ohio. In addition to the provisions supporting nuclear energy, the legislation included a provision implementing a decoupling mechanism for Ohio electric utilities and ending current energy efficiency program mandates on December 31, 2020, provided that statewide energy efficiency mandates are achieved as determined by the PUCO. On February 26, 2020, the PUCO ordered that a wind-down of statutorily required energy efficiency programs shall commence on September 30, 2020, and the programs shall terminate on December 31, 2020, and that the Ohio Companies’ existing portfolio plans are extended through 2020 without changes. On November 21, 2019, the Ohio Companies applied to the PUCO for approval of a decoupling mechanism, which would set residential and commercial base distribution related revenues at the levels collected in 2018. As such, those base distribution revenues would no longer be based on electric consumption, which allows continued support of energy efficiency initiatives while also providing revenue certainty to the Ohio Companies. On January 15, 2020, the PUCO approved the Ohio Companies’ decoupling application, and the decoupling mechanism took effect on February 1, 2020. Various Ohio House and Senate Bills were introduced in the third quarter of 2020 to, among other things, repeal HB 6, the legislation that established support for nuclear energy supply in Ohio, provided for a decoupling mechanism for Ohio electric utilities, and provided for the ending of current energy efficiency program mandates. FirstEnergy is unable to predict the outcome of the legislative activity in response to the investigation of HB 6, however, a repeal of the decoupling provision of HB 6 is reasonably possible. As of September 30, 2020, the uncollected amount recognized as a regulatory asset on FirstEnergy’s Consolidated Balance Sheet from the decoupling mechanism was approximately $100 million. However, absent the decoupling mechanism and other provisions of HB 6, it is expected that the Ohio Companies would have collected lost distribution revenues estimated at approximately $63 million for the nine months ended September 30, 2020, for a pre-tax net impact of approximately $37 million. Furthermore, as FirstEnergy would not have financially benefited from the zero nuclear credit included in HB 6, there is no expected impact to FirstEnergy due to the repeal of that provision in HB 6. On November 2, 2020, the Ohio Companies filed their annual update to the Ohio decoupling rider with an estimated annual revenue requirement of approximately $113 million with a proposed effective date of January 1, 2021, unless otherwise ordered by the PUCO. On July 17, 2019, the PUCO approved, with no material modifications, a settlement agreement that provides for the implementation of the Ohio Companies’ first phase of grid modernization plans, including the investment of $516 million over three years to modernize the Ohio Companies’ electric distribution system, and for all tax savings associated with the Tax Act to flow back to customers. The settlement had broad support, including PUCO Staff, the OCC, representatives of industrial and commercial customers, a low-income advocate, environmental advocates, hospitals, competitive generation suppliers and other parties. In March 2020, the PUCO issued entries directing utilities to review their service disconnection and restoration policies and suspend, for the duration of the COVID-19 pandemic, otherwise applicable requirements that may impose a service continuity hardship or service restoration hardship on customers. The Ohio Companies are utilizing their existing approved cost recovery mechanisms where applicable to address the financial impacts of these directives. On July 31, 2020, the Ohio Companies filed with the PUCO their transition plan and requests for waivers to allow for the safe resumption of normal business operations, including service disconnections for non-payment, on or after September 15, 2020. On September 23, 2020, the PUCO approved the Ohio Companies’ transition plan, including approval of the resumption of service disconnections for non-payment, which the Ohio Companies began on October 5, 2020. On July 29, 2020, the PUCO consolidated the Ohio Companies’ Applications for determination of the existence of significantly excessive earnings, or SEET, under ESP IV for calendar years 2018 and 2019, which had been previously filed on July 15, 2019, and May 15, 2020, respectively, and set a procedural schedule with evidentiary hearings scheduled for October 29, 2020. The calculations included in the Ohio Companies’ SEET filings for calendar years 2018 and 2019 demonstrate that the Ohio Companies did not have significantly excessive earnings, however, FirstEnergy and the Ohio Companies are unable to predict the PUCO’s ultimate