REGULATORY MATTERS | REGULATORY MATTERS STATE REGULATION Each of the Utilities' retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York by the NYPSC. The transmission operations of PE and TrAIL in Virginia, ATSI in Ohio, the Transmission Companies in Pennsylvania, PE and MP in West Virginia, and PE in Maryland are subject to certain regulations of the VSCC, PUCO, PPUC, WVPSC, and MDPSC, respectively. In addition, under Ohio law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility. Further, if any of the FirstEnergy affiliates were to engage in the construction of significant new transmission facilities, depending on the state, they may be required to obtain state regulatory authorization to site, construct and operate the new transmission facility. MARYLAND PE operates under MDPSC approved base rates that were effective as of October 19, 2023, and that were subsequently modified by an MDPSC order dated January 3, 2024, which became effective as of March 1, 2024. PE also provides SOS pursuant to a combination of settlement agreements, MDPSC orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic auctions that are overseen by the MDPSC and a third-party monitor. Although settlements with respect to SOS supply for PE customers have expired, service continues in the same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS. The EmPOWER Maryland program requires each electric utility to file a plan to reduce electric consumption and demand 0.2% per year, up to the ultimate goal of 2% annual savings. PE recovers program investments with a return through an annually reconciled surcharge, with most costs subject to recovery over a five-year period with a return on the unamortized balance. Maryland law only allows for the utility to recover lost distribution revenue attributable to energy efficiency or demand reduction programs through a base rate case proceeding. On August 1, 2023, PE filed its proposed plan for the 2024-2026 cycle as required by the MDPSC. Consistent with a December 29, 2022, order by the MDPSC phasing out the ability of Maryland utilities to earn a return on EmPOWER investments, PE will be required to expense 33% of its EmPOWER program costs in 2024, 67% in 2025 and 100% in 2026. Notwithstanding the order to phase out PE’s ability to earn a return on its EmPOWER investments, all previously unamortized costs for prior cycles will continue to earn a return and be collected by the end of 2029, consistent with the plan PE submitted on January 11, 2023. In the 2024-2026 order issued on December 29, 2023, the period to pay down the amortized balances was extended through the end of 2031. Additionally at the direction of the MDPSC, PE together with other Maryland utilities are required to address GHG reductions in addition to energy efficiency. In compliance with the MDPSC directive, PE submitted three scenarios with projected costs over a three-year cycle of $310 million, $354 million, and $510 million, respectively. The MDPSC conducted hearings on the proposed plans for all Maryland utilities on November 6-8, 2023. On December 29, 2023, the MDPSC issued an order approving the $310 million scenario for most programs, with some modifications. On February 21, 2024, the MDPSC approved PE’s tariff to recover costs in 2024 but directed PE to analyze alternative amortization methods for possible use in later years. NEW JERSEY JCP&L operates under NJBPU approved rates that took effect as of February 15, 2024, and will become effective for customers as of June 1, 2024. JCP&L provides BGS for retail customers who do not choose a third-party EGS and for customers of third- party EGSs that fail to provide the contracted service. All New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates. The base rate increase, which was approved by the NJBPU on February 14, 2024, took effect on February 15, 2024, and is effective for customers on June 1, 2024. Until those new rates became effective for customers, JCP&L is amortizing an existing regulatory liability totaling approximately $18 million to offset the base rate increase that otherwise would have occurred in this period. Under the base rate case settlement agreement, JCP&L also agreed to a two-phase reliability improvement plan to enhance the reliability related to 18 high-priority circuits, the first phase of which began on February 14, 2024, and represents an approximate investment of $95 million. Additionally, JCP&L recognized a $53 million pre-tax charge in the first quarter 2024 at the Integrated segment within “Other operating expenses” on the FirstEnergy Consolidated Statements of Income, associated with certain corporate support costs recorded to capital accounts from the FERC Audit that were determined, as a result of the settlement agreement, to be disallowed from future recovery. JCP&L has implemented energy efficiency and peak demand reduction programs in accordance with the New Jersey Clean Energy Act as approved by the NJBPU in April 2021. The NJBPU approved plans include recovery of lost revenues resulting from the programs and a three-year plan (July 