COMMITMENTS AND CONTINGENCIES | COMMITMENTS AND CONTINGENCIES We have significant commitments and contingencies arising from our operations, including those related to unconditional purchase obligations, environmental matters, and enforcement and litigation matters. Unconditional Purchase Obligations We have obligations to distribute and sell electricity and natural gas to our customers and expect to recover costs related to these obligations in future customer rates. In order to meet these obligations, we routinely enter into long-term purchase and sale commitments for various quantities and lengths of time. Our minimum future commitments related to these purchase obligations as of March 31, 2022, were approximately $8.4 billion. Environmental Matters Consistent with other companies in the energy industry, we face significant ongoing environmental compliance and remediation obligations related to current and past operations. Specific environmental issues affecting us include, but are not limited to, current and future regulation of air emissions such as sulfur dioxide, NOx, fine particulates, mercury, and GHGs; water intake and discharges; management of coal combustion products such as fly ash; and remediation of impacted properties, including former manufactured gas plant sites. Air Quality Cross State Air Pollution Rule – Good Neighbor Plan The EPA is proposing to update and expand the Cross State Air Pollution Rule to regulate NOx emissions in 25 states as part of the “good neighbor provision." As part of the proposed rule, expected to take effect in May 2023, the EPA would establish a new trading budget that would impose lower NOx emissions budgets on states, at a level that the EPA determined to be achievable through existing emissions controls as well as planned plant retirements. Based on a review of our existing units' 2020 and 2021 actual ozone season emissions and projected future emissions versus proposed NOx ozone season allocations, we anticipate that we should be able to comply with the expanded rule requirements without procuring additional allowances on the open market. Our planned RICE units in Wisconsin are not subject to this rule as proposed as each unit is expected to be less than 25 MW. We will closely monitor whether the EPA expands coverage of the rule to sources between 15 MW and 25 MW in the final rule. National Ambient Air Quality Standards Ozone After completing its review of the 2008 ozone standard, the EPA released a final rule in October 2015, creating a more stringent standard than the 2008 NAAQS. The 2015 ozone standard lowered the 8-hour limit for ground-level ozone. In December 2020, the EPA completed its 5-year review of the ozone standard and issued a final decision to retain, without any changes, the existing 2015 standard. Under Executive Order 13990, the Biden Administration ordered that all agencies review existing regulations, orders, guidance documents, policies, and similar actions promulgated, issued, or adopted between January 20, 2017 and January 20, 2021. In October 2021, the EPA announced that it will reconsider the December 2020 decision to retain the 2015 ozone standards with no changes and that it is targeting the end of 2023 to complete this reconsideration. The EPA issued final nonattainment area designations for the 2015 ozone standard in April 2018. The following counties within our service territory were designated as partial nonattainment: Kenosha and Northern Milwaukee/Ozaukee. The area designations were challenged in the D.C. Circuit Court of Appeals in Clean Wisconsin et al. v. U.S. Environmental Protection Agency. A decision was issued in July 2020 remanding the rule to the EPA for further evaluation. As a result of the July 2020 remand, in June 2021, the EPA published its final action to revise the nonattainment area designations and/or boundaries for 13 counties associated with six nonattainment areas, including several in Wisconsin. Under the new designations, all of Milwaukee and Ozaukee counties are now listed as nonattainment and portions of Racine, Waukesha, and Washington counties have been added to the nonattainment area. Additionally, the Chicago, Illinois, Indiana, and Wisconsin nonattainment area now includes an expanded portion of Kenosha County. Preliminary 2019-2021 monitoring data indicates that the Milwaukee and Chicago nonattainment areas will likely be adjusted to "moderate" nonattainment for the 2015 standard. In February 2022, revisions to the Wisconsin Administrative Code to adopt the 2015 standard were finalized. The amended regulations adopted the standards and incorporated by reference the federal air pollution monitoring requirements related to the standard. We believe that we are well positioned to meet the requirements associated with the 2015 ozone standard and do not expect to incur significant costs to comply with the associated state and federal rules. Particulate Matter In December 2020, the EPA completed its 5-year review of the 2012 annual and 24-hour standards for fine particulate matter. The EPA determined that no revisions were necessary to the current standard. This determination was also subject to review under Executive Order 13990 and in June 2021, the EPA announced it would reconsider the December 2020 decision. Under the Biden Administration's policy review, the EPA concluded that the scientific evidence and information from the December 2020 