NOTE 14. COMMITMENTS AND CONTINGENCIES |
Manufacturing, Supply and Other Service Agreements |
Our subsidiaries contract with various third party manufacturers, suppliers and service providers to provide raw materials used in our subsidiaries' products and semi-finished and finished goods, as well as certain packaging and labeling services. The most significant of these agreements are with Novartis Consumer Health, Inc. and Novartis AG (collectively, Novartis), Teikoku Seiyaku Co., Ltd., Mallinckrodt Inc., Noramco, Inc., Grünenthal GmbH, Sharp Corporation, and UPS Supply Chain Solutions, Inc. If, for any reason, our subsidiaries are unable to obtain sufficient quantities of any of the finished goods or raw materials or components required for their products or services needed to conduct their business, it could have a material adverse effect on our business, financial condition, results of operations and cash flows. |
In addition to the manufacturing and supply agreements described above, our subsidiaries have agreements with various companies for clinical development services. Although we have no reason to believe that the parties to these agreements will not meet their obligations, failure by any of these third parties to honor their contractual obligations may have a materially adverse effect on our business, financial condition, results of operations and cash flows. |
Novartis Manufacturing Agreement |
On May 3, 2001, our Endo Pharmaceuticals Inc. (EPI) subsidiary entered into a long-term manufacturing and development agreement with Novartis Consumer Health, Inc. whereby Novartis Consumer Health, Inc. agreed to manufacture certain of our commercial products and products in development and EPI agreed to purchase, on an annual basis, a minimum amount of product from Novartis Consumer Health, Inc. for the purchase price equal to a predetermined amount per unit, subject to periodic adjustments. This agreement had a five-year initial term, with automatic five-year renewals thereafter. In August 2005, EPI extended this agreement until 2011. On February 23, 2011, EPI gave notice to Novartis Consumer Health, Inc. that it would terminate this agreement effective February 2014. On December 31, 2012, the parties mutually agreed to terminate the agreement effective December 31, 2012. The termination did not give rise to any early termination penalties. Amounts purchased pursuant to this agreement were zero, $1.8 million and $66.3 million for the years ended December 31, 2013, 2012 and 2011, respectively. |
In December 2011, Novartis Consumer Health, Inc.’s Lincoln, Nebraska manufacturing facility was shut down to facilitate its implementation of certain manufacturing process improvements. These improvements were intended to address the possibility of rare instances of errors in the packaging of the tablets, potentially resulting in product mix-ups. The supply disruption was not related to the efficacy or safety of Endo's products. However, Endo experienced short-term supply constraints of certain analgesic products which had been manufactured at this facility prior to the shutdown, including Opana®, Voltaren® Gel, oxymorphone hydrochloride, Percodan®, Endodan®, morphine sulfate ER and Zydone®. Novartis Consumer Health agreed to reimburse EPI for certain out-of-pocket costs, including costs related to recalls of certain of our products manufactured at the Lincoln facility and incremental freight charges associated with the transfer of Voltaren® Gel to an alternate Novartis manufacturing site. |
In the first quarter of 2012, EPI began production of the formulation of Opana® ER, designed to be crush-resistant, at a third party manufacturing facility managed by EPI’s development partner, Grünenthal GmbH (Grünenthal). EPI began shipping this formulation in March 2012 and completed the transition to this formulation in the second quarter of 2012. EPI also began production of Voltaren® Gel at an alternative Novartis manufacturing source and resumed sales of Voltaren® Gel in April 2012. We had already initiated the manufacturing of Percocet® and Endocet® at our Huntsville, Alabama facility as a result of our acquisition of Qualitest Pharmaceuticals in 2010 and, as a result, there was minimal disruption to patients on these products. |
Novartis License and Supply Agreement |
Pursuant to the March 2008 Voltaren® Gel License and Supply Agreement (the Voltaren® Gel Agreement) with Novartis AG and Novartis Consumer Health, Inc. EPI has agreed to purchase from Novartis all of its requirements for Voltaren® Gel during the entire term of the Voltaren® Gel Agreement. The price of product purchased under the Voltaren® Gel Agreement is fixed for the first year and subject to annual changes based upon changes in the producer price index and raw materials. Amounts purchased pursuant to the Voltaren® Gel Agreement were $50.2 million, $34.0 million and $30.4 million for the years ended December 31, 2013, 2012 and 2011, respectively. |
Teikoku Seiyaku Co., Ltd. |
Under the terms of EPI's agreement (the Teikoku Agreement) with Teikoku Seiyaku Co. Ltd. (Teikoku), a Japanese manufacturer, Teikoku manufactures Lidoderm® at its two Japanese facilities, located on adjacent properties, for commercial sale by EPI in the U.S. EPI also has an option to extend the supply area to other territories. On April 24, 2007, EPI amended the Teikoku agreement (the Amended Agreement). The material components of the Amended Agreement are as follows: |
| | | | | | | |
• | EPI agreed to purchase a minimum number of patches per year through 2012, representing the noncancelable portion of the Amended Agreement. | | | | | | |
| | | | | | | |
• | Teikoku agreed to fix the supply price of Lidoderm® for a period of time after which the price will be adjusted at future dates certain based on a price index defined in the Amended Agreement. The minimum purchase requirement shall remain in effect subsequent to 2012. EPI has met its minimum purchase requirement for 2013. | | | | | | |
| | | | | | | |
• | Following cessation of EPI's obligation to pay royalties to Hind Healthcare Inc. (Hind) under the Sole and Exclusive License Agreement dated as of November 23, 1998, as amended, between Hind and EPI (the Hind Agreement), EPI began to pay to Teikoku annual royalties based on annual net sales of Lidoderm®. | | | | | | |
| | | | | | | |
• | The Amended Agreement will expire on December 31, 2021, unless terminated in accordance with its terms. Either party may terminate the Teikoku Agreement, upon 30 days' written notice, in the event that EPI fails to purchase the annual minimum quantity for each year after 2012 (e.g., 2013 through 2021). Notwithstanding the foregoing, after December 31, 2021, the Amended Agreement shall be automatically renewed on the first day of January each year unless (i) EPI and Teikoku agree to terminate the Amended Agreement upon mutual written agreement or (ii) either EPI or Teikoku terminates the Amended Agreement with 180-day written notice to the other party, which notice shall not in any event be effective prior to July 1, 2022. | | | | | | |
| | | | | | | |
• | EPI is the exclusive licensee for any authorized generic for Lidoderm®. | | | | | | |
On January 6, 2010, the parties amended the Teikoku Agreement, effective December 16, 2009. Pursuant to the amendment, Teikoku has agreed to supply Lidoderm® at a fixed price for a period of time after which the price will be adjusted at certain future dates based on a price index defined in the amendment. |
Effective November 1, 2010, the parties again amended the Teikoku Agreement. Pursuant to this amendment, Teikoku agreed to supply certain quantities of additional Lidoderm® at no cost to EPI in each of 2011, 2012 and 2013 in the event EPI’s firm orders of Lidoderm® exceeded certain thresholds in those years. |
Amounts purchased pursuant to the Teikoku Agreement, as amended, were $167.0 million, $179.5 million and $203.4 million for the years ended December 31, 2013, 2012 and 2011, respectively. |
On November 23, 2011, EPI's obligation to pay royalties to Hind under the Hind Agreement ceased. Accordingly, on November 23, 2011, pursuant to the terms of the Teikoku Agreement, EPI began to incur royalties to Teikoku based on annual net sales of Lidoderm®. The royalty rate is 6% of branded Lidoderm® net sales. During the years ended December 31, 2013 and 2012, we recorded $35.0 million and $55.7 million for these royalties to Teikoku, respectively. These amounts were included in our Consolidated Statements of Operations as Cost of revenues. At December 31, 2013, $35.0 million is recorded as a royalty payable and included in Accounts payable in the accompanying Consolidated Balance Sheets. |
On August 3, 2012, Teikoku agreed to provide to EPI, at a discount, any branded Lidoderm® product that was required to be provided to the wholesaler affiliate of Watson Laboratories, Inc. (now doing business as Actavis, Inc. and referred to herein as Watson or Actavis) pursuant to the Watson Settlement Agreement (discussed in the "Legal Proceedings" Section below). The discount will be equal to a 50% reduction to the regular prices that EPI would otherwise have been obligated to pay for this product. |