2021-June 2024) including total program costs of $203 million, of which $160 million of investment is recovered over a ten-year amortization period with a return as well as $43 million in operations and maintenance expenses and financing costs recovered on an annual basis. On December 5, 2023, JCP&L filed a petition with the NJBPU for a six-month extension of EE&C Plan I, which was originally scheduled to end on June 30, 2024, but would end on December 31, 2024, with the extension. The proposed budget for the extension period would add approximately $69 million to the original program cost. Under the proposal, JCP&L would recover the costs of the extension period and the revenue impact of sales losses resulting therefrom through two separate tariff riders. On December 1, 2023, JCP&L filed a related petition with the NJBPU requesting approval of its EE&C Plan II, which covers the January 1, 2025 through June 30, 2027 period and has a proposed budget of approximately $964 million. EE&C Plan II consists of a portfolio of ten energy efficiency programs, one peak demand reduction program and one building decarbonization program. Under the proposal, JCP&L would recover its EE&C Plan II revenue requirements and lost revenues from reduced electricity sales associated with EE&C Plan II. Evidentiary hearings are scheduled to begin August 19, 2024, with a final NJBPU decision and order required no later than October 15, 2024. The settlement of the distribution rate case in 2020, provided among other things, that JCP&L would be subject to a management audit, which began in May 2021. On April 12, 2023, the NJBPU accepted the final management audit report for filing purposes and ordered that interested stakeholders file comments on the report by May 22, 2023, which deadline was extended until July 31, 2023. JCP&L filed its comments on July 31, 2023. The parties have filed responses. On September 17, 2021, in connection with Mid-Atlantic Offshore Development, LLC, a transmission company jointly owned by Shell New Energies US and EDF Renewables North America, JCP&L submitted a proposal to the NJBPU and PJM to build transmission infrastructure connecting offshore wind-generated electricity to the New Jersey power grid. On October 26, 2022, the JCP&L proposal was accepted, in part, in an order issued by NJBPU. The proposal, as accepted, included approximately $723 million in investments for JCP&L to both build new and upgrade existing transmission infrastructure. JCP&L’s proposal projects an investment ROE of 10.2% and includes the option for JCP&L to acquire up to a 20% equity stake in Mid-Atlantic Offshore Development, LLC. The resulting rates associated with the project are expected to be shared among the ratepayers of all New Jersey electric utilities. On April 17, 2023, JCP&L applied for the FERC “abandonment” transmission rates incentive, which would provide for recovery of 100% of the cancelled prudent project costs that are incurred after the incentive is approved, and 50% of the costs incurred prior to that date, in the event that some or all of the project is cancelled for reasons beyond JCP&L’s control. FERC staff subsequently requested additional information on JCP&L’s application, which JCP&L provided. On August 21, 2023, FERC approved JCP&L’s application, effective August 22, 2023. On October 31, 2023, offshore wind developer, Orsted, announced plans to cease development of two offshore wind projects in New Jersey—Ocean Wind 1 and 2—having a combined planned capacity of 2,248 MWs. At this time, Orsted’s announcement does not affect JCP&L’s awarded projects and JCP&L is moving forward with preconstruction activities for the planned transmission infrastructure. Construction is expected to begin in 2025. Consistent with the commitments made in its proposal to the NJBPU, JCP&L formally submitted in November 2023 the first part of its application to the United States Department of Energy to finance a portion of the project using low-interest rate loans available under the United States Department of Energy’s Energy Infrastructure Reinvestment Program of the IRA of 2022. JCP&L submitted the second part of its two-part application on March 13, 2024. On April 3, 2024, Mid-Atlantic Offshore Development, LLC submitted a bid application for the NJBPU Prebuild Infrastructure Solicitation to the NJBPU which outlines its proposal to construct infrastructure connecting the identified landing point for offshore wind generation off the coast of New Jersey with the high-voltage electric grid at Larrabee Collector Station. JCP&L is described in the application as a joint developer with Mid-Atlantic Offshore Development, LLC, subject to the execution of a joint development agreement by the parties. Mid-Atlantic Offshore Development, LLC will be the party responsible for the project. On November 9, 2023, JCP&L filed a petition for approval of its second EnergizeNJ with the NJBPU that would, among other things, support grid modernization, system resiliency and substation modernization in technologies designed to provide enhanced customer benefits. JCP&L