Regulatory Matters (Narrative) (Details) | 1 Months Ended | 3 Months Ended | 12 Months Ended | | |
Dec. 31, 2015USD ($) | Mar. 31, 2018USD ($) | Dec. 31, 2017USD ($)MW | Dec. 31, 2016USD ($) | Dec. 31, 2015USD ($) | Jan. 17, 2017USD ($) | Jun. 30, 2016USD ($) |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Net Asset Percentage Limit | | | 25.00% | | | | |
Regulatory assets, noncurrent | | | $ 12,442,000,000 | $ 12,878,000,000 | | | |
Net property, plant and equipment | | | 86,391,000,000 | 82,520,000,000 | | | |
Regulatory assets | | | 13,879,000,000 | 13,901,000,000 | | | |
Impairment charges | | | 282,000,000 | 18,000,000 | $ 106,000,000 | | |
Debt Instrument, Face Amount | | | 6,070,000,000 | 9,127,000,000 | | | |
Regulated Revenue | | | 21,177,000,000 | 21,221,000,000 | 21,379,000,000 | | |
Generation Facilities To Be Retired [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Net property, plant and equipment | | | $ 397,000,000 | | | | |
Capacity (in MW) | MW | | | 1,738 | | | | |
Atlantic Coast Pipeline (ACP) [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Joint owner ownership percentage | | | 47.00% | | | | |
Long-term Purchase Commitment, Period | | | 20 years | | | | |
Sabal Trail Transmission Pipeline [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Joint owner ownership percentage | | | 7.50% | | | | |
Estimated capital cost | | | $ 3,200,000,000 | | | | |
Long-term Purchase Commitment, Period | | | 25 years | | | | |
Constitution Pipeline [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Joint owner ownership percentage | | | 24.00% | | | | |
Estimated Contributions | | | $ 229,000,000 | | | | |
Regulatory Clause Revenues, under-recovered [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 64,000,000 | 66,000,000 | | | |
Accrued Pension And Post Retirement [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 2,249,000,000 | 2,387,000,000 | | | |
Retired Generation Facilities [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 480,000,000 | 534,000,000 | | | |
NCEMPA deferrals [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 53,000,000 | 51,000,000 | | | |
Nuclear asset securitized balance, net [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 1,142,000,000 | 1,193,000,000 | | | |
Nuclear Deferral [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 119,000,000 | 226,000,000 | | | |
Minimum [Member] | Atlantic Coast Pipeline (ACP) [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Estimated capital cost | | | 6,000,000,000 | | | | |
Original estimated capital cost | | | 5,000,000,000 | | | | |
Maximum [Member] | Atlantic Coast Pipeline (ACP) [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Estimated capital cost | | | 6,500,000,000 | | | | |
Original estimated capital cost | | | $ 5,500,000,000 | | | | |
Dominion Resources [Member] | Atlantic Coast Pipeline (ACP) [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Joint owner ownership percentage | | | 48.00% | | | | |
Southern Company Gas [Member] | Atlantic Coast Pipeline (ACP) [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Joint owner ownership percentage | | | 5.00% | | | | |
Enbridge Inc. [Member] | Sabal Trail Transmission Pipeline [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Joint owner ownership percentage | | | 50.00% | | | | |
NextEra Energy [Member] | Sabal Trail Transmission Pipeline [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Joint owner ownership percentage | | | 42.50% | | | | |
Williams Partners L.P. [Member] | Constitution Pipeline [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Joint owner ownership percentage | | | 41.00% | | | | |
Duke Energy Carolinas [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | $ 2,853,000,000 | 3,159,000,000 | | | |
Net property, plant and equipment | | | 27,876,000,000 | 26,762,000,000 | | | |
Regulatory assets | | | 3,152,000,000 | 3,397,000,000 | | | |
Impairment charges | | | | 1,000,000 | 1,000,000 | | |
Debt Instrument, Face Amount | | | $ 550,000,000 | 1,600,000,000 | | | |
Duke Energy Carolinas [Member] | Atlantic Coast Pipeline (ACP) [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Long-term Purchase Commitment, Period | | | 20 years | | | | |
Duke Energy Carolinas [Member] | Accrued Pension And Post Retirement [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | $ 410,000,000 | 481,000,000 | | | |
Duke Energy Carolinas [Member] | Retired Generation Facilities [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 29,000,000 | 39,000,000 | | | |