Mallinckrodt Inc. |
Under the terms of our agreement, Mallinckrodt manufactured and supplied certain narcotic active drug substances, in bulk form, and raw materials for inclusion into our controlled substance pharmaceutical products. There was no minimum annual purchase commitment under the Mallinckrodt Agreement. However, we were required to purchase a fixed percentage of our annual requirements of each narcotic active drug substance covered by the Mallinckrodt Agreement from Mallinckrodt. The purchase price for these substances was equal to a fixed amount, adjusted on an annual basis. The initial term of this agreement was July 1, 1998 until September 30, 2013, with an automatic renewal provision for unlimited successive one-year periods. On September 30, 2011, we provided written notice to Mallinckrodt that the Company intended to let the Mallinckrodt Agreement expire effective September 30, 2013. The Company chose to allow the Mallinckrodt Agreement to expire in connection with its ongoing initiatives relating to the sourcing of active pharmaceutical ingredients. In April 2012, the Company entered into an agreement with Noramco, Inc. as described below. |
Amounts purchased pursuant to this agreement were $22.4 million, $37.6 million and $51.3 million for the years ended December 31, 2013, 2012 and 2011, respectively. |
Noramco, Inc. |
Under the terms of our agreement (the Noramco Agreement) with Noramco, Inc. (Noramco), Noramco manufactured and supplied to us certain narcotic active drug substances, in bulk form, and raw materials for inclusion in our controlled substance pharmaceutical products. There were no minimum annual purchase commitments under the Noramco Agreement. However, we were required to purchase a fixed percentage of our annual requirements of each narcotic active drug substance covered by the Noramco Agreement from Noramco. The purchase price for these substances was equal to a fixed amount, adjusted on an annual basis. Originally, the Noramco Agreement was to expire on December 31, 2011, with automatic renewal provisions for unlimited successive one-year periods. In September 2011, we extended the Noramco Agreement through early 2012. On April 27, 2012, we entered into a new supply agreement with Noramco (the 2012 Noramco Agreement). Under the terms of this supply agreement, Noramco manufactures and supplies to us certain narcotic active drug substances, in bulk form, for inclusion in our controlled substance pharmaceutical products. There are no minimum annual purchase commitments under the 2012 Noramco Agreement. However, we are required to purchase from Noramco a fixed percentage of our annual requirements of each narcotic active drug substance covered by the 2012 Noramco Agreement. The purchase price for these substances is equal to a fixed amount, adjusted on an annual basis based on volume. The term of the 2012 Noramco Agreement is for four years with automatic renewal provisions for unlimited successive one-year periods. |
Amounts purchased from Noramco were $66.1 million, $52.9 million and $55.5 million for the years ended December 31, 2013, 2012 and 2011, respectively. |
Grünenthal GMBH |
Under the terms of EPI's December 2007 License, Development and Supply Agreement with Grünenthal (the Grünenthal Agreement), Grünenthal agreed to manufacture and supply to EPI a crush-resistant formulation of Opana® ER based on a supply price equal to a certain percentage of net sales of Opana® ER, subject to a floor price. In the first quarter of 2012, we began production of the crush-resistant formulation of Opana® ER at a third party manufacturing facility managed by Grünenthal. The Grünenthal Agreement will expire on the later of (i) the 15th anniversary of the date of first commercial sale of the product, (ii) the expiration of the last issued patent in the territory claiming or covering products or (iii) the expiration of exclusivity granted by the FDA for the last product developed under the Grünenthal Agreement. Effective December 19, 2012, EPI and Grünenthal amended the Grünenthal Agreement whereby EPI became responsible for the planning of packaging of finished product and certain other routine packaging quality obligations and Grünenthal agreed to reimburse EPI for the third-party costs incurred related to packaging as well as pay EPI a periodic packaging fee. The amendment also changed certain of the terms with respect to the floor price required to be paid by EPI in consideration for product supplied by Grünenthal. |
EPI's license and supply payments made to Grünenthal pursuant to the Grünenthal Agreement are recorded in Cost of revenues in our Consolidated Financial Statements and must be paid in U.S. dollars within 45 days after each calendar quarter. We incurred $35.3 million and $35.7 million for the years ended December 31, 2013 and 2012, respectively. We incurred no such costs during the year ended December 31, 2011. |
Sharp Corporation |
Under the terms of our agreement (the Sharp Agreement) with Sharp Corporation (Sharp), a U.S. manufacturer, Sharp performs certain packaging and labeling services for Endo, including the packaging and labeling of Lidoderm® at its facilities in Allentown, Pennsylvania and Conshohocken, Pennsylvania, for commercial sale by us in the U.S. Effective June 1, 2012, the parties amended the Sharp Agreement to include several new products that Sharp will package and label. These products include our formulation of Opana® ER designed to be crush-resistant, Vantas®, Supprelin® LA, Valstar® and several SKUs of generic prednisone and methylprednisolone. The Sharp Agreement is effective until March 1, 2015 and is subject to renewal for additional one-year periods upon mutual agreement by both parties. Endo has the right to terminate the Sharp Agreement at any time upon 90 days’ written notice to Sharp. |
Amounts purchased pursuant to the Sharp agreement were $7.8 million, $9.5 million and $6.3 million for the years ended December 31, 2013, 2012 and 2011, respectively. |
Ventiv Commercial Services, LLC |
On December 27, 2011, EPI entered into a Sales and Promotional Services Agreement (the Ventiv Agreement) with Ventiv Commercial Services, LLC (Ventiv), effective as of December 30, 2011. Under the terms of the Ventiv Agreement, Ventiv provided to EPI certain sales and promotional services through a contracted field force, collectively referred to as the Ventiv Field Force. The Ventiv Field Force promoted Voltaren® Gel, Lidoderm®, Frova®, Opana® ER, Fortesta® Gel and any additional products added by EPI. The sales representatives were required to perform face-to-face, one-on-one discussions with physicians and other health care practitioners promoting these products. |
EPI paid to Ventiv a monthly fixed fee during the term of the Ventiv Agreement based on a budget that had been approved by both EPI and Ventiv. During the term of the Ventiv Agreement, Ventiv was also eligible to earn, in addition to the fixed management fee, an at-risk management fee. This at-risk management fee was payable upon the achievement of certain performance metrics mutually agreed upon by the parties. |
On September 26, 2012, the Ventiv Agreement was amended to decrease the size of the Ventiv Field Force and the fees payable to Ventiv. |
On May 31, 2013, EPI terminated the Ventiv Agreement, effective July 1, 2013. The termination did not give rise to any early termination fees or penalties. |
The expenses incurred with respect to Ventiv were $15.1 million, $37.2 million and $38.4 million for the years ended December 31, 2013, 2012 and 2011, respectively. These amounts were included within Selling, general and administrative expense in the accompanying Consolidated Statements of Operations. |
UPS Supply Chain Solutions |
Under the terms of this agreement, EPI utilizes UPS Supply Chain Solutions (UPS) to provide customer service support and warehouse, freight and distribution services for certain of its products in the U.S. The initial term of the agreement extends through March 31, 2015. The agreement may be terminated by either EPI or UPS (1) without cause upon prior written notice to the other party; (2) with cause in the event of an uncured material breach by the other party; and (3) if the other party become insolvent or bankrupt. In the event of termination of services provided under the Warehouse Distribution Services Schedule to the agreement (i) by EPI without cause or (ii) by UPS due to EPI’s breach, failure by EPI to make payments when due, or EPI’s insolvency, EPI would be required to pay UPS certain termination costs. Such termination costs would not be material to the Company's Consolidated Statements of Operations. On February 21, 2012, EPI amended this agreement to provide for a reduced pricing structure, which includes new monthly fees, new variable fees and new termination fees. On August 16, 2013, EPI further amended this agreement to add another mode of transport permissible under the agreement. |