determination supports revising the level of the annual standard for the particulate matter NAAQS to below the current level of 12 micrograms per cubic meter, while retaining the 24-hour standard. In March 2022, the EPA’s CASAC sent a letter to the EPA finalizing its peer review of the particulate matter standards. Based on their review, the majority of the members of the CASAC found that lowering the annual standard to within a range of 8 to 10 micrograms per cubic meter was appropriate, while a minority of the members of the committee found that a range of 10 to 11 micrograms per cubic meter would be appropriate. Additionally, a majority of the CASAC members favored lowering the 24-hour standard, while a minority concurred with EPA’s preliminary conclusion to retain the 24-hour standard without revision. A proposed rule is expected in summer 2022, and a final rule is expected in spring 2023. All counties within our service territory are in attainment with the current 2012 standards. If the EPA lowers the annual standard to 10 or 11 micrograms per cubic meter, our generating facilities within our service territory should remain in attainment. If the EPA lowers it to below 10 micrograms per cubic meter, there could be some non-attainment areas that may affect permitting of some smaller ancillary equipment located at our facilities. Climate Change The ACE rule, which replaced the Clean Power Plan, was vacated by the D.C. Circuit Court of Appeals in January 2021. In October 2021, the Supreme Court agreed to review the D.C. Circuit Court's ruling vacating the EPA's ACE rule. The Supreme Court is reviewing a number of issues regarding the scope of the EPA's regulatory authority to utilize Section 111(d) of the Clean Air Act to address CO 2 emissions. In February 2022, the Supreme Court heard oral arguments, and a decision is expected this summer. In January 2021, the EPA finalized a rule to revise the New Source Performance Standards for GHG emissions from new, modified, and reconstructed fossil-fueled power plants; however, it was vacated by the D.C. Circuit Court of Appeals in April 2021. The EPA has signaled that a rule replacement is expected by the end of 2022. WEC Energy Group continues to move forward on the ESG Progress Plan, which is heavily focused on reducing GHG emissions. The ESG Progress Plan includes the retirement of older, fossil-fueled generation, to be replaced with zero-carbon-emitting renewables and clean natural gas-fueled generation. We have already retired approximately 1,500 MW of coal-fired generation since the beginning of 2018. Through its ESG Progress Plan, WEC Energy Group expects to retire approximately 1,600 MW of additional fossil-fueled generation by the end of 2025, which includes the planned retirements in 2023-2024 of OCPP Units 5-8. In May 2021, WEC Energy Group announced goals to achieve reductions in carbon emissions from its electric generation fleet by 60% by the end of 2025 and by 80% by the end of 2030, both from a 2005 baseline. WEC Energy Group expects to achieve these goals by making operating refinements, retiring less efficient generating units, and executing its capital plan. Over the longer term, the target for WEC Energy Group's generation fleet is net-zero CO 2 emissions by 2050. WEC Energy Group also continues to reduce methane emissions by improving its natural gas distribution systems. WEC Energy Group set a target across its natural gas distribution operations to achieve net-zero methane emissions by the end of 2030. WEC Energy Group plans to achieve its net-zero goal through an effort that includes both continuous operational improvements and equipment upgrades, as well as the use of RNG throughout its utility systems. We are required to report our CO 2 equivalent emissions from the electric generating facilities we operate under the EPA Greenhouse Gases Reporting Program. We reported CO 2 equivalent emissions of 15.6 million metric tonnes to the EPA for 2021. The level of CO 2 and other GHG emissions varies from year to year and is dependent on the level of electric generation and mix of fuel sources, which is determined primarily by demand, the availability of the generating units, the unit cost of fuel consumed, and how our units are dispatched by MISO. We are also required to report CO 2 equivalent emissions related to the natural gas that our natural gas operations distribute and sell. We reported aggregated CO 2 equivalent emissions of 3.8 million metric tonnes to the EPA for 2021. Water Quality Clean Water Act Cooling Water Intake Structure Rule In August 2014, the EPA issued a final regulation under Section 316(b) of the Clean Water Act that requires the location, design, construction, and capacity of cooling water intake structures at existing power plants to reflect the BTA for minimizing adverse environmental impacts. The federal rule became effective in October 2014 and applies to all of our existing generating facilities with cooling water intake structures, except for the ERGS units, which were permitted and received a final BTA determination under the rules governing new facilities. In 2016, the WDNR initiated a state rulemaking process to incorporate the federal Section 316(b) requirements into the Wisconsin Administrative Code. This new state rule, NR 111, became effective in June 2020, and the WDNR will apply it when establishing BTA requirements for cooling water intake structures at