Duke Energy Carolinas [Member] | Nuclear Deferral [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 84,000,000 | 92,000,000 | | | |
Duke Energy Carolinas [Member] | William States Lee Combined Cycle Facility [Member] | NCEMC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Estimated capital cost of new utility plant, including AFUDC | | | $ 600,000,000 | | | | |
Joint owner ownership percentage | | | 13.00% | | | | |
Duke Energy Carolinas [Member] | William State Lee III Nuclear Station [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Net property, plant and equipment | | | $ 558,000,000 | | | | |
Duke Energy Carolinas [Member] | 2017 NC Rate Case [Member] | NCUC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amount | | | $ 647,000,000 | | | | |
Requested Rate Increase (Decrease), Percentage | | | 13.60% | | | | |
Duke Energy Carolinas [Member] | 2017 NC Rate Case [Member] | Subsequent Event [Member] | NCUC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amount | | $ (290,000,000) | | | | | |
Duke Energy Carolinas [Member] | Advanced Metering Infrastructure Deferral [Member] | PSCSC [Member] | Maximum [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | $ 45,000,000 | | | | |
Duke Energy Progress [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | 3,507,000,000 | 3,243,000,000 | | | |
Net property, plant and equipment | | | 19,101,000,000 | 18,387,000,000 | | | |
Regulatory assets | | | 3,859,000,000 | 3,431,000,000 | | | |
Impairment charges | | | 19,000,000 | 1,000,000 | 5,000,000 | | |
Debt Instrument, Face Amount | | | $ 800,000,000 | 450,000,000 | | | |
Duke Energy Progress [Member] | Atlantic Coast Pipeline (ACP) [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Long-term Purchase Commitment, Period | | | 20 years | | | | |
Duke Energy Progress [Member] | Accrued Pension And Post Retirement [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | $ 430,000,000 | 423,000,000 | | | |
Duke Energy Progress [Member] | Retired Generation Facilities [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 170,000,000 | 165,000,000 | | | |
Duke Energy Progress [Member] | NCEMPA deferrals [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 53,000,000 | 51,000,000 | | | |
Duke Energy Progress [Member] | Nuclear Deferral [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 35,000,000 | 38,000,000 | | | |
Duke Energy Progress [Member] | Asheville Plant [Member] | Generation Facilities To Be Retired [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Net property, plant and equipment | | | $ 385,000,000 | 492,000,000 | | | |
Capacity (in MW) | MW | | | 376 | | | | |
Duke Energy Progress [Member] | Shearon Harris Nuclear Station [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | $ 47,000,000 | | | | |
Wholesale Debt Return Amortization Period | | | 15 years | | | | |
Regulatory Noncurrent Asset, Amortization Period | | | 8 years | | | | |
Duke Energy Progress [Member] | 2017 NC Rate Case [Member] | NCUC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amount | | | $ 477,000,000 | | | | |
Requested Rate Increase (Decrease), Percentage | | | 14.90% | | | | |
Requested Rate Increase (Decrease), Amended, Amount | | | $ 420,000,000 | | | | |
Public Utilities, Requested Rate Increase (Decrease), Amended, Percentage | | | 13.00% | | | | |
Requested Return on Equity, Percentage | | | 9.90% | | | | |
Public Utilities, Requested Equity Capital Structure, Percentage | | | 52.00% | | | | |
Public Utilities, Requested Debt Capital Structure, Percentage | | | 48.00% | | | | |
Utilities Operating Expense, Impairments | | | $ 25,000,000 | | | | |
Duke Energy Progress [Member] | 2017 NC Rate Case Unsettled Amount [Member] | NCUC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amended, Amount | | | 300,000,000 | | | | |
Duke Energy Progress [Member] | Storm Cost Deferrals [Member] | PSCSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 73,000,000 | | | | |
Deferred Storm and Property Reserve Deficiency, Noncurrent | | | 74,000,000 | | | | |
Duke Energy Progress [Member] | Storm Cost Deferrals [Member] | NCUC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Estimated Storm Costs - Capital and Operation Maintenance | | | 116,000,000 | | | | |
Regulatory assets | | | 77,000,000 | | | | |
Duke Energy Progress [Member] | 2016 South Carolina Rate Case Settlement [Member] | PSCSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | $ 56,000,000 | | | | |
Approved return on equity percentage amount by state commission | | | 10.10% | | | | |