General |
In addition to the manufacturing and supply agreements described above, we have agreements with various companies for clinical development services. Although we have no reason to believe that the parties to these agreements will not meet their obligations, failure by any of these third parties to honor their contractual obligations may have a materially adverse effect on our business, financial condition, results of operations and cash flows. |
Milestones and Royalties |
See Note 11. License and Collaboration Agreements for a complete description of future milestone and royalty commitments pursuant to our acquisitions, license and collaboration agreements. |
Employment Agreements |
We, and in some cases certain of our subsidiaries, have entered into employment agreements with certain members of management. |
Research Contracts |
Our subsidiaries routinely contract with universities, medical centers, contract research organizations and other institutions for the conduct of research and clinical studies on their behalf. These agreements are generally for the duration of the contracted study and contain provisions that allow our subsidiaries to terminate prior to completion. |
Legal Proceedings |
|
We and certain of our subsidiaries are involved in various claims, legal proceedings and governmental investigations that arise from time to time in the ordinary course of our business, including relating to product liability, intellectual property, regulatory compliance and commercial matters. While we cannot predict the outcome of these ongoing legal proceedings and we and our subsidiaries intend to defend vigorously our and their position, an adverse outcome in any of these proceedings could have a material adverse effect on our current and future financial position, results of operations and cash flows. |
|
In view of the inherent difficulty of predicting the outcome of these various claims, legal proceedings and governmental investigations, particularly where there are many claimants, each with their own unique circumstances that give rise to their alleged claims, and the claimants seek indeterminate damages and particularly given the various stages of our proceedings, unless specified otherwise below, we and our subsidiaries are unable to predict the outcome of these matters or the ultimate legal and financial liability, and at this time cannot reasonably estimate the possible loss or range of loss. Accordingly, there are claims, legal proceedings and governmental investigations in which we and certain of our subsidiaries are involved where a loss is reasonably possible in future periods and for which we have not accrued a related liability. In addition, it is reasonably possible that a future loss could exceed the related accrued liability and could have a material adverse effect on our current and future financial position, results of operations and cash flows. |
Product Liability |
We and certain of our subsidiaries have been named as defendants in numerous lawsuits in various federal and state courts, as well as in Canada, alleging personal injury resulting from the use of certain of our products and the products of our subsidiaries. |
|
The Company believes that certain settlements and judgments, as well as legal defense costs, relating to product liability matters are or may be covered in whole or in part under its product liability insurance policies with a limited number of insurance carriers. In certain circumstances, insurance carriers reserve their rights with respect to coverage, or contest or deny coverage. The Company and its subsidiaries intend to contest vigorously all such disputes with respect to their insurance coverage and to enforce their rights under the terms of these insurance policies, and accordingly, the Company will record receivables with respect to amounts due under these policies, only when the resolution of any dispute has been reached and realization of the potential claim for recovery is considered probable. Amounts recovered under the Company's product liability insurance policies may be less than the stated coverage limits and may not be adequate to cover damages and/or costs relating to claims. In addition, there is no guarantee that insurers will pay claims or that coverage will otherwise be available. |
MCP Cases. Qualitest Pharmaceuticals, and in certain cases the Company or certain of its subsidiaries, along with several other pharmaceutical manufacturers, have been named as defendants in numerous lawsuits in various federal and state courts alleging personal injury resulting from the use of the prescription medicine metoclopramide. Plaintiffs in these suits allege various personal injuries including tardive dyskinesia, other movement disorders and death. Qualitest Pharmaceuticals and the Company intend to contest all of these cases vigorously and to explore other options as appropriate in the best interests of the Company and Qualitest Pharmaceuticals. Litigation similar to that described above may also be brought by other plaintiffs in various jurisdictions. However, we cannot predict the timing or outcome of any such litigation, or whether any additional litigation will be brought against the Company or its subsidiaries. Subject to certain terms and conditions, we will be indemnified by the former owners of Qualitest Pharmaceuticals with respect to metoclopramide litigation arising out of the sales of the product by Qualitest Pharmaceuticals between January 1, 2006 and November 30, 2010, the date on which the acquisition was completed, subject to an overall liability cap for all claims arising out of or related to the acquisition, including the claims described above. As of February 20, 2014, approximately 830 MCP cases are currently pending against Qualitest Pharmaceuticals and/or the Company. |
Propoxyphene Cases. Qualitest Pharmaceuticals and, in certain cases, the Company or certain of its subsidiaries, along with several other pharmaceutical manufacturers, have been named as defendants in numerous lawsuits originally filed in various federal and state courts alleging personal injury resulting from the use of prescription pain medicines containing propoxyphene. Plaintiffs in these suits allege various personal injuries including cardiac impairment, damage and death. In August 2011, a multidistrict litigation (MDL) was formed, and certain transferable cases pending in federal court were coordinated in the Eastern District of Kentucky as part of MDL No. 2226. On March 5, 2012 and June 22, 2012, pursuant to a standing show cause order, the MDL Judge dismissed with prejudice certain claims against generic manufacturers, including Qualitest Pharmaceuticals and the Company. Certain plaintiffs have appealed those decisions to the U.S. Court of Appeals for the Sixth Circuit. A consolidated appeal is pending before the Sixth Circuit in certain of these cases. In November 2012, additional cases were filed in various California state courts, and removed to corresponding federal courts. Many of these cases have already been remanded, although appeals are being pursued. A coordinated proceeding was formed in Los Angeles. Qualitest Pharmaceuticals and the Company intend to contest all of these cases vigorously and to explore other options as appropriate in the best interests of the Company and Qualitest Pharmaceuticals. Litigation similar to that described above may also be brought by other plaintiffs in various jurisdictions. However, we cannot predict the timing or outcome of any such litigation, or whether any additional litigation will be brought against the Company or its subsidiaries. Subject to certain terms and conditions, we will be indemnified by the former owners of Qualitest Pharmaceuticals with respect to propoxyphene litigation arising out of the sales of the product by Qualitest Pharmaceuticals between January 1, 2006 and November 30, 2010, the date on which the acquisition was completed, subject to an overall liability cap for all claims arising out of or related to the acquisition, including the claims described above. As of February 20, 2014, approximately 40 propoxyphene cases are currently pending against Qualitest Pharmaceuticals and/or the Company. There are also approximately 75 propoxyphene cases that were previously dismissed against the Company and that are now on appeal to the Sixth Circuit. |
The Company and Qualitest Pharmaceuticals have not recorded any losses associated with the MCP or Propoxyphene cases to date. While we cannot predict the outcome of these legal proceedings, we do not believe an adverse outcome would have a material adverse effect on our current and future financial position, results of operations and cash flows. |
Vaginal Mesh Cases. On October 20, 2008, the FDA issued a Public Health Notification regarding potential complications associated with transvaginal placement of surgical mesh to treat pelvic organ prolapse (POP) and stress urinary incontinence (SUI). The notification provides recommendations and encourages physicians to seek specialized training in mesh procedures, to advise their patients about the risks associated with these procedures and to be diligent in diagnosing and reporting complications. |