determination of the applications. On August 3, 2020, the OCC filed an interlocutory appeal asking the PUCO to stay the SEET proceeding until the SCOH determines whether DMR should be excluded from the SEET, as further discussed above. Furthermore, on July 29, 2020, Ohio House Bill 740 was introduced, which would repeal legislation passed last year that permitted the Ohio Companies to file their SEET results on a consolidated basis instead of on an individual company basis. On September 4, 2020, the PUCO opened its quadrennial review of ESP IV, consolidated it with the Ohio Companies’ 2018 and 2019 SEET Applications, and set a procedural schedule for the consolidated matters. On October 29, 2020, the PUCO issued an entry extending the deadline for the Ohio Companies to file quadrennial review of ESP IV testimony to March 1, 2021, with the evidentiary hearings to commence no sooner than May 3, 2021. On September 8, 2020, the OCC filed motions in the Ohio Companies’ Corporate Separation Audit and Rider DMR Audit dockets, requesting the PUCO to open an investigation and management audit, hire an independent auditor, and require FirstEnergy to show it did not improperly use money collected from consumers or violate any utility regulatory laws, rules or orders in its activities regarding HB 6. The Ohio Companies’ filed a response in opposition to the OCC’s motions on September 23, 2020. On September 15, 2020, the PUCO opened a new proceeding to review the political and charitable spending by the Ohio Companies in support of HB 6 and the subsequent referendum effort, directing the Ohio Companies to show cause, demonstrating that the costs of any political or charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by ratepayers. The Ohio Companies filed a response on September 30, 2020, stating that any political and charitable spending in support of HB 6 or the subsequent referendum were not included in rates or charges paid for by its customers. Several parties requested that the PUCO broaden the scope of the review of political and charitable spending. In connection with an on-going audit of the Ohio Companies’ policies and procedures relating to the code of conduct rules between affiliates, on November 4, 2020, the PUCO initiated an additional corporate separation audit as a result of the FirstEnergy leadership transition announcement made on October 29, 2020, further discussed below. The additional audit is to ensure compliance by the Ohio Companies and their affiliates with corporate separation laws and the Ohio Companies’ Corporate Separation Plan. The additional audit is for the period from November 2016 through October 2020, and the PUCO intends to select an auditor by December 2, 2020, with a final audit report to be filed in April 2021. See Note 10, "Commitments, Guarantees and Contingencies" for additional details on the government investigation and subsequent litigation surrounding the investigation of HB 6. PENNSYLVANIA The Pennsylvania Companies operate under rates approved by the PPUC, effective as of January 27, 2017. These rates were adjusted for the net impact of the Tax Act, effective March 15, 2018. The net impact of the Tax Act for the period January 1, 2018 through March 14, 2018 was separately tracked and its treatment will be addressed in a future rate proceeding. The Pennsylvania Companies operate under DSPs for the June 1, 2019 through May 31, 2023 delivery period, which provide for the competitive procurement of generation supply for customers who do not choose an alternative EGS or for customers of alternative EGSs that fail to provide the contracted service. Under the 2019-2023 DSPs, supply will be provided by wholesale suppliers through a mix of 3, 12 and 24-month energy contracts, as well as two RFPs for 2-year SREC contracts for ME, PN and Penn. Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, Pennsylvania EDCs implement energy efficiency and peak demand reduction programs. The Pennsylvania Companies’ Phase III EE&C plans for the June 2016 through May 2021 period, which were approved in March 2016, with expected costs up to $390 million, are designed to achieve the targets established in the PPUC’s Phase III Final Implementation Order with full recovery through the reconcilable EE&C riders. On June 18, 2020, the PPUC entered a Final Implementation Order for a Phase IV EE&C Plan, operating from June 2021 through May 2026. The Final Implementation Order set demand reduction targets, relative to 2007 to 2008 peak demands, at 2.9% MW for ME, 3.3% MW for PN, 2.0% MW for Penn, and 2.5% MW for WP; and energy consumption reduction targets, as a percentage of the Pennsylvania Companies’ historic 2009 to 2010 reference load at 3.1% MWH for ME, 3.0% MWH for PN, 2.7% MWH for Penn, and 2.4% MWH for WP. Phase IV plans must be filed by November 30, 