Regulatory Noncurrent Asset, Amortization Period | | | 15 years | | | | |
Duke Energy Progress [Member] | 2016 South Carolina Rate Case Settlement Year 1 Increase [Member] | PSCSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | $ 38,000,000 | | | | |
Duke Energy Progress [Member] | 2016 South Carolina Rate Case Settlement Year 2 Increase [Member] | PSCSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | 18,500,000 | | | | |
Duke Energy Progress [Member] | 2016 South Carolina Rate Case Settlement Year 2 Offset [Member] | PSCSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | (18,500,000) | | | | |
Duke Energy Progress [Member] | Western Carolinas Modernization Plan [Member] | NCUC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Estimated capital cost | | | 893,000,000 | | | | |
Duke Energy Florida [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | 2,503,000,000 | 2,480,000,000 | | | |
Net property, plant and equipment | | | 12,783,000,000 | 11,790,000,000 | | | |
Regulatory assets | | | 2,892,000,000 | 2,693,000,000 | | | |
Impairment charges | | | 138,000,000 | 6,000,000 | 7,000,000 | | |
Debt Instrument, Face Amount | | | 1,300,000,000 | 1,894,000,000 | | | |
Duke Energy Florida [Member] | Accrued Pension And Post Retirement [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 476,000,000 | 458,000,000 | | | |
Duke Energy Florida [Member] | Retired Generation Facilities [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 216,000,000 | 257,000,000 | | | |
Duke Energy Florida [Member] | Nuclear asset securitized balance, net [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 1,142,000,000 | 1,193,000,000 | | | |
Duke Energy Florida [Member] | Nuclear Deferral [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | | 96,000,000 | | | |
Duke Energy Florida [Member] | Citrus County Combined Cycle Facility [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Estimated capital cost of new utility plant, including AFUDC | | | $ 1,500,000,000 | | | | |
Duke Energy Florida [Member] | Crystal River Unit 3 [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory Noncurrent Asset, Amortization Period | | | 20 years | | | | |
Duke Energy Florida [Member] | Crystal River Unit 3 [Member] | ISFSI Projects [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | $ 113,000,000 | | | | |
Approved return on equity percentage amount by state commission | | | 7.35% | | | | |
Duke Energy Florida [Member] | Crystal River Unit 3 [Member] | FPSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | $ 1,283,000,000 | | | | 1,283,000,000 | | |
Impairment charges | | | | | 15,000,000 | | |
Duke Energy Florida [Member] | Crystal River Unit 3 [Member] | DEFPF [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Debt Instrument, Face Amount | | | | | | | $ 1,294,000,000 |
Proceeds from Issuance of Debt | | | | 1,287,000,000 | | | |
Duke Energy Florida [Member] | Storm Restoration Cost Recovery [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | $ 376,000,000 | | | | |
Customers Experiencing Outages | | | 1,300,000 | | | | |
Estimated Storm Costs - Capital and Operation Maintenance | | | $ 513,000,000 | | | | |
Allowed Storm Reserve | | | 132,000,000 | | | | |
Duke Energy Florida [Member] | 2017 Second Revised and Restated Settlement [Member] | FPSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | 75,000,000 | | | | |
Approved rate increase (decrease) amount by state commission | | | $ 67,000,000 | | | | |
Approved return on equity percentage amount by state commission | | | 9.50% | | | | |
Regulatory Noncurrent Asset, Amortization Period | | | 15 years | | | | |
Impairment charges | | | $ 135,000,000 | | | | |
Duke Energy Florida [Member] | 2017 Second Revised and Restated Settlement [Member] | FPSC [Member] | Regulatory Clause Revenues, under-recovered [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | $ 196,000,000 | | | | |
Regulatory Noncurrent Asset, Amortization Period | | | 24 months | | | | |
Duke Energy Florida [Member] | Hines Chiller Uprate Project [Member] | FPSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | $ 19,000,000 | | | | |
Estimated capital cost | | | $ 150,000,000 | | | | |
Duke Energy Florida [Member] | Osprey Energy Center Acquisition [Member] | USDOJ [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Other Commitment | | | | | | $ 600,000 | |
Duke Energy Florida [Member] | 2013 FPSC Settlement Agreement [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved return on equity percentage amount by state commission | | | 10.50% | | | | |