In July 2011, the FDA issued an update to the October 2008 Public Health Notification regarding mesh to further advise the public and the medical community of the potential complications associated with transvaginal placement of surgical mesh to treat POP and SUI. In this July 2011 update, the FDA maintained that adverse events are not rare, as previously reported, and questioned the relative effectiveness of transvaginal mesh as a treatment for POP as compared to non-mesh surgical repair. The July 2011 notification continued to encourage physicians to seek specialized training in mesh procedures, to consider and to advise their patients about the risks associated with these procedures and to be diligent in diagnosing and reporting complications. The FDA also convened an advisory panel which met on September 8-9, 2011 to further address the safety and effectiveness of transvaginal surgical mesh used to treat POP and SUI. At the conclusion of the meetings, the advisory panel recommended reclassifying transvaginal mesh products used to treat POP to Class III devices (premarket approval) and recommended that manufacturers of these products be required to conduct additional post-market surveillance studies. The advisory panel recommended that transvaginal surgical mesh products used to treat SUI remain as Class II devices. Regarding retropubic and transobturator (TOT) slings, the advisory panel recommended that no additional post-market surveillance studies are necessary. Regarding mini-slings, the advisory panel recommended premarket studies for new devices and additional post-market surveillance studies. |
On January 3, 2012, the FDA ordered manufacturers of transvaginal surgical mesh used for POP and of single incision mini-slings for urinary incontinence, such as our subsidiary AMS, to conduct post-market safety studies and to monitor adverse event rates relating to the use of these products. AMS received a total of nineteen class-wide post-market study orders regarding its pelvic floor repair and mini-sling products; however, the FDA agreed to place sixteen of these study orders on hold for a variety of reasons. Three of these post-market study orders remain active and AMS is continuing the process of complying with these orders. In these orders, the FDA also noted that it is still considering the recommendation of the September 9, 2011 advisory committee that urogynecological surgical mesh for transvaginal repair of POP be reclassified from Class II to Class III. |
Since 2008, AMS, and more recently, in certain cases the Company or certain of its subsidiaries, have been named as defendants in multiple lawsuits in various federal and state courts, as well as in Canada, alleging personal injury resulting from the use of transvaginal surgical mesh products designed to treat POP and SUI. Plaintiffs in these suits allege various personal injuries including chronic pain, incontinence and inability to control bowel function and permanent deformities. On February 7, 2012, a multidistrict litigation (MDL) was formed, and cases pending in federal courts are now consolidated in the Southern District of West Virginia as part of MDL No. 2325. Similar cases in various state courts around the country are also currently pending. As of February 20, 2014, approximately 22,000 filed mesh cases are currently pending against AMS and/or the Company or certain of its subsidiaries, some of which may have been filed on behalf of multiples plaintiffs. In addition, other cases have been served upon AMS pursuant to a tolling agreement order issued in the MDL in May 2013. Any complaint properly served on AMS from the effective date of that order on May 15, 2013 through October 1, 2013, and ultimately filed with the court at a later date, may be deemed filed as of the service date. Some of these cases served pursuant to the tolling agreement have been filed with the court, and we expect that there will be a number of additional complaints filed with the court at a later date pursuant to the tolling agreement order. Litigation similar to that described above may also be brought by other plaintiffs in various jurisdictions. The majority of the currently pending cases are in the MDL. The Company cannot predict the ultimate number of cases to be filed against it with certainty and we expect that more cases may be filed in subsequent periods. |
On June 14, 2013, AMS and certain plaintiffs' counsel representing mesh-related product liability claimants entered into a definitive Master Settlement Agreement (the MSA) regarding a set inventory of filed and unfiled mesh cases handled or controlled by the participating counsel. The MSA was entered into solely by way of compromise and settlement and is not in any way an admission of liability or fault by the Company or AMS Under the terms of the MSA, AMS paid $54.5 million in July 2013 into a settlement fund held in escrow by a mutually agreed upon escrow agent. The MSA establishes a claims administration process that includes guidelines and procedures for administering the settlement. Distribution of funds to any individual is conditioned upon a full release and a dismissal with prejudice of the entire action or claim as to all AMS parties and affiliates. Prior to receiving an award, an individual claimant shall represent and warrant that liens, assignment rights, or other claims that are identified in the claims administration process have been or will be satisfied by the individual claimant. The amount of settlement awards to participating claimants, the claims evaluation process and procedures used in conjunction with award distributions, and the negotiations leading to the settlement shall be kept confidential by all parties and their counsel. The Company has agreed with plaintiffs’ counsel involved in this settlement that a sufficient number of releases have been submitted to permit the parties to proceed with a distribution of certain funds from the escrow. Accordingly, approximately $43.0 million was released from the escrow fund during the fourth quarter of 2013. The remaining $11.5 million settlement fund held in escrow is included in Prepaid expenses and other current assets in the Consolidated Balance Sheets. |
|
During the fourth quarter of 2013, the Company recorded an incremental pre-tax charge in the amount of approximately $316.0 million increasing the Company's product liability accrual to approximately $520.0 million as of December 31, 2013. The liability is for all known pending and estimated future claims primarily related to vaginal mesh cases which the Company believes represents the minimum anticipated loss AMS will sustain with respect to these cases, which amount includes potential liabilities and/or possible settlements. The increase in our reserve reflects management’s ongoing assessment of our product liability portfolio, including the vaginal mesh cases, the status of the company’s ongoing settlement discussions related to vaginal mesh litigation and the inherent uncertainty as to the ultimate costs of resolving this litigation. The increases to this accrual during the years ended December 31, 2013 and 2012 were recorded in our Consolidated Statements of Operations as Litigation-related and other contingencies. |
AMS and the Company intend to contest vigorously all currently pending cases and any future cases that may be brought, if any, and to explore other options as appropriate in the best interests of the Company and AMS However, it is not possible at this time to determine with certainty the ultimate outcome of these matters or the effect of potential future claims. We will continue to monitor each related legal claim and adjust the accrual for new information and further developments. Nevertheless, we believe it is possible that the outcomes of such cases could result in losses in excess of insurance reimbursement levels that could have a material adverse effect on our business, financial condition, results of operations and cash flows. As of December 31, 2013, no insurance recoveries for these matters have been recorded. |
Although the Company believes there is a reasonable possibility that a loss in excess of the amount recognized exists, we are unable to estimate the possible loss or range of loss in excess of the amount recognized at this time. In most product liability litigations of this nature, plaintiffs allege a wide variety of claims, ranging from allegations of serious injury caused by the products to efforts to obtain compensation notwithstanding the absence of any significant injury. Given the wide range of alleged injuries and the early stage of this litigation, as evidenced in part by the fact that AMS has not yet received or had the opportunity to review complete information regarding all plaintiffs and their medical conditions, the Company and AMS are unable to fully evaluate the claims at this time. |
