COMMITMENTS AND CONTINGENCIES | COMMITMENTS AND CONTINGENCIES We have significant commitments and contingencies arising from our operations, including those related to unconditional purchase obligations, environmental matters, and enforcement and litigation matters. Unconditional Purchase Obligations We have obligations to distribute and sell electricity and natural gas to our customers and expect to recover costs related to these obligations in future customer rates. In order to meet these obligations, we routinely enter into long-term purchase and sale commitments for various quantities and lengths of time. Our minimum future commitments related to these purchase obligations as of March 31, 2024, were approximately $7.1 billion. Environmental Matters Consistent with other companies in the energy industry, we face significant ongoing environmental compliance and remediation obligations related to current and past operations. Specific environmental issues affecting us include, but are not limited to, current and future regulation of air emissions such as sulfur dioxide, NOx, fine particulates, mercury, and GHGs; water intake and discharges; management of coal combustion products such as fly ash; and remediation of impacted properties, including former manufactured gas plant sites. Air Quality Cross State Air Pollution Rule – Good Neighbor Plan In March 2023, the EPA issued its final Good Neighbor Plan, which became effective in August 2023 and requires significant reductions in ozone-forming emissions of NOx from power plants and industrial facilities. After review of the final rule, we are well positioned to meet the requirements. Our RICE units in Wisconsin are not currently subject to the final rule as each unit is less than 25 MWs. To the extent we use RICE engines for natural gas distribution operations, those engines not part of an LDC are subject to the emission limits and operational requirements of the rule beginning in 2026. The EPA has exempted LDCs from the final rule. Mercury and Air Toxics Standards In 2012, the EPA issued the MATS to limit emissions of mercury, acid gases, and other hazardous air pollutants. In April 2023, the EPA issued the pre-publication version of a proposed rule to strengthen and update MATS to reflect recent developments in control technologies and performance of coal and oil-fired units. The EPA proposed three revisions including a proposal to lower the PM limit from 0.03 lb/MMBtu to 0.01 lb/MMBtu. The EPA also sought comments on an even lower limit of 0.006 lb/MMBtu. Adoption of either of these lower limits could have an adverse effect on our operations. The EPA issued a final rule in April 2024, and we are currently evaluating the impact, if any, on our operations. National Ambient Air Quality Standards Ozone After completing its review of the 2008 ozone standard, the EPA released a final rule in October 2015, creating a more stringent standard than the 2008 NAAQS. The 2015 ozone standard lowered the 8-hour limit for ground-level ozone. In November 2022, the EPA's 2022 CASAC Ozone Review Panel issued a draft report supporting the reconsideration of the 2015 standard. The EPA staff initially issued a draft Policy Assessment in March 2023 that supported the reconsideration; however, in August 2023, the EPA announced that it is instead restarting its ozone standard evaluation. The EPA has indicated it plans to release its Integrated Review Plan in fall 2024. This new review is anticipated to take 3 to 5 years to complete. In February 2022, revisions to the Wisconsin Administrative Code to adopt the 2015 standard were finalized. The amended regulations incorporated by reference the federal air pollution monitoring requirements related to the standard. The WDNR submitted the rule updates as a SIP revision to the EPA, which the EPA approved in February 2023. The effective date for the initial nonattainment area designation was August 2018 and the attainment status is evaluated every three years thereafter until attainment is achieved. The Milwaukee, Sheboygan, and Chicago, IL-IN-WI nonattainment areas did not meet the marginal attainment deadline of August 2021, so in April 2022 the EPA proposed "moderate" nonattainment status for the 2015 standard. In October 2022, the EPA published its final reclassifications from "marginal" to "moderate" for these areas, effective November 7, 2022. Accordingly, the WDNR submitted a SIP revision to the EPA in December 2022 to address the moderate nonattainment status. In October 2023, the EPA found that 11 states, including Wisconsin, failed to submit adequate SIP revisions to address nonattainment areas classified as "moderate" for the 2015 standard. This action triggered a May 2025 deadline for states to get their SIP approved or the EPA will issue a federal implementation plan. Additionally, offset sanctions will take effect in 18 months if the SIP is not approved. The offset sanctions impact volatile organic compound and NOx emissions from new or modified sources in the nonattainment areas. The WDNR intends to submit a SIP revision by the May 2025 deadline. The next attainment evaluation date is August 2024. If the moderate attainment deadline is not met, the EPA will propose the nonattainment areas in Wisconsin be redesignated as serious nonattainment based on 2021-2023 data. We are currently evaluating the impacts of the potential nonattainment redesignation on our operations. Particulate Matter All counties within our service territory are in attainment with current 2012 standards for fine PM2.5. Under the Biden Administration's policy review, the EPA concluded that the scientific evidence and information from a December 2020 review of the 2012 standards supported revising the