Duke Energy Florida [Member] | 2013 FPSC Settlement Agreement [Member] | Crystal River Unit 3 [Member] | Original Uprate Project [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | $ 87,000,000 | | | | |
Regulatory Noncurrent Asset, Amortization Period | | | 7 years | | | | |
Duke Energy Florida [Member] | Levy Nuclear Project [Member] | Levy Nuclear Station [Member] | FPSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amount | | | $ 82,000,000 | | | | |
Duke Energy Ohio [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Limit of Total Capital | | | 30.00% | | | | |
Regulatory assets, noncurrent | | | $ 445,000,000 | 520,000,000 | | | |
Net property, plant and equipment | | | 6,041,000,000 | 5,547,000,000 | | | |
Regulatory assets | | | 494,000,000 | 557,000,000 | | | |
Impairment charges | | | 1,000,000 | | | | |
Debt Instrument, Face Amount | | | 100,000,000 | 250,000,000 | | | |
Regulated Revenue | | | 1,373,000,000 | 1,410,000,000 | 1,331,000,000 | | |
Duke Energy Ohio [Member] | Accrued Pension And Post Retirement [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 139,000,000 | 135,000,000 | | | |
Duke Energy Ohio [Member] | RTO Realignment [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | $ 50,000,000 | 71,000,000 | | | |
Approved MVP Proposals | | | 17 | | | | |
MISO estimate of Duke Energy Ohio's MVP obligation | | | $ 2,700,000,000 | | | | |
Duke Energy Ohio [Member] | Duke Energy Kentucky Rate Case [Member] | KPSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amount | | | $ 49,000,000 | | | | |
Requested Rate Increase (Decrease), Percentage | | | 15.00% | | | | |
Duke Energy Ohio [Member] | Woodsdale Station Fuel System [Member] | KPSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Estimated capital cost | | | $ 55,000,000 | | | | |
Duke Energy Ohio [Member] | East Bend Coal Ash Basin Filing [Member] | KPSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Estimated capital cost | | | 93,000,000 | | | | |
Duke Energy Ohio [Member] | Electric Base Rate Case [Member] | PUCO [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amount | | | $ 15,000,000 | | | | |
Requested Return on Equity, Percentage | | | 10.40% | | | | |
Duke Energy Ohio [Member] | Electric Base Rate Case [Member] | PUCO [Member] | Minimum [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amount | | | $ (18,000,000) | | | | |
Requested Return on Equity, Percentage | | | 9.22% | | | | |
Duke Energy Ohio [Member] | Electric Base Rate Case [Member] | PUCO [Member] | Maximum [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amount | | | $ (29,000,000) | | | | |
Requested Return on Equity, Percentage | | | 10.24% | | | | |
Duke Energy Ohio [Member] | Natural Gas Pipeline Extension [Member] | PUCO [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Estimated Capital Cost Excluding AFUDC | | | $ 110,000,000 | | | | |
Duke Energy Ohio [Member] | Accelerated Natural Gas Service Line Replacement Rider | PUCO [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Amount of Regulatory Costs Not yet Approved | | | 240,000,000 | | | | |
Duke Energy Ohio [Member] | Energy Efficiency Cost Recovery Program [Member] | PUCO [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | 56,000,000 | | | | |
Regulated Revenue | $ 20,000,000 | | | | | | |
Duke Energy Ohio [Member] | Energy Efficiency Cost Recovery Program [Member] | PUCO [Member] | Maximum [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | 38,000,000 | | | | |
Duke Energy Ohio [Member] | Mgp Remediation [Member] | East End Site [Member] | PUCO [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 35,000,000 | | | | |
Duke Energy Ohio [Member] | Advanced Metering Infrastructure Project [Member] | KPSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | 6,000,000 | | | | |
Estimated capital cost | | | $ 49,000,000 | | | | |
Duke Energy Kentucky [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Required Equity Capital Structure Percent | | | 35.00% | | | | |
Duke Energy Indiana [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | $ 978,000,000 | 1,073,000,000 | | | |
Net property, plant and equipment | | | 10,286,000,000 | 9,924,000,000 | | | |
Regulatory assets | | | 1,143,000,000 | 1,222,000,000 | | | |
Impairment charges | | | 18,000,000 | 8,000,000 | 88,000,000 | | |
Debt Instrument, Face Amount | | | | 500,000,000 | | | |
Duke Energy Indiana [Member] | Accrued Pension And Post Retirement [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 197,000,000 | 222,000,000 | | | |