In addition, we have been contacted regarding a civil investigation that has been initiated by a number of state attorneys general into mesh products, including transvaginal surgical mesh products designed to treat POP and SUI. In November, 2013, we received a subpoena relating to this investigation from the state of California, and have subsequently received additional subpoenas from other states. We are cooperating fully with this investigation. At this time, we cannot predict or determine the outcome of this investigation or reasonably estimate the amount or range of amounts of fines or penalties, if any, that might result from a settlement or an adverse outcome from this investigation. |
Department of Health and Human Services Subpoena and Related Matters |
As previously reported, in January 2007 and April 2011, the Company received subpoenas issued by HHS, OIG and the United States Department of Justice (DOJ), respectively. The subpoenas request documents relating to Lidoderm® (lidocaine patch 5%), focused primarily on the sale, marketing and promotion of Lidoderm®. |
In October 2012, preliminary discussions to resolve potential claims arising from this matter advanced to a point where the Company believed a loss to be probable. The Company recorded a charge of $53.0 million in the third quarter of 2012, which at that time the Company believed was the minimum possible settlement. Since that time, discussions had progressed and, without admitting any liability or wrongdoing, the Company reached a tentative agreement with the HHS-OIG, DOJ and participating state entities in the fourth quarter of 2012 to resolve this matter for a total of approximately $194.0 million. Accordingly, we recorded a corresponding charge in our 2012 Consolidated Statement of Operations as Litigation-related and other contingencies. |
On February 21, 2014, the Company executed agreements with the HHS-OIG and DOJ to resolve those potential claims for a total of approximately $193.0 million. Of that amount, Endo agreed to pay $171.8 million plus interest to settle civil claims under the Federal False Claims Act for federal healthcare payments under the Medicare, TRICARE, Veterans Administration, Federal Employee Health Care Benefits, and Federal employee workers compensation programs and for federal and state payments under State Medicaid programs. Endo agreed to pay $20.8 million to resolve criminal claims made by the Department of Justice. As part of the settlement, Endo entered a Deferred Prosecution Agreement to resolve the criminal claims and entered a Corporate Integrity Agreement with HHS-OIG. |
In September 2013, the State of Louisiana filed a Petition for Civil Penalties and Damages against the Company and its subsidiary, EPI in the Nineteenth Judicial District for the Parish of East Baton Rouge alleging that EPI and the Company engaged in unlawful marketing of Lidoderm® in the State of Louisiana. See State of Louisiana v. Endo Pharmaceuticals, Inc. et al., C624672 (19th Jud. Dist. La.). The State seeks civil fines, civil monetary penalties, damages, injunctive relief, attorneys' fees and costs under various causes of action. Without admitting liability or wrongdoing, in February 2014, EPI and the State of Louisiana reached an agreement to resolve this case for a total of $1.4 million plus attorney's fees. |
EPI is also in the process of responding to a Civil Investigative Demand issued by the State of Texas relating to Lidoderm® (lidocaine patch 5%), focused primarily on the sale, marketing and promotion of Lidoderm® in Texas. EPI and the Company are cooperating with the State’s investigation. At this time, the Company cannot predict or determine the outcome of this matter or reasonably estimate the amount or range of amounts of fines and penalties, if any, that might result from an adverse outcome but will explore all options as appropriate in the best interests of EPI and the Company. |
Litigation similar to that described above may also be brought by other plaintiffs in various jurisdictions. However, we cannot predict the timing or outcome of any such litigation, or whether any such litigation will be brought against the Company or its subsidiaries. |
Pricing Litigation |
A number of cases were brought by state government entities that allege generally that our wholly-owned subsidiary, EPI, and numerous other pharmaceutical companies reported false pricing information in connection with certain drugs that are reimbursable under Medicaid. These cases generally seek damages, treble damages, disgorgement of profits, restitution and attorneys’ fees. There is currently one case that remains pending in the Third Judicial District Court of Salt Lake County, Utah against EPI and numerous other pharmaceutical companies (State of Utah v. Actavis US, Inc., et al.). In February 2014, Endo and the State of Utah agreed in principle to resolve the matter for $2.0 million. |
Litigation similar to that described above may also be brought by other plaintiffs in various jurisdictions. However, we cannot predict the timing or outcome of any such litigation, or whether any such litigation will be brought against the Company or its subsidiaries. |
Qualitest Pharmaceuticals Civil Investigative Demands |
In April 2013, the Company's subsidiaries, EPI and Qualitest, received Civil Investigative Demands (CIDs) from the U.S. Attorney's Office for the Southern District of New York. The CIDs request documents and information regarding the manufacture and sale of chewable fluoride tablets and other products sold by Qualitest. EPI and Qualitest are cooperating with the government's investigation. At this time, EPI and Qualitest cannot predict or determine the outcome of this matter or reasonably estimate the amount or range of amounts of fines and penalties, if any, that might result from an adverse outcome but will explore all options as appropriate in the best interests of EPI and the Company. |
Unapproved Drug Litigation |
In September 2013, the State of Louisiana filed a Petition for Damages against EPI, Qualitest and Boca and over 50 other pharmaceutical companies alleging the defendants or their subsidiaries marketed products that were not approved by the FDA. See State of Louisiana v. Abbott Laboratories, Inc., et al., C624522 (19th Jud. Dist. La.). The State of Louisiana seeks damages, fines, penalties, attorneys’ fees and costs under various causes of action. |
EPI, Qualitest and Boca intend to contest the above case vigorously and to explore other options as appropriate in the best interests of the Company, EPI, Qualitest and Boca. Litigation similar to that described above may also be brought by other plaintiffs in various jurisdictions. However, we cannot predict the timing or outcome of any such litigation, or whether any such litigation will be brought against the Company or its subsidiaries. |
Opioid-Related Subpoenas |
In March 2013, the Company received an Investigative Subpoena from the Corporation Counsel for the City of Chicago seeking documents and information regarding the sales and marketing of opioids, including Opana®. Following discussion with the Company, in May 2013, the Corporation Counsel for the city of Chicago served the Company with a revised Investigative Subpoena seeking the same documents and information. In September 2013, the Company received a subpoena from the State of New York Office of Attorney General seeking documents and information regarding the sales and marketing of Opana®. In January 2014, the Company received a set of informal document requests from the Office of the United States Attorney for the Eastern District of Pennsylvania seeking documents and information regarding the sales and marketing of Opana® ER. |
The Company is cooperating with the Corporation Counsel for the City of Chicago, the State of New York Office of Attorney General and the Office of the United States Attorney for the Eastern District of Pennsylvania in their respective investigations. At this time, the Company cannot predict the outcome of these matters or reasonably estimate the amount or range of amounts or fines and penalties, if any, that might result from any adverse outcome but will explore all options as appropriate in the best interests of EPI and the Company. |
Antitrust Litigation and Investigation |
Multiple direct and indirect purchasers of Lidoderm® have filed a number of cases against EPI and co-defendants Teikoku Seiyaku Col, LTD, Teikoku Pharma USA, Inc. (collectively Teikoku) and Actavis plc., f/k/a as Watson Pharmaceuticals, Inc., and a number of its subsidiaries (collectively Actavis). The complaints in these cases generally allege that Endo, Teikoku and Actavis entered into an anticompetitive conspiracy to restrain trade through the settlement of patent infringement litigation concerning U.S. Patent No. 5,827,529 (the ’529 patent). Some of the complaints also allege that Teikoku wrongfully listed the ‘529 patent in the Orange Book as related to Lidoderm®, that Endo and Teikoku commenced sham patent litigation against Actavis and that Endo abused the FDA citizen petition process by filing a citizen petition and amendments solely to interfere with generic companies’ efforts to obtain FDA approval of their versions of Lidoderm®. The cases allege violations of Sections 1 and 2 of the Sherman Act (15 U.S.C. §§ 1, 2) and various state antitrust and consumer protection statutes. These cases generally seek damages, treble damages, disgorgement of profits, restitution, injunctive relief and attorneys’ fees. |
