Regulation and Rates | Regulation and Rates Regulatory Assets and Liabilities Regulatory accounting allows PSE to defer certain costs that would otherwise be charged to expense, if it is probable that future rates will permit recovery of such costs. It similarly requires deferral of revenues or gains that are expected to be returned to customers in the future. The net regulatory assets and liabilities at December 31, 2020, and 2019, included the following: Puget Sound Energy Remaining Amortization Period December 31, (Dollars in Thousands) 2020 2019 Storm damage costs electric 5 years $ 108,491 $ 121,894 Environmental remediation (a) 102,647 68,486 Decoupling deferrals and interest (b) Less than 2 years 88,504 43,509 PGA receivable 2 years 87,655 132,766 PCA mechanism N/A 82,801 41,745 Chelan PUD contract initiation 10.8 years 76,787 83,875 Deferred Washington Commission AFUDC 30 years 59,763 57,553 Lower Snake River 16.4 years 58,442 62,899 Baker Dam licensing operating and maintenance costs (c) 54,354 56,427 Get to zero depreciation expense deferral N/A 53,236 22,148 Unamortized loss on reacquired debt 1 to 47 years 37,991 40,177 Property tax tracker Less than 2 years 24,860 22,442 Advanced metering infrastructure (a) 22,652 14,845 Generation plant major maintenance, excluding Colstrip 3 to 10 years 10,494 12,744 Mint Farm ownership and operating costs 4.3 years 8,318 10,318 Energy conservation costs (a) 8,009 25,272 Snoqualmie licensing operating and maintenance costs (c) 7,435 7,442 Water heater rental property loss N/A 6,973 — Colstrip major maintenance (d) 4,335 2,929 Washington Commission electric vehicle N/A 3,641 1,430 Colstrip common property 3.4 years 2,472 3,188 White River relicensing and other costs 0.0 years — 6,399 Various other regulatory assets (a) 8,247 9,044 Total PSE regulatory assets $ 918,107 $ 847,532 Deferred income taxes (f) N/A (953,987) (946,936) Cost of removal (e) (508,707) (469,922) Repurposed production tax credits N/A (79,581) (24,823) Production tax credits (f) (47,094) (85,323) Treasury grants 3 years (43,164) (101,981) Decoupling liability Less than 2 years (16,448) (8,500) Green direct N/A (14,313) (2,421) Gain on Sale Shuffleton N/A (11,131) (12,483) Microsoft special contract regulatory liability N/A — (12,661) Various other regulatory liabilities (a) (10,796) (11,500) Total PSE regulatory liabilities (1,685,221) (1,676,550) PSE net regulatory assets (liabilities) $ (767,114) $ (829,018) __________________ (a) Amortization periods vary depending on timing of underlying transactions. (b) Decoupling deferrals and interest includes a 24 month GAAP reserve of $(8.0) million. (c) The FERC license requires PSE to incur various O&M expenses over the life of the 40 year and 50 year license for Snoqualmie and Baker, respectively. The regulatory asset represents the net present value of future expenditures and will be offset by actual costs incurred. (d) Amortization to be determined in a future rate filing. (e) The balance is dependent upon the cost of removal of underlying assets and the life of utility plant. (f) Amortize as PTCs are utilized by PSE on its tax return. (g) For additional information, see Note 14,"Income Taxes" to the consolidated financial statements included in Item 8 of this report. Puget Energy Remaining Amortization Period December 31, (Dollars in Thousands) 2020 2019 Total PSE regulatory assets (a) $ 918,107 $ 847,532 Puget Energy acquisition adjustments: Regulatory assets related to power contracts 5 to 32 years 11,728 14,146 Total Puget Energy regulatory assets 929,835 861,678 Total PSE regulatory liabilities (a) (1,685,221) (1,676,550) Puget Energy acquisition adjustments: Deferred income taxes 713 757 Regulatory liabilities related to power contracts 5 to 32 years (95,774) (156,597) Various other regulatory liabilities Varies (1,264) (1,265) Total Puget Energy regulatory liabilities (1,781,546) (1,833,655) Puget Energy net regulatory asset (liabilities) $ (851,711) $ (971,977) ____________________ (a) Puget Energy’s regulatory assets and liabilities include purchase accounting adjustments under ASC 805. If the Company determines that it no longer meets the criteria for continued application of ASC 980, the Company would be required to write-off its regulatory assets and liabilities related to those operations not meeting ASC 980 requirements. Discontinuation of ASC 980 could have a material impact on the Company's financial statements. In accordance with guidance provided by ASC 410, “Asset Retirement and Environmental Obligations (ARO),” PSE reclassified from accumulated depreciation to a regulatory liability $508.7 million and $469.9 million