level of the annual standard for the PM2.5 NAAQS to below the current level of 12 µg/m 3 , while retaining the 24-hour standard of 35 µg/m 3 . On February 7, 2024, the EPA finalized a rule which lowered the primary (health-based) annual PM2.5 NAAQS to 9 µg/m 3 . The secondary (welfare-based) PM2.5 standard and 24-hour standards (both primary and secondary) remain unchanged. The EPA has until May 2026 to designate areas as attainment and nonattainment with the new standard. The WDNR will need to draft and submit a SIP for the EPA's approval. The potential nonattainment status could impact future permitting activities for facilities in applicable locations. The impacts include the potential need for improved or new air pollution control equipment. As we transition to natural gas, this new standard is expected to have less of an impact on our units. Climate Change In May 2023, the EPA proposed GHG performance standards for existing fossil-fired steam generating and gas combustion units and also proposed to repeal the Affordable Clean Energy rule, which had replaced the Clean Power Plan. For coal plants, no standards would apply under the proposed version of the rule until 2032, and after 2032 the applicable standard would depend on the unit's retirement date. For combined cycle natural gas plants above a 50% capacity factor, the proposed rule is highly dependent on the use of hydrogen as an alternative fuel, and on carbon capture technology. For simple cycle natural gas-fired combustion turbines, the proposed version of the rule does not include applicable limits as long as the capacity factor is less than 20%. Our new Weston RICE project is not affected under the rule because each RICE unit is less than 25 MWs. The EPA issued a final rule in April 2024, and we are currently evaluating the impact, if any, on our operations. In May 2023, the EPA also proposed to revise the New Source Performance Standards for GHG emissions from new, modified, and reconstructed fossil-fueled power plants. The EPA is proposing two distinct 111(b) rules – one for natural gas-fired stationary combustion turbines and the other for coal-fired units. New natural gas stationary combustion turbine units would be divided into three subcategories based on their annual capacity factor – low load, intermediate load, and base load. Our RICE units are not affected by this rule since each unit is below 25 MWs. WEC Energy Group's ESG Progress Plan is heavily focused on reducing GHG emissions. In March 2024, the EPA announced it had removed regulations on existing natural gas combustion turbines from the rule. The EPA had indicated it intends to draft a new rule for existing natural gas units in the near future. A non-regulatory docket has been opened by the EPA for this new rulemaking. The EPA anticipates a final rule in the second quarter of 2024. The EPA released proposed regulations for the Mandatory Greenhouse Gas Reporting Rule, 40 Code of Federal Regulations Part 98, in June 2022. In May 2023, the EPA released a supplementary proposal, which includes updates of the global warming potentials to determine CO 2 equivalency for threshold reporting and the addition of a new section regarding energy consumption. The proposed revisions could impact the reporting required for our electric generation facilities and LDC. In August 2023, the EPA also issued its proposed updates to amend reporting requirements for petroleum and natural gas systems. The EPA has indicated it anticipates a final rule in the second quarter of 2024. We cannot estimate the potential impact of the proposed rule on our operations until the rule is final. The ESG Progress Plan includes the retirement of older, fossil-fueled generation, to be replaced with zero-carbon-emitting renewables and clean natural gas-fueled generation. We have already retired approximately 1,500 MWs of fossil-fueled generation since the beginning of 2018. WEC Energy Group expects to retire approximately 1,800 MWs of additional fossil-fueled generation by the end of 2031, which includes the planned retirements in 2024-2025 of OCPP Units 5-8. See Note 6, Property, Plant, and Equipment, for more information related to these planned power plant retirements. In May 2021, WEC Energy Group announced goals to achieve reductions in carbon emissions from its electric generation fleet by 60% by the end of 2025 and by 80% by the end of 2030, both from a 2005 baseline. WEC Energy Group expects to achieve these goals by continuing to make operating refinements, retiring less efficient generating units, and executing its capital plan. Over the longer term, the target for WEC Energy Group's generation fleet is to be net carbon neutral by 2050. WEC Energy Group also continues to reduce methane emissions by improving its natural gas distribution systems, and has set a target across its natural gas distribution operations to achieve net-zero methane emissions by the end of 2030. WEC Energy Group plans to achieve its net-zero goal through an effort that includes both continuous operational improvements and equipment upgrades, as well as the use of RNG throughout its natural gas utility distribution systems. Water Quality Clean Water Act Cooling Water Intake Structure Rule Section 316(b) of the CWA became effective in October 2014 and requires the location, design, construction, and capacity of cooling water intake structures at existing power plants reflect the BTA for minimizing adverse environmental impacts. The rule applies to all of our existing generating facilities with cooling water intake structures, except for the ERGS units, which were permitted and received a final BTA determination under the rules governing new facilities. Effective in June 2020, the requirements