proposes EnergizeNJ will be implemented over a five-year budget period with estimated costs of approximately $935 million over the deployment period, of which, $906 million is capital investments and $29 million is operating and maintenance expenses. Under the proposal, the costs of EnergizeNJ would be recovered through JCP&L’s base rates via annual and semi-annual base rate adjustment filings. Public hearings have been requested but are not yet scheduled. JCP&L has requested that the NJBPU issue a final decision and order no later than May 22, 2024, based on a June 1, 2024, commencement date for EnergizeNJ. JCP&L anticipates filing amendments to the EnergizeNJ program after receipt of approval from the NJBPU of the base rate case stipulation that was filed on February 2, 2024. On February 14, 2024, the NJBPU approved the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for a distribution base rate increase. On February 27, 2024, as part of the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of NJBPU approval of the base rate case settlement, to include the second phase of its reliability improvement plan that is expected to address any remaining high-priority circuits not addressed in the first phase. EnergizeNJ, as amended, if approved will result in the investment of approximately $930.5 million of total estimated costs over five years. OHIO The Ohio Companies operate under PUCO-approved base distribution rates that became effective in 2009. The Ohio Companies currently operate under ESP IV, which continues through May 31, 2024, that provides for the supply of power to non-shopping customers at a market-based price set through an auction process. ESP IV also continues the Rider DCR, which supports continued investment related to the distribution system for the benefit of customers, with revenue caps of $15 million per year through May 31, 2024. In addition, ESP IV includes: (1) continuation of a base distribution rate freeze through May 31, 2024; (2) a goal across FirstEnergy to reduce CO 2 emissions by 90% below 2005 levels by 2045; and (3) contributions, totaling $51 million to: (a) fund energy conservation programs, economic development and job retention in the Ohio Companies’ service territories; (b) establish a fuel-fund in each of the Ohio Companies’ service territories to assist low-income customers; and (c) establish a Customer Advisory Council to ensure preservation and growth of the competitive market in Ohio. On April 5, 2023, the Ohio Companies filed an application with the PUCO for approval of ESP V, for an eight-year term beginning June 1, 2024, and continuing through May 31, 2032. ESP V proposes to continue providing power to non-shopping customers at market-based prices set through an auction process, with process enhancements designed to reduce costs to customers. ESP V also proposes to continue riders supporting investment in the Ohio Companies’ distribution system, including Rider DCR with annual revenue cap increases of $15 million to $21 million per year, based on reliability performance, and Rider AMI for recovery of approved grid modernization investments. ESP V proposes new riders to support continued maintenance of the distribution system, including vegetation management and storm restoration operating expense. In addition, ESP V proposes four-year energy efficiency and peak demand reduction programs for residential and commercial customers, with cost recovery spread over eight years. ESP V further includes a commitment to spend $52 million in total over the eight-year term, without recovery from customers, on initiatives to assist low-income customers, education and incentives to help ensure customers have good experiences with electric vehicles. Hearings commenced on November 7, 2023 and concluded on December 6, 2023. On December 6, 2023, certain intervenors filed a motion requesting a limited stay of the Ohio Companies’ proposal to continue Rider DCR. The Ohio Companies contested the motion, which is pending. On May 16, 2022, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2021, which demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings. This matter remains pending before the PUCO. On July 15, 2022, the Ohio Companies filed an application with the PUCO for approval of phase two of their distribution grid modernization plan that would, among other things, provide for the installation of an additional 700 thousand smart meters, distribution automation equipment on approximately 240 distribution circuits, voltage regulating equipment on approximately 220 distribution circuits, and other investments and pilot programs in related technologies designed to provide enhanced customer benefits. The Ohio Companies propose that phase two will be implemented over a four-year budget period with estimated capital investments of approximately $626 million and operations and maintenance expenses of approximately $144 million over the deployment period. Under the proposal, costs of phase two of the grid modernization plan would be recovered through the Ohio Companies’ AMI rider, pursuant to the