in 2020 and 2019, respectively, for the cost of removal of utility plant. These amounts are collected from PSE’s customers through depreciation rates. Power Cost Only Rate Case On December 9, 2020, PSE filed its 2020 power cost only rate case (PCORC). The filing proposed an increase of $78.5 million (or an average of approximately 3.7%) in the Company's overall power supply costs with an anticipated effective date in June 2021. On February 2, 2021, PSE supplemented the PCORC to update its power costs, leading to a requested increase from $78.5 million to $88.0 million (or an average of approximately 4.1%). General Rate Case Filing PSE filed a GRC with the Washington Commission on June 20, 2019, requesting an overall increase in electric and natural gas rates of 6.9% and 7.9% respectively. PSE requested a return on equity of 9.8% with an overall rate of return of 7.62%. In addition to the traditional areas of focus (revenue requirements, cost allocation, rate design and cost of capital), the Company completed an attrition study and included a portion of the attrition revenue requirement in the overall request in order address the expected regulatory lag in the rate year. Additionally, as the non-plant related excess deferred taxes that resulted from the Tax Cuts and Jobs Act (TCJA) remained outstanding from PSE’s Expedited Rate Filing (ERF) as discussed below, PSE requested in its GRC to pass back the amounts over four years. On September 17, 2019, PSE filed a supplemental filing in the GRC, which provided updates as discussed in our original filing, but did not impact the requested overall electric and natural gas rate increases, return on equity or overall rate of return as originally filed. On January 15, 2020, PSE filed rebuttal testimony which included a reduction to the requested return on equity to 9.5%, which decreased the rate of return to 7.48%. The requested rate increase for both electric and natural gas remained at 6.9% and 7.9%, respectively. For both electric and natural gas PSE did not originally request its full attrition adjustment; therefore, the decrease in return on equity led to a reduction in the electric rate increase of only $1.5 million and did not have an impact on the natural gas rate increase. On July 8, 2020, the Washington Commission issued its order on PSE’s GRC. The ruling provided for a weighted cost of capital of 7.39% or 6.8% after-tax, and a capital structure of 48.5% in common equity with a return on equity of 9.4%. The order also resulted in a combined net increase to electric of $29.5 million, or 1.6%, and to natural gas of $36.5 million, or 4.0%. However, the Washington Commission extended the amortization of certain regulatory assets, PSE’s electric decoupling deferral, and PSE’s PGA deferral to mitigate the impact of the rate increase in response to the economic instability created by the COVID-19 pandemic, which reduced the electric revenue increase to approximately $0.9 million, or 0.05% and the natural gas increase to $1.3 million, or 0.15%. The Washington Commission also determined that the Company’s proposed attrition adjustment of $23.9 million for electric and $16.2 million for natural gas was not in the public interest at this time. The order also effectively ends the deferral of depreciation expense associated with PSE’s advanced metering infrastructure (AMI) investment while allowing the deferral on the return on AMI investments through December 31, 2019. Additional AMI investments will be evaluated in future proceedings for deferrals of return until the AMI project is complete. On July 17, 2020, PSE filed a motion for clarification with the Washington Commission seeking clarification on several items. On July 31, 2020, the Washington Commission issued an order granting PSE’s motion for clarification. The ruling adjusted certain items from the final order issued on July 8, 2020, which led to a combined net increase to electric of $59.6 million, or 2.9%, an increase of $30.1 million above the $29.5 million granted in the final order. The order also led to a combined net increase to natural gas of $42.9 million, or 5.6%, an increase of $6.4 million above the $36.5 million granted in the final order. The Washington Commission maintained adjustments which mitigated the impacts of the rate increases in response to the economic instability created by the COVID-19 pandemic, which reduced the electric revenue increase to approximately $27.7 million, or 1.3% and the natural gas increase to $0.2 million, or 0.02%. On August 6, 2020, PSE filed a petition for judicial review with the Superior Court of the State of Washington for King County (Superior