2020. Pennsylvania EDCs may file with the PPUC for approval of an LTIIP for infrastructure improvements and costs related to highway relocation projects, after which a DSIC may be approved to recover LTIIP costs. On August 30, 2019, the Pennsylvania Companies filed Petitions for approval of new LTIIPs for the five-year period beginning January 1, 2020 and ending December 31, 2024 for a total capital investment of approximately $572 million for certain infrastructure improvement initiatives. On January 16, 2020, the PPUC approved the LTIIPs without modification . The Pennsylvania Companies’ approved DSIC riders for quarterly cost recovery went into effect July 1, 2016. On August 30, 2019, Penn filed a Petition seeking approval of a waiver of the statutory DSIC cap of 5% of distribution rate revenue and approval to increase the maximum allowable DSIC to 11.81% of distribution rate revenue for the five-year period of its proposed LTIIP. On March 12, 2020, an order was entered approving a settlement by all parties to that case which provides for a temporary increase in the recoverability cap from 5% to 7.5%, to expire on the earlier of the effective date of new base rates following Penn’s next base rate case or the expiration of its LTIIP II program. Following the Pennsylvania Companies’ 2016 base rate proceedings, the PPUC ruled in a separate proceeding related to the DSIC mechanisms that the Pennsylvania Companies were not required to reflect federal and state income tax deductions related to DSIC-eligible property in DSIC rates, which decision was appealed by the Pennsylvania OCA to the Pennsylvania Commonwealth Court. The Commonwealth Court reversed the PPUC’s decision and remanded the matter to require the Pennsylvania Companies to revise their tariffs and DSIC calculations to include ADIT and state income taxes. On April 7, 2020, the Pennsylvania Supreme Court issued an order granting Petitions for Allowance of Appeal by both the PPUC and the Pennsylvania Companies of the Commonwealth Court’s Opinion and Order. Briefs and Reply Briefs of the parties were filed, and oral argument before the Supreme Court was held on October 21, 2020. An adverse ruling by the Pennsylvania Supreme Court is not expected to result in a material impact to FirstEnergy. The PPUC issued an order on March 13, 2020, forbidding utilities from terminating service for non-payment for the duration of the COVID-19 pandemic. On May 13, 2020, the PPUC issued a Secretarial letter directing utilities to track all prudently incurred incremental costs arising from the COVID-19 pandemic, and to create a regulatory asset for future recovery of incremental uncollectibles incurred as a result of the COVID-19 pandemic and termination moratorium. On October 13, 2020, the PPUC entered an order lifting the service termination moratorium effective November 9, 2020 subject to certain additional notification, payment procedures and exceptions, and permits the Pennsylvania Companies to create a regulatory asset for all incremental expenses associated with their compliance with the order. Customers with income levels at 300% of federal poverty income guidelines and below are not subject to termination through March 31, 2021 as long as they apply for assistance programs and payment arrangements. Utilities may create a regulatory asset for all incremental expenses associated with their compliance with the order. On October 27, 2020, several stakeholders filed a joint petition for clarification of the order. Answers to the joint petition for clarification were due on November 6, 2020. WEST VIRGINIA MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operate under rates approved by the WVPSC effective February 2015. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the ENEC. MP’s and PE’s ENEC rate is updated annually. On March 13, 2020, the WVPSC urged all utilities to suspend utility service terminations except where necessary as a matter of safety or where requested by the customer. On May 15, 2020, the WVPSC issued an order to authorize MP and PE to record a deferral of additional, extraordinary costs directly related to complying with the various COVID-19 government shut-down orders and operational precautions, including impacts on uncollectible expense and cash flow related to temporary discontinuance of service terminations for non-payment and any credits to minimum demand charges associated with business customers adversely impacted by shut-downs or temporary closures related to the pandemic. MP and PE resumed disconnection activity for commercial and industrial customers on September 15, 2020, and for residential customers on November 4, 2020. On August 28, 2020, MP and PE filed with the WVPSC their annual ENEC case requesting a decrease in ENEC rates of $55 million beginning January 1, 2021, representing a 4% |