A motion to consolidate and transfer these cases into a single multidistrict litigation is pending before the United States Judicial Panel on Multidistrict Litigation, In Re Lidoderm Antitrust Litig., MDL No. 2521, filed in December 2013. |
The Company intends to contest these cases vigorously and to explore all options as appropriate in the best interests of EPI and the Company. Litigation similar to that described above may also be brought by other plaintiffs in various jurisdictions. However, we cannot predict the timing or outcome of any such litigation, or whether any such litigation will be brought against the Company or EPI. |
On February 25, 2014, the Company's subsidiary, EPI received a Civil Investigative Demand (CID) from the United States Federal Trade Commission. The CID requests documents and information concerning EPI's Settlement Agreements with Actavis and Impax of the Opana® ER patent litigation and its Settlement Agreement with Actavis of the Lidoderm® patent litigation, as well as information concerning the marketing and sales of Opana® ER and Lidoderm®. EPI intends to fully cooperate with the FTC's investigation. At this time, EPI cannot predict or determine the outcome of this investigation or reasonably estimate the amount or range of amounts of fines and penalties, if any, that might result from an adverse outcome but will explore all options as appropriate in the best interests of EPI and the Company. |
Paragraph IV Certifications on Lidoderm® |
As previously reported, on January 15, 2010, the Company's subsidiary, EPI and the holders of the Lidoderm® New Drug Application and relevant patents, Teikoku Seiyaku Co., Ltd., and Teikoku Pharma USA, Inc. (collectively, Teikoku) received a Paragraph IV Certification Notice under 21 U.S.C. 355(j) (a Paragraph IV Notice) from Watson Laboratories, Inc. (now doing business as Actavis, Inc. and referred to herein as Watson or Actavis) advising of its filing of an ANDA for a generic version of Lidoderm® (lidocaine topical patch 5%). The Paragraph IV Notice refers to U.S. Patent No. 5,827,529, which covers the formulation of Lidoderm®, a topical patch to relieve the pain of post herpetic neuralgia launched in 1999. This patent is listed in the FDA’s Orange Book and expires in October 2015. As a result of this Notice, on February 19, 2010, EPI and Teikoku filed a lawsuit against Watson in the U.S. District Court of the District of Delaware. This lawsuit was heard by the court and the trial concluded on February 14, 2012. In October 2010, Teikoku Pharma USA listed U.S. Patent No. 5,741,510 in the FDA Orange Book, and this patent expires in March 2014. On June 30, 2011, EPI and Teikoku filed a second lawsuit against Watson in the U.S. District Court of the District of Delaware alleging infringement of U.S. Patent Nos. 5,741,510, 6,096,333, and 6,096,334 which cover lidocaine patch formulations and manufacturing processes. |
On May 28, 2012, EPI entered into a Settlement and License Agreement (the Watson Settlement Agreement) among EPI and Teikoku, on the one hand, and Watson, on the other hand. The Watson Settlement Agreement settled all ongoing patent litigation among the parties relating to Watson’s generic version of Lidoderm®. Under the terms of the Watson Settlement Agreement, the parties dismissed their respective claims and counterclaims without prejudice. As part of the settlement, Watson agreed not to challenge the validity or enforceability of EPI’s and Teikoku’s patents relating to Lidoderm® with respect to Watson’s generic version of Lidoderm®. Watson received FDA approval of its generic version of Lidoderm® in August 2012 and began selling its generic version of Lidoderm® on September 16, 2013 (the Start Date) pursuant to a license granted by EPI and Teikoku under the Watson Settlement Agreement. The license to Watson is exclusive as to EPI’s launch of an authorized generic version of Lidoderm® until the earlier of 1) the introduction of a generic version of Lidoderm® by a company other than Watson or 2) May 1, 2014. EPI receives an at market royalty equal to 25% of the gross profit generated on Watson's sales of its generic version of Lidoderm® during its period of exclusivity. During the year ended December 31, 2013, we recorded royalty income of $58.7 million, which is included in Service and other revenues in our Consolidated Statements of Operations. |
Additionally, under the Watson Settlement Agreement, EPI and Teikoku provided, at no cost, to Watson’s wholesaler affiliate branded Lidoderm® product for Watson’s wholesaler affiliate’s distribution, subject to certain terms and conditions. EPI and Teikoku began providing branded Lidoderm® of value totaling $12.0 million each month ($96.0 million in total for 2013) (valued at the then-prevailing wholesale acquisition cost) on January 1, 2013 and continued to do so through August 2013. The obligation of EPI and Teikoku to provide this branded product at no cost terminated on August 31, 2013. |
EPI is responsible for the payment of all gross-to-net sales adjustments arising from Watson's wholesaler affiliate's sale of the branded Lidoderm® product. |
Teikoku agreed to provide a rebate to EPI equal to 50% of the cost of branded Lidoderm® product required to be provided to Watson's wholesaler affiliate pursuant to the Watson Settlement Agreement. |
The Company previously concluded that the Watson Settlement Agreement is a multiple-element arrangement and, during the second quarter of 2012, recognized a liability and corresponding charge of $131.4 million in Patent litigation settlement, net in the Consolidated Statements of Operations, representing the initial estimated fair value of the settlement component. Fair value of the settlement component was estimated using the probability adjusted expected value of branded Lidoderm® product to be provided to Watson at the anticipated WAC expected to be in place at the time of shipment, less a reasonable estimate of Watson's selling costs. The resultant probability-weighted values were then discounted using a discount rate of 5.1%. |
The Company believes that the assumptions about the level and timing of branded Lidoderm® product to be shipped, discount rate, and probabilities used in the model appropriately reflected market participant assumptions at the date of settlement. Because the liability was recorded at fair value using WAC, the net charge recognized in 2012 was comprised of several elements, including our cost of product to be shipped, estimated gross-to-net deductions to be paid by the Company and the estimated product profit margin. We believe this was the most appropriate measure of fair value as these components combined represented the value accruing to Watson. |
Upon Watson receiving FDA approval of its generic version of Lidoderm® in August 2012, the Company reassessed EPI's obligation to Watson due to its belief that it would not be obligated to provide to Watson’s wholesaler affiliate branded Lidoderm® product beyond August 2013. Accordingly, in the third quarter of 2012, the Company recognized a change in estimate with respect to its obligation and reduced its liability associated with the Watson Settlement Agreement by $46.2 million to $85.1 million. The corresponding gain of $46.2 million was recorded in Patent litigation settlement, net in the Consolidated Statements of Operations. |
As a result of using a fair value measurement to record this liability, the charge recorded was greater than the actual cost EPI would subsequently incur. As such, relief of the liability in subsequent periods through shipments of branded Lidoderm® product resulted in income recorded as a component of Other (income) expense, net in the Company's Consolidated Statements of Operations. The related gross-to-net component of the settlement was recognized as product was shipped to Watson, the effect of which was an offset to the portion of the income recognized in Other (income) expense, net in the Company's Consolidated Statements of Operations, as the settlement liability was relieved. The rebate arrangement with Teikoku was also accounted for prospectively as product purchased from Teikoku was recorded into inventory at the discounted purchase price and relieved as shipments were made to Watson. The benefit associated with this rebate was recorded as a component of Other (income) expense, net in the Company's Consolidated Statements of Operations. |
As of December 31, 2013, there is no remaining liability associated with our Patent litigation settlement. During the year ended December 31, 2013, the net impact of the Watson Settlement Agreement recorded in Other (income) expense, net totaled $50.4 million and consisted of the amounts shown below (in thousands): |