of federal Section 316(b) of the CWA were incorporated into the Wisconsin Administrative Code. The WDNR applies this rule when establishing BTA requirements for cooling water intake structures at existing facilities. These BTA requirements are incorporated into WPDES permits for our facilities. We have received final or interim BTA determinations for all applicable generation facilities. Steam Electric Effluent Limitation Guidelines The EPA's ELG rule, effective January 2016 and modified in 2020, revised the treatment technology requirements related to BATW and wet FGD wastewaters at existing coal-fueled facilities and created new requirements for several types of power plant wastewaters. The two requirements that affect us relate to discharge limits for BATW and wet FGD wastewater. Although our coal-fueled facilities already have advanced wastewater treatment technologies installed that meet many of the discharge limits established by this rule, certain facility modifications were still necessary to meet all of the ELG rule requirements. Through 2023, compliance costs associated with the ELG rule required $97 million in capital investment. In March 2023, the EPA issued the proposed "supplemental ELG rule." The rule would replace the existing 2020 ELG rule and, as proposed, would establish stricter limitations on: 1) BATW; 2) FGD wastewater; 3) CCR leachate; and 4) legacy wastewaters. The most significant proposed ELG rule change is a ZLD requirement for FGD wastewater. Under the proposed rule, this new ZLD requirement must be met by a date determined by the WDNR that is as soon as possible beginning 60 days following publication of the final rule, but no later than December 31, 2029. The proposed rule would also create a subcategory for "early adopters" that have already installed a compliant biological treatment system by the date of the proposed rule. Early adopters would not be required to install further FGD wastewater treatment, provided the facility owner also agrees to permanently cease combustion of coal by December 31, 2032. Although the $89 million biological treatment system at ERGS is complete and was placed in service in December 2023 to meet the WPDES permit deadline, the timing of the project's completion did not comply with the deadline proposed by the EPA to qualify for the early adopter status. In addition, we do not believe that the biological treatment system would be compliant with the additional ZLD FGD wastewater treatment requirements as proposed. The EPA issued a final rule in April 2024, and we are currently evaluating the impact, if any, on our operations. If the supplemental ELG rule is finalized as proposed, we anticipate that our coal-fueled facilities, including ERGS Units 1 and 2 that were built with ELG-compliant dry BA transport systems, will meet the BATW rule provisions. The EPA also proposed requirements for legacy wastewaters and landfill leachate. We have reviewed the proposed requirements to determine potential costs and actions required for our facilities. We submitted comments to the EPA regarding these proposed requirements. Land Quality Manufactured Gas Plant Remediation We have identified sites at which we or a predecessor company owned or operated a manufactured gas plant or stored manufactured gas. We have also identified other sites that may have been impacted by historical manufactured gas plant activities. We are responsible for the environmental remediation of these sites. We are also working with the state of Wisconsin in our investigation and remediation planning. These sites are at various stages of investigation, monitoring, remediation, and closure. The future costs for detailed site investigation, future remediation, and monitoring are dependent upon several variables including, among other things, the extent of remediation, changes in technology, and changes in regulation. Historically, our regulators have allowed us to recover incurred costs, net of insurance recoveries and recoveries from potentially responsible parties, associated with the remediation of manufactured gas plant sites. Accordingly, we have established regulatory assets for costs associated with these sites. We have established the following regulatory assets and reserves for manufactured gas plant sites: (in millions) March 31, 2024 December 31, 2023 Regulatory assets $ 11.7 $ 12.2 Reserves for future environmental remediation (1) 10.3 10.3 (1) Recorded within other long-term liabilities on our balance sheets. Coal Combustion Residuals Rule The EPA issued a pre-publication proposed rule for CCR in May 2023, that would apply to landfills, historic fill sites, and projects where CCR was placed at a power plant site. As proposed, the rule would regulate previously exempt closed landfills. We are actively engaged with our trade organizations and provided them information to include in their comments to the EPA. The EPA issued a final rule in April 2024, and we are currently evaluating the impact, if any, on our operations. The rule could have a material adverse impact on our coal ash landfills and require additional remediation that has not been required under the current state programs; however, we expect the cost of any additional remediation would be recovered through future rates. Enforcement and Litigation Matters We are involved in legal and administrative proceedings before various courts and agencies with respect to matters arising in the ordinary course of business. Although we are unable to predict the outcome of these matters, management believes that appropriate reserves have been established and that final settlement of these actions will not have a material impact on our financial condition or results of operations. |