existing facilities. These BTA requirements are incorporated into WPDES permits for our facilities. We have received a final BTA determination for Valley power plant. We have received interim BTA determinations for PWGS and OCPP Units 5-8. We believe that existing technology at the PWGS satisfies the BTA requirements; however, a final determination will not be made until the WPDES permit is renewed for this facility, which is expected to be by the third quarter of 2022. We also believe that existing technology installed at the OCPP facility meets the BTA requirements; however, it is anticipated that these four generating units will be retired prior to the WDNR making a final BTA decision. As a result of past capital investments completed to address Section 316(b) compliance, we believe our fleet overall is well positioned to continue to meet this regulation and do not expect to incur significant additional compliance costs. Steam Electric Effluent Limitation Guidelines The EPA's final 2015 ELG rule took effect in January 2016 and was modified in 2020 to revise the treatment technology requirements related to BATW and wet FGD wastewaters at existing facilities. This rule created new requirements for several types of power plant wastewaters. The two new requirements that affect us relate to discharge limits for BATW and wet FGD wastewater. Our power plant facilities already have advanced wastewater treatment technologies installed that meet many of the discharge limits established by this rule. Modifications to OC 7 and OC 8 were completed and placed in-service in mid-2021. Wastewater treatment system modifications also will be required for wet FGD discharges and site wastewater from the ERGS units. Based on engineering cost estimates, we expect that compliance with the ELG rule will require an additional $90 million in capital investment. In December 2021, the PSCW Division of Energy Regulation and Analysis issued a Certificate of Authority approving the ERGS FGD wastewater treatment system modification. The BATW modifications do not require PSCW approval prior to construction. All of these ELG required projects are either in-service or are on track for completion by the WPDES permit deadline in December 2023. In July 2021, the EPA announced that it intends to initiate rulemaking to revise the ELG Rule as modified in 2020. The EPA has stated that the ELG Rule will continue to be implemented and enforced while the agency pursues this rulemaking process. The EPA plans to propose a revised rule in the fall of 2022. Waters of the United States In December 2021, the EPA and the United States Army Corps of Engineers together released a proposed rule to repeal the April 2020 Navigable Waters Protection Rule that defined WOTUS. The purpose of this proposed rule will be to restore regulations defining WOTUS that were in place prior to 2015 and to update certain provisions to be consistent with relevant Supreme Court decisions. The pre-2015 approach involves applying factors established through case law and agency precedents to determine whether a wetland or surface drainage feature is subject to federal jurisdiction. In January 2022, the Supreme Court granted certiorari in a case to evaluate the proper test for determining whether wetlands are WOTUS. At this point, our projects requiring federal permits are moving ahead, but we are monitoring to better understand potential future impacts. This case, once decided, should provide clarity regarding the definition of WOTUS. We will continue to monitor this litigation and any subsequent agency action. Land Quality Manufactured Gas Plant Remediation We have identified sites at which we or a predecessor company owned or operated a manufactured gas plant or stored manufactured gas. We have also identified other sites that may have been impacted by historical manufactured gas plant activities. We are responsible for the environmental remediation of these sites. We are also working with the state of Wisconsin in our investigation and remediation planning. These sites are at various stages of investigation, monitoring, remediation, and closure. The future costs for detailed site investigation, future remediation, and monitoring are dependent upon several variables including, among other things, the extent of remediation, changes in technology, and changes in regulation. Historically, our regulators have allowed us to recover incurred costs, net of insurance recoveries and recoveries from potentially responsible parties, associated with the remediation of manufactured gas plant sites. Accordingly, we have established regulatory assets for costs associated with these sites. We have established the following regulatory assets and reserves for manufactured gas plant sites: (in millions) March 31, 2022 December 31, 2021 Regulatory assets $ 16.4 $ 16.8 Reserves for future environmental remediation (1) 10.7 10.7 (1) Recorded within other long-term liabilities on our balance sheets. Enforcement and Litigation Matters We are involved in legal and administrative proceedings before various courts and agencies with respect to matters arising in the ordinary course of business. Although we are unable to predict the outcome of these matters, management believes that appropriate reserves have been established and that final settlement of these actions will not have a material impact on our financial condition or results of operations. |