| | | | |
| | | | | | | |
Litigation settlement liability relieved during the quarter | $ | 85,123 | | | | | |
| | | |
Cost of product shipped to Watson's wholesaler affiliate | (11,093 | ) | | | | |
Estimated gross-to-net liabilities on product shipped to Watson's wholesaler affiliate | (29,162 | ) | | | | |
Rebate on product shipped to Watson's wholesaler affiliate | 5,532 | | | | | |
| | | |
Net gain included in Other (income) expense, net | $ | 50,400 | | | | | |
| | | |
As previously reported, in January 2011, EPI and Teikoku received a Paragraph IV Notice from Mylan Technologies Inc. (Mylan) advising of its filing of an ANDA for a generic version of Lidoderm®. The Paragraph IV Notice refers to U.S. Patent Nos. 5,827,529 and 5,741,510, which cover the formulation of Lidoderm®. These patents are listed in the FDA’s Orange Book and expire in October 2015 and March 2014, respectively. On March 14, 2011, EPI filed a lawsuit against Mylan in the U.S. District Court for the District of Delaware, claiming that Mylan’s submission of its ANDA constitutes infringement of the ‘510 patent under 35 U.S.C. sec. 271(e)(2)(A). That patent expires on March 30, 2014. On October 4, 2013, the Company dismissed the suit against Mylan. |
On May 16, 2012, EPI and Teikoku received a Paragraph IV Notice from Noven Pharmaceuticals, Inc. (Noven) advising of its filing of an ANDA for a generic version of Lidoderm®. The Paragraph IV Notice refers to U.S. Patent No. 5,827,529, which covers the formulation of Lidoderm®. This patent is listed in the FDA's Orange Book and expires in October 2015. On June 29, 2012, EPI filed a lawsuit against Noven in the U.S. District Court for the District of Delaware. Because the suit was filed within the 45-day period under the Hatch-Waxman Act for filing a patent infringement action, we believe that it triggered an automatic 30-month stay of approval under the Act. |
On May 24, 2012, EPI and Teikoku received a Paragraph IV Notice from TWi Pharmaceuticals, Inc. (TWi) advising of its filing of an ANDA for a generic version of Lidoderm®. The Paragraph IV Notice refers to U.S. Patent Nos. 5,827,529 and 5,741,510, which cover the formulation of Lidoderm®. These patents are listed in the FDA's Orange Book and expire in October 2015 and March 2014, respectively. On July 5, 2012, EPI filed a lawsuit against TWi in the U.S. District Court for the District of Delaware. Because the suit was filed within the 45-day period under the Hatch-Waxman Act for filing a patent infringement action, we believe that it triggered an automatic 30-month stay of approval under the Act. |
EPI intends, and has been advised by Teikoku that they too intend, to defend vigorously the intellectual property rights relating to Lidoderm® and to pursue all available remaining legal and regulatory avenues in defense of Lidoderm®, including enforcement of the product’s intellectual property rights and approved labeling. However, there can be no assurance that EPI and Teikoku will be successful. If EPI and Teikoku are unsuccessful and any one of the above generic manufacturers is able to obtain FDA approval of its product, that generic manufacturer may be able to launch its generic version of Lidoderm® prior to the applicable patents’ expirations in 2014 and 2015. Additionally, we cannot predict or determine the timing or outcome of ongoing litigation but will explore all options as appropriate in the best interests of the Company and EPI. In addition to the above litigation, it is possible that another generic manufacturer may also seek to launch a generic version of Lidoderm® and challenge the applicable patents. |
Paragraph IV Certifications on Opana® ER |
As previously reported, starting in December 2007 through December 2011, EPI received Paragraph IV Notices from various generic drug manufacturers, including Impax Laboratories, Inc. (Impax), Actavis South Atlantic LLC (Actavis), Sandoz, Inc. (Sandoz), Barr Laboratories, Inc. (Teva), Watson Laboratories, Inc. (Watson), Roxane Laboratories, Inc. (Roxane) and most recently, Ranbaxy Inc. (Ranbaxy) advising of the filing by each such company of an ANDA for a generic version of the non-crush-resistant formulation of Opana® ER (oxymorphone hydrochloride extended-release tablets CII). To date, EPI settled all of the Paragraph IV litigation relating to the non-crush-resistant formulation of Opana® ER. Under the terms of the settlements, each generic manufacturer agreed not to challenge the validity or enforceability of patents relating to the non-crush-resistant formulation of Opana® ER. As a result, Actavis launched its generic version of non-crush-resistant Opana® ER 7.5 and 15 mg tablets on July 15, 2011, and Impax launched its generic version of non-crush-resistant Opana® ER 5, 7.5, 10, 15, 20, 30 and 40 mg tablets on January 2, 2013. Pursuant to the terms of the respective settlement agreements, Sandoz, Teva, Watson, Roxane and Actavis were granted licenses to patents listed in the Orange Book at the time each generic filed its ANDA. |
In late 2012, two patents (US Patent Nos. 8,309,122 and 8,329,216) were issued to EPI covering Opana® ER. On December 11, 2012, EPI filed a Complaint against Actavis in U.S. District Court for the Southern District of New York for patent infringement based on its ANDA for a non-crush-resistant generic version of Opana® ER. Between May 22 and June 21, 2013, EPI filed similar suits in the U.S. District Court for the Southern District of New York against the following applicants for non-crush-resistant Opana® ER: Par Pharmaceuticals, Teva Pharmaceuticals, Mallinckrodt LLC, Sandoz Inc., Roxane Laboratories, and Ranbaxy. Those suits allege infringement of US Patent Nos. 7,851,482, 8,309,122, and 8,329,216. In July 2013, Actavis and Roxane were granted FDA approval to market all strengths of their respective non-crush-resistant formulations of Opana® ER. On August 1, 2013, EPI dismissed its suit against Teva Pharmaceuticals based on its demonstration to EPI that it does not, at this time, intend to pursue an ANDA for non-crush-resistant Opana® ER. On August 6, 2013, EPI filed motions for preliminary injunctions against Actavis and Roxane requesting the court enjoin Actavis and Roxane from launching additional Opana® ER generics pending the outcome of the patent case. On September 12, 2013, the court denied the Company's motions for preliminary injunction. On that day, Actavis launched its generic version of non-crush-resistant Opana® ER 5, 10, 20, 30 and 40 mg tablets. EPI has appealed the denial of a preliminary injunction. A hearing on the appeal was heard January 9, 2014. No decision has issued. |
EPI intends to defend vigorously its intellectual property rights and to pursue all available legal and regulatory avenues in defense of the non-crush-resistant formulation Opana® ER, including enforcement of the product’s intellectual property rights and approved labeling. However, there can be no assurance that EPI will be successful. If EPI is unsuccessful, competitors that already have obtained, or are able to obtain, FDA approval of their products may be able to launch their generic versions of non-crush-resistant Opana® ER prior to the applicable patents’ expirations. Additionally, we cannot predict or determine the timing or outcome of related litigation but will explore all options as appropriate in the best interests of the Company and EPI. In addition to the above litigation, it is possible that another generic manufacturer may also seek to launch a generic version of non-crush-resistant Opana® ER and challenge the applicable patents. |
Pursuant to the June 2010 Settlement and License Agreement (the Impax Settlement Agreement) with Impax, EPI agreed to provide a payment to Impax should prescription sales of the non-crush-resistant formulation of Opana® ER, as defined in the Impax Settlement Agreement, fall below a predetermined contractual threshold in the quarter immediately prior to the date on which Impax was authorized to launch its generic version of the non-crush-resistant formulation of Opana® ER, which occurred on January 2, 2013. During the first quarter of 2012, the Novartis shut-down of its Lincoln, Nebraska manufacturing facility and resulting lack of 2012 oxymorphone active pharmaceutical ingredient (API) quota granted by the Drug Enforcement Agency to Novartis caused EPI to attempt an accelerated launch of the crush-resistant formulation of Opana® ER. While significant uncertainties existed throughout the first quarter of 2012 about EPI's ability to rapidly ramp up production of the formulation designed to be crush-resistant and produce finished goods at a new, untested manufacturing facility in a very short period of time, it was able to do so in March 2012. Accordingly, the Company recognized a liability under the Impax Settlement Agreement upon the Company’s sale of the formulation designed to be crush-resistant, which occurred in March 2012. The total 2012 charge of $102.0 million was recorded in Cost of revenues in our 2012 Consolidated Financial Statements. This amount was subsequently paid in April 2013. |