Court) challenging the portion of the final order that requires PSE to pass back to customers the reversal of plant-related excess deferred income taxes in a manner that may deviate from the Internal Revenue Service (IRS) normalization and consistency rules. On August 7, 2020, PSE filed a motion to stay with the Superior Court related to the portions of the final order under judicial review. On September 14, 2020, the Superior Court denied PSE's motion to stay. PSE reviewed the original Washington Commission order including the ramifications of certain tax issues and requested a Private Letter Ruling (PLR) with the IRS regarding this matter. PSE will continue to utilize the average rate assumption method (ARAM) in the turnaround of certain accelerated tax depreciation benefits on PSE assets. On September 23, 2020, PSE filed a compliance filing with the Washington Commission. The natural gas tariffs became effective October 1, 2020 and the electric tariffs on October 15, 2020. On October 7, 2020, PSE, the Washington Commission and interveners agreed to dismiss the petition for judicial review. The agreement is based on a commitment from the Washington Commission that if the IRS ruling finds that the Washington Commission’s methodology for reversing plant-related excess deferred income taxes is impermissible, the Washington Commission will open a proceeding to review and enact the changes required by the IRS ruling. There is approximately $25.6 million in annual revenue requirement related to the 2019 GRC which PSE has requested it be allowed to track in order to allow the Washington Commission to decide if it is appropriate for PSE to recover, pending the outcome of the IRS ruling. Expedited Rate Filing Rate Adjustment On November 7, 2018, PSE filed an ERF with the Washington Commission. The filing requested to change rates associated with PSE’s delivery and fixed production costs. It did not include variable power costs, purchased gas costs or natural gas pipeline replacement program costs, which are recovered in separate mechanisms. The filing was based on historical test year costs and rate base, and followed the reporting requirements of a Commission Basis Report, as defined by the Washington Administrative Code, but used end of period rate base and certain annualizing adjustments. It did not include any forward-looking or pro-forma adjustments. Included in the filing was a reduction to the overall authorized rate of return from 7.6% to 7.49% to recognize a reduction in debt costs associated with recent debt activity. PSE requested an overall increase in electric rates of $18.9 million annually, which is a 0.9% increase, and an overall increase in natural gas rates of $21.7 million annually, which is a 2.7% increase. On January 22, 2019, all parties in the proceeding reached an agreement on settlement terms that resolved all issues in the filing. The settlement agreement was filed on January 30, 2019. The parties agreed to a $21.5 million rate increase for natural gas and no rate increase for electric which became effective March 1, 2019. As is discussed below, these rates include the offsetting effect of passing back to customers plant related excess deferred income taxes that resulted from the TCJA, using the average rate assumption method (ARAM) amounts to arrive at the settlement rate changes. The settlement agreement provides for the pass back of plant related excess deferred income taxes that resulted from the TCJA using the ARAM methodology based on 2018 amounts beginning March 1, 2019, in the amount of $6.1 million for natural gas customers and $25.9 million for electric customers. The settlement agreement left the determination for the regulatory treatment of the remaining items related to the TCJA, listed below, to PSE’s next GRC, filed June 20, 2019: 1) excess deferred taxes for non-plant-related book/tax differences for periods prior to March 1, 2019, 2) the deferred balance associated with the over-collection of income tax expense for the period January 1 through April 30, 2018 (the time period that encompasses the effective date of the TCJA to May 1, 2018, the effective date of the TCJA rate change); and 3) the turnaround of plant related excess deferred income taxes using the ARAM method for the period from January 2018 through February 2019, the rate effective date for the ERF. The settlement agreement provides that PSE may defer the depreciation expense associated with PSE’s ongoing investment in its AMI investment and may defer the return on the AMI investment that was included in the test year of the filing. As noted above, the 2019 GRC effectively ends all deferrals of AMI depreciation