terms and conditions approved in ESP IV. On April 12, 2024, the Ohio Companies and certain of the parties filed a stipulation that modified the Ohio Companies’ application for phase two of its grid modernization plan. The stipulation, which is subject to PUCO approval, provides for the deployment of smart meters to the balance of the Ohio Companies’ customers or approximately 1.4 million meters. Phase two of the distribution grid modernization plan, as modified by the stipulation would be completed over a four-year budget period with estimated capital investments of approximately $421 million. On April 16, 2024, the PUCO scheduled the stipulation hearing for June 5, 2024. On September 8, 2020, the OCC filed motions in the Ohio Companies’ corporate separation audit and DMR audit dockets, requesting the PUCO to open an investigation and management audit, hire an independent auditor, and require FirstEnergy to show it did not improperly use money collected from consumers or violate any utility regulatory laws, rules or orders in its activities regarding HB 6. On December 30, 2020, in response to the OCC's motion, the PUCO reopened the DMR audit docket, and directed PUCO staff to solicit a third-party auditor and conduct a full review of the DMR to ensure funds collected from customers through the DMR were only used for the purposes established in ESP IV. On June 2, 2021, the PUCO selected an auditor, and the auditor filed the final audit report on January 14, 2022, which made certain findings and recommendations. The report found that spending of DMR revenues was not required to be tracked, and that DMR revenues, like all rider revenues, are placed into the regulated money pool as a matter of routine, where the funds lose their identity. Therefore, the report could not suggest that DMR funds were used definitively for direct or indirect support for grid modernization. The report also concluded that there was no documented evidence that ties revenues from the DMR to lobbying for the passage of HB 6, but also could not rule out with certainty uses of DMR funds to support the passage of HB 6. The report further recommended that the regulated companies' money pool be audited more frequently and the Ohio Companies adopt formal dividend policies. Final comments and responses were filed by parties during the second quarter of 2022. The proceeding was stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the expanded Rider DCR audit proceeding described below and set a procedural schedule, which was vacated on March 15, 2024. A new procedural schedule will be set at a May 21, 2024 prehearing conference. On September 15, 2020, the PUCO opened a new proceeding to review the political and charitable spending by the Ohio Companies in support of HB 6 and the subsequent referendum effort, and directing the Ohio Companies to show cause, demonstrating that the costs of any political or charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by customers. The Ohio Companies initially filed a response stating that the costs of any political or charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by customers, but on August 6, 2021, filed a supplemental response explaining that, in light of the facts set forth in the DPA and the findings of the Rider DCR audit report further discussed below, political or charitable spending in support of HB 6, or the subsequent referendum effort, affected pole attachment rates paid by approximately $15 thousand. On October 26, 2021, the OCC filed a motion requesting the PUCO to order an independent external audit to investigate FE’s political and charitable spending related to HB 6, and to appoint an independent review panel to retain and oversee the auditor. In November and December 2021, parties filed comments and reply comments regarding the Ohio Companies’ original and supplemental responses to the PUCO’s September 15, 2020, show cause directive. On May 4, 2022, the PUCO selected a third-party auditor to determine whether the show cause demonstration submitted by the Ohio Companies is sufficient to ensure that the cost of any political or charitable spending in support of HB 6 or the subsequent referendum effort was not included, directly or indirectly, in any rates or charges paid by ratepayers. The proceeding was stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner directed the third-party auditor to file its report by August 28, 2024. In connection with an ongoing audit of the Ohio Companies’ policies and procedures relating to the code of conduct rules between affiliates, on November 4, 2020, the PUCO initiated an additional corporate separation audit as a result of the FirstEnergy leadership transition announcement made on October 29, 2020, as further discussed below. The additional audit is to ensure compliance by the Ohio Companies and their affiliates with corporate separation laws and the Ohio Companies’ corporate separation plan. The additional audit is for the period from November 2016 through October 2020. The final audit report was filed on September 13, 2021. The audit report makes no