From September 21, 2012 through October 30, 2013, EPI and its partner Grünenthal received Paragraph IV Notices from each of Teva Pharmaceuticals USA, Inc. (Teva), Amneal Pharmaceuticals, LLC, Sandoz Inc., ThoRx Laboratories, Inc. (ThoRx), Par Pharmaceuticals (Par), Actavis South Atlantic LLC (Actavis), Impax Pharmaceuticals (Impax) and Ranbaxy Laboratories Limited (Ranbaxy), advising of the filing by each such company of an ANDA for a generic version of the formulation of Opana® ER designed to be crush-resistant. These Paragraph IV Notices refer to U.S. Patent Nos. 8,075,872, 8,114,383, 8,192,722, 7,851,482, 8,309,060, 8,309,122 and 8,329,216, which variously cover the formulation of Opana® ER, a highly pure version of the active pharmaceutical ingredient and the release profile of Opana® ER. EPI filed lawsuits against each of these filers in the U.S. District Court for the Southern District of New York. Each lawsuit was filed within the 45-day deadline to invoke a 30-month stay of FDA approval pursuant to the Hatch-Waxman legislative scheme. EPI intends, and has been advised by Grünenthal that it too intends, to defend vigorously the intellectual property rights covering the formulation of Opana® ER designed to be crush-resistant and to pursue all available legal and regulatory avenues in defense of crush-resistant Opana® ER, including enforcement of the product's intellectual property rights and approved labeling. However, there can be no assurance that EPI and Grünenthal will be successful. If we are unsuccessful and Teva, Amneal, Sandoz, ThoRx, Par, Actavis or Impax is able to obtain FDA approval of its product, generic versions of crush-resistant Opana® ER may be launched prior to the applicable patents' expirations in 2023 through 2029. Additionally, we cannot predict or determine the timing or outcome of this defense but will explore all options as appropriate in the best interests of the Company and EPI. In addition to the above litigation, it is possible that another generic manufacturer may also seek to launch a generic version of crush-resistant Opana® ER and challenge the applicable patents. |
Paragraph IV Certification on Fortesta® Gel |
On January 18, 2013, EPI and its licensor Strakan Limited received a notice from Watson advising of the filing by Watson of an ANDA for a generic version of Fortesta® (testosterone) Gel. On February 28, 2013, EPI filed a lawsuit against Watson in the U.S. District Court for the Eastern District of Texas, Marshall division. Because the suit was filed within the 45-day period under the Hatch-Waxman Act for filing a patent infringement action, we believe that it triggered an automatic 30-month stay of approval under the Act. Trial has been set for February 2, 2015. |
EPI intends, and has been advised by Strakan Limited that it too intends, to defend vigorously Fortesta® Gel and to pursue all available legal and regulatory avenues in defense of Fortesta® Gel, including enforcement of the product's intellectual property rights and approved labeling. However, there can be no assurance that EPI and Strakan will be successful. If EPI and Strakan are unsuccessful and Watson is able to obtain FDA approval of its product, Watson may be able to launch its generic version of Fortesta® Gel prior to the applicable patents' expirations in 2018. Additionally, we cannot predict or determine the timing or outcome of this litigation but will explore all options as appropriate in the best interests of the Company. In addition to the above litigation, it is possible that another generic manufacturer may also seek to launch a generic version of Fortesta® Gel and challenge the applicable patents. |
Paragraph IV Certification on Frova® |
As previously reported, in July 2011, EPI and its licensor, Vernalis Development Limited received a notice from Mylan Technologies Inc. (Mylan) advising of the filing by Mylan of an ANDA for a generic version of Frova® (frovatriptan succinate) 2.5 mg tablets. Mylan’s notice included a Paragraph IV Notice with respect to U.S. Patent Nos. 5,464,864, 5,561,603, 5,637,611, 5,827,871 and 5,962,501, which cover Frova®. These patents are listed in the FDA’s Orange Book and expire between 2013 and 2015. As a result of this Paragraph IV Notice, on August 16, 2011, EPI filed a lawsuit against Mylan in the U.S. District Court for the District of Delaware alleging infringement of U.S. Patent Nos. 5,464,864, 5,637,611 and 5,827,871. Because the suit was filed within the 45-day period under the Hatch-Waxman Act for filing a patent infringement action, we believe that it triggered an automatic 30-month stay of approval under the Act. On September 22, 2011, Mylan filed an Answer and Counterclaims, claiming the asserted patents are invalid or not infringed. A trial in this case was held starting November 12, 2013. On January 28, 2014, the U.S. District Court for the District of Delaware issued a decision upholding the validity and infringement by Mylan of U.S. Patent No. 5,464,864. Mylan has informed us that they intend to appeal this decision. |
EPI intends to continue to defend vigorously its intellectual property rights and to pursue all available legal and regulatory avenues in defense of Frova®, including enforcement of the product’s intellectual property rights and approved labeling. However, there can be no assurance that EPI will be successful. If EPI is unsuccessful and Mylan is able to obtain FDA approval of its product, Mylan may be able to launch its generic version of Frova® prior to the applicable patents’ expirations in 2014 and 2015. Additionally, we cannot predict or determine the timing or outcome of this litigation but will explore all options as appropriate in the best interests of the Company and EPI. In addition to the above litigation, it is possible that another generic manufacturer may also seek to launch a generic version of Frova® and challenge the applicable patents. |
Other Legal Proceedings |
In addition to the above proceedings, proceedings similar to those described above may also be brought in the future. Additionally, we and our subsidiaries are involved in, or have been involved in, arbitrations or various other legal proceedings that arise from the normal course of our business. We cannot predict the timing or outcome of these claims and other proceedings. Currently, neither we nor our subsidiaries are involved in any other legal proceedings that we expect to have a material effect on our business, financial condition, results of operations and cash flows. |
Leases |
We lease certain fixed assets under capital leases that expire through 2024. We lease automobiles, machinery and equipment and facilities under certain noncancelable operating leases that expire through 2021. These leases are renewable at our option. |
On October 28, 2011, our subsidiary EPI entered into a lease agreement with RT/TC Atwater LP, a Delaware limited partnership, for a new Company headquarters to consist of approximately 300,000 square feet of office space located at 1400 Atwater Boulevard, Malvern, Pennsylvania (with a four-year option to lease up to approximately 150,000 additional square feet). The term of this triple net lease is 12 years and includes three renewal options, each for an additional 60-month period. The lease commenced on December 31, 2012 with a monthly lease rate for the initial year of $0.5 million, increasing by 2.25% each year thereafter. |
This lease is accounted for as a direct financing arrangement whereby the Company recorded, over the construction period, the full cost of the asset in Property, plant and equipment, net. A corresponding liability was also recorded, net of leasehold improvements paid for by the Company, and is being amortized over the expected lease term through monthly rental payments using an effective interest method. At December 31, 2013, there was a liability of $53.6 million related to this arrangement, $3.7 million of which is included in Accounts payable and $49.9 million of which is included in Other liabilities in the accompanying Consolidated Balance Sheet. |
A summary of minimum future rental payments required under capital and operating leases as of December 31, 2013 are as follows (in thousands): |
|
| | | | | | | |
| Capital Leases(1) | | Operating Leases |
2014 | $ | 5,752 | | | $ | 13,891 | |
|
2015 | 5,846 | | | 9,561 | |
|
2016 | 5,977 | | | 6,741 | |
|
2017 | 6,112 | | | 3,916 | |
|
2018 | 6,249 | | | 1,532 | |
|
Thereafter | 39,548 | | | 1,646 | |
|
Total minimum lease payments | $ | 69,484 | | | $ | 37,287 | |
|
Less: Amount representing interest | 9,564 | | | |
|
Total present value of minimum payments | $ | 59,920 | | | |
|
Less: Current portion of such obligations | 3,714 | | | |
|
Long-term capital lease obligations | $ | 56,206 | | | |
|
__________ |
| | | | | | | |
-1 | The direct financing arrangement is included under Capital Leases. | | | | | | |
Expense incurred under operating leases was $24.4 million, $25.5 million and $22.5 million for the years ended December 31, 2013, 2012 and 2011, respectively. |