expense and deferrals of return on additional AMI investments will be evaluated in future proceedings. The rate of return adopted in the settlement for reporting and deferral purposes is 7.49%. On February 21, 2019, the Washington Commission approved the settlement with one condition: PSE passed back the deferred balance associated with the tax over-collection of $34.6 million for the period from January 1, 2018, through April 30, 2018, over a one-year period which ended May 1, 2020. Washington Commission Tax Deferral Filing The TCJA was signed into law in December 2017. As a result of this change, PSE re-measured its deferred tax balances under the new corporate tax rate. PSE filed an accounting petition on December 29, 2017, requesting deferred accounting treatment for the impacts of tax reform. The requested deferral accounting treatment resulted in the tax rate change being captured in the deferred income tax balance with an offset to the regulatory liability for deferred income taxes for GAAP purposes. Additionally, on March 30, 2018, PSE filed for a rate change for electric and natural gas customers associated with TCJA to reflect the decrease in the federal corporate income tax rate from 35.0% to 21.0%. The overall impact of the rate change, based on the annual period from May 2018 through April 2019, is a revenue decrease of $72.9 million, or 3.4%, for electric and $23.6 million, or 2.7%, for natural gas and became effective May 1, 2018, by operation of law. The March 30, 2018, rate change filing did not address excess deferred taxes or the deferred balance associated with the over-collection of income tax expense of $34.6 million for the period January 1 through April 30, 2018 (the time period that encompasses the effective date of the TCJA through May 1, 2018, the effective date of the rate change). The $34.6 million tax over-collection decreased PSE's revenue and increased the regulatory liability for a refund to customers. While the settlement agreement in the ERF provides for the pass back of plant related excess deferred income taxes that resulted from the TCJA using the ARAM methodology based on 2018 amounts through the PSE Schedule 141X tariff, the ongoing treatment of excess deferred taxes associated with non-plant-related book/tax differences and the treatment of the excess deferred taxes associated with plant related book/tax differences was left to be addressed in PSE’s GRC, which was filed on June 20, 2019. The Washington Commission also required in the ERF order that PSE pass back the deferred balance associated with the tax over-collection for the period from January 1, 2018, through April 30, 2018, as discussed above, over a one-year period which began May 1, 2019. Per PSE’s Schedule 141Y tariff, following the May 2019 through April 2020 refund period, if the residual balance of credit owed to customers will be greater than $0.1 million, PSE would submit a filing no later than July 31, 2020 with a proposal of passing back the residual balance effective September 1, 2020 through August 31, 2021. As this balance was greater than $0.1 million, PSE filed tariff revisions on July 20, 2020 and the Washington Commission approved the filing on August 27, 2020. Finally, the GRC final order determined that PSE is required to pass back 2019 and 2020 protected excess deferred tax reversals totaling $70.8 million over the 12 months following the rate effective period through PSE’s Schedule 141X tariff. The GRC final order also determined that PSE is required to pass back unprotected excess deferred tax balances totaling $38.9 million over 36 months following the rate effective period through PSE’s Schedule 141Z tariff. Further details of the outcome associated with PSE’s tax deferral filing are discussed in the ERF and GRC disclosures. Decoupling Filings While fluctuations in weather conditions will continue to affect PSE's billed revenue and energy supply expenses from month to month, PSE's decoupling mechanisms assist in mitigating the impact of weather on operating revenue and net income. Since 2013, the Washington Commission has allowed PSE to record a monthly adjustment to its electric and natural gas operating revenues related to electric transmission and distribution, natural gas operations and general administrative costs from most residential, commercial and industrial customers to mitigate the effects of abnormal weather, conservation impacts and changes in usage patterns per customer. As a result, these electric and natural gas revenues are recovered on a per customer basis regardless of actual consumption levels. PSE's energy supply costs, which are part of the PCA and