Duke Energy Indiana [Member] | Retired Generation Facilities [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 65,000,000 | 73,000,000 | | | |
Duke Energy Indiana [Member] | Benton County Wind Farm Dispute [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Litigation Settlement, Amount Awarded to Other Party | | | 29,000,000 | | | | |
Duke Energy Indiana [Member] | Coal Combustion Residual Plan [Member] | IURC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amount | | | $ 380,000,000 | | | | |
Federal Mandate Costs Recovered Through Tracker Mechanism | | | 80.00% | | | | |
Federally Mandated Costs Recovered In Future Rate Case | | | 20.00% | | | | |
Percentage of Costs Recovered through Existing Rider | | | 60.00% | | | | |
Percentage Recovered Through Future Rate Case | | | 40.00% | | | | |
Long-term Debt Rate | | | 4.73% | | | | |
Duke Energy Indiana [Member] | Coal Combustion Residual Plan [Member] | IURC [Member] | Maximum [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | $ 365,000,000 | | | | |
Duke Energy Indiana [Member] | IGCC Rider Proceeding [Member] | Edwardsport IGCC Plant [Member] | IURC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 152,000,000 | | | | |
Approved rate increase (decrease) amount by state commission | | | $ (87,500,000) | | | | |
Regulatory Noncurrent Asset, Amortization Period | | | 8 years | | | | |
Legal Fees | | | $ 5,500,000 | | | | |
Utilities Operating Expense, Other | | | | | $ 93,000,000 | | |
Duke Energy Indiana [Member] | FERC Transmission Rates [Member] | Federal Energy Regulatory Commission [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved return on equity percentage amount by state commission | | | 12.38% | | | | |
Approved Return on Equity Percentage Adder | | | 0.50% | | | | |
Duke Energy Indiana [Member] | FERC Complaint [Member] | Federal Energy Regulatory Commission [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Return on Equity, Percentage | | | 8.67% | | | | |
Duke Energy Indiana [Member] | FERC Complaint 1 [Member] | Federal Energy Regulatory Commission [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved return on equity percentage amount by state commission | | | 10.32% | | | | |
Duke Energy Indiana [Member] | FERC Complaint 2 [Member] | Federal Energy Regulatory Commission [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Return on Equity, Percentage | | | 9.70% | | | | |
Duke Energy Indiana [Member] | Grid Infrastructure Improvement Plan [Member] | IURC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | $ 1,400,000,000 | | | | |
Approved return on equity percentage amount by state commission | | | 10.00% | | | | |
Estimated capital cost | | | $ 1,800,000,000 | | | | |
Duke Energy Indiana [Member] | Advanced Metering Infrastructure Project [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Net property, plant and equipment | | | 21,000,000 | | | | |
Impairment charges | | | 22,000,000 | 8,000,000 | | | |
Piedmont Natural Gas [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets, noncurrent | | | 283,000,000 | 373,000,000 | | | |
Net property, plant and equipment | | | 5,246,000,000 | 4,814,000,000 | | | |
Regulatory assets | | | 378,000,000 | 497,000,000 | | | |
Impairment charges | | | 7,000,000 | | | | |
Piedmont Natural Gas [Member] | Regulatory Clause Revenues, under-recovered [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | 64,000,000 | 66,000,000 | | | |
Piedmont Natural Gas [Member] | Accrued Pension And Post Retirement [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Regulatory assets | | | $ 91,000,000 | $ 166,000,000 | | | |
Piedmont Natural Gas [Member] | South Carolina Rate Stabilization Adjustment Filing [Member] | PSCSC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Return on Equity, Percentage | | | 12.60% | | | | |
Approved return on equity percentage amount by state commission | | | 10.20% | | | | |
Piedmont Natural Gas [Member] | NCUC IMR Petition Filed October 2017 [Member] | NCUC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | $ 8,900,000 | | | | |
Piedmont Natural Gas [Member] | NCUC IMR Petition Filed May 2017 [Member] | NCUC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Approved rate increase (decrease) amount by state commission | | | 11,600,000 | | | | |
Piedmont Natural Gas [Member] | TPUC IMR Petition Filed November 2017 [Member] | TPUC [Member] | | | | | | | |
Public Utilities, General Disclosures [Line Items] | | | | | | | |
Requested Rate Increase (Decrease), Amount | | | 3,300,000 | | | | |
Requested Rate Increase (Decrease), Amended, Amount | | | $ 400,000 | | | | |