findings of major non-compliance with Ohio corporate separation requirements, minor non-compliance with eight requirements, and findings of compliance with 23 requirements. Parties filed comments and reply comments on the audit report. The proceeding was stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner set a procedural schedule, which was vacated on March 15, 2024. A new procedural schedule will be set at an April 25, 2024 prehearing conference. In connection with an ongoing annual audit of the Ohio Companies’ Rider DCR for 2020, and as a result of disclosures in FirstEnergy’s Form 10-K for the year ended December 31, 2020 (filed on February 18, 2021), the PUCO expanded the scope of the audit on March 10, 2021, to include a review of certain transactions that were either improperly classified, misallocated, or lacked supporting documentation, and to determine whether funds collected from customers were used to pay the vendors, and if so, whether or not the funds associated with those payments should be returned to customers through Rider DCR or through an alternative proceeding. On August 3, 2021, the auditor filed its final report on this phase of the audit, and the parties submitted comments and reply comments on this audit report in October 2021. Additionally, on September 29, 2021, the PUCO expanded the scope of the audit in this proceeding to determine if the costs of the naming rights for FirstEnergy Stadium have been recovered from the Ohio Companies’ customers. On November 19, 2021, the auditor filed its final report, in which the auditor concluded that the FirstEnergy Stadium naming rights expenses were not recovered from Ohio customers. On December 15, 2021, the PUCO further expanded the scope of the audit to include an investigation into an apparent nondisclosure of a side agreement in the Ohio Companies’ ESP IV settlement proceedings, but stayed its expansion of the audit until otherwise ordered by the PUCO. The proceeding was stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the Rider DMR audit proceeding described above, further lifted the stay of the portion of the investigation relating to an apparent nondisclosure of a side agreement, and set a procedural schedule, which was vacated on March 15, 2024. A new procedural schedule will be set at a May 21, 2024 prehearing conference. On March 1, 2024, the Attorney Examiner issued an Entry in all four PUCO investigations that, among other things, precluded taking or offering the testimony of Charles E. Jones, Michael J. Dowling, or Samuel Randazzo through deposition or other means, or requiring these individuals to produce documents, in any PUCO proceeding, until otherwise ordered. On September 22, 2023, OCC filed an application for rehearing challenging the PUCO’s August 23, 2023, order to stay the pending HB 6 related matters above, which the PUCO denied on October 18, 2023. On November 17, 2023, OCC filed an application for rehearing challenging the October 18, 2023 entry to the extent the PUCO decided not to stay pending proceedings regarding ESP V as well as phases one and two of the Ohio Companies’ distribution grid modernization plans. On November 27, 2023, the Ohio Companies filed a memorandum contra OCC’s application for rehearing. In the fourth quarter of 2020, motions were filed with the PUCO requesting that the PUCO amend the Ohio Companies’ riders for collecting the OVEC-related charges required by HB 6 to provide for refunds in the event such provisions of HB 6 are repealed. Neither the Ohio Companies nor FE benefit from the OVEC-related charges the Ohio Companies collect. Instead, the Ohio Companies are further required by HB 6 to remit all the OVEC-related charges they collect to non-FE Ohio electric distribution utilities. The Ohio Companies contested the motions, which are pending before the PUCO. On May 15, 2023, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2022, which demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings. This matter remains pending before the PUCO. See Note 9, “Commitments, Guarantees and Contingencies” below for additional details on the government investigations and subsequent litigation surrounding the investigation of HB 6. PENNSYLVANIA The Pennsylvania Companies operated under rates approved by the PPUC, effective as of January 27, 2017. On January 1, 2024, each of the Pennsylvania Companies merged with and into FE PA. As a result of the PA Consolidation, FE PA will have five rate districts in Pennsylvania – four that correspond to the territories previously serviced by ME, PN, Penn, and WP and one rate district that corresponds to WP’s service provided to The Pennsylvania State University. The rate districts created by the PA Consolidation will not reach full rate unity until the earlier of 2033 or the conclusion of three base rate cases filed after January 1, 2025. Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, the Pennsylvania Companies implemented energy efficiency and peak demand reduction programs with demand reduction targets, relative to 2007-2008 peak demands, at 2.9% MW for ME, 3.3% MW for PN, 2.0% MW for Penn, and 2.5% MW for WP; and energy consumption reduction targets, as a percentage of the Pennsylvania Companies’ historic 2009 to 2010 reference load at 3.1% MWh for ME, 3.0% MWh for PN, 2.7% MWh for Penn, and 2.4% MWh for WP. The fourth phase of FE PA’s energy efficiency and peak demand reduction program, which runs for the five-year period beginning June 1, 2021 through May 31, 2026, was approved by the PPUC on June 18, 2020, providing through cost recovery of approximately $390 million to be recovered through Energy Efficiency and Conservation Phase IV Riders for each FE PA rate district. Pennsylvania EDCs are permitted to seek PPUC approval of an LTIIP for infrastructure improvements and costs related to highway relocation projects, after which a DSIC may be approved to recover LTIIP costs. On January 16, 2020, the PPUC approved the Pennsylvania Companies’ LTIIPs for the five-year period beginning January 1, 2020 and ending December 31, 2024 for a total capital investment of approximately $572 million for certain infrastructure improvement initiatives. FE PA expects to seek approval for the next phase of its LTIIP program by the end of the third quarter of 2024. Following the Pennsylvania Companies’ 2016 base rate proceedings, the PPUC ruled in a separate proceeding related to the DSIC mechanisms that the Pennsylvania Companies were not required to reflect federal and state income tax deductions related to DSIC-eligible property in DSIC rates. The decision was appealed to the Pennsylvania Supreme Court and in July 2021 the court upheld the Pennsylvania Commonwealth Court’s reversal of the PPUC’s decision and remanded the matter back to the PPUC for determination as to how DSIC calculations shall account for accumulated deferred income taxes and state taxes. The PPUC issued the order as directed. On May 5, 2023, FirstEnergy and Brookfield submitted applications to FERC and to the PPUC to facilitate the FET Equity Interest Sale. On May 12, 2023, the parties also filed an application with the VSCC, which was approved on June 20, 2023. On August 14, 2023, FERC issued an order approving the FET Equity Interest Sale. On November 24, 2023, CFIUS notified FET, Brookfield and the Abu Dhabi Investment Authority, as an indirect investor in FET through Brookfield, that it had determined that there were no unresolved national security issues and its review of the transaction was concluded. On November 29, 2023, the parties filed a settlement agreement recommending that the PPUC approve the transaction subject to the terms of the settlement, which includes among other things, a number of ring-fencing provisions and a commitment to improve transmission reliability over the next five years. The settlement was approved by the PPUC on March 14, 2024. The transaction closed on March 25, 2024. On April 2, 2024, FE PA filed a base rate case with the PPUC, based on a projected 2025 annual test year. The rate case requests a net increase in base distribution revenues of approximately $502 million with a return on equity of 11.3% and capital structure of 46.2% debt and 53.8% equity, and reflects a roll-in of several current riders such as DSIC, Tax Act and smart meter. The increase represents an overall net average rate increase in FE PA rates by approximately 7.7%, and a 10.5% average residential rate increase. Key components of the base rate case filing include a proposal to change pension and OPEB recovery to the delayed recognition method and to implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension and OPEB expense requested in the proceeding and the actual annual amount each year using this method. Additionally, FE PA requests recovery of certain incurred costs, including the impact of major storms, COVID-19, a program to convert streetlights to LEDs, and others. The PPUC issued an order on April 25, 2024, deferring, by operation of law, the June 1, 2024 statutory effective date to January 1, 2025. A pre-hearing conference is scheduled for May 2, 2024. A PPUC decision is expected in December 2024, with new rates becoming effective in January 2025. WEST VIRGINIA MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operate under WVPSC-approved rates. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the ENEC. MP’s and PE’s ENEC rate is updated annually. On August 31, 2023, MP and PE filed with the WVPSC their annual ENEC case requesting an increase in ENEC rates of $167.5 million beginning January 1, 2024, which represents a 9.9% increase in overall rates. This increase, which was driven primarily by higher fuel expenses, includes the approximate $92 million carried over from the 2022 ENEC proceeding and a portion of the approximately $267 million under recovery balance at the end of the review period (July 1, 2022 to June 30, 2023). The remaining $75.6 million of the under recovery balance not recovered in 2024 will be deferred for collection during 2025, with an annual carrying charge of 4%. A hearing was held on November 30, 2023, at which time a joint stipulation for settlement that was agreed to by |