PGA mechanisms, are not included in the decoupling mechanism. The revenue recorded under the decoupling mechanisms will be affected by customer growth and not actual consumption. Following each calendar year, PSE will recover from, or refund to, customers the difference between allowed decoupling revenue and the corresponding actual revenue during the following May to April time period. On December 5, 2017, the Washington Commission approved PSE’s request within the 2017 GRC to extend the decoupling mechanism with several changes to the methodology that took effect on December 19, 2017. Electric and natural gas delivery revenues continue to be recovered on a per customer basis and electric fixed production energy costs are now decoupled and recovered on the basis of a fixed monthly amount. The allowed decoupling revenue for electric and natural gas customers will no longer increase annually each January 1 as occurred prior to December 19, 2017. Approved revenue per customer costs can only be changed in a GRC or ERF. Approved electric fixed production energy costs can only be changed in a GRC or a power cost only rate case. Other changes to the decoupling methodology approved by the Washington Commission include regrouping of electric and natural gas non-residential customers and the exclusion of certain electric schedules from the decoupling mechanism going forward. The rate test, which limits the amount of revenues PSE can collect in its annual filings, increased from 3.0% to 5.0% for natural gas customers but will remain at 3.0% for electric customers. The decoupling mechanism will be reviewed again in PSE’s first rate case filed in or after 2021, or in a separate proceeding, if appropriate. PSE’s decoupling mechanism over- and under- collections will still be collectible or refundable after this effective date even if the decoupling mechanism is not extended. On February 21, 2019, the Washington Commission approved the multi-party settlement agreement which was filed within PSE’s ERF filing. As part of this settlement agreement, electric and natural gas allowed delivery revenue per customer was updated to reflect changes in the approved revenue requirement. For electric, there were no changes to the annual allowed fixed power cost revenue. The changes took effect on March 1, 2019. On July 8, 2020, the Washington Commission issued the final order in Dockets UE-190529 and UG-190530, which instructed PSE to extend the collection of amortization balances for electric decoupling delivery and fixed power cost sections originally filed through the annual May 2020 decoupling filing. The extension requires PSE to move amortization balances for electric decoupling as of August 31, 2020 to be collected from customers for a two On December 1, 2020, PSE made a tariff correction filing for Schedule 142 amortization rates, with a proposed effective date of January 1, 2021, where it proposed to zero out rates still effective past October 15, 2020 on tariff sheet Schedule 142-H, which was replaced by rates on tariff sheet Schedule 142-I effective October 15, 2020. This resulted in an over-collection from electric decoupled customers of approximately $4.3 million at year-end. As part of this filing, PSE has proposed to true up the over-collection amounts for the period of October 15, 2020 through December 31, 2020 in PSE’s annual May 2021 decoupling filing. On December 31, 2020, PSE performed an analysis to determine if electric and natural gas decoupling revenue deferrals would be collected from customers within 24 months of the annual period, per ASC 980. If not, for GAAP purposes only, PSE would need to record a reserve against the decoupling revenue and regulatory asset balance. Once the reserve is probable of collection within 24 months from the end of the annual period, the reserve can be recognized as decoupling revenue. The analysis indicated that $8.0 million of electric deferred revenue will not be collected within 24 months of the annual period; therefore a reserve adjustment was booked to 2020 electric decoupling revenue. Natural gas deferred revenue will be collected within 24 months of the annual period; therefore, no reserve adjustment was booked to 2020 natural gas decoupling revenue. The previously unrecognized decoupling deferrals of $0.8 million at December 31, 2018, were recognized as decoupling revenue in the year ended December 31, 2019. Power Cost Adjustment Mechanism PSE currently has a PCA mechanism that provides for the deferral of power costs that vary from the “power cost baseline” level of power costs. The “power cost baseline” levels are set, in part, based on normalized assumptions