Free signup for more
- Track your favorite companies
- Receive email alerts for new filings
- Personalized dashboard of news and more
- Access all data and search results
Content analysis
?Positive | ||
Negative | ||
Uncertain | ||
Constraining | ||
Legalese | ||
Litigous | ||
Readability |
8th grade Avg
|
New words:
ACO, AECO, apportionment, arbitrarily, ARO, arose, bare, BBB, breach, breakdown, Budget, capriciously, certainty, Cheyenne, Citigroup, citizen, civil, closed, closing, Colorado, ColumbiaGrid, commensurate, commensurately, Consumer, contended, correspondingly, creditworthy, Curve, cut, declaratory, decommission, decommissioning, decoupling, demolishing, demolition, demonstrating, DEQ, deter, DETM, differential, disconnect, discourage, dominant, EA, error, eventual, face, flu, forfeiture, global, great, groundwater, hatchery, heavily, Horizon, impending, inaccurate, incumbent, incurrence, indeterminable, Joseph, Kelliher, lack, Lante, Lehman, live, mediation, Microsoft, mild, milder, Mirant, misconduct, momentum, mortality, nameplate, nationwide, noise, Nonqualified, NOPA, OATT, overstated, pandemic, partly, Paso, pipe, preliminarily, prepaid, prescribed, prompt, PTC, PUHCA, purge, rata, raw, rebalance, recurrence, remodeling, repealed, Retrofit, rollover, segregated, session, shell, Shirley, Simultaneously, situated, situation, size, southeastern, spare, spectrum, speed, spent, statute, steel, stochastic, stretch, stringent, suffer, takeover, Terrorist, threatened, timeframe, turnaround, underwriting, unexpected, unfounded, unhedged, unknown, unprotected, unregulated, unrelated, Unresolved, unscheduled, unsuccessful, vendor, visibility, VP, Wachovia, Warranty, wastewater, wheat, withdrew, wood
Removed:
adding, amortizable, applying, authorization, authorizing, bad, boring, bridge, cable, Cablecure, cancellation, cathodic, conventional, copper, deadline, declining, deductible, directional, drilling, duct, entry, Eurodollar, excavation, expended, fabrication, fiberoptic, Field, fine, fleet, formation, fragmented, grantor, hand, hydrostatic, indemnity, inspection, installation, installing, maturing, measure, merger, meter, moderate, multiplying, NA, nationally, necessarily, Nino, Orcom, Origination, overcollection, overhead, patented, petroleum, priced, product, reading, rebuild, rebuilding, rehabilitation, remand, remitted, requiring, restoring, retiree, revitalization, shown, smaller, soil, specialty, strength, substation, surcharge, taxesdecreased, undercollection, vacuum, virtually, worth
Filing tables
Filing exhibits
- 10-K Annual report
- 12.1 Statement Setting Forth Computation of Ratios of Earnings to Fixed Charges of Puget Energy (2001 Through 2005)
- 12.2 Statement Setting Forth Computation of Ratios of Earnings to Fixed Charges of Puget Sound Energy (2001 Through 2005)
- 21.1 Subsidiaries of Puget Energy
- 21.2 Subsidiaries of Pse
- 23.1 Consent of Pricewaterhousecoopers LLP
- 31.1 Certification of Puget Energy - Certification Pursuant to 18 U.s.c. Section 1350, As Adopted Pursuant to Section 302 of the Sarbanes-oxley Act of 2002 - Stephen P. Reynolds
- 31.2 Certification of Puget Energy - Certification Pursuant to 18 U.s.c. Section 1350, As Adopted Pursuant to Section 302 of the Sarbanes-oxley Act of 2002 - Bertrand A. Valdman
- 31.3 Certification of Puget Sound Energy - Certification Pursuant to 18 U.s.c. Section 1350, As Adopted Pursuant to Section 302 of the Sarbanes-oxley Act of 2002 - Stephen P. Reynolds
- 31.4 Certification of Puget Sound Energy - Certification Pursuant to 18 U.s.c. Section 1350, As Adopted Pursuant to Section 302 of the Sarbanes-oxley Act of 2002 - Bertrand A. Valdman
- 32.1 Certification Pursuant to 18 U.s.c. Section 1350, As Adopted Pursuant to Section 906 of the Sarbanes-oxley Act of 2002 - Stephen P. Reynolds
- 32.2 Certification Pursuant to 18 U.s.c. Section 1350, As Adopted Pursuant to Section 906 of the Sarbanes-oxley Act of 2002 - Bertrand A. Valdman
- 4.22 Thirty-second Supplemental Indenture Dated April 1, 2005, Defining the Rights of the Holders of Pse's First Mortgage Bond.
- 4.23 Thirty-third Supplemental Indenture Dated April 27, 2005, Defining the Rights of the Holders of Pse's First Mortgage Bond.
- 4.30 Eighty-second Supplemental Indenture Dated As of April 27, 2005, Defining the Rights of the Holders of Pse's First Mortgage Bonds.
- PDF 10-K for the Fiscal Year Ended December 31, 2005 PDF Version
Related press release
PSD similar filings
Filing view
External links