about weather and hydroelectric conditions. Excess power costs or savings are apportioned between PSE and its customers pursuant to the graduated scale set forth in the PCA mechanism and will trigger a surcharge or refund when the cumulative deferral trigger is reached. Effective January 1, 2017, the following graduated scale is used in the PCA mechanism: Company’s Share Customers' Share Annual Power Cost Variability Over Under Over Under Over or Under Collected by up to $17 million 100 % 100 % — % — % Over or Under Collected by between $17 million - $40 million 35 50 65 50 Over or Under Collected beyond $40 + million 10 10 90 90 For the year ended December 31, 2020, in its PCA mechanism, PSE under recovered its allowable costs by $75.4 million of which $43.3 million was apportioned to customers and $2.0 million of interest was accrued on the deferred customer balance. This compares to an under recovery of allowable costs of $67.2 million for the year ended December 31, 2019, of which $36.0 million amounts were apportioned to customers and accrued $1.0 million of interest on the total deferred customer balance. Power Cost Adjustment Clause Filing On July 1, 2019, PSE updated its Schedule 95 rates in the Power Cost Adjustment Clause tariff to reflect the transition fee as required by Section 12 of the Microsoft Special Contract. Additionally, Schedule 95 rates also include portions of fixed power cost adjustments per the allowed decoupling rate re-allocation effective April 1, 2019, resulting from Microsoft becoming a transportation customer as well as small variable power cost adjustments. On July 8, 2020, the Washington Commission issued the final order in Dockets UE-190529 and UG-190530, which instructed PSE to remove Schedule 95 collection on decoupling allowed rates for Microsoft Special Contracts, which will be included in allowed rates under the Decoupling Schedule 142 effective October 15, 2020. PSE exceeded the $20.0 million cumulative deferral balance in its PCA mechanism in 2019. The surcharging of deferrals can be triggered by the Company when the balance in the deferral account is a credit of $20.0 million or more. Due to concerns about the economic impact of the COVID-19 pandemic on customers, PSE voluntarily, with Washington Commission Staff support, delayed filing an increase to its Schedule 95 rates in its annual PCA report filing in Docket UE-200398, which was approved on July 30, 2020. Subsequently, PSE filed to recover the deferred balance in Docket UE-200893, effective December 1, 2020, and the Washington Commission approved PSE’s request on November 24, 2020. During 2019, actual power costs were higher than baseline power costs, thereby creating an under-recovery of $67.2 million. Under the terms of the PCA’s sharing mechanism for under-recovered power costs, PSE absorbed $31.2 million of the under-recovered amount, and customers were responsible for the remaining $36.0 million, or $37.0 million including interest. As PSE had an approved balance owing from customers including interest at the start of 2019 totaling $4.7 million, the approved cumulative deferral balance for the PCA as of December 2019 is $41.7 million. As previously stated, this filing is set to collect the customer’s share of the cumulative 2019 imbalance in PSE’s PCA mechanism. Purchased Gas Adjustment Mechanism On April 25, 2019, the Washington Commission approved PSE’s request for an out-of-cycle change to PGA rates with the rate change taking effect May 1, 2019. The out-of-cycle PGA filing was needed to begin amortizing a large PGA commodity deferral balance that had grown due to higher than projected commodity costs during the 2018/19 winter. These higher than projected commodity costs were primarily due to an October 9, 2018, rupture and subsequent explosion on Westcoast Pipeline which is one of the major pipelines feeding PSE’s distribution system. The pipeline was repaired in October 2018, however supply capacity on the pipeline was limited over the 2018/19 winter leading to higher prices. February weather was also much colder than normal which also increased the demand for natural gas. The out-of-cycle PGA rates were effective from May 1, 2019 through April 30, 2020 and on May 1, 2020 the rates were set to zero. At the end of the recovery period, an unamortized balance of $4.9 million remained which PSE requested to be amortized in its annual PGA filing for rates effective November 1, 2020. On October 24, 2019, the Washington Commission approved PSE’s request for November 2019 PGA rates, with the rate change taking effect on November 1, 2019. As part of that filing, PSE requested PGA rates increase annual revenue by $17.8 million, while the new tracker rates increased by annual revenue of $100.6 million; this was in addition to continuing the collection on the remaining balance of $54.0 million from the out-of-cycle PGA. The tracker rates include deferral balances for the three separate amounts: (i) $114.4 million of under collected commodity balances deferred in February and March; (ii) a $10.8 million balance of over-collected commodity costs for the 2018 PGA, and (iii) a $4.1 million remaining balance from the $54.7 million credit to customers, caused by the 2017 over-collection, established in the 2018 tracker. The high commodity deferral balances for winter months through March 2019 were the result of three noteworthy events last winter experienced by PSE: the Enbridge pipeline rupture, unusually low temperatures in February and March, and a compressor failure in February at the Jackson Prairie storage facility. Additionally, to reduce customer impact, as part of the approved PGA filing, PSE will be collecting $114.4 million commodity deferrals and related interest over a two-year period, instead of the historic one-year period, from November 2019 through October 2021. On July 8, 2020, the Washington Commission issued the final order in Dockets UE-190529 and UG-190530, which instructed PSE to extend the collection of amortization balances for the portion of PGA amortization balances originally filed through the annual November 1, 2019 PGA filing under the Supplemental Schedule 106B. The extension requires PSE to move amortization balances for PGA Schedule 106B as of August 31, 2020 to be collected from customers for a three-year period, instead of the originally approved two-year period. On October 29, 2020, the Washington Commission approved PSE’s request for November 2020 PGA rates in Docket UG-200832, effective November 1, 2020. As part of that filing, PSE requested PGA rates increase annual revenue by $32.6 million, while the new tracker rates increased annual revenue by $37.4 million; this was in addition to continuing the collection on the remaining balance of $69.4 million under Supplemental Schedule 106B. The following table presents the PGA mechanism balances and activity at December 31, 2020 and December 31, 2019: (Dollars in Thousands) At December 31, At December 31, PGA receivable balance and activity 2020 2019 PGA receivable beginning balance $ 132,766 $ 9,921 Actual natural gas costs 314,792 406,162 Allowed PGA recovery (363,886) (289,876) Interest 3,983 6,559 PGA receivable ending balance $ 87,655 $ 132,766 Get to Zero Depreciation Deferral On April 10, 2019, PSE filed an accounting petition with the Washington Commission, requesting authorization to defer depreciation expense associated with Get To Zero (GTZ) projects that were placed in service after June 30, 2018. The GTZ project consists of a number of short-lived technology upgrades. The depreciation expense associated with the GTZ projects with lives of 10 years or less that were placed in service after June 30, 2018, were deferred beginning May 1 per the petition request. For the year ended December 31, 2020 and December 31, 2019, PSE deferred $2.8 million and $21.7 million of depreciation expense for GTZ, respectively. In addition to the deferral of depreciation expense, PSE had also requested to defer carrying charges on the GTZ deferral, to be calculated utilizing the Company’s currently authorized after tax rate of return, or 6.89% per the 2018 ERF. The GTZ accounting petition was consolidated with PSE’s 2019 GRC and on July 8, 2020, the Washington Commission issued its order in PSE’s 2019 GRC. The ruling authorized PSE to amortize deferred GTZ expenses as proposed in the original GRC filing. The ruling also allows continued deferral of the depreciation expense associated with GTZ investments not already approved for recovery with a book life of 10 years or less, through PSE's next GRC. Finally, the final order set the rate at which PSE could defer and recover carrying charges from PSE’s authorized rate of return to the quarterly interest rate established by the FERC. Crisis Affected Customer Assistance Program On April 6, 2020, PSE filed with the Washington Commission revisions to its currently effective Tariff WN U-60. The purpose of this filing is to incorporate into PSE’s low-income tariff a new temporary bill assistance program, Crisis Affected Customer Assistance Program (CACAP), to mitigate the economic impact of the COVID-19 pandemic on PSE’s customers. CACAP would allow PSE customers facing financial hardship due to COVID-19 to receive up to $1,000 in bill assistance. The program puts to immediate use $ |